Number of Consumers NoCapacity of Distribution Whether Planned or Unserved (MU) due to Sr. No. Area Affected Division Affected Transformer (in KVA). Unplanned Outage From DateTime To DateTime Duration (Hrs:Mins) Outage

BLOCK I-ARAM BAGH, BLOCK III-ARAM BAGH, BLOCK II-ARAM BAGH, BLOCK B-ARAM BAGH, BLOCK A-ARAM BAGH, CHUNA MANDI-PAHAR GANJ, MANTOLA MOHALLA-PAHAR GANJ, MULTANI DHANDA-SADAR BAZAR, BLOCK J-NABI KARIM, PHARI DHIRAJ-SADAR BAZAR, TYPE III HOUSE-CHUNA MANDI, 1 MIG FLATS-CHUNA MANDI PHG 3299 0 KVA UNPLANNED 01-05-2020 02:21:55 01-05-2020 02:56:00 0:34 0.00063278 MUs KUCHA PATI RAM-, CHAWRI BAZAR- CHANDNI CHOWK, HAUZ QAZI-CHANDNI CHOWK, SITARAM BAZAR-CHANDNI CHOWK, DAV PUBLIC SCHOOL-KALA MASZID, 2 MOSQUE-KUCHA PATI RAM DRG 4383 4000 KVA UNPLANNED 01-05-2020 06:54:28 01-05-2020 07:35:00 0:40 0.00034444 MUs

BLOCK A-, BLOCK E-ZERO PUSTA, NAYAGAON- NEW KATWARA, MCD COLONY-NEW KATWARA, KACHI COLONY-JAGJEET NAGAR, BLOCK A-GHONDA PATTI, BLOCK H- GHONDA PATTI, BLOCK C-GHONDA PATTI, ZERO PUSTA- USMAN PUR, BLOCK D-BHAJANPURA, BLOCK C-BHAJANPURA, BLOCK B-MANUJPUR, JAGJEET NAGAR-GHONDA, BLOCK J- KARTAR NAGAR, GAUTAM VIHAR-GHONDA, GAMRI-GHONDA, GHONDA PATTI, BLOCK C-JAI PRAKASH NAGAR, BLOCK B- KARTAR NAGAR, BLOCK G-ZERO PUSTA, VIDHYUT 3 BROAD-ZERO PUSTA YVR 6885 7960 KVA UNPLANNED 01-05-2020 07:06:00 01-05-2020 07:50:00 0:44 0.00083111 MUs 4 BLOCK B-MANSAROWAR PARK DGN 28 630 KVA UNPLANNED 01-05-2020 08:20:00 01-05-2020 08:45:00 0:24 0.00002 MUs

BLOCK E-NEW , BLOCK A & B-VASUNDHARA ENCLAVE, DANIK JANYOG-VASUNDHARA ENCLAVE VSE, BLOCK 5 A-DALLU PURA VSE VSE 2048 9500 KVA UNPLANNED 01-05-2020 08:50:28 01-05-2020 09:44:00 0:53 0.00058889 MUs

BLOCK 29-HIMMATPURI, BLOCK 28-HIMMATPURI, BLOCK 20- HIMMATPURI, BLOCK 21-HIMMATPURI, BLOCK 17- HIMMATPURI, BLOCK 22-HIMMATPURI, BLOCK 16- HIMMATPURI, BLOCK 18-HIMMATPURI, BLOCK 19- HIMMATPURI, BLOCK 15-TRILOKPURI PHASE II, TRILOKPURI 6 PHASE I-, HIMMATPURI-MAYUR VIHAR MVR 3669 1490 KVA UNPLANNED 01-05-2020 08:49:00 01-05-2020 09:15:00 0:26 0.00078 MUs 7 TAKSHILA APARTMENT-MOTHER DAIRY LNR 35 400 KVA UNPLANNED 01-05-2020 09:15:52 01-05-2020 09:35:56 0:20 0 MUs

BLOCK_6A-SAT NAGAR, BLOCK_3H-KRISHNA NAGAR, BLOCK_21K-KRISHNA NAGAR, BLOCK_48-KRISHNA NAGAR, BLOCK_30B-KRISHNA NAGAR, DARYA GANJ, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY-KASHMERE GATE, PKT R- BLOCK D, PKT C-BLOCK B, JAFFRABAD-MAUJ PUR, BLOCK A- SADATPUR EXT-PUSTA AREA-L BLOCK, BLOCK H-BHAGIRATHI VIHAR, BLOCK F-SHIV VIHAR, BLOCK M-SHIV VIHAR, BLOCK N- SHIV VIHAR, BLOCK E-INDIRA VIHAR, SPORTS COMPLEX- VASUNDHARA ENCLAVE VSE, BHAJANPURA-DAYALPUR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-B-BLOCK SONIA VIHAR, BLOCK 8 F-INDIRA VIHAR SRD 1505 1260 KVA UNPLANNED 01-05-2020 11:27:29 01-05-2020 12:18:41 0:51 0.00014167 MUs 9 BABARPUR EXTN.-BABAR PUR NNG 189 990 KVA UNPLANNED 01-05-2020 11:32:28 01-05-2020 11:34:54 0:2 0.00000444 MUs 10 BLOCK B-KABIR NAGAR NNG 369 630 KVA UNPLANNED 01-05-2020 11:33:37 01-05-2020 11:36:37 0:3 0.000005 MUs

BLOCK CN-AMBIKA VIHAR BLOCK - B&C, BLOCK C-PATEL VIHAR, BLOCK CN-MANGALAM VIHAR, PHASE I-SHIV VIHAR, VILLAGE- KAMAL VIHAR, BLOCK C-KARAWAL NAGAR, SHIV VIHAR, SHIV VIHAR, PKT Y-SHIV VIHAR, BLOCK R-PATEL VIHAR, BLOCK B- PATEL VIHAR, BLOCK A-MANGALAM VIHAR, BLOCK CN-AMBIKA VIHAR BLOCK - B&C, BLOCK C-PATEL VIHAR, BLOCK CN-AMBIKA 11 VIHAR BLOCK - B&C KWN 4199 0 KVA UNPLANNED 01-05-2020 12:11:27 01-05-2020 13:11:27 1:0 0.00098333 MUs

BABARPUR WEST-BABAR PUR NNG, CHHAJJUPUR-BABAR PUR, BABARPUR EXTN.-BABAR PUR, BALBIR NAGAR EXTN.- 12 SILAMPUR, JYOTI COLONY-BALBIR NAGAR NNG 6639 4900 KVA UNPLANNED 01-05-2020 12:50:29 01-05-2020 13:34:52 0:44 0.00096556 MUs 13 LIG/MIG RES/NON COMM AREA-CHAWLA FARM KWN 135 630 KVA UNPLANNED 01-05-2020 15:56:36 01-05-2020 16:04:48 0:8 0.00002222 MUs

GEETA COLONY, BLOCK 2-GEETA COLONY, BLOCK 8-GEETA 14 COLONY, BLOCK 1A-GEETA COLONY, BLOCK 2A-GEETA COLONY KRN 1478 1030 KVA UNPLANNED 01-05-2020 18:25:47 01-05-2020 19:07:00 0:41 0.00044417 MUs

BLOCK 35-RAMJAS SPORTS COMPLEX, BLOCK 33-WEST , BLOCK 31-, BLOCK 32-WEST PATEL NAGAR, PKT C-BLOCK B, LIG/MIG RES/NON COMM AREA-A- BLOCK SONIA VIHAR, BLOCK 25-WEST PATEL NAGAR, CLOSED FACTORY-FARIDPURI, KT COLONY-VOLTAS LTD, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, ARMY QTRS- ANAND PARBAT, GGS INDRAPRASTHA UNIVERSITY-KASHMERE GATE, BLOCK N-SHIV VIHAR, BLOCK F-INDIRA VIHAR, BLOCK 26- WEST PATEL NAGAR, BLOCK F-PUNJABI BASTI, BLOCK T-BALJIT NAGAR, LIG/MIG RES/NON COMM AREA-B-BLOCK SONIA VIHAR, BLOCK 38-WEST PATEL NAGAR, BLOCK T-PANJABI BASTI, BLOCK 30-WEST PATEL NAGAR, BLOCK M-SHIV VIHAR, BLOCK 23-WEST PATEL NAGAR, BLOCK A-SADATPUR EXT- PUSTA AREA-L BLOCK, BHAJANPURA-DAYALPUR, BLOCK 28- WEST PATEL NAGAR, PKT R-BLOCK D, GEETA COLONY, SPORTS COMPLEX-VASUNDHARA ENCLAVE VSE, BLOCK E-INDIRA VIHAR, BLOCK H-BHAGIRATHI VIHAR, DARYA GANJ, BLOCK 35- WEST PATEL NAGAR, JAFFRABAD-MAUJ PUR, BLOCK F-SHIV 15 VIHAR, BLOCK 37-WEST PATEL NAGAR PNR 5610 2380 KVA UNPLANNED 01-05-2020 22:08:29 01-05-2020 22:52:14 0:43 0.00056139 MUs CHRISTAN COLONY-KHABAS PURA, PATODI HOUSE-CHANDNI 16 CHOWK DRG 521 990 KVA UNPLANNED 02-05-2020 10:45:00 02-05-2020 10:52:43 0:7 0.00000972 MUs

BLOCK R-PATEL VIHAR, BLOCK CN-AMBIKA VIHAR BLOCK - B&C, PHASE I-SHIV VIHAR, PKT Y-SHIV VIHAR, VILLAGE-KAMAL VIHAR, BLOCK CN-MANGALAM VIHAR, BLOCK CN-AMBIKA VIHAR BLOCK - B&C, SHIV VIHAR, BLOCK A-MANGALAM VIHAR, BLOCK C-PATEL VIHAR, SHIV VIHAR, BLOCK C-KARAWAL NAGAR, BLOCK C-PATEL VIHAR, BLOCK B-PATEL VIHAR, BLOCK 17 CN-AMBIKA VIHAR BLOCK - B&C KWN 4199 0 KVA UNPLANNED 02-05-2020 19:33:31 02-05-2020 19:50:00 0:16 0.00022222 MUs

VISHWAS NAGAR EXTN.-SHAHDARA, VISHWAS NAGAR EXTN.- 18 SHAHDARA, BLOCK T-GAUTAM PURI, VISHWAS NAGAR JLM 2908 3280 KVA UNPLANNED 02-05-2020 20:46:00 02-05-2020 22:23:45 1:37 0.00083528 MUs 19 SANT NIRANKARI BHAVAN-GANGA VIHAR KWN KWN 1209 0 KVA UNPLANNED 02-05-2020 21:07:00 02-05-2020 21:58:32 0:51 0.00198333 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unserved (MU) due to Sr. No. Area Affected Division Affected Transformer (in KVA). Unplanned Outage From DateTime To DateTime Duration (Hrs:Mins) Outage VISHWAS NAGAR EXTN.-SHAHDARA, EAST ROHTASH NAGAR- SHAHDARA, VISHWAS NAGAR, VISHWAS NAGAR EXTN.- 20 SHAHDARA JLM 3691 7200 KVA UNPLANNED 02-05-2020 21:52:29 02-05-2020 22:03:33 0:11 0.00022306 MUs

BLOCK F-WEST KARAWAL NAGAR, BLOCK H-WEST KARAWAL NAGAR, PKT B-BLOCK B, PKT A-BLOCK E, BLOCK F & G-BHAGAT SINGH COLONY, BLOCK B-SADATPUR EXT-PUSTA AREA-M BLOCK, WEST KARAWAL NAGAR, BLOCK C-KARAWAL NAGAR, BLOCK F-BHAGAT SINGH COLONY, BLOCK E-SADAT PUR, BLOCK B-SADAT PUR, BLOCK C-SADAT PUR, PKT C-BLOCK E, PKT A1- BLOCK E, PKT A3-BLOCK E, PKT A2-BLOCK E, PKT A4-BLOCK E, PKT E-SADATPUR EXT-PUSTA AREA-K BLOCK, BLOCK A- KARAWAL NAGAR (DEHROTI), PKT D-BLOCK A, BLOCK D-WEST 21 KARAWAL NAGAR, BLOCK D-WEST KARAWAL NAGAR KWN 4011 0 KVA UNPLANNED 03-05-2020 02:53:32 03-05-2020 04:51:00 1:57 0.0025675 MUs

BLOCK A-, JJC-DILSHAD COLONY, BLOCK F- DILSHAD COLONY, BLOCK B-DILSHAD COLONY, J.J.C.-NEW SIMAPURI, BLOCK B-NEW SIMAPURI, BLOCK C-NEW SIMAPURI, BLOCK B-PREM NAGAR DGN, BLOCK E-JHILMIL-TAHIRPUR, BLOCK A-RAJIV NAGAR DGN, GANDHI KUSTH ASHARAM- LEPROSY COLONY, BLOCK 8-SUNDER NAGRI DGN, BLOCK K- LEPROSY COLONY, DDA FLATS-BLOCK A, BLOCK A-NEW SIMAPURI, BLOCK E-NEW SIMAPURI, MCD PRIMARY SCHOOL- NEW SIMAPURI, MCD SCHOOL-SUNDER NAGRI DGN, BLOCK A- PREM NAGAR DGN, SHANTI KUSTH ASHRAM-RAJIV NAGAR DGN, DDA FLATS-RAJIV NAGAR DGN, BLOCK C- MOD PRIMARY SCHOOL-JHILMIL-TAHIRPUR, BLOCK P-JHILMIL-TAHIRPUR, 22 CHURCH-JHILMIL-TAHIRPUR DGN 7590 2880 KVA UNPLANNED 03-05-2020 07:57:41 03-05-2020 08:14:00 0:16 0.00004 MUs

BLOCK B-SHRI RAM NAGAR, BLOCK 1-RAM NAGAR EXTN., 23 BLOCK 1-BHAGWANPUR KHERA, BLOCK 1-RAM NAGAR DGN 2705 1980 KVA UNPLANNED 03-05-2020 08:27:30 03-05-2020 09:05:00 0:37 0.00020556 MUs

HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK D-HARIJAN BASTI EAST EXTN., BLOCK C-SEWA DHAM, BLOCK A-SEWA DHAM, BLOCK D-HARSH VIHAR, BLOCK 24 B-HARSH VIHAR, BLOCK A-HARSH VIHAR NNG 1903 0 KVA UNPLANNED 03-05-2020 08:25:00 03-05-2020 09:05:00 0:40 0.00091111 MUs BLOCK F-WEST KARAWAL NAGAR, PKT A-BLOCK E, BLOCK B- SADATPUR EXT-PUSTA AREA-M BLOCK, BLOCK B-SADAT PUR, BLOCK C-SADAT PUR, PKT A4-BLOCK E, BLOCK D-WEST 25 KARAWAL NAGAR KWN 553 0 KVA UNPLANNED 03-05-2020 08:40:00 03-05-2020 09:30:00 0:49 0.00087111 MUs VILL KARKARDOOMA-KARKAR DUMA, INSTITUTIONAL AREA BLOCK B-ALL DEAF & DUMB SOCIETY, HOSPITAL AREA- 26 INSTITUTIONAL AREA JLM 0 0 KVA UNPLANNED 03-05-2020 16:50:39 03-05-2020 17:24:51 0:34 0 MUs

BLOCK CN-AMBIKA VIHAR BLOCK - B&C, BLOCK C-PATEL VIHAR, BLOCK CN-MANGALAM VIHAR, PHASE I-SHIV VIHAR, VILLAGE- KAMAL VIHAR, BLOCK C-KARAWAL NAGAR, SHIV VIHAR, SHIV VIHAR, PKT Y-SHIV VIHAR, BLOCK R-PATEL VIHAR, BLOCK B- PATEL VIHAR, BLOCK A-MANGALAM VIHAR, PKT R-BLOCK A, BLOCK CN-AMBIKA VIHAR BLOCK - B&C, BLOCK C-PATEL VIHAR, 27 BLOCK CN-AMBIKA VIHAR BLOCK - B&C KWN 4199 0 KVA UNPLANNED 03-05-2020 19:44:35 03-05-2020 20:19:55 0:35 0.00047639 MUs

ANAND PARBAT, DARYA GANJ, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY-KASHMERE GATE, PKT R-BLOCK D, PKT C-BLOCK B, JAFFRABAD-MAUJ PUR, BLOCK A-SADATPUR EXT-PUSTA AREA-L BLOCK, BLOCK H-BHAGIRATHI VIHAR, BLOCK F-SHIV VIHAR, BLOCK M-SHIV VIHAR, BLOCK N-SHIV VIHAR, BLOCK E-INDIRA VIHAR, SPORTS COMPLEX- VASUNDHARA ENCLAVE VSE, BHAJANPURA-DAYALPUR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-B-BLOCK SONIA VIHAR, BLOCK 28 F-INDIRA VIHAR PNR 519 5620 KVA UNPLANNED 03-05-2020 20:10:32 03-05-2020 20:45:07 0:34 0.00016056 MUs 29 BLOCK D-RAM NAGAR EXTN. KRN 218 1500 KVA UNPLANNED 04-05-2020 11:27:16 04-05-2020 12:01:03 0:33 0 MUs

ANAND PARBAT, DARYA GANJ, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY-KASHMERE GATE, PKT R-BLOCK D, PKT C-BLOCK B, JAFFRABAD-MAUJ PUR, BLOCK A-SADATPUR EXT-PUSTA AREA-L BLOCK, BLOCK H-BHAGIRATHI VIHAR, BLOCK F-SHIV VIHAR, BLOCK M-SHIV VIHAR, BLOCK N-SHIV VIHAR, BLOCK E-INDIRA VIHAR, NAI BASTI-ANAND PARBAT, SPORTS COMPLEX-VASUNDHARA ENCLAVE VSE, BHAJANPURA- DAYALPUR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-B-BLOCK SONIA 30 VIHAR, BLOCK F-INDIRA VIHAR PNR 1942 7600 KVA UNPLANNED 04-05-2020 16:20:22 04-05-2020 17:03:15 0:42 0.00042 MUs

THAKKAR BAPA NAGAR-BLOCK 16, BLOCK 26B-AJMAL KHAN PARK, BLOCK 25B-AJMAL KHAN PARK, BLOCK 27B-AJMAL KHAN PARK, DARYA GANJ, GEETA COLONY, THAN SINGH NAGAR- ANAND PARBAT, GGS INDRAPRASTHA UNIVERSITY-KASHMERE GATE, PKT R-BLOCK D, PKT C-BLOCK B, JAFFRABAD-MAUJ PUR, BLOCK A-SADATPUR EXT-PUSTA AREA-L BLOCK, BLOCK 23B- PNR, BLOCK H-BHAGIRATHI VIHAR, BLOCK F-SHIV VIHAR, BLOCK M-SHIV VIHAR, BLOCK N-SHIV VIHAR, BLOCK E- INDIRA VIHAR, BLOCK B-PUNJABI BASTI, SPORTS COMPLEX- VASUNDHARA ENCLAVE VSE, BHAJANPURA-DAYALPUR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-B-BLOCK SONIA VIHAR, BLOCK 31 F-INDIRA VIHAR PNR 4078 0 KVA UNPLANNED 04-05-2020 18:28:21 04-05-2020 19:05:00 0:36 0.00103 MUs EAST END ENCLAVE-LAKSHMI NAGAR, BLOCK B-PRIYADARSANI 32 VIHAR LNR 292 1620 KVA UNPLANNED 04-05-2020 19:39:20 04-05-2020 20:09:00 0:29 0.0003625 MUs

33 CL-CHILLA SARDA BANGAR VILLAGE, MAYUR VIHAR EXTN. MVR 881 1430 KVA UNPLANNED 04-05-2020 19:43:20 04-05-2020 20:36:29 0:53 0.00033861 MUs

BLOCK B-SHRI RAM NAGAR, BLOCK G-MANSAROWAR PARK, SUDARSHAN STEEL ROLLING MILL-RAM NAGAR EAST, RAM NAGAR-SILAMPUR, BLOCK J-SHRI RAM NAGAR, BLOCK F-SHRI RAM NAGAR, BLOCK B-MANSAROWAR PARK, BLOCK A- MANSAROWAR PARK, BLOCK F-MANSAROWAR PARK, BLOCK D- MANSAROWAR PARK, BLOCK C-MANSAROWAR PARK, JINDAL BHAWAN-RAM NAGAR EAST, SACHDEVA INDUSTRIES-RAM NAGAR EAST, SHAHDRA METRO STATION-SHAHDARA DGN, BLOCK E-MANSAROWAR PARK, BLOCK H-MANSAROWAR PARK, 34 JHILMIL INDUSTRIAL AREA-JHILMIL COLONY DGN 3573 0 KVA UNPLANNED 04-05-2020 23:32:22 04-05-2020 23:53:00 0:20 0.00035 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unserved (MU) due to Sr. No. Area Affected Division Affected Transformer (in KVA). Unplanned Outage From DateTime To DateTime Duration (Hrs:Mins) Outage

D.S.I.D.C. COMPLEX-DTC DEPOT, BLOCK A4-NAND NAGARI, MCD PRIMARY SCHOOL-BLOCK D1, BLOCK B4-NAND NAGARI, BLOCK A-MANDOLI EXTN., KARMACHARI RAJYA BEEMA HOSPITAL-DTC DEPOT, DELHI JAL BOARD MIG FLATS-POCKET A, 35 BLOCK F-BUNKAR VIHAR NNG 751 4400 KVA UNPLANNED 05-05-2020 07:04:22 05-05-2020 07:47:18 0:42 0.001015 MUs

DARYA GANJ, GEETA COLONY, BLOCK 9-, BLOCK 13-EAST PATEL NAGAR, BLOCK 25-EAST PATEL NAGAR, BLOCK 26-EAST PATEL NAGAR, BLOCK 30-EAST PATEL NAGAR, RAJENDRA BHAWAN-RAJENDRA PLACE, GGS INDRAPRASTHA UNIVERSITY-KASHMERE GATE, PKT R-BLOCK D, PKT C-BLOCK B, JAFFRABAD-MAUJ PUR, BLOCK A-SADATPUR EXT-PUSTA AREA- L BLOCK, BLOCK H-BHAGIRATHI VIHAR, BLOCK F-SHIV VIHAR, BLOCK M-SHIV VIHAR, BLOCK N-SHIV VIHAR, BLOCK E-INDIRA VIHAR, RADHA SWAMI SAT SANG COMPLEX-RAJENDRA PLACE, MEMORIAL HOSPITAL-RAJENDRA PLACE, SPORTS COMPLEX- VASUNDHARA ENCLAVE VSE, BHAJANPURA-DAYALPUR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-B-BLOCK SONIA VIHAR, BLOCK 36 F-INDIRA VIHAR PNR 1224 2250 KVA UNPLANNED 05-05-2020 08:49:21 05-05-2020 09:17:58 0:28 0.00001556 MUs

GEETA COLONY, TAJ ENCLAVE-GEETA COLONY, SAROJINI PARK- GEETA COLONY, EKTA APPARTMENT-RANI GARDEN, KANCHAN 37 APPARTMENT-RANI GARDEN KRN 108 2060 KVA UNPLANNED 05-05-2020 15:03:00 05-05-2020 15:45:00 0:42 0.00025667 MUs BLOCK A & B-VASUNDHARA ENCLAVE, DARSHAN HOSPITAL- 38 DALLU PURA VSE VSE 854 2920 KVA UNPLANNED 05-05-2020 15:35:00 05-05-2020 16:25:00 0:49 0.000245 MUs

BLOCK C-, BLOCK D-PANDAV NAGAR, BLOCK A- PANDAV NAGAR, BLOCK J-PANDAV NAGAR, BLOCK B-VINOD NAGAR EAST, BLOCK U-SHAKARPUR KHAS, AKSHARDHAM MANDIR, INDUSTRIAL AREA-PATPAR GANJ INDUSTRIAL AREA, PANDAV NAGAR-PANDAV NAGAR LNR, J.J. COLONY-RAVIDAS CAMP, ANKUR APARTMENT-MOTHER DAIRY, BLOCK C- PANDOW NAGAR, L.P. DESHBANDHU SOC-L.P. EXTENSION, 39 OXFORD APPARTMENT-VINOD NAGAR LNR 1712 1390 KVA UNPLANNED 05-05-2020 21:13:00 05-05-2020 22:10:00 0:56 0.00046667 MUs 40 SIYARAM-GHISA DGN 17 990 KVA UNPLANNED 06-05-2020 07:18:13 06-05-2020 07:48:19 0:30 0.000025 MUs 41 JHILMIL INDUSTRIAL AREA-JHILMIL COLONY DGN 377 2970 KVA UNPLANNED 06-05-2020 10:12:00 06-05-2020 10:45:00 0:33 0 MUs

LIG/MIG RES/NON COMM AREA-VIJAY GHAT, RED FORT- CHANDNI CHOWK-RED FORT, RED FORT-VIJAY GHAT, LIG/MIG RES/NON COMM AREA-CHANDNI CHOWK-RED FORT, NIGAM BODH GHAT CEMETRY-KASHMERE GATE, SWATRANTATA SAINANI SMARAK-CHANDNI CHOWK-RED FORT, LIG/MIG RES/NON COMM AREA-KASHMERE GATE, LIG/MIG RES/NON 42 COMM AREA-VIJAY GHAT DRG CCK 381 0 KVA UNPLANNED 06-05-2020 11:05:00 06-05-2020 12:02:00 0:56 0.00017111 MUs GURU ANGAD NAGAR EAST-SWASTHYA VIHAR, EAST END ENCLAVE-LAKSHMI NAGAR, MOHAN PARK-WEST GURU ANGAD 43 NAGAR LNR 846 990 KVA UNPLANNED 06-05-2020 13:19:00 06-05-2020 14:08:00 0:49 0.00068056 MUs UNIVERSITY GRANT COMMISSION-ITO, SOC SCHOOL- CONNAUGHT PLACE DRG, BLOCK E-CONNAUGHT PLACE DRG, GANDHI SHANTI PRATISTHAN STAFF FLATS-CONNAUGHT 44 PLACE DRG DRG 158 630 KVA UNPLANNED 06-05-2020 14:58:24 06-05-2020 15:57:00 0:58 0 MUs

DARYA GANJ, GEETA COLONY, BLOCK 12-EAST PATEL NAGAR, BLOCK 25-EAST PATEL NAGAR, BLOCK 26-EAST PATEL NAGAR, BLOCK 30-EAST PATEL NAGAR, BLOCK 29-EAST PATEL NAGAR, BLOCK 34-EAST PATEL NAGAR, BLOCK 38-EAST PATEL NAGAR, BLOCK 33-EAST PATEL NAGAR, BLOCK 45-EAST PATEL NAGAR, BLOCK 47-EAST PATEL NAGAR, RAJENDRA BHAWAN-RAJENDRA PLACE, MIG FLATS-PRASAD NAGAR, GGS INDRAPRASTHA UNIVERSITY-KASHMERE GATE, PKT R-BLOCK D, PKT C-BLOCK B, JAFFRABAD-MAUJ PUR, BLOCK A-SADATPUR EXT-PUSTA AREA- L BLOCK, THAKKAR BAPA NAGAR-DEV NAGAR, BLOCK H- BHAGIRATHI VIHAR, BLOCK F-SHIV VIHAR, BLOCK M-SHIV VIHAR, BLOCK N-SHIV VIHAR, BLOCK E-INDIRA VIHAR, BLOCK 24-EAST PATEL NAGAR, SPORTS COMPLEX-VASUNDHARA ENCLAVE VSE, BHAJANPURA-DAYALPUR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON 45 COMM AREA-B-BLOCK SONIA VIHAR, BLOCK F-INDIRA VIHAR PNR 1769 1980 KVA UNPLANNED 06-05-2020 15:12:23 06-05-2020 15:25:00 0:12 0.00007 MUs

BLOCK A & B-VASUNDHARA ENCLAVE, DOCTORS APPARTMENT- VASUNDHARA ENCLAVE VSE, MANAVSTHALI APPARTMENT- VASUNDHARA ENCLAVE VSE, VASUNDHARA ENCLAVE VSE, SPORTS COMPLEX-VASUNDHARA ENCLAVE VSE, NEW PRAGATISHEEL APARTMENT-VASUNDHARA ENCLAVE VSE, SHANTI DOOT APPARTMENT-VASUNDHARA ENCLAVE VSE, 46 FANCY APPARTMENT-VASUNDHARA ENCLAVE VSE VSE 1328 6010 KVA UNPLANNED 06-05-2020 17:03:25 06-05-2020 17:11:00 0:7 0 MUs 47 BLOCK A-MANDOLI EXTN. NNG 221 990 KVA UNPLANNED 06-05-2020 17:29:42 06-05-2020 17:32:56 0:3 0.000005 MUs

BLOCK C-KABIR NAGAR, BLOCK A-KABIR NAGAR, BLOCK B- KABIR NAGAR, BABA DA DARGA-KARDAMPURI, BHIM RAO 48 AMBEDKAR COLLAGE-JYOTI NAGAR NNG 7401 3600 KVA UNPLANNED 06-05-2020 22:01:23 06-05-2020 22:26:50 0:25 0.00029861 MUs KATRA NAWAB-CHANDNI CHOWK, BALI MARAN-BARA DARI, FATEHPURI-KUCHA HASIRAM, TOWN HILL-KATRA NEEL, NAYA BAZAR-CHANDNI CHOWK, FATEHPURI-, MAIN 49 BAZAR-KHUSH DIL CCK 2457 2970 KVA UNPLANNED 07-05-2020 02:42:22 07-05-2020 03:34:00 0:51 0.0001275 MUs PETROL PUMP-POCKET C, LIG FLATS-POCKET F & E, BLOCK E- 50 INDUSTRIAL FACTORY-POCKET C DGN 59 990 KVA UNPLANNED 07-05-2020 07:23:58 07-05-2020 07:49:35 0:25 0.00013194 MUs 51 JHILMIL INDUSTRIAL AREA-JHILMIL COLONY DGN 57 990 KVA UNPLANNED 07-05-2020 07:26:53 07-05-2020 08:10:21 0:43 0.000215 MUs BLOCK 20-HIMMATPURI, BLOCK 19-HIMMATPURI, 52 HIMMATPURI-MAYUR VIHAR MVR 366 990 KVA UNPLANNED 07-05-2020 09:44:35 07-05-2020 10:35:33 0:50 0 MUs 53 BLOCK C-KABIR NAGAR, BLOCK B-KABIR NAGAR NNG 1250 630 KVA UNPLANNED 07-05-2020 10:04:45 07-05-2020 10:45:00 0:40 0 MUs 54 PKT 1- DDA FLATS-PHASE I MVR 21 630 KVA UNPLANNED 07-05-2020 12:07:03 07-05-2020 12:30:49 0:23 0.00001917 MUs

BLOCK E-ANARKALI COLONY NORTH, BLOCK B-SOUTH ANARKALI COLONY, BLOCK B-JAGATPURI, BLOCK K-JAGATPURI, 55 EXTENTION-JAGATPURI, BLOCK A-ANARKALI COLONY NORTH KRN 231 990 KVA UNPLANNED 07-05-2020 12:40:38 07-05-2020 13:12:04 0:31 0.00001722 MUs BLOCK H-OLD MUSTAFABAD, BLOCK D-OLD MUSTAFABAD, 56 BLOCK A-MAN SINGH NAGAR KWN 1052 0 KVA UNPLANNED 07-05-2020 12:42:27 07-05-2020 13:16:05 0:33 0.00036667 MUs

OLD DELHI RAILWAY STATION-CHANDNI CHOWK, LIG/MIG RES/NON COMM AREA-VIJAY GHAT, BLOCK J-NABI KARIM, GGS INDRAPRASTHA UNIVERSITY-KASHMERE GATE, ZEENAT BARI- MORI GATE, RED FORT-CHANDNI CHOWK-RED FORT, RED FORT- VIJAY GHAT, TELEGRAPH OFFICE-KASHMERE GATE, RAILWAY 57 COLONY-KASHMERE GATE CCK 3304 3600 KVA UNPLANNED 07-05-2020 17:15:00 07-05-2020 17:35:00 0:20 0.00007222 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unserved (MU) due to Sr. No. Area Affected Division Affected Transformer (in KVA). Unplanned Outage From DateTime To DateTime Duration (Hrs:Mins) Outage

ANAND PARBAT, DARYA GANJ, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY-KASHMERE GATE, PKT R-BLOCK D, PKT C-BLOCK B, JAFFRABAD-MAUJ PUR, BLOCK A-SADATPUR EXT-PUSTA AREA-L BLOCK, BLOCK H-BHAGIRATHI VIHAR, BLOCK F-SHIV VIHAR, BLOCK M-SHIV VIHAR, BLOCK N-SHIV VIHAR, BLOCK E-INDIRA VIHAR, SPORTS COMPLEX- VASUNDHARA ENCLAVE VSE, BHAJANPURA-DAYALPUR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-B-BLOCK SONIA VIHAR, BLOCK 58 F-INDIRA VIHAR PNR 662 2380 KVA UNPLANNED 07-05-2020 18:36:28 07-05-2020 19:27:00 0:50 0.00013889 MUs PKT 4-PHASE I, CL-CHILLA SARDA BANGAR VILLAGE, MAYUR 59 PLACE-MAYUR VIHAR, MAYUR VIHAR EXTN. MVR 1482 3890 KVA UNPLANNED 08-05-2020 10:42:27 08-05-2020 11:40:00 0:57 0.00077583 MUs

60 KASTURBA NAGAR-SHAHDARA, JAWALA NAGAR-SHAHDARA JLM 1039 630 KVA UNPLANNED 08-05-2020 14:00:12 08-05-2020 14:13:31 0:13 0.00001806 MUs

D.S.I.D.C. COMPLEX-DTC DEPOT, BLOCK A4-NAND NAGARI, MCD PRIMARY SCHOOL-BLOCK D1, BLOCK B4-NAND NAGARI, BLOCK B1-NAND NAGARI, BLOCK A-MANDOLI EXTN., KARMACHARI RAJYA BEEMA HOSPITAL-DTC DEPOT, DELHI JAL 61 BOARD MIG FLATS-POCKET A, BLOCK F-BUNKAR VIHAR NNG 173 4400 KVA UNPLANNED 09-05-2020 05:35:29 09-05-2020 06:20:00 0:44 0.00024444 MUs

NAYAGAON-NEW KATWARA, BLOCK B-BRAHM PURI, BLOCK P- BRAHM PURI, BLOCK F-BRAHM PURI, BLOCK L-BRAHM PURI, 62 KACHI COLONY-JAGJEET NAGAR, JAGJEET NAGAR-GHONDA YVR 1291 1980 KVA UNPLANNED 09-05-2020 09:49:00 09-05-2020 10:44:58 0:55 0.00126806 MUs 63 SEWA DHAM-MANDOLI NNG 0 400 KVA UNPLANNED 09-05-2020 10:34:07 09-05-2020 11:15:55 0:41 0 MUs PKT A-BLOCK E, PKT C-BLOCK E, PKT A4-BLOCK E, BLOCK D- 64 WEST KARAWAL NAGAR KWN 181 0 KVA UNPLANNED 09-05-2020 14:26:00 09-05-2020 15:08:09 0:42 0.000245 MUs

ARAM NAGAR-SADAR BAZAR, SADAR BAZAR - RAM NAGAR, BLOCK T-ARAM NAGAR, BLOCK T-SADAR BAZAR - RAM NAGAR, 65 BLOCK B-SADAR BAZAR - RAM NAGAR PHG 2867 7140 KVA UNPLANNED 09-05-2020 15:57:29 09-05-2020 16:45:00 0:47 0 MUs

SANSAR COMPOUND-, DAMODER PARK- 66 DILSHAD GARDEN, JHILMIL INDUSTRIAL AREA-JHILMIL COLONY DGN 767 3610 KVA UNPLANNED 09-05-2020 16:39:30 09-05-2020 17:00:00 0:20 0.00005 MUs BLOCK J-KARTAR NAGAR, SADAR BAZAR - RAM NAGAR, BLOCK C-JAI PRAKASH NAGAR, SADAR BAZAR B G ROAD, SADAR 67 BAZAR - RAM NAGAR PHG 5052 2970 KVA UNPLANNED 09-05-2020 19:49:30 09-05-2020 20:15:00 0:25 0.00038889 MUs BABARPUR WEST-BABAR PUR NNG, BABARPUR EXTN.-BABAR 68 PUR NNG 3671 4240 KVA UNPLANNED 09-05-2020 19:51:30 09-05-2020 20:26:40 0:35 0.00041806 MUs 69 JHILMIL INDUSTRIAL AREA-JHILMIL COLONY DGN 6 990 KVA UNPLANNED 10-05-2020 07:42:00 10-05-2020 08:20:00 0:38 0.00003167 MUs 70 DAMODER PARK-DILSHAD GARDEN DGN 26 990 KVA UNPLANNED 10-05-2020 07:45:00 10-05-2020 08:20:00 0:35 0.00002917 MUs 71 BLOCK D-TUKMIRPUR, BLOCK B-TUKMIRPUR KWN 188 630 KVA UNPLANNED 10-05-2020 09:45:42 10-05-2020 10:05:00 0:19 0 MUs

BLOCK A-SILAMPUR COLONY, BLOCK G-SILAMPUR COLONY, BLOCK E-NEW SILAMPURI PHASE II, BLOCK F- LIG/MIG RES/NON COMM AREA-NEW SILAMPURI PHASE II, NEW 72 SILAMPURI PHASE III, JAFFRABAD-MAUJ PUR YVR 1892 2610 KVA UNPLANNED 10-05-2020 10:22:31 10-05-2020 11:16:05 0:53 0.00080972 MUs

LIG/MIG RES/NON COMM AREA-MILAN GARDEN, LIG/MIG RES/NON COMM AREA-BALAJI MANDIR COLONY, LIG/MIG RES/NON COMM AREA-C-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-SONIA VIHAR, LIG/MIG RES/NON COMM AREA-G- BLOCK SONIA VIHAR EXTENSION, LIG/MIG RES/NON COMM AREA-G- BLOCK SONIA VIHAR EXTENSION, LIG/MIG RES/NON COMM AREA-D-BLOCK-SONIA VIHAR, LIG/MIG RES/NON COMM AREA-E-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-SONIA VIHAR, LIG/MIG RES/NON COMM AREA-G- BLOCK SONIA VIHAR EXTENSION, 73 LIG/MIG RES/NON COMM AREA-G-BLOCK SONIA VIHAR KWN 1096 400 KVA UNPLANNED 10-05-2020 11:31:31 10-05-2020 12:25:46 0:54 0.001905 MUs

BLOCK E-JHILMIL-TAHIRPUR, M.C.P. SCHOOL-POCKET O, BLOCK J & K-POCKET J&K, HANSRAJ SCHOOL-POCKET H, MUKHRJI SCHOOL-POCKET L, DDA FLATS-POCKET SG, POCKET M- DILSHAD GARDEN, POCKET N-DILSHAD GARDEN, BLOCK P- POCKET P, DDA QUARTERS-POCKET Q, GTB MIG FLATS-POCKET D, FLORA DALE SECONDARY SCHOOL-POCKET R, SHAHNI DEV MANDIR-POCKET SG, BLOCK D-POCKET N, SUNDAY TENT- JHILMIL-TAHIRPUR, BLOCK C- MOD PRIMARY SCHOOL-JHILMIL- 74 TAHIRPUR, BLOCK P-JHILMIL-TAHIRPUR DGN 4929 5930 KVA UNPLANNED 10-05-2020 11:41:31 10-05-2020 12:35:00 0:53 0.00001472 MUs 75 PKT A-BLOCK E, PKT C-BLOCK E, PKT A4-BLOCK E KWN 181 0 KVA UNPLANNED 10-05-2020 11:30:00 10-05-2020 12:19:04 0:49 0.00028583 MUs SARASWATI KUNJ- EAST END APPARTMENT-NEW ASHOK 76 NAGAR VSE 714 3150 KVA UNPLANNED 10-05-2020 11:45:31 10-05-2020 12:10:00 0:24 0.0002 MUs BLOCK A8-SADAT PUR, BLOCK C1-SADAT PUR, BLOCK F-SADAT 77 PUR KWN 207 0 KVA UNPLANNED 10-05-2020 12:05:00 10-05-2020 12:47:58 0:42 0.00028 MUs INSTITUTIONAL AREA BLOCK B-ALL INDIA DEAF & DUMB 78 SOCIETY, HOSPITAL AREA-INSTITUTIONAL AREA JLM 0 0 KVA UNPLANNED 10-05-2020 13:41:31 10-05-2020 14:37:00 0:55 0 MUs

SHAKARPUR EXTN.-SHAKARPUR KHAS, BLOCK N- VISHWAKARMA PARK, BLOCK J-VISHWAKARMA PARK, BLOCK M-JAGAT RAM PARK, BLOCK J & K-NARAYAN NAGAR, LAKSHMI NAGAR BLOCK J&K, LAKSHMI NAGAR BLOCK L, RAMESH PARK- LAKSHMI NAGAR, VISHWAKARMA PARK-LAKSHMI NAGAR, BLOCK K-JAGAT RAM PARK, GURU RAMDAS NAGAR-LAKSHMI NAGAR, RAMESH PARK-NARAYAN NAGAR, BLOCK F-LALITA 79 PARK, BLOCK J-LALITA PARK, BLOCK R-LALITA PARK LNR 4140 990 KVA UNPLANNED 10-05-2020 15:35:31 10-05-2020 16:10:00 0:34 0.00015111 MUs

BLOCK WA&O-SHAKARPUR KHAS, BLOCK H-SHAKARPUR KHAS, BLOCK A-SHAKARPUR KHAS, BLOCK G-SHAKARPUR KHAS, BLOCK U-SHAKARPUR KHAS, BLOCK A-SHAKARPUR KHAS, BLOCK R&A-SHAKARPUR KHAS, SHAKARPUR EXTN.- 80 SHAKARPUR KHAS, GURU RAMDAS NAGAR-LAKSHMI NAGAR LNR 4814 3960 KVA UNPLANNED 10-05-2020 15:35:32 10-05-2020 16:21:00 0:45 0.0006 MUs

BLOCK G-SILAMPUR COLONY, BLOCK F- LIG/MIG RES/NON COMM AREA-NEW SILAMPURI PHASE II, LALKUAN BAZAR- FRASH KHANA, CHAWRI BAZAR-KHUSH DIL, NAYA BAZAR- CHANDNI CHOWK, FATEHPURI-KHARI BAOLI, LALKUAN BAZAR- 81 SIKRIWALAN- NEW HAUZ QAZI, BLOCK T-NAYA BAZAR CCK 1014 0 KVA UNPLANNED 11-05-2020 09:51:20 11-05-2020 10:32:00 0:40 0.00034444 MUs

BLOCK J-VISHWAKARMA PARK, BLOCK M-JAGAT RAM PARK, BLOCK F-GURU ANGAD NAGAR WEST, BLOCK G-LAKSHMI NAGAR, LAKSHMI NAGAR BLOCK L, VISHWAKARMA PARK- LAKSHMI NAGAR, BLOCK K-JAGAT RAM PARK, GURU RAMDAS NAGAR-LAKSHMI NAGAR, BLOCK F-LALITA PARK, BLOCK J- LALITA PARK, BLOCK B-LAKSHMI NAGAR, YAMUNA FLOOD 82 PLAINS- YAMUNA FLOOD PLAINS LNR 5746 2610 KVA UNPLANNED 11-05-2020 11:00:20 11-05-2020 11:45:00 0:44 0.00128333 MUs RAILWAY WORKSHOP-SANJAY AMAR COLONY, IP STATE- 83 PRAGATI MAIDAN DRG 61 0 KVA UNPLANNED 11-05-2020 23:25:21 12-05-2020 00:06:00 0:40 0.00007778 MUs 84 BLOCK A-GANESH NAGAR LNR 13 990 KVA UNPLANNED 12-05-2020 10:26:00 12-05-2020 10:46:53 0:20 0.00005556 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unserved (MU) due to Sr. No. Area Affected Division Affected Transformer (in KVA). Unplanned Outage From DateTime To DateTime Duration (Hrs:Mins) Outage 85 OLD SEELAMPUR KRN 89 630 KVA UNPLANNED 12-05-2020 10:45:38 12-05-2020 11:26:10 0:40 0.00001111 MUs 86 BLOCK D-PANDAV NAGAR LNR 537 990 KVA UNPLANNED 12-05-2020 16:26:00 12-05-2020 16:47:00 0:20 0.00005556 MUs SHANKAR NAGAR EXTN-AZAD NAGAR, OLD SEELAMPUR, BLOCK X-RAJGARH COLONY, RAGHUBARPURA NO 2- SEELAMPUR, OLD SEELAMPUR DHRAM PURA, CHAND 87 MOHALLA-RAJGARH COLONY KRN 4848 3600 KVA UNPLANNED 13-05-2020 10:00:12 13-05-2020 10:48:00 0:47 0.00049611 MUs

ZEENAT BARI-MORI GATE, RAILWAY COLONY-KASHMERE GATE, GGS INDRAPRASTHA UNIVERSITY-KASHMERE GATE, BLOCK J-NABI KARIM, RED FORT-VIJAY GHAT, RED FORT- CHANDNI CHOWK-RED FORT, RAILWAY STATION- CHANDNI CHOWK, TELEGRAPH OFFICE-KASHMERE GATE, 88 LIG/MIG RES/NON COMM AREA-VIJAY GHAT CCK 3304 3600 KVA UNPLANNED 13-05-2020 09:58:00 13-05-2020 10:31:00 0:33 0.00033 MUs

BLOCK J-SHIV VIHAR, BLOCK A-PREM VIHAR, BLOCK C- KARAWAL NAGAR, BLOCK Q-SHIV VIHAR, BLOCK H-SHIV VIHAR, BLOCK D-SHIV VIHAR, BLOCK T-SHIV VIHAR, BLOCK F-SHIV VIHAR, BLOCK S-SHIV VIHAR, BLOCK B-SHIV VIHAR, PKT R- BLOCK A, BLOCK A-KARAWAL NAGAR (DEHROTI), BLOCK A- 89 SHIV VIHAR, BLOCK Q-SHIV VIHAR KWN 561 0 KVA UNPLANNED 13-05-2020 12:24:24 13-05-2020 13:12:53 0:48 0.00086667 MUs 90 PKT A-MAYUR VIHAR PHASE II MVR 117 630 KVA UNPLANNED 13-05-2020 13:23:29 13-05-2020 14:10:39 0:47 0.00002611 MUs BLOCK J-SHIV VIHAR, BLOCK A-PREM VIHAR, BLOCK C- KARAWAL NAGAR, BLOCK Q-SHIV VIHAR, BLOCK H-SHIV VIHAR, BLOCK D-SHIV VIHAR, BLOCK T-SHIV VIHAR, BLOCK F-SHIV VIHAR, BLOCK P-SHIV VIHAR, BLOCK B-SHIV VIHAR, PKT R- BLOCK A, BLOCK D-PREM VIHAR, BLOCK A-SHIV VIHAR, BLOCK 91 Q-SHIV VIHAR KWN 734 0 KVA UNPLANNED 13-05-2020 14:02:26 13-05-2020 14:47:41 0:45 0.0010625 MUs

BLOCK U-SHAKARPUR KHAS, BLOCK A-SHAKARPUR KHAS, BLOCK S-SCHOOL BLOCK, BLOCK S1-SCHOOL BLOCK, YAMUNA FLOOD PLAINS-LAXMI NAGAR YAMUNA FLOOD PLAINS, NEHRU ENCLAVE-SCHOOL BLOCK, DELHI DEVELOPMENT AUTHORITY- 92 SCHOOL BLOCK LNR 1299 990 KVA UNPLANNED 14-05-2020 09:14:25 14-05-2020 10:00:00 0:45 0.0002875 MUs

BLOCK 10-TRILOKPURI PHASE I, BLOCK 21-HIMMATPURI, BLOCK 22-HIMMATPURI, BLOCK 25-TRILOKPURI PHASE II, BLOCK 14-TRILOKPURI PHASE II, BLOCK 15-TRILOKPURI PHASE II, BLOCK 24-TRILOKPURI PHASE II, BLOCK 23-TRILOKPURI PHASE II, BLOCK 13-TRILOKPURI PHASE II, TRILOKPURI PHASE I- MAYUR VIHAR, HIMMATPURI-MAYUR VIHAR, TRILOKPURI PHASE II-MAYUR VIHAR, KHICHRI PUR-PHASE II, KOTLA EXCT- 93 PHASE II MVR 5092 3240 KVA UNPLANNED 14-05-2020 13:20:25 14-05-2020 13:59:20 0:38 0.000855 MUs 94 GHAROLI KONDLI VSE 3 400 KVA UNPLANNED 14-05-2020 13:19:55 14-05-2020 13:40:14 0:20 0 MUs

BLOCK R- AADINATH BHAWAN-POCKET R, MIG FLATS-POCKET F & E, HANSRAJ SCHOOL-POCKET H, GTB MIG FLATS-POCKET D, FLORA DALE SECONDARY SCHOOL-POCKET R, LIG FLATS- POCKET F & E, MCD OFFICE-POCKET F & E, HANSRAJ PUBLIC SCHOOL-POCKET F & E, DDA MARKET PKT B & E-POCKET F & E, DELHI JAL BOARD MIG FLATS-POCKET A, GOVT.BOYS 95 SEC.SCHOOL-POCKET A DGN 4811 7240 KVA UNPLANNED 14-05-2020 13:44:26 14-05-2020 14:25:00 0:40 0.00028889 MUs 96 GHAROLI KONDLI VSE 7 400 KVA UNPLANNED 14-05-2020 13:43:36 14-05-2020 14:03:13 0:19 0 MUs KATRA NAWAB-CHANDNI CHOWK, BALI MARAN-BARA DARI, FATEHPURI-KUCHA HASIRAM, TOWN HILL-KATRA NEEL, FATEHPURI-KHARI BAOLI, MAIN BAZAR-KHUSH DIL, KATRA 97 BARYAN-BARA DARI CCK 2200 2970 KVA UNPLANNED 14-05-2020 14:43:26 14-05-2020 15:22:00 0:38 0.000095 MUs

GURU TEG BAHADUR COMMUNITY CENTRE-PKT E, L.I.G HOUSING NAND NAGARI-PKT E, D.S.I.D.C. COMPLEX-DTC DEPOT, KACHI MANDIR-BLOCK E4, BLOCK E3-NAND NAGARI, BLOCK E1-NAND NAGARI, BHARAT MATA MANDIR-JJ COLONY, BLOCK E3-KANSHIPUR, BLOCK A2-NAND NAGARI, BLOCK A1- NAND NAGARI, BLOCK A3-NAND NAGARI, HARSH VIHAR SUB STATION-POLICE FARM, BLOCK F1-BUNKAR VIHAR, POCKET A- JJ COLONY, DELHI JAL BOARD MIG FLATS-POCKET A, AMIG FLATS-POCKET A, GOVT.BOYS SEC.SCHOOL-POCKET A, BLOCK E2-NAND NAGARI, BLOCK E5-NAND NAGARI, GOVT.SARVODAY VIDHYALAYA-BLOCK E5, BLOCK E1-BUNKAR VIHAR, BLOCK G3- BUNKAR VIHAR, BLOCK G4-BUNKAR VIHAR, BLOCK H-JJ 98 COLONY NNG 7380 5130 KVA UNPLANNED 14-05-2020 15:32:00 14-05-2020 16:03:44 0:31 0.00060278 MUs LIG/MIG RES/NON COMM AREA-CHAWLA FARM, LIG/MIG RES/NON COMM AREA-SABHEPUR, LIG/MIG RES/NON COMM AREA-MILAN GARDEN, LIG/MIG RES/NON COMM AREA-BALAJI MANDIR COLONY, CHAUHAN PATTI-VIJAY VIHAR, BADARPUR 99 KHADAR KWN 4107 5235 KVA UNPLANNED 14-05-2020 16:54:26 14-05-2020 17:48:42 0:54 0.001215 MUs

BLOCK T-BALJIT NAGAR, DARYA GANJ, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY-KASHMERE GATE, PKT R-BLOCK D, PKT C-BLOCK B, JAFFRABAD-MAUJ PUR, BLOCK A-SADATPUR EXT-PUSTA AREA-L BLOCK, BLOCK H-BHAGIRATHI VIHAR, BLOCK F-SHIV VIHAR, BLOCK M-SHIV VIHAR, BLOCK N-SHIV VIHAR, BLOCK E-INDIRA VIHAR, SHADIPUR DEPOT-BALJIT NAGAR, DTC FLATS-SHADIPUR DEPOT, KARAMPURA INDUSTRIES-BALJIT NAGAR, DELHI MILK SCHEM DMS-PREM NAGAR, SPORTS COMPLEX-VASUNDHARA ENCLAVE VSE, BHAJANPURA-DAYALPUR, LIG/MIG RES/NON COMM AREA-A- BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-B-BLOCK SONIA 100 VIHAR, BLOCK F-INDIRA VIHAR PNR 5033 3370 KVA UNPLANNED 14-05-2020 17:39:26 14-05-2020 18:22:00 0:42 0.000735 MUs

BLOCK F-NEHRU VIHAR, BLOCK G-NEHRU VIHAR, BLOCK A- BABU NAGAR, BLOCK H-OLD MUSTAFABAD, PKT R-BLOCK D, BLOCK A-RAMA GARDEN, BLOCK A-HARIJAN BASTI, BLOCK C- GOVIND VIHAR, BLOCK T-OLD MUSTAFABAD, BLOCK D-OLD MUSTAFABAD, BLOCK B-OLD MUSTAFABAD, BLOCK M-OLD MUSTAFABAD, BLOCK M-NEHRU VIHAR, BLOCK A-NEHRU VIHAR, BLOCK T-NEHRU VIHAR, BLOCK Z-NEHRU VIHAR, BLOCK B-KARAWAL NAGAR (DEHROTI), FACTORY (KHASRA)-HARIJAN BASTI, BLOCK C-HARIJAN BASTI, BLOCK B-HARIJAN BASTI, PKT M-BLOCK D, DEEKSHA MAHILA COLLAGE-DAYALPUR EXTN., BLOCK A-NEW CHAUHAN PUR, BLOCK E-DAYALPUR, BLOCK A- NEHRU VIHAR, BLOCK B-NEHRU VIHAR, BLOCK T-NEHRU VIHAR, OLD MUSTAFABAD- BLOCK C-DAYALPUR, BHAJANPURA- 101 DAYALPUR, BLOCK B-NEW CHAUHAN PUR KWN 12165 1500 KVA UNPLANNED 14-05-2020 17:43:26 14-05-2020 18:25:00 0:41 0.00074028 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unserved (MU) due to Sr. No. Area Affected Division Affected Transformer (in KVA). Unplanned Outage From DateTime To DateTime Duration (Hrs:Mins) Outage

BLOCK CN-AMBIKA VIHAR BLOCK - B&C, BLOCK C-PATEL VIHAR, BLOCK CN-MANGALAM VIHAR, PHASE I-SHIV VIHAR, VILLAGE- KAMAL VIHAR, BLOCK C-KARAWAL NAGAR, SHIV VIHAR, SHIV VIHAR, PKT Y-SHIV VIHAR, BLOCK B-PATEL VIHAR, BLOCK A- MANGALAM VIHAR, BLOCK CN-AMBIKA VIHAR BLOCK - B&C, 102 BLOCK C-PATEL VIHAR, BLOCK CN-AMBIKA VIHAR BLOCK - B&C KWN 4202 0 KVA UNPLANNED 14-05-2020 17:43:27 14-05-2020 18:40:02 0:56 0.00048222 MUs

BLOCK B4-OLD RAJENDRA NAGAR, NORTH EXTENSION AREA- BLOCK B-OLD RAJENDRA NAGAR, BLOCK B3-OLD RAJENDRA NAGAR, BLOCK 51-OLD RAJENDRA NAGAR, BLOCK B-OLD RAJENDRA NAGAR, DARYA GANJ, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY-KASHMERE GATE, PKT R-BLOCK D, PKT C-BLOCK B, JAFFRABAD-MAUJ PUR, BLOCK A-SADATPUR EXT-PUSTA AREA-L BLOCK, BLOCK H-BHAGIRATHI VIHAR, BLOCK F-SHIV VIHAR, BLOCK M-SHIV VIHAR, BLOCK N-SHIV VIHAR, BLOCK E-INDIRA VIHAR, SIR GANGA RAM HOSPITAL- CENTRAL RIDGE RESERVED FOREST, JANKI DEVI COLLEGE- CENTRAL RIDGE RESERVED FOREST, ASHRAM SANTSHRI ASSRAM-CENTRAL RIDGE RESERVED FOREST, WEST KAROL BAGH-CENTRAL RIDGE RESERVED FOREST, SPORTS COMPLEX- VASUNDHARA ENCLAVE VSE, CENTRAL RIDGE RESERVED FOREST, BHAJANPURA-DAYALPUR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA- A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-B- 103 BLOCK SONIA VIHAR, BLOCK F-INDIRA VIHAR SRD 899 730 KVA UNPLANNED 14-05-2020 17:44:26 14-05-2020 18:18:33 0:34 0 MUs

BLOCK F-NEHRU VIHAR, BLOCK C-TUKMIRPUR, DARYA GANJ, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY-KASHMERE GATE, PKT R-BLOCK D, BLOCK B-MUSTAFABAD (DAYALPUR), PKT C-BLOCK B, JAFFRABAD-MAUJ PUR, BLOCK A-SADATPUR EXT-PUSTA AREA-L BLOCK, BLOCK H-BHAGIRATHI VIHAR, BLOCK F-SHIV VIHAR, BLOCK M-SHIV VIHAR, BLOCK N-SHIV VIHAR, BLOCK A-NEHRU VIHAR, BLOCK Z-NEHRU VIHAR, BLOCK D-NEHRU VIHAR, BLOCK C-MUSTAFABAD (DAYALPUR), BLOCK A-MUSTAFABAD (DAYALPUR), BLOCK D-TUKMIRPUR, BLOCK B- TUKMIRPUR, BLOCK E-INDIRA VIHAR, SPORTS COMPLEX- VASUNDHARA ENCLAVE VSE, BLOCK B-NEHRU VIHAR, BLOCK T- NEHRU VIHAR, BHAJANPURA-DAYALPUR, BLOCK A- MUSTAFABAD (DAYALPUR), LIG/MIG RES/NON COMM AREA-A- BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-B-BLOCK SONIA 104 VIHAR, BLOCK F-INDIRA VIHAR KWN 3676 2880 KVA UNPLANNED 14-05-2020 17:45:26 14-05-2020 18:00:00 0:14 0.00024889 MUs

BLOCK T-AHATA KEDARA, CHOWK NAI BASTI-SADAR BAZAR, SADAR BAZAR - RAM NAGAR, MODEL BASTI-SADAR BAZAR B G ROAD, SCHOOL-AHATA KEDARA, BLOCK J-AHATA KEDARA, DDA 105 POLICE QTRS.-AHATA KEDARA PHG 3399 6340 KVA UNPLANNED 14-05-2020 17:52:27 14-05-2020 18:35:00 0:42 0.00151667 MUs

BLOCK A-SILAMPUR COLONY, BLOCK F- LIG/MIG RES/NON COMM AREA-NEW SILAMPURI PHASE II, BLOCK G-SILAMPUR COLONY, BLOCK E-NEW SILAMPURI PHASE II, JAFFRABAD- 106 MAUJ PUR, NEW SILAMPURI PHASE III YVR 1892 2610 KVA UNPLANNED 14-05-2020 17:58:26 14-05-2020 18:50:00 0:51 0.00022667 MUs

BLOCK A-VIVEK VIHAR PHASE II, PRATAP KHAND-JHILMIL COLONY, LABOUR COURT-SHIVA KHAND, GOVIND KHAND- JHILMIL COLONY, JHILMIL COLONY BLOCK A, BLOCK E-JHILMIL 107 COLONY BLOCK E, DDA MIG FLATS-VIVEK VIHAR PHASE II JLM 1071 630 KVA UNPLANNED 14-05-2020 17:55:00 14-05-2020 18:43:03 0:48 0.00106667 MUs 108 SEWA DHAM-MANDOLI NNG 138 400 KVA UNPLANNED 14-05-2020 17:50:00 14-05-2020 18:42:11 0:52 0.00023111 MUs

BLOCK J-SUNDER NAGRI, BLOCK L-SUNDER NAGRI, BLOCK KK- SUNDER NAGRI, BLOCK M-SUNDER NAGRI, BLOCK N-SUNDER NAGRI, BLOCK O-SUNDER NAGRI, BLOCK B-SUNDER NAGRI NNG, BLOCK F1-BUNKAR VIHAR, POCKET A-JJ COLONY, BLOCK C-SUNDER NAGRI NNG, BLOCK A-RAJIV NAGAR NNG, BLOCK J- SUNDER NAGRI NNG, BLOCK L-SUNDER NAGRI NNG, BLOCK K- SUNDER NAGRI NNG, BLOCK H-PREM NAGAR NNG, BLOCK E1- BUNKAR VIHAR, BLOCK G3-BUNKAR VIHAR, BLOCK F-BUNKAR 109 VIHAR, BLOCK G4-BUNKAR VIHAR, BLOCK H-JJ COLONY NNG 7722 5030 KVA UNPLANNED 14-05-2020 17:53:00 14-05-2020 18:43:08 0:50 0.00123611 MUs HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK D-HARIJAN BASTI EAST EXTN., BLOCK D-HARSH 110 VIHAR NNG 1903 0 KVA UNPLANNED 14-05-2020 17:56:00 14-05-2020 18:45:15 0:49 0.00032667 MUs BHARTI COLONY-NIRMAN VIHAR, BLOCK F-PREET VIHAR, 111 BLOCK E-PREET VIHAR, BLOCK C-PREET VIHAR LNR 254 0 KVA UNPLANNED 14-05-2020 18:34:00 14-05-2020 19:23:18 0:49 0.00055806 MUs 112 SHAHI IDGAH-SADAR BAZAR - P.P QUARTERS PHG 776 0 KVA UNPLANNED 14-05-2020 18:32:00 14-05-2020 19:30:00 0:58 0.00096667 MUs

LIG/MIG RES/NON COMM AREA-CRPF CAMP SONIA VIHAR, YAMUNA FLOOD PLAINS-ANNPURNA MANDIR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG 113 RES/NON COMM AREA-C-BLOCK SONIA VIHAR KWN 1770 0 KVA UNPLANNED 14-05-2020 19:05:30 14-05-2020 19:50:00 0:44 0.00250556 MUs YAMUNA FLOOD PLAINS-LAXMI NAGAR YAMUNA FLOOD 114 PLAINS LNR 0 400 KVA UNPLANNED 14-05-2020 22:29:22 14-05-2020 22:49:13 0:19 0 MUs 115 BLOCK B-MOTHER DAIRY LNR 6 400 KVA UNPLANNED 14-05-2020 23:00:42 14-05-2020 23:26:45 0:26 0 MUs SABOLI EXTN.-MANDOLI, BLOCK A-MEET NAGAR, BLOCK A- MANDOLI EXTN., SABOLI VILLAGE-MANDOLI, BLOCK K-ANUP VIHAR, KABRISTAN-SABOLI COLONY, BANK OF BARODA-SABOLI COLONY, MCD SCHOOL-SABOLI COLONY, SEWA DHAM- MANDOLI, VILLAGE SABOLI-SABOLI COLONY, SABOLI EXTN.- 116 MANDOLI NNG 3928 630 KVA UNPLANNED 15-05-2020 05:34:29 15-05-2020 06:20:00 0:45 0.000825 MUs

CHAUHAN BANGAR-JAFFRABAD, BLOCK E-NEW SILAMPURI PHASE II, BLOCK F- LIG/MIG RES/NON COMM AREA-NEW SILAMPURI PHASE II, BLOCK D- LIG/MIG RES/NON COMM AREA- 117 NEW SILAMPURI PHASE II YVR 199 0 KVA UNPLANNED 15-05-2020 06:34:00 15-05-2020 07:32:00 0:58 0.00037056 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unserved (MU) due to Sr. No. Area Affected Division Affected Transformer (in KVA). Unplanned Outage From DateTime To DateTime Duration (Hrs:Mins) Outage

BLOCK C-TUKMIRPUR, LIG/MIG RES/NON COMM AREA-CRPF CAMP SONIA VIHAR, YAMUNA FLOOD PLAINS-ANNPURNA MANDIR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-B-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-C-BLOCK SONIA 118 VIHAR, LIG/MIG RES/NON COMM AREA-C-BLOCK SONIA VIHAR KWN 345 0 KVA UNPLANNED 15-05-2020 08:35:29 15-05-2020 09:30:00 0:54 0.0006 MUs

GOVT GIRLS SECONDARY SCHOOL-DDA FLATS, BLOCK E-JHILMIL 119 COLONY BLOCK E, BLOCK D-JHILMIL COLONY BLOCK D JLM 413 990 KVA UNPLANNED 15-05-2020 08:47:32 15-05-2020 09:11:31 0:23 0 MUs

IP STATE-PRAGATI MAIDAN, MANEK BHAVAN- THE INDIAN INSTITUTE OF PUBLIC ADMINISTRATION-FEROJ SHAH KOTLA STADIUM, MANEK BHAVAN- HUMAN RESOURCE 120 DEVELOPMENT-FEROJ SHAH KOTLA STADIUM DRG 220 0 KVA UNPLANNED 15-05-2020 09:13:00 15-05-2020 10:04:33 0:51 0.00024083 MUs

BLOCK C-TUKMIRPUR, LIG/MIG RES/NON COMM AREA-CRPF CAMP SONIA VIHAR, YAMUNA FLOOD PLAINS-ANNPURNA MANDIR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-B-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-C-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-C-BLOCK SONIA 121 VIHAR, LIG/MIG RES/NON COMM AREA-C-BLOCK SONIA VIHAR KWN 0 0 KVA UNPLANNED 15-05-2020 11:56:31 15-05-2020 12:49:37 0:53 0 MUs 122 ROHITASH NAGAR EAST-SILAMPUR DGN 243 630 KVA UNPLANNED 15-05-2020 11:40:00 15-05-2020 12:10:00 0:29 0.00002417 MUs

BLOCK A-B&C-JAGAT PURI, HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK E-RAJIV NAGAR, BLOCK A-BANK COLONY, BLOCK D-HARIJAN BASTI EAST EXTN., POCKET A-JJ COLONY, BLOCK C-SEWA DHAM, BLOCK A-SEWA 123 DHAM, BLOCK D-HARSH VIHAR NNG 1903 0 KVA UNPLANNED 15-05-2020 12:39:00 15-05-2020 13:15:00 0:36 0.00101 MUs

SABOLI EXTN.-MANDOLI, BLOCK C-HARSH VIHAR, BLOCK E- RAJIV NAGAR, BLOCK A-MANDOLI EXTN., BLOCK A-MANDOLI VILLAGE, BLOCK A-BANK COLONY, SABOLI COLONY-MANDOLI, SABOLI VILLAGE-MANDOLI, BLOCK C-SEWA DHAM, BLOCK A- SEWA DHAM, BLOCK K-ANUP VIHAR, KABRISTAN-SABOLI COLONY, BANK OF BARODA-SABOLI COLONY, MCD SCHOOL- SABOLI COLONY, BLOCK D-HARSH VIHAR, SEWA DHAM- MANDOLI, SABOLI COLONY-MANDOLI, RAJEEV NAGAR-SEWA DHAM, VILLAGE SABOLI-SABOLI COLONY, SABOLI EXTN.- 124 MANDOLI NNG 3928 630 KVA UNPLANNED 15-05-2020 13:06:31 15-05-2020 13:30:00 0:23 0.00064528 MUs

BLOCK A-JHANDEWALAN, DARYA GANJ, LIG/MIG RES/NON COMM AREA-SHRIRAM COLONY D BOLCK, JHANDEWALAN FATTED FACTORY COMPLEX, DR. AMBEDKAR STADIUM-FEROJ SHAH KOTLA STADIUM, BLOCK A-AMAR NAGAR, BLOCK J-NABI KARIM, BAGICHI ALLUDDIN-SADAR BAZAR, ARAM NAGAR- SADAR BAZAR, JAFFRABAD-MAUJ PUR, MAUJ PUR COMPLEX 1, RED FORT-CHANDNI CHOWK-RED FORT, LIG/MIG RES/NON COMM AREA-SHRI RAM COLONY, LIG/MIG RES/NON COMM AREA-BLOCK B, BLOCK L-AMAR NAGAR, DDA POLICE QTRS.- AHATA KEDARA, BLOCK B-SADAR BAZAR - RAM NAGAR, MSC- ARAM NAGAR, BLOCK K-ARAM NAGAR, TELEGRAPH OFFICE- KASHMERE GATE, NIGAM BODH GHAT CEMETRY-KASHMERE GATE, PART II-BLOCK E-BLDGNAMERASTRIYA VIRJANAND 125 ANDH KANYA MAHAVIDYALAYA PHG 2940 3240 KVA UNPLANNED 15-05-2020 16:07:32 15-05-2020 16:55:44 0:48 0.00070667 MUs

BLOCK F-WEST KARAWAL NAGAR, BLOCK H-WEST KARAWAL NAGAR, PKT B-BLOCK B, PKT A-BLOCK E, BLOCK F & G-BHAGAT SINGH COLONY, BLOCK B-SADATPUR EXT-PUSTA AREA-M BLOCK, WEST KARAWAL NAGAR, BLOCK F-BHAGAT SINGH COLONY, BLOCK E-SADAT PUR, BLOCK B-SADAT PUR, BLOCK C- SADAT PUR, PKT C-BLOCK E, PKT A1-BLOCK E, PKT A3-BLOCK E, PKT A2-BLOCK E, PKT A4-BLOCK E, PKT E-SADATPUR EXT- PUSTA AREA-K BLOCK, BLOCK A-KARAWAL NAGAR (DEHROTI), PKT D-BLOCK A, BLOCK D-WEST KARAWAL NAGAR, BLOCK D- 126 WEST KARAWAL NAGAR KWN 4011 0 KVA UNPLANNED 15-05-2020 19:21:33 15-05-2020 20:10:00 0:48 0.00084 MUs

BLOCK F-WEST KARAWAL NAGAR, BLOCK H-WEST KARAWAL NAGAR, PKT B-BLOCK B, PKT A-BLOCK E, BLOCK F & G-BHAGAT SINGH COLONY, BLOCK B-SADATPUR EXT-PUSTA AREA-M BLOCK, WEST KARAWAL NAGAR, BLOCK F-BHAGAT SINGH COLONY, BLOCK E-SADAT PUR, BLOCK B-SADAT PUR, BLOCK C- SADAT PUR, PKT A1-BLOCK E, PKT A3-BLOCK E, PKT A2-BLOCK E, PKT A4-BLOCK E, PKT E-SADATPUR EXT-PUSTA AREA-K BLOCK, BLOCK A-KARAWAL NAGAR (DEHROTI), PKT D-BLOCK A, BLOCK D-WEST KARAWAL NAGAR, BLOCK D-WEST KARAWAL 127 NAGAR KWN 4011 0 KVA UNPLANNED 16-05-2020 04:38:35 16-05-2020 05:12:12 0:33 0.000605 MUs DARYA GANJ, HAPPY PUBLIC SCHOOL-PARDA BAGH, MOTHER 128 DAIRY-NETAJI SUBHASH MARG DRG 57 0 KVA UNPLANNED 16-05-2020 08:52:36 16-05-2020 09:28:47 0:36 0.00015 MUs

HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, SABOLI VILLAGE-MANDOLI, BLOCK D-HARIJAN BASTI EAST EXTN., BLOCK C-SEWA DHAM, BLOCK C-SEWA DHAM, 129 BLOCK D-HARSH VIHAR, SABOLI EXTN.-MANDOLI NNG 1903 0 KVA UNPLANNED 16-05-2020 09:59:00 16-05-2020 10:41:32 0:42 0.00093333 MUs

SABOLI EXTN.-MANDOLI, HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK D-HARIJAN BASTI EAST EXTN., BLOCK C-SEWA DHAM, BLOCK A-SEWA DHAM, BLOCK D- 130 HARSH VIHAR, SABOLI EXTN.-MANDOLI NNG 1903 0 KVA UNPLANNED 16-05-2020 19:02:00 16-05-2020 19:38:41 0:36 0.00074 MUs VILL KARKARDOOMA-KARKAR DUMA, INSTITUTIONAL AREA BLOCK B-ALL INDIA DEAF & DUMB SOCIETY, SHANTI VIHAR- KARKAR DUMA, KARKARDOOMA COMPLAX-KARKAR DUMA, HOSPITAL AREA-INSTITUTIONAL AREA, S BLOCK- 131 INSTITUTIONAL AREA JLM 636 990 KVA UNPLANNED 16-05-2020 19:55:36 16-05-2020 20:41:21 0:45 0.0004625 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unserved (MU) due to Sr. No. Area Affected Division Affected Transformer (in KVA). Unplanned Outage From DateTime To DateTime Duration (Hrs:Mins) Outage

BLOCK 10-KHICHRIPUR RESETTLEMENT COLONY BLOCK 5, BLOCK 4-KHICHRIPUR RESETTLEMENT COLONY, BLOCK 6- KHICHRIPUR RESETTLEMENT COLONY, BLOCK 5-KHICHRIPUR RESETTLEMENT COLONY, BLOCK 8-KHICHRIPUR RESETTLEMENT COLONY BLOCK 8, BLOCK 7-KHICHRIPUR RESETTLEMENT COLONY BLOCK 7, BLOCK 1-KHICHRIPUR RESETTLEMENT COLONY, BLOCK 3-KHICHARIPUR BLOCK 1, BLOCK 9-KHICHRIPUR RESETTLEMENT COLONY BLOCK 9, BLOCK 21-HIMMATPURI, BLOCK E-VINOD NAGAR EAST, SHASHI GARDEN-MAYUR VIHAR, PATPAR GANJ-SHASHI GARDEN, BLOCK F-PANDAV NAGAR, BLOCK F-VINOD NAGAR EAST, LAXMI NAGAR COMMERCIAL COPLEX-SWASTHYA VIHAR, BLOCK D-VINOD NAGAR EAST, BLOCK 15-KALYAN PURI, BLOCK A-VINOD NAGAR EAST, BLOCK B-VINOD NAGAR EAST, KHICHRIPUR RESETTLEMENT COLONY-KHICHARIPUR, PHASE I- MAYUR VIHAR, MAYUR VIHAR PHASE II, BLOCK 18-KALYAN PURI, PANDAV NAGAR MVR-SHAKARPUR MVR, KHICHARIPUR- 132 GAZIPUR, KHICHRIPUR RESETTLEMENT COLONY-KHICHARIPUR MVR 3222 4940 KVA UNPLANNED 16-05-2020 20:20:00 16-05-2020 22:54:00 2:34 0.00564667 MUs AKSHARDHAM MANDIR, PANDAV NAGAR-PANDAV NAGAR LNR, YAMUNA FLOOD PLAINS-LAXMI NAGAR YAMUNA FLOOD 133 PLAINS LNR 130 0 KVA UNPLANNED 16-05-2020 23:59:37 17-05-2020 01:06:00 1:6 0.000275 MUs

SABOLI EXTN.-MANDOLI, BLOCK A-MANDOLI EXTN., SABOLI COLONY-MANDOLI, SABOLI VILLAGE-MANDOLI, BLOCK K-ANUP VIHAR, KABRISTAN-SABOLI COLONY, BANK OF BARODA-SABOLI COLONY, MCD SCHOOL-SABOLI COLONY, SEWA DHAM- MANDOLI, SABOLI COLONY-MANDOLI, VILLAGE SABOLI-SABOLI 134 COLONY, SABOLI EXTN.-MANDOLI NNG 3928 630 KVA UNPLANNED 17-05-2020 02:58:37 17-05-2020 03:48:36 0:49 0.00145639 MUs

BLOCK 10-KHICHRIPUR RESETTLEMENT COLONY BLOCK 5, BLOCK 4-KHICHRIPUR RESETTLEMENT COLONY, BLOCK 6- KHICHRIPUR RESETTLEMENT COLONY, BLOCK 5-KHICHRIPUR RESETTLEMENT COLONY, BLOCK 8-KHICHRIPUR RESETTLEMENT COLONY BLOCK 8, BLOCK 7-KHICHRIPUR RESETTLEMENT COLONY BLOCK 7, BLOCK 1-KHICHRIPUR RESETTLEMENT COLONY, BLOCK 3-KHICHARIPUR BLOCK 1, BLOCK 9-KHICHRIPUR RESETTLEMENT COLONY BLOCK 9, BLOCK F-PANDAV NAGAR, BLOCK 18-KALYAN PURI, BLOCK 12- KALYAN PURI, BLOCK 1-KALYAN PURI, KHICHRIPUR RESETTLEMENT COLONY-KHICHARIPUR, HIMMATPURI-MAYUR VIHAR, BLOCK 18-KALYAN PURI, GAZIPUR DAIRY FARM, KHICHARIPUR-GAZIPUR, KHICHRIPUR RESETTLEMENT COLONY- KHICHARIPUR, 3RD RD & PKT A 2-MAYUR VIHAR PHASE III, 135 KHICHRI PUR-PHASE II, BLOCK A-MAYUR VIHAR PHASE III MVR 6309 1260 KVA UNPLANNED 17-05-2020 02:55:00 17-05-2020 03:45:00 0:49 0.00142917 MUs

136 BLOCK 1-BALBIR NAGAR, BALBIR NAGAR EXTN.-SILAMPUR DGN 64 990 KVA UNPLANNED 17-05-2020 07:38:15 17-05-2020 08:12:23 0:34 0.00004722 MUs 137 BLOCK A-JHILMIL INDUSTRIAL AREA DGN 10 630 KVA UNPLANNED 17-05-2020 07:42:53 17-05-2020 08:14:27 0:31 0.00002583 MUs 138 SEWA DHAM-MANDOLI NNG 95 400 KVA UNPLANNED 17-05-2020 08:34:38 17-05-2020 09:25:00 0:50 0.00015278 MUs BLOCK E-INDIRA VIHAR, JAFFRABAD-MAUJ PUR, BLOCK 1-WEST PATEL NAGAR, PUBLIC SCHOOL-BLOCK 31, BLOCK 16-EAST PATEL NAGAR, BLOCK 15-EAST PATEL NAGAR, BLOCK 28-EAST PATEL NAGAR, BLOCK M-SHIV VIHAR, PATEL NAGAR POST OFFICE-EAST PATEL NAGAR, BLOCK 18-EAST PATEL NAGAR, BLOCK 29-EAST PATEL NAGAR, BLOCK A-SADATPUR EXT-PUSTA AREA-L BLOCK, PKT R-BLOCK D, BLOCK 27-EAST PATEL NAGAR, BLOCK F-SHIV VIHAR, GEETA COLONY, BLOCK 2-WEST PATEL NAGAR, BLOCK 6-EAST PATEL NAGAR, BLOCK 15A-EAST PATEL NAGAR, BLOCK H-BHAGIRATHI VIHAR, BLOCK 3-WEST PATEL NAGAR, BLOCK 33-EAST PATEL NAGAR, BLOCK 11/F-EAST PATEL NAGAR, BLOCK 10-EAST PATEL NAGAR, SPORTS COMPLEX-VASUNDHARA ENCLAVE VSE, BLOCK 8-WEST PATEL NAGAR, BLOCK 4-EAST PATEL NAGAR, BLOCK 6-WEST PATEL NAGAR, BLOCK 11-EAST PATEL NAGAR, BLOCK 8-EAST PATEL NAGAR, P.G.D.A.V. SR. SCHOOL-EAST PATEL NAGAR, GGS INDRAPRASTHA UNIVERSITY-KASHMERE GATE, BLOCK 12- WEST PATEL NAGAR, BLOCK 12-EAST PATEL NAGAR, DARYA GANJ, BLOCK 3-EAST PATEL NAGAR, BLOCK 24-EAST PATEL NAGAR, BLOCK 14-EAST PATEL NAGAR, BLOCK F-INDIRA VIHAR, BLOCK 7-EAST PATEL NAGAR, BHAJANPURA-DAYALPUR, BLOCK N-SHIV VIHAR, BLOCK 10A-EAST PATEL NAGAR, PKT C-BLOCK B, BLOCK 7-WEST PATEL NAGAR, BLOCK X-WEST PATEL NAGAR, 139 DAYANAND MODEL SCHOOL(SECONDARY)-WEST PATEL PNR 3692 0 KVA UNPLANNED 17-05-2020 09:37:37 17-05-2020 10:15:01 0:37 0.00059611 MUs BLOCK G-PREET VIHAR, BLOCK B-PREET VIHAR, BLOCK D-PREET 140 VIHAR, BLOCK E-PREET VIHAR LNR 668 2250 KVA UNPLANNED 17-05-2020 11:30:00 17-05-2020 12:14:50 0:44 0.00075778 MUs

