CENELEC General Information
Table of contents
General information ...... 6 About CENELEC ...... 6 General information on technical activities ...... 7 Information on the Technical Board activities ...... 7 Vilamoura Procedure ...... 8 Published ...... 8 Enquiry launched ...... 8 New work item approved ...... 8 Inventory of Technical Activities ...... 9 Intermediate statistics for 2012 (situation at 2012-05-30) ...... 9 Figures for the current year are calculated up to 2012-05-30 ...... 13 Publications available since May 21,2011 ...... 14 EN : European Standards ...... 14 EN : CEN/CLC European Standards ...... 70 HD : Harmonization Documents...... 71 TR : Technical Reports ...... 73 TS : Technical Specifications ...... 74 CLC Guides...... 74 CEN/CLC Guide ...... 74 CENELEC Technical Bodies and meetings...... 75 CENELEC Technical Committees and Subcommittees ...... 75 CENELEC BT Task Forces and BT Working Groups ...... 77 CEN/CENELEC Technical Committees ...... 77 Guidance on how to read CENELEC Report on Technical Activities ...... 78 Technical Board / Reporting secretariats activities...... 84 Published (last 12 months) ...... 84 Ratified ...... 101 Vote launched ...... 102 Vote decided ...... 120 At Secretariat stage ...... 131 PQ/UQ launched ...... 131 New work item to be approved (BT/TC) ...... 132 BT Task Force and BT Working Group activities ...... 133 BTTF 62-3...... 133 BTTF 69-3...... 134 BTTF 76-3...... 135 BTWG 80-3...... 136 BTWG 101-5...... 137 BTWG 112-1 (dormant)...... 138 BTTF 116-1...... 139 BTTF 116-2...... 140 BTWG 126-2...... 141 BTTF 128-2...... 142 BTWG 128-3...... 143 BTTF 129-1...... 144 BTTF 132-1...... 145 BTTF 132-2...... 146 BTTF 133-1...... 147 BTWG 138-1...... 148 Technical committees activities ...... 149
3
CENELEC General Information
TC 2...... 149 TC 8X ...... 151 TC 9X ...... 153 SC 9XA ...... 159 SC 9XB ...... 161 SC 9XC ...... 164 TC 11...... 168 TC 13...... 169 TC 14...... 173 TC 17AC ...... 176 TC 17B ...... 179 TC 17D (dormant) ...... 182 TC 18X ...... 183 TC 20...... 184 TC 21X ...... 192 TC 22X ...... 195 TC 23BX ...... 197 TC 23E ...... 200 TC 26A ...... 202 TC 26B ...... 204 TC 31...... 205 SC 31-1 ...... 207 SC 31-2 (dormant) ...... 208 SC 31-3 (dormant) ...... 209 SC 31-4 (dormant) ...... 210 SC 31-5 (dormant) ...... 211 SC 31-7 (dormant) ...... 212 SC 31-8 ...... 213 SC 31-9 ...... 215 TC 34Z ...... 216 TC 36A ...... 222 TC 37A ...... 223 TC 38...... 225 TC 40XA ...... 226 TC 40XB ...... 228 TC 44X ...... 230 TC 45AX ...... 232 TC 45B ...... 234 TC 46X ...... 236 SC 46XA ...... 239 SC 46XC ...... 240 TC 55...... 245 TC 57...... 250 TC 59X ...... 254 TC 61...... 260 TC 62...... 277 TC 64...... 287 TC 65X ...... 291 TC 69X ...... 307 TC 72...... 308 TC 76...... 310 TC 78...... 311 TC 79...... 312
4
CENELEC General Information
TC 81X ...... 318 TC 82...... 321 TC 86A ...... 324 TC 86BXA ...... 328 TC 88...... 340 TC 94 (dormant)...... 342 TC 97...... 343 TC 99X ...... 345 TC 100X ...... 346 TC 106X ...... 350 TC 107X (dormant) ...... 353 TC 108X ...... 354 TC 111X ...... 357 TC 116...... 360 TC 204...... 365 TC 205...... 366 SC 205A ...... 368 TC 206...... 369 TC 209...... 371 TC 210...... 373 TC 213...... 378 TC 215...... 380 TC 216...... 383 Common CEN/CENELEC Activities ...... 385 Technical committees activities ...... 385 TC 1...... 385 TC 2...... 386 TC 3...... 387 TC 4...... 388 TC 5...... 389 Joint Working Group activities ...... 390 JWG 1 ...... 390 JWG 2 ...... 391 JWG 3 ...... 392 JWG 4 ...... 393 JWG AIMD ...... 394 JWG CBU ...... 395 JWG CMI ...... 396 JWG FCGA ...... 397 JWG FPR ...... 398 JWG NAWI...... 399 JWG PPE...... 400 JWG RRM...... 401
5
CENELEC General Information
General information
About CENELEC
INTRODUCING CENELEC
CENELEC, the European Committee for Electrotechnical Standardization, was created in 1973 in line with the enlargement of the Common Market to Denmark, Ireland and the United Kingdom. It arose from the merger of two previous organizations: CENELCOM and CENEL. Today, CENELEC is a non-profit technical organization set up under Belgian law and composed of the National Electrotechnical Committees of 32 European countries. The National Electrotechnical Committees of 12 other countries whose final goal is to become full members of the Organization once they fulfill all required membership criteria also participate in CENELEC standardization activities as Affiliates.
CENELEC’s mission is to prepare voluntary electrotechnical standards that help develop the Single European Market/European Economic Area for electrical and electronic goods and services by removing barriers to trade, creating new markets and cutting compliance costs. In addition to this, a European Council Resolution of 7th May 1985 (now Directive 98/34/EC), launched a “New Approach” for the European market and gave CENELEC a new dimension to its mission by recognizing it as the Standardization Body able to provide harmonized standards for the electrotechnical field.
The European legal framework thus created ensures that both European and national authorities recognize full presumption of conformity with the corresponding law for products that are in conformity with European harmonized standards (ENs). The use and application status of standards and their relation to European legislation distinguish ENs from any other standard in the world. We can proudly say that European Standards are the best tool in the market for helping manufacturers to comply with the applicable law.
CENELEC standards, because of their (mandatory) implementation by the CENELEC membership, grant direct access to the market of all CENELEC member countries without the need to retest, add/remove any specifications for product depending on the country of sale. Our standards are also widely recognized and used in the countries of our Affiliates.
Furthermore, and thanks to the cooperation agreement signed with the IEC in 1996 (commonly referred to as the Dresden Agreement), which foresees (a) common IEC/CENELEC planning of new work, (b) parallel approval procedures on IEC drafts and (c) feedback of CENELEC homegrown standards to international standardization, CENELEC helps to make the European market place as open to non-European exporters as to home-based manufacturers and producers. The outcome of the Dresden Agreement is that most CENELEC standards are also international standards, and are thus inherently recognized and used outside the European arena as the state of the art.
Besides offering a forum for all interested stakeholders through the national channels provided by its members, CENELEC also enables direct input of industry and identified organizations. Links with manufacturer organizations have been forged through formal cooperation agreements set with 48 major European industry associations and European organizations. Our industrial partners, as stated in CENELEC Guide 14, may advise on and suggest standardization priorities, propose drafts as a contribution to the European standardization process and deliver expert advice.
About CENELEC 6
CENELEC General Information
General information on technical activities
Information on the Technical Board activities
Meetings held or scheduled since November 2011
140th BT 2012-01-31 / 02-01 Brussels 141th BT 2012-05-30 / 05-31 Stockholm 142th BT 2012-09-18 / 09-19 Brussels 143th BT 2013-01-29 / 01-30 Brussels 144th BT 2013-05-28 / 05-29 Brussels 145th BT 2013-10-08 / 10-09 Brussels News about Technical Committees and Sub-Committees
CLC/SC 9XC "Electric supply and earthing systems for public transport equipment and ancillary apparatus (Fixed installations)" New Secretary: Mr Alexandre MACHET ( FR)
CLC/TC 17B "Low-voltage switchgear and controlgear" New Assistant Secretary: Mr Eric BETTEGA ( FR)
CLC/TC 18X "Electrical installations of ships and of mobile and fixed offshore units" New Chairman: Mr Alasdair ANDERSON ( GB)
CLC/TC 26A "Electric arc welding equipment" New Secretary: Mr René STIEPER ( DE)
CLC/TC 26B "Electric resistance welding" New Secretary: Mr René STIEPER ( DE)
CLC/TC 82 "Solar photovoltaic energy systems" New Assistant Secretary: Mr Fabio FANELLI ( IT)
CLC/TC 86BXA "Fibre optic interconnect, passive and connectorised components" New Secretary: Mrs Rosemary McGlashon ( GB)
CLC/TC 97 "Electrical installations for lighting and beaconing of aerodromes" New Secretary: Mr Luca SANDRO ( IT)
CLC/TC 100X "Audio, video and multimedia systems and equipment and related sub-systems" Newly set up (141 BT) New Secretary: Mr Gerhard HENNINGER ( DE)
CLC/TC 206 "Consumer equipment for entertainment and information and related sub-systems" D141/C099: Disbanded
CLC/TC 209 "Cable networks for television signals, sound signals and interactive services" New Chairman: Mr Volker LEISSE ( BE)
News about BT Working Groups and Task Forces
CLC/BTWG 126-2 "Internal regulations" New Convenor: Mr Rene NIELSEN ( DK)
Technical Activities 7
CENELEC General Information
Vilamoura Procedure
Published
CLC/TR 50173-99-3:2012 (PR=21331) based on BT/FR0178/NOT Information technology - Generic cabling systems -- Part 99-3: Home cabling infrastructures up to 50 m in length to
support simultaneous and non simultaneous provision of applications NOTE: 2012-01-18 - Publication editing allocated to [email protected]
Enquiry launched
prHD 60364-7-719:2011 (PR=21733) based on BT/DE0246/NOT Low-voltage installations - Part 7-719: Requirements for special installations or locations - Lighting installations for advertising signs with a rated output voltage not exceeding 1 000 V, which are illuminated by hot-cathode-
fluorescent-lamps, luminous-discharge tubes (neon-tubes), inductive discharge lamps, light emitting diodes (LED) and/or LED modules NOTE: 2nd Enquiry editing allocated to [email protected] * April 2011 decision: Project to be split in 2
parts, " Installation" part being handled by TC 64 and "Product" part being offered to TC 34Z.
New work item approved
prEN 50XXX (PR=24105) based on BT(DE/NOT)259 Cables for electric vehicles NOTE: Work based on Vilamoura BT/DE0259/NOT allocated to CLC/TC 20 - DE NC requested to transfer the
available draft to TC 20
prEN 62056-5-8 (PR=23403) based on BT/DE0251/NOT SLM container services NOTE: D139/C007: NWI approved * Work based on BT/DE0251/NOT and IEC draft for future IEC 62056-5-8 to be
handled under parallel procedures
Vilamoura Procedure 8
CENELEC Inventory of Technical Activities
Inventory of Technical Activities
Intermediate statistics for 2012 (situation at 2012-05-30)
CENELEC portfolio of all deliverables for the last 5 years
These figures cover all the published active standards (dow not reached yet) The Amendments and Interpretation Sheets associated with the different types of deliverables are also included All the figures for the previous years are hard coded based on the figures presented in the Annual report The figures for the current year are calculated up to 2012-05-30
2008 2009 2010 2011 2012 ENs 5220 5371 5537 5716 5797 HDs 305 295 297 289 293 CLC/TRs 57 73 88 93 94 CLC/TSs 51 53 65 68 68 ESs 1 1 0 0 0 ENVs 3 3 3 3 3 Reports 10 8 7 5 4 CWA 3 3 4 4 4 Guides 39 46 48 53 56 CECC Spec 316 316 308 297 297
Intermediate statistics for 2012 (situation at 2012-05-30) 9
CENELEC Inventory of Technical Activities
CENELEC deliverables issued during the last 5 years
These figures cover all the deliverables issued during a given year The Amendments and Interpretation Sheets associated with the different types of deliverables are also included All the figures for the previous years are hard coded based on the figures presented in the Annual Report The figures for the current year are calculated up to 2012-05-30
2008 2009 2010 2011 2012 ENs 483 413 415 407 168 HDs 10 5 10 5 7 TRs 12 16 16 5 1 TSs 11 7 15 6 2 CWA 0 0 1 0 0 Guides 0 9 5 4 2 TOTAL 516 450 462 427 180
Intermediate statistics for 2012 (situation at 2012-05-30) 10
CENELEC Inventory of Technical Activities
CENELEC Standards withdrawn during the last 4 years
These figures cover all types of standards These figures also include the Amendments and Interpretation sheets The figures for the current year are calculated up to 2012-05-30 A standard can be withdrawn: - by a vote or a BT decision (withdrawn vote/BT) - because the dow of its superseding standard is reached (withdrawn (dow))
Withdrawn Withdrawn Total vote/BT (dow) 2009 10 192 202 2010 7 262 269 2011 6 232 238 2012 0 92 92
Intermediate statistics for 2012 (situation at 2012-05-30) 11
CENELEC Inventory of Technical Activities
Ongoing projects at 2012-05-30
These figures cover all types of standards These figures also include the Amendments and Interpretation sheets The figures for the current year are calculated up to 2012-05-30
EN HD TS TR Ratified 115 0 1 1 Vote launched 487 4 3 4 Vote decided 185 0 1 2 Enquiry launched 60 4 0 0 Enquiry decided 4 1 0 0 PQ/UQ launched 7 0 0 0 Other ongoing projects 139 3 19 14
Intermediate statistics for 2012 (situation at 2012-05-30) 12
CENELEC Inventory of Technical Activities
CENELEC procedures launched during the last 5 years
The Amendments and Interpretation Sheets associated with the different types of deliverables are also included All the figures are automatically retrieved from the CENELEC database Figures for the current year are calculated up to 2012-05-30
2008 2009 2010 2011 2012 Vote 789 751 740 738 317 Enquiry 70 36 38 51 20 PQ/UQ 4 13 4 5 3 Total 863 800 782 794 340
Intermediate statistics for 2012 (situation at 2012-05-30) 13
CENELEC Inventory of Technical Activities
Publications available since May 21,2011
EN : European Standards
EN 50083-2:2012 (PR=22804) CLC/TC 209 EMC (2004/108/EC) Stage : 6060 Cable networks for television signals, sound signals and interactive services - Part 2: Electromagnetic compatibility
for equipment NOTE: 2011-11-18 - Publication editing allocated to [email protected] * Supersedes EN 50083-2:2006 dor : 2011-12-21 doa : 2012-06-21 dop : 2012-12-21 dow: 2013-06-21
EN 50085-2-1:2006/A1:2011 (PR=22775) CLC/TC 213 LVD (2006/95/EC) Stage : 6060 Cable trunking systems and cable ducting systems for electrical installations - Part 2-1: Cable trunking systems and
cable ducting systems intended for mounting on walls and ceilings NOTE: Publication editing allocated to [email protected] dor : 2011-10-10 doa : 2012-04-10 dop : 2012-10-10 dow : 2014-10-10
EN 50122-1:2011/A1:2011 (PR=23053) CLC/SC 9XC Stage : 6060 Railway applications - Fixed installations - Electrical safety, earthing and the return circuit - Part 1: Protective
provisions against electric shock NOTE: 2011-03-21 - Publication editing allocated to [email protected] dor : 2011-04-25 doa : 2011-10-25 dop : 2012-04-25 dow : 2014-04-25
EN 50128:2011 (PR=20508) CLC/SC 9XA Stage : 6060 Railway applications - Communication, signalling and processing systems - Software for railway control and
protection systems NOTE: 2011-03-21 - Publication editing allocated to [email protected] * Supersedes EN 50128:2001 dor : 2011-04-25 doa : 2011-10-25 dop : 2012-04-25 dow : 2014-04-25
EN 50130-4:2011 (PR=22803) CLC/TC 79 EMC (2004/108/EC) Stage : 6060 Alarm systems - Part 4: Electromagnetic compatibility - Product family standard: Immunity requirements for
components of fire, intruder, hold up, CCTV, access control and social alarm systems NOTE: Supersedes EN 50130-4:1995 + A1:1998 + A2:2003 + corr. Mar.2003 dor : 2011-06-13 doa : 2011-12-13 dop : 2012-06-13 dow : 2014-06-13
EN 50130-5:2011 (PR=22701) CLC/TC 79 Stage : 6060 Alarm systems - Part 5: Environmental test methods NOTE: Supersedes EN 50130-5:1998 dor : 2011-06-13 doa : 2011-12-13 dop : 2012-06-13 dow : 2014-06-13
EN 50132-5-1:2011 (PR=22579) CLC/TC 79 Stage : 6060 Alarm systems - CCTV surveillance systems for use in security applications - Part 5-1: Video transmission - General
video transmission performance requirements NOTE: Publication editing allocated to [email protected] * Supersedes EN 50132-5:2001 together with future EN 50132-5-2 (PR=22580) and EN 50132-5-3 (PR=22581) - These future EN and the present one cover the work on prEN 50132-5 (pr=21915) dor : 2011-10-31 doa : 2012-04-30 dop : 2012-10-31 dow : 2014-10-31
Publications available since May 30,2011 14
CENELEC Inventory of Technical Activities
EN 50132-5-2:2011 (PR=22580) CLC/TC 79 Stage : 6060 Alarm systems - CCTV surveillance systems for use in security applications - Part 5-2: IP Video Transmission
Protocols NOTE: Publication editing allocated to [email protected] * Supersedes EN 50132-5:2001 together with EN 50132-5-1 (PR=22579) and EN 50132-5-3 (PR=22581) - These future ENs and the present one cover the work on prEN 50132-5 (pr=21915) dor : 2011-10-31 doa : 2012-04-30 dop : 2012-10-31 dow : 2014-10-31
EN 50134-3:2012 (PR=21316) CLC/TC 79 Stage : 6060 Alarm systems - Social alarm systems - Part 3: Local unit and controller NOTE: 2012-02-09 - Publication editing allocated to [email protected] * Supersedes EN 50134-3:2001 dor : 2012-03-12 doa : 2012-09-12 dop : 2013-03-12 dow : 2015-03-12
EN 50136-1:2012 (PR=21534) CLC/TC 79 Stage : 6060 Alarm systems - Alarm transmission systems and equipment - Part 1: General requirements for alarm transmission
systems NOTE: 2011-11-23 - Publication editing allocated to [email protected] * Supersedes EN 50136-1-1:1998 +
A1:2001 + A2:2008, EN 50136-1-2:1998, EN 50136-1-3:1998, EN 50136-1-4:1998 and EN 50136-1-5:2008 dor : 2011-12-26 doa : 2012-06-26 dop : 2012-12-26 dow : 2014-12-26
EN 50149:2001/AC:2011 (PR=23799) CLC/SC 9XC Stage : 6060 Railway applications - Fixed installations - Electric traction - Copper and copper alloy grooved contact wires NOTE: D139/C141: To update the Swiss A-deviation in EN 50149:2001 (PR=102), (regulation SR 814.81 instead of
SR 814.013) dor : - doa : - dop : - dow : -
EN 50288-8:2012 (PR=21774) CLC/SC 46XC LVD (2006/95/EC) Stage : 6060 Multi-element metallic cables used in analogue and digital communication and control - Part 8: Specification for type
1 cables characterised up to 2 MHz NOTE: 2011-12-20 - Publication editing allocated to [email protected] Mandated: M/212 dor : 2012-01-23 doa : 2012-07-23 dop : 2013-01-23 dow: 2015-01-23
EN 50317:2012 (PR=21986) CLC/SC 9XC RAIL (2008/57/EC) Stage : 6060 Railway applications - Current collection systems - Requirements for and validation of measurements of the dynamic
interaction between pantograph and overhead contact line NOTE: 2011-11-23 - Publication editing allocated to [email protected] * Revision of EN 50317:2002
following ERA's requirement for a Standard: RfS-018 * Supersedes EN 50317:2002 + A1:2004 + A2:2007 dor : 2011-12-26 doa : 2012-06-26 dop : 2012-12-26 dow : 2014-12-26
EN 50342-1:2006/A1:2011 (PR=22309) CLC/TC 21X Stage : 6060 Lead-acid starter batteries - Part 1: General requirements and methods of test dor : 2011-10-17 doa : 2012-04-17 dop : 2012-10-17 dow : 2014-10-17
EN 50342-5:2010/AC:2011 (PR=23820) CLC/TC 21X Stage : 6060 Lead-acid starter batteries - Part 5: Properties of battery housings and handles dor : - doa : - dop : - dow : -
Publications available since May 30,2011 15
CENELEC Inventory of Technical Activities
EN 50360:2001/A1:2012 (PR=23365) CLC/TC 106X RTTED (1999/5/EC) Stage : 6060 Product standard to demonstrate the compliance of mobile phones with the basic restrictions related to human
exposure to electromagnetic fields (300 MHz - 3 GHz) NOTE: Publication editing allocated to [email protected] Mandated: M/305 dor : 2012-02-13 doa : 2012-08-13 dop : 2013-02-13 dow: 2015-02-13
EN 50367:2012 (PR=21758) CLC/SC 9XC RAIL (2008/57/EC) Stage : 6060 Railway applications - Current collection systems - Technical criteria for the interaction between pantograph and
overhead line (to achieve free access) NOTE: 2012-02-14 - Publication editing allocated to [email protected] * Revision following ERA's
requirement for a Standard RfS-016 * Supersedes EN 50367:2006 dor : 2012-03-19 doa : 2012-09-19 dop : 2013-03-19 dow : 2015-03-19
EN 50377-14-1:2011 (PR=23044) CLC/TC 86BXA Stage : 6060 Connector sets and interconnect components to be used in optical fibre communication systems - Product
specifications - Part 14-1: Cords with IEC 60793-2-50 singlemode category B1.1 and B1.3 fibre for category C NOTE: Project developed within a JWG with ETSI dor : 2011-05-02 doa : 2011-11-02 dop : 2012-05-02 dow : 2014-05-02
EN 50377-16-1:2011 (PR=22857) CLC/TC 86BXA Stage : 6060 Connector sets and interconnect components to be used in optical fibre communication systems - Product specifications - Part 16-1: Type LF3 APC simplex terminated on IEC 60793-2-50 category B1.1 and B1.3 singlemode fibre with titanium composite ferrule for category C NOTE: Publication editing allocated to [email protected] dor : 2011-10-31 doa : 2012-04-30 dop : 2012-10-31 dow : 2014-10-31
EN 50379-1:2012 (PR=22970) CLC/TC 216 Stage : 6060 Specification for portable electrical apparatus designed to measure combustion flue gas parameters of heating
appliances - Part 1: General requirements and test methods NOTE: 2012-02-14 - Publication editing allocated to [email protected] * Supersedes EN 50379-1:2004 dor : 2012-03-19 doa : 2012-09-19 dop : 2013-03-19 dow : 2015-03-19
EN 50379-2:2012 (PR=22971) CLC/TC 216 Stage : 6060 Specification for portable electrical apparatus designed to measure combustion flue gas parameters of heating
appliances - Part 2: Performance requirements for apparatus used in statutory inspections and assessment NOTE: 2012-02-14 - Publication editing allocated to [email protected] * Supersedes EN 50379-2:2004 dor : 2012-03-19 doa : 2012-09-19 dop : 2013-03-19 dow : 2015-03-19
EN 50379-3:2012 (PR=22972) CLC/TC 216 Stage : 6060 Specification for portable electrical apparatus designed to measure combustion flue gas parameters of heating appliances - Part 3: Performance requirements for apparatus used in non-statutory servicing of gas fired heating appliances NOTE: 2012-02-14 - Publication editing allocated to [email protected] * supersedes EN 50379-3:2004 dor : 2012-03-19 doa : 2012-09-19 dop : 2013-03-19 dow : 2015-03-19
Publications available since May 30,2011 16
CENELEC Inventory of Technical Activities
EN 50388:2012 (PR=23567) CLC/SC 9XC RAIL (2008/57/EC) Stage : 6060 Railway Applications - Power supply and rolling stock - Technical criteria for the coordination between power
supply (substation) and rolling stock to achieve interoperability NOTE: Publication editing allocated to [email protected] * Supersedes EN 50388:2005 dor : 2012-02-13 doa : 2012-08-13 dop : 2013-02-13 dow : 2015-02-13
EN 50400:2006/AC:2011 (PR=23797) CLC/TC 106X Stage : 6060 Basic standard to demonstrate the compliance of fixed equipment for radio transmission (110 MHz - 40 GHz) intended for use in wireless telecommunication networks with the basic restrictions or the reference levels related to general public exposure to radio frequency electromagnetic fields, when put into service NOTE: D139/C139: To modify the Swiss A-deviation in EN 50400:2006 (PR=15349) in accordance with
BT139/CH0115/NCP dor : - doa : - dop : - dow : -
EN 50401:2006/A1:2011 (PR=21907) CLC/TC 106X RTTED (1999/5/EC) Stage : 6060 Product standard to demonstrate the compliance of fixed equipment for radio transmission (110 MHz - 40 GHz) intended for use in wireless telecommunication networks with the basic restrictions or the reference levels related to general public exposure to radio frequency electromagnetic fields, when put into service NOTE: In hands of WG 1 Mandated: M/305 dor : 2011-08-29 doa : 2012-02-29 dop : 2012-08-29 dow: 2014-08-29
EN 50408:2008/A1:2011 (PR=23067) CLC/TC 61 Stage : 6060 Household and similar electrical appliances - Safety - Particular requirements for cab heaters for vehicles NOTE: 2011-03-21 - Publication editing allocated to [email protected] dor : 2011-04-25 doa : 2011-10-25 dop : 2012-04-25 dow : 2014-04-25
EN 50411-2-2:2012 (PR=23048) CLC/TC 86BXA Stage : 6060 Fibre organisers and closures to be used in optical fibre communication systems - Product specifications - Part 2-2:
Sealed pan fibre splice closures Type 1, for category S & A NOTE: 2011-11-18 - Publication editing allocated to [email protected] * Supersedes EN 50411-2-
2:2007 dor : 2011-12-21 doa : 2012-06-21 dop : 2012-12-21 dow : 2012-12-21
EN 50411-2-3:2012 (PR=23049) CLC/TC 86BXA Stage : 6060 Fibre organisers and closures to be used in optical fibre communication systems - Product specifications - Part 2-3:
Sealed inline fibre splice closures Type 1, for category S & A NOTE: 2011-11-18 - Publication editing allocated to [email protected] * Supersedes EN 50411-2-
3:2007 dor : 2011-12-21 doa : 2012-06-21 dop : 2012-12-21 dow : 2012-12-21
EN 50411-2-4:2012 (PR=23050) CLC/TC 86BXA Stage : 6060 Fibre organisers and closures to be used in optical fibre communication systems - Product specifications - Part 2-4:
Sealed dome fibre splice closures Type 1, for category S & A NOTE: 2011-11-18 - Publication editing allocated to [email protected] * Supersedes EN 50411-2-
4:2006 dor : 2011-12-21 doa : 2012-06-21 dop : 2012-12-21 dow : 2012-12-21
Publications available since May 30,2011 17
CENELEC Inventory of Technical Activities
EN 50411-3-3:2011 (PR=21888) CLC/TC 86BXA Stage : 6060 Fibre organisers and closures to be used in optical fibre communication systems - Product specifications - Part 3-3:
Singlemode optical fibre fusion splice protectors NOTE: Publication editing allocated to [email protected] dor : 2011-11-14 doa : 2012-05-14 dop : 2012-11-14 dow : 2014-11-14
EN 50411-6-1:2011 (PR=21470) CLC/TC 86BXA Stage : 6060 Fibre organisers and closures to be used in optical fibre communication systems - Product specifications - Part 6-1:
Unprotected microduct for category S and A dor : 2011-03-21 doa : 2011-09-21 dop : 2012-03-21 dow : 2014-03-21
EN 50441-1:2012 (PR=20803) CLC/SC 46XC LVD (2006/95/EC) Stage : 6060 Cables for indoor residential telecommunication installations - Part 1: Unscreened cables - Grade 1 NOTE: 2011-12-20 - Publication editing allocated to [email protected] * Supersedes EN 50441-1:2006 dor : 2012-01-23 doa : 2012-07-23 dop : 2013-01-23 dow : 2015-01-23
EN 50441-2:2012 (PR=20804) CLC/SC 46XC LVD (2006/95/EC) Stage : 6060 Cables for indoor residential telecommunication installations - Part 2: Screened cables - Grade 1 NOTE: 2011-12-20 - Publication editing allocated to [email protected] * Supersedes EN 50441-2:2006 dor : 2012-01-23 doa : 2012-07-23 dop : 2013-01-23 dow : 2015-01-23
EN 50441-4:2012 (PR=20805) CLC/SC 46XC LVD (2006/95/EC) Stage : 6060 Cables for indoor residential telecommunication installations - Part 4: Cables up to 1 200 MHz - Grade 3 NOTE: 2011-12-20 - Publication editing allocated to [email protected] dor : 2012-01-23 doa : 2012-07-23 dop : 2013-01-23 dow : 2015-01-23
EN 50443:2011 (PR=23055) CLC/SC 9XC Stage : 6060 Effects of electromagnetic interference on pipelines caused by high voltage a.c. electric traction systems and/or high
voltage a.c. power supply systems NOTE: Publication editing allocated to [email protected] dor : 2011-10-24 doa : 2012-04-24 dop : 2012-10-24 dow : 2014-10-24
EN 50464-1:2007/A1:2012 (PR=22806) CLC/TC 14 Stage : 6060 Three-phase oil-immersed distribution transformers 50 Hz, from 50 kVA to 2 500 kVA with highest voltage for
equipment not exceeding 36 kV - Part 1: General requirements NOTE: Publication editing allocated to [email protected] dor : 2011-10-31 doa : 2012-04-30 dop : 2012-10-31 dow : 2014-10-31
EN 50464-4:2007/A1:2011 (PR=22807) CLC/TC 14 Stage : 6060 Three-phase oil-immersed distribution transformers 50 Hz, from 50 kVA to 2 500 kVA with highest voltage for
equipment not exceeding 36 kV - Part 4: Requirements and tests concerning pressurised corrugated tanks NOTE: Publication editing allocated to [email protected] dor : 2011-10-10 doa : 2012-04-10 dop : 2012-10-10 dow : 2014-10-10
Publications available since May 30,2011 18
CENELEC Inventory of Technical Activities
EN 50467:2011 (PR=22267) CLC/SC 9XB Stage : 6060 Railway applications - Rolling stock - Electrical connectors, requirements and test methods NOTE: Publication editing allocated to [email protected] * Will supersede CLC/TS 50467:2008 + corr.
May.2008 Mandated: M/334; M/483 dor : 2011-10-10 doa : 2012-04-10 dop : 2012-10-10 dow: 2014-10-10
EN 50491-4-1:2012 (PR=23184) CLC/TC 205 LVD (2006/95/EC) Stage : 6060 General requirements for Home and Building Electronic Systems (HBES) and Building Automation and Control Systems (BACS) - Part 4-1: General functional safety requirements for products intended to be integrated in Building Electronic Systems (HBES) and Building Automation and Control Systems (BACS) NOTE: 2012-01-18 - Publication editing allocated to [email protected] * Supersedes EN 50090-2-3:2005 dor : 2012-02-20 doa : 2012-08-20 dop : 2013-02-20 dow : 2015-02-20
EN 50516-1-1:2011 (PR=22321) CLC/TC 86BXA Stage : 6060 Industrial connector sets and interconnect components to be used in optical fibre control and communication systems - Product specifications - Part 1-1: Type SC-RJ PC industrial terminated on EN 60793-2-10 category A1a and A1b multimode fibre to meet the requirements of category I (industrial environments) as specified in IEC 61753-1-3 dor : 2011-07-19 doa : 2012-01-19 dop : 2012-07-19 dow : 2014-07-19
EN 50516-2-1:2011 (PR=21984) CLC/TC 86BXA Stage : 6060 Industrial connector sets and interconnect components to be used in optical fibre control and communication systems - Product specifications - Part 2-1: Type ODVA PC industrial terminated on EN 60793-2-10 category A1a and A1b
multimode fibre to meet the requirements of category I (industrial environments) as specified in EN 50173-1 and IEC 61753-1-3 dor : 2011-07-19 doa : 2012-01-19 dop : 2012-07-19 dow : 2014-07-19
EN 50526-1:2012 (PR=20529) CLC/SC 9XC Stage : 6060 Railway applications - Fixed installations - D.C. surge arresters and voltage limiting devices - Part 1: Surge arresters NOTE: Publication editing allocated to [email protected] * Renumbered from prEN 50123-5 *
Supersedes EN 50123-5:2003 dor : 2011-10-10 doa : 2012-04-10 dop : 2012-10-10 dow : 2014-10-10
EN 50533:2011 (PR=21416) CLC/SC 9XB Stage : 6060 Railway applications - Three-phase train line voltage characteristics NOTE: Publication editing allocated to [email protected] dor : 2011-10-10 doa : 2012-04-10 dop : 2012-10-10 dow : 2014-10-10
EN 50536:2011/AC:2011 (PR=23600) CLC/TC 81X Stage : 6060 Protection against lightning - Thunderstorm warning systems dor : - doa : - dop : - dow : -
EN 50543:2011/AC:2011 (PR=23666) CLC/TC 216 Stage : 6060 Electronic portable and transportable apparatus designed to detect and measure carbon dioxide and/or carbon
monoxide in indoor ambient air - Requirements and test methods NOTE: Corrigendum editing allocated to [email protected] dor : - doa : - dop : - dow : -
Publications available since May 30,2011 19
CENELEC Inventory of Technical Activities
EN 50545-1:2011 (PR=22532) CLC/TC 216 Stage : 6060 Electrical apparatus for the detection and measurement of toxic and combustible gases in car parks and tunnels - Part 1: General performance requirements and test methods for the detection and measurement of carbon monoxide and nitrogen oxides NOTE: 2011-07-11 - Allocated to [email protected] * TC 216 agreed that there was no need to draft any further parts to this standard at present (see report of 2012-03-15 meeting * Handled by WG 05 * TC 216 is currently gathering further information on tunnels dor : 2011-08-15 doa : 2012-02-15 dop : 2012-08-15 dow : 2014-08-15
EN 50548:2011 (PR=22418) CLC/TC 82 Stage : 6060 Junction boxes for photovoltaic modules dor : 2011-02-14 doa : 2011-08-14 dop : 2012-02-14 dow : 2014-02-14
EN 50550:2011/AC:2012 (PR=24027) CLC/TC 23E EMC (2004/108/EC) LVD (2006/95/EC) Stage : 6060 Power frequency overvoltage protective device for household and similar applications (POP) dor : - doa : - dop : - dow : -
EN 50553:2012 (PR=20779) CLC/TC 9X RAIL (2008/57/EC) Stage : 6060 Railway applications - Requirements for running capability in case of fire on board of rolling stock NOTE: 2011-12-20 - Publication editing allocated to [email protected] dor : 2012-01-23 doa : 2012-07-23 dop : 2013-01-23 dow : 2015-01-23
EN 50557:2011 (PR=22789) CLC/TC 23E EMC (2004/108/EC) LVD (2006/95/EC) Stage : 6060 Requirements for automatic reclosing devices (ARDs) for circuit breakers-RCBOs-RCCBs for household and similar
uses NOTE: Publication editing allocated to [email protected] dor : 2011-07-19 doa : 2012-01-19 dop : 2012-07-19 dow : 2014-07-19
EN 50563:2011 (PR=23095) CLC/TC 100X ECOPOCO (278/2009) ERP (2009/125/EC) Stage : 6060 External a.c. - d.c. and a.c. - a.c. power supplies – Determination of no-load power and average efficiency of active
modes NOTE: Publication editing allocated to [email protected] * Work initially handled by by CLC/TC
108X/JWG TC 108X/TC 59X * D141/C010: transferred to new TC 100X Mandated: M/450 dor : 2011-10-10 doa : 2012-04-10 dop : 2012-10-10 dow: 2014-10-10
EN 50574:2012 (PR=22383) CLC/TC 111X WEEE (2002/96/EC) Stage : 6060 Collection, logistics & treatment requirements for end-of-life household appliances containing volatile fluorocarbons
or volatile hydrocarbons NOTE: 2012-02-20 - Publication editing allocated to [email protected]
EN 50580:2012 (PR=23389) CLC/TC 116 MD (2006/42/EC) Stage : 6060 Safety of hand-held electric motor operated tools - Particular requirements for spray guns NOTE: 2011-12-05 - Publications editing allocated to [email protected] * Renumbered from prEN 50144-2-7 to EN 50580 * Supersedes EN 50260-1:2002, EN 50144-2-7:2000, EN 50260-2-7:2002 and EN 50144- 1:1998 (+A1:2002 +A2:2003) dor : 2012-01-09 doa : 2012-07-09 dop : 2013-01-09 dow : 2015-01-09
Publications available since May 30,2011 20
CENELEC Inventory of Technical Activities
EN 55014-1:2006/A2:2011 (PR=22618) CISPR 14-1:2005/A2:2011 CLC/TC 210 IEC/SC CISPR/F EMC (2004/108/EC) // Stage : 6060 Electromagnetic compatibility - Requirements for household appliances, electric tools and similar apparatus - Part 1:
Emission dor : 2011-08-16 doa : 2011-11-16 dop : 2012-05-16 dow : 2014-08-16
EN 55016-4-2:2011 (PR=22995) CISPR 16-4-2:2011 CLC/TC 210 IEC/SC CISPR/A // Stage : 6060 Specification for radio disturbance and immunity measuring apparatus and methods - Part 4-2: Uncertainties,
statistics and limit modelling - Measurement instrumentation uncertainty NOTE: Supersedes EN 55016-4-2:2004 dor : 2011-07-13 doa : 2011-10-13 dop : 2012-04-13 dow : 2014-07-13
EN 55017:2011 (PR=22839) CISPR 17:2011 CLC/TC 210 IEC/SC CISPR/A // Stage : 6060 Methods of measurement of the suppression characteristics of passive EMC filtering devices dor : 2011-07-15 doa : 2011-10-15 dop : 2012-04-15 dow : 2014-07-15
EN 55020:2007/A11:2011 (PR=23250) CLC/TC 210 EMC (2004/108/EC) Stage : 6060 Sound and television broadcast receivers and associated equipment - Immunity characteristics - Limits and methods
of measurement NOTE: D137/C019: Amendment to EN 55020 resulting from D137/C018 * To be implemented by all countries
except CH Mandated: M/404 dor : 2011-06-27 doa : 2011-12-27 dop : 2012-06-27 dow: 2013-01-01
EN 55022:2010/AC:2011 (PR=23823) CLC/TC 210 EMC (2004/108/EC) RTTED (1999/5/EC) Stage : 6060 Information technology equipment - Radio disturbance characteristics - Limits and methods of measurement dor : - doa : - dop : - dow : -
EN 55032:2012 (PR=23015) CISPR 32:2012 (corrigendum Mar. 2012) CLC/TC 210 IEC/SC CISPR/I EMC (2004/108/EC) // Stage : 6060 Electromagnetic compatibility of multimedia equipment - Emission requirements NOTE: 2012-02-24: Publication editing allocated to [email protected] dor : 2012-03-05 doa : 2012-06-05 dop : 2012-12-05 dow : 2015-03-05
EN 60034-16-1:2011 (PR=22898) IEC 60034-16-1:2011 CLC/TC 2 IEC/TC 2 // Stage : 6060 Rotating electrical machines - Part 16-1: Excitation systems for synchronous machines - Definitions NOTE: 2011-05-27: Publication allocated to [email protected] * Supersedes EN 60034-16-1:1995 dor : 2011-06-29 doa : 2011-09-29 dop : 2012-03-29 dow : 2014-06-29
EN 60038:2011 (PR=23225) IEC 60038:2009 (Modified) CLC/TC 8X IEC/TC 8 Stage : 6060 CENELEC standard voltages NOTE: Supersedes HD 472 S1:1989 + corr. Feb.2002 + A1:1995 dor : 2011-09-05 doa : 2012-03-05 dop : 2012-09-05 dow : 2014-09-05
Publications available since May 30,2011 21
CENELEC Inventory of Technical Activities
EN 60061-1:1993/A45:2011 (PR=22738) IEC 60061-1:1969/A45:2011 CLC/TC 34Z IEC/SC 34B LVD (2006/95/EC) // Stage : 6060 Lamp caps and holders together with gauges for the control of interchangeability and safety - Part 1: Lamp caps dor : 2011-08-17 doa : 2011-11-17 dop : 2012-05-17 dow : 2014-08-17
EN 60061-1:1993/A46:2011 (PR=23071) IEC 60061-1:1969/A46:2011 CLC/TC 34Z IEC/SC 34B LVD (2006/95/EC) // Stage : 6060 Lamp caps and holders together with gauges for the control of interchangeability and safety - Part 1: Lamp caps dor : 2011-08-17 doa : 2011-11-17 dop : 2012-05-17 dow : 2014-08-17
EN 60061-1:1993/A47:2012 (PR=23276) IEC 60061-1:1969/A47:2011 CLC/TC 34Z IEC/SC 34B LVD (2006/95/EC) // Stage : 6060 Lamp caps and holders together with gauges for the control of interchangeability and safety - Part 1: Lamp caps NOTE: 2012-03-13 - Publication editing allocated to [email protected] dor : 2012-03-03 doa : 2012-06-03 dop : 2012-12-03 dow : 2015-03-03
EN 60061-2:1993/A42:2011 (PR=22739) IEC 60061-2:1969/A42:2011 CLC/TC 34Z IEC/SC 34B LVD (2006/95/EC) // Stage : 6060 Lamp caps and holders together with gauges for the control of interchangeability and safety - Part 2: Lampholders dor : 2011-10-29 doa : 2012-01-29 dop : 2012-07-29 dow : 2014-10-29
EN 60061-2:1993/A43:2011 (PR=23072) IEC 60061-2:1969/A43:2011 CLC/TC 34Z IEC/SC 34B LVD (2006/95/EC) // Stage : 6060 Lamp caps and holders together with gauges for the control of interchangeability and safety - Part 2: Lampholders dor : 2011-10-29 doa : 2012-01-29 dop : 2012-07-29 dow : 2014-10-29
EN 60061-2:1993/A44:2012 (PR=23277) IEC 60061-2:1969/A44:2011 CLC/TC 34Z IEC/SC 34B LVD (2006/95/EC) // Stage : 6060 Lamp caps and holders together with gauges for the control of interchangeability and safety - Part 2: Lampholders NOTE: 2012-01-20 - Publication editing allocated to [email protected] dor : 2012-01-19 doa : 2012-04-19 dop : 2012-10-19 dow : 2015-01-19
EN 60061-3:1993/A43:2011 (PR=22740) IEC 60061-3:1969/A43:2011 CLC/TC 34Z IEC/SC 34B LVD (2006/95/EC) // Stage : 6060 Lamp caps and holders together with gauges for the control of interchangeability and safety - Part 3: Gauges dor : 2011-10-29 doa : 2012-01-29 dop : 2012-07-29 dow : 2014-10-29
EN 60061-3:1993/A44:2011 (PR=23073) IEC 60061-3:1969/A44:2011 CLC/TC 34Z IEC/SC 34B LVD (2006/95/EC) // Stage : 6060 Lamp caps and holders together with gauges for the control of interchangeability and safety - Part 3: Gauges dor : 2011-10-29 doa : 2012-01-29 dop : 2012-07-29 dow : 2014-10-29
Publications available since May 30,2011 22
CENELEC Inventory of Technical Activities
EN 60061-3:1993/A45:2012 (PR=23278) IEC 60061-3:1969/A45:2011 CLC/TC 34Z IEC/SC 34B LVD (2006/95/EC) // Stage : 6060 Lamp caps and holders together with gauges for the control of interchangeability and safety - Part 3: Gauges NOTE: 2012-01-20 - Publication editing allocated to [email protected] dor : 2012-01-24 doa : 2012-04-24 dop : 2012-10-24 dow : 2015-01-24
EN 60061-4:1992/A13:2011 (PR=22525) IEC 60061-4:1990/A13:2011 CLC/TC 34Z IEC/SC 34B LVD (2006/95/EC) // Stage : 6060 Lamp caps and holders together with gauges for the control of interchangeability and safety - Part 4: Guidelines and
general information dor : 2010-10-05 doa : 2011-12-09 dop : 2012-03-09 dow : 2013-10-05
EN 60061-4:1992/A14:2011 (PR=23074) IEC 60061-4:1990/A14:2011 CLC/TC 34Z IEC/SC 34B LVD (2006/95/EC) // Stage : 6060 Lamp caps and holders together with gauges for the control of interchangeability and safety - Part 4: Guidelines and
general information dor : 2011-09-26 doa : 2011-12-26 dop : 2012-06-26 dow : 2014-09-26
EN 60068-2-83:2011 (PR=22730) IEC 60068-2-83:2011 CLC/SR 91 IEC/TC 91 // Stage : 6060 Environmental testing - Part 2-83: Tests - Test Tf: Solderability testing of electronic components for surface
mounting devices (SMD) by the wetting balance method using solder paste dor : 2011-10-12 doa : 2012-01-12 dop : 2012-07-12 dow : 2014-10-12
EN 60068-3-1:2011 (PR=22720) IEC 60068-3-1:2011 CLC/SR 104 IEC/TC 104 // Stage : 6060 Environmental testing - Part 3-1: Supporting documentation and guidance - Cold and dry heat tests NOTE: Supersedes EN 60068-3-1:1999 dor : 2011-09-23 doa : 2011-12-23 dop : 2012-06-23 dow : 2014-09-23
EN 60076-1:2011 (PR=22467) IEC 60076-1:2011 CLC/TC 14 IEC/TC 14 // Stage : 6060 Power transformers - Part 1: General NOTE: Supersedes EN 60076-1:1997 + A1:2000 + A12:2002 dor : 2011-05-25 doa : 2011-08-25 dop : 2012-05-04 dow : 2014-05-25
EN 60076-16:2011 (PR=22613) IEC 60076-16:2011 CLC/TC 14 IEC/TC 14 // Stage : 6060 Power transformers - Part 16: Transformers for wind turbines applications NOTE: 2011-09-22: Publication editing allocated to [email protected] dor : 2011-09-29 doa : 2011-12-29 dop : 2012-06-29 dow : 2014-09-29
Publications available since May 30,2011 23
CENELEC Inventory of Technical Activities
EN 60079-11:2012 (PR=22690) IEC 60079-11:2011 + corrigendum Jan. 2012 CLC/SC 31-3 IEC/SC 31G ATEX (94/9/EC) // Stage : 6060 Explosive atmospheres - Part 11: Equipment protection by intrinsic safety "i" NOTE: Publication editing allocated to [email protected] * Supersedes EN 60079-11:2007 + EN 61241-
11:2006 + EN 60079-27:2008 dor : 2011-08-04 doa : 2011-11-04 dop : 2012-07-06 dow : 2014-08-04
EN 60079-14:2008/AC:2011 (PR=23842) CLC/SC 31-1 Stage : 6060 Explosive atmospheres - Part 14: Electrical installations design, selection and erection dor : - doa : - dop : - dow : -
EN 60079-35-1:2011 + AC:2011 (PR=22756) IEC 60079-35-1:2011 CLC/TC 31 IEC/TC 31 ATEX (94/9/EC) // Stage : 6060 Explosive atmospheres - Part 35-1: Caplights for use in mines susceptible to firedamp - General requirements -
Construction and testing in relation to the risk of explosion NOTE: Supersedes EN 62013-1:2006 dor : 2011-06-30 doa : 2011-09-30 dop : 2012-03-30 dow : 2014-06-30
EN 60115-1:2011 (PR=21056) IEC 60115-1:2008 (Modified) CLC/TC 40XB IEC/TC 40 Stage : 6060 Fixed resistors for use in electronic equipment - Part 1: Generic specification NOTE: Supersedes EN 60115-1:2001 + A1:2001 + A11:2007 * D132/C001: Second vote on draft including the
needed CMs instead of the foreseen parallel vote on FDIS dor : 2011-08-15 doa : 2012-02-15 dop : 2012-08-15 dow : 2014-08-15
EN 60118-13:2011 (PR=22365) IEC 60118-13:2011 CLC/SR 29 IEC/TC 29 // Stage : 6060 Electroacoustics - Hearing aids - Part 13: Electromagnetic compatibility (EMC) NOTE: Supersede EN 60118-13:2005 Mandated: M/432 dor : 2011-05-16 doa : 2011-08-16 dop : 2012-02-16 dow: 2014-05-16
EN 60118-15:2012 (PR=22994) IEC 60118-15:2012 CLC/SR 29 IEC/TC 29 // Stage : 6060 Electroacoustics - Hearing aids - Part 15: Methods for characterising signal processing in hearing aids with a speech-
like signal NOTE: 2012-02-24: Publication editing allocated to [email protected] dor : 2012-03-27 doa : 2012-06-27 dop : 2012-12-27 dow : 2015-03-27
EN 60127-1:2006/A1:2011 (PR=23070) IEC 60127-1:2006/A1:2011 CLC/SR 32C IEC/SC 32C LVD (2006/95/EC) // Stage : 6060 Miniature fuses - Part 1: Definitions for miniature fuses and general requirements for miniature fuse-links dor : 2011-05-25 doa : 2011-08-25 dop : 2012-02-25 dow : 2014-05-25
Publications available since May 30,2011 24
CENELEC Inventory of Technical Activities
EN 60191-6-12:2011 (PR=23148) IEC 60191-6-12:2011 CLC/SR 47D IEC/SC 47D // Stage : 6060 Mechanical standardization of semiconductor devices - Part 6-12: General rules for the preparation of outline drawings of surface mounted semiconductor device packages - Design guidelines for fine-pitch land grid array (FLGA) NOTE: Supersedes EN 60191-6-12:2002 dor : 2011-07-13 doa : 2011-10-13 dop : 2012-04-13 dow : 2014-07-13
EN 60212:2011 (PR=22966) IEC 60212:2010 CLC/SR 112 IEC/TC 112 // Stage : 6060 Standard conditions for use prior to and during the testing of solid electrical insulating materials NOTE: Supersedes HD 437 S1:1984 dor : 2011-01-19 doa : 2011-04-19 dop : 2011-10-19 dow : 2014-01-19
EN 60268-16:2011 (PR=22800) IEC 60268-16:2011 CLC/SR 100 IEC/TC 100 // Stage : 6060 Sound system equipment - Part 16: Objective rating of speech intelligibility by speech transmission index NOTE: Supersedes EN 60268-16:2003 dor : 2011-08-02 doa : 2011-11-02 dop : 2012-05-02 dow : 2014-08-02
EN 60296:2012 (PR=23085) IEC 60296:2012 CLC/SR 10 IEC/TC 10 // Stage : 6060 Fluids for electrotechnical applications - Unused mineral insulating oils for transformers and switchgear NOTE: Supersedes EN 60296:2004*2012-02-24: Publication editing allocated to [email protected] dor : 2012-03-26 doa : 2012-06-26 dop : 2012-12-26 dow : 2015-03-26
EN 60297-3-107:2012 (PR=23392) IEC 60297-3-107:2012 CLC/SR 48D IEC/SC 48D // Stage : 6060 Mechanical structures for electronic equipment - Dimensions of mechanical structures of the 482,6 mm (19 in) series
- Part 3-107: Dimensions of subracks and plug-in units, small form factor NOTE: 2012-01-20 - Publication editing allocated to [email protected] dor : 2012-02-14 doa : 2012-05-14 dop : 2012-11-14 dow : 2015-02-14
EN 60309-2:1999/A2:2012 (PR=23616) IEC 60309-2:1999/A2:2012 CLC/BTWG 112-1 IEC/SC 23H LVD (2006/95/EC) RAIL (2008/57/EC) // Stage : 6060 Plugs, socket-outlets and couplers for industrial purposes - Part 2: Dimensional interchangeability requirements for
pin and contact-tube accessories NOTE: 2012-02-29 - Publication editing allocated to [email protected] . dor : 2012-04-19 doa : 2012-07-19 dop : 2013-01-19 dow : 2015-04-19
EN 60309-4:2007/A1:2012 (PR=23617) IEC 60309-4:2006/A1:2012 CLC/BTWG 112-1 IEC/SC 23H LVD (2006/95/EC) // Stage : 6060 Plugs, socket-outlets and couplers for industrial purposes - Part 4: Switched socket-outlets and connectors with or
without interlock NOTE: 2012-03-21: Publication processing allocated to [email protected] dor : 2012-04-19 doa : 2012-07-19 dop : 2013-01-19 dow : 2015-04-19
Publications available since May 30,2011 25
CENELEC Inventory of Technical Activities
EN 60335-1:2002/A15:2011 (PR=23099) CLC/TC 61 LVD (2006/95/EC) MD (2006/42/EC) Stage : 6060 Household and similar electrical appliances - Safety - Part 1: General requirements dor : 2011-05-02 doa : 2011-11-02 dop : 2012-05-02 dow : 2014-05-02
EN 60335-1:2012 (PR=22056) IEC 60335-1:2010 (Modified) (corrigendum Jul. 2010 + corrigendum Apr. 2011) CLC/TC 61 IEC/TC 61 LVD (2006/95/EC) MD (2006/42/EC) Stage : 6060 Household and similar electrical appliances - Safety - Part 1: General requirements NOTE: Supersedes EN 60335-1:2002 + corr. Jul.2009 + corr. May.2010 + A11:2004 + A1:2004 + corr. Jan.2007
+ A12:2006 + corr. Feb.2007 + A2:2006 + A13:2008 + A14:2010 * Incorporates FprAA (PR=23000) Mandated: M/396 dor : 2011-11-21 doa : 2012-05-21 dop : 2012-11-21 dow: 2014-11-21
EN 60335-2-9:2003/A13:2010/AC:2011 (PR=23640) CLC/TC 61 Stage : 6060 Household and similar electrical appliances - Safety - Part 2-9: Particular requirements for grills, toasters and similar
portable cooking appliances NOTE: Allocated to [email protected] * Incorporates former AC:2011 (PR=23336) dor : - doa : - dop : - dow : -
EN 60335-2-14:2006/A11:2012 (PR=22955) CLC/TC 61 LVD (2006/95/EC) Stage : 6060 Household and similar electrical appliances - Safety - Part 2-14: Particular requirements for kitchen machines NOTE: 2011-12-20 - Publication editing allocated to [email protected] Mandated: M/392 dor : 2012-01-23 doa : 2012-07-23 dop : 2013-01-23 dow: 2015-01-23
EN 60335-2-15:2002/A11:2012 (PR=22956) CLC/TC 61 LVD (2006/95/EC) Stage : 6060 Household and similar electrical appliances - Safety - Part 2-15: Particular requirements for appliances for heating
liquids NOTE: 2011-12-20 - Publication editing allocated to [email protected] Mandated: M/392 dor : 2012-01-23 doa : 2012-07-23 dop : 2013-01-23 dow: 2015-01-23
EN 60335-2-16:2003/A2:2012 (PR=23201) IEC 60335-2-16:2002/A2:2011 CLC/TC 61 IEC/TC 61 LVD (2006/95/EC) // Stage : 6060 Household and similar electrical appliances - Safety - Part 2-16: Particular requirements for food waste disposers NOTE: 2011-09-22: Publication editing allocated to [email protected] dor : 2011-10-18 doa : 2012-01-18 dop : 2012-09-02 dow : 2014-10-18
EN 60335-2-25:2012 (PR=21947) IEC 60335-2-25:2010 (Modified) CLC/TC 61 IEC/SC 61B LVD (2006/95/EC) Stage : 6060 Household and similar electrical appliances - Safety - Part 2-25: Particular requirements for microwave ovens,
including combination microwave ovens NOTE: Publication editing allocated to [email protected] * Supersedes EN 60335-2-25:2002 + A1:2005 + A2:2006 + A11:2010 * D136/018 (cancelling D130/054): dow = dor + 36 months * To be used in conjuction with EN 60335-1 (pr=22056) dor : 2011-11-28 doa : 2012-05-28 dop : 2012-11-28 dow : 2014-11-28
Publications available since May 30,2011 26
CENELEC Inventory of Technical Activities
EN 60335-2-30:2009/A11:2012 (PR=23669) CLC/TC 61 LVD (2006/95/EC) Stage : 6060 Household and similar electrical appliances - Safety - Part 2-30: Particular requirements for room heaters NOTE: 2012-01-18 - Publication editing allocated to [email protected] * D135/043: Amendment prepared by
CLC/TC 61/WG 4 to answer M/392 (LVD - limitation clause) Mandated: M/392 dor : 2012-02-20 doa : 2012-08-20 dop : 2013-02-20 dow: 2015-02-20
EN 60335-2-35:2002/A2:2011 (PR=22051) IEC 60335-2-35:2002/A2:2009 (Modified) CLC/TC 61 IEC/TC 61 LVD (2006/95/EC) Stage : 6060 Household and similar electrical appliances - Safety - Part 2-35: Particular requirements for instantaneous water
heaters NOTE: D136/018 (cancelling D130/054): dow = dor + 36 months - Ratified with inclusion of FI snc (on 22.101)
provided during parallel vote on CDV dor : 2011-01-24 doa : 2011-07-24 dop : 2012-04-28 dow : 2014-01-24
EN 60335-2-36:2002/A11:2012 (PR=23593) CLC/TC 61 MD (2006/42/EC) Stage : 6060 Household and similar electrical appliances - Safety - Part 2-36: Particular requirements for commercial electric
cooking ranges, ovens, hobs and hob elements NOTE: Publication editing allocated to [email protected] dor : 2011-12-21 doa : 2012-06-21 dop : 2012-12-21 dow : 2014-12-21
EN 60335-2-37:2002/A11:2012 (PR=23584) CLC/TC 61 MD (2006/42/EC) Stage : 6060 Household and similar electrical appliances - Safety - Part 2-37: Particular requirements for commercial electric deep
fat fryers NOTE: Publication editing allocated to [email protected] dor : 2011-12-21 doa : 2012-06-21 dop : 2012-12-21 dow : 2014-12-21
EN 60335-2-40:2003/A13:2012 (PR=22548) CLC/TC 61 LVD (2006/95/EC) MD (2006/42/EC) Stage : 6060 Household and similar electrical appliances - Safety - Part 2-40: Particular requirements for electrical heat pumps,
air-conditioners and dehumidifiers NOTE: Publication editing allocated to [email protected] * D136/018 (cancelling D130/054): dow = dor + 36
months Mandated: M/392 dor : 2011-07-11 doa : 2012-01-11 dop : 2012-08-23 dow: 2014-07-11
EN 60335-2-42:2003/A11:2012 (PR=23586) CLC/TC 61 MD (2006/42/EC) Stage : 6060 Household and similar electrical appliances - Safety - Part 2-42: Particular requirements for commercial electric
forced convection ovens, steam cookers and steam-convection ovens NOTE: 2011-11-18 - Publication editing allocated to [email protected] dor : 2011-12-21 doa : 2012-06-21 dop : 2012-12-21 dow : 2014-12-21
EN 60335-2-44:2002/A2:2012 (PR=23195) IEC 60335-2-44:2002/A2:2011 CLC/TC 61 IEC/TC 61 LVD (2006/95/EC) // Stage : 6060 Household and similar electrical appliances - Safety - Part 2-44: Particular requirements for ironers NOTE: 2011-09-22: Publication editing allocated to [email protected] dor : 2011-10-04 doa : 2012-01-04 dop : 2012-09-02 dow : 2014-10-04
Publications available since May 30,2011 27
CENELEC Inventory of Technical Activities
EN 60335-2-45:2002/A2:2012 (PR=23196) IEC 60335-2-45:2002/A2:2011 CLC/TC 61 IEC/TC 61 LVD (2006/95/EC) // Stage : 6060 Household and similar electrical appliances - Safety - Part 2-45: Particular requirements for portable heating tools
and similar appliances NOTE: 2011-09-22: Publication editing allocated to [email protected] dor : 2011-10-04 doa : 2012-01-04 dop : 2012-09-02 dow : 2014-10-04
EN 60335-2-47:2003/A11:2012 (PR=23587) CLC/TC 61 MD (2006/42/EC) Stage : 6060 Household and similar electrical appliances - Safety - Part 2-47: Particular requirements for commercial electric
boiling pans NOTE: 2011-11-18 - Publication editing allocated to [email protected] dor : 2011-12-21 doa : 2012-06-21 dop : 2012-12-21 dow : 2014-12-21
EN 60335-2-48:2003/A11:2012 (PR=23588) CLC/TC 61 MD (2006/42/EC) Stage : 6060 Household and similar electrical appliances - Safety - Part 2-48: Particular requirements for commercial electric
grillers and toasters NOTE: 2011-11-18 - Publication editing allocated to [email protected] dor : 2011-12-21 doa : 2012-06-21 dop : 2012-12-21 dow : 2014-12-21
EN 60335-2-49:2003/A11:2012 (PR=23589) CLC/TC 61 MD (2006/42/EC) Stage : 6060 Household and similar electrical appliances - Safety - Part 2-49: Particular requirements for commercial electric
appliances for keeping food and crockery warm NOTE: 2011-11-18 - Publication editing allocated to [email protected] dor : 2011-12-21 doa : 2012-06-21 dop : 2012-12-21 dow : 2014-12-21
EN 60335-2-51:2003/A2:2012 (PR=23197) IEC 60335-2-51:2002/A2:2011 CLC/TC 61 IEC/TC 61 LVD (2006/95/EC) // Stage : 6060 Household and similar electrical appliances - Safety - Part 2-51: Particular requirements for stationary circulation
pumps for heating and service water installations NOTE: 2011-09-22: Publication editing allocated to [email protected] dor : 2011-10-18 doa : 2012-01-18 dop : 2012-09-02 dow : 2014-10-18
EN 60335-2-53:2011 (PR=22702) IEC 60335-2-53:2011 CLC/TC 61 IEC/TC 61 LVD (2006/95/EC) // Stage : 6060 Household and similar electrical appliances - Safety - Part 2-53: Particular requirements for sauna heating appliances
and infrared cabins NOTE: Publication editing allocated to [email protected] * Supersedes EN 60335-2-53:2003 + A1:2007 * To
be used in conjunction with the latest edition of EN 60335-1 + AMDs dor : 2011-05-25 doa : 2011-08-25 dop : 2012-06-16 dow : 2014-05-25
EN 60335-2-66:2003/A2:2012 (PR=23198) IEC 60335-2-66:2002/A2:2011 CLC/TC 61 IEC/TC 61 LVD (2006/95/EC) // Stage : 6060 Household and similar electrical appliances - Safety - Part 2-66: Particular requirements for water-bed heaters NOTE: 2011-09-22: Publication editing allocated to [email protected] dor : 2011-10-04 doa : 2012-01-04 dop : 2012-09-02 dow : 2014-10-04
Publications available since May 30,2011 28
CENELEC Inventory of Technical Activities
EN 60335-2-81:2003/A2:2012 (PR=23199) IEC 60335-2-81:2002/A2:2011 CLC/TC 61 IEC/TC 61 LVD (2006/95/EC) // Stage : 6060 Household and similar electrical appliances - Safety - Part 2-81: Particular requirements for foot warmers and
heating mats NOTE: 2011-09-22: Publication editing allocated to [email protected] dor : 2011-10-18 doa : 2012-01-18 dop : 2012-09-02 dow : 2014-10-18
EN 60352-5:2012 (PR=23482) IEC 60352-5:2012 CLC/SR 48B IEC/SC 48B // Stage : 6060 Solderless connections - Part 5: Press-in connections - General requirements, test methods and practical guidance NOTE: Supersedes EN 60352-5:2008 * 2012-03-09: Publication editing allocated to [email protected] dor : 2012-03-28 doa : 2012-06-28 dop : 2012-12-28 dow : 2015-03-28
