April 10, 2020

UNIVERSITY OF COLORADO EAST CAMPUS SOLAR SCHEMATIC DESIGN This page is intended to be blank 01 DRB Recap 04 Schematic Design 02 Goals 05 Solar Design 03 Site Analysis 06 Next Steps

- 1 01

DRB RECAP

2 - DRB RECAP LOT 560: PREVIOUS CONCEPT (4/11/19)

LOT 574, 576, Further the design based on approved program and & BUS LOT framework at Concept level: apply to other parking lot LOT sites* including Lots 574, 576, and the Bus Lot; Lot 560 GREEN SPACE 548; and Lot 556 LOT 556 Investigate and detail the Structural Design EAST CAMPUS improvements. Explore and illustrate Site Design improvements - on and off site. Evaluate parking lot configurations & how they relate to solar layout. LOT 548 * Note to DRB: The project scope has evolved. CU Staff has since directed the design team to proceed with Lot 560, Lot 576 & the adjacent Green Space to obtain the solar production needed.

3 - DRB RECAP ~ 1750 kW Capacity LOT 560: PREVIOUS CONCEPT (4/11/19)

REMOVAL OF 4 SPOTS TO CREATE LARGER CENTRAL ISLAND WITH PAY STATION, TRASH RECEPTACLE, AND 2 ORNAMENTAL • 4 parking spaces from the TREES visitor’s lot (+/- 443 remain) PANELS REMOVED TO ALLOW SUNLIGHT FOR BIO SWALE BELOW 4 BIKE RACKS • The existing striped north/south ADA PARKING REMOVAL OF NORTH-SOUTH STRIPED PEDESTRIAN CONNECTION path (~9’ width) removed from TO CREATE LARGER WEST ISLANDS AND OPPORTUNITY FOR BIO the Permit Lot and added to the SWALE LONG SPAN STRUCTURE west islands 3 BIKE RACKS & CONNECTION TO EXISTING PICNIC AREA • Shade structure with PV panels ADA PARKING PLANTINGS, TYP. is added with bike racks and

PV SHADE STRUCTURE WITH 2 seating opportunities outside the BIKE RACKS, 2 BENCHES, TRASH RECEPTACLE - OPPORTUNITY FOR Life Science Lab building. EDUCATIONAL/ INTERPRETIVE SIGNAGE KEEP EXISTING TREE SHADING @ SOUTH PARKING ROW (NO PV)

CONNECTION TO BOULDER CREEK TRAIL 4 - DRB RECAP ~ 1872 kW Capacity LOT 560: PREVIOUS CONCEPT (4/11/19)

COLORED PLEXIGLAS OR DECORATIVE METAL PANELS COULD REPLACE AV MODULES TO EMPHASIZE CIRCULATION PATHWAYS.

COLORED PLEXIGLAS OR DECORATIVE METAL PANELS COULD REPLACE AV MODULES TO EMPHASIZE CIRCULATION PATHWAYS.

Note: This model is a hybrid version of the preferred concept; the direction was for no separate structures to provide north-south walkway. 5 - DRB RECAP LOT 560: PREVIOUS DESIGN CONSIDERATIONS (4/11/19)

BOLTED CONNECTIONS CAN/STRIP LIGHTS - VERTICAL MOUNT

WIDE FLANGE STEEL & CONCEALED CONDUIT

• IDEAL FOR LONG-SPAN OPTIONS • HIDES CONDUIT INSIDE FLANGE • HIDES INVERTERS & CHARGERS • BIRD-DETERRENT NEEDED

EV CHARGING STATION & INVERTER INTEGRATION SQUARE BASE COLORED PLEXIGLASS 'MODULES' (NON-PV)

6 - 02

GOALS

7 - PROJECT GOALS: Study Lot 560, Lot 576 and adjacent Green Space to maximize solar energy production at this location to help meet the campus goal. Accentuate the Visitor experience at Lot 560 with an aesthetic solution to highlight entry. Prioritize design & structural honesty. Tie design elements to CU campus precedents. Integrate pedestrian circulation & improve ADA access to buildings. Incorporate temporary bus parking & emergency vehicle circulation. Manage floodplain requirements, grading & drainage, and existing utilities. Provide appropriate cost-benefit ratio.

