Revision Code Prepared Checked/ Issue date: by: Approved by:

1st Draft GO SC

2nd GO SC 31.07.19

Rev B GO SC 08.08.19

Rev C LS GO 29.08.19 Rev D GO SC 17.10.19

2 Costock Road, East Leake

CONTENTS

1.0 Introduction 2.0 Planning Policy 3.0 Site Analysis 4.0 Design Development 5.0 Proposed Design

3 Costock Road, East Leake 1.0 INTRODUCTION

INTRODUCTION

This Design and Access statement has been prepared by Lathams to accompany a planning application on the site south of Costock Road, East Leake, for 22 residential units on behalf of Positive Homes Ltd. The scheme will use ‘Modern Methods of Construction (MMC)’, with dwellings precision engineered in a factory before being installed on

Gotham Road site. It will be one of the largest MMC schemes in the country. Every property will be ‘A’ rated under the Energy Performance Certificate system - putting them in the top 0.16% in the country for energy

efficiency. Currently only has 60 homes (0.18%) meeting Costock Road this standard * (Ministry of Housing, Communities & Local Government data, via https://epc.opendatacommunities.org/domestic/search).

Positive Homes Ltd is a Rushcliffe-based housing company which Main Street specialises in developing super-low energy homes. It focusses on smaller homes, with a mission to make energy efficiency the norm, not the exception for new properties. EAST LEAKE The award-winning firm has plans to build 700 homes for private sale and rent by 2026, aimed mainly at first time buyers, smaller families and older people looking to ‘downsize’.More information about Positive Homes is included with this planning application. The application site is a broadly rectangular plot 0.6 hectares in extent at the outskirts of the village of East Leake. The site is situated south Kingston Banks development of the Costock Road separated by a belt of native mature hedge. The site accommodates a low quality outbuilding on the northern side of the site presumably connected to former agricultural uses.

Key Byway open to all traffic

Public footpath 4 Costock Road, East Leake

SITE PHOTOGRAPHS

Site 1. Kingston Banks Development / Cornflower Way 2. Kingston Banks Development / 2 storeys brick/render houses 6. View of the Sports Pavilion from the main road

3. Kingston Banks Development / View across SUDS area towards carpark 4. Footpath towards the carpark/view of significant ash tree T1 in the 5. Kingston Banks Development / Render material on elevation background 5 Costock Road, East Leake 2.0 PLANNING POLICY

NATIONAL PLANNING POLICY FRAMEWORK (June 2019)

This proposed scheme takes into account all relevant national Section 2 The Future of Rushcliffe guidance contained in the National Planning Policy Framework. A full

list of relevant policies in Appendix 1. 2.4 Spatial Objectives 2.4.1 RUSHCLIFFE DISTRICT CORE STRATEGY i Environmentally responsible development addressing climate Change ii. High quality new housing vii Strong, safe and cohesive communities The following paragraphs state the relevant policies outlined within the viii Health and well-being Local Plan. ix Opportunities for all.

Part 1: Rushcliffe Core Strategy Section 3 Delivery Strategy

2.3 A Spatial Vision for Rushcliffe Policy 1 Presumption in Favour of Sustainable Development 2.3.4. Policy 2 Climate Change New communities and neighbourhoods have been built to the highest Policy 3 Spatial Strategy design and environmental standards, being resilient to climate change, with low water usage, high levels of energy efficiency, and low or 2.b) Approximately 5,500 homes beyond the main built up areas of zero carbon energy forms a major part of their overall energy usage, Nottingham (within Rushcliffe), including: including decentralised generation. Indeed phases constructed after iv) In or adjoining East Leake (a minimum of 400 homes); 2016 are all carbon neutral. There is a sustainable mix of good quality Policy 8 Housing size, mix and choice housing which maintains the character of the Borough, and meets the Policy 10 Design and enhancing local identity needs and aspirations of all Rushcliffe residents and communities, Policy 17 Biodiversity particularly those who may require affordable, specialist or adapted housing.

6 Costock Road, East Leake

EAST LEAKE NEIGHBOURHOOD PLAN AND PLANNING POLICIES

The design is fully compliant with all relevant policies of the East 2.3.4 Provide an adequate supply of new homes for older people sustainability, in that they promote a sense of community by providing Leake Neighbourhood Plan. wishing to downsize (freeing up family homes). connectivity and social spaces. 2.3.13 Homes and apartments suitable for smaller families and single 2.4.3 Ensure that in mixed developments of market and affordable Section 2 Housing people attracted the highest proportion of ‘high need’ responses homes, the affordable homes are indistinguishable in terms of external 2.1 Number of new homes and relationship to infrastructure (41%), followed by bungalows (32%) and smaller 3-4 bedroomed quality finishes etc. 2.1.1 Provide a positive contribution to meeting housing needs. houses including semi-detached (31%). 2.1.2 Ensure infrastructure is adequate to support proposed housing Policy H5 – Design and Building Standards growth. Policy H3: 2.5 Suitability of Sites for General Housing 2.1.11 It is expected that a number of smaller infill sites lying On developments of 10 or more homes development will provide 2.5.1 Ensure that the location of new housing development takes completely within the current village built-up area may come forward a mixture of homes for the market that broadly reflects Rushcliffe account of a range of constraints. for redevelopment and should not be subject to the above. Borough Council’s and East Leake’s most up do date assessments of housing needs derived from projections of household types, as shown Policy H6 – Sites where housing development will be permitted 2.2 Phasing of new housing below: 2.6 Satisfying Local Housing Need for Affordable Housing 2.2.1 Encourage evenly spread development of East Leake over the 2.6.1 Ensure that the affordable housing supply in East Leake period of the Core Strategy (2013-28). • 1 and 2 bedrooms Between 30% and 40%; If purpose built for continues to be developed at an appropriate rate. 2.2.2 Provide for any change in circumstance either within the market older people, e.g. homes with care and support or “retirement 2.6.2 Ensure that the mixture of types of new affordable homes meets (demand) or in relation to the requirements of the Plan or District area villages”, up to 100% need. (need) and allow development rates to react accordingly. • 3 bedrooms Between 40% and 60% 2.6.3 Improve opportunities for people with a local connection to • 4 bedrooms Between 10% and 20% obtain affordable housing in the future. 2.3 Types of New Homes Built for sale • 5+ bedrooms Between 0% and 5% 2.3.1 Ensure that new homes built for sale are of the size and type Section 4 Transport, Communications and Traffic forwhich there is demonstrable need. 2.4 Issues of Building Standards and Design Objectives