EN 60384-2:2012 (PR=23120) IEC 60384-2:2011 CLC/TC 40XA IEC/TC 40 // Stage : 6060 Fixed capacitors for use in electronic equipment - Part 2: Sectional specification - Fixed metallized polyethylene
terephthalate film dielectric d.c. capacitors NOTE: 2011-12-20 - Publication editing allocated to [email protected] * Supersedes EN 60384-2:2005 dor : 2012-01-13 doa : 2012-04-13 dop : 2012-10-13 dow : 2015-01-13
EN 60384-13:2012 (PR=23121) IEC 60384-13:2011 CLC/TC 40XA IEC/TC 40 // Stage : 6060 Fixed capacitors for use in electronic equipment - Part 13: Sectional specification - Fixed polypropylene film
dielectric metal foil d.c. capacitors NOTE: 2011-12-20 - Publication editing allocated to [email protected] * Supersedes EN 60384-13:2006 +
corr. Nov.2006 dor : 2012-01-13 doa : 2012-04-13 dop : 2012-10-13 dow : 2015-01-13
EN 60384-21:2012 (PR=23122) IEC 60384-21:2011 CLC/TC 40XA IEC/TC 40 // Stage : 6060 Fixed capacitors for use in electronic equipment - Part 21: Sectional specification - Fixed surface mount multilayer
capacitors of ceramic dielectric, Class 1 NOTE: 2011-12-20 - Publication editing allocated to [email protected] * Supersedes EN 60384-21:2004 dor : 2012-01-13 doa : 2012-04-13 dop : 2012-10-13 dow : 2015-01-13
EN 60384-22:2012 (PR=23123) IEC 60384-22:2011 CLC/TC 40XA IEC/TC 40 // Stage : 6060 Fixed capacitors for use in electronic equipment - Part 22: Sectional specification - Fixed surface mount multilayer
capacitors of ceramic dielectric, Class 2 NOTE: 2011-12-20 - Publication editing allocated to [email protected] * Supersedes EN 60384-22:2004 dor : 2012-01-13 doa : 2012-04-13 dop : 2012-10-13 dow : 2015-01-13
EN 60432-1:2000/A2:2012 (PR=23554) IEC 60432-1:1999/A2:2011 CLC/SR 34A IEC/SC 34A LVD (2006/95/EC) // Stage : 6060 Incandescent lamps - Safety specifications - Part 1: Tungsten filament lamps for domestic and similar general
lighting purposes NOTE: 2011-12-20 - Publication editing allocated to [email protected] dor : 2012-01-11 doa : 2012-04-11 dop : 2012-11-04 dow : 2015-01-11
Publications available since May 30,2011 29
CENELEC Inventory of Technical Activities
EN 60456:2011 + AC:2011 (PR=21844) IEC 60456:2010 (Modified) + corrigendum Sep. 2011 CLC/TC 59X IEC/SC 59D ECOHWM (1015/2010) ERP (2009/125/EC) Stage : 6060 Clothes washing machines for household use - Methods for measuring the performance NOTE: Supersedes EN 60456:2005 + A11:2006 + A12:2011 Mandated: M/458 dor : 2011-03-21 doa : 2011-09-21 dop : 2012-03-21 dow: 2014-03-21
EN 60475:2011 (PR=23086) IEC 60475:2011 CLC/SR 10 IEC/TC 10 // Stage : 6060 Method of sampling insulating liquids NOTE: IEC 60475 and IEC 60567 to be consulted together as a part of IEC 60567 has been transferred in IEC
60475*2011-10-28: Publication editing allocated to [email protected] dor : 2011-11-24 doa : 2012-02-24 dop : 2012-08-24 dow : 2014-11-24
EN 60505:2011 (PR=22723) IEC 60505:2011 CLC/SR 112 IEC/TC 112 // Stage : 6060 Evaluation and qualification of electrical insulation systems NOTE: Supersedes EN 60505:2004 dor : 2011-08-15 doa : 2011-11-15 dop : 2012-05-15 dow : 2014-08-15
EN 60512-1-100:2012 (PR=23425) IEC 60512-1-100:2012 CLC/SR 48B IEC/SC 48B // Stage : 6060 Connectors for electronic equipment - Tests and measurements - Part 1-100: General - Applicable publications NOTE: Supersedes EN 60512-1-100:2006 * 2012-03-09: Publication editing allocated to [email protected] dor : 2012-03-28 doa : 2012-06-28 dop : 2012-12-28 dow : 2015-03-28
EN 60512-7-2:2012 (PR=22777) IEC 60512-7-2:2011 CLC/SR 48B IEC/SC 48B // Stage : 6060 Connectors for electronic equipment - Tests and measurements - Part 7-2: Impact tests (free connectors) - Test 7b:
Mechanical strength impact NOTE: 2011-11-24: Publication editing allocated to [email protected] dor : 2011-12-22 doa : 2012-03-22 dop : 2012-09-22 dow : 2014-12-22
EN 60512-8-2:2011 (PR=22778) IEC 60512-8-2:2011 CLC/SR 48B IEC/SC 48B // Stage : 6060 Connectors for electronic equipment - Tests and measurements - Part 8-2: Static load tests (fixed connectors) - Test
8b: Static load, axial dor : 2011-05-12 doa : 2011-08-12 dop : 2012-02-12 dow : 2014-05-12
EN 60512-8-3:2011 (PR=22779) IEC 60512-8-3:2011 CLC/SR 48B IEC/SC 48B // Stage : 6060 Connectors for electronic equipment - Tests and measurements - Part 8-3: Static load tests (fixed connectors) - Test
8c: Robustness of actuating lever dor : 2011-05-12 doa : 2011-08-12 dop : 2012-02-12 dow : 2014-05-12
Publications available since May 30,2011 30
CENELEC Inventory of Technical Activities
EN 60512-9-2:2012 (PR=22780) IEC 60512-9-2:2011 CLC/SR 48B IEC/SC 48B // Stage : 6060 Connectors for electronic equipment - Tests and measurements - Part 9-2: Endurance tests - Test 9b: Electrical load
and temperature NOTE: 2011-12-20 - Publication editing allocated to [email protected] dor : 2012-01-02 doa : 2012-04-02 dop : 2012-10-02 dow : 2015-01-02
EN 60512-9-3:2011 (PR=22757) IEC 60512-9-3:2011 CLC/SR 48B IEC/SC 48B // Stage : 6060 Connectors for electronic equipment - Tests and measurements - Part 9-3: Endurance tests - Test 9c: Mechanical
operation (engaging/separating) with electrical load NOTE: Supersedes EN 60512-9-3:2006 + corr. Dec.2006 * To be read in conjunction with EN 60512-1 and EN
60512-1-100 dor : 2011-07-27 doa : 2011-10-27 dop : 2012-04-27 dow : 2014-07-27
EN 60512-9-4:2011 (PR=22781) IEC 60512-9-4:2011 CLC/SR 48B IEC/SC 48B // Stage : 6060 Connectors for electronic equipment - Tests and measurements - Part 9-4: Endurance tests - Test 9d: Durability of
contact retention system and seals (maintenance, ageing) dor : 2011-05-12 doa : 2011-08-12 dop : 2012-02-12 dow : 2014-05-12
EN 60512-17-2:2011 (PR=22782) IEC 60512-17-2:2011 CLC/SR 48B IEC/SC 48B // Stage : 6060 Connectors for electronic equipment - Tests and measurements - Part 17-2: Cable clamping tests - Test 17b: Cable
clamp resistance to cable rotation dor : 2011-05-12 doa : 2011-08-12 dop : 2012-02-12 dow : 2014-05-12
EN 60512-27-100:2012 (PR=22962) IEC 60512-27-100:2011 CLC/SR 48B IEC/SC 48B // Stage : 6060 Connectors for electronic equipment - Tests and measurements - Part 27-100: Signal integrity tests up to 500 MHz
on IEC 60603-7 series connectors - Tests 27a to 27g NOTE: 2011-12-20 - Publication editing allocated to [email protected] dor : 2012-01-11 doa : 2012-04-11 dop : 2012-10-11 dow : 2015-01-11
EN 60534-2-1:2011 (PR=22368) IEC 60534-2-1:2011 CLC/SR 65B IEC/SC 65B // Stage : 6060 Industrial-process control valves - Part 2-1: Flow capacity - Sizing equations for fluid flow under installed conditions NOTE: Supersedes EN 60534-2-1:1998 dor : 2011-05-04 doa : 2011-08-04 dop : 2012-02-04 dow : 2014-05-04
EN 60534-8-2:2011 (PR=22412) IEC 60534-8-2:2011 CLC/TC 65X IEC/SC 65B // Stage : 6060 Industrial-process control valves - Part 8-2: Noise considerations - Laboratory measurement of noise generated by
hydrodynamic flow through control valves NOTE: 2011-10-18: Publication editing allocated to [email protected] * Supersedes EN 60534-8-2:1993 dor : 2011-11-16 doa : 2012-02-16 dop : 2012-08-16 dow : 2014-11-16
Publications available since May 30,2011 31
CENELEC Inventory of Technical Activities
EN 60544-5:2012 (PR=23395) IEC 60544-5:2011 CLC/SR 112 IEC/TC 112 // Stage : 6060 Electrical insulating materials - Determination of the effects of ionizing radiation - Part 5: Procedures for assessment
of ageing in service NOTE: 2012-01-20 - Publication editing allocated to [email protected] * Supersedes EN 60544-5:2003 dor : 2012-01-18 doa : 2012-04-18 dop : 2012-10-18 dow : 2015-01-18
EN 60567:2011 (PR=23087) IEC 60567:2011 CLC/SR 10 IEC/TC 10 // Stage : 6060 Oil-filled electrical equipment - Sampling of gases and analysis of free and dissolved gases - Guidance NOTE: Supersedes EN 60567:2005 * IEC 60475 and IEC 60567 to be consulted together as a part of IEC 60567 has
been transferred in IEC 60475*2011-10-28: Publication editing allocated to [email protected] dor : 2011-11-24 doa : 2012-02-24 dop : 2012-08-24 dow : 2014-11-24
EN 60598-2-2:2012 (PR=23108) IEC 60598-2-2:2011 CLC/TC 34Z IEC/SC 34D LVD (2006/95/EC) // Stage : 6060 Luminaires - Part 2-2: Particular requirements - Recessed luminaires NOTE: Supersedes EN 60598-2-2:1996 + A1:1997 * 2011-11-24: Publication editing allocated to
[email protected] dor : 2011-12-13 doa : 2012-03-13 dop : 2012-09-13 dow : 2014-12-13
EN 60598-2-3:2003/A1:2011 (PR=22564) IEC 60598-2-3:2002/A1:2011 CLC/TC 34Z IEC/SC 34D LVD (2006/95/EC) // Stage : 6060 Luminaires - Part 2-3: Particular requirements - Luminaires for road and street lighting NOTE: 2011-04-22: Publication text allocated to [email protected] . dor : 2011-05-19 doa : 2011-08-19 dop : 2012-02-19 dow : 2014-05-19
EN 60598-2-13:2006/A1:2012 (PR=23463) IEC 60598-2-13:2006/A1:2011 CLC/TC 34Z IEC/SC 34D LVD (2006/95/EC) // Stage : 6060 Luminaires - Part 2-13: Particular requirements - Ground recessed luminaires NOTE: 2011-12-20 - Publication editing allocated to [email protected] dor : 2012-01-11 doa : 2012-04-11 dop : 2012-10-11 dow : 2015-01-11
EN 60598-2-18:1994/A1:2012 (PR=23213) IEC 60598-2-18:1993/A1:2011 CLC/TC 34Z IEC/SC 34D // Stage : 6060 Luminaires - Part 2: Particular requirements - Section 18: Luminaires for swimming pools and similar applications NOTE: 2012-01-20 - Publication editing allocated to [email protected] dor : 2012-01-18 doa : 2012-04-18 dop : 2012-10-18 dow : 2015-01-18
EN 60601-1:2006/A11:2011 (PR=23800) CLC/TC 62 AIMD (90/385/EEC) MDD (93/42/EEC) Stage : 6060 Medical electrical equipment - Part 1: General requirements for basic safety and essential performance NOTE: D139/C149: BT approved the modified Annex ZZ for EN 60601-1:2006 dor : 2011-10-01 doa : 2012-04-01 dop : 2012-10-01 dow : 2014-10-01
Publications available since May 30,2011 32
CENELEC Inventory of Technical Activities
EN 60601-2-2:2009/A11:2011 (PR=23801) CLC/TC 62 MDD (93/42/EEC) Stage : 6060 Medical electrical equipment - Part 2-2: Particular requirements for the basic safety and essential performance of
high frequency surgical equipment and high frequency surgical accessories NOTE: D139/C149: BT approved the modified Annex ZZ for EN 60601-2-2:2009 dor : 2011-10-01 doa : 2012-04-01 dop : 2012-10-01 dow : 2014-10-01
EN 60601-2-4:2011 (PR=22219) IEC 60601-2-4:2010 CLC/TC 62 IEC/SC 62D // Stage : 6060 Medical electrical equipment - Part 2-4: Particular requirements for the basic safety and essential performance of
cardiac defibrillators NOTE: Supersedes EN 60601-2-4:2003 Mandated: M/295 dor : 2011-01-12 doa : 2011-04-12 dop : 2012-04-12 dow: 2014-01-12
EN 60601-2-19:2009/A11:2011 (PR=23802) CLC/TC 62 MDD (93/42/EEC) Stage : 6060 Medical electrical equipment - Part 2-19: Particular requirements for the basic safety and essential performance of
infant incubators NOTE: D139/C149: BT approved the modified Annex ZZ for EN 60601-2-19:2009 dor : 2011-10-01 doa : 2012-04-01 dop : 2012-10-01 dow : 2014-10-01
EN 60601-2-20:2009/A11:2011 (PR=23803) CLC/TC 62 MDD (93/42/EEC) Stage : 6060 Medical electrical equipment - Part 2-20: Particular requirements for the basic safety and essential performance of
infant transport incubators NOTE: D139/C149: BT approved the modified Annex ZZ for EN 60601-2-20:2009 dor : 2011-10-01 doa : 2012-04-01 dop : 2012-10-01 dow : 2014-10-01
EN 60601-2-21:2009/A11:2011 (PR=23804) CLC/TC 62 MDD (93/42/EEC) Stage : 6060 Medical electrical equipment - Part 2-21: Particular requirements for the basic safety and essential performance of
infant radiant warmers NOTE: D139/C149: BT approved the modified Annex ZZ for EN 60601-2-21:2009 dor : 2011-10-01 doa : 2012-04-01 dop : 2012-10-01 dow : 2014-10-01
EN 60601-2-29:2008/A11:2011 (PR=23805) CLC/TC 62 MDD (93/42/EEC) Stage : 6060 Medical electrical equipment - Part 2-29: Particular requirements for the basic safety and essential performance of
radiotherapy simulators NOTE: D139/C149: BT approved the modified Annex ZZ for EN 60601-2-29:2008 dor : 2011-10-01 doa : 2012-04-01 dop : 2012-10-01 dow : 2014-10-01
EN 60601-2-31:2008/A1:2011 (PR=22895) IEC 60601-2-31:2008/A1:2011 CLC/TC 62 IEC/SC 62D // Stage : 6060 Medical electrical equipment - Part 2-31: Particular requirements for the basic safety and essential performance of
external cardiac pacemakers with internal power source Mandated: M/295 dor : 2011-08-03 doa : 2011-11-03 dop : 2012-05-03 dow: 2014-08-03
Publications available since May 30,2011 33
CENELEC Inventory of Technical Activities
EN 60601-2-33:2010/A11:2011 (PR=23806) CLC/TC 62 MDD (93/42/EEC) Stage : 6060 Medical electrical equipment - Part 2-33: Particular requirements for the basic safety and essential performance of
magnetic resonance equipment for medical diagnosis NOTE: D139/C149: BT approved the modified Annex ZZ for EN 60601-2-33:2010 dor : 2011-10-01 doa : 2012-04-01 dop : 2012-10-01 dow : 2014-10-01
EN 60601-2-37:2008/A11:2011 (PR=23808) CLC/TC 62 MDD (93/42/EEC) Stage : 6060 Medical electrical equipment - Part 2-37: Particular requirements for the basic safety and essential performance of
ultrasonic medical diagnostic and monitoring equipment NOTE: D139/C149: BT approved the modified Annex ZZ for EN 60601-2-37:2008 dor : 2011-10-01 doa : 2012-04-01 dop : 2012-10-01 dow : 2014-10-01
EN 60601-2-39:2008/A11:2011 (PR=23809) CLC/TC 62 MDD (93/42/EEC) Stage : 6060 Medical electrical equipment - Part 2-39: Particular requirements for basic safety and essential performance of
peritoneal dialysis equipment NOTE: D139/C149: BT approved the modified Annex ZZ for EN 60601-2-39:2008 dor : 2011-10-01 doa : 2012-04-01 dop : 2012-10-01 dow : 2014-10-01
EN 60601-2-41:2009/A11:2011 (PR=23810) CLC/TC 62 MDD (93/42/EEC) Stage : 6060 Medical electrical equipment - Part 2-41: Particular requirements for basic safety and essential performance of
surgical luminaires and luminaires for diagnosis NOTE: D139/C149: BT approved the modified Annex ZZ for EN 60601-2-41:2009 dor : 2011-10-01 doa : 2012-04-01 dop : 2012-10-01 dow : 2014-10-01
EN 60601-2-44:2009/A11:2011 (PR=23811) CLC/TC 62 MDD (93/42/EEC) Stage : 6060 Medical electrical equipment - Part 2-44: Particular requirements for the basic safety and essential performance of X-
ray equipment for computed tomography NOTE: D139/C149: BT approved the modified Annex ZZ for EN 60601-2-44:2009 dor : 2011-10-01 doa : 2012-04-01 dop : 2012-10-01 dow : 2014-10-01
EN 60601-2-46:2011 (PR=22193) IEC 60601-2-46:2010 CLC/TC 62 IEC/SC 62D // Stage : 6060 Medical electrical equipment - Part 2-46: Particular requirements for the basic safety and essential performance of
operating tables NOTE: Supersedes EN 60601-2-46:1998 Mandated: M/295 dor : 2011-01-20 doa : 2011-04-20 dop : 2012-04-20 dow: 2014-01-20
EN 60601-2-50:2009/A11:2011 (PR=23812) CLC/TC 62 MDD (93/42/EEC) Stage : 6060 Medical electrical equipment - Part 2-50: Particular requirements for the basic safety and essential performance of
infant phototherapy equipment NOTE: D139/C149: BT approved the modified Annex ZZ for EN 60601-2-50:2009 dor : 2011-10-01 doa : 2012-04-01 dop : 2012-10-01 dow : 2014-10-01
Publications available since May 30,2011 34
CENELEC Inventory of Technical Activities
EN 60603-7:2009/A1:2011 (PR=22848) IEC 60603-7:2008/A1:2011 CLC/SR 48B IEC/SC 48B // Stage : 6060 Connectors for electronic equipment - Part 7: Detail specification for 8-way, unshielded, free and fixed connectors dor : 2011-11-03 doa : 2012-02-03 dop : 2012-08-03 dow : 2014-11-03
EN 60603-7-1:2011 (PR=22877) IEC 60603-7-1:2011 CLC/SR 48B IEC/SC 48B // Stage : 6060 Connectors for electronic equipment - Part 7-1: Detail specification for 8-way, shielded, free and fixed connectors NOTE: Supersedes EN 60603-7-1:2009 dor : 2011-05-12 doa : 2011-08-12 dop : 2012-02-12 dow : 2014-05-12
EN 60626-1:2012 (PR=22004) IEC 60626-1:2009 CLC/SR 15 IEC/TC 15 // Stage : 6060 Combined flexible materials for electrical insulation - Part 1: Definitions and general requirements NOTE: Supersedes EN 60626-1:1995 + A1:1996 dor : 2012-03-23 doa : 2012-06-23 dop : 2012-12-23 dow : 2015-03-23
EN 60662:2012 (PR=22726) IEC 60662:2011 (Modified) CLC/SR 34A IEC/SC 34A ERP (2009/125/EC) // Stage : 6060 High-pressure sodium vapour lamps - Performance specifications NOTE: 2011-12-02 - Publication editing allocated to [email protected] * Supersedes EN 60662:1993 +
A4:1994 + A5:1994 + A6:1994 + A7:1995 + A9:1997 + A10:1997 dor : 2012-01-02 doa : 2012-07-02 dop : 2013-01-02 dow : 2015-01-02
EN 60669-2-6:2012 (PR=23371) IEC 60669-2-6:2012 (Modified) CLC/TC 23BX IEC/SC 23B LVD (2006/95/EC) // Stage : 6060 Switches for household and similar fixed electrical installations - Part 2-6: Particular requirements - Fireman's
switches for exterior and interior signs and luminaires NOTE: Supersedes EN 50425:2008 * incorporates FprEN 60669-2-6:2011/FprAA:2011 (pr=23738),
(implementation dates of FprAA) *2012-02-07: Publication editing allocated to [email protected] dor : 2012-02-22 doa : 2012-08-22 dop : 2013-02-22 dow : 2015-02-22
EN 60671:2011 (PR=22265) IEC 60671:2007 CLC/TC 45AX IEC/SC 45A Stage : 6060 Nuclear power plants - Instrumentation and control systems important to safety - Surveillance testing dor : 2011-08-08 doa : 2012-02-08 dop : 2012-08-08 dow : 2014-08-08
EN 60674-3-1:1998/A1:2011 (PR=23040) IEC 60674-3-1:1998/A1:2011 CLC/SR 15 IEC/TC 15 // Stage : 6060 Plastic films for electrical purposes - Part 3: Specifications for individual materials - Sheet 1: Biaxially oriented
polypropylene (PP) film for capacitors dor : 2011-10-18 doa : 2012-01-18 dop : 2012-07-18 dow : 2014-10-18
Publications available since May 30,2011 35
CENELEC Inventory of Technical Activities
EN 60674-3-8:2011 (PR=22372) IEC 60674-3-8:2011 CLC/SR 15 IEC/TC 15 // Stage : 6060 Plastic films for electrical purposes - Part 3: Specifications for individual materials - Sheet 8: Balanced biaxially
oriented polyethylene naphthalate (PEN) films used for electrical insulation NOTE: 2011-07-18: Allocated to [email protected] dor : 2011-08-17 doa : 2011-11-17 dop : 2012-05-17 dow : 2014-08-17
EN 60676:2012 (PR=23211) IEC 60676:2011 CLC/SR 27 IEC/TC 27 // Stage : 6060 Industrial electroheating equipment - Test methods for direct arc furnaces NOTE: Supersedes EN 60676:2002 * 2011-11-24: Publication editing allocated to [email protected] dor : 2011-12-13 doa : 2012-03-13 dop : 2012-09-13 dow : 2014-12-13
EN 60683:2012 (PR=23212) IEC 60683:2011 CLC/SR 27 IEC/TC 27 // Stage : 6060 Industrial electroheating equipment - Test methods for submerged-arc furnaces NOTE: Supersedes HD 599 S1:1992 * 2011-10-28: Publication editing allocated to [email protected] dor : 2011-11-23 doa : 2012-02-23 dop : 2012-08-23 dow : 2014-11-23
EN 60684-2:2011 (PR=22685) IEC 60684-2:2011 CLC/SR 15 IEC/TC 15 // Stage : 6060 Flexible insulating sleeving - Part 2: Methods of test NOTE: Supersedes EN 60684-2:1997 + A1:2003 + A2:2005 dor : 2011-09-14 doa : 2011-12-14 dop : 2012-06-14 dow : 2014-09-14
EN 60684-3-116:2011 (PR=22144) IEC 60684-3-116:2010 CLC/SR 15 IEC/TC 15 // Stage : 6060 Flexible insulating sleeving - Part 3: Specifications for individual types of sleeving - Sheets 116 and 117: Extruded
polychloroprene, general purpose NOTE: Supersedes EN 60684-3-116 & 117:2003 dor : 2010-07-20 doa : 2011-02-11 dop : 2012-05-11 dow : 2013-07-20
EN 60684-3-205:2011 (PR=22762) IEC 60684-3-205:2011 CLC/SR 15 IEC/TC 15 // Stage : 6060 Flexible insulating sleeving - Part 3: Specifications for individual types of sleeving - Sheet 205: Heat-shrinkable
chlorinated polyolefin sleeving, flame retarded, nominal shrink ratio 1,7:1 and 2:1 NOTE: 2011-06-27: Allocated to [email protected] dor : 2011-07-26 doa : 2011-10-26 dop : 2012-04-26 dow : 2014-07-26
EN 60684-3-247:2011 (PR=22763) IEC 60684-3-247:2011 CLC/SR 15 IEC/TC 15 // Stage : 6060 Flexible insulating sleeving - Part 3: Specifications for individual types of sleeving - Sheet 247: Heat-shrinkable
polyolefin sleeving, dual wall, not flame retarded, thick and medium wall dor : 2011-07-28 doa : 2011-10-28 dop : 2012-04-28 dow : 2014-07-28
Publications available since May 30,2011 36
CENELEC Inventory of Technical Activities
EN 60684-3-271:2011 (PR=22686) IEC 60684-3-271:2011 CLC/SR 15 IEC/TC 15 // Stage : 6060 Flexible insulating sleeving - Part 3: Specifications for individual types of sleeving - Sheet 271: Heat-shrinkable
elastomer sleevings, flame retarded, fluid resistant, shrink ratio 2:1 NOTE: Supersedes EN 60684-3-271:2004 dor : 2011-07-26 doa : 2011-10-26 dop : 2012-04-26 dow : 2014-07-26
EN 60695-6-2:2011 (PR=22769) IEC 60695-6-2:2011 CLC/SR 89 IEC/TC 89 // Stage : 6060 Fire hazard testing - Part 6-2: Smoke obscuration - Summary and relevance of test methods NOTE: To be used in conjunction with EN 60695-6-1 dor : 2011-09-29 doa : 2011-12-29 dop : 2012-06-29 dow : 2014-09-29
EN 60695-7-2:2011 (PR=22851) IEC 60695-7-2:2011 CLC/SR 89 IEC/TC 89 // Stage : 6060 Fire hazard testing - Part 7-2: Toxicity of fire effluent - Summary and relevance of test methods dor : 2011-10-04 doa : 2012-01-04 dop : 2012-07-04 dow : 2014-10-04
EN 60695-7-3:2011 (PR=22863) IEC 60695-7-3:2011 CLC/SR 89 IEC/TC 89 // Stage : 6060 Fire hazard testing - Part 7-3: Toxicity of fire effluent - Use and interpretation of test results dor : 2011-10-04 doa : 2012-01-04 dop : 2012-07-04 dow : 2014-10-04
EN 60695-11-4:2011 (PR=22827) IEC 60695-11-4:2011 CLC/SR 89 IEC/TC 89 LVD (2006/95/EC) // Stage : 6060 Fire hazard testing - Part 11-4: Test flames - 50 W flame - Apparatus and confirmational test method dor : 2011-11-01 doa : 2012-02-01 dop : 2012-08-01 dow : 2014-11-01
EN 60704-2-10:2011 (PR=23022) IEC 60704-2-10:2011 CLC/TC 59X IEC/SC 59K // Stage : 6060 Household and similar electrical appliances - Test code for the determination of airborne acoustical noise - Part 2-10:
Particular requirements for electric cooking ranges, ovens, grills, microwave ovens and any combination of these NOTE: 2011-10-07: Publication editing allocated to [email protected] * Supersedes EN 60704-2-10:2004 *
To be used in conjunction with EN 60704-1:2010 dor : 2011-11-01 doa : 2012-02-01 dop : 2012-08-01 dow : 2014-11-01
EN 60705:2012 (PR=22332) IEC 60705:2010 (Modified) CLC/TC 59X IEC/SC 59K ERP (2009/125/EC) Stage : 6060 Household microwave ovens - Methods for measuring performance NOTE: 2012-02-09 - Publication editing allocated to [email protected] * Supersedes EN 60705:1999 +
A1:2004 + A2:2006 * Superseded by EN 60705:2012 dor : 2012-03-12 doa : 2012-09-12 dop : 2013-03-12 dow : 2015-03-12
Publications available since May 30,2011 37
CENELEC Inventory of Technical Activities
EN 60728-6:2011 (PR=22798) IEC 60728-6:2011 CLC/TC 209 IEC/TC 100 // Stage : 6060 Cable networks for television signals, sound signals and interactive services - Part 6: Optical equipment NOTE: 2011-04-22: Publication text allocated to [email protected] * Supersedes EN 60728-6:2003 dor : 2011-05-16 doa : 2011-08-16 dop : 2012-02-16 dow : 2014-05-16
EN 60730-1:2011 (PR=22882) IEC 60730-1:2010 (Modified) CLC/TC 72 IEC/TC 72 EMC (2004/108/EC) LVD (2006/95/EC) RTTED (1999/5/EC) Stage : 6060 Automatic electrical controls for household and similar use - Part 1: General requirements NOTE: Publication editing allocated to [email protected] * TC request: No dow (EN 60730 1:2000 to remain valid until all the Part 2's which are used in conjunction with it have been withdrawn) * Supersedes EN
60730-1:2000 + corr. Aug.2007 + A1:2004 + A2:2008 + A12:2003 + A13:2004 + A14:2005 + A16:2007 + corr. Mar.2010 dor : 2011-10-24 doa : 2012-04-24 dop : 2012-10-24 dow: -
EN 60730-2-7:2010/AC:2011 (PR=23883) CLC/TC 72 Stage : 6060 Automatic electrical controls for household and similar use - Part 2-7: Particular requirements for timers and time
switches NOTE: 2011-11-23 - Corrigendum editing allocated to [email protected] dor : - doa : - dop : - dow : -
EN 60731:2012 (PR=22709) IEC 60731:2011 CLC/TC 62 IEC/SC 62C // Stage : 6060 Medical electrical equipment - Dosimeters with ionization chambers as used in radiotherapy NOTE: Supersedes EN 60731:1997 + A1:2002*2012-03-14: Publication editing allocated to
[email protected] dor : 2012-03-14 doa : 2012-06-14 dop : 2012-12-14 dow : 2015-03-14
EN 60745-2-4:2009/A11:2011 (PR=23383) CLC/TC 116 MD (2006/42/EC) Stage : 6060 Hand-held motor-operated electric tools - Safety - Part 2-4: Particular requirements for sanders and polishers other
than disk type NOTE: Publication editing allocated to [email protected] dor : 2011-11-14 doa : 2012-05-14 dop : 2012-11-14 dow : 2014-11-14
EN 60745-2-22:2011 (PR=21555) IEC 60745-2-22:2011 (Modified) CLC/TC 116 IEC/TC 116 MD (2006/42/EC) // Stage : 6060 Hand-held motor-operated electric tools - Safety - Part 2-22: Particular requirements for cut-off machines NOTE: Incorporates FprAA circulated simultaneously (pr=21556) * This Part 2-22 is to be used in conjunction with
EN 60745-1:2009 Mandated: M/396 dor : 2011-04-18 doa : 2011-10-18 dop : 2012-04-18 dow: 2014-04-18
EN 60747-15:2012 (PR=21876) IEC 60747-15:2010 CLC/SR 47E IEC/SC 47E // Stage : 6060 Semiconductor devices - Discrete devices - Part 15: Isolated power semiconductor devices NOTE: Publication editing allocated to [email protected] * Supersedes EN 60747-15:2004 dor : 2011-01-20 doa : 2012-04-20 dop : 2012-09-16 dow : 2014-01-20
Publications available since May 30,2011 38
CENELEC Inventory of Technical Activities
EN 60749-7:2011 (PR=22606) IEC 60749-7:2011 CLC/SR 47 IEC/TC 47 // Stage : 6060 Semiconductor devices - Mechanical and climatic test methods - Part 7: Internal moisture content measurement and
the analysis of other residual gases NOTE: Supersedes EN 60749-7:2002 dor : 2011-07-22 doa : 2011-10-22 dop : 2012-04-22 dow : 2014-07-22
EN 60749-21:2011 (PR=22642) IEC 60749-21:2011 CLC/SR 47 IEC/TC 47 // Stage : 6060 Semiconductor devices - Mechanical and climatic test methods - Part 21: Solderability NOTE: Supersedes EN 60749-21:2005 dor : 2011-05-12 doa : 2011-08-12 dop : 2012-02-12 dow : 2014-05-12
EN 60749-29:2011 (PR=22643) IEC 60749-29:2011 CLC/SR 47 IEC/TC 47 // Stage : 6060 Semiconductor devices - Mechanical and climatic test methods - Part 29: Latch-up test NOTE: Supersedes EN 60749-29:2003 + corr. Mar.2004 dor : 2011-05-12 doa : 2011-08-12 dop : 2012-02-12 dow : 2014-05-12
EN 60749-30:2005/A1:2011 (PR=22605) IEC 60749-30:2005/A1:2011 CLC/SR 47 IEC/TC 47 // Stage : 6060 Semiconductor devices - Mechanical and climatic test methods - Part 30: Preconditioning of non-hermetic surface
mount devices prior to reliability testing dor : 2011-06-29 doa : 2011-09-29 dop : 2012-03-29 dow : 2014-06-29
EN 60749-40:2011 (PR=22946) IEC 60749-40:2011 CLC/SR 47 IEC/TC 47 // Stage : 6060 Semiconductor devices - Mechanical and climatic test methods - Part 40: Board level drop test method using a strain
gauge NOTE: 2011-07-18: Allocated to [email protected] dor : 2011-08-17 doa : 2011-11-17 dop : 2012-05-17 dow : 2014-08-17
EN 60793-1-44:2011 (PR=22681) IEC 60793-1-44:2011 CLC/TC 86A IEC/SC 86A // Stage : 6060 Optical fibres - Part 1-44: Measurement methods and test procedures - Cut-off wavelength NOTE: Supersedes EN 60793-1-44:2002 dor : 2011-05-25 doa : 2011-08-25 dop : 2012-02-25 dow : 2014-05-25
EN 60793-2:2012 (PR=23402) IEC 60793-2:2011 CLC/TC 86A IEC/SC 86A // Stage : 6060 Optical fibres - Part 2: Product specifications - General NOTE: 2011-12-20 - Publication editing allocated to [email protected] * Supersedes EN 60793-2:2008 dor : 2012-01-02 doa : 2012-04-02 dop : 2012-10-02 dow : 2015-01-02
Publications available since May 30,2011 39
CENELEC Inventory of Technical Activities
EN 60794-1-1:2011 (PR=23214) IEC 60794-1-1:2011 + corrigendum Jan. 2012 CLC/TC 86A IEC/SC 86A // Stage : 6060 Optical fibre cables - Part 1-1: Generic specification - General NOTE: 2011-09-22: Publication editing allocated to [email protected] * Supersedes EN 60794-1-1:2002 dor : 2011-10-18 doa : 2012-01-18 dop : 2012-07-18 dow : 2014-10-18
EN 60794-2-10:2011 (PR=23059) IEC 60794-2-10:2011 CLC/TC 86A IEC/SC 86A // Stage : 6060 Optical fibre cables - Part 2-10: Indoor optical fibre cables - Family specification for simplex and duplex cables NOTE: Supersedes EN 60794-2-10:2003 * To be used in conjunction with EN 60794-1-1, EN 60794-1-2 and EN
60794-2 dor : 2011-09-14 doa : 2011-12-14 dop : 2012-06-14 dow : 2014-09-14
EN 60819-1:2012 (PR=22006) IEC 60819-1:2009 CLC/SR 15 IEC/TC 15 // Stage : 6060 Non-cellulosic papers for electrical purposes - Part 1: Definitions and general requirements NOTE: 2012-01-06 - Publication editing allocated to [email protected] * Supersedes EN 60819-1:1995 +
A1:1996. dor : 2012-02-14 doa : 2012-05-14 dop : 2012-11-14 dow : 2015-02-14
EN 60819-3-3:2011 (PR=23384) IEC 60819-3-3:2011 CLC/SR 15 IEC/TC 15 // Stage : 6060 Non-cellulosic papers for electrical purposes - Part 3: Specifications for individual materials - Sheet 3: Unfilled
aramid (aromatic polyamide) papers NOTE: 2011-09-22: Publication editing allocated to [email protected] * Supersedes EN 60819-3-
3:2006 dor : 2011-10-18 doa : 2012-01-18 dop : 2012-07-18 dow : 2014-10-18
EN 60851-5:2008/A1:2011 (PR=23092) IEC 60851-5:2008/A1:2011 CLC/TC 55 IEC/TC 55 // Stage : 6060 Winding wires - Test methods - Part 5: Electrical properties NOTE: 2011-06-27: Allocated to [email protected] dor : 2011-07-26 doa : 2011-10-26 dop : 2012-04-26 dow : 2014-07-26
EN 60838-2-2:2006/A1:2012 (PR=23734) IEC 60838-2-2:2006/A1:2012 CLC/TC 34Z IEC/SC 34B LVD (2006/95/EC) // Stage : 6060 Miscellaneous lampholders - Part 2-2: Particular requirements - Connectors for LED-modules NOTE: 2012-04-06: Publication allocated to [email protected]
EN 60865-1:2012 (PR=22838) IEC 60865-1:2011 CLC/SR 73 IEC/TC 73 // Stage : 6060 Short-circuit currents - Calculation of effects - Part 1: Definitions and calculation methods NOTE: Supersedes EN 60865-1:1993 * 2011-10-28: Publication editing allocated to [email protected] dor : 2011-11-28 doa : 2012-02-28 dop : 2012-09-23 dow : 2014-11-28
Publications available since May 30,2011 40
CENELEC Inventory of Technical Activities
EN 60874-1:2012 (PR=23264) IEC 60874-1:2011 CLC/TC 86BXA IEC/SC 86B // Stage : 6060 Fibre optic interconnecting devices and passive components - Connectors for optical fibres and cables - Part 1:
Generic specification NOTE: 2011-12-20 - Publication editing allocated to [email protected] * Supersedes EN 60874-1:2007 dor : 2011-12-29 doa : 2012-03-29 dop : 2012-09-29 dow : 2012-12-29
EN 60874-1-1:2012 (PR=23265) IEC 60874-1-1:2011 CLC/TC 86BXA IEC/SC 86B // Stage : 6060 Fibre optic interconnecting devices and passive components - Connectors for optical fibres and cables - Part 1-1:
Blank detail specification NOTE: Supersedes EN 60874-1-1:2007 * 2011-11-24: Publication editing allocated to [email protected] dor : 2011-12-22 doa : 2012-03-22 dop : 2012-09-22 dow : 2012-12-22
EN 60893-3-2:2004/A1:2011 (PR=22271) IEC 60893-3-2:2003/A1:2011 CLC/SR 15 IEC/TC 15 // Stage : 6060 Insulating materials - Industrial rigid laminated sheets based on thermosetting resins for electrical purposes - Part 3-
2: Specifications for individual materials - Requirements for rigid laminated sheets based on epoxy resins dor : 2011-07-01 doa : 2011-10-01 dop : 2012-04-01 dow : 2014-07-01
EN 60901:1996/A5:2012 (PR=22615) IEC 60901:1996/A5:2011 CLC/SR 34A IEC/SC 34A ERP (2009/125/EC) // Stage : 6060 Single-capped fluorescent lamps - Performance specifications NOTE: 2011-12-20 - Publication editing allocated to [email protected] dor : 2011-12-28 doa : 2012-03-28 dop : 2012-11-04 dow : 2014-12-28
EN 60929:2011 + AC:2011 (PR=22765) IEC 60929:2011 + corrigendum Sep. 2011 CLC/TC 34Z IEC/SC 34C // Stage : 6060 AC and/or DC-supplied electronic control gear for tubular fluorescent lamps - Performance requirements NOTE: 2011-05-27: Publication allocated to [email protected] * Supersedes EN 60929:2006 + corr.
Dec.2006 dor : 2011-06-23 doa : 2011-09-23 dop : 2012-03-23 dow : 2014-06-23
EN 60947-3:2009/A1:2012 (PR=23188) IEC 60947-3:2008/A1:2012 CLC/TC 17B IEC/SC 17B EMC (2004/108/EC) LVD (2006/95/EC) // Stage : 6060 Low-voltage switchgear and controlgear - Part 3: Switches, disconnectors, switch-disconnectors and fuse-
combination units NOTE: This A1 is to be used with EN 60947-1:2007/A1:2011 * 2012-02-24: Publication editing allocated to
[email protected] dor : 2012-03-21 doa : 2012-06-21 dop : 2012-12-21 dow : 2015-03-21
EN 60947-4-3:2000/A2:2011 (PR=22831) IEC 60947-4-3:1999/A2:2011 CLC/TC 17B IEC/SC 17B EMC (2004/108/EC) LVD (2006/95/EC) // Stage : 6060 Low-voltage switchgear and controlgear - Part 4-3: Contactors and motor-starters - AC semiconductor controllers
and contactors for non-motor loads NOTE: 2011-03-25 - Publication editing allocated to [email protected] Mandated: M/404 dor : 2011-04-18 doa : 2011-07-18 dop : 2012-03-02 dow: 2014-04-18
Publications available since May 30,2011 41
CENELEC Inventory of Technical Activities
EN 60950-1:2006/AC:2011 (PR=23796) CLC/TC 108X Stage : 6060 Information technology equipment - Safety - Part 1: General requirements NOTE: D139/C138: To modify the Swiss A-deviation in EN 60950-1:2006 (PR=16298) in accordance with
BT139/CH0114/NCP dor : - doa : - dop : - dow : -
EN 60965:2011 (PR=22732) IEC 60965:2009 CLC/TC 45AX IEC/SC 45A Stage : 6060 Nuclear power plants - Control rooms - Supplementary control points for reactor shutdown without access to the
main control room dor : 2011-08-08 doa : 2012-02-08 dop : 2012-08-08 dow : 2014-08-08
EN 60974-12:2011 (PR=22818) IEC 60974-12:2011 CLC/TC 26A IEC/TC 26 LVD (2006/95/EC) // Stage : 6060 Arc welding equipment - Part 12: Coupling devices for welding cables NOTE: Supersedes EN 60974-12:2005 dor : 2011-06-22 doa : 2011-09-22 dop : 2012-03-22 dow : 2014-06-22
EN 60974-13:2011 (PR=22828) IEC 60974-13:2011 CLC/TC 26A IEC/TC 26 LVD (2006/95/EC) // Stage : 6060 Arc welding equipment - Part 13: Welding clamp NOTE: 2011-05-27: Publication allocated to [email protected] . dor : 2011-06-22 doa : 2011-09-22 dop : 2012-03-22 dow : 2014-06-22
EN 61000-3-12:2011 (PR=22617) IEC 61000-3-12:2011 CLC/TC 210 IEC/SC 77A EMC (2004/108/EC) RTTED (1999/5/EC) // Stage : 6060 Electromagnetic compatibility (EMC) - Part 3-12: Limits - Limits for harmonic currents produced by equipment
connected to public low-voltage systems with input current > 16 A and <= 75 A per phase NOTE: Publication editing allocated to [email protected] * Supersedes EN 61000-3-12:2005 dor : 2011-06-16 doa : 2011-09-16 dop : 2012-06-16 dow : 2014-06-16
EN 61000-4-15:2011 (PR=22369) IEC 61000-4-15:2010 + corrigendum Mar. 2012 CLC/TC 210 IEC/SC 77A // Stage : 6060 Electromagnetic compatibility (EMC) - Part 4-15: Testing and measurement techniques - Flickermeter - Functional
and design specifications NOTE: Supersedes EN 61000-4-15:1998 + A1:2003 dor : 2011-01-02 doa : 2011-04-02 dop : 2011-10-02 dow : 2014-01-02
EN 61000-4-25:2002/A1:2012 (PR=23394) IEC 61000-4-25:2001/A1:2012 CLC/TC 210 IEC/SC 77C // Stage : 6060 Electromagnetic compatibility (EMC) - Part 4-25: Testing and measurement techniques - HEMP immunity test
methods for equipment and systems NOTE: 2012-03-14: Publication editing allocated to [email protected] dor : 2012-04-12 doa : 2012-07-12 dop : 2013-01-12 dow : 2015-04-12
Publications available since May 30,2011 42
CENELEC Inventory of Technical Activities
EN 61008-1:2004/A13:2012 (PR=23062) CLC/TC 23E Stage : 6060 Residual current operated circuit-breakers without integral overcurrent protection for household and similar uses
(RCCB's) - Part 1: General rules NOTE: 2011-12-02 - Publication editing allocated to [email protected] * Amendment to EN 61008-1-2004
following Danish request in order to modify the properties of the test button for 30mA RCDs dor : 2012-01-02 doa : 2012-07-02 dop : 2013-01-02 dow : 2015-01-02
EN 61009-1:2004/A14:2012 (PR=23063) CLC/TC 23E Stage : 6060 Residual current operated circuit-breakers with integral overcurrent protection for household and similar uses
(RCBO's) - Part 1: General rules NOTE: 2011-12-02 - Publication editing allocated to [email protected] * Amendment to EN 61009-1-2004
following Danish request in order to modify the properties of the test button for 30mA RCDs dor : 2012-01-02 doa : 2012-07-02 dop : 2013-01-02 dow : 2015-01-02
EN 61029-2-3:2011 (PR=4179) IEC 61029-2-3:1993 (Modified) + A1:2001 CLC/TC 116 IEC/TC 116 MD (2006/42/EC) Stage : 6060 Safety of transportable motor-operated electric tools - Part 2-3: Particular requirements for planers and thicknessers NOTE: To be read in conjunction with EN 61029-1:2009 Mandated: M/396 dor : 2011-02-14 doa : 2011-08-14 dop : 2012-02-14 dow: 2014-02-14
EN 61029-2-5:2011 (PR=23008) IEC 61029-2-5:1993 (Modified) + A1:2001 (Modified) CLC/TC 116 IEC/TC 116 MD (2006/42/EC) Stage : 6060 Safety of transportable motor-operated electric tools - Part 2-5: Particular requirements for band saws NOTE: D137/C102: NWI approved by BT with deadline: 2011-02-28 * Will supersede EN 61029-2-5:2002 * To be
used in conjunction with EN 61029-1:2009 dor : 2011-10-10 doa : 2012-04-10 dop : 2012-10-10 dow : 2014-10-10
EN 61076-2:2011 (PR=22647) IEC 61076-2:2011 CLC/SR 48B IEC/SC 48B // Stage : 6060 Connectors for electronic equipment - Product requirements - Part 2: Sectional specification for circular connectors NOTE: Supersedes EN 61076-2:1999 * To be used in conjunction with EN 61076-1 & EN 62197-1 dor : 2011-07-26 doa : 2011-10-26 dop : 2012-04-26 dow : 2014-07-26
EN 61076-2-001:2011 (PR=22646) IEC 61076-2-001:2011 CLC/SR 48B IEC/SC 48B // Stage : 6060 Connectors for electronic equipment - Product requirements - Part 2-001: Circular connectors - Blank detail
specification NOTE: Supersedes EN 61076-2-001:2001* To be used in conjunction with EN 61076-1, EN 61076-2 & EN 62197-1 dor : 2011-07-26 doa : 2011-10-26 dop : 2012-04-26 dow : 2014-07-26
EN 61076-2-106:2011 (PR=22645) IEC 61076-2-106:2011 CLC/SR 48B IEC/SC 48B // Stage : 6060 Connectors for electronic equipment - Product requirements - Part 2-106: Circular connectors - Detail specification
for connectors M 16 x 0,75 with screw-locking and degree of protection IP40 or IP65/67 NOTE: 2011-06-27: Allocated to [email protected] dor : 2011-07-26 doa : 2011-10-26 dop : 2012-04-26 dow : 2014-07-26
Publications available since May 30,2011 43
CENELEC Inventory of Technical Activities
EN 61148:2012 (PR=22954) IEC 61148:2011 CLC/TC 22X IEC/TC 22 // Stage : 6060 Terminal markings for valve device stacks and assemblies and for power conversion equipment NOTE: 2011-10-28: Publication editing allocated to [email protected] dor : 2011-11-24 doa : 2012-02-24 dop : 2012-08-24 dow : 2014-11-24
EN 61158-3-12:2012 (PR=22479) IEC 61158-3-12:2010 CLC/TC 65X IEC/SC 65C // Stage : 6060 Industrial communication networks - Fieldbus specifications - Part 3-12: Data-link layer service definition - Type 12
elements NOTE: Project launched as FprEN 61158-300 and ratified as EN 61158-3-12 - Initial project split into 5 subparts
i.e. EN 61158-3-12, 14, 19, 21 and 22 * Supersedes EN 61158-3-12:2008 dor : 2012-03-28 doa : 2012-06-28 dop : 2012-12-28 dow : 2015-03-28
EN 61158-3-14:2012 (PR=24075) IEC 61158-3-14:2010 CLC/TC 65X IEC/SC 65C Stage : 6060 Industrial communication networks - Fieldbus specifications - Part 3-14: Data-link layer service definition - Type 14
elements NOTE: 2012-03-22 - Publication editing allocated to [email protected] * Project handled under parallel procedures as FprEN 61158-300 and split into 5 parts to be published as EN 61158-3-12, 14, 19, 21 and 22. Supersedes EN 61158-3-14:2008 dor : 2012-03-28 doa : 2012-06-28 dop : 2012-12-28 dow : 2015-03-28
EN 61158-3-19:2012 (PR=24076) IEC 61158-3-19:2010 CLC/TC 65X IEC/SC 65C Stage : 6060 Industrial communication networks - Fieldbus specifications - Part 3-19: Data-link layer service definition - Type 19
elements NOTE: 2012-03-22 - Publication editing allocated to [email protected] * Project handled under parallel procedures as FprEN 61158-300 and split into 5 parts to be published as EN 61158-3-12, 14, 19, 21 and 22. Supersedes EN 61158-3-19:2008 dor : 2012-03-28 doa : 2012-06-28 dop : 2012-12-28 dow : 2015-03-28
EN 61158-3-21:2012 (PR=24077) IEC 61158-3-21:2010 CLC/TC 65X IEC/SC 65C Stage : 6060 Industrial communication networks - Fieldbus specifications - Part 3-21: Data-link layer service definition - Type 21
elements NOTE: 2012-03-22 - Publication editing allocated to [email protected] * Project handled under parallel
procedures as FprEN 61158-300 and split into 5 parts to be published as EN 61158-3-12, 14, 19, 21 and 22. dor : 2012-03-28 doa : 2012-06-28 dop : 2012-12-28 dow : 2015-03-28
EN 61158-3-22:2012 (PR=24078) IEC 61158-3-22:2010 CLC/TC 65X IEC/SC 65C Stage : 6060 Industrial communication networks - Fieldbus specifications - Part 3-22: Data-link layer service definition - Type 22
elements NOTE: 2012-03-22 - Publication editing allocated to [email protected] * Project handled under parallel
procedures as FprEN 61158-300 and split into 5 parts to be published as EN 61158-3-12, 14, 19, 21 and 22. dor : 2012-03-28 doa : 2012-06-28 dop : 2012-12-28 dow : 2015-03-28
Publications available since May 30,2011 44
CENELEC Inventory of Technical Activities
EN 61158-4-2:2012 (PR=22480) IEC 61158-4-2:2010 CLC/TC 65X IEC/SC 65C // Stage : 6060 Industrial communication networks - Fieldbus specifications - Part 4-2: Data-link layer protocol specification - Type
2 elements NOTE: Project launched as FprEN 61158-400 based on 65C/605/FDIS and to be ratified as EN 61158-4-2 - Initial
project split into 9 subparts i.e. EN 61158-4-2, 3, 11, 12, 14, 18, 19, 21 and 22 * Supersedes EN 61158-4-2:2008 dor : 2012-03-28 doa : 2012-06-28 dop : 2012-12-28 dow : 2015-03-28
EN 61158-4-3:2012 (PR=24079) IEC 61158-4-3:2010 CLC/TC 65X IEC/SC 65C Stage : 6060 Industrial communication networks - Fieldbus specifications - Part 4-3: Data-link layer protocol specification - Type
3 elements NOTE: 2012-03-22 - Publication editing allocated to [email protected] * Project handled under parallel procedures as FprEN 61158-400 and split into 9 subparts to be published as EN 61158-4-2, 3, 11, 12, 14, 18, 19, 21 and 22 * Supersedes EN 61158-4-3:2008 dor : 2012-03-28 doa : 2012-06-28 dop : 2012-12-28 dow : 2015-03-28
EN 61158-4-11:2012 (PR=24080) IEC 61158-4-11:2010 CLC/TC 65X IEC/SC 65C Stage : 6060 Industrial communication networks - Fieldbus specifications - Part 4-11: Data-link layer protocol specification -
Type 11 elements NOTE: 2012-03-22 - Publication editing allocated to [email protected] * Project handled under parallel procedures as FprEN 61158-400 and split into 9 subparts to be published as EN 61158-4-2, 3, 11, 12, 14, 18, 19, 21 and 22 * Supersedes EN 61158-4-11:2008 dor : 2012-03-28 doa : 2012-06-28 dop : 2012-12-28 dow : 2015-03-28
EN 61158-4-12:2012 (PR=24081) IEC 61158-4-12:2010 CLC/TC 65X IEC/SC 65C Stage : 6060 Industrial communication networks - Fieldbus specifications - Part 4-12: Data-link layer protocol specification -
Type 12 elements NOTE: 2012-03-22 - Publication editing allocated to [email protected] * Project handled under parallel procedures as FprEN 61158-400 and split into 9 subparts to be published as EN 61158-4-2, 3, 11, 12, 14, 18, 19, 21 and 22 * Supersedes EN 61158-4-12:2008 dor : 2012-03-28 doa : 2012-06-28 dop : 2012-12-28 dow : 2015-03-28
EN 61158-4-14:2012 (PR=24082) IEC 61158-4-14:2010 CLC/TC 65X IEC/SC 65C Stage : 6060 Industrial communication networks - Fieldbus specifications - Part 4-14: Data-link layer protocol specification -
Type 14 elements NOTE: 2012-03-22 - Publication editing allocated to [email protected] * Project handled under parallel procedures as FprEN 61158-400 and split into 9 subparts to be published as EN 61158-4-2, 3, 11, 12, 14, 18, 19, 21 and 22 * Supersedes EN 61158-4-14:2008 dor : 2012-03-28 doa : 2012-06-28 dop : 2012-12-28 dow : 2015-03-28
Publications available since May 30,2011 45
CENELEC Inventory of Technical Activities
EN 61158-4-18:2012 (PR=24083) IEC 61158-4-18:2010 CLC/TC 65X IEC/SC 65C Stage : 6060 Industrial communication networks - Fieldbus specifications - Part 4-18: Data-link layer protocol specification -
Type 18 elements NOTE: 2012-03-22 - Publication editing allocated to [email protected] * Project handled under parallel procedures as FprEN 61158-400 and split into 9 subparts to be published as EN 61158-4-2, 3, 11, 12, 14, 18, 19, 21 and 22 * Supersedes EN 61158-4-18:2008 dor : 2012-03-28 doa : 2012-06-28 dop : 2012-12-28 dow : 2015-03-28
EN 61158-4-19:2012 (PR=24084) IEC 61158-4-19:2010 CLC/TC 65X IEC/SC 65C Stage : 6060 Industrial communication networks - Fieldbus specifications - Part 4-19: Data-link layer protocol specification -
Type 19 elements NOTE: 2012-03-22 - Publication editing allocated to [email protected] * Project handled under parallel procedures as FprEN 61158-400 and split into 9 subparts to be published as EN 61158-4-2, 3, 11, 12, 14, 18, 19, 21 and 22 * Supersedes EN 61158-4-19:2008 dor : 2012-03-28 doa : 2012-06-28 dop : 2012-12-28 dow : 2015-03-28
EN 61158-4-21:2012 (PR=24085) IEC 61158-4-21:2010 CLC/TC 65X IEC/SC 65C Stage : 6060 Industrial communication networks - Fieldbus specifications - Part 4-21: Data-link layer protocol specification -
Type 21 elements NOTE: 2012-03-22 - Publication editing allocated to [email protected] * Project handled under parallel procedures as FprEN 61158-400 and split into 9 subparts to be published as EN 61158-4-2, 3, 11, 12, 14, 18, 19, 21 and 22. dor : 2012-03-28 doa : 2012-06-28 dop : 2012-12-28 dow : 2015-03-28
EN 61158-4-22:2012 (PR=24086) IEC 61158-4-22:2010 CLC/TC 65X IEC/SC 65C Stage : 6060 Industrial communication networks - Fieldbus specifications - Part 4-22: Data-link layer protocol specification -
Type 22 elements NOTE: 2012-03-22 - Publication editing allocated to [email protected] * Project handled under parallel procedures as FprEN 61158-400 and split into 9 subparts to be published as EN 61158-4-2, 3, 11, 12, 14, 18, 19, 21 and 22. dor : 2012-03-28 doa : 2012-06-28 dop : 2012-12-28 dow : 2015-03-28
EN 61162-450:2011 (PR=22959) IEC 61162-450:2011 CLC/SR 80 IEC/TC 80 // Stage : 6060 Maritime navigation and radiocommunication equipment and systems - Digital interfaces - Part 450: Multiple talkers
and multiple listeners - Ethernet interconnection dor : 2011-07-15 doa : 2011-10-15 dop : 2012-04-15 dow : 2014-07-15
EN 61169-35:2011 (PR=22714) IEC 61169-35:2011 CLC/SR 46F IEC/SC 46F // Stage : 6060 Radio-frequency connectors - Part 35: Sectional specification for 2,92 series RF connectors dor : 2011-08-15 doa : 2011-11-15 dop : 2012-05-15 dow : 2014-08-15
Publications available since May 30,2011 46
CENELEC Inventory of Technical Activities
EN 61181:2007/A1:2012 (PR=23514) IEC 61181:2007/A1:2012 CLC/BTTF 116-1 IEC/TC 10 // Stage : 6060 Mineral oil-filled electrical equipment - Application of dissolved gas analysis (DGA) to factory tests on electrical
equipment NOTE: 2012-03-09: Publication editing allocated to [email protected] dor : 2012-03-29 doa : 2012-06-29 dop : 2012-12-29 dow : 2015-03-29
EN 61199:2011 (PR=22519) IEC 61199:2011 CLC/SR 34A IEC/SC 34A LVD (2006/95/EC) // Stage : 6060 Single-capped fluorescent lamps - Safety specifications NOTE: Supersedes EN 61199:1999 dor : 2011-08-15 doa : 2011-11-15 dop : 2012-05-15 dow : 2014-08-15
EN 61217:2012 (PR=22904) IEC 61217:2011 CLC/TC 62 IEC/SC 62C MDD (93/42/EEC) // Stage : 6060 Radiotherapy equipment - Coordinates, movements and scales NOTE: 2011-12-20 - Publication editing allocated to [email protected] * Supersedes EN 61217:1996 +
A1:2001 + A2:2008 Mandated: M/295 dor : 2012-01-11 doa : 2012-04-11 dop : 2012-10-11 dow: 2015-01-11
EN 61274-1:2012 (PR=23266) IEC 61274-1:2011 CLC/TC 86BXA IEC/SC 86B // Stage : 6060 Fibre optic interconnecting devices and passive components - Adaptors for fibre optic connectors - Part 1: Generic
specification NOTE: 2011-12-20 - Publication editing allocated to [email protected] * Supersedes EN 61274-1:2008 dor : 2011-12-29 doa : 2012-03-29 dop : 2012-09-29 dow : 2012-12-29
EN 61274-1-1:2012 (PR=23273) IEC 61274-1-1:2011 CLC/TC 86BXA IEC/SC 86B // Stage : 6060 Fibre optic interconnecting devices and passive components - Adaptors for fibre optic connectors - Part 1-1: Blank
detail specification NOTE: Supersedes EN 61274-1-1:2006*2011-11-24: Publication editing allocated to [email protected] dor : 2011-12-22 doa : 2012-03-22 dop : 2012-09-22 dow : 2012-12-22
EN 61290-4-1:2011 (PR=22887) IEC 61290-4-1:2011 CLC/SR 86C IEC/SC 86C // Stage : 6060 Optical amplifiers - Test methods - Part 4-1: Gain transient parameters - Two-wavelength method dor : 2011-09-14 doa : 2011-12-14 dop : 2012-06-14 dow : 2014-09-14
EN 61290-4-2:2011 (PR=22888) IEC 61290-4-2:2011 CLC/SR 86C IEC/SC 86C // Stage : 6060 Optical amplifiers - Test methods - Part 4-2: Gain transient parameters - Broadband source method dor : 2011-08-17 doa : 2011-11-17 dop : 2012-05-17 dow : 2014-08-17
Publications available since May 30,2011 47
CENELEC Inventory of Technical Activities
EN 61291-2:2012 (PR=23621) IEC 61291-2:2012 CLC/SR 86C IEC/SC 86C // Stage : 6060 Optical amplifiers - Part 2: Digital applications - Performance specification template NOTE: 2012-01-20 - Publication editing allocated to [email protected] * Supersedes EN 61291-2:2007 dor : 2012-02-14 doa : 2012-05-14 dop : 2012-11-14 dow : 2015-02-14
EN 61291-4:2012 (PR=23302) IEC 61291-4:2011 CLC/SR 86C IEC/SC 86C // Stage : 6060 Optical amplifiers - Part 4: Multichannel applications - Performance specification template NOTE: 2011-12-20 - Publication editing allocated to [email protected] * Supersedes EN 61291-4:2008 * To
be used in conjunction with EN 61291-1:2006 dor : 2011-12-29 doa : 2012-03-29 dop : 2012-09-29 dow : 2014-12-29
EN 61300-3-7:2012 (PR=21571) IEC 61300-3-7:2009 (Modified) CLC/TC 86BXA IEC/SC 86B // Stage : 6060 Fibre optic interconnecting devices and passive components - Basic test and measurement procedures - Part 3-7:
Examinations and measurements - Wavelength dependence of attenuation and return loss of single mode components NOTE: Publication editing allocated to [email protected] * Supersedes EN 61300-3-5:2001 & EN 61300-3-
7:2001 * FprAA taking into account agreed national comments incorporated dor : 2011-12-07 doa : 2012-03-07 dop : 2012-09-07 dow : 2012-12-07
EN 61300-3-28:2012 (PR=23301) IEC 61300-3-28:2012 CLC/TC 86BXA IEC/SC 86B // Stage : 6060 Fibre optic interconnecting devices and passive components - Basic test and measurement procedures - Part 3-28:
Examinations and measurements - Transient loss NOTE: Supersedes EN 61300-3-28:2002 * D133/C027: dow=dor + 12 months for revisions of standards*2012-03-
21: Publication processing allocated to [email protected] dor : 2012-04-19 doa : 2012-07-19 dop : 2013-01-19 dow : 2013-04-19
EN 61300-3-33:2012 (PR=23560) IEC 61300-3-33:2012 CLC/TC 86BXA IEC/SC 86B // Stage : 6060 Fibre optic interconnecting devices and passive components - Basic test and measurement procedures - Part 3-33:
Examinations and measurements - Withdrawal force from a resilient alignment sleeve using gauge pins NOTE: Supersedes EN 61300-3-33:1999 * 2012-03-09: Publication editing allocated to [email protected] dor : 2012-03-28 doa : 2012-06-28 dop : 2012-12-28 dow : 2013-03-28
EN 61300-3-39:2012 (PR=22996) IEC 61300-3-39:2011 CLC/TC 86BXA IEC/SC 86B // Stage : 6060 Fibre optic interconnecting devices and passive components - Basic test and measurement procedures - Part 3-39: Examinations and measurements - Physical contact (PC) optical connector reference plug selection for return loss measurements NOTE: 2011-12-20 - Publication editing allocated to [email protected] * Supersedes EN 61300-3-39:1997 dor : 2011-12-27 doa : 2012-03-27 dop : 2012-09-27 dow : 2012-12-27
Publications available since May 30,2011 48
CENELEC Inventory of Technical Activities
EN 61300-3-45:2011 (PR=22824) IEC 61300-3-45:2011 CLC/TC 86BXA IEC/SC 86B // Stage : 6060 Fibre optic interconnecting devices and passive components - Basic test and measurement procedures - Part 3-45:
Examinations and measurements - Attenuation of random mated multi-fibre connectors NOTE: 2011-05-27: Publication allocated to [email protected] . dor : 2011-06-16 doa : 2011-09-16 dop : 2012-03-16 dow : 2014-06-16
EN 61300-3-46:2011 (PR=23077) IEC 61300-3-46:2011 CLC/TC 86BXA IEC/SC 86B // Stage : 6060 Fibre optic interconnecting devices and passive components - Basic test and measurement procedures - Part 3-46:
Measurement - Bore diameter for guide pin in MT ferrules dor : 2011-07-21 doa : 2011-10-21 dop : 2012-04-21 dow : 2014-07-21
EN 61307:2011 (PR=23016) IEC 61307:2011 CLC/SR 27 IEC/TC 27 // Stage : 6060 Industrial microwave heating installations - Test methods for the determination of power output NOTE: Supersedes EN 61307:2006 dor : 2011-06-22 doa : 2011-09-22 dop : 2012-03-22 dow : 2014-06-22
EN 61314-1:2012 (PR=23267) IEC 61314-1:2011 CLC/TC 86BXA IEC/SC 86B // Stage : 6060 Fibre optic interconnecting devices and passive components - Fibre optic fan-outs - Part 1: Generic specification NOTE: 2011-12-20 - Publication editing allocated to [email protected] * Supersedes EN 61314-1:2009 dor : 2011-12-29 doa : 2012-03-29 dop : 2012-09-29 dow : 2012-12-29
EN 61314-1-1:2012 (PR=23268) IEC 61314-1-1:2011 CLC/TC 86BXA IEC/SC 86B // Stage : 6060 Fibre optic interconnecting devices and passive components - Fibre optic fan-outs - Part 1-1: Blank detail
specification NOTE: Supersedes EN 61314-1-1:2006 * 2011-11-24: Publication editing allocated to [email protected] dor : 2011-12-22 doa : 2012-03-22 dop : 2012-09-22 dow : 2012-12-22
EN 61340-4-4:2012 (PR=23078) IEC 61340-4-4:2012 CLC/SR 101 IEC/TC 101 // Stage : 6060 Electrostatics - Part 4-4: Standard test methods for specific applications - Electrostatic classification of flexible
intermediate bulk containers (FIBC) NOTE: Supersedes EN 61340-4-4:2005*2012-02-07: Publication editing allocated to [email protected] dor : 2012-02-22 doa : 2012-05-22 dop : 2012-11-22 dow : 2015-02-22
EN 61341:2011 (PR=23255) IEC/TR 61341:2010 CLC/SR 34A IEC/SC 34A Stage : 6060 Method of measurement of centre beam intensity and beam angle(s) of reflector lamps NOTE: Publication editing allocated to [email protected] dor : 2011-07-04 doa : 2012-01-04 dop : 2012-07-04 dow : 2014-07-04
Publications available since May 30,2011 49
CENELEC Inventory of Technical Activities
EN 61347-2-2:2012 (PR=22162) IEC 61347-2-2:2011 CLC/TC 34Z IEC/SC 34C LVD (2006/95/EC) // Stage : 6060 Lamp controlgear - Part 2-2: Particular requirements for d.c. or a.c. supplied electronic step-down convertors for
filament lamps NOTE: 2011-12-20 - Publication editing allocated to [email protected] * Supersedes EN 61347-2-2:2001 +
A1:2006 + A2:2006 dor : 2012-01-11 doa : 2012-04-11 dop : 2012-10-11 dow : 2015-01-11
EN 61347-2-3:2011 + AC:2011 (PR=22727) IEC 61347-2-3:2011 + corrigendum Sep. 2011 CLC/TC 34Z IEC/SC 34C LVD (2006/95/EC) // Stage : 6060 Lamp control gear - Part 2-3: Particular requirements for a.c. and/or d.c. supplied electronic control gear for
fluorescent lamps NOTE: Supersedes EN 61347-2-3:2001 + corr. Jul.2003 + corr. Dec. 2010 + A1:2004 + A2:2006, EN 60925:1991 + A1:1996 + A2:2001, EN 61347-2-4:2001 + corr.Jul. 2003 + corr. Dec.2010, EN 61347-2-5:2001 + corr. Jul.