8 - - 8 PROJECT GOALS: 4 MW (DC) Campus Capacity Goal Indicated by NREL REOpt Study SOLAR ENERGY GOALS: (from current 1.3 mW) CU has a 4 mW goal for campus (4,000 kW) $0.13 per kWh Target PPA (hard + soft costs) Currently CU has 1.3 mW of solar tied to the microgrid

VARIED 2.5-3.0 mW range acceptable O R I E N T A T I O N S

PPA (Power Purchase Agreement) Owned by 3rd Party Financier 25 years

9 - 03

SITE ANALYSIS

10 - • SITE ANALYSIS LOCATION PRIMARY USERS:

TRANSPORTATION CENTER RESEARCH LAB 6 Permit Lots: MARINE STREET SCIENCE CENTER HOUSING SYSTEM MAINTENANCE CENTER • CU Facilities & Fleet Vehicles

ET MARINE STREET MARINE STREET • CU Faculty TRE S H

30T 33 • CU Administration ADMINISTRATIVE & RESEARCH CENTER RESEARCH LAB 1 • Shops Staff/Equipment

HOUSING SYSTEM • Buff Bus Temporary Parking SERVICE CENTER LOT 576 SCIENCE LEARNING LABORATORY Visitor Lot: RESEARCH LAB 2

MAINTENANCE/ STORAGE • Short-term Visitors LOT 560

LASP SPACE TECH RESEARCH GREEN

TREET CENTER SPACE

H S H 30T

INST. FOR BEHAVIORAL GENETICS

K R CREE SCALE BOULDE 0 100 200 400 FT N 11 - SITE ANALYSIS CIRCULATION, VIEWS, ADJACENCIES, SUN LEGEND AARAPAHOERAPAHOE DRIVEDRIVE Visitor Lot

TRANSP. RESEARCH LAB 6 HOUSING CENTER SYSTEM Permit Lot T MARINE STREET SCIENCE CENTER E MAINTENANCE E CENTER R

T SCOTT S Green Space STREET CARPENTER H MMARINEARINE SSTREETTREET TTH PARK 0 ADMINISTRATIVE & 330 RESEARCH CENTER RESEARCH LAB 1, Pedestrian Circulation LITMAN

HOUSING SYSTEM SERVICE Informal Dirt Path SCIENCE CENTER LOT 576 LEARNING LAB RESEARCH Primary Vehicular LAB 2 VISITOR PARKING Circulation DIRT MOUND (METERED) SHOPS BEE HIVES STORAGE (TO BE REMOVED) LASP SPACE TECH Views Into Site RESEARCH LOT 560 CENTER GREEN ADA Parking (Not to Code) INSTITUTE TEMPORARY SPACE FOR SCOTT BEHAVIORAL BUS PARKING CARPENTER GENETICS Bike Parking PARK WOOD CHIPPER H K PAT CREE Seating Area BOULDER CREEK DER H BBOULDEROUL CREEK PATH PAT BBOULDEROULDER CREEKCREEK ER MM SCALE ’S SU SUN 0 80 160 320 FT H EAST ER PAT CAMPUS SUN’S WINT N 12 - SITE ANALYSIS FLOOD ZONES, TOPOGRAPHY, DRAINAGE FLOW 5265 LEGEND 00000000000000000000 777777777777777 272727272727272722727272272727272727272722222222222222222222

5275275275275275275275275275275275275 FEMA 500-Year Zone FEMA 100-Year Zone FEMA Conveyance Zone

LOTLOLOT 57657576 Target Area 70 52755227 LOT 576 Contour Flow Direction

LOT 560

LOTLOLOT 56056560

5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5

5 GREEN

6 6 6 6 6 6 6

26 26 26

526 526 526 526 526 526 526 526 526 526 526 526 526 526 526 526 52 5 52 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5

526 SPACE 52652526260 GREENGGRREEEEN SPACESPSPACACE 5 6 262 526552

SCALE 0 100 200 400 FT N

13 - *Map information from maps.bouldercolorado.gov 13 - SITE ANALYSIS EXISTING UTILITIES LEGEND Target Area

ADMINISTRAADMINIST TIVE Sanitary Sewer & RESEARCH CENTER RESEARCH LAB 1 Storm Sewer Water Line