2.3.2 Maintain a mixture of property types to ensure social diversity. 2.4.1 Provide additional sound insulation requirement due to proximity 4.1 Better and safer routes for pedestrians and cyclists 2.3.3 Encourage a strong housing ladder, with no gaps, to enable of Airport families to remain in the village as they move up the housing ladder. 2.4.2 Ensure developments are well designed, in particular that they contribute to the character of East Leake, and to the wider aims of

7 Costock Road, East Leake

Existing hedgerows will be maintained and improved. Twelve new Policy T1 New developments and connectivity Summary trees are proposed, along with significant planting of wildflowers and The proposed development on the outskirts of East Leake sits plants to encourage wildlife and improve the quality of life for the Section 5 – Maintaining the environment comfortably within the aims and aspirations of the NPPF, the Local residents. Plan and the Neighbourhood Plan policies stated above. High quality, 5.3 Green Spaces low environmental impact housing is to contribute to the sustainable 5.3.1 Preserve existing green spaces in the village and include green nature of the local area by providing a mix of housing catering for spaces in new developments, ensuring they are maintained. specific local needs. 5.3.2 Bring the countryside into the built environment wherever

possible. The proposed development provides suitable amount of affordable housing in the proposed tenure mix. Policy E3 – Green Infrastructure within the Built Environment

The proposed scheme only includes a mix of 2 and 3 bedroom homes, for a target market of first time buyers, small families and the elderly looking to downsize. The Neighbourhood Plan identified these groups as being in the most need for suitable housing in the village. However many of the recent developments around East Leake have featured significant numbers of larger, detached properties. The proposal is designed to redress that imbalance.

A new internal footpath is proposed to connect Costock Road Playing fields with the overspill car park. This will form part of the Section 106 agreement. The site is connected to the village centre via the existing Costock Road footpath, and is opposite the proposed Sheep Plank Lane strategic green/foot path.

8 Costock Road, East Leake 3.0 SITE ANALYSIS

SITE CONSTRAINTS

The site itself is an open field with slight fall from North to South. All boundaries to the site have mature hedgerows with a drainage ditch running along the eastern and northern boundaries.

A footpath runs along the south side of Costock Road connects East Leake with the Sports Pitches to the East. The footpath is narrow and with vehicular movement causes some issue. The car park at the front of the new David Wilson development provides better access to the new pavilion proposed pitches.

Car park There is one large tree along the Western boundary.

Attenuation Key

Site

Busy traffic on Costock Road

Hedgerows

Line of ditches

Pedestrian access from East Leake to Sport pitch

Significant trees

Byway open to all traffic

Public footpath

Existing gate / site entrance

9 Costock Road, East Leake

LOCAL SERVICES AND LAND USES

The site is surrounded by a variety of uses including retail, shops education, places of worship within walking distance from the site, proving this location to be highly sustainable. One primary school, Brookside Primary School, has been identified within vincity of the site. Local Meadow Park East Leake providing additional amenity space for the residents is located within 550 m from the site. Numerous shops and groceries are located within 500 m radius from the site boundary.

Key

Site

Places of Worship 200 meters

Shops / Retail Leisure 400 meters Education

Restaurant/Public House 600 meters Health

Park

Office

Main bus route

10 Costock Road, East Leake

HERITAGE

The site sits outside of the East Leake Conservation boundary with no visual impact on it or any Listed Buildings. The historic core of the village is centred around Main Street and the Grade 1 Church of St Mary, remote from the site.

The closest Listed Building to the site is the Grade II East Leake Baptist Church off Costock Road.

No further analysis of heritage impact was considered necessary following this understanding.

Key

Site G1 Listed Church of St Mary GII Listed Buildings Conservation Area Boundary

11 Costock Road, East Leake

FLOOD RISK

An initial assessment of the site, based on Environment Agency mapping system, indicated that the northern section to is partly in flood zones 2 and 3, as shown on adjacent image. However, further detailed floodrisk analysis has been undertaken by BWB engineers.

The results of the detailed floodrisk assesment, attached with the application, indicate the fact that Costock Road acts as a natural flood barrier therefore the site is located wholly within Flood Zone 1.

These floodrisk assesment results have been submitted to the Environment Agency for incorporation into its mapping. At time of writing the result has been accepted in principle.

Key

Site

Flood Zone 3

Flood Zone 2

Local Green Space

12 Costock Road, East Leake 4.0 DESIGN DEVELOPMENT

SITE STRATEGY

Being of linear proportions, there is a simple, straight forward way to arrange residential development. A main spine road is necessary for development to runnorth/south along either the west or east boundaries. To ensure the mature hedgerow (and tree) to the western and southern is retained, the decision to use the east edge for the access road was taken. This also keeps the development visibily isolated from the adjacent car park and neighbouring development.

The location of the site entrance was therefore relocated accordingly which in turn improves visibility of traffic as demonstarted within the accompanying transport assessment.

A row of houses is aligned but set back from Costock Road for a few reasons: ■■ To create frontage to the development ■■ To improve the setting of the development with the introduction of a green open space ■■ to provide better, safer pedestrian access from the car park to the sports pitches

Key

Site Retain significant trees

New site entrance Frontage along Costock Road

Maintain existing hedgerows Public space

Utilise ditch for attenuation

Improved Pedestrian access to Sport pitch

13 Costock Road, East Leake

© This drawing and the building works depicted are the copyright of the Architect and may not be reproduced except with written consent. Figured dimensions only are to be taken from this drawing. All contractors must visit the site and be responsible for taking and checking all dimensions The Holt - 2B4P relative to their work. Lathams are to be advised of any variation between drawings and site conditions. GIA - 80m2

0 1 2 5 10m 7 (08)09

HOUSING PROVISION + SUSTAINABILITY (08)09 4

Taken together, this is a truly sustainable development, which will Positive Homes propose to use the ‘Ilke Homes’ modular housing

ultralow carbon emitting, affordable8 to run, and a benchmark for system (www.ilkehomes.co.uk). This will be one of the first private sale (08)09 others to follow. housing scheme constructed in this manner in the . 6 (08)09