2003 + corr. Dec. 2010 and EN 61347-2-6:2001 + corr. Jul. 2003 + corr. Dec. 2010 * This EN is to be used in conjunction with EN 61347-1:2008 + A1 (pr=22943) dor : 2011-06-23 doa : 2011-09-23 dop : 2012-03-23 dow : 2014-06-23
EN 61347-2-3:2011/AC:2011 (PR=23845) CLC/TC 34Z LVD (2006/95/EC) Stage : 6060 Lamp control gear - Part 2-3: Particular requirements for a.c. and/or d.c. supplied electronic control gear for
fluorescent lamps dor : - doa : - dop : - dow : -
EN 61347-2-7:2012 (PR=22594) IEC 61347-2-7:2011 CLC/TC 34Z IEC/SC 34C LVD (2006/95/EC) // Stage : 6060 Lamp controlgear - Part 2-7: Particular requirements for battery supplied electronic controlgear for emergency
lighting (self-contained) NOTE: 2011-12-20 - Publication editing allocated to [email protected] * Supersedes EN 61347-2-7:2006 dor : 2012-01-11 doa : 2012-04-11 dop : 2012-10-11 dow : 2015-01-11
EN 61378-1:2011 (PR=22426) IEC 61378-1:2011 + corrigendum Jan. 2012 CLC/TC 14 IEC/TC 14 // Stage : 6060 Convertor transformers - Part 1: Transformers for industrial applications NOTE: 2011-07-28: Publication allocated to [email protected] * Supersedes EN 61378-1:1998 dor : 2011-08-30 doa : 2011-11-30 dop : 2012-05-30 dow : 2014-08-30
EN 61386-25:2011 (PR=22945) IEC 61386-25:2011 CLC/TC 213 IEC/SC 23A LVD (2006/95/EC) // Stage : 6060 Conduit systems for cable management - Part 25: Particular requirements - Conduit fixing devices NOTE: To be read in conjunction with EN 61386-1:2008 dor : 2011-10-27 doa : 2012-01-27 dop : 2012-07-27 dow : 2014-10-27
EN 61394:2011 (PR=22160) IEC 61394:2011 CLC/SR 7 IEC/TC 7 // Stage : 6060 Overhead lines - Requirements for greases for aluminium, aluminium alloy and steel bare conductors dor : 2011-11-16 doa : 2012-02-16 dop : 2012-08-16 dow : 2014-11-16
Publications available since May 30,2011 50
CENELEC Inventory of Technical Activities
EN 61439-1:2011 (PR=22861) IEC 61439-1:2011 CLC/SR 17D IEC/SC 17D EMC (2004/108/EC) LVD (2006/95/EC) // Stage : 6060 Low-voltage switchgear and controlgear assemblies - Part 1: General rules NOTE: Supersedes EN 61439-1:2009 * Initially handled by CLC/TC 17D (dormant) dor : 2011-09-23 doa : 2011-12-23 dop : 2012-06-23 dow : 2014-09-23
EN 61439-2:2011 (PR=22862) IEC 61439-2:2011 CLC/SR 17D IEC/SC 17D EMC (2004/108/EC) LVD (2006/95/EC) // Stage : 6060 Low-voltage switchgear and controlgear assemblies - Part 2: Power switchgear and controlgear assemblies NOTE: Supersedes EN 61439-2:2009 * To be read in conjunction with EN 61439-1:201X * Initially handled by
CLC/TC 17D (dormant) dor : 2011-09-23 doa : 2011-12-23 dop : 2012-06-23 dow : 2014-09-23
EN 61439-3:2012 (PR=23019) IEC 61439-3:2012 CLC/SR 17D IEC/SC 17D EMC (2004/108/EC) LVD (2006/95/EC) // Stage : 6060 Low-voltage switchgear and controlgear assemblies - Part 3: Distribution boards intended to be operated by ordinary
persons (DBO) NOTE: Supersedes EN 60439-3:1991 + A1:1994 + A2:2001 * 2012-02-24: Publication editing allocated to
[email protected] dor : 2012-03-22 doa : 2012-06-22 dop : 2012-12-22 dow : 2015-03-22
EN 61500:2011 (PR=22731) IEC 61500:2009 CLC/TC 45AX IEC/SC 45A Stage : 6060 Nuclear power plants - Instrumentation and control important to safety - Data communication in systems performing
category A functions dor : 2011-08-08 doa : 2012-02-08 dop : 2012-08-08 dow : 2014-08-08
EN 61534-1:2011 (PR=22837) IEC 61534-1:2011 CLC/SR 23A IEC/SC 23A LVD (2006/95/EC) // Stage : 6060 Powertrack systems - Part 1: General requirements NOTE: Supersedes EN 61534-1:2003 dor : 2011-06-22 doa : 2011-09-22 dop : 2012-03-22 dow : 2014-06-22
EN 61557-13:2011 (PR=22664) IEC 61557-13:2011 CLC/SR 85 IEC/TC 85 LVD (2006/95/EC) // Stage : 6060 Electrical safety in low voltage distribution systems up to 1 000 V a.c. and 1 500 V d.c. - Equipment for testing, measuring or monitoring of protective measures - Part 13: Hand-held and hand-manipulated current clamps and sensors for measurement of leakage currents in electrical distribution systems dor : 2011-08-12 doa : 2011-11-12 dop : 2012-05-12 dow : 2014-08-12
EN 61558-2-15:2012 (PR=23031) IEC 61558-2-15:2011 CLC/SR 96 IEC/TC 96 LVD (2006/95/EC) // Stage : 6060 Safety of transformers, reactors, power supply units and combinations thereof - Part 2-15: Particular requirements
and tests for isolating transformers for the supply of medical locations NOTE: Supersedes EN 61558-2-15:2001 + corr. Apr.2004 * 2011-11-24: Publication editing allocated to
[email protected] dor : 2011-12-27 doa : 2012-03-27 dop : 2012-09-27 dow : 2014-12-27
Publications available since May 30,2011 51
CENELEC Inventory of Technical Activities
EN 61587-1:2012 (PR=23150) IEC 61587-1:2011 CLC/SR 48D IEC/SC 48D // Stage : 6060 Mechanical structures for electronic equipment - Tests for IEC 60917 and IEC 60297 series - Part 1: Environmental
requirements, test set-up and safety aspects for cabinets, racks, subracks and chassis under indoor conditions NOTE: 2012-01-23 - Publication editing allocated to cpalagi@cencenelec.* Supersedes EN 61587-1:2007 dor : 2011-12-13 doa : 2012-03-13 dop : 2012-09-13 dow : 2014-12-13
EN 61587-2:2011 (PR=23110) IEC 61587-2:2011 CLC/SR 48D IEC/SC 48D // Stage : 6060 Mechanical structures for electronic equipment - Tests for IEC 60917 and IEC 60297 - Part 2: Seismic tests for
cabinets and racks NOTE: Supersedes EN 61587-2:2001 dor : 2011-09-29 doa : 2011-12-29 dop : 2012-06-29 dow : 2014-09-29
EN 61701:2012 (PR=23090) IEC 61701:2011 CLC/TC 82 IEC/TC 82 // Stage : 6060 Salt mist corrosion testing of photovoltaic (PV) modules NOTE: 2012-01-20 - Publication editing allocated to cpalagi@cencenelec * Supersedes EN 61701:1999 dor : 2012-01-19 doa : 2012-04-19 dop : 2012-10-19 dow : 2015-01-19
EN 61709:2011 (PR=22543) IEC 61709:2011 CLC/SR 56 IEC/TC 56 // Stage : 6060 Electric components - Reliability - Reference conditions for failure rates and stress models for conversion NOTE: Supersedes EN 61709:1998 dor : 2011-07-29 doa : 2011-10-29 dop : 2012-04-29 dow : 2014-07-29
EN 61730-1:2007/A1:2012 (PR=22436) IEC 61730-1:2004/A1:2011 CLC/TC 82 IEC/TC 82 LVD (2006/95/EC) // Stage : 6060 Photovoltaic (PV) module safety qualification - Part 1: Requirements for construction NOTE: 82/659A/FDIS cancels and replaces 82/659/FDIS circulated on 2011-08-12, the deadline for vote remains
unchanged*2011-11-24: Publication editing allocated to [email protected] dor : 2011-12-19 doa : 2012-03-19 dop : 2012-09-19 dow : 2014-12-19
EN 61730-2:2007/A1:2012 (PR=22437) IEC 61730-2:2004/A1:2011 CLC/TC 82 IEC/TC 82 LVD (2006/95/EC) // Stage : 6060 Photovoltaic (PV) module safety qualification - Part 2: Requirements for testing NOTE: 2011-11-24: Publication editing allocated to [email protected] dor : 2011-12-19 doa : 2012-03-19 dop : 2012-09-19 dow : 2014-12-19
EN 61747-5-2:2011 (PR=22031) IEC 61747-5-2:2011 CLC/SR 110 IEC/TC 110 // Stage : 6060 Liquid crystal display devices - Part 5-2: Environmental, endurance and mechanical test methods - Visual inspection
of active matrix colour liquid crystal display modules dor : 2011-07-21 doa : 2011-10-21 dop : 2012-04-21 dow : 2014-07-21
Publications available since May 30,2011 52
CENELEC Inventory of Technical Activities
EN 61747-6-2:2011 (PR=22029) IEC 61747-6-2:2011 + corrigendum Jan. 2012 CLC/SR 110 IEC/TC 110 // Stage : 6060 Liquid crystal display devices - Part 6-2: Measuring methods for liquid crystal display modules - Reflective type dor : 2011-07-15 doa : 2011-10-15 dop : 2012-04-15 dow : 2014-07-15
EN 61747-6-3:2011 (PR=22030) IEC 61747-6-3:2011 CLC/SR 110 IEC/TC 110 // Stage : 6060 Liquid crystal display devices - Part 6-3: Measuring methods for liquid crystal display modules - Motion artifact
measurement of active matrix liquid crystal display modules dor : 2011-08-17 doa : 2011-11-17 dop : 2012-05-17 dow : 2014-08-17
EN 61753-087-6:2012 (PR=23645) IEC 61753-087-6:2012 CLC/TC 86BXA IEC/SC 86B // Stage : 6060 Fibre optic interconnecting devices and passive components - Performance standard - Part 087-6: Non-connectorised single-mode bidirectional 1310 nm upstream and 1490 nm downstream WWDM devices for category O - Uncontrolled environment NOTE: 86B/3328/RVC established on 2011-11-18: To be published without FDIS stage*2012-02-24: Publication
editing allocated to [email protected] dor : 2012-03-27 doa : 2012-06-27 dop : 2012-12-27 dow : 2015-03-27
EN 61755-3-6:2006/A1:2012 (PR=23263) IEC 61755-3-6:2006/A1:2012 CLC/TC 86BXA IEC/SC 86B // Stage : 6060 Fibre optic connector optical interfaces - Part 3-6: Optical interface - 2,5 mm and 1,25 mm diameter cylindrical 8
degrees angled-PC composite ferrule using Cu-Ni-alloy as fibre surrounding material, single mode fibre NOTE: 2012-03-09: Publication editing allocated to [email protected] dor : 2012-03-29 doa : 2012-06-29 dop : 2012-12-29 dow : 2015-03-29
EN 61784-3-18:2011 (PR=22483) IEC 61784-3-18:2011 CLC/TC 65X IEC/SC 65C // Stage : 6060 Industrial communication networks - Profiles - Part 3-18: Functional safety fieldbuses - Additional specifications for
CPF 18 NOTE: 2011-05-12: Allocated to [email protected] dor : 2011-05-25 doa : 2011-08-25 dop : 2012-02-25 dow : 2014-05-25
EN 61784-5-2:2012 (PR=22420) IEC 61784-5-2:2010 CLC/TC 65X IEC/SC 65C // Stage : 6060 Industrial communication networks - Profiles - Part 5-2: Installation of fieldbuses - Installation profiles for CPF 2 NOTE: Vote launched on 65C/602/FDIS split into 9 subparts to be published separately at IEC and CLC levels *
Supersedes EN 61784-5-2:2008 dor : 2011-10-19 doa : 2012-01-19 dop : 2012-10-20 dow : 2014-10-19
EN 61784-5-3:2012 (PR=23849) IEC 61784-5-3:2010 CLC/TC 65X IEC/SC 65C Stage : 6060 Industrial communication networks - Profiles - Part 5-3: Installation of fieldbuses - Installation profiles for CPF 3 NOTE: Vote launched on 65C/602/FDIS split into 9 subparts to be published separately at IEC and CLC levels *
Supersedes EN 61784-5-3:2008 dor : 2011-10-19 doa : 2012-01-19 dop : 2012-10-20 dow : 2014-10-19
Publications available since May 30,2011 53
CENELEC Inventory of Technical Activities
EN 61784-5-4:2012 (PR=23850) IEC 61784-5-4:2010 CLC/TC 65X IEC/SC 65C Stage : 6060 Industrial communication networks - Profiles - Part 5-4: Installation of fieldbuses - Installation profiles for CPF 4 NOTE: Vote launched on 65C/602/FDIS split into 9 subparts to be published separately at IEC and CLC levels dor : 2011-10-19 doa : 2012-01-19 dop : 2012-10-20 dow : 2014-10-19
EN 61784-5-6:2012 (PR=23851) IEC 61784-5-6:2010 CLC/TC 65X IEC/SC 65C Stage : 6060 Industrial communication networks - Profiles - Part 5-6: Installation of fieldbuses - Installation profiles for CPF 6 NOTE: Vote launched on 65C/602/FDIS split into 9 subparts to be published separately at IEC and CLC levels *
Supersedes EN 61784-5-6:2008 dor : 2011-10-19 doa : 2012-01-19 dop : 2012-10-20 dow : 2014-10-19
EN 61784-5-10:2012 (PR=23852) IEC 61784-5-10:2010 CLC/TC 65X IEC/SC 65C Stage : 6060 Industrial communication networks - Profiles - Part 5-10: Installation of fieldbuses - Installation profiles for CPF 10 NOTE: Vote launched on 65C/602/FDIS split into 9 subparts to be published separately at IEC and CLC levels *
Supersedes EN 61784-5-10:2008 dor : 2011-10-19 doa : 2012-01-19 dop : 2012-10-20 dow : 2014-10-19
EN 61784-5-11:2012 (PR=23853) IEC 61784-5-11:2010 CLC/TC 65X IEC/SC 65C Stage : 6060 Industrial communication networks - Profiles - Part 5-11: Installation of fieldbuses - Installation profiles for CPF 11 NOTE: Vote launched on 65C/602/FDIS split into 9 subparts to be published separately at IEC and CLC levels *
Supersedes EN 61784-5-11:2008 dor : 2011-10-19 doa : 2012-01-19 dop : 2012-10-20 dow : 2014-10-19
EN 61784-5-12:2012 (PR=23854) IEC 61784-5-12:2010 CLC/TC 65X IEC/SC 65C Stage : 6060 Industrial communication networks - Profiles - Part 5-12: Installation of fieldbuses - Installation profiles for CPF 12 NOTE: Vote launched on 65C/602/FDIS split into 9 subparts to be published separately at IEC and CLC levels dor : 2011-10-19 doa : 2012-01-19 dop : 2012-10-20 dow : 2014-10-19
EN 61784-5-14:2012 (PR=23855) IEC 61784-5-14:2010 CLC/TC 65X IEC/SC 65C Stage : 6060 Industrial communication networks - Profiles - Part 5-14: Installation of fieldbuses - Installation profiles for CPF 14 NOTE: Vote launched on 65C/602/FDIS split into 9 subparts to be published separately at IEC and CLC levels dor : 2011-10-19 doa : 2012-01-19 dop : 2012-10-20 dow : 2014-10-19
EN 61784-5-15:2012 (PR=23856) IEC 61784-5-15:2010 CLC/TC 65X IEC/SC 65C Stage : 6060 Industrial communication networks - Profiles - Part 5-15: Installation of fieldbuses - Installation profiles for CPF 15 NOTE: Vote launched on 65C/602/FDIS split into 9 subparts to be published separately at IEC and CLC levels dor : 2011-10-19 doa : 2012-01-19 dop : 2012-10-20 dow : 2014-10-19
Publications available since May 30,2011 54
CENELEC Inventory of Technical Activities
EN 61788-4:2011 (PR=22783) IEC 61788-4:2011 CLC/SR 90 IEC/TC 90 // Stage : 6060 Superconductivity - Part 4: Residual resistance ratio measurement - Residual resistance ratio of Nb-Ti composite
superconductors NOTE: Supersedes EN 61788-4:2007 dor : 2011-08-15 doa : 2011-11-15 dop : 2012-05-15 dow : 2014-08-15
EN 61788-6:2011 (PR=22784) IEC 61788-6:2011 CLC/SR 90 IEC/TC 90 // Stage : 6060 Superconductivity - Part 6: Mechanical properties measurement - Room temperature tensile test of Cu/Nb-Ti
composite superconductors NOTE: Supersedes EN 61788-6:2008 dor : 2011-08-15 doa : 2011-11-15 dop : 2012-05-15 dow : 2014-08-15
EN 61788-11:2011 (PR=22785) IEC 61788-11:2011 CLC/SR 90 IEC/TC 90 // Stage : 6060 Superconductivity - Part 11: Residual resistance ratio measurement - Residual resistance ratio of Nb3Sn composite
superconductors NOTE: Supersedes EN 61788-11:2003 dor : 2011-08-15 doa : 2011-11-15 dop : 2012-05-15 dow : 2014-08-15
EN 61788-15:2011 (PR=23039) IEC 61788-15:2011 CLC/SR 90 IEC/TC 90 // Stage : 6060 Superconductivity - Part 15: Electronic characteristic measurements - Intrinsic surface impedance of superconductor
films at microwave frequencies NOTE: 2011-10-28: Publication editing allocated to [email protected] dor : 2011-11-28 doa : 2012-02-28 dop : 2012-08-28 dow : 2014-11-28
EN 61800-3:2004/A1:2012 (PR=22973) IEC 61800-3:2004/A1:2011 CLC/TC 22X IEC/SC 22G EMC (2004/108/EC) // Stage : 6060 Adjustable speed electrical power drive systems - Part 3: EMC requirements and specific test methods NOTE: 2011-11-24: Publication editing allocated to [email protected] Mandated: M/404 dor : 2011-12-19 doa : 2012-03-19 dop : 2012-09-19 dow: 2014-12-19
EN 61812-1:2011 (PR=22705) IEC 61812-1:2011 CLC/TC 94 IEC/TC 94 EMC (2004/108/EC) LVD (2006/95/EC) // Stage : 6060 Time relays for industrial and residential use - Part 1: Requirements and tests NOTE: Supersedes EN 116000-2:1992 and EN 61812-1:1996 + corr. Feb.1999 + A11:1999 dor : 2011-06-29 doa : 2011-09-29 dop : 2012-03-29 dow : 2014-06-29
EN 61821:2011 (PR=23005) IEC 61821:2011 CLC/TC 97 IEC/TC 97 // Stage : 6060 Electrical installations for lighting and beaconing of aerodromes - Maintenance of aeronautical ground lighting
constant current series circuits NOTE: Supersedes EN 61821:2003 dor : 2011-11-03 doa : 2012-02-03 dop : 2012-08-03 dow : 2014-11-03
Publications available since May 30,2011 55
CENELEC Inventory of Technical Activities
EN 61837-2:2011 (PR=22678) IEC 61837-2:2011 CLC/SR 49 IEC/TC 49 // Stage : 6060 Surface mounted piezoelectric devices for frequency control and selection - Standard outlines and terminal lead
connections - Part 2: Ceramic enclosures dor : 2011-07-01 doa : 2011-10-01 dop : 2012-04-01 dow : 2014-07-01
EN 61850-4:2011 (PR=22715) IEC 61850-4:2011 CLC/TC 57 IEC/TC 57 // Stage : 6060 Communication networks and systems for power utility automation - Part 4: System and project management NOTE: Supersedes EN 61850-4:2002 dor : 2011-05-16 doa : 2011-08-16 dop : 2012-02-16 dow : 2014-05-16
EN 61850-7-1:2011 (PR=21866) IEC 61850-7-1:2011 CLC/TC 57 IEC/TC 57 // Stage : 6060 Communication networks and systems for power utility automation - Part 7-1: Basic communication structure -
Principles and models NOTE: Supersedes EN 61850-7-1:2003 dor : 2011-08-19 doa : 2011-11-19 dop : 2012-05-19 dow : 2014-08-19
EN 61850-8-1:2011 (PR=22348) IEC 61850-8-1:2011 CLC/TC 57 IEC/TC 57 // Stage : 6060 Communication networks and systems for power utility automation - Part 8-1: Specific communication service
mapping (SCSM) - Mappings to MMS (ISO 9506-1 and ISO 9506-2) and to ISO/IEC 8802-3 NOTE: Supersedes EN 60850-8-1:2004 dor : 2011-07-22 doa : 2011-10-22 dop : 2012-04-22 dow : 2014-07-22
EN 61850-9-2:2011 (PR=22373) IEC 61850-9-2:2011 CLC/TC 57 IEC/TC 57 // Stage : 6060 Communication networks and systems for power utility automation - Part 9-2: Specific communication service
mapping (SCSM) - Sampled values over ISO/IEC 8802-3 NOTE: 2011-10-07: Publication editing allocated to [email protected] * Supersedes EN 61850-9-2:2004 dor : 2011-10-27 doa : 2012-01-27 dop : 2012-07-27 dow : 2014-10-27
EN 61851-1:2011 (PR=22334) IEC 61851-1:2010 CLC/TC 69X IEC/TC 69 LVD (2006/95/EC) // Stage : 6060 Electric vehicle conductive charging system - Part 1: General requirements NOTE: Supersedes EN 61851-1:2001 dor : 2011-04-12 doa : 2011-07-01 dop : 2012-01-01 dow : 2014-04-01
EN 61869-3:2011 (PR=22867) IEC 61869-3:2011 CLC/TC 38 IEC/TC 38 LVD (2006/95/EC) // Stage : 6060 Instrument transformers - Part 3: Additional requirements for inductive voltage transformers NOTE: Supersedes EN 60044-2:1999 + A1:2000 + A2:2003 * To be read in conjunction with EN 61869-1:2009 dor : 2011-08-17 doa : 2011-11-17 dop : 2012-05-17 dow : 2014-08-17
Publications available since May 30,2011 56
CENELEC Inventory of Technical Activities
EN 61869-5:2011 (PR=22616) IEC 61869-5:2011 CLC/TC 38 IEC/TC 38 LVD (2006/95/EC) // Stage : 6060 Instrument transformers - Part 5: Additional requirements for capacitor voltage transformers NOTE: Supersedes EN 60044-5:2004 * To be read in conjunction with EN 61869-1:2009 dor : 2011-08-17 doa : 2011-11-17 dop : 2012-05-17 dow : 2014-08-17
EN 61915-2:2012 (PR=23151) IEC 61915-2:2011 CLC/TC 17B IEC/SC 17B // Stage : 6060 Low-voltage switchgear and controlgear - Device profiles for networked industrial devices - Part 2: Root device
profiles for starters and similar equipment NOTE: 2011-10-28: Publication editing allocated to [email protected] dor : 2011-11-24 doa : 2012-02-24 dop : 2012-08-24 dow : 2014-11-24
EN 61936-1:2010/AC:2012 (PR=24028) CLC/TC 99X Stage : 6060 Power installations exceeding 1 kV a.c. - Part 1: Common rules dor : - doa : - dop : - dow : -
EN 61937-1:2007/A1:2011 (PR=23379) IEC 61937-1:2007/A1:2011 CLC/SR 100 IEC/TC 100 // Stage : 6060 Digital audio - Interface for non-linear PCM encoded audio bitstreams applying IEC 60958 - Part 1: General dor : 2011-11-16 doa : 2012-02-16 dop : 2012-08-16 dow : 2014-11-16
EN 61937-2:2007/A1:2011 (PR=23380) IEC 61937-2:2007/A1:2011 CLC/SR 100 IEC/TC 100 // Stage : 6060 Digital audio - Interface for non-linear PCM encoded audio bitstreams applying IEC 60958 - Part 2: Burst-info NOTE: 2011-10-28: Publication editing allocated to [email protected] dor : 2011-11-28 doa : 2012-02-28 dop : 2012-08-28 dow : 2014-11-28
EN 61937-10:2011 (PR=23043) IEC 61937-10:2011 CLC/TC 100X IEC/TC 100 // Stage : 6060 Digital audio - Interface for non-linear PCM encoded audio bitstreams applying IEC 60958 - Part 10: Non-linear PCM bitstreams according to the MPEG-4 Audio Lossless Coding (ALS) format NOTE: Initially handled by TC 206 (disbanded) * D141/C101: Transferred to new TC 100X dor : 2011-05-25 doa : 2011-08-25 dop : 2012-02-25 dow : 2014-05-25
EN 61951-2:2011 (PR=22550) IEC 61951-2:2011 CLC/TC 21X IEC/SC 21A // Stage : 6060 Secondary cells and batteries containing alkaline or other non-acid electrolytes - Portable sealed rechargeable single
cells - Part 2: Nickel-metal hydride NOTE: Supersedes EN 61951-2:2003 dor : 2011-06-29 doa : 2011-09-29 dop : 2012-03-29 dow : 2014-06-29
EN 61954:2011 (PR=22866) IEC 61954:2011 CLC/TC 22X IEC/SC 22F // Stage : 6060 Static VAR compensators (SVC) - Testing of thyristor valves NOTE: Publication editing allocated to [email protected] * Supersedes EN 61954:1999 + A1:2003 dor : 2011-05-26 doa : 2011-08-26 dop : 2012-02-26 dow : 2014-05-26
Publications available since May 30,2011 57
CENELEC Inventory of Technical Activities
EN 61960:2011 (PR=22710) IEC 61960:2011 CLC/TC 21X IEC/SC 21A // Stage : 6060 Secondary cells and batteries containing alkaline or other non-acid electrolytes - Secondary lithium cells and
batteries for portable applications NOTE: Supersedes EN 61960:2004 dor : 2011-07-21 doa : 2011-10-21 dop : 2012-04-21 dow : 2014-07-21
EN 61967-8:2011 (PR=22743) IEC 61967-8:2011 CLC/SR 47A IEC/SC 47A // Stage : 6060 Integrated circuits - Measurement of electromagnetic emissions - Part 8: Measurement of radiated emissions - IC
stripline method NOTE: To be read in conjunction with EN 61967-1 dor : 2011-09-15 doa : 2011-12-15 dop : 2012-06-15 dow : 2014-09-15
EN 61969-1:2012 (PR=23231) IEC 61969-1:2011 CLC/SR 48D IEC/SC 48D // Stage : 6060 Mechanical structures for electronic equipment - Outdoor enclosures - Part 1: Design guidelines NOTE: Supersedes EN 61969-1:2000 * 2011-11-24: Publication editing allocated to [email protected] dor : 2011-12-22 doa : 2012-03-22 dop : 2012-09-22 dow : 2014-12-22
EN 61969-2:2012 (PR=23232) IEC 61969-2:2011 CLC/SR 48D IEC/SC 48D // Stage : 6060 Mechanical structures for electronic equipment - Outdoor enclosures - Part 2: Coordination dimensions NOTE: Supersedes EN 61969-2:2000, EN 61969-2-1:2000, EN 61969-2-2:2000*2011-11-24: Publication editing
allocated to [email protected] dor : 2011-12-22 doa : 2012-03-22 dop : 2012-09-22 dow : 2014-12-22
EN 61969-3:2012 (PR=23233) IEC 61969-3:2011 CLC/SR 48D IEC/SC 48D // Stage : 6060 Mechanical structures for electronic equipment - Outdoor enclosures - Part 3: Environmental requirements, tests and
safety aspects NOTE: Supersedes EN 61969-3:2001 * 2011-11-24: Publication editing allocated to [email protected] dor : 2011-12-22 doa : 2012-03-22 dop : 2012-09-22 dow : 2014-12-22
EN 61970-301:2011 (PR=22683) IEC 61970-301:2011 CLC/TC 57 IEC/TC 57 // Stage : 6060 Energy management system application program interface (EMS-API) - Part 301: Common information model
(CIM) base NOTE: Supersedes EN 61970-301:2004 dor : 2011-09-30 doa : 2011-12-31 dop : 2012-06-30 dow : 2014-09-30
EN 61987-10:2009/AC:2011 (PR=23747) CLC/TC 65X Stage : 6060 Industrial-process measurement and control - Data structures and elements in process equipment catalogues - Part 10: Lists of properties (LOPs) for industrial-process measurement and control for electronic data exchange - Fundamentals dor : - doa : - dop : - dow : -
Publications available since May 30,2011 58
CENELEC Inventory of Technical Activities
EN 61988-1:2011 (PR=23081) IEC 61988-1:2011 CLC/SR 110 IEC/TC 110 // Stage : 6060 Plasma display panels - Part 1: Terminology and letter symbols NOTE: Supersedes EN 61988-1:2003 dor : 2011-08-30 doa : 2011-11-30 dop : 2012-05-30 dow : 2014-08-30
EN 61988-2-1:2012 (PR=23082) IEC 61988-2-1:2012 CLC/SR 110 IEC/TC 110 // Stage : 6060 Plasma display panels - Part 2-1: Measuring methods - Optical and optoelectrical NOTE: Supersedes EN 61988-2-1:2002 and EN 61988-2-2:2003*2012-02-07: Publication editing allocated to
[email protected] dor : 2012-02-28 doa : 2012-05-28 dop : 2012-11-28 dow : 2015-02-28
EN 61988-2-4:2011 (PR=23136) IEC 61988-2-4:2011 CLC/SR 110 IEC/TC 110 // Stage : 6060 Plasma display panels - Part 2-4: Measuring methods - Visual quality: Image artifacts dor : 2011-09-29 doa : 2011-12-29 dop : 2012-06-29 dow : 2014-09-29
EN 62023:2012 (PR=23083) IEC 62023:2011 + corrigendum Feb. 2012 CLC/SR 3 IEC/TC 3 // Stage : 6060 Structuring of technical information and documentation NOTE: Supersedes EN 62023:2000 * 2011-10-28: Publication editing allocated to [email protected] dor : 2011-11-23 doa : 2012-02-23 dop : 2012-08-23 dow : 2014-11-23
EN 62027:2012 (PR=23084) IEC 62027:2011 CLC/SR 3 IEC/TC 3 // Stage : 6060 Preparation of object lists, including parts lists NOTE: Supersedes EN 62027:2000 * 2011-10-18: Publication editing allocated to [email protected] dor : 2011-11-16 doa : 2012-02-16 dop : 2012-08-16 dow : 2014-11-16
EN 62034:2012 (PR=22974) IEC 62034:2012 CLC/TC 34Z IEC/SC 34D // Stage : 6060 Automatic test systems for battery powered emergency escape lighting NOTE: Supersedes EN 62034:2006*2012-03-09: Publication editing allocated to [email protected] dor : 2012-03-28 doa : 2012-06-28 dop : 2012-12-28 dow : 2015-03-28
EN 62040-3:2011 (PR=22790) IEC 62040-3:2011 CLC/TC 22X IEC/SC 22H // Stage : 6060 Uninterruptible power systems (UPS) - Part 3: Method of specifying the performance and test requirements NOTE: Supersedes EN 62040-3:2001 + A11:2009 dor : 2011-04-18 doa : 2011-07-18 dop : 2012-01-18 dow : 2014-04-18
EN 62047-5:2011 (PR=22629) IEC 62047-5:2011 + corrigendum Mar. 2012 CLC/SR 47F IEC/SC 47F // Stage : 6060 Semiconductor devices - Micro-electromechanical devices - Part 5: RF MEMS switches dor : 2011-08-17 doa : 2011-11-17 dop : 2012-05-17 dow : 2014-08-17
Publications available since May 30,2011 59
CENELEC Inventory of Technical Activities
EN 62047-7:2011 (PR=22658) IEC 62047-7:2011 CLC/SR 47F IEC/SC 47F // Stage : 6060 Semiconductor devices - Micro-electromechanical devices - Part 7: MEMS BAW filter and duplexer for radio
frequency control and selection dor : 2011-07-21 doa : 2011-10-21 dop : 2012-04-21 dow : 2014-07-21
EN 62047-9:2011 (PR=22644) IEC 62047-9:2011 + corrigendum Mar. 2012 CLC/SR 47F IEC/SC 47F // Stage : 6060 Semiconductor devices - Micro-electromechanical devices - Part 9: Wafer to wafer bonding strength measurement
for MEMS dor : 2011-08-17 doa : 2011-11-17 dop : 2012-05-17 dow : 2014-08-17
EN 62047-10:2011 (PR=23075) IEC 62047-10:2011 + corrigendum Feb. 2012 CLC/SR 47F IEC/SC 47F // Stage : 6060 Semiconductor devices - Micro-electromechanical devices - Part 10: Micro-pillar compression test for MEMS
materials dor : 2011-08-30 doa : 2011-11-30 dop : 2012-05-30 dow : 2014-08-30
EN 62047-12:2011 (PR=23076) IEC 62047-12:2011 CLC/SR 47F IEC/SC 47F // Stage : 6060 Semiconductor devices - Micro-electromechanical devices - Part 12: Bending fatigue testing method of thin film
materials using resonant vibration of MEMS structures dor : 2011-10-18 doa : 2012-01-18 dop : 2012-07-18 dow : 2014-10-18
EN 62047-13:2012 (PR=23280) IEC 62047-13:2012 CLC/SR 47F IEC/SC 47F // Stage : 6060 Semiconductor devices - Micro-electromechanical devices - Part 13: Bend- and shear- type test methods of
measuring adhesive strength for MEMS structures NOTE: 2012-03-09: Publication editing allocated to [email protected] dor : 2012-04-03 doa : 2012-07-03 dop : 2013-01-03 dow : 2015-04-03
EN 62047-14:2012 (PR=23220) IEC 62047-14:2012 CLC/SR 47F IEC/SC 47F // Stage : 6060 Semiconductor devices - Micro-electromechanical devices - Part 14: Forming limit measuring method of metallic
film materials NOTE: 2012-03-09: Publication editing allocated to [email protected] dor : 2012-04-03 doa : 2012-07-03 dop : 2013-01-03 dow : 2015-04-03
EN 62059-32-1:2012 (PR=22139) IEC 62059-32-1:2011 CLC/TC 13 IEC/TC 13 MID (2004/22/EC) // Stage : 6060 Electricity metering equipment - Dependability - Part 32-1: Durability - Testing of the stability of metrological
characteristics by applying elevated temperature NOTE: 2011-12-20 - Publication editing allocated to [email protected] dor : 2012-01-11 doa : 2012-04-11 dop : 2012-10-11 dow : 2015-01-11
Publications available since May 30,2011 60
CENELEC Inventory of Technical Activities
EN 62087:2012 (PR=23522) IEC 62087:2011 CLC/TC 100X IEC/TC 100 ECOSET (107/2009) ECOTV (642/2009) ERP (2009/125/EC) Stage : 6060 Methods of measurement for the power consumption of audio, video and related equipment NOTE: Publication editing allocated to [email protected] * IEC 62087:2011 ed 3 which erroneously missed the IEC/CENELEC parallel procedure endorsed through UAP without modifications * Work on CMs to fulfil M/451
needed for future Ed 4 to be handled under // procedure * Supersedes EN 62087:2009 * Initially handled by TC 206 (disbanded) * D141/C101: Transferred to new TC 100X Mandated: M/451 dor : 2012-02-13 doa : 2012-08-13 dop : 2013-02-13 dow: 2015-02-13
EN 62109-2:2011 (PR=22622) IEC 62109-2:2011 CLC/TC 82 IEC/TC 82 LVD (2006/95/EC) // Stage : 6060 Safety of power converters for use in photovoltaic power systems - Part 2: Particular requirements for inverters NOTE: To be read in conjunction with EN 62109-1:2010 dor : 2011-07-28 doa : 2011-10-28 dop : 2012-04-28 dow : 2014-07-28
EN 62115:2005/A2:2011 + AC:2011 (PR=22679) IEC 62115:2003/A2:2010 (Modified) CLC/TC 61 IEC/TC 61 TOYS (2009/48/EC) TOYS (OLD) (88/378/EEC) // Stage : 6060 Electric toys - Safety NOTE: Incorporates EN 62115:2005/FprAA:2011 (pr=22951) dor : 2011-01-02 doa : 2011-07-02 dop : 2012-01-02 dow : 2014-01-02
EN 62115:2005/A2:2011/AC:2011 (PR=23704) CLC/TC 61 TOYS (2009/48/EC) Stage : 6060 Electric toys - Safety dor : - doa : - dop : - dow : -
EN 62129-2:2011 (PR=22821) IEC 62129-2:2011 CLC/SR 86 IEC/TC 86 // Stage : 6060 Calibration of wavelength/optical frequency measurement instruments - Part 2: Michelson interferometer single
wavelength meters dor : 2011-06-30 doa : 2011-09-30 dop : 2012-03-30 dow : 2014-06-30
EN 62137-3:2012 (PR=22949) IEC 62137-3:2011 CLC/SR 91 IEC/TC 91 // Stage : 6060 Electronics assembly technology - Part 3: Selection guidance of environmental and endurance test methods for solder
joints NOTE: 2011-11-24: Publication editing allocated to [email protected] dor : 2011-12-13 doa : 2012-03-13 dop : 2012-09-13 dow : 2014-12-13
EN 62149-1:2012 (PR=23620) IEC 62149-1:2011 CLC/SR 86C IEC/SC 86C // Stage : 6060 Fibre optic active components and devices - Performance standards - Part 1: General and guidance NOTE: 2011-12-20 - Publication editing allocated to [email protected] * Supersedes EN 62149-1:2004 dor : 2012-01-11 doa : 2012-04-11 dop : 2012-10-11 dow : 2015-01-11
Publications available since May 30,2011 61
CENELEC Inventory of Technical Activities
EN 62149-7:2012 (PR=23628) IEC 62149-7:2012 CLC/SR 86C IEC/SC 86C // Stage : 6060 Fibre optic active components and devices - Performance standards - Part 7: 1 310 nm discrete vertical cavity surface
emitting laser devices NOTE: 2012-04-06: Publication allocated to [email protected] .
EN 62196-1:2012 (PR=23252) IEC 62196-1:2011 CLC/TC 23BX IEC/SC 23H LVD (2006/95/EC) // Stage : 6060 Plugs, socket-outlets, vehicle connectors and vehicle inlets - Conductive charging of electric vehicles - Part 1:
General requirements NOTE: Supersedes EN 62196-1:2003 Mandated: M/468 dor : 2012-02-01 doa : 2012-05-01 dop : 2012-11-01 dow: 2015-02-01
EN 62196-2:2012 (PR=23259) IEC 62196-2:2011 CLC/TC 23BX IEC/SC 23H LVD (2006/95/EC) // Stage : 6060 Plugs, socket-outlets, vehicle connectors and vehicle inlets - Conductive charging of electric vehicles - Part 2:
Dimensional compatibility and interchangeability requirements for a.c. pin and contact-tube accessories NOTE: To be read in conjunction with EN 62196-1 Mandated: M/468 dor : 2012-02-01 doa : 2012-05-01 dop : 2012-11-01 dow: 2015-02-01
EN 62208:2011 (PR=22816) IEC 62208:2011 CLC/SR 17D IEC/SC 17D LVD (2006/95/EC) // Stage : 6060 Empty enclosures for low-voltage switchgear and controlgear assemblies - General requirements NOTE: Supersedes EN 62208:2003 * Initially handled by CLC/TC 17D (dormant) dor : 2011-09-23 doa : 2011-12-23 dop : 2012-06-23 dow : 2014-09-23
EN 62216:2011 (PR=22011) IEC 62216:2009 CLC/SR 100 IEC/TC 100 // Stage : 6060 Digital terrestrial television receivers for the DVB-T system NOTE: Supersedes EN 62216-1:2002 dor : 2011-01-02 doa : 2011-04-02 dop : 2012-04-02 dow : 2014-01-02
EN 62244:2011 (PR=21459) IEC 62244:2006 (Modified) CLC/TC 45B IEC/SC 45B Stage : 6060 Radiation protection instrumentation - Installed radiation monitors for the detection of radioactive and special
nuclear materials at national borders NOTE: 2011-05-25: Publication allocated to [email protected] dor : 2011-06-27 doa : 2011-12-27 dop : 2012-06-27 dow : 2014-06-27
EN 62253:2011 (PR=23093) IEC 62253:2011 CLC/TC 82 IEC/TC 82 LVD (2006/95/EC) // Stage : 6060 Photovoltaic pumping systems - Design qualification and performance measurements dor : 2011-08-19 doa : 2011-11-19 dop : 2012-05-19 dow : 2014-08-19
Publications available since May 30,2011 62
CENELEC Inventory of Technical Activities
EN 62258-2:2011 (PR=22625) IEC 62258-2:2011 CLC/SR 47 IEC/TC 47 // Stage : 6060 Semiconductor die products - Part 2: Exchange data formats NOTE: Supersedes EN 62258-2:2005 * To be read in conjunction with EN 62258-1 dor : 2011-06-29 doa : 2011-09-29 dop : 2012-03-29 dow : 2014-06-29
EN 62264-5:2012 (PR=21963) IEC 62264-5:2011 CLC/TC 65X IEC/SC 65E // Stage : 6060 Enterprise system integration - Part 5: Business to manufacturing transactions NOTE: 2012-03-14 - Publication editing allocated to [email protected] dor : 2012-02-03 doa : 2012-05-03 dop : 2012-11-03 dow : 2015-02-03
EN 62271-1:2008/A1:2011 (PR=22903) IEC 62271-1:2007/A1:2011 CLC/TC 17AC IEC/SC 17A // Stage : 6060 High-voltage switchgear and controlgear - Part 1: Common specifications dor : 2011-07-21 doa : 2011-10-21 dop : 2012-04-21 dow : 2014-07-21
EN 62271-102:2002/A1:2011 (PR=22865) IEC 62271-102:2001/A1:2011 + corrigendum Jan. 2012 CLC/TC 17AC IEC/SC 17A // Stage : 6060 High-voltage switchgear and controlgear - Part 102: Alternating current disconnectors and earthing switches dor : 2011-09-23 doa : 2011-12-23 dop : 2012-06-23 dow : 2014-09-23
EN 62271-103:2011 (PR=22885) IEC 62271-103:2011 CLC/TC 17AC IEC/SC 17A // Stage : 6060 High-voltage switchgear and controlgear - Part 103: Switches for rated voltages above 1 kV up to and including 52
kV NOTE: Supersedes EN 60265-1:1998 dor : 2011-07-21 doa : 2011-10-21 dop : 2012-04-21 dow : 2014-07-21
EN 62271-106:2011 (PR=22829) IEC 62271-106:2011 CLC/TC 17AC IEC/SC 17A // Stage : 6060 High-voltage switchgear and controlgear - Part 106: Alternating current contactors, contactor-based controllers and
motor-starters NOTE: Supersedes EN 60470:2000 + corr. June 2000 * To be read in conjunction with EN 62271-1:2008 dor : 2011-09-23 doa : 2011-12-23 dop : 2012-06-23 dow : 2014-09-23
EN 62271-200:2012 (PR=22850) IEC 62271-200:2011 CLC/TC 17AC IEC/SC 17C // Stage : 6060 High-voltage switchgear and controlgear - Part 200: AC metal-enclosed switchgear and controlgear for rated
voltages above 1 kV and up to and including 52 kV NOTE: Supersedes EN 62271-200:2004*2011-10-28: Publication editing allocated to [email protected] dor : 2011-11-28 doa : 2012-02-28 dop : 2012-08-28 dow : 2014-11-28
Publications available since May 30,2011 63
CENELEC Inventory of Technical Activities
EN 62271-203:2012 (PR=22764) IEC 62271-203:2011 CLC/TC 17AC IEC/SC 17C // Stage : 6060 High-voltage switchgear and controlgear - Part 203: Gas-insulated metal-enclosed switchgear for rated voltages
above 52 kV NOTE: 2012-03-13 - Publication editing allocated to [email protected] * Supersedes EN 62271-203:2004 * To
be read in conjunction with EN 62271-1:2008 dor : 2011-10-12 doa : 2012-01-12 dop : 2012-11-11 dow : 2014-10-12
EN 62271-204:2011 (PR=22833) IEC 62271-204:2011 CLC/TC 17AC IEC/SC 17C // Stage : 6060 High-voltage switchgear and controlgear - Part 204: Rigid gas-insulated transmission lines for rated voltage above 52
kV NOTE: To be read in conjunction with EN 62271-1:2008 dor : 2011-08-30 doa : 2011-11-30 dop : 2012-05-30 dow : 2014-08-30
EN 62282-3-100:2012 (PR=23215) IEC 62282-3-100:2012 CLC/SR 105 IEC/TC 105 LVD (2006/95/EC) // Stage : 6060 Fuel cell technologies - Part 3-100: Stationary fuel cell power systems - Safety NOTE: Supersedes EN 62282-3-1:2007 * 2012-02-24: Publication editing allocated to [email protected] dor : 2012-03-22 doa : 2012-06-22 dop : 2012-12-22 dow : 2015-03-22
EN 62282-3-200:2012 (PR=23060) IEC 62282-3-200:2011 CLC/SR 105 IEC/TC 105 // Stage : 6060 Fuel cell technologies - Part 3-200: Stationary fuel cell power systems - Performance test methods NOTE: Supersedes EN 62282-3-2:2006 * 2011-10-28: Publication editing allocated to [email protected] dor : 2011-11-23 doa : 2012-02-23 dop : 2012-08-23 dow : 2014-11-23
EN 62290-2:2011 (PR=22815) IEC 62290-2:2011 CLC/TC 9X IEC/TC 9 // Stage : 6060 Railway applications - Urban guided transport management and command/control systems - Part 2: Functional
requirements specification dor : 2011-07-26 doa : 2011-10-26 dop : 2012-04-26 dow : 2014-07-26
EN 62305-2:2012 (PR=22661) IEC 62305-2:2010 (Modified) CLC/TC 81X IEC/TC 81 Stage : 6060 Protection against lightning - Part 2: Risk management NOTE: 2012-02-14 - Publication editing allocated to [email protected] * Supersedes EN 62305-2:2006 +
corr. Nov.2006 dor : 2012-03-19 doa : 2012-09-19 dop : 2013-03-19 dow : 2014-01-13
EN 62327:2011 (PR=20663) IEC 62327:2006 (Modified) CLC/TC 45B IEC/TC 45 Stage : 6060 Radiation protection instrumentation - Hand-held instruments for the detection and identification of radionuclides
and for the indication of ambient dose equivalent rate from photon radiation NOTE: 2011-05-25: Publication allocated to [email protected] dor : 2011-06-27 doa : 2011-12-27 dop : 2012-06-27 dow : 2014-06-27
Publications available since May 30,2011 64
CENELEC Inventory of Technical Activities
EN 62337:2012 (PR=23066) IEC 62337:2012 CLC/TC 65X IEC/SC 65E // Stage : 6060 Commissioning of electrical, instrumentation and control systems in the process industry - Specific phases and
milestones NOTE: Supersedes EN 62337:2007*2012-03-09: Publication editing allocated to [email protected] dor : 2012-03-28 doa : 2012-06-28 dop : 2012-12-28 dow : 2015-03-28
EN 62341-6-2:2012 (PR=23115) IEC 62341-6-2:2012 CLC/SR 110 IEC/TC 110 // Stage : 6060 Organic light emitting diode (OLED) displays - Part 6-2: Measuring methods of visual quality and ambient
performance NOTE: 2012-02-07: Publication editing allocated to [email protected] dor : 2012-02-28 doa : 2012-05-28 dop : 2012-11-28 dow : 2015-02-28
EN 62363:2011 (PR=22142) IEC 62363:2008 (Modified) CLC/TC 45B IEC/SC 45B Stage : 6060 Radiation protection instrumentation - Portable photon contamination meters and monitors NOTE: Publication editing allocated to [email protected] dor : 2011-06-20 doa : 2011-12-20 dop : 2012-06-20 dow : 2014-06-20
EN 62381:2012 (PR=23065) IEC 62381:2012 CLC/TC 65X IEC/SC 65E // Stage : 6060 Automation systems in the process industry - Factory acceptance test (FAT), site acceptance test (SAT) and site
integration test (SIT) NOTE: Supersedes EN 62381:2007*2012-03-09: Publication editing allocated to [email protected] dor : 2012-03-28 doa : 2012-06-28 dop : 2012-12-28 dow : 2015-03-28
EN 62386-209:2011 (PR=22385) IEC 62386-209:2011 CLC/TC 34Z IEC/SC 34C // Stage : 6060 Digital addressable lighting interface - Part 209: Particular requirements for control gear - Colour control (device
type 8) dor : 2011-07-29 doa : 2011-10-29 dop : 2012-04-29 dow : 2014-07-29
EN 62386-210:2011 (PR=22893) IEC 62386-210:2011 CLC/TC 34Z IEC/SC 34C // Stage : 6060 Digital addressable lighting interface - Part 210: Particular requirements for control gear - Sequencer (device type 9) dor : 2011-05-25 doa : 2011-08-25 dop : 2012-02-25 dow : 2014-05-25
EN 62387-1:2012 (PR=21441) IEC 62387-1:2007 (Modified) CLC/TC 45B IEC/SC 45B Stage : 6060 Radiation protection instrumentation - Passive integrating dosimetry systems for environmental and personal
monitoring - Part 1: General characteristics and performance requirements NOTE: D130/071: BTTF 111-3 converted into CLC/TC 45B * 2011-12-02 - Publication editing allocated to
[email protected] dor : 2012-01-02 doa : 2012-07-02 dop : 2013-01-02 dow : 2015-01-02
Publications available since May 30,2011 65
CENELEC Inventory of Technical Activities
EN 62439-4:2010/A1:2012 (PR=23218) IEC 62439-4:2010/A1:2012 CLC/TC 65X IEC/SC 65C // Stage : 6060 Industrial communication networks - High availability automation networks - Part 4: Cross-network Redundancy
Protocol (CRP) NOTE: 2012-03-09: Publication editing allocated to [email protected] dor : 2012-03-30 doa : 2012-06-30 dop : 2012-12-30 dow : 2015-03-30
EN 62439-7:2012 (PR=23216) IEC 62439-7:2011 CLC/TC 65X IEC/SC 65C // Stage : 6060 Industrial communication networks - High availability automation networks - Part 7: Ring-based Redundancy
Protocol (RRP) NOTE: 2012-01-20 - Publication editing allocated to [email protected] dor : 2012-01-20 doa : 2012-04-20 dop : 2012-10-20 dow : 2015-01-20
EN 62442-1:2011 + AC:2012 (PR=22846) IEC 62442-1:2011 CLC/TC 34Z IEC/SC 34C // Stage : 6060 Energy performance of lamp controlgear - Part 1: Controlgear for fluorescent lamps - Method of measurement to
determine the total input power of controlgear circuits and the efficiency of the controlgear NOTE: Supersedes EN 50294:1998 + A1:2001 + A2:2003 dor : 2011-11-16 doa : 2012-02-16 dop : 2012-08-16 dow : 2014-11-16
EN 62442-1:2011/AC:2012 (PR=24182) CLC/TC 34Z Stage : 6060 Energy performance of lamp controlgear - Part 1: Controlgear for fluorescent lamps - Method of measurement to
determine the total input power of controlgear circuits and the efficiency of the controlgear dor : - doa : - dop : - dow : -
EN 62496-2-1:2011 (PR=22822) IEC 62496-2-1:2011 CLC/SR 86 IEC/TC 86 // Stage : 6060 Optical circuit boards - Part 2-1: Measurements - Optical attenuation and isolation dor : 2011-09-01 doa : 2011-12-01 dop : 2012-06-01 dow : 2014-09-01
EN 62509:2011 (PR=22213) IEC 62509:2010 CLC/TC 82 IEC/TC 82 // Stage : 6060 Battery charge controllers for photovoltaic systems - Performance and functioning NOTE: To be used in conjunction with EN 62093 dor : 2011-01-20 doa : 2011-04-20 dop : 2012-03-02 dow : 2014-01-20
EN 62516-2:2011 (PR=23094) IEC 62516-2:2011 CLC/SR 100 IEC/TC 100 // Stage : 6060 Terrestrial digital multimedia broadcasting (T-DMB) receivers - Part 2: Interactive data services using BIFS dor : 2011-08-15 doa : 2011-11-15 dop : 2012-05-15 dow : 2014-08-15
EN 62520:2011 (PR=22465) IEC 62520:2011 CLC/TC 9X IEC/TC 9 // Stage : 6060 Railway applications - Electric traction - Short-primary type linear induction motors (LIM) fed by power converters NOTE: 2011-05-27: Publication allocated to [email protected] . dor : 2011-06-29 doa : 2011-09-29 dop : 2012-03-29 dow : 2014-06-29
Publications available since May 30,2011 66
CENELEC Inventory of Technical Activities
EN 62541-4:2011 (PR=21959) IEC 62541-4:2011 CLC/TC 65X IEC/SC 65E // Stage : 6060 OPC unified architecture - Part 4: Services NOTE: 2011-10-28: Publication editing allocated to [email protected] dor : 2011-11-24 doa : 2012-02-24 dop : 2012-08-24 dow : 2014-11-24
EN 62541-5:2011 (PR=21960) IEC 62541-5:2011 CLC/TC 65X IEC/SC 65E // Stage : 6060 OPC unified architecture - Part 5: Information model NOTE: 2011-10-28: Publication editing allocated to [email protected] dor : 2011-11-22 doa : 2012-02-22 dop : 2012-08-22 dow : 2014-11-22
EN 62541-6:2011 (PR=21961) IEC 62541-6:2011 CLC/TC 65X IEC/SC 65E // Stage : 6060 OPC unified architecture - Part 6: Mappings NOTE: 2011-10-28: Publication editing allocated to [email protected] dor : 2011-11-22 doa : 2012-02-22 dop : 2012-08-22 dow : 2014-11-22
EN 62541-8:2011 (PR=21962) IEC 62541-8:2011 CLC/TC 65X IEC/SC 65E // Stage : 6060 OPC unified architecture - Part 8: Data Access NOTE: 2011-10-28: Publication editing allocated to [email protected] dor : 2011-11-22 doa : 2012-02-22 dop : 2012-08-22 dow : 2014-11-22
EN 62549:2011 (PR=22379) IEC 62549:2011 CLC/TC 213 IEC/SC 23A LVD (2006/95/EC) // Stage : 6060 Articulated systems and flexible systems for cable guiding NOTE: 2011-10-28: Publication editing allocated to [email protected] *Initial project offered to IEC in the
frame of the Dresden Agreement dor : 2011-11-28 doa : 2012-02-28 dop : 2012-08-28 dow : 2014-11-28
EN 62554:2011 (PR=22886) IEC 62554:2011 CLC/SR 34A IEC/SC 34A // Stage : 6060 Sample preparation for measurement of mercury level in fluorescent lamps dor : 2011-09-23 doa : 2011-12-23 dop : 2012-06-23 dow : 2014-09-23
EN 62561-5:2011 (PR=22869) IEC 62561-5:2011 (Modified) CLC/TC 81X IEC/TC 81 // Stage : 6060 Lightning protection system components (LPSC) - Part 5: Requirements for earth electrode inspection housings and
earth electrode seals NOTE: Publication editing allocated to [email protected] * Supersedes EN 50164-5:2009 * D137/026: dow fixed to dor + 36 months (TC request for 72 months refused) * Incorporates PR=23342 covering common modifications towards 81/391/FDIS dor : 2011-07-28 doa : 2012-01-28 dop : 2012-07-28 dow : 2014-07-28
Publications available since May 30,2011 67
CENELEC Inventory of Technical Activities
EN 62561-6:2011 (PR=22870) IEC 62561-6:2011 (Modified) CLC/TC 81X IEC/TC 81 // Stage : 6060 Lightning protection system components (LPSC) - Part 6: Requirements for lightning strike counters (LSC) NOTE: Supersedes EN 50164-6:2009 * D137/026: dow fixed to dor+ 36 months (TC request for 72 months refused)
* Incorporates EN 62561-6:2011/AA (pr=23488) dor : 2011-07-28 doa : 2012-01-28 dop : 2012-07-28 dow : 2014-07-28
EN 62561-7:2012 (PR=23144) IEC 62561-7:2011 (Modified) CLC/TC 81X IEC/TC 81 // Stage : 6060 Lightning Protection System Components (LPSC) - Part 7: Requirements for earthing enhancing compounds NOTE: 2011-12-20 - Publication editing allocated to [email protected] * Supersedes EN 50164-7:2008 * FprAA circulated simultaneously with this FprEN * 2011-12-20 - Publication editing allocated to
[email protected] * Supersedes EN 50164-7:2008 * Incorporates FprAA (pr= 23489) circulated simultaneously with this FprEN* D137/026: BT decided to fix the dow = dor + 36 months for the EN 62561 series dor : 2012-01-02 doa : 2012-07-02 dop : 2013-01-02 dow : 2015-01-02
EN 62572-3:2012 (PR=23114) IEC 62572-3:2011 CLC/SR 86C IEC/SC 86C // Stage : 6060 Fibre optic active components and devices - Reliability standards - Part 3: Laser modules used for
telecommunication NOTE: 2011-12-20 - Publication editing allocated to [email protected] dor : 2011-12-29 doa : 2012-03-29 dop : 2012-09-29 dow : 2014-12-29
EN 62595-1-2:2012 (PR=23340) IEC 62595-1-2:2011 CLC/SR 110 IEC/TC 110 // Stage : 6060 LCD backlight unit - Part 1-2: Terminology and letter symbols NOTE: 2012-01-20 - Publication editing allocated to [email protected] dor : 2012-01-18 doa : 2012-04-18 dop : 2012-10-18 dow : 2015-01-18
EN 62604-2:2012 (PR=22691) IEC 62604-2:2011 CLC/SR 49 IEC/TC 49 // Stage : 6060 Surface Acoustic Wave (SAW) and Bulk Acoustic Wave (BAW) duplexers of assessed quality - Part 2: Guidelines
for the use NOTE: 2011-12-20 - Publication editing allocated to [email protected] dor : 2012-01-02 doa : 2012-04-02 dop : 2012-10-02 dow : 2015-01-02
EN 62605:2011 (PR=22799) IEC 62605:2011 CLC/SR 100 IEC/TC 100 // Stage : 6060 Multimedia systems and equipment - Multimedia e-publishing and e-books - Interchange format for e-dictionaries dor : 2011-08-15 doa : 2011-11-15 dop : 2012-05-15 dow : 2014-08-15
EN 62631-1:2011 (PR=22801) IEC 62631-1:2011 CLC/SR 112 IEC/TC 112 // Stage : 6060 Dielectric and resistive properties of solid insulating materials - Part 1: General NOTE: Partially supersedes HD 429 S1:1983 (PR=2906), HD 438 S1:1984 (PR=2909) and HD 568 S1:1990
(PR=218) together with future parts and subparts of EN 62631 series dor : 2011-06-02 doa : 2011-09-02 dop : 2012-03-02 dow : 2014-06-02
Publications available since May 30,2011 68
CENELEC Inventory of Technical Activities
EN 62634:2011 (PR=22950) IEC 62634:2011 CLC/SR 100 IEC/TC 100 // Stage : 6060 Radio data system (RDS) - Receiver products and characteristics - Methods of measurement NOTE: Supersedes EN 60315-9:1996 dor : 2011-08-02 doa : 2011-11-02 dop : 2012-05-02 dow : 2014-08-02
EN 62639:2012 (PR=23021) IEC 62639:2012 CLC/SR 34A IEC/SC 34A // Stage : 6060 Fluorescent induction lamps - Performance specification NOTE: 2012-02-24: Publication editing allocated to [email protected] dor : 2012-03-27 doa : 2012-06-27 dop : 2012-12-27 dow : 2015-03-27
EN 62660-1:2011 (PR=22754) IEC 62660-1:2010 CLC/TC 21X IEC/TC 21 // Stage : 6060 Secondary lithium-ion cells for the propulsion of electric road vehicles - Part 1: Performance testing NOTE: Publication editing allocated to [email protected] dor : 2011-01-20 doa : 2011-04-20 dop : 2012-04-20 dow : 2014-01-20
EN 62660-2:2011 (PR=22755) IEC 62660-2:2010 CLC/TC 21X IEC/TC 21 // Stage : 6060 Secondary lithium-ion cells for the propulsion of electric road vehicles - Part 2: Reliability and abuse testing NOTE: Publication editing allocated to [email protected] dor : 2011-01-20 doa : 2011-04-20 dop : 2011-10-20 dow : 2014-01-20
EN 80416-3:2002/A1:2011 (PR=22892) IEC 80416-3:2002/A1:2011 CLC/SR 3C IEC/SC 3C // Stage : 6060 Basic principles for graphical symbols for use on equipment - Part 3: Guidelines for the application of graphical
symbols dor : 2011-08-16 doa : 2011-11-16 dop : 2012-05-16 dow : 2014-08-16
EN 80601-2-35:2009/A11:2011 (PR=23807) CLC/TC 62 MDD (93/42/EEC) Stage : 6060 Medical electrical equipment - Part 2-35: Particular requirements for the basic safety and essential performance of
heating devices using blankets, pads and mattresses and intended for heating in medical use NOTE: D139/C149: BT approved the modified Annex ZZ for EN 80601-2-35:2009 dor : 2011-10-01 doa : 2012-04-01 dop : 2012-10-01 dow : 2014-10-01
EN 80601-2-58:2009/A11:2011 (PR=23813) CLC/TC 62 MDD (93/42/EEC) Stage : 6060 Medical electrical equipment - Part 2-58: Particular requirements for the basic safety and essential performance of
lens removal devices and vitrectomy devices for ophthalmic surgery NOTE: D139/C149: BT approved the modified Annex ZZ for EN 80601-2-58:2009 dor : 2011-10-01 doa : 2012-04-01 dop : 2012-10-01 dow : 2014-10-01
Publications available since May 30,2011 69
CENELEC Inventory of Technical Activities
EN 140401-804:2011 + AC:2012 (PR=21905) CLC/TC 40XB Stage : 6060 Detail Specification: Fixed low power film high stability SMD resistors - Rectangular - Stability classes 0,1; 0,25 NOTE: 2011-04-07 - Publication editing allocated to [email protected] * Supersedes EN 140401-804:2005 to include the adoption of an ESD test, of test methods for lead-free soldering, and of new coding defined in EN 60062. It shall further reflect the new procedural references of IEC QC 001002-3 dor : 2011-05-09 doa : 2011-11-09 dop : 2012-05-09 dow : 2014-05-09
EN 140401-804:2011/AC:2012 (PR=23922) CLC/TC 40XB Stage : 6060 Detail Specification: Fixed low power film high stability SMD resistors - Rectangular - Stability classes 0,1; 0,25 NOTE: D140/C021: Issue of a corrigendum to EN 140401-804:2011 approved to cover shortcomings that would
cause difficulties to the user dor : - doa : - dop : - dow : -
EN : CEN/CLC European Standards
EN ISO/IEC 17020:2012 (PR=23288) ISO/IEC 17020:2012 CEN/CLC/TC 1 // Stage : 6060 Conformity assessment - General criteria for the operation of various types of bodies performing inspection
(ISO/IEC/FDIS 17020:2011) NOTE: // vote at CEN level * Will supersede EN ISO/IEC 17020:2004 dor : 2012-02-18 doa : 2012-06-30 dop : 2012-09-30 dow: 2012-09-30
EN ISO/IEC 80079-34:2011 (PR=23257) ISO/IEC 80079-34:2011 (Modified) CLC/TC 31 IEC/SC 31M ATEX (94/9/EC) // Stage : 6060 Explosive atmospheres - Part 34: Application of quality systems for equipment manufacture NOTE: Supersedes EN 13980:2002 * Enquiry at ISO/CEN level (31M/31/CDV, CEN Project = WI 00305114) - vote on 31M/45/FDIS at IEC/CLC level (agreement between ISO and IEC, see also D130/103) * Incorporates FprAA (pr=23305) dor : 2011-05-25 doa : 2011-11-25 dop : 2012-05-25 dow : 2014-05-25
EN ISO
EN ISO 13485:2012 + AC:201X (PR=24011) ISO 13485:2003 CEN/CLC/TC 3 IEC/SC 62A AIMD (90/385/EEC) IVD (98/79/EC) MDD (93/42/EEC) Stage : 6060 Medical devices - Quality management systems - Requirements for regulatory purposes NOTE: Will supersede EN ISO 13485:2003 Mandated: M/023 dor : 2012-01-24 doa : 2012-05-31 dop : 2012-08-31 dow: 2012-08-31
EN ISO 50001:2011 (PR=23639) CEN/CLC/JWG 3 Stage : 6060 Energy management systems - Requirements with guidance for use dor : 2011-10-25 doa : 2012-01-31 dop : 2012-04-30 dow : 2012-04-26
Publications available since May 30,2011 70
CENELEC Inventory of Technical Activities
HD : Harmonization Documents
HD 428.1 S1:1992/AC:2011 (PR=23798) CLC/TC 14 Stage : 6060 Three-phase oil-immersed distribution transformers 50 Hz, from 50 to 2500 kVA with highest voltage for equipment not exceeding 36 kV - Part 1: General requirements and requirements for transformers with highest voltage for equipment not exceeding 24 kV NOTE: D139/C140: To delete the Swiss A-deviation in HD 428.1 S1:1992 (PR=205) dor : - doa : - dop : - dow : -
HD 538.1 S1:1992/AC:2011 (PR=23795) CLC/TC 14 Stage : 6060 Three-phase dry-type distribution transformers 50 Hz, from 100 to 2500 kVA, with highest voltage for equipment not exceeding 36 kV - Part 1: General requirements and requirements for transformers with highest voltage for equipment not exceeding 24 kV NOTE: D139/C137: to delete the Swiss A deviation in HD 538.1 S1:1992 (PR=212) dor : - doa : - dop : - dow : -
HD 60364-4-442:2012 (PR=21347) IEC 60364-4-44:2007 (CLAUSE 442) (Modified) CLC/TC 64 IEC/TC 64 Stage : 6060 Low-voltage electrical installations - Part 4-442: Protection for safety - Protection of low-voltage installations against
temporary overvoltages due to earth faults in the high-voltage system and due to faults in the low voltage system NOTE: Publication editing allocated to [email protected] * Formal vote on Clause 442 only (Clauses 443 &
445 remaining unchanged - Clause 444 being handled by pr=16993) dor : 2011-12-07 doa : 2012-06-07 dop : 2012-12-07 dow : 2014-12-07
HD 60364-4-444:2010/AC:2012 (PR=23970) CLC/TC 64 Stage : 6060 Low-voltage electrical installations - Part 4-444: Protection for safety - Protection against voltage disturbances and
electromagnetic disturbances dor : - doa : - dop : - dow : -
HD 60364-5-54:2011 (PR=22820) IEC 60364-5-54:2011 CLC/TC 64 IEC/TC 64 // Stage : 6060 Low-voltage electrical installations - Part 5-54: Selection and erection of electrical equipment - Earthing
arrangements and protective conductors NOTE: Supersedes HD 60364-5-54:2007 * Incorporates FprHD 60364-5-54:2010/FprAA:2011 (pr=23335) with the
implementation dates of FprAA dor : 2011-04-27 doa : 2011-10-27 dop : 2012-04-27 dow : 2014-04-27
HD 60364-5-56:2010/A1:2011 (PR=23186) CLC/TC 64 Stage : 6060 Low-voltage electrical installations - Part 5-56: Selection and erection of electrical equipment - Safety services NOTE: Publication editing allocated to [email protected] dor : 2011-12-12 doa : 2012-06-12 dop : 2012-12-12 dow : 2014-12-12
Publications available since May 30,2011 71
CENELEC Inventory of Technical Activities
HD 60364-5-559:2012 (PR=23208) IEC 60364-5-55:2011 (Modified) CLC/TC 64 IEC/TC 64 // Stage : 6060 Low-voltage electrical installations - Part 5-559: Selection and erection of electrical equipment - Luminaires and
lighting installations NOTE: Supersedes HD 60364-5-559:2005 + corr. Oct.2007 * HD based only on Clause 559 of IEC 60364-5- 55:2001/A3 which became new edition at FDIS * Incorporates FprAA (PR=23624) covering CMs * 2012-03-14: Publication editing allocated to [email protected] dor : 2012-03-14 doa : 2012-09-14 dop : 2013-03-14 dow : 2015-03-14