BLOCK D-NEW KONDALI, PKT 6-NEW KONDALI, PKT 2-NEW KONDALI, PKT 1-NEW KONDALI, PKT 3-NEW KONDALI, GHAROLI KONDLI, BLOCK B-KONDALI EXTN., KONDALI VILLAGE- GHAROLI KONDLI, BLOCK B-AMBEDKAR AWAS KALYAN SAMITI, BLOCK C-RAJBIR COLONY, GHAROLI VILLAGE-GHAROLI KONDLI, SEC C-MAYUR VIHAR PHASE III, SEC D-MAYUR VIHAR PHASE III, SEWAGE TREATMENT PLANT-GHAROLI KONDLI, BLOCK B- KONDALI VILLAGE, BLOCK A-KONDALI VILLAGE, BLOCK C- KONDALI VILLAGE, BLOCK F-KONDALI VILLAGE, BLOCK A- 141 KONDALI EXTN., KONDALI VILLAGE-GHAROLI KONDLI VSE 7914 1620 KVA UNPLANNED 17-05-2020 13:27:39 17-05-2020 14:24:57 0:57 0.00201083 MUs 142 JHILMIL INDUSTRIAL AREA-JHILMIL COLONY DGN 26 990 KVA UNPLANNED 17-05-2020 17:48:23 17-05-2020 18:47:35 0:59 0.00004917 MUs 143 BABARPUR EXTN.-BABAR PUR, MAUJ PUR COMPLEX 1 YVR 138 630 KVA UNPLANNED 17-05-2020 22:41:54 17-05-2020 23:05:26 0:23 0.00010222 MUs BLOCK B1-NEW ASHOK NAGAR, BLOCK C2-NEW ASHOK NAGAR, BLOCK C1-NEW ASHOK NAGAR, BLOCK D-NEW ASHOK NAGAR, BLOCK E-NEW ASHOK NAGAR, BLOCK D-NEW ASHOK NAGAR, NEW ASHOK NAGAR MVR-VASUNDHARA ENCLAVE 144 MVR VSE 4225 1620 KVA UNPLANNED 18-05-2020 01:04:27 18-05-2020 01:45:00 0:40 0.00091111 MUs BLOCK D-OLD MUSTAFABAD, BLOCK H-OLD MUSTAFABAD, 145 BLOCK A-MAN SINGH NAGAR KWN 1055 0 KVA UNPLANNED 18-05-2020 12:04:25 18-05-2020 12:45:58 0:41 0 MUs BLOCK A-BABU NAGAR, BLOCK C-GOVIND VIHAR, BLOCK D-OLD MUSTAFABAD, OLD MUSTAFABAD- BLOCK C-DAYALPUR, 146 BHAJANPURA-DAYALPUR KWN 1720 400 KVA UNPLANNED 18-05-2020 15:02:00 18-05-2020 15:56:57 0:54 0.001905 MUs 147 BAR COUNSIL OF INDIA-ROUSE AVENUE DRG 1 630 KVA UNPLANNED 18-05-2020 16:05:00 18-05-2020 16:30:01 0:25 0.00005556 MUs HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK E-RAJIV NAGAR, BLOCK A-BANK COLONY, BLOCK D-HARIJAN BASTI EAST EXTN., POCKET A-JJ COLONY, BLOCK A- SEWA DHAM, BLOCK D-HARSH VIHAR, BLOCK B-HARSH VIHAR, 148 BLOCK A-HARSH VIHAR NNG 1903 0 KVA UNPLANNED 18-05-2020 17:00:00 18-05-2020 17:43:46 0:43 0.00033444 MUs 149 BLOCK A-B&C-JAGAT PURI, BLOCK D-JAGAT PURI NNG 137 630 KVA UNPLANNED 18-05-2020 17:38:20 18-05-2020 17:40:45 0:2 0.00000389 MUs BLOCK T-GAUTAM PURI, JAG JEEVAN NAGAR-NEW KATWARA- 150 SHASTRI PARK YVR 3 400 KVA UNPLANNED 18-05-2020 18:12:45 18-05-2020 18:38:58 0:26 0.00003611 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unserved (MU) due to Sr. No. Area Affected Division Affected Transformer (in KVA). Unplanned Outage From DateTime To DateTime Duration (Hrs:Mins) Outage

IP STATE-PRAGATI MAIDAN, MANEK BHAVAN- HUMAN RESOURCE DEVELOPMENT-FEROJ SHAH KOTLA STADIUM, MANEK BHAVAN- THE INDIAN INSTITUTE OF PUBLIC 151 ADMINISTRATION-FEROJ SHAH KOTLA STADIUM DRG 65 0 KVA UNPLANNED 18-05-2020 19:07:00 18-05-2020 20:05:00 0:58 0.00008056 MUs

BLOCK A-CHANDER VIHAR, FAZALPUR-MANDAWALI VILLAGE, BLOCK A-MANDAWALI, BLOCK U-CHANDER VIHAR, BLOCK H- MANDAWALI VILLAGE, BLOCK C-MANDAWALI VILLAGE, BLOCK B-MANDAWALI VILLAGE, BLOCK D-MANDAWALI VILLAGE, 152 RAILWAY COLONY-MANDAWALI VILLAGE LNR 7969 630 KVA UNPLANNED 18-05-2020 23:24:21 18-05-2020 23:59:00 0:34 0.00128444 MUs

BLOCK CN-AMBIKA VIHAR BLOCK - B&C, BLOCK C-PATEL VIHAR, BLOCK CN-MANGALAM VIHAR, PHASE I-SHIV VIHAR, VILLAGE- KAMAL VIHAR, BLOCK C-KARAWAL NAGAR, SHIV VIHAR, SHIV VIHAR, PKT Y-SHIV VIHAR, BLOCK B-PATEL VIHAR, BLOCK A- MANGALAM VIHAR, BLOCK V-O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK CN-AMBIKA VIHAR BLOCK - B&C, 153 BLOCK C-PATEL VIHAR, BLOCK CN-AMBIKA VIHAR BLOCK - B&C KWN 4202 0 KVA UNPLANNED 19-05-2020 00:31:20 19-05-2020 01:10:00 0:38 0.00039056 MUs NAI SARAK-JOGIWARA, KATRA NAWAB-CHANDNI CHOWK, NAI SARAK-KATRA ASRAFI, ROSHAN PURA-CHANDNI CHOWK, MAIN 154 BAZAR-KHUSH DIL CCK 2317 3960 KVA UNPLANNED 19-05-2020 05:21:22 19-05-2020 06:20:00 0:58 0.000435 MUs

BLOCK D3-NAND NAGARI, BLOCK E1-NAND NAGARI, BLOCK E3- KANSHIPUR, BLOCK A2-NAND NAGARI, BLOCK A1-NAND NAGARI, BLOCK A4-NAND NAGARI, BLOCK A3-NAND NAGARI, MCD PRIMARY SCHOOL-BLOCK D1, MCD SCHOOL-BLOCK C3, BSES OFFICE-BLOCK C2, BLOCK C1-NAND NAGARI, BLOCK B5- NAND NAGARI, BLOCK B3-NAND NAGARI, BLOCK D2-NAND NAGARI, BLOCK D-BLOCK C3, BLOCK A-EAST GOKUL PURI, MCD PRIMARY SCHOOL-BLOCK D3, GOVT. BOYS SCHOOL-BLOCK A3, MCD PRIMARY SCHOOL-BLOCK A3, PKT C4-BLOCK C1, PKT D3- 155 BLOCK C1, PKT C3-BLOCK C1, ANUP VIHAR-MANDOLI NNG 7116 0 KVA UNPLANNED 19-05-2020 07:22:21 19-05-2020 07:55:07 0:32 0.00131556 MUs

CHAUHAN BANGAR-JAFFRABAD, BLOCK F- LIG/MIG RES/NON COMM AREA-NEW SILAMPURI PHASE II, BLOCK D- LIG/MIG 156 RES/NON COMM AREA-NEW SILAMPURI PHASE II YVR 345 0 KVA UNPLANNED 19-05-2020 08:10:00 19-05-2020 08:55:56 0:45 0.0005 MUs

LIG/MIG RES/NON COMM AREA-CHAWLA FARM, LIG/MIG RES/NON COMM AREA-SABHEPUR, LIG/MIG RES/NON COMM AREA-MILAN GARDEN, LIG/MIG RES/NON COMM AREA-BALAJI MANDIR COLONY, BLOCK B-SHIV VIHAR, CHAUHAN PATTI- 157 VIJAY VIHAR, BADARPUR KHADAR KWN 4107 5235 KVA UNPLANNED 19-05-2020 10:36:22 19-05-2020 12:25:10 1:48 0.00222 MUs OLD SEELAMPUR, RAGUWARPURA-SUBHASH MOHALLA II, SUBHASH MOHALLA-SEELAMPUR, RAGHUBARPURA NO 2- SEELAMPUR, BLOCK 10-RAM NAGAR, OLD SEELAMPUR- 158 SUBHASH MOHALLA II KRN 502 990 KVA UNPLANNED 19-05-2020 11:29:31 19-05-2020 12:15:53 0:46 0.00001278 MUs

BLOCK A-SHASTRI PARK, CHAUHAN BANGAR-JAFFRABAD, BLOCK N-NEW SILAMPURI PHASE I, BLOCK T-GAUTAM PURI, NAYAGAON-NEW KATWARA, BLOCK B-SUBHASH MOHALLA, BLOCK E-SUBHASH MOHALLA, BLOCK I-BRAHM PURI, BLOCK K- BRAHM PURI, BLOCK B-BRAHM PURI, BLOCK R-BRAHM PURI, BLOCK N-BRAHM PURI, KACHI COLONY-JAGJEET NAGAR, BLOCK A-GHONDA PATTI, BLOCK C6-, BLOCK B5-YAMUNA PUR (GONDA) BLOCK B, JAFFRABAD-MAUJ PUR, MAUJ PUR COMPLEX 1, LIG/MIG RES/NON COMM AREA- SHASTRI PARK, BLOCK A-GARI MANDU, BLOCK D-BHAJANPURA, BLOCK C-BHAJANPURA, BLOCK B-MANUJPUR, JAGJEET NAGAR- GHONDA, BLOCK J-KARTAR NAGAR, GAUTAM VIHAR-GHONDA, GAMRI-GHONDA, GHONDA PATTI CHAUHAN, WEST GHONDA, JAFFRABAD-MAUJ PUR, BLOCK C-BHAJANPURA, BLOCK D- 159 BHAJANPURA YVR 10841 7590 KVA UNPLANNED 19-05-2020 12:45:24 19-05-2020 13:26:56 0:41 0.00129833 MUs

RADHE SHYAM PARK-SWASTHYA VIHAR, MAUSAM VIHAR- SWASTHYA VIHAR, GOVIND PURA OLD-SWASTHYA VIHAR, SUKH VIHAR-SWASTHYA VIHAR, RADHE SHYAM PARK EXTN.- SWASTHYA VIHAR, OLD BRIJPURI-SWASTHYA VIHAR, JITAR NAGAR BLOCK A-GAGAN VIHAR, BLOCK J-JAGATPURI, BLOCK A- BALDEV PARK EAST, BLOCK F-BALDEV PARK EAST, BLOCK D- 160 BALDEV PARK EAST, JITAR NAGAR BLOCK C-GAGAN VIHAR KRN 6020 3600 KVA UNPLANNED 19-05-2020 12:47:22 19-05-2020 13:15:00 0:27 0.000315 MUs

KATRA NAWAB-CHANDNI CHOWK, BALI MARAN-BARA DARI, ROSHAN PURA-CHANDNI CHOWK, FATEHPURI-KUCHA 161 HASIRAM, TOWN HILL-KATRA NEEL, MAIN BAZAR-KHUSH DIL CCK 2200 2970 KVA UNPLANNED 19-05-2020 12:47:23 19-05-2020 13:32:27 0:45 0.0006 MUs MOSQUE-LAL KUAN BAZAR, LALKUAN BAZAR-FRASH KHANA, BALI MARAN-BARA DARI, CHAWRI BAZAR-KHUSH DIL, HAUZ QAZI ROAD-PEEPAL MAHADEV GALI, LALKUAN BAZAR- SIKRIWALAN- NEW HAUZ QAZI, MAIN BAZAR-KHUSH DIL, 162 KATRA BARYAN-BARA DARI CCK 4856 5350 KVA UNPLANNED 19-05-2020 14:24:00 19-05-2020 15:23:00 0:58 0.00170778 MUs

SABOLI EXTN.-MANDOLI, BLOCK A-MANDOLI EXTN., SABOLI COLONY-MANDOLI, SABOLI VILLAGE-MANDOLI, BLOCK K-ANUP VIHAR, KABRISTAN-SABOLI COLONY, BANK OF BARODA-SABOLI COLONY, MCD SCHOOL-SABOLI COLONY, BLOCK A-RAJIV NAGAR, SEWA DHAM-MANDOLI, VILLAGE SABOLI-SABOLI 163 COLONY, SABOLI EXTN.-MANDOLI NNG 3928 630 KVA UNPLANNED 19-05-2020 14:36:25 19-05-2020 15:10:00 0:33 0.00099 MUs

SABOLI COLONY-MANDOLI, SABOLI VILLAGE-MANDOLI, BLOCK B-ANUP VIHAR, BLOCK B-SEWA DHAM, SEWA DHAM- MANDOLI, BLOCK D-MEET NAGAR, SABOLI COLONY-MANDOLI, 164 SEWA DHAM-MANDOLI NNG 155 400 KVA UNPLANNED 19-05-2020 14:48:22 19-05-2020 15:25:00 0:36 0.00018 MUs 165 OLDANPUR-NAVIN SHAHDARA DGN 40 630 KVA UNPLANNED 19-05-2020 16:31:47 19-05-2020 17:04:15 0:32 0.00002667 MUs SADAR BAZAR B G ROAD, SADAR BAZAR - RAM NAGAR, SADAR BAZAR - RAM NAGAR, BLOCK C-JAI PRAKASH NAGAR, BLOCK J- 166 KARTAR NAGAR PHG 5052 2970 KVA UNPLANNED 20-05-2020 02:16:25 20-05-2020 03:10:00 0:53 0.00054472 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unserved (MU) due to Sr. No. Area Affected Division Affected Transformer (in KVA). Unplanned Outage From DateTime To DateTime Duration (Hrs:Mins) Outage

BLOCK T-ASHOKA PAHARI, VERUNALEYA DELHI JAL BOARD- JHANDEWALAN, PKT C-BLOCK B, SWAMI RAMTIRTH NAGAR- JHANDEWALAN EXTENSION, LIG/MIG RES/NON COMM AREA-A- BLOCK SONIA VIHAR, BLOCK 3E-JHANDEWALAN EXTENSION, ANARKALI BAZAR-JHANDEWALAN EXTENSION, BLOCK 1E- JHANDEWALAN EXTENSION, LIG/MIG RES/NON COMM AREA-A- BLOCK SONIA VIHAR, GGS INDRAPRASTHA UNIVERSITY- KASHMERE GATE, BLOCK N-SHIV VIHAR, BLOCK F-INDIRA VIHAR, MCD GARAGE- SLUM-JHANDEWALAN, MCD OFFICE- JHANDEWALAN EXTENSION, BLOCK 2E-JHANDEWALAN EXTENSION, LIG/MIG RES/NON COMM AREA-B-BLOCK SONIA VIHAR, CINEMA-JHANDEWALAN EXTENSION, BLOCK 57-AJMAL KHAN PARK, JHANDEWALAN FATTED FACTORY COMPLEX, GAS AGENCY-JHANDEWALAN, BLOCK M-SHIV VIHAR, SLUM- JHANDEWALAN, BLOCK A-SADATPUR EXT-PUSTA AREA-L BLOCK, BHAJANPURA-DAYALPUR, KAROL BAGH TERMINAL SLUM-JHANDEWALAN, PKT R-BLOCK D, GEETA COLONY, SPORTS COMPLEX-VASUNDHARA ENCLAVE VSE, BLOCK E- INDIRA VIHAR, BLOCK A-JHANDEWALAN, BLOCK H- BHAGIRATHI VIHAR, BLOCK 4E-JHANDEWALAN EXTENSION, DARYA GANJ, OPD. DR. N.C. JOSHI MEMORIAL HOSPITAL-JOSHI ROAD, JAFFRABAD-MAUJ PUR, BLOCK F-SHIV VIHAR, S.R.T. NAGAR-JHANDEWALAN EXTENSION, BLOCK 1E-JHANDEWALAN 167 EXTENSION SRD 2186 0 KVA UNPLANNED 20-05-2020 03:45:23 20-05-2020 04:33:01 0:47 0.00075722 MUs

BLOCK_6-KAROL BAGH WEST EXTENSION AREA, BLOCK_17A- KAROL BAGH WEST EXTENSION AREA, DARYA GANJ, GEETA COLONY, BLOCK 8-KAROL BAGH WEST EXTENSION AREA, BLOCK 15A-KAROL BAGH, BLOCK 16A-KAROL BAGH, GGS INDRAPRASTHA UNIVERSITY-KASHMERE GATE, PKT R-BLOCK D, PKT C-BLOCK B, JAFFRABAD-MAUJ PUR, BLOCK A-SADATPUR EXT-PUSTA AREA-L BLOCK, BLOCK H-BHAGIRATHI VIHAR, BLOCK F-SHIV VIHAR, BLOCK M-SHIV VIHAR, BLOCK N-SHIV VIHAR, BLOCK E-INDIRA VIHAR, SPORTS COMPLEX- VASUNDHARA ENCLAVE VSE, BHAJANPURA-DAYALPUR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-B-BLOCK SONIA VIHAR, BLOCK 168 F-INDIRA VIHAR SRD 634 0 KVA UNPLANNED 20-05-2020 04:53:23 20-05-2020 05:49:02 0:55 0.00032083 MUs

GURUDWARA SISGANJ ROAD-CHANDNI CHOWK, LAJPAT RAI MARKET-CHANDNI CHOWK, BHAGIRATH PLACE-CHANDNI CHOWK, HARI RAM MARKET-CHANDNI CHOWK, MOR SARAY 169 COLONY-CHANDNI CHOWK CCK 1323 0 KVA UNPLANNED 20-05-2020 07:33:23 20-05-2020 08:02:00 0:28 0.00001556 MUs BLOCK 10-KHICHRIPUR RESETTLEMENT COLONY BLOCK 5, BLOCK 4-KHICHRIPUR RESETTLEMENT COLONY, KHICHARIPUR- 170 GAZIPUR MVR 32 990 KVA UNPLANNED 20-05-2020 09:15:31 20-05-2020 10:15:00 0:59 0.00003278 MUs PRATAP NAGAR-PHASE I, ACHARYA NIKETAN-SHASHI GARDEN, PATPAR GANJ-SHASHI GARDEN, PHASE I-MAYUR VIHAR, PANDAV NAGAR MVR-SHAKARPUR MVR, KHICHRI PUR-PHASE 171 II MVR 1001 0 KVA UNPLANNED 20-05-2020 13:21:32 20-05-2020 14:20:00 0:58 0.00087 MUs ANAND VIHAR BLOCK A, ANAND VIHAR BLOCK C, ANAND 172 VIHAR BLOCK B JLM 43 990 KVA UNPLANNED 20-05-2020 14:50:44 20-05-2020 15:05:26 0:14 0.00011667 MUs 173 PKT B-CHITRAKOOT NNG 60 630 KVA UNPLANNED 20-05-2020 16:45:04 20-05-2020 16:47:48 0:2 0.00000389 MUs 174 BLOCK D-MANDOLI EXTN. NNG 27 990 KVA UNPLANNED 20-05-2020 16:45:57 20-05-2020 16:49:03 0:3 0.000005 MUs 175 BLOCK C-KABIR NAGAR, BLOCK A-KABIR NAGAR NNG 36 990 KVA UNPLANNED 20-05-2020 16:46:59 20-05-2020 16:50:38 0:3 0.00000667 MUs

BLOCK 10-TRILOKPURI PHASE I, BLOCK 7-TRILOKPURI PHASE I, BLOCK 5-TRILOKPURI PHASE I, BLOCK 6-TRILOKPURI PHASE I, BLOCK 4-TRILOKPURI PHASE I, BLOCK 3-TRILOKPURI PHASE I, BLOCK 1-TRILOKPURI PHASE I, BLOCK 12-TRILOKPURI PHASE I, BLOCK 11-TRILOKPURI PHASE I, BLOCK 9-TRILOKPURI PHASE I, BLOCK 8-TRILOKPURI PHASE I, BLOCK 16-HIMMATPURI, BLOCK 18-HIMMATPURI, BLOCK 25-TRILOKPURI PHASE II, BLOCK 14- TRILOKPURI PHASE II, BLOCK 15-TRILOKPURI PHASE II, BLOCK 24-TRILOKPURI PHASE II, BLOCK 13-TRILOKPURI PHASE II, BLOCK 21-KALYAN PURI, BLOCK 20-KALYAN PURI, BLOCK 19- KALYAN PURI, TRILOKPURI PHASE I-MAYUR VIHAR, TRILOKPURI PHASE II-MAYUR VIHAR, BLOCK 18-KALYAN PURI, MAYUR 176 VIHAR YAMUNA FLOOD PLAINS, KOTLA EXCT-PHASE II MVR 10260 630 KVA UNPLANNED 21-05-2020 00:05:25 21-05-2020 00:52:35 0:47 0.0015275 MUs 177 OLDANPUR-NAVIN SHAHDARA DGN 313 630 KVA UNPLANNED 21-05-2020 09:17:15 21-05-2020 09:48:18 0:31 0.00002583 MUs

BLOCK A-SHAKARPUR KHAS, BLOCK G-SHAKARPUR KHAS, BLOCK A-SHAKARPUR KHAS, BLOCK R&A-SHAKARPUR KHAS, 178 SHAKARPUR EXTN.-SHAKARPUR KHAS LNR 3526 3960 KVA UNPLANNED 21-05-2020 09:20:00 21-05-2020 10:05:00 0:45 0.00035 MUs BLOCK B3-YAMUNA VIHAR, TANKI ROAD-C-BLOCK 179 BHAJANPURA YVR 17 990 KVA UNPLANNED 21-05-2020 10:55:42 21-05-2020 11:05:00 0:9 0 MUs

LIG/MIG RES/NON COMM AREA-VIJAY GHAT, ZEENAT BARI- MORI GATE, RED FORT-CHANDNI CHOWK-RED FORT, RED FORT- VIJAY GHAT, LIG/MIG RES/NON COMM AREA-CHANDNI CHOWK-RED FORT, NIGAM BODH GHAT CEMETRY-KASHMERE GATE, SWATRANTATA SAINANI SMARAK-CHANDNI CHOWK- RED FORT, LIG/MIG RES/NON COMM AREA-KASHMERE GATE, 180 LIG/MIG RES/NON COMM AREA-VIJAY GHAT DRG CCK 382 0 KVA UNPLANNED 21-05-2020 12:40:00 21-05-2020 13:32:00 0:51 0.00026917 MUs SHANKAR NAGAR EXTN-AZAD NAGAR, OLD SEELAMPUR, BLOCK X-RAJGARH COLONY, RAGHUBARPURA NO 2- SEELAMPUR, OLD SEELAMPUR DHRAM PURA, CHAND 181 MOHALLA-RAJGARH COLONY KRN 4850 3600 KVA UNPLANNED 21-05-2020 15:55:00 21-05-2020 16:25:00 0:29 0.00044306 MUs

BLOCK B-VINOD NAGAR WEST, BLOCK B-VINOD NAGAR EAST, BLOCK A-VINOD NAGAR EAST, NAVA KUNJ APARTMENT- MOTHER DAIRY, SCHOOL-MOTHER DAIRY, RETREAT APARTMENT-MOTHER DAIRY, AKASH BHARTI APPARTMENT- MOTHER DAIRY, SARASWATI KUNJ APARTMENT-MOTHER 182 DAIRY, BLOCK D-MANDAWALI VILLAGE LNR 375 2690 KVA UNPLANNED 21-05-2020 23:15:27 22-05-2020 00:00:00 0:44 0.00167444 MUs 183 INDUSTRIAL AREA-PATPAR GANJ INDUSTRIAL AREA LNR 160 1620 KVA UNPLANNED 22-05-2020 01:43:27 22-05-2020 02:42:00 0:58 0.00030611 MUs MANTOLA MOHALLA-PAHAR GANJ, MULTANI DHANDA-SADAR BAZAR, S.R.T. NAGAR-ARYA NAGAR, SHEELA HOTEL-ARYA NAGAR, ST. ANTONYS CHURCH SCHOOL-ARYA NAGAR, SENIOR SECONDARY ENGINEER WORKSHOP N.R.OFFICE-CHANDNI 184 CHOWK CCK PHG 651 0 KVA UNPLANNED 22-05-2020 07:48:29 22-05-2020 08:08:00 0:19 0.00008972 MUs

CHAUHAN BANGAR-JAFFRABAD, BLOCK E-NEW SILAMPURI PHASE II, BLOCK F- LIG/MIG RES/NON COMM AREA-NEW SILAMPURI PHASE II, BLOCK D- LIG/MIG RES/NON COMM AREA- 185 NEW SILAMPURI PHASE II, JAFFRABAD-MAUJ PUR YVR 371 0 KVA UNPLANNED 22-05-2020 08:40:00 22-05-2020 09:30:12 0:50 0.00059722 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unserved (MU) due to Sr. No. Area Affected Division Affected Transformer (in KVA). Unplanned Outage From DateTime To DateTime Duration (Hrs:Mins) Outage

BLOCK B6-OLD RAJENDRA NAGAR, BLOCK B4-OLD RAJENDRA NAGAR, NORTH EXTENSION AREA- BLOCK B-OLD RAJENDRA NAGAR, BLOCK B3-OLD RAJENDRA NAGAR, BLOCK 51-OLD RAJENDRA NAGAR, BLOCK B-OLD RAJENDRA NAGAR, DARYA GANJ, GEETA COLONY, SALWAN PUBLIC SCHOOL-OLD RAJENDRA NAGAR, GGS INDRAPRASTHA UNIVERSITY- KASHMERE GATE, PKT R-BLOCK D, PKT C-BLOCK B, JAFFRABAD- MAUJ PUR, BLOCK A-SADATPUR EXT-PUSTA AREA-L BLOCK, BLOCK H-BHAGIRATHI VIHAR, BLOCK F-SHIV VIHAR, BLOCK M- SHIV VIHAR, BLOCK N-SHIV VIHAR, BLOCK E-INDIRA VIHAR, JANKI DEVI COLLEGE-CENTRAL RIDGE RESERVED FOREST, WEST KAROL BAGH-CENTRAL RIDGE RESERVED FOREST, SPORTS COMPLEX-VASUNDHARA ENCLAVE VSE, BHAJANPURA- DAYALPUR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-B-BLOCK SONIA 186 VIHAR, BLOCK F-INDIRA VIHAR SRD 900 630 KVA UNPLANNED 22-05-2020 09:07:28 22-05-2020 09:45:00 0:37 0.00089417 MUs

BLOCK A-SADATPUR EXT-PUSTA AREA-L BLOCK, BLOCK A- SADAT PUR, BLOCK A8-SADAT PUR, BLOCK F-SADAT PUR, BLOCK C1-SADAT PUR, BLOCK F-SADAT PUR, BLOCK F- MUSTAFABAD (DAYALPUR), BLOCK D-MUSTAFABAD 187 (DAYALPUR), PKT C1-SADATPUR EXT-PUSTA AREA-K BLOCK KWN 199 0 KVA UNPLANNED 22-05-2020 09:31:33 22-05-2020 10:20:00 0:48 0.00030667 MUs 188 BLOCK D-AJIT NAGAR KRN 351 990 KVA UNPLANNED 22-05-2020 11:00:10 22-05-2020 11:47:49 0:47 0.00006528 MUs 189 ANAND VIHAR BLOCK A JLM 43 990 KVA UNPLANNED 22-05-2020 11:15:32 22-05-2020 11:45:43 0:30 0.00004167 MUs

RAILWAY STATION-CHANDNI CHOWK, AJMERI GATE-CHANDNI CHOWK, MOSQUE-LAL KUAN BAZAR, LALKUAN BAZAR-FRASH 190 KHANA, MAIN BAZAR-KHUSH DIL CCK 375 3960 KVA UNPLANNED 22-05-2020 13:06:37 22-05-2020 14:32:00 1:25 0.00068472 MUs

PKT C-BLOCK B, BLOCK B4-OLD RAJENDRA NAGAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, GGS INDRAPRASTHA UNIVERSITY-KASHMERE GATE, BLOCK N-SHIV VIHAR, BLOCK F-INDIRA VIHAR, SIR GANGA RAM HOSPITAL- CENTRAL RIDGE RESERVED FOREST, WEST KAROL BAGH- CENTRAL RIDGE RESERVED FOREST, BLOCK B-OLD RAJENDRA NAGAR, BLOCK 51-OLD RAJENDRA NAGAR, LIG/MIG RES/NON COMM AREA-B-BLOCK SONIA VIHAR, BLOCK M-SHIV VIHAR, JANKI DEVI COLLEGE-CENTRAL RIDGE RESERVED FOREST, BLOCK A-SADATPUR EXT-PUSTA AREA-L BLOCK, BHAJANPURA- DAYALPUR, CENTRAL RIDGE RESERVED FOREST, PKT R-BLOCK D, GEETA COLONY, SPORTS COMPLEX-VASUNDHARA ENCLAVE VSE, BLOCK E-INDIRA VIHAR, NORTH EXTENSION AREA- BLOCK B-OLD RAJENDRA NAGAR, BLOCK H-BHAGIRATHI VIHAR, DARYA GANJ, ASHRAM SANTSHRI ASSRAM-CENTRAL RIDGE RESERVED FOREST, JAFFRABAD-MAUJ PUR, BLOCK F-SHIV 191 VIHAR, BLOCK B3-OLD RAJENDRA NAGAR SRD 900 730 KVA UNPLANNED 22-05-2020 13:55:29 22-05-2020 14:40:00 0:44 0 MUs SHIV MANDIR-JYOTI NAGAR EAST, BLOCK B-DURGA PURI, 192 MANSAROVAR PARK-DURGA PURI NNG 208 630 KVA UNPLANNED 22-05-2020 15:34:14 22-05-2020 15:35:34 0:1 0.00000167 MUs GURUDWARA SISGANJ ROAD-CHANDNI CHOWK, BHAGIRATH PLACE-CHANDNI CHOWK, MOR SARAY COLONY-CHANDNI 193 CHOWK CCK 235 990 KVA UNPLANNED 22-05-2020 15:37:41 22-05-2020 16:13:56 0:36 0.00004 MUs

BLOCK H-KRISHNA NAGAR, BLOCK F-KRISHNA NAGAR, BLOCK E- KRISHNA NAGAR, VISHWAS NAGAR, BLOCK J-KRISHNA NAGAR 194 EAST, JHEEL-KRISHNA NAGAR BLOCK B KRN 2694 2290 KVA UNPLANNED 22-05-2020 16:07:33 22-05-2020 16:45:30 0:37 0.00086333 MUs BLOCK F-ZERO PUSTA, BLOCK E-ZERO PUSTA, ZERO PUSTA- USMAN PUR, LIG/MIG RES/NON COMM AREA-ZERO PUSTA, DELHI VIDHYUT BROAD-ZERO PUSTA, YAMUNA VIHAR 195 YAMUNA FLOOD PLAINS YVR 1609 630 KVA UNPLANNED 22-05-2020 16:17:00 22-05-2020 17:08:22 0:51 0.00201167 MUs

BALMIKI BASTI-FEROJ SHAH KOTLA STADIU, LIG/MIG RES/NON COMM AREA-RAJ GHAT, DARYA GANJ, CHANDANI MAHAL- CHANDNI CHOWK, PATODI HOUSE-CHANDNI CHOWK, LIG/MIG RES/NON COMM AREA-VIJAY GHAT, BALMIKI BASTI- NDMC SCHOOL-FEROJ SHAH KOTLA STADIU, LIG/MIG RES/NON COMM AREA-RAJ GHAT, LIG/MIG RES/NON COMM AREA-VIJAY 196 GHAT DRG DRG 539 100 KVA UNPLANNED 23-05-2020 08:57:49 23-05-2020 09:55:00 0:57 0.0001425 MUs

BLOCK A-TUKMIRPUR, BLOCK C-TUKMIRPUR, BLOCK D-KHAJURI KHAS, BLOCK B-CHANDU NAGAR, CLOCK C-BIHARIPUR, BLOCK 197 D-SHERPUR, BLOCK C-SHERPUR, BLOCK D-TUKMIRPUR KWN 1434 2290 KVA UNPLANNED 23-05-2020 09:05:31 23-05-2020 09:40:00 0:34 0.00044389 MUs PRATAP NAGAR-PHASE I, PKT 4-PHASE I, MAYUR VIHAR EXTN., 198 KHICHRI PUR-PHASE II MVR 2315 4170 KVA UNPLANNED 23-05-2020 10:15:31 23-05-2020 11:05:00 0:49 0.0006125 MUs 199 BLOCK X-RAJGARH COLONY KRN 57 990 KVA UNPLANNED 23-05-2020 10:49:36 23-05-2020 11:39:43 0:50 0.00001389 MUs 200 JHILMIL INDUSTRIAL AREA-JHILMIL COLONY DGN 16 1000 KVA UNPLANNED 23-05-2020 11:20:05 23-05-2020 11:57:07 0:37 0.00002056 MUs FAZALPUR-MANDAWALI VILLAGE, BLOCK D-MANDAWALI 201 VILLAGE LNR 1594 990 KVA UNPLANNED 23-05-2020 13:51:16 23-05-2020 14:05:32 0:14 0 MUs

BLOCK _A-SURAJMAL VIHAR, SHAHDARA JLM, PUSHPANJALI- ANAND VIHAR, RAM VIHAR-ANAND VIHAR, ANAND VIHAR BLOCK A, VILL KARKARDOOMA-KARKAR DUMA, DAYA NAND VIHAR-ANAND VIHAR, ANAND VIHAR BLOCK C, JAGRITI ENCLAVE-ANAND VIHAR, ANAND VIHAR BLOCK B, SURYA NIKETAN-RISHAB VIHAR, SHYAM ENCLAVE-ANAND VIHAR, SAINI ENCLAVE-ANAND VIHAR, SURYA NIKETAN-ANAND 202 VIHAR, KARKARDOOMA COMPLAX-KARKAR DUMA JLM 3107 5350 KVA UNPLANNED 23-05-2020 14:23:32 23-05-2020 15:08:24 0:44 0.00112444 MUs FAZALPUR-MANDAWALI VILLAGE, BLOCK D-MANDAWALI 203 VILLAGE LNR 1594 990 KVA UNPLANNED 23-05-2020 22:39:30 23-05-2020 22:59:19 0:19 0 MUs CHRISTAN COLONY-KHABAS PURA, CHANDANI MAHAL- 204 CHANDNI CHOWK DRG 1947 1980 KVA UNPLANNED 23-05-2020 23:41:36 24-05-2020 00:34:15 0:52 0.00154556 MUs

SABOLI EXTN.-MANDOLI, SABOLI COLONY-MANDOLI, SABOLI VILLAGE-MANDOLI, BLOCK B-ANUP VIHAR, NEW MANDOLI INDUSTRIAL AREA, BLOCK B-PRATAP NAGAR, LIG/MIG RES/NON COMM AREA-SEWA DHAM, BLOCK D-ANUP VIHAR, BLOCK K-ANUP VIHAR, BLOCK A-ANUP VIHAR, BLOCK C-ANUP 205 VIHAR, SEWA DHAM-MANDOLI, SEWA DHAM-MANDOLI NNG 915 0 KVA UNPLANNED 24-05-2020 06:35:32 24-05-2020 07:26:26 0:50 0.00147222 MUs 206 JHILMIL INDUSTRIAL AREA-JHILMIL COLONY DGN 8 990 KVA UNPLANNED 24-05-2020 09:20:00 24-05-2020 09:40:00 0:20 0.00001667 MUs 207 JHILMIL INDUSTRIAL AREA-JHILMIL COLONY DGN 3 990 KVA UNPLANNED 24-05-2020 09:20:00 24-05-2020 09:43:00 0:22 0.00001833 MUs 208 MAYUR VIHAR PHASE III VSE 174 400 KVA UNPLANNED 24-05-2020 09:30:33 24-05-2020 10:28:00 0:57 0 MUs

PATPAR GANJ-SHASHI GARDEN, BLOCK F-PANDAV NAGAR, SAMASPUR-PANDAV NAGAR, BLOCK E-PANDAV NAGAR, 209 PANDAV NAGAR MVR-SHAKARPUR MVR MVR 3330 5000 KVA UNPLANNED 24-05-2020 19:47:34 24-05-2020 20:35:00 0:47 0.00114889 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unserved (MU) due to Sr. No. Area Affected Division Affected Transformer (in KVA). Unplanned Outage From DateTime To DateTime Duration (Hrs:Mins) Outage

MAUSAM VIHAR-SWASTHYA VIHAR, SUKH VIHAR-SWASTHYA VIHAR, RADHE SHYAM PARK EXTN.-SWASTHYA VIHAR, JITAR NAGAR BLOCK A-GAGAN VIHAR, BLOCK J-JAGATPURI, BLOCK A- BALDEV PARK EAST, GAGAN VIHAR-JAGATPURI, BLOCK D- BALDEV PARK EAST, BLOCK K-JAGATPURI, JITAR NAGAR BLOCK 210 C-GAGAN VIHAR, BLOCK D-SOUTH ANARKALI COLONY KRN 4595 3600 KVA UNPLANNED 25-05-2020 00:01:00 25-05-2020 00:52:00 0:51 0.00079333 MUs

BLOCK B-DILSHAD COLONY, VISHWAS NAGAR-SHAHDARA, DAYANAND HOSPITAL-UNIVERSITY COLLEGE OF MEDICAL SCIENCES DGN, BLOCK R- AADINATH BHAWAN-POCKET R, DELHI JAL BOARD-POCKET C, M.C.D. HOUSE-POCKET B, MIG FLATS-POCKET F & E, HANSRAJ SCHOOL-POCKET H, GROUP I FLATS-JANTA FLATS-PKT A, GTB MIG FLATS-POCKET D, FLORA DALE SECONDARY SCHOOL-POCKET R, POST OFFICE-DILSHAD GARDEN, MTNL OFFICE-DILSHAD GARDEN, BLOCK J-DILSHAD GARDEN, FACTORY-DILSHAD GARDEN, DAMODER PARK- DILSHAD GARDEN, DELHI POWER SUPPLY-DILSHAD GARDEN, DDA MARKET PKT B & E-POCKET F & E, DELHI JAL BOARD- PKT A-JANTA FLATS-PKT A, BLOCK D-JANTA FLATS-PKT A, GROUP 4- 211 POCKET B DGN 2156 3240 KVA UNPLANNED 25-05-2020 02:07:00 25-05-2020 03:06:00 0:58 0.00240056 MUs ZAKIR HUSAIN P.G. EVENING COLLAGE-SKD BASTI, DELHI GOVT. STAFF FLATS-PRESS ENCLAVE, KAMLA MARKET-AJMERI GATE, GOVT FLAT-AJMERI GATE, RAILWAY QTRS-PAHAR GANJ 212 DRG DRG 1445 4500 KVA UNPLANNED 25-05-2020 08:37:21 25-05-2020 09:30:00 0:52 0.00047667 MUs 213 PKT D-MAYUR VIHAR PHASE II, MAYUR VIHAR PHASE II MVR 29 630 KVA UNPLANNED 25-05-2020 09:43:19 25-05-2020 10:17:30 0:34 0.00001889 MUs BLOCK D-LALITA PARK, BLOCK C-LALITA PARK, PUSTA-LALITA 214 PARK LNR 223 990 KVA UNPLANNED 25-05-2020 15:44:33 25-05-2020 16:18:00 0:33 0.0001375 MUs

BLOCK A-MANSAROWAR PARK, BLOCK B-MANSAROWAR PARK, BLOCK D-MANSAROWAR PARK, BLOCK B-SHRI RAM NAGAR, RAM NAGAR-SILAMPUR, BLOCK J-SHRI RAM NAGAR, SHAHDRA METRO STATION-SHAHDARA DGN, SUDARSHAN STEEL ROLLING MILL-RAM NAGAR EAST, BLOCK E-MANSAROWAR PARK, SACHDEVA INDUSTRIES-RAM NAGAR EAST, BLOCK F- SHRI RAM NAGAR, BLOCK H-MANSAROWAR PARK, JINDAL BHAWAN-RAM NAGAR EAST, BLOCK F-MANSAROWAR PARK, BLOCK C-MANSAROWAR PARK, JHILMIL INDUSTRIAL AREA- 215 JHILMIL COLONY, BLOCK G-MANSAROWAR PARK DGN 3579 0 KVA UNPLANNED 25-05-2020 16:01:21 25-05-2020 16:37:00 0:35 0.000875 MUs

SABOLI VILLAGE-MANDOLI, BLOCK B-ANUP VIHAR, NEW MANDOLI INDUSTRIAL AREA, BLOCK A-ANUP VIHAR, BLOCK C- ANUP VIHAR, BLOCK A-SEWA DHAM, SEWA DHAM-MANDOLI, 216 ANUP VIHAR-MANDOLI, SEWA DHAM-MANDOLI NNG 0 0 KVA UNPLANNED 25-05-2020 19:23:22 25-05-2020 20:18:00 0:54 0 MUs SHANKAR NAGAR EXTN-AZAD NAGAR, OLD SEELAMPUR, BLOCK X-RAJGARH COLONY, RAGHUBARPURA NO 2- SEELAMPUR, OLD SEELAMPUR DHRAM PURA, CHAND 217 MOHALLA-RAJGARH COLONY KRN 4850 3600 KVA UNPLANNED 25-05-2020 20:55:22 25-05-2020 21:45:00 0:49 0 MUs 218 BLOCK J-DILSHAD COLONY, BLOCK F-DILSHAD COLONY DGN 171 990 KVA UNPLANNED 26-05-2020 08:32:18 26-05-2020 08:58:00 0:25 0.00002083 MUs BLOCK_34P-KRISHNA NAGAR, BLOCK_31-KRISHNA NAGAR, 219 BLOCK_44O-KRISHNA NAGAR SRD 267 630 KVA UNPLANNED 26-05-2020 10:44:56 26-05-2020 10:55:00 0:10 0.00000833 MUs

BLOCK B-KRISHNA NAGAR EAST, BLOCK A-KRISHNA NAGAR EAST, BLOCK H-KRISHNA NAGAR, BLOCK F-KRISHNA NAGAR, BLOCK E-KRISHNA NAGAR, BLOCK B-RADHEPURI EXTENSION, BLOCK D-RADHEPURI EXTENSION, BLOCK E-RADHEPURI EXTENSION, BLOCK J-KRISHNA NAGAR EAST, BLOCK J-KRISHNA NAGAR EAST, KRISHNA NAGAR EAST BLOCK E-RADHEPURI, KRISHNA NAGAR EAST BLOCK A-RADHEPURI, KRISHNA NAGAR EAST BLOCK D-RADHEPURI, KRISHNA NAGAR EAST BLOCK B- 220 RADHEPURI, JHEEL-KRISHNA NAGAR BLOCK B KRN 6626 3240 KVA UNPLANNED 26-05-2020 14:24:00 26-05-2020 15:05:00 0:40 0.00108889 MUs BLOCK B-VINOD NAGAR WEST, BLOCK D-VINOD NAGAR WEST, 221 L.P. DESHBANDHU SOC-L.P. EXTENSION LNR 491 990 KVA UNPLANNED 26-05-2020 17:19:00 26-05-2020 17:45:00 0:26 0.00085222 MUs

ANAND PARBAT, DARYA GANJ, GEETA COLONY, INDUSTRIAL AREA-ANAND PARBHAT, GGS INDRAPRASTHA UNIVERSITY- KASHMERE GATE, PKT R-BLOCK D, PKT C-BLOCK B, JAFFRABAD- MAUJ PUR, BLOCK A-SADATPUR EXT-PUSTA AREA-L BLOCK, BLOCK H-BHAGIRATHI VIHAR, BLOCK F-SHIV VIHAR, BLOCK M- SHIV VIHAR, BLOCK N-SHIV VIHAR, BLOCK E-INDIRA VIHAR, NAI BASTI-ANAND PARBAT, SPORTS COMPLEX-VASUNDHARA ENCLAVE VSE, BHAJANPURA-DAYALPUR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON 222 COMM AREA-B-BLOCK SONIA VIHAR, BLOCK F-INDIRA VIHAR PNR 1927 5940 KVA UNPLANNED 26-05-2020 17:38:24 26-05-2020 18:36:00 0:57 0.00121917 MUs

BLOCK C-MADHUBAN ENCLAVE, BLOCK B-NIRMAN VIHAR, BLOCK A-PREET VIHAR, BLOCK B-PREET VIHAR, BLOCK D-PREET VIHAR, RAILWAY COLONY-MANDAWALI VILLAGE, GANESH NAGAR EXTN.-SHAKARPUR KHAS, SHAKARPUR EXTN.- SHAKARPUR KHAS, NEW RAJDHANI ENCLAVE-GAGAN VIHAR, BLOCK D-PREET VIHAR, FAZALPUR-MANDAWALI VILLAGE, MOTHER DAIRY-INDRAPRASTHA EXTENSION LNR, FAJALPUR- 223 MANDAWALI LNR 4596 630 KVA UNPLANNED 26-05-2020 20:18:00 26-05-2020 20:42:39 0:24 0.0006 MUs 224 JAFFRABAD-MAUJ PUR YVR 195 990 KVA UNPLANNED 27-05-2020 09:42:16 27-05-2020 09:50:00 0:7 0 MUs BLOCK M-JAGAT RAM PARK, LAKSHMI NAGAR BLOCK L, BLOCK 225 J-LALITA PARK LNR 334 630 KVA UNPLANNED 27-05-2020 10:02:48 27-05-2020 10:38:24 0:35 0.00009722 MUs 226 KUNDAN NAGAR-LAKSHMI NAGAR LNR 7 990 KVA UNPLANNED 27-05-2020 10:05:15 27-05-2020 10:39:22 0:34 0.00009444 MUs

BLOCK G-MANSAROWAR PARK, SUDARSHAN STEEL ROLLING MILL-RAM NAGAR EAST, RAM NAGAR-SILAMPUR, DAYANAND HOSPITAL-UNIVERSITY COLLEGE OF MEDICAL SCIENCES DGN, BLOCK B-MANSAROWAR PARK, BLOCK A-MANSAROWAR PARK, BLOCK F-MANSAROWAR PARK, BLOCK D-MANSAROWAR PARK, BLOCK C-MANSAROWAR PARK, BLOCK E-MANSAROWAR PARK, BLOCK H-MANSAROWAR PARK, JHILMIL INDUSTRIAL AREA- 227 JHILMIL COLONY DGN 3101 2610 KVA UNPLANNED 27-05-2020 11:15:00 27-05-2020 12:08:00 0:53 0.00220833 MUs CHANDER NAGAR-KRISHNA NAGAR, CHANDER NAGAR BLOCK 228 C-KRISHNA NAGAR EXTN. KRN 753 990 KVA UNPLANNED 27-05-2020 14:30:12 27-05-2020 14:48:25 0:18 0.00005 MUs 229 HARSH VIHAR SUB STATION-POLICE FARM NNG 190 0 KVA UNPLANNED 27-05-2020 14:52:26 27-05-2020 15:30:45 0:38 0.00030611 MUs

NEW GOVIND PURA-JAGATPURI, GEETA COLONY, BLOCK 9- GANDHI NAGAR, BLOCK 10-GANDHI NAGAR, BLOCK 9-GANDHI 230 NAGAR, BLOCK 9-RAGHUBARPURA, YAMUNA RIVER-BLOCK 9 KRN 4954 3410 KVA UNPLANNED 27-05-2020 15:07:25 27-05-2020 15:29:26 0:22 0.00056833 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unserved (MU) due to Sr. No. Area Affected Division Affected Transformer (in KVA). Unplanned Outage From DateTime To DateTime Duration (Hrs:Mins) Outage

BLOCK _A-SURAJMAL VIHAR, BLOCK C-SURAJMAL VIHAR, BLOCK B-SURAJMAL VIHAR, BLOCK D-SURAJMAL VIHAR, YAMUNA SPORTS COMPLEX-VIVEK VIHAR, PUSHPANJALI- ANAND VIHAR, VILL KARKARDOOMA-KARKAR DUMA, JAGRITI ENCLAVE-ANAND VIHAR, SURYA NIKETAN-RISHAB VIHAR, BAHUBALI ENCLAVE-ANAND VIHAR, SHYAM ENCLAVE-ANAND VIHAR, SAINI ENCLAVE-ANAND VIHAR, SURAJMAL VIHAR- 231 VIVEK VIHAR, KARKARDOOMA COMPLAX-KARKAR DUMA JLM 2580 5580 KVA UNPLANNED 27-05-2020 18:13:46 27-05-2020 18:57:24 0:43 0.00099139 MUs

BLOCK U-SHAKARPUR KHAS, BLOCK A-SHAKARPUR KHAS, BLOCK S-SCHOOL BLOCK, BLOCK S1-SCHOOL BLOCK, YAMUNA FLOOD PLAINS-LAXMI NAGAR YAMUNA FLOOD PLAINS, NEHRU ENCLAVE-SCHOOL BLOCK, DELHI DEVELOPMENT AUTHORITY- 232 SCHOOL BLOCK LNR 1301 990 KVA UNPLANNED 27-05-2020 18:16:41 27-05-2020 19:00:00 0:43 0.00246056 MUs 233 BLOCK D-NEW KONDALI VSE 216 0 KVA UNPLANNED 27-05-2020 18:37:00 27-05-2020 19:00:00 0:22 0.00015278 MUs 234 BLOCK T-AHATA KEDARA, SADAR BAZAR - RAM NAGAR PHG 934 990 KVA UNPLANNED 27-05-2020 18:37:00 27-05-2020 19:05:00 0:27 0.0001575 MUs

RAJIV COLONY-JHILMIL INDUSTRIAL AREA, BABARPUR WEST- BABAR PUR NNG, CHHAJJUPUR-BABAR PUR, BABARPUR EXTN.- BABAR PUR, BALBIR NAGAR EXTN.-SILAMPUR, BLOCK A-KABIR NAGAR, BLOCK B-KABIR NAGAR, PKT B-CHITRAKOOT, DEV 235 PUBLIC SCHOOL-CHITRAKOOT, BLOCK D-BLOCK C3 NNG 4479 3050 KVA UNPLANNED 28-05-2020 04:44:25 28-05-2020 05:38:52 0:54 0.000795 MUs

236 BLOCK B-VINOD NAGAR WEST, BLOCK D-VINOD NAGAR WEST LNR 491 990 KVA UNPLANNED 28-05-2020 05:44:00 28-05-2020 06:12:10 0:28 0.00081667 MUs 237 HATHI KHANA-NAWAB GANJ PHG 1092 990 KVA UNPLANNED 28-05-2020 08:41:58 28-05-2020 09:02:31 0:20 0.00005556 MUs

BLOCK A-SHASTRI PARK, BLOCK C-SHASTRI PARK, BLOCK B- SHASTRI PARK, BLOCK E-ZERO PUSTA, NAYAGAON-NEW KATWARA, KACHI COLONY-JAGJEET NAGAR, BLOCK A-GHONDA PATTI, BLOCK H-GHONDA PATTI, BLOCK C-GHONDA PATTI, LIG/MIG RES/NON COMM AREA-SHASTRI PARK, ZERO PUSTA- USMAN PUR, BLOCK D-BHAJANPURA, BLOCK C-BHAJANPURA, BLOCK B-MANUJPUR, JAGJEET NAGAR-GHONDA, BLOCK J- KARTAR NAGAR, GAUTAM VIHAR-GHONDA, GAMRI-GHONDA, GHONDA PATTI, BLOCK C-JAI PRAKASH NAGAR, BLOCK B- KARTAR NAGAR, BLOCK G-ZERO PUSTA, DELHI VIDHYUT 238 BROAD-ZERO PUSTA YVR 6903 7960 KVA UNPLANNED 28-05-2020 08:46:00 28-05-2020 09:35:00 0:49 0.00111611 MUs 239 BLOCK 9-GANDHI NAGAR KRN 176 990 KVA UNPLANNED 28-05-2020 11:43:05 28-05-2020 12:12:05 0:29 0.00000806 MUs 240 SEWA DHAM-MANDOLI NNG 363 400 KVA UNPLANNED 28-05-2020 12:43:26 28-05-2020 13:11:43 0:28 0.00032667 MUs

KINARI BAZAR-DHARAM PURA, MAIN BAZAR CHANDANI CHOWK-SISGANJ, DARIBA KALA-KATRA MASHRU, GOVT. BOYS SECONDARY SCHOOL-KUCHA ALAM, DARIBA MARKET-KATRA 241 MASHRU, KUCHA JAGLLA-KUCHA ALAM CCK 611 990 KVA UNPLANNED 28-05-2020 13:06:11 28-05-2020 13:47:37 0:41 0.00004556 MUs BLOCK D-OLD MUSTAFABAD, BLOCK H-OLD MUSTAFABAD, 242 BLOCK A-MAN SINGH NAGAR KWN 1055 0 KVA UNPLANNED 28-05-2020 13:21:27 28-05-2020 13:46:22 0:24 0.00032667 MUs 243 GANESH NAGAR-SHAKARPUR KHAS LNR 162 990 KVA UNPLANNED 28-05-2020 15:01:00 28-05-2020 15:19:58 0:18 0.00005 MUs BLOCK C10 MAHANAGAR STAFF UNION-COMMUNITY CENTRE 244 YAMUNA VIHAR BLOCK C YVR 43 990 KVA UNPLANNED 28-05-2020 15:47:12 28-05-2020 15:49:28 0:2 0.00000278 MUs

ZAKIR HUSAIN P.G. EVENING COLLAGE-SKD BASTI, GOVT. GIRLS SENIOR SECONDARY SCHOOL-TURKMAN GATE, CHANDANI 245 MAHAL-CHANDNI CHOWK, RAM MANDIR-KAMLA MARKET DRG 704 1980 KVA UNPLANNED 28-05-2020 15:53:27 28-05-2020 16:33:16 0:39 0.00031417 MUs 246 DDA FLATS-KARKAR DUMA JLM 104 990 KVA UNPLANNED 28-05-2020 16:31:59 28-05-2020 17:10:58 0:38 0.00031667 MUs 247 KIRAN VIHAR-ANAND VIHAR JLM 259 990 KVA UNPLANNED 28-05-2020 16:50:49 28-05-2020 17:20:33 0:29 0.00024167 MUs

BLOCK B-SUBHASH MOHALLA, SANT NIRANKARI BHAVAN- GANGA VIHAR KWN, VIJAY PARK-YAMUNA VIHAR, BLOCK C12- YAMUNA VIHAR, BLOCK C6-YAMUNA VIHAR, BLOCK C7- YAMUNA VIHAR, BLOCK C2-YAMUNA VIHAR, BLOCK C10 MAHANAGAR STAFF UNION-COMMUNITY CENTRE YAMUNA VIHAR BLOCK C, SUBHASH VIHAR-YAMUNA VIHAR, BLOCK C8- YAMUNA VIHAR, MAUJ PUR COMPLEX 1, NORTH GHONDA, BLOCK C3-YAMUNA VIHAR, BSES 66 KV GRID S/STATION- 248 COMMUNITY CENTRE YAMUNA VIHAR YVR 2560 2380 KVA UNPLANNED 28-05-2020 17:19:00 28-05-2020 17:52:41 0:33 0.00114583 MUs

BLOCK B-SUBHASH MOHALLA, SANT NIRANKARI BHAVAN- GANGA VIHAR KWN, VIJAY PARK-YAMUNA VIHAR, BLOCK C12- YAMUNA VIHAR, BLOCK C6-YAMUNA VIHAR, BLOCK C7- YAMUNA VIHAR, BLOCK C2-YAMUNA VIHAR, BLOCK C10 MAHANAGAR STAFF UNION-COMMUNITY CENTRE YAMUNA VIHAR BLOCK C, SUBHASH VIHAR-YAMUNA VIHAR, BLOCK C8- YAMUNA VIHAR, JAFFRABAD-MAUJ PUR, MAUJ PUR COMPLEX 1, NORTH GHONDA, BLOCK C3-YAMUNA VIHAR, BSES 66 KV 249 GRID S/STATION-COMMUNITY CENTRE YAMUNA VIHAR YVR 2560 2380 KVA UNPLANNED 28-05-2020 17:57:00 28-05-2020 18:50:00 0:53 0.00184028 MUs MANDAWALI FAZALPUR BLOCK B-JOSHI COLONY, J.J. COLONY- MOTHER DAIRY, KARISHMA APPARTMENT-MOTHER DAIRY, MITRA APPARTMENT-MOTHER DAIRY, VANDANA APPARTMENT-MOTHER DAIRY, SHUBHAM APARTMENT- MOTHER DAIRY, AJANTA APARTMENT-MOTHER DAIRY, ORIENTAL APARTMENT-MOTHER DAIRY, AGGARWAL PLAZA- 250 MOTHER DAIRY LNR 808 3320 KVA UNPLANNED 28-05-2020 18:28:27 28-05-2020 19:10:00 0:41 0.00056944 MUs

PKT 6-NEW KONDALI, PKT 2-NEW KONDALI, PKT 3-NEW KONDALI, SPORTS COMPLEX-VASUNDHARA ENCLAVE VSE, MANGAL APPARTMENT-VASUNDHARA ENCLAVE VSE, HINDON APARTMENT-VASUNDHARA ENCLAVE VSE, NDSE APPARTMENT- VASUNDHARA ENCLAVE VSE, ANIKET APPARTMENT- VASUNDHARA ENCLAVE VSE, ABDUL FAZAL APPARTMENT- VASUNDHARA ENCLAVE VSE, CITY APPARTMENT- VASUNDHARA ENCLAVE VSE, GAS AGENCY-VASUNDHARA ENCLAVE VSE, NAVAL APPARTMENT-DALLU PURA VSE, BLOCK 251 A-DALLU PURA VSE VSE 879 3090 KVA UNPLANNED 28-05-2020 18:49:44 28-05-2020 19:45:00 0:55 0.00045833 MUs

NAI SARAK-JOGIWARA, KATRA NAWAB-CHANDNI CHOWK, BALI MARAN-BARA DARI, NAI SARAK-KATRA ASRAFI, ROSHAN PURA- 252 CHANDNI CHOWK, MAIN BAZAR-KHUSH DIL CCK 2317 3960 KVA UNPLANNED 28-05-2020 20:46:27 28-05-2020 21:30:09 0:43 0.00016722 MUs

BLOCK T-GAUTAM PURI, VISHWAS NAGAR EXTN.-SHAHDARA, 253 VISHWAS NAGAR, VISHWAS NAGAR EXTN.-SHAHDARA JLM 2909 3280 KVA UNPLANNED 28-05-2020 21:36:00 28-05-2020 22:18:00 0:42 0.00044333 MUs

MAIN BAZAR CHANDANI CHOWK-SISGANJ, DARIBA KALA- KATRA MASHRU, FATEHPURI-KUCHA HASIRAM, BLOCK C- KHAJURI KHAS, BLOCK A-KHAJURI KHAS, CLOCK C-BIHARIPUR, BLOCK C-KHAJURI KHAS, BLOCK B-KHAJURI KHAS, PKT A-BLOCK B, BLOCK J-KHAJURI KHAS, LIG/MIG RES/NON COMM AREA- BLOCK B, BLOCK I-KHAJURI KHAS EXTN., BLOCK D-SHERPUR, 254 BLOCK C-SHERPUR KWN 5637 0 KVA UNPLANNED 29-05-2020 03:13:28 29-05-2020 03:50:00 0:36 0.00031 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unserved (MU) due to Sr. No. Area Affected Division Affected Transformer (in KVA). Unplanned Outage From DateTime To DateTime Duration (Hrs:Mins) Outage SUBHASH PARK-GORAKH PARK, DSIDC COMPLEX-SEELAMPUR 255 YVR YVR 2086 3150 KVA UNPLANNED 29-05-2020 05:08:29 29-05-2020 06:00:00 0:51 0.00121833 MUs 256 SEWA DHAM-MANDOLI NNG 138 400 KVA UNPLANNED 29-05-2020 07:22:28 29-05-2020 07:48:58 0:26 0.00011556 MUs MEDICAL COUNCIL OF INDIA-BAL BHAWAN, MINISTRY OF COMMUNICATION-ROUSE AVENUE, INDRAPRASTH HEAD POST 257 OFFICE-ITO DRG 362 0 KVA UNPLANNED 29-05-2020 07:36:00 29-05-2020 08:35:00 0:58 0.00045111 MUs 258 KUNDAN NAGAR-LAKSHMI NAGAR LNR 12 990 KVA UNPLANNED 29-05-2020 09:30:00 29-05-2020 09:50:52 0:20 0.00005556 MUs

M.C.P. SCHOOL-POCKET O, DELHI JAL BOARD-POCKET I, BLOCK J & K-POCKET J&K, HANSRAJ SCHOOL-POCKET H, MUKHRJI SCHOOL-POCKET L, DDA FLATS-POCKET SG, DDA MARKET PKT B 259 & E-POCKET F & E, SHAHNI DEV MANDIR-POCKET SG DGN 1927 2250 KVA UNPLANNED 29-05-2020 11:08:35 29-05-2020 11:28:00 0:19 0.00000528 MUs 260 BLOCK A & B-VASUNDHARA ENCLAVE VSE 86 630 KVA UNPLANNED 29-05-2020 11:57:39 29-05-2020 12:31:19 0:33 0.00009167 MUs 261 BLOCK A & B-VASUNDHARA ENCLAVE VSE 27 630 KVA UNPLANNED 29-05-2020 11:59:53 29-05-2020 12:29:38 0:29 0.00008056 MUs 262 BLOCK 16-EAST PATEL NAGAR PNR 388 990 KVA UNPLANNED 29-05-2020 14:01:02 29-05-2020 14:30:00 0:28 0.00023333 MUs BLOCK A-GURU RAMDAS NAGAR, GURU RAMDAS NAGAR- 263 LAKSHMI NAGAR LNR 11 990 KVA UNPLANNED 29-05-2020 15:06:24 29-05-2020 15:24:41 0:18 0 MUs BLOCK X-WEST PATEL NAGAR, BLOCK 8-WEST PATEL NAGAR, PATEL NAGAR POST OFFICE-EAST PATEL NAGAR, BLOCK 24- WEST PATEL NAGAR, BLOCK 31-WEST PATEL NAGAR, BLOCK 32- WEST PATEL NAGAR, PKT C-BLOCK B, BLOCK A-WEST PATEL NAGAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, BLOCK E-WEST PATEL NAGAR, BLOCK 25-WEST PATEL NAGAR, P.G.D.A.V. SR. SCHOOL-EAST PATEL NAGAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, BLOCK B- PUNJABI BASTI, BLOCK 12-WEST PATEL NAGAR, BLOCK 7-WEST PATEL NAGAR, GGS INDRAPRASTHA UNIVERSITY-KASHMERE GATE, BLOCK N-SHIV VIHAR, BLOCK Z-WEST PATEL NAGAR, BLOCK F-INDIRA VIHAR, BLOCK 11-EAST PATEL NAGAR, LIG/MIG RES/NON COMM AREA-B-BLOCK SONIA VIHAR, BLOCK B-WEST PATEL NAGAR, DAYANAND MODEL SCHOOL(SECONDARY)-WEST PATEL NAGAR, BLOCK M-SHIV VIHAR, BLOCK 23-WEST PATEL NAGAR, BLOCK A-SADATPUR EXT-PUSTA AREA-L BLOCK, BHAJANPURA-DAYALPUR, BLOCK 24- SARVODAYA KANYA VIDYALAYA, BLOCK 28-WEST PATEL NAGAR, BLOCK 2-WEST PATEL NAGAR, PKT R-BLOCK D, GEETA COLONY, BLOCK 1-WEST PATEL NAGAR, SPORTS COMPLEX- VASUNDHARA ENCLAVE VSE, BLOCK 15-WEST PATEL NAGAR, BLOCK E-INDIRA VIHAR, BLOCK 3-WEST PATEL NAGAR, BLOCK H-BHAGIRATHI VIHAR, DARYA GANJ, THAKKAR BAPA NAGAR- BLOCK 16, JAFFRABAD-MAUJ PUR, BLOCK F-SHIV VIHAR, BLOCK 264 6-WEST PATEL NAGAR PNR 5948 1980 KVA UNPLANNED 29-05-2020 17:25:29 29-05-2020 18:15:13 0:49 0.00080306 MUs

BLOCK I-ARAM BAGH, BLOCK II-ARAM BAGH, CHUNA MANDI- PAHAR GANJ, MANTOLA MOHALLA-PAHAR GANJ, MULTANI DHANDA-SADAR BAZAR, S.R.T. NAGAR-ARYA NAGAR, BLOCK C- 265 AMAR NAGAR, BLOCK L-AMAR NAGAR PHG 3457 2970 KVA UNPLANNED 29-05-2020 17:46:29 29-05-2020 18:35:00 0:48 0.00109333 MUs BLOCK I-ARAM BAGH, BLOCK II-ARAM BAGH, CHUNA MANDI- PAHAR GANJ, MANTOLA MOHALLA-PAHAR GANJ, PANCHKUIAN ROAD RAILWAY COLONY-PAHAR GANJ, S.R.T. 266 NAGAR-ARYA NAGAR PHG 2959 2610 KVA UNPLANNED 29-05-2020 18:00:29 29-05-2020 18:14:42 0:14 0.00013222 MUs

KHUREJI KHAS-SWASTHYA VIHAR, BRIJ PURI-SWASTHYA VIHAR, OLD BRIJPURI-SWASTHYA VIHAR, CHANDER NAGAR-KRISHNA NAGAR, CHANDER NAGAR BLOCK C-PANDIT PARK, CHANDER NAGAR BLOCK C-KRISHNA NAGAR EXTN., ARAM PARK-GEETA COLONY, BLOCK 17-GEETA COLONY, BLOCK 16-GEETA COLONY, BLOCK 18-GEETA COLONY, SAROJINI PARK-GEETA COLONY, SHIVPURI-JAGATPURI, JHEEL-GHONDALI, WEST LAXMI MARKET 267 KHUREJI-ARAM PARK, SAROJINI PARK-ARAM PARK KRN 6450 1620 KVA UNPLANNED 29-05-2020 19:12:29 29-05-2020 19:52:52 0:40 0.00102222 MUs

SUBHASH PARK-GORAKH PARK, NEW JAFFRABAD-GORAKH PARK, BLOCK G-SILAMPUR COLONY, BLOCK E-NEW SILAMPURI PHASE II, BLOCK H-GHONDA PATTI, VIJAY PARK-YAMUNA VIHAR, BLOCK C12-YAMUNA VIHAR, JAFFRABAD-MAUJ PUR, BLOCK C5-YAMUNA VIHAR, BLOCK C4-YAMUNA VIHAR, BLOCK D-BHAJANPURA, BLOCK C-BHAJANPURA, BLOCK B-MANUJPUR, BLOCK B-GARI MANDU, GHONDA PATTI, JAFFRABAD-MAUJ 268 PUR, BLOCK E-SUBHASH MOHALLA YVR 4477 3600 KVA UNPLANNED 29-05-2020 19:16:29 29-05-2020 20:07:00 0:50 0.001375 MUs

DR BHIM RAO AMBEDKAR COLONY-JHILMIL INDUSTRIAL AREA, CHIKAMBARPUR-OLD SIMAPURI, SONIA GANDHI JJ CAMP- JHILMIL INDUSTRIAL AREA, BLOCK A-JHILMIL INDUSTRIAL AREA, BLOCK R- AADINATH BHAWAN-POCKET R, PETROL PUMP-POCKET C, SIYARAM-GHISA, MTNL OFFICE-DILSHAD GARDEN, DAMODER PARK-DILSHAD GARDEN, RED CROSS 269 HOSPITAL CHIKAMBARPUR-OLD SIMAPURI DGN 675 0 KVA UNPLANNED 29-05-2020 19:29:28 29-05-2020 20:28:00 0:58 0.00066056 MUs

PKT H-BLOCK E, BLOCK D-KHAJURI KHAS, BLOCK C-KHAJURI KHAS, BLOCK A-KHAJURI KHAS, BLOCK B-CHANDU NAGAR, BLOCK B-KHAJURI KHAS, BLOCK J-KHAJURI KHAS, LIG/MIG 270 RES/NON COMM AREA-BLOCK B, BLOCK I-KHAJURI KHAS EXTN. KWN 6278 2650 KVA UNPLANNED 29-05-2020 21:28:29 29-05-2020 22:25:00 0:56 0.00088667 MUs

PKT A-BLOCK E, BLOCK B-SADATPUR EXT-PUSTA AREA-M BLOCK, WEST KARAWAL NAGAR, BLOCK C-KARAWAL NAGAR, BLOCK E-SADAT PUR, BLOCK B-SADAT PUR, BLOCK C-SADAT PUR, PKT A2-BLOCK E, PKT E-SADATPUR EXT-PUSTA AREA-K 271 BLOCK, BLOCK A-KARAWAL NAGAR (DEHROTI) KWN 0 0 KVA UNPLANNED 30-05-2020 02:00:00 30-05-2020 02:40:00 0:40 0 MUs INSTITUTIONAL AREA BLOCK B-ALL INDIA DEAF & DUMB 272 SOCIETY, HOSPITAL AREA-INSTITUTIONAL AREA JLM 17 0 KVA UNPLANNED 30-05-2020 04:58:29 30-05-2020 05:40:00 0:41 0.00002278 MUs

SHAHDARA JLM, KASTURBA NAGAR-SHAHDARA, MAHARAM NAGAR-SHAHDARA, AMBEDKAR NAGAR-SHAHDARA, ARJUN 273 NAGAR EAST-SHAHDARA, JAWALA NAGAR-SHAHDARA JLM 501 0 KVA UNPLANNED 30-05-2020 06:15:00 30-05-2020 07:13:00 0:58 0.00093444 MUs

D.S.I.D.C. COMPLEX-DTC DEPOT, BLOCK A4-NAND NAGARI, MCD PRIMARY SCHOOL-BLOCK D1, BLOCK B4-NAND NAGARI, BLOCK B1-NAND NAGARI, BLOCK B3-NAND NAGARI, BLOCK A- MANDOLI EXTN., KARMACHARI RAJYA BEEMA HOSPITAL-DTC DEPOT, DELHI JAL BOARD MIG FLATS-POCKET A, BLOCK F- 274 BUNKAR VIHAR NNG 881 4400 KVA UNPLANNED 30-05-2020 07:26:29 30-05-2020 08:24:15 0:57 0.001615 MUs

SABOLI EXTN.-MANDOLI, BLOCK A-MANDOLI EXTN., SABOLI COLONY-MANDOLI, SABOLI VILLAGE-MANDOLI, BLOCK K-ANUP VIHAR, KABRISTAN-SABOLI COLONY, BANK OF BARODA-SABOLI COLONY, MCD SCHOOL-SABOLI COLONY, BLOCK D-MEET NAGAR, SEWA DHAM-MANDOLI, VILLAGE SABOLI-SABOLI 275 COLONY, SABOLI EXTN.-MANDOLI NNG 3928 630 KVA UNPLANNED 30-05-2020 07:47:30 30-05-2020 08:34:34 0:47 0.00137083 MUs 276 DAMODER PARK-DILSHAD GARDEN DGN 26 990 KVA UNPLANNED 30-05-2020 08:40:00 30-05-2020 09:05:00 0:24 0.00002 MUs

277 BLOCK A- RESI FLATS-POCKET A, DELHI JAL BOARD-POCKET C DGN 137 630 KVA UNPLANNED 30-05-2020 09:25:35 30-05-2020 09:50:00 0:24 0.00002 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unserved (MU) due to Sr. No. Area Affected Division Affected Transformer (in KVA). Unplanned Outage From DateTime To DateTime Duration (Hrs:Mins) Outage 278 BLOCK _A-SURAJMAL VIHAR, SHAHDARA JLM JLM 12 800 KVA UNPLANNED 30-05-2020 10:51:30 30-05-2020 11:28:08 0:36 0.00046 MUs 279 INDUSTRIAL AREA-PATPAR GANJ INDUSTRIAL AREA LNR 81 0 KVA UNPLANNED 30-05-2020 12:00:30 30-05-2020 12:25:00 0:24 0.00038667 MUs

280 BLOCK C12-YAMUNA VIHAR, BLOCK C7-YAMUNA VIHAR YVR 67 990 KVA UNPLANNED 30-05-2020 12:03:55 30-05-2020 12:40:20 0:36 0.00005 MUs 281 GURU ANGAD NAGAR EAST-SWASTHYA VIHAR LNR 274 630 KVA UNPLANNED 30-05-2020 13:32:48 30-05-2020 13:56:44 0:23 0 MUs

BHARTI COLONY-NIRMAN VIHAR, BLOCK C-PREET VIHAR, GGS INDRAPRASTHA UNIVERSITY-KASHMERE GATE, MAIN MARKET- KATRA DHOBI, SADAR BAZAR-RAJENDRA MARKET, ZEENAT BARI-MORI GATE, KASHMIRI GATE-MORI GATE, CHABI 282 GANJ-MORI GATE, GOVT OF N C T OFFICE-KASHMERE GATE CCK 3989 6570 KVA UNPLANNED 30-05-2020 14:31:00 30-05-2020 15:29:00 0:58 0.00051556 MUs

LIG/MIG RES/NON COMM AREA-A-BLOCK SHRI RAM COLONY, BLOCK A-SHRI RAM COLONY, BLOCK D-C-BLOCK SHRI RAM COLONY, BLOCK F-WEST KARAWAL NAGAR, BLOCK D-DLF ANKUR VIHAR, BLOCK F & G-BHAGAT SINGH COLONY, WEST KARAWAL NAGAR, LIG/MIG RES/NON COMM AREA-SHRI RAM COLONY, BLOCK H-BHAGIRATHI VIHAR, BLOCK A-G- BLOCK SONIA VIHAR EXTENSION, BLOCK B-G- BLOCK SONIA VIHAR EXTENSION, BLOCK E-G- BLOCK SONIA VIHAR EXTENSION, BLOCK B-KHAJURI KHAS, BLOCK F-BHAGAT SINGH COLONY, BLOCK A-BHAGAT SINGH COLONY, BLOCK E-BHAGAT SINGH COLONY, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-C-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-C-BLOCK SONIA VIHAR, BLOCK D-WEST KARAWAL NAGAR, LIG/MIG RES/NON COMM AREA-G- BLOCK SONIA VIHAR EXTENSION, LIG/MIG RES/NON COMM AREA-G- BLOCK SONIA VIHAR EXTENSION, BLOCK D-WEST KARAWAL NAGAR, LIG/MIG RES/NON COMM 283 AREA-G- BLOCK SONIA VIHAR EXTENSION KWN 7107 630 KVA UNPLANNED 30-05-2020 15:46:31 30-05-2020 16:40:00 0:53 0.001855 MUs

284 LIG/MIG RES/NON COMM AREA-FEROJ SHAH KOTLA STADIUM DRG 110 990 KVA UNPLANNED 30-05-2020 17:53:00 30-05-2020 18:33:01 0:40 0 MUs 285 BLOCK A-MANDAWALI LNR 10 990 KVA UNPLANNED 30-05-2020 21:58:11 30-05-2020 22:16:51 0:18 0 MUs

BLOCK B-MANUJPUR, BLOCK C5-YAMUNA VIHAR, SUBHASH PARK-GORAKH PARK, BLOCK C12-YAMUNA VIHAR, BLOCK B- GARI MANDU, BLOCK E-NEW SILAMPURI PHASE II, BLOCK C- BHAJANPURA, GHONDA PATTI, JAFFRABAD-MAUJ PUR, NEW JAFFRABAD-GORAKH PARK, BLOCK E-SUBHASH MOHALLA, JAFFRABAD-MAUJ PUR, BLOCK H-GHONDA PATTI, BLOCK G- SILAMPUR COLONY, BLOCK D-BHAJANPURA, BLOCK C4- 286 YAMUNA VIHAR, VIJAY PARK-YAMUNA VIHAR YVR 4477 3600 KVA UNPLANNED 30-05-2020 23:22:31 30-05-2020 23:44:00 0:21 0.000385 MUs

GEETA COLONY, BLOCK 2-GEETA COLONY, BLOCK 8-GEETA 287 COLONY, BLOCK 1A-GEETA COLONY, BLOCK 2A-GEETA COLONY KRN 1478 1030 KVA UNPLANNED 31-05-2020 02:28:33 31-05-2020 03:00:00 0:31 0.00056833 MUs BABARPUR WEST-BABAR PUR NNG, BABARPUR EXTN.-BABAR 288 PUR NNG 3675 4240 KVA UNPLANNED 31-05-2020 02:37:32 31-05-2020 03:11:22 0:33 0.00022917 MUs 289 JHILMIL INDUSTRIAL AREA-JHILMIL COLONY DGN 398 1980 KVA UNPLANNED 31-05-2020 02:39:32 31-05-2020 04:28:00 1:48 0.0009 MUs

MAIN BAZAR CHANDANI CHOWK-SISGANJ, DARIBA KALA- KATRA MASHRU, FATEHPURI-KUCHA HASIRAM, BLOCK C- KHAJURI KHAS, BLOCK A-KHAJURI KHAS, CLOCK C-BIHARIPUR, BLOCK C-KHAJURI KHAS, BLOCK B-KHAJURI KHAS, PKT A-BLOCK B, BLOCK J-KHAJURI KHAS, LIG/MIG RES/NON COMM AREA- BLOCK B, BLOCK I-KHAJURI KHAS EXTN., BLOCK D-SHERPUR, BLOCK C-SHERPUR, LIG/MIG RES/NON COMM AREA-A-BLOCK 290 SONIA VIHAR KWN 5637 0 KVA UNPLANNED 31-05-2020 02:40:32 31-05-2020 03:30:00 0:49 0 MUs 291 SEWA DHAM-MANDOLI NNG 121 400 KVA UNPLANNED 31-05-2020 02:45:31 31-05-2020 03:15:37 0:30 0.00011667 MUs

BLOCK J-DILSHAD COLONY, JJC-DILSHAD COLONY, BLOCK G- DILSHAD COLONY, BLOCK B-DILSHAD COLONY, BLOCK F- DILSHAD COLONY, DAYANAND HOSPITAL-UNIVERSITY COLLEGE OF MEDICAL SCIENCES DGN, SIYARAM-GHISA, J.J.C.-KALANDER COLONY, DELHI JAL BOARD-POCKET I, HANSRAJ SCHOOL- POCKET H, BLOCK A-MANSAROWAR PARK, TUBLE-DILSHAD 292 COLONY, BLOCK C-DILSHAD COLONY DGN 3661 1660 KVA UNPLANNED 31-05-2020 02:44:00 31-05-2020 04:27:00 1:43 0.00268944 MUs

BLOCK J-JAGATPURI, BLOCK B-JAGATPURI, BLOCK A-BALDEV PARK EAST, BLOCK H-JAGATPURI, BLOCK E-ANARKALI COLONY NORTH, BLOCK B-SOUTH ANARKALI COLONY, BLOCK B- JAGATPURI, BLOCK K-JAGATPURI, EXTENTION-JAGATPURI, BLOCK A-ANARKALI COLONY NORTH, BLOCK D-SOUTH 293 ANARKALI COLONY KRN 6435 1980 KVA UNPLANNED 31-05-2020 03:00:32 31-05-2020 03:36:50 0:36 0.00073 MUs

SIMAPURI BUS DEPOT-DILSHAD COLONY, BLOCK J-DILSHAD COLONY, JJC-DILSHAD COLONY, BLOCK F-DILSHAD COLONY, BLOCK B-DILSHAD COLONY, BLOCK B-NEW SIMAPURI, BLOCK C- NEW SIMAPURI, BLOCK E-NEW SIMAPURI, BLOCK D-NEW SIMAPURI, BLOCK A-OLD SIMAPURI, DELHI JAL BOARD-POCKET C, BLOCK J-DILSHAD GARDEN, BLOCK E-NEW SIMAPURI, MCD PRIMARY SCHOOL-NEW SIMAPURI, NAGAR NIGAM PUBLIC 294 SCHOOL-POCKET C, SHIV MANDIR-NEW SIMAPURI DGN 2522 2380 KVA UNPLANNED 31-05-2020 03:01:32 31-05-2020 04:30:00 1:28 0.00200444 MUs

DDA FLATS-ROUSE AVENUE, GOVIND BALLABH PANT HASPITAL- LN JPN COLONY, BSES OFFICE-TURKMAN MARG, ZAKIR HUSAIN P.G. EVENING COLLAGE-SKD BASTI, DELHI GOVT. STAFF FLATS- PRESS ENCLAVE, BLOCK D-AJMERI GATE, RAILWAY COLONY- 295 CONNAUGHT PLACE DRG DRG 86 0 KVA UNPLANNED 31-05-2020 02:42:00 31-05-2020 03:32:00 0:49 0.00040833 MUs

BLOCK B-SUBHASH MOHALLA, BLOCK E-SUBHASH MOHALLA, VIJAY PARK-YAMUNA VIHAR, SUBHASH VIHAR-YAMUNA VIHAR, BLOCK B5-YAMUNA PUR (GONDA) BLOCK B, MAUJ PUR COMPLEX 1, NORTH GHONDA, BLOCK B4-YAMUNA VIHAR, BLOCK B3-YAMUNA VIHAR, BLOCK C-BHAJANPURA, TANKI ROAD-C-BLOCK BHAJANPURA, WEST GHONDA, TIKONA PARK- BHAJANPURA, BSES 66 KV GRID S/STATION-COMMUNITY CENTRE YAMUNA VIHAR, MUNICIPAL CORPN SCHOOL- SUBHASH VIHAR, BLOCK E-SUBHASH MOHALLA, BLOCK C- 296 BHAJANPURA, BLOCK D-BHAJANPURA YVR 6823 4270 KVA UNPLANNED 31-05-2020 03:09:25 31-05-2020 03:54:43 0:45 0.0012 MUs SUNDER PARK-SHAHDARA, BHOLA NATH NAGAR-SHAHDARA, MAHARAM NAGAR-SHAHDARA, EAST ROHTASH NAGAR- 297 SHAHDARA JLM 4158 3010 KVA UNPLANNED 31-05-2020 03:20:32 31-05-2020 04:01:30 0:40 0.00011111 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unserved (MU) due to Sr. No. Area Affected Division Affected Transformer (in KVA). Unplanned Outage From DateTime To DateTime Duration (Hrs:Mins) Outage