* Ministry of Housing, Communities & Local Government data, via Homes are built to exacting standards in a precision engineering https://epc.opendatacommunities.org/domestic/search

factory in Knaresborough, Yorkshire, before being craned into position Party wall Party wall on site. This is a true ‘modern method of construction’ (MMC) system,

which is being increasingly promoted by the Government andGround Homes Floor First Floor Roof 1 1 : 100 2 1 : 100 3 1 : 100

England as the solution to slow pace of current build out rates.7 7 (08)09 (08)09

ENERGY PERFORMANCE

3 3

Eave 5 5 5566

2 2 All homes on this site will be ‘A’ rated under their Energy Performance 6 First Floor 3060 Certificate. Since the EPC system was introduced in 2008, there have

1 1

4 been 3,997 new domestic properties built inGround Rushcliffe. Floor Of these, only 0

B GO Canopy revised 09.07.19 22 have achieved the highest ‘A’ rated standard (0.55%). Nationally, A Draft Issue - Client 04.07.19 Entrance Elevation Rear Elevation Side Elevation Rev Drawn Revision Description Date 4 5 6 Status RIBA Stage 3 only 1% of new homes constructed in the last 10 years are1 : 100 to the 1 : 100 1 : 100 Derby Nottingham 12 St. Mary's Gate Knight + Whitehall House 8 7 Derby DE1 3JR 4 Carlton Street +44 (0)1332 365 777 Nottingham NG1 1NN (08)09 (08)09 +44 (0)115 828 0422 London highest energy standards.* 70 Cowcross Street [email protected] London EC1M 6EJ lathams.uk.com +44 (0)20 7490 0672

The proposed development will therefore perform better than 99% of Materials List TBC

Eave Key Description Project 5566 East Leake 1 Cladding Blue Brick Slips

all homes built since 2008 – while doubling the number of homes in 2 Composite Windows - Dark Grey Aluminium Client 3 Roofing - Roof Tiles. Colour TBC. First Floor Positive Homes Rushcliffe built to the highest energy standards.3060 4 Front Door - Colour TBC Drawing Title 5 Rainwater Goods - Dark Grey Aluminium. The Holt - 2B4P Using data from previous homes it has constructed, and performance 6 External Render - Colour TBC. Ground Floor Drawing Number Revision 0 (08)09 B modelling using SAP, Positive Homes predicts household energy bills Scale Date 1 : 100 04/07/19

Drawn Checked to be on average around £10 a week. Section AA Section BB GO SC 7 8 Lathams Job Number Original Size 1 : 100 1 : 100 A1 © Lathams Architecture + Urbanism Ltd

14 © This drawing and the building works depicted are the copyright of the Architect and may not be reproduced except with written consent. Figured dimensions only are to be taken from this N drawing. All contractors must visit the site and be Costock Road, East Leakeresponsible for taking and checking all dimensions relative to their work. Lathams are to be advised of any variation between drawings and site conditions.

No of units = 22 Parking allowance: 1.78 per house with visitor spaces Visitor Parking: 3

Curtilage parking (4.8m x 2.4m) 5.0 PROPOSED DESIGN Parallel parking (6m x 2.4m)

The Dalby (3B5P) 80m2 15 Units

Haldon (2B4P) 60m2 7 Units

The Holt (2B4P) 80m2 7 Units

Sports Centre 2 Ref: 19/00068/FUL 1 The proposed design consists of 22 units. Whilst all units are provided with incurtlage parking spaces for the residents, the streetscape has

4 5 3 2 1 been designed to allow for generous green spaces in front of the V1

Carpark

T 2

h B

e

T 4 2

h P B H

e

T 4 a 2 6

h P l B H d 0

e

a o 4 m houses. As shown on the images, the trees and soft landscape create 3 6 V2

T l n P H B d 0 2 h

a o m 5 e 6 3

T l n P d 0 2 B

h D

o m 5 e 80 a n

P 2

lb D

m

80 y a

2

l

b

m

y

2 the environment which will make the development distinguishable

V3

and will provide local identity for its future residents. 5 4 3 12

6 6

The Holt 2 2B4P 80m 6

7 The Dalby 2 3B5P 80m 7

7

8 8

The Dalby 2 3B5P 80m

8

9 The Dalby 2 9 3B5P 80m

9

10 10

e Haldon Th 2 2B4P 60m 10

11 11 e Haldon Th 2 2B4P 60m

11

12 12

e Haldon Th 2 2B4P 60m

12

e Haldon Th 2 2B4P 60m 13 13

13

14 14

The Holt 2 2B4P 80m

14

15 15 The Holt 2 2B4P 80m

J GO Tenure mix change. New house type 11.10.19 15 16 incorporated. 16 I LS Revised house type layout and parking 11.09.19 amendments H GO Tree species updated 29.08.19 The Holt 2 2B4P 80m G GO Revision to footpaths plot 1, 16,22. 22.07.19 Minor amendments to setting out on the south side. Adjustments to levels in line with eng. input. 16 F GO Changes to surfaces and canopies 08.07.19 E GO Draft Issue - Client 27.06.19 V4 D GO Minor amendments. 2parking spaces 24.06.19 V5 V6 omitted. C GO Revised layout. Revised tenure mix. 17.06.19 B GO Revision. Issue for comment. 13.06.19 A GO Issue for Comment 23.05.19

Rev Drawn Revision Description Date

Status RIBA STAGE 3

Derby Nottingham 12 St. Mary's Gate Knight + Whitehall House Derby DE1 3JR 4 Carlton Street 18 +44 (0)1332 365 777 Nottingham NG1 1NN 19 +44 (0)115 828 0422 21 20 London 22 70 Cowcross Street [email protected] London EC1M 6EJ lathams.uk.com +44 (0)20 7490 0672