HD 60364-7-701:2007/AC:2011 (PR=23794) CLC/TC 64 Stage : 6060 Low-voltage electrical installations - Part 7-701: Requirements for special installations or locations - Locations
containing a bath or shower NOTE: D139/C136: to delete the Austrian A deviation in HD 60364-7-701:2007 (PR=16051), Subclause 701.55 dor : - doa : - dop : - dow : -
HD 60364-7-701:2007/A11:2011 (PR=23672) CLC/TC 64 Stage : 6060 Low-voltage electrical installations - Part 7-701: Requirements for special installations or locations - Locations
containing a bath or shower NOTE: 2011-10-18: Publication editing allocated to [email protected] dor : 2011-11-01 doa : 2012-02-01 dop : 2012-05-01 dow : 2012-08-01
HD 60364-7-709:2009/A1:2012 (PR=23207) IEC 60364-7-709:2007/A1:2012 CLC/TC 64 IEC/TC 64 // Stage : 6060 Low-voltage electrical installations - Part 7-709: Requirements for special installations or locations - Marinas and
similar locations NOTE: 2012-02-24: Publication editing allocated to [email protected] dor : 2012-03-21 doa : 2012-06-21 dop : 2012-12-21 dow : 2015-03-21
HD 60364-7-710:2012 (PR=2282) IEC 60364-7-710:2002 (Modified) CLC/TC 64 IEC/TC 64 Stage : 6060 Low-voltage electrical installations - Part 7-710: Requirements for special installations or locations - Medical
locations NOTE: 2011-12-05 - Publications editing allocated to [email protected] dor : 2012-01-09 doa : 2012-07-09 dop : 2013-01-09 dow : 2015-01-09
HD 60364-7-714:2012 (PR=23155) IEC 60364-7-714:2011 CLC/TC 64 IEC/TC 64 // Stage : 6060 Low-voltage electrical installations - Part 7-714: Requirements for special installations or locations - External
lighting installations NOTE: 2012-03-14: Publication editing allocated to [email protected] * Supersedes HD 384.7.714
S1:2000 dor : 2012-03-14 doa : 2012-06-14 dop : 2012-12-14 dow : 2015-03-14
Publications available since May 30,2011 72
CENELEC Inventory of Technical Activities
HD 60364-7-715:2012 (PR=23156) IEC 60364-7-715:2011 (Modified) CLC/TC 64 IEC/TC 64 // Stage : 6060 Low-voltage electrical installations - Part 7-715: Requirements for special installations or locations - Extra-low-
voltage lighting installations NOTE: 2012-01-20 - Publication editing allocated to cpalagi@cencenelec. * Supersedes HD 60364-7-715:2005 *
Incorporates FprAA (PR=23623) covering CMs dor : 2012-01-18 doa : 2012-07-18 dop : 2013-01-18 dow : 2015-01-18
HD 60364-7-722:2012 (PR=23274) CLC/TC 64 Stage : 6060 Low voltage electrical installations - Part 7-722: Requirements for special installations or locations - Supply of
electric vehicle NOTE: 2011-12-20 - Publication editing allocated to [email protected] * dor : 2012-01-23 doa : 2012-07-23 dop : 2013-01-23 dow : 2015-01-23
TR : Technical Reports
CLC/TR 50173-99-3:2012 (PR=21331) CLC/TC 215 Stage : 6060 Information technology - Generic cabling systems - Part 99-3: Home cabling infrastructures up to 50 m in length to
support simultaneous and non simultaneous provision of applications NOTE: 2012-01-18 - Publication editing allocated to [email protected] * Vilamoura notification
BT/FR0178/NOT referred to CLC/TC 215 dor : 2012-02-20 doa : - dop : - dow : -
CLC/TR 50491-6-3:2011 (PR=23293) CLC/TC 205 Stage : 6060 General requirements for Home and Building Electronic Systems (HBES) and Building Automation and Control
Systems (BACS) - Part 6-3: HBES installations - Assessment and definition of levels NOTE: 2011-10-17: Publication editing allocated to [email protected] dor : 2011-11-21 doa : - dop : - dow : -
CLC/TR 62662:2011 (PR=23256) IEC/TR 62662:2010 CLC/SR 36 IEC/TC 36 Stage : 6060 Guidance for production, testing and diagnostics of polymer insulators with respect to brittle fracture of core
materials dor : 2011-10-24 doa : - dop : - dow : -
CLC/TR 62685:2011 (PR=23434) IEC/TR 62685:2010 CLC/TC 65X IEC/SC 65C Stage : 6060 Industrial communication networks - Profiles - Assessment guideline for safety devices using IEC 61784-3
functional safety communication profiles (FSCPs) NOTE: Endorsement of IEC/TR at European level dor : 2011-10-03 doa : - dop : - dow : -
CEN/CLC/ETSI/TR
CEN/CLC/ETSI/TR 50572:2011 (PR=23622) CLC/CLC/ETSI SMCG Stage : 6060 Functional reference architecture for communications in smart metering systems NOTE: Publication editing allocated to [email protected] * CEN/CLC/ETSI for vote under CENELEC
lead as a TR
Publications available since May 30,2011 73
CENELEC Inventory of Technical Activities
TS : Technical Specifications
CLC/TS 50131-2-8:2012 (PR=22572) CLC/TC 79 Stage : 6060 Alarm systems - Intrusion and hold-up systems - Part 2-8: Intrusion detectors - Shock detectors NOTE: 2011-12-20 - Publication editing allocated to [email protected] * Handled by WG 2 dor : 2012-01-23 doa : 2012-07-23 dop : - dow : -
CLC/TS 50562:2011 (PR=21759) CLC/SC 9XC Stage : 6060 Railway applications - Fixed installations - Process, measures and demonstration of safety for electric traction
systems NOTE: 2011-04-19 - Publication editing allocated to [email protected] * Work related to revision of EN
50126 series dor : 2011-05-24 doa : 2011-11-24 dop : - dow: -
CLC/TS 62441:2012 (PR=23363) IEC/TS 62441:2011 CLC/TC 108X IEC/TC 108 Stage : 6060 Safeguards against accidentally caused candle flame ignition for audio/video, communication and information
technology equipment NOTE: 2011-12-20 - Publication editing allocated to [email protected] * Supersedes CLC/TS 62441:2007 dor : 2012-01-23 doa : 2012-07-23 dop : - dow: -
CLC Guides
CLC Guide 1:2012 (PR=24029) CLC/AG Stage : 6060 Survey of Resolutions of the CENELEC General Assembly NOTE: 2012-02-15 - Publication editing allocated to [email protected] * Supersedes CLC/Guide 1:2011 ed 10 dor : - doa : - dop : - dow : -
CEN/CLC Guide
CEN/CLC Guide 8:2011 (PR=23944) CLC/AG Stage : 6060 CEN-CENELEC Guidelines for Implementation of the Common IPR Policy on Patent (and other statutory
intellectual property rights based on inventions) NOTE: 2011-12-16 - Publication allocated to [email protected] * Will supersede CEN/CLC Guide 8:2010 dor : 2011-12-14 doa : 2012-06-14 dop : 2012-12-14 dow: 2014-12-14
CEN/CLC Guide 20:2011 (PR=23614) CLC/AG Stage : 6060 Guide on Membership Criteria of CEN and CENELEC NOTE: CEN/CLC Guide approved by CEN/CA and CLC/CA through decision 129/04 taken on 2011-06-07. dor : - doa : 2011-06-17 dop : 2011-06-17 dow : 2011-06-17
CEN/CLC Guide 21:2012 (PR=23969) CLC/AG Stage : 6060 CEN-CENELEC Membership Fee - Calculation methodology and periodic review policy NOTE: CENELEC CA Decision 130/06 – CEN CA Resolution 38/2011: Revision of the ‘CEN-CENELEC
Membership Calculation Policy’ to be published as a CEN-CENELEC guide dor : 2012-01-09 doa : - dop : - dow : -
Publications available since May 30,2011 74
CENELEC Inventory of Technical Activities
CENELEC Technical Bodies and meetings
CENELEC Technical Committees and Subcommittees
TC 2 Rotating machinery TC 8X System aspects of electrical energy supply TC 9X Electrical and electronic applications for railways SC 9XA Communication, signalling and processing systems SC 9XB Electromechanical material on board rolling stock SC 9XC Electric supply and earthing systems for public transport equipment and ancillary apparatus (Fixed installations) TC 11 Overhead electrical lines exceeding 1 kV a.c. (1,5 kV d.c.) TC 13 Equipment for electrical energy measurement and load control TC 14 Power transformers TC 17AC High-voltage switchgear and controlgear TC 17B Low-voltage switchgear and controlgear TC 17D (dormant) Low-voltage switchgear and controlgear assemblies TC 18X Electrical installations of ships and of mobile and fixed offshore units TC 20 Electric cables TC 21X Secondary cells and batteries TC 22X Power electronics TC 23BX Switches, boxes and enclosures for household and similar purposes, plugs and socket outlets for d.c. and for the charging of electrical vehicles including their connectors TC 23E Circuit breakers and similar devices for household and similar applications TC 26A Electric arc welding equipment TC 26B Electric resistance welding TC 31 Electrical apparatus for potentially explosive atmospheres SC 31-1 Installation rules SC 31-2 (dormant) Flameproof enclosures "d" SC 31-3 (dormant) Intrinsically safe apparatus and systems "i" SC 31-4 (dormant) Increased safety "e" SC 31-5 (dormant) Apparatus type of protection "n" SC 31-7 (dormant) Pressurization and other techniques SC 31-8 Electrostatic painting and finishing equipment SC 31-9 Electrical apparatus for the detection and measurement of combustible gases to be used in industrial and commercial potentially explosive atmospheres TC 34Z Luminaires and associated equipment TC 36A Insulated bushings TC 37A Low voltage surge protective devices TC 38 Instrument transformers TC 40XA Capacitors and EMI suppression components TC 40XB Resistors TC 44X Safety of machinery: electrotechnical aspects TC 45AX Instrumentation and control of nuclear facilities TC 45B Radiation protection instrumentation TC 46X Communication cables SC 46XA Coaxial cables SC 46XC Multicore, multipair and quad data communication cables TC 55 Winding wires TC 57 Power systems management and associated information exchange TC 59X Performance of household and similar electrical appliances TC 61 Safety of household and similar electrical appliances TC 62 Electrical equipment in medical practice TC 64 Electrical installations and protection against electric shock TC 65X Industrial-process measurement, control and automation TC 69X Electrical systems for electric road vehicles TC 72 Automatic controls for household use TC 76 Optical radiation safety and laser equipment TC 78 Equipment and tools for live working TC 79 Alarm systems TC 81X Lightning protection TC 82 Solar photovoltaic energy systems
CENELEC Technical Bodies and meetings 75
CENELEC Inventory of Technical Activities
TC 86A Optical fibres and optical fibre cables TC 86BXA Fibre optic interconnect, passive and connectorised components TC 88 Wind turbines TC 94 (dormant) Relays TC 97 Electrical installations for lighting and beaconing of aerodromes TC 99X Power installations exceeding 1 kV a.c. (1,5 kV d.c.) TC 100X Audio, video and multimedia systems and equipment and related sub-systems TC 106X Electromagnetic fields in the human environment TC 107X (dormant) Process management for avionics TC 108X Safety of electronic equipment within the fields of Audio/Video, Information Technology and Communication Technology TC 111X Environment TC 116 Safety of motor-operated electric tools TC 204 Safety of electrostatic painting and finishing equipment TC 205 Home and Building Electronic Systems (HBES) SC 205A Mains communicating systems TC 206 Consumer equipment for entertainment and information and related sub-systems TC 209 Cable networks for television signals, sound signals and interactive services TC 210 Electromagnetic Compatibility (EMC) TC 213 Cable management systems TC 215 Electrotechnical aspects of telecommunication equipment TC 216 Gas detectors
CENELEC Technical Bodies and meetings 76
CENELEC Inventory of Technical Activities
CENELEC BT Task Forces and BT Working Groups
BTTF 62-3 Operation of electrical installations BTTF 69-3 Road traffic signal systems BTTF 76-3 Test schedules related to CENELEC Guide 17 BTWG 80-3 Database and electronic communications BTWG 101-5 Usability and safety of electrical products with reference to people with special needs BTWG 112-1 (dormant) Improvement of EN 60309-1 and EN 60309-2 BTTF 116-1 Fluids for electrotechnical applications BTTF 116-2 Alcohol interlocks BTWG 126-2 Internal regulations BTTF 128-2 Erection and operation of electrical test equipment BTWG 128-3 BT efficiency BTTF 129-1 Thermal resistant aluminium alloy wire for overhead line conductor BTTF 132-1 Aluminium conductors steel supported (ACSS type) for overhead electrical lines BTTF 132-2 Revision of EN 50156 "Electrical equipment for furnaces and ancillary equipment" BTTF 133-1 Sound systems for emergency purposes which are not part of fire detection and alarm systems BTWG 138-1 CENELEC/BT action plan
CEN/CENELEC Technical Committees
TC 1 Criteria for conformity assessment bodies TC 2 CEN/CENELEC Joint Technical Group Power Engineering TC 3 Quality management and corresponding general aspects for medical devices TC 4 Project committee - Services for fire safety and security systems TC 5 Space JWG 1 Energy audits JWG 2 Guarantees of origin and energy certificates JWG 3 Energy Management and related services - General requirements and qualification procedures JWG 4 Energy Efficiency and Saving Calculations JWG AIMD CEN/CENELEC Joint Working Group Active Implantable Medical Devices JWG CBU Underground plastic conduits for protection of cables JWG CMI CEN/CENELEC Joint Working Group Continuous Measuring Instruments JWG FCGA Fuel cell gas appliances JWG FPR Fire protection for railway applications JWG NAWI Non automatic weighing instruments JWG PPE Electrostatic risks JWG RRM CEN/CENELEC Joint Working Group Remote Reading of Meters
CENELEC Technical Bodies and meetings 77
CENELEC Inventory of Technical Activities
Guidance on how to read CENELEC Report on Technical Activities
Classification of activities and information listed
* Classification a) The technical activities are listed in 4 parts, the first one for the direct endorsement by Technical Board, if necessary with the help of CENELEC Reporting Secretariats and specialised Working Groups & Task Forces. Then, the harmonization work performed by BTTFs/BTWGs and Technical Committees, followed by common CEN/CENELEC technical activities. b) The items of work are grouped, within each technical body's programme of work (SR or TC), according to their stage of progress. In the BT/SR programme of work the items are sorted additionally according to the technical domain, i.e. to the relevant IEC TC/SC.
System of stage codification has been established to record the work item progress by ISO, IEC, CEN and CENELEC (See progress stage codification).
The groups of stage codes under which the work items are classified within each TC are listed (see groups of stage codes).
* Work item contents
The items of work listed in the sections of this report, which are relative to SRs and TCs activities are composed of the following fields: a) Left margin indications:
shows a work item subject to a CE or EFTA Order Voucher. shows a work item that has been created or updated since the last report
b) The reference of the CENELEC document.
Examples:
EN 60335-2-28:2005 : Standard published or ratified prEN 60335-2-28 : Draft standard
HD 444 S3:2003/A1:2005 : Amendment 1, published or ratified, to HD EN 50001:2003/prA1 : Draft amendment 1 to EN EN 50001:2003/prAB : Draft amendment B (not yet numbered) to EN EN 60001:2003/prA11 : Draft amendment of purely CENELEC origin EN 60335-2-10:2003/prA51 : Draft amendment of purely CENELEC origin for CLC/TC 61
CLC/TR 50373:2004 : Published Technical Report CLC/prTR 60825 : Draft Technical Report CLC/TS 61496:2003 : Published Technical Specification CLC/prTS 50131-4 : Draft Technical Specification
Guidance on how to read 78
CENELEC Inventory of Technical Activities
c) The project number, i.e. the identifier of a project throughout its life. this number is under brackets after the project reference (example: (PR=13204))
d) The reference of the related international document.
Examples: IEC 60384-4:200X (40/1759/CDV) : Committee Draft for Vote IEC 60335-2-35:200X (61/3088/FDIS) : Draft International Standard IEC 60364-5-537:1981 : International Standard IEC 60436:1981/A1:1984 : Amendment to an International Standard
Note: The reference of the related document is indicated as follows: Reference alone when the CENELEC project is equivalent to the IEC document Reference + (Modified) when the CENELEC project contains common modifications compared with the IEC document
e) The relevant CLC and/or IEC Technical Committees
f) The current stage code of the CENELEC project followed by an arrow and the expected date for the next stage. (example: 3099 2006-09-18 means: Enquiry decided and scheduled mid September 2006)
The next stage code is determined by the procedures described in the CEN/CENELEC Common Rules and the target dates are those provided by the Technical Committees or are evaluated by CS.
g) The estimated target date for vote (given by the Technical Body when new work item is requested to BT or set by default to 2 years if no date is given by the Technical Body). 1 extension of target date for vote of maximum 1 year can be requested if necessary.
Note: In case of parallel enquiry, the target date for vote is not fixed as depending from IEC.
h) The title of the CENELEC document.
i) The indication of an EN/EFTA Order Voucher, if applicable, following the word "Mandated"
The existence of an Order Voucher is also indicated by a in the left margin.
i) The note gives additional information, if appropriate.
Guidance on how to read 79
CENELEC Inventory of Technical Activities
* Abbreviations
BT Technical Board prEN Draft EN BTTF BT Task Force prHD Draft HD BTWG BT Working Group A Amendment to an EN or HD CA Administration Board prA Draft amendment CLC CENELEC CLC/TS Technical specification CLC/prTS Draft Technical specification NC CENELEC National Committee PD Permanent Delegate NWI New work item TC Technical Committee SC Subcommittee dor Date of ratification WG Working Group dav Date of availability CM Common modification doa Date of announcement SNC Special National Condition dop Date of publication dow Date of withdrawal PQ Primary Questionnaire UQ Updating Questionnaire DXXX/YYY BT XXX decision N° YYY 5MP CENELEC Enquiry (5 months ex: D126/032: 32nd decision of 126 BT procedure) 2,3,4MP Second CENELEC Enquiry DXXX/CYYY BT decision by correspondence (2 to 4 months) 2MV Formal Vote (2 months) CDV IEC Committee Draft for Vote UAP Unique Acceptance Procedure FDIS Draft International Standard (5 months)
* Deliverables
EN European Standard HD Harmonisation Document TR Technical Report TS Technical Specification CWA CENELEC Workshop Agreement IS Interpretation sheet
ENV European prestandard (*) ES European Specification (*) Report CENELEC Report (*) SPEC CECC specification (document developed by the former CECC forum regarding electronic components).
(*) These types of deliverables are not published anymore and are progressively withdrawn or converted (into ENs, TSs or TRs).
Guidance on how to read 80
CENELEC Inventory of Technical Activities
Groups of stage codes
The items of work in the listings which follow are sorted in principle according to their stage code. These listings would however not be very user's friendly to list individually every detail step of the progress. For this reason, stage codes corresponding to close steps of progress have been grouped under global headings according to the following table:
Published (*) : 6060 – 6560 – 9598
Under withdrawal procedure : 9500 – 9520 – 9560 – 9561 - 9562
Ratified : 5099 – 6000 - 6020
Vote launched : 5020 – 5021 - 5060 – 5061 – 5062 – 5063 - 5091 - 5093 – 5095
Vote decided : 1090 – 1590 – 1599 – 3090 – 4090 – 4099 – 5000
Enquiry launched : 4020 – 4021 - 4060 – 4061 – 4062 – 4091 – 4095
Enquiry decided : 3099 – 4000 – 4093
At Secretariat stage : 2020 – 2060 – 2091 – 2093 – 2095 – 2099 - 3020 – 3060 – 3091 – 3092 – 3093 – 3095 – 4092 – 5092
PQ, UQ launched : 1520 – 1521 - 1560 – 1561 – 1562 – 1591 – 1595
New work item approved : 1099 – 1500
Work stopped (**) : 0098 – 1098 – 1598 – 2098 – 3098 – 4098 – 5098
New work item to be approved (BT/TC) (***) : 0000 – 0099 - 1000 – 1020 – 1021 – 1061 – 1062 – 1091 – 1095 – 1592
(*) Only the items published during the last 12 months are listed (**) Only the items stopped during the last 12 months are listed (***) Mostly NWI recently requested by a technical body and waiting BT approval
Guidance on how to read 81
CENELEC Inventory of Technical Activities
Progress stage codification
The following table is based on the code classification approved by ISO, IEC, CEN and CENELEC, some additional codes were introduced for the needs of automatic handling for the CENELEC database
NEW PHASE SITUATION CODE 00 Definition of new Registration of concept for new W1, national proposal for new WI, proposal for 0000 project mandate 0098 Decision to drop work - Standstill maintained / released
0099 Acceptance by Technical Body of new W1 / national proposal
10 Evaluation of concrete 1000 Registration of New Work Item request to be approved by BT proposal 1020 Proposal of RD to Technical Body
1021 Proposal of RD to BT
1061 TC proposal on RD sent to BT by correspondence
1062 TC proposal on RD presented to BT meeting
1090 Decision to launch vote
1091 Decision deferred / Advice expected / Wait evolution of another project
1095 Decision to transfer work to NC / another body - Standstill maintained
1098 Decision to drop work - Standstill maintained / released
1099 Decision to proceed: launch PQ / UQ or prepare draft for circulation
15 Evaluation of interest 1500 Document available for PQ / UQ 1520 Circulation of PQ / UQ
1521 PQ / UQ circulated by another organization
1560 PQ/UQ results established and sent to Technical Body
1561 PQ/UQ results established and sent to BT by correspondence
1562 PQ/UQ results established and presented to BT meeting
Decision on PQ/UQ results deferred / Advice expected / Wait evolution of 1591 another project 1595 Decision to transfer project to another body
1598 Decision to drop project - Standstill maintained / released
1599 Decision to proceed and launch vote
20 Drafting 2020 Draft in preparation in IEC / CLC Technical Body 2060 Preparation of draft completed
2091 Decision on draft deferred / Wait evolution of another project
2093 Decision to prepare amended draft
2095 Decision to transfer project to another body
2098 Decision to drop project - Standstill maintained / released
2099 Decision to proceed to consensus phase with draft
Guidance on how to read 82
CENELEC Inventory of Technical Activities
NEW PHASE SITUATION CODE 30 Consensus building 3020 Draft circulated for comments 3060 Comments on draft dispatched
3090 Decision to accelerate procedure and launch vote
3091 Decision on draft deferred / Wait evolution of another project
3092 Decision to return to drafting phase
3093 Decision to circulate amended draft
3095 Decision to transfer work to another body
3098 Decision to drop project - Standstill maintained / released
3099 Decision to send to enquiry / accelerate procedure and launch vote
40 Enquiry 4000 Document available for enquiry 4020 Enquiry circulated
4021 Enquiry circulated by another organization
4060 Enquiry results established and sent to Technical Body
4061 Enquiry results established and sent to BT by correspondence
4062 Enquiry results established and presented to BT meeting
4090 Decision to launch vote
4091 Decision deferred / Wait evolution of another project
4092 Decision to return to drafting phase
4093 Decision to circulate amended draft (second enquiry)
4095 Decision to transfer work to another body
4098 Decision to drop project – Standstill maintained / released
4099 Decision to launch vote
50 Formal Approval 5000 Document available for vote 5020 Vote circulated
5021 Vote circulated by another organization
5060 Voting results sent to Technical Body, SR
5061 Voting results sent to BT for ratification by correspondence
Voting results presented to BT meeting for ratification (those not ratified by 5062 correspondence) Appeal procedure from a CENELEC member - Voting results submitted to 5063 AG, CA 5091 Decision on voting results deferred / Advice expected
5092 Decision to return to consensus / enquiry phase (same body)
5093 Decision to circulate amended draft (second vote)
5095 Decision to transfer work to another body
5098 Decision to drop project - Standstill maintained / released
5099 Project ratified - Proceed to publication phase
60 Publishing 6000 Report / Guide / Withdrawal of SNCs or Deviations ratified 6020 CLC document being finalized
6060 Document made available
65 Implementation 6560 Implementation completed 95 Withdrawal 9500 Proposition to withdraw 9520 Initiation of withdrawal vote
9560 Results sent to Technical Body, SR
9562 Results sent to BT
9598 Decision not to withdraw
9599 Decision to withdraw
Guidance on how to read 83
CENELEC Inventory of Technical Activities
Technical Board / Reporting secretariats activities
Published (last 12 months)
EN 62023:2012 (PR=23083) IEC 62023:2011 + corrigendum Feb. 2012 CLC/SR 3 IEC/TC 3 // Stage : 6060 Structuring of technical information and documentation NOTE: Supersedes EN 62023:2000 * 2011-10-28: Publication editing allocated to [email protected] dor : 2011-11-23 doa : 2012-02-23 dop : 2012-08-23 dow: 2014-11-23
EN 62027:2012 (PR=23084) IEC 62027:2011 CLC/SR 3 IEC/TC 3 // Stage : 6060 Preparation of object lists, including parts lists NOTE: Supersedes EN 62027:2000 * 2011-10-18: Publication editing allocated to [email protected] dor : 2011-11-16 doa : 2012-02-16 dop : 2012-08-16 dow: 2014-11-16
EN 80416-3:2002/A1:2011 (PR=22892) IEC 80416-3:2002/A1:2011 CLC/SR 3C IEC/SC 3C // Stage : 6060 Basic principles for graphical symbols for use on equipment - Part 3: Guidelines for the application of graphical
symbols dor : 2011-08-16 doa : 2011-11-16 dop : 2012-05-16 dow : 2014-08-16
EN 61394:2011 (PR=22160) IEC 61394:2011 CLC/SR 7 IEC/TC 7 // Stage : 6060 Overhead lines - Requirements for greases for aluminium, aluminium alloy and steel bare conductors dor : 2011-11-16 doa : 2012-02-16 dop : 2012-08-16 dow: 2014-11-16
EN 60296:2012 (PR=23085) IEC 60296:2012 CLC/SR 10 IEC/TC 10 // Stage : 6060 Fluids for electrotechnical applications - Unused mineral insulating oils for transformers and switchgear NOTE: Supersedes EN 60296:2004*2012-02-24: Publication editing allocated to [email protected] dor : 2012-03-26 doa : 2012-06-26 dop : 2012-12-26 dow: 2015-03-26
EN 60475:2011 (PR=23086) IEC 60475:2011 CLC/SR 10 IEC/TC 10 // Stage : 6060 Method of sampling insulating liquids NOTE: IEC 60475 and IEC 60567 to be consulted together as a part of IEC 60567 has been transferred in IEC
60475*2011-10-28: Publication editing allocated to [email protected] dor : 2011-11-24 doa : 2012-02-24 dop : 2012-08-24 dow: 2014-11-24
EN 60567:2011 (PR=23087) IEC 60567:2011 CLC/SR 10 IEC/TC 10 // Stage : 6060 Oil-filled electrical equipment - Sampling of gases and analysis of free and dissolved gases - Guidance NOTE: Supersedes EN 60567:2005 * IEC 60475 and IEC 60567 to be consulted together as a part of IEC 60567 has
been transferred in IEC 60475*2011-10-28: Publication editing allocated to [email protected] dor : 2011-11-24 doa : 2012-02-24 dop : 2012-08-24 dow: 2014-11-24
TB/SR Activities 84
CENELEC Inventory of Technical Activities
EN 60626-1:2012 (PR=22004) IEC 60626-1:2009 CLC/SR 15 IEC/TC 15 // Stage : 6060 Combined flexible materials for electrical insulation - Part 1: Definitions and general requirements NOTE: Supersedes EN 60626-1:1995 + A1:1996 dor : 2012-03-23 doa : 2012-06-23 dop : 2012-12-23 dow: 2015-03-23
EN 60674-3-1:1998/A1:2011 (PR=23040) IEC 60674-3-1:1998/A1:2011 CLC/SR 15 IEC/TC 15 // Stage : 6060 Plastic films for electrical purposes - Part 3: Specifications for individual materials - Sheet 1: Biaxially oriented
polypropylene (PP) film for capacitors dor : 2011-10-18 doa : 2012-01-18 dop : 2012-07-18 dow : 2014-10-18
EN 60674-3-8:2011 (PR=22372) IEC 60674-3-8:2011 CLC/SR 15 IEC/TC 15 // Stage : 6060 Plastic films for electrical purposes - Part 3: Specifications for individual materials - Sheet 8: Balanced biaxially
oriented polyethylene naphthalate (PEN) films used for electrical insulation NOTE: 2011-07-18: Allocated to [email protected] dor : 2011-08-17 doa : 2011-11-17 dop : 2012-05-17 dow : 2014-08-17
EN 60684-2:2011 (PR=22685) IEC 60684-2:2011 CLC/SR 15 IEC/TC 15 // Stage : 6060 Flexible insulating sleeving - Part 2: Methods of test NOTE: Supersedes EN 60684-2:1997 + A1:2003 + A2:2005 dor : 2011-09-14 doa : 2011-12-14 dop : 2012-06-14 dow : 2014-09-14
EN 60684-3-116:2011 (PR=22144) IEC 60684-3-116:2010 CLC/SR 15 IEC/TC 15 // Stage : 6060 Flexible insulating sleeving - Part 3: Specifications for individual types of sleeving - Sheets 116 and 117: Extruded
polychloroprene, general purpose NOTE: Supersedes EN 60684-3-116 & 117:2003 dor : 2010-07-20 doa : 2011-02-11 dop : 2012-05-11 dow : 2013-07-20
EN 60684-3-205:2011 (PR=22762) IEC 60684-3-205:2011 CLC/SR 15 IEC/TC 15 // Stage : 6060 Flexible insulating sleeving - Part 3: Specifications for individual types of sleeving - Sheet 205: Heat-shrinkable
chlorinated polyolefin sleeving, flame retarded, nominal shrink ratio 1,7:1 and 2:1 NOTE: 2011-06-27: Allocated to [email protected] dor : 2011-07-26 doa : 2011-10-26 dop : 2012-04-26 dow : 2014-07-26
EN 60684-3-247:2011 (PR=22763) IEC 60684-3-247:2011 CLC/SR 15 IEC/TC 15 // Stage : 6060 Flexible insulating sleeving - Part 3: Specifications for individual types of sleeving - Sheet 247: Heat-shrinkable
polyolefin sleeving, dual wall, not flame retarded, thick and medium wall dor : 2011-07-28 doa : 2011-10-28 dop : 2012-04-28 dow : 2014-07-28
TB/SR Activities 85
CENELEC Inventory of Technical Activities
EN 60684-3-271:2011 (PR=22686) IEC 60684-3-271:2011 CLC/SR 15 IEC/TC 15 // Stage : 6060 Flexible insulating sleeving - Part 3: Specifications for individual types of sleeving - Sheet 271: Heat-shrinkable
elastomer sleevings, flame retarded, fluid resistant, shrink ratio 2:1 NOTE: Supersedes EN 60684-3-271:2004 dor : 2011-07-26 doa : 2011-10-26 dop : 2012-04-26 dow : 2014-07-26
EN 60819-1:2012 (PR=22006) IEC 60819-1:2009 CLC/SR 15 IEC/TC 15 // Stage : 6060 Non-cellulosic papers for electrical purposes - Part 1: Definitions and general requirements NOTE: 2012-01-06 - Publication editing allocated to [email protected] * Supersedes EN 60819-1:1995 +
A1:1996. dor : 2012-02-14 doa : 2012-05-14 dop : 2012-11-14 dow: 2015-02-14
EN 60819-3-3:2011 (PR=23384) IEC 60819-3-3:2011 CLC/SR 15 IEC/TC 15 // Stage : 6060 Non-cellulosic papers for electrical purposes - Part 3: Specifications for individual materials - Sheet 3: Unfilled
aramid (aromatic polyamide) papers NOTE: 2011-09-22: Publication editing allocated to [email protected] * Supersedes EN 60819-3-
3:2006 dor : 2011-10-18 doa : 2012-01-18 dop : 2012-07-18 dow : 2014-10-18
EN 60893-3-2:2004/A1:2011 (PR=22271) IEC 60893-3-2:2003/A1:2011 CLC/SR 15 IEC/TC 15 // Stage : 6060 Insulating materials - Industrial rigid laminated sheets based on thermosetting resins for electrical purposes - Part 3-
2: Specifications for individual materials - Requirements for rigid laminated sheets based on epoxy resins dor : 2011-07-01 doa : 2011-10-01 dop : 2012-04-01 dow : 2014-07-01
EN 61439-1:2011 (PR=22861) IEC 61439-1:2011 CLC/SR 17D IEC/SC 17D EMC (2004/108/EC) LVD (2006/95/EC) // Stage : 6060 Low-voltage switchgear and controlgear assemblies - Part 1: General rules NOTE: Supersedes EN 61439-1:2009 * Initially handled by CLC/TC 17D (dormant) dor : 2011-09-23 doa : 2011-12-23 dop : 2012-06-23 dow : 2014-09-23
EN 61439-2:2011 (PR=22862) IEC 61439-2:2011 CLC/SR 17D IEC/SC 17D EMC (2004/108/EC) LVD (2006/95/EC) // Stage : 6060 Low-voltage switchgear and controlgear assemblies - Part 2: Power switchgear and controlgear assemblies NOTE: Supersedes EN 61439-2:2009 * To be read in conjunction with EN 61439-1:201X * Initially handled by
CLC/TC 17D (dormant) dor : 2011-09-23 doa : 2011-12-23 dop : 2012-06-23 dow : 2014-09-23
EN 61439-3:2012 (PR=23019) IEC 61439-3:2012 CLC/SR 17D IEC/SC 17D EMC (2004/108/EC) LVD (2006/95/EC) // Stage : 6060 Low-voltage switchgear and controlgear assemblies - Part 3: Distribution boards intended to be operated by ordinary
persons (DBO) NOTE: Supersedes EN 60439-3:1991 + A1:1994 + A2:2001 * 2012-02-24: Publication editing allocated to
[email protected] dor : 2012-03-22 doa : 2012-06-22 dop : 2012-12-22 dow: 2015-03-22
TB/SR Activities 86
CENELEC Inventory of Technical Activities
EN 62208:2011 (PR=22816) IEC 62208:2011 CLC/SR 17D IEC/SC 17D LVD (2006/95/EC) // Stage : 6060 Empty enclosures for low-voltage switchgear and controlgear assemblies - General requirements NOTE: Supersedes EN 62208:2003 * Initially handled by CLC/TC 17D (dormant) dor : 2011-09-23 doa : 2011-12-23 dop : 2012-06-23 dow : 2014-09-23
EN 61534-1:2011 (PR=22837) IEC 61534-1:2011 CLC/SR 23A IEC/SC 23A LVD (2006/95/EC) // Stage : 6060 Powertrack systems - Part 1: General requirements NOTE: Supersedes EN 61534-1:2003 dor : 2011-06-22 doa : 2011-09-22 dop : 2012-03-22 dow : 2014-06-22
EN 60676:2012 (PR=23211) IEC 60676:2011 CLC/SR 27 IEC/TC 27 // Stage : 6060 Industrial electroheating equipment - Test methods for direct arc furnaces NOTE: Supersedes EN 60676:2002 * 2011-11-24: Publication editing allocated to [email protected] dor : 2011-12-13 doa : 2012-03-13 dop : 2012-09-13 dow: 2014-12-13
EN 60683:2012 (PR=23212) IEC 60683:2011 CLC/SR 27 IEC/TC 27 // Stage : 6060 Industrial electroheating equipment - Test methods for submerged-arc furnaces NOTE: Supersedes HD 599 S1:1992 * 2011-10-28: Publication editing allocated to [email protected] dor : 2011-11-23 doa : 2012-02-23 dop : 2012-08-23 dow: 2014-11-23
EN 61307:2011 (PR=23016) IEC 61307:2011 CLC/SR 27 IEC/TC 27 // Stage : 6060 Industrial microwave heating installations - Test methods for the determination of power output NOTE: Supersedes EN 61307:2006 dor : 2011-06-22 doa : 2011-09-22 dop : 2012-03-22 dow : 2014-06-22
EN 60118-13:2011 (PR=22365) IEC 60118-13:2011 CLC/SR 29 IEC/TC 29 // Stage : 6060 Electroacoustics - Hearing aids - Part 13: Electromagnetic compatibility (EMC) NOTE: Supersede EN 60118-13:2005 Mandated: M/432 dor : 2011-05-16 doa : 2011-08-16 dop : 2012-02-16 dow: 2014-05-16
EN 60118-15:2012 (PR=22994) IEC 60118-15:2012 CLC/SR 29 IEC/TC 29 // Stage : 6060 Electroacoustics - Hearing aids - Part 15: Methods for characterising signal processing in hearing aids with a speech-
like signal NOTE: 2012-02-24: Publication editing allocated to [email protected] dor : 2012-03-27 doa : 2012-06-27 dop : 2012-12-27 dow: 2015-03-27
TB/SR Activities 87
CENELEC Inventory of Technical Activities
EN 60127-1:2006/A1:2011 (PR=23070) IEC 60127-1:2006/A1:2011 CLC/SR 32C IEC/SC 32C LVD (2006/95/EC) // Stage : 6060 Miniature fuses - Part 1: Definitions for miniature fuses and general requirements for miniature fuse-links dor : 2011-05-25 doa : 2011-08-25 dop : 2012-02-25 dow : 2014-05-25
EN 60432-1:2000/A2:2012 (PR=23554) IEC 60432-1:1999/A2:2011 CLC/SR 34A IEC/SC 34A LVD (2006/95/EC) // Stage : 6060 Incandescent lamps - Safety specifications - Part 1: Tungsten filament lamps for domestic and similar general
lighting purposes NOTE: 2011-12-20 - Publication editing allocated to [email protected] dor : 2012-01-11 doa : 2012-04-11 dop : 2012-11-04 dow: 2015-01-11
EN 60662:2012 (PR=22726) IEC 60662:2011 (Modified) CLC/SR 34A IEC/SC 34A ERP (2009/125/EC) // Stage : 6060 High-pressure sodium vapour lamps - Performance specifications NOTE: 2011-12-02 - Publication editing allocated to [email protected] * Supersedes EN 60662:1993 +
A4:1994 + A5:1994 + A6:1994 + A7:1995 + A9:1997 + A10:1997 dor : 2012-01-02 doa : 2012-07-02 dop : 2013-01-02 dow: 2015-01-02
EN 60901:1996/A5:2012 (PR=22615) IEC 60901:1996/A5:2011 CLC/SR 34A IEC/SC 34A ERP (2009/125/EC) // Stage : 6060 Single-capped fluorescent lamps - Performance specifications NOTE: 2011-12-20 - Publication editing allocated to [email protected] dor : 2011-12-28 doa : 2012-03-28 dop : 2012-11-04 dow: 2014-12-28
EN 61199:2011 (PR=22519) IEC 61199:2011 CLC/SR 34A IEC/SC 34A LVD (2006/95/EC) // Stage : 6060 Single-capped fluorescent lamps - Safety specifications NOTE: Supersedes EN 61199:1999 dor : 2011-08-15 doa : 2011-11-15 dop : 2012-05-15 dow : 2014-08-15
EN 61341:2011 (PR=23255) IEC/TR 61341:2010 CLC/SR 34A IEC/SC 34A Stage : 6060 Method of measurement of centre beam intensity and beam angle(s) of reflector lamps NOTE: Publication editing allocated to [email protected] dor : 2011-07-04 doa : 2012-01-04 dop : 2012-07-04 dow : 2014-07-04
EN 62554:2011 (PR=22886) IEC 62554:2011 CLC/SR 34A IEC/SC 34A // Stage : 6060 Sample preparation for measurement of mercury level in fluorescent lamps dor : 2011-09-23 doa : 2011-12-23 dop : 2012-06-23 dow : 2014-09-23
EN 62639:2012 (PR=23021) IEC 62639:2012 CLC/SR 34A IEC/SC 34A // Stage : 6060 Fluorescent induction lamps - Performance specification NOTE: 2012-02-24: Publication editing allocated to [email protected] dor : 2012-03-27 doa : 2012-06-27 dop : 2012-12-27 dow: 2015-03-27
TB/SR Activities 88
CENELEC Inventory of Technical Activities
CLC/TR 62662:2011 (PR=23256) IEC/TR 62662:2010 CLC/SR 36 IEC/TC 36 Stage : 6060 Guidance for production, testing and diagnostics of polymer insulators with respect to brittle fracture of core
materials dor : 2011-10-24 doa : - dop : - dow : -
EN 61169-35:2011 (PR=22714) IEC 61169-35:2011 CLC/SR 46F IEC/SC 46F // Stage : 6060 Radio-frequency connectors - Part 35: Sectional specification for 2,92 series RF connectors dor : 2011-08-15 doa : 2011-11-15 dop : 2012-05-15 dow : 2014-08-15
EN 60749-7:2011 (PR=22606) IEC 60749-7:2011 CLC/SR 47 IEC/TC 47 // Stage : 6060 Semiconductor devices - Mechanical and climatic test methods - Part 7: Internal moisture content measurement and
the analysis of other residual gases NOTE: Supersedes EN 60749-7:2002 dor : 2011-07-22 doa : 2011-10-22 dop : 2012-04-22 dow : 2014-07-22
EN 60749-21:2011 (PR=22642) IEC 60749-21:2011 CLC/SR 47 IEC/TC 47 // Stage : 6060 Semiconductor devices - Mechanical and climatic test methods - Part 21: Solderability NOTE: Supersedes EN 60749-21:2005 dor : 2011-05-12 doa : 2011-08-12 dop : 2012-02-12 dow : 2014-05-12
EN 60749-29:2011 (PR=22643) IEC 60749-29:2011 CLC/SR 47 IEC/TC 47 // Stage : 6060 Semiconductor devices - Mechanical and climatic test methods - Part 29: Latch-up test NOTE: Supersedes EN 60749-29:2003 + corr. Mar.2004 dor : 2011-05-12 doa : 2011-08-12 dop : 2012-02-12 dow : 2014-05-12
EN 60749-30:2005/A1:2011 (PR=22605) IEC 60749-30:2005/A1:2011 CLC/SR 47 IEC/TC 47 // Stage : 6060 Semiconductor devices - Mechanical and climatic test methods - Part 30: Preconditioning of non-hermetic surface
mount devices prior to reliability testing dor : 2011-06-29 doa : 2011-09-29 dop : 2012-03-29 dow : 2014-06-29
EN 60749-40:2011 (PR=22946) IEC 60749-40:2011 CLC/SR 47 IEC/TC 47 // Stage : 6060 Semiconductor devices - Mechanical and climatic test methods - Part 40: Board level drop test method using a strain
gauge NOTE: 2011-07-18: Allocated to [email protected] dor : 2011-08-17 doa : 2011-11-17 dop : 2012-05-17 dow : 2014-08-17
TB/SR Activities 89
CENELEC Inventory of Technical Activities
EN 62258-2:2011 (PR=22625) IEC 62258-2:2011 CLC/SR 47 IEC/TC 47 // Stage : 6060 Semiconductor die products - Part 2: Exchange data formats NOTE: Supersedes EN 62258-2:2005 * To be read in conjunction with EN 62258-1 dor : 2011-06-29 doa : 2011-09-29 dop : 2012-03-29 dow : 2014-06-29
EN 61967-8:2011 (PR=22743) IEC 61967-8:2011 CLC/SR 47A IEC/SC 47A // Stage : 6060 Integrated circuits - Measurement of electromagnetic emissions - Part 8: Measurement of radiated emissions - IC
stripline method NOTE: To be read in conjunction with EN 61967-1 dor : 2011-09-15 doa : 2011-12-15 dop : 2012-06-15 dow : 2014-09-15
EN 60191-6-12:2011 (PR=23148) IEC 60191-6-12:2011 CLC/SR 47D IEC/SC 47D // Stage : 6060 Mechanical standardization of semiconductor devices - Part 6-12: General rules for the preparation of outline drawings of surface mounted semiconductor device packages - Design guidelines for fine-pitch land grid array (FLGA) NOTE: Supersedes EN 60191-6-12:2002 dor : 2011-07-13 doa : 2011-10-13 dop : 2012-04-13 dow : 2014-07-13
EN 60747-15:2012 (PR=21876) IEC 60747-15:2010 CLC/SR 47E IEC/SC 47E // Stage : 6060 Semiconductor devices - Discrete devices - Part 15: Isolated power semiconductor devices NOTE: Publication editing allocated to [email protected] * Supersedes EN 60747-15:2004 dor : 2011-01-20 doa : 2012-04-20 dop : 2012-09-16 dow: 2014-01-20
EN 62047-5:2011 (PR=22629) IEC 62047-5:2011 + corrigendum Mar. 2012 CLC/SR 47F IEC/SC 47F // Stage : 6060 Semiconductor devices - Micro-electromechanical devices - Part 5: RF MEMS switches dor : 2011-08-17 doa : 2011-11-17 dop : 2012-05-17 dow : 2014-08-17
EN 62047-7:2011 (PR=22658) IEC 62047-7:2011 CLC/SR 47F IEC/SC 47F // Stage : 6060 Semiconductor devices - Micro-electromechanical devices - Part 7: MEMS BAW filter and duplexer for radio
frequency control and selection dor : 2011-07-21 doa : 2011-10-21 dop : 2012-04-21 dow : 2014-07-21
EN 62047-9:2011 (PR=22644) IEC 62047-9:2011 + corrigendum Mar. 2012 CLC/SR 47F IEC/SC 47F // Stage : 6060 Semiconductor devices - Micro-electromechanical devices - Part 9: Wafer to wafer bonding strength measurement
for MEMS dor : 2011-08-17 doa : 2011-11-17 dop : 2012-05-17 dow : 2014-08-17
TB/SR Activities 90
CENELEC Inventory of Technical Activities
EN 62047-10:2011 (PR=23075) IEC 62047-10:2011 + corrigendum Feb. 2012 CLC/SR 47F IEC/SC 47F // Stage : 6060 Semiconductor devices - Micro-electromechanical devices - Part 10: Micro-pillar compression test for MEMS
materials dor : 2011-08-30 doa : 2011-11-30 dop : 2012-05-30 dow : 2014-08-30
EN 62047-12:2011 (PR=23076) IEC 62047-12:2011 CLC/SR 47F IEC/SC 47F // Stage : 6060 Semiconductor devices - Micro-electromechanical devices - Part 12: Bending fatigue testing method of thin film
materials using resonant vibration of MEMS structures dor : 2011-10-18 doa : 2012-01-18 dop : 2012-07-18 dow : 2014-10-18
EN 62047-13:2012 (PR=23280) IEC 62047-13:2012 CLC/SR 47F IEC/SC 47F // Stage : 6060 Semiconductor devices - Micro-electromechanical devices - Part 13: Bend- and shear- type test methods of
measuring adhesive strength for MEMS structures NOTE: 2012-03-09: Publication editing allocated to [email protected] dor : 2012-04-03 doa : 2012-07-03 dop : 2013-01-03 dow: 2015-04-03
EN 62047-14:2012 (PR=23220) IEC 62047-14:2012 CLC/SR 47F IEC/SC 47F // Stage : 6060 Semiconductor devices - Micro-electromechanical devices - Part 14: Forming limit measuring method of metallic
film materials NOTE: 2012-03-09: Publication editing allocated to [email protected] dor : 2012-04-03 doa : 2012-07-03 dop : 2013-01-03 dow: 2015-04-03
EN 60352-5:2012 (PR=23482) IEC 60352-5:2012 CLC/SR 48B IEC/SC 48B // Stage : 6060 Solderless connections - Part 5: Press-in connections - General requirements, test methods and practical guidance NOTE: Supersedes EN 60352-5:2008 * 2012-03-09: Publication editing allocated to [email protected] dor : 2012-03-28 doa : 2012-06-28 dop : 2012-12-28 dow: 2015-03-28
EN 60512-1-100:2012 (PR=23425) IEC 60512-1-100:2012 CLC/SR 48B IEC/SC 48B // Stage : 6060 Connectors for electronic equipment - Tests and measurements - Part 1-100: General - Applicable publications NOTE: Supersedes EN 60512-1-100:2006 * 2012-03-09: Publication editing allocated to [email protected] dor : 2012-03-28 doa : 2012-06-28 dop : 2012-12-28 dow: 2015-03-28
EN 60512-7-2:2012 (PR=22777) IEC 60512-7-2:2011 CLC/SR 48B IEC/SC 48B // Stage : 6060 Connectors for electronic equipment - Tests and measurements - Part 7-2: Impact tests (free connectors) - Test 7b:
Mechanical strength impact NOTE: 2011-11-24: Publication editing allocated to [email protected] dor : 2011-12-22 doa : 2012-03-22 dop : 2012-09-22 dow: 2014-12-22
TB/SR Activities 91
CENELEC Inventory of Technical Activities
EN 60512-8-2:2011 (PR=22778) IEC 60512-8-2:2011 CLC/SR 48B IEC/SC 48B // Stage : 6060 Connectors for electronic equipment - Tests and measurements - Part 8-2: Static load tests (fixed connectors) - Test
8b: Static load, axial dor : 2011-05-12 doa : 2011-08-12 dop : 2012-02-12 dow : 2014-05-12
EN 60512-8-3:2011 (PR=22779) IEC 60512-8-3:2011 CLC/SR 48B IEC/SC 48B // Stage : 6060 Connectors for electronic equipment - Tests and measurements - Part 8-3: Static load tests (fixed connectors) - Test
8c: Robustness of actuating lever dor : 2011-05-12 doa : 2011-08-12 dop : 2012-02-12 dow : 2014-05-12
EN 60512-9-2:2012 (PR=22780) IEC 60512-9-2:2011 CLC/SR 48B IEC/SC 48B // Stage : 6060 Connectors for electronic equipment - Tests and measurements - Part 9-2: Endurance tests - Test 9b: Electrical load
and temperature NOTE: 2011-12-20 - Publication editing allocated to [email protected] dor : 2012-01-02 doa : 2012-04-02 dop : 2012-10-02 dow: 2015-01-02
EN 60512-9-3:2011 (PR=22757) IEC 60512-9-3:2011 CLC/SR 48B IEC/SC 48B // Stage : 6060 Connectors for electronic equipment - Tests and measurements - Part 9-3: Endurance tests - Test 9c: Mechanical
operation (engaging/separating) with electrical load NOTE: Supersedes EN 60512-9-3:2006 + corr. Dec.2006 * To be read in conjunction with EN 60512-1 and EN
60512-1-100 dor : 2011-07-27 doa : 2011-10-27 dop : 2012-04-27 dow : 2014-07-27
EN 60512-9-4:2011 (PR=22781) IEC 60512-9-4:2011 CLC/SR 48B IEC/SC 48B // Stage : 6060 Connectors for electronic equipment - Tests and measurements - Part 9-4: Endurance tests - Test 9d: Durability of
contact retention system and seals (maintenance, ageing) dor : 2011-05-12 doa : 2011-08-12 dop : 2012-02-12 dow : 2014-05-12
EN 60512-17-2:2011 (PR=22782) IEC 60512-17-2:2011 CLC/SR 48B IEC/SC 48B // Stage : 6060 Connectors for electronic equipment - Tests and measurements - Part 17-2: Cable clamping tests - Test 17b: Cable
clamp resistance to cable rotation dor : 2011-05-12 doa : 2011-08-12 dop : 2012-02-12 dow : 2014-05-12
EN 60512-27-100:2012 (PR=22962) IEC 60512-27-100:2011 CLC/SR 48B IEC/SC 48B // Stage : 6060 Connectors for electronic equipment - Tests and measurements - Part 27-100: Signal integrity tests up to 500 MHz
on IEC 60603-7 series connectors - Tests 27a to 27g NOTE: 2011-12-20 - Publication editing allocated to [email protected] dor : 2012-01-11 doa : 2012-04-11 dop : 2012-10-11 dow: 2015-01-11
TB/SR Activities 92
CENELEC Inventory of Technical Activities
EN 60603-7:2009/A1:2011 (PR=22848) IEC 60603-7:2008/A1:2011 CLC/SR 48B IEC/SC 48B // Stage : 6060 Connectors for electronic equipment - Part 7: Detail specification for 8-way, unshielded, free and fixed connectors dor : 2011-11-03 doa : 2012-02-03 dop : 2012-08-03 dow : 2014-11-03
EN 60603-7-1:2011 (PR=22877) IEC 60603-7-1:2011 CLC/SR 48B IEC/SC 48B // Stage : 6060 Connectors for electronic equipment - Part 7-1: Detail specification for 8-way, shielded, free and fixed connectors NOTE: Supersedes EN 60603-7-1:2009 dor : 2011-05-12 doa : 2011-08-12 dop : 2012-02-12 dow : 2014-05-12
EN 61076-2:2011 (PR=22647) IEC 61076-2:2011 CLC/SR 48B IEC/SC 48B // Stage : 6060 Connectors for electronic equipment - Product requirements - Part 2: Sectional specification for circular connectors NOTE: Supersedes EN 61076-2:1999 * To be used in conjunction with EN 61076-1 & EN 62197-1 dor : 2011-07-26 doa : 2011-10-26 dop : 2012-04-26 dow : 2014-07-26
EN 61076-2-001:2011 (PR=22646) IEC 61076-2-001:2011 CLC/SR 48B IEC/SC 48B // Stage : 6060 Connectors for electronic equipment - Product requirements - Part 2-001: Circular connectors - Blank detail
specification NOTE: Supersedes EN 61076-2-001:2001* To be used in conjunction with EN 61076-1, EN 61076-2 & EN 62197-1 dor : 2011-07-26 doa : 2011-10-26 dop : 2012-04-26 dow : 2014-07-26
EN 61076-2-106:2011 (PR=22645) IEC 61076-2-106:2011 CLC/SR 48B IEC/SC 48B // Stage : 6060 Connectors for electronic equipment - Product requirements - Part 2-106: Circular connectors - Detail specification
for connectors M 16 x 0,75 with screw-locking and degree of protection IP40 or IP65/67 NOTE: 2011-06-27: Allocated to [email protected] dor : 2011-07-26 doa : 2011-10-26 dop : 2012-04-26 dow : 2014-07-26
EN 60297-3-107:2012 (PR=23392) IEC 60297-3-107:2012 CLC/SR 48D IEC/SC 48D // Stage : 6060 Mechanical structures for electronic equipment - Dimensions of mechanical structures of the 482,6 mm (19 in) series
- Part 3-107: Dimensions of subracks and plug-in units, small form factor NOTE: 2012-01-20 - Publication editing allocated to [email protected] dor : 2012-02-14 doa : 2012-05-14 dop : 2012-11-14 dow: 2015-02-14
EN 61587-1:2012 (PR=23150) IEC 61587-1:2011 CLC/SR 48D IEC/SC 48D // Stage : 6060 Mechanical structures for electronic equipment - Tests for IEC 60917 and IEC 60297 series - Part 1: Environmental
requirements, test set-up and safety aspects for cabinets, racks, subracks and chassis under indoor conditions NOTE: 2012-01-23 - Publication editing allocated to cpalagi@cencenelec.* Supersedes EN 61587-1:2007 dor : 2011-12-13 doa : 2012-03-13 dop : 2012-09-13 dow: 2014-12-13
TB/SR Activities 93
CENELEC Inventory of Technical Activities
EN 61587-2:2011 (PR=23110) IEC 61587-2:2011 CLC/SR 48D IEC/SC 48D // Stage : 6060 Mechanical structures for electronic equipment - Tests for IEC 60917 and IEC 60297 - Part 2: Seismic tests for
cabinets and racks NOTE: Supersedes EN 61587-2:2001 dor : 2011-09-29 doa : 2011-12-29 dop : 2012-06-29 dow : 2014-09-29
EN 61969-1:2012 (PR=23231) IEC 61969-1:2011 CLC/SR 48D IEC/SC 48D // Stage : 6060 Mechanical structures for electronic equipment - Outdoor enclosures - Part 1: Design guidelines NOTE: Supersedes EN 61969-1:2000 * 2011-11-24: Publication editing allocated to [email protected] dor : 2011-12-22 doa : 2012-03-22 dop : 2012-09-22 dow: 2014-12-22
EN 61969-2:2012 (PR=23232) IEC 61969-2:2011 CLC/SR 48D IEC/SC 48D // Stage : 6060 Mechanical structures for electronic equipment - Outdoor enclosures - Part 2: Coordination dimensions NOTE: Supersedes EN 61969-2:2000, EN 61969-2-1:2000, EN 61969-2-2:2000 * 2011-11-24: Publication editing
allocated to [email protected] dor : 2011-12-22 doa : 2012-03-22 dop : 2012-09-22 dow: 2014-12-22
EN 61969-3:2012 (PR=23233) IEC 61969-3:2011 CLC/SR 48D IEC/SC 48D // Stage : 6060 Mechanical structures for electronic equipment - Outdoor enclosures - Part 3: Environmental requirements, tests and
safety aspects NOTE: Supersedes EN 61969-3:2001 * 2011-11-24: Publication editing allocated to [email protected] dor : 2011-12-22 doa : 2012-03-22 dop : 2012-09-22 dow: 2014-12-22
EN 61837-2:2011 (PR=22678) IEC 61837-2:2011 CLC/SR 49 IEC/TC 49 // Stage : 6060 Surface mounted piezoelectric devices for frequency control and selection - Standard outlines and terminal lead
connections - Part 2: Ceramic enclosures dor : 2011-07-01 doa : 2011-10-01 dop : 2012-04-01 dow : 2014-07-01
EN 62604-2:2012 (PR=22691) IEC 62604-2:2011 CLC/SR 49 IEC/TC 49 // Stage : 6060 Surface Acoustic Wave (SAW) and Bulk Acoustic Wave (BAW) duplexers of assessed quality - Part 2: Guidelines
for the use NOTE: 2011-12-20 - Publication editing allocated to [email protected] dor : 2012-01-02 doa : 2012-04-02 dop : 2012-10-02 dow: 2015-01-02
EN 61709:2011 (PR=22543) IEC 61709:2011 CLC/SR 56 IEC/TC 56 // Stage : 6060 Electric components - Reliability - Reference conditions for failure rates and stress models for conversion NOTE: Supersedes EN 61709:1998 dor : 2011-07-29 doa : 2011-10-29 dop : 2012-04-29 dow : 2014-07-29
TB/SR Activities 94
CENELEC Inventory of Technical Activities
EN 60534-2-1:2011 (PR=22368) IEC 60534-2-1:2011 CLC/SR 65B IEC/SC 65B // Stage : 6060 Industrial-process control valves - Part 2-1: Flow capacity - Sizing equations for fluid flow under installed conditions NOTE: Supersedes EN 60534-2-1:1998 dor : 2011-05-04 doa : 2011-08-04 dop : 2012-02-04 dow : 2014-05-04
EN 60865-1:2012 (PR=22838) IEC 60865-1:2011 CLC/SR 73 IEC/TC 73 // Stage : 6060 Short-circuit currents - Calculation of effects - Part 1: Definitions and calculation methods NOTE: Supersedes EN 60865-1:1993 *2011-10-28: Publication editing allocated to [email protected] dor : 2011-11-28 doa : 2012-02-28 dop : 2012-09-23 dow: 2014-11-28
EN 61162-450:2011 (PR=22959) IEC 61162-450:2011 CLC/SR 80 IEC/TC 80 // Stage : 6060 Maritime navigation and radiocommunication equipment and systems - Digital interfaces - Part 450: Multiple talkers
and multiple listeners - Ethernet interconnection dor : 2011-07-15 doa : 2011-10-15 dop : 2012-04-15 dow : 2014-07-15
EN 61557-13:2011 (PR=22664) IEC 61557-13:2011 CLC/SR 85 IEC/TC 85 LVD (2006/95/EC) // Stage : 6060 Electrical safety in low voltage distribution systems up to 1 000 V a.c. and 1 500 V d.c. - Equipment for testing, measuring or monitoring of protective measures - Part 13: Hand-held and hand-manipulated current clamps and sensors for measurement of leakage currents in electrical distribution systems dor : 2011-08-12 doa : 2011-11-12 dop : 2012-05-12 dow : 2014-08-12
EN 62129-2:2011 (PR=22821) IEC 62129-2:2011 CLC/SR 86 IEC/TC 86 // Stage : 6060 Calibration of wavelength/optical frequency measurement instruments - Part 2: Michelson interferometer single
wavelength meters dor : 2011-06-30 doa : 2011-09-30 dop : 2012-03-30 dow : 2014-06-30
EN 62496-2-1:2011 (PR=22822) IEC 62496-2-1:2011 CLC/SR 86 IEC/TC 86 // Stage : 6060 Optical circuit boards - Part 2-1: Measurements - Optical attenuation and isolation dor : 2011-09-01 doa : 2011-12-01 dop : 2012-06-01 dow : 2014-09-01
EN 61290-4-1:2011 (PR=22887) IEC 61290-4-1:2011 CLC/SR 86C IEC/SC 86C // Stage : 6060 Optical amplifiers - Test methods - Part 4-1: Gain transient parameters - Two-wavelength method dor : 2011-09-14 doa : 2011-12-14 dop : 2012-06-14 dow : 2014-09-14
EN 61290-4-2:2011 (PR=22888) IEC 61290-4-2:2011 CLC/SR 86C IEC/SC 86C // Stage : 6060 Optical amplifiers - Test methods - Part 4-2: Gain transient parameters - Broadband source method dor : 2011-08-17 doa : 2011-11-17 dop : 2012-05-17 dow : 2014-08-17
TB/SR Activities 95
CENELEC Inventory of Technical Activities
EN 61291-2:2012 (PR=23621) IEC 61291-2:2012 CLC/SR 86C IEC/SC 86C // Stage : 6060 Optical amplifiers - Part 2: Digital applications - Performance specification template NOTE: 2012-01-20 - Publication editing allocated to [email protected] * Supersedes EN 61291-2:2007 dor : 2012-02-14 doa : 2012-05-14 dop : 2012-11-14 dow: 2015-02-14
EN 61291-4:2012 (PR=23302) IEC 61291-4:2011 CLC/SR 86C IEC/SC 86C // Stage : 6060 Optical amplifiers - Part 4: Multichannel applications - Performance specification template NOTE: 2011-12-20 - Publication editing allocated to [email protected] * Supersedes EN 61291-4:2008 * To
be used in conjunction with EN 61291-1:2006 dor : 2011-12-29 doa : 2012-03-29 dop : 2012-09-29 dow: 2014-12-29
EN 62149-1:2012 (PR=23620) IEC 62149-1:2011 CLC/SR 86C IEC/SC 86C // Stage : 6060 Fibre optic active components and devices - Performance standards - Part 1: General and guidance NOTE: 2011-12-20 - Publication editing allocated to [email protected] * Supersedes EN 62149-1:2004 dor : 2012-01-11 doa : 2012-04-11 dop : 2012-10-11 dow: 2015-01-11
EN 62572-3:2012 (PR=23114) IEC 62572-3:2011 CLC/SR 86C IEC/SC 86C // Stage : 6060 Fibre optic active components and devices - Reliability standards - Part 3: Laser modules used for
telecommunication NOTE: 2011-12-20 - Publication editing allocated to [email protected] dor : 2011-12-29 doa : 2012-03-29 dop : 2012-09-29 dow: 2014-12-29
EN 60695-6-2:2011 (PR=22769) IEC 60695-6-2:2011 CLC/SR 89 IEC/TC 89 // Stage : 6060 Fire hazard testing - Part 6-2: Smoke obscuration - Summary and relevance of test methods NOTE: To be used in conjunction with EN 60695-6-1 dor : 2011-09-29 doa : 2011-12-29 dop : 2012-06-29 dow : 2014-09-29
