Final Final Draft Resettlement Policy Framework

Total Page:16

File Type:pdf, Size:1020Kb

Final Final Draft Resettlement Policy Framework Amaravati Sustainable Capital City Development Project Resettlement Policy Framework Amaravati Sustainable Capital City Development Project (ASCCDP) Final Final Draft Resettlement Policy Framework Andhra Pradesh Capital Region Development Authority (APCRDA) Government of Andhra Pradesh, Amaravati July 2018 Version 5 1 Amaravati Sustainable Capital City Development Project Resettlement Policy Framework Contents ACRONYMS ........................................................................................................................................................... 3 EXECUTIVE SUMMARY ...................................................................................................................................... 4 I. INTRODUCTION .............................................................................................................................................. 12 Background .................................................................................................................................................... 12 Need for Resettlement Policy Framework ................................................................................................. 12 Amaravati Capital City development and the World Bank supported Project .................................... 13 II. LAND ASSEMBLY INSTRUMENTS ............................................................................................................. 17 Land Pooling Scheme (LPS) ......................................................................................................................... 18 Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 (LARR Act, 2013) .................................................................................................. 22 Negotiated Settlement Policy ...................................................................................................................... 22 III.CONSISTENCY OF LAND ASSEMBLY MECHANISMS WITH THE WORLD BANK RESETTLEMENT POLICY .............................................................................................................................. 25 World Bank Operational Policy OP 4.12 on Involuntary Resettlement ................................................. 25 IV. ASSISTANCE TO LANDLESS AGRICULTURAL LABORERS ............................................................... 29 V. INSTITUTIONAL AND IMPLEMENTATION ARRANGEMENTS ........................................................ 35 Implementation Mechanism for LPS / LA / Negotiated Settlement Policy ......................................... 35 Coordination with District Administration for Land Acquisition ......................................................... 36 Sub-Component Social Impact Assessments ............................................................................................. 38 Preparation and approval of sub-component specific RAPs................................................................... 39 Valuation of Land and Assets ...................................................................................................................... 40 Due Diligence Approach .............................................................................................................................. 41 Grievance Redressal Mechanisms (GRMs) ................................................................................................ 44 Funding arrangements, Costs and Escrow Account ................................................................................ 53 Disclosure ....................................................................................................................................................... 54 Management Information System (MIS) .................................................................................................... 54 Monitoring and Evaluation (M&E) ............................................................................................................. 55 Annexures .............................................................................................................................................................. 63 Annexure 1 - Definitions ...................................................................................................................................... 64 Annexure 2 - Land Pooling Scheme (LPS) Annex ............................................................................................ 68 Annexure 3 – Entitlements Matrix – Negotiated Settlement Policy ............................................................ 103 Annexure 4 – Entitlements Matrix: Land Acquisition ................................................................................... 105 Annexure 5 - Comparison of World Bank OP 4.12 with Land Assembly Instruments ............................ 110 Annexure 6 - Summary of Stakeholders Consultation .................................................................................. 