3

T

B

h

5 e 3

T

P

B

h D

5 e 80 a

3 P

T l D b B

h m

80 y a 5 e 3 2 T l 17 P b B D m h

y 17

5 e 80

a 2

3 P

T lb D

B m h

80 y a 5 e 3 2 T l P b B

h D m

y

5 e 80

a 2

P

l D b

m

80 y a

2

lb

m

y 2 Project East Leake

Client

17 Positive Homes LTD 18 19 20 21 22 Drawing Title Tenure Mix & Parrking Allocation Plan

Drawing Number Revision 7381 (08)02 J

Scale Date As indicated 11/09/19

Drawn Checked Tenure Mix Plan & Parking Allocation GO SC Lathams Job Number Original Size 1 : 200 7381 A1 Street Scene 1 Site Plan © Lathams Architecture + Urbanism Ltd 15 Status RIBA STAGE 3

Project Drawing Title Derby East Leake Street Scene 2 12 St. Mary's Gate DE1 3JR +44 (0)1332 365 777 Nottingham Client Drawing Number Revision Knight + Whitehall House Positive Homes LTD 7381 (08)11 A 4 Carlton Street NG1 1NN A GO Change to the tenure mix 17.10.19 +44 (0)115 828 0422 [email protected] Lathams Job Number Scale @ A4 Date London lathams.uk.com Rev Drawn Revision Description Date 7381 07/08/19 70 Cowcross Street EC1M 6EJ +44 (0)20 7490 0672 © Lathams Architecture + Urbanism Ltd Costock Road, East Leake

16 Street Scene 2 (artist impression) Costock Road, East Leake

MATERIALS SECURITY / DESIGNING OUT CRIME ACCESS

The proposed homes will be a mix of white silicone render and brick. The design and layout of the proposals have had regard to the need The site topography is uniform and fairly flat. Part of the drainage The brick slip system, supplied by Wetherby Building Systems, and opportunity to reduce crime and fear of crime. Specific measures strategy requires a slight raise in these levels to allow for cross fall to in ‘Charcoal Stock’ colours (www.wbs-ltd.co.uk). Roof tiles will be integrated into the scheme include: the ditch to the eastern boundary.

Marley Modern Grey or similar to be approved. Windows to be UPVC ■■ A small, intimate development where new residents are colour grey and front door UPVC colour black. Rainwater goods more likely to recognise each other, and challenge potential The dwellings have been designed to meet Part M of the Building UPVC colour black. unauthorised visitors. Regulations and allow for easy access. This includes level access to

■■ Overlooking of accessible open spaces (access ways, the front entrance doors, internal turning space for wheelchairs and Together this gives a contemporary look whilst providing, a clear driveways, entrances to the site) from multiple viewpoints, downstairs toilet facilities. reference to the village heritage and genius locci. e.g. from within the kitchens to the front street and from within upper bedrooms and landing to the side and rear of the properties.

■■ Private garden areas protected by secure boundary treatments, including replacing all damaged site boundary fences and retention of existing secure boundary treatments along the entrance drive.

■■ High security doors and locking window, meeting ‘Secure by Design’ standards.

■■ Bin storage within each curtilage – bins to be housed in purpose built timber stores where they are at the front of properties.

■■ Cycle storage to rear of the property.

17 Costock Road, East Leake

HIGHWAYS AND VEHICULAR ACCESS PARKING AND WASTE MANAGEMENT

A detailed Transport Statement is included with this application, In line with advice received in the pre-application process, the scheme As described in detail in the Transport Statement, the car parking completed by engineers BWB. A few principle conclusions are includes a new footpath for pedestrians to move safely between the provision is in line with requirements set out by highlighted: Sports Pavilion and the overspill car park, previously provided as part County Council Highways: ‘Residential Car Parking research for 1) The proposed new access and 65m visibility splays meet the of the neighbouring development by David Wilson. At present people Nottinghamshire – Highway Development Control Guidance’, 2010. required standards, set out in paragraph 3.26 of the Nottinghamshire have to use the Costock Road path, and the potential for accidents There are 42 parking spaces for 22 homes, including six visitor Highway Design Guide. with cars is high (particularly when vehicles park half on the road/ parking spaces. 2) There will only be a small increase in vehicle movements (11 in half on the pavement). Providing this access will depend on the co- the morning peak, 13 in the evening peak). This is below the level operation of neighbouring landowners. The scheme has been designed to reduce the visual impact of the considered to be a major impact on the road network motor car – for example by setting the majority of homes back from 3) The site is accessible by a range of sustainable travel modes. Given There are turning heads at the top and bottom of the development the access road, so two spaces are provided in series rather than the areas contained within acceptable walking distance of the site, meaning there is adequate for a large vehicle to turn and/or wait for parallel allows for significant green space and new trees in front of and the existing pedestrian infrastructure available, there are good another larger vehicle coming up the drive. These turning heads allow each home. opportunities for pedestrian travel. a fire engine to stop and serve the final plot, which is comfortably 4) Similarly, given the areas contained within cycling distance and the within the maximum 45m reach of a hose. The engine can then reverse In line with the recommendations contained in ‘Manual for Streets’, nature of the roads surrounding the site, there are some opportunities on site and drive out in a forward gear (the same principle applies to the site masterplan has been designed to ensure that refuse collection for cycle travel between the site and local area. all larger vehicles, e.g. delivery vans etc). vehicles can park at the kerbside adjacent to all dwellings, or 5) The site is also accessible by public transport, with a regular bus The new driveway is not proposed for adoption by the Highway manoeuvre to within 25 metres walking distance for refuse workers of service routing along Gotham Road throughout the day. Authority. It will remain in the shared ownership of the residents of the any designated collection points. new housing, under a management company. Because the drive will The proposed carriageway is 4.8m in width with adequate room for be kept private and not adopted, there is no requirement for refuse Vehicle tracking data is included with this application. The swept vehicles to pass, while also allowing for vehicle speeds to be slowed vehicles to access the site (see ‘waste management’ section). A path details demonstrate that a large refuse vehicle could manoeuvre and controlled to the benefit of pedestrians. This meets standards turning head has been provided that allows for large vehicles such as satisfactorily in and out of the proposed access from Costock Road. set out in Manual for Streets, specifically section 7.2 and Figure 7.1, fire engines to manoeuvre with ease. Vehicle tracking information is page 79. included with this application. Lighting will be provided along the entrance drive.