EN 60695-7-2:2011 (PR=22851) IEC 60695-7-2:2011 CLC/SR 89 IEC/TC 89 // Stage : 6060 Fire hazard testing - Part 7-2: Toxicity of fire effluent - Summary and relevance of test methods dor : 2011-10-04 doa : 2012-01-04 dop : 2012-07-04 dow : 2014-10-04
EN 60695-7-3:2011 (PR=22863) IEC 60695-7-3:2011 CLC/SR 89 IEC/TC 89 // Stage : 6060 Fire hazard testing - Part 7-3: Toxicity of fire effluent - Use and interpretation of test results dor : 2011-10-04 doa : 2012-01-04 dop : 2012-07-04 dow : 2014-10-04
EN 60695-11-4:2011 (PR=22827) IEC 60695-11-4:2011 CLC/SR 89 IEC/TC 89 LVD (2006/95/EC) // Stage : 6060 Fire hazard testing - Part 11-4: Test flames - 50 W flame - Apparatus and confirmational test method dor : 2011-11-01 doa : 2012-02-01 dop : 2012-08-01 dow : 2014-11-01
TB/SR Activities 96
CENELEC Inventory of Technical Activities
EN 61788-4:2011 (PR=22783) IEC 61788-4:2011 CLC/SR 90 IEC/TC 90 // Stage : 6060 Superconductivity - Part 4: Residual resistance ratio measurement - Residual resistance ratio of Nb-Ti composite
superconductors NOTE: Supersedes EN 61788-4:2007 dor : 2011-08-15 doa : 2011-11-15 dop : 2012-05-15 dow : 2014-08-15
EN 61788-6:2011 (PR=22784) IEC 61788-6:2011 CLC/SR 90 IEC/TC 90 // Stage : 6060 Superconductivity - Part 6: Mechanical properties measurement - Room temperature tensile test of Cu/Nb-Ti
composite superconductors NOTE: Supersedes EN 61788-6:2008 dor : 2011-08-15 doa : 2011-11-15 dop : 2012-05-15 dow : 2014-08-15
EN 61788-11:2011 (PR=22785) IEC 61788-11:2011 CLC/SR 90 IEC/TC 90 // Stage : 6060 Superconductivity - Part 11: Residual resistance ratio measurement - Residual resistance ratio of Nb3Sn composite
superconductors NOTE: Supersedes EN 61788-11:2003 dor : 2011-08-15 doa : 2011-11-15 dop : 2012-05-15 dow : 2014-08-15
EN 61788-15:2011 (PR=23039) IEC 61788-15:2011 CLC/SR 90 IEC/TC 90 // Stage : 6060 Superconductivity - Part 15: Electronic characteristic measurements - Intrinsic surface impedance of superconductor
films at microwave frequencies NOTE: 2011-10-28: Publication editing allocated to [email protected] dor : 2011-11-28 doa : 2012-02-28 dop : 2012-08-28 dow: 2014-11-28
EN 60068-2-83:2011 (PR=22730) IEC 60068-2-83:2011 CLC/SR 91 IEC/TC 91 // Stage : 6060 Environmental testing - Part 2-83: Tests - Test Tf: Solderability testing of electronic components for surface
mounting devices (SMD) by the wetting balance method using solder paste dor : 2011-10-12 doa : 2012-01-12 dop : 2012-07-12 dow : 2014-10-12
EN 62137-3:2012 (PR=22949) IEC 62137-3:2011 CLC/SR 91 IEC/TC 91 // Stage : 6060 Electronics assembly technology - Part 3: Selection guidance of environmental and endurance test methods for solder
joints NOTE: 2011-11-24: Publication editing allocated to [email protected] dor : 2011-12-13 doa : 2012-03-13 dop : 2012-09-13 dow: 2014-12-13
EN 61558-2-15:2012 (PR=23031) IEC 61558-2-15:2011 CLC/SR 96 IEC/TC 96 LVD (2006/95/EC) // Stage : 6060 Safety of transformers, reactors, power supply units and combinations thereof - Part 2-15: Particular requirements
and tests for isolating transformers for the supply of medical locations NOTE: Supersedes EN 61558-2-15:2001 + corr. Apr.2004 * 2011-11-24: Publication editing allocated to
[email protected] dor : 2011-12-27 doa : 2012-03-27 dop : 2012-09-27 dow: 2014-12-27
TB/SR Activities 97
CENELEC Inventory of Technical Activities
EN 60268-16:2011 (PR=22800) IEC 60268-16:2011 CLC/SR 100 IEC/TC 100 // Stage : 6060 Sound system equipment - Part 16: Objective rating of speech intelligibility by speech transmission index NOTE: Supersedes EN 60268-16:2003 dor : 2011-08-02 doa : 2011-11-02 dop : 2012-05-02 dow : 2014-08-02
EN 61937-1:2007/A1:2011 (PR=23379) IEC 61937-1:2007/A1:2011 CLC/SR 100 IEC/TC 100 // Stage : 6060 Digital audio - Interface for non-linear PCM encoded audio bitstreams applying IEC 60958 - Part 1: General dor : 2011-11-16 doa : 2012-02-16 dop : 2012-08-16 dow : 2014-11-16
EN 61937-2:2007/A1:2011 (PR=23380) IEC 61937-2:2007/A1:2011 CLC/SR 100 IEC/TC 100 // Stage : 6060 Digital audio - Interface for non-linear PCM encoded audio bitstreams applying IEC 60958 - Part 2: Burst-info NOTE: 2011-10-28: Publication editing allocated to [email protected] dor : 2011-11-28 doa : 2012-02-28 dop : 2012-08-28 dow: 2014-11-28
EN 62216:2011 (PR=22011) IEC 62216:2009 CLC/SR 100 IEC/TC 100 // Stage : 6060 Digital terrestrial television receivers for the DVB-T system NOTE: Supersedes EN 62216-1:2002 dor : 2011-01-02 doa : 2011-04-02 dop : 2012-04-02 dow : 2014-01-02
EN 62516-2:2011 (PR=23094) IEC 62516-2:2011 CLC/SR 100 IEC/TC 100 // Stage : 6060 Terrestrial digital multimedia broadcasting (T-DMB) receivers - Part 2: Interactive data services using BIFS dor : 2011-08-15 doa : 2011-11-15 dop : 2012-05-15 dow : 2014-08-15
EN 62574:2011 (PR=22965) IEC 62574:2011 CLC/SR 100 IEC/TC 100 // Stage : 6060 Audio, video and multimedia systems - General channel assignment of multichannel audio dor : 2011-05-12 doa : 2011-08-12 dop : 2012-02-12 dow : 2014-05-12
EN 62605:2011 (PR=22799) IEC 62605:2011 CLC/SR 100 IEC/TC 100 // Stage : 6060 Multimedia systems and equipment - Multimedia e-publishing and e-books - Interchange format for e-dictionaries dor : 2011-08-15 doa : 2011-11-15 dop : 2012-05-15 dow : 2014-08-15
EN 62634:2011 (PR=22950) IEC 62634:2011 CLC/SR 100 IEC/TC 100 // Stage : 6060 Radio data system (RDS) - Receiver products and characteristics - Methods of measurement NOTE: Supersedes EN 60315-9:1996 dor : 2011-08-02 doa : 2011-11-02 dop : 2012-05-02 dow : 2014-08-02
TB/SR Activities 98
CENELEC Inventory of Technical Activities
EN 61340-4-4:2012 (PR=23078) IEC 61340-4-4:2012 CLC/SR 101 IEC/TC 101 // Stage : 6060 Electrostatics - Part 4-4: Standard test methods for specific applications - Electrostatic classification of flexible
intermediate bulk containers (FIBC) NOTE: Supersedes EN 61340-4-4:2005 * 2012-02-07: Publication editing allocated to [email protected] dor : 2012-02-22 doa : 2012-05-22 dop : 2012-11-22 dow: 2015-02-22
EN 60068-3-1:2011 (PR=22720) IEC 60068-3-1:2011 CLC/SR 104 IEC/TC 104 // Stage : 6060 Environmental testing - Part 3-1: Supporting documentation and guidance - Cold and dry heat tests NOTE: Supersedes EN 60068-3-1:1999 dor : 2011-09-23 doa : 2011-12-23 dop : 2012-06-23 dow : 2014-09-23
EN 62282-3-100:2012 (PR=23215) IEC 62282-3-100:2012 CLC/SR 105 IEC/TC 105 LVD (2006/95/EC) // Stage : 6060 Fuel cell technologies - Part 3-100: Stationary fuel cell power systems - Safety NOTE: Supersedes EN 62282-3-1:2007 * 2012-02-24: Publication editing allocated to [email protected] dor : 2012-03-22 doa : 2012-06-22 dop : 2012-12-22 dow: 2015-03-22
EN 62282-3-200:2012 (PR=23060) IEC 62282-3-200:2011 CLC/SR 105 IEC/TC 105 // Stage : 6060 Fuel cell technologies - Part 3-200: Stationary fuel cell power systems - Performance test methods NOTE: Supersedes EN 62282-3-2:2006 * 2011-10-28: Publication editing allocated to [email protected] dor : 2011-11-23 doa : 2012-02-23 dop : 2012-08-23 dow: 2014-11-23
EN 61747-5-2:2011 (PR=22031) IEC 61747-5-2:2011 CLC/SR 110 IEC/TC 110 // Stage : 6060 Liquid crystal display devices - Part 5-2: Environmental, endurance and mechanical test methods - Visual inspection
of active matrix colour liquid crystal display modules dor : 2011-07-21 doa : 2011-10-21 dop : 2012-04-21 dow : 2014-07-21
EN 61747-6-2:2011 (PR=22029) IEC 61747-6-2:2011 + corrigendum Jan. 2012 CLC/SR 110 IEC/TC 110 // Stage : 6060 Liquid crystal display devices - Part 6-2: Measuring methods for liquid crystal display modules - Reflective type dor : 2011-07-15 doa : 2011-10-15 dop : 2012-04-15 dow : 2014-07-15
EN 61747-6-3:2011 (PR=22030) IEC 61747-6-3:2011 CLC/SR 110 IEC/TC 110 // Stage : 6060 Liquid crystal display devices - Part 6-3: Measuring methods for liquid crystal display modules - Motion artifact
measurement of active matrix liquid crystal display modules dor : 2011-08-17 doa : 2011-11-17 dop : 2012-05-17 dow : 2014-08-17
EN 61988-1:2011 (PR=23081) IEC 61988-1:2011 CLC/SR 110 IEC/TC 110 // Stage : 6060 Plasma display panels - Part 1: Terminology and letter symbols NOTE: Supersedes EN 61988-1:2003 dor : 2011-08-30 doa : 2011-11-30 dop : 2012-05-30 dow : 2014-08-30
TB/SR Activities 99
CENELEC Inventory of Technical Activities
EN 61988-2-1:2012 (PR=23082) IEC 61988-2-1:2012 CLC/SR 110 IEC/TC 110 // Stage : 6060 Plasma display panels - Part 2-1: Measuring methods - Optical and optoelectrical NOTE: Supersedes EN 61988-2-1:2002 and EN 61988-2-2:2003*2012-02-07: Publication editing allocated to
[email protected] dor : 2012-02-28 doa : 2012-05-28 dop : 2012-11-28 dow: 2015-02-28
EN 61988-2-4:2011 (PR=23136) IEC 61988-2-4:2011 CLC/SR 110 IEC/TC 110 // Stage : 6060 Plasma display panels - Part 2-4: Measuring methods - Visual quality: Image artifacts dor : 2011-09-29 doa : 2011-12-29 dop : 2012-06-29 dow : 2014-09-29
EN 62149-7:2012 (PR=23628) IEC 62149-7:2012 CLC/SR 86C IEC/SC 86C // Stage : 6060 Fibre optic active components and devices - Performance standards - Part 7: 1 310 nm discrete vertical cavity surface
emitting laser devices NOTE: 2012-04-06: Publication allocated to [email protected] .
EN 62341-6-2:2012 (PR=23115) IEC 62341-6-2:2012 CLC/SR 110 IEC/TC 110 // Stage : 6060 Organic light emitting diode (OLED) displays - Part 6-2: Measuring methods of visual quality and ambient
performance NOTE: 2012-02-07: Publication editing allocated to [email protected] dor : 2012-02-28 doa : 2012-05-28 dop : 2012-11-28 dow: 2015-02-28
EN 62595-1-2:2012 (PR=23340) IEC 62595-1-2:2011 CLC/SR 110 IEC/TC 110 // Stage : 6060 LCD backlight unit - Part 1-2: Terminology and letter symbols NOTE: 2012-01-20 - Publication editing allocated to [email protected] dor : 2012-01-18 doa : 2012-04-18 dop : 2012-10-18 dow: 2015-01-18
EN 60212:2011 (PR=22966) IEC 60212:2010 CLC/SR 112 IEC/TC 112 // Stage : 6060 Standard conditions for use prior to and during the testing of solid electrical insulating materials NOTE: Supersedes HD 437 S1:1984 dor : 2011-01-19 doa : 2011-04-19 dop : 2011-10-19 dow : 2014-01-19
EN 60505:2011 (PR=22723) IEC 60505:2011 CLC/SR 112 IEC/TC 112 // Stage : 6060 Evaluation and qualification of electrical insulation systems NOTE: Supersedes EN 60505:2004 dor : 2011-08-15 doa : 2011-11-15 dop : 2012-05-15 dow : 2014-08-15
TB/SR Activities 100
CENELEC Inventory of Technical Activities
EN 60544-5:2012 (PR=23395) IEC 60544-5:2011 CLC/SR 112 IEC/TC 112 // Stage : 6060 Electrical insulating materials - Determination of the effects of ionizing radiation - Part 5: Procedures for assessment
of ageing in service NOTE: 2012-01-20 - Publication editing allocated to [email protected] * Supersedes EN 60544-5:2003 dor : 2012-01-18 doa : 2012-04-18 dop : 2012-10-18 dow: 2015-01-18
EN 62631-1:2011 (PR=22801) IEC 62631-1:2011 CLC/SR 112 IEC/TC 112 // Stage : 6060 Dielectric and resistive properties of solid insulating materials - Part 1: General NOTE: Partially supersedes HD 429 S1:1983 (PR=2906), HD 438 S1:1984 (PR=2909) and HD 568 S1:1990
(PR=218) together with future parts and subparts of EN 62631 series dor : 2011-06-02 doa : 2011-09-02 dop : 2012-03-02 dow : 2014-06-02
Ratified
EN 60645-1:201X (PR=22819) IEC 60645-1:2012 CLC/SR 29 IEC/TC 29 LVD (2006/95/EC) MDD (93/42/EEC) // Stage : 5099 2012-04-19 Electroacoustics - Audiometric equipment - Part 1: Equipment for pure-tone audiometry NOTE: Will supersede EN 60645-1:2001 Mandated: M/432
EN 60432-2:2000/A2:201X (PR=23555) IEC 60432-2:1999/A2:2012 CLC/SR 34A IEC/SC 34A LVD (2006/95/EC) // Stage : 5099 2012-05-24 Incandescent lamps - Safety specifications - Part 2: Tungsten halogen lamps for domestic and similar general lighting
purposes NOTE: 2012-04-06: Publication allocated to [email protected] .
EN 61010-2-033:201X (PR=23303) IEC 61010-2-033:2012 CLC/SR 66 IEC/TC 66 LVD (2006/95/EC) // Stage : 5099 2012-06-06 Safety requirements for electrical equipment for measurement, control, and laboratory use - Part 2-033: Particular requirements for hand-held multimeters and other hand-held meters, for domestic and professional use, capable of measuring mains voltage NOTE: 2012-04-16 - Publication editing allocated to [email protected] * To be used in conjunction with EN 61010-1:2010 * D135/C248: documents associated to IEC 61010-2-033 to be circulated to ANEC, ECOS, ETUI- REHS and NORMAPME for due consultation Mandated: M/446
EN 61291-1:201X (PR=23613) IEC 61291-1:2012 CLC/SR 86C IEC/SC 86C // Stage : 5099 2012-06-06 Optical amplifiers - Part 1: Generic specification NOTE: 2012-04-16 - Publication editing allocated to [email protected] * Will supersede EN 61291-1:2006
EN 61362:201X (PR=23113) IEC 61362:2012 CLC/SR 4 IEC/TC 4 // Stage : 5099 2012-06-22 Guide to specification of hydraulic turbine governing systems NOTE: 2012-05-08 - Publication editing allocated to [email protected] * Will supersede EN 61362:1998
TB/SR Activities 101
CENELEC Inventory of Technical Activities
EN 62282-2:201X (PR=23163) IEC 62282-2:2012 CLC/SR 105 IEC/TC 105 // Stage : 5099 2012-05-28 Fuel cell technologies - Part 2: Fuel cell modules NOTE: Will supersede EN 62282-2:2004 + A1:2007*2012-04-06: Publication allocated to [email protected]
.
Vote launched
FprEN 60848:2011 (PR=23945) IEC 60848:201X (3/1084/CDV) CLC/SR 3 IEC/TC 3 // Stage : 5060 2012-06-19 GRAFCET specification language for sequential function charts NOTE: Will supersede EN 60848:2002
FprEN 82079-1:2012 (PR=23298) IEC 82079-1:201X (3/1093/FDIS) CLC/SR 3 IEC/TC 3 // Stage : 5060 2012-05-21 Preparation of instructions for use - Structuring, content and presentation - Part 1: General principles and detailed
requirements NOTE: Will supersede EN 62079:2001
FprEN 61360-2:2011 (PR=21619) IEC 61360-2:201X (3D/196/FDIS) CLC/SR 3D IEC/SC 3D // Stage : 5060 2012-02-21 Standard data element types with associated classification scheme for electric components - Part 2: EXPRESS
dictionary schema NOTE: Will supersede EN 61360-2:2002 + A1:2004
EN 62097:2009/FprA1:2011 (PR=23732) IEC 62097:2009/A1:201X (4/265/CDV) CLC/SR 4 IEC/TC 4 // Stage : 5060 2012-02-27 Hydraulic machines, radial and axial - Performance conversion method from model to prototype NOTE: Awaiting outcome of RVC before further processing
FprEN 62567:2011 (PR=23646) IEC 62567:201X (7/610/CDV) CLC/SR 7 IEC/TC 7 // Stage : 5060 2012-01-30 Methods for testing self-damping characteristics of stranded conductors for overhead lines NOTE: Awaiting outcome of RVC before further processing
FprEN 62568:2011 (PR=23647) IEC 62568:201X (7/611/CDV) CLC/SR 7 IEC/TC 7 // Stage : 5060 2012-01-30 Method for fatigue testing of conductors for overhead lines NOTE: Awaiting outcome of RVC before further processing
FprEN 62697-1:2012 (PR=23187) IEC 62697-1:201X (10/887/FDIS) CLC/SR 10 IEC/TC 10 // Stage : 5020 2012-07-20 Test method for quantitative determination of corrosive sulfur compounds in unused and used insulating liquids -
Part 1: Test method for quantitative determination of dibenzyldisulfide (DBDS)
TB/SR Activities 102
CENELEC Inventory of Technical Activities
FprEN 62701:2012 (PR=24216) IEC 62701:201X (10/888/CDV) CLC/SR 10 IEC/TC 10 // Stage : 5020 2012-10-19 Fluids for electrotechnical applications - Recycled mineral insulating oils for transformers and switchgears
EN 60626-3:2008/FprA1:2012 (PR=23834) IEC 60626-3:2008/A1:201X (15/647/CDV) CLC/SR 15 IEC/TC 15 // Stage : 5060 2012-05-18 Combined flexible materials for electrical insulation - Part 3: Specifications for individual materials NOTE: First voting result "FDIS decided" dropped * 15/473A/RVC established on 2012-04-13: To be published
without FDIS stage
FprEN 60684-3-214:2012 (PR=24142) IEC 60684-3-214:201X (15/671/CDV) CLC/SR 15 IEC/TC 15 // Stage : 5020 2012-09-07 Flexible insulating sleeving - Part 3: Specifications for individual types of sleeving - Sheet 214: Heat-shrinkable,
polyolefin sleeving, not flame retarded, thick and medium wall NOTE: Will supersede EN 60684-3-214:2005
FprEN 60893-3-1:2010 (PR=23239) IEC 60893-3-1:201X (15/606/CDV) CLC/SR 15 IEC/TC 15 // Stage : 5060 2011-07-29 Insulating materials - Industrial rigid laminated sheets based on thermosetting resins for electrical purposes - Part 3-
1: Specifications for individual materials - Types of industrial rigid laminated sheets NOTE: Will supersede EN 60893-3-1:2004 * 15/641/RVC established on 2011-06-24: To be published without FDIS
stage
FprEN 62677-1:2012 (PR=24143) IEC 62677-1:201X (15/672/CDV) CLC/SR 15 IEC/TC 15 // Stage : 5020 2012-09-07 Heat shrinkable low and medium voltage moulded shapes - Part 1: General requirements
FprEN 61439-6:2012 (PR=22993) IEC 61439-6:201X (17D/452/FDIS) CLC/SR 17D IEC/SC 17D EMC (2004/108/EC) LVD (2006/95/EC) // Stage : 5060 2012-05-14 Low-voltage switchgear and controlgear assemblies - Part 6: Busbar trunking systems (busways) NOTE: Will supersede EN 60439-2:2000 + A1:2005 * Initially handled by CLC/TC 17D (dormant)
FprEN 61439-7:2011 (PR=23923) IEC 61439-7:201X (17D/449/CDV) CLC/SR 17D IEC/SC 17D EMC (2004/108/EC) LVD (2006/95/EC) // Stage : 5060 2012-06-04 Low-voltage switchgear and controlgear assemblies - Part 7: Assemblies for specific installations at public sites such
as marinas, camping sites, market squares and similar applications and for charging stations for electrical vehicles
prEN 60092-507:2007 (PR=17128) IEC 60092-507:2008 CLC/SR 18 IEC/TC 18 // Stage : 5091 - Electrical installations in ships - Part 507: Small vessels NOTE: Will supersede EN 60092-507:2000 * CLC/SR 18 info: Delay due to lack of consensus in IEC TC 18 on how to procede in this matter (overlap between ISO & IEC publications, resulting in similar problems between CEN and CENELEC) - Advice expected from IEC/TC 18 officers before giving recommendation on this project
TB/SR Activities 103
CENELEC Inventory of Technical Activities
EN 61535:2009/FprA1:2012 (PR=23524) IEC 61535:2009/A1:201X (23/577/FDIS) CLC/SR 23 IEC/TC 23 LVD (2006/95/EC) // Stage : 5060 2012-05-14 Installation couplers intended for permanent connection in fixed installations
FprEN 60519-10:2012 (PR=24020) IEC 60519-10:201X (27/853/CDV) CLC/SR 27 IEC/TC 27 LVD (2006/95/EC) // Stage : 5020 2012-07-13 Safety in electroheat installations - Part 10: Particular requirements for electrical resistance trace heating systems for
industrial and commercial applications NOTE: Will supersede EN 60519-10:2005
FprEN 60519-12:2012 (PR=24063) IEC 60519-12:201X (27/859/CDV) CLC/SR 27 IEC/TC 27 // Stage : 5020 2012-07-27 Safety in electroheating installations - Part 12: Particular requirements for infrared electroheating installations
FprEN 62395-1:2012 (PR=24202) IEC 62395-1:201X (27/866/CDV) CLC/SR 27 IEC/TC 27 LVD (2006/95/EC) // Stage : 5020 2012-10-12 Electrical resistance trace heating systems for industrial and commercial applications - Part 1: General and testing
requirements NOTE: Will supersede EN 62395-1:2006
FprEN 62395-2:2012 (PR=24203) IEC 62395-2:201X (27/867/CDV) CLC/SR 27 IEC/TC 27 // Stage : 5020 2012-10-12 Electrical resistance trace heating systems for industrial and commercial applications - Part 2: Application guide for
system design, installation and maintenance NOTE: Will supersede CLC/TS 62395-2:2010
FprEN 60601-2-66:2011 (PR=23596) IEC 60601-2-66:201X (29/747/CDV) CLC/SR 29 IEC/TC 29 MDD (93/42/EEC) // Stage : 5060 2011-11-28 Hearing instruments and hearing instrument systems - Part 2-66: General requirements for basic safety and essential
performance NOTE: To be read in conjunction with EN 60601-1:2006
FprEN 61094-8:2011 (PR=23860) IEC 61094-8:201X (29/752/CDV) CLC/SR 29 IEC/TC 29 // Stage : 5060 2012-05-29 Electroacoustics - Measurement microphones - Part 8: Methods for free-field calibration of working standard
microphones by comparison NOTE: 29/759/RVC established on 2012-04-20: To be published without FDIS
FprEN 62585:2012 (PR=23109) IEC 62585:201X (29/770/FDIS) CLC/SR 29 IEC/TC 29 // Stage : 5020 2012-07-13 Electroacoustics - Methods to determine corrections to obtain the free-field response of a sound level meter
TB/SR Activities 104
CENELEC Inventory of Technical Activities
FprHD 60269-2:2012 (PR=24145) IEC 60269-2:201X (32B/595/CDV) (Modified) CLC/SR 32B IEC/SC 32B LVD (2006/95/EC) // Stage : 5020 2012-09-07 Low-voltage fuses - Part 2: Supplementary requirements for fuses for use by authorized persons (fuses mainly for
industrial application) - Examples of standardized systems of fuses A to K NOTE: Will supersede HD 60269-2:2010
HD 60269-3:2010/FprA1:2012 (PR=24144) IEC 60269-3:2010/A1:201X (32B/594/CDV) CLC/SR 32B IEC/SC 32B LVD (2006/95/EC) // Stage : 5020 2012-09-07 Low-voltage fuses - Part 3: Supplementary requirements for fuses for use by unskilled persons (fuses mainly for
household and similar applications) - Examples of standardized systems of fuses A to F
EN 60269-4:2009/FprA1:2011 (PR=23608) IEC 60269-4:2009/A1:201X (32B/579/CDV) CLC/SR 32B IEC/SC 32B LVD (2006/95/EC) // Stage : 5060 2012-03-09 Low-voltage fuses - Part 4: Supplementary requirements for fuse-links for the protection of semiconductor devices NOTE: 32B/586/RVC + 32B/586A/RVC established on 2012-02-03: To be published without FDIS stage (modifying
first decision to go to FDIS)
EN 60127-4:2005/FprA2:2012 (PR=24021) IEC 60127-4:2005/A2:201X (32C/456/CDV) CLC/SR 32C IEC/SC 32C // Stage : 5020 2012-07-13 Miniature fuses - Part 4: Universal modular fuse-links (UMF) - Through-hole and surface mount types
FprEN 60127-7:2012 (PR=24140) IEC 60127-7:201X (32C/458/CDV) CLC/SR 32C IEC/SC 32C LVD (2006/95/EC) // Stage : 5020 2012-09-07 Miniature fuses - Part 7: Miniature fuse-links for special applications
FprEN 60358-1:2012 (PR=23088) IEC 60358-1:201X (33/499/FDIS) CLC/SR 33 IEC/TC 33 LVD (2006/95/EC) // Stage : 5060 2012-06-04 Coupling capacitors and capacitor dividers - Part 1: Common clauses NOTE: Will supersede HD 597 S1:1992 (pr=546) together with Parts 2, 3 and 4
FprEN 60358-2:2012 (PR=24016) IEC 60358-2:201X (33/497/CDV) CLC/SR 33 IEC/TC 33 // Stage : 5020 2012-07-06 Coupling capacitors and capacitor dividers - Part 2: AC or DC single-phase coupling capacitor connected between
line and ground for power line carrier-frequency (PLC) application NOTE: Will supersede HD 597 S1:1992 (pr=546) together with Parts 1, 3 and 4
FprEN 60831-1:2012 (PR=24015) IEC 60831-1:201X (33/496/CDV) CLC/SR 33 IEC/TC 33 LVD (2006/95/EC) // Stage : 5020 2012-07-06 Shunt power capacitors of the self-healing type for a.c. systems having a rated voltage up to and including 1000 V -
Part 1: General - Performance, testing and rating - Safety requirements - Guide for installation and operation NOTE: Will supersede EN 60831-1:1996 + A1:2003
TB/SR Activities 105
CENELEC Inventory of Technical Activities
FprEN 60831-2:2012 (PR=24007) IEC 60831-2:201X (33/495/CDV) CLC/SR 33 IEC/TC 33 LVD (2006/95/EC) // Stage : 5020 2012-06-29 Shunt power capacitors of the self-healing type for a.c. systems having a rated voltage up to and including 1000 V -
Part 2: Ageing test, self-healing test and destruction test NOTE: Will supersede EN 60831-2:1996
FprEN 62146-1:2012 (PR=24017) IEC 62146-1:201X (33/498/CDV) CLC/SR 33 IEC/TC 33 // Stage : 5020 2012-07-06 Grading capacitors for high-voltage alternating current circuit-breakers
FprEN 60432-3:2012 (PR=23556) IEC 60432-3:201X (34A/1567/FDIS) CLC/SR 34A IEC/SC 34A LVD (2006/95/EC) // Stage : 5020 2012-06-08 Incandescent lamps - Safety specifications - Part 3: Tungsten-halogen lamps (non-vehicle) NOTE: CDV launched as FprA3 - FDIS circulated as ed 2 * Will supersede EN 60432-3:2003 + A1:2005 + A2:2008
EN 60809:1996/FprA5:2012 (PR=23142) IEC 60809:1995/A5:201X (34A/1574/FDIS) CLC/SR 34A IEC/SC 34A // Stage : 5020 2012-07-06 Lamps for road vehicles - Dimensional, electrical and luminous requirements
EN 60968:1990/FprA3:2011 (PR=23940) IEC 60968:1988/A3:201X (34A/1540/CDV) CLC/SR 34A IEC/SC 34A LVD (2006/95/EC) // Stage : 5060 2012-06-11 Self-ballasted lamps for general lighting services - Safety requirements
EN 61195:1999/FprA1:2012 (PR=23938) IEC 61195:1999/A1:201X (34A/1536/CDV) CLC/SR 34A IEC/SC 34A LVD (2006/95/EC) // Stage : 5060 2012-06-11 Double-capped fluorescent lamps - Safety specifications
EN 61199:2011/FprA1:2011 (PR=23939) IEC 61199:2011/A1:201X (34A/1538/CDV) CLC/SR 34A IEC/SC 34A LVD (2006/95/EC) // Stage : 5060 2012-06-11 Single-capped fluorescent lamps - Safety specifications
EN 61231:2010/FprA1:2012 (PR=24070) IEC 61231:2010/A1:201X (34A/1561/CDV) CLC/SR 34A IEC/SC 34A // Stage : 5020 2012-08-03 International lamp coding system (ILCOS)
EN 61549:2003/FprA3:2012 (PR=23579) IEC 61549:2003/A3:201X (34A/1568/FDIS) CLC/SR 34A IEC/SC 34A LVD (2006/95/EC) // Stage : 5020 2012-06-08 Miscellaneous lamps
EN 62035:2000/FprA2:2012 (PR=23400) IEC 62035:1999/A2:201X (34A/1575/FDIS) CLC/SR 34A IEC/SC 34A ERP (2009/125/EC) LVD (2006/95/EC) // Stage : 5020 2012-07-13 Discharge lamps (excluding fluorescent lamps) - Safety specifications
TB/SR Activities 106
CENELEC Inventory of Technical Activities
FprEN 62560:2010 (PR=22593) IEC 62560:2011 (Modified) + corrigendum Jan. 2012 CLC/SR 34A IEC/SC 34A LVD (2006/95/EC) // Stage : 5091 - Self-ballasted LED-lamps for general lighting services by voltage > 50 V - Safety specifications NOTE: 2011-12-02 - Publication editing allocated to [email protected] * Decision on voting results deffered until FprAA (PR=23476) covering common modifications is voted upon, both documents will be merged and published as one single document - vote DL for FprAA is 2011-11-25
FprEN 62612:2011 (PR=23835) IEC 62612:201X (34A/1515/CDV) CLC/SR 34A IEC/SC 34A ERP (2009/125/EC) // Stage : 5060 2012-04-23 Self-ballasted LED lamps for general lighting services with supply voltages > 50 V - Performance requirements NOTE: Awaiting outcome of RVC before further processing Mandated: M/495
FprEN 62281:2011 (PR=23929) IEC 62281:201X (35/1296/CDV) CLC/SR 35 IEC/TC 35 // Stage : 5060 2012-06-04 Safety of primary and secondary lithium cells and batteries during transport NOTE: Will supersede EN 62281:2004
FprEN 62217:2012 (PR=23372) IEC 62217:201X (36/321/FDIS) CLC/SR 36 IEC/TC 36 // Stage : 5020 2012-07-06 Polymeric HV insulators for indoor and outdoor use - General definitions, test methods and acceptance criteria NOTE: Will supersede EN 62217:2006
FprEN 60286-4:2012 (PR=24128) IEC 60286-4:201X (40/2152/CDV) CLC/SR 40 IEC/TC 40 // Stage : 5020 2012-09-07 Packaging of components for automatic handling - Part 4: Stick magazines for electronic components encapsulated
in packages of different forms NOTE: Will supersede EN 60286-4:1998
FprEN 60717:2011 (PR=23475) IEC 60717:2012 CLC/SR 40 IEC/TC 40 // Stage : 5060 2011-10-14 Method for the determination of the space required by capacitors and resistors with unidirectional terminations NOTE: 40/2123/RVC established on 2011-07-22: To be published without FDIS stage
FprEN 61083-2:2011 (PR=23564) IEC 61083-2:201X (42/290/CDV) CLC/SR 42 IEC/TC 42 // Stage : 5060 2011-11-14 Instruments and software used for measurement in high-voltage and high-current tests - Part 2: Requirements for
software for impulse tests NOTE: Will supersede EN 61083-2:1997 * Awaiting outcome of RVC before further processing
FprEN 62037-1:2012 (PR=22977) IEC 62037-1:201X (46/402/FDIS) CLC/SR 46 IEC/TC 46 // Stage : 5060 2012-05-21 Passive r.f. and microwave devices, intermodulation level measurement - Part 1: General requirements and
measuring methods NOTE: Will supersede EN 62037:1999 (PART)
TB/SR Activities 107
CENELEC Inventory of Technical Activities
FprEN 62037-2:2012 (PR=22978) IEC 62037-2:201X (46/408/FDIS) CLC/SR 46 IEC/TC 46 // Stage : 5060 2012-06-11 Passive r.f. and microwave devices, intermodulation level measurement - Part 2: Measurement of passive
intermodulation in coaxial cable assemblies NOTE: Will supersede EN 62037:1999 (PART)
FprEN 62037-3:2012 (PR=22979) IEC 62037-3:201X (46/417/FDIS) CLC/SR 46 IEC/TC 46 // Stage : 5020 2012-07-13 Passive r.f. and microwave devices, intermodulation level measurement - Part 3: Measurement of passive
intermodulation in coaxial connectors NOTE: Will supersede EN 62037:1999 (PART)
FprEN 62037-4:2012 (PR=22980) IEC 62037-4:201X (46/418/FDIS) CLC/SR 46 IEC/TC 46 // Stage : 5020 2012-07-13 Passive r.f. and microwave devices, intermodulation level measurement - Part 4: Measurement of passive
intermodulation in coaxial cables NOTE: Will supersede EN 62037:1999 (PART)
FprEN 62037-5:2012 (PR=22981) IEC 62037-5:201X (46/409/FDIS) CLC/SR 46 IEC/TC 46 // Stage : 5060 2012-06-11 Passive r.f. and microwave devices, intermodulation level measurement - Part 5: Measurement of passive
intermodulation in filters NOTE: Will supersede EN 62037:1999 (PART)
FprEN 62037-6:2012 (PR=22982) IEC 62037-6:201X (46/410/FDIS) CLC/SR 46 IEC/TC 46 // Stage : 5060 2012-06-11 Passive r.f. and microwave devices, intermodulation level measurement - Part 6: Measurement of passive
intermodulation in antennas NOTE: Will supersede EN 62037:1999 (PART)
prEN 61169-4:2006 (PR=21020) IEC 61169-4:2008 CLC/SR 46F IEC/SC 46F // Stage : 5091 2009-10-01 Radio-frequency connectors - Part 4: RF coaxial connectors with inner diameter of outer conductor 16 mm (0,63 in)
with screw lock - Characteristic impedance 50 ohms (Type 7-16) NOTE: D133/C149: Ratification deferred until IEC has published a corrigendum which takes into account the
editorial IT comments made during the voting procedure * Will supersede HD 134.4 S2:1977
FprEN 61169-26:2011 (PR=23865) IEC 61169-26:201X (46F/203/CDV) CLC/SR 46F IEC/SC 46F // Stage : 5060 2012-05-14 Radio-frequency connectors - Part 26: Sectional specification of TNCA series RF coaxial connector NOTE: Awaiting outcome of RVC before further processing
FprEN 61169-42:2009 (PR=22505) IEC 61169-42:201X (46F/142/CDV) CLC/SR 46F IEC/SC 46F // Stage : 5060 2010-04-12 Radio-frequency connectors - Part 42: Sectional specification for CQN series quick lock RF coaxial connectors NOTE: 46F/165/RVC established on 2010-03-26: To be published without FDIS
TB/SR Activities 108
CENELEC Inventory of Technical Activities
FprEN 61169-44:2010 (PR=23230) IEC 61169-44:201X (46F/184/CDV) CLC/SR 46F IEC/SC 46F // Stage : 5060 2011-07-15 Radio-frequency connectors - Part 44: Sectional specification for series SMP push-on radio-frequency coaxial
connectors NOTE: 46F/194/RVC established on 2011-06-03: To be published without FDIS stage
FprEN 61169-47:2011 (PR=23866) IEC 61169-47:201X (46F/204/CDV) CLC/SR 46F IEC/SC 46F // Stage : 5060 2012-05-14 Radio-frequency connectors - Part 47: Sectional specification - Radio-frequency coaxial connectors with clamp
coupling, typically for use in 75 O cable networks (type F-Quick) NOTE: Awaiting outcome of RVC before further processing
CLC/FprTR 62258-4:2010 (PR=23112) IEC/TR 62258-4:201X (47/2073A/DTR) CLC/SR 47 IEC/TC 47 // Stage : 5060 2011-10-14 Semiconductor die products - Part 4: Questionnaire for die users and suppliers NOTE: Will supersede CLC/TR 62258-4:2007 * 47/2108/RVC established on 2011-09-09: To be published as a TR
FprEN 62483:2012 (PR=24129) IEC 62483:201X (47/2122/CDV) CLC/SR 47 IEC/TC 47 // Stage : 5020 2012-09-07 Environmental acceptance requirements for tin whisker susceptibility of tin and tin alloy surface finishes NOTE: 47/2121/NP and 47/2122/CDV circulated simultaneously at IEC level * Project to be cancelled if
47/2121/NP is not approved
FprEN 62132-8:2012 (PR=23299) IEC 62132-8:201X (47A/882/FDIS) CLC/SR 47A IEC/SC 47A // Stage : 5020 2012-06-15 Integrated circuits - Measurement of electromagnetic immunity - Part 8: Measurement of radiated immunity - IC
stripline method NOTE: To be read in conjunction with EN 62132-1:2006
FprEN 62215-3:2012 (PR=24071) IEC 62215-3:201X (47A/881/CDV) CLC/SR 47A IEC/SC 47A // Stage : 5020 2012-08-03 Integrated circuits - Measurement of impulse immunity - Part 3: Non-synchronous transient injection method
FprEN 60191-6-1:2011 (PR=23601) IEC 60191-6-1:201X (47D/804/CDV) CLC/SR 47D IEC/SC 47D // Stage : 5060 2011-12-07 Mechanical standardization of semiconductor devices - Part 6-1: General rules for the preparation of outline
drawings of surface mounted semiconductor device packages - Design guide for gull-wing lead terminals NOTE: Will supersede EN 60191-6-1:2001* 47D/814/RVC established on 2011-11-25: CDV approved vut project
withdrawn in the meantime
FprEN 60191-6-22:2011 (PR=23888) IEC 60191-6-22:201X (47D/812/CDV) CLC/SR 47D IEC/SC 47D // Stage : 5060 2012-05-21 Mechanical Standardization Of Semiconductor Devices - Part 6-22: General rules for the preparation of outline drawings of surface mounted semiconductor device packages - Design guide for semiconductor packages Silicon Fine-pitch Ball Grid Array and Silicon Fine-pitch Land Grid Array (S-FBGA and S-FLGA) NOTE: Awaiting outcome of RVC before further processing
TB/SR Activities 109
CENELEC Inventory of Technical Activities
FprEN 62047-11:2011 (PR=23953) IEC 62047-11:201X (47F/113/CDV) CLC/SR 47F IEC/SC 47F // Stage : 5060 2012-06-19 Semiconductor devices - Microelectromechanical devices - Part 11: Test method for linear thermal expansion
coefficients of freestanding MEMS materials
FprEN 62047-18:2012 (PR=24073) IEC 62047-18:201X (47F/120/CDV) CLC/SR 47F IEC/SC 47F // Stage : 5020 2012-08-03 Semiconductor devices - Micro-electromechanical devices - Part 18: Bend testing methods of thin film materials
FprEN 62047-19:2012 (PR=24006) IEC 62047-19:201X (47F/117/CDV) CLC/SR 47F IEC/SC 47F // Stage : 5020 2012-06-29 Semiconductor devices - Micro-electromechanical devices - Part 19: Electronic compasses
EN 60352-2:2006/FprA1:2012 (PR=24184) IEC 60352-2:2006/A1:201X (48B/2300/CDV) CLC/SR 48B IEC/SC 48B // Stage : 5020 2012-10-05 Solderless connections - Part 2: Crimped connections - General requirements, test methods and practical guidance
FprEN 60512-16-21:2012 (PR=23111) IEC 60512-16-21:2012 CLC/SR 48B IEC/SC 48B // Stage : 5060 2012-04-23 Connectors for electronic equipment - Tests and measurements - Part 16-21: Mechanical tests on contacts and
terminations - Test 16u: Whisker test via the application of external mechanical stresses NOTE: 2012-05-23: Publication editing allocated to [email protected]
FprEN 60512-24-1:2009 (PR=22400) IEC 60512-24-1:201X (48B/2027/CDV) CLC/SR 48B IEC/SC 48B // Stage : 5060 2010-01-05 Connectors for electronic equipment - Tests and measurements - Part 24-1: Magnetic interference tests - Test 24a:
Residual magnetism NOTE: 48B/2117/RVC established on 2009-12-18: To be published without FDIS stage
FprEN 60512-99-001:2012 (PR=23610) IEC 60512-99-001:201X (48B/2291/FDIS) CLC/SR 48B IEC/SC 48B // Stage : 5060 2012-06-11 Connectors for electronic equipment - Tests and measurements - Part 99-001: Test schedule for engaging and separating connectors under electrical load - Test 99a: Connectors used in twisted pair communication cabling with remote power
FprEN 61076-2-101:2011 (PR=23438) IEC 61076-2-101:2012 CLC/SR 48B IEC/SC 48B // Stage : 5060 2012-03-19 Connectors for electronic equipment - Product requirements - Part 2-101: Circular connectors - Detail specification
for M12 connectors with screw-locking NOTE: 2012-05-08 - Publication editing allocated to [email protected] * Will supersede EN 61076-2-
101:2008
TB/SR Activities 110
CENELEC Inventory of Technical Activities
FprEN 61076-3-110:2012 (PR=23390) IEC 61076-3-110:2012 CLC/SR 48B IEC/SC 48B // Stage : 5060 2012-04-23 Connectors for electronic equipment - Product requirements - Part 3-110: Detail specification for shielded, free and
fixed connectors for data transmission with frequencies up to 1 000 MHz NOTE: Will supersede EN 61076-3-110:2008
FprEN 61076-4-116:2011 (PR=23391) IEC 61076-4-116:2012 CLC/SR 48B IEC/SC 48B // Stage : 5060 2012-03-19 Connectors for electronic equipment - Product requirements - Part 4-116: Printed board connectors - Detail
specification for a high-speed two-part connector with integrated shielding function NOTE: 2012-05-08 - Publication editing allocated to [email protected]
FprEN 60917-2-5:2012 (PR=23643) IEC 60917-2-5:201X (48D/509/FDIS) CLC/SR 48D IEC/SC 48D // Stage : 5060 2012-05-28 Modular order for the development of mechanical structures for electronic equipment practices - Part 2-5: Sectional specification - Interface coordination dimensions for the 25 mm equipment practice - Cabinet interface dimensions for miscellaneous equipment
FprEN 61587-3:2012 (PR=24146) IEC 61587-3:201X (48D/513/CDV) CLC/SR 48D IEC/SC 48D // Stage : 5020 2012-09-07 Mechanical structures for electronic equipment - Tests for IEC 60917 and IEC 60297 - Part 3: Electromagnetic
shielding performance tests for cabinets and subracks NOTE: Will supersede EN 61587-3:2006
FprEN 61587-4:2012 (PR=23648) IEC 61587-4:201X (48D/514/FDIS) CLC/SR 48D IEC/SC 48D // Stage : 5020 2012-06-08 Mechanical structures for electronic equipment - Tests for IEC 60917 and IEC 60297 - Part 4: Combination of
performance levels for modular cabinets NOTE: 48D/507/RVC established on 2012-01-27: FDIS decided
FprEN 60679-3:2011 (PR=23625) IEC 60679-3:201X (49/971/CDV) CLC/SR 49 IEC/TC 49 // Stage : 5060 2012-02-29 Quartz crystal controlled oscillators of assessed quality - Part 3: Standard outlines and lead connections NOTE: Will supersede EN 60679-3:2001 * 49/988/RVC established on 2011-12-09: To be published without FDIS
stage
FprEN 60862-2:2010 (PR=23260) IEC 60862-2:2012 CLC/SR 49 IEC/TC 49 // Stage : 5060 2011-07-31 Surface acoustic wave (SAW) filters of assessed quality - Part 2: Guidance to the use NOTE: Will supersede EN 60862-2:2002 * 49/970/RVC + 49/970A/RVC established on 2011-06-10: To be published
without FDIS stage
FprEN 61240:2012 (PR=23282) IEC 61240:201X (49/995/FDIS) CLC/SR 49 IEC/TC 49 // Stage : 5020 2012-07-13 Piezoelectric devices - Preparation of outline drawings of surface-mounted device (SMD) for frequency control and
selection - General rules NOTE: Will supersede EN 61240:1997
TB/SR Activities 111
CENELEC Inventory of Technical Activities
FprEN 61837-1:2010 (PR=23253) IEC 61837-1:2012 CLC/SR 49 IEC/TC 49 // Stage : 5060 2011-07-01 Surface mounted piezoelectric devices for frequency control and selection - Standard outlines and terminal lead
connections - Part 1: Plastic moulded enclosure outlines NOTE: 2012-05-08 - Publication editing allocated to [email protected] * Will supersede EN 61837-1:1999 * To be read in conjunction with EN 61240 * 49/969/RVC established on 2011-05-27: To be published without FDIS stage
FprEN 62575-2:2012 (PR=23386) IEC 62575-2:201X (49/994/FDIS) CLC/SR 49 IEC/TC 49 // Stage : 5020 2012-07-06 Radio frequency (RF) bulk acoustic wave (BAW) filters of assessed quality - Part 2: Guidelines for the use
FprEN 61124:2012 (PR=22707) IEC 61124:201X (56/1461/FDIS) CLC/SR 56 IEC/TC 56 // Stage : 5060 2012-04-23 Reliability testing - Compliance tests for constant failure rate and constant failure intensity NOTE: Will supersede EN 61124:2006
FprEN 62628:2012 (PR=23644) IEC 62628:201X (56/1469/FDIS) CLC/SR 56 IEC/TC 56 // Stage : 5020 2012-07-20 Guidance on software aspects of dependability
FprEN 62673:2012 (PR=24147) IEC 62673:201X (56/1467/CDV) CLC/SR 56 IEC/TC 56 // Stage : 5020 2012-09-07 Methodology for communication network dependability assessment and assurance
FprEN 61010-2-091:2012 (PR=23058) IEC 61010-2-091:201X (66/462/FDIS) CLC/SR 66 IEC/TC 66 LVD (2006/95/EC) // Stage : 5060 2012-06-11 Safety requirements for electrical equipment for measurement, control and laboratory use - Part 2-091: Particular
requirements for cabinet x-ray systems NOTE: This FprEN is to be read in conjunction with EN 61010-1:2010
FprEN 61924-2:2011 (PR=23932) IEC 61924-2:201X (80/649/CDV) CLC/SR 80 IEC/TC 80 // Stage : 5060 2012-06-04 Maritime navigation and radiocommunication equipment and systems - Integrated navigation systems (INS) - Part 2:
Modular structure for INS - Operational and performance requirements, methods of testing and required test results
FprEN 61993-2:2012 (PR=23042) IEC 61993-2:201X (80/656/CDV) CLC/SR 80 IEC/TC 80 // Stage : 5020 2012-07-13 Maritime navigation and radiocommunication equipment and systems - Automatic Identification Systems (AIS) - Part 2: Class A shipborne equipment of the automatic identification system (AIS) - Operational and performance requirements, methods of test and required test results NOTE: Will supersede EN 61993-2:2002 * Second circulation of CDV at CLC level (circulation of 80/656/CDV
postponed at IEC level) --> first parallel vote cancelled
TB/SR Activities 112
CENELEC Inventory of Technical Activities
FprEN 62287-2:2012 (PR=24149) IEC 62287-2:201X (80/665/CDV) CLC/SR 80 IEC/TC 80 // Stage : 5020 2012-09-07 Maritime navigation and radiocommunication equipment and systems - Class B shipborne equipment of the
automatic identification system (AIS) - Part 2: Self-organising time division multiple access (SOTDMA) techniques
FprEN 62729:2012 (PR=23561) IEC 62729:201X (80/663/FDIS) CLC/SR 80 IEC/TC 80 // Stage : 5060 2012-06-11 Maritime navigation and radiocommunication equipment and systems - Shipborne equipment for long-range
identification and tracking (LRIT) - Performance requirements
FprEN 60469:2012 (PR=23995) IEC 60469:201X (85/409/CDV) CLC/SR 85 IEC/TC 85 // Stage : 5020 2012-06-22 Transitions, pulses and related waveforms - Terms, definitions and algorithms
FprEN 61557-10:2011 (PR=23742) IEC 61557-10:201X (85/395/CDV) CLC/SR 85 IEC/TC 85 LVD (2006/95/EC) // Stage : 5060 2012-03-12 Electrical safety in low voltage distribution systems up to 1 000 V a.c. and 1 500 V d.c. - Equipment for testing, measuring or monitoring of protective measures - Part 10: Combined measuring equipment for testing, measuring or monitoring of protective measures NOTE: Will supersede EN 61557-10:2001 * Awaiting outcome of RVC before further processing
FprEN 61557-14:2011 (PR=23826) IEC 61557-14:201X (85/402/CDV) CLC/SR 85 IEC/TC 85 LVD (2006/95/EC) // Stage : 5060 2012-04-16 Electrical safety in low voltage distribution systems up to 1 000 V a.c. and 1 500 V d.c. - Equipment for testing, measuring or monitoring of protective measures - Part 14: Equipment for testing the safety of electrical equipment of machinery NOTE: Awaiting outcome of RVC before further processing
FprEN 62586-1:2012 (PR=24159) IEC 62586-1:201X (85/415/CDV) CLC/SR 85 IEC/TC 85 EMC (2004/108/EC) // Stage : 5020 2012-09-14 Power quality measurement in power supply systems - Part 1: Power Quality Instruments (PQI)
FprEN 62586-2:2012 (PR=24160) IEC 62586-2:201X (85/416/CDV) CLC/SR 85 IEC/TC 85 EMC (2004/108/EC) // Stage : 5020 2012-09-14 Power quality measurement in power supply systems - Part 2: Functional tests and uncertainty requirements
FprEN 62638:2012 (PR=23387) IEC 62638:201X (85/408A/CDV) CLC/SR 85 IEC/TC 85 // Stage : 5020 2012-06-22 Recurrent test and test after repair NOTE: 85/408A/CDV cancels and replaces 85/408/CDV circulated on 2012-01-20; the document is reissued to
correct the title page. The voting deadline remains unchanged
TB/SR Activities 113
CENELEC Inventory of Technical Activities
FprEN 61280-1-1:2012 (PR=24154) IEC 61280-1-1:201X (86C/1065/CDV) CLC/SR 86C IEC/SC 86C // Stage : 5020 2012-09-14 Fibre optic communication subsystem basic test procedures - Part 1-1: Test procedures for general communication
subsystems - Transmitter output optical power measurement for single-mode optical fibre cable NOTE: Will supersede EN 61280-1-1:1998
FprEN 61280-2-2:2011 (PR=23880) IEC 61280-2-2:201X (86C/1043/CDV) CLC/SR 86C IEC/SC 86C // Stage : 5060 2012-03-19 Fibre optic communication subsystem test procedures - Part 2-2: Digital systems - Optical eye pattern, waveform and
extinction ratio measurement NOTE: Will supersede EN 61280-2-2:2008 * Shortened CDV period of 3 months for documents prepared by IEC/TC 40, IEC/TC 86 and IEC/TC 100 approved by CLC/BT in D138/086 * Awaiting outcome of RVC before further processing
FprEN 61757-1:2012 (PR=23627) IEC 61757-1:2012 CLC/SR 86C IEC/SC 86C // Stage : 5060 2012-05-21 Fibre optic sensors - Part 1: Generic specification NOTE: Will supersede EN 61757-1:1999
FprEN 62150-3:2012 (PR=23602) IEC 62150-3:201X (86C/1061/FDIS) CLC/SR 86C IEC/SC 86C // Stage : 5020 2012-06-01 Fibre optic active components and devices - Test and measurement procedures - Part 3: Optical power variation
induced by mechanical disturbance in optical receptacles and transceiver interfaces
FprEN 62343:2012 (PR=24025) IEC 62343:201X (86C/1055/CDV) CLC/SR 86C IEC/SC 86C // Stage : 5020 2012-07-13 Dynamic modules and devices - General and guidance
FprEN 62555:2011 (PR=23837) IEC 62555:201X (87/486/CDV) CLC/SR 87 IEC/TC 87 // Stage : 5060 2012-04-23 Ultrasonics - Power measurement - Output power measurement for high intensity therapeutic ultrasound (HITU)
transducers and systems NOTE: Awaiting outcome of RVC before further processing
FprEN 60695-4:2012 (PR=23566) IEC 60695-4:2012 CLC/SR 89 IEC/TC 89 // Stage : 5060 2012-04-23 Fire hazard testing - Part 4: Terminology concerning fire tests for electrotechnical products NOTE: Will supersede EN 60695-4:2006 *2012-05-23: Publication editing allocated to [email protected]
FprEN 60695-9-1:2012 (PR=24133) IEC 60695-9-1:201X (89/1111/CDV) CLC/SR 89 IEC/TC 89 // Stage : 5020 2012-08-24 Fire hazard testing - Part 9-1: Surface spread of flame - General guidance NOTE: Will supersede EN 60695-9-1:2005
TB/SR Activities 114
CENELEC Inventory of Technical Activities
FprEN 60695-11-3:2012 (PR=22826) IEC 60695-11-3:201X (89/1113/FDIS) CLC/SR 89 IEC/TC 89 LVD (2006/95/EC) // Stage : 5020 2012-07-06 Fire hazard testing - Part 11-3: Test flames - 500 W flames - Apparatus and confirmational test methods
FprEN 61788-5:2012 (PR=24134) IEC 61788-5:201X (90/295/CDV) CLC/SR 90 IEC/TC 90 // Stage : 5020 2012-09-07 Superconductivity - Part 5: Matrix to superconductor volume ratio measurement - Copper to superconductor volume
ratio of Cu/Nb-Ti composite superconducting wires NOTE: Will supersede EN 61788-5:2001
FprEN 61788-12:2012 (PR=24135) IEC 61788-12:201X (90/296/CDV) CLC/SR 90 IEC/TC 90 // Stage : 5020 2012-09-07 Superconductivity - Part 12: Matrix to superconductor volume ratio measurement - Copper to non-copper volume
ratio of Nb3Sn composite superconducting wires NOTE: Will supersede EN 61788-12:2002
FprEN 61788-13:2012 (PR=23531) IEC 61788-13:201X (90/302/FDIS) CLC/SR 90 IEC/TC 90 // Stage : 5020 2012-07-13 Superconductivity - Part 13: AC loss measurements - Magnetometer methods for hysteresis loss in superconducting
multifilamentary composites NOTE: Will supersede EN 61788-13:2003
FprEN 61788-16:2011 (PR=23838) IEC 61788-16:201X (90/285/CDV) CLC/SR 90 IEC/TC 90 // Stage : 5060 2012-04-23 Superconductivity - Part 16: Electronic characteristic measurements - Power-dependent surface resistance of
superconductors at microwave frequencies NOTE: Awaiting outcome of RVC before further processing
FprEN 61788-17:2011 (PR=23839) IEC 61788-17:201X (90/286/CDV) CLC/SR 90 IEC/TC 90 // Stage : 5060 2012-04-23 Superconductivity - Part 17: Electronic characteristic measurements - Local critical current density and its
distribution in large-area superconducting films NOTE: Awaiting outcome of RVC before further processing
FprEN 61788-18:2012 (PR=24188) IEC 61788-18:201X (90/301/CDV) CLC/SR 90 IEC/TC 90 // Stage : 5020 2012-10-05 Superconductivity - Part 18: Mechanical properties measurement - Room temperature tensile test of Ag- and/or Ag
alloy-sheathed Bi-2223 and Bi-2212 composite superconductors
FprEN 61182-2-2:2012 (PR=22770) IEC 61182-2-2:2012 CLC/SR 91 IEC/TC 91 // Stage : 5060 2012-04-23 Printed board assembly products - Manufacturing description data and transfer methodology - Part 2-2: Sectional
requirements for implementation of printed board fabrication data description NOTE: 2012-05-08 - Publication editing allocated to [email protected]
TB/SR Activities 115
CENELEC Inventory of Technical Activities
FprEN 61191-1:2011 (PR=23840) IEC 61191-1:201X (91/1014/CDV) CLC/SR 91 IEC/TC 91 // Stage : 5060 2012-04-23 Printed board assemblies - Part 1: Generic specification - Requirements for soldered electrical and electronic
assemblies using surface mount and related assembly technologies NOTE: Will supersede EN 61191-1:1998 * Awaiting outcome of RVC before further processing
FprEN 61191-2:2011 (PR=23841) IEC 61191-2:201X (91/1015/CDV) CLC/SR 91 IEC/TC 91 // Stage : 5060 2012-04-23 Printed board assemblies - Part 2: Sectional specification - Requirements for surface mount soldered assemblies NOTE: Will supersede EN 61191-2:1998 * Awaiting outcome of RVC before further processing
FprEN 61249-4-18:2011 (PR=23465) IEC 61249-4-18:201X (91/972/CDV) CLC/SR 91 IEC/TC 91 // Stage : 5060 2011-10-03 Materials for printed boards and other interconnecting structures - Part 4-18: Sectional specification set for prepreg materials, unclad (for the manufacture of multilayer boards) - Hich performance epoxide woven E-glass prepreg of defined flammability (vertical burning test) for lead-free assembly NOTE: Awaiting outcome of RVC before further processing
FprEN 61249-4-19:2011 (PR=23466) IEC 61249-4-19:201X (91/973/CDV) CLC/SR 91 IEC/TC 91 // Stage : 5060 2011-10-03 Materials for printed boards and other interconnecting structures - Part 4-19: Sectional specification set for prepreg materials, unclad (for the manufacture of multilayer boards) - Hich performance non-halogenated epoxide woven E- glass prepreg of defined flammability (vertical burning test) for lead-free assembly NOTE: Awaiting outcome of RVC before further processing
prEN 62468:2007 (PR=21106) IEC 62468:201X (91/642/CDV) CLC/SR 91 IEC/TC 91 // Stage : 5060 2007-10-19 The marking for the presence and absence of the specified chemical substances in materials, components and
mounted boards used in electrical and electronic equipment NOTE: 91/729/RVC established on 2007-09-28: Comments to be discussed at 16-19 October 2007 meeting
FprEN 62739-1:2012 (PR=24102) IEC 62739-1:201X (91/1029/CDV) CLC/SR 91 IEC/TC 91 // Stage : 5020 2012-08-10 Test method for erosion of wave soldering equipment using molten lead-free solder alloy - Part 1: Erosion test
method for metal materials without surface processing
FprEN 60255-26:2011 (PR=23743) IEC 60255-26:201X (95/287/CDV) CLC/SR 95 IEC/TC 95 EMC (2004/108/EC) // Stage : 5060 2012-03-12 Measuring relays and protection equipment - Part 26: Electromagnetic compatibility requirements NOTE: Will supersede EN 60255-26:2009, EN 60255-11:2010 (PART), EN 60255-22-1:2008, EN 60255-22-2:2008, EN 60255-22-3:2008, EN 60255-22-4:2008, EN 60255-22-5:2011, EN 60255-22-6:2001, EN 60255-22-7:2003, EN 60255-25:2000 * Awaiting outcome of RVC before further processing
TB/SR Activities 116
CENELEC Inventory of Technical Activities
FprEN 60255-127:2009 (PR=22510) IEC 60255-127:201X (95/254/CDV) CLC/SR 95 IEC/TC 95 // Stage : 5060 2010-03-23 Measuring relays and protection equipment - Part 127: Functional requirements for over/under voltage protection NOTE: EN 60255-127 and EN 60255-151:2009 will supersede EN 60255-3:1998 + corr. Jan. 1998 * 95/261/RVC
established on 2010-03-05: To be published without FDIS stage
FprEN 60255-149:2012 (PR=24235) IEC 60255-149:201X (95/295/CDV) CLC/SR 95 IEC/TC 95 // Stage : 5020 2012-10-26 Measuring relays and protection equipment - Part 149: Functional requirements for thermal electrical relays NOTE: Will supersede EN 60255-8:1998
EN 61558-2-16:2009/FprA1:2012 (PR=24208) IEC 61558-2-16:2009/A1:201X (96/393/CDV) CLC/SR 96 IEC/TC 96 LVD (2006/95/EC) // Stage : 5020 2012-10-12 Safety of transformers, reactors, power supply units and similar products for supply voltages up to 1 100 V - Part 2- 16: Particular requirements and tests for switch mode power supply units and transformers for switch mode power supply units
FprEN 61938:2011 (PR=23892) IEC 61938:201X (100/1921/CDV) CLC/SR 100 IEC/TC 100 // Stage : 5060 2012-04-06 Multimedia systems - Guide to the recommended characteristics of analogue interfaces to achieve interoperability NOTE: Will supersede EN 61938:1997 * 100/1958/RVC established on 2012-03-02: To be published without FDIS
stage
FprEN 62665:2011 (PR=23701) IEC 62665:2012 CLC/SR 100 IEC/TC 100 // Stage : 5060 2012-01-31 Multimedia systems and equipment - Multimedia e-publishing and e-books technologies - Texture map for auditory
presentation of printed texts NOTE: D133/C027: dow=dor + 12 months for revisions of standards * 100/1923/RVC established on 2011-12-09:
To be published without FDIS stage
FprEN 62553:2010 (PR=23080) IEC 62553:201X (103/89/CDV) CLC/SR 103 IEC/TC 103 // Stage : 5060 2012-04-04 Methods of measurement for digital network - Performance characteristics of terrestrial digital multimedia
transmission network NOTE: 103/106/RVC established on 2012-02-24: To be published without FDIS stage
FprEN 60068-2-65:2011 (PR=23581) IEC 60068-2-65:201X (104/556/CDV) CLC/SR 104 IEC/TC 104 // Stage : 5060 2011-11-23 Environmental testing - Part 2-65: Methods of test - Test Fg: Vibration, acoustically induced NOTE: Will supersede EN 60068-2-65:1994 * Awaiting outcome of RVC before further processing
FprEN 62282-3-300:2011 (PR=23091) IEC 62282-3-300:201X (105/377/FDIS) CLC/SR 105 IEC/TC 105 LVD (2006/95/EC) // Stage : 5060 2012-03-05 Fuel cell technologies - Part 3-300: Stationary fuel cell power systems - Installation NOTE: Will supersede EN 62282-3-3:2008
TB/SR Activities 117
CENELEC Inventory of Technical Activities
FprEN 62282-3-201:2012 (PR=23978) IEC 62282-3-201:201X (105/379/CDV) CLC/SR 105 IEC/TC 105 // Stage : 5020 2012-06-15 Fuel cell technologies - Part 3-201: Small stationary fuel cell power systems - Performance test methods
FprEN 62282-6-200:2012 (PR=23484) IEC 62282-6-200:201X (105/394/FDIS) CLC/SR 105 IEC/TC 105 // Stage : 5020 2012-07-06 Fuel cell technologies - Part 6-200: Micro fuel cell power systems - Performance test methods NOTE: Will supersede EN 62282-6-200:2008
FprEN 62282-6-300:2011 (PR=23862) IEC 62282-6-300:201X (105/370/CDV) CLC/SR 105 IEC/TC 105 // Stage : 5060 2012-05-07 Fuel cell technologies - Part 6-300: Micro fuel cell power systems - Fuel cartridge interchangeability NOTE: Will supersede EN 62282-6-300:2009 * Awaiting outcome of RVC before further processing
FprEN 61747-2-1:2012 (PR=24155) IEC 61747-2-1:201X (110/371/CDV) CLC/SR 110 IEC/TC 110 // Stage : 5020 2012-09-14 Liquid crystal display devices - Part 2-1: Passive matrix monochrome LCD modules - Blank detail specification NOTE: Will supersede EN 61747-2-1:2001
FprEN 61747-4:2011 (PR=23933) IEC 61747-4:201X (110/349/CDV) CLC/SR 110 IEC/TC 110 // Stage : 5060 2012-06-04 Liquid crystal display devices - Part 4: Liquid crystal display modules and cells - Essential ratings and characteristics NOTE: Will supersede EN 61747-4:1998
FprEN 61747-30-1:2012 (PR=23487) IEC 61747-30-1:201X (110/364/FDIS) CLC/SR 110 IEC/TC 110 // Stage : 5060 2012-06-19 Liquid crystal display devices - Part 30-1: Measuring methods for liquid crystal display modules - Transmissive type NOTE: Will supersede EN 61747-6:2004 * This project was circulated as FprEN 61747-6-1:2011 at CDV stage
(110/294/CDV); it has been changed to FprEN 61747-30-1:2012 at this FDIS stage.