BLOCK 3B-SADAT PUR, PKT 2A-BLOCK A, LIG/MIG RES/NON COMM AREA-DAYALPUR EXTN., BLOCK B-NEW CHAUHAN PUR, BHAGAT NAGAR-DAYALPUR, BLOCK 1D-SADAT PUR, BLOCK F- SADAT PUR, BLOCK 1B-SADAT PUR, BLOCK 2C-SADAT PUR, BLOCK 5B-SADAT PUR, PKT A-BLOCK B, BLOCK A-MUSTAFABAD (DAYALPUR), PKT 1-BLOCK A, PKT B-BLOCK A, DEEKSHA MAHILA COLLAGE-DAYALPUR EXTN., BLOCK D-NEW CHAUHAN PUR, BLOCK C2-NEW CHAUHAN PUR, BLOCK B-NEW CHAUHAN PUR, BLOCK B-DAYALPUR, BLOCK E-DAYALPUR, BLOCK A- NEHRU VIHAR, BLOCK B-NEHRU VIHAR, BLOCK T-NEHRU 298 VIHAR, LIG/MIG RES/NON COMM AREA-DAYALPUR EXTN. KWN 4591 0 KVA UNPLANNED 31-05-2020 04:17:32 31-05-2020 05:05:00 0:47 0 MUs

BLOCK D-NEHRU VIHAR, BLOCK F-NEHRU VIHAR, BLOCK C- TUKMIRPUR, DARYA GANJ, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY-KASHMERE GATE, BLOCK B- CHANDU NAGAR, PKT R-BLOCK D, PKT C-BLOCK B, JAFFRABAD- MAUJ PUR, BLOCK A-SADATPUR EXT-PUSTA AREA-L BLOCK, BLOCK H-BHAGIRATHI VIHAR, BLOCK F-SHIV VIHAR, BLOCK M- SHIV VIHAR, BLOCK N-SHIV VIHAR, BLOCK A-NEHRU VIHAR, BLOCK C-NEHRU VIHAR, BLOCK M-NEHRU VIHAR, BLOCK B- NEHRU VIHAR, BLOCK E-NEHRU VIHAR, BLOCK Z-NEHRU VIHAR, BLOCK D-NEHRU VIHAR, BLOCK D-TUKMIRPUR, BLOCK B-TUKMIRPUR, BLOCK E-INDIRA VIHAR, SPORTS COMPLEX- VASUNDHARA ENCLAVE VSE, BHAJANPURA-DAYALPUR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-B-BLOCK SONIA VIHAR, BLOCK 299 F-INDIRA VIHAR KWN 7156 4740 KVA UNPLANNED 31-05-2020 05:07:33 31-05-2020 06:00:00 0:52 0.00004333 MUs

CHAUHAN BANGAR-JAFFRABAD, DARYA GANJ, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY-KASHMERE GATE, PKT R- BLOCK D, PKT C-BLOCK B, JAFFRABAD-MAUJ PUR, DAYANAND HOSPITAL-UNIVERSITY COLLEGE OF MEDICAL SCIENCES DGN, DELHI JAL BOARD-POCKET C, BLOCK A-SADATPUR EXT-PUSTA AREA-L BLOCK, SANSAR COMPOUND-DILSHAD GARDEN, BLOCK J-DILSHAD GARDEN, FACTORY-DILSHAD GARDEN, DAMODER PARK-DILSHAD GARDEN, DELHI POWER SUPPLY-DILSHAD GARDEN, TEMPLE-DILSHAD GARDEN, BLOCK H-BHAGIRATHI VIHAR, BLOCK F-SHIV VIHAR, BLOCK M-SHIV VIHAR, BLOCK N- SHIV VIHAR, BLOCK E-INDIRA VIHAR, SPORTS COMPLEX- VASUNDHARA ENCLAVE VSE, BHAJANPURA-DAYALPUR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-B-BLOCK SONIA VIHAR, BLOCK 300 F-INDIRA VIHAR DGN 1205 3600 KVA UNPLANNED 31-05-2020 06:36:32 31-05-2020 06:54:02 0:17 0.00018889 MUs MAHARAM NAGAR-SHAHDARA, SUNDER PARK-SHAHDARA, BHOLA NATH NAGAR-SHAHDARA, EAST ROHTASH NAGAR- 301 SHAHDARA JLM 4158 3010 KVA UNPLANNED 31-05-2020 06:42:34 31-05-2020 07:20:00 0:37 0.00001028 MUs 302 SEWA DHAM-MANDOLI NNG 26 400 KVA UNPLANNED 31-05-2020 08:17:34 31-05-2020 09:10:00 0:52 0.00004333 MUs 303 ARAM NAGAR-SADAR BAZAR PHG 193 990 KVA UNPLANNED 31-05-2020 08:27:59 31-05-2020 08:45:43 0:17 0.00007083 MUs KATRA NAWAB-CHANDNI CHOWK, BALI MARAN-BARA DARI, 304 TOWN HILL-KATRA NEEL CCK 492 990 KVA UNPLANNED 31-05-2020 09:41:09 31-05-2020 10:00:00 0:18 0.00001 MUs

305 BLOCK A- RESI FLATS-POCKET A, DELHI JAL BOARD-POCKET C DGN 137 630 KVA UNPLANNED 31-05-2020 09:43:01 31-05-2020 10:15:36 0:32 0.00002667 MUs WEST AZAD NAGAR, BLOCK H-KRISHNA NAGAR, BLOCK C- KRISHNA NAGAR, BLOCK F-KRISHNA NAGAR, BLOCK D-KRISHNA 306 NAGAR, BLOCK E-KRISHNA NAGAR KRN 2751 2970 KVA UNPLANNED 31-05-2020 09:42:00 31-05-2020 09:57:00 0:15 0.0001375 MUs 307 JHILMIL INDUSTRIAL AREA-JHILMIL COLONY DGN 6 630 KVA UNPLANNED 31-05-2020 09:44:15 31-05-2020 10:16:18 0:32 0.00002667 MUs

BLOCK_6-KAROL BAGH WEST EXTENSION AREA, BLOCK_17A- KAROL BAGH WEST EXTENSION AREA, BLOCK_14A-KAROL BAGH WEST EXTENSION AREA, BLOCK 25-OLD RAJENDRA NAGAR, DARYA GANJ, GEETA COLONY, RAMA KRISHNA MISSION FREE T.B. CLINIC-BLOCK 18, BLOCK 8-KAROL BAGH WEST EXTENSION AREA, BLOCK 15A-KAROL BAGH, GGS INDRAPRASTHA UNIVERSITY-KASHMERE GATE, PKT R-BLOCK D, PKT C-BLOCK B, JAFFRABAD-MAUJ PUR, BLOCK A-SADATPUR EXT-PUSTA AREA-L BLOCK, BLOCK H-BHAGIRATHI VIHAR, BLOCK F-SHIV VIHAR, BLOCK M-SHIV VIHAR, BLOCK N-SHIV VIHAR, BLOCK E-INDIRA VIHAR, MCD ADARSH SCHOOL-BLOCK 18, SANDHA RAMA SCHOOL-BLOCK 18, SPORTS COMPLEX- VASUNDHARA ENCLAVE VSE, BHAJANPURA-DAYALPUR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-B-BLOCK SONIA VIHAR, BLOCK 308 F-INDIRA VIHAR SRD 1752 2970 KVA UNPLANNED 31-05-2020 10:12:32 31-05-2020 11:05:00 0:52 0.00030333 MUs

SABOLI EXTN.-MANDOLI, BLOCK A-MANDOLI EXTN., SABOLI COLONY-MANDOLI, SABOLI VILLAGE-MANDOLI, BLOCK D- HARIJAN BASTI EAST EXTN., BLOCK E-SEWA DHAM, BLOCK K- ANUP VIHAR, KABRISTAN-SABOLI COLONY, BANK OF BARODA- SABOLI COLONY, MCD SCHOOL-SABOLI COLONY, BLOCK D- MEET NAGAR, SEWA DHAM-MANDOLI, VILLAGE SABOLI- SABOLI COLONY, SABOLI EXTN.-MANDOLI, SEWA DHAM- 309 MANDOLI NNG 3928 630 KVA UNPLANNED 31-05-2020 10:25:32 31-05-2020 11:00:00 0:34 0.00139778 MUs 310 BLOCK A-GURU RAMDAS NAGAR LNR 54 990 KVA UNPLANNED 31-05-2020 11:11:00 31-05-2020 11:32:00 0:20 0.00005556 MUs

BLOCK B6-NAND NAGARI, SABOLI EXTN.-MANDOLI, BLOCK A- MANDOLI EXTN., BLOCK A-BANK COLONY, SABOLI COLONY- MANDOLI, SABOLI VILLAGE-MANDOLI, BLOCK B-ANUP VIHAR, BLOCK E-SEWA DHAM, BUDH VIHAR-SEWA DHAM, BLOCK K- ANUP VIHAR, BLOCK A-ANUP VIHAR, BLOCK C-ANUP VIHAR, KABRISTAN-SABOLI COLONY, BANK OF BARODA-SABOLI COLONY, MCD SCHOOL-SABOLI COLONY, SEWA DHAM- MANDOLI, SABOLI COLONY-MANDOLI, VILLAGE SABOLI-SABOLI 311 COLONY, SABOLI EXTN.-MANDOLI NNG 3928 630 KVA UNPLANNED 31-05-2020 11:45:32 31-05-2020 12:20:00 0:34 0.00077444 MUs 312 JHEEL-JHEEL KHURENJA KRN 144 990 KVA UNPLANNED 31-05-2020 11:50:58 31-05-2020 12:23:49 0:32 0.00000889 MUs

ROHITASH NAGAR EAST-SILAMPUR, KABUL NAGAR-ROHITASH NAGAR, BLOCK B-SHRI RAM NAGAR, SUDARSHAN STEEL ROLLING MILL-RAM NAGAR EAST, RAM NAGAR-SILAMPUR, GOVT SCHOOL NO-2-DDA FLATS, BLOCK B-MANSAROWAR PARK, BLOCK A-MANSAROWAR PARK, JINDAL BHAWAN-RAM NAGAR EAST, SACHDEVA INDUSTRIES-RAM NAGAR EAST, MAHAVEER (TRANSPORT)-RAM NAGAR EXTN., DELHI JAL BOARD-DDA FLATS, BLOCK R-PRATAP PURA, JHILMIL 313 INDUSTRIAL AREA-JHILMIL COLONY DGN 3675 1620 KVA UNPLANNED 31-05-2020 11:56:32 31-05-2020 12:36:00 0:39 0.000585 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unserved (MU) due to Sr. No. Area Affected Division Affected Transformer (in KVA). Unplanned Outage From DateTime To DateTime Duration (Hrs:Mins) Outage 314 SEC C-MAYUR VIHAR PHASE III VSE 863 630 KVA UNPLANNED 31-05-2020 15:36:37 31-05-2020 15:59:50 0:23 0.00063889 MUs 315 BLOCK E-MADHU VIHAR LNR 86 630 KVA UNPLANNED 31-05-2020 16:12:00 31-05-2020 16:33:20 0:21 0.00005833 MUs

SABOLI EXTN.-MANDOLI, BLOCK C-HARSH VIHAR, BLOCK A- BANK COLONY, SABOLI VILLAGE-MANDOLI, BLOCK C-SEWA DHAM, BLOCK A-SEWA DHAM, SEWA DHAM-MANDOLI, BLOCK A-ANUP VIHAR, BLOCK B-HARSH VIHAR, BLOCK A-HARSH 316 VIHAR, RAJEEV NAGAR-SEWA DHAM, SEWA DHAM-MANDOLI NNG 181 400 KVA UNPLANNED 31-05-2020 18:05:00 31-05-2020 19:04:00 0:58 0.00033833 MUs

PKT C-BLOCK B, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, FACTORY-DILSHAD GARDEN, BLOCK J-DILSHAD GARDEN, TEMPLE-DILSHAD GARDEN, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, GGS INDRAPRASTHA UNIVERSITY-KASHMERE GATE, BLOCK N-SHIV VIHAR, BLOCK F- INDIRA VIHAR, LIG/MIG RES/NON COMM AREA-B-BLOCK SONIA VIHAR, CHAUHAN BANGAR-JAFFRABAD, DAMODER PARK-DILSHAD GARDEN, BLOCK M-SHIV VIHAR, BLOCK A- SADATPUR EXT-PUSTA AREA-L BLOCK, DELHI POWER SUPPLY- DILSHAD GARDEN, DELHI JAL BOARD-POCKET C, BHAJANPURA- DAYALPUR, SANSAR COMPOUND-DILSHAD GARDEN, PKT R- BLOCK D, GEETA COLONY, SPORTS COMPLEX-VASUNDHARA ENCLAVE VSE, BLOCK E-INDIRA VIHAR, DAYANAND HOSPITAL- UNIVERSITY COLLEGE OF MEDICAL SCIENCES DGN, BLOCK H- BHAGIRATHI VIHAR, DARYA GANJ, JAFFRABAD-MAUJ PUR, 317 BLOCK F-SHIV VIHAR DGN 1205 3600 KVA UNPLANNED 31-05-2020 18:05:33 31-05-2020 18:40:00 0:34 0.00103889 MUs BLOCK G-SILAMPUR COLONY, BLOCK E-NEW SILAMPURI PHASE 318 II, JAFFRABAD-MAUJ PUR YVR 1318 990 KVA UNPLANNED 31-05-2020 22:00:00 31-05-2020 22:47:53 0:47 0 MUs

319 BLOCK B-BRIJ PURI, BLOCK E-BRIJ PURI, BLOCK C-BRIJ PURI KWN 1269 630 KVA UNPLANNED 06-05-2020 16:40:00 06-05-2020 17:07:10 0:27 0 MUs

VISHWAS NAGAR EXTN.-SHAHDARA, VISHWAS NAGAR EXTN.- 320 SHAHDARA, BLOCK T-GAUTAM PURI, VISHWAS NAGAR JLM 2909 3280 KVA UNPLANNED 07-05-2020 10:04:27 07-05-2020 10:21:00 0:16 0.00004444 MUs SABOLI VILLAGE-MANDOLI, BLOCK B-ANUP VIHAR, BLOCK D- ANUP VIHAR, BLOCK K-ANUP VIHAR, BLOCK A-ANUP VIHAR, BLOCK C-ANUP VIHAR, BLOCK B-RAJIV NAGAR, SABOLI COLONY- 321 MANDOLI NNG 155 0 KVA UNPLANNED 03-05-2020 12:13:12 03-05-2020 12:44:44 0:31 0.000155 MUs

SABOLI EXTN.-MANDOLI, SABOLI COLONY-MANDOLI, SABOLI VILLAGE-MANDOLI, BLOCK B-ANUP VIHAR, NEW MANDOLI INDUSTRIAL AREA, BLOCK D-ANUP VIHAR, BLOCK K-ANUP VIHAR, BLOCK A-ANUP VIHAR, BLOCK C-ANUP VIHAR, BLOCK D- HARSH VIHAR, BLOCK D-MEET NAGAR, SEWA DHAM- MANDOLI, ANUP VIHAR-MANDOLI, SABOLI EXTN.-MANDOLI, 322 SEWA DHAM-MANDOLI NNG 691 0 KVA UNPLANNED 29-05-2020 19:56:24 29-05-2020 20:18:09 0:21 0.00046667 MUs

PART II-BLOCK H-NEW RAJENDRA NAGAR, PART II- N.P.L. QTRS.-NEW RAJENDRA NAGAR, DARYA GANJ, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY-KASHMERE GATE, PKT R- BLOCK D, PKT C-BLOCK B, JAFFRABAD-MAUJ PUR, BLOCK A- SADATPUR EXT-PUSTA AREA-L BLOCK, BLOCK H-BHAGIRATHI VIHAR, BLOCK F-SHIV VIHAR, BLOCK M-SHIV VIHAR, BLOCK N- SHIV VIHAR, BLOCK E-INDIRA VIHAR, BSNL-NEW RAJENDRA NAGAR, SPORTS COMPLEX-VASUNDHARA ENCLAVE VSE, BHAJANPURA-DAYALPUR, LIG/MIG RES/NON COMM AREA-A- BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-B-BLOCK SONIA 323 VIHAR, BLOCK F-INDIRA VIHAR SRD 1019 630 KVA PLANNED 21-05-2020 09:00:00 21-05-2020 13:20:50 4:20 0.00151667 MUs 324 CHETAN BASTI- BLOCK J-NEHRU NAGAR PNR 348 990 KVA UNPLANNED 30-05-2020 14:10:05 30-05-2020 14:44:35 0:34 0.00009444 MUs NAI SARAK-KATRA ASRAFI, ROSHAN PURA-CHANDNI CHOWK, MAIN BAZAR CHANDANI CHOWK-SISGANJ, GURUDWARA 325 SISGANJ ROAD-CHANDNI CHOWK CCK 390 990 KVA UNPLANNED 11-05-2020 12:50:21 11-05-2020 13:30:00 0:39 0.00010833 MUs

BLOCK A-TUKMIRPUR, BLOCK B-MUSTAFABAD (DAYALPUR), BLOCK 1B-SADAT PUR, BLOCK F-MUSTAFABAD (DAYALPUR), BLOCK C-MUSTAFABAD (DAYALPUR), BLOCK A-MUSTAFABAD (DAYALPUR), BLOCK D-MUSTAFABAD (DAYALPUR), BLOCK B- 326 DAYALPUR, BLOCK A-MUSTAFABAD (DAYALPUR) KWN 1275 990 KVA UNPLANNED 19-05-2020 14:00:42 19-05-2020 15:50:00 1:49 0.00060556 MUs

BLOCK C-SHRI RAM COLONY, LIG/MIG RES/NON COMM AREA- CHAWLA FARM, LIG/MIG RES/NON COMM AREA-G- BLOCK SONIA VIHAR EXTENSION, LIG/MIG RES/NON COMM AREA- MILAN GARDEN, LIG/MIG RES/NON COMM AREA-BALAJI MANDIR COLONY, BLOCK A-G- BLOCK SONIA VIHAR EXTENSION, BLOCK B-G- BLOCK SONIA VIHAR EXTENSION, BLOCK E-G- BLOCK SONIA VIHAR EXTENSION, BLOCK E-BHAGAT SINGH COLONY, CHAUHAN PATTI-VIJAY VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-SONIA VIHAR, LIG/MIG RES/NON COMM AREA-G- BLOCK SONIA VIHAR EXTENSION, LIG/MIG RES/NON COMM AREA-G- BLOCK SONIA VIHAR EXTENSION, LIG/MIG RES/NON COMM AREA-E-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-SONIA VIHAR, LIG/MIG RES/NON COMM AREA-G- BLOCK SONIA VIHAR EXTENSION, 327 LIG/MIG RES/NON COMM AREA-G-BLOCK SONIA VIHAR KWN 173 0 KVA UNPLANNED 19-05-2020 22:03:57 20-05-2020 01:45:56 3:41 0.00122778 MUs

GOVT. QTRS-64 KHAMBA, GOVIND BALLABH PANT HASPITAL- LN JPN COLONY, MEDICAL COUNCIL OF INDIA-BAL BHAWAN, UNIVERSITY GRANT COMMISSION-ITO, LIG/MIG RES/NON COMM AREA-FEROJ SHAH KOTLA STADIUM, MAMC AUDITORIUM-ROUSE AVENUE, MATA SUNDARI SCHOOL- ROUSE AVENUE, MEER DARD H.S.-ROUSE AVENUE, DEMOLISHED AREA-ROUSE AVENUE, BAR COUNSIL OF INDIA- 328 ROUSE AVENUE DRG 1799 0 KVA UNPLANNED 30-05-2020 17:30:00 30-05-2020 17:36:58 0:6 0.00000833 MUs BLOCK C-PATEL VIHAR, PHASE I-SHIV VIHAR, VILLAGE-KAMAL 329 VIHAR, BLOCK B-PATEL VIHAR KWN 130 100 KVA UNPLANNED 25-05-2020 11:22:09 25-05-2020 11:53:39 0:31 0.00012917 MUs JAFFRABAD-MAUJ PUR, MAUJ PUR COMPLEX 1, ARJUN 330 MOHALLA-MAUJPUR YVR 1100 990 KVA UNPLANNED 26-05-2020 18:06:58 26-05-2020 19:02:42 0:55 0.00061111 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unserved (MU) due to Sr. No. Area Affected Division Affected Transformer (in KVA). Unplanned Outage From DateTime To DateTime Duration (Hrs:Mins) Outage

DARYA GANJ, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY-KASHMERE GATE, PKT R-BLOCK D, PKT C-BLOCK B, JAFFRABAD-MAUJ PUR, BLOCK D-ASHOK NAGAR, G.B.SSS SCHOOL-GOKUL PURI, BLOCK B-EAST GOKUL PURI, BLOCK A- MEET NAGAR, BLOCK E-UTTARANCHAL COLONY, BLOCK A- SADATPUR EXT-PUSTA AREA-L BLOCK, BLOCK A-UTTARANCHAL COLONY, BLOCK B-UTTARANCHAL COLONY, BLOCK A-EAST GOKUL PURI, BLOCK C-AMAR COLONY, BLOCK C-MEET NAGAR, BLOCK H-BHAGIRATHI VIHAR, BLOCK F-SHIV VIHAR, BLOCK M- SHIV VIHAR, BLOCK N-SHIV VIHAR, BLOCK E-INDIRA VIHAR, SPORTS COMPLEX-VASUNDHARA ENCLAVE VSE, BHAJANPURA- DAYALPUR, BLOCK D-MEET NAGAR, BLOCK E-MEET NAGAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-B-BLOCK SONIA VIHAR, BLOCK 331 F-INDIRA VIHAR NNG 4225 2650 KVA UNPLANNED 18-05-2020 20:43:25 18-05-2020 21:35:23 0:51 0.00141667 MUs BLOCK C1-NEW ASHOK NAGAR, BLOCK A-NEW ASHOK NAGAR, BLOCK D-NEW ASHOK NAGAR, NEW ASHOK NAGAR MVR- 332 VASUNDHARA ENCLAVE MVR VSE 442 990 KVA UNPLANNED 18-05-2020 02:10:10 18-05-2020 02:51:36 0:41 0.00001139 MUs

PART II- INDIAN AGRICULTURAL RESEARCH INSTITUTE-NEW RAJENDRA NAGAR, BLOCK 38-OLD RAJENDRA NAGAR, BLOCK B- OLD RAJENDRA NAGAR, DARYA GANJ, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY-KASHMERE GATE, PKT R-BLOCK D, PKT C-BLOCK B, JAFFRABAD-MAUJ PUR, BLOCK A-SADATPUR EXT-PUSTA AREA-L BLOCK, BLOCK H-BHAGIRATHI VIHAR, BLOCK F-SHIV VIHAR, BLOCK M-SHIV VIHAR, BLOCK N-SHIV VIHAR, BLOCK E-INDIRA VIHAR, SPORTS COMPLEX- VASUNDHARA ENCLAVE VSE, BHAJANPURA-DAYALPUR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-B-BLOCK SONIA VIHAR, BLOCK 333 F-INDIRA VIHAR SRD 1019 630 KVA UNPLANNED 05-05-2020 11:33:47 05-05-2020 12:15:06 0:41 0.000205 MUs

SABOLI EXTN.-MANDOLI, BLOCK C-HARSH VIHAR, BLOCK E- RAJIV NAGAR, BLOCK C-SEWA DHAM, BLOCK A-SEWA DHAM, 334 BLOCK D-HARSH VIHAR, BLOCK B-HARSH VIHAR NNG 173 0 KVA UNPLANNED 16-05-2020 20:23:44 16-05-2020 21:14:50 0:51 0.00028333 MUs AZAD NAGAR EAST, SHANKAR NAGAR WEST-AZAD NAGAR, 335 SHANKAR NAGAR EXTN-AZAD NAGAR KRN 506 630 KVA UNPLANNED 13-05-2020 16:04:11 13-05-2020 16:25:00 0:20 0.00005556 MUs BLOCK A-SADATPUR EXT-PUSTA AREA-L BLOCK, BLOCK A- SADAT PUR, BLOCK A8-SADAT PUR, BLOCK F-SADAT PUR, BLOCK C1-SADAT PUR, BLOCK 5C-SADAT PUR, PKT C1- 336 SADATPUR EXT-PUSTA AREA-K BLOCK KWN 130 0 KVA UNPLANNED 29-05-2020 08:51:18 29-05-2020 09:17:32 0:26 0.00010833 MUs 337 GURU ANGAD NAGAR EAST-SWASTHYA VIHAR LNR 123 630 KVA UNPLANNED 21-05-2020 14:00:00 21-05-2020 14:52:49 0:52 0.00014444 MUs BLOCK A-B&C-JAGAT PURI, BLOCK A1-NAND NAGARI, BLOCK D- 338 JAGAT PURI NNG 409 630 KVA UNPLANNED 18-05-2020 11:07:27 18-05-2020 11:41:35 0:34 0.00014167 MUs

339 BABARPUR WEST-BABAR PUR NNG, BLOCK B-KABIR NAGAR NNG 94 990 KVA UNPLANNED 04-05-2020 22:59:58 04-05-2020 23:31:08 0:31 0.00012917 MUs

BLOCK A-MEET NAGAR, BLOCK A-BANK COLONY, BLOCK B- ANUP VIHAR, NEW MANDOLI INDUSTRIAL AREA, BLOCK B- PRATAP NAGAR, BLOCK C-NORTH CHHAJUPUR, BLOCK D-ANUP VIHAR, BLOCK K-ANUP VIHAR, BLOCK A-ANUP VIHAR, BLOCK C- ANUP VIHAR, BLOCK D-HARSH VIHAR, BLOCK E-MEET NAGAR, 340 SABOLI COLONY-MANDOLI, ANUP VIHAR-MANDOLI NNG 691 0 KVA UNPLANNED 22-05-2020 22:19:55 22-05-2020 22:54:02 0:34 0.00075556 MUs

KUCHA PATI RAM-CHANDNI CHOWK, CHAWRI BAZAR- CHANDNI CHOWK, HAUZ QAZI-CHANDNI CHOWK, MOSQUE- 341 LAL KUAN BAZAR, MOSQUE-KUCHA PATI RAM DRG 276 990 KVA UNPLANNED 08-05-2020 15:11:58 08-05-2020 15:41:01 0:29 0.00005639 MUs

BLOCK B-NEW CHAUHAN PUR, BLOCK B-BHAGAT SINGH COLONY, BLOCK A-BHAGAT SINGH COLONY, BLOCK C-BHAGAT SINGH COLONY, BLOCK H-BHAGAT SINGH COLONY, BLOCK I- BHAGAT SINGH COLONY, BLOCK K-KARAWAL NAGAR 342 (DEHROTI), BLOCK D-WEST KARAWAL NAGAR KWN 1818 0 KVA UNPLANNED 28-05-2020 16:28:00 28-05-2020 16:48:14 0:20 0.00011111 MUs 343 BLOCK A-EAST GOKUL PURI NNG 302 630 KVA UNPLANNED 22-05-2020 13:20:52 22-05-2020 14:09:13 0:48 0.0002 MUs LIG/MIG RES/NON COMM AREA-DAYALPUR EXTN., BLOCK K- KARAWAL NAGAR (DEHROTI), DEEKSHA MAHILA COLLAGE- 344 DAYALPUR EXTN. KWN 130 0 KVA UNPLANNED 31-05-2020 07:52:35 31-05-2020 08:35:33 0:42 0.000175 MUs BLOCK F-ZERO PUSTA, BLOCK G-ZERO PUSTA, BLOCK H-ZERO 345 PUSTA, YAMUNA VIHAR YAMUNA FLOOD PLAINS YVR 47 990 KVA UNPLANNED 16-05-2020 14:16:09 16-05-2020 15:09:14 0:53 0.00014722 MUs BLOCK CN-AMBIKA VIHAR BLOCK - B&C, PHASE I-SHIV VIHAR, BLOCK C-KARAWAL NAGAR, SHIV VIHAR, BLOCK F-SHIV VIHAR, BLOCK S-SHIV VIHAR, BLOCK C-SHIV VIHAR, BLOCK B-PRAKASH VIHAR, BLOCK A-SHIV VIHAR, BLOCK CN-AMBIKA VIHAR BLOCK - 346 B&C KWN 276 0 KVA UNPLANNED 30-05-2020 00:09:35 30-05-2020 00:53:51 0:44 0.00030556 MUs 347 BLOCK B-JYOTI NAGAR NNG 259 630 KVA UNPLANNED 26-05-2020 17:37:56 26-05-2020 17:58:32 0:20 0.00016667 MUs

SABOLI EXTN.-MANDOLI, BLOCK B-ANUP VIHAR, NEW MANDOLI INDUSTRIAL AREA, BLOCK K-ANUP VIHAR, BLOCK A- ANUP VIHAR, BLOCK C-ANUP VIHAR, MCD SCHOOL-SABOLI COLONY, SEWA DHAM-MANDOLI, ANUP VIHAR-MANDOLI, 348 SABOLI EXTN.-MANDOLI, SEWA DHAM-MANDOLI NNG 432 0 KVA UNPLANNED 14-05-2020 20:46:58 14-05-2020 21:40:00 0:53 0.00073611 MUs

SABOLI EXTN.-MANDOLI, BLOCK A-MANDOLI EXTN., BLOCK A- MANDOLI VILLAGE, SABOLI COLONY-MANDOLI, BLOCK A-SEWA DHAM, KABRISTAN-SABOLI COLONY, BANK OF BARODA-SABOLI COLONY, MCD SCHOOL-SABOLI COLONY, SEWA DHAM- MANDOLI, SABOLI COLONY-MANDOLI, VILLAGE SABOLI-SABOLI 349 COLONY, SABOLI EXTN.-MANDOLI NNG 0 0 KVA UNPLANNED 01-05-2020 11:05:00 01-05-2020 11:37:00 0:31 0 MUs

BLOCK J-KARTAR NAGAR, SADAR BAZAR - RAM NAGAR, BLOCK 350 C-JAI PRAKASH NAGAR, SADAR BAZAR - RAM NAGAR PHG 1938 990 KVA PLANNED 22-05-2020 10:00:00 22-05-2020 11:30:00 1:30 0.000525 MUs MOR SARAY COLONY-CHANDNI CHOWK, BHAGIRATH PLACE- CHANDNI CHOWK, GURUDWARA SISGANJ ROAD-CHANDNI 351 CHOWK CCK 235 990 KVA UNPLANNED 19-05-2020 15:16:29 19-05-2020 15:43:11 0:26 0.00003611 MUs

BLOCK U-SHIV VIHAR, BLOCK H-SHIV VIHAR, BLOCK D-SHIV VIHAR, BLOCK T-SHIV VIHAR, BLOCK F-SHIV VIHAR, BLOCK L- SHIV VIHAR, BLOCK S-SHIV VIHAR, BLOCK O-SHIV VIHAR, BLOCK M-SHIV VIHAR, BLOCK N-SHIV VIHAR, PKT R-BLOCK A, BLOCK V-O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK Q- 352 SHIV VIHAR, BLOCK H-SHIV VIHAR KWN 2122 0 KVA UNPLANNED 20-05-2020 11:09:12 20-05-2020 11:48:39 0:39 0.0001625 MUs

SABOLI EXTN.-MANDOLI, BLOCK A-MANDOLI EXTN., BLOCK A- BANK COLONY, SABOLI COLONY-MANDOLI, SABOLI VILLAGE- MANDOLI, BLOCK E-SEWA DHAM, MCD SCHOOL-MANDOLI 353 EXTN., BLOCK D-MANDOLI EXTN., SABOLI EXTN.-MANDOLI NNG 506 990 KVA UNPLANNED 14-05-2020 20:53:27 14-05-2020 21:31:38 0:38 0.00015833 MUs BLOCK B-ANUP VIHAR, NEW MANDOLI INDUSTRIAL AREA, 354 SEWA DHAM-MANDOLI, SEWA DHAM-MANDOLI NNG 432 0 KVA UNPLANNED 30-05-2020 09:04:14 30-05-2020 09:30:55 0:26 0.00036111 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unserved (MU) due to Sr. No. Area Affected Division Affected Transformer (in KVA). Unplanned Outage From DateTime To DateTime Duration (Hrs:Mins) Outage LALKUAN BAZAR-FRASH KHANA, NAYA BAZAR-CHANDNI 355 CHOWK CCK 324 990 KVA UNPLANNED 05-05-2020 11:23:34 05-05-2020 12:14:34 0:51 0.00014167 MUs

356 BLOCK C1-NEW ASHOK NAGAR, BLOCK E-NEW ASHOK NAGAR VSE 83 630 KVA UNPLANNED 22-05-2020 21:21:00 22-05-2020 22:03:46 0:42 0 MUs

BLOCK D-NEHRU VIHAR, BLOCK F-NEHRU VIHAR, BLOCK B- CHANDU NAGAR, BLOCK A-NEHRU VIHAR, BLOCK C-NEHRU VIHAR, BLOCK B-NEHRU VIHAR, BLOCK D-MUSTAFABAD 357 (DAYALPUR), BLOCK A-NEHRU VIHAR, BHAJANPURA-DAYALPUR KWN 1581 1500 KVA UNPLANNED 24-05-2020 00:17:40 24-05-2020 00:58:04 0:40 0.00044444 MUs

DARYA GANJ, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY-KASHMERE GATE, PKT R-BLOCK D, PKT C-BLOCK B, JAFFRABAD-MAUJ PUR, G.B.SSS SCHOOL-GOKUL PURI, BLOCK B- EAST GOKUL PURI, BLOCK A-MEET NAGAR, BLOCK E- UTTARANCHAL COLONY, BLOCK A-SADATPUR EXT-PUSTA AREA- L BLOCK, BLOCK B-UTTARANCHAL COLONY, BLOCK A-EAST GOKUL PURI, BLOCK H-BHAGIRATHI VIHAR, BLOCK F-SHIV VIHAR, BLOCK M-SHIV VIHAR, BLOCK N-SHIV VIHAR, BLOCK E- INDIRA VIHAR, SPORTS COMPLEX-VASUNDHARA ENCLAVE VSE, BHAJANPURA-DAYALPUR, BLOCK E-MEET NAGAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-B-BLOCK SONIA VIHAR, BLOCK F- 358 INDIRA VIHAR NNG 531 630 KVA UNPLANNED 07-05-2020 11:42:56 07-05-2020 12:40:00 0:57 0.00015833 MUs

SABOLI EXTN.-MANDOLI, BLOCK A-MANDOLI EXTN., BLOCK A- MANDOLI VILLAGE, BLOCK A-BANK COLONY, SABOLI COLONY- MANDOLI, BLOCK B-ANUP VIHAR, BLOCK B-SEWA DHAM, BLOCK A-SEWA DHAM, BLOCK K-ANUP VIHAR, KABRISTAN- SABOLI COLONY, BANK OF BARODA-SABOLI COLONY, MCD SCHOOL-SABOLI COLONY, BLOCK D-HARSH VIHAR, SEWA DHAM-MANDOLI, SABOLI COLONY-MANDOLI, ANUP VIHAR- MANDOLI, VILLAGE SABOLI-SABOLI COLONY, SABOLI EXTN.- 359 MANDOLI NNG 4340 0 KVA UNPLANNED 07-05-2020 00:20:00 07-05-2020 00:41:00 0:20 0.00030556 MUs

HARSH VIHAR SUB STATION-POLICE FARM, BLOCK A-BANK COLONY, SABOLI VILLAGE-MANDOLI, BLOCK E-SEWA DHAM, BLOCK A-SEWA DHAM, SEWA DHAM-MANDOLI, BLOCK B- 360 HARSH VIHAR, BLOCK A-HARSH VIHAR, SEWA DHAM-MANDOLI NNG 86 0 KVA UNPLANNED 19-05-2020 18:47:11 19-05-2020 19:40:00 0:52 0.00014444 MUs

BLOCK H-KRISHNA NAGAR, BLOCK A-KRISHNA NAGAR, BLOCK C- KRISHNA NAGAR, BLOCK F-KRISHNA NAGAR, BLOCK E-KRISHNA NAGAR, CHANDER NAGAR BLOCK C-KRISHNA NAGAR EXTN., 361 BLOCK J-KRISHNA NAGAR EAST KRN 262 990 KVA UNPLANNED 24-05-2020 13:37:01 24-05-2020 14:17:20 0:40 0.00015556 MUs

SABOLI EXTN.-MANDOLI, BLOCK C-HARSH VIHAR, BLOCK B- ANUP VIHAR, NEW MANDOLI INDUSTRIAL AREA, BLOCK D- ANUP VIHAR, BLOCK K-ANUP VIHAR, BLOCK A-ANUP VIHAR, BLOCK C-ANUP VIHAR, BLOCK D-HARSH VIHAR, BLOCK A- HARSH VIHAR, MCD SCHOOL-CHITRAKOOT, BLOCK A-EAST 362 GOKUL PURI, BLOCK D-MEET NAGAR, ANUP VIHAR-MANDOLI NNG 86 0 KVA UNPLANNED 17-05-2020 12:04:43 17-05-2020 12:59:30 0:54 0.00015 MUs 363 SITARAM BAZAR-CHANDNI CHOWK DRG 130 990 KVA UNPLANNED 06-05-2020 11:55:07 06-05-2020 12:52:11 0:57 0.0000475 MUs BLOCK E-SUBHASH MOHALLA, BLOCK B-BRAHM PURI, BLOCK D- 364 BHAJANPURA, BLOCK E-SUBHASH MOHALLA YVR 2822 990 KVA UNPLANNED 22-05-2020 11:53:16 22-05-2020 12:22:58 0:29 0.00016111 MUs

BLOCK B-KUNDAN NAGAR, KUNDAN NAGAR-LAKSHMI NAGAR, BANK ENCLAVE-LAKSHMI NAGAR, KRISHAN KUNJ-LAKSHMI 365 NAGAR, KRISHNA KUNJ-LAKSHMI NAGAR LNR 17 990 KVA UNPLANNED 28-05-2020 10:40:00 28-05-2020 11:30:40 0:50 0.00013889 MUs

366 BLOCK B-VINOD NAGAR WEST, BLOCK D-VINOD NAGAR WEST LNR 491 990 KVA UNPLANNED 28-05-2020 16:15:00 28-05-2020 17:10:00 0:54 0.0003 MUs 367 BLOCK B-BRIJ PURI KWN 0 990 KVA UNPLANNED 21-05-2020 16:45:53 21-05-2020 17:03:52 0:17 0.00004722 MUs SABOLI EXTN.-MANDOLI, BLOCK A-MANDOLI EXTN., BLOCK B- ANUP VIHAR, KABRISTAN-SABOLI COLONY, MCD SCHOOL- SABOLI COLONY, SEWA DHAM-MANDOLI, SABOLI EXTN.- 368 MANDOLI NNG 2394 0 KVA UNPLANNED 22-05-2020 10:27:33 22-05-2020 11:18:50 0:51 0.000425 MUs

KASTURBA NAGAR-SHAHDARA, MAHARAM NAGAR- SHAHDARA, AMBEDKAR NAGAR-SHAHDARA, BIHARI COLONY- SHAHDARA, VIVEK VIHAR BLOCK C, JAWALA NAGAR- 369 SHAHDARA, ANAJ MANDI- KASTOORBA-JAWALA NAGAR JLM 7 990 KVA UNPLANNED 23-05-2020 00:30:00 23-05-2020 02:12:40 1:42 0.00014167 MUs

SUNDER PARK-SHAHDARA, BHOLA NATH NAGAR-SHAHDARA, 370 EAST ROHTASH NAGAR-SHAHDARA, VISHWAS NAGAR JLM 159 990 KVA UNPLANNED 31-05-2020 09:38:50 31-05-2020 10:06:51 0:28 0.00003889 MUs BLOCK A-GURU RAMDAS NAGAR, BLOCK K-JAGAT RAM PARK, 371 GURU RAMDAS NAGAR-LAKSHMI NAGAR LNR 103 990 KVA UNPLANNED 26-05-2020 15:55:31 26-05-2020 16:39:43 0:44 0.00012222 MUs

HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK A-BANK COLONY, BLOCK D-HARIJAN BASTI EAST EXTN., BLOCK A-SEWA DHAM, BLOCK A-SEWA DHAM, BLOCK D- HARSH VIHAR, BLOCK B-HARSH VIHAR, BLOCK A-HARSH VIHAR, 372 BLOCK B-SEWA DHAM NNG 1903 0 KVA UNPLANNED 10-05-2020 13:01:28 10-05-2020 13:27:30 0:26 0.00050556 MUs GORAKH PARK WEST-SILAMPUR, BALBIR NAGAR EXTN.- 373 SILAMPUR, BLOCK A-PRATAP PURA DGN 615 990 KVA UNPLANNED 23-05-2020 23:15:59 23-05-2020 23:40:33 0:24 0.00012 MUs

374 BLOCK B-JOHRI PUR, BLOCK A-JOHRI PUR, BHAGIRATHI VIHAR KWN 1003 0 KVA UNPLANNED 31-05-2020 18:33:14 31-05-2020 19:06:56 0:33 0 MUs

BLOCK P-BRAHM PURI, BLOCK A-GHONDA PATTI, BLOCK C- GHONDA PATTI, BLOCK C-BHAJANPURA, BLOCK J-KARTAR 375 NAGAR, GAMRI-GHONDA, BLOCK C-JAI PRAKASH NAGAR YVR 341 990 KVA PLANNED 28-05-2020 11:00:00 28-05-2020 12:46:12 1:46 0 MUs BLOCK B2-YAMUNA VIHAR, BLOCK C-BHAJANPURA, BLOCK B- MANUJPUR, TANKI ROAD-C-BLOCK BHAJANPURA, BLOCK C- 376 BHAJANPURA YVR 290 0 KVA UNPLANNED 03-05-2020 05:42:58 03-05-2020 06:40:33 0:57 0.00012667 MUs

BHARAT MATA MANDIR-JJ COLONY, HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, NEW MANDOLI INDUSTRIAL AREA, DEEPAK MEDITECH-NEW MANDOLI INDUSTRIAL AREA, BLOCK C-SEWA DHAM, BLOCK A- 377 SEWA DHAM, BLOCK D-HARSH VIHAR, BLOCK A-RAJIV NAGAR NNG 432 400 KVA UNPLANNED 28-05-2020 06:03:13 28-05-2020 06:19:37 0:16 0.00022222 MUs

ARAM PARK-GEETA COLONY, BLOCK 17-GEETA COLONY, SAROJINI PARK-GEETA COLONY, WEST LAXMI MARKET KHUREJI- 378 ARAM PARK, SAROJINI PARK-ARAM PARK KRN 1399 630 KVA UNPLANNED 02-05-2020 12:20:00 02-05-2020 13:44:53 1:24 0.00014 MUs GANESH NAGAR SOUTH-INDRAPRASTHA EXTENSION, BLOCK A- MANDAWALI, BLOCK B-JOSHI COLONY, MANDAWALI FAZALPUR BLOCK B-JOSHI COLONY, MANDAWALI FAZALPUR 379 BLOCK A-JOSHI COLONY LNR 260 630 KVA UNPLANNED 21-05-2020 22:20:00 21-05-2020 22:50:24 0:30 0.00008333 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unserved (MU) due to Sr. No. Area Affected Division Affected Transformer (in KVA). Unplanned Outage From DateTime To DateTime Duration (Hrs:Mins) Outage

DARYA GANJ, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY-KASHMERE GATE, PKT R-BLOCK D, PKT C-BLOCK B, JAFFRABAD-MAUJ PUR, G.B.SSS SCHOOL-GOKUL PURI, BLOCK B- EAST GOKUL PURI, BLOCK E1-NAND NAGARI, BLOCK E- UTTARANCHAL COLONY, BLOCK A-SADATPUR EXT-PUSTA AREA- L BLOCK, BLOCK A-EAST GOKUL PURI, BLOCK H-BHAGIRATHI VIHAR, BLOCK F-SHIV VIHAR, BLOCK M-SHIV VIHAR, BLOCK N- SHIV VIHAR, BLOCK E-INDIRA VIHAR, SPORTS COMPLEX- VASUNDHARA ENCLAVE VSE, BHAJANPURA-DAYALPUR, BLOCK D-MEET NAGAR, BLOCK E-MEET NAGAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON 380 COMM AREA-B-BLOCK SONIA VIHAR, BLOCK F-INDIRA VIHAR NNG 533 630 KVA UNPLANNED 19-05-2020 10:38:47 19-05-2020 11:31:03 0:52 0.00014444 MUs 381 CHANDER NAGAR BLOCK D-SHASTRI PARK KRN 35 990 KVA UNPLANNED 03-05-2020 09:10:00 03-05-2020 11:06:46 1:56 0.00012889 MUs

BLOCK C-SHASTRI PARK, BLOCK B-NEW SILAMPURI PHASE II, BLOCK C-NEW SILAMPURI PHASE II, BLOCK E-NEW SILAMPURI PHASE II, BLOCK D- LIG/MIG RES/NON COMM AREA-NEW 382 SILAMPURI PHASE II, JAFFRABAD-MAUJ PUR YVR 43 0 KVA UNPLANNED 06-05-2020 16:32:52 06-05-2020 16:51:37 0:18 0.000025 MUs 383 BLOCK J-SHIV VIHAR, BLOCK Q-SHIV VIHAR KWN 787 0 KVA UNPLANNED 10-05-2020 13:27:53 10-05-2020 14:01:22 0:33 0.00009167 MUs

384 AMBEDKAR NAGAR-SHAHDARA, JAWALA NAGAR-SHAHDARA JLM 172 630 KVA PLANNED 22-05-2020 10:00:00 22-05-2020 14:05:00 4:5 0.00034028 MUs

BLOCK J-SHIV VIHAR, PKT W-BLOCK A, BLOCK Z-O & P BLOCKS SHIV VIHAR KARWAL NAGAR, SHIV VIHAR, BLOCK U-SHIV VIHAR, BLOCK Q-SHIV VIHAR, BLOCK H-SHIV VIHAR, BLOCK D- SHIV VIHAR, BLOCK T-SHIV VIHAR, BLOCK F-SHIV VIHAR, BLOCK L-SHIV VIHAR, BLOCK S-SHIV VIHAR, BLOCK O-SHIV VIHAR, BLOCK M-SHIV VIHAR, BLOCK N-SHIV VIHAR, BLOCK B-SHIV VIHAR, PKT R-BLOCK A, BLOCK V-O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK CN-AMBIKA VIHAR BLOCK - B&C, BLOCK J-SHIV VIHAR, BLOCK Q-SHIV VIHAR, BLOCK H-SHIV 385 VIHAR KWN 6574 0 KVA UNPLANNED 26-05-2020 17:02:38 26-05-2020 17:45:00 0:42 0.0007 MUs BLOCK C12-YAMUNA VIHAR, BLOCK C6-YAMUNA VIHAR, BLOCK C2-YAMUNA VIHAR, BLOCK C10 MAHANAGAR STAFF UNION- COMMUNITY CENTRE YAMUNA VIHAR BLOCK C, BLOCK C1- YAMUNA VIHAR, BLOCK C5-YAMUNA VIHAR, BLOCK C4- YAMUNA VIHAR, BLOCK C3-YAMUNA VIHAR, BLOCK B3- 386 YAMUNA VIHAR YVR 1606 990 KVA UNPLANNED 08-05-2020 11:49:55 08-05-2020 12:45:00 0:55 0.00045833 MUs BLOCK A-MEET NAGAR, BLOCK B-UTTARANCHAL COLONY, BLOCK A-EAST GOKUL PURI, BLOCK C-MEET NAGAR, BLOCK E- 387 MEET NAGAR NNG 812 1620 KVA UNPLANNED 27-05-2020 16:40:00 27-05-2020 17:06:00 0:26 0.00067889 MUs

MAHARAM NAGAR-SHAHDARA, JAWALA NAGAR-SHAHDARA, 388 SHAHDRA METRO STATION-SHAHDARA DGN JLM 94 630 KVA UNPLANNED 27-05-2020 03:21:36 27-05-2020 03:40:28 0:18 0.000025 MUs PRATAP NAGAR-PHASE I, BLOCK B-ANUP VIHAR, NEW MANDOLI INDUSTRIAL AREA, BLOCK B-PRATAP NAGAR, BLOCK K-ANUP VIHAR, BLOCK A-ANUP VIHAR, BLOCK C-ANUP VIHAR, SEWA DHAM-MANDOLI, ANUP VIHAR-MANDOLI, SEWA DHAM- 389 MANDOLI NNG 432 0 KVA UNPLANNED 13-05-2020 21:36:21 13-05-2020 21:59:31 0:23 0.00031944 MUs MULTANI DHANDA-SADAR BAZAR, BAGICHI ALLUDDIN-SADAR 390 BAZAR, MSC-ARAM NAGAR PHG 524 990 KVA PLANNED 19-05-2020 10:00:00 19-05-2020 13:35:00 3:35 0 MUs

SABOLI EXTN.-MANDOLI, BLOCK C-HARSH VIHAR, BLOCK A- BANK COLONY, BLOCK B-PRATAP NAGAR, BLOCK B-SEWA DHAM, BLOCK C-SEWA DHAM, BUDH VIHAR-SEWA DHAM, BLOCK A-SEWA DHAM, BLOCK D-HARSH VIHAR, BLOCK B- HARSH VIHAR, BLOCK A-HARSH VIHAR, BLOCK A-RAJIV NAGAR, BLOCK B-RAJIV NAGAR, BLOCK E-MEET NAGAR, BLOCK A-SEWA 391 DHAM, ANUP VIHAR-MANDOLI, RAJEEV NAGAR-SEWA DHAM NNG 173 0 KVA UNPLANNED 14-05-2020 23:09:47 15-05-2020 00:05:39 0:55 0.00030556 MUs BLOCK C-SHASTRI PARK, BLOCK B-NEW SILAMPURI PHASE II, BLOCK F- LIG/MIG RES/NON COMM AREA-NEW SILAMPURI PHASE II, BLOCK D- LIG/MIG RES/NON COMM AREA-NEW 392 SILAMPURI PHASE II YVR 86 0 KVA UNPLANNED 02-05-2020 13:15:10 02-05-2020 13:55:04 0:39 0.00010833 MUs BLOCK 1-RAM NAGAR EXTN., BLOCK 1-BHAGWANPUR KHERA, 393 MAHAVEER (TRANSPORT)-RAM NAGAR EXTN. DGN 92 990 KVA UNPLANNED 07-05-2020 11:47:47 07-05-2020 12:40:00 0:52 0.00007222 MUs

BLOCK C-PATEL VIHAR, BLOCK CN-MANGALAM VIHAR, PHASE I- SHIV VIHAR, VILLAGE-KAMAL VIHAR, SHIV VIHAR, BLOCK R- PATEL VIHAR, BLOCK B-PATEL VIHAR, BLOCK A-MANGALAM VIHAR, LIG/MIG RES/NON COMM AREA-D-BLOCK-SONIA 394 VIHAR, BLOCK C-PATEL VIHAR KWN 30 0 KVA UNPLANNED 20-05-2020 20:24:54 20-05-2020 21:23:00 0:58 0.00032222 MUs

HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK A-BANK COLONY, SABOLI VILLAGE-MANDOLI, BLOCK B-SEWA DHAM, BLOCK C-SEWA DHAM, BLOCK A-SEWA DHAM, SEWA DHAM-MANDOLI, BLOCK D-HARSH VIHAR, BLOCK B-HARSH VIHAR, BLOCK A-HARSH VIHAR, VILLAGE 395 SABOLI-SABOLI COLONY, SEWA DHAM-MANDOLI NNG 1432 0 KVA UNPLANNED 19-05-2020 17:10:00 19-05-2020 17:39:16 0:29 0.00008056 MUs

BLOCK D-NEHRU VIHAR, BLOCK F-NEHRU VIHAR, BLOCK B- CHANDU NAGAR, BLOCK B-NEW CHAUHAN PUR, BLOCK Z- 396 NEHRU VIHAR, BLOCK B-NEHRU VIHAR, BLOCK T-NEHRU VIHAR KWN 1042 990 KVA UNPLANNED 31-05-2020 16:57:26 31-05-2020 18:06:19 1:8 0.00037778 MUs BLOCK E-ANARKALI COLONY NORTH, BLOCK B-SOUTH ANARKALI COLONY, BLOCK D-ANARKALI COLONY NORTH, 397 BLOCK A-ANARKALI COLONY NORTH KRN 229 630 KVA UNPLANNED 21-05-2020 00:12:09 21-05-2020 00:25:02 0:12 0.00000667 MUs BLOCK B-KRISHNA NAGAR EAST, BLOCK A-KRISHNA NAGAR, BLOCK C-KRISHNA NAGAR, BLOCK D-RAM NAGAR, BLOCK D- RAM NAGAR EXTN., BLOCK 10-RAM NAGAR, BLOCK F-RAM 398 NAGAR KRN 259 1500 KVA UNPLANNED 22-05-2020 02:32:25 22-05-2020 02:56:16 0:23 0.00001917 MUs GOVT. GIRLS SENIOR SECONDARY SCHOOL-TURKMAN GATE, 399 CHANDANI MAHAL-CHANDNI CHOWK DRG 71 990 KVA UNPLANNED 07-05-2020 13:14:03 07-05-2020 13:55:20 0:41 0.00007972 MUs

BLOCK F-WEST KARAWAL NAGAR, BLOCK D-JHILMIL COLONY BLOCK D, BLOCK A-KHAJURI KHAS, BLOCK A-PRAKASH VIHAR, BLOCK C-KARAWAL NAGAR, BLOCK B-BHAGAT SINGH COLONY, BLOCK A-BHAGAT SINGH COLONY, BLOCK H-BHAGAT SINGH COLONY, BLOCK B-PRAKASH VIHAR, BLOCK E-PRAKASH VIHAR, BLOCK D-PRAKASH VIHAR, BLOCK C-PRAKASH VIHAR, BLOCK A- 400 KARAWAL NAGAR (DEHROTI) KWN 130 1980 KVA UNPLANNED 23-05-2020 03:50:58 23-05-2020 04:45:00 0:54 0.000225 MUs

BLOCK A-HARIJAN BASTI, BHARAT MATA MANDIR-JJ COLONY, SABOLI EXTN.-MANDOLI, HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK E-RAJIV NAGAR, BLOCK A-BANK COLONY, SABOLI VILLAGE-MANDOLI, POCKET A-JJ COLONY, NEW MANDOLI INDUSTRIAL AREA, DEEPAK MEDITECH-NEW MANDOLI INDUSTRIAL AREA, BLOCK K-ANUP VIHAR, MCD SCHOOL-SABOLI COLONY, BLOCK D-HARSH VIHAR, 401 BLOCK B-RAJIV NAGAR, VILLAGE SABOLI-SABOLI COLONY NNG 604 400 KVA UNPLANNED 07-05-2020 00:20:00 07-05-2020 01:06:00 0:45 0.000875 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unserved (MU) due to Sr. No. Area Affected Division Affected Transformer (in KVA). Unplanned Outage From DateTime To DateTime Duration (Hrs:Mins) Outage 402 BLOCK D-ASHOK NAGAR NNG 88 630 KVA UNPLANNED 23-05-2020 12:30:00 23-05-2020 13:24:44 0:54 0.00015 MUs

PKT C-BLOCK B, BLOCK U-SHIV VIHAR, BLOCK H-SHIV VIHAR, BLOCK D-SHIV VIHAR, BLOCK T-SHIV VIHAR, BLOCK K-SHIV VIHAR, BLOCK F-SHIV VIHAR, BLOCK L-SHIV VIHAR, BLOCK S- SHIV VIHAR, BLOCK O-SHIV VIHAR, BLOCK M-SHIV VIHAR, BLOCK N-SHIV VIHAR, PKT R-BLOCK A, BLOCK D-PRAKASH VIHAR, BLOCK V-O & P BLOCKS SHIV VIHAR KARWAL NAGAR, PKT A-BLOCK B, PKT B-BLOCK B, PKT D-BLOCK B, BLOCK J-SHIV 403 VIHAR KWN 3852 0 KVA UNPLANNED 26-05-2020 20:40:50 26-05-2020 21:30:27 0:49 0.00020417 MUs BLOCK B-ANUP VIHAR, SEWA DHAM-MANDOLI, J.R. COMPLEX- SEWA DHAM, SEWA DHAM-MANDOLI, SABOLI COLONY- 404 MANDOLI, SEWA DHAM-MANDOLI NNG 249 0 KVA UNPLANNED 30-05-2020 15:04:16 30-05-2020 16:02:10 0:57 0.00031667 MUs BLOCK T-GAUTAM PURI, JAG JEEVAN NAGAR-NEW KATWARA- 405 SHASTRI PARK, BLOCK R-BRAHM PURI YVR 121 990 KVA UNPLANNED 25-05-2020 21:31:30 25-05-2020 21:50:37 0:19 0 MUs EAST ROHTASH NAGAR-SHAHDARA, VISHWAS NAGAR, 406 VISHWAS NAGAR EXTN.-SHAHDARA JLM 396 990 KVA UNPLANNED 27-05-2020 08:19:00 27-05-2020 09:18:00 0:58 0.00080556 MUs 407 BABARPUR EXTN.-BABAR PUR NNG 173 990 KVA UNPLANNED 18-05-2020 16:21:19 18-05-2020 16:53:33 0:32 0.00017778 MUs BLOCK J-KARTAR NAGAR, GAUTAM VIHAR-GHONDA, ARVIND NAGAR-GHONDA, GHONDA PATTI CHAUHAN, BLOCK V- 408 GHONDA PATTI CHAUHAN YVR 324 990 KVA UNPLANNED 21-05-2020 13:48:33 21-05-2020 14:26:29 0:37 0 MUs BLOCK X-RAJGARH COLONY, BLOCK A-KRISHNA NAGAR, CHAND 409 MOHALLA-RAJGARH COLONY KRN 57 990 KVA UNPLANNED 19-05-2020 23:51:10 20-05-2020 00:23:53 0:32 0.00002667 MUs

HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK D-HARIJAN BASTI EAST EXTN., BLOCK A-SEWA 410 DHAM, BLOCK D-HARSH VIHAR, BLOCK A-HARSH VIHAR NNG 1903 0 KVA UNPLANNED 26-05-2020 00:03:30 26-05-2020 00:34:55 0:31 0.00043056 MUs

PKT B-BLOCK B, BLOCK A-PREM VIHAR, BHAGAT NAGAR- DAYALPUR, PKT W-BLOCK A, BLOCK Z-O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK A-HARIJAN BASTI, BLOCK C- KARAWAL NAGAR, SHIV VIHAR, PKT Y-SHIV VIHAR, PKT EA- BLOCK B, BLOCK S-SHIV VIHAR, BLOCK B-SHIV VIHAR, PKT A- BLOCK A, PKT D-SHIV VIHAR, PKT C-SHIV VIHAR, BLOCK C- HARIJAN BASTI, BLOCK V-O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK D-NEW CHAUHAN PUR, BLOCK B-NEW CHAUHAN PUR, LIG/MIG RES/NON COMM AREA-NEW CHAUHAN PUR, BLOCK D-PREM VIHAR, BLOCK B-PREM VIHAR, 411 BHAJANPURA-DAYALPUR, PKT W-BLOCK A KWN 1373 0 KVA UNPLANNED 01-05-2020 15:36:46 01-05-2020 16:28:25 0:51 0.00035417 MUs SHASHI GARDEN-MAYUR VIHAR, ACHARYA NIKETAN-SHASHI GARDEN, PATPAR GANJ-SHASHI GARDEN, KOTLA-MAYUR 412 VIHAR, -SHASHI GARDEN MVR 4851 4710 KVA UNPLANNED 21-05-2020 14:13:00 21-05-2020 14:27:15 0:14 0.00033444 MUs

PKT C-BLOCK B, SHIV VIHAR, BLOCK U-SHIV VIHAR, BLOCK H- SHIV VIHAR, BLOCK D-SHIV VIHAR, BLOCK T-SHIV VIHAR, BLOCK K-SHIV VIHAR, BLOCK F-SHIV VIHAR, BLOCK L-SHIV VIHAR, BLOCK S-SHIV VIHAR, BLOCK O-SHIV VIHAR, BLOCK M- SHIV VIHAR, BLOCK N-SHIV VIHAR, BLOCK C-SHIV VIHAR, PKT A- BLOCK A, PKT R-BLOCK A, BLOCK B-HARIJAN BASTI, BLOCK V-O & P BLOCKS SHIV VIHAR KARWAL NAGAR, PKT A-BLOCK B, PKT B-BLOCK B, PKT D-BLOCK B, BLOCK A-SHIV VIHAR, BLOCK J- 413 SHIV VIHAR KWN 3850 0 KVA UNPLANNED 15-05-2020 04:09:34 15-05-2020 04:54:24 0:44 0.00024444 MUs

BLOCK Z-O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK U- SHIV VIHAR, BLOCK H-SHIV VIHAR, BLOCK D-SHIV VIHAR, BLOCK T-SHIV VIHAR, BLOCK F-SHIV VIHAR, BLOCK L-SHIV VIHAR, BLOCK S-SHIV VIHAR, BLOCK O-SHIV VIHAR, BLOCK M- SHIV VIHAR, BLOCK N-SHIV VIHAR, PKT R-BLOCK A, BLOCK V-O 414 & P BLOCKS SHIV VIHAR KARWAL NAGAR, PKT A-BLOCK B KWN 2122 0 KVA UNPLANNED 19-05-2020 18:53:53 19-05-2020 19:40:54 0:47 0.00019583 MUs BLOCK H-OLD SIMAPURI, BLOCK C-OLD SIMAPURI, MCD-OLD 415 SIMAPURI, GOVT. DISPENCERY-OLD SIMAPURI DGN 42 990 KVA UNPLANNED 30-05-2020 14:55:00 30-05-2020 15:21:00 0:26 0.00014444 MUs BLOCK L-RAM NAGAR, SENIOR SECONDARY ENGINEER 416 WORKSHOP N.R.OFFICE-CHANDNI CHOWK CCK PHG 65 990 KVA UNPLANNED 14-05-2020 12:25:00 14-05-2020 13:17:00 0:51 0.00007083 MUs

417 BLOCK B-BRIJ PURI, BLOCK E-BRIJ PURI, BLOCK F-BRIJ PURI KWN 1618 990 KVA UNPLANNED 21-05-2020 15:34:09 21-05-2020 16:29:05 0:54 0.000375 MUs MAIN BAZAR CHANDANI CHOWK-SISGANJ, DARIBA KALA- KATRA MASHRU, FATEHPURI-KUCHA HASIRAM, BLOCK D- KHAJURI KHAS, BLOCK C-KHAJURI KHAS, BLOCK A-KHAJURI KHAS, BLOCK C-KHAJURI KHAS, BLOCK B-KHAJURI KHAS, PKT A- BLOCK B, BLOCK J-KHAJURI KHAS, LIG/MIG RES/NON COMM AREA-BLOCK B, BLOCK I-KHAJURI KHAS EXTN., BLOCK D- 418 SHERPUR KWN 4724 1890 KVA UNPLANNED 29-05-2020 19:39:55 29-05-2020 19:53:29 0:13 0.00007222 MUs

PKT B-BLOCK B, PKT A-BLOCK E, BLOCK B-NEW CHAUHAN PUR, BLOCK 3A-SADAT PUR, BLOCK C-SHERPUR, PKT A4-BLOCK E, 419 PKT B-BLOCK A, BLOCK D-WEST KARAWAL NAGAR KWN 130 0 KVA UNPLANNED 11-05-2020 15:18:24 11-05-2020 16:15:31 0:57 0.0002375 MUs BABARPUR EXTN.-BABAR PUR, JAFFRABAD-MAUJ PUR, MAUJ 420 PUR COMPLEX 1 YVR 486 630 KVA UNPLANNED 21-05-2020 18:13:04 21-05-2020 18:44:49 0:31 0.00006889 MUs

NAYAGAON-NEW KATWARA, VIJAY PARK-YAMUNA VIHAR, BLOCK A-GARI MANDU, BLOCK B3-YAMUNA VIHAR, JAGJEET 421 NAGAR-GHONDA, BLOCK B-KARTAR NAGAR YVR 115 990 KVA UNPLANNED 17-05-2020 15:33:22 17-05-2020 15:59:09 0:25 0 MUs NAYAGAON-NEW KATWARA, KACHI COLONY-JAGJEET NAGAR, JAFFRABAD-MAUJ PUR, JAGJEET NAGAR-GHONDA, BLOCK A- 422 NEHRU VIHAR YVR 0 990 KVA UNPLANNED 17-05-2020 14:45:09 17-05-2020 15:32:58 0:47 0 MUs

SABOLI EXTN.-MANDOLI, BLOCK A-MANDOLI EXTN., BLOCK A- MANDOLI VILLAGE, BLOCK A-BANK COLONY, SABOLI COLONY- MANDOLI, BLOCK B-ANUP VIHAR, BLOCK E-SEWA DHAM, NEW MANDOLI INDUSTRIAL AREA, BLOCK B-PRATAP NAGAR, BLOCK A-SEWA DHAM, DEEPAK MEDITECH-NEW MANDOLI INDUSTRIAL AREA, SEWA DHAM-MANDOLI, BLOCK D-ANUP VIHAR, BLOCK K-ANUP VIHAR, BLOCK A-ANUP VIHAR, KABRISTAN-SABOLI COLONY, BANK OF BARODA-SABOLI COLONY, MCD SCHOOL-SABOLI COLONY, BLOCK B-HARSH VIHAR, BLOCK A-HARSH VIHAR, J.R. COMPLEX-SEWA DHAM, SEWA DHAM-MANDOLI, SABOLI COLONY-MANDOLI, VILLAGE SABOLI-SABOLI COLONY, SABOLI EXTN.-MANDOLI, SEWA 423 DHAM-MANDOLI NNG 4798 400 KVA UNPLANNED 25-05-2020 08:38:03 25-05-2020 09:20:00 0:41 0.00091111 MUs

BLOCK B-EAST GOKUL PURI, BLOCK A-MEET NAGAR, BLOCK E- UTTARANCHAL COLONY, BLOCK B-UTTARANCHAL COLONY, BLOCK C-AMAR COLONY, BLOCK C-MEET NAGAR, BLOCK D- 424 MEET NAGAR, BLOCK E-MEET NAGAR NNG 216 0 KVA UNPLANNED 20-05-2020 15:07:03 20-05-2020 15:57:14 0:50 0.00034722 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unserved (MU) due to Sr. No. Area Affected Division Affected Transformer (in KVA). Unplanned Outage From DateTime To DateTime Duration (Hrs:Mins) Outage

HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK E-RAJIV NAGAR, BLOCK A-MANDOLI VILLAGE, BLOCK A-BANK COLONY, SABOLI COLONY-MANDOLI, BLOCK D- HARIJAN BASTI EAST EXTN., BLOCK E-SEWA DHAM, NEW MANDOLI INDUSTRIAL AREA, BLOCK B-SEWA DHAM, BLOCK A- SEWA DHAM, BLOCK H-SEWA DHAM, DEEPAK MEDITECH-NEW MANDOLI INDUSTRIAL AREA, BLOCK C-SEWA DHAM, BLOCK D- HARSH VIHAR, GOVT.CO. SEC. SCHOOL-HARSH VIHAR, J.R. COMPLEX-SEWA DHAM, BLOCK B-SEWA DHAM, BLOCK E-SEWA 425 DHAM NNG 432 0 KVA UNPLANNED 21-05-2020 23:09:11 21-05-2020 23:33:07 0:23 0.00031944 MUs BABARPUR WEST-BABAR PUR NNG, BABARPUR EXTN.-BABAR 426 PUR NNG 1026 400 KVA UNPLANNED 07-05-2020 12:02:30 07-05-2020 13:00:00 0:57 0.00031667 MUs LIG/MIG RES/NON COMM AREA-CHAWLA FARM, LIG/MIG RES/NON COMM AREA-SABHEPUR, LIG/MIG RES/NON COMM AREA-MILAN GARDEN, LIG/MIG RES/NON COMM AREA-BALAJI MANDIR COLONY, CHAUHAN PATTI-VIJAY VIHAR, BADARPUR 427 KHADAR KWN 4121 5235 KVA UNPLANNED 22-05-2020 12:32:57 22-05-2020 13:05:00 0:32 0.00044444 MUs

HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK E-RAJIV NAGAR, BLOCK A-MANDOLI VILLAGE, BLOCK A-BANK COLONY, SABOLI COLONY-MANDOLI, BLOCK D- HARIJAN BASTI EAST EXTN., BLOCK E-SEWA DHAM, NEW MANDOLI INDUSTRIAL AREA, BLOCK B-SEWA DHAM, BLOCK H- SEWA DHAM, DEEPAK MEDITECH-NEW MANDOLI INDUSTRIAL AREA, BLOCK C-SEWA DHAM, BLOCK A-SEWA DHAM, BLOCK D- HARSH VIHAR, BLOCK A-HARSH VIHAR, GOVT.CO. SEC. SCHOOL- HARSH VIHAR, J.R. COMPLEX-SEWA DHAM, BLOCK E-SEWA 428 DHAM NNG 0 0 KVA UNPLANNED 10-05-2020 11:47:00 10-05-2020 12:53:00 1:6 0 MUs

DARYA GANJ, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY-KASHMERE GATE, PKT R-BLOCK D, PKT C-BLOCK B, JAFFRABAD-MAUJ PUR, G.B.SSS SCHOOL-GOKUL PURI, BLOCK B- EAST GOKUL PURI, BLOCK A-MEET NAGAR, BLOCK A-SADATPUR EXT-PUSTA AREA-L BLOCK, BLOCK A-EAST GOKUL PURI, BLOCK C-AMAR COLONY, BLOCK C-MEET NAGAR, BLOCK H- BHAGIRATHI VIHAR, BLOCK F-SHIV VIHAR, BLOCK M-SHIV VIHAR, BLOCK N-SHIV VIHAR, BLOCK E-INDIRA VIHAR, SPORTS COMPLEX-VASUNDHARA ENCLAVE VSE, BHAJANPURA- DAYALPUR, BLOCK D-MEET NAGAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA- A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-B- 429 BLOCK SONIA VIHAR, BLOCK F-INDIRA VIHAR NNG 4223 2650 KVA UNPLANNED 07-05-2020 00:20:00 07-05-2020 00:42:00 0:22 0.00077611 MUs

BLOCK F-WEST KARAWAL NAGAR, BLOCK K-WEST KARAWAL NAGAR, PKT B-BLOCK B, PKT A-BLOCK E, LIG/MIG RES/NON COMM AREA-DAYALPUR EXTN., BLOCK B-NEW CHAUHAN PUR, BLOCK B-SADATPUR EXT-PUSTA AREA-M BLOCK, BLOCK 3A- SADAT PUR, PKT EA-BLOCK B, PKT D-BLOCK B, PKT E-BLOCK B, BLOCK C-SHERPUR, BLOCK E-SADAT PUR, BLOCK B-SADAT PUR, BLOCK C-SADAT PUR, PKT C-BLOCK E, PKT A1-BLOCK E, PKT A4- BLOCK E, PKT E-SADATPUR EXT-PUSTA AREA-K BLOCK, BLOCK A- KARAWAL NAGAR (DEHROTI), PKT D-BLOCK A, PKT C-BLOCK A, PKT E-BLOCK A, PKT B-BLOCK A, PKT G-BLOCK A, BLOCK D- WEST KARAWAL NAGAR, BLOCK A-HARIJAN BASTI, BLOCK D- 430 WEST KARAWAL NAGAR KWN 1510 0 KVA UNPLANNED 03-05-2020 08:00:00 03-05-2020 08:54:25 0:54 0.000225 MUs

HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK E-RAJIV NAGAR, BLOCK A-MANDOLI VILLAGE, BLOCK A-BANK COLONY, SABOLI COLONY-MANDOLI, BLOCK D- HARIJAN BASTI EAST EXTN., BLOCK E-SEWA DHAM, NEW MANDOLI INDUSTRIAL AREA, BLOCK B-SEWA DHAM, BLOCK A- SEWA DHAM, BLOCK H-SEWA DHAM, DEEPAK MEDITECH-NEW MANDOLI INDUSTRIAL AREA, BLOCK C-SEWA DHAM, BLOCK D- HARSH VIHAR, GOVT.CO. SEC. SCHOOL-HARSH VIHAR, BLOCK B- RAJIV NAGAR, J.R. COMPLEX-SEWA DHAM, BLOCK B-SEWA 431 DHAM, BLOCK E-SEWA DHAM NNG 432 0 KVA UNPLANNED 03-05-2020 20:38:49 03-05-2020 21:21:33 0:42 0.00058333 MUs BLOCK B-VINOD NAGAR EAST, BLOCK A-VINOD NAGAR EAST, 432 L.P. DESHBANDHU SOC-L.P. EXTENSION LNR 26 630 KVA UNPLANNED 06-05-2020 11:25:45 06-05-2020 12:12:04 0:46 0.00003833 MUs 433 MAUJ PUR COMPLEX 1 YVR 86 990 KVA UNPLANNED 25-05-2020 00:21:51 25-05-2020 02:05:00 1:43 0.00028611 MUs COMMUNITY CENTRE-JAMA MASZID, MOTIA MAHAL-CHANDNI 434 CHOWK DRG 127 990 KVA UNPLANNED 25-05-2020 13:15:07 25-05-2020 13:56:43 0:41 0.00007972 MUs HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK A-BANK COLONY, BLOCK D-HARSH VIHAR, 435 BLOCK A-HARSH VIHAR NNG 1432 0 KVA UNPLANNED 05-05-2020 22:04:45 05-05-2020 22:36:01 0:31 0.00043056 MUs

PKT W-BLOCK A, BLOCK Z-O & P BLOCKS SHIV VIHAR KARWAL NAGAR, SHIV VIHAR, BLOCK U-SHIV VIHAR, BLOCK H-SHIV VIHAR, BLOCK D-SHIV VIHAR, BLOCK T-SHIV VIHAR, BLOCK F- SHIV VIHAR, BLOCK L-SHIV VIHAR, BLOCK S-SHIV VIHAR, BLOCK O-SHIV VIHAR, BLOCK M-SHIV VIHAR, BLOCK N-SHIV VIHAR, BLOCK R-SHIV VIHAR, BLOCK B-SHIV VIHAR, PKT X-SHIV VIHAR, PKT R-BLOCK A, BLOCK V-O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK D-PREM VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, BLOCK Q-SHIV VIHAR, BLOCK H- 436 SHIV VIHAR KWN 2122 0 KVA UNPLANNED 17-05-2020 20:31:40 17-05-2020 21:06:02 0:34 0.00023611 MUs 437 BLOCK B-EAST GOKUL PURI, BLOCK A-EAST GOKUL PURI NNG 218 630 KVA UNPLANNED 11-05-2020 22:08:00 11-05-2020 22:13:58 0:5 0.00003472 MUs 438 CHRISTAN COLONY-KHABAS PURA DRG 72 990 KVA UNPLANNED 23-05-2020 10:42:25 23-05-2020 11:37:24 0:54 0.00006 MUs

BLOCK A-BABU NAGAR, MUSTAFABAD-MUNGA NAGAR, BLOCK 439 B-MAN SINGH NAGAR, BHAJANPURA-DAYALPUR KWN 1408 0 KVA UNPLANNED 14-05-2020 14:56:01 14-05-2020 15:31:45 0:35 0.00014583 MUs 440 PKT B-CHITRAKOOT NNG 86 630 KVA UNPLANNED 10-05-2020 00:26:15 10-05-2020 00:59:33 0:33 0.00009167 MUs

BLOCK A-JOHRI PUR, BHAGIRATHI VIHAR, JOHRI ENCLAVE- BHAGIRATHI VIHAR, WEST KARAWAL NAGAR, TUNDA NAGAR- 441 BHAGIRATHI VIHAR, BHAGIRATHI VIHAR KWN 130 0 KVA UNPLANNED 23-05-2020 23:22:03 24-05-2020 00:18:48 0:56 0.00023333 MUs 442 BLOCK D-PREET VIHAR LNR 178 990 KVA UNPLANNED 30-05-2020 18:22:56 30-05-2020 19:11:03 0:48 0.00002667 MUs

BLOCK C2-YAMUNA VIHAR, BLOCK C9-YAMUNA VIHAR, BLOCK C1-YAMUNA VIHAR, BLOCK C8-YAMUNA VIHAR, BSES 66 KV 443 GRID S/STATION-COMMUNITY CENTRE YAMUNA VIHAR YVR 13 990 KVA UNPLANNED 27-05-2020 12:51:41 27-05-2020 13:36:42 0:45 0.0001 MUs 444 CHANDANI MAHAL-CHANDNI CHOWK DRG 268 990 KVA UNPLANNED 10-05-2020 14:52:49 10-05-2020 15:45:37 0:52 0.00007222 MUs MUSTAFABAD-MUNGA NAGAR, BLOCK C-MUSTAFABAD 445 (DAYALPUR) KWN 173 0 KVA UNPLANNED 15-05-2020 13:54:18 15-05-2020 14:51:49 0:57 0.00031667 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unserved (MU) due to Sr. No. Area Affected Division Affected Transformer (in KVA). Unplanned Outage From DateTime To DateTime Duration (Hrs:Mins) Outage

SABOLI EXTN.-MANDOLI, HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK E-RAJIV NAGAR, BLOCK A-MANDOLI VILLAGE, BLOCK A-BANK COLONY, SABOLI COLONY- MANDOLI, SABOLI VILLAGE-MANDOLI, BLOCK D-HARIJAN BASTI EAST EXTN., BLOCK E-SEWA DHAM, POCKET B-GURU TEG BAHADUR ENCLAVE, POCKET A-JJ COLONY, NEW MANDOLI INDUSTRIAL AREA, BLOCK B-SEWA DHAM, BLOCK A-SEWA DHAM, BLOCK H-SEWA DHAM, BUDH VIHAR-SEWA DHAM, DEEPAK MEDITECH-NEW MANDOLI INDUSTRIAL AREA, BLOCK C-SEWA DHAM, BLOCK A-SEWA DHAM, BLOCK C-ANUP VIHAR, BLOCK D-HARSH VIHAR, BLOCK B-HARSH VIHAR, BLOCK A- HARSH VIHAR, GOVT.CO. SEC. SCHOOL-HARSH VIHAR, J.R. COMPLEX-SEWA DHAM, SEWA DHAM-MANDOLI, BLOCK E- SEWA DHAM, VILLAGE SABOLI-SABOLI COLONY, SEWA DHAM- 446 MANDOLI NNG 691 0 KVA UNPLANNED 15-05-2020 07:58:42 15-05-2020 08:55:00 0:56 0.00124444 MUs

BLOCK 19-OLD RAJENDRA NAGAR, BLOCK 14-OLD RAJENDRA NAGAR, BLOCK 53-OLD RAJENDRA NAGAR, NORTH EXTENSION AREA- BLOCK B-OLD RAJENDRA NAGAR, BLOCK B3-OLD 447 RAJENDRA NAGAR, BLOCK B-OLD RAJENDRA NAGAR SRD 211 630 KVA UNPLANNED 26-05-2020 19:52:14 26-05-2020 20:40:00 0:47 0.00005222 MUs

BLOCK D-C-BLOCK SHRI RAM COLONY, LIG/MIG RES/NON COMM AREA-CRPF CAMP SONIA VIHAR, BLOCK C-KHAJURI KHAS, LIG/MIG RES/NON COMM AREA-BALAJI MANDIR COLONY, BLOCK A-G- BLOCK SONIA VIHAR EXTENSION, LIG/MIG RES/NON COMM AREA-BLOCK B, BLOCK D- TUKMIRPUR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-B-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-C-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-G- BLOCK SONIA VIHAR EXTENSION, LIG/MIG RES/NON COMM AREA-D-BLOCK- SONIA VIHAR, LIG/MIG RES/NON COMM AREA-E-BLOCK SONIA 448 VIHAR KWN 2749 0 KVA UNPLANNED 28-05-2020 22:05:22 28-05-2020 23:00:00 0:54 0.0003 MUs BLOCK C12-YAMUNA VIHAR, BLOCK C11-YAMUNA VIHAR, BLOCK C6-YAMUNA VIHAR, BLOCK C7-YAMUNA VIHAR, BLOCK 449 C3-YAMUNA VIHAR YVR 134 630 KVA UNPLANNED 26-05-2020 15:30:45 26-05-2020 16:28:00 0:57 0.00031667 MUs BLOCK B-SUBHASH MOHALLA, BLOCK E-SUBHASH MOHALLA, BLOCK D-BHAJANPURA, WEST GHONDA, BLOCK E-SUBHASH 450 MOHALLA YVR 2083 990 KVA UNPLANNED 07-05-2020 13:00:07 07-05-2020 13:22:47 0:22 0.00006111 MUs JHILMIL COLONY BLOCK A, BLOCK E-JHILMIL COLONY BLOCK E, BLOCK D-JHILMIL COLONY BLOCK D, NEW VISWAS NAGAR- SHAHDARA, BLOCK E-JHILMIL-TAHIRPUR, BLOCK C-JHILMIL 451 COLONY BLOCK C JLM 595 990 KVA UNPLANNED 23-05-2020 03:50:00 23-05-2020 05:40:00 1:50 0.00015278 MUs 452 JAFFRABAD-MAUJ PUR YVR 625 630 KVA UNPLANNED 09-05-2020 09:21:44 09-05-2020 09:56:52 0:35 0.00007778 MUs

DARYA GANJ, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY-KASHMERE GATE, PKT R-BLOCK D, PKT C-BLOCK B, JAFFRABAD-MAUJ PUR, G.B.SSS SCHOOL-GOKUL PURI, BLOCK B- EAST GOKUL PURI, BLOCK A-MEET NAGAR, BLOCK A-SADATPUR EXT-PUSTA AREA-L BLOCK, BLOCK A-EAST GOKUL PURI, BLOCK C-AMAR COLONY, BLOCK C-MEET NAGAR, BLOCK H- BHAGIRATHI VIHAR, BLOCK F-SHIV VIHAR, BLOCK M-SHIV VIHAR, BLOCK N-SHIV VIHAR, BLOCK E-INDIRA VIHAR, SPORTS COMPLEX-VASUNDHARA ENCLAVE VSE, BHAJANPURA- DAYALPUR, BLOCK D-MEET NAGAR, BLOCK E-MEET NAGAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-B-BLOCK SONIA VIHAR, BLOCK 453 F-INDIRA VIHAR NNG 4225 2650 KVA UNPLANNED 10-05-2020 11:49:00 10-05-2020 12:53:00 1:4 0.00227556 MUs SHASHI GARDEN-MAYUR VIHAR, PATPAR GANJ-SHASHI 454 GARDEN, PANDAV NAGAR MVR-SHAKARPUR MVR MVR 43 630 KVA UNPLANNED 02-05-2020 10:43:55 02-05-2020 11:21:00 0:37 0.00005139 MUs