18 Costock Road, East Leake

PARKING AND WASTE MANAGEMENT DRAINAGE STRATEGY ECOLOGY + TREES

The site is bounded by drainage ditches on all sides. Surface water This application includes a landscape and boundary treatment generated by the development will make use of the ditches on the strategy, which includes a list of proposed planting. As well as retaining eastern and northern boundaries. The eastern ditch will be widened almost all of the existing hedgerows, 12 new trees are proposed, as and replanted with native species. This will act as a ‘linear balancing shown on the images overleaf. pond’ to hold excessive amounts, which will then be fed slowly via a hydrabrake into the existing ditch network on the northern boundary. A new wildflower meadow area at the front of the site, to be seeded with Special General Purpose Wild Flower mix EM3F, at a sowing This system will not require a connection to the existing surface water rate 4g/m2. Ground preparation, sowing and maintenance to be in sewer system, and as a result of its design will not add to flood risk accordance with seed providers recommendations. in the village.

Foul drainage will be to the existing sewer under Costock Road.

19 View from the sportfields

Status RIBA STAGE 3

Project Drawing Title Derby East Leake Street Scene 3 12 St. Mary's Gate DE1 3JR +44 (0)1332 365 777 Nottingham Client Drawing Number Revision Knight + Whitehall House Positive Homes LTD 7381 (08)12 A 4 Carlton Street NG1 1NN A GO Change to the tenure mix 17.10.19 +44 (0)115 828 0422 [email protected] Lathams Job Number Scale @ A4 Date London lathams.uk.com Rev Drawn Revision Description Date 7381 07/08/19 70 Cowcross Street EC1M 6EJ +44 (0)20 7490 0672 © Lathams Architecture + Urbanism Ltd © This drawing and the building works depicted are the copyright of the Architect and may not be reproduced except with written consent. Figured dimensions only are to be taken from this drawing. All contractors must visit the site and be responsible for taking and checking all Costock Road, East Leake Area of the hedge to be trimmed dimensions relative to their work. Lathams are to and maintained to allow for S3 be advised of any variation between drawings and site conditions. visibility splay © This drawing and the building works depicted© are This drawing© This and drawing the building and the works building depicted works aredepicted are the copyright of the Architect and may not be the copyrightthe copyrightof the Architect of the andArchitect may notand be may not be reproduced except with written consent. Figuredreproduced reproduced except with except written with consent. written Figuredconsent. Figured dimensions only are to be taken from this drawing.dimensions dimensions only are to only be takenare to from be taken this drawing.from this drawing. All contractors must visit the site and be All contractorsAll contractors must visit must the site visit and the be site and be responsible for taking and checking all dimensionsresponsible responsible for taking forand taking checking and allchecking dimensions all dimensions relative to their work. Lathams are to be advisedrelative of torelative their work. to their Lathams work. areLathams to be advisedare to be of advised of any variation between drawings and site conditions.any variationany betweenvariation drawings between drawingsand site conditions. and site conditions.

4

7

. KEY 5

5

Site Boundary TW

4

7

.

2 HARD LANDSCAPE - PAVING 6

Paving Type 1 Gy Black Tarmac. 47.32

Paving Type 2 H3 Dark Grey Tarmac. Public Footpath/Parking spaces

Paving Type 3 WF1 Hardscape Hardland (UK) Promenade Square Edged Blue. Sofit Private footpath. 46.65 GR1 T3 T3 T3 Sports Centre 2 Ref: 19/00068/FUL 1 SOFT LANDSCAPING - PLANTING WF1

Existing Trees

New Trees Native Deciduous. T2

4 5 3 T1 - Crataegus 'Paul's Scarlet' 2 1 H2 T2 - Sorbus Aucuparia V1 T3 - Prunus Avium H2 H1 H2 T4 - Malus Sylvestris

Carpark 48 .00 48 .00 48 .00 Private Lawn (G1) V2 Wildflower Seeding (WF1)

Public Realm Ornamental Hedge (H1)

Private Shrub and Ornamental Mix (H2) H3 Fruit and Nut Native Hedge - Existing (H3) V3 ElevationElevation 1 1 BOUNDARY TREATMENTS 5 Elevation 1 4 1 1 3 T2 1 1 : 200 1 : 2001 : 200 Timber fence. 12 G1

LANDSCAPE GENERAL NOTES H1 T1

PLANTING GUIDLINES 6 All planting and landscape operations should comply with the requirements specified in 6 BS3936:1992' NurseryStock(Part One)' and BS 4428:1998 'Code of Practice for General Landscape Operations (excluding hard surfaces)'. All topsoil and testing to conform to BS 3882:2015 'Specification for Topsoil and Requirements for Use'. 6 Existing levels to be preserved around existing trees and protected during construction to BS5837:2012 - see Arboricultural Report.

Proposed Tree Planting To be planted in the first available planting season after construction as root balled stock. Tee pit dimensions are subject to soil conditions and rootball size. All tree pits to have irrigation 7 pipe and end cap, 150mm depth aggregate drainage layer with geotextile separation layer 7 © This drawing and the building works depicted are and horticultural grade sand to support root ball. All topsoil to conform to BS 3882:2015 the copyright of the Architect and may not be 'Multipurpose'.All backfilled material is to include an organic slow release fertilizer (Vitax Q4HN reproduced except with written consent. Figured or similar approved). Trees to have be double stalke support. 7 dimensions only are to be taken from this drawing. All contractors must visit the site and be responsible for taking and checking all dimensions Guidance for Tree Pit Sizes relative to their work. Lathams are to be advised of G1 T4 any variation between drawings and site conditions. Tree Size Rootball Size Tree Pit Size As Spec 50dia x 50cm 100dia x 75cm

Proposed Hedge Planting 8 To be planted in a minimum of 300-450mm depth approved topsoil to BS 3882:2007 8 'Multipurpose' or better in the first available planting season after construction. All shrubs are to be planted as bareroot stock unless otherwise specified. All stock is to be well rooted into the container. All hedges are to be planted in double staggered rows, 250mm apart and 350mm linear separation, generally 5no. per metre. All shrubs are to be planted with a slow 8 release organic fertilizer to a N.P.K ratio of 4.5-2.0-7.7+ 0.8%mg (vitax or similar approved) and backfilled with a mixture of excavated top soil and compost (not peat based). A minimum of 50 mm approved ornamental grade bark mulch is to be applied to planting areas unless stated otherwise. Fencing support for new hedges to be timber post and general pattern wire mesh to BS 1722-2; height 600mm; installed before planting hedge, lightly secure hedge 9 plants to fence wires at appropriate intervals. 9