FprEN 61747-40-1:2011 (PR=23668) IEC 61747-40-1:201X (110/319/CDV) CLC/SR 110 IEC/TC 110 // Stage : 5060 2012-01-30 Liquid crystal display devices - Part 40-1: Mechanical testing guidelines for display cover glass for mobile devices NOTE: Awaiting outcome of RVC before further processing
FprEN 61988-2-5:2012 (PR=23382) IEC 61988-2-5:2012 CLC/SR 110 IEC/TC 110 // Stage : 5060 2012-05-21 Plasma display panels - Part 2-5: Measuring methods - Acoustic noise NOTE: 2012-05-24: Publication editing allocated to [email protected]
FprEN 61988-4-2:2012 (PR=23381) IEC 61988-4-2:2012 CLC/SR 110 IEC/TC 110 // Stage : 5060 2012-04-23 Plasma Display Panels - Part 4-2: Environmental testing mathods - Panel strength
TB/SR Activities 118
CENELEC Inventory of Technical Activities
FprEN 62341-5-2:2011 (PR=23486) IEC 62341-5-2:201X (110/293/CDV) CLC/SR 110 IEC/TC 110 // Stage : 5060 2011-10-10 Organic Light Emitting Diode (OLED) displays - Part 5-2: Mechanical endurance test methods NOTE: Awaiting outcome of RVC before further processing
FprEN 62341-5-3:2012 (PR=24222) IEC 62341-5-3:201X (110/377/CDV) CLC/SR 110 IEC/TC 110 // Stage : 5020 2012-10-19 Organic light emitting diode (OLED) displays - Part 5-3: Measuring methods of image sticking and lifetime
FprEN 62341-6-3:2012 (PR=23472) IEC 62341-6-3:201X (110/374/FDIS) CLC/SR 110 IEC/TC 110 // Stage : 5020 2012-07-13 Organic light emitting diode (OLED) displays - Part 6-3: Measuring methods of image quality
FprEN 62629-22-1:2011 (PR=23894) IEC 62629-22-1:201X (110/347/CDV) CLC/SR 110 IEC/TC 110 // Stage : 5060 2012-05-21 3D Display Devices - Part 22-1: Measuring methods for Autostereoscopic displays - Optical NOTE: Awaiting outcome of RVC before further processing
FprEN 62679-3-2:2012 (PR=23979) IEC 62679-3-2:201X (110/351/CDV) CLC/SR 110 IEC/TC 110 // Stage : 5020 2012-06-15 Electronic paper display - Part 3-2: Measuring methods - Electro-optical
FprEN 60216-1:2012 (PR=24156) IEC 60216-1:201X (112/207/CDV) CLC/SR 112 IEC/TC 112 // Stage : 5020 2012-09-14 Electrical insulating materials - Thermal endurance properties - Part 1: Ageing procedures and evaluation of test
results NOTE: Will supersede EN 60216-1:2001
FprEN 60216-8:2012 (PR=24018) IEC 60216-8:201X (112/201/CDV) CLC/SR 112 IEC/TC 112 // Stage : 5020 2012-07-06 Electrical insulating materials - Thermal endurance properties - Part 8: Instructions for calculating thermal endurance
characteristics using simplified procedures
FprEN 60243-1:2011 (PR=23942) IEC 60243-1:201X (112/199/CDV) CLC/SR 112 IEC/TC 112 // Stage : 5060 2012-06-11 Electrical strength of insulating materials - Test methods - Part 1: Tests at power frequencies NOTE: Will supersede EN 60243-1:1998
FprEN 60544-2:2012 (PR=23599) IEC 60544-2:201X (112/208/FDIS) CLC/SR 112 IEC/TC 112 // Stage : 5020 2012-06-22 Electrical insulating materials - Determination of the effects of ionizing radiation on insulating materials - Part 2:
Procedures for irradiation and test
TB/SR Activities 119
CENELEC Inventory of Technical Activities
FprEN 62068:2011 (PR=23943) IEC 62068:201X (112/198/CDV) CLC/SR 112 IEC/TC 112 // Stage : 5060 2012-06-11 Electrical insulation materials and systems - General method of evaluation of electrical endurance under repetitive
voltage impulses NOTE: Will supersede EN 62068-1:2003
Vote decided
FprEN 62656-1:201X (PR=23739) IEC 62656-1:201X (3D/191/CDV) CLC/SR 3D IEC/SC 3D // Stage : 3090 2012-08-31 Draft for vote due at CCMC by: - Standardized product ontology register and transfer by spreadsheets - Part 1: Logical structure for data parcels NOTE: 3D/200/RVC established on 2012-02-24: FDIS decided
FprEN 62364:201X (PR=23275) IEC 62364:201X (4/260/CDV) CLC/SR 4 IEC/TC 4 // Stage : 3090 2012-08-31 Draft for vote due at CCMC by: - Hydraulic machines - Guide for dealing with hydro-abrasive erosion in Kaplan, Francis and Pelton turbines NOTE: 4/274/RVC established on 2012-03-30: FDIS decided
FprEN 62641:201X (PR=23397) IEC 62641:201X (7/606/CDV) CLC/SR 7 IEC/TC 7 // Stage : 3090 2012-06-30 Draft for vote due at CCMC by: - Conductors for overhead lines - Aluminium and aluminium alloy wires for concentric lay stranded conductors NOTE: Negative results at CLC level dropped - To follow IEC decision : 7/617/RVC established on 2011-09-23:
FDIS decided
FprEN 60422:201X (PR=23116) IEC 60422:201X (10/822/CDV) CLC/SR 10 IEC/TC 10 // Stage : 3090 - Draft for vote due at CCMC by: - Mineral insulating oils in electrical equipment - Supervision and maintenance guidance NOTE: Will supersede EN 60422:2006 * 10/841/RVC established on 2011-05-06: FDIS decided
FprEN 60455-3-8:201X (PR=23863) IEC 60455-3-8:201X (15/651/CDV) CLC/SR 15 IEC/TC 15 // Stage : 3090 2012-09-30 Draft for vote due at CCMC by: - Resin based reactive compounds used for electrical insulation - Part 3: Specifications for individual materials - Sheet
8: Resinous compounds for cable accessories NOTE: 15/677A/RVC established on 2012-05-04: FDIS decided
EN 60893-3-3:2004/FprA1:201X (PR=22206) IEC 60893-3-3:2003/A1:2011 CLC/SR 15 IEC/TC 15 // Stage : 3090 2011-03-31 Draft for vote due at CCMC by: - Insulating materials - Industrial rigid laminated sheets based on thermosetting resins for electrical purposes - Part 3-
3: Specifications for individual materials - Requirements for rigid laminated sheets based on melamine resins NOTE: 15/616/RVC established on 2011-02-18: FDIS decided
TB/SR Activities 120
CENELEC Inventory of Technical Activities
EN 60893-3-4:2004/FprA1:201X (PR=22203) IEC 60893-3-4:2003/A1:200X (15/490/CDV) CLC/SR 15 IEC/TC 15 // Stage : 3090 2011-03-31 Draft for vote due at CCMC by: - Insulating materials - Industrial rigid laminated sheets based on thermosetting resins for electrical purposes - Part 3-
4: Specifications for individual materials - Requirements for rigid laminated sheets based on phenolic resins NOTE: 15/620/RVC established on 2011-02-25: FDIS decided
FprEN 61212-3-1:201X (PR=23240) IEC 61212-3-1:201X (15/607/CDV) CLC/SR 15 IEC/TC 15 // Stage : 3090 2011-11-30 Draft for vote due at CCMC by: - Insulating materials - Industrial rigid round laminated tubes and rods based on thermosetting resins for electrical
purposes - Part 3: Specifications for individual materials - Sheet 1: Round laminated rolled tubes NOTE: Will supersede EN 61212-3-1:2006 * 15/640/RVC established on 2011-06-24: FDIS decided
FprEN 61212-3-2:201X (PR=23733) IEC 61212-3-2:201X (15/646/CDV) CLC/SR 15 IEC/TC 15 // Stage : 3090 2012-09-30 Draft for vote due at CCMC by: - Insulating materials - Industrial rigid round laminated tubes and rods based on thermosetting resins for electrical
purposes - Part 3: Specifications for individual materials - Sheet 2: Round laminated moulded tubes NOTE: Will supersede EN 61212-3-2:2006 * 15/660/RVC established on 2012-02-10: FDIS decided
FprEN 61439-4:201X (PR=23399) IEC 61439-4:201X (17D/436/CDV) CLC/SR 17D IEC/SC 17D EMC (2004/108/EC) LVD (2006/95/EC) // Stage : 3090 2012-05-31 Draft for vote due at CCMC by: - Low-voltage switchgear and controlgear assemblies - Part 4: Assemblies for construction sites (ACS) NOTE: Will supersede EN 60439-4:2004 * To be read in conjunction with EN 61439-1:201X * Initially handled by
CLC/TC 17D (dormant) * 17D/455/RVC established on 2012-05-04: FDIS decided
FprEN ISO 80000-1:201X (PR=24161) ISO 80000-1:2009 CLC/SR 25 IEC/TC 25 Stage : 3090 2012-09-13 Draft for vote due at CCMC by: - Quantities and units - Part 1: General NOTE: Adoption of ISO 80000-1:2009 - CEN lead (Resolution CEN/BT 5/2012) - Track: UAP
FprEN ISO 80000-2:201X (PR=24162) ISO 80000-2:2009 CLC/SR 25 IEC/TC 25 Stage : 3090 2012-09-13 Draft for vote due at CCMC by: - Quantities and units - Part 2: Mathematical signs and symbols to be used in the natural sciences and technology NOTE: Adoption of ISO 80000-2:2009 - CEN lead (Resolution CEN/BT 5/2012) - Track: UAP
FprEN ISO 80000-3:201X (PR=24163) ISO 80000-3:2006 CLC/SR 25 IEC/TC 25 Stage : 3090 2012-09-13 Draft for vote due at CCMC by: - Quantities and units - Part 3: Space and time NOTE: Adoption of ISO 80000-3:2006 - CEN lead (Resolution CEN/BT 5/2012) - Track: UAP
TB/SR Activities 121
CENELEC Inventory of Technical Activities
FprEN ISO 80000-4:201X (PR=24164) ISO 80000-4:2006 CLC/SR 25 IEC/TC 25 Stage : 3090 2012-09-13 Draft for vote due at CCMC by: - Quantities and units - Part 4: Mechanics NOTE: Adoption of ISO 80000-4:2006 - CEN lead (Resolution CEN/BT 5/2012) - Track: UAP
FprEN ISO 80000-5:201X (PR=24165) ISO 80000-5:2007 CLC/SR 25 IEC/TC 25 Stage : 3090 2012-09-13 Draft for vote due at CCMC by: - Quantities and units - Part 5: Thermodynamics NOTE: Adoption of ISO 80000-5:2007 - CEN lead (Resolution CEN/BT 5/2012) - Track: UAP
FprEN ISO 80000-7:201X (PR=24166) ISO 80000-7:2008 CLC/SR 25 IEC/TC 25 Stage : 3090 2012-09-13 Draft for vote due at CCMC by: - Quantities and units - Part 7: Light NOTE: Adoption of ISO 80000-7:2008 - CEN lead (Resolution CEN/BT 5/2012) - Track: UAP
FprEN ISO 80000-9:201X (PR=24167) ISO 80000-9:2009 CLC/SR 25 IEC/TC 25 Stage : 3090 2012-09-13 Draft for vote due at CCMC by: - Quantities and units - Part 9: Physical chemistry and molecular physics NOTE: Adoption of ISO 80000-9:2009 - CEN lead (Resolution CEN/BT 5/2012) - Track: UAP
FprEN ISO 80000-10:201X (PR=24168) ISO 80000-10:2009 CLC/SR 25 IEC/TC 25 Stage : 3090 2012-09-13 Draft for vote due at CCMC by: - Quantities and units - Part 10: Atomic and nuclear physics NOTE: Adoption of ISO 80000-10:2009 - CEN lead (Resolution CEN/BT 5/2012) - Track: UAP
FprEN ISO 80000-11:201X (PR=24169) ISO 80000-11:2008 CLC/SR 25 IEC/TC 25 Stage : 3090 2012-09-13 Draft for vote due at CCMC by: - Quantities and units - Part 11: Characteristic numbers NOTE: Adoption of ISO 80000-11:2008 - CEN lead (Resolution CEN/BT 5/2012) - Track: UAP
FprEN ISO 80000-12:201X (PR=24170) ISO 80000-12:2009 CLC/SR 25 IEC/TC 25 Stage : 3090 2012-09-13 Draft for vote due at CCMC by: - Quantities and units - Part 12: Solid state physics NOTE: Adoption of ISO 80000-12:2009 - CEN lead (Resolution CEN/BT 5/2012) - Track: UAP
FprEN 61260-1:201X (PR=23748) IEC 61260-1:201X (29/748/CDV) CLC/SR 29 IEC/TC 29 // Stage : 3090 2012-12-31 Draft for vote due at CCMC by: - Electroacoustics - Octave-band and fractional-octave-band filters - Part 1: Specifications NOTE: Will partially supersede EN 61260:1995 + A1:2001 * 29/758/RVC established on 2012-03-09: FDIS decided
TB/SR Activities 122
CENELEC Inventory of Technical Activities
FprEN 61672-1:201X (PR=23117) IEC 61672-1:201X (29/724/CDV) CLC/SR 29 IEC/TC 29 // Stage : 3090 2011-12-31 Draft for vote due at CCMC by: - Electroacoustics - Sound level meters - Part 1: Specifications NOTE: Will supersede EN 61672-1:2003 * 29/739/RVC established on 2011-02-25: FDIS decided
FprEN 61672-2:201X (PR=23118) IEC 61672-2:201X (29/725/CDV) CLC/SR 29 IEC/TC 29 // Stage : 3090 2011-12-31 Draft for vote due at CCMC by: - Electroacoustics - Sound level meters - Part 2: Pattern evaluation tests NOTE: Will supersede EN 61672-2:2003 * 29/740/RVC established on 2011-02-25: FDIS decided
FprEN 61672-3:201X (PR=23119) IEC 61672-3:201X (29/726/CDV) CLC/SR 29 IEC/TC 29 // Stage : 3090 2011-12-31 Draft for vote due at CCMC by: - Electroacoustics - Sound level meters - Part 3: Periodic tests NOTE: Will supersede EN 61672-3:2006 * 29/741/RVC established on 2011-02-25: FDIS decided
FprEN 60143-2:201X (PR=23424) IEC 60143-2:201X (33/486/CDV) CLC/SR 33 IEC/TC 33 LVD (2006/95/EC) // Stage : 3090 2012-05-30 Draft for vote due at CCMC by: - Series capacitors for power systems - Part 2: Protective equipments for series capacitor banks NOTE: Will supersede EN 60143-2:1994 * 35/500/RVC established on 2012-03-16: FDIS decided
EN 60810:2003/FprA2:201X (PR=23642) IEC 60810:2003/A2:201X (34A/1496/CDV) CLC/SR 34A IEC/SC 34A // Stage : 3090 2012-05-31 Draft for vote due at CCMC by: - Lamps for road vehicles - Performance requirements NOTE: 34A/1542/RVC established on 2011-12-23: FDIS decided
EN 62031:2008/FprA1:201X (PR=23143) IEC 62031:2008/A1:201X (34A/1416/CDV) CLC/SR 34A IEC/SC 34A LVD (2006/95/EC) // Stage : 3090 2012-03-31 Draft for vote due at CCMC by: - LED modules for general lighting - Safety specifications NOTE: 34A/1461/RVC + 34A/1461A/RVC established on 2012-01-13: FDIS decided
FprEN 60099-5:201X (PR=23147) IEC 60099-5:201X (37/371/CDV) CLC/SR 37 IEC/TC 37 // Stage : 3090 2011-12-31 Draft for vote due at CCMC by: - Surge arresters - Part 5: Selection and application recommendations NOTE: Will supersede EN 60099-5:1996 + A1:1999 * 37/387/RVC + 37/387A/RVC established on 2011-09-02:
FDIS decided
TB/SR Activities 123
CENELEC Inventory of Technical Activities
FprEN 61643-311:201X (PR=22795) IEC 61643-311:201X (37B/98/CDV) CLC/SR 37B IEC/SC 37B // Stage : 3090 2011-06-30 Draft for vote due at CCMC by: - Components for low-voltage surge protective devices - Part 311: Test circuits and methods for gas discharge tubes NOTE: Future EN 61643-311 (PR=22795), EN 61643-312 (PR=22796) and EN 61643-313 (PR=22797) will
supersede EN 61643-311:2001 * 37B/105/RVC established on 2011-04-15: FDIS decided
FprEN 61643-312:201X (PR=22796) IEC 61643-312:201X (37B/99/CDV) CLC/SR 37B IEC/SC 37B // Stage : 3090 2011-06-30 Draft for vote due at CCMC by: - Components for low-voltage surge protective devices - Part 312: Preferred values and characteristics for gas
discharge tubes NOTE: Future EN 61643-311 (PR=22795), EN 61643-312 (PR=22796) and EN 61643-313 (PR=22797) will
supersede EN 61643-311:2001 * 37B/106/RVC established on 2011-04-15: FDIS decided
FprEN 61643-313:201X (PR=22797) IEC 61643-313:201X (37B/100/CDV) CLC/SR 37B IEC/SC 37B // Stage : 3090 2011-06-30 Draft for vote due at CCMC by: - Components for low-voltage surge protective devices - Part 313: Selection and applications principles for gas
discharge tubes NOTE: Future EN 61643-311 (PR=22795), EN 61643-312 (PR=22796) and EN 61643-313 (PR=22797) will
supersede EN 61643-311:2001 * 37B/107/RVC established on 2011-04-15: FDIS decided
FprEN 60286-3:201X (PR=23373) IEC 60286-3:201X (40/2088/CDV) CLC/SR 40 IEC/TC 40 // Stage : 3090 2012-02-28 Draft for vote due at CCMC by: - Packaging of components for automatic handling - Part 3: Packaging of surface mount components on continuous
tapes NOTE: Will supersede EN 60286-3:2007 * 40/2138/RVC established on 2011-10-21: FDIS decided
FprEN 61169-43:201X (PR=23824) IEC 61169-43:201X (46F/200/CDV) CLC/SR 46F IEC/SC 46F // Stage : 3090 2012-05-31 Draft for vote due at CCMC by: - Radio-frequency connectors - Part 43: Sectional specification for RBMA Series Blind mating RF coaxial connectors NOTE: 46F/2011/RVC established on 2012-03-23: FDIS decided.
EN 60749-27:2006/FprA1:201X (PR=23706) IEC 60749-27:2006/A1:201X (47/2107/CDV) CLC/SR 47 IEC/TC 47 // Stage : 3090 2012-05-31 Draft for vote due at CCMC by: - Semiconductor devices - Mechanical and climatic test methods - Part 27: Electrostatic discharge (ESD) sensitivity
testing - Machine model (MM) NOTE: 47/2125/RVC established on 2012-03-09: FDIS decided
TB/SR Activities 124
CENELEC Inventory of Technical Activities
FprEN 60191-4:201X (PR=23598) IEC 60191-4:201X (47D/803/CDV) CLC/SR 47D IEC/SC 47D // Stage : 3090 2012-02-28 Draft for vote due at CCMC by: - Mechanical standardization of semiconductor devices - Part 4: Coding system and classification into forms of
package outlines for semiconductor device packages NOTE: Will supersede EN 60191-4:1999 + A1:2002 + A2:2002 * This sending cancels and replaces the one of 2011-06-03 as the circulation of 47D/803/CDV has been postponed at IEC level. * 47D/813/RVC established on 2011-11-25: FDIS decided
FprEN 60191-6-5:201X (PR=23098) IEC 60191-6-5:201X (47D/781/CDV) CLC/SR 47D IEC/SC 47D // Stage : 3090 2011-06-30 Draft for vote due at CCMC by: - Mechanical standardization of semiconductor devices - Part 6-5: General rules for the preparation of outline
drawings of surface mounted semiconductor device packages - Design guide for fine-pitch ball grid array (FBGA) NOTE: Will supersede EN 60191-6-5:2001 * 47D/794/RVC established on 2011-04-01: FDIS decided.
FprEN 60747-16-5:201X (PR=23129) IEC 60747-16-5:201X (47E/401/CDV) CLC/SR 47E IEC/SC 47E // Stage : 3090 2011-11-30 Draft for vote due at CCMC by: - Semiconductor devices - Part 16-5: Microwave integrated circuits - Oscillators NOTE: 47E/414/RVC established on 2011-08-12: FDIS decided
FprEN 60512-28-100:201X (PR=23836) IEC 60512-28-100:201X (48B/2271/CDV) CLC/SR 48B IEC/SC 48B // Stage : 3090 2012-10-30 Draft for vote due at CCMC by: - Connectors for electronic equipment - Tests and measurements - Part 28-100: Signal integrity tests up to 1 000 mhz
on IEC 60603-7 and IEC 61076-3 series connectors - Tests 28a to 28g NOTE: 48B/2298/RVC established on 2012-04-13: FDIS decided
prEN 61076-3-105:201X (PR=17049) IEC 61076-3-105:201X (48B/1552/CDV) CLC/SR 48B IEC/SC 48B // Stage : 4099 2006-09-30 Draft for vote due at CCMC by: - Connectors for electronic equipment - Part 3-105: Detail specification for 4 pair balanced, individually shielded, fixed and free connectors with a characteristic impedance of 100 ohms, covering a frequency range from DC to 1 500 MHz NOTE: 48B/1673A/RVC: FDIS decided
FprEN 62276:201X (PR=23153) IEC 62276:201X (49/927/CDV) CLC/SR 49 IEC/TC 49 // Stage : 3090 2011-06-30 Draft for vote due at CCMC by: - Single Crystal Wafers for Surface Acoustic Wave (SAW) devices applications - Specification and measuring method NOTE: Will supersede EN 62276:2005 * 49/948/RVC established on 2011-04-01: FDIS decided.
FprEN 62358:201X (PR=23339) IEC 62358:201X (51/993/CDV) CLC/SR 51 IEC/TC 51 // Stage : 3090 2012-03-30 Draft for vote due at CCMC by: - Ferrite cores - Standard inductance factor for gapped cores and its tolerance NOTE: Will supersede EN 62358:2004 * 51/1002/RVC established on 2011-09-23: FDIS decided.
TB/SR Activities 125
CENELEC Inventory of Technical Activities
FprEN 62674-1:201X (PR=23338) IEC 62674-1:201X (51/992/CDV) CLC/SR 51 IEC/TC 51 // Stage : 3090 2012-03-30 Draft for vote due at CCMC by: - High frequency inductive components - Part 1: Fixed surface mount inductors for use in electronic and
telecommunication equipment NOTE: 51/1001/RVC established on 2011-09-23: FDIS decided.
FprEN 61710:201X (PR=23517) IEC 61710:201X (56/1424/CDV) CLC/SR 56 IEC/TC 56 // Stage : 3090 2011-12-31 Draft for vote due at CCMC by: - Power law model - Goodness-of-fit tests and estimation methods NOTE: 56/1455/RVC established on 2011-10-07: FDIS decided.
FprEN 62506:201X (PR=23221) IEC 62506:201X (56/1401/CDV) CLC/SR 56 IEC/TC 56 // Stage : 3090 2011-07-31 Draft for vote due at CCMC by: - Methods for product accelerated testing NOTE: 56/1427/RVC established on 2011-05-13: FDIS decided
FprEN 62551:201X (PR=23154) IEC 62551:201X (56/1397/CDV) CLC/SR 56 IEC/TC 56 // Stage : 3090 2012-03-31 Draft for vote due at CCMC by: - Analysis techniques for dependability - Petri net techniques NOTE: 56/1423/RVC + 56/1423A/RVC established on 2012-01-27: FDIS decided
FprEN 61010-2-032:201X (PR=23816) IEC 61010-2-032:201X (66/457/CDV) CLC/SR 66 IEC/TC 66 LVD (2006/95/EC) // Stage : 3090 2012-09-30 Draft for vote due at CCMC by: - Safety requirements for electrical equipment for measurement, control, and laboratory use - Part 2-032: Particular
requirements for hand-held and hand-manipulated current sensors for electrical test and measurement NOTE: Will supersede EN 61010-2-032:2002
FprEN 60404-11:201X (PR=23819) IEC 60404-11:1991 + A1:1998 + A2:2012 CLC/SR 68 IEC/TC 68 Stage : 1090 - Draft for vote due at CCMC by: - Magnetic materials - Part 11: Method of test for the determination of surface insulation resistance of magnetic sheet
and strip NOTE: D139/C197: UAP to be launched on IEC 60404-11:1991 + A1:1998 + Future A2 when FDIS is available,
FprEN 60404-11:201X will replace EN 10282:2001
FprEN 60404-15:201X (PR=23444) IEC 60404-15:201X (68/423/CDV) CLC/SR 68 IEC/TC 68 // Stage : 3090 2012-03-31 Draft for vote due at CCMC by: - Magnetic materials - Part 15: Methods for the determination of the relative magnetic permeability of feebly magnetic
materials NOTE: 68/431/RVC + 68/431A/RVC established on 2011-10-07: FDIS decided
TB/SR Activities 126
CENELEC Inventory of Technical Activities
FprEN 60688:201X (PR=23283) IEC 60688:201X (85/382/CDV) CLC/SR 85 IEC/TC 85 LVD (2006/95/EC) // Stage : 3090 2011-10-31 Draft for vote due at CCMC by: - Electrical measuring transducers for converting a.c. electrical quantities to analogue or digital signals NOTE: Will supersede EN 60688:1992 + A1:1999 + A2:2001 * 85/398/RVC established on 2011-09-16: FDIS
decided
EN 61157:2007/FprA1:201X (PR=23754) IEC 61157:2007/A1:201X (87/482/CDV) CLC/SR 87 IEC/TC 87 // Stage : 3090 - Draft for vote due at CCMC by: - Standard means for the reporting of the acoustic output of medical diagnostic ultrasonic equipment NOTE: 87/500/RVC established on 2012-03-09: FDIS decided
FprEN 61161:201X (PR=23755) IEC 61161:201X (87/483/CDV) CLC/SR 87 IEC/TC 87 // Stage : 3090 2012-09-30 Draft for vote due at CCMC by: - Ultrasonics - Power measurement - Radiation force balances and performance requirements NOTE: Will supersede EN 61161:2007 * 87/501/RVC established on 2012-03-09: FDIS decided
FprEN 61689:201X (PR=23756) IEC 61689:201X (87/484/CDV) CLC/SR 87 IEC/TC 87 // Stage : 3090 2012-09-30 Draft for vote due at CCMC by: - Ultrasonics - Physiotherapy systems - Field specifications and methods of measurement in the frequency range 0,5
MHz to 5 MHz NOTE: Will supersede EN 61689:2007 * To be read in conjunction with EN 60601-2-5:201X (pr=21936) *
87/502/RVC established on 2012-03-09: FDIS decided
EN 62127-1:2007/FprA1:201X (PR=23751) IEC 62127-1:2007/A1:201X (87/479/CDV) CLC/SR 87 IEC/TC 87 // Stage : 3090 2012-09-30 Draft for vote due at CCMC by: - Ultrasonics - Hydrophones - Part 1: Measurement and characterization of medical ultrasonic fields up to 40 MHz NOTE: 87/497/RVC established on 2012-03-09: FDIS decided
EN 62127-2:2007/FprA1:201X (PR=23752) IEC 62127-2:2007/A1:201X (87/480/CDV) CLC/SR 87 IEC/TC 87 // Stage : 3090 2012-09-30 Draft for vote due at CCMC by: - Ultrasonics - Hydrophones - Part 2: Calibration for ultrasonic fields up to 40 MHz NOTE: 87/498/RVC established on 2012-03-09: FDIS decided
EN 62127-3:2007/FprA1:201X (PR=23753) IEC 62127-3:2007/A1:201X (87/481/CDV) CLC/SR 87 IEC/TC 87 // Stage : 3090 2012-09-30 Draft for vote due at CCMC by: - Ultrasonics - Hydrophones - Part 3: Properties of hydrophones for ultrasonic fields up to 40 MHz NOTE: 87/499/RVC established on 2012-03-09: FDIS decided
TB/SR Activities 127
CENELEC Inventory of Technical Activities
FprEN 60695-2-10:201X (PR=23727) IEC 60695-2-10:201X (89/1076/CDV) CLC/SR 89 IEC/TC 89 LVD (2006/95/EC) // Stage : 3090 2012-05-31 Draft for vote due at CCMC by: - Fire hazard testing - Part 2-10: Glowing/hot-wire based test methods - Glow-wire apparatus and common test
procedure NOTE: Will supersede EN 60695-2-10:2011 * 89/1105/RVC established on 2012-02-03: FDIS decided
FprEN 60695-11-2:201X (PR=23729) IEC 60695-11-2:201X (89/1078/CDV) CLC/SR 89 IEC/TC 89 LVD (2006/95/EC) // Stage : 3090 2012-05-31 Draft for vote due at CCMC by: - Fire hazard testing - Part 11-2: Test flames - 1 kW nominal pre-mixed flame: Apparatus, confirmatory test
arrangement and guidance NOTE: Will supersede EN 60695-11-2:2003 * 89/1107/RVC established on 2012-02-10: Revised CDV to be
circulated
FprEN 60695-11-10:201X (PR=23730) IEC 60695-11-10:201X (89/1079/CDV) CLC/SR 89 IEC/TC 89 LVD (2006/95/EC) // Stage : 3090 2012-05-31 Draft for vote due at CCMC by: - Fire hazard testing - Part 11-10: Test flames - 50 W horizontal and vertical flame test methods NOTE: Will supersede EN 60695-11-10:1999 + A1:2003 * 89/1106/RVC established on 2012-02-03: FDIS decided
FprEN 60695-11-20:201X (PR=23731) IEC 60695-11-20:201X (89/1080/CDV) CLC/SR 89 IEC/TC 89 LVD (2006/95/EC) // Stage : 3090 2012-05-31 Draft for vote due at CCMC by: - Fire hazard testing - Part 11-20: Test flames - 500 W flame test methods NOTE: Will supersede EN 60695-11-20:1999 + A1:2003 * 89/1108/RVC established on 2012-02-10: Revised CDV
to be circulated
FprEN 61189-11:201X (PR=23740) IEC 61189-11:201X (91/1001/CDV) CLC/SR 91 IEC/TC 91 // Stage : 3090 2012-08-31 Draft for vote due at CCMC by: - Test methods for electrical materials, interconnection structures and assemblies - Part 11: Measurement of melting
temperature or melting temperature ranges of solder alloys NOTE: 91/1040/RVC established on 2012-04-20: FDIS decided
FprEN 61193-3:201X (PR=22318) IEC 61193-3:201X (91/859/CDV) CLC/SR 91 IEC/TC 91 // Stage : 3090 2011-03-31 Draft for vote due at CCMC by: - Quality assessment systems - Part 3: Selection and use of sampling plans for printed board and laminate end-product
and in-process auditing NOTE: 91/936/RVC + 91/936A/RVC established on 2010-11-12: FDIS decided
FprEN 61249-2-27:201X (PR=23132) IEC 61249-2-27:201X (91/946/CDV) CLC/SR 91 IEC/TC 91 // Stage : 3090 2011-09-30 Draft for vote due at CCMC by: - Materials for printed boards and other interconnecting structures - Part 2-27: Reinforced base materials clad and unclad - Bismaleimide/triazine modified with non-halogenated epoxide woven glass laminate sheets of defined flammability (vertical burning test), copper-clad NOTE: 91/989/RVC established on 2011-08-19: FDIS decided
TB/SR Activities 128
CENELEC Inventory of Technical Activities
FprEN 61249-2-30:201X (PR=23133) IEC 61249-2-30:201X (91/947/CDV) CLC/SR 91 IEC/TC 91 // Stage : 3090 2011-09-30 Draft for vote due at CCMC by: - Materials for printed boards and other interconnecting structures - Part 2-30: Reinforced base materials clad and unclad - Non-halogenated epoxide modified cyanate ester woven glass laminate sheets of defined flammability (vertical burning test), copper-clad NOTE: 91/993/RVC established on 2011-08-19: FDIS decided
FprEN 61249-2-39:201X (PR=23134) IEC 61249-2-39:201X (91/948/CDV) CLC/SR 91 IEC/TC 91 // Stage : 3090 2011-09-30 Draft for vote due at CCMC by: - Materials for printed boards and other interconnecting structures - Part 2-39: Reinforced base materials clad and unclad - Modified epoxide and non-epoxide, woven E-glass laminated sheets of defined flammability (vertical burning test), copper-clad for lead-free assembly NOTE: 91/990/RVC established on 2011-08-19: FDIS decided
FprEN 61249-2-40:201X (PR=23135) IEC 61249-2-40:201X (91/949/CDV) CLC/SR 91 IEC/TC 91 // Stage : 3090 2011-09-30 Draft for vote due at CCMC by: - Materials for printed boards and other interconnecting structures - Part 2-40: Reinforced base materials clad and unclad - High performance, modified, non-halogenated epoxide woven E-glass laminated sheets of defined flammability (vertical burning test), copper-clad for lead-free assembly NOTE: 91/991/RVC established on 2011-08-19: FDIS decided
prEN 62326-3:201X (PR=16232) IEC 62326-3:201X (91/445/CDV) CLC/SR 91 IEC/TC 91 // Stage : 4099 2005-12-31 Draft for vote due at CCMC by: - Printed boards - Part 3: Safety certification of rigid printed circuit boards for use in electronic assemblies
(performance for capability approval) NOTE: 91/482A/RVC established on 2005-09-02: FDIS decided
FprEN 61558-2-14:201X (PR=23533) IEC 61558-2-14:201X (96/376/CDV) CLC/SR 96 IEC/TC 96 LVD (2006/95/EC) // Stage : 3090 2012-05-31 Draft for vote due at CCMC by: - Safety of transformers, reactors, power supply units and combinations thereof - Part 2-14: Particular requirements
and test for variable transformers and power supply units incorporating variable transformers NOTE: To be read in conjunction with EN 61558-1:2005 + A1:2009 * 96/389/RVC + 96/389A/RVC established on
2012-04-27: FDIS decided.
FprEN 61558-2-26:201X (PR=23532) IEC 61558-2-26:201X (96/375/CDV) CLC/SR 96 IEC/TC 96 LVD (2006/95/EC) // Stage : 3090 2012-05-31 Draft for vote due at CCMC by: - Safety of transformers, reactors, power supply units and combinations thereof - Part 2-26: Particular requirements
and tests for transformers and power supply units for saving energy and other purposes NOTE: To be read in conjunction with EN 61558-1:2005 * 96/388/RVC established on 2011-11-25: FDIS decided
TB/SR Activities 129
CENELEC Inventory of Technical Activities
FprEN 60068-1:201X (PR=22975) IEC 60068-1:201X (104/517/CDV) CLC/SR 104 IEC/TC 104 // Stage : 3090 2011-11-30 Draft for vote due at CCMC by: - Environmental testing - Part 1: General and guidance NOTE: Will supersede EN 60068-1:1994 * 104/563/RVC + 104/563A/RVC established on 2011-10-28: FDIS
decided
FprEN 60068-2-55:201X (PR=23105) IEC 60068-2-55:201X (104/528/CDV) CLC/SR 104 IEC/TC 104 // Stage : 3090 2011-09-30 Draft for vote due at CCMC by: - Environmental testing - Part 2-55: Tests - Test Ee and guidance: Loose cargo testing including bounce NOTE: Will supersede EN 60068-2-55:1993 * 104/552/RVC established on 2011-04-15: FDIS decided
FprEN 60068-2-57:201X (PR=23106) IEC 60068-2-57:201X (104/530/CDV) CLC/SR 104 IEC/TC 104 // Stage : 3090 2011-09-30 Draft for vote due at CCMC by: - Envionmental testing - Part 2-57: Test methods - Test Ff: Vibration - Time-history & sine-beat method NOTE: 104/553/RVC established on 2011-04-15: FDIS decided * CDV was circulated as IEC 60068-2-
57:2000/FprA1
FprEN 60068-2-78:201X (PR=23470) IEC 60068-2-78:201X (104/549/CDV) CLC/SR 104 IEC/TC 104 // Stage : 3090 2012-02-28 Draft for vote due at CCMC by: - Environmental testing - Part 2-78: Tests - Test Cab: Damp heat, steady state NOTE: Will supersede EN 60068-2-78:2001 * 104/567/RVC + 104/567A/RVC established on 2011-11-04: FDIS
decided
FprEN 60721-2-1:201X (PR=23467) IEC 60721-2-1:201X (104/546/CDV) CLC/SR 104 IEC/TC 104 // Stage : 3090 2012-02-28 Draft for vote due at CCMC by: - Classification of environmental conditions - Part 2-1: Environmental conditions appearing in nature - Temperature
and humidity NOTE: Will supersede HD 478.2.1 S1:1989 * 104/564/RVC + 104/564A/RVC established on 2011-11-04: FDIS
decided
FprEN 60721-2-2:201X (PR=23468) IEC 60721-2-2:201X (104/547/CDV) CLC/SR 104 IEC/TC 104 // Stage : 3090 2012-02-28 Draft for vote due at CCMC by: - Classification of environmental conditions - Part 2-2: Environmental conditions appearing in nature - Precipitation
and wind NOTE: Will supersede HD 478.2.2:1990 * 104/565/RVC + 104/565A/RVC established on 2011-11-04: FDIS decided
FprEN 60721-2-3:201X (PR=23469) IEC 60721-2-3:201X (104/548/CDV) CLC/SR 104 IEC/TC 104 // Stage : 3090 2012-02-28 Draft for vote due at CCMC by: - Classification of environmental conditions - Part 2-3: Environmental conditions appearing in nature - Air pressure NOTE: Will supersede HD 478.2.3 S1:1990 * 104/566/RVC + 104/566A/RVC established on 2011-11-04: FDIS
decided
TB/SR Activities 130
CENELEC Inventory of Technical Activities
FprEN 62282-5-1:201X (PR=23107) IEC 62282-5-1:201X (105/299/CDV) CLC/SR 105 IEC/TC 105 LVD (2006/95/EC) // Stage : 3090 2011-09-15 Draft for vote due at CCMC by: - Fuel cell technologies - Part 5-1: Portable fuel cell power systems - Safety NOTE: Will supersede EN 62282-5-1:2007 * 105/323/RVC + 105/323A/RVC established on 2011-11-18: FDIS
decided
EN 62282-6-100:2010/FprA1:201X (PR=23791) IEC 62282-6-100:2010/A1:201X (105/348/CDV) CLC/SR 105 IEC/TC 105 // Stage : 3090 2012-06-30 Draft for vote due at CCMC by: - Fuel cell technologies - Part 6-100: Micro fuel cell power systems - Safety NOTE: 105/391/RVC established on 2012-03-16: FDIS decided
FprEN 62595:201X (PR=23637) IEC 62595:201X (110/316/CDV) CLC/SR 110 IEC/TC 110 // Stage : 3090 2012-05-15 Draft for vote due at CCMC by: - Electro-optical measurement methods of LED backlight unit for liquid crystal displays NOTE: 110/360/RVC established on 2012-03-02: FDIS decided
At Secretariat stage
FprEN 61169-1:201X (PR=23597) IEC 61169-1:201X (46F/192A/CDV) CLC/SR 46F IEC/SC 46F // Stage : 5092 2011-12-31 Radio-frequency connectors - Part 1: Generic specification - General requirements and measuring methods NOTE: Will supersede EN 61169-1:1994 + A1:1996 + A2:1997 * 46F/202/RVC established on 2011-11-11: Revised
CDV expected
FprEN 60695-2-11 (PR=23728) IEC 60695-2-11:201X (89/1077/CDV) CLC/SR 89 IEC/TC 89 LVD (2006/95/EC) // Stage : 3092 2012-05-31 Draft for vote due at CCMC by: - Fire hazard testing - Part 2-11: Glowing/hot-wire based test methods - Glow-wire flammability test method for end-
products NOTE: Will supersede EN 60695-2-11:2001 * 89/1109/RVC established on 2012-02-10: Revised Committee Draft
(CD) to be circulated
PQ/UQ launched
prEN 60493-1 (PR=24030) IEC 60493-1:2011 CLC/SR 112 IEC/TC 112 Stage : 1520 2012-06-29 Draft for vote due at CCMC by: 2014-07-08 Guide for the statistical analysis of ageing test data - Part 1: Methods based on mean values of normally distributed
test results NOTE: DE NC request: PQ procedure to be approved by 141 BT (Feb 2012) * D141/C067: Request approved *
2012-03-23 - PQ processing allocated to [email protected]
TB/SR Activities 131
CENELEC Inventory of Technical Activities
New work item to be approved (BT/TC)
FprEN 62560:2010/prA (PR=24115) CLC/SR 34A LVD (2006/95/EC) Stage : 1000 2012-04-24 Draft for vote due at CCMC by: - Self-ballasted LED-lamps for general lighting services by voltage > 50 V - Safety specifications NOTE: NWI requested to 141 BT meeting following Danish Safety Technology Authority appeal - FprEN on hold
TB/SR Activities 132
CENELEC Inventory of Technical Activities
BT Task Force and BT Working Group activities
BTTF 62-3
Operation of electrical installations
To prepare a standard, as described in BT(DE/NOT)110 (Operation of power installations - Part 1: General Requirements).
Remarks 67 BT decided that BTTF 62-3 should prepare a standard dealing with the broad (general) principles of operation of power installations and asked BTTF 62-3 to take into account the essential requirements of the directive on safety at the work place. 74 BT agreed to change the title of BTTF 62-3 into "Operation of electrical installations".
Officers Meetings Convenor: Mr Andreas LANTWIN ( DE) Brussels 2009-10-26 / 10-27
Helsinki 2010-10-04 / 10-06 Vienna 2011-10-10 / 10-12 Stockholm 2012-05-21 / 05-23
At Secretariat stage
prEN 50110-1:201X (PR=21676) CLC/BTTF 62-3 Stage : 2020 - Draft for vote due at CCMC by: 2014-04-27 Operation of electrical installations NOTE: Project reactivated further to extension of 9 months requested by BTTF secretary * Enquiry processing allocated to [email protected] * Revision of EN 50110-1:2004 (PR=13757) to improve definition and understandability of responsibility levels in EN 50110 * D140/C032: CENELEC enquiry approved
BTTF/BTWG Activities 133
CENELEC Inventory of Technical Activities
BTTF 69-3
Road traffic signal systems
To prepare a standard, as described in BT(DE/NOT)141 (Road traffic signal systems).
Officers Meetings Convenor: Mr David OVERTON ( GB) Amsterdam 2010-03-22
Frankfurt 2011-03-25 Amsterdam 2012-03-26 / 03-27 Prague 2013-03-01
Ratified
EN 50293:201X (PR=22902) CLC/BTTF 69-3 EMC (2004/108/EC) Stage : 5099 2012-06-08 Road traffic signal systems - Electromagnetic compatibility NOTE: 2012-05-04 - Publication editing allocated to [email protected] * Will supersede EN
50293:2000
New work item to be approved (BT/TC)
EN 50556:2011/prA (PR=24179) CLC/BTTF 69-3 Stage : 1000 2012-05-02 Draft for vote due at CCMC by: - Road traffic signal systems NOTE: NWI to be requested to 141BT * UAP track
BTTF/BTWG Activities 134
CENELEC Inventory of Technical Activities
BTTF 76-3
Test schedules related to CENELEC Guide 17
To decide on the acceptance or rejection of proposed provisional test schedules, as described under subclause 4.2.1 of CENELEC Guide 17 : Procedure for the certification of products not fully covered by safety standards because of technical progress for use within the CENELEC Certification Agreement (CCA).
Officers Meetings Convenor: Dr Ing. Gerhard DREGER ( DE) Brussels 2005-02-28
Situation as of September 2011
PTS 94001 WITHDRAWN (Socket-outlets provided with socket-contact shutters)
PTS 2001/02 Tumble dryers which use a refrigerating system with non- flammable refrigerant, incorporating sealed motor compressors, for dehumidification process PTS 2002/01 Particular requirements for professional ice-cream makers and similar machines which use a refrigerating system operating with non flammable refrigerant, incorporating sealed motor compressors PTS 2007-01 Particular requirements for combined appliances for multifunctional shower cabinets and sauna PTS 2010-01 Particular requirements for glass heated appliance to be used as a part of the enclosure of the shower cabinet
BTTF/BTWG Activities 135
CENELEC Inventory of Technical Activities
BTWG 80-3
Database and electronic communications
To advise BT on measures and procedures related to a more efficient use of modern data handling and on the gradual introduction of electronic data interchange in the daily operations of CENELEC.
To identify and access needs expressed by the persons responsible for CENELEC National Committee management in relation to the Central Secretariat database and associated communication facilities.
To assist the Central Secretariat - in the preparation of specifications for the services offered to National Committees by Central Secretariat, - in the development of these services.
To help the Central Secretariat in defining guidelines for CENELEC's cooperation with multilateral and advisory groups such as ISO/IEC/ITU IT Strategic Group and AGC.
Officers Meetings Convenor: Mr Richard VALENTA ( AT) Vilnius 2009-04-22
Brussels 2009-11-17 Agia Napa 2010-04-14 Brussels 2010-10-27
No standardization work registered
BTTF/BTWG Activities 136
CENELEC Inventory of Technical Activities
BTWG 101-5
Usability and safety of electrical products with reference to people with special needs
To prepare a CENELEC response to EC study mandates for the production of guidance documents in the field of safety and usability of electrical products with reference to people with special needs (e.g. children, elderly and people with disabilities).
To define general guidelines to ensure that Design for All and Assistive Technologies requirements are taken into account when performing standardization work in CENELEC.
To comment to the list of recommendations if appropriate.
To identify where CENELEC standardization is needed and define a work programme in response to the mandate.
Officers Meetings Convenor: Mr Oscar QUEROL ( ES) Barcelona 2005-11-22
No standardization work registered
BTTF/BTWG Activities 137
CENELEC Inventory of Technical Activities
BTWG 112-1 (dormant)
Improvement of EN 60309-1 and EN 60309-2
To work out possible common modifications to EN 60309-1 and EN 60309-2 on plugs, socket-outlets and couplers for industrial purposes, on the basis of the commments put forward by the Italian National Committee.
Officers Meetings Convenor: Mr Giacomo SCAINELLI ( IT) France 2006-02-28
Published (last 12 months)
EN 60309-2:1999/A2:2012 (PR=23616) IEC 60309-2:1999/A2:2012 CLC/BTWG 112-1 IEC/SC 23H LVD (2006/95/EC) RAIL (2008/57/EC) // Stage : 6060 Plugs, socket-outlets and couplers for industrial purposes - Part 2: Dimensional interchangeability requirements for
pin and contact-tube accessories NOTE: 2012-02-29 - Publication editing allocated to [email protected] . dor : 2012-04-19 doa : 2012-07-19 dop : 2013-01-19 dow: 2015-04-19
EN 60309-4:2007/A1:2012 (PR=23617) IEC 60309-4:2006/A1:2012 CLC/BTWG 112-1 IEC/SC 23H LVD (2006/95/EC) // Stage : 6060 Plugs, socket-outlets and couplers for industrial purposes - Part 4: Switched socket-outlets and connectors with or
without interlock NOTE: 2012-03-21: Publication processing allocated to [email protected] dor : 2012-04-19 doa : 2012-07-19 dop : 2013-01-19 dow: 2015-04-19
Vote launched
EN 60309-1:1999/FprA2:2012 (PR=23615) IEC 60309-1:1999/A2:201X (23H/282/FDIS) CLC/BTWG 112-1 IEC/SC 23H LVD (2006/95/EC) RAIL (2008/57/EC) // Stage : 5060 2012-06-04 Plugs, socket-outlets and couplers for industrial purposes - Part 1: General requirements NOTE: 23H/278/RVC established on 2012-02-03: FDIS decided
BTTF/BTWG Activities 138
CENELEC Inventory of Technical Activities
BTTF 116-1
Fluids for electrotechnical applications
To prepare a draft standard, as described in BT(IT/NOT)83 (Fluids for electrotechnical applications - National standard for the inventory control, handling, decontamination and/or disposal of electrical equipment and insulating fluids containing PCBs).
Officers Meetings Convenor: Mr Massimo POMPILI ( IT) Milan 2009-06-10
Published (last 12 months)
EN 61181:2007/A1:2012 (PR=23514) IEC 61181:2007/A1:2012 CLC/BTTF 116-1 IEC/TC 10 // Stage : 6060 Mineral oil-filled electrical equipment - Application of dissolved gas analysis (DGA) to factory tests on electrical
equipment NOTE: 2012-03-09: Publication editing allocated to [email protected] dor : 2012-03-29 doa : 2012-06-29 dop : 2012-12-29 dow: 2015-03-29
BTTF/BTWG Activities 139
CENELEC Inventory of Technical Activities
BTTF 116-2
Alcohol interlocks
To develop two European standards on the subject.