SCIENCE LEARNING LABORATORY Electrical MAINTENANCE/ LOT 576 STORAGE Irrigation Main

RESEARESEARCH LAB 2 Lighting Telephone/Fiber Optic Light Pole

LASP SPACSPACE TECH LOT 560 Project Site Area RESEARCHARCH CENTER GREEN SPACE NOTE • Proposed columns to avoid existing utility corridors. INSTINST. FORFOR BEHAVIORAL GENETICS • Existing light poles to be removed/replaced in areas disturbed by construction. SCALE 0 60 120 240 FT N 14 - SITE ANALYSIS

EXISTING VEGETATION LEGEND Target Area

ADMINISTRATIVEADADMINISTRA ST ATTIVE & RESEARCH CENTER Tree - To Remain RESEARCH LAB 1 Tree - To Be Replaced

LOT 576 Tree - To Be Removed SCIENCE LEARLEARNINGNING (no replacement needed) LABORATORYRATORY MAINTENANCE/ STORAGE Native Area

RESEARCHSSEARCHEARCH LAB 2 Irrigated Landscaped Area

LASP SPACSPACE TECH LOT 560 RESEARCEARCH CENTER

GREEN SPACE

INST.INST FOFORR BEHABEHAVIORALVIORAL GENETICSENETICS

SCALE 0 60 120 240 FT N 15 - 04

SCHEMATIC DESIGN

16 - • SCHEMATIC DESIGN LOT 560 PARKING LAYOUT EXISTING LAYOUT PROPOSED LAYOUT

Existing Vehicular Parking Spaces= 412 Proposed Vechicular Parking Spaces= 407 Existing Bike Parking Spaces = 56 Proposed Bike Parking Spaces= 72 17 - HALF BUTTERFLY SCHEMATIC DESIGN PV STRUCTURE OVERALL DESIGN PLAN PAY STATION BENCH

ADMINISTRATIVE & RAMP, TYP. RESEARCH CENTER RESEARCH LAB 1, PV STRUCTURE LITMAN NEW/RELOCATED BIKE RACKS, TYP. 3/4" CRUSHED GRANITE AT ISLAND, TYP. PLANTINGS AT END ISLANDS, TYP. SCIENCE LEARNING EV CHARGING STATIONS CENTER NEW BIKE RACKS SHOPS PARKING

RESEARCH LAB 2 PV STRUCTURE NEW BIKE RACKS, 6' HIGH METAL CONCRETE PAD AND PATH BREAKAWAY FENCE TO EXISTING SEATING AREA SANDSTONE STEPPERS, TYP. LASP SPACE TECH RESEARCH CENTER PV STRUCTURE NATIVE AREA, TYP. WOOD CHIPPER LOCATION INSTITUTE FOR BEHAVIORAL GENETICS PV STRUCTURE COLUMN, TYP. NEW BIKE RACKS, BENCHES, TRASH RECEPTACLE, AND BIKE LANE CONCRETE PAD PLANTING AT END ISLANDS, TYP. SCALE ADA PARKING, TYP. 0 60 120 240 FT EXISTING TREE TO REMAIN, TYP. N LONGSPAN PV STRUCTURE 6 CHARGING STATIONS OUTLINE FOR FLEET VEHICLES 18 - HALF BUTTERFLY SCHEMATIC DESIGN PV STRUCTURE OVERALL SITE PLAN PAY STATION BENCH

RAMP, TYP. ADMINISTRATIVE & RESEARCH CENTER RESEARCH LAB 1, PV STRUCTURE LITMAN 3/4" CRUSHED NEW/RELOCATED BIKE RACKS, TYP. GRANITE AT ISLAND, TYP.