Proposed Specimen/Ornamental Shrub Planting G1 • To be planted in a minimum of 300-450mm depth approved topsoil to BS 3882:2007 9 'Multipurpose', laid over free draining subsoil in the first available planting season after Street Elevation 1 Street Elevation 2 Street Elevation 3 construction. • All shrubs are to be planted as container stock unless otherwise specified (refer to T1 specification for container size) all stock is to be well rooted into the container. • All shrubs are to be planted with a slow release organic fertilizer (Vitax or similar approved) and backfilled with a mixture of excavated top soil and compost (not peat based). ElevationElevation 2 2 ElevationElevation 3 3 ElevationElevation 4 4 • A minimum of 50 mm approved ornamental grade bark mulch is to be applied to planting 10 10 Elevation 2 Elevation 3 Elevation 4 areas unless stated otherwise. 2 2 2 1 : 2001 : 200 3 3 3 1 : 2001 : 200 4 4 4 1 : 2001 : 200 Seeding / Turfing 1 : 200 1 : 200 1 : 200 • Carry out the work while soil and weather conditions are suitable. When preparing ground for seeding cultivate to a fine, firm tilth with good crumb structure; avoid works in the 10 C GOC GO Revision Revision to footpaths to footpaths plot 1, 16,22.plot 1, 16,22.22.07.1922.07.19 vacinity of Root Protection Areas as per Aboricultural report. C GO Revision to footpaths plot 1, 16,22. 22.07.19 • When sowing establish good seed contact with the root zone. Grass seed generally WF1 Minor amendmentsMinor amendments to setting to settingout on out on between April to June or August to October. Minor amendments to setting out onthe souththe side. south Adjustments side. Adjustments to levels to inlevels in • For turfed areas prepare a bed of 50mm minimum depth approved topsoil to BS3882 the south side. Adjustments to levelsline inwithline eng. with input. eng. input. 11 Multipupose. laid over free draining subsoil. 11 line with eng. input. • Do not lay turf when persistent cold or drying winds are likely to occur or soil is frost B GOB GO Changes Changes to surfaces to surfaces and canopies and canopies 08.07.19 08.07.19 B GO Changes to surfaces and canopies 08.07.19 bound, waterlogged or excessively dry. A GOA GO Draft Issue Draft - IssueClient - Client 27.06.1927.06.19 • Consolidating; lightly and evenly firm as laying proceeds to ensure full contact with 11 A GO Draft Issue - Client 27.06.19 substrate. Do not use rollers. • Thoroughly water completed turf immediately after laying. Sowing rate 1.5 grams per Sq.M; prepare ground in accordance with seed providers recommendation and Rev DrawnRev Drawn Revision Revision Description Description Date Date specification. T4 Rev Drawn Revision Description Date

Maintenance Notes Status StatusRIBA STAGERIBA STAGE 3 3 • Planting to be protected from mammal and human damage by stock proof fencing. H3 Status RIBA STAGE 3 • Planted areas to be forked through regularly to keep soil loose and aerated. 12 H2 12 • Watering as required to maintain healthy growth (allow for 24 N° waterings minimum). Derby Derby NottinghamNottingham • Any species that dies or fails to establish in the first five years should be replaced by an Derby Nottingham12 St. Mary's12 St. Gate Mary's Gate Knight + KnightWhitehall + Whitehall House House identical species. 12 St. Mary's Gate KnightDerby + DE1 WhitehallDerby 3JR DE1 House 3JR 4 Carlton4 Street Carlton Street • Allow for a minimum of 24 maintenance visits. Derby DE1 3JR 4 +44Carlton (0)1332 Street+44 365(0)1332 777 365 777 NottinghamNottingham NG1 1NN NG1 1NN 12 H1 +44 (0)1332 365 777 Nottingham NG1 1NN +44 (0)115+44 828 (0)115 0422 828 0422 +44 (0)115 828 0422 London London London 70 Cowcross70 Cowcross Street Street 70 Cowcross Street London EC1MLondon 6EJ EC1M 6EJ 13 H2 13 London EC1M 6EJ +44 (0)20+44 7490 (0)20 0672 7490 0672 +44 (0)20 7490 0672 PLANTING SPEC 13 Public Realm Ornamental Hedge Plants: Ref H1 G1 Species Size (cm) Root T1 Berberis thunbergii 5L C Escallonia 'Red Elf' 5L C H2 14 14 Main Street Elevation Euonymus fortunei 'Emerald n Gold' 5L C Photinia x fraseri (Red robin) 5L C Prunus lusitanica 5L C Pyracantha coccinea 5L C 14 H1 Private Shrub and Ornamental Mix: Ref H2 Project Project Project Species Size (cm) Root East LeakeEast Leake Selected Shrub Species Size (cm) Root 15 East Leake 15 Elevation 1 Ceanothus 'Blue Mound' 5L C Choisya ternata 5L C 1 1 : 200 Euonymus fortunei 'Emerald n Gold' 5L C H1 Client Client 15 Hebe albicans 'Red Edge' 5L C Client Hebe rakaiensis 5L C 16 PositivePositive Homes Homes LTD LTD Hypericum 'Hidcote' 5L C H2 16 Positive Homes LTD Lavandula angustifolia 'Hidcote' 5L C Perovskia 'Blue Spire' 5L C Prunus lusitanica 5L C Santolina chamaecyparissus 5L C F GO Tenure mix change. New house type 11.10.19 Drawing DrawingTitle Title Skimmia japonica 'Rubella' 5L C incorporated. Drawing Title 16 E LS Revised house type layout and parking 11.09.19 Street ElevationsStreet Elevations Selected Herbaceous Species Size (cm) Root T4 amendments Street Elevations Alchemilla mollis 2L C D GO Tree species updated 29.08.19 Bergenia cordifolia 2L C H1 C GO Revision to footpaths plot 1, 16,22. 22.07.19 Deschampsia cespitosa 2L C V4 V5 Minor amendments to setting out on Drawing DrawingNumber Number RevisionRevision Digitalis purpurea 2L C V6 the south side. Adjustments to levels in Echinacea purpurea 2L C Drawing Number Revision Festuca glauca 2L C line with eng. input. 7381 (08)077381 (08)07 C C Geranium macrorrhizum 2L C B GO Changes to surfaces and canopies 08.07.19 7381 (08)07 C Miscanthus sinensis 2L C A GO Draft Issue - Client 27.06.19 Scale Scale Date Date Salvia officinalis 'Purpurascens' 2L C Scale Date Sedum 'Autumn Joy' 2L C 1 : 2001 : 200 06/19/1906/19/19 Stachys byzantina 2L C Rev Drawn Revision Description Date 1 : 200 06/19/19 Drawn Drawn CheckedChecked Fruit & Nut Native Hedge: Ref H3 Status RIBA STAGE 3 Drawn Checked GO GO SC SC Species Size (cm) Root Percentage Derby Nottingham GO SC Cratagus monogyna (Hawthorn) 60/90 BR 20% 12 St. Mary's Gate Knight + Whitehall House LathamsLathams Job Number Job Number Original OriginalSize Size 18 T1 Corylus avellana (Hazel) 60/90 BR 20% 19 Derby DE1 3JR 4 Carlton Street +44 (0)1332 365 777 Nottingham NG1 1NN Lathams Job Number Original Size Prunus spinosa (Blackthorn) 60/90 BR 20% 21 20 7381 7381 Alnus glutinosa (Alder) 60/90 BR 15% +44 (0)115 828 0422 A1A1 22 7381 Prunus avium (Wild Cherry) 60/90 BR 10% London Rosa canina (Dog Rose) 60/90 BR 5% © Lathams© LathamsArchitecture Architecture + UrbanismA1 + Urbanism Ltd Ltd 70 Cowcross Street [email protected] Viburnmum opulus (Guelder Rose) 60/90 BR 5% London EC1M 6EJ lathams.uk.com © Lathams Architecture + Urbanism Ltd Sambucus nigra (Common Elder) 60/90 BR 5% +44 (0)20 7490 0672

