NORTH CENTRAL RAILWAY

SAHARANPUR PARLIAMENTARY CONSTITUENCY , the most populous state of Nation is served by North Central Railway along with Northern, North Eastern M. C. Chauhan and East Central Railways. Indian Railways (IR) plays a very General Manager North Central Railway important role in development of the state and provides connectivity for freight and passengers, including international tourists. IR has a history of more than 160 years in the state and has the highest route kilometers - 9100 route kilometers - within it, which is 14% of entire railway network. IR has made Uttar Pradesh proud by giving it Nation's first semi high speed train Gatimaan Express, which initially ran between and . It has now been extended upto with effect from 01.04.2018 - a move that will boost tourism in bundelkhand region of Uttar Pradesh. Efforts for further development of railway infrastructure in Uttar Pradesh have been intensified in last four years with 376% more investment in comparison to previous years. Results of such a massive investment are becoming visible with enhanced infrastructure and modern passenger amenities. Soon the era of congestion and inconvenience will be a matter of past and a new Railway equipped with state-of-the-art facilities will be able to serve the citizens with greater level of satisfaction. The longest stretch of the under construction Eastern Dedicated Freight Corridor i.e. almost 57% of the entire length lies in Uttar Pradesh from Pt. Deen Dayal Upadhyaya Jn. to .

In this brochure, we have compiled the important contributions and achievements of Indian Railways in the development of the constituency of Uttar Pradesh in the last four years. I hope that it will serve as a ready reckoner for those eager to know about the role of Railways in the development of this constituency.

It may be noted that the budgets allocated to various projects are not apportioned constituency wise but reflect the cost of the project. INPUTS BY RAILWAY IN SAHARANPUR PARLIAMENTARY CONSTITUENCY SAHARANPUR PARLIAMENTARY CONSTITUENCY A. ASSEMBLY SEGMENTS: , , , Saharanpur Nagar, Saharanpur. B. WORKS COMPLETED IN LAST FOUR YEARS: 1. Infrastructural Developments: GExtension of loop line at Baliakheri. GEnergy efficient LED lights. GMoradabad-Saharanpur-4-Lane Road over bridge in lieu of level crossing No. 530-B near Baliakheri. GDelhi Shahadra-Shamli-Tapri, Road Under Bridge in lieu of level crossing no. 118, 122, 123, 125, 135, 144. 2. Improvements in Passenger Amenities: GMinimum Essential Amenities work completed. GImprovement to circulating area at Saharanpur station. GOne Sulabh toilet provided in circulating area at Saharanpur station. GWifi Provided at Saharanpur station. GProvision of fibre reinforced vaccum dewatering concrete at Platform no. 4 at Saharanpur Station. GProvision of Coach Guidance System at Saharanpur station. GProvision of washable apron at Platform No. 4 & 5 (DLI end) at Saharanpur station. GImprovement to circulating area, parking area, platform shelter, drain and surface of platform no. 1 at Saharanpur station. GReplacement of old wornout ACC/GI sheets covered shed at platform no. 4 and improvement to platform surface of platform-3 with kota stone at Saharanpur station. GInstallation of water vending machine at Saharanpur Station. GProvision of electronic Train Indicator Boards at each platform & foot over bridge at Saharanpur Station. GInauguration of Pay & Use Toilet constructed on BOT basis at Saharanpur Station. GInauguration of Child Care Cabin at Saharanpur Station. GWashable apron provided on line no. 4 and 3 at Saharanpur station. GROB provided at Manned Level Crossing No. C92 on Saharanpur-Ambala Section. At Muzaffarnagar station: GImprovement of waiting hall & public toilet. GWater vending machine on Platform No. 2. GWi-Fi facilities.

C. OTHER DEVELOPMENTS: New Trains introduced with stoppage over Saharanpur Constituency. GTrain No. 14521/14522 stoppage provided at Deoband station. GTrain No. 12171/12172 stoppage provided at Tapri station. GTrain No. 19609/19610 stoppage provided at Manyharan station.

D. ONGOING WORKS: GLaksar-Saharanpur-2-lane road over bridge in lieu of level crossing No. 524 near Chodiala. GLaksar-Saharanpur-4- lane road over bridge in lieu of level crossing No. 512 near Dhandhera. GMuzaffarnagar-Tapri Patch Doubling Project 51.53 Km. GDeoband-Roorkee, New line Project 27.45 Km. GRepair to passenger amenities on circulating area, Foot Over Bridge etc at Muzaffarnagar station. GImprovement of level crossing surface, Platform surface & providing small Platform shelter. GRepair to level crossing from Khatauli to Tapri. GWork is being executed by construction organization in C/W doubling of track from to Tapri. GSaharanpur-Ambala-Road over bridge in lieu of level crossing No.97-4 lane. GSaharanpur-Ambala-Road over bridge in lieu of level crossing Nos.100 and 117 GSaharanpur-Ambala-Road over bridge in lieu of level crossing Nos.107 and 112 GSaharanpur-Ambala-Road over bridge in lieu of level crossing Nos.97A, 99 and 122 GMeerut City-Saharanpur Road over bridge in lieu of level crossing No. 84-A GSaharanpur-Ambala-Road over bridge in lieu of level crossing No.111-4 lane. GSaharanpur-Ambala-Road over bridge in lieu of level crossing No.88 GSaharanpur-Ambala-Road over bridge in lieu of level crossing No. 89 and 90-A GSaharanpur-Ambala Single lane Road under bridge in lieu of level crossing No.91 GSaraswa-Kalanour - Limited height subway at level crossing No.96-C. GReplacement of Worn out water storage tank of Staff Quarters & service building at Saharanpur. GImprovement to Circulating Area, Parking Area, Platform Shelter, Drain and Surface of Platform No.1 at Saharapur station. GSaharapur-Replacement of old womout ACGI sheets of covered shed at Platform no. 4, 5 an improvement to platform surface of platform -3 with kota stone. GExtension of Foot Over Bridge at platform No. 5 & 6 with landing in circulating area of new PRS CUM UTS building at Saharapur Station. GDelhi-Ambala, Ghaziabad- Saharapur Delhi Area- Repl. of signalling gears with centralised operation of point signal 13 station. GRenovation of RPF Barrack at Saharapur. GKhan-Alampura-Replacement of signalling gears. GSaharapur-Pilkhani Provision of IBS between Saharapur-Pilkhani. GSaharapur-Replacement of quarters, type-I 50 units with type-II in Khalasi Line. GClubbing of type-I Non std. staff quarters of block no. 239, 10 units into 5 units std. type-II quarters at Saharapur. GNew lift and Escalator at Saharapur station. GImprovement to road surface speed breakers of various L-Xings. GProvision of fibre reinforced vitcum dewatering concrete at Platform No.4 at Saharapur station.