PLANTINGS AT END ISLANDS, TYP. SCIENCE LEARNING EV CHARGING STATIONS CENTER NEW BIKE RACKS SHOPS PARKING

RESEARCH LAB 2 PV STRUCTURE NEW BIKE RACKS, 6' HIGH METAL CONCRETE PAD AND PATH BREAKAWAY FENCE TO EXISTING SEATING AREA SANDSTONE STEPPERS, TYP. LASP SPACE TECH RESEARCH CENTER PV STRUCTURE

NATIVE AREA, TYP. WOOD CHIPPER LOCATION INSTITUTE FOR BEHAVIORAL GENETICS PV STRUCTURE COLUMN, TYP. NEW BIKE RACKS, BENCHES, BIKE LANE TRASH RECEPTACLE, AND SCALE CONCRETE PAD PLANTING AT END ISLANDS, TYP. 0 60 120 240 FT N ADA PARKING, TYP. EXISTING TREE TO REMAIN, TYP. LONGSPAN PV STRUCTURE 6 CHARGING STATIONS OUTLINE FOR FLEET VEHICLES 19 - MATCH EXISTING CONCRETE EXISTING AT BUILDING BUILDING FFE = SCHEMATIC DESIGN 5267.44 NARRATIVE: ADA RAMP

LOT 560 GRADING PLAN 4.1% 11.9% Replace the existing surface parking lot to .9 % PROVIDE CURB CUT AT EXISTING accommodate the proposed solar panel structures. GRAVEL DRIVE Additional civil improvements include: 5271 PROTECT EXISTING CURB

EXISTING 00.8% Grading & Drainage: Match existing grades at 22.7%.7% .8% PROVIDE CURB BUILDING FFE = 5270 CUT AT EXISTING 5271.64 GRAVEL DRIVE the curb & gutter along the west perimeter. 22.5% .5 5269 Mitigate floodplain impacts that occur from the %

5268 5267 5266 11.5%.5% solar structure columns by generally lowering 00.9% 11.0%.0% .9% the parking lot grades +/-6". Construct parking islands containing crushed granite surrounded by PROTECT EXISTING CURB flush curb to allow stormwater to drain into the islands. Install underdrains within the islands to 11.1%.1% collect runoff and eventually discharge to Boulder Creek. 5' ISLAND WITH EXISTING FLUSH CURB, BUILDING FFE = 0.8% 5273.14 Accessibility: Relocate the 8 accessible parking PROTECT stalls associated with the ARCE building along EXISTING CURB 5265 the north end of the parking lot. Relocate the 2 accessible parking stalls associated with the RL-4 % 11.4%.4% 11.2%.2 and Behavioral Genetics building to the west, directly adjacent to the existing walk.

6" VERTICAL CURB EXISTING SCALE BUILDING FFE = 5269.51 0 30 60 120 FT % .9 % N 00.9% 8 11.8%. PROTECT 6" VERTICAL EXISTING CURB AROUND CURB PLANTERS, TYP. 20 - SCHEMATIC DESIGN LOT 560 UTILITY PLAN NARRATIVE:

9' TYP. 23'

18' Additional civil improvements include: 10'

18' Water Quality: Improve water quality stormwater 23' releases from the parking lot. Two alternatives are PLANTER proposed:

EXISTING TELE 1. Install varied layers of filter material in islands, or EXISTING EXISTING FIBER ELECTRIC OPTIC 2. Provide no filter material in the islands and # EXISTING STORM SAWCUT LINE install rain garden east of parking lot. PROPOSED 6' PERF PVC, TYP. SANDSTONE CROSSING TYP.

PROPOSED 10" PROPOSED 12" PVC, PVC, SCALE 0 30 60 120 FT N

21 - 1*1&$0-6./4 SCHEMATIC DESIGN 163-*/ 5:1 45&&-'3".& 5:14&&4&$5*0/

 4  LOT 560 STRUCTURAL PLAN  NARRATIVE: 4

 4 The structure is anticipated to consist of drilled   pier foundations, approximately 24" in diameter. 4 The structural support for the solar canopies is 163-*/ 5:1 1*1&$0-6./4 anticipated to consist of steel columns at a spacing 45&&-'3".& 5:14&&4&$5*0/ of 27'.

4 The canopy framing is anticipated to be in multiple  4 configurations with varying spans. The larger canopies will have clear spans in excess of 64' with cantilevers on the ends.

The framing will consist of either rectangular HSS or wide flange beams. The solar arrays will be

 4 4 supported on either 3" metal deck, or metal purlins spanning between beams.