Officers Meetings Convenor: Mr Johannes LAGOIS ( DE) Frankfurt 2011-03-03 / 03-04
Frankfurt 2011-06-09 / 06-10 Helsinki 2011-11-10 / 11-11 Frankfurt 2012-10-25 / 10-26
Enquiry decided
prEN 50436-1:201X (PR=23306) CLC/BTTF 116-2 Stage : 3099 - Draft for vote due at CCMC by: 2013-07-15 Alcohol interlocks - Test methods and performance requirements - Part 1: Instruments for drink-driving-offender
programs NOTE: Will supersede EN 50436-1:2005 * D138/C130: NWI approved * 2011-06 decision: Draft to be prepared and submitted to enquiry * 2012-03-28 - Enquiry processing allocated to [email protected] * CLC/BT approval received
prEN 50436-2:201X (PR=23356) CLC/BTTF 116-2 Stage : 3099 - Draft for vote due at CCMC by: 2013-07-15 Alcohol interlocks - Test methods and performance requirements - Part 2: Instruments having a mouthpiece and
measuring breath alcohol for general preventive use NOTE: Will supersede EN 50436-2:2007 * D138/C130: NWI approved * 2011-06 decision: Draft to be prepared and submitted to enquiry * 2012-03-28 - Enquiry processing allocated to [email protected] * CLC/BT approval received
BTTF/BTWG Activities 140
CENELEC Inventory of Technical Activities
BTWG 126-2
Internal regulations
To deal with Parts 2 and 3 of the Internal Regulations
Officers Meetings Convenor: Mr Rene NIELSEN ( DK) Brussels 2007-11-21
Warsaw 2008-02-05 Brussels 2009-10-08 Brussels 2011-05-31
No standardization work registered
BTTF/BTWG Activities 141
CENELEC Inventory of Technical Activities
BTTF 128-2
Erection and operation of electrical test equipment
To revise EN 50191:1999 "Erection and operation of electrical test equipment"
Officers Meetings Convenor: Mr Hans-Peter STEIMEL ( DE) Cologne 2008-12-02
Cologne 2009-01-16 Frankfurt 2009-11-17 Cologne 2010-06-16
No standardization work registered
BTTF/BTWG Activities 142
CENELEC Inventory of Technical Activities
BTWG 128-3
BT efficiency
Officers Meetings Convenor: Mr Mike GRAHAM ( GB) Brussels 2009-10-08
Brussels 2010-07-06 Brussels 2011-05-31 Brussels 2011-12-02
No standardization work registered
BTTF/BTWG Activities 143
CENELEC Inventory of Technical Activities
BTTF 129-1
Thermal resistant aluminium alloy wire for overhead line conductor
To revise prEN 62004:2006 "Thermal resistant aluminium alloy wire for overhead line conductor"
Officers Meetings
Convenor: Mr Peter FIERS ( AT)
No standardization work registered
BTTF/BTWG Activities 144
CENELEC Inventory of Technical Activities
BTTF 132-1
Aluminium conductors steel supported (ACSS type) for overhead electrical lines to handle the VILAMOURA notification BT/ES0023/NOT under Spanish convenorship with participation of AT, BE, DE, FR and IT NCs
Officers Meetings Convenor: Mr Jose Angel ORAINDI ( ES) Madrid 2008-09-23
Paris 2009-01-20 Vienna 2009-04-15
No standardization work registered
BTTF/BTWG Activities 145
CENELEC Inventory of Technical Activities
BTTF 132-2
Revision of EN 50156 "Electrical equipment for furnaces and ancillary equipment"
To revise EN 50156
Officers Meetings
Convenor: Mr Bernhard HOFFMANN ( DE)
Enquiry launched
prEN 50156-1:2012 (PR=21846) CLC/BTTF 132-2 LVD (2006/95/EC) PED (97/23/EC) Stage : 4020 2012-10-05 Draft for vote due at CCMC by: 2011-12-31 Electrical equipment for furnaces and ancillary equipment - Part 1: Requirements for application design and
installation NOTE: D138/056: (Under Benchmark 3) Target date for vote extended to read 2011-12-31
BTTF/BTWG Activities 146
CENELEC Inventory of Technical Activities
BTTF 133-1
Sound systems for emergency purposes which are not part of fire detection and alarm systems
To prepare a draft residual standard based on EN 60849:1998 that is complementary to EN 54-16 "Fire detection and fire alarm systems -- Part 16: Voice alarm control and indicating equipment"
Officers Meetings Convenor: Mr Wolfgang PEIN ( DE) Frankfurt 2010-05-19
Frankfurt 2010-07-17 / 07-18 Frankfurt 2010-08-17 / 08-18 Frankfurt 2011-09-23
Vote launched
FprEN 50849:2011 (PR=22098) CLC/BTTF 133-1 Stage : 5060 2012-04-23 Sound systems for emergency purposes NOTE: 2011-10-04: UAP editing allocated to [email protected] * Will supersede EN 60849:1998 * D133/044: CLC/BTTF 133-1 set up to prepare draft residual standard based on EN 60849:1998 that is
complementary to EN 54-16 - Residual standard to be numbered in EN 50000 series + situation of EN 60849:1998 to be evaluated when the new EN is ratified
BTTF/BTWG Activities 147
CENELEC Inventory of Technical Activities
BTWG 138-1
CENELEC/BT action plan
To establish a CENELEC/BT Action Plan in view of the implementation of the CENELEC strategy 2010-2013
Officers Meetings Convenor: Dr Carlo MASETTI ( IT) Brussels 2011-09-06
Brussels 2011-12-02
No standardization work registered
BTTF/BTWG Activities 148
CENELEC Inventory of Technical Activities
Technical committees activities
TC 2
Rotating machinery
To prepare harmonized standards giving specifications and application rules for rotating machines based on IEC publication 34 "Rotating electrical machines" and its parts and also standards relating to the mechanical vibration of these machines. New work is concentrated only on subjects which have not already been proposed to IEC TC 2 or to one of its Working Groups.
Officers Meetings Secretary: Mr Bernhard SATTLER ( DE) Brussels 2007-12-06
Chairman: Mr Michel LHENRY ( FR)
Published (last 12 months)
EN 60034-16-1:2011 (PR=22898) IEC 60034-16-1:2011 CLC/TC 2 IEC/TC 2 // Stage : 6060 Rotating electrical machines - Part 16-1: Excitation systems for synchronous machines - Definitions NOTE: 2011-05-27: Publication allocated to [email protected] * Supersedes EN 60034-16-1:1995 dor : 2011-06-29 doa : 2011-09-29 dop : 2012-03-29 dow: 2014-06-29
Vote launched
FprEN 60034-18-31:2012 (PR=23513) IEC 60034-18-31:201X (2/1662/FDIS) CLC/TC 2 IEC/TC 2 // Stage : 5020 2012-06-01 Rotating electrical machines - Part 18-31: Functional evaluation of insulation systems - Test procedures for form-
wound windings - Thermal evaluation and classification of insulation systems used in rotating machines NOTE: Will supersede EN 60034-18-31:1994 + A1:1996 * 2/1656/RVC established on 2012-02-03: FDIS decided
FprEN 60034-18-34:2012 (PR=23057) IEC 60034-18-34:201X (2/1660/FDIS) CLC/TC 2 IEC/TC 2 // Stage : 5060 2012-05-28 Rotating electrical machines - Part 18-34: Functional evaluation of insulation systems - Test procedures for form-
wound windings - Evaluation of thermomechanical endurance of insulation systems NOTE: Will supersede CLC/TS 60034-18-34:2004
Vote decided
FprEN 60034-18-21:201X (PR=23512) IEC 60034-18-21:201X (2/1629/CDV) CLC/TC 2 IEC/TC 2 // Stage : 3090 2012-03-31 Draft for vote due at CCMC by: - Rotating electrical machines - Part 18-21: Functional evaluation of insulation systems - Test procedures for wire-
wound windings - Thermal evaluation and classification NOTE: Will supersede EN 60034-18-21:1994 + A1:1996 + A2:1996 * 2/1659/RVC established on 2012-02-10:
FDIS decided
Technical committees Activities 149
CENELEC Inventory of Technical Activities
FprEN 60034-28:201X (PR=23741) IEC 60034-28:201X (2/1639/CDV) CLC/TC 2 IEC/TC 2 // Stage : 3090 2012-04-30 Draft for vote due at CCMC by: - Rotating electrical machines - Part 28: Test methods for determining quantities of equivalent circuit diagrams for
three-phase low-voltage cage induction motors NOTE: Will supersede EN 60034-28:2007 * 2/1661/RVC + 2/1661A/RVC established on 2011-03-30: FDIS decided
At Secretariat stage
FprEN 60034-2-3:201X (PR=23462) IEC 60034-2-3:201X (2/1626/CDV) CLC/TC 2 IEC/TC 2 // Stage : 5092 2012-09-30 Rotating electrical machines - Part 2-3: Specific test methods for determining losses and efficiency of converter-fed
AC motors NOTE: 2/1643/RVC established on 2011-10-14: Revised CDV will be distributed by 2012-09
Technical committees Activities 150
CENELEC Inventory of Technical Activities
TC 8X
System aspects of electrical energy supply
To prepare the necessary standards framework and coordinate the development, in cooperation with other TC/SCs, of CENELEC standards needed to facilitate the functioning of electricity supply systems in open markets.
Officers Meetings Chairman: Mr Hervé ROCHEREAU ( FR) Brussels 2009-12-02 Secretary: Mr Simone BOTTON ( IT) Brussels 2010-10-27
Brussels 2011-11-24 Brussels 2012-11-22
Published (last 12 months)
EN 60038:2011 (PR=23225) IEC 60038:2009 (Modified) CLC/TC 8X IEC/TC 8 Stage : 6060 CENELEC standard voltages NOTE: Supersedes HD 472 S1:1989 + corr. Feb.2002 + A1:1995 dor : 2011-09-05 doa : 2012-03-05 dop : 2012-09-05 dow: 2014-09-05
Vote launched
EN 50160:2010/FprAA:2010 (PR=22961) CLC/TC 8X Stage : 5091 - Voltage characteristics of electricity supplied by public electricity networks NOTE: D136/C121: NWI to improve consensus on 4.2.2.2, keeping in mind elements associated with dispersed generation and faster phenomena * Views of all stakeholders (including cooperating partners) taken into account * Mode 4 of Cooperation to be established with TBs who expressed comments
CLC/FprTS 50549-1:2011 (PR=20863) CLC/TC 8X Stage : 5060 2011-10-24 Requirements for the connection of generators above 16 A per phase - Part 1: Connection to the LV distribution
system NOTE: Vote failed * 2011-11-24 decision: New voting draft to be issued - Draft for second vote to be available at
CCMC by 2012-06-30
CLC/FprTS 50549-2:2011 (PR=23224) CLC/TC 8X Stage : 5060 2011-10-24 Requirements for the connection of generators above 16 A per phase - Part 2: Connection to the MV distribution
system NOTE: Vote failed * 2011-11-24 decision: New voting draft to be issued - Draft for second vote to be available at
CCMC by 2012-06-30
Technical committees Activities 151
CENELEC Inventory of Technical Activities
At Secretariat stage
CLC/prTR 50422 (PR=23209) CLC/TC 8X Stage : 2020 2012-10-25 Draft for vote due at CCMC by: 2012-12-31 Guide for the application of the European Standard EN 50160 NOTE: D137/022: NWI approved by BT * Revision of CLC/TR 50422 taking into account the new edition of EN 50160 * 2011-11 TC advice: Priority work to be handled by WG 1 - TF 8. Draft expected 4 weeks before November 2012 plenary meeting
New work item approved
prEN 50438 (PR=22109) CLC/TC 8X Stage : 1099 2009-08-01 Draft for vote due at CCMC by: 2012-10-05 Requirements for the connection of micro-generators in parallel with public low-voltage distribution networks NOTE: D134/C071: NWI approved with target date for vote: 2010-12-31 * 2010-10 TC decision: To begin shortly the voting procedure and immediately after the vote, to start a new maintenance work in order to amend clause 4.2.2 and Annex H (jointly with WG 1) * D139/047: Extension of tdv approved to read 2012-10-05
CLC/prTR 50XXX (PR=23226) CLC/TC 8X Stage : 1099 - Draft for vote due at CCMC by: 2011-12-31 Status of smart grid projects in Europe NOTE: D138/C036: NWI approved with target date for vote: 2011-12-31 * TR to provide useful input to the
European Commission Task Force on Smart Grids
Technical committees Activities 152
CENELEC Inventory of Technical Activities
TC 9X
Electrical and electronic applications for railways
Standardization of electrical and electronic systems, equipment and associated software for use in all railway applications, whether on vehicles or fixed installations, including urban transport.
Officers Meetings Secretary: Mr Bernard LEROUGE ( FR) Verona 2011-06-29 / 07-01 Chairman: Mr Daniele BOZZOLO ( IT) Fehraltorf 2011-12-14 / 12-16
Vienna 2012-06-13 / 06-15 Prague 2012-11-21 / 11-23
Published (last 12 months)
EN 50553:2012 (PR=20779) CLC/TC 9X RAIL (2008/57/EC) Stage : 6060 Railway applications - Requirements for running capability in case of fire on board of rolling stock NOTE: 2011-12-20 - Publication editing allocated to [email protected] dor : 2012-01-23 doa : 2012-07-23 dop : 2013-01-23 dow: 2015-01-23
EN 62290-2:2011 (PR=22815) IEC 62290-2:2011 CLC/TC 9X IEC/TC 9 // Stage : 6060 Railway applications - Urban guided transport management and command/control systems - Part 2: Functional
requirements specification dor : 2011-07-26 doa : 2011-10-26 dop : 2012-04-26 dow : 2014-07-26
EN 62520:2011 (PR=22465) IEC 62520:2011 CLC/TC 9X IEC/TC 9 // Stage : 6060 Railway applications - Electric traction - Short-primary type linear induction motors (LIM) fed by power converters NOTE: 2011-05-27: Publication allocated to [email protected] . dor : 2011-06-29 doa : 2011-09-29 dop : 2012-03-29 dow : 2014-06-29
Vote launched
FprEN 61375-1:2012 (PR=22486) IEC 61375-1:201X (9/1641/FDIS) CLC/TC 9X IEC/TC 9 RAIL (2008/57/EC) // Stage : 5060 2012-05-01 Electronic railway equipment - Train communication network (TCN) - Part 1: General architecture NOTE: Simultaneous circulation with all FDISs related to IEC 61375-2-2, -3-1, -3-2, -3-3.
FprEN 61375-2-1:2012 (PR=22487) IEC 61375-2-1:201X (9/1642/FDIS) CLC/TC 9X IEC/TC 9 RAIL (2008/57/EC) // Stage : 5060 2012-05-01 Electronic railway equipment - Train communication network (TCN) - Part 2-1: Wire Train Bus (WTB)
Technical committees Activities 153
CENELEC Inventory of Technical Activities
FprEN 61375-2-2:2012 (PR=22488) IEC 61375-2-2:201X (9/1643/FDIS) CLC/TC 9X IEC/TC 9 RAIL (2008/57/EC) // Stage : 5060 2012-05-01 Electronic railway equipment - Train communication network (TCN) - Part 2-2: Wire Train Bus conformance testing
FprEN 61375-2-5:2012 (PR=24005) IEC 61375-2-5:201X (9/1629/CDV) CLC/TC 9X IEC/TC 9 RAIL (2008/57/EC) // Stage : 5020 2012-06-29 Electronic railway equipment - Train backbone - Part 2-5: Ethernet Train Backbone
FprEN 61375-3-1:2012 (PR=22489) IEC 61375-3-1:201X (9/1644/FDIS) CLC/TC 9X IEC/TC 9 RAIL (2008/57/EC) // Stage : 5060 2012-05-01 Electronic railway equipment - Train communication network (TCN) - Part 3-1: Multifunction Vehicle Bus (MVB)
FprEN 61375-3-2:2012 (PR=22490) IEC 61375-3-2:201X (9/1645/FDIS) CLC/TC 9X IEC/TC 9 RAIL (2008/57/EC) // Stage : 5060 2012-05-01 Electronic railway equipment - Train communication network (TCN) - Part 3-2: MVB (Multifunction vehicle bus)
conformance testing
FprEN 61375-3-3:2012 (PR=22491) IEC 61375-3-3:201X (9/1646/FDIS) CLC/TC 9X IEC/TC 9 RAIL (2008/57/EC) // Stage : 5060 2012-05-01 Electronic railway equipment - Train communication network (TCN) - Part 3-3: CANopen Consist Network (CCN)
FprEN 61375-3-4:2011 (PR=23886) IEC 61375-3-4:201X (9/1616/CDV) CLC/TC 9X IEC/TC 9 // Stage : 5060 2012-05-21 Electronic railway equipment - Train Bus - Part 3-4: ECN - Ethernet Consist Network
FprEN 62625-1:2012 (PR=24072) IEC 62625-1:201X (9/1657/CDV) CLC/TC 9X IEC/TC 9 RAIL (2008/57/EC) // Stage : 5020 2012-08-03 Electronic railway equipment - On board driving data recording system - Part 1: System specification Mandated: M/483
Vote decided
prEN 50463-1:2011 (PR=21429) CLC/TC 9X MID (2004/22/EC) RAIL (2008/57/EC) Stage : 4099 - Draft for vote due at CCMC by: 2012-09-30 Railway applications - Energy measurement on board trains - Part 1: General NOTE: EN 50463-1 (pr=21429), EN 50463-2 (pr=21455), EN 50463-3 (pr=21430), EN 50463-4 (pr=21431) and EN 50463-5 (pr=22597) together will supersede EN 50463:2007 (pr=15982) * D139/C179 + D139/047: Extension of tdv approved to read 2012-09-30*2012-02-13: FV editing allocated to [email protected]. Mandated: M/334
Technical committees Activities 154
CENELEC Inventory of Technical Activities
prEN 50463-2:2011 (PR=21455) CLC/TC 9X MID (2004/22/EC) RAIL (2008/57/EC) Stage : 4099 - Draft for vote due at CCMC by: 2012-09-30 Railway applications - Energy measurement on board trains - Part 2: Energy measuring NOTE: EN 50463-1 (pr=21429), EN 50463-2 (pr=21455), EN 50463-3 (pr=21430), EN 50463-4 (pr=21431) and EN 50463-5 (pr=22597) together will supersede EN 50463:2007 (pr=15982) * D139/C179 + D139/047: Extension of tdv approved to read 2012-09-30*2012-02-13: FV editing allocated to [email protected]. Mandated: M/334
prEN 50463-3:2011 (PR=21430) CLC/TC 9X MID (2004/22/EC) RAIL (2008/57/EC) Stage : 4099 - Draft for vote due at CCMC by: 2012-09-30 Railway applications - Energy measurement on board trains - Part 3: Data handling NOTE: EN 50463-1 (pr=21429), EN 50463-2 (pr=21455), EN 50463-3 (pr=21430), EN 50463-4 (pr=21431) and EN 50463-5 (pr=22597) together will supersede EN 50463:2007 (pr=15982) * D139/C179 + D139/047: Extension of tdv approved to read 2012-09-30*2012-02-13: FV editing allocated to [email protected]. Mandated: M/334
prEN 50463-4:2011 (PR=21431) CLC/TC 9X MID (2004/22/EC) RAIL (2008/57/EC) Stage : 4099 - Draft for vote due at CCMC by: 2012-09-30 Railway applications - Energy measurement on board trains - Part 4: Communication NOTE: EN 50463-1 (pr=21429), EN 50463-2 (pr=21455), EN 50463-3 (pr=21430), EN 50463-4 (pr=21431) and EN 50463-5 (pr=22597) together will supersede EN 50463:2007 (pr=15982) * D139/C179 + D139/047: Extension of tdv approved to read 2012-09-30*2012-02-13: FV editing allocated to [email protected]. Mandated: M/334
prEN 50463-5:2011 (PR=22597) CLC/TC 9X MID (2004/22/EC) RAIL (2008/57/EC) Stage : 4099 - Draft for vote due at CCMC by: 2012-09-30 Railway applications - Energy measurement on board trains - Part 5: Conformity assessment NOTE: EN 50463-1 (pr=21429), EN 50463-2 (pr=21455), EN 50463-3 (pr=21430), EN 50463-4 (pr=21431) and EN 50463-5 (pr=22597) together will supersede EN 50463:2007 (pr=15982) * D139/C179 + D139/047: Extension of tdv approved to read 2012-09-30*201-202-13: FV editing allocated to [email protected]. Mandated: M/334
At Secretariat stage
prEN 50126-1 (PR=21752) CLC/TC 9X RAIL (2008/57/EC) Stage : 2020 2011-06-30 Draft for vote due at CCMC by: 2013-03-31 Railway applications - The specification and Demonstration of Reliability, Availability, Maintainability and Safety
(RAMS) - Part 1: Generic RAMS process NOTE: D132/C130: NWI approved * In hands of WG 14 * To be offered to IEC to revise IEC 62278 * D138/C125: Extension of the target date for vote approved to read 2013-03-31 * 2012-02 TC advice: Draft for enquiry expected 2012-03 Mandated: M/334; M/483
prEN 50126-2 (PR=21753) CLC/TC 9X RAIL (2008/57/EC) Stage : 2020 2011-06-30 Draft for vote due at CCMC by: 2013-03-31 Railway applications - The specification and Demonstration of Reliability, Availability, Maintainability and Safety
(RAMS) - Part 2: Systems Approach to Safety NOTE: D132/C130: NWI approved * In hands of WG 14 * D138/C125: Extension of the target date for vote
approved to read 2013-03-31 * 2012-02 TC advice: Draft for enquiry expected 2012-03 Mandated: M/334; M/483
Technical committees Activities 155
CENELEC Inventory of Technical Activities
prEN 50126-4 (PR=21754) CLC/TC 9X RAIL (2008/57/EC) Stage : 2020 2011-06-30 Draft for vote due at CCMC by: 2013-03-31 Railway applications - The specification and Demonstration of Reliability, Availability, Maintainability and Safety
(RAMS) - Part 4: Functional Safety - Electric and electronic systems NOTE: D132/C130: NWI approved * Full revision and re-organization of EN 50126 series needed to get a full set of standards covering the whole railway system * In hands of WG 14 * To be offered to IEC to revise IEC 62278 * D138/C125: Extension of the target date for vote approved to read 2013-03-31 Mandated: M/334; M/483
prEN 50126-5 (PR=21755) CLC/TC 9X RAIL (2008/57/EC) Stage : 2020 2011-06-30 Draft for vote due at CCMC by: 2013-03-31 Railway applications - The specification and Demonstration of Reliability, Availability, Maintainability and Safety
(RAMS) - Part 5: Functional Safety - Software NOTE: D132/C130: NWI approved * Full revision and re-organization of EN 50126 series needed to get a full set of standards covering the whole railway system * In hands of WG 14 * To be offered to IEC to revise IEC 62278 * D138/C125: Extension of the target date for vote approved to read 2013-03-31 Mandated: M/334; M/483
prEN 50155 (PR=21756) CLC/TC 9X RAIL (2008/57/EC) Stage : 2020 2011-06-30 Draft for vote due at CCMC by: 2013-03-31 Railway applications - Electronic equipment used on rolling stock NOTE: D132/C130: NWI approved * Revision of EN 50155 needed to check consistency with revised EN 50126 series and make necessary adaptations * To be offered to IEC to revise IEC 60571 * D138/C125: Extension of the target date for vote approved to read 2013-03-31 Mandated: M/334; M/483
New work item approved
prEN 50121-1 (PR=23680) CLC/TC 9X EMC (2004/108/EC) Stage : 1099 - Draft for vote due at CCMC by: 2014-01-15 Railway applications - Electromagnetic compatibility - Part 1: General NOTE: D139/C178: NWI approved * In hands of WG 15 Mandated: M/483
prEN 50121-2 (PR=23681) CLC/TC 9X EMC (2004/108/EC) Stage : 1099 - Draft for vote due at CCMC by: 2014-01-15 Railway applications - Electromagnetic compatibility - Part 2: Emission of the whole railway system to the outside
world NOTE: D139/C178: NWI approved * In hands of WG 15 Mandated: M/483
prEN 50121-3-1 (PR=23682) CLC/TC 9X EMC (2004/108/EC) Stage : 1099 - Draft for vote due at CCMC by: 2014-01-15 Railway applications - Electromagnetic compatibility - Part 3-1: Rolling stock - Train and complete vehicle NOTE: D139/C178: NWI approved * In hands of WG 15 Mandated: M/483
Technical committees Activities 156
CENELEC Inventory of Technical Activities
prEN 50121-3-2 (PR=23683) CLC/TC 9X EMC (2004/108/EC) Stage : 1099 - Draft for vote due at CCMC by: 2014-01-15 Railway applications - Electromagnetic compatibility (EMC) - Part 3-2: Rolling stock - Rolling stock apparatus NOTE: D139/C178: NWI approved * In hands of WG 15 Mandated: M/483
prEN 50121-4 (PR=23684) CLC/TC 9X EMC (2004/108/EC) Stage : 1099 - Draft for vote due at CCMC by: 2014-01-15 Railway applications - Electromagnetic compatibility (EMC) - Part 4: Emission and immunity of the signalling and
telecommunications apparatus NOTE: D139/C178: NWI approved * In hands of WG 15 Mandated: M/483
prEN 50121-5 (PR=23685) CLC/TC 9X EMC (2004/108/EC) Stage : 1099 - Draft for vote due at CCMC by: 2014-01-15 Railway applications - Electromagnetic compatibility (EMC) - Part 5: Emission and immunity of fixed power supply
installations and apparatus NOTE: D139/C178: NWI approved * In hands of WG 15 Mandated: M/483
EN 50155:2007/prA (PR=24061) CLC/TC 9X RAIL (2008/57/EC) Stage : 1099 - Draft for vote due at CCMC by: - Railway applications - Electronic equipment used on rolling stock NOTE: D141/C071: NWI approved * TC request: 3-month UAP Mandated: M/483
CLC/prTR 50542 (PR=24059) CLC/TC 9X Stage : 1099 - Draft for vote due at CCMC by: - Railway applications - Communication means between safety equipment and man-machine interfaces (MMI) NOTE: Will supersede CLC/TR 50542:2010 * D141/C071: NWI approved Mandated: M/483
CLC/prTR 50XXX (PR=23678) CLC/TC 9X Stage : 1099 - Draft for vote due at CCMC by: - Railway applications - Functional Interface Specification. Door System NOTE: D139/C178: NWI approved * In hands of WG 15 Mandated: M/483
CLC/prTS 50XXX (PR=23574) CLC/TC 9X Stage : 1099 - Draft for vote due at CCMC by: - Specification and verification of energy consumption for railway rolling stock NOTE: D139/C081: NWI approved * Transformation of TecRec 100_001 (first TecRec offered by UNIFE and UIC)
into a CENELEC TS
Technical committees Activities 157
CENELEC Inventory of Technical Activities
CLC/prTR 50XXX (PR=23679) CLC/TC 9X Stage : 1099 - Draft for vote due at CCMC by: - Railway applications - Functional Interface Specification - Pantograph System NOTE: D139/C178: NWI approved * In hands of WG 15 Mandated: M/483
Technical committees Activities 158
CENELEC Inventory of Technical Activities
SC 9XA
Communication, signalling and processing systems
To deal with the standardization of railway communication, signalling and processing systems, taking into account the relevant safety requirements
Officers Meetings Secretary: Mr Daniel COINEAU ( FR) Brussels 2010-11-16 Chairman: Mr Harald PETERS ( DE) Berlin 2011-05-10
Brussels 2011-11-24 Brussels 2012-11-13
Published (last 12 months)
EN 50128:2011 (PR=20508) CLC/SC 9XA Stage : 6060 Railway applications - Communication, signalling and processing systems - Software for railway control and
protection systems NOTE: 2011-03-21 - Publication editing allocated to [email protected] * Supersedes EN 50128:2001 dor : 2011-04-25 doa : 2011-10-25 dop : 2012-04-25 dow: 2014-04-25
Enquiry launched
prEN 50578:2012 (PR=23347) CLC/SC 9XA Stage : 4020 2012-07-27 Draft for vote due at CCMC by: 2013-07-15 Railways applications - Direct current signalling relays NOTE: D138/C124: NWI approved * Conversion of UIC leaflet 736 into a CENELEC deliverable * 2011-11-28:
Enquiry processing allocated to [email protected]
New work item approved
CLC/prTS 50238-3 (PR=23571) CLC/SC 9XA Stage : 1099 - Draft for vote due at CCMC by: - Railway applications - Compatibility between rolling stock and train detection systems - Part 3: Compatibility with
axle counters NOTE: D139/C081: NWI approved * Revision of CLC/TS 50238-3:2010 * Following comments from the Croatian Delegation on a technical issue on TS 50238-3, SC9XA resolves to revise it in order to solve this and other outstanding technical issues * In hands of WGA4-2
prEN 50XXX-1 (PR=23572) CLC/SC 9XA Stage : 1099 - Draft for vote due at CCMC by: 2013-10-15 Railways applications - Basic parameters of train detection systems - Part 1: Track circuits NOTE: D139/C081: NWI approved * Resolution 36/3 following the report from WGA4-2 Survey Group on Train
Detection Systems * 2 part standard
Technical committees Activities 159
CENELEC Inventory of Technical Activities
prEN 50XXX-2 (PR=23573) CLC/SC 9XA Stage : 1099 - Draft for vote due at CCMC by: 2013-10-15 Railways applications - Basic parameters of train detection systems - Part 2: Axle counters NOTE: D139/C081: NWI approved * Resolution 36/3 following the report from WGA4-2 Survey Group on Train
Detection Systems * 2 part standard
Work stopped (last 12 months)
CLC/prTS 50XXX (PR=16623) CLC/SC 9XA Stage : 98 - Railway applications - Characteristics of Trackside Train Detection Systems NOTE: D121/068 confirmed by correspondence: PAGI report and NWI approved * TC advice: Expected input from
ERA not yet available * D136/033: Set back to PWI * 2011-12 TC advice: Covered by PR=23572 and PR=23573 Mandated: M/334; M/483
prEN 50XXX (PR=23491) CLC/SC 9XA Stage : 1098 - Railways applications - ETCS driver machine interface NOTE: NWI requested to 139 BT (May 2011 by corr.) - decision reported to 139 BT (October 2011) due to FR and GB comments * D139/C036: NWI rejected by BT * CLC/TC 9X to consider the withdrawal of the CLC/TS 50459 series or its transformation to cover Urban Rail only * SC9XA resolution 37/3: Given the discussion about the
ongoing development by ERA of an ETCS – DMI document, SC9XA resolves to wait for the final version of this document to be available before considering the potential withdrawal of TS 50459 series or its transformation into Technical Reports.
Technical committees Activities 160
CENELEC Inventory of Technical Activities
SC 9XB
Electromechanical material on board rolling stock
To deal with the standardization of all electromechanical equipment used on rolling stock, excluding electronic control and power electronics.
Officers Meetings Secretary: Mr Jan ANDERS ( DE) Helsinki 2010-11-30 Chairman: Mr Andrew KING ( GB) Verona 2011-06-28
Fehraltorf 2011-12-13 Vienna 2012-06-12
Published (last 12 months)
EN 50467:2011 (PR=22267) CLC/SC 9XB Stage : 6060 Railway applications - Rolling stock - Electrical connectors, requirements and test methods NOTE: Publication editing allocated to [email protected] * Will supersede CLC/TS 50467:2008 + corr.
May.2008 Mandated: M/334; M/483 dor : 2011-10-10 doa : 2012-04-10 dop : 2012-10-10 dow: 2014-10-10
EN 50533:2011 (PR=21416) CLC/SC 9XB Stage : 6060 Railway applications - Three-phase train line voltage characteristics NOTE: Publication editing allocated to [email protected] dor : 2011-10-10 doa : 2012-04-10 dop : 2012-10-10 dow : 2014-10-10
Ratified
CLC/TR 50501-2:201X (PR=21757) CLC/SC 9XB Stage : 5099 2012-03-12 Railway applications - Rolling stock - Intercommunication between vehicles and train/wayside - Part 2: Technical
contents of standardization work in the field of intercommunication NOTE: 2012-01-10 - Publication editing allocated to [email protected] * 2010-06 decision (37/03): To
circulate the project as prTR instead of prTS
Vote launched
FprEN 61881-2:2012 (PR=23068) IEC 61881-2:201X (9/1679/FDIS) CLC/SC 9XB IEC/TC 9 // Stage : 5020 2012-07-06 Railway applications - Rolling stock equipment - Capacitors for power electronics - Part 2: Aluminium electrolytic
capacitors with non solid electrolyte NOTE: 9/1537/RVC + 9/1537A/RVC + 9/1537B/RVC established on 2011-11-11: FDIS decided
Technical committees Activities 161
CENELEC Inventory of Technical Activities
FprEN 61881-3:2012 (PR=23069) IEC 61881-3:201X (9/1680/FDIS) CLC/SC 9XB IEC/TC 9 // Stage : 5020 2012-07-06 Railway applications - Rolling stock equipment - Capacitors for power electronics - Part 3: Electric double-layer
capacitors NOTE: 9/1538/RVC + 9/1538A/RVC established on 2011-09-23: FDIS decided
Vote decided
FprEN 60349-4:201X (PR=23562) IEC 60349-4:201X (9/1548/CDV) CLC/SC 9XB IEC/TC 9 // Stage : 3090 2012-10-31 Draft for vote due at CCMC by: - Electric traction - Rotating electrical machines for rail and road vehicles - Part 4: Permanent magnet synchronous
electrical machines connected to an electronic converter NOTE: 9/1607/RVC + 9/1607A/RVC established on 2012-02-24: FDIS decided
Enquiry launched
prEN 50125-1:2012 (PR=21987) CLC/SC 9XB RAIL (2008/57/EC) Stage : 4020 2012-09-07 Draft for vote due at CCMC by: 2012-10-31 Railway applications - Environmental conditions for equipment - Part 1: Equipment on board rolling stock NOTE: Will supersede EN 50125-1:1999 * D133/C176/ NWI approved with target date for vote : 2011-10-31 * Based on ERA request * In hands of WG 27 * 2010-11 TC decision: To launch enquiry * D139/C179: Extension of tdv approved to read 2012-10-31* 2011-12-14 - Enquiry processing allocated to [email protected] Mandated: M/334
prEN 50153:2012 (PR=22836) CLC/SC 9XB RAIL (2008/57/EC) Stage : 4020 2012-09-14 Draft for vote due at CCMC by: 2012-12-31 Railway applications - Rolling stock - Protective provisions relating to electrical hazards NOTE: Will supersede EN 50153:2002 * D136/C132: NWI approved - Target date for vote: 2012-12-31 * 2012-02-
06 - Enquiry editing allocated to [email protected]* Mandated: M/334; M/483
prEN 50343:2012 (PR=22268) CLC/SC 9XB RAIL (2008/57/EC) Stage : 4020 2012-09-07 Draft for vote due at CCMC by: 2012-12-31 Railway applications - Rolling stock - Rules for installation of cabling NOTE: Will supersede EN 50343:2003 * D134/C181: NWI approved - Target date for vote: 2011-12-31 - Revision of EN 50343:2003 (after 5 years) * D141/C071: Extension of tdv approved to read 2012-12-31 * 2012-01-23 - Enquiry processing allocated to [email protected] * Mandated: M/334; M/483
prEN 50547:2011 (PR=21418) CLC/SC 9XB Stage : 4060 2012-03-19 Draft for vote due at CCMC by: 2011-12-31 Railway applications - Batteries for auxiliary power supply systems NOTE: D138/C126: Second extension of target date for vote approved to read 2011-12-31
Technical committees Activities 162
CENELEC Inventory of Technical Activities
At Secretariat stage
prEN 50502 (PR=23686) CLC/SC 9XB Stage : 2020 - Draft for vote due at CCMC by: 2014-01-15 Railway applications - Rolling stock - Electric equipment in trolley buses - Safety requirements and connection
systems NOTE: D139/C178: NWI approved * ENQ+FV * Revision of CLC/TS 50502:2008
CLC/FprTS 50546 (PR=21417) CLC/SC 9XB Stage : 2020 2009-10-14 Draft for vote due at CCMC by: 2011-12-31 Railway applications – Rolling stock – 3-phase shore (external) supply system for rail vehicles NOTE: D138/C126: Second extension of target date for vote approved to read 2011-12-31
Work stopped (last 12 months)
CLC/prTS 60349-3 (PR=22967) IEC/TS 60349-3:2010 CLC/SC 9XB IEC/TC 9 Stage : 1098 - Electric traction - Rotating electrical machines for rail and road vehicles - Part 3: Determination of the total losses of
converter-fed alternating current motors by summation of the component losses NOTE: SC 9XB 201112-13 decision: No action - stop project
Technical committees Activities 163
CENELEC Inventory of Technical Activities
SC 9XC
Electric supply and earthing systems for public transport equipment and ancillary apparatus (Fixed installations)
To deal with the standardization of - AC and DC supply lines, both overhead and third rail type, - ancillary circuits, - machinery and equipment of special feature for traction in fixed plants, - installations and safety requirements in fixed plants.
Officers Meetings Chairman: Mr Alvaro FUMI ( IT) London 2010-11-26 Secretary: Mr Alexandre MACHET ( FR) Vienna 2011-05-12
Rome 2011-10-18 / 10-19 Hamburg 2012-05-22 / 05-23
Published (last 12 months)
EN 50122-1:2011/A1:2011 (PR=23053) CLC/SC 9XC Stage : 6060 Railway applications - Fixed installations - Electrical safety, earthing and the return circuit - Part 1: Protective
provisions against electric shock NOTE: 2011-03-21 - Publication editing allocated to [email protected] dor : 2011-04-25 doa : 2011-10-25 dop : 2012-04-25 dow: 2014-04-25
EN 50149:2001/AC:2011 (PR=23799) CLC/SC 9XC Stage : 6060 Railway applications - Fixed installations - Electric traction - Copper and copper alloy grooved contact wires NOTE: D139/C141: To update the Swiss A-deviation in EN 50149:2001 (PR=102), (regulation SR 814.81 instead of
SR 814.013) dor : - doa : - dop : - dow : -
EN 50317:2012 (PR=21986) CLC/SC 9XC RAIL (2008/57/EC) Stage : 6060 Railway applications - Current collection systems - Requirements for and validation of measurements of the dynamic
interaction between pantograph and overhead contact line NOTE: 2011-11-23 - Publication editing allocated to [email protected] * Revision of EN 50317:2002
following ERA's requirement for a Standard: RfS-018 * Supersedes EN 50317:2002 + A1:2004 + A2:2007 dor : 2011-12-26 doa : 2012-06-26 dop : 2012-12-26 dow: 2014-12-26
EN 50367:2012 (PR=21758) CLC/SC 9XC RAIL (2008/57/EC) Stage : 6060 Railway applications - Current collection systems - Technical criteria for the interaction between pantograph and
overhead line (to achieve free access) NOTE: 2012-02-14 - Publication editing allocated to [email protected] * Revision following ERA's
requirement for a Standard RfS-016 * Supersedes EN 50367:2006 dor : 2012-03-19 doa : 2012-09-19 dop : 2013-03-19 dow: 2015-03-19
Technical committees Activities 164
CENELEC Inventory of Technical Activities
EN 50388:2012 (PR=23567) CLC/SC 9XC RAIL (2008/57/EC) Stage : 6060 Railway Applications - Power supply and rolling stock - Technical criteria for the coordination between power
supply (substation) and rolling stock to achieve interoperability NOTE: Publication editing allocated to [email protected] * Supersedes EN 50388:2005 dor : 2012-02-13 doa : 2012-08-13 dop : 2013-02-13 dow: 2015-02-13
EN 50443:2011 (PR=23055) CLC/SC 9XC Stage : 6060 Effects of electromagnetic interference on pipelines caused by high voltage a.c. electric traction systems and/or high
voltage a.c. power supply systems NOTE: Publication editing allocated to [email protected] dor : 2011-10-24 doa : 2012-04-24 dop : 2012-10-24 dow: 2014-10-24
EN 50526-1:2012 (PR=20529) CLC/SC 9XC Stage : 6060 Railway applications - Fixed installations - D.C. surge arresters and voltage limiting devices - Part 1: Surge arresters NOTE: Publication editing allocated to [email protected] * Renumbered from prEN 50123-5 *
Supersedes EN 50123-5:2003 dor : 2011-10-10 doa : 2012-04-10 dop : 2012-10-10 dow: 2014-10-10
CLC/TS 50562:2011 (PR=21759) CLC/SC 9XC Stage : 6060 Railway applications - Fixed installations - Process, measures and demonstration of safety for electric traction
systems NOTE: 2011-04-19 - Publication editing allocated to [email protected] * Work related to revision of EN
50126 series dor : 2011-05-24 doa : 2011-11-24 dop : - dow: -
Ratified
EN 50149:201X (PR=21423) CLC/SC 9XC RAIL (2008/57/EC) Stage : 5099 2012-05-28 Railway applications - Fixed installations - Electric traction - Copper and copper alloy grooved contact wires NOTE: 2012-03-27 - Publication editing allocated to [email protected] * Will supersede EN
50149:2001 * ERA's requirement for a Standard: RfS-020
Vote decided
FprEN 50152-1:2012 (PR=21092) CLC/SC 9XC Stage : 4099 - Draft for vote due at CCMC by: 2012-10-31 Railway applications - Fixed installations - Particular requirements for alternating current switchgear - Part 1:
Circuit-breakers with nominal voltage above 1 kV NOTE: 2012-04-04 - FV editing allocated to [email protected] * Will supersede EN 50152-1:2007 (pr=16849) * D139/C180: Exceptional second extension of tdv approved to read 2012-10-31 * This EN is to be used in conjunction with EN 62271-1:2008 and EN 62271-100:2009
FprEN 50152-2:2012 (PR=21093) CLC/SC 9XC Stage : 4099 - Draft for vote due at CCMC by: 2012-10-31 Railway applications - Fixed installations - Particular requirements for alternating current switchgear - Part 2:
Disconnectors, earthing switches and switches with nominal voltage above 1 kV NOTE: 2012-04-04 - FV editing allocated to [email protected] * Will supersede EN 50152-2:2007 * D139/C180: Exceptional second extension of tdv approved to read 2012-10-31 * This EN is to be used in conjunction with EN 62271-1:2008, EN 62271-102:2002 and EN 62271-103:201X
Technical committees Activities 165
CENELEC Inventory of Technical Activities
Enquiry launched
prEN 50526-2:2012 (PR=21094) CLC/SC 9XC Stage : 4020 2012-09-07 Draft for vote due at CCMC by: 2011-10-31 Railway applications - Fixed installations - D.C. surge arresters and voltage limiting devices - Part 2: Voltage
limiting devices NOTE: 2012-02-07 - Enquiry allocated to [email protected] * D129/042: NWI approved * Not to be offered to IEC (see D126/046) * Renumbered from prEN 50123-8 * D137/038: (Under BM3) extension of the tdv approved to read: 2011-10-31
At Secretariat stage
EN 50119:2009/prA1 (PR=22270) CLC/SC 9XC RAIL (2008/57/EC) Stage : 2060 - Draft for vote due at CCMC by: 2013-11-30 Railway applications - Fixed installations - Electric traction overhead contact lines NOTE: D134/C181: NWI approved * 2010-05 SC advice: Draft completed * Target date for vote: 2013-11-30
New work item approved
EN 50123-6:2003/prA (PR=23568) CLC/SC 9XC Stage : 1099 - Draft for vote due at CCMC by: 2013-10-15 Railway applications - Fixed installations - D.C. switchgear - Part 6: D.C. switchgear assemblies NOTE: D139/C081: NWI approved * In hands of CLC/SC 9XC WG 18 * Track to be used: Enquiry + Formal Vote
prEN 50526-3 (PR=23348) CLC/SC 9XC Stage : 1099 - Draft for vote due at CCMC by: 2014-04-15 Railway applications - Fixed installations - D.C. surge arresters and voltage limiting devices - Part 3 Application
guide NOTE: D138/C124: NWI approved * 2012-05-11: Project deleted following the new audit system rules then
reactivated following a 9-month tolerance request
prEN 50XXX (PR=23052) CLC/SC 9XC Stage : 1099 - Draft for vote due at CCMC by: 2013-06-30 Railway applications - Fixed installations - Simulation tool for the validation of simulation tools used for the design
of traction power supply systems NOTE: D137/C146: NWI approved with target date for vote: 2013-06-30 * ERA's requirement for a Standard: RfS-
030 * New WG set up
prEN 50XXX (PR=23349) CLC/SC 9XC Stage : 1099 - Draft for vote due at CCMC by: 2014-04-15 Railway applications - Fixed installations - Protection principles for electric traction systems NOTE: D138/C124: NWI approved * 2012-05-11: Project deleted following the new audit system rules then
reactivated following a 9-month tolerance request
Technical committees Activities 166
CENELEC Inventory of Technical Activities
prEN 50XXX (PR=22269) CLC/SC 9XC CONRAIL (2001/16/EC) HSR (96/48/EC) RAIL (2008/57/EC) Stage : 1099 2010-04-01 Draft for vote due at CCMC by: 2013-11-30 Railway applications - Fixed installations - Requirements and testing methods for sectioning devices in the view of
interoperability constituent NOTE: D134/C181: NWI approved * Target date for vote: 2013-11-30 * Related to ERA IU-RfS-017 Rev: 0.0 dated 2008-04-03 * 2012-02 TC advice: Project could be closed as RfS-017 is withdrawn by ERA but a written confirmation is expected before closing the project Mandated: M/334; M/483
CLC/prTR 50XXX (PR=24060) CLC/SC 9XC Stage : 1099 - Draft for vote due at CCMC by: - Railway applications - Specification for reversible direct current substations NOTE: D141/C071: NWI approved * Endorsement of UNIFE TecRec 400-00X into a CLC/TR Mandated: M/483
Work stopped (last 12 months)
prEN 50388 (PR=17184) CLC/SC 9XC RAIL (2008/57/EC) Stage : 98 - Railway applications - Power supply and rolling stock - Technical criteria for the coordination between power supply
(substation) and rolling stock to achieve interoperability NOTE: ERA's requirement for a Standard: RfS-019 * D137/040: (Under Benchmark 3) Set back to PWI stage * NWI
requested to restart the work (See PR=23567)
Technical committees Activities 167
CENELEC Inventory of Technical Activities
TC 11
Overhead electrical lines exceeding 1 kV a.c. (1,5 kV d.c.)
To prepare harmonized standard for overhead electrical lines.
The standard(s) will specify the general requirements that should be met by the design and construction of an overhead line to ensure that the line is suitable for its purpose with regard to safety of persons, maintenance, operation and environmental consideration. CENELEC, CEN, IEC publications and other relevant documents have to be considered.
Officers Meetings Chairman: Mr Jan ROGIER ( BE) Brussels 2008-02-07 Secretary: Mr Patrice MONTPELLIER ( FR) Brussels 2009-10-07
Brussels 2010-10-06 Brussels 2011-09-20
Vote launched
FprEN 50341-1:2012 (PR=22540) CLC/TC 11 Stage : 5020 2012-10-12 Overhead electrical lines exceeding AC 1 kV - Part 1: General requirements - Common specifications NOTE: 2012-04-04 - UAP editing allocated to [email protected] * Will supersede EN 50341-1:2001 (PR=155) + A1:2009 (PR=21990) + EN 50423-1:2005 (PR=14245) * D138/025: NNAs in future Part 3 of the prEN should be finalized within 12 months after the availability of Part 1
Technical committees Activities 168
CENELEC Inventory of Technical Activities
TC 13
Equipment for electrical energy measurement and load control
Standardization in the field for metering equipment and systems (using whenever possible IEC standards), including smart metering systems, for electrical energy measurement, tariff- and load control, customer information and payment, for use in power stations, along the network and at energy end users, as well as to prepare international standards for meter test equipment and methods. Excluded: Standardization for the interface of metering equipment for interconnection lines and industrial consumers and producers requiring energy management type interfaces to the control system, covered by IEC/TC 57
Officers Meetings Chairman: Mr Bernd SCHULZ ( DE) Poitiers 2008-10-09 Secretary: Mr Pascal TANTIN ( FR) Brussels 2010-03-02
Brussels 2011-01-27
Published (last 12 months)
EN 62059-32-1:2012 (PR=22139) IEC 62059-32-1:2011 CLC/TC 13 IEC/TC 13 MID (2004/22/EC) // Stage : 6060 Electricity metering equipment - Dependability - Part 32-1: Durability - Testing of the stability of metrological
characteristics by applying elevated temperature NOTE: 2011-12-20 - Publication editing allocated to [email protected] dor : 2012-01-11 doa : 2012-04-11 dop : 2012-10-11 dow: 2015-01-11
Vote launched
CLC/FprTR 50579:2012 (PR=23429) CLC/TC 13 Stage : 5060 2012-05-21 Electricity metering equipment - Severity levels, immunity requirements and test methods for conducted disturbances
in the frequency range 2 - 150 kHz NOTE: 2012-05-02 - Publication editing allocated to [email protected] * Temporary solution until IEC SC77A develops the appropriate horizontal standards for emission levels, immunity requirements and test methods for this frequency range, currently not covered
Vote decided
FprEN 62056-3-1:201X (PR=23017) IEC 62056-3-1:201X (13/1461/CDV) CLC/TC 13 IEC/TC 13 // Stage : 3090 2011-12-31 Draft for vote due at CCMC by: - Electricity metering - Data exchange for meter reading, tariff and load control - Part 3-1: Use of local area networks
on twisted pair with carrier signalling NOTE: Will supersede EN 62056-31:2000 * 13/1485/RVC established on 2011-10-14: FDIS decided * CDV circulated as FprEN 62056-31 - Following renumbering at IEC level to read IEC 62056-3-1, CLC project has been renumbered accordingly
Technical committees Activities 169
CENELEC Inventory of Technical Activities
FprEN 62056-5-3:201X (PR=23229) IEC 62056-5-3:201X (13/1468/CDV) CLC/TC 13 IEC/TC 13 // Stage : 3090 2012-12-31 Draft for vote due at CCMC by: - Electricity metering data exchange - The DLMS/COSEM suite - Part 5-3: DLMS/COSEM application layer NOTE: Will supersede EN 62056-53:2007 * 13/1489/RVC established on 2011-10-14: FDIS decided
FprEN 62056-6-1:201X (PR=23222) IEC 62056-6-1:201X (13/1465/CDV) CLC/TC 13 IEC/TC 13 // Stage : 3090 2012-12-31 Draft for vote due at CCMC by: - Electricity metering data exchange - The DLMS/COSEM suite - Part 6-1: COSEM Object Identification System
(OBIS) NOTE: Will supersede EN 62056-61:2007 * 13/1487/RVC established on 2011-10-14: FDIS decided
FprEN 62056-6-2:201X (PR=23223) IEC 62056-6-2:201X (13/1466/CDV) CLC/TC 13 IEC/TC 13 // Stage : 3090 2012-12-31 Draft for vote due at CCMC by: - Electricity metering data exchange - The DLMS/COSEM suite - Part 6-2: COSEM interface classes NOTE: Will supersede EN 62056-62:2007 * 13/1488/RVC established on 2011-10-14: FDIS decided
FprEN 62056-7-6:201X (PR=23422) IEC 62056-7-6:201X (13/1476/CDV) CLC/TC 13 IEC/TC 13 // Stage : 3090 2012-12-31 Draft for vote due at CCMC by: - Electricity metering data exchange - the DLMS/COSEM suite - Part 7-6: The 3-layer, connection-oriented HDLC
based communication profile NOTE: Will partially supersede EN 62056-53:2007 * 13/1492/RVC established on 2011-10-14: FDIS decided
FprEN 62056-8-3:201X (PR=23396) IEC 62056-8-3:201X (13/1474/CDV) CLC/TC 13 IEC/TC 13 // Stage : 3090 2012-12-31 Draft for vote due at CCMC by: - Electricity metering data exchange - The DLMS/COSEM suite - Part 8-3: The PLC S-FSK profile for neighbourhood
networks NOTE: 13/1490/RVC established on 2011-10-14: FDIS decided Mandated: M/441
FprEN 62056-9-7:201X (PR=23398) IEC 62056-9-7:201X (13/1475/CDV) CLC/TC 13 IEC/TC 13 // Stage : 3090 2012-12-31 Draft for vote due at CCMC by: - Electricity metering data exchange - The DLMS/COSEM suite - Part 9-7: Communication profile for TCP-UDP/IP
networks NOTE: Will partially supersede EN 62056-53:2007 (Clause B.3) * 13/1491/RVC established on 2011-10-14: FDIS
decided
Technical committees Activities 170
CENELEC Inventory of Technical Activities
At Secretariat stage
CLC/prTS 50567-1 (PR=23406) CLC/TC 13 Stage : 2020 - Draft for vote due at CCMC by: - Meter data exchange over power lines - Part 1: Lower layer profile using Orthogonal Frequency Division
Multiplexing (OFDM) Type 1 NOTE: 20110526- Allocated to [email protected] * D139/C007: NWI approved Mandated: M/441
CLC/prTS 50567-2 (PR=23407) CLC/TC 13 Stage : 2020 - Draft for vote due at CCMC by: - Meter data exchange over power lines - Part 2: Lower layer profile using Orthogonal Frequency Division
Multiplexing (OFDM) Type 2 NOTE: 20110526- Allocated to [email protected] * D139/C007: NWI approved Mandated: M/441
CLC/prTS 50568-2 (PR=23408) CLC/TC 13 Stage : 2020 - Draft for vote due at CCMC by: - Electricity metering data exchange - The Smart Metering Information Tables and Protocols (SMITP) suite - Part 2:
Local data exchange via optical interface NOTE: 20110526- Allocated to [email protected] * D139/C007: NWI approved Mandated: M/441
CLC/prTS 50568-4 (PR=23409) CLC/TC 13 Stage : 2020 - Draft for vote due at CCMC by: - Electricity metering data exchange - The Smart Metering Information Tables and Protocols (SMITP) suite - Part 4:
Physical layer based on B-PSK modulation + Data Link Layer NOTE: 20110526- Allocated to [email protected] * D139/C007: NWI approved Mandated: M/441
CLC/prTS 50568-5 (PR=23410) CLC/TC 13 Stage : 2020 - Draft for vote due at CCMC by: - Electricity metering data exchange - The Smart Metering Information Tables and Protocols (SMITP) suite - Part 5:
Application layer messages exchange on DLC and IP networks NOTE: 20110526- Allocated to [email protected] * D139/C007: NWI approved Mandated: M/441
CLC/prTS 50568-6 (PR=23411) CLC/TC 13 Stage : 2020 - Draft for vote due at CCMC by: - Electricity metering data exchange - The Smart Metering Information Tables and Protocols (SMITP) suite - Part 6:
Meter database and data structures NOTE: 20110526- Allocated to [email protected] * D139/C007: NWI approved Mandated: M/441
Technical committees Activities 171
CENELEC Inventory of Technical Activities
CLC/prTS 50568-8 (PR=23412) CLC/TC 13 Stage : 2020 - Draft for vote due at CCMC by: - Electricity metering data exchange - The Smart Metering Information Tables and Protocols (SMITP) suite - Part 8:
DLC profile based on B-PSK modulation NOTE: 20110526- Allocated to [email protected] * D139/C007: NWI approved Mandated: M/441
CLC/prTS 50568-9 (PR=23413) CLC/TC 13 Stage : 2020 - Draft for vote due at CCMC by: - Electricity metering data exchange - The Smart Metering Information Tables and Protocols (SMITP) suite - Part 9:
IP Profile on public telecommunication network NOTE: 20110526- Allocated to [email protected] * D139/C007: NWI approved Mandated: M/441
CLC/prTS 52056-8-4 (PR=23404) CLC/TC 13 Stage : 2020 - Draft for vote due at CCMC by: - Electricity metering data exchange - The DLMS/COSEM suite - Part 8-4: The PLC Orthogonal Frequency Division
Multiplexing (OFDM) Type 1 profile NOTE: 20110526- Allocated to [email protected] * D139/C007: NWI approved Mandated: M/441
CLC/prTS 52056-8-5 (PR=23405) CLC/TC 13 Stage : 2020 - Draft for vote due at CCMC by: - Electricity metering data exchange - The DLMS/COSEM suite - Part 8-5: The PLC Orthogonal Frequency Division
Multiplexing (OFDM) Type 2 profile NOTE: 20110526- Allocated to [email protected] * D139/C007: NWI approved Mandated: M/441
New work item approved
CLC/prTS 50XXX (PR=23767) CLC/TC 13 Stage : 1099 - Draft for vote due at CCMC by: - OSGP for utility metering, tariff, load control and other applications - Communication protocols, data structures and
procedures NOTE: D139/084: NWI approved * Work linked to M/441 Mandated: M/441
prEN 62056-5-8 (PR=23403) CLC/TC 13 // Stage : 1099 - Draft for vote due at CCMC by: - SML container services NOTE: D139/C007: NWI approved * Work based on BT/DE0251/NOT and IEC draft for future IEC 62056-5-8 to be
handled under parallel procedures Mandated: M/441
Technical committees Activities 172
CENELEC Inventory of Technical Activities
TC 14
Power transformers
To prepare European standards based on concluded international standards set up by IEC/TC 14 or based on other sources (including National Committees), for power transformers, autotransformers, reactors, on-load tap-changers and other accessories. a) These units shall have at least one winding rated above 1 000 V. b) These units shall also be rated as follows: - transformers and autotransformers: above 25 kVA (if single-phase) or above 40 kVA (if polyphase); - reactors: above 2 kVAR (if single-phase) or above 10 kVAR (if polyphase) or covered by EN 60289; - special power transformers of any power rating if comprised in the limits given in a); - transformers intended to supply distribution networks irrespectively from their kVA rating; - traction transformers for fixed installation.
Standards for traction transformer for fixed installations should be developed in cooperation with CLC/TC 9.
The committee is not responsible for instrument transformers, testing transformers, welding transformers and traction transformers on board rolling stock
Officers Meetings Chairman: Prof. Antonio BOSSI ( IT) Brussels 2008-04-22 / 04-23 Secretary: Prof. Angelo BAGGINI ( IT) Madrid 2009-10-05 / 10-06
Brussels 2012-02-15 / 02-16 Brussels 2012-09-11
Published (last 12 months)
HD 428.1 S1:1992/AC:2011 (PR=23798) CLC/TC 14 Stage : 6060 Three-phase oil-immersed distribution transformers 50 Hz, from 50 to 2500 kVA with highest voltage for equipment not exceeding 36 kV - Part 1: General requirements and requirements for transformers with highest voltage for equipment not exceeding 24 kV NOTE: D139/C140: To delete the Swiss A-deviation in HD 428.1 S1:1992 (PR=205) dor : - doa : - dop : - dow : -
HD 538.1 S1:1992/AC:2011 (PR=23795) CLC/TC 14 Stage : 6060 Three-phase dry-type distribution transformers 50 Hz, from 100 to 2500 kVA, with highest voltage for equipment not exceeding 36 kV - Part 1: General requirements and requirements for transformers with highest voltage for equipment not exceeding 24 kV NOTE: D139/C137: to delete the Swiss A deviation in HD 538.1 S1:1992 (PR=212) dor : - doa : - dop : - dow : -
EN 50464-1:2007/A1:2012 (PR=22806) CLC/TC 14 Stage : 6060 Three-phase oil-immersed distribution transformers 50 Hz, from 50 kVA to 2 500 kVA with highest voltage for
equipment not exceeding 36 kV - Part 1: General requirements NOTE: Publication editing allocated to [email protected] dor : 2011-10-31 doa : 2012-04-30 dop : 2012-10-31 dow: 2014-10-31
Technical committees Activities 173
CENELEC Inventory of Technical Activities
EN 50464-4:2007/A1:2011 (PR=22807) CLC/TC 14 Stage : 6060 Three-phase oil-immersed distribution transformers 50 Hz, from 50 kVA to 2 500 kVA with highest voltage for
equipment not exceeding 36 kV - Part 4: Requirements and tests concerning pressurised corrugated tanks NOTE: Publication editing allocated to [email protected] dor : 2011-10-10 doa : 2012-04-10 dop : 2012-10-10 dow : 2014-10-10
EN 60076-1:2011 (PR=22467) IEC 60076-1:2011 CLC/TC 14 IEC/TC 14 // Stage : 6060 Power transformers - Part 1: General NOTE: Supersedes EN 60076-1:1997 + A1:2000 + A12:2002 dor : 2011-05-25 doa : 2011-08-25 dop : 2012-05-04 dow : 2014-05-25
EN 60076-16:2011 (PR=22613) IEC 60076-16:2011 CLC/TC 14 IEC/TC 14 // Stage : 6060 Power transformers - Part 16: Transformers for wind turbines applications NOTE: 2011-09-22: Publication editing allocated to [email protected] dor : 2011-09-29 doa : 2011-12-29 dop : 2012-06-29 dow : 2014-09-29
EN 61378-1:2011 (PR=22426) IEC 61378-1:2011 + corrigendum Jan. 2012 CLC/TC 14 IEC/TC 14 // Stage : 6060 Convertor transformers - Part 1: Transformers for industrial applications NOTE: 2011-07-28: Publication allocated to [email protected] * Supersedes EN 61378-1:1998 dor : 2011-08-30 doa : 2011-11-30 dop : 2012-05-30 dow : 2014-08-30
Vote launched
FprEN 60076-3:2012 (PR=24097) IEC 60076-3:201X (14/716/CDV) CLC/TC 14 IEC/TC 14 // Stage : 5020 2012-08-10 Power transformers - Part 3: Insulation levels, dielectric tests and external clearances in air NOTE: Will supersede EN 60076-3:2001
FprEN 60076-14:2012 (PR=24171) IEC 60076-14:201X (14/719/CDV) CLC/TC 14 IEC/TC 14 // Stage : 5020 2012-09-21 Power transformers - Part 14: Liquid-immersed power transformers using high-temperature insulation materials
FprEN 60076-18:2012 (PR=23523) IEC 60076-18:201X (14/718/FDIS) CLC/TC 14 IEC/TC 14 // Stage : 5020 2012-06-22 Power transformers - Part 18: Measurement of frequency response NOTE: 14/706/RVC + 14/706A/RVC established on 2012-01-27: FDIS decided
Technical committees Activities 174
CENELEC Inventory of Technical Activities
New work item approved
EN 50216-4:2002/prA (PR=22810) CLC/TC 14 Stage : 1099 2011-03-01 Draft for vote due at CCMC by: 2011-08-31 Power transformer and reactor fittings - Part 4: Basic accessories (earthing terminal, drain and filling devices,
thermometer pocket, wheel assembly) NOTE: D136/C080: NWI approved - Target date for vote: 2011-08-31 * In hands of WG 27 * WG will also
investigate the possibility of standardizing the rail gauge
prEN 50299 (PR=22811) CLC/TC 14 Stage : 1099 2011-03-01 Draft for vote due at CCMC by: 2012-08-31 Oil-immersed cable connection assemblies for transformers and reactors having highest voltage for equipment Um
from 72,5 kV to 550 kV NOTE: Will supersede EN 50299:2002 * D136/C080: NWI approved - Target date for vote: 2012-08-31 * In hands
of WG 28 * Revision of EN to implement requirements for plug in cable-connections
prEN 50541-2 (PR=22805) CLC/TC 14 Stage : 1099 2010-09-01 Draft for vote due at CCMC by: 2011-08-31 Three phase dry-type distribution transformers 50 Hz, from 100 to 3 150 kVA, with highest voltage for equipment
not exceeding 36 kV - Part 2: Determination of the power rating of a transformer loaded with non-sinusoidal current NOTE: D136/C080: NWI approved -Target date for vote: 2011-08-31 * Conversion of HD 538.3 S1:1997
CLC/prTR 50XXX (PR=22808) CLC/TC 14 Stage : 1099 2011-03-01 Draft for vote due at CCMC by: 2012-08-31 Three-phase substation transformers less than or equal to 170 kV and 100 MVA NOTE: D136/C080: NWI approved - Target date for vote: 2012-08-31 * In hands of WG 26
Technical committees Activities 175
CENELEC Inventory of Technical Activities
TC 17AC
High-voltage switchgear and controlgear
To prepare harmonized standards for high-voltage switchgear and controlgear including their assemblies for rated voltages above AC 1 kV or above DC 1,5 kV.