117 2 Amaravati Sustainable Capital City Development Project Resettlement Policy Framework ACRONYMS AP Andhra Pradesh APCRDA Andhra Pradesh Capital Region Development Authority APSSDC Andhra Pradesh State Skill Development Corporation ASCCDP Amaravati Sustainable Capital City Development Project BSO Board Standing Orders CA Competent Authority CBD Central Business District DC District Collector DT Deputy Tehsildar EC Encumbrance Certificate EPTRI Environment Pollution Training & Research Institute F&I Formulation and Implementation GP Gram Panchayat GTP Gujarat Town Planning HR&CE Hindu Religious & Charitable Endowments IAY Indira Awaas Yojana LA Land Acquisition LPOC Land Pooling Ownership Certificate LPS Land Pooling Scheme MA&UD Municipal Administration & Urban Development MGNREGA Mahatma Gandhi National Rural Employment Guarantee Act MIS Management Information System MNREGS Mahatma Gandhi National Rural Employment Guarantee Scheme MoU Memorandum of Understanding NIC National Informatics Centre NMT Non-motorized Transport OP Out Patients PAF Project Affected Family PDF Project Displaced Family POT Prohibition of Transfer R&R Resettlement & Rehabilitation RPF Resettlement Policy Framework RSR Resettlement Register RTFCTLARR Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement – referred to as LARR Act SIA Social Impact Assessment SWM Solid Waste Management TDR Transferrable Developmental Rights ULB Urban Local Body URDPFI Urban and Regional Development Plan Formulation and Implementation VGTMUDA Vijayawada, Guntur, Tenali, Mangalagiri Urban Development Authority 3 Amaravati Sustainable Capital City Development Project Resettlement Policy Framework EXECUTIVE SUMMARY In June 2014, the state of Andhra Pradesh (AP) was bifurcated into the successor states of (AP) and Telangana, through the Andhra Pradesh Reorganization Act (2014) of the Indian Parliament. A new state administration was set up to govern the new state, and the development of a new administrative center, Amaravati Capital City, was announced. The site of the new capital city was finalized by the Government of AP at a location of great historical significance, strategically selected given the area’s economic potential, good access to a skilled labor workforce and water to cater to a growing urban population. The nearest cities to the new Capital City are Vijayawada at a distance of 30 km, and Guntur at a distance of 18 km. The Capital Region, is characterized by strong network of transport infrastructure via rail (Vijayawada and Guntur cities have major railway stations), roads (the NH-16 and the NH-65 pass through the region), and a domestic airport near Vijayawada city (proposed to be converted into an international airport). Further, the region is located in proximity of a proposed sea port in Machilipatnam. The economy of the Capital Region is primarily driven by agricultural (production of crops including cotton, sugar-cane, pulses, spices, etc.) and service sectors (trading, construction, hospitality, etc.). The industrial activity in the region is limited to upstream manufacturing and characterized by disorganized industrial units across sectors such as food processing, textile, non-metallic minerals, pharmaceuticals, aquaculture, etc. Amaravati City and the surrounding region is also known for the perennial Krishna river, scenic islands and various religious and cultural heritage sites such as Durga temple, Buddhist Stupa, Undavalli Caves, Bhavani temple, Narasimhaswamy temple, Dharanikota, etc. At the time of the announcement of the Capital City the area predominantly consisted of agricultural fields, mainly with commercial crops. Amaravati City is spread across 25 villages in three mandals (Thulluru, Mangalagiri and Tadepalli) of Guntur District. In 2011, the population in the area was almost 100,0001. The Government of Andhra Pradesh directed the Andhra Pradesh Capital Region Development Authority (APCRDA) to undertake development schemes in the Capital City area and accordingly the Capital City Development Project is under implementation. The World Bank supported – Amaravati Sustainable Capital City Development Project – ASCCDP (the project) – is aimed at providing select urban infrastructure in designated locations of Amaravati Capital City, and to develop capacity of its urban governance institutions. The total budget for the project is estimated at US$ 715 million, of which IBRD financing would be US$300.00 million, and co-financing from the Asian
Recommended publications
  • Interior Works of Kovoor Branch, Nellore District, Andhra Pradesh
    NIT NO 2018-19/civil/15 DATE 13.11.2018 SBI INFRA MANAGEMENT SOLUTIONS PVT. LTD., (SBIIMS), (WHOLLY OWNED SUBSIDIARY OF SBI) AMARAVATI CIRCLE OFFICE INVITES e-TENDERS ON BEHALF OF SBI THROUGH E-TENDERING PROCESS FOR CORRIGENDUM-EXTENSION OF LAST DATE INTERIOR WORKS OF KOVOOR BRANCH, NELLORE DISTRICT, ANDHRA PRADESH Contractors who are on the panel of SBI, Hyderabad Circle (LHO) in the appropriate interior work category are only eligible. (Contractors should submit proof of the same) Note: Firm should possess valid digital signature for this e-tender. Last date for submission of e-Tender: 3.00 P.M. (IST) on 19.11.2018 Opening of e Tenders: 4.30 P.M. (IST) on 19.11.2018 The Vice president, SBI Infra Management Solutions Pvt. Ltd. Amaravati Circle Office 2nd Floor, SBI Amaravati LHO Building, Gunfoundry, Abids Hyderabad – 500 001 Ph: 040-23387364, 365 Page 1 of 3 Signature of contractor NOTICE INVITING TENDER (NIT) CORRIGENDUM-EXTENSION OF LAST DATE NAME OF WORK: e-TENDER Notice for Interior Works of KOVOOR Branch, NELLORE District, Andhra Pradesh. Online e tenders are invited for the above mentioned work from the contractors on the approved panel of SBI, LHO-Hyderabad in the appropriate interior work category (contractors to furnish proof of empanelment and its validity) 1 Name of the work E-Tender Notice for INTERIOR WORKS OF KOVOOR BRANCH, NELLORE DISTRICT, ANDHRA PRADESH 2 Cost of Tender Documents 1)Rs 500/- to be credited in the SBIIMS Account No. 37648595191, SBI, Madam cama Road Branch, IFSC: SBIN0008586. 2)Proof for crediting the amount such as counter foil, UTR no etc should be enclosed with the covering letter mentioning GST number 3 Date and Time where tender forms are FROM 13.11.2018 to 19.11.2018 at available (From_____ to ______) https://etender.sbi/ 4 Time and last date of submission of online Up to 3.00PM on 19.11.2018 eTender 5 Place, Time& Address for submission of e Up to 3.00 p.m.