4  4 SCALE 0 20 40 80 FT N

163-*/ 5:1 45&&-'3".& 5:14&&4&$5*0/ 1*1&$0-6./4 22 - SCHEMATIC DESIGN STRUCTURAL DETAILS )44#&". )44#&". $"11-"5&8#-*/%#0-54 "/%45*''&/&31-"5&4 )*%%&/ &3&$5*0/#0-5 1*1&$0-6./ 1*1&$0-6./

"5)44#&".50$0-6./ "5)44#&".50$0-6./ * #0-5&%$0//&$5*0/ 8&-%&%$0//&$5*0/

 

i 1+1 "&44



#&".50$0-6./$0//&$5*0/ i  1*1&$0-6./ $0-6./#"4&$0//&$5*0/ ΋ 45%1*1& #&".50$0-6./$0//&$5*0/  45*''&/&31-"5& $6450.71*1&#"4&  $0-6./#"4&$0//&$5*0/  ΋ 45%1*1& #:$"45$0//&9  

 $0/$1*&3"11309

 "#07&'*/*4)&%(3"%& ΋ %3*--&%1*&34 8'#&".  $"11-"5&8#-*/%#0-54

 "/%45*''&/&31-"5&4 1*1&$0-6./ ΋ %3*--&%1*&34 Cantilever Canopy - Lot 560 "58'#&".50$0-6./ $0-6./#"4&$0//&$5*0/ Butterfly Canopy - Lot 560 #0-5&%$0//&$5*0/ Top Connection Sections

i ;163-*/4 

)44Y 03 8Y  #&".50$0-6./$0//&$5*0/  $0-6./#"4&$0//&$5*0/

 ΋ 45%1*1& 

΋ %3*--&%1*&34

Longspan Canopy - Lot 560 23 - SCHEMATIC DESIGN NARRATIVE: LOT 560 ELECTRICAL PLAN Lighting will be provided under the solar canopies using a direct linear fixture mounted to the STRIP LIGHT underside of the canopy. PAL Microlinea Series 3 Direct Wet Location - LED Electric vehicle charging stations will be provided. Electrical distribution to the side will be provided P and coordinated with UCB Utilities Group.

PEDESTRIAN POLE FIXTURE CREE Edge Series

LED PARKING LOT FIXTURE CREE Edge Series

SCALE 0 40 80 160 FT N

24 - SCHEMATIC DESIGN LOT 560 PHOTOMETRIC PLAN LEGEND 0.00fc-0.10fc (no/low light - below criteria) 0.11fc-0.89fc (low light - below criteria) 0.90fc-7.99fc (meets criteria)

SCALE 80 160 FT

25 - SCHEMATIC DESIGN PLANT PALETTE

Planted Parking Islands

Achillea 'Moonshine' Bouteloua gracilis Deschampsia cespitosa Euonymus fortunei Helictotrichon Hermerocallis 'Stella D'Oro' Moonshine Yarrow 'Blonde Ambition' 'Northern Lights' 'Coloratus' sempervirens Dwarf Daylilly B. A. Grama Grass N. L. Tufted Hair Grass Purpleleaf Wintercreeper Blue Oat Grass

Perovskia atriplicifolia Potentilla neumanniana Schizachyrium scoparium Sedum Symphoricarpos x doorenbosii 'Little Spire' 'Nana' 'Blue Heaven Grass' 'Autumn Joy' 'Magic Berry' Dwarf Russian Sage Dwarf Spring Blue Heaven Little Autumn Joy Sedum Magic Berry Snowberry Potentilla Bluestem

SCALE 0 40 80 160 FT N

26 - SCHEMATIC DESIGN PLANT COLOR DIAGRAMS

Parking Island Seasonal Flower Interest Parking Island Seasonal Leaf Interest

5 Tan 20 White Blue Cream Red Dark Purple 4 Dark Pink Pink Light Pink 15 Yellow Yellow Green 3 Green Dark Green Light Green Light Green Yellow 10 Green 2 Blue Green Grey Green

Amount of Each Color Lime Green Amount of Each Color 5 1

0 0

Mid Fall Late Fall Mid Spring Early Fall Mid Winter Early Fall Mid Fall Late Fall Early Spring Late Spring Mid Summer Early Winter Late Winter Early Spring Mid SpringLate Spring Early WinterMid WinterLate Winter Early Summer Late Summer Early SummerMid SummerLate Summer

27 - 05

SOLAR DESIGN

28 - SOLAR DESIGN: PARAMETERS STRUCTURAL PARAMETERS

5.0O IDEAL ANGLE To minimize cost and maximize modularity, parking layouts set structural parameters.

