Installation of Voice I, Voice II, Voice III and Signage Rail by Nari Ward, West Harlem Waterfront Riverwalk, St
Design Commission Meeting Agenda Monday, December 9, 2013 Public Meeting 1:40 p.m. Consent Items 24912: Installation of Voice I, Voice II, Voice III and Signage Rail by Nari Ward, West Harlem Waterfront Riverwalk, St. Clair Place to West 135th Street, from the east side of Marginal Street to the Bulkhead, Manhattan. (Final) (CC 7, CB 9) DCLA%/EDC/SBS 24913: Construction of a cultural center as part of a mixed-use development, Downtown Brooklyn Cultural District, Flatbush Avenue, Ashland Place and Lafayette Avenue, Brooklyn. (Preliminary and Final) (CC 35, CB 2) DCLA 24914: Rehabilitation of the east façade, including the installation of signage, West Farms Branch Library, 2085 Honeywell Avenue, Bronx. (Preliminary and Final) (CC 15, CB 6) DDC 24915: Reconstruction of a retaining wall and adjacent site work, Jerome Avenue and Parkview Terrace between East 196th Street and Morris Avenue, Bronx. (Preliminary and Final) (CC 15, CB 7) DDC/DOT/DPR 24916: Reconstruction of Fordham Plaza, including the construction of a café, a market building and four prototypical food kiosks, East Fordham Road, Third Avenue, Park Avenue and 189th Street, Bronx. (Final) (CC 15, CB 6) DDC/DOT 24917: Installation of an electrical cabinet, Al Oerter Recreation Center, 131-40 Fowler Avenue, Queens. (Final) (CC 20, CB 7) DEP/DPR 24918: Installation of two ramps, duct enclosures and a guard booth, Donald Cranston Judicial Center, 19-19 Hazen Street, Rikers Island, Bronx. (Preliminary and Final) (CC 22, CB 1) DOC 24919: Installation of Wi-Fi equipment on existing Cobrahead and Davit light poles, West 110th Street to West 138th Street between Frederick Douglass Boulevard and Madison Avenue, Manhattan.
[Show full text]