    [Show full text]
  • Amaravati :A Buddhist Heritage City of Andhra Pradesh
    Amaravati :A Buddhist Heritage City of Andhra Pradesh 1 A Presentation by The Cultural Centre of Vijayawada 2 Welcome to Amaravati-Dhanyakataka Where Buddhism flourished more than 1700 years… 3 Buddhism and the Andhra Region Buddhism reached the Andhra Region during the life time of the Buddha Dhamma spread fast after the 3rd century BC in the Andhra region when it was part of the Mauryan empire 4 Amaravati’s leading role in the evolution of three phases of Buddhism is well-known from 3rd Century BC to 8th Century AD Theravada Acharya Buddhaghosha (4th — 5th centuries AD) - the great systematizer hailed from Amaravati region 5 Mahayana phase Acharya Nagarjuna, the great systematiser of Mahayana tradition, lived and enlarged the Mahastupa at Dhanyakataka In the Mahayana countries, he is considered a later day Buddha Vajrayana Phase According to the Tibetan tradition, Buddha Sakyamuni manifested in the form of Kalachakra or Wheel of Time and gave teachings on this Tantra to an assembly of innumerable Buddhas, Bodhisattvas, gods, nagas, yakshas etc., at the stupa of Dhanyakataka A good no. of Vajrayana Sculptures like Maitreya, Heruka, Tara and Vajra Tara (10th Century AD )were recovered from the exacavations at Amaravati 6 Spread of Buddhism Buddhism spread rapidly in the Andhra region owing to the patronage of Ashoka Maurya Asoka and his Wife Mahastupa at Dhanyakataka(Amaravati) was built during his reign 7 Amaravati-Dhanyakataka Maha Stupa Remains of Mahachaitya originally 200 feet in diameter & 100 feet in height (Deepala Dinne) and site museum which contains Buddha’s relic are worth visit. Maha Stupa Asokan edict 8 Dhanyakataka – Amaravati Re-Discovery • Dhanyakataka – Amaravati, a world famous Buddhist site is situated on the right bank of the river Krishna, about 35 kms from the Guntur and 40 kms from Vijayawada.
    [Show full text]
  • GOVERNMENT of ANDHRA PRADESH ABSTRACT Municipal
    GOVERNMENT OF ANDHRA PRADESH ABSTRACT Municipal Administration & Urban Development Department-Andhra Pradesh Capital Region Development Authority Act,2014 - Declaration of A.P. Capital City Area-Orders-Issued. MUNICIPAL ADMINISTRATION & URBAN DEVELOPMENT (M2) DEPARTMENT G.O.MS.No. 254 Dated: 30.12.2014 Read the following: 1. Andhra Pradesh Capital Region Development Authority Act, 2014 (Act.No.11 of 2014) 2. G.O.Ms.No.252, MA& UD Department, Dated: 30.12.2014 3. G.O.Ms.No.253, MA& UD Department, Dated: 30.12.2014 ***** ORDER: The Andhra Pradesh Capital Region Development Authority Act, 2014 has come into force with effect from 30th day of December, 2014 by virtue of notification published in the Extra-ordinary issue Andhra Pradesh Gazette, dated : 30-12-2014. 2. The Government have held detailed consultations with the experts of Urban Development, various public organizations and have considered the various aspects of public welfare and accessibility to all part of the state subsequent to such consultations, the Government have decided to locate capital city area within the capital region declared vide G.O 3rd read above. 3. The Government in exercise of powers under sub section 3 of section 3 of Andhra Pradesh Capital Region Development Authority Act, 2014 hereby notify the areas covering broadly an area of about 122 sq.kms as detailed in the schedule to the notification appended here to, as Andhra Pradesh Capital City area which is meant to development of the state capital under the provision of the Andhra Pradesh Region Development Authority Act, 2014. 4. The appended notification shall be published in the Extra-ordinary issue of Andhra Pradesh Gazettee dated:30-12-2014.