KABUL NAGAR-ROHITASH NAGAR, BLOCK R-PRATAP PURA, BLOCK A-PRATAP PURA, BLOCK S-PRATAP PURA, BLOCK T- 455 PRATAP PURA, GOPAL K.OIL DEPO.-PRATAP PURA DGN 252 990 KVA UNPLANNED 31-05-2020 13:46:38 31-05-2020 14:41:00 0:54 0.0003 MUs PKT C-BLOCK B, SHIV MANDIR-JYOTI NAGAR EAST, BLOCK B- DURGA PURI, BLOCK E-JYOTI NAGAR EAST, BLOCK B-JYOTI 456 NAGAR, BLOCK M-DURGA PURI NNG 110 990 KVA UNPLANNED 06-05-2020 10:52:41 06-05-2020 11:50:55 0:58 0.00032222 MUs

LIG/MIG RES/NON COMM AREA-B-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-SONIA VIHAR, LIG/MIG RES/NON COMM AREA-D-BLOCK-SONIA VIHAR, LIG/MIG RES/NON COMM AREA-E-BLOCK SONIA VIHAR, LIG/MIG 457 RES/NON COMM AREA-SONIA VIHAR KWN 340 0 KVA UNPLANNED 26-05-2020 14:24:52 26-05-2020 15:10:00 0:45 0.00025 MUs BLOCK C-HARSH VIHAR, BLOCK C-SEWA DHAM, BLOCK A-SEWA 458 DHAM, BLOCK D-HARSH VIHAR NNG 86 0 KVA UNPLANNED 29-05-2020 12:40:00 29-05-2020 13:35:00 0:54 0.00015 MUs

SHANKAR NAGAR EXTN-AZAD NAGAR, BLOCK C-KRISHNA 459 NAGAR, BLOCK F-KRISHNA NAGAR, BLOCK E-KRISHNA NAGAR KRN 3 990 KVA UNPLANNED 27-05-2020 02:02:33 27-05-2020 02:56:42 0:54 0.00003 MUs

BLOCK A-KABIR NAGAR, SABOLI EXTN.-MANDOLI, BLOCK C- HARSH VIHAR, BLOCK A-MANDOLI VILLAGE, BLOCK A-BANK COLONY, SABOLI VILLAGE-MANDOLI, BLOCK D-HARIJAN BASTI EAST EXTN., BLOCK B-SEWA DHAM, DEEPAK MEDITECH-NEW MANDOLI INDUSTRIAL AREA, BLOCK C-SEWA DHAM, SEWA DHAM-MANDOLI, BLOCK C-ANUP VIHAR, BANK OF BARODA- SABOLI COLONY, MCD SCHOOL-SABOLI COLONY, BLOCK A- RAJIV NAGAR, BLOCK D-MEET NAGAR, VILLAGE SABOLI-SABOLI 460 COLONY, SEWA DHAM-MANDOLI NNG 173 0 KVA UNPLANNED 15-05-2020 08:35:33 15-05-2020 09:33:01 0:57 0.00031667 MUs 461 BIHARI COLONY-SHAHDARA JLM 43 990 KVA UNPLANNED 31-05-2020 03:09:46 31-05-2020 03:37:05 0:27 0.0000375 MUs

BLOCK A-CHAND BAGH, BLOCK B-BRIJ PURI, BLOCK E-BRIJ PURI, BLOCK C-BRIJ PURI, BLOCK B-CHAND BAGH, SANT NIRANKARI BHAVAN-GANGA VIHAR KWN, BLOCK D-KHAJURI KHAS, BLOCK C-KHAJURI KHAS, BLOCK A-KHAJURI KHAS, BLOCK B-MAN SINGH NAGAR, NIRAHKARI BHAVAN (HOUSE)-BRIJ PURI, BLOCK C-KHAJURI KHAS, BLOCK B-KHAJURI KHAS, BLOCK J-KHAJURI KHAS, LIG/MIG RES/NON COMM AREA-BLOCK B, BLOCK G-KHAJURI KHAS EXTN., BLOCK D-BRIJ PURI, BLOCK F- MUSTAFABAD (DAYALPUR), BLOCK F-BRIJ PURI, BLOCK D-WEST 462 KARAWAL NAGAR KWN 7184 4730 KVA UNPLANNED 25-05-2020 02:11:16 25-05-2020 02:44:22 0:33 0.00009167 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unserved (MU) due to Sr. No. Area Affected Division Affected Transformer (in KVA). Unplanned Outage From DateTime To DateTime Duration (Hrs:Mins) Outage

CHHAJJUPUR-BABAR PUR, BALBIR NAGAR EXTN.-SILAMPUR, 463 JYOTI COLONY-BALBIR NAGAR, BLOCK A-SEWA DHAM NNG 432 630 KVA UNPLANNED 17-05-2020 22:40:48 17-05-2020 23:01:33 0:20 0.00005556 MUs BLOCK C-SHASTRI PARK, BLOCK E-NEW SILAMPURI PHASE II, BLOCK F- LIG/MIG RES/NON COMM AREA-NEW SILAMPURI PHASE II, BLOCK D- LIG/MIG RES/NON COMM AREA-NEW 464 SILAMPURI PHASE II YVR 173 0 KVA UNPLANNED 08-05-2020 10:56:29 08-05-2020 11:44:08 0:47 0.00026111 MUs 465 HATHI KHANA-NAWAB GANJ PHG 34 990 KVA UNPLANNED 27-05-2020 11:54:44 27-05-2020 12:41:56 0:47 0.00013056 MUs SABOLI EXTN.-MANDOLI, BLOCK C-HARSH VIHAR, BLOCK E- RAJIV NAGAR, BLOCK C-SEWA DHAM, BLOCK A-SEWA DHAM, BLOCK D-HARSH VIHAR, BLOCK B-HARSH VIHAR, BLOCK A- 466 HARSH VIHAR NNG 86 0 KVA UNPLANNED 23-05-2020 11:52:21 23-05-2020 12:50:00 0:57 0.00015833 MUs

BLOCK A-KHAJURI KHAS, BLOCK B-NEW CHAUHAN PUR, BLOCK A-PRAKASH VIHAR, BLOCK B-BHAGAT SINGH COLONY, BLOCK I- BHAGAT SINGH COLONY, BLOCK B-PRAKASH VIHAR, BLOCK E- PRAKASH VIHAR, NANK MILK PLANT-PRAKASH VIHAR, BLOCK D- 467 PRAKASH VIHAR, BLOCK C-PRAKASH VIHAR KWN 173 0 KVA UNPLANNED 21-05-2020 15:22:39 21-05-2020 16:40:33 1:17 0.00042778 MUs

JYOTI COLONY-BALBIR NAGAR, PKT A-CHITRAKOOT, BLOCK D- NEW SIMAPURI, PKT C-BLOCK B, BLOCK D-JYOTI NAGAR, BLOCK J-JYOTI NAGAR, PKT A-BLOCK A, BLOCK A-HARIJAN BASTI, PKT S- BLOCK C, NEAR SHADARA RAILWAY GODOWN-SHAHDARA DGN, PKT B-BLOCK A, BLOCK B-JYOTI NAGAR, BLOCK H-JYOTI 468 NAGAR NNG 803 990 KVA UNPLANNED 22-05-2020 00:14:28 22-05-2020 01:02:15 0:47 0.00013056 MUs 469 BLOCK T-GAUTAM PURI YVR 86 990 KVA UNPLANNED 18-05-2020 11:59:19 18-05-2020 12:45:57 0:46 0.00012778 MUs 470 BLOCK C-SHASTRI PARK, BLOCK J-SILAMPUR COLONY YVR 69 0 KVA UNPLANNED 21-05-2020 12:00:57 21-05-2020 12:21:03 0:20 0.00004444 MUs NAI SARAK-JOGIWARA, KATRA NAWAB-CHANDNI CHOWK, CHAWRI BAZAR-KHUSH DIL, HAUZ QAZI ROAD-PEEPAL 471 MAHADEV GALI, MAIN BAZAR-KHUSH DIL CCK 52 630 KVA UNPLANNED 08-05-2020 11:33:48 08-05-2020 12:21:48 0:47 0.00005222 MUs NEW USMANPUR-NEW KATWARA, MCD COLONY-NEW KATWARA, BLOCK E-SUBHASH MOHALLA, KACHI COLONY- JAGJEET NAGAR, JAFFRABAD-MAUJ PUR, ZERO PUSTA-USMAN PUR, BLOCK B-MANUJPUR, JAGJEET NAGAR-GHONDA, ANSARI 472 ROAD-USMAN PUR YVR 121 990 KVA UNPLANNED 23-05-2020 23:16:05 24-05-2020 00:09:27 0:53 0.00020611 MUs BLOCK B-VINOD NAGAR EAST, BLOCK A-VINOD NAGAR EAST, 473 NAVKALA APPARTMENT-MOTHER DAIRY LNR 289 630 KVA PLANNED 29-05-2020 12:00:00 29-05-2020 14:13:29 2:13 0 MUs

SABOLI EXTN.-MANDOLI, BLOCK C-HARSH VIHAR, BLOCK A- MANDOLI VILLAGE, BLOCK D-HARIJAN BASTI EAST EXTN., NEW MANDOLI INDUSTRIAL AREA, BLOCK B-PRATAP NAGAR, BLOCK B-SEWA DHAM, BLOCK A-SEWA DHAM, BLOCK C-SEWA DHAM, BLOCK H-SEWA DHAM, DEEPAK MEDITECH-NEW MANDOLI INDUSTRIAL AREA, BLOCK D-HARSH VIHAR, BLOCK B-RAJIV NAGAR, BLOCK A-SEWA DHAM, RAJEEV NAGAR-SEWA DHAM, 474 SEWA DHAM-MANDOLI NNG 1278 0 KVA UNPLANNED 15-05-2020 00:59:17 15-05-2020 01:49:10 0:49 0.00013611 MUs

PART I- BLOCK R-NEW RAJENDRA NAGAR, DARYA GANJ, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY-KASHMERE GATE, PKT R-BLOCK D, PKT C-BLOCK B, JAFFRABAD-MAUJ PUR, BLOCK A-SADATPUR EXT-PUSTA AREA-L BLOCK, BLOCK H-BHAGIRATHI VIHAR, BLOCK F-SHIV VIHAR, BLOCK M-SHIV VIHAR, BLOCK N- SHIV VIHAR, BLOCK E-INDIRA VIHAR, SPORTS COMPLEX- VASUNDHARA ENCLAVE VSE, CENTRAL RIDGE RESERVED FOREST, BHAJANPURA-DAYALPUR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA- A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-B- 475 BLOCK SONIA VIHAR, BLOCK F-INDIRA VIHAR SRD 672 990 KVA PLANNED 19-05-2020 09:00:00 19-05-2020 12:27:17 3:27 0.0012075 MUs

BLOCK A-DILSHAD COLONY, HANSRAJ SCHOOL-POCKET H, GROUP I FLATS-JANTA FLATS-PKT A, GTB MIG FLATS-POCKET D, FLORA DALE SECONDARY SCHOOL-POCKET R, BLOCK J-DILSHAD 476 GARDEN, DELHI JAL BOARD- PKT A-JANTA FLATS-PKT A DGN 312 630 KVA UNPLANNED 25-05-2020 04:00:00 25-05-2020 04:30:00 0:29 0.00020944 MUs CHANDER NAGAR-KRISHNA NAGAR, CHANDER NAGAR BLOCK F- GOPAL PARK, BLOCK E-WEST CHANDER NAGAR, SHIVPURI- 477 JAGATPURI KRN 743 990 KVA UNPLANNED 14-05-2020 19:08:00 14-05-2020 19:52:18 0:44 0.00012222 MUs

BLOCK A-TUKMIRPUR, BLOCK C-TUKMIRPUR, LIG/MIG RES/NON COMM AREA-CRPF CAMP SONIA VIHAR, BLOCK A- SADATPUR EXT-PUSTA AREA-L BLOCK, BLOCK A-SADAT PUR, BLOCK A8-SADAT PUR, BLOCK F-SADAT PUR, BLOCK C1-SADAT 478 PUR, PKT C1-SADATPUR EXT-PUSTA AREA-K BLOCK KWN 0 1030 KVA UNPLANNED 16-05-2020 16:45:22 16-05-2020 17:18:57 0:33 0 MUs VILL KARKARDOOMA-KARKAR DUMA, VISHWAS NAGAR, 479 KARKARDOOMA COMPLAX-KARKAR DUMA JLM 66 990 KVA UNPLANNED 16-05-2020 11:49:37 16-05-2020 12:45:20 0:55 0.00045833 MUs

BLOCK D-MEET NAGAR, BLOCK C-AMAR COLONY, PKT C-BLOCK B, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, GGS INDRAPRASTHA UNIVERSITY-KASHMERE GATE, BLOCK N-SHIV VIHAR, BLOCK F-INDIRA VIHAR, BLOCK B-EAST GOKUL PURI, LIG/MIG RES/NON COMM AREA-B-BLOCK SONIA VIHAR, BLOCK A-MEET NAGAR, BLOCK A-EAST GOKUL PURI, BLOCK M-SHIV VIHAR, BLOCK A-SADATPUR EXT-PUSTA AREA-L BLOCK, BHAJANPURA-DAYALPUR, PKT R-BLOCK D, GEETA COLONY, SPORTS COMPLEX-VASUNDHARA ENCLAVE VSE, BLOCK E- INDIRA VIHAR, BLOCK C-MEET NAGAR, BLOCK H-BHAGIRATHI VIHAR, DARYA GANJ, JAFFRABAD-MAUJ PUR, BLOCK F-SHIV 480 VIHAR, BLOCK E-MEET NAGAR, G.B.SSS SCHOOL-GOKUL PURI NNG 4223 2650 KVA UNPLANNED 07-05-2020 00:53:20 07-05-2020 01:28:49 0:35 0.00077778 MUs BLOCK B-NEW SILAMPURI PHASE II, BLOCK C-NEW SILAMPURI 481 PHASE II YVR 173 0 KVA UNPLANNED 13-05-2020 10:41:06 13-05-2020 11:33:35 0:52 0.00028889 MUs BLOCK A-TUKMIRPUR, BLOCK C-TUKMIRPUR, BLOCK B- MUSTAFABAD (DAYALPUR), BLOCK F-SADAT PUR, BLOCK F- MUSTAFABAD (DAYALPUR), BLOCK C-MUSTAFABAD (DAYALPUR), BLOCK A-MUSTAFABAD (DAYALPUR), BLOCK D- MUSTAFABAD (DAYALPUR), BLOCK A-MUSTAFABAD 482 (DAYALPUR) KWN 1275 990 KVA UNPLANNED 12-05-2020 11:40:00 12-05-2020 12:30:00 0:49 0.00020417 MUs

BLOCK A-SILAMPUR COLONY, BLOCK F- LIG/MIG RES/NON COMM AREA-NEW SILAMPURI PHASE II, BLOCK T-GAUTAM PURI, MCD COLONY-NEW KATWARA, BLOCK B-SUBHASH MOHALLA, BLOCK R-BRAHM PURI, JAFFRABAD-MAUJ PUR, 483 NORTH GHONDA, BLOCK C-GHONDA YVR 264 990 KVA UNPLANNED 25-05-2020 09:17:57 25-05-2020 10:14:13 0:56 0.00031111 MUs

484 BLOCK_11A-BALMIKI COLONY, BLOCK_13A-BALMIKI COLONY SRD 195 990 KVA UNPLANNED 15-05-2020 15:51:10 15-05-2020 16:46:19 0:55 0.00004583 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unserved (MU) due to Sr. No. Area Affected Division Affected Transformer (in KVA). Unplanned Outage From DateTime To DateTime Duration (Hrs:Mins) Outage

BLOCK I-BRAHM PURI, BLOCK O-BRAHM PURI, BLOCK M- BRAHM PURI, BLOCK K-BRAHM PURI, BLOCK B-BRAHM PURI, BLOCK N-BRAHM PURI, BLOCK P-BRAHM PURI, BLOCK H- BRAHM PURI, BLOCK E-BRAHM PURI, BLOCK F-BRAHM PURI, BLOCK L-BRAHM PURI, BLOCK J-BRAHM PURI, JAFFRABAD- MAUJ PUR, BLOCK D- LIG/MIG RES/NON COMM AREA-NEW 485 SILAMPURI PHASE II YVR 2244 990 KVA UNPLANNED 06-05-2020 12:00:36 06-05-2020 13:00:00 0:59 0.00013111 MUs 486 BLOCK A-NATHU PURA, BLOCK B-ASHOK NAGAR NNG 98 630 KVA UNPLANNED 27-05-2020 16:40:20 27-05-2020 17:27:03 0:46 0.00012778 MUs 487 RAM NAGAR-SILAMPUR, DELHI JAL BOARD-DDA FLATS DGN 1043 990 KVA UNPLANNED 03-05-2020 13:22:58 03-05-2020 13:50:00 0:27 0.0001875 MUs

LALKUAN BAZAR-FRASH KHANA, BALI MARAN-BARA DARI, 488 NAYA BAZAR-CHANDNI CHOWK, FATEHPURI-KHARI BAOLI CCK 270 990 KVA UNPLANNED 02-05-2020 11:39:44 02-05-2020 12:35:06 0:55 0.00006111 MUs

BLOCK G-DILSHAD COLONY, BLOCK J-OLD SIMAPURI, BLOCK H- OLD SIMAPURI, BLOCK G-OLD SIMAPURI, BLOCK D-OLD SIMAPURI, BLOCK C-OLD SIMAPURI, BLOCK B-OLD SIMAPURI, 489 MCD-OLD SIMAPURI, GOVT. DISPENCERY-OLD SIMAPURI DGN 726 990 KVA UNPLANNED 21-05-2020 10:02:04 21-05-2020 10:16:37 0:14 0 MUs

BLOCK B-NORTH CHHAJUPUR, BLOCK E-NORTH CHHAJUPUR, 490 BLOCK A-NORTH CHHAJUPUR, BLOCK C-NORTH CHHAJUPUR NNG 116 990 KVA UNPLANNED 08-05-2020 16:49:13 08-05-2020 17:40:39 0:51 0.0002125 MUs

BLOCK 27B-AJMAL KHAN PARK, ANAND PARBAT, DARYA GANJ, GEETA COLONY, THAN SINGH NAGAR-ANAND PARBAT, GGS INDRAPRASTHA UNIVERSITY-KASHMERE GATE, PKT R-BLOCK D, PKT C-BLOCK B, JAFFRABAD-MAUJ PUR, BLOCK A-SADATPUR EXT-PUSTA AREA-L BLOCK, BLOCK H-BHAGIRATHI VIHAR, BLOCK F-SHIV VIHAR, BLOCK M-SHIV VIHAR, BLOCK N-SHIV VIHAR, BLOCK E-INDIRA VIHAR, SPORTS COMPLEX- VASUNDHARA ENCLAVE VSE, BHAJANPURA-DAYALPUR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-B-BLOCK SONIA VIHAR, BLOCK 491 F-INDIRA VIHAR PNR 1313 990 KVA PLANNED 18-05-2020 09:00:00 18-05-2020 13:08:34 4:8 0.00144667 MUs BLOCK B-GOKUL PURI, BLOCK A-GOKUL PURI, BLOCK B-GANGA 492 VIHAR, PKT B-BLOCK A KWN 931 630 KVA UNPLANNED 12-05-2020 13:34:55 12-05-2020 13:48:29 0:13 0.00007222 MUs

BHAGAT NAGAR-DAYALPUR, BLOCK U-SHIV VIHAR, BLOCK D- NEW CHAUHAN PUR, BLOCK D-PREM VIHAR, BLOCK B- 493 MAHALAXMI ENCLAVE, BLOCK A-NEHRU VIHAR KWN 115 400 KVA UNPLANNED 10-05-2020 13:33:26 10-05-2020 14:09:43 0:36 0.0001 MUs

BLOCK C-SHASTRI PARK, CHAUHAN BANGAR-JAFFRABAD, BLOCK B-NEW SILAMPURI PHASE II, BLOCK C-NEW SILAMPURI PHASE II, BLOCK F- LIG/MIG RES/NON COMM AREA-NEW SILAMPURI PHASE II, BLOCK D- LIG/MIG RES/NON COMM AREA- 494 NEW SILAMPURI PHASE II YVR 69 0 KVA UNPLANNED 06-05-2020 12:19:04 06-05-2020 12:52:44 0:33 0.00007333 MUs

SABOLI EXTN.-MANDOLI, BLOCK A-MANDOLI EXTN., SABOLI VILLAGE-MANDOLI, BLOCK K-ANUP VIHAR, BLOCK A-ANUP VIHAR, KABRISTAN-SABOLI COLONY, BANK OF BARODA-SABOLI COLONY, MCD SCHOOL-SABOLI COLONY, BLOCK A-SEWA DHAM, SEWA DHAM-MANDOLI, VILLAGE SABOLI-SABOLI 495 COLONY, SABOLI EXTN.-MANDOLI NNG 3928 630 KVA UNPLANNED 26-05-2020 22:21:19 26-05-2020 22:39:11 0:17 0.00037778 MUs

PKT C-BLOCK B, BLOCK U-SHIV VIHAR, BLOCK H-SHIV VIHAR, BLOCK D-SHIV VIHAR, BLOCK T-SHIV VIHAR, BLOCK K-SHIV VIHAR, BLOCK F-SHIV VIHAR, BLOCK L-SHIV VIHAR, BLOCK S- SHIV VIHAR, BLOCK O-SHIV VIHAR, BLOCK M-SHIV VIHAR, BLOCK N-SHIV VIHAR, PKT R-BLOCK A, BLOCK V-O & P BLOCKS SHIV VIHAR KARWAL NAGAR, PKT A-BLOCK B, PKT B-BLOCK B, PKT D-BLOCK B, BLOCK CN-AMBIKA VIHAR BLOCK - B&C, BLOCK 496 J-SHIV VIHAR KWN 3850 0 KVA UNPLANNED 14-05-2020 18:36:53 14-05-2020 19:33:32 0:56 0.00023333 MUs BLOCK B-SUBHASH MOHALLA, SUBHASH VIHAR-YAMUNA VIHAR, JAFFRABAD-MAUJ PUR, MAUJ PUR COMPLEX 1, NORTH GHONDA, GHONDA PATTI CHAUHAN, BLOCK C-GHONDA, 497 BLOCK C-BHAJANPURA YVR 22 990 KVA UNPLANNED 30-05-2020 10:59:21 30-05-2020 11:30:35 0:31 0.00043056 MUs NAYAGAON-NEW KATWARA, NEW USMANPUR-NEW KATWARA, BLOCK B-SUBHASH MOHALLA, VIJAY PARK- YAMUNA VIHAR, JAFFRABAD-MAUJ PUR, JAGJEET NAGAR- GHONDA, BLOCK J-KARTAR NAGAR, BLOCK C-JAI PRAKASH 498 NAGAR YVR 115 990 KVA UNPLANNED 17-05-2020 19:37:48 17-05-2020 20:19:19 0:41 0 MUs 499 BLOCK X-RAJGARH COLONY, JHEEL-JHEEL KHURENJA KRN 583 990 KVA UNPLANNED 24-05-2020 09:18:19 24-05-2020 09:58:46 0:40 0.00011111 MUs

LIG/MIG RES/NON COMM AREA-CRPF CAMP SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, 500 LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR KWN 2749 0 KVA UNPLANNED 21-05-2020 18:30:05 21-05-2020 18:57:18 0:27 0.00015 MUs SABOLI EXTN.-MANDOLI, SABOLI VILLAGE-MANDOLI, BLOCK B- 501 ANUP VIHAR NNG 216 0 KVA UNPLANNED 28-05-2020 19:00:26 28-05-2020 19:12:23 0:11 0.00007639 MUs

PKT H-BLOCK E, BLOCK C-KHAJURI KHAS, BLOCK A-KHAJURI KHAS, BLOCK J-KHAJURI KHAS, LIG/MIG RES/NON COMM AREA- 502 BLOCK B, BLOCK I-KHAJURI KHAS EXTN. KWN 911 630 KVA UNPLANNED 27-05-2020 15:50:18 27-05-2020 17:24:35 1:34 0.00104444 MUs

BLOCK B-NEW CHAUHAN PUR, PKT C-BLOCK B, BLOCK Z-O & P BLOCKS SHIV VIHAR KARWAL NAGAR, PHASE I-SHIV VIHAR, BLOCK C-KARAWAL NAGAR, SHIV VIHAR, SHIV VIHAR, PKT Y- SHIV VIHAR, BLOCK S-SHIV VIHAR, BLOCK A-G- BLOCK SONIA VIHAR EXTENSION, BLOCK B-PATEL VIHAR, BLOCK B-SHIV VIHAR, PKT X-SHIV VIHAR, PKT A-BLOCK A, PKT D-SHIV VIHAR, BLOCK B-PRAKASH VIHAR, BLOCK C-HARIJAN BASTI, BLOCK B- HARIJAN BASTI, BLOCK V-O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK B-NEW CHAUHAN PUR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, BLOCK CN-AMBIKA VIHAR BLOCK - B&C, LIG/MIG RES/NON COMM AREA-C-BLOCK SONIA VIHAR, BLOCK D-WEST KARAWAL NAGAR, BLOCK B- 503 NEW CHAUHAN PUR, BLOCK CN-AMBIKA VIHAR BLOCK - B&C KWN 1009 0 KVA UNPLANNED 14-05-2020 23:50:47 15-05-2020 00:46:52 0:56 0.00023333 MUs

BLOCK B-GOKUL PURI, BLOCK A-GOKUL PURI, SANT NIRANKARI 504 BHAVAN-GANGA VIHAR KWN, PKT B-BLOCK A KWN 1307 990 KVA UNPLANNED 14-05-2020 08:33:00 14-05-2020 09:14:07 0:41 0.00034167 MUs BLOCK 3-KHICHARIPUR BLOCK 1, BLOCK 7-TRILOKPURI PHASE I, BLOCK 5-TRILOKPURI PHASE I, BLOCK 6-TRILOKPURI PHASE I, BLOCK 9-TRILOKPURI PHASE I, TRILOKPURI PHASE I-MAYUR 505 VIHAR MVR 222 990 KVA UNPLANNED 09-05-2020 23:23:03 10-05-2020 01:06:17 1:43 0.00002861 MUs CHANDER NAGAR BLOCK F-GOPAL PARK, GALI NO-1-NEW LAYALPUR COLONY, BLOCK D-RAM NAGAR, BLOCK D- JAGATPURI, BLOCK F-NEW LAYALPUR COLONY, BLOCK D- 506 CHANDAR NAGAR KRN 1578 990 KVA UNPLANNED 23-05-2020 11:50:00 23-05-2020 12:06:20 0:16 0.00004444 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unserved (MU) due to Sr. No. Area Affected Division Affected Transformer (in KVA). Unplanned Outage From DateTime To DateTime Duration (Hrs:Mins) Outage

HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK A-BANK COLONY, BLOCK D-HARIJAN BASTI EAST EXTN., BLOCK A-SEWA DHAM, BLOCK A-SEWA DHAM, BLOCK D- ANUP VIHAR, BLOCK D-HARSH VIHAR, BLOCK A-HARSH VIHAR, 507 SEWA DHAM-MANDOLI NNG 1903 0 KVA UNPLANNED 10-05-2020 11:47:00 10-05-2020 12:53:00 1:6 0.00053167 MUs SEWA DHAM-MANDOLI, BLOCK B-ANUP VIHAR, SEWA DHAM- 508 MANDOLI, NEW MANDOLI INDUSTRIAL AREA NNG 259 0 KVA UNPLANNED 26-05-2020 14:16:33 26-05-2020 15:00:22 0:43 0.00035833 MUs BLOCK C-SHASTRI PARK, BLOCK E-NEW SILAMPURI PHASE II, BLOCK F- LIG/MIG RES/NON COMM AREA-NEW SILAMPURI PHASE II, BLOCK D- LIG/MIG RES/NON COMM AREA-NEW 509 SILAMPURI PHASE II YVR 173 0 KVA UNPLANNED 07-05-2020 12:07:13 07-05-2020 12:59:00 0:51 0.00028333 MUs

BLOCK J-SHIV VIHAR, BLOCK A-RAMA GARDEN, BHAGAT NAGAR-DAYALPUR, BLOCK CN-AMBIKA VIHAR BLOCK - B&C, BLOCK Z-O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK C- PATEL VIHAR, SHIV VIHAR, BLOCK C-MAHALAXMI ENCLAVE, BLOCK U-SHIV VIHAR, BLOCK Q-SHIV VIHAR, BLOCK H-SHIV VIHAR, BLOCK D-SHIV VIHAR, BLOCK T-SHIV VIHAR, BLOCK F- SHIV VIHAR, BLOCK L-SHIV VIHAR, BLOCK O-SHIV VIHAR, BLOCK M-SHIV VIHAR, BLOCK N-SHIV VIHAR, BLOCK R-PATEL VIHAR, BLOCK D-SHIV VIHAR, PKT R-BLOCK A, PKT C-SHIV VIHAR, BLOCK D-HARIJAN BASTI, BLOCK V-O & P BLOCKS SHIV VIHAR KARWAL NAGAR, LIG/MIG RES/NON COMM AREA-NEW CHAUHAN PUR, BLOCK D-PREM VIHAR, BHAJANPURA- DAYALPUR, BLOCK CN-AMBIKA VIHAR BLOCK - B&C, BLOCK A- HARIJAN BASTI, BLOCK B-NEW CHAUHAN PUR, BLOCK Q-SHIV 510 VIHAR, BLOCK H-SHIV VIHAR KWN 6574 0 KVA UNPLANNED 31-05-2020 06:21:56 31-05-2020 07:19:05 0:57 0.000475 MUs

VIJAY PARK-YAMUNA VIHAR, MAUJ PUR COMPLEX 1, BSES 66 511 KV GRID S/STATION-COMMUNITY CENTRE YAMUNA VIHAR YVR 219 630 KVA UNPLANNED 26-05-2020 15:49:54 26-05-2020 16:40:00 0:50 0.00041667 MUs

HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK A-BANK COLONY, SABOLI VILLAGE-MANDOLI, BLOCK B-ANUP VIHAR, BLOCK C-SEWA DHAM, BLOCK A-SEWA DHAM, LIG/MIG RES/NON COMM AREA-SEWA DHAM, BLOCK C- ANUP VIHAR, BLOCK D-HARSH VIHAR, BLOCK B-HARSH VIHAR, 512 BLOCK A-HARSH VIHAR, GOVT.CO. SEC. SCHOOL-HARSH VIHAR NNG 2671 0 KVA UNPLANNED 30-05-2020 11:29:10 30-05-2020 12:17:41 0:48 0.0004 MUs

SABOLI EXTN.-MANDOLI, BLOCK A-MANDOLI EXTN., SABOLI COLONY-MANDOLI, SABOLI VILLAGE-MANDOLI, BLOCK B-ANUP VIHAR, BLOCK K-ANUP VIHAR, BLOCK A-ANUP VIHAR, KABRISTAN-SABOLI COLONY, BANK OF BARODA-SABOLI COLONY, MCD SCHOOL-SABOLI COLONY, BLOCK D-MEET NAGAR, SEWA DHAM-MANDOLI, SABOLI COLONY-MANDOLI, 513 VILLAGE SABOLI-SABOLI COLONY, SABOLI EXTN.-MANDOLI NNG 3928 630 KVA UNPLANNED 18-05-2020 10:11:27 18-05-2020 11:00:58 0:49 0.00040833 MUs BLOCK C-HARSH VIHAR, BLOCK A-SEWA DHAM, BLOCK D- 514 HARSH VIHAR, BLOCK A-HARSH VIHAR NNG 86 0 KVA UNPLANNED 17-05-2020 11:28:39 17-05-2020 12:25:00 0:56 0.00015556 MUs

BLOCK M-SUNDER NAGRI, SABOLI EXTN.-MANDOLI, BLOCK C- HARSH VIHAR, BLOCK A-MANDOLI EXTN., SABOLI COLONY- MANDOLI, SABOLI VILLAGE-MANDOLI, BLOCK D-HARIJAN BASTI EAST EXTN., BLOCK B-ANUP VIHAR, POCKET B-GURU TEG BAHADUR ENCLAVE, BLOCK K-ANUP VIHAR, BLOCK C-ANUP VIHAR, KABRISTAN-SABOLI COLONY, BANK OF BARODA-SABOLI COLONY, MCD SCHOOL-SABOLI COLONY, BLOCK A-HARSH VIHAR, BLOCK A-RAJIV NAGAR, SEWA DHAM-MANDOLI, ANUP VIHAR-MANDOLI, RAJEEV NAGAR-SEWA DHAM, VILLAGE SABOLI-SABOLI COLONY, SABOLI EXTN.-MANDOLI, SEWA 515 DHAM-MANDOLI NNG 3928 630 KVA UNPLANNED 31-05-2020 07:19:10 31-05-2020 08:14:02 0:54 0.00075 MUs

LIG/MIG RES/NON COMM AREA-CHAWLA FARM, LIG/MIG RES/NON COMM AREA-SABHEPUR, LIG/MIG RES/NON COMM AREA-MILAN GARDEN, LIG/MIG RES/NON COMM AREA-BALAJI MANDIR COLONY, LIG/MIG RES/NON COMM AREA-SONIA VIHAR, LIG/MIG RES/NON COMM AREA-G- BLOCK SONIA VIHAR EXTENSION, LIG/MIG RES/NON COMM AREA-G- BLOCK SONIA VIHAR EXTENSION, LIG/MIG RES/NON COMM AREA-D- BLOCK-SONIA VIHAR, LIG/MIG RES/NON COMM AREA-E-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-SONIA VIHAR, LIG/MIG RES/NON COMM AREA-G- BLOCK SONIA VIHAR EXTENSION, LIG/MIG RES/NON COMM AREA-G-BLOCK SONIA 516 VIHAR KWN 0 400 KVA UNPLANNED 25-05-2020 08:12:09 25-05-2020 08:54:10 0:42 0 MUs BLOCK C-KHAJURI KHAS, BLOCK A-KHAJURI KHAS, BLOCK J- KHAJURI KHAS, LIG/MIG RES/NON COMM AREA-BLOCK B, 517 BLOCK I-KHAJURI KHAS EXTN. KWN 2377 630 KVA UNPLANNED 27-05-2020 13:14:08 27-05-2020 13:42:28 0:28 0.00023333 MUs

PKT W-BLOCK A, BLOCK Z-O & P BLOCKS SHIV VIHAR KARWAL NAGAR, SHIV VIHAR, BLOCK U-SHIV VIHAR, BLOCK Q-SHIV VIHAR, BLOCK H-SHIV VIHAR, BLOCK D-SHIV VIHAR, BLOCK T- SHIV VIHAR, BLOCK F-SHIV VIHAR, BLOCK L-SHIV VIHAR, BLOCK S-SHIV VIHAR, BLOCK O-SHIV VIHAR, BLOCK M-SHIV VIHAR, BLOCK N-SHIV VIHAR, BLOCK B-SHIV VIHAR, PKT R-BLOCK A, BLOCK V-O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK 518 CN-AMBIKA VIHAR BLOCK - B&C, BLOCK Q-SHIV VIHAR KWN 3979 0 KVA UNPLANNED 04-05-2020 12:11:26 04-05-2020 12:59:24 0:47 0.00013056 MUs CHHAJJUPUR-BABAR PUR, BABARPUR EXTN.-BABAR PUR, 519 BALBIR NAGAR EXTN.-SILAMPUR NNG 33 400 KVA UNPLANNED 22-05-2020 16:50:10 22-05-2020 17:28:40 0:38 0.00015833 MUs

BLOCK A-BALDEV PARK EAST, NEW GOVIND PURA-JAGATPURI, CHANDER NAGAR-KRISHNA NAGAR, BLOCK F-BALDEV PARK EAST, BLOCK B-KRISHNA NAGAR EAST, BLOCK A-KRISHNA NAGAR, BLOCK B-SOUTH ANARKALI COLONY, BLOCK B-JAGAT PURI, BLOCK B-JAGATPURI, BLOCK D-JAGATPURI, BLOCK D- ANARKALI COLONY NORTH, BLOCK D-SOUTH ANARKALI 520 COLONY KRN 4239 990 KVA UNPLANNED 01-05-2020 03:24:55 01-05-2020 05:46:00 2:21 0.0017625 MUs 521 CHANDANI MAHAL-CHANDNI CHOWK DRG 52 990 KVA UNPLANNED 11-05-2020 12:13:47 11-05-2020 12:46:35 0:32 0.00003556 MUs BABARPUR EXTN.-BABAR PUR, VIJAY PARK-YAMUNA VIHAR, 522 JAFFRABAD-MAUJ PUR, MAUJ PUR COMPLEX 1 YVR 20 630 KVA UNPLANNED 16-05-2020 13:52:18 16-05-2020 14:26:18 0:33 0.00009167 MUs BLOCK A-GANESH NAGAR, GANESH NAGAR SOUTH- INDRAPRASTHA EXTENSION, MOTHER DAIRY-INDRAPRASTHA 523 EXTENSION LNR LNR 548 400 KVA UNPLANNED 27-05-2020 17:51:59 27-05-2020 17:59:55 0:7 0.00001944 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unserved (MU) due to Sr. No. Area Affected Division Affected Transformer (in KVA). Unplanned Outage From DateTime To DateTime Duration (Hrs:Mins) Outage

LIG/MIG RES/NON COMM AREA-MILAN GARDEN, LIG/MIG RES/NON COMM AREA-BALAJI MANDIR COLONY, LIG/MIG RES/NON COMM AREA-SONIA VIHAR, LIG/MIG RES/NON COMM AREA-G- BLOCK SONIA VIHAR EXTENSION, LIG/MIG RES/NON COMM AREA-G- BLOCK SONIA VIHAR EXTENSION, LIG/MIG RES/NON COMM AREA-D-BLOCK-SONIA VIHAR, LIG/MIG RES/NON COMM AREA-E-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-SONIA VIHAR, LIG/MIG 524 RES/NON COMM AREA-G- BLOCK SONIA VIHAR EXTENSION KWN 345 400 KVA UNPLANNED 14-05-2020 18:20:52 14-05-2020 19:19:58 0:59 0.00065556 MUs BLOCK A-HARIJAN BASTI, HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK A-BANK COLONY, POCKET A-JJ COLONY, BLOCK A-SEWA DHAM, BUDH VIHAR- SEWA DHAM, BLOCK A-SEWA DHAM, BLOCK D-HARSH VIHAR, BLOCK B-HARSH VIHAR, BLOCK A-HARSH VIHAR, BLOCK B- 525 SEWA DHAM NNG 1432 0 KVA UNPLANNED 18-05-2020 12:24:19 18-05-2020 13:16:38 0:52 0.00028889 MUs

SABOLI EXTN.-MANDOLI, BLOCK A-MANDOLI EXTN., SABOLI COLONY-MANDOLI, SABOLI VILLAGE-MANDOLI, BLOCK B-ANUP VIHAR, BLOCK K-ANUP VIHAR, BLOCK A-ANUP VIHAR, KABRISTAN-SABOLI COLONY, BANK OF BARODA-SABOLI COLONY, MCD SCHOOL-SABOLI COLONY, SEWA DHAM- MANDOLI, VILLAGE SABOLI-SABOLI COLONY, SABOLI EXTN.- 526 MANDOLI NNG 3928 630 KVA UNPLANNED 30-05-2020 18:07:28 30-05-2020 18:40:50 0:33 0.00045833 MUs

SABOLI EXTN.-MANDOLI, BLOCK A-MANDOLI EXTN., BLOCK A- MANDOLI VILLAGE, SABOLI COLONY-MANDOLI, BLOCK B-ANUP VIHAR, BLOCK E-SEWA DHAM, BLOCK A-SEWA DHAM, BLOCK C- ANUP VIHAR, KABRISTAN-SABOLI COLONY, BANK OF BARODA- SABOLI COLONY, MCD SCHOOL-SABOLI COLONY, BLOCK A- HARSH VIHAR, SEWA DHAM-MANDOLI, SABOLI COLONY- MANDOLI, VILLAGE SABOLI-SABOLI COLONY, SABOLI EXTN.- 527 MANDOLI NNG 4342 0 KVA UNPLANNED 08-05-2020 12:38:55 08-05-2020 13:05:43 0:26 0.00036111 MUs

LIG/MIG RES/NON COMM AREA-CHAWLA FARM, LIG/MIG RES/NON COMM AREA-SABHEPUR, LIG/MIG RES/NON COMM AREA-MILAN GARDEN, LIG/MIG RES/NON COMM AREA-BALAJI MANDIR COLONY, BLOCK M-NEHRU VIHAR, BLOCK F- MUSTAFABAD (DAYALPUR), CHAUHAN PATTI-VIJAY VIHAR, LIG/MIG RES/NON COMM AREA-SONIA VIHAR, LIG/MIG RES/NON COMM AREA-G- BLOCK SONIA VIHAR EXTENSION, LIG/MIG RES/NON COMM AREA-G- BLOCK SONIA VIHAR EXTENSION, LIG/MIG RES/NON COMM AREA-D-BLOCK-SONIA VIHAR, LIG/MIG RES/NON COMM AREA-E-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-SONIA VIHAR, LIG/MIG RES/NON COMM AREA-G- BLOCK SONIA VIHAR EXTENSION, 528 LIG/MIG RES/NON COMM AREA-G-BLOCK SONIA VIHAR KWN 518 400 KVA UNPLANNED 26-05-2020 12:44:42 26-05-2020 13:20:49 0:36 0.0006 MUs

DARYA GANJ, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY-KASHMERE GATE, PKT R-BLOCK D, PKT C-BLOCK B, JAFFRABAD-MAUJ PUR, G.B.SSS SCHOOL-GOKUL PURI, BLOCK B- EAST GOKUL PURI, BLOCK A-MEET NAGAR, BLOCK E- UTTARANCHAL COLONY, BLOCK A-SADATPUR EXT-PUSTA AREA- L BLOCK, BLOCK A-UTTARANCHAL COLONY, BLOCK A-EAST GOKUL PURI, BLOCK C-AMAR COLONY, BLOCK C-MEET NAGAR, BLOCK H-BHAGIRATHI VIHAR, BLOCK F-SHIV VIHAR, BLOCK M- SHIV VIHAR, BLOCK N-SHIV VIHAR, BLOCK E-INDIRA VIHAR, SPORTS COMPLEX-VASUNDHARA ENCLAVE VSE, BHAJANPURA- DAYALPUR, BLOCK D-MEET NAGAR, BLOCK E-MEET NAGAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-B-BLOCK SONIA VIHAR, BLOCK 529 F-INDIRA VIHAR NNG 4231 2650 KVA UNPLANNED 25-05-2020 08:55:26 25-05-2020 09:39:55 0:44 0.00122222 MUs

BLOCK A-JHANDEWALAN, DARYA GANJ, LIG/MIG RES/NON COMM AREA-SHRIRAM COLONY D BOLCK, JHANDEWALAN FATTED FACTORY COMPLEX, DR. AMBEDKAR STADIUM-FEROJ SHAH KOTLA STADIUM, BLOCK C9-YAMUNA VIHAR, JAFFRABAD- MAUJ PUR, MAUJ PUR COMPLEX 1, RED FORT-CHANDNI CHOWK-RED FORT, LIG/MIG RES/NON COMM AREA-SHRI RAM COLONY, LIG/MIG RES/NON COMM AREA-BLOCK B, DDA POLICE QTRS.-AHATA KEDARA, BLOCK B-SADAR BAZAR - RAM NAGAR, TELEGRAPH OFFICE-KASHMERE GATE, NIGAM BODH GHAT CEMETRY-KASHMERE GATE, PART II-BLOCK E- BLDGNAMERASTRIYA VIRJANAND ANDH KANYA 530 MAHAVIDYALAYA YVR 2472 990 KVA UNPLANNED 18-05-2020 14:37:38 18-05-2020 15:21:41 0:44 0.00048889 MUs LIG/MIG RES/NON COMM AREA-CHAWLA FARM, LIG/MIG RES/NON COMM AREA-SABHEPUR, LIG/MIG RES/NON COMM AREA-MILAN GARDEN, LIG/MIG RES/NON COMM AREA-BALAJI MANDIR COLONY, CHAUHAN PATTI-VIJAY VIHAR, BADARPUR 531 KHADAR KWN 4107 5235 KVA UNPLANNED 14-05-2020 18:14:37 14-05-2020 19:08:47 0:54 0.00075 MUs 532 FAZALPUR-MANDAWALI VILLAGE LNR 187 990 KVA UNPLANNED 08-05-2020 15:55:00 08-05-2020 16:30:00 0:35 0.00009722 MUs BLOCK CN-AMBIKA VIHAR BLOCK - B&C, BLOCK C-KARAWAL 533 NAGAR, SHIV VIHAR, BLOCK C-SHIV VIHAR KWN 259 0 KVA UNPLANNED 19-05-2020 01:49:25 19-05-2020 02:22:22 0:32 0.00026667 MUs

SABOLI EXTN.-MANDOLI, BLOCK C-HARSH VIHAR, SABOLI VILLAGE-MANDOLI, BLOCK B-SEWA DHAM, DEEPAK MEDITECH- NEW MANDOLI INDUSTRIAL AREA, GANGA FARM HOUSE- SEWA DHAM, BLOCK K-ANUP VIHAR, BLOCK C-ANUP VIHAR, MCD SCHOOL-SABOLI COLONY, SEWA DHAM-MANDOLI, 534 SABOLI EXTN.-MANDOLI, SEWA DHAM-MANDOLI NNG 173 0 KVA UNPLANNED 15-05-2020 02:56:07 15-05-2020 03:50:28 0:54 0.0003 MUs 535 BLOCK D-BHAJANPURA, BLOCK E-SUBHASH MOHALLA YVR 184 990 KVA UNPLANNED 21-05-2020 15:55:33 21-05-2020 16:26:43 0:31 0.00006889 MUs

LIG/MIG RES/NON COMM AREA-BALAJI MANDIR COLONY, LIG/MIG RES/NON COMM AREA-C-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-C-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-D-BLOCK-SONIA VIHAR, LIG/MIG RES/NON COMM AREA-E-BLOCK SONIA VIHAR, 536 LIG/MIG RES/NON COMM AREA-SONIA VIHAR KWN 1923 0 KVA UNPLANNED 12-05-2020 19:16:54 12-05-2020 19:56:10 0:39 0.00021667 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unserved (MU) due to Sr. No. Area Affected Division Affected Transformer (in KVA). Unplanned Outage From DateTime To DateTime Duration (Hrs:Mins) Outage

BLOCK 3B-SADAT PUR, LIG/MIG RES/NON COMM AREA- DAYALPUR EXTN., BLOCK B-NEW CHAUHAN PUR, BLOCK 1D- SADAT PUR, BLOCK F-SADAT PUR, BLOCK 1B-SADAT PUR, BLOCK 2C-SADAT PUR, BLOCK 5B-SADAT PUR, BLOCK A- MUSTAFABAD (DAYALPUR), PKT 1-BLOCK A, DEEKSHA MAHILA COLLAGE-DAYALPUR EXTN., BLOCK D-NEW CHAUHAN PUR, BLOCK C2-NEW CHAUHAN PUR, BLOCK B-DAYALPUR, BLOCK E- DAYALPUR, BLOCK A-NEHRU VIHAR, BLOCK A-SHIV VIHAR, BLOCK B-NEW CHAUHAN PUR, LIG/MIG RES/NON COMM AREA- 537 DAYALPUR EXTN. KWN 1031 990 KVA UNPLANNED 10-05-2020 22:02:21 10-05-2020 22:51:35 0:49 0.00020417 MUs BLOCK 9-GANDHI NAGAR, BLOCK 9-SUBHASH MOHALLA_I, 538 BLOCK 9-RAGHUBARPURA KRN 714 990 KVA PLANNED 21-05-2020 08:00:00 21-05-2020 12:22:46 4:22 0.00109167 MUs

LIG/MIG RES/NON COMM AREA-CRPF CAMP SONIA VIHAR, LIG/MIG RES/NON COMM AREA-CHAWLA FARM, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-B-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-C-BLOCK SONIA VIHAR, LIG/MIG 539 RES/NON COMM AREA-C-BLOCK SONIA VIHAR KWN 219 0 KVA UNPLANNED 15-05-2020 10:33:43 15-05-2020 11:29:50 0:56 0.00015556 MUs BLOCK B-SUBHASH MOHALLA, BLOCK D-BHAJANPURA, BLOCK E- SUBHASH MOHALLA, BLOCK E-SUBHASH MOHALLA, WEST 540 GHONDA YVR 2091 990 KVA UNPLANNED 24-05-2020 16:03:56 24-05-2020 16:52:26 0:48 0.00010667 MUs BLOCK 61-AJMAL KHAN PARK, BLOCK I-BRAHM PURI, BLOCK F- 541 BRAHM PURI YVR 22 990 KVA UNPLANNED 25-05-2020 12:13:23 25-05-2020 13:00:00 0:46 0.00012778 MUs BLOCK A-JAGATPURI EXTN., BLOCK 1-RAM NAGAR, BLOCK A- CHANDRA LOK, BLOCK B-SAKDARPUR, BLOCK A- BHARTIYA BODH SABHA-HARDEV PURI, BLOCK A-B&C-JAGAT PURI, DEV PUBLIC SCHOOL-CHITRAKOOT, BLOCK A1-NAND NAGARI, BLOCK A-AMAR COLONY, BLOCK B-CHANDRA LOK, BLOCK M- 542 DURGA PURI NNG 86 630 KVA UNPLANNED 25-05-2020 00:27:33 25-05-2020 01:21:03 0:53 0.00014722 MUs BLOCK B-JOHRI PUR, BLOCK A-JOHRI PUR, JAGDAMBA COLONY- BHAGIRATHI VIHAR, JOHRI ENCLAVE-BHAGIRATHI VIHAR, 543 BHAGIRATHI VIHAR KWN 1001 0 KVA UNPLANNED 14-05-2020 20:23:18 14-05-2020 21:05:56 0:42 0.000175 MUs

BLOCK T-GAUTAM PURI, BLOCK B-SUBHASH MOHALLA, BLOCK E-SUBHASH MOHALLA, BLOCK R-BRAHM PURI, JAFFRABAD- MAUJ PUR, BLOCK D-BHAJANPURA, BLOCK B-GARI MANDU, 544 WEST GHONDA, BLOCK E-SUBHASH MOHALLA YVR 2431 990 KVA PLANNED 27-05-2020 11:00:00 27-05-2020 17:48:16 6:48 0.00113333 MUs 545 ANAND PARBAT PNR 240 990 KVA UNPLANNED 24-05-2020 10:54:00 24-05-2020 11:50:00 0:56 0.00015556 MUs SHASHI GARDEN-MAYUR VIHAR, ACHARYA NIKETAN-SHASHI GARDEN, PATPAR GANJ-SHASHI GARDEN, PATPARGANJ- 546 SHASHI GARDEN MVR 2434 990 KVA PLANNED 21-05-2020 10:05:00 21-05-2020 13:51:11 3:46 0.00062778 MUs

SABOLI VILLAGE-MANDOLI, BLOCK B-ANUP VIHAR, NEW MANDOLI INDUSTRIAL AREA, BLOCK B-PRATAP NAGAR, BLOCK D-ANUP VIHAR, BLOCK K-ANUP VIHAR, BLOCK A-ANUP VIHAR, BLOCK C-ANUP VIHAR, SEWA DHAM-MANDOLI, ANUP VIHAR- 547 MANDOLI, SEWA DHAM-MANDOLI NNG 432 0 KVA UNPLANNED 25-05-2020 23:39:57 26-05-2020 00:04:45 0:24 0.00033333 MUs

BHARAT MATA MANDIR-JJ COLONY, HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK E-RAJIV NAGAR, BLOCK A-BANK COLONY, NEW MANDOLI INDUSTRIAL AREA, DEEPAK MEDITECH-NEW MANDOLI INDUSTRIAL AREA, BLOCK C-SEWA DHAM, BLOCK A-SEWA DHAM, BLOCK D-HARSH VIHAR, BLOCK A-HARSH VIHAR, BLOCK A-RAJIV NAGAR, BLOCK 548 B-RAJIV NAGAR NNG 432 400 KVA UNPLANNED 23-05-2020 10:00:31 23-05-2020 10:29:19 0:28 0.00038889 MUs BLOCK D-DLF ANKUR VIHAR, BLOCK A-PRAKASH VIHAR, BLOCK C-BHAGAT SINGH COLONY, BLOCK I-BHAGAT SINGH COLONY, 549 BLOCK D-PRAKASH VIHAR KWN 130 400 KVA UNPLANNED 17-05-2020 04:05:00 17-05-2020 04:58:47 0:53 0.00022083 MUs

PART I- BLOCK C-NEW RAJENDRA NAGAR, BLOCK 21-OLD RAJENDRA NAGAR, BLOCK 30-OLD RAJENDRA NAGAR, BLOCK 39-OLD RAJENDRA NAGAR, BLOCK 38-OLD RAJENDRA NAGAR, BLOCK B-OLD RAJENDRA NAGAR, SALWAN PUBLIC SCHOOL- 550 OLD RAJENDRA NAGAR SRD 129 400 KVA UNPLANNED 20-05-2020 11:30:39 20-05-2020 11:45:59 0:15 0.00004167 MUs

BLOCK A-MANDOLI VILLAGE, BLOCK A-BANK COLONY, BLOCK D- HARIJAN BASTI EAST EXTN., BLOCK B-SEWA DHAM, BLOCK A- SEWA DHAM, BLOCK H-SEWA DHAM, BUDH VIHAR-SEWA DHAM, BLOCK B-HARSH VIHAR, BLOCK A-HARSH VIHAR, GOVT.CO. SEC. SCHOOL-HARSH VIHAR, BLOCK B-SEWA DHAM, 551 BLOCK A-SEWA DHAM NNG 489 0 KVA UNPLANNED 18-05-2020 11:45:44 18-05-2020 12:23:08 0:37 0.00030833 MUs 552 BLOCK A-PRAKASH VIHAR KWN 216 0 KVA UNPLANNED 21-05-2020 14:32:58 21-05-2020 15:19:35 0:46 0.00031944 MUs

BLOCK C-TUKMIRPUR, LIG/MIG RES/NON COMM AREA- CHAWLA FARM, BLOCK D-TUKMIRPUR, BLOCK V-O & P BLOCKS SHIV VIHAR KARWAL NAGAR, LIG/MIG RES/NON COMM AREA- A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A- BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-C-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-C-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-C-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-SONIA VIHAR, LIG/MIG RES/NON COMM AREA-D-BLOCK-SONIA VIHAR, LIG/MIG RES/NON COMM AREA-SONIA VIHAR, LIG/MIG RES/NON 553 COMM AREA-G-BLOCK SONIA VIHAR KWN 805 0 KVA UNPLANNED 17-05-2020 15:23:28 17-05-2020 16:20:26 0:56 0.00031111 MUs 554 BLOCK A-MANDOLI EXTN. NNG 13 990 KVA UNPLANNED 20-05-2020 14:44:03 20-05-2020 15:38:01 0:53 0.00044167 MUs BLOCK 28-HIMMATPURI, BLOCK F-PANDAV NAGAR, SAMASPUR- PANDAV NAGAR, BLOCK E-PANDAV NAGAR, PANDAV NAGAR 555 MVR-SHAKARPUR MVR MVR 58 990 KVA UNPLANNED 29-05-2020 13:27:55 29-05-2020 14:38:14 1:10 0.00019444 MUs

SHIVAJI PARK-BALBIR NAGAR, BLOCK 1-BALBIR NAGAR, BALBIR 556 NAGAR EXTN.-SILAMPUR, GOPAL K.OIL DEPO.-PRATAP PURA DGN 599 990 KVA UNPLANNED 26-05-2020 01:55:00 26-05-2020 02:21:00 0:26 0.00014444 MUs

G.B.SSS SCHOOL-GOKUL PURI, HARSH VIHAR SUB STATION- POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK A-BANK COLONY, SABOLI COLONY-MANDOLI, BLOCK D-HARIJAN BASTI EAST EXTN., POCKET A-JJ COLONY, BLOCK B-SEWA DHAM, BLOCK A-SEWA DHAM, BLOCK C-SEWA DHAM, BLOCK A-SEWA DHAM, BLOCK D-HARSH VIHAR, BLOCK B-HARSH VIHAR, BLOCK 557 A-HARSH VIHAR, BLOCK B-SEWA DHAM NNG 1903 0 KVA UNPLANNED 14-05-2020 19:24:29 14-05-2020 20:19:27 0:54 0.00075 MUs BLOCK B-ARAM BAGH, SHORA KOTHI-PAHAR GANJ, PANCHKUIAN ROAD RAILWAY COLONY-PAHAR GANJ, PAHAR GANJ PHG, NEW RATAN MARKET-PANCHKUIAN ROAD 558 RAILWAY COLONY PHG 58 990 KVA PLANNED 20-05-2020 10:00:00 20-05-2020 12:16:13 2:16 0.00079333 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unserved (MU) due to Sr. No. Area Affected Division Affected Transformer (in KVA). Unplanned Outage From DateTime To DateTime Duration (Hrs:Mins) Outage

SHAHDARA JLM, PUSHPANJALI-ANAND VIHAR, RAM VIHAR- ANAND VIHAR, ANAND VIHAR BLOCK A, VILL KARKARDOOMA- KARKAR DUMA, ANAND VIHAR BLOCK C, JAGRITI ENCLAVE- ANAND VIHAR, ANAND VIHAR BLOCK B, SHYAM ENCLAVE- ANAND VIHAR, SAINI ENCLAVE-ANAND VIHAR, SURYA NIKETAN-ANAND VIHAR, KARKARDOOMA COMPLAX-KARKAR 559 DUMA JLM 3107 5350 KVA UNPLANNED 23-05-2020 15:59:00 23-05-2020 16:33:07 0:34 0 MUs 560 BLOCK D-BHAJANPURA YVR 86 990 KVA UNPLANNED 28-05-2020 17:03:18 28-05-2020 17:47:52 0:44 0.00012222 MUs

561 BLOCK B-BRIJ PURI, BLOCK E-BRIJ PURI, BLOCK F-BRIJ PURI KWN 1618 990 KVA UNPLANNED 14-05-2020 16:27:17 14-05-2020 17:00:21 0:33 0.00022917 MUs 562 BLOCK C-KABIR NAGAR, BLOCK A-KABIR NAGAR NNG 20 630 KVA UNPLANNED 15-05-2020 14:39:20 15-05-2020 15:05:00 0:25 0.00005556 MUs BLOCK B-B-BLOCK SHRI RAM COLONY, BLOCK C-SHRI RAM COLONY, BLOCK D-C-BLOCK SHRI RAM COLONY, LIG/MIG 563 RES/NON COMM AREA-SHRI RAM COLONY KWN 1540 630 KVA UNPLANNED 29-05-2020 17:56:16 29-05-2020 18:25:00 0:28 0.00015556 MUs

CHHAJJUPUR-BABAR PUR, BABARPUR EXTN.-BABAR PUR, BALBIR NAGAR EXTN.-SILAMPUR, PKT A-BLOCK A, BLOCK A- HARIJAN BASTI, PKT B-BLOCK A, BLOCK E-JYOTI NAGAR EAST, 564 BLOCK B-JYOTI NAGAR, BLOCK H-JYOTI NAGAR NNG 107 990 KVA UNPLANNED 19-05-2020 00:34:59 19-05-2020 01:31:24 0:56 0.00023333 MUs

BHARAT MATA MANDIR-JJ COLONY, HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK A- BANK COLONY, BLOCK E-SEWA DHAM, POCKET A-JJ COLONY, NEW MANDOLI INDUSTRIAL AREA, DEEPAK MEDITECH-NEW MANDOLI INDUSTRIAL AREA, BLOCK D-HARSH VIHAR, BLOCK B- HARSH VIHAR, BLOCK A-HARSH VIHAR, BLOCK D-MEET NAGAR, 565 SABOLI EXTN.-MANDOLI NNG 889 400 KVA UNPLANNED 28-05-2020 21:20:00 28-05-2020 22:13:00 0:53 0.00151639 MUs 566 BLOCK A-EAST GOKUL PURI NNG 436 630 KVA UNPLANNED 12-05-2020 14:15:33 12-05-2020 14:51:17 0:35 0.00019444 MUs BABARPUR WEST-BABAR PUR NNG, BABARPUR EXTN.-BABAR 567 PUR NNG 431 1000 KVA PLANNED 27-05-2020 09:00:00 27-05-2020 12:35:00 3:35 0 MUs BLOCK CN-AMBIKA VIHAR BLOCK - B&C, SHIV VIHAR, PKT Y- SHIV VIHAR, PKT D-SHIV VIHAR, BLOCK CN-AMBIKA VIHAR 568 BLOCK - B&C, BLOCK J-SHIV VIHAR KWN 1009 0 KVA UNPLANNED 15-05-2020 05:06:58 15-05-2020 07:02:00 1:55 0.00047917 MUs BLOCK F-OLD SIMAPURI, BLOCK H-OLD SIMAPURI, BLOCK C- OLD SIMAPURI, BLOCK B-OLD SIMAPURI, GOVT. DISPENCERY- 569 OLD SIMAPURI DGN 173 990 KVA UNPLANNED 28-05-2020 10:10:00 28-05-2020 10:50:37 0:40 0.00022222 MUs

HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK E-RAJIV NAGAR, BLOCK A-MANDOLI VILLAGE, BLOCK A-BANK COLONY, SABOLI COLONY-MANDOLI, BLOCK D- HARIJAN BASTI EAST EXTN., BLOCK E-SEWA DHAM, NEW MANDOLI INDUSTRIAL AREA, BLOCK B-PRATAP NAGAR, BLOCK B-SEWA DHAM, BLOCK A-SEWA DHAM, BLOCK H-SEWA DHAM, DEEPAK MEDITECH-NEW MANDOLI INDUSTRIAL AREA, BLOCK C-SEWA DHAM, BLOCK A-SEWA DHAM, BANK OF BARODA- SABOLI COLONY, BLOCK D-HARSH VIHAR, BLOCK B-HARSH VIHAR, BLOCK A-HARSH VIHAR, GOVT.CO. SEC. SCHOOL-HARSH VIHAR, BLOCK A-RAJIV NAGAR, BLOCK B-RAJIV NAGAR, J.R. COMPLEX-SEWA DHAM, BLOCK B-SEWA DHAM, BLOCK A-SEWA 570 DHAM, BLOCK E-SEWA DHAM, RAJEEV NAGAR-SEWA DHAM NNG 604 0 KVA UNPLANNED 14-05-2020 21:48:19 14-05-2020 22:40:00 0:51 0.00099167 MUs BLOCK B-EAST GOKUL PURI, BLOCK A-MEET NAGAR, BLOCK E- UTTARANCHAL COLONY, BLOCK A-EAST GOKUL PURI, BLOCK C- AMAR COLONY, BLOCK C-MEET NAGAR, BLOCK D-MEET 571 NAGAR, BLOCK E-MEET NAGAR NNG 83 990 KVA UNPLANNED 14-05-2020 17:57:56 14-05-2020 18:52:08 0:54 0.00027 MUs 572 NEW MANDOLI INDUSTRIAL AREA NNG 86 0 KVA UNPLANNED 27-05-2020 14:00:34 27-05-2020 14:15:00 0:14 0.00003889 MUs

BLOCK B-EAST GOKUL PURI, BLOCK A-AMAR COLONY, BLOCK A- MEET NAGAR, BLOCK B-UTTARANCHAL COLONY, BLOCK A- EAST GOKUL PURI, BLOCK C-AMAR COLONY, BLOCK C-MEET 573 NAGAR, BLOCK D-MEET NAGAR, BLOCK E-MEET NAGAR NNG 432 990 KVA UNPLANNED 15-05-2020 02:05:00 15-05-2020 02:28:43 0:23 0.00031944 MUs

BLOCK D-HARSH VIHAR, BLOCK B-ANUP VIHAR, BLOCK C-ANUP VIHAR, LIG/MIG RES/NON COMM AREA-SEWA DHAM, BLOCK C- SEWA DHAM, GOVT.CO. SEC. SCHOOL-HARSH VIHAR, BLOCK A- SEWA DHAM, BLOCK A-HARSH VIHAR, BLOCK A-BANK COLONY, BLOCK B-HARSH VIHAR, BLOCK C-HARSH VIHAR, HARSH VIHAR 574 SUB STATION-POLICE FARM, SABOLI VILLAGE-MANDOLI NNG 2671 0 KVA UNPLANNED 26-05-2020 18:06:01 26-05-2020 18:44:48 0:38 0.00031667 MUs

AMBEDKAR NAGAR INDUSTRIAL AREA-BHAGIRATHI VIHAR, BHAGIRATHI VIHAR, LAXMI GARDEN-AMBEDKAR NAGAR, 575 BLOCK D-OLD MUSTAFABAD, BHARAT-AMBEDKAR NAGAR KWN 545 0 KVA UNPLANNED 29-05-2020 05:05:45 29-05-2020 05:53:33 0:47 0.00019583 MUs 576 BLOCK A-MANDOLI EXTN. NNG 290 990 KVA UNPLANNED 11-05-2020 17:53:01 11-05-2020 18:23:16 0:30 0.00008333 MUs

BLOCK B-MOTHER DAIRY, VIDHI APARTMENT-MOTHER DAIRY, KURMANCHAL NIKETAN-MOTHER DAIRY, INDER PRASTHA APARTMENT-MOTHER DAIRY, SAGAR SADAN-MOTHER DAIRY, AZAD APARTMENT-MOTHER DAIRY, VRINDAVAN APARTMENT- 577 MOTHER DAIRY, BLOCK A-MOTHER DAIRY LNR 1324 4750 KVA UNPLANNED 08-05-2020 15:13:00 08-05-2020 15:42:00 0:29 0 MUs M.C.D. HOUSE-POCKET B, DDA MARKET PKT B & E-POCKET F & 578 E, GROUP 4-POCKET B DGN 20 990 KVA UNPLANNED 16-05-2020 12:29:03 16-05-2020 14:11:58 1:42 0.00014167 MUs

PKT R-BLOCK A, BLOCK B-NEW CHAUHAN PUR, PKT A-BLOCK E, BLOCK B-NEW CHAUHAN PUR, PKT A4-BLOCK E, BLOCK B- HARIJAN BASTI, BLOCK B-GOVIND VIHAR, PKT X-SHIV VIHAR, BLOCK CN-AMBIKA VIHAR BLOCK - B&C, BLOCK N-SHIV VIHAR, BLOCK A-PREM VIHAR, BLOCK B-DAYALPUR, BLOCK T-SHIV VIHAR, BLOCK B-SHIV VIHAR, BLOCK V-O & P BLOCKS SHIV VIHAR KARWAL NAGAR, PKT D-BLOCK A, BLOCK E-DAYALPUR, BLOCK I-BHAGAT SINGH COLONY, BLOCK H-SHIV VIHAR, BLOCK L-SHIV VIHAR, BLOCK D-PRAKASH VIHAR, BLOCK B-PATEL VIHAR, BLOCK CN-AMBIKA VIHAR BLOCK - B&C, BLOCK CN- AMBIKA VIHAR BLOCK - B&C, PHASE I-SHIV VIHAR, BLOCK M- SHIV VIHAR, BLOCK B-NEW CHAUHAN PUR, BLOCK O-SHIV VIHAR, PKT Y-SHIV VIHAR, BLOCK J-SHIV VIHAR, BLOCK C-DLF ANKUR VIHAR, BLOCK D-SHIV VIHAR, BLOCK U-SHIV VIHAR, PKT C-SHIV VIHAR, BLOCK H-BHAGAT SINGH COLONY, SHIV VIHAR, BLOCK A-HARIJAN BASTI, PKT F-BLOCK A, BLOCK Q-SHIV VIHAR, WEST KARAWAL NAGAR, BLOCK F-SHIV VIHAR, SHIV 579 VIHAR, BLOCK D-SHIV VIHAR KWN 2129 0 KVA UNPLANNED 31-05-2020 16:58:27 31-05-2020 17:54:41 0:56 0.00023333 MUs

LIG/MIG RES/NON COMM AREA-CHAWLA FARM, LIG/MIG RES/NON COMM AREA-SABHEPUR, LIG/MIG RES/NON COMM AREA-MILAN GARDEN, BLOCK C-KARAWAL NAGAR, CHAUHAN PATTI-VIJAY VIHAR, LIG/MIG RES/NON COMM AREA-C-BLOCK 580 SONIA VIHAR, LIG/MIG RES/NON COMM AREA-SONIA VIHAR KWN 609 630 KVA UNPLANNED 22-05-2020 20:55:26 22-05-2020 21:38:35 0:43 0.00029861 MUs BLOCK B-SHRI RAM NAGAR, BLOCK M-SHRI RAM NAGAR, 581 JINDAL BHAWAN-RAM NAGAR EAST DGN 40 990 KVA UNPLANNED 26-05-2020 08:50:00 26-05-2020 09:18:00 0:27 0.00015 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unserved (MU) due to Sr. No. Area Affected Division Affected Transformer (in KVA). Unplanned Outage From DateTime To DateTime Duration (Hrs:Mins) Outage

BLOCK A-BABU NAGAR, BLOCK B-GOVIND VIHAR, BLOCK C- MAN SINGH NAGAR, BLOCK A-KHAJURI KHAS, BLOCK H-OLD MUSTAFABAD, PKT R-BLOCK D, BLOCK B-MAN SINGH NAGAR, BLOCK C-MAHALAXMI ENCLAVE, BLOCK C-GOVIND VIHAR, BLOCK D-OLD MUSTAFABAD, BLOCK B-OLD MUSTAFABAD, BLOCK G-BHAGIRATHI VIHAR, BLOCK F-BHAGIRATHI VIHAR, BLOCK E-BHAGIRATHI VIHAR, BLOCK D-BHAGIRATHI VIHAR, BLOCK H-BHAGIRATHI VIHAR, BLOCK C-BHAGIRATHI VIHAR, BLOCK A-MAN SINGH NAGAR, BLOCK B-MAHALAXMI ENCLAVE, BLOCK A1-MUNGA NAGAR, OLD MUSTAFABAD- BLOCK C- 582 DAYALPUR, BHAJANPURA-DAYALPUR KWN 10132 6250 KVA UNPLANNED 31-05-2020 05:57:35 31-05-2020 06:43:39 0:46 0.00012778 MUs BLOCK C2-YAMUNA VIHAR, BLOCK C9-YAMUNA VIHAR, BLOCK C1-YAMUNA VIHAR, BLOCK B2-YAMUNA VIHAR, BLOCK C8- 583 YAMUNA VIHAR YVR 108 990 KVA UNPLANNED 27-05-2020 11:41:23 27-05-2020 12:37:18 0:55 0.00012222 MUs

BLOCK C-TUKMIRPUR, DARYA GANJ, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY-KASHMERE GATE, PKT R-BLOCK D, BLOCK B-MUSTAFABAD (DAYALPUR), PKT C-BLOCK B, JAFFRABAD-MAUJ PUR, BLOCK A-SADATPUR EXT-PUSTA AREA- L BLOCK, BLOCK H-BHAGIRATHI VIHAR, BLOCK F-SHIV VIHAR, BLOCK M-SHIV VIHAR, BLOCK N-SHIV VIHAR, BLOCK F- MUSTAFABAD (DAYALPUR), BLOCK D-TUKMIRPUR, BLOCK B- TUKMIRPUR, BLOCK E-INDIRA VIHAR, SPORTS COMPLEX- VASUNDHARA ENCLAVE VSE, BHAJANPURA-DAYALPUR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-B-BLOCK SONIA VIHAR, BLOCK 584 F-INDIRA VIHAR KWN 863 630 KVA UNPLANNED 09-05-2020 00:33:15 09-05-2020 01:21:03 0:47 0.00019583 MUs

BLOCK 1B-DEV NAGAR, BLOCK 6B-DEV NAGAR, BLOCK_1A- REHAGAR PURA, PHASE I-DEV NAGAR, MATA RAMESHWARI NEHRU NAGAR-DEV NAGAR, DARYA GANJ, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY-KASHMERE GATE, PKT R- BLOCK D, PKT C-BLOCK B, JAFFRABAD-MAUJ PUR, BLOCK A- SADATPUR EXT-PUSTA AREA-L BLOCK, BLOCK H-BHAGIRATHI VIHAR, BLOCK F-SHIV VIHAR, BLOCK M-SHIV VIHAR, BLOCK N- SHIV VIHAR, BLOCK E-INDIRA VIHAR, KHALSA NAGAR-DEV NAGAR, SPORTS COMPLEX-VASUNDHARA ENCLAVE VSE, BHAJANPURA-DAYALPUR, LIG/MIG RES/NON COMM AREA-A- BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-B-BLOCK SONIA 585 VIHAR, BLOCK F-INDIRA VIHAR PNR 2601 990 KVA UNPLANNED 14-05-2020 13:51:29 14-05-2020 14:45:00 0:53 0.00014722 MUs BHARAT MATA MANDIR-JJ COLONY, HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK A- BANK COLONY, NEW MANDOLI INDUSTRIAL AREA, DEEPAK MEDITECH-NEW MANDOLI INDUSTRIAL AREA, BLOCK D-HARSH 586 VIHAR NNG 432 400 KVA UNPLANNED 03-05-2020 08:36:27 03-05-2020 09:33:38 0:57 0.00079167 MUs

WEST AZAD NAGAR, SHANKAR NAGAR EXTN-AZAD NAGAR, OLD SEELAMPUR, BLOCK X-RAJGARH COLONY, BLOCK A- 587 KRISHNA NAGAR, SHANKAR NAGAR-AZAD NAGAR KRN 501 990 KVA UNPLANNED 26-05-2020 16:30:08 26-05-2020 17:45:00 1:14 0.00020556 MUs BLOCK A-MANDOLI EXTN., SABOLI VILLAGE-MANDOLI, BLOCK B- ANUP VIHAR, NEW MANDOLI INDUSTRIAL AREA, BLOCK D- ANUP VIHAR, BLOCK K-ANUP VIHAR, BLOCK A-ANUP VIHAR, BLOCK C-ANUP VIHAR, SEWA DHAM-MANDOLI, SABOLI COLONY-MANDOLI, ANUP VIHAR-MANDOLI, SEWA DHAM- 588 MANDOLI NNG 216 0 KVA UNPLANNED 30-05-2020 18:50:21 30-05-2020 19:46:41 0:56 0.00038889 MUs DHARAM PURA-KAILASH NAGAR, BLOCK 9-SUBHASH MOHALLA_I, SUBHASH MOHALLA-SEELAMPUR, BLOCK 9- 589 KAILASH NAGAR, GANDHI NAGAR-KAILASH NAGAR KRN 382 990 KVA UNPLANNED 31-05-2020 09:10:00 31-05-2020 10:08:00 0:58 0.00012889 MUs

PKT W-BLOCK A, BLOCK CN-AMBIKA VIHAR BLOCK - B&C, PKT Y- SHIV VIHAR, BLOCK D-BHAGIRATHI VIHAR, BLOCK R-PATEL VIHAR, BLOCK C-SHIV VIHAR, BLOCK D-SHIV VIHAR, BLOCK B- SHIV VIHAR, PKT X-SHIV VIHAR, PKT D-SHIV VIHAR, BLOCK C- HARIJAN BASTI, BLOCK D-HARIJAN BASTI, BLOCK B-HARIJAN BASTI, PKT D-BLOCK B, BLOCK CN-AMBIKA VIHAR BLOCK - B&C, 590 BLOCK A-HARIJAN BASTI, BLOCK B-NEW CHAUHAN PUR KWN 371 0 KVA UNPLANNED 15-05-2020 03:23:45 15-05-2020 04:21:24 0:57 0.0002375 MUs 591 RED FORT-CHANDNI CHOWK-RED FORT CCK 20 990 KVA UNPLANNED 02-05-2020 12:22:25 02-05-2020 12:53:11 0:30 0.00003333 MUs 592 INDIRA CAMP-JHILMIL INDUSTRIAL AREA DGN 31 990 KVA UNPLANNED 17-05-2020 08:44:47 17-05-2020 11:13:45 2:28 0.00041111 MUs 593 VIJAY PARK-YAMUNA VIHAR, MAUJ PUR COMPLEX 1 YVR 389 990 KVA UNPLANNED 15-05-2020 14:59:56 15-05-2020 15:55:00 0:55 0.00012222 MUs 594 PKT 4-PHASE I, MAYUR VIHAR PHASE II MVR 109 990 KVA UNPLANNED 27-05-2020 00:14:04 27-05-2020 00:55:20 0:41 0.00011389 MUs BLOCK B2-YAMUNA VIHAR, NORTH GHONDA, BLOCK D- BHAJANPURA, BLOCK J-KARTAR NAGAR, GAUTAM VIHAR- GHONDA, ARVIND NAGAR-GHONDA, GHONDA PATTI 595 CHAUHAN, BLOCK V-GHONDA PATTI CHAUHAN YVR 324 990 KVA UNPLANNED 27-05-2020 22:41:14 27-05-2020 23:22:48 0:41 0.00009111 MUs 596 SUBHASH PARK-GORAKH PARK, OLD SEELAMPUR YVR 371 630 KVA UNPLANNED 14-05-2020 23:00:18 14-05-2020 23:44:31 0:44 0 MUs

PKT W-BLOCK A, BLOCK Z-O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK U-SHIV VIHAR, BLOCK H-SHIV VIHAR, BLOCK D- SHIV VIHAR, BLOCK T-SHIV VIHAR, BLOCK F-SHIV VIHAR, BLOCK L-SHIV VIHAR, BLOCK S-SHIV VIHAR, BLOCK O-SHIV VIHAR, BLOCK M-SHIV VIHAR, BLOCK N-SHIV VIHAR, PKT R-BLOCK A, BLOCK B-KARAWAL NAGAR (DEHROTI), BLOCK V-O & P BLOCKS 597 SHIV VIHAR KARWAL NAGAR KWN 2129 0 KVA UNPLANNED 25-05-2020 05:11:01 25-05-2020 05:41:44 0:30 0.000125 MUs NEW RAJDHANI ENCLAVE-GAGAN VIHAR, NEW RAJDHANI 598 ENCLAVE BLOCK C-GAGAN VIHAR LNR 75 630 KVA UNPLANNED 30-05-2020 05:56:42 30-05-2020 07:21:21 1:24 0 MUs

SABOLI EXTN.-MANDOLI, HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK A-BANK COLONY, BLOCK D-HARIJAN BASTI EAST EXTN., BLOCK C-SEWA DHAM, BLOCK A- SEWA DHAM, BLOCK D-HARSH VIHAR, BLOCK B-HARSH VIHAR, 599 BLOCK A-HARSH VIHAR NNG 1903 0 KVA UNPLANNED 18-05-2020 15:40:59 18-05-2020 16:31:32 0:50 0.00041667 MUs BANK OF BARODA-SABOLI COLONY, VILLAGE SABOLI-SABOLI 600 COLONY, SABOLI EXTN.-MANDOLI NNG 131 630 KVA UNPLANNED 09-05-2020 10:21:43 09-05-2020 11:21:13 0:59 0.00016389 MUs

BLOCK A-PREM VIHAR, PKT C-BLOCK B, PKT W-BLOCK A, BLOCK CN-AMBIKA VIHAR BLOCK - B&C, BLOCK A-HARIJAN BASTI, BLOCK C-KARAWAL NAGAR, SHIV VIHAR, PKT Y-SHIV VIHAR, BLOCK U-SHIV VIHAR, BLOCK R-PATEL VIHAR, BLOCK B-PATEL VIHAR, BLOCK C-SHIV VIHAR, BLOCK D-SHIV VIHAR, BLOCK R- SHIV VIHAR, BLOCK B-SHIV VIHAR, PKT X-SHIV VIHAR, PKT A- BLOCK A, PKT R-BLOCK A, PKT F-BLOCK A, PKT D-SHIV VIHAR, PKT C-SHIV VIHAR, PKT A-SHIV VIHAR, BLOCK C-KARAWAL NAGAR, BLOCK C-HARIJAN BASTI, BLOCK D-HARIJAN BASTI, BLOCK V-O & P BLOCKS SHIV VIHAR KARWAL NAGAR, PKT D- BLOCK B, BLOCK CN-AMBIKA VIHAR BLOCK - B&C, BLOCK CN- 601 AMBIKA VIHAR BLOCK - B&C, PKT W-BLOCK A KWN 9068 0 KVA UNPLANNED 04-05-2020 13:30:00 04-05-2020 14:12:37 0:42 0.000245 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unserved (MU) due to Sr. No. Area Affected Division Affected Transformer (in KVA). Unplanned Outage From DateTime To DateTime Duration (Hrs:Mins) Outage

MANTOLA MOHALLA-PAHAR GANJ, PANCHKUIAN ROAD RAILWAY COLONY-PAHAR GANJ, KASERU WALAN-PAHAR 602 GANJ, AMRIT KAUR MARKET-PAHAR GANJ PHG 950 990 KVA PLANNED 19-05-2020 10:00:00 19-05-2020 13:35:00 3:35 0.00125417 MUs

HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK E-RAJIV NAGAR, BLOCK A-BANK COLONY, SABOLI COLONY-MANDOLI, BLOCK D-HARIJAN BASTI EAST EXTN., BLOCK E-SEWA DHAM, POCKET A-JJ COLONY, BLOCK B- SEWA DHAM, BLOCK A-SEWA DHAM, BLOCK C-SEWA DHAM, BLOCK C-SEWA DHAM, BLOCK A-SEWA DHAM, BLOCK D-HARSH 603 VIHAR, BLOCK B-HARSH VIHAR, BLOCK A-HARSH VIHAR NNG 1903 0 KVA UNPLANNED 14-05-2020 21:05:00 14-05-2020 21:44:19 0:39 0 MUs HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK E-SEWA DHAM, BLOCK D-HARSH VIHAR, BLOCK 604 B-HARSH VIHAR, BLOCK A-HARSH VIHAR NNG 1432 0 KVA UNPLANNED 10-05-2020 09:43:52 10-05-2020 10:38:27 0:54 0.00045 MUs