Provide structural design for 3 solar carports, based on parking layout.

Solar provider to finesse final application of solar modules onto optimized structural 

 concepts.

STANDARD CLEARANCE 7lb/ft2 Snow Load: Structural & PV Recommendation (within local code of 30lb/ft2)

Wind Uplift: 155 MPH local code requirements for structural capacity. 5 degree slope SOLAR PARAMETERS reduces wind uplift.

At Colorado’s latitude, the steeper the slope, the better the generation (kW-h/kW), Maintenance: but increased environmental loads. The ‘ideal’ is to identify a preferred configuration • Bird Deterrence - Tube Steel Preferred. (kW) and then maximize for generation kW-h/kW). • String Inverter - mounted on poles or pad mounted nearby, or potentially below roof of structure. South-facing solar is the most productive, followed closely by east/west-facing. • Owner must commit to snow plowing and occasional asphalt maintenance below structure. At slopes below 7.5O, the greatest structural economy is achieved.

29 - SOLAR DESIGN STRUCTURAL LAYOUT STUDY

  2' DIAMETER BASE FLUSH CURB TO ALLOW MEDIAN INFILL PER CIVIL/  ',$0(7(5%$6( )/86+&85%72WATER RUNOFF AND HOLD 0(',$1,1),//3(5  5(&200(1'('%<RECOMMENDED BY $//2::$7(5  &,9,//$1'6&$3(LANDSCAPE Industry Standard 6758&785$/STRUCTURAL 5812))$1'+2/'EDGE OF ASPHALT   ('*(2)$63+$/7  PV Panel Size

  8675<67$1'$5' 00(5&,$/3902'8/(6,=( 27(   $&78$/6,=(:,//9$5<3(5   /$53529,'(5

$6680(63$&,1* 3(5&,9,/5(48,5(0(176 

PER CIVIL REQUIREMENTS CIVIL PER 1: ACTUAL SIZE WILL VARY PER SOLAR PROVIDER. 7:((102'8/(6 2: ASSUME 1/2” SPACING BETWEEN PANELS.

758&785$/ 5,'  $5$0(7(56   67$1'$5'3$5.,1*63$&('(37+ STANDARD PARKING DEPTH SPACE

     

  67$1'$5'3$5.,1*63$&(:,'7+STANDARD PARKING SPACE WIDTH

APPROX. 24 PV MODULES PER DESIGN TEAM DEFINED GRID DESIGN TEAM DEFINED GRID $3352;39 '(6,*17($0 '(6,*17($0 02'8/(63(5STRUCTURAL MODULE '(),1('*5,'MODULE WIDTH MODULE'(),1('*5,' DEPTH START POINT 30 - SOLAR DESIGN

PV STRUCTURE LAYOUT 245'-0" 127'-0" SOUTH FACING

HALF BUTTERFLY 25'-0" SOUTH FACING SOUTH FACING 105'-0"

BUTTERFLY NORTH FACING 41'-0" 245'-0"

WEST FACING 181'-0"

WEST FACING WEST FACING 105'-0" 316'-0" SOUTH FACING 105'-0"

LONG SPAN 370'-0" SCALE 105'-0" LONG SPAN - GS 0 40 80 160 FT N 31 - 0$1$*(0(17 '$6+('*5$<  STRUCTURE A STRUCTURE SOLAR DESIGN $1''2:1$/21*2876,'( &21'8,7 62/,'*5$< 72 72581%$&.72&2/801 A 581$/21*,16,'(2)9 LONG SPAN Monolithic: ,)'(&.,1*:$7(5

&/($5 2)9 :(67    

generation APPLICATION: bac • Design-Team-Defined structurewith monolithic •

   ƒ cantilever overparkingspaces.

    k-of-house power 32 - 

($67

 SOLAR DESIGN STRUCTURE B

B Cantilever: APPLICATION: double-row locations with walk between parking BUTTERFLY • 10' wide flush concrete island to accommodate structure