    [Show full text]
  • EDB Issue-6 17-11-2018 2T.Indd
    www.apedb.gov.in ANDHRA PRADESH ECONOMIC NOVEMBER 2018 | ISSUE - 6 DEVELOPMENT BOARD SUNANDHRARISE PRADESH AP No.1 in EoDB Industrial Concessions Amaravati Bonds Tirupati and Vijayawada show investors’ trust the most liveable cities LIXIL sets up Anna Canteen is manufacturing plant ‘modern Akshaya Patra’ ANDHRA PRADESH ECONOMIC DEVELOPMENT BOARD NOVEMBER 2018 | ISSUE-6 | PAGE 2 From the desk of Sri Nara Chandrababu Naidu Chief Minister of Andhra Pradesh and Chairman, APEDB ranked No.1 in Ease of Doing Business for the second time around by the World Bank, stands testimony to our efforts. I can proudly share with you that we have taken giant steps in making real-time governance and e-Pragati more efficient. It enables seamless delivery of Government services. Andhra Pradesh is truly a Sunrise State. From April 2015 to August 2018, 28,886 industrial units have been set up; and, in the last one year, there have been 15,527 single-window applications, of which 99.56 per cent have been approved within 21 days of application. In 2017–2018, there were 2705 specified investment proposals, of which 755 were completed. The State received total investments worth Rs.1,49,693.61 crores, creating 32,93,242 specified job opportunities. Recently, we signed MoUs to push growth in the retail sector, agri businesses, and construction industry among others. We have also paid attention to building a skilling eco-system so that the job demands of these sectors are met. At the World Cities Summit 2018, it was heartening to see international leaders acknowledge the progress being made in Sri Nara Chandrababu Naidu building a world-class Capital in Amravati.
    [Show full text]
  • Assessment of Water Quality for Groundwater in Thullur Mandal, Guntur District, A.P, India
    April 2017, Volume 4, Issue 04 JETIR (ISSN-2349-5162) ASSESSMENT OF WATER QUALITY FOR GROUNDWATER IN THULLUR MANDAL, GUNTUR DISTRICT, A.P, INDIA 1P. Akhil Teja, 2V. Jaya Krishna, 3CH. Manikanta, 4M. Musalaiah 1, 2, 3 Final B.Tech Students, 4Assistant Professor, 1Department of Civil Engineering, 1MVR College of Engineering and Technology, Paritala, Andhra Pradesh, India Abstract— Groundwater is an essential and valuable natural source of water supply all over the world. To meet out the rising demand it is crucial to identify and recognize the fresh water resources and also to find out remedial methods for improvement of water quality. So, assessment of ground water quality has always been paramount in the field of environmental quality management. Physico-chemical parameters of groundwater quality based on physic-chemical parameters plays a prominent role in evaluating its suitability for drinking purpose. The present study deals with the determination of water quality index of Thullur mandal, Guntur district, Andhra Pradesh, in order to ascertain the quality of Groundwater for public consumption, recreation and other purposes. The samples were collected from all 19 villages of Thullur mandal. The samples were analyzed in the laboratory using standard APHA 1985 procedures. From the analyzed data, WQI has been calculated using Weighted Average method. The variations of water quality on different samples were also discussed. Index Terms— Groundwater, Water Quality Parameters, Sampling, Water Quality Standards, Water Quality. 1. INTRODUCTION Water is the most important natural resource, which forms the core of ecological system. Recently there has been overall development in various fields such as agriculture, industry and urbanization in India.