BLOCK B5-NAND NAGARI, BLOCK B6-NAND NAGARI, BLOCK B4- NAND NAGARI, BLOCK B2-NAND NAGARI, BLOCK B1-NAND 605 NAGARI, BLOCK B3-NAND NAGARI, SS SCHOOL-BLOCK B5 NNG 745 990 KVA UNPLANNED 22-05-2020 20:40:00 22-05-2020 21:07:37 0:27 0.0001125 MUs BLOCK A-MANDOLI VILLAGE, BLOCK A-BANK COLONY, BLOCK E- 606 SEWA DHAM, SABOLI EXTN.-MANDOLI NNG 437 990 KVA UNPLANNED 29-05-2020 18:12:08 29-05-2020 19:07:40 0:55 0.00012222 MUs 607 HARSH VIHAR SUB STATION-POLICE FARM NNG 190 1260 KVA UNPLANNED 13-05-2020 17:30:00 13-05-2020 18:02:00 0:31 0.00012056 MUs

BLOCK H-WEST KARAWAL NAGAR, BLOCK A-PREM VIHAR, PKT C-BLOCK B, PKT W-BLOCK A, PHASE I-SHIV VIHAR, SHIV VIHAR, SHIV VIHAR, PKT Y-SHIV VIHAR, BLOCK U-SHIV VIHAR, BLOCK T- SHIV VIHAR, BLOCK C-SHERPUR, BLOCK B-PATEL VIHAR, BLOCK B-SHIV VIHAR, PKT X-SHIV VIHAR, PKT A-BLOCK A, PKT R- BLOCK A, PKT F-BLOCK A, PKT C-SHIV VIHAR, BLOCK K- KARAWAL NAGAR (DEHROTI), BLOCK D-HARIJAN BASTI, BLOCK B-HARIJAN BASTI, BLOCK V-O & P BLOCKS SHIV VIHAR KARWAL NAGAR, PKT D-BLOCK B, BLOCK D-PREM VIHAR, BLOCK D-WEST KARAWAL NAGAR, BLOCK B-NEW CHAUHAN PUR, PKT W- 608 BLOCK A, BLOCK Q-SHIV VIHAR, BLOCK H-SHIV VIHAR KWN 3347 0 KVA UNPLANNED 31-05-2020 14:04:40 31-05-2020 14:38:01 0:33 0.0001375 MUs CHHAJJUPUR-BABAR PUR, BABARPUR EXTN.-BABAR PUR, BALBIR NAGAR EXTN.-SILAMPUR, DEV PUBLIC SCHOOL- 609 CHITRAKOOT NNG 525 400 KVA UNPLANNED 28-05-2020 05:51:52 28-05-2020 06:31:29 0:39 0.00021667 MUs 610 NAYAGAON-NEW KATWARA YVR 69 990 KVA UNPLANNED 12-05-2020 13:08:36 12-05-2020 13:44:06 0:35 0.00007778 MUs

BLOCK J-SHIV VIHAR, BLOCK A-PREM VIHAR, PKT W-BLOCK A, BLOCK CN-MANGALAM VIHAR, JAGDAMBA COLONY- BHAGIRATHI VIHAR, BLOCK C-KARAWAL NAGAR, BLOCK Q- SHIV VIHAR, BLOCK H-SHIV VIHAR, BLOCK D-SHIV VIHAR, BLOCK T-SHIV VIHAR, BLOCK F-SHIV VIHAR, BLOCK B-SHIV VIHAR, PKT R-BLOCK A, BLOCK D-PREM VIHAR, BLOCK A-SHIV 611 VIHAR, BLOCK Q-SHIV VIHAR, BLOCK H-SHIV VIHAR KWN 216 0 KVA UNPLANNED 14-05-2020 18:35:00 14-05-2020 19:28:32 0:53 0.00036806 MUs

SABOLI VILLAGE-MANDOLI, BLOCK B-ANUP VIHAR, NEW MANDOLI INDUSTRIAL AREA, SEWA DHAM-MANDOLI, SABOLI 612 EXTN.-MANDOLI, SEWA DHAM-MANDOLI NNG 777 0 KVA UNPLANNED 07-05-2020 00:20:00 07-05-2020 00:41:00 0:20 0.0005 MUs

BLOCK B-NATHU PURA, BLOCK A-NATHU COLONY, BLOCK E- RAJIV NAGAR, BLOCK A-MANDOLI VILLAGE, BLOCK A-BANK COLONY, POCKET A-JJ COLONY, NEW MANDOLI INDUSTRIAL AREA, BLOCK B-SEWA DHAM, BLOCK A-SEWA DHAM, BLOCK C- SEWA DHAM, BLOCK H-SEWA DHAM, BLOCK A-SEWA DHAM, SEWA DHAM-MANDOLI, BLOCK D-HARSH VIHAR, BLOCK A- RAJIV NAGAR, BLOCK B-RAJIV NAGAR, BLOCK A-SEWA DHAM, 613 RAJEEV NAGAR-SEWA DHAM NNG 1278 0 KVA UNPLANNED 23-05-2020 17:07:05 23-05-2020 17:58:11 0:51 0.00014167 MUs

VISHWAS NAGAR-SHAHDARA, KASTURBA NAGAR-SHAHDARA, 614 MAHARAM NAGAR-SHAHDARA, JAWALA NAGAR-SHAHDARA JLM 755 990 KVA UNPLANNED 23-05-2020 10:44:57 23-05-2020 12:40:00 1:55 0.00031944 MUs

HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK E-RAJIV NAGAR, BLOCK A-MANDOLI VILLAGE, BLOCK A-BANK COLONY, SABOLI COLONY-MANDOLI, BLOCK D- HARIJAN BASTI EAST EXTN., BLOCK E-SEWA DHAM, NEW MANDOLI INDUSTRIAL AREA, BLOCK B-SEWA DHAM, BLOCK H- SEWA DHAM, DEEPAK MEDITECH-NEW MANDOLI INDUSTRIAL AREA, BLOCK C-SEWA DHAM, BLOCK A-SEWA DHAM, BLOCK D- HARSH VIHAR, BLOCK B-HARSH VIHAR, BLOCK A-HARSH VIHAR, GOVT.CO. SEC. SCHOOL-HARSH VIHAR, BLOCK B-RAJIV NAGAR, J.R. COMPLEX-SEWA DHAM, BLOCK B-SEWA DHAM, BLOCK E- 615 SEWA DHAM NNG 432 0 KVA UNPLANNED 03-05-2020 08:37:45 03-05-2020 09:27:51 0:50 0.00069444 MUs 616 AKSHARDHAM MANDIR LNR 0 0 KVA UNPLANNED 11-05-2020 12:16:13 11-05-2020 12:41:52 0:25 0 MUs 617 BLOCK C-KABIR NAGAR, BLOCK A-KABIR NAGAR NNG 36 990 KVA UNPLANNED 20-05-2020 10:40:12 20-05-2020 11:04:11 0:23 0.00012778 MUs SABOLI EXTN.-MANDOLI, SABOLI COLONY-MANDOLI, SABOLI VILLAGE-MANDOLI, SEWA DHAM-MANDOLI, VILLAGE SABOLI- 618 SABOLI COLONY NNG 86 0 KVA UNPLANNED 31-05-2020 14:51:40 31-05-2020 15:31:00 0:39 0.00010833 MUs

BHAGIRATHI VIHAR, JAGDAMBA COLONY-BHAGIRATHI VIHAR, JOHRI ENCLAVE-BHAGIRATHI VIHAR, BLOCK F-SHIV VIHAR, 619 BLOCK B-INDIRA VIHAR, TUNDA NAGAR-BHAGIRATHI VIHAR KWN 660 0 KVA UNPLANNED 24-05-2020 14:25:48 24-05-2020 15:16:52 0:51 0.00014167 MUs 620 BABARPUR EXTN.-BABAR PUR NNG 909 630 KVA UNPLANNED 03-05-2020 21:50:00 03-05-2020 22:01:13 0:11 0.00007639 MUs BABARPUR EXTN.-BABAR PUR, JAFFRABAD-MAUJ PUR, MAUJ 621 PUR COMPLEX 1 YVR 486 630 KVA UNPLANNED 18-05-2020 11:01:36 18-05-2020 11:54:16 0:52 0.00028889 MUs

PKT W-BLOCK A, BLOCK Z-O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BHAGIRATHI VIHAR, BLOCK U-SHIV VIHAR, BLOCK H- SHIV VIHAR, BLOCK D-SHIV VIHAR, BLOCK T-SHIV VIHAR, BLOCK F-SHIV VIHAR, BLOCK L-SHIV VIHAR, BLOCK O-SHIV VIHAR, BLOCK M-SHIV VIHAR, BLOCK N-SHIV VIHAR, BLOCK B- SHIV VIHAR, PKT X-SHIV VIHAR, PKT R-BLOCK A, BLOCK V-O & P 622 BLOCKS SHIV VIHAR KARWAL NAGAR KWN 2122 0 KVA UNPLANNED 10-05-2020 23:54:51 11-05-2020 00:42:17 0:47 0.00019583 MUs BLOCK 1-RAM NAGAR, BLOCK A-B&C-JAGAT PURI, BLOCK A- MANDOLI EXTN., BLOCK B-JAGAT PURI, BLOCK J-DILSHAD 623 GARDEN DGN 485 1000 KVA UNPLANNED 15-05-2020 01:03:43 15-05-2020 02:00:17 0:56 0.00028 MUs 624 BLOCK B-GARI MANDU YVR 173 630 KVA UNPLANNED 05-05-2020 11:06:50 05-05-2020 11:39:55 0:33 0.00018333 MUs

SEC C-MAYUR VIHAR PHASE III, PKT 5-MAYUR VIHAR PHASE III, 625 CITY APPARTMENT-VASUNDHARA ENCLAVE VSE VSE 9 630 KVA UNPLANNED 28-05-2020 18:41:18 28-05-2020 19:50:26 1:9 0.00001917 MUs BLOCK E-NEW ASHOK NAGAR, BLOCK A & B-VASUNDHARA 626 ENCLAVE VSE 203 630 KVA UNPLANNED 03-05-2020 21:00:00 03-05-2020 21:18:25 0:18 0 MUs

BLOCK R-SHIV VIHAR, PKT A-SHIV VIHAR, BLOCK B-HARIJAN 627 BASTI, BLOCK T-NEHRU VIHAR, BLOCK A-HARIJAN BASTI KWN 130 0 KVA UNPLANNED 10-05-2020 16:58:54 10-05-2020 17:36:25 0:37 0.00015417 MUs BLOCK G-PREET VIHAR, BLOCK F-PREET VIHAR, BLOCK E-PREET 628 VIHAR LNR 379 990 KVA UNPLANNED 16-05-2020 12:41:57 16-05-2020 13:35:00 0:53 0.00014722 MUs BLOCK C-MAN SINGH NAGAR, BLOCK B-MAN SINGH NAGAR, 629 BLOCK A-MAN SINGH NAGAR KWN 130 0 KVA UNPLANNED 12-05-2020 12:44:26 12-05-2020 13:20:09 0:35 0.00014583 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unserved (MU) due to Sr. No. Area Affected Division Affected Transformer (in KVA). Unplanned Outage From DateTime To DateTime Duration (Hrs:Mins) Outage

BLOCK Z-WELCOME COLONY, BLOCK C-NEW SILAMPURI PHASE II, BLOCK E-SUBHASH MOHALLA, JAFFRABAD-MAUJ PUR, BLOCK C4-YAMUNA VIHAR, BLOCK C3-YAMUNA VIHAR, BLOCK 630 B4-YAMUNA VIHAR, JAFFRABAD-MAUJ PUR YVR 189 990 KVA UNPLANNED 31-05-2020 10:17:08 31-05-2020 11:00:00 0:42 0.00023333 MUs

BLOCK B-SADATPUR EXT-PUSTA AREA-M BLOCK, BLOCK E- SADAT PUR, BLOCK B-SADAT PUR, BLOCK C-SADAT PUR, PKT A3- 631 BLOCK E, PKT E-SADATPUR EXT-PUSTA AREA-K BLOCK KWN 488 630 KVA UNPLANNED 30-05-2020 12:22:22 30-05-2020 13:16:04 0:53 0.00022083 MUs

KACHI MANDIR-BLOCK E4, BLOCK E3-NAND NAGARI, BLOCK E1- NAND NAGARI, MCD SCHOOL-BLOCK C3, BLOCK E5-NAND 632 NAGARI, GOVT.SARVODAY VIDHYALAYA-BLOCK E5 NNG 305 630 KVA UNPLANNED 30-05-2020 11:06:39 30-05-2020 11:54:32 0:47 0.00026111 MUs NORTH GHONDA, BLOCK B3-YAMUNA VIHAR, TANKI ROAD-C- 633 BLOCK BHAJANPURA, BLOCK D-BHAJANPURA YVR 89 630 KVA UNPLANNED 23-05-2020 12:03:14 23-05-2020 13:05:00 1:1 0.00033889 MUs 634 ISBT-ISBT ANAND VIHAR LNR 86 100 KVA UNPLANNED 08-05-2020 14:05:00 08-05-2020 14:08:00 0:3 0.00000833 MUs PHARI DHIRAJ-SADAR BAZAR, NAYA MOHALLA-KISHAN GANJ 635 RS, SADAR BAZAR B G ROAD PHG 524 990 KVA UNPLANNED 17-05-2020 10:00:00 17-05-2020 10:36:22 0:36 0.0001 MUs AMBEDKAR NAGAR INDUSTRIAL AREA-BHAGIRATHI VIHAR, BHAGIRATHI VIHAR, LAXMI GARDEN-AMBEDKAR NAGAR, BHARAT-AMBEDKAR NAGAR, TUNDA NAGAR-BHAGIRATHI 636 VIHAR KWN 545 0 KVA UNPLANNED 23-05-2020 12:11:23 23-05-2020 13:10:17 0:58 0.00024167 MUs

GURU TEG BAHADUR COMMUNITY CENTRE-PKT E, L.I.G HOUSING NAND NAGARI-PKT E, D.S.I.D.C. COMPLEX-DTC DEPOT, KACHI MANDIR-BLOCK E4, BLOCK E3-NAND NAGARI, BLOCK E1-NAND NAGARI, BHARAT MATA MANDIR-JJ COLONY, BLOCK E3-KANSHIPUR, BLOCK A2-NAND NAGARI, BLOCK A1- NAND NAGARI, BLOCK A3-NAND NAGARI, MCD PRIMARY SCHOOL-BLOCK D1, BLOCK B6-NAND NAGARI, BLOCK B4-NAND NAGARI, BLOCK B1-NAND NAGARI, HARSH VIHAR SUB STATION- POLICE FARM, BLOCK F1-BUNKAR VIHAR, POCKET A-JJ COLONY, DELHI JAL BOARD MIG FLATS-POCKET A, AMIG FLATS-POCKET A, GOVT.BOYS SEC.SCHOOL-POCKET A, BLOCK E2-NAND NAGARI, BLOCK E5-NAND NAGARI, GOVT.SARVODAY VIDHYALAYA-BLOCK E5, BLOCK E1-BUNKAR VIHAR, BLOCK G3- BUNKAR VIHAR, BLOCK G4-BUNKAR VIHAR, BLOCK H-JJ 637 COLONY, BLOCK B-ASHOK NAGAR, BLOCK C-AMAR COLONY NNG 7380 5130 KVA UNPLANNED 06-05-2020 09:13:21 06-05-2020 09:37:20 0:23 0.00044722 MUs

BLOCK A-MEET NAGAR, BLOCK E-UTTARANCHAL COLONY, BLOCK B-UTTARANCHAL COLONY, BLOCK B-ASHOK NAGAR, BLOCK A-EAST GOKUL PURI, BLOCK C-MEET NAGAR, BLOCK D- 638 MEET NAGAR, BLOCK E-MEET NAGAR NNG 0 1620 KVA UNPLANNED 23-05-2020 10:00:00 23-05-2020 10:45:00 0:45 0 MUs

SABOLI EXTN.-MANDOLI, BLOCK A-MEET NAGAR, BLOCK C- HARSH VIHAR, SEWA DHAM-MANDOLI, BLOCK A-EAST GOKUL 639 PURI, BLOCK B-RAJIV NAGAR, BLOCK E-MEET NAGAR NNG 21 630 KVA UNPLANNED 19-05-2020 14:37:17 19-05-2020 15:16:24 0:39 0.00010833 MUs 640 SHAHDARA JLM JLM 0 1260 KVA UNPLANNED 30-05-2020 10:46:00 30-05-2020 10:55:00 0:9 0 MUs BLOCK_3H-KRISHNA NAGAR, BLOCK_21K-KRISHNA NAGAR, 641 BLOCK_48-KRISHNA NAGAR SRD 604 630 KVA UNPLANNED 16-05-2020 14:35:04 16-05-2020 15:33:50 0:58 0.00008056 MUs BLOCK D-SHIV VIHAR, BLOCK R-SHIV VIHAR, BLOCK D-HARIJAN 642 BASTI KWN 370 0 KVA UNPLANNED 29-05-2020 05:10:00 29-05-2020 06:07:37 0:57 0.0002375 MUs

RADHE SHYAM PARK EXTN.-SWASTHYA VIHAR, NEW GOVIND PURA-JAGATPURI, CHANDER NAGAR BLOCK F-GOPAL PARK, BLOCK A-KRISHNA NAGAR, BLOCK E-KRISHNA NAGAR, BLOCK E- WEST CHANDER NAGAR, CHANDER NAGAR BLOCK C-KRISHNA NAGAR EXTN., SHIVPURI-JAGATPURI, RASHID MARKET- JAGATPURI, BALDEV PARK-JAGATPURI, CHANDER NAGAR 643 BLOCK D-KRISHNA NAGAR EXTN. KRN 530 990 KVA UNPLANNED 21-05-2020 00:25:56 21-05-2020 00:45:50 0:19 0.00001056 MUs

BLOCK J-SHIV VIHAR, BHAGAT NAGAR-DAYALPUR, BLOCK CN- AMBIKA VIHAR BLOCK - B&C, BLOCK Z-O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK U-SHIV VIHAR, BLOCK Q-SHIV VIHAR, BLOCK H-SHIV VIHAR, BLOCK N-SHIV VIHAR, BLOCK B- SHIV VIHAR, BLOCK C-KARAWAL NAGAR, BLOCK V-O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK Q-SHIV VIHAR, 644 BLOCK H-SHIV VIHAR KWN 2565 0 KVA UNPLANNED 10-05-2020 14:15:43 10-05-2020 15:12:59 0:57 0.00015833 MUs

BLOCK A-JAGATPURI EXTN., SABOLI EXTN.-MANDOLI, BLOCK A- MANDOLI EXTN., BLOCK A-MANDOLI VILLAGE, SABOLI COLONY- MANDOLI, SABOLI VILLAGE-MANDOLI, BLOCK B-ANUP VIHAR, BLOCK E-SEWA DHAM, NEW MANDOLI INDUSTRIAL AREA, BLOCK B-PRATAP NAGAR, BLOCK A-SEWA DHAM, DEEPAK MEDITECH-NEW MANDOLI INDUSTRIAL AREA, SEWA DHAM- MANDOLI, BLOCK D-ANUP VIHAR, BLOCK K-ANUP VIHAR, BLOCK A-ANUP VIHAR, BLOCK C-ANUP VIHAR, KABRISTAN- SABOLI COLONY, BANK OF BARODA-SABOLI COLONY, MCD SCHOOL-SABOLI COLONY, J.R. COMPLEX-SEWA DHAM, SEWA DHAM-MANDOLI, SABOLI COLONY-MANDOLI, ANUP VIHAR- MANDOLI, VILLAGE SABOLI-SABOLI COLONY, SABOLI EXTN.- 645 MANDOLI, SEWA DHAM-MANDOLI NNG 4798 400 KVA UNPLANNED 24-05-2020 07:49:15 24-05-2020 08:40:02 0:50 0.00055556 MUs

BLOCK E1-NAND NAGARI, BHARAT MATA MANDIR-JJ COLONY, JANTA FLATS-NAND NAGARI, SABOLI VILLAGE-MANDOLI, BLOCK E5-NAND NAGARI, GOVT.SARVODAY VIDHYALAYA- 646 BLOCK E5, GOVT. BOYS SCHOOL-BLOCK A3 NNG 1253 630 KVA UNPLANNED 29-05-2020 20:58:59 29-05-2020 21:37:20 0:38 0.00031667 MUs

BLOCK B-KABIR NAGAR, SABOLI EXTN.-MANDOLI, BLOCK C- HARSH VIHAR, BLOCK A-MANDOLI EXTN., BLOCK A-MANDOLI VILLAGE, BLOCK A-BANK COLONY, SABOLI COLONY-MANDOLI, SABOLI VILLAGE-MANDOLI, BLOCK D-ANUP VIHAR, BLOCK K- ANUP VIHAR, BLOCK C-ANUP VIHAR, KABRISTAN-SABOLI COLONY, BANK OF BARODA-SABOLI COLONY, MCD SCHOOL- SABOLI COLONY, BLOCK D-MEET NAGAR, SEWA DHAM- MANDOLI, SABOLI COLONY-MANDOLI, ANUP VIHAR-MANDOLI, VILLAGE SABOLI-SABOLI COLONY, SABOLI EXTN.-MANDOLI, 647 SEWA DHAM-MANDOLI NNG 3928 630 KVA UNPLANNED 14-05-2020 18:00:57 14-05-2020 18:59:47 0:58 0.00025778 MUs BLOCK 2-GEETA COLONY, RANI GARDEN-GEETA COLONY, BLOCK 7-GEETA COLONY, BLOCK 8A-GEETA COLONY, BLOCK 8- GEETA COLONY, BLOCK 1A-GEETA COLONY, BLOCK 2A-GEETA 648 COLONY KRN 238 630 KVA UNPLANNED 26-05-2020 11:27:57 26-05-2020 12:25:00 0:57 0.00007917 MUs

BLOCK CN-AMBIKA VIHAR BLOCK - B&C, BLOCK CN- MANGALAM VIHAR, SHIV VIHAR, PKT Y-SHIV VIHAR, BLOCK A- MANGALAM VIHAR, BLOCK CN-AMBIKA VIHAR BLOCK - B&C, 649 BLOCK C-PATEL VIHAR, BLOCK CN-AMBIKA VIHAR BLOCK - B&C KWN 4216 0 KVA UNPLANNED 20-05-2020 11:52:17 20-05-2020 16:33:05 4:40 0 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unserved (MU) due to Sr. No. Area Affected Division Affected Transformer (in KVA). Unplanned Outage From DateTime To DateTime Duration (Hrs:Mins) Outage SUNDER PARK-SHAHDARA, EAST ROHTASH NAGAR-SHAHDARA, 650 VISHWAS NAGAR JLM 488 990 KVA UNPLANNED 31-05-2020 13:03:33 31-05-2020 13:56:40 0:53 0.00014722 MUs

BLOCK A1-NAND NAGARI, BLOCK C-HARSH VIHAR, BLOCK A- MANDOLI EXTN., SABOLI VILLAGE-MANDOLI, BLOCK B-ANUP VIHAR, NEW MANDOLI INDUSTRIAL AREA, BLOCK B-PRATAP NAGAR, BLOCK A-SEWA DHAM, BLOCK D-ANUP VIHAR, BLOCK K-ANUP VIHAR, BLOCK A-ANUP VIHAR, BLOCK C-ANUP VIHAR, SEWA DHAM-MANDOLI, ANUP VIHAR-MANDOLI, SEWA DHAM- 651 MANDOLI NNG 432 0 KVA UNPLANNED 25-05-2020 21:20:32 25-05-2020 22:14:16 0:53 0.00073611 MUs

BLOCK D-GOKUL PURI, SABOLI EXTN.-MANDOLI, BLOCK A- MANDOLI EXTN., BLOCK A-MANDOLI VILLAGE, SABOLI COLONY- MANDOLI, SABOLI VILLAGE-MANDOLI, BLOCK E-UTTARANCHAL COLONY, BLOCK B-ANUP VIHAR, BLOCK E-SEWA DHAM, BLOCK A-SEWA DHAM, DEEPAK MEDITECH-NEW MANDOLI INDUSTRIAL AREA, KABRISTAN-SABOLI COLONY, BANK OF BARODA-SABOLI COLONY, MCD SCHOOL-SABOLI COLONY, BLOCK A-EAST GOKUL PURI, BLOCK D-MEET NAGAR, BLOCK E- MEET NAGAR, SEWA DHAM-MANDOLI, SABOLI COLONY- MANDOLI, VILLAGE SABOLI-SABOLI COLONY, SABOLI EXTN.- 652 MANDOLI, SEWA DHAM-MANDOLI NNG 4342 0 KVA UNPLANNED 18-05-2020 21:00:24 18-05-2020 21:20:00 0:19 0.00042222 MUs

LAXMI NAGAR COMMERCIAL COPLEX-SWASTHYA VIHAR, 653 BLOCK B-KUNDAN NAGAR, KUNDAN NAGAR-LAKSHMI NAGAR LNR 7 990 KVA UNPLANNED 26-05-2020 23:00:34 26-05-2020 23:58:08 0:57 0.00031667 MUs

BLOCK B-SUBHASH MOHALLA, BLOCK C6-YAMUNA VIHAR, BLOCK C7-YAMUNA VIHAR, BLOCK C2-YAMUNA VIHAR, BLOCK B5-YAMUNA PUR (GONDA) BLOCK B, BLOCK B2-YAMUNA 654 VIHAR, BLOCK C4-YAMUNA VIHAR, BLOCK C3-YAMUNA VIHAR YVR 38 990 KVA UNPLANNED 17-05-2020 00:55:17 17-05-2020 01:48:12 0:52 0 MUs

SABOLI EXTN.-MANDOLI, HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK A-BANK COLONY, SABOLI VILLAGE-MANDOLI, BLOCK B-ANUP VIHAR, NEW MANDOLI INDUSTRIAL AREA, BLOCK C-SEWA DHAM, BLOCK A- SEWA DHAM, LIG/MIG RES/NON COMM AREA-SEWA DHAM, BLOCK C-ANUP VIHAR, BLOCK D-HARSH VIHAR, BLOCK B- HARSH VIHAR, BLOCK A-HARSH VIHAR, GOVT.CO. SEC. SCHOOL- 655 HARSH VIHAR, SABOLI EXTN.-MANDOLI NNG 4095 0 KVA UNPLANNED 01-05-2020 14:25:11 01-05-2020 15:13:48 0:48 0.00066667 MUs BLOCK D-ASHOK NAGAR, BLOCK A-NATHU PURA, BLOCK B- 656 JYOTI NAGAR, BLOCK B-ASHOK NAGAR NNG 16 630 KVA UNPLANNED 28-05-2020 15:34:27 28-05-2020 16:03:13 0:28 0.00023333 MUs

G.B.SSS SCHOOL-GOKUL PURI, BLOCK A1-NAND NAGARI, SABOLI EXTN.-MANDOLI, BLOCK A-MEET NAGAR, SABOLI COLONY-MANDOLI, SABOLI VILLAGE-MANDOLI, BLOCK B-ANUP VIHAR, BLOCK E-SEWA DHAM, NEW MANDOLI INDUSTRIAL AREA, BLOCK B-PRATAP NAGAR, BLOCK B-SEWA DHAM, BUDH VIHAR-SEWA DHAM, DEEPAK MEDITECH-NEW MANDOLI INDUSTRIAL AREA, SEWA DHAM-MANDOLI, BLOCK D-ANUP VIHAR, BLOCK K-ANUP VIHAR, BLOCK A-ANUP VIHAR, BLOCK C- ANUP VIHAR, BLOCK E-MEET NAGAR, SEWA DHAM-MANDOLI, ANUP VIHAR-MANDOLI, VILLAGE SABOLI-SABOLI COLONY, 657 SABOLI EXTN.-MANDOLI, SEWA DHAM-MANDOLI NNG 691 0 KVA UNPLANNED 14-05-2020 22:14:36 14-05-2020 23:06:19 0:51 0.00113333 MUs 658 NEW SILAMPURI PHASE III YVR 516 990 KVA UNPLANNED 11-05-2020 14:46:59 11-05-2020 15:13:29 0:26 0.00007222 MUs BLOCK B2-YAMUNA VIHAR, BLOCK B4-YAMUNA VIHAR, BLOCK 659 B3-YAMUNA VIHAR YVR 37 990 KVA UNPLANNED 28-05-2020 23:40:31 29-05-2020 00:01:54 0:21 0.00008167 MUs 660 PKT B-MAYUR VIHAR PHASE II MVR 9 630 KVA UNPLANNED 25-05-2020 21:47:43 25-05-2020 22:17:51 0:30 0.00000833 MUs 661 BLOCK D-HARSH VIHAR, BLOCK B-HARSH VIHAR NNG 86 0 KVA UNPLANNED 07-05-2020 11:34:13 07-05-2020 12:30:00 0:55 0.00015278 MUs 662 BLOCK A-DILSHAD COLONY, DDA FLATS-BLOCK A DGN 352 630 KVA UNPLANNED 06-05-2020 11:50:43 06-05-2020 12:35:45 0:45 0.0000625 MUs G.B.SSS SCHOOL-GOKUL PURI, BLOCK B-EAST GOKUL PURI, BLOCK A-AMAR COLONY, BLOCK A-MEET NAGAR, BLOCK A- EAST GOKUL PURI, BLOCK C-AMAR COLONY, BLOCK C-MEET 663 NAGAR, BLOCK D-MEET NAGAR NNG 4649 1620 KVA UNPLANNED 04-05-2020 13:17:40 04-05-2020 13:40:36 0:22 0.00018333 MUs

CHETAN BASTI- BLOCK J-NEHRU NAGAR, DARYA GANJ, GEETA COLONY, PREM NAGAR-BALJIT NAGAR, GGS INDRAPRASTHA UNIVERSITY-KASHMERE GATE, PKT R-BLOCK D, PKT C-BLOCK B, JAFFRABAD-MAUJ PUR, BLOCK A-SADATPUR EXT-PUSTA AREA- L BLOCK, BLOCK H-BHAGIRATHI VIHAR, BLOCK F-SHIV VIHAR, BLOCK M-SHIV VIHAR, BLOCK N-SHIV VIHAR, BLOCK E-INDIRA VIHAR, SPORTS COMPLEX-VASUNDHARA ENCLAVE VSE, BHAJANPURA-DAYALPUR, LIG/MIG RES/NON COMM AREA-A- BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-B-BLOCK SONIA 664 VIHAR, BLOCK F-INDIRA VIHAR PNR 1168 990 KVA UNPLANNED 15-05-2020 14:36:19 15-05-2020 15:26:50 0:50 0.00013889 MUs

BLOCK D-HARSH VIHAR, BLOCK B-ANUP VIHAR, BLOCK C-ANUP VIHAR, LIG/MIG RES/NON COMM AREA-SEWA DHAM, BLOCK C- SEWA DHAM, GOVT.CO. SEC. SCHOOL-HARSH VIHAR, BLOCK A- SEWA DHAM, BLOCK A-HARSH VIHAR, BLOCK A-BANK COLONY, BLOCK B-HARSH VIHAR, BLOCK C-HARSH VIHAR, HARSH VIHAR 665 SUB STATION-POLICE FARM, SABOLI VILLAGE-MANDOLI NNG 2671 0 KVA UNPLANNED 28-05-2020 22:40:00 28-05-2020 23:35:28 0:55 0.00076389 MUs

SABOLI COLONY-MANDOLI, BLOCK B-ANUP VIHAR, BLOCK B- PRATAP NAGAR, BLOCK K-ANUP VIHAR, BLOCK A-ANUP VIHAR, 666 SABOLI COLONY-MANDOLI, ANUP VIHAR-MANDOLI NNG 173 0 KVA UNPLANNED 30-05-2020 09:53:35 30-05-2020 10:44:16 0:50 0.00027778 MUs

BLOCK A-MANDOLI EXTN., SABOLI COLONY-MANDOLI, BLOCK B- ANUP VIHAR, NEW MANDOLI INDUSTRIAL AREA, BLOCK B- PRATAP NAGAR, BLOCK B-SEWA DHAM, BLOCK D-ANUP VIHAR, BLOCK K-ANUP VIHAR, BLOCK A-EAST GOKUL PURI, BLOCK D- MEET NAGAR, BLOCK E-MEET NAGAR, SEWA DHAM-MANDOLI, 667 SEWA DHAM-MANDOLI NNG 1071 0 KVA UNPLANNED 28-05-2020 21:20:00 28-05-2020 22:13:00 0:53 0.00182556 MUs BLOCK D-ASHOK NAGAR, BLOCK E-NATHU PURA, BLOCK A- NATHU PURA, BLOCK E-JYOTI NAGAR EAST, BLOCK B-ASHOK 668 NAGAR, BLOCK E-ASHOK NAGAR NNG 1048 630 KVA UNPLANNED 21-05-2020 15:58:00 21-05-2020 16:40:13 0:42 0.00011667 MUs 669 RAILWAY STATION-PAHAR GANJ DRG DRG 194 0 KVA UNPLANNED 20-05-2020 13:41:00 20-05-2020 14:33:23 0:52 0.00021667 MUs BLOCK A- RESI FLATS-POCKET A, BLOCK B- GROUP I FLATS- POCKET B, DELHI JAL BOARD-POCKET C, DELHI POWER SUPPLY- DILSHAD GARDEN, HANSRAJ PUBLIC SCHOOL-POCKET F & E, RAJKIYA SARVODAYA BALVIDYALAYA-POCKET C, BLOCK C- 670 DILSHAD COLONY DGN 9 630 KVA UNPLANNED 28-05-2020 22:46:44 29-05-2020 00:43:00 1:56 0.00064444 MUs

LIG/MIG RES/NON COMM AREA-CRPF CAMP SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, 671 LIG/MIG RES/NON COMM AREA-D-BLOCK-SONIA VIHAR KWN 2753 0 KVA UNPLANNED 18-05-2020 18:07:46 18-05-2020 18:35:46 0:27 0.000225 MUs 672 GAGAN VIHAR-JAGATPURI KRN 378 990 KVA UNPLANNED 30-05-2020 10:58:00 30-05-2020 11:46:25 0:48 0.00032 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unserved (MU) due to Sr. No. Area Affected Division Affected Transformer (in KVA). Unplanned Outage From DateTime To DateTime Duration (Hrs:Mins) Outage HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, SABOLI COLONY-MANDOLI, BLOCK D-HARIJAN BASTI EAST EXTN., BLOCK C-SEWA DHAM, BLOCK D-HARSH VIHAR, 673 BLOCK A-HARSH VIHAR NNG 1903 0 KVA UNPLANNED 31-05-2020 03:22:50 31-05-2020 04:21:49 0:58 0.00112778 MUs

SEC D-MAYUR VIHAR PHASE III, BLOCK B-KONDALI VILLAGE, BLOCK A-KONDALI VILLAGE, BLOCK C-KONDALI VILLAGE, BLOCK 674 F-KONDALI VILLAGE, BLOCK A-KONDALI EXTN. VSE 59 0 KVA UNPLANNED 11-05-2020 14:21:17 11-05-2020 16:50:54 2:29 0.00041389 MUs BLOCK C7-YAMUNA VIHAR, BLOCK C2-YAMUNA VIHAR, BLOCK D-BHAJANPURA, BLOCK C-BHAJANPURA, BLOCK B-MANUJPUR, BLOCK E-SUBHASH MOHALLA, BLOCK C-BHAJANPURA, BLOCK D- 675 BHAJANPURA YVR 697 990 KVA UNPLANNED 23-05-2020 00:31:07 23-05-2020 00:57:53 0:26 0.00007222 MUs

BLOCK 10-KHICHRIPUR RESETTLEMENT COLONY BLOCK 5, BLOCK 4-KHICHRIPUR RESETTLEMENT COLONY, BLOCK 3- KHICHARIPUR BLOCK 1, BLOCK 9-KHICHRIPUR RESETTLEMENT 676 COLONY BLOCK 9, KHICHARIPUR-GAZIPUR MVR 1256 990 KVA UNPLANNED 08-05-2020 16:03:09 08-05-2020 16:41:40 0:38 0.00005278 MUs BLOCK C-KABIR NAGAR, BLOCK A-KABIR NAGAR, BLOCK B- 677 KABIR NAGAR, BLOCK A-EAST GOKUL PURI NNG 20 630 KVA UNPLANNED 15-05-2020 12:25:07 15-05-2020 13:23:00 0:57 0.00012667 MUs

HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK A-BANK COLONY, BLOCK D-HARIJAN BASTI EAST EXTN., BLOCK B-SEWA DHAM, BLOCK D-HARSH VIHAR, BLOCK 678 A-HARSH VIHAR, GOVT.CO. SEC. SCHOOL-HARSH VIHAR NNG 1903 0 KVA UNPLANNED 28-05-2020 21:20:00 28-05-2020 21:54:00 0:33 0.00099917 MUs

BLOCK CN-AMBIKA VIHAR BLOCK - B&C, BLOCK Z-O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK A-HARIJAN BASTI, SHIV VIHAR, PKT Y-SHIV VIHAR, PKT D-SHIV VIHAR, BLOCK C- HARIJAN BASTI, BLOCK D-HARIJAN BASTI, BLOCK CN-AMBIKA 679 VIHAR BLOCK - B&C, BLOCK CN-AMBIKA VIHAR BLOCK - B&C KWN 2075 0 KVA UNPLANNED 05-05-2020 19:45:50 05-05-2020 20:37:22 0:51 0.00035417 MUs

BLOCK C-TUKMIRPUR, LIG/MIG RES/NON COMM AREA- SABHEPUR, LIG/MIG RES/NON COMM AREA-G- BLOCK SONIA VIHAR EXTENSION, BLOCK D-TUKMIRPUR, BLOCK V-O & P BLOCKS SHIV VIHAR KARWAL NAGAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-C-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-C-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-C-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-C-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-SONIA VIHAR, LIG/MIG RES/NON COMM AREA-D- BLOCK-SONIA VIHAR, LIG/MIG RES/NON COMM AREA-E-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-SONIA VIHAR, LIG/MIG RES/NON COMM AREA-G- BLOCK SONIA VIHAR EXTENSION, LIG/MIG RES/NON COMM AREA-G-BLOCK SONIA 680 VIHAR KWN 5382 0 KVA UNPLANNED 05-05-2020 17:10:20 05-05-2020 17:30:28 0:20 0.00008333 MUs BLOCK F-WEST KARAWAL NAGAR, BLOCK A-SADAT PUR, BLOCK F-SADAT PUR, BLOCK F-MUSTAFABAD (DAYALPUR), BLOCK A- MUSTAFABAD (DAYALPUR), BLOCK D-MUSTAFABAD 681 (DAYALPUR) KWN 877 0 KVA UNPLANNED 30-05-2020 15:21:35 30-05-2020 16:04:52 0:43 0.00005972 MUs BLOCK F- LIG/MIG RES/NON COMM AREA-NEW SILAMPURI PHASE II, BLOCK D- LIG/MIG RES/NON COMM AREA-NEW SILAMPURI PHASE II, BLOCK E-NEW SILAMPURI PHASE II, 682 BLOCK C-SHASTRI PARK YVR 17 0 KVA UNPLANNED 03-05-2020 18:31:51 03-05-2020 18:45:00 0:13 0.00000722 MUs 683 BLOCK 6-GEETA COLONY KRN 398 990 KVA UNPLANNED 29-05-2020 12:45:17 29-05-2020 13:18:51 0:33 0.00009167 MUs

BLOCK A-MANDOLI EXTN., BLOCK B-ANUP VIHAR, NEW MANDOLI INDUSTRIAL AREA, BLOCK B-PRATAP NAGAR, BLOCK D-ANUP VIHAR, BLOCK K-ANUP VIHAR, BLOCK A-ANUP VIHAR, BLOCK D-HARSH VIHAR, SEWA DHAM-MANDOLI, ANUP VIHAR- 684 MANDOLI, SEWA DHAM-MANDOLI NNG 259 0 KVA UNPLANNED 20-05-2020 11:29:30 20-05-2020 12:21:56 0:52 0.00043333 MUs

BLOCK J-SHIV VIHAR, BLOCK Z-O & P BLOCKS SHIV VIHAR KARWAL NAGAR, SHIV VIHAR, BLOCK U-SHIV VIHAR, BLOCK Q- SHIV VIHAR, BLOCK H-SHIV VIHAR, BLOCK D-SHIV VIHAR, BLOCK T-SHIV VIHAR, BLOCK F-SHIV VIHAR, BLOCK L-SHIV VIHAR, BLOCK O-SHIV VIHAR, BLOCK M-SHIV VIHAR, BLOCK N- SHIV VIHAR, PKT R-BLOCK A, BLOCK V-O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK CN-AMBIKA VIHAR BLOCK - 685 B&C, BLOCK Q-SHIV VIHAR, BLOCK H-SHIV VIHAR KWN 6566 0 KVA UNPLANNED 14-05-2020 18:58:48 14-05-2020 19:04:00 0:5 0.00005556 MUs OLDANPUR-NAVIN SHAHDARA, BLOCK T-PRATAP PURA, BLOCK 686 U-PRATAP PURA DGN 15 630 KVA UNPLANNED 20-05-2020 11:31:14 20-05-2020 12:14:23 0:43 0 MUs

687 BLOCK C12-YAMUNA VIHAR, BLOCK C7-YAMUNA VIHAR YVR 341 990 KVA UNPLANNED 27-05-2020 17:46:21 27-05-2020 18:06:17 0:19 0.00002639 MUs

NAYAGAON-NEW KATWARA, KACHI COLONY-JAGJEET NAGAR, 688 JAGJEET NAGAR-GHONDA, BLOCK C-JAI PRAKASH NAGAR YVR 1018 990 KVA UNPLANNED 21-05-2020 11:46:17 21-05-2020 12:21:19 0:35 0.00007778 MUs

SABOLI EXTN.-MANDOLI, BLOCK A-MANDOLI EXTN., SABOLI VILLAGE-MANDOLI, BLOCK K-ANUP VIHAR, KABRISTAN-SABOLI COLONY, BANK OF BARODA-SABOLI COLONY, MCD SCHOOL- SABOLI COLONY, SEWA DHAM-MANDOLI, VILLAGE SABOLI- 689 SABOLI COLONY, SABOLI EXTN.-MANDOLI NNG 3928 630 KVA UNPLANNED 07-05-2020 00:20:00 07-05-2020 00:42:00 0:22 0.00036667 MUs

HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK E-RAJIV NAGAR, BLOCK A-MANDOLI VILLAGE, BLOCK A-BANK COLONY, SABOLI COLONY-MANDOLI, BLOCK D- HARIJAN BASTI EAST EXTN., BLOCK E-SEWA DHAM, NEW MANDOLI INDUSTRIAL AREA, BLOCK B-SEWA DHAM, BLOCK A- SEWA DHAM, BLOCK C-SEWA DHAM, BLOCK H-SEWA DHAM, BUDH VIHAR-SEWA DHAM, DEEPAK MEDITECH-NEW MANDOLI INDUSTRIAL AREA, BLOCK C-SEWA DHAM, BLOCK A-SEWA DHAM, BLOCK D-HARSH VIHAR, BLOCK A-HARSH VIHAR, GOVT.CO. SEC. SCHOOL-HARSH VIHAR, J.R. COMPLEX-SEWA 690 DHAM, BLOCK A-SEWA DHAM, BLOCK E-SEWA DHAM NNG 432 0 KVA UNPLANNED 15-05-2020 23:24:35 15-05-2020 23:57:10 0:32 0.00044444 MUs BLOCK B- GROUP I FLATS-POCKET B, DELHI JAL BOARD-POCKET 691 C, BLOCK C-DILSHAD COLONY DGN 94 750 KVA UNPLANNED 31-05-2020 06:09:15 31-05-2020 07:00:08 0:50 0.00026389 MUs BLOCK 10-GANDHI NAGAR, BLOCK 9-GANDHI NAGAR, BLOCK 9- 692 KAILASH NAGAR KRN 700 990 KVA UNPLANNED 23-05-2020 09:30:00 23-05-2020 09:55:45 0:25 0.00003472 MUs BLOCK B-EAST GOKUL PURI, BLOCK E-UTTARANCHAL COLONY, BLOCK B-UTTARANCHAL COLONY, BLOCK A-EAST GOKUL PURI, 693 BLOCK E-MEET NAGAR NNG 218 630 KVA UNPLANNED 17-05-2020 07:19:21 17-05-2020 08:05:33 0:46 0.00012778 MUs BLOCK E-SUBHASH MOHALLA, BLOCK H-GHONDA PATTI, BLOCK B4-YAMUNA VIHAR, BLOCK B3-YAMUNA VIHAR, BLOCK D- BHAJANPURA, TANKI ROAD-C-BLOCK BHAJANPURA, BLOCK E- SUBHASH MOHALLA, BLOCK C-BHAJANPURA, BLOCK D- 694 BHAJANPURA YVR 1236 990 KVA UNPLANNED 14-05-2020 12:32:46 14-05-2020 13:26:30 0:53 0.00029444 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unserved (MU) due to Sr. No. Area Affected Division Affected Transformer (in KVA). Unplanned Outage From DateTime To DateTime Duration (Hrs:Mins) Outage

BLOCK J-SUNDER NAGRI, BLOCK L-SUNDER NAGRI, BLOCK KK- SUNDER NAGRI, BLOCK M-SUNDER NAGRI, SABOLI EXTN.- MANDOLI, BLOCK C-SUNDER NAGRI NNG, BLOCK A-RAJIV NAGAR NNG, BLOCK J-SUNDER NAGRI NNG, BLOCK L-SUNDER NAGRI NNG, BLOCK K-SUNDER NAGRI NNG, BLOCK F-BUNKAR VIHAR, BLOCK A-ANUP VIHAR, BLOCK A-EAST GOKUL PURI, 695 SABOLI COLONY-MANDOLI NNG 3081 990 KVA PLANNED 18-05-2020 10:00:00 18-05-2020 15:02:49 5:2 0.00167778 MUs

BLOCK D-DLF ANKUR VIHAR, BLOCK A-PRAKASH VIHAR, BLOCK C-KARAWAL NAGAR, PKT F-BLOCK B, BLOCK B-BHAGAT SINGH COLONY, BLOCK H-BHAGAT SINGH COLONY, BLOCK C-BHAGAT SINGH COLONY, BLOCK I-BHAGAT SINGH COLONY, BLOCK E- BHAGAT SINGH COLONY, BLOCK C-PRAKASH VIHAR, BLOCK C- DLF ANKUR VIHAR, BLOCK V-O & P BLOCKS SHIV VIHAR 696 KARWAL NAGAR KWN 805 990 KVA UNPLANNED 27-05-2020 13:15:50 27-05-2020 15:18:12 2:2 0.00454111 MUs GEETA COLONY, BLOCK 5-GEETA COLONY, BLOCK 7-GEETA 697 COLONY KRN 836 990 KVA UNPLANNED 01-05-2020 08:55:17 01-05-2020 10:00:00 1:4 0.00008889 MUs

SABOLI EXTN.-MANDOLI, BLOCK A-MANDOLI EXTN., BLOCK A- MANDOLI VILLAGE, SABOLI COLONY-MANDOLI, SABOLI VILLAGE-MANDOLI, BLOCK B-ANUP VIHAR, BLOCK E-SEWA DHAM, BLOCK B-SEWA DHAM, BLOCK A-SEWA DHAM, BLOCK A- ANUP VIHAR, KABRISTAN-SABOLI COLONY, BANK OF BARODA- SABOLI COLONY, MCD SCHOOL-SABOLI COLONY, SEWA DHAM- MANDOLI, SABOLI COLONY-MANDOLI, VILLAGE SABOLI-SABOLI 698 COLONY, SABOLI EXTN.-MANDOLI NNG 4342 0 KVA UNPLANNED 14-05-2020 19:29:08 14-05-2020 20:22:56 0:53 0.00103056 MUs BLOCK A-NEW ASHOK NAGAR, BLOCK B-AMBEDKAR AWAS KALYAN SAMITI, BLOCK A-MAYUR VIHAR PHASE III, SEC C- MAYUR VIHAR PHASE III, SEC D-MAYUR VIHAR PHASE III, 699 BLOCK A-MAYUR VIHAR PHASE III VSE 2190 0 KVA UNPLANNED 25-05-2020 23:39:02 26-05-2020 00:27:19 0:48 0.0008 MUs BLOCK C-MAN SINGH NAGAR, PKT R-BLOCK D, BLOCK B-MAN 700 SINGH NAGAR, BLOCK A-MAN SINGH NAGAR KWN 173 0 KVA UNPLANNED 23-05-2020 16:27:09 23-05-2020 17:23:52 0:56 0.00031111 MUs 701 AGCR ENCLAVE-ANAND VIHAR JLM 39 990 KVA UNPLANNED 26-05-2020 22:58:14 26-05-2020 23:53:34 0:55 0.00007639 MUs

BLOCK A-MEET NAGAR, BLOCK B-UTTARANCHAL COLONY, BLOCK A-EAST GOKUL PURI, BLOCK C-AMAR COLONY, BLOCK C- 702 MEET NAGAR, BLOCK D-MEET NAGAR NNG 432 990 KVA UNPLANNED 26-05-2020 15:10:00 26-05-2020 16:03:03 0:53 0.00073611 MUs

ROHITASH NAGAR EAST-SILAMPUR, KABUL NAGAR-ROHITASH NAGAR, BLOCK A-DILSHAD COLONY, BIHARI COLONY- SHAHDARA, BLOCK 1-BALBIR NAGAR, EAST ROHTASH NAGAR- SHAHDARA, BLOCK R-PRATAP PURA, BLOCK A-PRATAP PURA, BLOCK S-PRATAP PURA, BLOCK T-PRATAP PURA, GOPAL K.OIL DEPO.-PRATAP PURA, BLOCK J-DILSHAD GARDEN, SHAHDRA METRO STATION-SHAHDARA DGN, BLOCK H-MANSAROWAR 703 PARK DGN 271 990 KVA UNPLANNED 26-05-2020 00:35:00 26-05-2020 03:20:00 2:45 0.00091667 MUs BABARPUR EXTN.-BABAR PUR, JAFFRABAD-MAUJ PUR, MAUJ 704 PUR COMPLEX 1 YVR 486 630 KVA UNPLANNED 17-05-2020 16:33:50 17-05-2020 17:03:28 0:29 0.00006444 MUs 705 JAFFRABAD-MAUJ PUR YVR 159 990 KVA UNPLANNED 24-05-2020 18:13:44 24-05-2020 18:39:05 0:25 0.00005556 MUs

KAILASH NAGAR, BLOCK D-AJIT NAGAR, DHARAM PURA- KAILASH NAGAR, BLOCK 9-DHARAM PURA, BLOCK 9-KAILASH NAGAR, AJIT NAGAR-KAILASH NAGAR, DHRAM PURA-KAILASH 706 NAGAR, BLOCK 9-GANDHI NAGAR KRN 6111 2380 KVA UNPLANNED 11-05-2020 14:36:00 11-05-2020 15:13:00 0:36 0 MUs 707 BLOCK D-PREET VIHAR LNR 182 990 KVA UNPLANNED 28-05-2020 12:28:00 28-05-2020 12:50:00 0:22 0.00006111 MUs BLOCK A-MAYUR VIHAR PHASE III, SEC C-MAYUR VIHAR PHASE III, SEC D-MAYUR VIHAR PHASE III, BLOCK A-MAYUR VIHAR 708 PHASE III VSE 2190 0 KVA UNPLANNED 26-05-2020 12:34:24 26-05-2020 13:15:00 0:40 0.00008889 MUs

BLOCK J-SHIV VIHAR, BLOCK Z-O & P BLOCKS SHIV VIHAR KARWAL NAGAR, SHIV VIHAR, BLOCK U-SHIV VIHAR, BLOCK H- SHIV VIHAR, BLOCK O-SHIV VIHAR, BLOCK N-SHIV VIHAR, 709 BLOCK Q-SHIV VIHAR, BLOCK H-SHIV VIHAR KWN 2568 0 KVA UNPLANNED 20-05-2020 18:50:32 20-05-2020 19:38:56 0:48 0.0002 MUs

BLOCK A-SHASTRI PARK, BLOCK J-SILAMPUR COLONY, BLOCK B- NEW SILAMPURI PHASE II, BLOCK C-NEW SILAMPURI PHASE II, BLOCK F-ZERO PUSTA, BLOCK E-ZERO PUSTA, MCD COLONY- 710 NEW KATWARA, BLOCK G-ZERO PUSTA YVR 151 400 KVA UNPLANNED 14-05-2020 19:49:07 14-05-2020 20:43:45 0:54 0 MUs 711 BLOCK D-MANDAWALI VILLAGE LNR 86 630 KVA UNPLANNED 08-05-2020 14:55:00 08-05-2020 15:06:21 0:11 0.00003056 MUs

BLOCK D-HARSH VIHAR, BLOCK B-ANUP VIHAR, BLOCK C-ANUP VIHAR, LIG/MIG RES/NON COMM AREA-SEWA DHAM, BLOCK C- SEWA DHAM, GOVT.CO. SEC. SCHOOL-HARSH VIHAR, BLOCK A- SEWA DHAM, BLOCK A-HARSH VIHAR, BLOCK A-BANK COLONY, BLOCK B-HARSH VIHAR, BLOCK C-HARSH VIHAR, HARSH VIHAR 712 SUB STATION-POLICE FARM, SABOLI VILLAGE-MANDOLI NNG 2671 0 KVA UNPLANNED 26-05-2020 12:00:00 26-05-2020 12:38:01 0:38 0.00031667 MUs

BLOCK A-MEET NAGAR, BLOCK B-UTTARANCHAL COLONY, BLOCK A-HARSH VIHAR, BLOCK A-EAST GOKUL PURI, BLOCK C- 713 MEET NAGAR, BLOCK E-MEET NAGAR NNG 0 1620 KVA UNPLANNED 18-05-2020 13:57:00 18-05-2020 15:06:00 1:9 0 MUs

BLOCK A-BALDEV PARK EAST, BLOCK F-BALDEV PARK EAST, BLOCK E-ANARKALI COLONY NORTH, BLOCK B-SOUTH ANARKALI COLONY, BLOCK B-JAGATPURI, BLOCK D-JAGATPURI, 714 BLOCK D-SOUTH ANARKALI COLONY KRN 2552 990 KVA UNPLANNED 02-05-2020 11:10:00 02-05-2020 13:40:00 2:30 0.000625 MUs

BLOCK E1-NAND NAGARI, BHARAT MATA MANDIR-JJ COLONY, BLOCK C1-NAND NAGARI, JANTA FLATS-NAND NAGARI, SABOLI EXTN.-MANDOLI, HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK E-RAJIV NAGAR, SABOLI COLONY-MANDOLI, SABOLI VILLAGE-MANDOLI, BLOCK D- HARIJAN BASTI EAST EXTN., BLOCK E-SEWA DHAM, NEW MANDOLI INDUSTRIAL AREA, DEEPAK MEDITECH-NEW MANDOLI INDUSTRIAL AREA, BLOCK C-SEWA DHAM, BLOCK A- SEWA DHAM, MCD SCHOOL-SABOLI COLONY, BLOCK D-HARSH VIHAR, BLOCK B-HARSH VIHAR, BLOCK B-RAJIV NAGAR, SABOLI 715 EXTN.-MANDOLI NNG 432 400 KVA UNPLANNED 29-05-2020 19:30:00 29-05-2020 20:18:40 0:48 0.00066667 MUs VILL KARKARDOOMA-KARKAR DUMA, SHANTI VIHAR-KARKAR 716 DUMA, DDA FLATS-KARKAR DUMA JLM 597 990 KVA UNPLANNED 27-05-2020 07:19:50 27-05-2020 08:05:49 0:45 0.0000625 MUs BLOCK E-JHILMIL-TAHIRPUR, BLOCK C- MOD PRIMARY SCHOOL- JHILMIL-TAHIRPUR, BLOCK P-JHILMIL-TAHIRPUR, CHURCH- 717 JHILMIL-TAHIRPUR DGN 419 630 KVA PLANNED 28-05-2020 10:00:00 28-05-2020 17:55:00 7:55 0.00105556 MUs

BLOCK G-NEHRU VIHAR, BLOCK C-TUKMIRPUR, BLOCK C-BRIJ PURI, MUSTAFABAD-MUNGA NAGAR, BLOCK F-MUSTAFABAD 718 (DAYALPUR), BLOCK A-MUSTAFABAD (DAYALPUR) KWN 173 0 KVA UNPLANNED 21-05-2020 12:32:28 21-05-2020 13:31:55 0:59 0.00032778 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unserved (MU) due to Sr. No. Area Affected Division Affected Transformer (in KVA). Unplanned Outage From DateTime To DateTime Duration (Hrs:Mins) Outage

DDA FLATS- MOTIAKHAN DUMP SCHEME-MOTIA KHAN, CHANDANI MAHAL-CHANDNI CHOWK, MULTANI DHANDA- SADAR BAZAR, S.R.T. NAGAR-ARYA NAGAR, BLOCK L-RAM NAGAR, MOTIYA KHAN-SHAHI IDGAH COLONY, NEW DELHI RAILWAY STATION-PAHAR GANJ DRG, BLOCK C-AMAR NAGAR, 719 BLOCK L-AMAR NAGAR PHG 143 990 KVA UNPLANNED 29-05-2020 19:04:29 29-05-2020 19:36:31 0:32 0.00008889 MUs BLOCK E-RAJIV NAGAR, BLOCK B-RAJIV NAGAR, SEWA DHAM- 720 MANDOLI NNG 86 0 KVA UNPLANNED 19-05-2020 14:50:00 19-05-2020 15:40:00 0:49 0.00013611 MUs DURGA PARK COLONY-DALLU PURA, VARUN ENCLAVE-DALLU PURA, PKT 2-NEW KONDALI, DALLU PURA VSE-VASUNDHARA ENCLAVE VSE, MCD SCHOOL-GHAROLI KONDLI, LIG/MIG RES/NON COMM AREA-DALLU PURA, DARSHAN HOSPITAL- DALLU PURA VSE, BLOCK A-DALLU PURA VSE, BLOCK B-DALLU 721 PURA VSE VSE 2161 1000 KVA PLANNED 29-05-2020 10:00:00 29-05-2020 13:06:06 3:6 0.00062 MUs

BLOCK J-SHIV VIHAR, BLOCK A-PREM VIHAR, PKT C-BLOCK B, PKT W-BLOCK A, BLOCK C-KARAWAL NAGAR, BLOCK C- MAHALAXMI ENCLAVE, BLOCK Q-SHIV VIHAR, BLOCK H-SHIV VIHAR, BLOCK D-SHIV VIHAR, BLOCK T-SHIV VIHAR, BLOCK F- SHIV VIHAR, BLOCK S-SHIV VIHAR, BLOCK N-SHIV VIHAR, BLOCK P-SHIV VIHAR, BLOCK B-SHIV VIHAR, PKT X-SHIV VIHAR, PKT A-BLOCK A, PKT R-BLOCK A, PKT C-SHIV VIHAR, BLOCK D- PREM VIHAR, BLOCK A-SHIV VIHAR, PKT W-BLOCK A, BLOCK Q- 722 SHIV VIHAR KWN 86 0 KVA UNPLANNED 10-05-2020 11:21:24 10-05-2020 12:53:06 1:31 0.00025278 MUs

PKT W-BLOCK A, BLOCK C-PATEL VIHAR, BLOCK CN- MANGALAM VIHAR, PHASE I-SHIV VIHAR, BLOCK D-DLF ANKUR VIHAR, BLOCK N-SHIV VIHAR, BLOCK R-PATEL VIHAR, BLOCK A- MANGALAM VIHAR, BLOCK B-BHAGAT SINGH COLONY, BLOCK H-BHAGAT SINGH COLONY, BLOCK I-BHAGAT SINGH COLONY, BLOCK R-SHIV VIHAR, BLOCK E-PRAKASH VIHAR, BLOCK A- 723 KARAWAL NAGAR (DEHROTI) KWN 340 0 KVA UNPLANNED 16-05-2020 19:44:55 16-05-2020 21:10:09 1:25 0.00023611 MUs

724 BLOCK 10-KHICHRIPUR RESETTLEMENT COLONY BLOCK 5 MVR 1131 400 KVA UNPLANNED 27-05-2020 19:30:17 27-05-2020 21:28:34 1:58 0.00429389 MUs

BLOCK B-NEW SIMAPURI, BLOCK B-NEW SILAMPURI PHASE II, 725 BLOCK C-NEW SILAMPURI PHASE II, JAFFRABAD-MAUJ PUR YVR 0 0 KVA UNPLANNED 12-05-2020 03:45:36 12-05-2020 04:07:10 0:21 0 MUs BLOCK_5A-SAT NAGAR, BLOCK_2A-SAT NAGAR, BLOCK_48D- 726 NAIWALA, BLOCK_39A-NAIWALA SRD 19 990 KVA UNPLANNED 23-05-2020 12:59:57 23-05-2020 13:36:37 0:36 0.00005 MUs

LIG/MIG RES/NON COMM AREA-CHAWLA FARM, LIG/MIG RES/NON COMM AREA-SABHEPUR, BLOCK B-MUSTAFABAD (DAYALPUR), CHAUHAN PATTI-VIJAY VIHAR, LIG/MIG RES/NON COMM AREA-C-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-D-BLOCK-SONIA VIHAR, LIG/MIG RES/NON COMM AREA-E-BLOCK SONIA VIHAR, LIG/MIG RES/NON 727 COMM AREA-SONIA VIHAR KWN 86 0 KVA UNPLANNED 13-05-2020 12:52:23 13-05-2020 13:50:00 0:57 0.00015833 MUs

BLOCK B-NEW SILAMPURI PHASE II, BLOCK C-NEW SILAMPURI PHASE II, BLOCK E-NEW SILAMPURI PHASE II, NAYAGAON-NEW 728 KATWARA, BLOCK E-SUBHASH MOHALLA YVR 69 0 KVA UNPLANNED 12-05-2020 13:58:46 12-05-2020 14:13:17 0:14 0.00003111 MUs

DARYA GANJ, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY-KASHMERE GATE, PKT R-BLOCK D, PKT C-BLOCK B, JAFFRABAD-MAUJ PUR, BLOCK D-ASHOK NAGAR, G.B.SSS SCHOOL-GOKUL PURI, BLOCK B-EAST GOKUL PURI, BLOCK A- MEET NAGAR, BLOCK A-BANK COLONY, BLOCK E- UTTARANCHAL COLONY, POCKET B-GURU TEG BAHADUR ENCLAVE, BLOCK A-SADATPUR EXT-PUSTA AREA-L BLOCK, BLOCK A-UTTARANCHAL COLONY, BLOCK B-UTTARANCHAL COLONY, BLOCK A-EAST GOKUL PURI, BLOCK C-AMAR COLONY, BLOCK C-MEET NAGAR, BLOCK H-BHAGIRATHI VIHAR, BLOCK F- SHIV VIHAR, BLOCK M-SHIV VIHAR, BLOCK N-SHIV VIHAR, BLOCK E-INDIRA VIHAR, SPORTS COMPLEX-VASUNDHARA ENCLAVE VSE, BHAJANPURA-DAYALPUR, BLOCK D-MEET NAGAR, BLOCK E-MEET NAGAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA- A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-B- 729 BLOCK SONIA VIHAR, BLOCK F-INDIRA VIHAR NNG 4225 2650 KVA UNPLANNED 19-05-2020 22:37:23 19-05-2020 23:13:29 0:36 0.0005 MUs

SHIVAJI PARK-BALBIR NAGAR, ROHITASH NAGAR EAST- SILAMPUR, BHOLA NATH NAGAR-SHAHDARA, AMBEDKAR NAGAR-SHAHDARA, BLOCK 10-GANDHI NAGAR, BLOCK 1- BALBIR NAGAR, EAST ROHTASH NAGAR-SHAHDARA, BALBIR 730 NAGAR EXTN.-SILAMPUR, ROHITASH NAGAR-SILAMPUR DGN 522 400 KVA UNPLANNED 25-05-2020 00:41:49 25-05-2020 01:39:13 0:57 0.00031667 MUs

BHAGAT NAGAR-DAYALPUR, BLOCK CN-AMBIKA VIHAR BLOCK - B&C, BLOCK CN-MANGALAM VIHAR, SHIV VIHAR, SHIV VIHAR, 731 BLOCK U-SHIV VIHAR, BLOCK CN-AMBIKA VIHAR BLOCK - B&C KWN 130 0 KVA UNPLANNED 10-05-2020 13:54:06 10-05-2020 14:52:32 0:58 0.00024167 MUs

BLOCK C-HARSH VIHAR, BLOCK E-RAJIV NAGAR, BLOCK A- MANDOLI VILLAGE, BLOCK A-BANK COLONY, BLOCK E- UTTARANCHAL COLONY, BLOCK B-SEWA DHAM, BLOCK H- SEWA DHAM, DEEPAK MEDITECH-NEW MANDOLI INDUSTRIAL AREA, BLOCK C-SEWA DHAM, BLOCK A-SEWA DHAM, BLOCK D- 732 HARSH VIHAR, BLOCK B-HARSH VIHAR, BLOCK A-HARSH VIHAR NNG 86 0 KVA UNPLANNED 15-05-2020 11:21:37 15-05-2020 12:18:00 0:56 0.00015556 MUs

SABOLI EXTN.-MANDOLI, BLOCK A-MANDOLI EXTN., SABOLI VILLAGE-MANDOLI, BLOCK K-ANUP VIHAR, KABRISTAN-SABOLI COLONY, BANK OF BARODA-SABOLI COLONY, MCD SCHOOL- SABOLI COLONY, SEWA DHAM-MANDOLI, VILLAGE SABOLI- 733 SABOLI COLONY, SABOLI EXTN.-MANDOLI NNG 3928 630 KVA UNPLANNED 10-05-2020 11:49:00 10-05-2020 12:53:00 1:4 0 MUs BLOCK T-BALJIT NAGAR, BLOCK 30-WEST PATEL NAGAR, PREM 734 NAGAR-BALJIT NAGAR PNR 129 990 KVA UNPLANNED 06-05-2020 12:21:19 06-05-2020 13:05:00 0:43 0.00011944 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unserved (MU) due to Sr. No. Area Affected Division Affected Transformer (in KVA). Unplanned Outage From DateTime To DateTime Duration (Hrs:Mins) Outage

BLOCK L-SUNDER NAGRI, DARYA GANJ, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY-KASHMERE GATE, PKT R-BLOCK D, PKT C-BLOCK B, JAFFRABAD-MAUJ PUR, G.B.SSS SCHOOL- GOKUL PURI, BLOCK B-EAST GOKUL PURI, BLOCK A-AMAR COLONY, BLOCK A-MEET NAGAR, BLOCK E-UTTARANCHAL COLONY, BLOCK A-SADATPUR EXT-PUSTA AREA-L BLOCK, BLOCK A-UTTARANCHAL COLONY, BLOCK B-UTTARANCHAL COLONY, MCD SCHOOL-SABOLI COLONY, BLOCK A-EAST GOKUL PURI, BLOCK C-AMAR COLONY, BLOCK C-MEET NAGAR, BLOCK H-BHAGIRATHI VIHAR, BLOCK F-SHIV VIHAR, BLOCK M-SHIV VIHAR, BLOCK N-SHIV VIHAR, BLOCK E-INDIRA VIHAR, SPORTS COMPLEX-VASUNDHARA ENCLAVE VSE, BHAJANPURA- DAYALPUR, BLOCK D-MEET NAGAR, BLOCK E-MEET NAGAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-B-BLOCK SONIA VIHAR, BLOCK 735 F-INDIRA VIHAR NNG 4225 2650 KVA UNPLANNED 11-05-2020 19:21:50 11-05-2020 20:17:12 0:55 0.00076389 MUs

BLOCK B4-OLD RAJENDRA NAGAR, NORTH EXTENSION AREA- BLOCK B-OLD RAJENDRA NAGAR, BLOCK B3-OLD RAJENDRA NAGAR, BLOCK 51-OLD RAJENDRA NAGAR, BLOCK B-OLD RAJENDRA NAGAR, DARYA GANJ, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY-KASHMERE GATE, PKT R-BLOCK D, PKT C-BLOCK B, JAFFRABAD-MAUJ PUR, BLOCK A-SADATPUR EXT-PUSTA AREA-L BLOCK, BLOCK H-BHAGIRATHI VIHAR, BLOCK F-SHIV VIHAR, BLOCK M-SHIV VIHAR, BLOCK N-SHIV VIHAR, BLOCK E-INDIRA VIHAR, JANKI DEVI COLLEGE-CENTRAL RIDGE RESERVED FOREST, WEST KAROL BAGH-CENTRAL RIDGE RESERVED FOREST, SPORTS COMPLEX-VASUNDHARA ENCLAVE VSE, BHAJANPURA-DAYALPUR, LIG/MIG RES/NON COMM AREA- A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A- BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-B-BLOCK 736 SONIA VIHAR, BLOCK F-INDIRA VIHAR SRD 899 630 KVA PLANNED 16-05-2020 09:00:00 16-05-2020 17:00:14 8:0 0.0028 MUs

BLOCK B-GOVIND VIHAR, BLOCK F-WEST KARAWAL NAGAR, BLOCK B-NEW CHAUHAN PUR, BHAGAT NAGAR-DAYALPUR, WEST KARAWAL NAGAR, SHIV VIHAR, BLOCK F-SHIV VIHAR, PKT A4-BLOCK E, BLOCK R-SHIV VIHAR, BLOCK D-WEST 737 KARAWAL NAGAR, BLOCK D-WEST KARAWAL NAGAR KWN 334 630 KVA UNPLANNED 31-05-2020 11:44:59 31-05-2020 12:30:34 0:45 0.0001875 MUs BLOCK 61-AJMAL KHAN PARK, BLOCK 60-AJMAL KHAN PARK, BLOCK 50-AJMAL KHAN PARK, BLOCK 13-KAROL BAGH, BLOCK 738 12A-KAROL BAGH SRD 109 990 KVA UNPLANNED 14-05-2020 20:22:08 14-05-2020 22:29:31 2:7 0.00017639 MUs 739 BLOCK F-BALDEV PARK EAST KRN 17 630 KVA UNPLANNED 23-05-2020 01:16:26 23-05-2020 01:46:48 0:30 0.00001667 MUs

BLOCK H-WEST KARAWAL NAGAR, BLOCK K-WEST KARAWAL NAGAR, PKT B-BLOCK B, PKT A-BLOCK E, LIG/MIG RES/NON COMM AREA-DAYALPUR EXTN., BLOCK B-NEW CHAUHAN PUR, BLOCK 3A-SADAT PUR, PKT EA-BLOCK B, PKT D-BLOCK B, PKT E- BLOCK B, BLOCK C-SHERPUR, BLOCK E-SADAT PUR, BLOCK B- SADAT PUR, BLOCK C-SADAT PUR, PKT C-BLOCK E, PKT A1- BLOCK E, PKT A4-BLOCK E, BLOCK A-KARAWAL NAGAR (DEHROTI), PKT D-BLOCK A, PKT C-BLOCK A, PKT E-BLOCK A, PKT B-BLOCK A, PKT G-BLOCK A, BLOCK D-WEST KARAWAL NAGAR, BLOCK A-HARIJAN BASTI, BLOCK D-WEST KARAWAL 740 NAGAR KWN 1510 0 KVA UNPLANNED 02-05-2020 17:47:47 02-05-2020 18:45:45 0:57 0.0002375 MUs

SABOLI EXTN.-MANDOLI, HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK E-RAJIV NAGAR, BLOCK A-MANDOLI VILLAGE, BLOCK A-BANK COLONY, SABOLI COLONY- MANDOLI, BLOCK D-HARIJAN BASTI EAST EXTN., BLOCK E- SEWA DHAM, NEW MANDOLI INDUSTRIAL AREA, BLOCK B- SEWA DHAM, BLOCK H-SEWA DHAM, DEEPAK MEDITECH-NEW MANDOLI INDUSTRIAL AREA, BLOCK C-SEWA DHAM, BLOCK A- SEWA DHAM, BLOCK D-HARSH VIHAR, BLOCK B-HARSH VIHAR, BLOCK A-HARSH VIHAR, GOVT.CO. SEC. SCHOOL-HARSH VIHAR, 741 J.R. COMPLEX-SEWA DHAM, BLOCK E-SEWA DHAM NNG 777 0 KVA UNPLANNED 07-05-2020 00:20:00 07-05-2020 00:40:00 0:20 0.0005 MUs NAI SARAK-JOGIWARA, KATRA NAWAB-CHANDNI CHOWK, 742 MAIN BAZAR-KHUSH DIL CCK 129 990 KVA UNPLANNED 15-05-2020 11:24:19 15-05-2020 11:44:38 0:20 0.00005556 MUs

BLOCK A-MANDOLI VILLAGE, BLOCK B-ANUP VIHAR, NEW MANDOLI INDUSTRIAL AREA, BLOCK K-ANUP VIHAR, BLOCK A- ANUP VIHAR, SEWA DHAM-MANDOLI, SABOLI EXTN.- 743 MANDOLI, SEWA DHAM-MANDOLI NNG 432 0 KVA UNPLANNED 22-05-2020 11:04:49 22-05-2020 11:52:58 0:48 0.00066667 MUs BLOCK_13A-BALMIKI COLONY, BLOCK 12A-KAROL BAGH, 744 BLOCK_1A-REHAGAR PURA SRD 95 990 KVA UNPLANNED 15-05-2020 13:43:27 15-05-2020 14:39:34 0:56 0.00004667 MUs GORAKH PARK WEST-SILAMPUR, BLOCK B-GORAKH PARK, BLOCK A-DILSHAD COLONY, JAFFRABAD-MAUJ PUR, BLOCK A- PRATAP PURA, BLOCK B-PRATAP PURA, BLOCK C-PRATAP PURA, BLOCK D-PRATAP PURA, NEAR SHADARA RAILWAY 745 GODOWN-SHAHDARA DGN DGN 527 400 KVA UNPLANNED 24-05-2020 01:00:00 24-05-2020 02:34:00 1:34 0.00049611 MUs PKT A-CHITRAKOOT, PKT B-CHITRAKOOT, MCD SCHOOL- 746 CHITRAKOOT NNG 77 400 KVA UNPLANNED 25-05-2020 15:18:36 25-05-2020 16:15:00 0:56 0.00015556 MUs MADHU VIHAR-INDRAPRASTHA EXTENSION, BLOCK H-GAZIPUR VILLAGE, BLOCK A-GAZIPUR VILLAGE, D.S.I.D.C.-GAZIPUR 747 VILLAGE LNR 573 990 KVA UNPLANNED 26-05-2020 00:03:20 26-05-2020 01:01:00 0:57 0.0002375 MUs BLOCK H-JAGATPURI, BLOCK E-ANARKALI COLONY NORTH, BLOCK B-JAGATPURI, BLOCK K-JAGATPURI, EXTENTION- 748 JAGATPURI KRN 511 990 KVA UNPLANNED 08-05-2020 11:34:32 08-05-2020 12:25:00 0:50 0 MUs BHARAT MATA MANDIR-JJ COLONY, HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, NEW MANDOLI INDUSTRIAL AREA, BLOCK B-SEWA DHAM, BLOCK A- SEWA DHAM, DEEPAK MEDITECH-NEW MANDOLI INDUSTRIAL 749 AREA, BLOCK D-HARSH VIHAR NNG 345 400 KVA UNPLANNED 31-05-2020 03:18:08 31-05-2020 04:15:23 0:57 0.00063333 MUs BLOCK 15-TRILOKPURI PHASE II, TRILOKPURI PHASE I-MAYUR 750 VIHAR MVR 313 400 KVA UNPLANNED 16-05-2020 14:31:00 16-05-2020 16:24:54 1:53 0.00009417 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unserved (MU) due to Sr. No. Area Affected Division Affected Transformer (in KVA). Unplanned Outage From DateTime To DateTime Duration (Hrs:Mins) Outage

DARYA GANJ, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY-KASHMERE GATE, PKT R-BLOCK D, PKT C-BLOCK B, JAFFRABAD-MAUJ PUR, G.B.SSS SCHOOL-GOKUL PURI, BLOCK B- EAST GOKUL PURI, BLOCK A-MEET NAGAR, BLOCK A-SADATPUR EXT-PUSTA AREA-L BLOCK, BLOCK A-EAST GOKUL PURI, BLOCK H-BHAGIRATHI VIHAR, BLOCK F-SHIV VIHAR, BLOCK M-SHIV VIHAR, BLOCK N-SHIV VIHAR, BLOCK E-INDIRA VIHAR, SPORTS COMPLEX-VASUNDHARA ENCLAVE VSE, BHAJANPURA- DAYALPUR, BLOCK E-MEET NAGAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA- A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-B- 751 BLOCK SONIA VIHAR, BLOCK F-INDIRA VIHAR NNG 533 630 KVA UNPLANNED 19-05-2020 07:35:17 19-05-2020 08:23:19 0:48 0.00026667 MUs BLOCK B-EAST GOKUL PURI, BLOCK A-MEET NAGAR, BLOCK A- 752 EAST GOKUL PURI, BLOCK E-MEET NAGAR NNG 218 630 KVA UNPLANNED 14-05-2020 10:57:35 14-05-2020 11:49:56 0:52 0.00028889 MUs BLOCK 3-KHICHARIPUR BLOCK 1, BLOCK E-VINOD NAGAR EAST, BLOCK 19-KALYAN PURI, BLOCK 12-KALYAN PURI, BLOCK 753 18-KALYAN PURI MVR 43 990 KVA UNPLANNED 26-05-2020 12:06:29 26-05-2020 13:35:00 1:28 0.00012222 MUs DARYA GANJ, EVERGREEN PUBLICATION-KALA MAHAL, CHRISTAN COLONY-KHABAS PURA, MOTHER DAIRY-NETAJI 754 SUBHASH MARG DRG 379 990 KVA UNPLANNED 07-05-2020 03:36:00 07-05-2020 04:19:19 0:43 0.00008361 MUs BLOCK CN-AMBIKA VIHAR BLOCK - B&C, SHIV VIHAR, BLOCK CN- AMBIKA VIHAR BLOCK - B&C, BLOCK CN-AMBIKA VIHAR BLOCK - 755 B&C KWN 130 0 KVA UNPLANNED 30-05-2020 22:40:41 31-05-2020 00:28:12 1:47 0.00044583 MUs

BLOCK F-NEHRU VIHAR, BLOCK G-NEHRU VIHAR, BLOCK B-BRIJ PURI, BLOCK B-MUSTAFABAD (DAYALPUR), BLOCK D-OLD MUSTAFABAD, BLOCK A-NEHRU VIHAR, BLOCK Z-NEHRU VIHAR, BLOCK E-DAYALPUR, BLOCK A-NEHRU VIHAR, BLOCK B- NEHRU VIHAR, BLOCK T-NEHRU VIHAR, OLD MUSTAFABAD- 756 BLOCK C-DAYALPUR KWN 1318 990 KVA UNPLANNED 09-05-2020 16:40:37 09-05-2020 17:06:46 0:26 0.00014444 MUs

BLOCK B-GOVIND VIHAR, BLOCK A-PREM VIHAR, BLOCK C- MAHALAXMI ENCLAVE, LIG/MIG RES/NON COMM AREA-NEW CHAUHAN PUR, BLOCK C-PREM VIHAR, BLOCK D-PREM VIHAR, 757 BLOCK B-PREM VIHAR, BLOCK B-MAHALAXMI ENCLAVE KWN 1566 990 KVA UNPLANNED 23-05-2020 15:15:44 23-05-2020 15:28:06 0:12 0.00005 MUs BLOCK C2-YAMUNA VIHAR, BLOCK C9-YAMUNA VIHAR, BLOCK C1-YAMUNA VIHAR, BLOCK B2-YAMUNA VIHAR, BLOCK C8- YAMUNA VIHAR, BSES 66 KV GRID S/STATION-COMMUNITY 758 CENTRE YAMUNA VIHAR YVR 767 990 KVA UNPLANNED 30-05-2020 12:38:53 30-05-2020 13:12:55 0:34 0.00037778 MUs

DARYA GANJ, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY-KASHMERE GATE, PKT R-BLOCK D, PKT C-BLOCK B, JAFFRABAD-MAUJ PUR, G.B.SSS SCHOOL-GOKUL PURI, BLOCK B- EAST GOKUL PURI, BLOCK A-MEET NAGAR, BLOCK A-SADATPUR EXT-PUSTA AREA-L BLOCK, BLOCK A-EAST GOKUL PURI, BLOCK C-AMAR COLONY, BLOCK C-MEET NAGAR, BLOCK H- BHAGIRATHI VIHAR, BLOCK F-SHIV VIHAR, BLOCK M-SHIV VIHAR, BLOCK N-SHIV VIHAR, BLOCK E-INDIRA VIHAR, SPORTS COMPLEX-VASUNDHARA ENCLAVE VSE, BHAJANPURA- DAYALPUR, BLOCK D-MEET NAGAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA- A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-B- 759 BLOCK SONIA VIHAR, BLOCK F-INDIRA VIHAR NNG 4231 2650 KVA UNPLANNED 23-05-2020 18:45:00 23-05-2020 19:08:00 0:22 0.00088 MUs

PKT C-BLOCK B, SABOLI EXTN.-MANDOLI, BLOCK A-MANDOLI EXTN., SABOLI COLONY-MANDOLI, KABRISTAN-SABOLI COLONY, MCD SCHOOL-SABOLI COLONY, SEWA DHAM- 760 MANDOLI, SABOLI COLONY-MANDOLI, SABOLI EXTN.-MANDOLI NNG 2394 0 KVA UNPLANNED 26-05-2020 16:50:00 26-05-2020 17:46:38 0:56 0.00046667 MUs