&21'8,7 62/,'*5$< 72 base, pedestrians & vehicle bumpers 581$/21*,16,'(2)9 • Less cost and maintenance ,)'(&.,1*:$7(5 0$1$*(0(17 '$6+('*5$<  72581%$&.72&2/801 $1''2:1&(17(52)9



 ƒ  ƒ  6287+    12    

33 - SOLAR DESIGN STRUCTURE C

C Cantilever: APPLICATION: single row locations adjacent to buildings HALF BUTTERFLY • 8’ walk in front of vehicle for ADA access & allows for &21'8,7 62/,'*5$< 72 bumper overhang 581$/21*,16,'(2)9

,)'(&.,1*:$7(5 $1$*(0(17 '$6+('*5$<  72581%$&.72&2/801 $1''2:1$/21*2876,'( 2)9

ƒ

   1257+      &/($5

 

34 - SOLAR DESIGN APPLICATION: maximum power STRUCTURE D generation at Green Space D Monolithic: LONG SPAN - GS &21'8,7 62/,'*5$< 72 581$/21*,16,'(2)9

6+((7)/2::$7(5 0$1$*(0(17







ƒ   87+ 

 

 

   

PARAMETERS: • Same as structure A, except lower to the ground • No concrete base above grade to minimize debris blockage 35 - SOLAR DESIGN ARCHITECTURAL COLOR PALETTE

STRUCTURE

NEUTRAL: Clear adonized metal MONOCHROMATIC: CU black HIGH CONTRAST: Clear adonized metal deck, *beams & columns deck, beams & columns deck & CU black beams & columns CONCRETE BASE

BOARDFORM CONCRETE: FORMED CONCRETE BASE: Natural finish or integral color *Natural finish 36 - SOLAR DESIGN ELECTRICAL INTEGRATION

PERFORATED3(5)25$7('0(7$/ METAL GUSSET AT*866(7$76287+ SOUTH COLUMN AND EAST $1'($67&2/801 385/,169,6,%/(,)12 COLUMN(1'6 ENDS PURLINS VISIBLE IF NO METAL 0(7$/'(&.,1*DECKING

GUSSET-MOUNTED*866(702817(' INVERTER (18,19(57(5 727$/ TOTAL) &21'8,772,19(57(572CONDUIT TO INVERTER TO 581$/21*,16,'(2)9RUN ALONG INSIDE OF V COLUMN-MOUNTED&2/80102817(' DISCONNECT ',6&211(&7 MAX 0$;   6' - 8" TBD INVERTER BY SIZE 7%'%<,19(57(56,=(

(/(&75,&$/ELECTRICAL ,17(*5$7,21# &21'8,772*5,'72581CONDUIT TO GRID TO INTEGRATION @ $/21*2876,'(2) &2/8016 RUN ALONG&21&5(7(%$6( OUTSIDE OF COLUMNS CONCRETE BASE

Longspan Canopy Electrical Integration

37 - SOLAR DESIGN LOT 560 DESIGN STRATEGIES

PEDESTRIAN GUTTER SYSTEM BIKE ROUTE VEHICULAR UNDERGROUND EXISTING PATH BUFF BUS STORM SEWER TEMP. PARKING VEHICULAR CIRCULATION STORM WATER PEDESTRIAN/BIKE CIRCULATION

38 - SOLAR DESIGN ENERGY PRODUCTION ESTIMATES

LOT 560 ESTIMATE* LOT 576/GREEN SPACE = 1.37 mW ESTIMATE** = 1.21 mW SCALE TOTAL SOLAR ENERGY POTENTIAL = 2.58 mW 0 60 120 240 FT N *Estimate based on modified design by Namaste Solar **Estimate extrapolated from Lot 560. Note: Solar energy production is a preliminary estimate and subject to change. 39 - SOLAR DESIGN VIEW FACING EAST AT LOT 560 VISITOR LOT STRUCTURES

40 - SOLAR DESIGN VIEW FACING NORTHWEST AT LOT 560

41 - SOLAR DESIGN VIEW FACING NORTHEAST AT LOT 560

42 - NEXT STEPS SOLAR DESIGN SAWTOOTH OPTION - DESIGN EXPLORED BUT NOT SELECTED

ADD SAWTOOTH IMAGE WITH LINE THROUGH IT

44 -