    [Show full text]
  • Civil Works at Eluru Branch, West Godavari District, Andhra Pradesh
    TENDER ID AMR201909039 DATE 25/09/19 SBI INFRA MANAGEMENT SOLUTIONS PVT. LTD., (SBIIMS), (WHOLLY OWNED SUBSIDIARY OF SBI) AMARAVATI CIRCLE OFFICE INVITES e-TENDERS ON BEHALF OF SBI THROUGH E-TENDERING PROCESS FOR CIVIL WORKS AT ELURU BRANCH, WEST GODAVARI DISTRICT, ANDHRA PRADESH Contractors who are on the panel of SBI, Hyderabad Circle (LHO) in the appropriate CIVIL work category are only eligible. (Contractors should submit proof of the same) Note: Firm should possess valid digital signature for this e-tender. Last date for submission of e-Tender: 3.00 P.M. (IST) on 09.10.2019 Opening of e Tenders: 4.00 P.M. (IST) on 09.10.2019 The Vice president, SBI Infra Management Solutions Pvt. Ltd. Amaravati Circle Office 2nd Floor, SBI Amaravati LHO Building, Gunfoundry, Abids Hyderabad – 500 001 Ph: 040-23387364, 365 Page 1 of 35 Signature of contractor NOTICE INVITING TENDER (NIT) NAME OF WORK: e-TENDER Notice for CIVIL WORKS (TOILETS RENOVATION) of ELURU BRANCH, WEST GODAVARI DISTRICT, Andhra Pradesh. Online e tenders are invited for the above mentioned work from the contractors on the approved panel of SBI, LHO-Hyderabad in the appropriate CIVIL work category (contractors to furnish proof of empanelment and its validity) 1 Name of the work E-Tender Notice for CIVIL WORKS (TOILET BLOCK RENOVATION) AT ELURU BRANCH (0836), WEST GODAVARI DISTRICT ANDHRA PRADESH 2 Cost of Tender Documents Rs.1000/- to be paid through State Bank Collect ONLY as detailed under; 1) login https://www.onlinesbi.com 2) Select SB Collect from Top Menu, click the check box and “Proceed” 3) Select “All India” in “State of Corporate/Institution” & Select “Commercial Services” in “Type of Corporate/Institution” then “Go” 4) Select “ SBI Infra Management Solutions pvt.
    [Show full text]
  • M/S AMARAVATI LIFE SCIENCES
    APPLICATION FOR ENVIRONMENTAL CLEARANCE ANNEXURE For “PROPOSED MANUFACTURING OF BULK DRUGS, INTERMEDIATES & SOLVENT RECOVERY SYSTEM” By M/s AMARAVATI LIFE SCIENCES At Sy.No.712 & 713, Vinukonda Road, Kolagutla Village, Durgi Mandal, Guntur District, Andhra Pradesh EIA Consultant HUBERT ENVIRO CARE SYSTEMS (P) LTD, CHENNAI (NABET Accredited vide Certificate No. NABET/EIA/1619/RA0083 & MoEF Recognized Lab vide F. No. Q-15018/13/2016-CPW) APRIL 2019 LIST OF ANNEXURE Annexure S. No Name of the Annexure Page Nos No 1 I Project Site Layout 1 2 II Proposed Water Balance 2 3 III Effluent Treatment Plant layout 3 4 IV Sewage Treatment Plant Layout 4 5 V Multiple Effective Evaporator Plant Layout 6 6 VI Manufacturing Process flow chart 7 7 VII Topo map of the project Site 8 Note: Annexure are given as Separate Book 33 1 7 2 26 15 6 32 16 3 24 8 31 4 25 5 9 MAIN ENTRANCE ROAD 34 17 10 18 30 14 43 13 23 40 11 VINUKONDA ROAD 12 36 ROAD 44 21 20 19 22 38 39 MAIN ENTRANCE 28 41 37 35 27 29 ROAD 42 AREA IN AREA IN S.NO LAND ALLOCATION BREAKUP (Sq.m) (Acres) 1 Roads and Pavement Area 7882.53 1.948 2 Buildup Area 13335.17 3.296 3 Green Belt Area 15491 3.827 4 Vacant Area 10234.84 2.529 TOTAL LAND AREA 46943.53 11.60 APPROVED/DATE TITLE: CLIENT: HECS(P)Ltd ENGINEEING CHECKED/DATE M/s. AMARAVATI LIFE SCIENCES., NAME DATE DRAWN AMR 17.12.18 OVERALL SITE LAYOUT DRAWING DRAFTING CHECKED/DATE DURGI VILLAGE & MANDAL, GUNTUR DISTRICT, DESIGNED CR 17.12.18 ANDHRA PRADESH CHECKED CEO 17.12.18 CLASS I.D SCALE REV IMO No.