BLOCK A3-NAND NAGARI, SABOLI EXTN.-MANDOLI, HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK A-MANDOLI EXTN., BLOCK A-BANK COLONY, SABOLI VILLAGE-MANDOLI, BLOCK D-HARIJAN BASTI EAST EXTN., BLOCK E-SEWA DHAM, POCKET A-JJ COLONY, NEW MANDOLI INDUSTRIAL AREA, BLOCK A-SEWA DHAM, BLOCK A-SEWA DHAM, BLOCK C-ANUP VIHAR, BANK OF BARODA-SABOLI COLONY, MCD SCHOOL-SABOLI COLONY, BLOCK D-HARSH VIHAR, BLOCK A-HARSH VIHAR, BLOCK A-RAJIV NAGAR, BLOCK 761 B-RAJIV NAGAR, SEWA DHAM-MANDOLI NNG 1432 0 KVA UNPLANNED 15-05-2020 06:42:10 15-05-2020 07:36:33 0:54 0.0003 MUs 762 SADAR BAZAR B G ROAD PHG 22 990 KVA UNPLANNED 28-05-2020 14:06:04 28-05-2020 14:42:26 0:36 0.00005 MUs 763 NAYAGAON-NEW KATWARA, BLOCK P-BRAHM PURI YVR 86 990 KVA UNPLANNED 07-05-2020 14:18:40 07-05-2020 14:41:46 0:23 0.00006389 MUs SABOLI EXTN.-MANDOLI, SABOLI VILLAGE-MANDOLI, BLOCK B- SEWA DHAM, MCD SCHOOL-SABOLI COLONY, VILLAGE SABOLI- 764 SABOLI COLONY NNG 86 0 KVA UNPLANNED 23-05-2020 15:23:06 23-05-2020 15:46:46 0:23 0.00006389 MUs

PART II- DDA COMPLEX-NEW RAJENDRA NAGAR, N.P.L. STAFF QTRS.-PART II-BLOCK G, DARYA GANJ, GEETA COLONY, PKT R- BLOCK D, PKT C-BLOCK B, JAFFRABAD-MAUJ PUR, BLOCK H- BHAGIRATHI VIHAR, BLOCK F-SHIV VIHAR, BLOCK M-SHIV VIHAR, BLOCK N-SHIV VIHAR, BLOCK E-INDIRA VIHAR, N.P.L. STAFF QTRS.-NEW RAJENDRA NAGAR, SPORTS COMPLEX- VASUNDHARA ENCLAVE VSE, BHAJANPURA-DAYALPUR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-B-BLOCK SONIA VIHAR, BLOCK 765 F-INDIRA VIHAR SRD 729 630 KVA UNPLANNED 01-05-2020 11:42:39 01-05-2020 11:55:09 0:12 0.00003333 MUs

DARYA GANJ, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY-KASHMERE GATE, PKT R-BLOCK D, PKT C-BLOCK B, JAFFRABAD-MAUJ PUR, BLOCK A-SADATPUR EXT-PUSTA AREA- L BLOCK, THAKKAR BAPA NAGAR-DEV NAGAR, BLOCK H- BHAGIRATHI VIHAR, BLOCK F-SHIV VIHAR, BLOCK M-SHIV VIHAR, BLOCK N-SHIV VIHAR, BLOCK E-INDIRA VIHAR, BAPA NAGAR-ANAND PARBAT, KHALSA NAGAR-DEV NAGAR, BLOCK G-DEV NAGAR, SPORTS COMPLEX-VASUNDHARA ENCLAVE VSE, BHAJANPURA-DAYALPUR, LIG/MIG RES/NON COMM AREA-A- BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-B-BLOCK SONIA 766 VIHAR, BLOCK F-INDIRA VIHAR PNR 3451 990 KVA UNPLANNED 21-05-2020 13:03:05 21-05-2020 13:34:45 0:31 0.00034444 MUs COMMUNITY CENTRE-JAMA MASZID, MOTIA MAHAL-CHANDNI CHOWK, CHANDANI MAHAL-CHANDNI CHOWK, CHITTLI 767 QABAR-CHANDNI CHOWK DRG 134 990 KVA UNPLANNED 26-05-2020 19:05:00 26-05-2020 19:30:27 0:25 0.00005556 MUs SHIVAJI PARK-BALBIR NAGAR, ROHITASH NAGAR EAST- 768 SILAMPUR, KABUL NAGAR-ROHITASH NAGAR DGN 136 990 KVA UNPLANNED 09-05-2020 14:37:46 09-05-2020 15:09:29 0:31 0.00003444 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unserved (MU) due to Sr. No. Area Affected Division Affected Transformer (in KVA). Unplanned Outage From DateTime To DateTime Duration (Hrs:Mins) Outage

BLOCK A2-NAND NAGARI, BLOCK A1-NAND NAGARI, BLOCK A4- NAND NAGARI, BLOCK A3-NAND NAGARI, BLOCK B3-NAND NAGARI, MCD PRIMARY SCHOOL-BLOCK D3, GOVT. BOYS 769 SCHOOL-BLOCK A3, MCD PRIMARY SCHOOL-BLOCK A3 NNG 1102 990 KVA UNPLANNED 04-05-2020 12:21:11 04-05-2020 12:51:19 0:30 0.00016667 MUs 770 BLOCK B-EAST GOKUL PURI NNG 130 630 KVA UNPLANNED 04-05-2020 17:31:07 04-05-2020 17:53:27 0:22 0.00009167 MUs

BLOCK C-TUKMIRPUR, LIG/MIG RES/NON COMM AREA-CRPF CAMP SONIA VIHAR, BLOCK A-SADATPUR EXT-PUSTA AREA-L BLOCK, BLOCK A-SADAT PUR, BLOCK A8-SADAT PUR, BLOCK F- SADAT PUR, BLOCK C-MUSTAFABAD (DAYALPUR), PKT C1- 771 SADATPUR EXT-PUSTA AREA-K BLOCK KWN 173 1030 KVA UNPLANNED 12-05-2020 10:55:46 12-05-2020 11:40:00 0:44 0.00024444 MUs

DARYA GANJ, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY-KASHMERE GATE, PKT R-BLOCK D, PKT C-BLOCK B, JAFFRABAD-MAUJ PUR, G.B.SSS SCHOOL-GOKUL PURI, BLOCK B- EAST GOKUL PURI, BLOCK A-AMAR COLONY, BLOCK A-MEET NAGAR, BLOCK E-UTTARANCHAL COLONY, BLOCK A-SADATPUR EXT-PUSTA AREA-L BLOCK, BLOCK A-EAST GOKUL PURI, BLOCK C-AMAR COLONY, BLOCK C-MEET NAGAR, BLOCK H- BHAGIRATHI VIHAR, BLOCK F-SHIV VIHAR, BLOCK M-SHIV VIHAR, BLOCK N-SHIV VIHAR, BLOCK E-INDIRA VIHAR, SPORTS COMPLEX-VASUNDHARA ENCLAVE VSE, BHAJANPURA- DAYALPUR, BLOCK D-MEET NAGAR, BLOCK E-MEET NAGAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-B-BLOCK SONIA VIHAR, BLOCK 772 F-INDIRA VIHAR NNG 4231 2650 KVA UNPLANNED 30-05-2020 22:37:40 30-05-2020 23:02:55 0:25 0.00055556 MUs

D.S.I.D.C. COMPLEX-DTC DEPOT, BABA DA DARGA- 773 KARDAMPURI, BLOCK E1-NAND NAGARI, BLOCK E3-KANSHIPUR NNG 228 630 KVA PLANNED 16-05-2020 11:00:00 16-05-2020 15:33:06 4:33 0.00189583 MUs BLOCK A-MANDOLI VILLAGE, SABOLI COLONY-MANDOLI, 774 BLOCK A-SEWA DHAM NNG 161 990 KVA UNPLANNED 18-05-2020 17:57:04 18-05-2020 18:17:28 0:20 0.00011111 MUs

VISHWAS NAGAR-SHRESHTHA VIHAR, BLOCK 1-BALBIR NAGAR, BLOCK 1-RAM NAGAR, BLOCK B-NEW MODERN SHAHDARA, BLOCK A-B&C-JAGAT PURI, BALBIR NAGAR EXTN.-SILAMPUR, BLOCK B-JAGAT PURI, DDA FLATS-SILAMPUR, SHAHDRA METRO STATION-SHAHDARA DGN, BLOCK A-NEW MODERN 775 SHAHDARA, BLOCK C-NEW MODERN SHAHDARA DGN 913 630 KVA UNPLANNED 22-05-2020 00:22:01 22-05-2020 05:30:00 5:7 0.00085278 MUs

LIG/MIG RES/NON COMM AREA-SABHEPUR, CHAUHAN PATTI- VIJAY VIHAR, LIG/MIG RES/NON COMM AREA-D-BLOCK-SONIA 776 VIHAR, LIG/MIG RES/NON COMM AREA-E-BLOCK SONIA VIHAR KWN 259 0 KVA UNPLANNED 27-05-2020 15:23:21 27-05-2020 16:00:01 0:36 0.0003 MUs RADHE SHYAM PARK-SWASTHYA VIHAR, BLOCK A-BALDEV PARK EAST, NEW GOVIND PURA-JAGATPURI, BLOCK F-BALDEV PARK EAST, BLOCK C-RADHEPURI EXTENSION, BLOCK 4-GEETA COLONY, BALDEV PARK-JAGATPURI, BLOCK D-BALDEV PARK 777 EAST KRN 683 990 KVA UNPLANNED 31-05-2020 05:44:24 31-05-2020 06:17:11 0:32 0.00001778 MUs 778 JAFFRABAD-MAUJ PUR YVR 86 990 KVA UNPLANNED 25-05-2020 13:47:29 25-05-2020 14:36:08 0:48 0.00013333 MUs BHARAT MATA MANDIR-JJ COLONY, HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, NEW MANDOLI INDUSTRIAL AREA, DEEPAK MEDITECH-NEW MANDOLI INDUSTRIAL AREA, BLOCK D-HARSH VIHAR, BLOCK B- 779 HARSH VIHAR, BLOCK A-SEWA DHAM NNG 432 400 KVA UNPLANNED 23-05-2020 22:20:49 23-05-2020 22:45:32 0:24 0.00033333 MUs

BLOCK A-BALDEV PARK EAST, GAGAN VIHAR-JAGATPURI, BLOCK F-BALDEV PARK EAST, BLOCK E-ANARKALI COLONY NORTH, BLOCK B-SOUTH ANARKALI COLONY, BLOCK B- JAGATPURI, SHIVPURI-JAGATPURI, BLOCK D-JAGATPURI, BLOCK K-JAGATPURI, EXTENTION-JAGATPURI, BLOCK A-ANARKALI 780 COLONY NORTH, BLOCK D-SOUTH ANARKALI COLONY KRN 577 990 KVA UNPLANNED 23-05-2020 00:06:00 23-05-2020 00:30:41 0:24 0.00001333 MUs

SABOLI EXTN.-MANDOLI, BLOCK A-MANDOLI EXTN., SABOLI COLONY-MANDOLI, SABOLI VILLAGE-MANDOLI, BLOCK B- PRATAP NAGAR, BLOCK K-ANUP VIHAR, KABRISTAN-SABOLI COLONY, BANK OF BARODA-SABOLI COLONY, MCD SCHOOL- SABOLI COLONY, BLOCK D-MEET NAGAR, SEWA DHAM- MANDOLI, SABOLI COLONY-MANDOLI, VILLAGE SABOLI-SABOLI 781 COLONY, SABOLI EXTN.-MANDOLI NNG 3928 630 KVA UNPLANNED 15-05-2020 17:29:21 15-05-2020 18:25:00 0:55 0.00076389 MUs

782 SABOLI EXTN.-MANDOLI, VILLAGE SABOLI-SABOLI COLONY NNG 259 0 KVA UNPLANNED 30-05-2020 16:51:09 30-05-2020 17:40:41 0:49 0.00040833 MUs

BLOCK 56-OLD RAJENDRA NAGAR, BLOCK 55-OLD RAJENDRA NAGAR, BLOCK B6-OLD RAJENDRA NAGAR, PKT C-BLOCK B, BLOCK 38-OLD RAJENDRA NAGAR, BLOCK B4-OLD RAJENDRA NAGAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, GGS INDRAPRASTHA UNIVERSITY-KASHMERE GATE, BLOCK N-SHIV VIHAR, BLOCK F-INDIRA VIHAR, SIR GANGA RAM HOSPITAL-CENTRAL RIDGE RESERVED FOREST, BLOCK 13- KAROL BAGH, BLOCK 58-OLD RAJENDRA NAGAR, BLOCK B-OLD RAJENDRA NAGAR, BLOCK 51-OLD RAJENDRA NAGAR, LIG/MIG RES/NON COMM AREA-B-BLOCK SONIA VIHAR, BLOCK 51-OLD RAJENDRA NAGAR, BLOCK M-SHIV VIHAR, JANKI DEVI COLLEGE- CENTRAL RIDGE RESERVED FOREST, BLOCK 59-OLD RAJENDRA NAGAR, BLOCK A-SADATPUR EXT-PUSTA AREA-L BLOCK, BHAJANPURA-DAYALPUR, PKT R-BLOCK D, GEETA COLONY, BLOCK A-OLD RAJENDRA NAGAR, SPORTS COMPLEX- VASUNDHARA ENCLAVE VSE, BLOCK E-INDIRA VIHAR, BLOCK H- BHAGIRATHI VIHAR, DARYA GANJ, JAFFRABAD-MAUJ PUR, BLOCK F-SHIV VIHAR, BLOCK 54-OLD RAJENDRA NAGAR, BLOCK 783 B3-OLD RAJENDRA NAGAR SRD 1420 990 KVA PLANNED 20-05-2020 09:00:00 20-05-2020 12:09:24 3:9 0.0011025 MUs

LIG/MIG RES/NON COMM AREA-SABHEPUR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-G- BLOCK SONIA VIHAR EXTENSION, LIG/MIG RES/NON COMM AREA-G- BLOCK SONIA VIHAR EXTENSION, LIG/MIG RES/NON COMM AREA-E-BLOCK SONIA VIHAR, 784 LIG/MIG RES/NON COMM AREA-SONIA VIHAR KWN 259 0 KVA UNPLANNED 27-05-2020 18:39:18 27-05-2020 19:03:45 0:24 0.0002 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unserved (MU) due to Sr. No. Area Affected Division Affected Transformer (in KVA). Unplanned Outage From DateTime To DateTime Duration (Hrs:Mins) Outage

BLOCK A-PREM VIHAR, PKT C-BLOCK B, PKT W-BLOCK A, BLOCK CN-AMBIKA VIHAR BLOCK - B&C, BLOCK Z-O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK A-HARIJAN BASTI, PKT Y-SHIV VIHAR, BLOCK U-SHIV VIHAR, BLOCK S-SHIV VIHAR, BLOCK R- SHIV VIHAR, BLOCK B-SHIV VIHAR, PKT X-SHIV VIHAR, PKT A- BLOCK A, PKT R-BLOCK A, PKT F-BLOCK A, PKT D-SHIV VIHAR, PKT C-SHIV VIHAR, BLOCK C-HARIJAN BASTI, BLOCK B-HARIJAN BASTI, BLOCK V-O & P BLOCKS SHIV VIHAR KARWAL NAGAR, PKT D-BLOCK B, BLOCK CN-AMBIKA VIHAR BLOCK - B&C, BLOCK 785 A-HARIJAN BASTI, PKT W-BLOCK A KWN 3348 0 KVA UNPLANNED 10-05-2020 15:04:53 10-05-2020 15:42:39 0:37 0.00015417 MUs

BLOCK D-MEET NAGAR, BLOCK C-AMAR COLONY, PKT C-BLOCK B, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, GGS INDRAPRASTHA UNIVERSITY-KASHMERE GATE, BLOCK N-SHIV VIHAR, BLOCK F-INDIRA VIHAR, BLOCK B-EAST GOKUL PURI, LIG/MIG RES/NON COMM AREA-B-BLOCK SONIA VIHAR, BLOCK A-MEET NAGAR, BLOCK A-EAST GOKUL PURI, BLOCK M-SHIV VIHAR, BLOCK A-SADATPUR EXT-PUSTA AREA-L BLOCK, BHAJANPURA-DAYALPUR, PKT R-BLOCK D, GEETA COLONY, SPORTS COMPLEX-VASUNDHARA ENCLAVE VSE, BLOCK E- INDIRA VIHAR, BLOCK C-MEET NAGAR, BLOCK H-BHAGIRATHI VIHAR, DARYA GANJ, JAFFRABAD-MAUJ PUR, BLOCK F-SHIV 786 VIHAR, BLOCK E-MEET NAGAR, G.B.SSS SCHOOL-GOKUL PURI NNG 4231 2650 KVA UNPLANNED 31-05-2020 03:20:25 31-05-2020 04:17:19 0:56 0.0014 MUs BLOCK A-TUKMIRPUR, BLOCK C-TUKMIRPUR, BLOCK D-KHAJURI KHAS, CLOCK C-BIHARIPUR, BLOCK B-KHAJURI KHAS, BLOCK D- 787 TUKMIRPUR, BLOCK T-NEHRU VIHAR KWN 130 0 KVA UNPLANNED 23-05-2020 10:57:41 23-05-2020 11:33:34 0:35 0.00014583 MUs BLOCK A1-NAND NAGARI, SABOLI EXTN.-MANDOLI, BLOCK B- ANUP VIHAR, NEW MANDOLI INDUSTRIAL AREA, BLOCK B- PRATAP NAGAR, DEEPAK MEDITECH-NEW MANDOLI INDUSTRIAL AREA, BLOCK D-ANUP VIHAR, BLOCK K-ANUP VIHAR, BLOCK A-ANUP VIHAR, BLOCK C-ANUP VIHAR, SEWA DHAM-MANDOLI, ANUP VIHAR-MANDOLI, SEWA DHAM- 788 MANDOLI NNG 863 0 KVA UNPLANNED 25-05-2020 22:31:17 25-05-2020 23:26:09 0:54 0.0015 MUs

789 SUBHASH PARK-GORAKH PARK, JANTA COLONY-VIVEK VIHAR YVR 668 630 KVA UNPLANNED 22-05-2020 22:27:09 22-05-2020 23:05:00 0:37 0.00008222 MUs BLOCK D-ASHOK NAGAR, BLOCK B-EAST GOKUL PURI, BLOCK A- EAST GOKUL PURI, BLOCK C-AMAR COLONY, BLOCK C-MEET 790 NAGAR, BLOCK D-MEET NAGAR NNG 83 990 KVA UNPLANNED 24-05-2020 14:06:57 24-05-2020 14:57:09 0:50 0.00020833 MUs

BLOCK A-TUKMIRPUR, BLOCK C-TUKMIRPUR, BLOCK B- MUSTAFABAD (DAYALPUR), BLOCK A-SADATPUR EXT-PUSTA AREA-L BLOCK, BLOCK 1B-SADAT PUR, BLOCK F-MUSTAFABAD (DAYALPUR), BLOCK C-MUSTAFABAD (DAYALPUR), BLOCK A- MUSTAFABAD (DAYALPUR), BLOCK D-MUSTAFABAD 791 (DAYALPUR), BLOCK A-MUSTAFABAD (DAYALPUR) KWN 1275 990 KVA UNPLANNED 15-05-2020 13:41:21 15-05-2020 14:09:34 0:28 0.00015556 MUs

BLOCK B-SUBHASH MOHALLA, SUBHASH VIHAR-YAMUNA VIHAR, MAUJ PUR COMPLEX 1, NORTH GHONDA, BSES 66 KV 792 GRID S/STATION-COMMUNITY CENTRE YAMUNA VIHAR YVR 1165 630 KVA UNPLANNED 28-05-2020 17:05:26 28-05-2020 17:54:18 0:48 0.00026667 MUs

SANT NIRANKARI BHAVAN-GANGA VIHAR KWN, LIG/MIG RES/NON COMM AREA-G- BLOCK SONIA VIHAR EXTENSION, LIG/MIG RES/NON COMM AREA-BALAJI MANDIR COLONY, BLOCK E-G- BLOCK SONIA VIHAR EXTENSION, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-C-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-C-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-G- BLOCK SONIA VIHAR EXTENSION, 793 LIG/MIG RES/NON COMM AREA-E-BLOCK SONIA VIHAR KWN 173 100 KVA UNPLANNED 19-05-2020 12:29:13 19-05-2020 12:56:42 0:27 0.00015 MUs BHOLA NATH NAGAR-SHAHDARA, BIHARI COLONY-SHAHDARA, 794 SHALIMAR PARK-SHAHDARA JLM 97 990 KVA UNPLANNED 29-05-2020 12:41:36 29-05-2020 16:11:17 3:29 0.00029028 MUs 795 BABARPUR EXTN.-BABAR PUR NNG 31 630 KVA UNPLANNED 14-05-2020 13:38:51 14-05-2020 14:27:57 0:49 0.00027222 MUs BLOCK J-SHIV VIHAR, BLOCK C-KARAWAL NAGAR, BLOCK Q- SHIV VIHAR, BLOCK H-SHIV VIHAR, BLOCK F-SHIV VIHAR, BLOCK S-SHIV VIHAR, BLOCK P-SHIV VIHAR, BLOCK Q-SHIV 796 VIHAR, BLOCK H-SHIV VIHAR KWN 2565 0 KVA UNPLANNED 18-05-2020 18:44:27 18-05-2020 19:36:54 0:52 0.00014444 MUs

BLOCK A-SILAMPUR COLONY, BLOCK B-SUBHASH MOHALLA, BLOCK C12-YAMUNA VIHAR, BLOCK C2-YAMUNA VIHAR, BLOCK C9-YAMUNA VIHAR, BLOCK C1-YAMUNA VIHAR, BLOCK B2- YAMUNA VIHAR, BLOCK C8-YAMUNA VIHAR, WEST GHONDA, 797 AMBEDKAR AWAS KALYAN SAMITI-GHAROLI KONDLI YVR 18 990 KVA UNPLANNED 27-05-2020 14:19:49 27-05-2020 14:49:01 0:29 0.00006444 MUs NORTH GHONDA, BLOCK D-BHAJANPURA, BLOCK C- BHAJANPURA, BLOCK B-GARI MANDU, BLOCK E-SUBHASH 798 MOHALLA, BLOCK D-BHAJANPURA YVR 181 990 KVA UNPLANNED 27-05-2020 18:10:13 27-05-2020 18:25:27 0:15 0.00003333 MUs

MANTOLA MOHALLA-PAHAR GANJ, PANCHKUIAN ROAD RAILWAY COLONY-PAHAR GANJ, MAULANA AZAD 799 FOUNDATION-PANCHKUIAN ROAD RAILWAY COLONY PHG 380 990 KVA PLANNED 21-05-2020 10:00:00 21-05-2020 12:16:28 2:16 0.00079333 MUs

800 FAZALPUR-MANDAWALI VILLAGE, BLOCK U-CHANDER VIHAR LNR 131 630 KVA UNPLANNED 08-05-2020 12:00:00 08-05-2020 12:55:00 0:54 0.00015 MUs 801 BLOCK 8A-GEETA COLONY, BLOCK 10-GANDHI NAGAR KRN 43 990 KVA UNPLANNED 28-05-2020 12:47:28 28-05-2020 14:06:47 1:19 0.00010972 MUs BLOCK C-KHAJURI KHAS, BLOCK A-KHAJURI KHAS, BLOCK J- KHAJURI KHAS, LIG/MIG RES/NON COMM AREA-BLOCK B, BLOCK I-KHAJURI KHAS EXTN., BLOCK V-O & P BLOCKS SHIV 802 VIHAR KARWAL NAGAR KWN 2377 630 KVA UNPLANNED 17-05-2020 11:09:54 17-05-2020 14:25:50 3:15 0.00270833 MUs

CHAUHAN BANGAR-JAFFRABAD, BLOCK Z-WELCOME COLONY, BLOCK J-SILAMPUR COLONY, BLOCK A-SILAMPUR COLONY, BLOCK B-NEW SILAMPURI PHASE II, BLOCK C-NEW SILAMPURI PHASE II, BLOCK E-NEW SILAMPURI PHASE II, BLOCK F- LIG/MIG RES/NON COMM AREA-NEW SILAMPURI PHASE II, BLOCK K-BRAHM PURI, BLOCK B-BRAHM PURI, BLOCK B2- YAMUNA VIHAR, JAFFRABAD-MAUJ PUR, BLOCK D- LIG/MIG RES/NON COMM AREA-NEW SILAMPURI PHASE II, JAFFRABAD- 803 MAUJ PUR YVR 7458 0 KVA UNPLANNED 10-05-2020 22:57:00 10-05-2020 23:39:04 0:42 0 MUs

SABOLI EXTN.-MANDOLI, BLOCK A-MANDOLI EXTN., BLOCK A- MANDOLI VILLAGE, SABOLI COLONY-MANDOLI, SABOLI VILLAGE-MANDOLI, POCKET B-GURU TEG BAHADUR ENCLAVE, NEW MANDOLI INDUSTRIAL AREA, DEEPAK MEDITECH-NEW MANDOLI INDUSTRIAL AREA, MCD SCHOOL-SABOLI COLONY, BLOCK D-MEET NAGAR, VILLAGE SABOLI-SABOLI COLONY, 804 SEWA DHAM-MANDOLI NNG 432 0 KVA UNPLANNED 29-05-2020 21:49:15 29-05-2020 22:21:05 0:31 0.00043056 MUs BLOCK J-SHIV VIHAR, SHIV VIHAR, BLOCK H-SHIV VIHAR, BLOCK 805 Q-SHIV VIHAR, BLOCK H-SHIV VIHAR KWN 2568 0 KVA UNPLANNED 21-05-2020 18:02:40 21-05-2020 18:53:58 0:51 0.0002125 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unserved (MU) due to Sr. No. Area Affected Division Affected Transformer (in KVA). Unplanned Outage From DateTime To DateTime Duration (Hrs:Mins) Outage

SABOLI EXTN.-MANDOLI, BLOCK A-MANDOLI EXTN., SABOLI VILLAGE-MANDOLI, BLOCK K-ANUP VIHAR, KABRISTAN-SABOLI COLONY, BANK OF BARODA-SABOLI COLONY, MCD SCHOOL- SABOLI COLONY, BLOCK A-EAST GOKUL PURI, BLOCK D-MEET NAGAR, BLOCK E-MEET NAGAR, SEWA DHAM-MANDOLI, 806 VILLAGE SABOLI-SABOLI COLONY, SABOLI EXTN.-MANDOLI NNG 3928 630 KVA UNPLANNED 28-05-2020 21:20:00 28-05-2020 22:13:00 0:53 0.00206111 MUs BLOCK J-JYOTI NAGAR, BLOCK D-ASHOK NAGAR, BLOCK A- NATHU PURA, BLOCK B-ASHOK NAGAR, BLOCK E-ASHOK 807 NAGAR NNG 630 990 KVA UNPLANNED 26-05-2020 01:02:43 26-05-2020 01:56:07 0:53 0.00014722 MUs 808 BLOCK A-PREET VIHAR, BLOCK D-PREET VIHAR LNR 178 990 KVA UNPLANNED 10-05-2020 01:54:19 10-05-2020 02:09:56 0:15 0.0000625 MUs CHHAJJUPUR-BABAR PUR, BALBIR NAGAR EXTN.-SILAMPUR, 809 BABARPUR EXTN.-BABAR PUR NNG 1916 900 KVA PLANNED 28-05-2020 09:00:00 28-05-2020 12:59:14 3:59 0.00132778 MUs SABOLI EXTN.-MANDOLI, HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, SABOLI COLONY-MANDOLI, BLOCK B-PRATAP NAGAR, BLOCK C-SEWA DHAM, BLOCK A- SEWA DHAM, BLOCK D-HARSH VIHAR, BLOCK B-HARSH VIHAR, 810 BLOCK A-HARSH VIHAR NNG 1432 0 KVA UNPLANNED 18-05-2020 17:05:19 18-05-2020 17:56:47 0:51 0.000425 MUs

811 NAYA BAZAR-CHANDNI CHOWK, FATEHPURI-KHARI BAOLI CCK 389 990 KVA UNPLANNED 30-05-2020 14:36:38 30-05-2020 15:04:05 0:27 0.00003 MUs 812 BLOCK C12-YAMUNA VIHAR YVR 51 990 KVA UNPLANNED 07-05-2020 15:12:32 07-05-2020 15:45:45 0:33 0.00009167 MUs BLOCK D-BHAJANPURA, BLOCK C-BHAJANPURA, BLOCK B- MANUJPUR, BLOCK E-SUBHASH MOHALLA, BLOCK D- 813 BHAJANPURA YVR 181 990 KVA UNPLANNED 27-05-2020 19:13:15 27-05-2020 19:31:33 0:18 0.00004 MUs 814 BALBIR NAGAR EXTN.-SILAMPUR NNG 173 630 KVA UNPLANNED 24-05-2020 16:58:47 24-05-2020 17:23:28 0:24 0.00013333 MUs

BLOCK C-HARSH VIHAR, BLOCK E-RAJIV NAGAR, BLOCK C-SEWA DHAM, BLOCK A-SEWA DHAM, BLOCK D-HARSH VIHAR, BLOCK 815 B-HARSH VIHAR, BLOCK A-HARSH VIHAR NNG 86 0 KVA UNPLANNED 17-05-2020 14:00:00 17-05-2020 14:30:59 0:30 0.00008333 MUs BLOCK B-KABIR NAGAR, BLOCK 1-RAM NAGAR, BLOCK A- CHANDRA LOK, BLOCK B-SAKDARPUR, BLOCK B-CHANDRA LOK, 816 BLOCK B-DURGA PURI NNG 130 630 KVA UNPLANNED 25-05-2020 02:08:20 25-05-2020 02:28:49 0:20 0.00008333 MUs

DEV PUBLIC SCHOOL-CHITRAKOOT, SABOLI EXTN.-MANDOLI, BLOCK D-HARIJAN BASTI EAST EXTN., BLOCK B-PRATAP NAGAR, BLOCK A-ANUP VIHAR, BLOCK B-UTTARANCHAL COLONY, BLOCK D-HARSH VIHAR, BLOCK B-HARSH VIHAR, BLOCK A-HARSH VIHAR, SEWA DHAM-MANDOLI, RAJEEV 817 NAGAR-SEWA DHAM NNG 86 0 KVA UNPLANNED 31-05-2020 14:38:21 31-05-2020 15:30:00 0:51 0.00014167 MUs COMMUNITY CENTRE-JAMA MASZID, EVERGREEN PUBLICATION-KALA MAHAL, MOTHER DAIRY-NETAJI SUBHASH 818 MARG DRG 579 630 KVA PLANNED 20-05-2020 10:00:00 20-05-2020 12:00:05 2:0 0.0007 MUs

BLOCK C-HARSH VIHAR, BLOCK A-BANK COLONY, SABOLI VILLAGE-MANDOLI, BLOCK B-ANUP VIHAR, BLOCK E-SEWA DHAM, BLOCK C-SEWA DHAM, BLOCK A-SEWA DHAM, LIG/MIG RES/NON COMM AREA-SEWA DHAM, BLOCK C-ANUP VIHAR, BLOCK D-HARSH VIHAR, BLOCK B-HARSH VIHAR, BLOCK A- 819 HARSH VIHAR, GOVT.CO. SEC. SCHOOL-HARSH VIHAR NNG 2671 0 KVA UNPLANNED 21-05-2020 11:54:35 21-05-2020 12:47:44 0:53 0.00014722 MUs

BLOCK CN-AMBIKA VIHAR BLOCK - B&C, BLOCK C-PATEL VIHAR, BLOCK CN-MANGALAM VIHAR, PHASE I-SHIV VIHAR, VILLAGE- KAMAL VIHAR, BLOCK C-KARAWAL NAGAR, BLOCK R-PATEL VIHAR, BLOCK B-PATEL VIHAR, BLOCK A-MANGALAM VIHAR, BLOCK C-SHIV VIHAR, BLOCK B-SHIV VIHAR, BLOCK A- KARAWAL NAGAR (DEHROTI), BLOCK A-SHIV VIHAR, BLOCK C- 820 PATEL VIHAR, BLOCK H-SHIV VIHAR KWN 30 400 KVA UNPLANNED 18-05-2020 01:23:18 18-05-2020 02:20:27 0:57 0.00039583 MUs GHAROLI VILLAGE-GHAROLI KONDLI, BLOCK A-MAYUR VIHAR PHASE III, SEC D-MAYUR VIHAR PHASE III, BLOCK A-MAYUR 821 VIHAR PHASE III VSE 2190 0 KVA UNPLANNED 27-05-2020 15:35:44 27-05-2020 16:09:53 0:34 0 MUs

SABOLI EXTN.-MANDOLI, BLOCK A-MANDOLI EXTN., BLOCK A- MANDOLI VILLAGE, SABOLI COLONY-MANDOLI, SABOLI VILLAGE-MANDOLI, BLOCK E-SEWA DHAM, BLOCK B-SEWA DHAM, DEEPAK MEDITECH-NEW MANDOLI INDUSTRIAL AREA, BLOCK K-ANUP VIHAR, BLOCK C-ANUP VIHAR, KABRISTAN- SABOLI COLONY, BANK OF BARODA-SABOLI COLONY, MCD SCHOOL-SABOLI COLONY, SEWA DHAM-MANDOLI, VILLAGE SABOLI-SABOLI COLONY, SABOLI EXTN.-MANDOLI, SEWA 822 DHAM-MANDOLI NNG 3928 630 KVA UNPLANNED 14-05-2020 23:14:23 14-05-2020 23:34:46 0:20 0.00016667 MUs SABOLI EXTN.-MANDOLI, BLOCK B-ANUP VIHAR, NEW MANDOLI INDUSTRIAL AREA, GOVT.BOYS SEC.SCHOOL-POCKET A, BLOCK K-ANUP VIHAR, BLOCK A-ANUP VIHAR, BLOCK C- ANUP VIHAR, SEWA DHAM-MANDOLI, ANUP VIHAR-MANDOLI, 823 SEWA DHAM-MANDOLI NNG 604 0 KVA UNPLANNED 04-05-2020 14:26:29 04-05-2020 15:17:44 0:51 0.00099167 MUs

DARYA GANJ, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY-KASHMERE GATE, PKT R-BLOCK D, PKT C-BLOCK B, JAFFRABAD-MAUJ PUR, BLOCK C-DURGA PURI, G.B.SSS SCHOOL- GOKUL PURI, BLOCK B-EAST GOKUL PURI, BLOCK D3-NAND NAGARI, BLOCK A-MEET NAGAR, BLOCK A-SADATPUR EXT- PUSTA AREA-L BLOCK, BLOCK A-EAST GOKUL PURI, BLOCK C- AMAR COLONY, BLOCK C-MEET NAGAR, BLOCK H-BHAGIRATHI VIHAR, BLOCK F-SHIV VIHAR, BLOCK M-SHIV VIHAR, BLOCK N- SHIV VIHAR, BLOCK E-INDIRA VIHAR, SPORTS COMPLEX- VASUNDHARA ENCLAVE VSE, BHAJANPURA-DAYALPUR, BLOCK D-MEET NAGAR, BLOCK E-MEET NAGAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON 824 COMM AREA-B-BLOCK SONIA VIHAR, BLOCK F-INDIRA VIHAR NNG 4225 2650 KVA UNPLANNED 11-05-2020 21:10:16 11-05-2020 21:52:00 0:41 0.00034167 MUs

SABOLI EXTN.-MANDOLI, BLOCK A-MANDOLI EXTN., BLOCK A- MANDOLI VILLAGE, SABOLI COLONY-MANDOLI, BLOCK B-ANUP VIHAR, BLOCK A-SEWA DHAM, KABRISTAN-SABOLI COLONY, BANK OF BARODA-SABOLI COLONY, MCD SCHOOL-SABOLI COLONY, SEWA DHAM-MANDOLI, SABOLI COLONY-MANDOLI, 825 VILLAGE SABOLI-SABOLI COLONY, SABOLI EXTN.-MANDOLI NNG 4335 0 KVA UNPLANNED 02-05-2020 09:59:14 02-05-2020 10:27:35 0:28 0.00023333 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unserved (MU) due to Sr. No. Area Affected Division Affected Transformer (in KVA). Unplanned Outage From DateTime To DateTime Duration (Hrs:Mins) Outage

BLOCK A-PREM VIHAR, PKT C-BLOCK B, PKT W-BLOCK A, BLOCK CN-AMBIKA VIHAR BLOCK - B&C, BLOCK Z-O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK A-HARIJAN BASTI, BLOCK C- KARAWAL NAGAR, SHIV VIHAR, PKT Y-SHIV VIHAR, BLOCK U- SHIV VIHAR, BLOCK R-PATEL VIHAR, BLOCK B-PATEL VIHAR, BLOCK C-SHIV VIHAR, BLOCK D-SHIV VIHAR, BLOCK R-SHIV VIHAR, BLOCK B-SHIV VIHAR, PKT X-SHIV VIHAR, PKT A-BLOCK A, PKT R-BLOCK A, PKT F-BLOCK A, PKT D-SHIV VIHAR, PKT C- SHIV VIHAR, PKT A-SHIV VIHAR, BLOCK C-KARAWAL NAGAR, BLOCK C-HARIJAN BASTI, BLOCK D-HARIJAN BASTI, BLOCK V-O & P BLOCKS SHIV VIHAR KARWAL NAGAR, PKT D-BLOCK B, BLOCK CN-AMBIKA VIHAR BLOCK - B&C, BLOCK CN-AMBIKA 826 VIHAR BLOCK - B&C, PKT W-BLOCK A, BLOCK Q-SHIV VIHAR KWN 9090 0 KVA UNPLANNED 28-05-2020 22:33:29 28-05-2020 23:18:51 0:45 0.000375 MUs

BLOCK A-SHASTRI PARK, SUBHASH PARK-GORAKH PARK, BLOCK Z-WELCOME COLONY, BLOCK B-SUBHASH MOHALLA, BLOCK E-SUBHASH MOHALLA, BLOCK B4-YAMUNA VIHAR, 827 BLOCK C-BHAJANPURA, JAFFRABAD-MAUJ PUR YVR 478 630 KVA UNPLANNED 31-05-2020 12:05:11 31-05-2020 13:00:16 0:55 0.00012222 MUs

BLOCK A-TUKMIRPUR, MUSTAFABAD-MUNGA NAGAR, BLOCK B- MUSTAFABAD (DAYALPUR), PKT B-BLOCK B, LIG/MIG RES/NON COMM AREA-DAYALPUR EXTN., BLOCK B-NEW CHAUHAN PUR, BLOCK Z-O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK C- PATEL VIHAR, PHASE I-SHIV VIHAR, SHIV VIHAR, SHIV VIHAR, PKT Y-SHIV VIHAR, BLOCK H-SHIV VIHAR, BLOCK K-SHIV VIHAR, BLOCK S-SHIV VIHAR, BLOCK M-SHIV VIHAR, BLOCK N-SHIV VIHAR, BLOCK B-PATEL VIHAR, BLOCK B-BHAGAT SINGH COLONY, BLOCK H-BHAGAT SINGH COLONY, PKT X-SHIV VIHAR, PKT C-SHIV VIHAR, BLOCK B-HARIJAN BASTI, PKT B-BLOCK A, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-B-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-C-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-C-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-C-BLOCK SONIA VIHAR, BLOCK D-WEST KARAWAL NAGAR, BLOCK B-NEW CHAUHAN PUR, 828 BLOCK J-SHIV VIHAR KWN 1484 0 KVA UNPLANNED 14-05-2020 22:45:59 14-05-2020 23:37:27 0:51 0.0002125 MUs

DARYA GANJ, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY-KASHMERE GATE, PKT R-BLOCK D, PKT C-BLOCK B, JAFFRABAD-MAUJ PUR, G.B.SSS SCHOOL-GOKUL PURI, BLOCK B- EAST GOKUL PURI, BLOCK A-MEET NAGAR, BLOCK E- UTTARANCHAL COLONY, BLOCK A-SADATPUR EXT-PUSTA AREA- L BLOCK, BLOCK A-UTTARANCHAL COLONY, BLOCK A-EAST GOKUL PURI, BLOCK C-AMAR COLONY, BLOCK C-MEET NAGAR, BLOCK H-BHAGIRATHI VIHAR, BLOCK F-SHIV VIHAR, BLOCK M- SHIV VIHAR, BLOCK N-SHIV VIHAR, BLOCK E-INDIRA VIHAR, SPORTS COMPLEX-VASUNDHARA ENCLAVE VSE, BHAJANPURA- DAYALPUR, BLOCK D-MEET NAGAR, BLOCK E-MEET NAGAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-B-BLOCK SONIA VIHAR, BLOCK 829 F-INDIRA VIHAR NNG 4225 2650 KVA UNPLANNED 09-05-2020 17:10:00 09-05-2020 17:59:28 0:49 0.00068056 MUs 830 SEWA DHAM-MANDOLI, SEWA DHAM-MANDOLI NNG 43 0 KVA UNPLANNED 17-05-2020 09:40:00 17-05-2020 10:06:19 0:26 0.00003611 MUs

BLOCK F-NORTH CHHAJUPUR, BLOCK E-NORTH CHHAJUPUR, PKT C-BLOCK B, BLOCK D-JYOTI NAGAR, BLOCK A-HARIJAN 831 BASTI, BLOCK C-NORTH CHHAJUPUR, PKT H-BLOCK D NNG 529 990 KVA UNPLANNED 28-05-2020 15:52:51 28-05-2020 16:41:35 0:48 0.0002 MUs NEW USMANPUR-NEW KATWARA, MCD COLONY-NEW KATWARA, JAG JEEVAN NAGAR-NEW KATWARA-SHASTRI PARK, ANSARI ROAD-USMAN PUR, JAG JEEVAN NAGAR-NEW 832 KATWARA GHONDA YVR 160 990 KVA UNPLANNED 08-05-2020 04:16:48 08-05-2020 05:06:00 0:49 0.00016333 MUs 833 BLOCK V-O & P BLOCKS SHIV VIHAR KARWAL NAGAR KWN 130 100 KVA UNPLANNED 22-05-2020 17:06:05 22-05-2020 17:59:55 0:53 0.00022083 MUs BLOCK B-SUBHASH MOHALLA, SUBHASH VIHAR-YAMUNA VIHAR, BLOCK B5-YAMUNA PUR (GONDA) BLOCK B, 834 MUNICIPAL CORPN SCHOOL-SUBHASH VIHAR YVR 662 630 KVA UNPLANNED 19-05-2020 13:30:40 19-05-2020 14:07:08 0:36 0.0002 MUs BLOCK A-MEET NAGAR, BLOCK B-UTTARANCHAL COLONY, BLOCK A-EAST GOKUL PURI, BLOCK C-MEET NAGAR, BLOCK E- 835 MEET NAGAR NNG 0 1620 KVA UNPLANNED 27-05-2020 12:30:00 27-05-2020 13:04:00 0:33 0 MUs

BLOCK 2B-DEV NAGAR, BLOCK 3-DEV NAGAR, BLOCK 7B-DEV NAGAR, BLOCK_5B-DEV NAGAR, BLOCK_8B-DEV NAGAR, BLOCK_9B-DEV NAGAR, DARYA GANJ, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY-KASHMERE GATE, PKT R-BLOCK D, PKT C-BLOCK B, JAFFRABAD-MAUJ PUR, BLOCK A-SADATPUR EXT-PUSTA AREA-L BLOCK, BLOCK H-BHAGIRATHI VIHAR, BLOCK F-SHIV VIHAR, BLOCK M-SHIV VIHAR, BLOCK N-SHIV VIHAR, BLOCK E-INDIRA VIHAR, REHGAR PURA-DEV NAGAR, SPORTS COMPLEX-VASUNDHARA ENCLAVE VSE, BHAJANPURA- DAYALPUR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-B-BLOCK SONIA 836 VIHAR, BLOCK F-INDIRA VIHAR PNR 1794 630 KVA PLANNED 20-05-2020 09:00:00 20-05-2020 13:33:13 4:33 0.0015925 MUs BLOCK H-OLD MUSTAFABAD, BLOCK T-OLD MUSTAFABAD, BLOCK D-OLD MUSTAFABAD, BLOCK B-OLD MUSTAFABAD, 837 BLOCK T-NEHRU VIHAR KWN 1597 1500 KVA UNPLANNED 09-05-2020 16:05:54 09-05-2020 17:04:00 0:58 0.00056389 MUs

SABOLI EXTN.-MANDOLI, HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK A-BANK COLONY, SABOLI VILLAGE-MANDOLI, BLOCK B-ANUP VIHAR, POCKET A-JJ COLONY, BLOCK C-SEWA DHAM, BLOCK A-SEWA DHAM, LIG/MIG RES/NON COMM AREA-SEWA DHAM, BLOCK K-ANUP VIHAR, BLOCK C-ANUP VIHAR, BLOCK D-HARSH VIHAR, BLOCK B-HARSH VIHAR, BLOCK A-HARSH VIHAR, GOVT.CO. SEC. 838 SCHOOL-HARSH VIHAR NNG 2671 0 KVA UNPLANNED 21-05-2020 22:05:09 21-05-2020 22:25:37 0:20 0.00016667 MUs

BLOCK 3B-SADAT PUR, LIG/MIG RES/NON COMM AREA- DAYALPUR EXTN., BLOCK B-NEW CHAUHAN PUR, BHAGAT NAGAR-DAYALPUR, BLOCK B-SADATPUR EXT-PUSTA AREA-M BLOCK, BLOCK 1D-SADAT PUR, BLOCK F-SADAT PUR, BLOCK 1B- SADAT PUR, BLOCK 2C-SADAT PUR, BLOCK 5B-SADAT PUR, BLOCK A-MUSTAFABAD (DAYALPUR), BLOCK R-PATEL VIHAR, PKT A-BLOCK A, PKT 1-BLOCK A, DEEKSHA MAHILA COLLAGE- DAYALPUR EXTN., BLOCK C2-NEW CHAUHAN PUR, BLOCK B- NEW CHAUHAN PUR, BLOCK B-DAYALPUR, BLOCK E- DAYALPUR, BLOCK A-NEHRU VIHAR, LIG/MIG RES/NON COMM 839 AREA-DAYALPUR EXTN. KWN 1031 990 KVA UNPLANNED 08-05-2020 16:25:03 08-05-2020 16:51:06 0:26 0.00010833 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unserved (MU) due to Sr. No. Area Affected Division Affected Transformer (in KVA). Unplanned Outage From DateTime To DateTime Duration (Hrs:Mins) Outage

SABOLI EXTN.-MANDOLI, HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK A-BANK COLONY, SABOLI VILLAGE-MANDOLI, BLOCK B-ANUP VIHAR, BLOCK C- SEWA DHAM, BLOCK A-SEWA DHAM, LIG/MIG RES/NON COMM AREA-SEWA DHAM, BLOCK C-ANUP VIHAR, BLOCK D- HARSH VIHAR, BLOCK B-HARSH VIHAR, BLOCK A-HARSH VIHAR, 840 GOVT.CO. SEC. SCHOOL-HARSH VIHAR NNG 2671 0 KVA UNPLANNED 31-05-2020 03:19:19 31-05-2020 04:16:31 0:57 0.00079167 MUs 841 BLOCK T-GAUTAM PURI YVR 69 990 KVA UNPLANNED 09-05-2020 14:54:33 09-05-2020 15:26:36 0:32 0.00007111 MUs

PRATAP NAGAR-PHASE I, SABOLI EXTN.-MANDOLI, SABOLI VILLAGE-MANDOLI, BLOCK D-HARIJAN BASTI EAST EXTN., BLOCK B-ANUP VIHAR, NEW MANDOLI INDUSTRIAL AREA, BLOCK B-SEWA DHAM, BLOCK A-SEWA DHAM, BLOCK A-ANUP VIHAR, BLOCK C-ANUP VIHAR, BLOCK B-SEWA DHAM, SEWA 842 DHAM-MANDOLI, SEWA DHAM-MANDOLI NNG 432 0 KVA UNPLANNED 03-05-2020 08:35:33 03-05-2020 09:27:31 0:51 0.00070833 MUs

SUBHASH PARK EXTN.-GORAKH PARK, GORAKH PARK EAST- SILAMPUR, GORAKH PARK WEST-SILAMPUR, NEW JAFFRABAD- GORAKH PARK, BLOCK B-GORAKH PARK, OLDANPUR-NAVIN SHAHDARA, PANCHSHEEL PARK-NAVIN SHAHDARA, DWARKAPURI-NAVIN SHAHDARA, DELHI TRANSPORT- WELCOME COLONY, INDIAN GAS-SHAHDARA DGN, ROHITASH NAGAR-SILAMPUR, BLOCK D-PRATAP PURA, BLOCK A-PRATAP 843 PURA, BLOCK V-PRATAP PURA DGN 3046 990 KVA UNPLANNED 15-05-2020 09:00:00 15-05-2020 09:43:02 0:43 0.00029861 MUs BLOCK A-MANDOLI VILLAGE, BLOCK A-SEWA DHAM, BLOCK H- SEWA DHAM, BUDH VIHAR-SEWA DHAM, BLOCK B-SEWA 844 DHAM NNG 489 0 KVA UNPLANNED 10-05-2020 10:30:46 10-05-2020 11:20:55 0:50 0.00069444 MUs 845 GHONDA PATTI CHAUHAN YVR 715 1500 KVA UNPLANNED 20-05-2020 12:43:05 20-05-2020 13:40:00 0:56 0.00046667 MUs BLOCK E-SUBHASH MOHALLA, BLOCK D-BHAJANPURA, BLOCK C- BHAJANPURA, BLOCK E-SUBHASH MOHALLA, BLOCK D- 846 BHAJANPURA YVR 181 990 KVA UNPLANNED 29-05-2020 12:13:03 29-05-2020 12:53:51 0:40 0.00008889 MUs 847 LIG/MIG RES/NON COMM AREA-SABHEPUR KWN 130 425 KVA UNPLANNED 14-05-2020 22:50:42 15-05-2020 01:25:00 2:34 0.00064167 MUs INSTITUTIONAL AREA BLOCK B-ALL INDIA DEAF & DUMB 848 SOCIETY, HOSPITAL AREA-INSTITUTIONAL AREA JLM 78 0 KVA UNPLANNED 22-05-2020 12:09:00 22-05-2020 12:52:00 0:42 0.000105 MUs

SABOLI EXTN.-MANDOLI, BLOCK A-MANDOLI EXTN., BLOCK A- MANDOLI VILLAGE, SABOLI COLONY-MANDOLI, BLOCK B-ANUP VIHAR, BLOCK B-PRATAP NAGAR, BLOCK A-SEWA DHAM, KABRISTAN-SABOLI COLONY, BANK OF BARODA-SABOLI COLONY, MCD SCHOOL-SABOLI COLONY, SEWA DHAM- MANDOLI, SABOLI COLONY-MANDOLI, VILLAGE SABOLI-SABOLI 849 COLONY, SABOLI EXTN.-MANDOLI, SEWA DHAM-MANDOLI NNG 4342 0 KVA UNPLANNED 31-05-2020 05:12:45 31-05-2020 06:06:52 0:54 0.00075 MUs

SABOLI COLONY-MANDOLI, BLOCK B-ANUP VIHAR, BLOCK D- 850 ANUP VIHAR, BLOCK K-ANUP VIHAR, BLOCK C-ANUP VIHAR NNG 86 0 KVA UNPLANNED 21-05-2020 12:50:51 21-05-2020 13:45:00 0:54 0.00015 MUs BLOCK C-KABIR NAGAR, BLOCK A-KABIR NAGAR, BLOCK B- 851 KABIR NAGAR NNG 6 990 KVA UNPLANNED 05-05-2020 10:46:46 05-05-2020 11:44:00 0:57 0.00015833 MUs PKT A-BLOCK E, BLOCK F-SADAT PUR, PKT A1-BLOCK E, PKT A4- 852 BLOCK E, BLOCK D-WEST KARAWAL NAGAR KWN 216 0 KVA UNPLANNED 15-05-2020 21:15:28 15-05-2020 21:50:12 0:34 0.00023611 MUs

HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK A-BANK COLONY, SABOLI VILLAGE-MANDOLI, BLOCK B-ANUP VIHAR, BLOCK E-SEWA DHAM, BLOCK C-SEWA DHAM, BLOCK A-SEWA DHAM, LIG/MIG RES/NON COMM AREA- SEWA DHAM, BLOCK C-ANUP VIHAR, BLOCK D-HARSH VIHAR, BLOCK B-HARSH VIHAR, BLOCK A-HARSH VIHAR, GOVT.CO. 853 SEC. SCHOOL-HARSH VIHAR NNG 2671 0 KVA UNPLANNED 21-05-2020 13:17:24 21-05-2020 13:59:12 0:41 0.00056944 MUs PKT B-BLOCK B, BLOCK H-SHIV VIHAR, BLOCK K-SHIV VIHAR, BLOCK S-SHIV VIHAR, BLOCK M-SHIV VIHAR, BLOCK D-SHIV 854 VIHAR, BLOCK J-SHIV VIHAR KWN 1484 0 KVA UNPLANNED 19-05-2020 20:02:43 19-05-2020 21:00:16 0:57 0.0002375 MUs BLOCK B-ANUP VIHAR, NEW MANDOLI INDUSTRIAL AREA, BLOCK B-PRATAP NAGAR, BLOCK D-ANUP VIHAR, BLOCK K- ANUP VIHAR, BLOCK A-ANUP VIHAR, BLOCK C-ANUP VIHAR, SEWA DHAM-MANDOLI, ANUP VIHAR-MANDOLI, SEWA DHAM- 855 MANDOLI NNG 432 0 KVA UNPLANNED 21-05-2020 21:32:00 21-05-2020 22:24:44 0:52 0.00072222 MUs BLOCK B-SUBHASH MOHALLA, VIJAY PARK-YAMUNA VIHAR, SUBHASH VIHAR-YAMUNA VIHAR, MAUJ PUR COMPLEX 1, NORTH GHONDA, BSES 66 KV GRID S/STATION-COMMUNITY 856 CENTRE YAMUNA VIHAR YVR 1587 630 KVA UNPLANNED 04-05-2020 16:29:25 04-05-2020 17:06:28 0:37 0.00020556 MUs BLOCK D-ASHOK NAGAR, BLOCK C-HARSH VIHAR, BLOCK A- 857 NATHU PURA, BLOCK B-ASHOK NAGAR NNG 589 630 KVA UNPLANNED 23-05-2020 10:40:00 23-05-2020 11:35:00 0:54 0.00015 MUs

SABOLI EXTN.-MANDOLI, BLOCK A-MANDOLI EXTN., BLOCK A- MANDOLI VILLAGE, SABOLI COLONY-MANDOLI, SABOLI VILLAGE-MANDOLI, BLOCK B-ANUP VIHAR, POCKET A-JJ COLONY, BLOCK A-SEWA DHAM, DEEPAK MEDITECH-NEW MANDOLI INDUSTRIAL AREA, BLOCK D-ANUP VIHAR, BLOCK A- ANUP VIHAR, KABRISTAN-SABOLI COLONY, BANK OF BARODA- SABOLI COLONY, MCD SCHOOL-SABOLI COLONY, BLOCK D- HARSH VIHAR, BLOCK A-HARSH VIHAR, BLOCK A-SEWA DHAM, SEWA DHAM-MANDOLI, SABOLI COLONY-MANDOLI, VILLAGE 858 SABOLI-SABOLI COLONY, SABOLI EXTN.-MANDOLI NNG 4342 0 KVA UNPLANNED 10-05-2020 19:19:59 10-05-2020 19:57:38 0:37 0.00030833 MUs

BLOCK A-BABU NAGAR, MUSTAFABAD-MUNGA NAGAR, BLOCK 859 B-MAN SINGH NAGAR, BHAJANPURA-DAYALPUR KWN 1408 0 KVA UNPLANNED 12-05-2020 20:37:06 12-05-2020 21:16:11 0:39 0.0001625 MUs

SABOLI EXTN.-MANDOLI, BLOCK A-MANDOLI EXTN., BLOCK A- MANDOLI VILLAGE, SABOLI COLONY-MANDOLI, BLOCK B-ANUP VIHAR, BLOCK A-SEWA DHAM, KABRISTAN-SABOLI COLONY, BANK OF BARODA-SABOLI COLONY, MCD SCHOOL-SABOLI COLONY, BLOCK E-MEET NAGAR, SEWA DHAM-MANDOLI, SABOLI COLONY-MANDOLI, VILLAGE SABOLI-SABOLI COLONY, 860 SABOLI EXTN.-MANDOLI NNG 4342 0 KVA UNPLANNED 28-05-2020 21:20:00 28-05-2020 22:13:00 0:53 0.00098639 MUs

BLOCK B-ANUP VIHAR, NEW MANDOLI INDUSTRIAL AREA, BLOCK K-ANUP VIHAR, BLOCK A-ANUP VIHAR, SEWA DHAM- 861 MANDOLI, ANUP VIHAR-MANDOLI, SEWA DHAM-MANDOLI NNG 604 0 KVA UNPLANNED 21-05-2020 07:15:00 21-05-2020 07:58:58 0:43 0.00083611 MUs OLDANPUR-NAVIN SHAHDARA, PANCHSHEEL PARK-NAVIN SHAHDARA, BLOCK S-PRATAP PURA, BLOCK T-PRATAP PURA, 862 GOPAL K.OIL DEPO.-PRATAP PURA DGN 615 630 KVA UNPLANNED 21-05-2020 11:15:14 21-05-2020 11:27:40 0:12 0.00003333 MUs BLOCK_B-VIVEK VIHAR PHASE II, NEW VISWAS NAGAR- SHAHDARA, JAWALA NAGAR-SHAHDARA, DDA MIG FLATS- 863 VIVEK VIHAR PHASE II JLM 502 630 KVA UNPLANNED 26-05-2020 17:07:55 26-05-2020 17:23:14 0:15 0.00004167 MUs OLD SEELAMPUR, BLOCK 10-GANDHI NAGAR, BLOCK D-AJIT 864 NAGAR KRN 27 990 KVA UNPLANNED 15-05-2020 23:55:17 16-05-2020 00:09:28 0:14 0.00001167 MUs 865 BLOCK A-PREET VIHAR, BLOCK D-PREET VIHAR LNR 517 990 KVA UNPLANNED 13-05-2020 13:41:25 13-05-2020 14:19:55 0:38 0 MUs

SANSAR COMPOUND-DILSHAD GARDEN, DAMODER PARK- 866 DILSHAD GARDEN, JHILMIL INDUSTRIAL AREA-JHILMIL COLONY DGN 420 1990 KVA UNPLANNED 09-05-2020 14:27:41 09-05-2020 15:12:49 0:45 0.0000625 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unserved (MU) due to Sr. No. Area Affected Division Affected Transformer (in KVA). Unplanned Outage From DateTime To DateTime Duration (Hrs:Mins) Outage HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK D-HARSH VIHAR, BLOCK B-HARSH VIHAR, BLOCK 867 A-HARSH VIHAR NNG 1432 0 KVA UNPLANNED 07-05-2020 00:20:00 07-05-2020 00:40:00 0:20 0.00041667 MUs BLOCK H-SHIV VIHAR, BLOCK K-SHIV VIHAR, BLOCK S-SHIV VIHAR, BLOCK M-SHIV VIHAR, PKT A-BLOCK B, BLOCK J-SHIV 868 VIHAR KWN 1479 0 KVA UNPLANNED 04-05-2020 18:00:43 04-05-2020 18:42:04 0:41 0.00011389 MUs 869 BLOCK G-DILSHAD COLONY, BLOCK F-DILSHAD COLONY DGN 192 990 KVA UNPLANNED 31-05-2020 05:59:18 31-05-2020 07:15:00 1:15 0.000375 MUs 870 D.S.I.D.C. COMPLEX-DTC DEPOT, BLOCK E3-KANSHIPUR NNG 203 630 KVA UNPLANNED 10-05-2020 16:28:01 10-05-2020 17:17:40 0:49 0.00020417 MUs

BLOCK 26B-AJMAL KHAN PARK, DARYA GANJ, GEETA COLONY, THAN SINGH NAGAR-ANAND PARBAT, GGS INDRAPRASTHA UNIVERSITY-KASHMERE GATE, PKT R-BLOCK D, PKT C-BLOCK B, JAFFRABAD-MAUJ PUR, BLOCK A-SADATPUR EXT-PUSTA AREA- L BLOCK, BLOCK H-BHAGIRATHI VIHAR, BLOCK F-SHIV VIHAR, BLOCK M-SHIV VIHAR, BLOCK N-SHIV VIHAR, BLOCK E-INDIRA VIHAR, SPORTS COMPLEX-VASUNDHARA ENCLAVE VSE, BHAJANPURA-DAYALPUR, LIG/MIG RES/NON COMM AREA-A- BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-B-BLOCK SONIA 871 VIHAR, BLOCK F-INDIRA VIHAR PNR 1156 990 KVA UNPLANNED 13-05-2020 10:49:42 13-05-2020 11:35:00 0:45 0 MUs 872 SHAHDARA JLM JLM 0 1260 KVA UNPLANNED 16-05-2020 11:26:00 16-05-2020 11:50:00 0:24 0.00001333 MUs

BLOCK D-GOKUL PURI, BLOCK J-SHIV VIHAR, PKT B-BLOCK B, BLOCK A-RAMA GARDEN, PKT W-BLOCK A, BLOCK CN-AMBIKA VIHAR BLOCK - B&C, BLOCK C-KARAWAL NAGAR, SHIV VIHAR, PKT Y-SHIV VIHAR, BLOCK Q-SHIV VIHAR, BLOCK H-SHIV VIHAR, BLOCK F-SHIV VIHAR, BLOCK L-SHIV VIHAR, BLOCK S-SHIV VIHAR, BLOCK O-SHIV VIHAR, BLOCK M-SHIV VIHAR, BLOCK N- SHIV VIHAR, BLOCK P-SHIV VIHAR, BLOCK B-SHIV VIHAR, PKT X- SHIV VIHAR, PKT C-SHIV VIHAR, BLOCK D-HARIJAN BASTI, BLOCK D-PREM VIHAR, BLOCK CN-AMBIKA VIHAR BLOCK - B&C, BLOCK B-NEW CHAUHAN PUR, BLOCK CN-AMBIKA VIHAR 873 BLOCK - B&C, BLOCK H-SHIV VIHAR KWN 276 0 KVA UNPLANNED 31-05-2020 19:28:07 31-05-2020 20:02:09 0:34 0.00014167 MUs 874 VIJAY PARK-YAMUNA VIHAR, MAUJ PUR COMPLEX 1 YVR 389 990 KVA UNPLANNED 13-05-2020 11:37:13 13-05-2020 12:31:35 0:54 0.00045 MUs BLOCK B-EAST GOKUL PURI, BLOCK A-AMAR COLONY, BLOCK A- MEET NAGAR, BLOCK A-EAST GOKUL PURI, BLOCK C-AMAR COLONY, BLOCK C-MEET NAGAR, BLOCK D-MEET NAGAR, 875 BLOCK E-MEET NAGAR NNG 4649 1620 KVA UNPLANNED 14-05-2020 17:04:36 14-05-2020 17:47:51 0:43 0.00059722 MUs

JHILMIL COLONY BLOCK A, JHILMIL COLONY BLOCK B, BLOCK D- 876 JHILMIL COLONY BLOCK D, BLOCK C-JHILMIL COLONY BLOCK C JLM 68 990 KVA UNPLANNED 03-05-2020 20:56:27 03-05-2020 21:53:21 0:56 0.00046667 MUs

SABOLI EXTN.-MANDOLI, BLOCK A-MANDOLI EXTN., BLOCK A- MANDOLI VILLAGE, SABOLI COLONY-MANDOLI, SABOLI VILLAGE-MANDOLI, BLOCK B-ANUP VIHAR, BLOCK E-SEWA DHAM, BLOCK A-SEWA DHAM, KABRISTAN-SABOLI COLONY, BANK OF BARODA-SABOLI COLONY, MCD SCHOOL-SABOLI COLONY, BLOCK B-RAJIV NAGAR, J.R. COMPLEX-SEWA DHAM, SEWA DHAM-MANDOLI, SABOLI COLONY-MANDOLI, VILLAGE 877 SABOLI-SABOLI COLONY, SABOLI EXTN.-MANDOLI NNG 4342 0 KVA UNPLANNED 29-05-2020 19:35:00 29-05-2020 20:17:37 0:42 0.00035 MUs LIG/MIG RES/NON COMM AREA-CHAWLA FARM, LIG/MIG RES/NON COMM AREA-SABHEPUR, LIG/MIG RES/NON COMM AREA-D-BLOCK-SONIA VIHAR, LIG/MIG RES/NON COMM AREA- 878 SONIA VIHAR KWN 173 0 KVA UNPLANNED 10-05-2020 14:47:19 10-05-2020 15:07:26 0:20 0.00011111 MUs BLOCK A-DILSHAD COLONY, TELIBARA-SHAHDARA, NEAR 879 SHADARA RAILWAY GODOWN-SHAHDARA DGN JLM 43 400 KVA UNPLANNED 05-05-2020 23:38:53 06-05-2020 00:34:07 0:55 0.00007639 MUs BLOCK A-DILSHAD COLONY, JHILMIL INDUSTRIAL AREA-JHILMIL 880 COLONY DGN 15 990 KVA UNPLANNED 28-05-2020 18:45:00 28-05-2020 19:35:00 0:49 0.00027222 MUs BLOCK A-PREM VIHAR, BLOCK R-PATEL VIHAR, BLOCK C-SHIV VIHAR, BLOCK D-SHIV VIHAR, BLOCK R-SHIV VIHAR, PKT A-SHIV 881 VIHAR KWN 371 0 KVA UNPLANNED 17-05-2020 11:02:18 17-05-2020 12:57:34 1:55 0.00047917 MUs 882 VISHWAS NAGAR EXTN.-SHAHDARA JLM 43 990 KVA UNPLANNED 27-05-2020 00:40:07 27-05-2020 02:51:57 2:11 0.00018194 MUs BLOCK O-SUNDER NAGRI, BLOCK B-EAST GOKUL PURI, BLOCK A- MEET NAGAR, BLOCK A-EAST GOKUL PURI, BLOCK C-AMAR COLONY, BLOCK C-MEET NAGAR, BLOCK D-MEET NAGAR, 883 BLOCK E-MEET NAGAR NNG 83 990 KVA PLANNED 29-05-2020 11:00:00 29-05-2020 17:30:00 6:30 0.0065 MUs

KUCHA PATI RAM-CHANDNI CHOWK, CHAWRI BAZAR- CHANDNI CHOWK, HAUZ QAZI-CHANDNI CHOWK, SITARAM BAZAR-CHANDNI CHOWK, DAV PUBLIC SCHOOL-KALA MASZID, 884 CHAWRI BAZAR-KHUSH DIL, CHRISTAN COLONY-KHABAS PURA DRG 18 990 KVA UNPLANNED 26-05-2020 23:40:00 27-05-2020 00:12:01 0:32 0.00007111 MUs 885 BLOCK A-EAST GOKUL PURI NNG 302 630 KVA UNPLANNED 12-05-2020 12:06:43 12-05-2020 12:55:36 0:48 0.00026667 MUs

BLOCK J-SHIV VIHAR, BLOCK Z-O & P BLOCKS SHIV VIHAR KARWAL NAGAR, SHIV VIHAR, BLOCK U-SHIV VIHAR, BLOCK Q- SHIV VIHAR, BLOCK H-SHIV VIHAR, BLOCK D-SHIV VIHAR, BLOCK T-SHIV VIHAR, BLOCK K-SHIV VIHAR, BLOCK F-SHIV VIHAR, BLOCK L-SHIV VIHAR, BLOCK O-SHIV VIHAR, BLOCK M- SHIV VIHAR, BLOCK N-SHIV VIHAR, PKT A-BLOCK A, PKT R- BLOCK A, BLOCK V-O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK CN-AMBIKA VIHAR BLOCK - B&C, BLOCK Q-SHIV VIHAR, 886 BLOCK H-SHIV VIHAR KWN 6566 0 KVA UNPLANNED 14-05-2020 19:05:00 14-05-2020 20:03:30 0:58 0.00064444 MUs CHHAJJUPUR-BABAR PUR, BABARPUR EXTN.-BABAR PUR, 887 BALBIR NAGAR EXTN.-SILAMPUR NNG 130 990 KVA UNPLANNED 24-05-2020 11:03:42 24-05-2020 11:17:20 0:13 0.00005417 MUs

SUBHASH PARK-GORAKH PARK, BLOCK E-NEW SILAMPURI PHASE II, BLOCK F- LIG/MIG RES/NON COMM AREA-NEW SILAMPURI PHASE II, KAILASH NAGAR YVR, BLOCK D- LIG/MIG 888 RES/NON COMM AREA-NEW SILAMPURI PHASE II YVR 69 0 KVA UNPLANNED 15-05-2020 11:21:24 15-05-2020 12:06:39 0:45 0.0001 MUs 889 BLOCK_1A-REHAGAR PURA SRD 194 990 KVA UNPLANNED 09-05-2020 11:03:49 09-05-2020 11:26:32 0:22 0.00009167 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unserved (MU) due to Sr. No. Area Affected Division Affected Transformer (in KVA). Unplanned Outage From DateTime To DateTime Duration (Hrs:Mins) Outage

BLOCK 3A-SADAT PUR, BLOCK B-HARIJAN BASTI, BLOCK D- PREM VIHAR, BLOCK N-SHIV VIHAR, BLOCK A-PREM VIHAR, BLOCK E-PRAKASH VIHAR, BLOCK B-SHIV VIHAR, BLOCK Z-O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK I-BHAGAT SINGH COLONY, LIG/MIG RES/NON COMM AREA-DAYALPUR EXTN., BLOCK C-KARAWAL NAGAR, BLOCK D-PRAKASH VIHAR, BLOCK C-PRAKASH VIHAR, BLOCK B-PATEL VIHAR, BLOCK S- SHIV VIHAR, BLOCK R-PATEL VIHAR, BLOCK C-SHIV VIHAR, BLOCK M-SHIV VIHAR, BLOCK B-NEW CHAUHAN PUR, BLOCK O- SHIV VIHAR, BLOCK A-SHIV VIHAR, PKT Y-SHIV VIHAR, VILLAGE- KAMAL VIHAR, BLOCK J-SHIV VIHAR, BLOCK B-BHAGAT SINGH COLONY, BLOCK U-SHIV VIHAR, PKT D-SHIV VIHAR, BLOCK CN- MANGALAM VIHAR, BLOCK H-BHAGAT SINGH COLONY, BLOCK D-WEST KARAWAL NAGAR, BLOCK B-PRAKASH VIHAR, BLOCK D- DLF ANKUR VIHAR, LIG/MIG RES/NON COMM AREA-DAYALPUR EXTN., BLOCK A-MANGALAM VIHAR, BLOCK C-PATEL VIHAR, 890 SHIV VIHAR, BLOCK C-PATEL VIHAR KWN 427 400 KVA UNPLANNED 14-05-2020 21:06:38 14-05-2020 21:50:24 0:43 0.00017917 MUs BALBIR NAGAR EXTN.-SILAMPUR, JYOTI COLONY-BALBIR 891 NAGAR, BALBIR NAGAR EXTN.-SILAMPUR NNG 766 990 KVA UNPLANNED 20-05-2020 13:18:31 20-05-2020 13:35:54 0:17 0.00014167 MUs BSES 66 KV GRID S/STATION-COMMUNITY CENTRE YAMUNA 892 VIHAR YVR 69 630 KVA UNPLANNED 29-05-2020 17:36:10 29-05-2020 17:58:41 0:22 0.00004889 MUs

LIG/MIG RES/NON COMM AREA-CHAWLA FARM, LIG/MIG RES/NON COMM AREA-SABHEPUR, CHAUHAN PATTI-VIJAY VIHAR, LIG/MIG RES/NON COMM AREA-C-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-C-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-SONIA VIHAR, LIG/MIG RES/NON COMM AREA-D-BLOCK-SONIA VIHAR, LIG/MIG RES/NON COMM AREA-E-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-SONIA VIHAR, LIG/MIG RES/NON COMM AREA-G- BLOCK SONIA VIHAR EXTENSION, LIG/MIG 893 RES/NON COMM AREA-G-BLOCK SONIA VIHAR KWN 130 0 KVA UNPLANNED 02-05-2020 11:00:35 02-05-2020 11:29:04 0:28 0.00011667 MUs

D.S.I.D.C. COMPLEX-DTC DEPOT, BLOCK A- BHARTIYA BODH SABHA-HARDEV PURI, BLOCK B-NATHU PURA, BLOCK A-NATHU COLONY, BLOCK A-MANDOLI VILLAGE, NEW MANDOLI INDUSTRIAL AREA, BLOCK B-SEWA DHAM, BLOCK A-SEWA DHAM, BLOCK C-SEWA DHAM, BLOCK H-SEWA DHAM, BLOCK C- SEWA DHAM, BLOCK A-SEWA DHAM, BLOCK D-HARSH VIHAR, BLOCK A-HARSH VIHAR, BLOCK A-RAJIV NAGAR, BLOCK B-RAJIV 894 NAGAR, BLOCK A-SEWA DHAM, RAJEEV NAGAR-SEWA DHAM NNG 1278 0 KVA UNPLANNED 23-05-2020 15:24:49 23-05-2020 16:20:00 0:55 0.00015278 MUs BHARAT MATA MANDIR-JJ COLONY, HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK E-RAJIV NAGAR, SABOLI COLONY-MANDOLI, POCKET A-JJ COLONY, NEW MANDOLI INDUSTRIAL AREA, BLOCK B-SEWA DHAM, DEEPAK MEDITECH-NEW MANDOLI INDUSTRIAL AREA, BLOCK A-SEWA DHAM, BLOCK D-HARSH VIHAR, BLOCK A-RAJIV 895 NAGAR NNG 432 400 KVA UNPLANNED 11-05-2020 14:42:17 11-05-2020 15:16:47 0:34 0.00047222 MUs BLOCK C-DURGA PURI, BLOCK B-EAST GOKUL PURI, BLOCK A- MEET NAGAR, BLOCK E-UTTARANCHAL COLONY, BLOCK A- UTTARANCHAL COLONY, BLOCK B-UTTARANCHAL COLONY, BLOCK A-EAST GOKUL PURI, BLOCK D-MEET NAGAR, BLOCK E- 896 MEET NAGAR NNG 218 630 KVA UNPLANNED 20-05-2020 14:31:42 20-05-2020 15:23:59 0:52 0.00036111 MUs

BLOCK B-SUBHASH MOHALLA, VIJAY PARK-YAMUNA VIHAR, MAUJ PUR COMPLEX 1, NORTH GHONDA, BSES 66 KV GRID 897 S/STATION-COMMUNITY CENTRE YAMUNA VIHAR YVR 219 630 KVA UNPLANNED 28-05-2020 15:43:38 28-05-2020 16:12:54 0:29 0.00016111 MUs

SABOLI EXTN.-MANDOLI, BLOCK A-MANDOLI EXTN., BLOCK A- BANK COLONY, SABOLI COLONY-MANDOLI, SABOLI VILLAGE- MANDOLI, BLOCK E-SEWA DHAM, BLOCK B-SEWA DHAM, BLOCK A-SEWA DHAM, BLOCK K-ANUP VIHAR, BLOCK A-ANUP VIHAR, KABRISTAN-SABOLI COLONY, BANK OF BARODA-SABOLI COLONY, MCD SCHOOL-SABOLI COLONY, SEWA DHAM- MANDOLI, SABOLI COLONY-MANDOLI, VILLAGE SABOLI-SABOLI 898 COLONY, SABOLI EXTN.-MANDOLI NNG 3928 630 KVA UNPLANNED 18-05-2020 11:16:45 18-05-2020 12:11:07 0:54 0.00045 MUs

BABARPUR WEST-BABAR PUR NNG, PKT B-CHITRAKOOT, DARYA GANJ, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY-KASHMERE GATE, PKT R-BLOCK D, PKT C-BLOCK B, JAFFRABAD-MAUJ PUR, G.B.SSS SCHOOL-GOKUL PURI, BLOCK B- EAST GOKUL PURI, BLOCK A-MEET NAGAR, BLOCK A-SADATPUR EXT-PUSTA AREA-L BLOCK, BLOCK B-UTTARANCHAL COLONY, BLOCK A-EAST GOKUL PURI, BLOCK C-AMAR COLONY, BLOCK C- MEET NAGAR, BLOCK H-BHAGIRATHI VIHAR, BLOCK F-SHIV VIHAR, BLOCK M-SHIV VIHAR, BLOCK N-SHIV VIHAR, BLOCK E- INDIRA VIHAR, SPORTS COMPLEX-VASUNDHARA ENCLAVE VSE, BHAJANPURA-DAYALPUR, BLOCK D-MEET NAGAR, BLOCK E- MEET NAGAR, RAJEEV NAGAR-SEWA DHAM, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-B-BLOCK SONIA VIHAR, BLOCK F- 899 INDIRA VIHAR NNG 4231 2650 KVA UNPLANNED 31-05-2020 05:16:20 31-05-2020 06:11:12 0:54 0.0015 MUs AMBEDKAR NAGAR INDUSTRIAL AREA-BHAGIRATHI VIHAR, BHAGIRATHI VIHAR, LAXMI GARDEN-AMBEDKAR NAGAR, BHARAT-AMBEDKAR NAGAR, HOSPITAL ANUR SINGH- 900 AMBEDKAR NAGAR KWN 545 0 KVA UNPLANNED 22-05-2020 13:24:19 22-05-2020 14:21:34 0:57 0.0002375 MUs

BLOCK C-MAN SINGH NAGAR, BLOCK B-GOKUL PURI, BLOCK B- JOHRI PUR, BLOCK A-JOHRI PUR, AMBEDKAR NAGAR INDUSTRIAL AREA-BHAGIRATHI VIHAR, BLOCK B-MAN SINGH NAGAR, BHAGIRATHI VIHAR, TUNDA NAGAR-BHAGIRATHI VIHAR, JOHRI ENCLAVE-BHAGIRATHI VIHAR, LAXMI GARDEN- AMBEDKAR NAGAR, LIG/MIG RES/NON COMM AREA-BALAJI MANDIR COLONY, BLOCK F-SHIV VIHAR, BLOCK P-SHIV VIHAR, BLOCK A-MAN SINGH NAGAR, BLOCK B-JOHRI PUR, BHARAT- 901 AMBEDKAR NAGAR, BHAGIRATHI VIHAR, BHAGIRATHI VIHAR KWN 432 2480 KVA UNPLANNED 28-05-2020 22:09:55 28-05-2020 23:55:40 1:45 0.00145833 MUs

BLOCK D-NEHRU VIHAR, BLOCK G-NEHRU VIHAR, BLOCK C- KHAJURI KHAS, BLOCK A-KHAJURI KHAS, BLOCK C-KHAJURI KHAS, BLOCK B-KHAJURI KHAS, BLOCK J-KHAJURI KHAS, LIG/MIG RES/NON COMM AREA-BLOCK B, BLOCK F-KHAJURI 902 KHAS EXTN., BLOCK I-KHAJURI KHAS EXTN. KWN 911 630 KVA UNPLANNED 23-05-2020 23:58:28 24-05-2020 00:47:11 0:48 0.0004 MUs BLOCK B-NEW SILAMPURI PHASE II, BLOCK C-NEW SILAMPURI 903 PHASE II, JAFFRABAD-MAUJ PUR YVR 86 0 KVA UNPLANNED 05-05-2020 13:03:10 05-05-2020 14:00:00 0:56 0.00015556 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unserved (MU) due to Sr. No. Area Affected Division Affected Transformer (in KVA). Unplanned Outage From DateTime To DateTime Duration (Hrs:Mins) Outage

BLOCK A1-NAND NAGARI, SABOLI EXTN.-MANDOLI, BLOCK A- MANDOLI EXTN., SABOLI VILLAGE-MANDOLI, KABRISTAN- SABOLI COLONY, MCD SCHOOL-SABOLI COLONY, BLOCK A- HARSH VIHAR, SEWA DHAM-MANDOLI, VILLAGE SABOLI- 904 SABOLI COLONY, SABOLI EXTN.-MANDOLI NNG 2401 0 KVA UNPLANNED 23-05-2020 00:28:23 23-05-2020 00:42:41 0:14 0.00015556 MUs BLOCK B-ANUP VIHAR, NEW MANDOLI INDUSTRIAL AREA, BLOCK K-ANUP VIHAR, BLOCK C-ANUP VIHAR, SEWA DHAM- 905 MANDOLI, SEWA DHAM-MANDOLI NNG 345 0 KVA UNPLANNED 18-05-2020 06:44:31 18-05-2020 07:00:41 0:16 0.00017778 MUs

GAGAN VIHAR-JAGATPURI, CHANDER NAGAR BLOCK F-GOPAL PARK, BLOCK D-RAM NAGAR, BLOCK E-WEST CHANDER NAGAR, CHANDER NAGAR BLOCK D-SHASTRI PARK, BLOCK E- CHANDAR NAGAR, GOPAL PARK-KRISHNA NAGAR, BLOCK D- 906 CHANDAR NAGAR, BLOCK F-CHANDAR NAGAR KRN 802 990 KVA UNPLANNED 26-05-2020 01:35:48 26-05-2020 01:59:50 0:24 0.00002 MUs

BHARAT MATA MANDIR-JJ COLONY, HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK A- BANK COLONY, SABOLI COLONY-MANDOLI, POCKET A-JJ COLONY, NEW MANDOLI INDUSTRIAL AREA, BLOCK B-SEWA DHAM, BLOCK A-SEWA DHAM, DEEPAK MEDITECH-NEW MANDOLI INDUSTRIAL AREA, BLOCK C-SEWA DHAM, BLOCK A- 907 SEWA DHAM, BLOCK D-HARSH VIHAR, BLOCK B-HARSH VIHAR NNG 604 400 KVA UNPLANNED 14-05-2020 18:08:39 14-05-2020 19:02:21 0:53 0.00103056 MUs PKT A-BLOCK A, SHIV MANDIR-JYOTI NAGAR EAST, PKT D- BLOCK A, PKT B-BLOCK A, BLOCK H-JYOTI NAGAR, BLOCK D- 908 MEET NAGAR NNG 231 1000 KVA UNPLANNED 30-05-2020 16:28:04 30-05-2020 17:13:33 0:45 0.00025 MUs