Reinstating Grass Areas – General Amenity - Ref G1; To Garden Plots Surrounding Amenity

General Amenity Low Maintenance A22 perennial ryegrass; sowing rate 50 grams per Sq.M; prepare ground as per notes and in accordance with seed providers recommendation and specification.

Wildflower Seeding - Ref: WF1 17 17 Area to be seeded with Special General Purpose Wild Flower mix EM3F, sowing rate 4g/m2. Seed mixes to be provided by Emorsgate Seeds. Ground preparation, sowing and maintenance to be in accordance with seed providers recommendations. H3 Project Green Roof - Ref: GR1 H1 East Leake 100% British native wildflower green roof turf by Tillars Turf

Elevation 2 Elevation 3 Elevation 4 E GO Tenure mix change. New house type 11.10.19 TREE SPEC Client incorporated. 17 2 3 4 18 1 : 200 1 : 200 1 : 200 D LS Revised house type layout and parking 11.09.19 19 Positive Homes LTD Individual Trees 20 amendments 21 22 Ref Species Root Height (M) Girth(cm) G1 C GO Revision to footpaths plot 1, 16,22. 22.07.19 Drawing Title Minor amendments to setting out on T1 Acer platanoides RB 3.5 - 4.5 14 - 16 the south side. Adjustments to levels in T2 Sorbus aucuparia RB 3.5 - 4.5 14 - 16 Landscape Strategy & Boundary Treatments T3 Prunus avium RB 3.5 - 4.5 14 - 16 line with eng. input. B GO Changes to surfaces and canopies 08.07.19 A GO Draft Issue - Client 27.06.19 H3 Drawing Number Revision Scale 7381 (08)05 F Rev Drawn Revision Description Date

Scale Date 0 10m 20m 30m 40m 50m Status RIBA STAGE 3 As indicated 06/19/19

Drawn Checked Derby Nottingham 12 St. Mary's Gate Knight + Whitehall House Author Checker Derby DE1 3JR 4 Carlton Street Landscape Strategy & Boundary Treatmnets +44 (0)1332 365 777 Nottingham NG1 1NN Lathams Job Number Original Size +44 (0)115 828 0422 1 : 200 7381 A1 London 70 Cowcross Street 20 Landscape Strategy © Lathams Architecture + Urbanism Ltd London EC1M 6EJ +44 (0)20 7490 0672

Project East Leake

Client Positive Homes LTD

Drawing Title Street Elevations

Drawing Number Revision 7381 (08)07 E

Scale Date 1 : 200 06/19/19

Drawn Checked

GO SC

Lathams Job Number Original Size 7381 A1 © Lathams Architecture + Urbanism Ltd

Costock Road, East Leake APPENDIX 1

NATIONAL PLANNING POLICY FRAMEWORK (June 2019)

The purpose of the planning system is to contribute to the achievement supply of homes, it is important that a sufficient amount and variety of of sustainable development. At a very high level, the objective of These objectives should be delivered through the preparation and land can come forward where it is needed, that the needs of groups sustainable development can be summarised as meeting the needs of implementation of plans and the application of the policies in this with specific housing requirements are addressed and that land with the present without compromising the ability of future generations to Framework; they are not criteria against which every decision can or permission is developed without unnecessary delay. meet their own needs (Paragraph 7). should be judged. Planning policies and decisions should play an active role in guiding development towards sustainable solutions, but 61. Within this context, the size, type and tenure of housing needed for Achieving sustainable development means that the planning system in doing so should take local circumstances into account, to reflect different groups in the community should be assessed and reflected has three overarching objectives, which are interdependent and need the character, needs and opportunities of each area. (Paragraph 9). in planning policies (including, but not limited to, those who require to be pursued in mutually supportive ways (so that opportunities can In situations where the presumption applies to applications involving affordable housing, families with children, older people, students, be taken to secure net gains across each of the different objectives): the provision of housing, the adverse impact of allowing development people with disabilities, service families, travellers, people who rent that conflicts with the neighbourhood plan is likely to significantly and their homes and people wishing to commission or build their own

a) an economic objective – to help build a strong, responsive and competitive demonstrably outweigh the benefits, provided all of the following apply: homes).