    [Show full text]
  • World Bank Document
    A Public Disclosure Authorized Amaravati Sustainable Capital City Development Project (ASCCDP) RevisedFinal draft Resettlement Action Plan Public Disclosure Authorized for 10 Sub-Arterial Roads Public Disclosure Authorized Andhra Pradesh Capital Region Development Authority Amaravati, Andhra Pradesh Public Disclosure Authorized August2018 Ver. 5.0 TABLE OF CONTENTS ACRONYMS ............................................................................................................................................... 3 EXECUTIVE SUMMARY .......................................................................................................................... 4 I. INTRODUCTION ................................................................................................................................... 8 Amaravati Sustainable Capital City Development Project (ASCCDP) .......................................... 8 10 Sub-Arterial Roads .......................................................................................................................... 10 Impacts of 10 roads .............................................................................................................................. 12 II. SOCIAL IMPACT ASSESSMENT ..................................................................................................... 15 Magnitude of Social Impacts .............................................................................................................. 15 III. CONSULTATIONS / BASELINE SOCIO-ECONOMIC CHARACTERISTICS
    [Show full text]
  • 42010001 Meruga Nirmala H NO 5-12-36/41-1 NEAR
    Final List of the Candidates Registered in ONLINE to appear for UGC NET to be held on 24-12-2011 at NAGARJUNA UNIVERSITY CAMPUS, NAGARJUNA NAGAR ADMISSION CARDS were POSTED to all the Following Candidates. Subject Subject Roll No Name Address Code 1. Economics(01) Meruga Nirmala H NO 5-12-36/41-1 NEAR SRINIVASA THEATER,GIDDALUR VIL & 42010001 POST &MANDAL,PRAKASAM 2. Economics(01) B Srinivasa Rao 37-5-8, 1ST FLOOR,,PATNALA VARI STREET, MARKET 42010002 AREA,KAKINADA 3. Economics(01) Sailaja Maddela D.NO.15-13-123/44,ZIYAUDDIN NAGAR, NEAR RTC 42010003 COLONY,GUNTUR 4. Economics(01) Vijaya Babu chiluvuru CHILUVURU (P.O) DUGGIRALA (M.D) GUNTUR 42010004 (D.T),CHILUVURU,GUNTUR 5. Economics(01) 42010006 Anuradha Seelam T-29A/1,ROAD NO.20 BALJEET NAGAR,NEWDELHI 6. Economics(01) Karumuri Kishore Kumar LH-2,ROOM NO-122,P.O.CENTRAL UNIVERSITY,GACHIBOWLI, 42010007 HYDERABAD. 7. Economics(01) Ramesh Settipalli INAPURU,NEAR BRIDGE,,PAMIDIMUKKALA MANDAL,,KRISHNA 42010008 DISTRICT 8. Economics (01) 42010009 G.Lakshmipathi 24-5-49/1,JANARDHANA COLONY,KANDUKURU 9. Economics(01) 42010010 Rajendra Babu Gudiri DOOR NO-27-3-44,,SRIRAM PURAM,BHIMAVARAM 10. Economics(01) Srinivasarao Gudipudi H.NO.8-94-1A, KOTHAPETA,,NEAR PENTHECOSTAL 42010011 CHURCH,,KANIGIRI 11. Economics(01) Aravind Swamy Pappala KUNKALAGUNTA(PO&VILL), NEKARIKALLU(MD),H.NO-5-122,NEAR 42010012 AKKAMA GUDI TEMPLE,GUNTUR 12. Economics(01) 42010013 Paleena D NO:17-2-22,SAMATANAGAR, AKIVIDU,AKIVIDU 13. Economics(01) Marella Yedukondala Rao E.PALEENA , H.NO - 19-3-1/1/A,MARKANDEYACOLONY , VVV HIGH 42010014 SCHOOL BESIDE,GODAVARIKHANI , KARIMNAGAR 14.