BLOCK J-SHIV VIHAR, BLOCK A-PREM VIHAR, BLOCK C- KARAWAL NAGAR, BLOCK Q-SHIV VIHAR, BLOCK H-SHIV VIHAR, BLOCK D-SHIV VIHAR, BLOCK T-SHIV VIHAR, BLOCK F-SHIV VIHAR, BLOCK B-SHIV VIHAR, PKT R-BLOCK A, BLOCK A-SHIV 909 VIHAR, BLOCK Q-SHIV VIHAR KWN 130 0 KVA UNPLANNED 29-05-2020 04:47:52 29-05-2020 05:34:47 0:46 0.00019167 MUs BLOCK 25-TRILOKPURI PHASE II, BLOCK 24-TRILOKPURI PHASE II, BLOCK 13-TRILOKPURI PHASE II, KHICHRI PUR-PHASE II, 910 KOTLA EXCT-PHASE II MVR 329 630 KVA UNPLANNED 15-05-2020 01:38:20 15-05-2020 02:01:50 0:23 0.00006389 MUs NEW MANDOLI INDUSTRIAL AREA, SEWA DHAM-MANDOLI, ANUP VIHAR-MANDOLI, SABOLI EXTN.-MANDOLI, SEWA DHAM- 911 MANDOLI NNG 43 0 KVA UNPLANNED 27-05-2020 12:10:00 27-05-2020 13:05:00 0:54 0.000075 MUs

KINARI BAZAR-DHARAM PURA, MAIN BAZAR CHANDANI CHOWK-SISGANJ, DARIBA KALA-KATRA MASHRU, NAYA BAZAR- CHANDNI CHOWK, GOVT. BOYS SECONDARY SCHOOL-KUCHA ALAM, DARIBA MARKET-KATRA MASHRU, KUCHA JAGLLA- 912 KUCHA ALAM CCK 1647 990 KVA PLANNED 21-05-2020 09:30:00 21-05-2020 12:18:18 2:48 0.00098 MUs

BLOCK C-HARSH VIHAR, BLOCK A-BANK COLONY, SABOLI VILLAGE-MANDOLI, BLOCK B-ANUP VIHAR, BLOCK C-SEWA DHAM, BLOCK A-SEWA DHAM, LIG/MIG RES/NON COMM AREA- SEWA DHAM, BLOCK C-ANUP VIHAR, BLOCK D-HARSH VIHAR, BLOCK B-HARSH VIHAR, BLOCK A-HARSH VIHAR, GOVT.CO. 913 SEC. SCHOOL-HARSH VIHAR NNG 2664 0 KVA UNPLANNED 01-05-2020 16:13:33 01-05-2020 16:44:48 0:31 0.00025833 MUs CHRISTAN COLONY-KHABAS PURA, PATODI HOUSE-CHANDNI 914 CHOWK DRG 30 990 KVA UNPLANNED 02-05-2020 12:21:56 02-05-2020 12:56:57 0:35 0.00004861 MUs 915 BLOCK D-HARSH VIHAR, BLOCK E-MEET NAGAR NNG 86 0 KVA UNPLANNED 23-05-2020 19:21:56 23-05-2020 20:16:38 0:54 0.00015 MUs

BLOCK B-NEW SILAMPURI PHASE II, BLOCK E-NEW SILAMPURI PHASE II, BLOCK F- LIG/MIG RES/NON COMM AREA-NEW 916 SILAMPURI PHASE II, NEW SILAMPURI PHASE III YVR 0 0 KVA UNPLANNED 11-05-2020 12:22:11 11-05-2020 13:05:26 0:43 0 MUs 917 CHANDANI MAHAL-CHANDNI CHOWK DRG 348 990 KVA UNPLANNED 22-05-2020 12:08:16 22-05-2020 12:35:18 0:27 0.00003 MUs

LIG/MIG RES/NON COMM AREA-DAYALPUR EXTN., BLOCK A- PREM VIHAR, BLOCK A-RAMA GARDEN, BLOCK B-NEW CHAUHAN PUR, PKT R-BLOCK A, LIG/MIG RES/NON COMM AREA-NEW CHAUHAN PUR, BLOCK A-NEW CHAUHAN PUR, 918 BLOCK B-NEW CHAUHAN PUR KWN 108 100 KVA UNPLANNED 05-05-2020 18:57:42 05-05-2020 19:13:20 0:15 0.0000625 MUs

BLOCK M-SUNDER NAGRI, SABOLI EXTN.-MANDOLI, BLOCK A- MANDOLI EXTN., SABOLI COLONY-MANDOLI, SABOLI VILLAGE- MANDOLI, BLOCK B-ANUP VIHAR, BLOCK B-PRATAP NAGAR, BLOCK K-ANUP VIHAR, KABRISTAN-SABOLI COLONY, BANK OF BARODA-SABOLI COLONY, MCD SCHOOL-SABOLI COLONY, SEWA DHAM-MANDOLI, ANUP VIHAR-MANDOLI, VILLAGE 919 SABOLI-SABOLI COLONY, SABOLI EXTN.-MANDOLI NNG 3928 630 KVA UNPLANNED 10-05-2020 21:04:06 10-05-2020 21:20:00 0:15 0.00033333 MUs

BHARAT MATA MANDIR-JJ COLONY, HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK E-RAJIV NAGAR, BLOCK A-BANK COLONY, POCKET A-JJ COLONY, NEW MANDOLI INDUSTRIAL AREA, DEEPAK MEDITECH-NEW MANDOLI INDUSTRIAL AREA, BLOCK C-SEWA DHAM, BLOCK A- SEWA DHAM, BLOCK D-HARSH VIHAR, BLOCK B-HARSH VIHAR, 920 BLOCK B-RAJIV NAGAR NNG 432 400 KVA UNPLANNED 23-05-2020 23:26:00 23-05-2020 23:57:09 0:31 0.00043056 MUs BLOCK G-NEHRU VIHAR, BLOCK T-OLD MUSTAFABAD, BLOCK D- MUSTAFABAD (DAYALPUR), BLOCK A-NEHRU VIHAR, BLOCK T- 921 NEHRU VIHAR KWN 643 990 KVA UNPLANNED 24-05-2020 00:10:53 24-05-2020 01:10:20 0:59 0.00032778 MUs BLOCK 2-GEETA COLONY, BLOCK 8-GEETA COLONY, BLOCK 1A- 922 GEETA COLONY, BLOCK 2A-GEETA COLONY KRN 181 630 KVA UNPLANNED 04-05-2020 12:36:36 04-05-2020 13:28:53 0:52 0.00007222 MUs BLOCK B-EAST GOKUL PURI, BLOCK A-MEET NAGAR, BLOCK A- EAST GOKUL PURI, BLOCK C-AMAR COLONY, BLOCK C-MEET 923 NAGAR, BLOCK D-MEET NAGAR NNG 86 0 KVA UNPLANNED 27-05-2020 19:02:40 27-05-2020 19:47:50 0:45 0.000125 MUs

924 SHIVAJI PARK-BALBIR NAGAR, BALBIR NAGAR EXTN.-SILAMPUR DGN 43 630 KVA UNPLANNED 26-05-2020 17:15:58 26-05-2020 17:41:00 0:25 0.00003472 MUs NEW USMANPUR-NEW KATWARA, GAUTAM VIHAR-GHONDA, ARVIND NAGAR-GHONDA, GHONDA PATTI CHAUHAN, BLOCK V- 925 GHONDA PATTI CHAUHAN YVR 18 990 KVA UNPLANNED 31-05-2020 04:42:04 31-05-2020 05:31:34 0:49 0.00021778 MUs BLOCK D-ASHOK NAGAR, BLOCK A-EAST GOKUL PURI, BLOCK C- 926 MEET NAGAR, BLOCK D-MEET NAGAR NNG 37 990 KVA UNPLANNED 24-05-2020 15:43:16 24-05-2020 16:33:23 0:50 0.00041667 MUs

MANTOLA MOHALLA-PAHAR GANJ, SHORA KOTHI-PAHAR GANJ, PANCHKUIAN ROAD RAILWAY COLONY-PAHAR GANJ, KASERU WALAN-PAHAR GANJ, NEW RATAN MARKET- 927 PANCHKUIAN ROAD RAILWAY COLONY PHG 1181 630 KVA PLANNED 20-05-2020 10:00:00 20-05-2020 14:00:00 4:0 0 MUs

SABOLI EXTN.-MANDOLI, BLOCK C-HARSH VIHAR, BLOCK A- MANDOLI EXTN., BLOCK A-MANDOLI VILLAGE, BLOCK A-BANK COLONY, SABOLI COLONY-MANDOLI, BLOCK B-ANUP VIHAR, BLOCK E-SEWA DHAM, BLOCK B-SEWA DHAM, BLOCK A-SEWA DHAM, BLOCK A-SEWA DHAM, BLOCK K-ANUP VIHAR, KABRISTAN-SABOLI COLONY, BANK OF BARODA-SABOLI COLONY, MCD SCHOOL-SABOLI COLONY, SEWA DHAM- MANDOLI, SABOLI COLONY-MANDOLI, VILLAGE SABOLI-SABOLI 928 COLONY, SABOLI EXTN.-MANDOLI NNG 4342 0 KVA UNPLANNED 10-05-2020 11:47:00 10-05-2020 12:53:00 1:6 0.00014667 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unserved (MU) due to Sr. No. Area Affected Division Affected Transformer (in KVA). Unplanned Outage From DateTime To DateTime Duration (Hrs:Mins) Outage

DARYA GANJ, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY-KASHMERE GATE, PKT R-BLOCK D, PKT C-BLOCK B, JAFFRABAD-MAUJ PUR, G.B.SSS SCHOOL-GOKUL PURI, BLOCK B- EAST GOKUL PURI, BLOCK A-AMAR COLONY, BLOCK A-MEET NAGAR, BLOCK A-SADATPUR EXT-PUSTA AREA-L BLOCK, BLOCK A-UTTARANCHAL COLONY, BLOCK A-EAST GOKUL PURI, BLOCK C-AMAR COLONY, BLOCK C-MEET NAGAR, BLOCK H- BHAGIRATHI VIHAR, BLOCK F-SHIV VIHAR, BLOCK M-SHIV VIHAR, BLOCK N-SHIV VIHAR, BLOCK E-INDIRA VIHAR, SPORTS COMPLEX-VASUNDHARA ENCLAVE VSE, BHAJANPURA- DAYALPUR, BLOCK D-MEET NAGAR, BLOCK E-MEET NAGAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-B-BLOCK SONIA VIHAR, BLOCK 929 F-INDIRA VIHAR NNG 4225 2650 KVA UNPLANNED 09-05-2020 00:03:08 09-05-2020 00:20:15 0:17 0.00047222 MUs 930 PKT 1- DDA FLATS-PHASE I MVR 86 630 KVA UNPLANNED 27-05-2020 02:29:44 27-05-2020 02:46:42 0:16 0.00004444 MUs BLOCK D-HARIJAN BASTI, BLOCK B-HARIJAN BASTI, BLOCK A- 931 HARIJAN BASTI KWN 86 0 KVA UNPLANNED 26-05-2020 11:35:13 26-05-2020 12:29:15 0:54 0.00015 MUs BLOCK A-BABU NAGAR, BLOCK A-MAN SINGH NAGAR, 932 BHAJANPURA-DAYALPUR KWN 1408 0 KVA UNPLANNED 14-05-2020 21:53:53 14-05-2020 22:29:55 0:36 0.00015 MUs BHAGIRATHI VIHAR, JAGDAMBA COLONY-BHAGIRATHI VIHAR, BLOCK P-SHIV VIHAR, PKT C-SHIV VIHAR, BHARAT-AMBEDKAR 933 NAGAR, BHAGIRATHI VIHAR KWN 2090 0 KVA UNPLANNED 04-05-2020 13:35:00 04-05-2020 14:34:01 0:59 0.00024583 MUs BLOCK A-KHAJURI KHAS, BLOCK A-PRAKASH VIHAR, BLOCK B- BHAGAT SINGH COLONY, BLOCK H-BHAGAT SINGH COLONY, BLOCK I-BHAGAT SINGH COLONY, BLOCK B-PRAKASH VIHAR, BLOCK E-PRAKASH VIHAR, BLOCK D-PRAKASH VIHAR, BLOCK C- 934 PRAKASH VIHAR KWN 432 1980 KVA UNPLANNED 22-05-2020 12:48:56 22-05-2020 13:45:00 0:56 0.00077778 MUs

BLOCK B-KABIR NAGAR, SABOLI EXTN.-MANDOLI, BLOCK E- RAJIV NAGAR, SABOLI COLONY-MANDOLI, SABOLI VILLAGE- MANDOLI, BLOCK B-ANUP VIHAR, BLOCK A-SEWA DHAM, DEEPAK MEDITECH-NEW MANDOLI INDUSTRIAL AREA, BLOCK D-ANUP VIHAR, MCD SCHOOL-SABOLI COLONY, BLOCK B- HARSH VIHAR, BLOCK A-HARSH VIHAR, BLOCK D-MEET NAGAR, 935 BLOCK A-SEWA DHAM, VILLAGE SABOLI-SABOLI COLONY NNG 259 0 KVA UNPLANNED 10-05-2020 17:47:10 10-05-2020 18:11:22 0:24 0.0002 MUs

BLOCK J-JYOTI NAGAR, PKT A-BLOCK A, PKT C-BLOCK A, PKT D- 936 BLOCK A, PKT B-BLOCK A, BLOCK H-JYOTI NAGAR NNG 130 1000 KVA UNPLANNED 12-05-2020 17:38:07 12-05-2020 18:30:47 0:52 0.00021667 MUs BLOCK A-MAYUR VIHAR PHASE III, SEC D-MAYUR VIHAR PHASE 937 III, BLOCK A-MAYUR VIHAR PHASE III VSE 2190 0 KVA UNPLANNED 29-05-2020 20:02:01 29-05-2020 22:11:59 2:9 0.00035833 MUs BLOCK F-WEST KARAWAL NAGAR, BLOCK F & G-BHAGAT SINGH COLONY, WEST KARAWAL NAGAR, BLOCK A-BHAGAT SINGH COLONY, BLOCK D-WEST KARAWAL NAGAR, BLOCK D-WEST 938 KARAWAL NAGAR KWN 1361 630 KVA UNPLANNED 29-05-2020 15:49:13 29-05-2020 16:43:44 0:54 0.000225 MUs 939 LIG/MIG RES/NON COMM AREA-VIJAY GHAT DRG CCK 52 400 KVA UNPLANNED 12-05-2020 12:53:46 12-05-2020 13:44:07 0:50 0.00005556 MUs

BLOCK D-MEET NAGAR, BLOCK C-AMAR COLONY, PKT C-BLOCK B, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, GGS INDRAPRASTHA UNIVERSITY-KASHMERE GATE, BLOCK N-SHIV VIHAR, BLOCK F-INDIRA VIHAR, BLOCK B-EAST GOKUL PURI, LIG/MIG RES/NON COMM AREA-B-BLOCK SONIA VIHAR, BLOCK A-MEET NAGAR, BLOCK A-EAST GOKUL PURI, BLOCK M-SHIV VIHAR, BLOCK A-SADATPUR EXT-PUSTA AREA-L BLOCK, BHAJANPURA-DAYALPUR, PKT R-BLOCK D, GEETA COLONY, SPORTS COMPLEX-VASUNDHARA ENCLAVE VSE, BLOCK E- INDIRA VIHAR, BLOCK C-MEET NAGAR, BLOCK H-BHAGIRATHI VIHAR, DARYA GANJ, JAFFRABAD-MAUJ PUR, BLOCK F-SHIV 940 VIHAR, G.B.SSS SCHOOL-GOKUL PURI NNG 4231 2650 KVA UNPLANNED 21-05-2020 20:46:49 21-05-2020 21:05:22 0:18 0.00025 MUs

BLOCK D-DLF ANKUR VIHAR, BLOCK A-PRAKASH VIHAR, BLOCK C-KARAWAL NAGAR, BLOCK A-BHAGAT SINGH COLONY, BLOCK I-BHAGAT SINGH COLONY, BLOCK E-SADAT PUR, BLOCK E- PRAKASH VIHAR, BLOCK D-PRAKASH VIHAR, BLOCK C-PRAKASH 941 VIHAR, BLOCK C-DLF ANKUR VIHAR KWN 216 0 KVA UNPLANNED 14-05-2020 05:21:24 14-05-2020 06:03:54 0:42 0.00029167 MUs

BABARPUR EXTN.-BABAR PUR, HARSH VIHAR SUB STATION- POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK E-RAJIV NAGAR, BLOCK A-MANDOLI EXTN., BLOCK A-MANDOLI VILLAGE, BLOCK A-BANK COLONY, SABOLI COLONY-MANDOLI, SABOLI VILLAGE- MANDOLI, BLOCK D-HARIJAN BASTI EAST EXTN., BLOCK E- SEWA DHAM, NEW MANDOLI INDUSTRIAL AREA, BLOCK B- SEWA DHAM, BLOCK A-SEWA DHAM, BLOCK C-SEWA DHAM, BLOCK H-SEWA DHAM, DEEPAK MEDITECH-NEW MANDOLI INDUSTRIAL AREA, BLOCK C-SEWA DHAM, BLOCK A-SEWA DHAM, SEWA DHAM-MANDOLI, BLOCK D-HARSH VIHAR, BLOCK A-HARSH VIHAR, GOVT.CO. SEC. SCHOOL-HARSH VIHAR, J.R. COMPLEX-SEWA DHAM, BLOCK B-SEWA DHAM, BLOCK A- 942 SEWA DHAM, BLOCK E-SEWA DHAM NNG 432 0 KVA UNPLANNED 17-05-2020 20:55:06 17-05-2020 21:53:19 0:58 0.00080556 MUs PKT C-BLOCK B, BLOCK J-JYOTI NAGAR, PKT D-BLOCK A, BLOCK 943 H-JYOTI NAGAR NNG 130 1000 KVA UNPLANNED 10-05-2020 14:11:13 10-05-2020 14:54:00 0:42 0.000175 MUs

NEW USMANPUR-NEW KATWARA, MCD COLONY-NEW KATWARA, JAG JEEVAN NAGAR-NEW KATWARA-SHASTRI 944 PARK, JAG JEEVAN NAGAR-NEW KATWARA GHONDA YVR 1000 990 KVA UNPLANNED 22-05-2020 11:54:51 22-05-2020 13:05:00 1:10 0.00058333 MUs

BLOCK F-WEST KARAWAL NAGAR, BLOCK A-KHAJURI KHAS, PHASE I-SHIV VIHAR, BLOCK A-PRAKASH VIHAR, BLOCK C- KARAWAL NAGAR, BLOCK B-BHAGAT SINGH COLONY, BLOCK I- BHAGAT SINGH COLONY, BLOCK R-SHIV VIHAR, BLOCK E- PRAKASH VIHAR, BLOCK D-PRAKASH VIHAR, BLOCK C-PRAKASH VIHAR, BLOCK C-DLF ANKUR VIHAR, BLOCK B-HARIJAN BASTI, 945 BLOCK D-PREM VIHAR, BLOCK B-NEW CHAUHAN PUR KWN 130 0 KVA UNPLANNED 31-05-2020 02:27:57 31-05-2020 05:13:14 2:45 0.0006875 MUs MAUJ PUR COMPLEX 1, BLOCK B3-YAMUNA VIHAR, BLOCK C- BHAJANPURA, BLOCK B-MANUJPUR, TANKI ROAD-C-BLOCK 946 BHAJANPURA YVR 48 630 KVA UNPLANNED 25-05-2020 17:35:58 25-05-2020 18:17:06 0:41 0.00011389 MUs BLOCK B-ANUP VIHAR, BLOCK D-ANUP VIHAR, BLOCK K-ANUP 947 VIHAR, BLOCK C-ANUP VIHAR NNG 259 0 KVA UNPLANNED 28-05-2020 18:38:33 28-05-2020 19:00:18 0:21 0.000175 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unserved (MU) due to Sr. No. Area Affected Division Affected Transformer (in KVA). Unplanned Outage From DateTime To DateTime Duration (Hrs:Mins) Outage

BLOCK A-PREM VIHAR, PKT C-BLOCK B, PKT W-BLOCK A, BLOCK CN-AMBIKA VIHAR BLOCK - B&C, BLOCK A-HARIJAN BASTI, BLOCK C-KARAWAL NAGAR, SHIV VIHAR, PKT Y-SHIV VIHAR, BLOCK U-SHIV VIHAR, BLOCK R-PATEL VIHAR, BLOCK B-PATEL VIHAR, BLOCK C-SHIV VIHAR, BLOCK D-SHIV VIHAR, BLOCK R- SHIV VIHAR, BLOCK B-SHIV VIHAR, PKT X-SHIV VIHAR, PKT A- BLOCK A, PKT R-BLOCK A, PKT F-BLOCK A, PKT D-SHIV VIHAR, PKT C-SHIV VIHAR, PKT A-SHIV VIHAR, BLOCK C-KARAWAL NAGAR, BLOCK B-PRAKASH VIHAR, BLOCK C-HARIJAN BASTI, BLOCK D-HARIJAN BASTI, BLOCK B-HARIJAN BASTI, BLOCK V-O & P BLOCKS SHIV VIHAR KARWAL NAGAR, PKT D-BLOCK B, BLOCK CN-AMBIKA VIHAR BLOCK - B&C, BLOCK CN-AMBIKA 948 VIHAR BLOCK - B&C, PKT W-BLOCK A KWN 9071 0 KVA UNPLANNED 14-05-2020 18:17:36 14-05-2020 19:42:46 1:25 0.00059028 MUs 949 RAGHUVIR PURA-KANTI NAGAR, OLD SEELAMPUR KRN 478 630 KVA UNPLANNED 08-05-2020 12:58:51 08-05-2020 13:35:00 0:36 0.00005 MUs

BLOCK A-PREM VIHAR, PKT C-BLOCK B, PKT W-BLOCK A, BLOCK U-SHIV VIHAR, BLOCK B-SHIV VIHAR, PKT X-SHIV VIHAR, PKT A- BLOCK A, PKT R-BLOCK A, PKT F-BLOCK A, PKT C-SHIV VIHAR, BLOCK V-O & P BLOCKS SHIV VIHAR KARWAL NAGAR, PKT D- 950 BLOCK B, PKT W-BLOCK A KWN 3346 0 KVA UNPLANNED 05-05-2020 13:03:06 05-05-2020 13:39:26 0:36 0.00015 MUs BLOCK C-HARSH VIHAR, BLOCK B-ANUP VIHAR, NEW MANDOLI INDUSTRIAL AREA, BLOCK K-ANUP VIHAR, SEWA DHAM- 951 MANDOLI, SEWA DHAM-MANDOLI NNG 345 0 KVA UNPLANNED 20-05-2020 06:40:23 20-05-2020 07:11:53 0:31 0.00034444 MUs

BLOCK A-DILSHAD COLONY, BLOCK D-DILSHAD COLONY, BLOCK D-NEW SIMAPURI, BLOCK B-PREM NAGAR DGN, BLOCK A- RAJIV NAGAR DGN, BLOCK 8-SUNDER NAGRI DGN, DDA FLATS- BLOCK A, BLOCK A-PREM NAGAR DGN, SHANTI KUSTH 952 ASHRAM-RAJIV NAGAR DGN DGN 833 630 KVA UNPLANNED 01-05-2020 15:58:36 01-05-2020 16:43:27 0:44 0.00024444 MUs BLOCK B1-NAND NAGARI, HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK A-BANK COLONY, SABOLI VILLAGE-MANDOLI, POCKET A-JJ COLONY, BLOCK C- SEWA DHAM, BLOCK A-SEWA DHAM, BLOCK B-HARSH VIHAR, 953 BLOCK A-HARSH VIHAR NNG 432 0 KVA UNPLANNED 19-05-2020 20:40:42 19-05-2020 21:26:10 0:45 0.000625 MUs 954 MATA RAMESHWARI NEHRU NAGAR-DEV NAGAR PNR 298 990 KVA UNPLANNED 20-05-2020 13:39:47 20-05-2020 14:18:00 0:38 0 MUs BLOCK F-NEHRU VIHAR, PHASE I-SHIV VIHAR, BLOCK D-DLF ANKUR VIHAR, BLOCK A-PRAKASH VIHAR, BLOCK B-BHAGAT SINGH COLONY, BLOCK C-BHAGAT SINGH COLONY, BLOCK I- BHAGAT SINGH COLONY, BLOCK E-BHAGAT SINGH COLONY, BLOCK E-SADAT PUR, BLOCK B-PRAKASH VIHAR, BLOCK E- PRAKASH VIHAR, BLOCK D-PRAKASH VIHAR, BLOCK C-PRAKASH VIHAR, BLOCK C-DLF ANKUR VIHAR, BLOCK B-NEW CHAUHAN 955 PUR KWN 216 0 KVA UNPLANNED 29-05-2020 20:48:37 29-05-2020 22:40:00 1:51 0.00077083 MUs

BLOCK B6-OLD RAJENDRA NAGAR, BLOCK 51-OLD RAJENDRA NAGAR, BLOCK 51-OLD RAJENDRA NAGAR, BLOCK B-OLD RAJENDRA NAGAR, DARYA GANJ, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY-KASHMERE GATE, PKT R-BLOCK D, PKT C-BLOCK B, JAFFRABAD-MAUJ PUR, BLOCK A-SADATPUR EXT-PUSTA AREA-L BLOCK, BLOCK H-BHAGIRATHI VIHAR, BLOCK F-SHIV VIHAR, BLOCK M-SHIV VIHAR, BLOCK N-SHIV VIHAR, BLOCK E-INDIRA VIHAR, SPORTS COMPLEX- VASUNDHARA ENCLAVE VSE, BHAJANPURA-DAYALPUR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-B-BLOCK SONIA VIHAR, BLOCK 956 F-INDIRA VIHAR SRD 749 990 KVA UNPLANNED 22-05-2020 12:33:05 22-05-2020 13:15:00 0:41 0.00017083 MUs

LIG/MIG RES/NON COMM AREA-CRPF CAMP SONIA VIHAR, MAIN BAZAR CHANDANI CHOWK-SISGANJ, DARIBA KALA- KATRA MASHRU, FATEHPURI-KUCHA HASIRAM, BLOCK D- KHAJURI KHAS, BLOCK C-KHAJURI KHAS, BLOCK A-KHAJURI KHAS, CLOCK C-BIHARIPUR, BLOCK C-KHAJURI KHAS, BLOCK B- KHAJURI KHAS, PKT A-BLOCK B, BLOCK J-KHAJURI KHAS, LIG/MIG RES/NON COMM AREA-BLOCK B, BLOCK I-KHAJURI KHAS EXTN., BLOCK D-SHERPUR, BLOCK C-SHERPUR, CHAUHAN PATTI-VIJAY VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK 957 SONIA VIHAR KWN 5637 0 KVA UNPLANNED 28-05-2020 23:09:53 28-05-2020 23:45:00 0:35 0.00034028 MUs 958 TELEGRAPH OFFICE-KASHMERE GATE CCK 52 990 KVA UNPLANNED 08-05-2020 12:14:42 08-05-2020 12:52:32 0:37 0.00004111 MUs LIG/MIG RES/NON COMM AREA-CHAWLA FARM, LIG/MIG RES/NON COMM AREA-SABHEPUR, CHAUHAN PATTI-VIJAY 959 VIHAR KWN 142 990 KVA UNPLANNED 25-05-2020 12:18:04 25-05-2020 13:16:54 0:58 0.00001611 MUs BLOCK D-MEET NAGAR, BLOCK A-EAST GOKUL PURI, BLOCK C- MEET NAGAR, BLOCK C-AMAR COLONY, BLOCK A-AMAR COLONY, BLOCK B-EAST GOKUL PURI, BLOCK A-MEET NAGAR, 960 BLOCK E-MEET NAGAR NNG 4649 1620 KVA UNPLANNED 03-05-2020 20:42:45 03-05-2020 21:01:37 0:18 0.00015 MUs 961 PKT C-MAYUR VIHAR PHASE II MVR 86 990 KVA UNPLANNED 27-05-2020 01:58:20 27-05-2020 02:28:33 0:30 0.00008333 MUs HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK D-HARIJAN BASTI EAST EXTN., BLOCK C-SEWA DHAM, BLOCK A-SEWA DHAM, BLOCK D-HARSH VIHAR, BLOCK 962 A-HARSH VIHAR NNG 1903 0 KVA UNPLANNED 07-05-2020 00:20:00 07-05-2020 00:40:00 0:20 0.00052222 MUs

BLOCK D-NEHRU VIHAR, BLOCK B-NEHRU VIHAR, BLOCK F- MUSTAFABAD (DAYALPUR), BLOCK D-TUKMIRPUR, BLOCK B- 963 TUKMIRPUR, BLOCK B-SHIV VIHAR, BLOCK B-NEHRU VIHAR KWN 198 1500 KVA UNPLANNED 09-05-2020 07:28:38 09-05-2020 08:23:26 0:54 0.000225 MUs

BLOCK H-BRAHM PURI, BLOCK J-KARTAR NAGAR, GAUTAM VIHAR-GHONDA, ARVIND NAGAR-GHONDA, GHONDA PATTI 964 CHAUHAN, BLOCK V-GHONDA PATTI CHAUHAN YVR 498 990 KVA UNPLANNED 29-05-2020 14:12:24 29-05-2020 14:55:03 0:42 0.00009333 MUs 965 VIJAY PARK-YAMUNA VIHAR, MAUJ PUR COMPLEX 1 YVR 508 990 KVA UNPLANNED 12-05-2020 13:01:14 12-05-2020 13:36:32 0:35 0 MUs

BLOCK F-WEST KARAWAL NAGAR, BLOCK F & G-BHAGAT SINGH COLONY, WEST KARAWAL NAGAR, BLOCK F-BHAGAT SINGH COLONY, BLOCK A-BHAGAT SINGH COLONY, BLOCK E-BHAGAT SINGH COLONY, BLOCK D-WEST KARAWAL NAGAR, BLOCK D- 966 WEST KARAWAL NAGAR KWN 1361 630 KVA UNPLANNED 21-05-2020 13:12:00 21-05-2020 14:52:00 1:40 0.00069444 MUs

BLOCK B-SEWA DHAM, BLOCK A-EAST GOKUL PURI, BLOCK C- 967 MEET NAGAR, BLOCK D-MEET NAGAR, BLOCK E-MEET NAGAR NNG 37 990 KVA UNPLANNED 24-05-2020 17:34:31 24-05-2020 18:02:25 0:27 0.00015 MUs 968 VISHWAS NAGAR EXTN.-SHAHDARA JLM 528 630 KVA UNPLANNED 22-05-2020 14:20:03 22-05-2020 15:14:30 0:54 0.00015 MUs

HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH 969 VIHAR, BLOCK B-HARSH VIHAR, BLOCK A-HARSH VIHAR NNG 173 0 KVA UNPLANNED 09-05-2020 20:45:21 09-05-2020 21:06:59 0:21 0.00011667 MUs BLOCK C-KHAJURI KHAS, BLOCK A-KHAJURI KHAS, BLOCK J- KHAJURI KHAS, LIG/MIG RES/NON COMM AREA-BLOCK B, 970 BLOCK I-KHAJURI KHAS EXTN. KWN 2377 630 KVA UNPLANNED 25-05-2020 11:43:46 25-05-2020 12:21:24 0:37 0.00020556 MUs BSES 66 KV GRID S/STATION-COMMUNITY CENTRE YAMUNA 971 VIHAR YVR 0 630 KVA UNPLANNED 28-05-2020 13:23:03 28-05-2020 14:15:00 0:51 0 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unserved (MU) due to Sr. No. Area Affected Division Affected Transformer (in KVA). Unplanned Outage From DateTime To DateTime Duration (Hrs:Mins) Outage

LIG/MIG RES/NON COMM AREA-VIKRAM NAGAR, CHAWRI BAZAR-CHANDNI CHOWK, GOVT.GIRLS SENIOR SECONDARY SCHOOL-KAMLA MARKET, SARYODHAY GARLS SCHOOL-KAMLA 972 MARKET, BRIJ MARKITING PKT LTD-CHAWRI BAZAR DRG 495 990 KVA UNPLANNED 08-05-2020 11:23:18 08-05-2020 12:16:55 0:53 0.00010306 MUs

SHIV VIHAR, BLOCK H-SHIV VIHAR, BLOCK D-SHIV VIHAR, BLOCK K-SHIV VIHAR, BLOCK F-SHIV VIHAR, BLOCK S-SHIV VIHAR, BLOCK M-SHIV VIHAR, BLOCK N-SHIV VIHAR, BLOCK A- 973 SHIV VIHAR, BLOCK J-SHIV VIHAR KWN 1484 0 KVA UNPLANNED 17-05-2020 00:58:18 17-05-2020 01:57:06 0:58 0.00024167 MUs BLOCK A-MEET NAGAR, BLOCK A-EAST GOKUL PURI, BLOCK E- 974 MEET NAGAR NNG 21 630 KVA UNPLANNED 21-05-2020 16:00:00 21-05-2020 16:53:22 0:53 0.00011778 MUs NEW JAFFRABAD-GORAKH PARK, KABUL NAGAR-ROHITASH NAGAR, OLDANPUR-NAVIN SHAHDARA, DWARKAPURI-NAVIN 975 SHAHDARA DGN 136 630 KVA UNPLANNED 21-05-2020 22:59:50 21-05-2020 23:20:05 0:20 0.00005556 MUs

LIG/MIG RES/NON COMM AREA-CRPF CAMP SONIA VIHAR, LIG/MIG RES/NON COMM AREA-CHAWLA FARM, LIG/MIG RES/NON COMM AREA-SABHEPUR, LIG/MIG RES/NON COMM AREA-MILAN GARDEN, LIG/MIG RES/NON COMM AREA-BALAJI MANDIR COLONY, CHAUHAN PATTI-VIJAY VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-SONIA VIHAR, LIG/MIG RES/NON COMM AREA-G- BLOCK SONIA VIHAR EXTENSION, LIG/MIG RES/NON COMM AREA-G- BLOCK SONIA VIHAR EXTENSION, LIG/MIG RES/NON COMM AREA-D-BLOCK-SONIA VIHAR, LIG/MIG RES/NON COMM AREA-E-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-SONIA VIHAR, LIG/MIG RES/NON COMM AREA-G- BLOCK SONIA VIHAR EXTENSION, 976 LIG/MIG RES/NON COMM AREA-G-BLOCK SONIA VIHAR KWN 432 400 KVA UNPLANNED 28-05-2020 20:40:00 28-05-2020 21:35:53 0:55 0.00076389 MUs

BLOCK D-SHIV VIHAR, BLOCK J-SHIV VIHAR, BLOCK A-PREM VIHAR, BLOCK T-SHIV VIHAR, PKT R-BLOCK A, BLOCK B-SHIV VIHAR, BLOCK Q-SHIV VIHAR, BLOCK A-SHIV VIHAR, BLOCK H- SHIV VIHAR, BLOCK F-SHIV VIHAR, BLOCK Q-SHIV VIHAR, 977 BLOCK C-KARAWAL NAGAR KWN 0 0 KVA UNPLANNED 28-05-2020 14:25:28 28-05-2020 15:11:00 0:45 0 MUs

978 ROHITASH NAGAR EAST-SILAMPUR, BLOCK 1-BALBIR NAGAR DGN 220 630 KVA UNPLANNED 25-05-2020 02:48:00 25-05-2020 03:40:00 0:51 0.00026917 MUs

SABOLI EXTN.-MANDOLI, BLOCK A-MANDOLI EXTN., BLOCK A- MANDOLI VILLAGE, SABOLI COLONY-MANDOLI, BLOCK B-ANUP VIHAR, BLOCK E-SEWA DHAM, BLOCK B-SEWA DHAM, BLOCK A- SEWA DHAM, DEEPAK MEDITECH-NEW MANDOLI INDUSTRIAL AREA, KABRISTAN-SABOLI COLONY, BANK OF BARODA-SABOLI COLONY, MCD SCHOOL-SABOLI COLONY, J.R. COMPLEX-SEWA DHAM, SEWA DHAM-MANDOLI, SABOLI COLONY-MANDOLI, VILLAGE SABOLI-SABOLI COLONY, SABOLI EXTN.-MANDOLI, 979 SEWA DHAM-MANDOLI NNG 4342 0 KVA UNPLANNED 14-05-2020 21:05:21 14-05-2020 21:30:00 0:24 0.00053333 MUs 980 BLOCK C-KABIR NAGAR, BLOCK A-KABIR NAGAR NNG 1194 990 KVA UNPLANNED 15-05-2020 10:46:54 15-05-2020 11:42:48 0:55 0.00015278 MUs BLOCK D-MEET NAGAR, BLOCK A-EAST GOKUL PURI, BLOCK C- MEET NAGAR, BLOCK C-AMAR COLONY, BLOCK A-AMAR COLONY, BLOCK B-EAST GOKUL PURI, BLOCK A-MEET NAGAR, 981 BLOCK E-MEET NAGAR NNG 4649 1620 KVA UNPLANNED 10-05-2020 11:49:00 10-05-2020 12:52:00 1:3 0.0012075 MUs

BLOCK B-CHANDU NAGAR, BLOCK C-PATEL VIHAR, BLOCK CN- MANGALAM VIHAR, PHASE I-SHIV VIHAR, SHIV VIHAR, BLOCK B- PATEL VIHAR, BLOCK A-MANGALAM VIHAR, BLOCK B-HARIJAN BASTI, BLOCK B-NEW CHAUHAN PUR, BLOCK D-WEST 982 KARAWAL NAGAR, BLOCK C-PATEL VIHAR KWN 427 400 KVA UNPLANNED 31-05-2020 11:00:54 31-05-2020 11:36:03 0:35 0.00024306 MUs 983 BLOCK G-SILAMPUR COLONY YVR 69 0 KVA UNPLANNED 27-05-2020 12:15:39 27-05-2020 12:38:29 0:22 0.00004889 MUs PHASE I-SHIV VIHAR, VILLAGE-KAMAL VIHAR, BLOCK B-PATEL 984 VIHAR, BLOCK C-PATEL VIHAR KWN 259 100 KVA UNPLANNED 18-05-2020 15:49:30 18-05-2020 16:43:47 0:54 0.00045 MUs

BLOCK D-MEET NAGAR, BLOCK C-AMAR COLONY, PKT C-BLOCK B, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, GGS INDRAPRASTHA UNIVERSITY-KASHMERE GATE, BLOCK N-SHIV VIHAR, BLOCK F-INDIRA VIHAR, BLOCK B-EAST GOKUL PURI, LIG/MIG RES/NON COMM AREA-B-BLOCK SONIA VIHAR, BLOCK A-MEET NAGAR, BLOCK A-EAST GOKUL PURI, BLOCK M-SHIV VIHAR, BLOCK A-SADATPUR EXT-PUSTA AREA-L BLOCK, BHAJANPURA-DAYALPUR, PKT R-BLOCK D, GEETA COLONY, SPORTS COMPLEX-VASUNDHARA ENCLAVE VSE, BLOCK E- INDIRA VIHAR, BLOCK C-MEET NAGAR, BLOCK H-BHAGIRATHI VIHAR, DARYA GANJ, JAFFRABAD-MAUJ PUR, BLOCK F-SHIV 985 VIHAR, G.B.SSS SCHOOL-GOKUL PURI NNG 4231 2650 KVA UNPLANNED 28-05-2020 21:20:00 28-05-2020 22:13:00 0:53 0.00245861 MUs MAIN BAZAR CHANDANI CHOWK-SISGANJ, DARIBA KALA- 986 KATRA MASHRU CCK 103 990 KVA UNPLANNED 19-05-2020 17:43:57 19-05-2020 18:36:37 0:52 0.00011556 MUs 987 BLOCK C7-YAMUNA VIHAR, JAFFRABAD-MAUJ PUR YVR 625 630 KVA UNPLANNED 09-05-2020 07:53:04 09-05-2020 08:50:15 0:57 0.00015833 MUs

BLOCK JB-WELCOME COLONY, BLOCK I-BRAHM PURI, BLOCK O- BRAHM PURI, BLOCK M-BRAHM PURI, BLOCK K-BRAHM PURI, BLOCK B-BRAHM PURI, BLOCK Q-BRAHM PURI, BLOCK N- 988 BRAHM PURI, GHONDA PATTI CHAUHAN YVR 896 990 KVA PLANNED 19-05-2020 11:00:00 19-05-2020 15:33:05 4:33 0 MUs BLOCK F-NORTH CHHAJUPUR, PKT C-BLOCK B, BLOCK D-JYOTI NAGAR, BLOCK C-NORTH CHHAJUPUR, BLOCK E-JYOTI NAGAR 989 EAST, BLOCK B-JYOTI NAGAR NNG 70 990 KVA UNPLANNED 18-05-2020 04:31:59 18-05-2020 04:55:05 0:23 0.00005111 MUs BLOCK A-BABU NAGAR, BLOCK B-MAN SINGH NAGAR, 990 BHAJANPURA-DAYALPUR KWN 1409 0 KVA UNPLANNED 26-05-2020 16:08:10 26-05-2020 17:00:00 0:51 0.00028333 MUs HAUZ QAZI-CHANDNI CHOWK, DAV PUBLIC SCHOOL-KALA 991 MASZID DRG 38 990 KVA UNPLANNED 28-05-2020 13:42:20 28-05-2020 14:33:53 0:51 0.00005667 MUs SEWA DHAM-MANDOLI, ANUP VIHAR-MANDOLI, SEWA DHAM- 992 MANDOLI NNG 173 0 KVA UNPLANNED 27-05-2020 15:54:20 27-05-2020 16:50:00 0:55 0.00030556 MUs

OLDANPUR-NAVIN SHAHDARA, PANCHSHEEL PARK-NAVIN SHAHDARA, DWARKAPURI-NAVIN SHAHDARA, BLOCK A- DILSHAD COLONY, BLOCK V-PRATAP PURA, BLOCK S-PRATAP 993 PURA, BLOCK T-PRATAP PURA, BLOCK U-PRATAP PURA DGN 102 630 KVA UNPLANNED 19-05-2020 23:40:00 20-05-2020 00:10:00 0:29 0.00020139 MUs

HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK A-BANK COLONY, SABOLI VILLAGE-MANDOLI, BLOCK B-ANUP VIHAR, BLOCK C-SEWA DHAM, BLOCK A-SEWA DHAM, LIG/MIG RES/NON COMM AREA-SEWA DHAM, BLOCK C- ANUP VIHAR, BLOCK D-HARSH VIHAR, BLOCK B-HARSH VIHAR, BLOCK A-HARSH VIHAR, GOVT.CO. SEC. SCHOOL-HARSH VIHAR, 994 BLOCK B-RAJIV NAGAR NNG 2671 0 KVA UNPLANNED 31-05-2020 05:06:48 31-05-2020 05:29:34 0:22 0.00024444 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unserved (MU) due to Sr. No. Area Affected Division Affected Transformer (in KVA). Unplanned Outage From DateTime To DateTime Duration (Hrs:Mins) Outage

BLOCK F-WEST KARAWAL NAGAR, PKT B-BLOCK B, PKT A- BLOCK E, BHAGAT NAGAR-DAYALPUR, WEST KARAWAL NAGAR, BLOCK E-SADAT PUR, PKT C-BLOCK E, PKT A1-BLOCK E, PKT A4-BLOCK E, PKT B-BLOCK A, BLOCK D-WEST KARAWAL 995 NAGAR, BLOCK D-WEST KARAWAL NAGAR KWN 0 0 KVA UNPLANNED 18-05-2020 12:51:00 18-05-2020 15:45:00 2:54 0 MUs

BLOCK D3-NAND NAGARI, BSES OFFICE-BLOCK C2, BLOCK C1- NAND NAGARI, BLOCK B1-NAND NAGARI, BLOCK B-PRATAP 996 NAGAR, PKT C4-BLOCK C1, PKT D3-BLOCK C1 NNG 296 990 KVA UNPLANNED 31-05-2020 14:36:40 31-05-2020 15:30:00 0:53 0.00014722 MUs NAI SARAK-JOGIWARA, CHAWRI BAZAR-KHUSH DIL, LALKUAN BAZAR-SIKRIWALAN- NEW HAUZ QAZI, MAIN BAZAR-KHUSH 997 DIL CCK 21 990 KVA UNPLANNED 04-05-2020 12:00:03 04-05-2020 12:47:45 0:47 0.00005222 MUs BLOCK J-DILSHAD COLONY, BLOCK G-DILSHAD COLONY, BLOCK 998 F-DILSHAD COLONY DGN 50 990 KVA UNPLANNED 24-05-2020 14:05:00 24-05-2020 14:30:00 0:24 0.00012667 MUs

LIG/MIG RES/NON COMM AREA-CHAWLA FARM, LIG/MIG RES/NON COMM AREA-SABHEPUR, BLOCK E-G- BLOCK SONIA VIHAR EXTENSION, CHAUHAN PATTI-VIJAY VIHAR, LIG/MIG RES/NON COMM AREA-C-BLOCK SONIA VIHAR, LIG/MIG 999 RES/NON COMM AREA-SONIA VIHAR KWN 173 0 KVA UNPLANNED 11-05-2020 12:21:43 11-05-2020 13:13:19 0:51 0.00028333 MUs

BLOCK M-SUNDER NAGRI, SABOLI EXTN.-MANDOLI, BLOCK A- MANDOLI EXTN., SABOLI VILLAGE-MANDOLI, NEW MANDOLI INDUSTRIAL AREA, BLOCK C-SEWA DHAM, LIG/MIG RES/NON COMM AREA-SEWA DHAM, BLOCK K-ANUP VIHAR, KABRISTAN- SABOLI COLONY, BANK OF BARODA-SABOLI COLONY, MCD SCHOOL-SABOLI COLONY, BLOCK D-HARSH VIHAR, BLOCK A- RAJIV NAGAR, BLOCK B-RAJIV NAGAR, BLOCK D-MEET NAGAR, SEWA DHAM-MANDOLI, VILLAGE SABOLI-SABOLI COLONY, 1000 SABOLI EXTN.-MANDOLI NNG 3928 630 KVA UNPLANNED 28-05-2020 08:13:32 28-05-2020 09:01:27 0:47 0.00052222 MUs

BLOCK B6-NAND NAGARI, SABOLI EXTN.-MANDOLI, BLOCK A- MANDOLI EXTN., BLOCK A-MANDOLI VILLAGE, SABOLI COLONY- MANDOLI, SABOLI VILLAGE-MANDOLI, BLOCK B-ANUP VIHAR, BLOCK E-SEWA DHAM, NEW MANDOLI INDUSTRIAL AREA, BLOCK B-PRATAP NAGAR, BLOCK A-SEWA DHAM, DEEPAK MEDITECH-NEW MANDOLI INDUSTRIAL AREA, SEWA DHAM- MANDOLI, LIG/MIG RES/NON COMM AREA-SEWA DHAM, BLOCK D-ANUP VIHAR, BLOCK K-ANUP VIHAR, BLOCK A-ANUP VIHAR, BLOCK C-ANUP VIHAR, KABRISTAN-SABOLI COLONY, BANK OF BARODA-SABOLI COLONY, MCD SCHOOL-SABOLI COLONY, J.R. COMPLEX-SEWA DHAM, SEWA DHAM-MANDOLI, SABOLI COLONY-MANDOLI, ANUP VIHAR-MANDOLI, VILLAGE SABOLI-SABOLI COLONY, SABOLI EXTN.-MANDOLI, SEWA 1001 DHAM-MANDOLI NNG 4798 400 KVA UNPLANNED 24-05-2020 10:23:48 24-05-2020 11:15:50 0:52 0.00101111 MUs

PKT C-BLOCK B, BLOCK D-JYOTI NAGAR, BLOCK J-JYOTI NAGAR, SHIV MANDIR-JYOTI NAGAR EAST, PKT S-BLOCK C, BLOCK B- 1002 JYOTI NAGAR, BLOCK H-JYOTI NAGAR NNG 578 990 KVA UNPLANNED 23-05-2020 00:55:20 23-05-2020 01:48:59 0:53 0.00022083 MUs 1003 BLOCK A-DALLU PURA VSE VSE 86 400 KVA UNPLANNED 29-05-2020 15:38:48 29-05-2020 16:30:07 0:51 0.00014167 MUs CHHAJJUPUR-BABAR PUR, BABARPUR EXTN.-BABAR PUR, 1004 BALBIR NAGAR EXTN.-SILAMPUR NNG 31 630 KVA UNPLANNED 22-05-2020 08:07:40 22-05-2020 08:43:07 0:35 0.00009722 MUs

BLOCK C-TUKMIRPUR, LIG/MIG RES/NON COMM AREA- SABHEPUR, LIG/MIG RES/NON COMM AREA-G- BLOCK SONIA VIHAR EXTENSION, BLOCK D-TUKMIRPUR, BLOCK V-O & P BLOCKS SHIV VIHAR KARWAL NAGAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-C-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-C-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-C-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-C-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-SONIA VIHAR, LIG/MIG RES/NON COMM AREA-D- BLOCK-SONIA VIHAR, LIG/MIG RES/NON COMM AREA-E-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-SONIA VIHAR, LIG/MIG RES/NON COMM AREA-G- BLOCK SONIA VIHAR EXTENSION, LIG/MIG RES/NON COMM AREA-G-BLOCK SONIA 1005 VIHAR KWN 5386 0 KVA UNPLANNED 14-05-2020 19:00:34 14-05-2020 20:00:02 0:59 0.00081944 MUs MANTOLA MOHALLA-PAHAR GANJ, AMRIT KAUR MARKET- 1006 PAHAR GANJ PHG 510 990 KVA PLANNED 18-05-2020 10:00:00 18-05-2020 13:25:22 3:25 0.00056944 MUs

DARYA GANJ, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY-KASHMERE GATE, PKT R-BLOCK D, PKT C-BLOCK B, JAFFRABAD-MAUJ PUR, G.B.SSS SCHOOL-GOKUL PURI, BLOCK B- EAST GOKUL PURI, BLOCK A-MEET NAGAR, BLOCK E- UTTARANCHAL COLONY, BLOCK A-SADATPUR EXT-PUSTA AREA- L BLOCK, BLOCK A-EAST GOKUL PURI, BLOCK C-AMAR COLONY, BLOCK C-MEET NAGAR, BLOCK H-BHAGIRATHI VIHAR, BLOCK F- SHIV VIHAR, BLOCK M-SHIV VIHAR, BLOCK N-SHIV VIHAR, BLOCK E-INDIRA VIHAR, SPORTS COMPLEX-VASUNDHARA ENCLAVE VSE, BHAJANPURA-DAYALPUR, BLOCK D-MEET NAGAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-B-BLOCK SONIA 1007 VIHAR, BLOCK F-INDIRA VIHAR NNG 4225 2650 KVA UNPLANNED 14-05-2020 18:00:03 14-05-2020 18:55:09 0:55 0.00024444 MUs

BLOCK C-DURGA PURI, BLOCK B-EAST GOKUL PURI, BLOCK A- MEET NAGAR, BLOCK E-UTTARANCHAL COLONY, BLOCK A-EAST 1008 GOKUL PURI, BLOCK D-MEET NAGAR, BLOCK E-MEET NAGAR NNG 218 630 KVA UNPLANNED 19-05-2020 05:59:59 19-05-2020 06:50:21 0:50 0.00027778 MUs

SABOLI VILLAGE-MANDOLI, BLOCK B-ANUP VIHAR, BLOCK D- ANUP VIHAR, BLOCK K-ANUP VIHAR, BLOCK A-ANUP VIHAR, 1009 BLOCK C-ANUP VIHAR, ANUP VIHAR-MANDOLI NNG 173 0 KVA UNPLANNED 23-05-2020 07:07:42 23-05-2020 07:48:45 0:41 0.00022778 MUs

BLOCK E-BRAHM PURI, BLOCK L-BRAHM PURI, BLOCK C12- 1010 YAMUNA VIHAR, BLOCK B5-YAMUNA PUR (GONDA) BLOCK B YVR 55 990 KVA UNPLANNED 27-05-2020 15:49:08 27-05-2020 16:45:11 0:56 0.00015556 MUs

BLOCK F-NEHRU VIHAR, BLOCK C-TUKMIRPUR, BLOCK B- MUSTAFABAD (DAYALPUR), LIG/MIG RES/NON COMM AREA- DAYALPUR EXTN., BLOCK B-NEHRU VIHAR, BLOCK A-NEHRU VIHAR, BLOCK D-NEHRU VIHAR, BLOCK C-MUSTAFABAD (DAYALPUR), BLOCK A-MUSTAFABAD (DAYALPUR), BLOCK D- TUKMIRPUR, BLOCK B-TUKMIRPUR, BLOCK E-DAYALPUR, 1011 BLOCK B-NEHRU VIHAR, BLOCK A-MUSTAFABAD (DAYALPUR) KWN 664 630 KVA UNPLANNED 09-05-2020 10:29:56 09-05-2020 11:23:52 0:53 0.00014722 MUs BLOCK J-JYOTI NAGAR, PKT A-BLOCK A, PKT D-BLOCK A, PKT B- 1012 BLOCK A, BLOCK H-JYOTI NAGAR NNG 606 1000 KVA UNPLANNED 12-05-2020 11:56:16 12-05-2020 12:20:31 0:24 0.0001 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unserved (MU) due to Sr. No. Area Affected Division Affected Transformer (in KVA). Unplanned Outage From DateTime To DateTime Duration (Hrs:Mins) Outage

NIGAM BODH GHAT CEMETRY-KASHMERE GATE, SWATRANTATA SAINANI SMARAK-CHANDNI CHOWK-RED 1013 FORT, LIG/MIG RES/NON COMM AREA-KASHMERE GATE CCK 307 630 KVA UNPLANNED 06-05-2020 15:20:26 06-05-2020 16:02:46 0:42 0.00004667 MUs

BLOCK A-BABU NAGAR, BLOCK A-KHAJURI KHAS, BLOCK A- RAMA GARDEN, BHAGAT NAGAR-DAYALPUR, BLOCK B-NEW CHAUHAN PUR, BLOCK D-PREM VIHAR, BHAJANPURA- 1014 DAYALPUR, LIG/MIG RES/NON COMM AREA-DAYALPUR EXTN. KWN 388 0 KVA UNPLANNED 12-05-2020 20:07:09 12-05-2020 20:33:40 0:26 0.000325 MUs

BLOCK_20C-KRISHNA NAGAR, BLOCK_3H-KRISHNA NAGAR, BLOCK_19C-KRISHNA NAGAR, BLOCK_30B-KRISHNA NAGAR, DARYA GANJ, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY-KASHMERE GATE, PKT R-BLOCK D, PKT C-BLOCK B, JAFFRABAD-MAUJ PUR, BLOCK A-SADATPUR EXT-PUSTA AREA- L BLOCK, BLOCK H-BHAGIRATHI VIHAR, BLOCK F-SHIV VIHAR, BLOCK M-SHIV VIHAR, BLOCK N-SHIV VIHAR, BLOCK E-INDIRA VIHAR, SPORTS COMPLEX-VASUNDHARA ENCLAVE VSE, BHAJANPURA-DAYALPUR, LIG/MIG RES/NON COMM AREA-A- BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-B-BLOCK SONIA 1015 VIHAR, BLOCK F-INDIRA VIHAR SRD 1278 990 KVA UNPLANNED 29-05-2020 10:49:52 29-05-2020 11:30:10 0:40 0.0002 MUs BLOCK C-GOKUL PURI, BLOCK D-GOKUL PURI, BLOCK A-GOKUL 1016 PURI, BLOCK B-GANGA VIHAR KWN 1224 990 KVA UNPLANNED 31-05-2020 11:45:22 31-05-2020 13:11:58 1:26 0.00047778 MUs BLOCK J-SHIV VIHAR, BLOCK C-PATEL VIHAR, BLOCK Q-SHIV VIHAR, BLOCK H-SHIV VIHAR, BLOCK B-SHIV VIHAR, BLOCK Q- 1017 SHIV VIHAR, BLOCK H-SHIV VIHAR KWN 2568 0 KVA UNPLANNED 28-05-2020 23:20:21 29-05-2020 00:18:33 0:58 0.00024167 MUs

SABOLI EXTN.-MANDOLI, HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK E-RAJIV NAGAR, BLOCK A-BANK COLONY, POCKET A-JJ COLONY, BLOCK B-SEWA DHAM, BLOCK C-SEWA DHAM, BLOCK A-SEWA DHAM, BLOCK D-HARSH VIHAR, BLOCK B-HARSH VIHAR, BLOCK A-HARSH VIHAR, BLOCK 1018 A-SEWA DHAM NNG 1432 0 KVA UNPLANNED 14-05-2020 20:50:40 14-05-2020 21:25:00 0:34 0.00047222 MUs BLOCK B-KUNDAN NAGAR, BLOCK F-VISHWAKARMA PARK, BLOCK A-GURU RAMDAS NAGAR, GURU RAMDAS NAGAR- 1019 LAKSHMI NAGAR LNR 78 630 KVA UNPLANNED 05-05-2020 13:23:06 05-05-2020 13:48:51 0:25 0 MUs HARIZAN BASTI-GAZIPUR VILLAGE, BLOCK H-GAZIPUR VILLAGE, 1020 D.S.I.D.C.-GAZIPUR VILLAGE LNR 253 990 KVA UNPLANNED 20-05-2020 14:51:39 20-05-2020 16:21:13 1:29 0.00024722 MUs

SABOLI VILLAGE-MANDOLI, BLOCK B-ANUP VIHAR, NEW MANDOLI INDUSTRIAL AREA, BLOCK B-PRATAP NAGAR, BLOCK D-ANUP VIHAR, BLOCK K-ANUP VIHAR, BLOCK A-ANUP VIHAR, BLOCK C-ANUP VIHAR, SEWA DHAM-MANDOLI, ANUP VIHAR- 1021 MANDOLI, SEWA DHAM-MANDOLI NNG 259 0 KVA UNPLANNED 26-05-2020 10:16:23 26-05-2020 11:05:19 0:48 0.0004 MUs

1022 AJMERI GATE-CHANDNI CHOWK, MOSQUE-LAL KUAN BAZAR CCK 1444 990 KVA UNPLANNED 14-05-2020 11:34:28 14-05-2020 12:09:52 0:35 0.00003889 MUs

BLOCK CN-AMBIKA VIHAR BLOCK - B&C, PKT Y-SHIV VIHAR, BLOCK B-SHIV VIHAR, PKT X-SHIV VIHAR, PKT D-SHIV VIHAR, 1023 PKT C-SHIV VIHAR, BLOCK CN-AMBIKA VIHAR BLOCK - B&C KWN 1009 0 KVA UNPLANNED 13-05-2020 10:51:41 13-05-2020 11:09:11 0:17 0.00011806 MUs SABOLI EXTN.-MANDOLI, BLOCK C-HARSH VIHAR, BLOCK D- 1024 HARSH VIHAR, BLOCK B-HARSH VIHAR NNG 86 0 KVA UNPLANNED 25-05-2020 13:09:08 25-05-2020 14:07:00 0:57 0.00015833 MUs BLOCK B-SADATPUR EXT-PUSTA AREA-M BLOCK, SHIV VIHAR, BLOCK E-SADAT PUR, BLOCK B-SADAT PUR, BLOCK C-SADAT PUR, PKT A3-BLOCK E, PKT A2-BLOCK E, PKT E-SADATPUR EXT- 1025 PUSTA AREA-K BLOCK KWN 488 630 KVA UNPLANNED 23-05-2020 15:05:59 23-05-2020 16:04:01 0:58 0.00040278 MUs

BLOCK C1-NAND NAGARI, HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK A-BANK COLONY, POCKET B-GURU TEG BAHADUR ENCLAVE, BLOCK C-SEWA 1026 DHAM, BLOCK A-SEWA DHAM, BLOCK D-HARSH VIHAR NNG 1432 0 KVA UNPLANNED 31-05-2020 22:11:21 31-05-2020 22:40:57 0:29 0.00024167 MUs BLOCK A-KABIR NAGAR, BHARAT MATA MANDIR-JJ COLONY, HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK A-BANK COLONY, NEW MANDOLI INDUSTRIAL AREA, DEEPAK MEDITECH-NEW MANDOLI INDUSTRIAL AREA, BLOCK D-HARSH VIHAR, BLOCK B-HARSH VIHAR, BLOCK A- 1027 HARSH VIHAR NNG 432 400 KVA UNPLANNED 18-05-2020 18:04:56 18-05-2020 18:43:44 0:38 0.00052778 MUs SUDARSHAN STEEL ROLLING MILL-RAM NAGAR EAST, RAM NAGAR-SILAMPUR, SHAHDRA METRO STATION-SHAHDARA 1028 DGN DGN 184 630 KVA UNPLANNED 25-05-2020 00:11:03 25-05-2020 00:25:07 0:14 0.00007778 MUs

1029 PKT C-BLOCK B, BLOCK B-JYOTI NAGAR, BLOCK A-BLOCK B NNG 192 630 KVA UNPLANNED 26-05-2020 11:13:14 26-05-2020 12:05:00 0:51 0.0002125 MUs

BLOCK CN-AMBIKA VIHAR BLOCK - B&C, BLOCK C-PATEL VIHAR, BLOCK CN-MANGALAM VIHAR, PHASE I-SHIV VIHAR, VILLAGE- KAMAL VIHAR, SHIV VIHAR, SHIV VIHAR, PKT Y-SHIV VIHAR, BLOCK B-PATEL VIHAR, BLOCK A-MANGALAM VIHAR, BLOCK CN-AMBIKA VIHAR BLOCK - B&C, BLOCK C-PATEL VIHAR, BLOCK 1030 CN-AMBIKA VIHAR BLOCK - B&C KWN 4202 0 KVA UNPLANNED 10-05-2020 19:40:31 10-05-2020 20:15:43 0:35 0.00029167 MUs

FAZALPUR-MANDAWALI VILLAGE, BLOCK A-MANDAWALI, 1031 RAILWAY COLONY-MANDAWALI VILLAGE LNR 132 990 KVA UNPLANNED 19-05-2020 00:42:00 19-05-2020 01:37:28 0:55 0.00015278 MUs

PKT B-BLOCK B, PKT A-BLOCK E, PKT C-BLOCK E, PKT A1-BLOCK 1032 E, PKT A4-BLOCK E, BLOCK D-WEST KARAWAL NAGAR KWN 259 0 KVA UNPLANNED 09-05-2020 15:36:21 09-05-2020 16:30:08 0:53 0.00044167 MUs

HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK E-RAJIV NAGAR, BLOCK A-MANDOLI VILLAGE, BLOCK A-BANK COLONY, SABOLI COLONY-MANDOLI, BLOCK D- HARIJAN BASTI EAST EXTN., BLOCK E-SEWA DHAM, NEW MANDOLI INDUSTRIAL AREA, BLOCK B-SEWA DHAM, BLOCK H- SEWA DHAM, DEEPAK MEDITECH-NEW MANDOLI INDUSTRIAL AREA, BLOCK C-SEWA DHAM, BLOCK A-SEWA DHAM, BLOCK D- HARSH VIHAR, BLOCK A-HARSH VIHAR, GOVT.CO. SEC. SCHOOL- HARSH VIHAR, J.R. COMPLEX-SEWA DHAM, BLOCK E-SEWA 1033 DHAM NNG 345 0 KVA UNPLANNED 18-05-2020 06:27:49 18-05-2020 06:46:11 0:18 0.0002 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unserved (MU) due to Sr. No. Area Affected Division Affected Transformer (in KVA). Unplanned Outage From DateTime To DateTime Duration (Hrs:Mins) Outage

PKT R-BLOCK A, BLOCK B-NEW CHAUHAN PUR, PKT W-BLOCK A, BLOCK B-HARIJAN BASTI, BLOCK D-PREM VIHAR, PKT W- BLOCK A, BLOCK H-SHIV VIHAR, BLOCK A-PREM VIHAR, BLOCK B-SHIV VIHAR, BLOCK Z-O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK H-SHIV VIHAR, BLOCK B-PATEL VIHAR, BLOCK CN-AMBIKA VIHAR BLOCK - B&C, BLOCK K-KARAWAL NAGAR (DEHROTI), BLOCK R-PATEL VIHAR, BLOCK CN-AMBIKA VIHAR BLOCK - B&C, PKT B-BLOCK B, PHASE I-SHIV VIHAR, BLOCK B- NEW CHAUHAN PUR, PKT Y-SHIV VIHAR, VILLAGE-KAMAL VIHAR, BLOCK U-SHIV VIHAR, PKT D-SHIV VIHAR, BLOCK CN- MANGALAM VIHAR, BLOCK A-HARIJAN BASTI, SHIV VIHAR, BLOCK D-WEST KARAWAL NAGAR, LIG/MIG RES/NON COMM AREA-DAYALPUR EXTN., BLOCK Q-SHIV VIHAR, BLOCK A- MANGALAM VIHAR, BLOCK C-PATEL VIHAR, LIG/MIG RES/NON COMM AREA-SABHEPUR, BLOCK F-SHIV VIHAR, SHIV VIHAR, BLOCK C-PATEL VIHAR, BLOCK B-KARAWAL NAGAR (DEHROTI), 1034 BLOCK C-BHAGAT SINGH COLONY KWN 427 400 KVA UNPLANNED 31-05-2020 15:46:37 31-05-2020 16:43:00 0:56 0.00038889 MUs

LALKUAN BAZAR-FRASH KHANA, FATEHPURI MASJID-CHANDNI 1035 CHOWK, KHARI BAWLI-NAYA BANS- LAHORI GATE CCK 69 990 KVA UNPLANNED 06-05-2020 11:28:29 06-05-2020 12:18:15 0:49 0.00005444 MUs TRILOKPURI PHASE I-MAYUR VIHAR, PATPARGANJ-SHASHI 1036 GARDEN MVR 77 400 KVA UNPLANNED 23-05-2020 02:01:24 23-05-2020 02:34:05 0:32 0.00004444 MUs

LIG/MIG RES/NON COMM AREA-CHAWLA FARM, LIG/MIG RES/NON COMM AREA-SABHEPUR, CHAUHAN PATTI-VIJAY VIHAR, LIG/MIG RES/NON COMM AREA-C-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-D-BLOCK-SONIA VIHAR, LIG/MIG RES/NON COMM AREA-E-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-SONIA VIHAR, LIG/MIG 1037 RES/NON COMM AREA-G-BLOCK SONIA VIHAR KWN 86 0 KVA UNPLANNED 16-05-2020 19:46:35 16-05-2020 20:38:46 0:52 0.00014444 MUs

AMBEDKAR NAGAR INDUSTRIAL AREA-BHAGIRATHI VIHAR, BLOCK B-SADATPUR EXT-PUSTA AREA-M BLOCK, SHIV VIHAR, BLOCK E-SADAT PUR, BLOCK B-SADAT PUR, BLOCK C-SADAT PUR, PKT A3-BLOCK E, PKT E-SADATPUR EXT-PUSTA AREA-K 1038 BLOCK, BLOCK D-WEST KARAWAL NAGAR KWN 488 630 KVA UNPLANNED 23-05-2020 11:59:44 23-05-2020 13:47:02 1:47 0.00044583 MUs 1039 SEWA DHAM-MANDOLI NNG 0 400 KVA UNPLANNED 10-05-2020 11:47:00 10-05-2020 12:53:00 1:6 0 MUs

LIG/MIG RES/NON COMM AREA-CRPF CAMP SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-B-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-C-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-SONIA VIHAR, LIG/MIG 1040 RES/NON COMM AREA-D-BLOCK-SONIA VIHAR KWN 173 100 KVA UNPLANNED 21-05-2020 15:30:36 21-05-2020 16:24:35 0:53 0.00029444 MUs

BLOCK 61-AJMAL KHAN PARK, BLOCK 60-AJMAL KHAN PARK, 1041 BLOCK 2E-JHANDEWALAN EXTENSION, ALFA SPICE-SAT NAGAR SRD 129 990 KVA UNPLANNED 04-05-2020 11:16:11 04-05-2020 12:06:59 0:50 0.00013889 MUs

BLOCK J-SUNDER NAGRI, BLOCK L-SUNDER NAGRI, BLOCK KK- SUNDER NAGRI, BLOCK M-SUNDER NAGRI, BLOCK N-SUNDER NAGRI, BLOCK O-SUNDER NAGRI, BLOCK B-SUNDER NAGRI NNG, BLOCK B3-NAND NAGARI, BLOCK F1-BUNKAR VIHAR, POCKET A-JJ COLONY, BLOCK C-SUNDER NAGRI NNG, BLOCK A- RAJIV NAGAR NNG, BLOCK J-SUNDER NAGRI NNG, BLOCK L- SUNDER NAGRI NNG, BLOCK K-SUNDER NAGRI NNG, BLOCK H- PREM NAGAR NNG, BLOCK E1-BUNKAR VIHAR, BLOCK G3- BUNKAR VIHAR, BLOCK F-BUNKAR VIHAR, BLOCK G4-BUNKAR 1042 VIHAR, BLOCK H-JJ COLONY NNG 7722 5030 KVA UNPLANNED 14-05-2020 19:48:59 14-05-2020 20:42:58 0:53 0.00073611 MUs 1043 SEWA DHAM-MANDOLI NNG 432 400 KVA UNPLANNED 15-05-2020 14:42:19 15-05-2020 15:35:00 0:52 0.00072222 MUs BLOCK D-ASHOK NAGAR, HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK C-SEWA DHAM, BLOCK A- SEWA DHAM, BLOCK D-HARSH VIHAR, BLOCK B-HARSH VIHAR, 1044 BLOCK A-HARSH VIHAR NNG 1432 0 KVA UNPLANNED 19-05-2020 22:05:33 19-05-2020 22:20:36 0:15 0.000125 MUs

HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK E-RAJIV NAGAR, BLOCK A-MANDOLI VILLAGE, BLOCK A-BANK COLONY, SABOLI COLONY-MANDOLI, BLOCK D- HARIJAN BASTI EAST EXTN., BLOCK E-SEWA DHAM, NEW MANDOLI INDUSTRIAL AREA, BLOCK B-SEWA DHAM, BLOCK H- SEWA DHAM, DEEPAK MEDITECH-NEW MANDOLI INDUSTRIAL AREA, BLOCK C-SEWA DHAM, BLOCK D-HARSH VIHAR, GOVT.CO. SEC. SCHOOL-HARSH VIHAR, J.R. COMPLEX-SEWA 1045 DHAM, BLOCK E-SEWA DHAM NNG 1027 0 KVA UNPLANNED 28-05-2020 21:20:00 28-05-2020 22:13:00 0:53 0.00175194 MUs BLOCK J-SHIV VIHAR, PKT Y-SHIV VIHAR, BLOCK P-SHIV VIHAR, 1046 BLOCK A-SHIV VIHAR KWN 130 25 KVA UNPLANNED 23-05-2020 14:23:33 23-05-2020 15:10:54 0:47 0.00019583 MUs BLOCK D-ASHOK NAGAR, BLOCK B-ASHOK NAGAR, PKT EA- 1047 BLOCK B NNG 69 630 KVA UNPLANNED 21-05-2020 21:06:57 21-05-2020 21:33:36 0:26 0.00005778 MUs

DARYA GANJ, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY-KASHMERE GATE, PKT R-BLOCK D, PKT C-BLOCK B, JAFFRABAD-MAUJ PUR, G.B.SSS SCHOOL-GOKUL PURI, BLOCK B- EAST GOKUL PURI, BLOCK A-MEET NAGAR, BLOCK E- UTTARANCHAL COLONY, BLOCK A-SADATPUR EXT-PUSTA AREA- L BLOCK, BLOCK A-UTTARANCHAL COLONY, BLOCK B- UTTARANCHAL COLONY, BLOCK A-EAST GOKUL PURI, BLOCK H- BHAGIRATHI VIHAR, BLOCK F-SHIV VIHAR, BLOCK M-SHIV VIHAR, BLOCK N-SHIV VIHAR, BLOCK E-INDIRA VIHAR, SPORTS COMPLEX-VASUNDHARA ENCLAVE VSE, BHAJANPURA- DAYALPUR, BLOCK D-MEET NAGAR, BLOCK E-MEET NAGAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-B-BLOCK SONIA VIHAR, BLOCK 1048 F-INDIRA VIHAR NNG 533 630 KVA UNPLANNED 09-05-2020 18:20:55 09-05-2020 19:02:45 0:41 0.00011389 MUs

SABOLI EXTN.-MANDOLI, BLOCK A-MANDOLI EXTN., BLOCK B- ANUP VIHAR, BLOCK B-PRATAP NAGAR, BLOCK B-SEWA DHAM, BLOCK A-SEWA DHAM, BLOCK A-SEWA DHAM, BLOCK D-ANUP VIHAR, BLOCK K-ANUP VIHAR, BLOCK A-ANUP VIHAR, BLOCK C- ANUP VIHAR, BLOCK B-HARSH VIHAR, BLOCK D-MEET NAGAR, 1049 ANUP VIHAR-MANDOLI NNG 173 0 KVA UNPLANNED 25-05-2020 20:30:00 25-05-2020 21:17:00 0:47 0.00026111 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unserved (MU) due to Sr. No. Area Affected Division Affected Transformer (in KVA). Unplanned Outage From DateTime To DateTime Duration (Hrs:Mins) Outage

PKT W-BLOCK A, BLOCK Z-O & P BLOCKS SHIV VIHAR KARWAL NAGAR, SHIV VIHAR, BLOCK U-SHIV VIHAR, BLOCK Q-SHIV VIHAR, BLOCK H-SHIV VIHAR, BLOCK D-SHIV VIHAR, BLOCK T- SHIV VIHAR, BLOCK F-SHIV VIHAR, BLOCK L-SHIV VIHAR, BLOCK S-SHIV VIHAR, BLOCK O-SHIV VIHAR, BLOCK M-SHIV VIHAR, BLOCK N-SHIV VIHAR, PKT X-SHIV VIHAR, PKT R-BLOCK A, BLOCK V-O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK CN-AMBIKA VIHAR BLOCK - B&C, BLOCK Q-SHIV VIHAR, BLOCK 1050 H-SHIV VIHAR KWN 4001 0 KVA UNPLANNED 16-05-2020 17:34:37 16-05-2020 18:16:40 0:42 0.00035 MUs

BLOCK B-SHRI RAM NAGAR, SUDARSHAN STEEL ROLLING MILL- RAM NAGAR EAST, JINDAL BHAWAN-RAM NAGAR EAST, 1051 SACHDEVA INDUSTRIES-RAM NAGAR EAST DGN 137 990 KVA UNPLANNED 26-05-2020 09:43:29 26-05-2020 10:15:00 0:31 0.00021528 MUs BLOCK B-ANUP VIHAR, SEWA DHAM-MANDOLI, J.R. COMPLEX- SEWA DHAM, SEWA DHAM-MANDOLI, SABOLI COLONY- 1052 MANDOLI, SEWA DHAM-MANDOLI NNG 249 0 KVA UNPLANNED 30-05-2020 11:50:01 30-05-2020 12:35:03 0:45 0.000375 MUs GTB ENCLAVE POLICE BOOTH-JHILMIL-TAHIRPUR NNG, DELHI JAL BOARD MIG FLATS-POCKET A, GOVT.BOYS SEC.SCHOOL- 1053 POCKET A NNG 45 990 KVA UNPLANNED 10-05-2020 15:09:39 10-05-2020 15:54:09 0:44 0.00036667 MUs

DARYA GANJ, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY-KASHMERE GATE, PKT R-BLOCK D, PKT C-BLOCK B, JAFFRABAD-MAUJ PUR, G.B.SSS SCHOOL-GOKUL PURI, BLOCK B- EAST GOKUL PURI, BLOCK A-MEET NAGAR, BLOCK A-SADATPUR EXT-PUSTA AREA-L BLOCK, BLOCK B-UTTARANCHAL COLONY, BLOCK A-EAST GOKUL PURI, BLOCK C-AMAR COLONY, BLOCK C- MEET NAGAR, BLOCK H-BHAGIRATHI VIHAR, BLOCK F-SHIV VIHAR, BLOCK M-SHIV VIHAR, BLOCK N-SHIV VIHAR, BLOCK E- INDIRA VIHAR, SPORTS COMPLEX-VASUNDHARA ENCLAVE VSE, BHAJANPURA-DAYALPUR, BLOCK D-MEET NAGAR, BLOCK E- MEET NAGAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-B-BLOCK SONIA 1054 VIHAR, BLOCK F-INDIRA VIHAR NNG 4225 2650 KVA UNPLANNED 19-05-2020 01:14:34 19-05-2020 01:36:35 0:22 0.00061111 MUs BLOCK G-SILAMPUR COLONY, BLOCK T-GAUTAM PURI, JAG 1055 JEEVAN NAGAR-NEW KATWARA-SHASTRI PARK YVR 510 400 KVA UNPLANNED 27-05-2020 11:38:13 27-05-2020 12:08:50 0:30 0.00006667 MUs BABARPUR EXTN.-BABAR PUR, BALBIR NAGAR EXTN.- 1056 SILAMPUR NNG 31 630 KVA UNPLANNED 22-05-2020 09:59:53 22-05-2020 10:50:43 0:50 0.00020833 MUs 1057 CHIKAMBARPUR-OLD SIMAPURI DGN 259 990 KVA UNPLANNED 25-05-2020 23:05:00 25-05-2020 23:40:26 0:35 0.00029167 MUs BLOCK A-JAGATPURI EXTN., BLOCK A-B&C-JAGAT PURI, BLOCK 1058 A-NATHU COLONY, BLOCK D-JAGAT PURI NNG 549 630 KVA UNPLANNED 24-05-2020 21:58:04 24-05-2020 22:24:54 0:26 0.00007222 MUs

BLOCK D-ASHOK NAGAR, BLOCK A-MEET NAGAR, BLOCK E- UTTARANCHAL COLONY, BLOCK B-UTTARANCHAL COLONY, BLOCK A-EAST GOKUL PURI, BLOCK C-MEET NAGAR, BLOCK D- 1059 MEET NAGAR, BLOCK E-MEET NAGAR NNG 86 1620 KVA UNPLANNED 12-05-2020 21:50:26 12-05-2020 22:38:00 0:47 0.00013056 MUs

SABOLI EXTN.-MANDOLI, BLOCK A-MANDOLI EXTN., SABOLI COLONY-MANDOLI, SABOLI VILLAGE-MANDOLI, BLOCK K-ANUP VIHAR, BLOCK C-ANUP VIHAR, KABRISTAN-SABOLI COLONY, BANK OF BARODA-SABOLI COLONY, MCD SCHOOL-SABOLI COLONY, SEWA DHAM-MANDOLI, VILLAGE SABOLI-SABOLI 1060 COLONY, SABOLI EXTN.-MANDOLI NNG 3928 630 KVA UNPLANNED 31-05-2020 03:16:20 31-05-2020 04:09:41 0:53 0.00147222 MUs TELI WARA-NAWAB GANJ, SIMLA MANDI GOODTRAN-RUI 1061 MANDI, SADAR BAZAR B G ROAD PHG 1301 990 KVA PLANNED 20-05-2020 10:00:00 20-05-2020 12:58:00 2:58 0.00103833 MUs G.B.SSS SCHOOL-GOKUL PURI, BLOCK A-AMAR COLONY, BLOCK A-MEET NAGAR, BLOCK B-UTTARANCHAL COLONY, BLOCK A- 1062 EAST GOKUL PURI NNG 436 630 KVA UNPLANNED 31-05-2020 10:01:31 31-05-2020 10:58:00 0:56 0 MUs ANAND VIHAR BLOCK A, ASHOKA NIKETAN-ANAND VIHAR, AGCR ENCLAVE-ANAND VIHAR, ANAND VIHAR BLOCK C, 1063 ANAND VIHAR BLOCK B JLM 211 990 KVA UNPLANNED 28-05-2020 13:35:00 28-05-2020 14:07:00 0:31 0.00004306 MUs CHHAJJUPUR-BABAR PUR, BALBIR NAGAR EXTN.-SILAMPUR, 1064 BABARPUR EXTN.-BABAR PUR NNG 393 990 KVA UNPLANNED 28-05-2020 06:37:22 28-05-2020 06:45:40 0:8 0 MUs 1065 DELHI JAL BOARD-JYOTI NAGAR NNG 86 100 KVA UNPLANNED 27-05-2020 15:34:35 27-05-2020 16:30:00 0:55 0.00015278 MUs

BLOCK A-BALDEV PARK EAST, BLOCK F-BALDEV PARK EAST, BLOCK A-KRISHNA NAGAR, BLOCK D-RAM NAGAR, BLOCK D- RAM NAGAR EXTN., BLOCK 11-GEETA COLONY, BLOCK 9- DHARAM PURA, BLOCK 10-RAM NAGAR, KARKARDOOMA 1066 COMPLAX-KARKAR DUMA, BLOCK F-RAM NAGAR KRN 443 1500 KVA UNPLANNED 19-05-2020 02:27:59 19-05-2020 02:53:53 0:25 0.00001389 MUs