economy, by ensuring that sufficient land of the right types is available in the

right places and at the right time to support growth, innovation and improved a) the neighbourhood plan became part of the development plan two years or 65. Strategic policy-making authorities should establish a housing

productivity; and by identifying and coordinating the provision of infrastructure less before the date on which the decision is made; requirement figure for their whole area, which shows the extent to

b) a social objective – to support strong, vibrant and healthy communities, by b) the neighbourhood plan contains policies and allocations to meet its identified which their identified housing need (and any needs that cannot be

ensuring that a sufficient number and range of homes can be provided to meet housing requirement; met within neighbouring areas) can be met over the plan period.

the needs of present and future generations; and by fostering a well-designed c) the local planning authority has at least a three year supply of deliverable Within this overall requirement, strategic policies should also set out

and safe built environment, with accessible services and open spaces that housing sites a housing requirement for designated neighbourhood areas which

reflect current and future needs and support communities’ health, social and d) the local planning authority’s housing delivery was at least 45% of that required reflects the overall strategy for the pattern and scale of development

cultural well-being; and over the previous three years. (Paragraph 14). and any relevant allocations. Once the strategic policies have been

c) an environmental objective – to contribute to protecting and enhancing our adopted, these figures should not need retesting at the neighbourhood

natural, built and historic environment; including making effective use of land, plan examination, unless there has been a significant change in

helping to improve biodiversity, using natural resources prudently, minimising Section 5 Delivering a sufficient supply of home circumstances that affects the requirement.

waste and pollution, and mitigating and adapting to climate change, including

moving to a low carbon economy. (Paragraph 8). 59. To support the Government’s objective of significantly boosting the 68. Small and medium sized sites can make an important contribution

22 Costock Road, East Leake

to meeting the housing requirement of an area, and are often built-out a) encourage multiple benefits from both urban and rural land, including through site. In these circumstances:

relatively quickly. mixed use schemes and taking opportunities to achieve net environmental gains a) plans should contain policies to optimise the use of land in their area and

– such as developments that would enable new habitat creation or improve meet as much of the identified need for housing as possible. This will be

71. Local planning authorities should support the development of entry- public access to the countryside; tested robustly at examination, and should include the use of minimum density

level exception sites, suitable for first time buyers (or those looking to b) recognise that some undeveloped land can perform many functions, such as standards for city and town centres and other locations that are well served by

rent their first home), unless the need for such homes is already being for wildlife, recreation, flood risk mitigation, cooling/shading, carbon storage or public transport. These standards should seek a significant uplift in the average

met within the authority’s area. These sites should be on land which is food production.: density of residential development within these areas, unless it can be shown that

not already allocated for housing and should: c) give substantial weight to the value of using suitable brownfield land within there are strong reasons why this would be inappropriate.

settlements for homes and other identified needs, and support appropriate

a) comprise of entry-level homes that offer one or more types of affordable opportunities to remediate despoiled, degraded, derelict, contaminated or Section 12 Achieving well-designed places

housing as defined in Annex 2 of this Framework; and unstable land.

b) be adjacent to existing settlements, proportionate in size to them, not 124. The creation of high quality buildings and places is fundamental

compromise the protection given to areas or assets of particular importance in 119. Local planning authorities, and other plan-making bodies, should to what the planning and development process should achieve.

this Framework, and comply with any local design policies and standards. take a proactive role in identifying and helping to bring forward land that Good design is a key aspect of sustainable development, creates may be suitable for meeting development needs, including suitable better places in which to live and work and helps make development Section 11 Making effective use of land sites on brownfield registers or held in public ownership, using the acceptable to communities. Being clear about design expectations, full range of powers available to them. This should include identifying and how these will be tested, is essential for achieving this. So too is

117. Planning policies and decisions should promote an effective opportunities to facilitate land assembly, supported where necessary effective engagement between applicants, communities, local planning use of land in meeting the need for homes and other uses, while by compulsory purchase powers, where this can help to bring more authorities and other interests throughout the process. safeguarding and improving the environment and ensuring safe and land forward for meeting development needs and/or secure better healthy living conditions. Strategic policies should set out a clear development outcomes. 131. In determining applications, great weight should be given to strategy for accommodating objectively assessed needs, in a way outstanding or innovative designs which promote high levels of that makes as much use as possible of previously-developed or 123. Where there is an existing or anticipated shortage of land for sustainability, or help raise the standard of design more generally in ‘brownfield’ land. meeting identified housing needs, it is especially important that planning an area, so long as they fit in with the overall form and layout of their policies and decisions avoid homes being built at low densities, and surroundings.

118. Planning policies and decisions should: ensure that developments make optimal use of the potential of each

23 Costock Road, East Leake

Section 14 Meeting the challenge of climate In determining planning applications, local planning authorities should change, flooding and coastal change expect new development to:

New development should be planned for in ways that: a) comply with any development plan policies on local requirements for

decentralised energy supply unless it can be demonstrated by the applicant,

a) avoid increased vulnerability to the range of impacts arising from climate having regard to the type of development involved and its design, that this is not

change. When new development is brought forward in areas which are vulnerable, feasible or viable; and

care should be taken to ensure that risks can be managed through suitable b) take account of landform, layout, building orientation, massing and landscaping

adaptation measures, including through the planning of green infrastructure; and to minimise energy consumption.

b) can help to reduce greenhouse gas emissions, such as through its location,

orientation and design. Any local requirements for the sustainability of buildings

should reflect the Government’s policy for national technical standards

To help increase the use and supply of renewable and low carbon energy and heat, plans should:

a) provide a positive strategy for energy from these sources, that maximises the

potential for suitable development, while ensuring that adverse impacts are

addressed satisfactorily (including cumulative landscape and visual impacts);

b) consider identifying suitable areas for renewable and low carbon energy

sources, and supporting infrastructure, where this would help secure their

development; and

c) identify opportunities for development to draw its energy supply from

decentralised, renewable or low carbon energy supply systems and for

colocating potential heat customers and suppliers.

24