    [Show full text]
  • Feasibility Study of the Development of New Capital City and Urban Infrastructure in Andhra Pradesh State, India Final Report
    Ministry of Economy, Trade and Industry Project to Promote Overseas Sales of Quality Energy Infrastructure Systems in Fiscal Year 2016 Feasibility Study of the Development of New Capital City and Urban Infrastructure in Andhra Pradesh State, India Final Report March 2017 Sumitomo Corporation Feasibility Study of the Development of New Capital City and Urban Infrastructure in Andhra Pradesh State, India Final Report Feasibility Study of the Development of New Capital City and Urban Infrastructure in Andhra Pradesh State, India Table of Contents 1 Introduction .............................................................................................................. 1-1 1.1 Project Background .................................................................................................. 1-1 1.2 Project Objectives ..................................................................................................... 1-1 1.3 Project Area .............................................................................................................. 1-2 2 Present Condition and Development Plan of New Capital City and Surrounding Cities .................................................................................................................................. 2-3 2.1 Present Condition...................................................................................................... 2-3 2.1.1 General Condition ..................................................................................................... 2-3 2.1.2 Infrastructure
    [Show full text]
  • World Bank Document
    Amaravati Sustainable Capital City Development Project Resettlement Policy Framework Amaravati Sustainable Capital City Development Project (ASCCDP) Public Disclosure Authorized Final Final Draft Resettlement Policy Framework Public Disclosure Authorized Public Disclosure Authorized Andhra Pradesh Capital Region Development Authority (APCRDA) Government of Andhra Pradesh, Amaravati July 2018 Version 5 Public Disclosure Authorized 1 Amaravati Sustainable Capital City Development Project Resettlement Policy Framework Contents ACRONYMS ........................................................................................................................................................... 3 EXECUTIVE SUMMARY ...................................................................................................................................... 4 I. INTRODUCTION .............................................................................................................................................. 12 Background .................................................................................................................................................... 12 Need for Resettlement Policy Framework ................................................................................................. 12 Amaravati Capital City development and the World Bank supported Project .................................... 13 II. LAND ASSEMBLY INSTRUMENTS ............................................................................................................
    [Show full text]
  • Additional Agenda-2 for 42Nd Meeting of Standing Committee on Power System Planning for Southern Region
    भारत सरकार Government of India िवतु मतर्ालयं Ministry of Power के न्दर्ीय ुिवत पर्ािधकरण Central Electricity Authority िवुत पर्णाली योजना ं एव मूल्यांकन पर्भाग-II Power System Planning & Appraisal Division-II सेवा मे / To, संलग्न सूची के अनुसार As per list enclosed िवषय: दिक्षणी क्षेतर्े क िलए िवुत पर्णाली योजना पर स्थायी सिमित की 42 वैठक ब की अितिरक्त कायर्सूची-II । Subject: Additional Agenda-2 for 42nd meeting of Standing Committee on Power System Planning for Southern Region. महोदय(Sir)/महोदया(Madam), दिक्षणी क्षेतर्े क िलए िवुत पर्णाली योजना पर स्थायी सिमित की 42 व बैठक 27 अपर्ैल, 2018 को 10:00 बजे से होटल कर्ाउन प्लाजा, एरनाकु लम (के रल) म आयोिजत की जायेगी । बैठक की अितिरक्त कायर्सूची-II संलग्न है । The 42nd meeting of the Standing Committee on Power System Planning of Southern Region will be held at 10:00 hrs on 27th April, 2018 at Hotel Crown Plaza, Ernakulam (Kerala). Additional Agenda-2 for the meeting is enclosed. भवदीय/Yours faithfully, Sd/- (बी.एस.बैरवा/B.S. Bairwa) िनदशके / Director सेवा भवन, आर. के . परमु -I, नई िदली-110066 टेलीफोन : 011-26198092 ईमेल: [email protected] वेबसाइट: www.cea.nic.in Sewa Bhawan, R.K Puram-I, New Delhi-110066 Telephone: 011-26198092 Email:[email protected] Website: www.cea.nic.in Address List: 1.
    [Show full text]