BLOCK C-MAN SINGH NAGAR, BLOCK B-JOHRI PUR, BLOCK A- JOHRI PUR, MUSTAFABAD-MUNGA NAGAR, AMBEDKAR NAGAR INDUSTRIAL AREA-BHAGIRATHI VIHAR, BHAGIRATHI VIHAR, BLOCK B-CHAMAN PARK, JAGDAMBA COLONY- BHAGIRATHI VIHAR, TUNDA NAGAR-BHAGIRATHI VIHAR, JOHRI ENCLAVE-BHAGIRATHI VIHAR, LAXMI GARDEN- AMBEDKAR NAGAR, BLOCK F-SHIV VIHAR, BLOCK B-JOHRI PUR, BLOCK A-CHAMAN PARK, BLOCK B-INDIRA VIHAR, BLOCK E- INDIRA VIHAR, BLOCK A-SHIV VIHAR, LIG/MIG RES/NON COMM AREA-G- BLOCK SONIA VIHAR EXTENSION, BLOCK C & D- INDIRA VIHAR, BLOCK F-INDIRA VIHAR, JOHRI ENCLAVE- BHAGIRATHI VIHAR, BHAGIRATHI VIHAR, BHAGIRATHI VIHAR, 1067 BHAGIRATHI VIHAR KWN 2402 630 KVA UNPLANNED 28-05-2020 22:10:31 28-05-2020 23:05:00 0:54 0.00075 MUs NAYAGAON-NEW KATWARA, JAGJEET NAGAR-GHONDA, 1068 BLOCK C-JAI PRAKASH NAGAR YVR 115 990 KVA UNPLANNED 17-05-2020 11:58:45 17-05-2020 12:23:32 0:24 0.00005333 MUs

HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK D-HARIJAN BASTI EAST EXTN., BLOCK B-PRATAP NAGAR, BLOCK A-SEWA DHAM, BLOCK D-HARSH VIHAR, BLOCK 1069 B-HARSH VIHAR, RAJEEV NAGAR-SEWA DHAM NNG 1903 0 KVA UNPLANNED 20-05-2020 18:34:05 20-05-2020 19:28:45 0:54 0.00075 MUs 1070 CHANDANI MAHAL-CHANDNI CHOWK DRG 91 990 KVA UNPLANNED 10-05-2020 17:07:41 10-05-2020 18:33:44 1:26 0.00016722 MUs BLOCK B-NEW SILAMPURI PHASE II, JAFFRABAD-MAUJ PUR, 1071 BLOCK C-NEW SILAMPURI PHASE II YVR 69 0 KVA UNPLANNED 12-05-2020 11:24:15 12-05-2020 12:00:00 0:35 0.00007778 MUs

BLOCK A-SILAMPUR COLONY, BLOCK F- LIG/MIG RES/NON COMM AREA-NEW SILAMPURI PHASE II, BLOCK D- LIG/MIG 1072 RES/NON COMM AREA-NEW SILAMPURI PHASE II YVR 69 0 KVA UNPLANNED 21-05-2020 10:29:04 21-05-2020 10:35:19 0:6 0.00001333 MUs 1073 BLOCK D-ASHOK NAGAR NNG 643 990 KVA UNPLANNED 18-05-2020 13:16:11 18-05-2020 13:44:14 0:28 0.00015556 MUs 1074 BLOCK G-PREET VIHAR, BLOCK F-PREET VIHAR LNR 87 990 KVA UNPLANNED 31-05-2020 12:41:33 31-05-2020 13:25:48 0:44 0.00012222 MUs

BLOCK III-ARAM BAGH, BLOCK II-ARAM BAGH, BLOCK B-ARAM BAGH, BLOCK A-ARAM BAGH, CHUNA MANDI-PAHAR GANJ, 1075 NEW RATAN MARKET-PANCHKUIAN ROAD RAILWAY COLONY PHG 723 990 KVA PLANNED 21-05-2020 10:00:00 21-05-2020 12:50:28 2:50 0.00099167 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unserved (MU) due to Sr. No. Area Affected Division Affected Transformer (in KVA). Unplanned Outage From DateTime To DateTime Duration (Hrs:Mins) Outage

BLOCK 4D-OLD RAJENDRA NAGAR, BLOCK 13-OLD RAJENDRA NAGAR, BLOCK 12-OLD RAJENDRA NAGAR, BLOCK 21-OLD RAJENDRA NAGAR, BLOCK 30-OLD RAJENDRA NAGAR, BLOCK 29-OLD RAJENDRA NAGAR, BLOCK 20-OLD RAJENDRA NAGAR, BLOCK 38-OLD RAJENDRA NAGAR, DARYA GANJ, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY-KASHMERE GATE, PKT R-BLOCK D, PKT C-BLOCK B, JAFFRABAD-MAUJ PUR, BLOCK A-SADATPUR EXT-PUSTA AREA-L BLOCK, BLOCK H-BHAGIRATHI VIHAR, BLOCK F-SHIV VIHAR, BLOCK M-SHIV VIHAR, BLOCK N- SHIV VIHAR, BLOCK E-INDIRA VIHAR, SPORTS COMPLEX- VASUNDHARA ENCLAVE VSE, BHAJANPURA-DAYALPUR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-B-BLOCK SONIA VIHAR, BLOCK 1076 F-INDIRA VIHAR SRD 1160 990 KVA UNPLANNED 22-05-2020 14:42:53 22-05-2020 15:15:42 0:32 0.00017778 MUs BLOCK B-EAST GOKUL PURI, BLOCK A-MEET NAGAR, BLOCK A- SEWA DHAM, BLOCK H-SEWA DHAM, BLOCK A-EAST GOKUL PURI, BLOCK C-AMAR COLONY, BLOCK C-MEET NAGAR, BLOCK 1077 D-MEET NAGAR NNG 83 990 KVA UNPLANNED 03-05-2020 20:06:10 03-05-2020 20:32:47 0:26 0.00011556 MUs

BLOCK A-JHANDEWALAN, DARYA GANJ, LIG/MIG RES/NON COMM AREA-SHRIRAM COLONY D BOLCK, JHANDEWALAN FATTED FACTORY COMPLEX, DR. AMBEDKAR STADIUM-FEROJ SHAH KOTLA STADIUM, JAFFRABAD-MAUJ PUR, MAUJ PUR COMPLEX 1, RED FORT-CHANDNI CHOWK-RED FORT, LIG/MIG RES/NON COMM AREA-SHRI RAM COLONY, LIG/MIG RES/NON COMM AREA-BLOCK B, DDA POLICE QTRS.-AHATA KEDARA, BLOCK B-SADAR BAZAR - RAM NAGAR, TELEGRAPH OFFICE- KASHMERE GATE, NIGAM BODH GHAT CEMETRY-KASHMERE GATE, PART II-BLOCK E-BLDGNAMERASTRIYA VIRJANAND 1078 ANDH KANYA MAHAVIDYALAYA YVR 2472 990 KVA UNPLANNED 26-05-2020 10:58:49 26-05-2020 11:32:40 0:33 0.000275 MUs GORAKH PARK WEST-SILAMPUR, NEW JAFFRABAD-GORAKH 1079 PARK, BLOCK A-PRATAP PURA DGN 268 990 KVA UNPLANNED 01-05-2020 15:35:00 01-05-2020 16:29:32 0:54 0.000375 MUs BLOCK A-MANDOLI VILLAGE, POCKET A-JJ COLONY, NEW MANDOLI INDUSTRIAL AREA, BLOCK B-SEWA DHAM, BLOCK A- SEWA DHAM, BLOCK C-SEWA DHAM, BLOCK H-SEWA DHAM, BLOCK D-HARSH VIHAR, BLOCK A-SEWA DHAM, RAJEEV NAGAR- 1080 SEWA DHAM NNG 1278 0 KVA UNPLANNED 16-05-2020 15:15:07 16-05-2020 15:44:30 0:29 0.00016111 MUs

BLOCK J-SHIV VIHAR, PKT W-BLOCK A, BLOCK Z-O & P BLOCKS SHIV VIHAR KARWAL NAGAR, SHIV VIHAR, BLOCK U-SHIV VIHAR, BLOCK Q-SHIV VIHAR, BLOCK H-SHIV VIHAR, BLOCK D- SHIV VIHAR, BLOCK T-SHIV VIHAR, BLOCK F-SHIV VIHAR, BLOCK L-SHIV VIHAR, BLOCK S-SHIV VIHAR, BLOCK O-SHIV VIHAR, BLOCK M-SHIV VIHAR, BLOCK N-SHIV VIHAR, PKT X-SHIV VIHAR, PKT R-BLOCK A, BLOCK D-HARIJAN BASTI, BLOCK V-O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK CN-AMBIKA VIHAR BLOCK - B&C, BLOCK Q-SHIV VIHAR, BLOCK H-SHIV 1081 VIHAR KWN 6566 0 KVA UNPLANNED 16-05-2020 18:48:10 16-05-2020 19:29:21 0:41 0.00011389 MUs

BLOCK A-MEET NAGAR, BLOCK E-UTTARANCHAL COLONY, BLOCK A-UTTARANCHAL COLONY, BLOCK A-EAST GOKUL PURI, 1082 BLOCK D-MEET NAGAR, BLOCK E-MEET NAGAR NNG 85 630 KVA UNPLANNED 20-05-2020 13:17:45 20-05-2020 13:44:55 0:27 0.00015 MUs 1083 MCD COLONY-NEW KATWARA YVR 325 990 KVA UNPLANNED 28-05-2020 13:19:30 28-05-2020 13:47:07 0:27 0.000075 MUs

BLOCK A-PHASE I, BLOCK 21-HIMMATPURI, BLOCK 22- HIMMATPURI, BLOCK 14-TRILOKPURI PHASE II, BLOCK 15- TRILOKPURI PHASE II, BLOCK 24-TRILOKPURI PHASE II, BLOCK 23-TRILOKPURI PHASE II, HIMMATPURI-MAYUR VIHAR, KOTLA- MAYUR VIHAR, MAYUR VIHAR PHASE II, PATPARGANJ-SHASHI 1084 GARDEN, KHICHRI PUR-PHASE II, KOTLA EXCT-PHASE II MVR 4078 0 KVA UNPLANNED 13-05-2020 12:45:58 13-05-2020 15:15:00 2:29 0 MUs

BLOCK J-JAGATPURI, LIG/MIG RES/NON COMM AREA- DAYALPUR EXTN., BLOCK A-RAMA GARDEN, BLOCK C12- YAMUNA VIHAR, BLOCK C6-YAMUNA VIHAR, BLOCK C7- YAMUNA VIHAR, BLOCK C2-YAMUNA VIHAR, BLOCK C1- YAMUNA VIHAR, NORTH GHONDA, BLOCK C4-YAMUNA VIHAR, BLOCK C3-YAMUNA VIHAR, BLOCK K-JAGATPURI, PKT R-BLOCK 1085 A, LIG/MIG RES/NON COMM AREA-NEW CHAUHAN PUR YVR 475 990 KVA UNPLANNED 25-05-2020 00:10:56 25-05-2020 00:49:10 0:38 0.00008444 MUs KABUL NAGAR-ROHITASH NAGAR, EAST ROHTASH NAGAR- SHAHDARA, BLOCK R-PRATAP PURA, GOPAL K.OIL DEPO.- 1086 PRATAP PURA DGN 149 630 KVA UNPLANNED 26-05-2020 05:22:00 26-05-2020 05:46:00 0:24 0.00013333 MUs BLOCK J-VISHWAKARMA PARK, BLOCK A-GURU RAMDAS NAGAR, BLOCK K-JAGAT RAM PARK, GURU RAMDAS NAGAR- 1087 LAKSHMI NAGAR LNR 103 990 KVA UNPLANNED 30-05-2020 13:11:40 30-05-2020 14:28:45 1:17 0.00010694 MUs SABOLI EXTN.-MANDOLI, HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK B-SEWA DHAM, BLOCK D- 1088 HARSH VIHAR, BLOCK B-HARSH VIHAR NNG 1432 0 KVA UNPLANNED 29-05-2020 18:20:00 29-05-2020 18:56:52 0:36 0.0001 MUs BLOCK A-NATHU COLONY, BLOCK A-HARIJAN BASTI, BLOCK D- ASHOK NAGAR, BLOCK D-HARDEV PURI, BLOCK B-ASHOK 1089 NAGAR NNG 86 630 KVA UNPLANNED 22-05-2020 01:07:21 22-05-2020 02:06:10 0:58 0.00016111 MUs MOSQUE-LAL KUAN BAZAR, LALKUAN BAZAR-FRASH KHANA, CHAWRI BAZAR-KHUSH DIL, NAYA BAZAR-CHANDNI CHOWK, FATEHPURI-KHARI BAOLI, LALKUAN BAZAR-SIKRIWALAN- NEW 1090 HAUZ QAZI CCK 1244 990 KVA UNPLANNED 01-05-2020 12:14:24 01-05-2020 12:40:57 0:26 0.00007222 MUs SABOLI EXTN.-MANDOLI, SABOLI VILLAGE-MANDOLI, VILLAGE 1091 SABOLI-SABOLI COLONY NNG 259 0 KVA UNPLANNED 16-05-2020 19:41:59 16-05-2020 20:19:36 0:37 0.00030833 MUs BLOCK A-GHONDA PATTI, BLOCK C-GHONDA PATTI, BLOCK J- 1092 KARTAR NAGAR, GAMRI-GHONDA YVR 1950 990 KVA UNPLANNED 22-05-2020 19:24:18 22-05-2020 19:25:49 0:1 0 MUs BLOCK A-JOHRI PUR, BLOCK F-INDIRA VIHAR, BLOCK C & D- INDIRA VIHAR, BLOCK C & D-INDIRA VIHAR, BHAGIRATHI 1093 VIHAR KWN 2061 0 KVA UNPLANNED 15-05-2020 07:47:26 15-05-2020 08:32:28 0:45 0.0001875 MUs BLOCK G-DILSHAD COLONY, BLOCK F-DILSHAD COLONY, NEAR 1094 JIVAN CLINIC-DILSHAD COLONY DGN 255 990 KVA UNPLANNED 27-05-2020 09:10:50 27-05-2020 09:44:58 0:34 0.00009444 MUs

BLOCK B-KRISHNA NAGAR EAST, BLOCK A-KRISHNA NAGAR EAST, BLOCK A-KRISHNA NAGAR, KRISHNA NAGAR EAST BLOCK G-RADHEPURI, BLOCK B-RADHEPURI EXTENSION, KRISHNA NAGAR EAST BLOCK A-RADHEPURI, KRISHNA NAGAR EAST 1095 BLOCK B-RADHEPURI KRN 589 990 KVA UNPLANNED 09-05-2020 02:31:01 09-05-2020 03:01:58 0:30 0.00001667 MUs BLOCK C2-YAMUNA VIHAR, BLOCK C9-YAMUNA VIHAR, BLOCK C1-YAMUNA VIHAR, BLOCK B2-YAMUNA VIHAR, BLOCK C8- 1096 YAMUNA VIHAR, MAUJ PUR COMPLEX 1 YVR 767 990 KVA UNPLANNED 12-05-2020 15:46:46 12-05-2020 16:16:46 0:29 0.00006444 MUs PHASE I-SHIV VIHAR, VILLAGE-KAMAL VIHAR, SHIV VIHAR, BLOCK B-PATEL VIHAR, BLOCK H-BHAGAT SINGH COLONY, 1097 BLOCK D-PRAKASH VIHAR KWN 130 100 KVA UNPLANNED 21-05-2020 13:49:28 21-05-2020 14:48:00 0:58 0.00024167 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unserved (MU) due to Sr. No. Area Affected Division Affected Transformer (in KVA). Unplanned Outage From DateTime To DateTime Duration (Hrs:Mins) Outage

BLOCK J-SHIV VIHAR, PKT H-BLOCK E, BLOCK D-KHAJURI KHAS, BLOCK CN-AMBIKA VIHAR BLOCK - B&C, BLOCK C-PATEL VIHAR, BLOCK CN-MANGALAM VIHAR, PHASE I-SHIV VIHAR, BLOCK D- DLF ANKUR VIHAR, VILLAGE-KAMAL VIHAR, BLOCK C-KARAWAL NAGAR, SHIV VIHAR, SHIV VIHAR, PKT Y-SHIV VIHAR, BLOCK B- PATEL VIHAR, BLOCK A-MANGALAM VIHAR, BLOCK B-BHAGAT SINGH COLONY, BLOCK C-BHAGAT SINGH COLONY, BLOCK E- PRAKASH VIHAR, BLOCK C-DLF ANKUR VIHAR, BLOCK CN- AMBIKA VIHAR BLOCK - B&C, BLOCK C-PATEL VIHAR, BLOCK CN- 1098 AMBIKA VIHAR BLOCK - B&C KWN 4216 0 KVA UNPLANNED 29-05-2020 21:11:24 29-05-2020 22:05:28 0:54 0.000375 MUs COMMUNITY CENTRE-JAMA MASZID, HAUZ QAZI-CHANDNI CHOWK, MOTIA MAHAL-CHANDNI CHOWK, MAMC 1099 AUDITORIUM-ROUSE AVENUE DRG 248 990 KVA UNPLANNED 29-05-2020 14:29:30 29-05-2020 15:22:54 0:53 0.00014722 MUs

HAUZ QAZI-CHANDNI CHOWK, MOSQUE-LAL KUAN BAZAR, NAI SARAK-JOGIWARA, CHAWRI BAZAR-KHUSH DIL, KINARI BAZAR- DHARAM PURA, GURUDWARA SISGANJ ROAD-CHANDNI 1100 CHOWK, HAUZ QAZI ROAD-PEEPAL MAHADEV GALI CCK 328 990 KVA UNPLANNED 12-05-2020 11:28:05 12-05-2020 12:17:44 0:49 0.00005444 MUs

BLOCK A-SHRI RAM COLONY, LIG/MIG RES/NON COMM AREA- CRPF CAMP SONIA VIHAR, MUSTAFABAD-MUNGA NAGAR, LIG/MIG RES/NON COMM AREA-BALAJI MANDIR COLONY, BLOCK A-G- BLOCK SONIA VIHAR EXTENSION, PKT E-SADATPUR EXT-PUSTA AREA-K BLOCK, YAMUNA FLOOD PLAINS- ANNPURNA MANDIR, LIG/MIG RES/NON COMM AREA-A- BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-B-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-C-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-C-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-C-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-G- BLOCK SONIA VIHAR EXTENSION, LIG/MIG RES/NON COMM AREA-E-BLOCK 1101 SONIA VIHAR KWN 86 0 KVA UNPLANNED 31-05-2020 04:51:37 31-05-2020 05:47:30 0:55 0.00015278 MUs

BLOCK A-MANDOLI EXTN., SABOLI VILLAGE-MANDOLI, BLOCK B- ANUP VIHAR, NEW MANDOLI INDUSTRIAL AREA, BLOCK C- NORTH CHHAJUPUR, BLOCK D-ANUP VIHAR, BLOCK A-ANUP VIHAR, BLOCK C-ANUP VIHAR, SEWA DHAM-MANDOLI, ANUP 1102 VIHAR-MANDOLI, SEWA DHAM-MANDOLI NNG 432 0 KVA UNPLANNED 23-05-2020 21:09:04 23-05-2020 21:34:52 0:25 0.00034722 MUs 1103 MANSAROVAR PARK-DURGA PURI NNG 130 630 KVA UNPLANNED 28-05-2020 13:00:30 28-05-2020 13:50:53 0:50 0.00020833 MUs BLOCK A-EAST GOKUL PURI, BLOCK C-MEET NAGAR, BLOCK B- UTTARANCHAL COLONY, BLOCK A-MEET NAGAR, BLOCK E- 1104 MEET NAGAR NNG 259 1620 KVA UNPLANNED 11-05-2020 21:44:00 11-05-2020 22:01:00 0:17 0.00014167 MUs BLOCK B-ANUP VIHAR, NEW MANDOLI INDUSTRIAL AREA, 1105 SEWA DHAM-MANDOLI, SEWA DHAM-MANDOLI NNG 691 0 KVA UNPLANNED 28-05-2020 22:30:00 28-05-2020 23:22:12 0:52 0.00115556 MUs

BLOCK CN-AMBIKA VIHAR BLOCK - B&C, SHIV VIHAR, SHIV VIHAR, PKT Y-SHIV VIHAR, BLOCK U-SHIV VIHAR, PKT D-SHIV 1106 VIHAR, BLOCK CN-AMBIKA VIHAR BLOCK - B&C KWN 173 0 KVA UNPLANNED 19-05-2020 18:01:11 19-05-2020 18:40:26 0:39 0.00021667 MUs

LIG/MIG RES/NON COMM AREA-DAYALPUR EXTN., BLOCK A- PREM VIHAR, BLOCK A-RAMA GARDEN, BLOCK B-NEW CHAUHAN PUR, BLOCK A-HARIJAN BASTI, BLOCK A-PRAKASH VIHAR, BLOCK C-KARAWAL NAGAR, BLOCK H-SHIV VIHAR, BLOCK R-PATEL VIHAR, BLOCK B-BHAGAT SINGH COLONY, BLOCK C-SHIV VIHAR, BLOCK D-SHIV VIHAR, BLOCK R-SHIV VIHAR, PKT R-BLOCK A, PKT A-SHIV VIHAR, BLOCK C-PRAKASH VIHAR, BLOCK B-KARAWAL NAGAR (DEHROTI), FACTORY (KHASRA)-HARIJAN BASTI, BLOCK C-HARIJAN BASTI, BLOCK D- HARIJAN BASTI, BLOCK B-HARIJAN BASTI, LIG/MIG RES/NON COMM AREA-NEW CHAUHAN PUR, BLOCK A-NEW CHAUHAN 1107 PUR, BLOCK B-DAYALPUR, BLOCK B-NEW CHAUHAN PUR KWN 5264 0 KVA UNPLANNED 26-05-2020 00:01:10 26-05-2020 00:42:38 0:41 0.00028472 MUs

BALBIR NAGAR EXTN.-SILAMPUR, JYOTI COLONY-BALBIR NAGAR, BLOCK KK-SUNDER NAGRI, BLOCK J-JYOTI NAGAR, BLOCK D-ASHOK NAGAR, BLOCK A-SEWA DHAM, BLOCK B- 1108 JYOTI NAGAR, BLOCK H-JYOTI NAGAR NNG 274 630 KVA UNPLANNED 22-05-2020 23:30:00 23-05-2020 00:20:00 0:49 0.00027222 MUs BLOCK C-HARSH VIHAR, BLOCK E-RAJIV NAGAR, NEW MANDOLI INDUSTRIAL AREA, DEEPAK MEDITECH-NEW MANDOLI INDUSTRIAL AREA, BLOCK A-SEWA DHAM, BLOCK D- 1109 HARSH VIHAR, BLOCK B-RAJIV NAGAR NNG 173 0 KVA UNPLANNED 20-05-2020 11:09:58 20-05-2020 11:48:19 0:38 0.00021111 MUs

BLOCK A-KABIR NAGAR, BLOCK B-NORTH CHHAJUPUR, BLOCK 1110 A-NORTH CHHAJUPUR, BLOCK C-NORTH CHHAJUPUR NNG 809 990 KVA UNPLANNED 23-05-2020 12:40:22 23-05-2020 13:37:03 0:56 0.00015556 MUs COMMUNITY CENTRE-JAMA MASZID, HAUZ QAZI-CHANDNI 1111 CHOWK, DAV PUBLIC SCHOOL-KALA MASZID DRG 52 990 KVA UNPLANNED 03-05-2020 13:46:39 03-05-2020 15:39:19 1:52 0.00012444 MUs

LIG/MIG RES/NON COMM AREA-SHASTRI PARK, BLOCK D- 1112 BHAJANPURA, GAMRI-GHONDA, BLOCK E-SUBHASH MOHALLA YVR 497 990 KVA UNPLANNED 27-05-2020 23:24:31 27-05-2020 23:54:54 0:30 0.00006667 MUs

MANTOLA MOHALLA-PAHAR GANJ, PANCHKUIAN ROAD 1113 RAILWAY COLONY-PAHAR GANJ, KASERU WALAN-PAHAR GANJ PHG 971 630 KVA UNPLANNED 11-05-2020 10:06:48 11-05-2020 10:40:00 0:33 0.00009167 MUs

PKT B-BLOCK B, PKT A-BLOCK E, LIG/MIG RES/NON COMM AREA-DAYALPUR EXTN., BLOCK B-NEW CHAUHAN PUR, BLOCK 3A-SADAT PUR, BLOCK C-SHERPUR, DEEKSHA MAHILA COLLAGE- DAYALPUR EXTN., BLOCK B-NEW CHAUHAN PUR, BLOCK D- WEST KARAWAL NAGAR, BLOCK A-HARIJAN BASTI, BLOCK D- 1114 WEST KARAWAL NAGAR KWN 216 0 KVA UNPLANNED 28-05-2020 02:15:24 28-05-2020 03:10:58 0:55 0.00038194 MUs

BLOCK A1-NAND NAGARI, BLOCK A-MANDOLI VILLAGE, POCKET A-JJ COLONY, BLOCK B-SEWA DHAM, BLOCK A-SEWA DHAM, BLOCK H-SEWA DHAM, BUDH VIHAR-SEWA DHAM, BLOCK C-SEWA DHAM, BLOCK B-HARSH VIHAR, BLOCK A- 1115 HARSH VIHAR, BLOCK B-SEWA DHAM NNG 489 0 KVA UNPLANNED 15-05-2020 02:51:04 15-05-2020 03:20:25 0:29 0.00012083 MUs 1116 BLOCK D-ASHOK NAGAR NNG 971 630 KVA UNPLANNED 21-05-2020 11:11:43 21-05-2020 12:05:00 0:53 0.00014722 MUs

RADHE SHYAM PARK-SWASTHYA VIHAR, BLOCK A-BALDEV PARK EAST, CHANDER NAGAR-KRISHNA NAGAR, BLOCK F- BALDEV PARK EAST, BLOCK E-ANARKALI COLONY NORTH, BLOCK B-SOUTH ANARKALI COLONY, BLOCK B-JAGATPURI, BLOCK B-JAGATPURI, BLOCK D-JAGATPURI, BLOCK D-SOUTH 1117 ANARKALI COLONY KRN 2552 990 KVA UNPLANNED 01-05-2020 09:10:00 01-05-2020 11:05:00 1:55 0.00185278 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unserved (MU) due to Sr. No. Area Affected Division Affected Transformer (in KVA). Unplanned Outage From DateTime To DateTime Duration (Hrs:Mins) Outage

BLOCK B-SUBHASH MOHALLA, BLOCK E-SUBHASH MOHALLA, SUBHASH VIHAR-YAMUNA VIHAR, BLOCK B5-YAMUNA PUR (GONDA) BLOCK B, BLOCK C8-YAMUNA VIHAR, BLOCK D- 1118 BHAJANPURA, WEST GHONDA, BLOCK E-SUBHASH MOHALLA YVR 522 990 KVA UNPLANNED 24-05-2020 05:11:26 24-05-2020 06:08:02 0:56 0.00021778 MUs

BALBIR NAGAR EXTN.-SILAMPUR, PKT A-CHITRAKOOT, BLOCK A-CHANDRA LOK, BLOCK B-SAKDARPUR, PKT A-BLOCK A, BLOCK B-EAST GOKUL PURI, BLOCK C1-NAND NAGARI, BLOCK A- AMAR COLONY, BLOCK A-MEET NAGAR, PKT B-BLOCK A, BLOCK H-JYOTI NAGAR, BLOCK A-EAST GOKUL PURI, BLOCK C-AMAR 1119 COLONY, BLOCK C-MEET NAGAR, BLOCK D-MEET NAGAR NNG 604 990 KVA UNPLANNED 18-05-2020 23:56:55 19-05-2020 00:42:19 0:45 0.000875 MUs

BLOCK B-GOVIND VIHAR, BLOCK A-PREM VIHAR, PKT C-BLOCK B, PHASE I-SHIV VIHAR, BLOCK A-HARIJAN BASTI, VILLAGE- KAMAL VIHAR, SHIV VIHAR, BLOCK F-SHIV VIHAR, BLOCK N- SHIV VIHAR, BLOCK B-PATEL VIHAR, BLOCK D-SHIV VIHAR, BLOCK B-SHIV VIHAR, PKT A-BLOCK A, PKT C-SHIV VIHAR, BLOCK E-PRAKASH VIHAR, BLOCK K-KARAWAL NAGAR (DEHROTI), BLOCK B-HARIJAN BASTI, BLOCK D-PREM VIHAR, BLOCK B-PREM VIHAR, BLOCK B-NEW CHAUHAN PUR, BLOCK Q- 1120 SHIV VIHAR KWN 130 0 KVA UNPLANNED 31-05-2020 12:42:50 31-05-2020 13:16:28 0:33 0.0001375 MUs

BLOCK D-NEHRU VIHAR, BLOCK A-PREM VIHAR, PKT C-BLOCK B, PKT W-BLOCK A, BLOCK U-SHIV VIHAR, BLOCK B-SHIV VIHAR, PKT X-SHIV VIHAR, PKT A-BLOCK A, PKT R-BLOCK A, PKT F- BLOCK A, PKT C-SHIV VIHAR, BLOCK V-O & P BLOCKS SHIV 1121 VIHAR KARWAL NAGAR, PKT D-BLOCK B, PKT W-BLOCK A KWN 3348 0 KVA UNPLANNED 19-05-2020 18:22:23 19-05-2020 19:15:55 0:53 0.00022083 MUs

BHARAT MATA MANDIR-JJ COLONY, HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK A- MANDOLI EXTN., BLOCK E-SEWA DHAM, NEW MANDOLI INDUSTRIAL AREA, DEEPAK MEDITECH-NEW MANDOLI INDUSTRIAL AREA, BLOCK C-SEWA DHAM, BLOCK A-SEWA DHAM, MCD SCHOOL-SABOLI COLONY, BLOCK D-MANDOLI EXTN., BLOCK D-HARSH VIHAR, BLOCK B-HARSH VIHAR, BLOCK 1122 A-HARSH VIHAR, SABOLI EXTN.-MANDOLI NNG 345 400 KVA UNPLANNED 31-05-2020 05:03:05 31-05-2020 05:55:00 0:51 0.00056667 MUs BLOCK B-ANUP VIHAR, NEW MANDOLI INDUSTRIAL AREA, BLOCK K-ANUP VIHAR, BLOCK C-ANUP VIHAR, SEWA DHAM- 1123 MANDOLI, SEWA DHAM-MANDOLI NNG 173 0 KVA UNPLANNED 30-05-2020 16:04:38 30-05-2020 16:29:21 0:24 0.00013333 MUs

VIJAY PARK-YAMUNA VIHAR, BLOCK C11-YAMUNA VIHAR, BLOCK C7-YAMUNA VIHAR, BLOCK C10 MAHANAGAR STAFF 1124 UNION-COMMUNITY CENTRE YAMUNA VIHAR BLOCK C YVR 53 630 KVA UNPLANNED 31-05-2020 06:59:58 31-05-2020 07:43:32 0:43 0.000215 MUs

BLOCK D-MEET NAGAR, BLOCK C-AMAR COLONY, PKT C-BLOCK B, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, GGS INDRAPRASTHA UNIVERSITY-KASHMERE GATE, BLOCK N-SHIV VIHAR, BLOCK F-INDIRA VIHAR, BLOCK B-EAST GOKUL PURI, LIG/MIG RES/NON COMM AREA-B-BLOCK SONIA VIHAR, BLOCK A-MEET NAGAR, BLOCK A-EAST GOKUL PURI, BLOCK M-SHIV VIHAR, BLOCK A-SADATPUR EXT-PUSTA AREA-L BLOCK, BHAJANPURA-DAYALPUR, PKT R-BLOCK D, GEETA COLONY, SPORTS COMPLEX-VASUNDHARA ENCLAVE VSE, BLOCK E- INDIRA VIHAR, BLOCK C-MEET NAGAR, BLOCK H-BHAGIRATHI VIHAR, DARYA GANJ, JAFFRABAD-MAUJ PUR, BLOCK F-SHIV 1125 VIHAR, BLOCK E-MEET NAGAR, G.B.SSS SCHOOL-GOKUL PURI NNG 4223 2650 KVA UNPLANNED 05-05-2020 20:21:50 05-05-2020 21:17:00 0:55 0.00076389 MUs BLOCK D-DLF ANKUR VIHAR, BLOCK B-BHAGAT SINGH COLONY, BLOCK H-BHAGAT SINGH COLONY, BLOCK C-BHAGAT SINGH COLONY, BLOCK I-BHAGAT SINGH COLONY, BLOCK E-BHAGAT SINGH COLONY, BLOCK B-PRAKASH VIHAR, BLOCK C-DLF 1126 ANKUR VIHAR KWN 1520 0 KVA UNPLANNED 10-05-2020 16:09:07 10-05-2020 16:26:53 0:17 0.00007083 MUs

NEW USMANPUR-NEW KATWARA, MCD COLONY-NEW KATWARA, JAG JEEVAN NAGAR-NEW KATWARA-SHASTRI 1127 PARK, JAG JEEVAN NAGAR-NEW KATWARA GHONDA YVR 1003 990 KVA UNPLANNED 12-05-2020 08:20:54 12-05-2020 09:01:23 0:40 0.00008889 MUs SABOLI VILLAGE-MANDOLI, BLOCK B-ANUP VIHAR, SABOLI 1128 EXTN.-MANDOLI NNG 173 0 KVA UNPLANNED 30-05-2020 09:03:04 30-05-2020 09:41:28 0:38 0.00021111 MUs NAI SARAK-KATRA ASRAFI, TOWN HALL-KUCHA NATWA, MAIN 1129 BAJAR-MALIWARA CCK 252 990 KVA UNPLANNED 30-05-2020 13:59:44 30-05-2020 14:54:35 0:54 0.00006 MUs BLOCK R&A-SHAKARPUR KHAS, SHAKARPUR EXTN.- 1130 SHAKARPUR KHAS LNR 566 990 KVA UNPLANNED 28-05-2020 17:40:00 28-05-2020 18:05:00 0:24 0.00013333 MUs 1131 BABARPUR EXTN.-BABAR PUR NNG 96 990 KVA UNPLANNED 28-05-2020 11:51:59 28-05-2020 12:27:05 0:35 0.00014583 MUs BLOCK B-BHAGAT SINGH COLONY, BLOCK H-BHAGAT SINGH COLONY, BLOCK C-SHIV VIHAR, BLOCK D-SHIV VIHAR, BLOCK R- SHIV VIHAR, BLOCK B-KARAWAL NAGAR (DEHROTI), BLOCK D- HARIJAN BASTI, BLOCK B-HARIJAN BASTI, BLOCK A-HARIJAN 1132 BASTI KWN 216 0 KVA UNPLANNED 25-05-2020 22:48:41 25-05-2020 23:25:55 0:37 0.00025694 MUs

BLOCK D3-NAND NAGARI, SABOLI EXTN.-MANDOLI, BLOCK A- MANDOLI EXTN., SABOLI VILLAGE-MANDOLI, BLOCK K-ANUP VIHAR, KABRISTAN-SABOLI COLONY, BANK OF BARODA-SABOLI COLONY, MCD SCHOOL-SABOLI COLONY, BLOCK D-MEET NAGAR, SEWA DHAM-MANDOLI, VILLAGE SABOLI-SABOLI 1133 COLONY, SABOLI EXTN.-MANDOLI NNG 3928 630 KVA UNPLANNED 22-05-2020 23:05:00 22-05-2020 23:59:52 0:54 0.0009 MUs

BLOCK B4-NAND NAGARI, SABOLI EXTN.-MANDOLI, BLOCK A- MANDOLI EXTN., BLOCK A-MANDOLI VILLAGE, BLOCK A-BANK COLONY, SABOLI COLONY-MANDOLI, SABOLI VILLAGE- MANDOLI, BLOCK B-ANUP VIHAR, NEW MANDOLI INDUSTRIAL AREA, BLOCK C-NORTH CHHAJUPUR, BLOCK A-SEWA DHAM, SEWA DHAM-MANDOLI, BLOCK D-ANUP VIHAR, BLOCK K-ANUP VIHAR, BLOCK A-ANUP VIHAR, BLOCK C-ANUP VIHAR, KABRISTAN-SABOLI COLONY, BANK OF BARODA-SABOLI COLONY, MCD SCHOOL-SABOLI COLONY, BLOCK D-MANDOLI EXTN., J.R. COMPLEX-SEWA DHAM, SEWA DHAM-MANDOLI, SABOLI COLONY-MANDOLI, ANUP VIHAR-MANDOLI, VILLAGE SABOLI-SABOLI COLONY, SABOLI EXTN.-MANDOLI, SEWA 1134 DHAM-MANDOLI NNG 4798 400 KVA UNPLANNED 24-05-2020 22:42:05 24-05-2020 23:06:36 0:24 0.00053333 MUs 1135 CHANDANI MAHAL-CHANDNI CHOWK DRG 268 990 KVA UNPLANNED 10-05-2020 15:52:40 10-05-2020 16:47:38 0:54 0.000075 MUs

BLOCK A-RAMA GARDEN, BLOCK C-PATEL VIHAR, BLOCK C- KARAWAL NAGAR, BLOCK S-SHIV VIHAR, BLOCK C-HARIJAN 1136 BASTI, BLOCK D-HARIJAN BASTI, BLOCK J-SHIV VIHAR KWN 130 0 KVA UNPLANNED 07-05-2020 01:30:02 07-05-2020 02:15:54 0:45 0.0001875 MUs SABOLI EXTN.-MANDOLI, BLOCK C-HARSH VIHAR, BLOCK A- MANDOLI EXTN., BLOCK B-ANUP VIHAR, NEW MANDOLI INDUSTRIAL AREA, BLOCK K-ANUP VIHAR, BLOCK A-ANUP VIHAR, BLOCK C-ANUP VIHAR, SEWA DHAM-MANDOLI, SEWA 1137 DHAM-MANDOLI NNG 345 0 KVA UNPLANNED 22-05-2020 05:48:23 22-05-2020 06:38:24 0:50 0.00055556 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unserved (MU) due to Sr. No. Area Affected Division Affected Transformer (in KVA). Unplanned Outage From DateTime To DateTime Duration (Hrs:Mins) Outage

1138 MOHALLA SUBHASH NAGAR-NAIWALA, BLOCK_49A-NAIWALA SRD 2 990 KVA UNPLANNED 11-05-2020 10:49:52 11-05-2020 11:28:29 0:38 0.00005278 MUs

BLOCK M-SUNDER NAGRI, SABOLI VILLAGE-MANDOLI, BLOCK B- ANUP VIHAR, NEW MANDOLI INDUSTRIAL AREA, BLOCK B- PRATAP NAGAR, BLOCK D-ANUP VIHAR, BLOCK A-ANUP VIHAR, BLOCK C-ANUP VIHAR, SEWA DHAM-MANDOLI, ANUP VIHAR- 1139 MANDOLI, SEWA DHAM-MANDOLI NNG 432 0 KVA UNPLANNED 14-05-2020 19:31:51 14-05-2020 20:26:20 0:54 0.00075 MUs BLOCK B-SUBHASH MOHALLA, BLOCK E-SUBHASH MOHALLA, BLOCK D-BHAJANPURA, WEST GHONDA, BLOCK E-SUBHASH 1140 MOHALLA YVR 2091 990 KVA UNPLANNED 24-05-2020 17:26:06 24-05-2020 17:52:38 0:26 0.00005778 MUs NAYA VISHWAS NAGAR-SHAHDARA, AMBEDKAR NAGAR- 1141 SHAHDARA, JAWALA NAGAR-SHAHDARA JLM 26 630 KVA PLANNED 20-05-2020 10:00:00 20-05-2020 14:42:47 4:42 0.00039167 MUs BHARAT MATA MANDIR-JJ COLONY, HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, NEW MANDOLI INDUSTRIAL AREA, DEEPAK MEDITECH-NEW 1142 MANDOLI INDUSTRIAL AREA, BLOCK D-HARSH VIHAR NNG 544 400 KVA UNPLANNED 10-05-2020 11:47:00 10-05-2020 12:53:00 1:6 0.001155 MUs

BLOCK G-BHAGIRATHI VIHAR, BLOCK F-BHAGIRATHI VIHAR, BLOCK E-BHAGIRATHI VIHAR, BLOCK D-BHAGIRATHI VIHAR, 1143 BLOCK H-BHAGIRATHI VIHAR, BLOCK C-BHAGIRATHI VIHAR KWN 1812 630 KVA UNPLANNED 07-05-2020 12:45:33 07-05-2020 13:41:00 0:55 0.00015278 MUs 1144 BLOCK CN-MANGALAM VIHAR KWN 130 100 KVA UNPLANNED 18-05-2020 20:58:50 18-05-2020 22:55:02 1:56 0.00048333 MUs SANSAR COMPOUND-DILSHAD GARDEN, DELHI POWER SUPPLY- 1145 DILSHAD GARDEN DGN 173 990 KVA UNPLANNED 15-05-2020 00:06:16 15-05-2020 00:30:00 0:23 0.00012778 MUs

BLOCK E1-NAND NAGARI, BHARAT MATA MANDIR-JJ COLONY, JANTA FLATS-NAND NAGARI, BLOCK E5-NAND NAGARI, 1146 GOVT.SARVODAY VIDHYALAYA-BLOCK E5 NNG 1253 630 KVA UNPLANNED 29-05-2020 22:52:36 29-05-2020 23:09:34 0:16 0.00011111 MUs

SABOLI EXTN.-MANDOLI, BLOCK A-MANDOLI EXTN., SABOLI COLONY-MANDOLI, SABOLI VILLAGE-MANDOLI, BLOCK K-ANUP VIHAR, KABRISTAN-SABOLI COLONY, BANK OF BARODA-SABOLI COLONY, MCD SCHOOL-SABOLI COLONY, BLOCK D-MEET NAGAR, SEWA DHAM-MANDOLI, VILLAGE SABOLI-SABOLI 1147 COLONY, SABOLI EXTN.-MANDOLI NNG 3928 630 KVA UNPLANNED 17-05-2020 05:23:37 17-05-2020 06:18:20 0:54 0.0012 MUs

DARYA GANJ, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY-KASHMERE GATE, PKT R-BLOCK D, PKT C-BLOCK B, JAFFRABAD-MAUJ PUR, G.B.SSS SCHOOL-GOKUL PURI, BLOCK B- EAST GOKUL PURI, BLOCK A-MEET NAGAR, BLOCK E- UTTARANCHAL COLONY, BLOCK A-SADATPUR EXT-PUSTA AREA- L BLOCK, BLOCK A-EAST GOKUL PURI, BLOCK C-AMAR COLONY, BLOCK C-MEET NAGAR, BLOCK H-BHAGIRATHI VIHAR, BLOCK F- SHIV VIHAR, BLOCK M-SHIV VIHAR, BLOCK N-SHIV VIHAR, BLOCK E-INDIRA VIHAR, SPORTS COMPLEX-VASUNDHARA ENCLAVE VSE, BHAJANPURA-DAYALPUR, BLOCK D-MEET NAGAR, BLOCK E-MEET NAGAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA- A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-B- 1148 BLOCK SONIA VIHAR, BLOCK F-INDIRA VIHAR NNG 4225 2650 KVA UNPLANNED 14-05-2020 10:19:59 14-05-2020 10:48:26 0:28 0.00038889 MUs MIG FLATS-POCKET F & E, HANSRAJ SCHOOL-POCKET H, LIG 1149 FLATS-POCKET F & E, MCD OFFICE-POCKET F & E DGN 30 990 KVA UNPLANNED 22-05-2020 16:50:00 22-05-2020 17:23:00 0:33 0.00018333 MUs SUDARSHAN STEEL ROLLING MILL-RAM NAGAR EAST, RAM NAGAR-SILAMPUR, DELHI JAL BOARD-DDA FLATS, JHILMIL 1150 INDUSTRIAL AREA-JHILMIL COLONY DGN 214 630 KVA UNPLANNED 27-05-2020 13:27:37 27-05-2020 14:13:07 0:45 0.000125 MUs ROHITASH NAGAR EAST-SILAMPUR, BLOCK 1-RAM NAGAR EXTN., BLOCK 1-BHAGWANPUR KHERA, BLOCK 1-BALBIR 1151 NAGAR DGN 218 990 KVA UNPLANNED 15-05-2020 11:32:47 15-05-2020 11:56:30 0:23 0.00063889 MUs ROHITASH NAGAR EAST-SILAMPUR, BLOCK 1-BALBIR NAGAR, 1152 BALBIR NAGAR EXTN.-SILAMPUR DGN 220 630 KVA UNPLANNED 17-05-2020 11:08:33 17-05-2020 11:39:59 0:31 0.00008611 MUs

LIG/MIG RES/NON COMM AREA-CHAWLA FARM, LIG/MIG RES/NON COMM AREA-SABHEPUR, LIG/MIG RES/NON COMM AREA-G- BLOCK SONIA VIHAR EXTENSION, LIG/MIG RES/NON COMM AREA-BALAJI MANDIR COLONY, LIG/MIG RES/NON COMM AREA-SHRI RAM COLONY, BLOCK H-BHAGIRATHI VIHAR, BLOCK A-G- BLOCK SONIA VIHAR EXTENSION, BLOCK B- G- BLOCK SONIA VIHAR EXTENSION, BLOCK E-G- BLOCK SONIA VIHAR EXTENSION, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-C-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-G- BLOCK SONIA VIHAR EXTENSION, LIG/MIG RES/NON COMM AREA-G- BLOCK SONIA VIHAR EXTENSION, LIG/MIG RES/NON COMM AREA-D- BLOCK-SONIA VIHAR, LIG/MIG RES/NON COMM AREA-E-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-SONIA VIHAR, LIG/MIG RES/NON COMM AREA-G- BLOCK SONIA VIHAR EXTENSION, LIG/MIG RES/NON COMM AREA-G-BLOCK SONIA 1153 VIHAR KWN 1436 0 KVA UNPLANNED 03-05-2020 09:20:46 03-05-2020 10:18:00 0:57 0.00015833 MUs BLOCK C6-YAMUNA VIHAR, BLOCK C7-YAMUNA VIHAR, BLOCK 1154 C3-YAMUNA VIHAR YVR 38 990 KVA UNPLANNED 28-05-2020 11:26:19 28-05-2020 12:20:00 0:53 0.00014722 MUs

BLOCK K-WEST KARAWAL NAGAR, PKT B-BLOCK B, PKT A- BLOCK E, LIG/MIG RES/NON COMM AREA-DAYALPUR EXTN., BLOCK B-NEW CHAUHAN PUR, BLOCK 3A-SADAT PUR, PKT EA- BLOCK B, PKT D-BLOCK B, PKT E-BLOCK B, BLOCK C-SHERPUR, BLOCK E-SADAT PUR, BLOCK B-SADAT PUR, BLOCK C-SADAT PUR, PKT C-BLOCK E, PKT A1-BLOCK E, PKT A2-BLOCK E, PKT A4- BLOCK E, BLOCK A-KARAWAL NAGAR (DEHROTI), PKT A-BLOCK B, PKT D-BLOCK A, PKT C-BLOCK A, PKT E-BLOCK A, PKT B- BLOCK A, PKT G-BLOCK A, BLOCK D-NEW CHAUHAN PUR, 1155 BLOCK D-WEST KARAWAL NAGAR KWN 1512 0 KVA UNPLANNED 18-05-2020 18:21:17 18-05-2020 19:11:22 0:50 0.00013889 MUs

BLOCK_8A-SANT NAGAR, BLOCK_9A-BALMIKI COLONY, DARYA GANJ, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY- KASHMERE GATE, PKT R-BLOCK D, PKT C-BLOCK B, JAFFRABAD- MAUJ PUR, BLOCK A-SADATPUR EXT-PUSTA AREA-L BLOCK, BLOCK H-BHAGIRATHI VIHAR, BLOCK F-SHIV VIHAR, BLOCK M- SHIV VIHAR, BLOCK N-SHIV VIHAR, BLOCK E-INDIRA VIHAR, ALFA SPICE-SAT NAGAR, SPORTS COMPLEX-VASUNDHARA ENCLAVE VSE, BHAJANPURA-DAYALPUR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON 1156 COMM AREA-B-BLOCK SONIA VIHAR, BLOCK F-INDIRA VIHAR SRD 789 990 KVA PLANNED 22-05-2020 09:00:00 22-05-2020 12:04:00 3:4 0.00107333 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unserved (MU) due to Sr. No. Area Affected Division Affected Transformer (in KVA). Unplanned Outage From DateTime To DateTime Duration (Hrs:Mins) Outage

BLOCK A-HARIJAN BASTI, HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK A-MANDOLI EXTN., BLOCK A-BANK COLONY, SABOLI COLONY-MANDOLI, BLOCK E- SEWA DHAM, BLOCK B-SEWA DHAM, BUDH VIHAR-SEWA DHAM, DEEPAK MEDITECH-NEW MANDOLI INDUSTRIAL AREA, BLOCK A-SEWA DHAM, BLOCK D-HARSH VIHAR, BLOCK B- HARSH VIHAR, BLOCK A-HARSH VIHAR, BLOCK B-RAJIV NAGAR, 1157 BLOCK A-SEWA DHAM, ANUP VIHAR-MANDOLI NNG 1432 0 KVA UNPLANNED 15-05-2020 01:56:23 15-05-2020 02:50:00 0:53 0.00103056 MUs

LIG/MIG RES/NON COMM AREA-B-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-SONIA VIHAR, LIG/MIG RES/NON COMM AREA-D-BLOCK-SONIA VIHAR, LIG/MIG RES/NON COMM AREA-SONIA VIHAR, LIG/MIG RES/NON 1158 COMM AREA-G- BLOCK SONIA VIHAR EXTENSION KWN 173 0 KVA UNPLANNED 12-05-2020 09:33:58 12-05-2020 10:07:36 0:33 0.00018333 MUs PKT A-CHITRAKOOT, PKT B-CHITRAKOOT, MCD SCHOOL- 1159 CHITRAKOOT NNG 45 400 KVA UNPLANNED 30-05-2020 13:36:02 30-05-2020 14:23:42 0:47 0.00039167 MUs

BLOCK A-RAMA GARDEN, BLOCK R-PATEL VIHAR, BLOCK D- SHIV VIHAR, BLOCK R-SHIV VIHAR, BLOCK D-HARIJAN BASTI, BLOCK B-HARIJAN BASTI, BLOCK A-NEW CHAUHAN PUR, BLOCK 1160 A-HARIJAN BASTI, BLOCK B-NEW CHAUHAN PUR KWN 86 0 KVA UNPLANNED 10-05-2020 12:55:05 10-05-2020 13:23:33 0:28 0.00007778 MUs

HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK A-BANK COLONY, SABOLI VILLAGE-MANDOLI, BLOCK D-HARIJAN BASTI EAST EXTN., BLOCK B-ANUP VIHAR, POCKET A-JJ COLONY, BLOCK C-SEWA DHAM, BLOCK A-SEWA DHAM, LIG/MIG RES/NON COMM AREA-SEWA DHAM, BLOCK C- ANUP VIHAR, BLOCK D-HARSH VIHAR, BLOCK B-HARSH VIHAR, 1161 BLOCK A-HARSH VIHAR, GOVT.CO. SEC. SCHOOL-HARSH VIHAR NNG 2671 0 KVA UNPLANNED 28-05-2020 21:20:00 28-05-2020 21:54:00 0:33 0.00067833 MUs 1162 BLOCK V-GHONDA PATTI CHAUHAN YVR 69 990 KVA UNPLANNED 21-05-2020 13:03:01 21-05-2020 13:47:29 0:44 0.00009778 MUs

BLOCK C-HARSH VIHAR, BLOCK D-HARIJAN BASTI EAST EXTN., BLOCK B-PRATAP NAGAR, BLOCK D-HARSH VIHAR, BLOCK B- HARSH VIHAR, BLOCK A-HARSH VIHAR, BLOCK B-RAJIV NAGAR, 1163 RAJEEV NAGAR-SEWA DHAM NNG 86 0 KVA UNPLANNED 31-05-2020 11:08:20 31-05-2020 12:05:00 0:56 0.00015556 MUs

BLOCK A-SHASTRI PARK, CHAUHAN BANGAR-JAFFRABAD, BLOCK N-NEW SILAMPURI PHASE I, BLOCK T-GAUTAM PURI, NAYAGAON-NEW KATWARA, BLOCK B-SUBHASH MOHALLA, BLOCK E-SUBHASH MOHALLA, BLOCK I-BRAHM PURI, BLOCK K- BRAHM PURI, BLOCK B-BRAHM PURI, BLOCK R-BRAHM PURI, BLOCK N-BRAHM PURI, KACHI COLONY-JAGJEET NAGAR, BLOCK A-GHONDA PATTI, BLOCK C6-YAMUNA VIHAR, BLOCK B5-YAMUNA PUR (GONDA) BLOCK B, JAFFRABAD-MAUJ PUR, MAUJ PUR COMPLEX 1, LIG/MIG RES/NON COMM AREA- SHASTRI PARK, BLOCK A-GARI MANDU, BLOCK D-BHAJANPURA, BLOCK C-BHAJANPURA, BLOCK B-MANUJPUR, JAGJEET NAGAR- GHONDA, BLOCK J-KARTAR NAGAR, GAUTAM VIHAR-GHONDA, GAMRI-GHONDA, GHONDA PATTI CHAUHAN, WEST GHONDA, JAFFRABAD-MAUJ PUR, BLOCK C-BHAJANPURA, BLOCK D- 1164 BHAJANPURA YVR 10841 7590 KVA UNPLANNED 19-05-2020 14:00:00 19-05-2020 14:02:26 0:2 0 MUs

1165 BHOLA NATH NAGAR-SHAHDARA, BIHARI COLONY-SHAHDARA JLM 103 630 KVA UNPLANNED 28-05-2020 01:51:51 28-05-2020 03:41:55 1:50 0.00015278 MUs SABOLI EXTN.-MANDOLI, BLOCK A-MANDOLI EXTN., BLOCK D- ANUP VIHAR, KABRISTAN-SABOLI COLONY, MCD SCHOOL- SABOLI COLONY, SEWA DHAM-MANDOLI, SABOLI EXTN.- 1166 MANDOLI NNG 2392 0 KVA UNPLANNED 01-05-2020 11:44:25 01-05-2020 12:34:37 0:50 0.00041667 MUs

BLOCK B-ANUP VIHAR, BLOCK D-ANUP VIHAR, BLOCK A-ANUP 1167 VIHAR, BLOCK C-ANUP VIHAR, ANUP VIHAR-MANDOLI NNG 173 0 KVA UNPLANNED 27-05-2020 15:21:53 27-05-2020 16:18:00 0:56 0.00031111 MUs BABARPUR EXTN.-BABAR PUR, JAFFRABAD-MAUJ PUR, MAUJ 1168 PUR COMPLEX 1, JAGJEET NAGAR-GHONDA YVR 486 630 KVA UNPLANNED 17-05-2020 14:44:17 17-05-2020 15:32:24 0:48 0.00013333 MUs

BABARPUR WEST-BABAR PUR NNG, CHHAJJUPUR-BABAR PUR, BABARPUR EXTN.-BABAR PUR, BALBIR NAGAR EXTN.- SILAMPUR, BLOCK A-HARIJAN BASTI, BLOCK D-ASHOK NAGAR, BLOCK A2-NAND NAGARI, BABARPUR WEST-BABAR PUR, 1169 BLOCK B-JYOTI NAGAR, BLOCK H-JYOTI NAGAR NNG 595 630 KVA UNPLANNED 22-05-2020 00:43:34 22-05-2020 01:35:00 0:51 0.00014167 MUs BLOCK D-HARIJAN BASTI EAST EXTN., BLOCK B-ANUP VIHAR, NEW MANDOLI INDUSTRIAL AREA, BLOCK D-ANUP VIHAR, BLOCK A-ANUP VIHAR, BLOCK C-ANUP VIHAR, BLOCK B-HARSH VIHAR, BLOCK E-MEET NAGAR, ANUP VIHAR-MANDOLI, SEWA 1170 DHAM-MANDOLI NNG 432 0 KVA UNPLANNED 24-05-2020 09:36:43 24-05-2020 10:23:26 0:46 0.00063889 MUs

VIJAY PARK-YAMUNA VIHAR, MAUJ PUR COMPLEX 1, BSES 66 1171 KV GRID S/STATION-COMMUNITY CENTRE YAMUNA VIHAR YVR 219 630 KVA UNPLANNED 07-05-2020 13:11:35 07-05-2020 13:40:58 0:29 0.00016111 MUs

SABOLI EXTN.-MANDOLI, BLOCK A-MANDOLI EXTN., BLOCK A- MANDOLI VILLAGE, SABOLI COLONY-MANDOLI, SABOLI VILLAGE-MANDOLI, BLOCK B-ANUP VIHAR, BLOCK A-SEWA DHAM, KABRISTAN-SABOLI COLONY, BANK OF BARODA-SABOLI COLONY, MCD SCHOOL-SABOLI COLONY, SEWA DHAM- MANDOLI, SABOLI COLONY-MANDOLI, VILLAGE SABOLI-SABOLI 1172 COLONY, SABOLI EXTN.-MANDOLI NNG 4342 0 KVA UNPLANNED 16-05-2020 19:09:41 16-05-2020 19:37:22 0:27 0.000225 MUs

BLOCK A- BHARTIYA BODH SABHA-HARDEV PURI, BLOCK B- NATHU PURA, BLOCK A-NATHU COLONY, BABA DA DARGA- KARDAMPURI, BLOCK A-NATHU PURA, BLOCK B-ASHOK 1173 NAGAR, BLOCK E-ASHOK NAGAR, BLOCK E-MEET NAGAR NNG 1233 630 KVA UNPLANNED 19-05-2020 11:10:00 19-05-2020 12:05:00 0:54 0.00015 MUs

NEW GOVIND PURA-JAGATPURI, BLOCK D-RAM NAGAR, BLOCK 9-GANDHI NAGAR, SHIVPURI-JAGATPURI, BLOCK D-JAGATPURI, 1174 BALDEV PARK-JAGATPURI KRN 769 990 KVA UNPLANNED 27-05-2020 13:15:40 27-05-2020 13:38:34 0:22 0.00006111 MUs 1175 BLOCK CN-MANGALAM VIHAR KWN 130 100 KVA UNPLANNED 31-05-2020 11:52:34 31-05-2020 12:37:28 0:44 0.00018333 MUs SABOLI EXTN.-MANDOLI, SABOLI VILLAGE-MANDOLI, BLOCK D- ANUP VIHAR, BLOCK K-ANUP VIHAR, BLOCK A-ANUP VIHAR, BLOCK D-MEET NAGAR, VILLAGE SABOLI-SABOLI COLONY, 1176 SEWA DHAM-MANDOLI NNG 216 0 KVA UNPLANNED 20-05-2020 18:11:13 20-05-2020 19:02:18 0:51 0.00035417 MUs LIG/MIG RES/NON COMM AREA-CHAWLA FARM, LIG/MIG RES/NON COMM AREA-SABHEPUR, LIG/MIG RES/NON COMM AREA-MILAN GARDEN, LIG/MIG RES/NON COMM AREA-BALAJI MANDIR COLONY, CHAUHAN PATTI-VIJAY VIHAR, BADARPUR 1177 KHADAR KWN 4107 5235 KVA UNPLANNED 10-05-2020 13:28:04 10-05-2020 13:56:16 0:28 0.00031111 MUs

PAHAR GANJ PHG, MANTOLA MOHALLA-PAHAR GANJ, SHORA KOTHI-PAHAR GANJ, PANCHKUIAN ROAD RAILWAY COLONY- 1178 PAHAR GANJ, KASERU WALAN-PAHAR GANJ PHG 1179 630 KVA UNPLANNED 28-05-2020 21:00:00 28-05-2020 21:29:12 0:29 0.00008056 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unserved (MU) due to Sr. No. Area Affected Division Affected Transformer (in KVA). Unplanned Outage From DateTime To DateTime Duration (Hrs:Mins) Outage HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK A-BANK COLONY, BLOCK C-SEWA DHAM, BLOCK A-SEWA DHAM, BLOCK D-HARSH VIHAR, BLOCK B-HARSH VIHAR, BLOCK A-HARSH VIHAR, BLOCK D-MEET NAGAR, BLOCK 1179 E-MEET NAGAR NNG 86 0 KVA UNPLANNED 09-05-2020 19:26:39 09-05-2020 19:58:25 0:31 0.00008611 MUs

BLOCK A-PANDAV NAGAR, BLOCK A-GANESH NAGAR, BLOCK C- 1180 GANESH NAGAR, PANDAV NAGAR BLOCK D-GANESH NAGAR LNR 226 990 KVA UNPLANNED 25-05-2020 00:19:00 25-05-2020 00:48:52 0:29 0.00008056 MUs SABOLI EXTN.-MANDOLI, SABOLI COLONY-MANDOLI, SABOLI VILLAGE-MANDOLI, BLOCK B-ANUP VIHAR, BLOCK E-SEWA DHAM, NEW MANDOLI INDUSTRIAL AREA, BLOCK B-SEWA DHAM, BLOCK C-ANUP VIHAR, SEWA DHAM-MANDOLI, ANUP VIHAR-MANDOLI, SABOLI EXTN.-MANDOLI, SEWA DHAM- 1181 MANDOLI NNG 432 0 KVA UNPLANNED 10-05-2020 11:47:00 10-05-2020 12:53:00 1:6 0 MUs

AZAD MARKET-KISHAN GANJ RS, BLOCK 11-GEETA COLONY, BLOCK 2-GEETA COLONY, BLOCK 6-GEETA COLONY, BLOCK 16- GEETA COLONY, BLOCK 18-GEETA COLONY, BLOCK 15-GEETA COLONY, BLOCK 14-GEETA COLONY, BLOCK 5-GEETA COLONY, BLOCK 7-GEETA COLONY, BLOCK 8A-GEETA COLONY, BLOCK 8- GEETA COLONY, BLOCK 1A-GEETA COLONY, OLD GEETA 1182 COLONY-BLOCK 8A KRN 295 990 KVA UNPLANNED 26-05-2020 01:31:06 26-05-2020 02:19:23 0:48 0.00004 MUs BLOCK T-GAUTAM PURI, VIJAY PARK-YAMUNA VIHAR, BLOCK 1183 C12-YAMUNA VIHAR YVR 1207 990 KVA UNPLANNED 21-05-2020 12:27:01 21-05-2020 13:09:01 0:42 0.00009333 MUs

THAKKAR BAPA NAGAR-BLOCK 16, DARYA GANJ, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY-KASHMERE GATE, PKT R-BLOCK D, PKT C-BLOCK B, JAFFRABAD-MAUJ PUR, BLOCK A-SADATPUR EXT-PUSTA AREA-L BLOCK, BLOCK H-BHAGIRATHI VIHAR, BLOCK F-SHIV VIHAR, BLOCK M-SHIV VIHAR, BLOCK N- SHIV VIHAR, BLOCK E-INDIRA VIHAR, BLOCK B-PUNJABI BASTI, SPORTS COMPLEX-VASUNDHARA ENCLAVE VSE, BHAJANPURA- DAYALPUR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-B-BLOCK SONIA 1184 VIHAR, BLOCK F-INDIRA VIHAR PNR 2092 990 KVA PLANNED 19-05-2020 09:00:00 19-05-2020 12:41:41 3:41 0.00128917 MUs

ROHITASH NAGAR EAST-SILAMPUR, EAST ROHTASH NAGAR- SHAHDARA, BLOCK A-PRATAP PURA, GOPAL K.OIL DEPO.- 1185 PRATAP PURA, SHAHDRA METRO STATION-SHAHDARA DGN DGN 210 990 KVA UNPLANNED 21-05-2020 00:30:17 21-05-2020 01:00:12 0:29 0.00015306 MUs BLOCK B-GOVIND VIHAR, BLOCK A-PREM VIHAR, BLOCK B- 1186 NEHRU VIHAR KWN 130 0 KVA UNPLANNED 14-05-2020 14:29:45 14-05-2020 15:28:02 0:58 0.00024167 MUs M.C.P. SCHOOL-POCKET O, DELHI JAL BOARD-POCKET I, BLOCK J & K-POCKET J&K, HANSRAJ SCHOOL-POCKET H, MUKHRJI SCHOOL-POCKET L, DDA FLATS-POCKET SG, SHAHNI DEV 1187 MANDIR-POCKET SG DGN 1927 2250 KVA UNPLANNED 15-05-2020 10:30:00 15-05-2020 11:22:47 0:52 0.00007222 MUs SHIVAJI PARK-BALBIR NAGAR, ROHITASH NAGAR EAST- SILAMPUR, BLOCK 1-BALBIR NAGAR, BALBIR NAGAR EXTN.- 1188 SILAMPUR DGN 784 400 KVA UNPLANNED 25-05-2020 12:04:50 25-05-2020 12:40:03 0:35 0.00009722 MUs

HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH 1189 VIHAR, BLOCK D-HARSH VIHAR, BLOCK B-RAJIV NAGAR NNG 1432 0 KVA UNPLANNED 03-05-2020 11:44:43 03-05-2020 12:22:57 0:38 0.00019 MUs

BLOCK B-ANUP VIHAR, BLOCK E-SEWA DHAM, NEW MANDOLI INDUSTRIAL AREA, BLOCK K-ANUP VIHAR, SEWA DHAM- 1190 MANDOLI, ANUP VIHAR-MANDOLI, SEWA DHAM-MANDOLI NNG 432 0 KVA UNPLANNED 31-05-2020 03:12:09 31-05-2020 04:09:01 0:56 0.00077778 MUs

BLOCK I-BRAHM PURI, BLOCK L-BRAHM PURI, JAGJEET NAGAR- 1191 GHONDA, BLOCK J-KARTAR NAGAR, BLOCK B-KARTAR NAGAR YVR 1699 990 KVA UNPLANNED 26-05-2020 12:19:15 26-05-2020 13:06:28 0:47 0.00052222 MUs

LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-C-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-C-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-C-BLOCK SONIA VIHAR, 1192 LIG/MIG RES/NON COMM AREA-SHRIRAM COLONY E BOLCK KWN 130 0 KVA UNPLANNED 30-05-2020 04:06:51 30-05-2020 06:35:00 2:28 0.00061667 MUs BLOCK N-VISHWAKARMA PARK, BLOCK J & K-NARAYAN NAGAR, RAMESH PARK-LAKSHMI NAGAR, VISHWAKARMA 1193 PARK-LAKSHMI NAGAR LNR 546 990 KVA UNPLANNED 30-05-2020 05:16:55 30-05-2020 06:35:09 1:18 0 MUs

G.B.SSS SCHOOL-GOKUL PURI, BLOCK B-EAST GOKUL PURI, 1194 BLOCK A-MEET NAGAR, BLOCK A-EAST GOKUL PURI NNG 52 630 KVA UNPLANNED 19-05-2020 13:10:00 19-05-2020 14:03:20 0:53 0.00007361 MUs BLOCK B-EAST GOKUL PURI, BLOCK A-MEET NAGAR, BLOCK A- EAST GOKUL PURI, BLOCK C-AMAR COLONY, BLOCK C-MEET 1195 NAGAR, BLOCK D-MEET NAGAR NNG 3085 0 KVA UNPLANNED 04-05-2020 09:48:30 04-05-2020 10:37:59 0:49 0.00040833 MUs 1196 HARSH VIHAR SUB STATION-POLICE FARM NNG 0 0 KVA UNPLANNED 28-05-2020 12:33:00 28-05-2020 12:48:00 0:15 0 MUs BLOCK C-PANDAV NAGAR, BLOCK D-PANDAV NAGAR, BLOCK A- PANDAV NAGAR, BLOCK J-PANDAV NAGAR, PANDAV NAGAR- 1197 PANDAV NAGAR LNR LNR 841 990 KVA UNPLANNED 06-05-2020 01:10:00 06-05-2020 01:15:28 0:5 0 MUs RAILWAY WORKSHOP-SANJAY AMAR COLONY, IP STATE- 1198 PRAGATI MAIDAN DRG 142 990 KVA PLANNED 31-05-2020 10:00:00 31-05-2020 15:25:00 5:25 0.00045139 MUs 1199 SIYARAM-GHISA DGN 173 990 KVA UNPLANNED 19-05-2020 11:08:23 19-05-2020 11:38:19 0:29 0.00016111 MUs

LIG/MIG RES/NON COMM AREA-CHAWLA FARM, BLOCK Z-O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK B2-YAMUNA VIHAR, CHAUHAN PATTI-VIJAY VIHAR, LIG/MIG RES/NON 1200 COMM AREA-A-BLOCK SONIA VIHAR KWN 8 100 KVA UNPLANNED 19-05-2020 23:31:04 19-05-2020 23:51:31 0:20 0.00011111 MUs

BLOCK B-ANUP VIHAR, BLOCK A-MANDOLI EXTN., SABOLI EXTN.-MANDOLI, SEWA DHAM-MANDOLI, SABOLI COLONY- MANDOLI, VILLAGE SABOLI-SABOLI COLONY, SABOLI EXTN.- MANDOLI, MCD SCHOOL-SABOLI COLONY, KABRISTAN-SABOLI COLONY, BLOCK A-SEWA DHAM, BANK OF BARODA-SABOLI COLONY, BLOCK A-MANDOLI VILLAGE, SABOLI COLONY- 1201 MANDOLI NNG 4342 0 KVA UNPLANNED 28-05-2020 22:32:00 28-05-2020 23:10:00 0:38 0.00084444 MUs BLOCK 12-GEETA COLONY, BLOCK 13-GEETA COLONY, BLOCK 7- 1202 GEETA COLONY KRN 62 990 KVA UNPLANNED 08-05-2020 14:13:50 08-05-2020 15:30:00 1:16 0.00021111 MUs

TELI WARA-NAWAB GANJ, SHIVAJI PARK-BALBIR NAGAR, PHARI DHIRAJ-SADAR BAZAR, BHARAT MATA MANDIR-JJ COLONY, BLOCK A2-NAND NAGARI, JANTA FLATS-NAND NAGARI, SABOLI EXTN.-MANDOLI, BLOCK C-HARSH VIHAR, BLOCK A-MANDOLI EXTN., POCKET A-JJ COLONY, BLOCK B- SEWA DHAM, SADAR BAZAR B G ROAD, KABRISTAN-SABOLI COLONY, BANK OF BARODA-SABOLI COLONY, MCD SCHOOL- SABOLI COLONY, MCD SCHOOL-MANDOLI EXTN., BLOCK D- MANDOLI EXTN., BLOCK D-HARSH VIHAR, SEWA DHAM- MANDOLI, VILLAGE SABOLI-SABOLI COLONY, SABOLI EXTN.- 1203 MANDOLI NNG 6080 3010 KVA UNPLANNED 06-05-2020 11:49:49 06-05-2020 12:17:14 0:27 0.000375 MUs MANTOLA MOHALLA-PAHAR GANJ, AMRIT KAUR MARKET- 1204 PAHAR GANJ, ARAM PARK-GEETA COLONY PHG 510 990 KVA PLANNED 20-05-2020 10:00:00 20-05-2020 16:05:00 6:5 0 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unserved (MU) due to Sr. No. Area Affected Division Affected Transformer (in KVA). Unplanned Outage From DateTime To DateTime Duration (Hrs:Mins) Outage

BLOCK C-TUKMIRPUR, LIG/MIG RES/NON COMM AREA-CRPF CAMP SONIA VIHAR, BLOCK A-KHAJURI KHAS, BLOCK D- TUKMIRPUR, BLOCK V-O & P BLOCKS SHIV VIHAR KARWAL NAGAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-B-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-C-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-C-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-C-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-C-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-SONIA VIHAR, LIG/MIG RES/NON COMM AREA-D-BLOCK-SONIA VIHAR, LIG/MIG 1205 RES/NON COMM AREA-G-BLOCK SONIA VIHAR KWN 805 0 KVA UNPLANNED 31-05-2020 10:11:03 31-05-2020 11:09:45 0:58 0.00032222 MUs

SHIV VIHAR, BLOCK U-SHIV VIHAR, BLOCK H-SHIV VIHAR, BLOCK D-SHIV VIHAR, BLOCK T-SHIV VIHAR, BLOCK F-SHIV VIHAR, BLOCK L-SHIV VIHAR, BLOCK O-SHIV VIHAR, BLOCK M- SHIV VIHAR, BLOCK N-SHIV VIHAR, BLOCK B-SHIV VIHAR, PKT R- BLOCK A, PKT D-SHIV VIHAR, BLOCK V-O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK A-SHIV VIHAR, BLOCK J-SHIV 1206 VIHAR KWN 2122 0 KVA UNPLANNED 17-05-2020 00:06:41 17-05-2020 00:36:44 0:30 0.000125 MUs

1207 BLOCK 1-BALBIR NAGAR, BALBIR NAGAR EXTN.-SILAMPUR DGN 271 990 KVA UNPLANNED 16-05-2020 10:10:29 16-05-2020 11:07:16 0:56 0.00006222 MUs 1208 BLOCK E-RAJIV NAGAR, BLOCK B-RAJIV NAGAR NNG 86 0 KVA UNPLANNED 21-05-2020 15:55:23 21-05-2020 16:13:34 0:18 0.00005 MUs

BLOCK E-NEW SILAMPURI PHASE II, BLOCK B-SUBHASH MOHALLA, BLOCK E-SUBHASH MOHALLA, BLOCK B5-YAMUNA PUR (GONDA) BLOCK B, BLOCK B2-YAMUNA VIHAR, NORTH GHONDA, BLOCK B4-YAMUNA VIHAR, BLOCK B3-YAMUNA 1209 VIHAR, BLOCK E-SUBHASH MOHALLA YVR 549 990 KVA UNPLANNED 10-05-2020 10:21:57 10-05-2020 11:06:17 0:44 0.00024444 MUs BLOCK J-KHAJURI KHAS EXTN., BLOCK F-KHAJURI KHAS EXTN., BLOCK G-KHAJURI KHAS EXTN., BLOCK H-KHAJURI KHAS EXTN., 1210 BLOCK I-KHAJURI KHAS EXTN. KWN 2229 990 KVA UNPLANNED 09-05-2020 10:41:19 09-05-2020 11:03:28 0:22 0.00006111 MUs

BLOCK C-PATEL VIHAR, BLOCK CN-MANGALAM VIHAR, PHASE I- SHIV VIHAR, BLOCK D-DLF ANKUR VIHAR, BLOCK F & G- BHAGAT SINGH COLONY, BLOCK A-PRAKASH VIHAR, VILLAGE- KAMAL VIHAR, BLOCK R-PATEL VIHAR, BLOCK B-PATEL VIHAR, BLOCK A-MANGALAM VIHAR, BLOCK B-BHAGAT SINGH COLONY, BLOCK F-BHAGAT SINGH COLONY, BLOCK H-BHAGAT SINGH COLONY, BLOCK C-BHAGAT SINGH COLONY, BLOCK I- BHAGAT SINGH COLONY, BLOCK E-BHAGAT SINGH COLONY, BLOCK B-PRAKASH VIHAR, BLOCK C-PRAKASH VIHAR, BLOCK C- 1211 DLF ANKUR VIHAR, BLOCK C-PATEL VIHAR KWN 5861 0 KVA UNPLANNED 20-05-2020 22:00:00 20-05-2020 22:53:09 0:53 0.00044167 MUs 1212 MAYUR VIHAR EXTN. MVR 76 630 KVA UNPLANNED 05-05-2020 12:24:57 05-05-2020 12:58:10 0:33 0.00007333 MUs PKT C-BLOCK B, PKT W-BLOCK A, BLOCK U-SHIV VIHAR, BLOCK B-SHIV VIHAR, PKT X-SHIV VIHAR, PKT A-BLOCK A, PKT R- BLOCK A, PKT F-BLOCK A, PKT C-SHIV VIHAR, BLOCK V-O & P BLOCKS SHIV VIHAR KARWAL NAGAR, PKT D-BLOCK B, PKT W- 1213 BLOCK A KWN 3347 0 KVA UNPLANNED 31-05-2020 10:25:00 31-05-2020 11:05:04 0:40 0.00022222 MUs

BLOCK B-EAST GOKUL PURI, BLOCK A-AMAR COLONY, BLOCK A- MEET NAGAR, BLOCK E-UTTARANCHAL COLONY, BLOCK A- UTTARANCHAL COLONY, BLOCK B-UTTARANCHAL COLONY, BLOCK A-EAST GOKUL PURI, BLOCK C-AMAR COLONY, BLOCK D- 1214 MEET NAGAR, BLOCK E-MEET NAGAR NNG 49 630 KVA PLANNED 27-05-2020 11:00:00 27-05-2020 17:25:48 6:25 0.00213889 MUs GANESH NAGAR SOUTH-INDRAPRASTHA EXTENSION, MOTHER 1215 DAIRY-INDRAPRASTHA EXTENSION LNR LNR 548 400 KVA UNPLANNED 27-05-2020 12:49:46 27-05-2020 13:05:00 0:15 0.0000625 MUs

BLOCK C-MAN SINGH NAGAR, BLOCK B-BRIJ PURI, BLOCK E- BRIJ PURI, PKT R-BLOCK D, BLOCK B-MAN SINGH NAGAR, BLOCK T-OLD MUSTAFABAD, BLOCK B-OLD MUSTAFABAD, 1216 BLOCK F-BRIJ PURI, BLOCK A-MAN SINGH NAGAR KWN 130 0 KVA UNPLANNED 28-05-2020 14:05:00 28-05-2020 14:43:49 0:38 0.00015833 MUs CHAUHAN BANGAR-JAFFRABAD, BABARPUR EXTN.-BABAR PUR, BLOCK F-ZERO PUSTA, BLOCK T-GAUTAM PURI, 1217 JAFFRABAD-MAUJ PUR, MAUJ PUR COMPLEX 1 YVR 25 630 KVA UNPLANNED 19-05-2020 11:26:55 19-05-2020 11:58:41 0:31 0.00017222 MUs MAUJ PUR COMPLEX 1, NORTH GHONDA, GHONDA PATTI, 1218 BLOCK C-GHONDA YVR 22 990 KVA UNPLANNED 25-05-2020 15:46:03 25-05-2020 16:33:18 0:47 0.00026111 MUs SABOLI EXTN.-MANDOLI, BLOCK B-ANUP VIHAR, NEW MANDOLI INDUSTRIAL AREA, BLOCK D-ANUP VIHAR, BLOCK K- ANUP VIHAR, BLOCK A-ANUP VIHAR, BLOCK C-ANUP VIHAR, SEWA DHAM-MANDOLI, ANUP VIHAR-MANDOLI, SEWA DHAM- 1219 MANDOLI NNG 604 0 KVA UNPLANNED 28-05-2020 19:47:12 28-05-2020 20:34:23 0:47 0.00091389 MUs

BLOCK C-DURGA PURI, BLOCK B-EAST GOKUL PURI, BLOCK A- MEET NAGAR, BLOCK B-ANUP VIHAR, BLOCK A-EAST GOKUL PURI, BLOCK C-AMAR COLONY, BLOCK C-MEET NAGAR, BLOCK 1220 D-MEET NAGAR, BLOCK E-MEET NAGAR NNG 604 990 KVA UNPLANNED 24-05-2020 11:54:59 24-05-2020 12:33:18 0:38 0.00073889 MUs

1221 NAYA BAZAR-CHANDNI CHOWK, FATEHPURI-KHARI BAOLI CCK 363 990 KVA UNPLANNED 30-05-2020 13:39:20 30-05-2020 13:47:00 0:7 0.00000778 MUs BLOCK 5-TRILOKPURI PHASE I, BLOCK 6-TRILOKPURI PHASE I, BLOCK 4-TRILOKPURI PHASE I, BLOCK 1-TRILOKPURI PHASE I, BLOCK 15-TRILOKPURI PHASE II, TRILOKPURI PHASE I-MAYUR 1222 VIHAR MVR 246 990 KVA UNPLANNED 31-05-2020 05:30:13 31-05-2020 06:04:44 0:34 0.00009444 MUs BLOCK A-BABU NAGAR, BLOCK A-PRAKASH VIHAR, BLOCK C- KARAWAL NAGAR, BLOCK B-BHAGAT SINGH COLONY, BLOCK E- BHAGAT SINGH COLONY, BLOCK B-PRAKASH VIHAR, BLOCK E- PRAKASH VIHAR, BLOCK D-PRAKASH VIHAR, BLOCK C-PRAKASH 1223 VIHAR KWN 86 0 KVA UNPLANNED 16-05-2020 20:10:08 16-05-2020 20:34:09 0:24 0.00006667 MUs BLOCK 1-RAM NAGAR EXTN., BLOCK 1-BHAGWANPUR KHERA, 1224 BLOCK 1-RAM NAGAR DGN 293 990 KVA UNPLANNED 01-05-2020 11:50:00 01-05-2020 12:31:46 0:41 0.00005694 MUs NEW USMANPUR-NEW KATWARA, MCD COLONY-NEW 1225 KATWARA YVR 324 990 KVA UNPLANNED 07-05-2020 12:04:55 07-05-2020 12:59:18 0:54 0.00015 MUs

PKT B-CHITRAKOOT, BLOCK A-AMAR COLONY, BLOCK A-MEET 1226 NAGAR, BLOCK A-EAST GOKUL PURI, BLOCK D-MEET NAGAR NNG 436 630 KVA UNPLANNED 31-05-2020 12:42:33 31-05-2020 13:40:00 0:57 0 MUs

JYOTI COLONY-BALBIR NAGAR, BLOCK B-EAST GOKUL PURI, BLOCK A-BANK COLONY, BLOCK B-UTTARANCHAL COLONY, BLOCK A-EAST GOKUL PURI, BLOCK C-AMAR COLONY, BLOCK C- 1227 MEET NAGAR, BLOCK D-MEET NAGAR, BLOCK E-MEET NAGAR NNG 83 990 KVA UNPLANNED 31-05-2020 21:18:11 31-05-2020 22:09:02 0:50 0.00041667 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unserved (MU) due to Sr. No. Area Affected Division Affected Transformer (in KVA). Unplanned Outage From DateTime To DateTime Duration (Hrs:Mins) Outage

BLOCK 60-AJMAL KHAN PARK, BLOCK 50-AJMAL KHAN PARK, BLOCK T-GAUTAM PURI, BLOCK E-SUBHASH MOHALLA, BLOCK I- BRAHM PURI, BLOCK H-BRAHM PURI, BLOCK F-BRAHM PURI, BLOCK E-BRAHM PURI, BLOCK L-BRAHM PURI, AJMAL KHAN PARK SRD-KAROL BAGH SRD, JAGJEET NAGAR-GHONDA, 1228 GHONDA PATTI CHAUHAN, KAILASH NAGAR YVR YVR 1574 990 KVA UNPLANNED 14-05-2020 20:57:20 14-05-2020 21:45:00 0:47 0 MUs