Note : In general, relevant IEC standards will be transposed into EN via the Dresden Agreement.
To prepare and revise harmonized standards for enclosures of gas-filled high-voltage switchgear having a design pressure higher than atmospheric pressure.
To observe and support European activities related to standardization in the field of high voltage switchgear and controlgear in order to ensure the availability of EN suitable to cover the essential requirements of European Directives.
Officers Meetings Secretary: Mr Ansgar MUELLER ( DE) Brussels 2008-02-26 Chairman: Mr Fahd SULTANEM ( FR) Brussels 2010-04-27
Published (last 12 months)
EN 62271-1:2008/A1:2011 (PR=22903) IEC 62271-1:2007/A1:2011 CLC/TC 17AC IEC/SC 17A // Stage : 6060 High-voltage switchgear and controlgear - Part 1: Common specifications dor : 2011-07-21 doa : 2011-10-21 dop : 2012-04-21 dow: 2014-07-21
EN 62271-102:2002/A1:2011 (PR=22865) IEC 62271-102:2001/A1:2011 + corrigendum Jan. 2012 CLC/TC 17AC IEC/SC 17A // Stage : 6060 High-voltage switchgear and controlgear - Part 102: Alternating current disconnectors and earthing switches dor : 2011-09-23 doa : 2011-12-23 dop : 2012-06-23 dow : 2014-09-23
EN 62271-103:2011 (PR=22885) IEC 62271-103:2011 CLC/TC 17AC IEC/SC 17A // Stage : 6060 High-voltage switchgear and controlgear - Part 103: Switches for rated voltages above 1 kV up to and including 52
kV NOTE: Supersedes EN 60265-1:1998 dor : 2011-07-21 doa : 2011-10-21 dop : 2012-04-21 dow : 2014-07-21
EN 62271-106:2011 (PR=22829) IEC 62271-106:2011 CLC/TC 17AC IEC/SC 17A // Stage : 6060 High-voltage switchgear and controlgear - Part 106: Alternating current contactors, contactor-based controllers and
motor-starters NOTE: Supersedes EN 60470:2000 + corr. June 2000 * To be read in conjunction with EN 62271-1:2008 dor : 2011-09-23 doa : 2011-12-23 dop : 2012-06-23 dow : 2014-09-23
Technical committees Activities 176
CENELEC Inventory of Technical Activities
EN 62271-200:2012 (PR=22850) IEC 62271-200:2011 CLC/TC 17AC IEC/SC 17C // Stage : 6060 High-voltage switchgear and controlgear - Part 200: AC metal-enclosed switchgear and controlgear for rated
voltages above 1 kV and up to and including 52 kV NOTE: Supersedes EN 62271-200:2004*2011-10-28: Publication editing allocated to [email protected] dor : 2011-11-28 doa : 2012-02-28 dop : 2012-08-28 dow: 2014-11-28
EN 62271-203:2012 (PR=22764) IEC 62271-203:2011 CLC/TC 17AC IEC/SC 17C // Stage : 6060 High-voltage switchgear and controlgear - Part 203: Gas-insulated metal-enclosed switchgear for rated voltages
above 52 kV NOTE: 2012-03-13 - Publication editing allocated to [email protected] * Supersedes EN 62271-203:2004 * To
be read in conjunction with EN 62271-1:2008 dor : 2011-10-12 doa : 2012-01-12 dop : 2012-11-11 dow: 2014-10-12
EN 62271-204:2011 (PR=22833) IEC 62271-204:2011 CLC/TC 17AC IEC/SC 17C // Stage : 6060 High-voltage switchgear and controlgear - Part 204: Rigid gas-insulated transmission lines for rated voltage above 52
kV NOTE: To be read in conjunction with EN 62271-1:2008 dor : 2011-08-30 doa : 2011-11-30 dop : 2012-05-30 dow : 2014-08-30
Vote launched
FprEN 62271-4:2012 (PR=24139) IEC 62271-4:201X (17A/999/CDV) CLC/TC 17AC IEC/SC 17A // Stage : 5020 2012-09-07 High-voltage switchgear and controlgear - Part 4: Handling procedures for sulphur hexafluoride (SF6) NOTE: Will supersede CLC/TR 62271-303:2009
EN 62271-102:2002/FprA2:2011 (PR=23946) IEC 62271-102:2001/A2:201X (17A/994/CDV) CLC/TC 17AC IEC/SC 17A // Stage : 5060 2012-06-19 High-voltage switchgear and controlgear - Part 102: Alternating current disconnectors and earthing switches
FprEN 62271-107:2012 (PR=23368) IEC 62271-107:201X (17A/997/FDIS) CLC/TC 17AC IEC/SC 17A // Stage : 5060 2012-05-28 High-voltage switchgear and controlgear - Part 107: Alternating current fused circuit-switchers for rated voltages
above 1 kV up to and including 52 kV NOTE: Will supersede EN 62271-107:2005
FprEN 62271-112:2012 (PR=24127) IEC 62271-112:201X (17A/998/CDV) CLC/TC 17AC IEC/SC 17A // Stage : 5020 2012-09-07 High-voltage switchgear and controlgear - Part 112: Alternating current high-speed earthing switches for secondary
arc extinction on transmission lines
Technical committees Activities 177
CENELEC Inventory of Technical Activities
FprEN 62271-202:2012 (PR=24201) IEC 62271-202:201X (17C/551/CDV) CLC/TC 17AC IEC/SC 17C // Stage : 5020 2012-10-12 High-voltage switchgear and controlgear - Part 202: High voltage/low voltage prefabricated substation NOTE: Will supersede EN 62271-202:2077
FprEN 62271-207:2012 (PR=23423) IEC 62271-207:2012 CLC/TC 17AC IEC/SC 17C // Stage : 5060 2012-04-23 High-voltage switchgear and controlgear - Part 207: Seismic qualification for gas-insulated switchgear assemblies
for rated voltages above 52 kV NOTE: 2012-05-08 - Publication editing allocated to [email protected] * Will supersede EN 62271-207:2007
Vote decided
EN 62271-100:2009/FprA1:201X (PR=23366) IEC 62271-100:2008/A1:201X (17A/956/CDV) CLC/TC 17AC IEC/SC 17A // Stage : 3090 2012-03-31 Draft for vote due at CCMC by: - High-voltage switchgear and controlgear - Part 100: Alternating-current circuit-breakers NOTE: 17A/979/RVC established on 2011-08-12: FDIS decided
FprEN 62271-101:201X (PR=23370) IEC 62271-101:201X (17A/960/CDV) CLC/TC 17AC IEC/SC 17A // Stage : 3090 2012-03-31 Draft for vote due at CCMC by: - High-voltage switchgear and controlgear - Part 101: Synthetic testing NOTE: Vote initially launched as EN 62271-101:2006/FprA1:2011 due to bad information received from IEC (corrected 2011-03-08) * Will supersede EN 62271-101:2006 + A1:2010 * 17A/980/RVC established on 2011-08- 12: FDIS decided
FprEN 62271-105:201X (PR=23367) IEC 62271-105:201X (17A/957/CDV) CLC/TC 17AC IEC/SC 17A // Stage : 3090 2012-03-31 Draft for vote due at CCMC by: - High-voltage switchgear and controlgear - Part 105: Alternating current switch-fuse combinations for rated voltages
above 1 kV up to and including 52 kV NOTE: Will supersede EN 62271-105:2003 * 17A/982/RVC established on 2011-08-26: FDIS decided
FprEN 62271-110:201X (PR=23369) IEC 62271-110:201X (17A/959/CDV) CLC/TC 17AC IEC/SC 17A // Stage : 3090 2012-03-31 Draft for vote due at CCMC by: - High-voltage switchgear and controlgear - Part 110: Inductive load switching NOTE: Will supersede EN 62271-110:2009 * 17A/981/RVC established on 2011-08-19: FDIS decided
Technical committees Activities 178
CENELEC Inventory of Technical Activities
TC 17B
Low-voltage switchgear and controlgear
To prepare harmonized standards for low-voltage apparatus, based on concluded international standards (normally prepared by IEC SC 17B).
Officers Meetings Secretary: Mr Joseph BRIANT ( FR) Brussels 2010-04-07 Chairman: Mr Alberto SIANI ( IT) Brussels 2010-09-17
Brussels 2011-01-27 Brussels 2011-09-30
Published (last 12 months)
EN 60947-3:2009/A1:2012 (PR=23188) IEC 60947-3:2008/A1:2012 CLC/TC 17B IEC/SC 17B EMC (2004/108/EC) LVD (2006/95/EC) // Stage : 6060 Low-voltage switchgear and controlgear - Part 3: Switches, disconnectors, switch-disconnectors and fuse-
combination units NOTE: This A1 is to be used with EN 60947-1:2007/A1:2011*2012-02-24: Publication editing allocated to
[email protected] dor : 2012-03-21 doa : 2012-06-21 dop : 2012-12-21 dow: 2015-03-21
EN 60947-4-3:2000/A2:2011 (PR=22831) IEC 60947-4-3:1999/A2:2011 CLC/TC 17B IEC/SC 17B EMC (2004/108/EC) LVD (2006/95/EC) // Stage : 6060 Low-voltage switchgear and controlgear - Part 4-3: Contactors and motor-starters - AC semiconductor controllers
and contactors for non-motor loads NOTE: 2011-03-25 - Publication editing allocated to [email protected] Mandated: M/404 dor : 2011-04-18 doa : 2011-07-18 dop : 2012-03-02 dow: 2014-04-18
EN 61915-2:2012 (PR=23151) IEC 61915-2:2011 CLC/TC 17B IEC/SC 17B // Stage : 6060 Low-voltage switchgear and controlgear - Device profiles for networked industrial devices - Part 2: Root device
profiles for starters and similar equipment NOTE: 2011-10-28: Publication editing allocated to [email protected] dor : 2011-11-24 doa : 2012-02-24 dop : 2012-08-24 dow: 2014-11-24
Ratified
EN 60947-4-2:201X (PR=22830) IEC 60947-4-2:2011 CLC/TC 17B IEC/SC 17B EMC (2004/108/EC) LVD (2006/95/EC) // Stage : 5099 2011-07-20 Low-voltage switchgear and controlgear - Part 4-2: Contactors and motor-starters - AC semiconductor motor
controllers and starters NOTE: 2011-05-27: Publication allocated to [email protected] * . Will supersede EN 60947-4-2:2000 +
A1:2002 + A2:2006 * To be read in conjunction with EN 60947-1
Technical committees Activities 179
CENELEC Inventory of Technical Activities
EN 60947-8:2003/A2:201X (PR=22832) IEC 60947-8:2003/A2:2011 CLC/TC 17B IEC/SC 17B EMC (2004/108/EC) LVD (2006/95/EC) // Stage : 5099 2011-07-20 Low-voltage switchgear and controlgear - Part 8: Control units for built-in thermal protection (PTC) for rotating
electrical machines NOTE: 2011-05-27: Publication allocated to [email protected] . Mandated: M/404
Vote launched
EN 60947-2:2006/FprA2:2011 (PR=23258) IEC 60947-2:2006/A2:201X (17B/1724A/CDV) CLC/TC 17B IEC/SC 17B EMC (2004/108/EC) LVD (2006/95/EC) // Stage : 5060 2011-06-13 Low-voltage switchgear and controlgear - Part 2: Circuit-breakers NOTE: Awaiting outcome of RVC before further processing
EN 60947-4-1:2010/FprA1:2012 (PR=23595) IEC 60947-4-1:2009/A1:201X (17B/1769/FDIS) CLC/TC 17B IEC/SC 17B EMC (2004/108/EC) LVD (2006/95/EC) // Stage : 5060 2012-06-04 Low-voltage switchgear and controlgear - Part 4-1: Contactors and motor-starters - Electromechanical contactors and
motor-starters NOTE: 17B/1759/RVC established on 2011-11-25: FDIS decided
EN 60947-5-2:2007/FprA1:2011 (PR=23385) IEC 60947-5-2:2007/A1:201X (17B/1733/CDV) CLC/TC 17B IEC/SC 17B LVD (2006/95/EC) // Stage : 5060 2012-05-29 Low-voltage switchgear and controlgear - Part 5-2: Control circuit devices and switching elements - Proximity
switches NOTE: 17B/1774/RVC established on 2012-04-20: To be published without FDIS
FprEN 60947-5-3:2012 (PR=24106) IEC 60947-5-3:201X (17B/1771/CDV) CLC/TC 17B IEC/SC 17B EMC (2004/108/EC) LVD (2006/95/EC) MD (2006/42/EC) // Stage : 5020 2012-08-17 Low-voltage switchgear and controlgear - Part 5-3: Control circuit devices and switching elements - Requirements
for proximity devices with defined behaviour under fault conditions (PDDB) NOTE: Will supersede EN 60947-5-3:1999 + A1:2005
FprEN 60947-7-4:2012 (PR=24069) IEC 60947-7-4:201X (17B/1766/CDV) CLC/TC 17B IEC/SC 17B LVD (2006/95/EC) // Stage : 5020 2012-08-03 Low-voltage switchgear and controlgear - Part 7-4: Ancillary equipment - PCB terminal blocks for copper
conductors
Technical committees Activities 180
CENELEC Inventory of Technical Activities
FprEN 62683:2011 (PR=23787) IEC 62683:201X (17B/1754/CDV) CLC/TC 17B IEC/SC 17B // Stage : 5060 2012-03-26 Low-voltage switchgear and controlgear - Product data and properties for information exchange NOTE: Awaiting outcome of RVC before further processing
Vote decided
FprEN 62026-2:201X (PR=20887) IEC 62026-2:2008 (Modified) CLC/TC 17B IEC/SC 17B LVD (2006/95/EC) // Stage : 4099 Low-voltage switchgear and controlgear - Controller-device interfaces (CDIs) - Part 2: Actuator sensor interface
(AS-i) NOTE: Will supersede EN 50295:1999 * D135/011: Ratification postponed pending outcome of CLC/TC 17B secretariat enquiry and intended subsequent vote on the proposed common modifications * May 2012: Text of CMs received and submitted to Consultant for assessment
FprEN 62026-7:201X (PR=22641) IEC 62026-7:2010 CLC/TC 17B IEC/SC 17B EMC (2004/108/EC) LVD (2006/95/EC) // Stage : 4099 Low-voltage switchgear and controlgear - Controller-device interfaces (CDIs) - Part 7: CompoNet NOTE: Missing assessment and Annex ZZ - May 2012: Text of CMs received - Submitted to Consultant for
assessment
New work item to be approved (BT/TC)
EN 60947-5-5:1997/prA11 (PR=24141) CLC/TC 17B LVD (2006/95/EC) MD (2006/42/EC) Stage : 1000 2012-05-15 Draft for vote due at CCMC by: - Low-voltage switchgear and controlgear - Part 5-5: Control circuit devices and switching elements - Electrical
emergency stop device with mechanical latching function NOTE: NWI request to 141 BT (April 18, 2012) * Proposed track: 3-month UAP
Technical committees Activities 181
CENELEC Inventory of Technical Activities
TC 17D (dormant)
Low-voltage switchgear and controlgear assemblies
To prepare a harmonized standard for factory-built and other assemblies of low-voltage switchgear and controlgear based on IEC 60439.
Officers Meetings Secretary: Mr Wolfgang KLUGE ( DE) Brussels 1997-09-24
Chairman: Mr Jean-Paul LIONET ( FR)
No active standardization work registered
Technical committees Activities 182
CENELEC Inventory of Technical Activities
TC 18X
Electrical installations of ships and of mobile and fixed offshore units
Provisional: To prepare standards for electrical installations and equipment of ships and of mobile and fixed offshore units, including interconnected subsea equipment, incorporating good practice and aligning as far as possible existing regulations and IEC/CENELEC Publications. The standards will chiefly concern: a) factors promoting the safety of ships and of mobile and fixed offshore units, including interconnected subsea equipment; b) factors promoting safety of life; c) factors promoting the protection of the environment. The standards will form a code of practical interpretation and amplification of the requirements of the International Convention on Safety of Life at Sea, a guide for future regulations may be prepared by Administrations, and a statement of practice for use by builders and appropriate organizations. The standards will also foster interchangeability of parts and ease the selection and procurement of equipment, including media for transport of energy, signals and data, by indicating, as appropriate, IEC/CENELEC-standards of ratings, types, dimensions, materials, quality, test methods, etc., whether or not these are influenced by regulations, and will thus facilitate interchanges between purchaser and supplier.
Officers Meetings
Chairman: Mr Alasdair ANDERSON ( GB) Secretary: Mr Geir Bull-Njaa ( NO)
No standardization work registered
Technical committees Activities 183
CENELEC Inventory of Technical Activities
TC 20
Electric cables
To prepare harmonized standards in the field of insulated conductors, cables and flexible cords and their accessories, for both low and high voltage with the exception of telecommunications wires and cables.
Officers Meetings Chairman: Mr Jan SCHUTTEN ( NL) Vienna 2009-06-04 / 06-05 Secretary: Mr Helmut MYLAND ( DE) London 2010-05-26 / 05-27
Copenhagen 2011-05-25 / 05-26 Amsterdam 2012-05-30 / 05-31
Ratified
EN 60811-100:201X (PR=22905) IEC 60811-100:2012 CLC/TC 20 IEC/TC 20 LVD (2006/95/EC) // Stage : 5099 2012-05-14 Electric and optical fibre cables - Test methods for non-metallic materials - Part 100: General NOTE: 20/1220/RVC established on 2011-03-11: FDIS decided * Will supersede EN 60811-1-1:1995 (PART) + A1:2001 (PART), EN 60811-1-2:1995 (PART) + A2:2000 (PART), EN 60811-1-3:1995 (PART) + A1:2001 (PART), EN 60811-1-4:1995 (PART) + A2:2001 (PART), EN 60811-2-1:1998 (PART) + A1:2001 (PART), EN 60811-3-
1:1995 (PART) + A1:1996 (PART) + A2:2001 (PART), EN 60811-3-2:1995 (PART) + A2:2004 (PART), EN 60811- 4-1:2004 (PART), EN 60811-4-2:2004 (PART), EN 60811-5-1:1999 (PART) + A1:2004 (PART)*2012-03-14: Publication editing allocated to [email protected]
EN 60811-201:201X (PR=22906) IEC 60811-201:2012 CLC/TC 20 IEC/TC 20 LVD (2006/95/EC) // Stage : 5099 2012-05-14 Electric and optical fibre cables - Test methods for non-metallic materials - Part 201: General tests - Measurement of
insulation thickness NOTE: Will supersede EN 60811-1-1:1995 (PART) + A1:2001 (PART) * 2012-03-14: Publication editing allocated
EN 60811-202:201X (PR=22907) IEC 60811-202:2012 CLC/TC 20 IEC/TC 20 LVD (2006/95/EC) // Stage : 5099 2012-05-14 Electric and optical fibre cables - Test methods for non-metallic materials - Part 202: General tests - Measurement of
thickness of non-metallic sheath NOTE: Will supersede EN 60811-1-1:1995 (PART) + A1:2001 (PART) * 2012-03-14: Publication editing allocated
EN 60811-203:201X (PR=22908) IEC 60811-203:2012 CLC/TC 20 IEC/TC 20 LVD (2006/95/EC) // Stage : 5099 2012-05-14 Electric and optical fibre cables - Test methods for non-metallic materials - Part 203: General tests - Measurement of
overall dimensions NOTE: Will supersede EN 60811-1-1:1995 (PART) + A1:2001 (PART) * 2012-03-14: Publication editing allocated
Technical committees Activities 184
CENELEC Inventory of Technical Activities
EN 60811-301:201X (PR=22909) IEC 60811-301:2012 CLC/TC 20 IEC/TC 20 LVD (2006/95/EC) // Stage : 5099 2012-05-14 Electric and optical fibre cables - Test methods for non-metallic materials - Part 301: Electrical tests - Measurement
of the permittivity at 23 °C of filling compounds NOTE: Will supersede EN 60811-5-1:1999 (PART) + A1:2004 (PART) * 2012-03-14: Publication editing allocated
EN 60811-302:201X (PR=22910) IEC 60811-302:2012 CLC/TC 20 IEC/TC 20 LVD (2006/95/EC) // Stage : 5099 2012-05-14 Electric and optical fibre cables - Test methods for non-metallic materials - Part 302: Electrical tests - Measurement
of the d.c. resistivity at 23 °C and 100 °C of filling compounds NOTE: Will supersede EN 60811-5-1:1999 (PART) + A1:2004 (PART) * 2012-03-14: Publication editing allocated
EN 60811-401:201X (PR=22911) IEC 60811-401:2012 CLC/TC 20 IEC/TC 20 LVD (2006/95/EC) // Stage : 5099 2012-05-14 Electric and optical fibre cables - Test methods for non-metallic materials - Part 401: Miscellaneous tests - Thermal
ageing methods - Ageing in an air oven NOTE: Will supersede EN 60811-1-2:1995 (PART) + A2:2000 (PART) * 2012-03-14: Publication editing allocated
EN 60811-402:201X (PR=22912) IEC 60811-402:2012 CLC/TC 20 IEC/TC 20 LVD (2006/95/EC) // Stage : 5099 2012-05-14 Electric and optical fibre cables - Test methods for non-metallic materials - Part 402: Miscellaneous tests - Water
absorption tests NOTE: Will supersede EN 60811-1-3:1995 (PART) + A1:2001 (PART) * 2012-03-14: Publication editing allocated
EN 60811-403:201X (PR=22913) IEC 60811-403:2012 CLC/TC 20 IEC/TC 20 LVD (2006/95/EC) // Stage : 5099 2012-05-14 Electric and optical fibre cables - Test methods for non-metallic materials - Part 403: Miscellaneous tests - Ozone
resistance tests on cross-linked compounds NOTE: Will supersede EN 60811-2-1:1998 (PART) + A1:2001 (PART) * 2012-03-14: Publication editing allocated
EN 60811-404:201X (PR=22914) IEC 60811-404:2012 CLC/TC 20 IEC/TC 20 LVD (2006/95/EC) // Stage : 5099 2012-05-14 Electric and optical fibre cables - Test methods for non-metallic materials - Part 404: Miscellaneous tests - Mineral
oil immersion tests for sheaths NOTE: Will supersede EN 60811-2-1:1998 (PART) + A1:2001 (PART) * 2012-03-14: Publication editing allocated
EN 60811-405:201X (PR=22915) IEC 60811-405:2012 CLC/TC 20 IEC/TC 20 LVD (2006/95/EC) // Stage : 5099 2012-05-14 Electric and optical fibre cables - Test methods for non-metallic materials - Part 405: Miscellaneous tests - Thermal
stability test for PVC insulations and PVC sheaths NOTE: Will supersede EN 60811-3-2:1995 (PART) + A2:2004 (PART) * 2012-03-14: Publication editing allocated
Technical committees Activities 185
CENELEC Inventory of Technical Activities
EN 60811-406:201X (PR=22916) IEC 60811-406:2012 CLC/TC 20 IEC/TC 20 LVD (2006/95/EC) // Stage : 5099 2012-05-14 Electric and optical fibre cables - Test methods for non-metallic materials - Part 406: Miscellaneous tests -
Resistance to stress cracking of polyethylene and polypropylene compounds NOTE: Will supersede EN 60811-4-1:2004 (PART) * 2012-03-14: Publication editing allocated to
EN 60811-407:201X (PR=22917) IEC 60811-407:2012 CLC/TC 20 IEC/TC 20 LVD (2006/95/EC) // Stage : 5099 2012-05-14 Electric and optical fibre cables - Test methods for non-metallic materials - Part 407: Miscellaneous tests -
Measurement of mass increase of polyethylene and polypropylene compounds NOTE: Will supersede EN 60811-4-2:2004 (PART) * 2012-03-14: Publication editing allocated to
EN 60811-408:201X (PR=22918) IEC 60811-408:2012 CLC/TC 20 IEC/TC 20 LVD (2006/95/EC) // Stage : 5099 2012-05-14 Electric and optical fibre cables - Test methods for non-metallic materials - Part 408: Miscellaneous tests - Long-
term stability test of polyethylene and polypropylene compounds NOTE: Will supersede EN 60811-4-2:2004 (PART) * 2012-03-14: Publication editing allocated to
EN 60811-409:201X (PR=22919) IEC 60811-409:2012 CLC/TC 20 IEC/TC 20 LVD (2006/95/EC) // Stage : 5099 2012-05-14 Electric and optical fibre cables - Test methods for non-metallic materials - Part 409: Miscellaneous tests - Loss of
mass test for thermoplastic insulations and sheaths NOTE: Will supersede EN 60811-3-2:1995 (PART) + A2:2004 (PART) * 2012-03-14: Publication editing allocated
EN 60811-410:201X (PR=22920) IEC 60811-410:2012 CLC/TC 20 IEC/TC 20 LVD (2006/95/EC) // Stage : 5099 2012-05-14 Electric and optical fibre cables - Test methods for non-metallic materials - Part 410: Miscellaneous tests - Test
method for copper-catalyzed oxidative degradation of polyolefin insulated conductors NOTE: Will supersede EN 60811-4-2:2004 (PART) * 2012-03-14: Publication editing allocated to
EN 60811-411:201X (PR=22921) IEC 60811-411:2012 CLC/TC 20 IEC/TC 20 LVD (2006/95/EC) // Stage : 5099 2012-05-14 Electric and optical fibre cables - Test methods for non-metallic materials - Part 411: Miscellaneous tests - Low
temperature brittleness of filling compounds NOTE: Will supersede EN 60811-5-1:1999 (PART) + A1:2004 (PART) * 2012-03-14: Publication editing allocated
EN 60811-412:201X (PR=22922) IEC 60811-412:2012 CLC/TC 20 IEC/TC 20 LVD (2006/95/EC) // Stage : 5099 2012-05-14 Electric and optical fibre cables - Test methods for non-metallic materials - Part 412: Miscellaneous tests - Thermal
ageing methods - Ageing in an air bomb NOTE: Will supersede EN 60811-1-2:1995 (PART) + A2:2000 (PART) * 2012-03-14: Publication editing allocated
Technical committees Activities 186
CENELEC Inventory of Technical Activities
EN 60811-501:201X (PR=22923) IEC 60811-501:2012 CLC/TC 20 IEC/TC 20 LVD (2006/95/EC) // Stage : 5099 2012-05-15 Electric and optical fibre cables - Test methods for non-metallic materials - Part 501: Mechanical tests - Tests for
determining the mechanical properties of insulating and sheathing compounds NOTE: Will supersede EN 60811-1-1:1995 (PART) + A1:2001 (PART) * 2012-03-21: Publication processing
allocated to [email protected]
EN 60811-502:201X (PR=22924) IEC 60811-502:2012 CLC/TC 20 IEC/TC 20 LVD (2006/95/EC) // Stage : 5099 2012-05-15 Electric and optical fibre cables - Test methods for non-metallic materials - Part 502: Mechanical tests - Shrinkage
test for insulations NOTE: Will supersede EN 60811-1-3:1995 (PART) + A1:2001 (PART) * 2012-03-21: Publication processing
allocated to [email protected]
EN 60811-503:201X (PR=22925) IEC 60811-503:2012 CLC/TC 20 IEC/TC 20 LVD (2006/95/EC) // Stage : 5099 2012-05-15 Electric and optical fibre cables - Test methods for non-metallic materials - Part 503: Mechanical tests - Shrinkage
test for sheaths NOTE: Will supersede EN 60811-1-3:1995 (PART) + A1:2001 (PART) * 2012-03-21: Publication processing
allocated to [email protected]
EN 60811-504:201X (PR=22926) IEC 60811-504:2012 CLC/TC 20 IEC/TC 20 LVD (2006/95/EC) // Stage : 5099 2012-05-15 Electric and optical fibre cables - Test methods for non-metallic materials - Part 504: Mechanical tests - Bending
tests at low temperature for insulation and sheaths NOTE: Will supersede EN 60811-1-4:1995 (PART) + A2:2001 (PART) * 2012-03-21: Publication processing
allocated to [email protected]
EN 60811-505:201X (PR=22927) IEC 60811-505:2012 CLC/TC 20 IEC/TC 20 LVD (2006/95/EC) // Stage : 5099 2012-05-15 Electric and optical fibre cables - Test methods for non-metallic materials - Part 505: Mechanical tests - Elongation
at low temperature for insulations and sheaths NOTE: Will supersede EN 60811-1-4:1995 (PART) + A2:2001 (PART) * 2012-03-21: Publication processing
allocated to [email protected]
EN 60811-506:201X (PR=22928) IEC 60811-506:2012 CLC/TC 20 IEC/TC 20 LVD (2006/95/EC) // Stage : 5099 2012-05-15 Electric and optical fibre cables - Test methods for non-metallic materials - Part 506: Mechanical tests - Impact test
at low temperature for insulations and sheaths NOTE: Will supersede EN 60811-1-4:1995 (PART) + A2:2001 (PART) * 2012-03-21: Publication processing
allocated to [email protected]
EN 60811-507:201X (PR=22929) IEC 60811-507:2012 CLC/TC 20 IEC/TC 20 LVD (2006/95/EC) // Stage : 5099 2012-05-15 Electric and optical fibre cables - Test methods for non-metallic materials - Part 507: Mechanical tests - Hot set test
for cross-linked materials NOTE: Will supersede EN 60811-2-1:1998 (PART) + A1:2001 (PART) * 2012-03-21: Publication processing
allocated to [email protected]
Technical committees Activities 187
CENELEC Inventory of Technical Activities
EN 60811-508:201X (PR=22930) IEC 60811-508:2012 CLC/TC 20 IEC/TC 20 LVD (2006/95/EC) // Stage : 5099 2012-05-15 Electric and optical fibre cables - Test methods for non-metallic materials - Part 508: Mechanical tests - Pressure test
at high temperature for insulation and sheaths NOTE: Will supersede EN 60811-3-1:1995 (PART) + A1:1996 (PART) + A2:2001 (PART) * 2012-03-21:
Publication processing allocated to [email protected]
EN 60811-509:201X (PR=22931) IEC 60811-509:2012 CLC/TC 20 IEC/TC 20 LVD (2006/95/EC) // Stage : 5099 2012-05-15 Electric and optical fibre cables - Test methods for non-metallic materials - Part 509: Mechanical tests - Test for
resistance of insulations and sheaths to cracking (heat shock test) NOTE: Will supersede EN 60811-3-1:1995 (PART) + A1:1996 (PART) + A2:2001 (PART) * 2012-03-21:
Publication processing allocated to [email protected]
EN 60811-510:201X (PR=22932) IEC 60811-510:2012 CLC/TC 20 IEC/TC 20 LVD (2006/95/EC) // Stage : 5099 2012-05-15 Electric and optical fibre cables - Test methods for non-metallic materials - Part 510: Mechanical tests - Methods
specific to polyethylene and polypropylene compounds - Wrapping test after thermal ageing in air NOTE: Will supersede EN 60811-4-2:2004 (PART) * 2012-03-21: Publication processing allocated to
EN 60811-511:201X (PR=22933) IEC 60811-511:2012 CLC/TC 20 IEC/TC 20 LVD (2006/95/EC) // Stage : 5099 2012-05-15 Electric and optical fibre cables - Test methods for non-metallic materials - Part 511: Mechanical tests -
Measurement of the melt flow index of polyethylene compounds NOTE: Will supersede EN 60811-4-1:2004 (PART) * *2012-03-21: Publication processing allocated to
EN 60811-512:201X (PR=22934) IEC 60811-512:2012 CLC/TC 20 IEC/TC 20 LVD (2006/95/EC) // Stage : 5099 2012-05-15 Electric and optical fibre cables - Test methods for non-metallic materials - Part 512: Mechanical tests - Tensile strength and elongation at break after conditioning at elevated temperature - Methods specific to polyethylene and polypropylene compounds NOTE: Will supersede EN 60811-4-2:2004 (PART) * 2012-03-21: Publication processing allocated to
EN 60811-513:201X (PR=22935) IEC 60811-513:2012 CLC/TC 20 IEC/TC 20 LVD (2006/95/EC) // Stage : 5099 2012-05-15 Electric and optical fibre cables - Test methods for non-metallic materials - Part 513: Mechanical tests - Methods
specific to polyethylene and polypropylene compounds - Wrapping test after conditioning NOTE: Will supersede EN 60811-4-2:2004 (PART) * 2012-03-21: Publication processing allocated to
EN 60811-601:201X (PR=22936) IEC 60811-601:2012 CLC/TC 20 IEC/TC 20 LVD (2006/95/EC) // Stage : 5099 2012-05-15 Electric and optical fibre cables - Test methods for non-metallic materials - Part 601: Physical tests - Measurement of
the drop point of filling compounds NOTE: Will supersede EN 60811-5-1:1999 (PART) + A1:2004 (PART) * 2012-03-21: Publication processing
allocated to [email protected]
Technical committees Activities 188
CENELEC Inventory of Technical Activities
EN 60811-602:201X (PR=22937) IEC 60811-602:2012 CLC/TC 20 IEC/TC 20 LVD (2006/95/EC) // Stage : 5099 2012-05-15 Electric and optical fibre cables - Test methods for non-metallic materials - Part 602: Physical tests - Separation of
oil in filling compounds NOTE: Will supersede EN 60811-5-1:1999 (PART) + A1:2004 (PART) * 2012-03-21: Publication processing
allocated to [email protected]
EN 60811-603:201X (PR=22938) IEC 60811-603:2012 CLC/TC 20 IEC/TC 20 LVD (2006/95/EC) // Stage : 5099 2012-05-15 Electric and optical fibre cables - Test methods for non-metallic materials - Part 603: Physical tests - Measurement of
total acid number of filling compounds NOTE: Will supersede EN 60811-5-1:1999 (PART) + A1:2004 (PART) * 2012-03-21: Publication processing
allocated to [email protected]
EN 60811-604:201X (PR=22939) IEC 60811-604:2012 CLC/TC 20 IEC/TC 20 LVD (2006/95/EC) // Stage : 5099 2012-05-15 Electric and optical fibre cables - Test methods for non-metallic materials - Part 604: Physical tests - Measurement of
absence of corrosive components in filling compounds NOTE: Will supersede EN 60811-5-1:1999 (PART) + A1:2004 (PART) * 2012-03-21: Publication processing
allocated to [email protected]
EN 60811-605:201X (PR=22940) IEC 60811-605:2012 CLC/TC 20 IEC/TC 20 LVD (2006/95/EC) // Stage : 5099 2012-05-15 Electric and optical fibre cables - Test methods for non-metallic materials - Part 605 : Physical tests - Measurement
of carbon black and/or mineral filler in polyethylene compounds NOTE: Will supersede EN 60811-4-1:2004 (PART) * 2012-03-21: Publication processing allocated to
EN 60811-606:201X (PR=22941) IEC 60811-606:2012 CLC/TC 20 IEC/TC 20 LVD (2006/95/EC) // Stage : 5099 2012-05-15 Electric and optical fibre cables - Test methods for non-metallic materials - Part 606: Physical tests - Methods for
determining the density NOTE: Will supersede EN 60811-1-3:1995 (PART) + A1:2001 (PART) * 2012-03-21: Publication processing
allocated to [email protected]
EN 60811-607:201X (PR=22942) IEC 60811-607:2012 CLC/TC 20 IEC/TC 20 LVD (2006/95/EC) // Stage : 5099 2012-05-15 Electric and optical fibre cables - Test methods for non-metallic materials - Part 607: Physical tests - Test for the
assessment of carbon black dispersion in polyethylene and polypropylene NOTE: Will supersede EN 60811-4-1:2004 (PART) * 2012-03-21: Publication processing allocated to
Vote launched
CLC/FprTR 50576:2012 (PR=23693) CLC/TC 20 Stage : 5060 2012-05-21 Electric cables - Extended application of test results NOTE: 2012-05-02 - Publication editing allocated to [email protected] * D139/C157: NWI approved *
2011-10-28 - TCA editing allocated to [email protected] Mandated: M/443
Technical committees Activities 189
CENELEC Inventory of Technical Activities
EN 61034-1:2005/FprA1:2012 (PR=24012) IEC 61034-1:2005/A1:201X (20/1322/CDV) CLC/TC 20 IEC/TC 20 LVD (2006/95/EC) // Stage : 5020 2012-07-06 Measurement of smoke density of cables burning under defined conditions - Part 1: Test apparatus
EN 61034-2:2005/FprA1:2012 (PR=24013) IEC 61034-2:2005/A1:201X (20/1323/CDV) CLC/TC 20 IEC/TC 20 LVD (2006/95/EC) // Stage : 5020 2012-07-06 Measurement of smoke density of cables burning under defined conditions - Part 2: Test procedure and requirements
Enquiry launched
prEN 50393:2012 (PR=23490) CLC/TC 20 Stage : 4020 2012-10-12 Draft for vote due at CCMC by: 2013-09-15 Test methods and requirements for accessories for use on distribution cables of rated voltage 0,6/1,0 (1,2) kV NOTE: 2012-03-07 - Enquiry processing allocated to [email protected] * Will supersede EN 50393:2006
prEN 50565-1:2011 (PR=22562) CLC/TC 20 LVD (2006/95/EC) Stage : 4060 2012-06-15 Draft for vote due at CCMC by: 2013-08-15 Electric cables - Guide to use for cables with a rated voltage not exceeding 450/750 V - Part 1: General guidance NOTE: Enquiry editing allocated to [email protected] * Will supersede HD 516 S2:1997 together with Part
2 (to be handled later on)
prEN 50575:2012 (PR=23570) CLC/TC 20 CPD (89/106/EEC) LVD (2006/95/EC) Stage : 4020 2012-06-15 Draft for vote due at CCMC by: 2013-10-15 Power, control and communication cables - Cables for general applications in construction works subject to reaction
to fire requirements NOTE: Project to be handled in collaboration with TC 46X and TC 86A* 2011-10-28: Enquiry editing allocated to
[email protected] Mandated: M/443
prEN 50577:2012 (PR=23694) CLC/TC 20 Stage : 4020 2012-07-20 Draft for vote due at CCMC by: 2014-01-15 Electric cables - Fire resistance test for unprotected electric cables (P classification) NOTE: 2011-11-18 - Enquiry processing allocated to [email protected] Mandated: M/117; M/443
At Secretariat stage
prHD 632 S3 (PR=22560) CLC/TC 20 Stage : 2020 2012-03-31 Draft for vote due at CCMC by: 2012-06-30 Power cables with extruded insulation and their accessories for rated voltages above 36 kV (Um = 42 kV) up to 150
kV (Um = 170 kV) NOTE: D135/C185: NWI approved - To be issued in English only (cf D104/118 + D114/076) - Draft for UAP
scheduled end of March 2012 * D141/C036: Extension of the target date for vote approved to read 2012-06-30
Technical committees Activities 190
CENELEC Inventory of Technical Activities
prEN 50565-2 (PR=23833) CLC/TC 20 LVD (2006/95/EC) Stage : 2020 - Draft for vote due at CCMC by: 2014-03-15 Electric cables - Guide to use for cables with a rated voltage not exceeding 450/750 V - Part 2- Specific guidance
related to 50525 cable types NOTE: D140/C017: NWI approved * ENQ + FV track * Will supersede HD 516 S2:1997 together with prEN 50565-
1:2011 (PR=22562) currently at CLC enquiry stage) * 2011-12 decision: to start enquiry procedure
New work item approved
prHD 603 S2 (PR=22561) CLC/TC 20 LVD (2006/95/EC) Stage : 1099 2010-10-01 Draft for vote due at CCMC by: 2012-05-31 Distribution cables of rated voltage 0,6/1 kV NOTE: D135/C185: NWI approved - To be issued in English only (cf D104/118 + D114/076) - Target date for vote:
2012-05-31
prEN 50XXX (PR=24105) CLC/TC 20 Stage : 1099 - Draft for vote due at CCMC by: - Cables for electric vehicles NOTE: Work based on Vilamoura BT/DE0259/NOT allocated to CLC/TC 20 - DE NC requested to transfer the
available draft to TC 20
prEN 50XXX (PR=24019) CLC/TC 20 Stage : 1099 2012-08-31 Draft for vote due at CCMC by: 2014-02-24 Cables for photovoltaic systems NOTE: Follow-up of Vilamoura notification Vila_BT_DE0258_NOT allocated to CLC/TC 20
Work stopped (last 12 months)
prEN 50XXX-2 (PR=23441) CLC/TC 20 LVD (2006/95/EC) Stage : 98 - Electric cables - Guide to use for cables with a rated voltage not exceeding 450/750 V - Part 2: Specific guidance
related to EN 50525 cable types NOTE: Issued to supersede HD 516 S2:1997 together with Part 1 (PR=22562) * 2011-05 decision: covered by PR =
23833
Technical committees Activities 191
CENELEC Inventory of Technical Activities
TC 21X
Secondary cells and batteries
To execute the following standardization activities for secondary cells and batteries: - to implement IEC/TC 21/SC 21A documents into CENELEC standards; - to prepare Product Standards, general requirements and methods of testing included; - to prepare Safety Standards and associated Codes of Practice; - to consider Environmental Requirements (EC Rules) for the products.
Officers Meetings Secretary: Mr Jürgen BAUER ( DE) Brussels 2008-06-03 Chairman: Mr Jean Paul DOUADY ( FR) Brussels 2009-06-10
Brussels 2010-06-03 Brussels 2011-11-22
Published (last 12 months)
EN 50342-1:2006/A1:2011 (PR=22309) CLC/TC 21X Stage : 6060 Lead-acid starter batteries - Part 1: General requirements and methods of test dor : 2011-10-17 doa : 2012-04-17 dop : 2012-10-17 dow: 2014-10-17
EN 50342-5:2010/AC:2011 (PR=23820) CLC/TC 21X Stage : 6060 Lead-acid starter batteries - Part 5: Properties of battery housings and handles dor : - doa : - dop : - dow : -
EN 61951-2:2011 (PR=22550) IEC 61951-2:2011 CLC/TC 21X IEC/SC 21A // Stage : 6060 Secondary cells and batteries containing alkaline or other non-acid electrolytes - Portable sealed rechargeable single
cells - Part 2: Nickel-metal hydride NOTE: Supersedes EN 61951-2:2003 dor : 2011-06-29 doa : 2011-09-29 dop : 2012-03-29 dow : 2014-06-29
EN 61960:2011 (PR=22710) IEC 61960:2011 CLC/TC 21X IEC/SC 21A // Stage : 6060 Secondary cells and batteries containing alkaline or other non-acid electrolytes - Secondary lithium cells and
batteries for portable applications NOTE: Supersedes EN 61960:2004 dor : 2011-07-21 doa : 2011-10-21 dop : 2012-04-21 dow : 2014-07-21
EN 62660-1:2011 (PR=22754) IEC 62660-1:2010 CLC/TC 21X IEC/TC 21 // Stage : 6060 Secondary lithium-ion cells for the propulsion of electric road vehicles - Part 1: Performance testing NOTE: Publication editing allocated to [email protected] dor : 2011-01-20 doa : 2011-04-20 dop : 2012-04-20 dow : 2014-01-20
Technical committees Activities 192
CENELEC Inventory of Technical Activities
EN 62660-2:2011 (PR=22755) IEC 62660-2:2010 CLC/TC 21X IEC/TC 21 // Stage : 6060 Secondary lithium-ion cells for the propulsion of electric road vehicles - Part 2: Reliability and abuse testing NOTE: Publication editing allocated to [email protected] dor : 2011-01-20 doa : 2011-04-20 dop : 2011-10-20 dow : 2014-01-20
Ratified
EN 61056-1:201X (PR=23350) IEC 61056-1:2012 CLC/TC 21X IEC/TC 21 // Stage : 5099 2012-04-25 General purpose lead-acid batteries (valve-regulated types) - Part 1: General requirements, functional characteristics
- Methods of test NOTE: Will supersede EN 61056-1:2003*2012-03-09: Publication editing allocated to [email protected]
EN 61056-2:201X (PR=23351) IEC 61056-2:2012 CLC/TC 21X IEC/TC 21 // Stage : 5099 2012-04-25 General purpose lead-acid batteries (valve-regulated types) - Part 2: Dimensions, terminals and marking NOTE: Will supersede EN 61056-2:2003*2012-03-09: Publication editing allocated to [email protected]
Vote launched
FprEN 60952-1:2011 (PR=23900) IEC 60952-1:201X (21/769/CDV) CLC/TC 21X IEC/TC 21 // Stage : 5060 2012-05-28 Aircraft batteries - Part 1: General test requirements and performance levels NOTE: Will supersede EN 60952-1:2004 * Awaiting outcome of RVC before further processing
FprEN 60952-2:2011 (PR=23901) IEC 60952-2:201X (21/770/CDV) CLC/TC 21X IEC/TC 21 // Stage : 5060 2012-05-28 Aircraft batteries - Part 2: Design and construction requirements NOTE: Will supersede EN 60952-2:2004 * Awaiting outcome of RVC before further processing
FprEN 60952-3:2011 (PR=23902) IEC 60952-3:201X (21/771/CDV) CLC/TC 21X IEC/TC 21 // Stage : 5060 2012-05-28 Aircraft batteries - Part 3: Product specification and declaration of design and performance (DDP) NOTE: Will supersede EN 60952-3:2004 * Awaiting outcome of RVC before further processing
FprEN 61427-1:2012 (PR=24062) IEC 61427-1:201X (21/776/CDV) CLC/TC 21X IEC/TC 21 // Stage : 5020 2012-07-27 Secondary cells and batteries for Renewable Energy Storage - General Requirements and methods of test - Part 1:
Photovoltaic Off grid application
FprEN 61982:2012 (PR=23553) IEC 61982:2012 CLC/TC 21X IEC/TC 21 // Stage : 5060 2012-05-07 Secondary batteries (except lithium) for the propulsion of electric road vehicles - Performance and endurance tests NOTE: 2012-05-08 - Publication editing allocated to [email protected] * Will supersede EN 61982-1:2006, EN 61982-2:2002 + corr. Dec.2002, EN 61982-3:2001 * 21/772/RVC established on 2012-01-06: FDIS decided * CDV circulated as FprEN 61982-1 (edition 2) - FDIS circulated as FprEN 61982 (edition 1)
Technical committees Activities 193
CENELEC Inventory of Technical Activities
FprEN 62133:2010 (PR=23189) IEC 62133:201X (21A/481/CDV) CLC/TC 21X IEC/SC 21A // Stage : 5060 2011-05-02 Secondary cells and batteries containing alkaline or other non-acid electrolytes - Safety requirements for portable
sealed secondary cells, and for batteries made from them, for use in portable applications NOTE: Will supersede EN 62133:2003 * Awaiting outcome of RVC before further processing
New work item approved
prEN 50342-1 (PR=24057) CLC/TC 21X Stage : 1099 - Draft for vote due at CCMC by: 2014-07-10 Lead-acid starter batteries - Part 1: General requirements and methods of test NOTE: Will supersede EN 50342-1:2006 + A1:2011 * D141/C078: NWI approved
prEN 50342-6 (PR=22319) CLC/TC 21X Stage : 1099 2010-05-01 Draft for vote due at CCMC by: 2012-11-26 Lead-acid starter batteries - Part 6: Batteries for Micro Cycle Applications NOTE: D135/C011: NWI approved - Target date for vote: 2012-11-26 * 141 BT requested to approve an extension
of the tdv to read: 2013-06-14
prEN 50342-7 (PR=24058) CLC/TC 21X Stage : 1099 - Draft for vote due at CCMC by: 2014-07-10 Lead-acid starter batteries - Part 7: General requirements, methods of tests and dimensions for motorcycle batteries NOTE: D141/C078: NWI approved * European standard for motorcycle batteries - Linked with Janpanese standards
Technical committees Activities 194
CENELEC Inventory of Technical Activities
TC 22X
Power electronics
To prepare standards dealing with power electronics. The standards will deal with equipment, their component parts (especially electronic devices) and their extension to the system aspect. Standards for power converters interfacing general power systems to dedicated systems, for example railways, shall be dealt with jointly by TC 22X and relevant product committees.
The following are excluded: - converters for rolling stock; - converters and charging equipment for electrical vehicles; - emitters for telecommunication; - dimmers for lighting.
Officers Meetings Secretary: Dipl.-Ing. Martial PATRA ( FR) Paris 2007-10-29 Chairman: Mr Benno WEIS ( DE) Brussels 2009-12-15
Brussels (Siemens) 2011-12-13 to be confirmed 2012-12-05
Published (last 12 months)
EN 61148:2012 (PR=22954) IEC 61148:2011 CLC/TC 22X IEC/TC 22 // Stage : 6060 Terminal markings for valve device stacks and assemblies and for power conversion equipment NOTE: 2011-10-28: Publication editing allocated to [email protected] dor : 2011-11-24 doa : 2012-02-24 dop : 2012-08-24 dow: 2014-11-24
EN 61800-3:2004/A1:2012 (PR=22973) IEC 61800-3:2004/A1:2011 CLC/TC 22X IEC/SC 22G EMC (2004/108/EC) // Stage : 6060 Adjustable speed electrical power drive systems - Part 3: EMC requirements and specific test methods NOTE: 2011-11-24: Publication editing allocated to [email protected] Mandated: M/404 dor : 2011-12-19 doa : 2012-03-19 dop : 2012-09-19 dow: 2014-12-19
EN 61954:2011 (PR=22866) IEC 61954:2011 CLC/TC 22X IEC/SC 22F // Stage : 6060 Static VAR compensators (SVC) - Testing of thyristor valves NOTE: Publication editing allocated to [email protected] * Supersedes EN 61954:1999 + A1:2003 dor : 2011-05-26 doa : 2011-08-26 dop : 2012-02-26 dow : 2014-05-26
EN 62040-3:2011 (PR=22790) IEC 62040-3:2011 CLC/TC 22X IEC/SC 22H // Stage : 6060 Uninterruptible power systems (UPS) - Part 3: Method of specifying the performance and test requirements NOTE: Supersedes EN 62040-3:2001 + A11:2009 dor : 2011-04-18 doa : 2011-07-18 dop : 2012-01-18 dow : 2014-04-18
Technical committees Activities 195
CENELEC Inventory of Technical Activities
Vote launched
EN 61204-3:201X (PR=22518) IEC 61204-3:2011 CLC/TC 22X IEC/SC 22E EMC (2004/108/EC) // Stage : 5091 - Low-voltage power supplies, d.c. output - Part 3: Electromagnetic compatibility (EMC) NOTE: Will supersede EN 61204-3:2000
EN 61954:2011/FprA1:2012 (PR=24032) IEC 61954:2011/A1:201X (22F/274/CDV) CLC/TC 22X IEC/SC 22F // Stage : 5020 2012-07-20 Static VAR compensators (SVC) - Testing of thyristor valves
EN 62040-1:2008/FprA1:2011 (PR=23947) IEC 62040-1:2008/A1:201X (22H/148/CDV) CLC/TC 22X IEC/SC 22H LVD (2006/95/EC) // Stage : 5060 2012-06-19 Uninterruptible power systems (UPS) - Part 1: General and safety requirements for UPS
FprEN 62040-4:2012 (PR=24151) IEC 62040-4:201X (22H/149/CDV) CLC/TC 22X IEC/SC 22H // Stage : 5020 2012-09-14 Uninterruptible power systems (UPS) - Part 4: Environmental aspects - requirements and reporting
FprEN 62477-1:2012 (PR=22817) IEC 62477-1:201X (22/200/FDIS) CLC/TC 22X IEC/TC 22 // Stage : 5020 2012-06-01 Safety requirements for power electronic converter systems and equipment - Part 1: General NOTE: 22/190/RVC + 22/190A/RVC established on 2011-12-02: FDIS decided
At Secretariat stage
prEN 50171 (PR=23607) CLC/TC 22X LVD (2006/95/EC) Stage : 2020 2011-09-30 Draft for vote due at CCMC by: 2013-12-15 Central power supply systems NOTE: Will supersede EN 50171:2001 * Draft to be provided by DE NC * D139/C110: NWI approved * ENQ + FV
track
prEN 50XXX (PR=23551) CLC/TC 22X ECOELM (640/2009) ERP (2009/125/EC) Stage : 2020 - Draft for vote due at CCMC by: 2013-10-17 Energy efficiency and Eco-design requirements for power drive systems, motor starters, power electronics and their
driven applications NOTE: D139/C064: NWI approved * Proposed track: ENQ + FV Mandated: M/470; M/476
Work stopped (last 12 months)
prEN 50171 (PR=16314) CLC/TC 22X Stage : 98 - Central power supply systems NOTE: 2006-03 decision: Work to be conducted in CLC before new offer to IEC/SC 22H who already rejected a previous offer because of risk of inconsistency with the corpus of existing standards within the responsibility of
IEC/SC 22H * D134/092: Set back to PWI stage - Standstill released * Covered by pr=23607, for which BT approved relevant NWI on 2011-09-01
Technical committees Activities 196
CENELEC Inventory of Technical Activities
TC 23BX
Switches, boxes and enclosures for household and similar purposes, plugs and socket outlets for d.c. and for the charging of electrical vehicles including their connectors a) To prepare standards for general purpose switches including electronic switches, time-delay switches, remote control switches and isolating switches, Fireman's switches, for a.c. only, with rated voltage not exceeding 440 V, and with a maximum rated current not exceeding 125 A, intended for household and similar purposes, either indoors or outdoors. b) To prepare standards for switches and related accessories for use in Home and Building Electronic Systems (HBES), with a working voltage not exceeding 250 V a.c. and a rated current up to and including 16 A, intended for household and similar purposes, either indoors or outdoors and to associate electronic extension units. c) To prepare standards for general purpose plugs and fixed and portable socket-outlets, with a rated voltage not exceeding 440 V d.c. and a rated current not exceeding 10A, intended to be used in restricted access areas where only skilled or instructed people have access. d) To prepare standards for general purpose boxes and enclosures for household devices, boxes and enclosures with provision for suspension means, connecting boxes and enclosures, floor boxes and enclosures, enclosures for housing protective devices and similar power consuming devices with a rated voltage not exceeding 440 V, intended for household and similar purposes, either indoors or outdoors. e) To prepare standards for ancillary products which relate to/incorporate products covered by a), b), c), e.g. luminaire couplers, adaptors/cable reels, indicator light units, etc. f) To prepare standards for socket-outlet (socket outlets and plugs) - connector (connectors and inlets) configurations for conductive charging of electric vehicles, including plug-in hybrid road vehicles.
Officers Meetings Chairman: Mr Wim DE KESEL ( BE) London 2009-06-17 / 06-18 Secretary: Mr Cristiano MASINI ( IT) Stockholm 2010-06-15 / 06-16
Madrid 2011-06-14 / 06-15 To be confirmed 2012-06-14 / 06-15
Published (last 12 months)
EN 60669-2-6:2012 (PR=23371) IEC 60669-2-6:2012 (Modified) CLC/TC 23BX IEC/SC 23B LVD (2006/95/EC) // Stage : 6060 Switches for household and similar fixed electrical installations - Part 2-6: Particular requirements - Fireman's
switches for exterior and interior signs and luminaires NOTE: Supersedes EN 50425:2008 * This FprEN is intended to be merged with FprEN 60669-2- 6:2011/FprAA:2011 (pr=23738), circulated to formal vote on 2011-09-09, and published as one single document,
with the implementation dates of FprAA * 23B/1032/RVC established on 2011-10-21: To be published without FDIS stage*2012-02-07: Publication editing allocated to [email protected] dor : 2012-02-22 doa : 2012-08-22 dop : 2013-02-22 dow: 2015-02-22
EN 62196-1:2012 (PR=23252) IEC 62196-1:2011 CLC/TC 23BX IEC/SC 23H LVD (2006/95/EC) // Stage : 6060 Plugs, socket-outlets, vehicle connectors and vehicle inlets - Conductive charging of electric vehicles - Part 1:
General requirements NOTE: Supersedes EN 62196-1:2003 Mandated: M/468 dor : 2012-02-01 doa : 2012-05-01 dop : 2012-11-01 dow: 2015-02-01
Technical committees Activities 197
CENELEC Inventory of Technical Activities
EN 62196-2:2012 (PR=23259) IEC 62196-2:2011 CLC/TC 23BX IEC/SC 23H LVD (2006/95/EC) // Stage : 6060 Plugs, socket-outlets, vehicle connectors and vehicle inlets - Conductive charging of electric vehicles - Part 2:
Dimensional compatibility and interchangeability requirements for a.c. pin and contact-tube accessories NOTE: To be read in conjunction with EN 62196-1 Mandated: M/468 dor : 2012-02-01 doa : 2012-05-01 dop : 2012-11-01 dow: 2015-02-01
Vote launched
FprEN 60669-1:2011 (PR=22272) IEC 60669-1:201X (23B/1010/CDV) CLC/TC 23BX IEC/SC 23B LVD (2006/95/EC) // Stage : 5091 2012-03-31 Switches for household and similar fixed-electrical installations - Part 1: General requirements NOTE: Will supersede EN 60669-1:1999 + A1:2002 + A2:2008 & EN 60669-1:1999/IS1:2009 * This FprEN is intended to be merged with FprEN 60669-1:2011/FprAA:2011 (pr=22639) and published as one single document,
with the implementation dates of FprAA * 23B/1057/RVC established on 2011-03-02: CDV rejected - Comments to be discussed during March 2012 meeting
EN 60669-1:201X/AA:201X (PR=22639) CLC/TC 23BX LVD (2006/95/EC) Stage : 5091 - Switches for household and similar fixed-electrical installations - Part 1: General requirements NOTE: FprAA will be merged with FprEN 60669-1:2011 (pr=22272) for publication as one single document, with
the implementation dates of FprAA
EN 60669-2-5:201X/AA:201X (PR=22634) CLC/TC 23BX EMC (2004/108/EC) LVD (2006/95/EC) Stage : 5091 - Switches for household and similar fixed electrical installations - Part 2-5: Switches and related accessories for use in
home and building electronic systems (HBES) NOTE: FprAA circulated simultaneously with FprEN 60669-2-5 (PR=22633) under parallel vote on CDV, intended
to be merged with FprEN 60669-2-5 and published as one single document, with the implementation dates of FprAA.
EN 62196-1:2012/FprAA:2012 (PR=23821) CLC/TC 23BX LVD (2006/95/EC) Stage : 5020 2012-09-07 Plugs, socket-outlets, vehicle connectors and vehicle inlets - Conductive charging of electric vehicles - Part 1:
General requirements NOTE: D140/C018: NWI approved * Common Modifications to FprEN (Ratification on hold until result of FprAA is
available) * D140/044-045: EN 62196-1 ratified * 2012-04-25 - UAP editing allocated to [email protected] Mandated: M/468
EN 62196-2:2012/FprAA:2012 (PR=23822) CLC/TC 23BX LVD (2006/95/EC) Stage : 5020 2012-09-07 Plugs, socket-outlets, vehicle connectors and vehicle inlets - Conductive charging of electric vehicles - Part 2:
Dimensional compatibility and interchangeability requirements for a.c. pin and contact-tube accessories NOTE: D140/C018: NWI approved * Common Modifications to FprEN (Ratification on hold until result of FprAA is
available) * D140/044-045: EN 62196-2 ratified * 2012-04-25 - UAP editing allocated to [email protected] Mandated: M/468
Technical committees Activities 198
CENELEC Inventory of Technical Activities
Vote decided
FprEN 60669-2-5:201X (PR=22633) IEC 60669-2-5:201X (23B/1017/CDV) CLC/TC 23BX IEC/SC 23B EMC (2004/108/EC) LVD (2006/95/EC) // Stage : 3090 2012-07-31 Draft for vote due at CCMC by: - Switches for household and similar fixed electrical installations - Part 2-5: Switches and related accessories for use in
home and building electronic systems (HBES) NOTE: Will supersede EN 50428:2005 + A1:2007 + A2:2009 * FprAA covering CMs circulated simultaneously (PR=22634), the intension is to merge FprEN & FprAA and publish them as one single document, with the implementation dates of FprAA. * 23B/1055/RVC established on 2012-02-03: FDIS decided
Work stopped (last 12 months)
EN 60669-2-6:201X/AA:201X (PR=23738) CLC/TC 23BX LVD (2006/95/EC) Stage : 5098 - Switches for household and similar fixed electrical installations - Part 2-6: Particular requirements - Fireman's
switches for exterior and interior signs and luminaires NOTE: FprAAcovering common modifications towards FprEN 60669-2-6:2011 (PR=23371) under parallel vote on
CDV merged and to be published as one single document, with the implementation dates of FprAA
New work item to be approved (BT/TC)
EN 60670-1:2005/prA (PR=24178) CLC/TC 23BX LVD (2006/95/EC) Stage : 1000 2012-07-03 Boxes and enclosures for electrical accessories for household and similar fixed electrical installations - Part 1:
General requirements NOTE: NWI requested to 142 BT
prEN 60670-24 (PR=24247) CLC/TC 23BX LVD (2006/95/EC) IEC 60670-24:2011 (EQV)
Stage : 1000 2012-07-03 Boxes and enclosures for electrical accessories for household and similar fixed electrical installations - Part 1:
General requirements NOTE: NWI requested to 142 BT
Technical committees Activities 199
CENELEC Inventory of Technical Activities
TC 23E
Circuit breakers and similar devices for household and similar applications
To prepare harmonized standards for electrical circuit breakers for overcurrent protection, devices protecting against electric shock and all related accessories. These devices are used for household and similar purposes. The word "similar" includes locations such as offices, commercial and industrial premises, hospitals, public buildings etc. This equipment is intended for fixed installations or for use in or with appliances or other equipment. This equipment may include electronic components.
Officers Meetings Chairman: Mr Michel DELL'OVA ( FR) Milan 2008-09-24 Secretary: Mr Giovanni CASSINELLI ( IT) Brussels 2009-11-12
Paris 2011-03-24 Brussels 2012-05-10
Published (last 12 months)
EN 50550:2011/AC:2012 (PR=24027) CLC/TC 23E EMC (2004/108/EC) LVD (2006/95/EC) Stage : 6060 Power frequency overvoltage protective device for household and similar applications (POP) dor : - doa : - dop : - dow : -
EN 50557:2011 (PR=22789) CLC/TC 23E EMC (2004/108/EC) LVD (2006/95/EC) Stage : 6060 Requirements for automatic reclosing devices (ARDs) for circuit breakers-RCBOs-RCCBs for household and similar
uses NOTE: Publication editing allocated to [email protected] dor : 2011-07-19 doa : 2012-01-19 dop : 2012-07-19 dow: 2014-07-19
EN 61008-1:2004/A13:2012 (PR=23062) CLC/TC 23E Stage : 6060 Residual current operated circuit-breakers without integral overcurrent protection for household and similar uses
(RCCB's) - Part 1: General rules NOTE: 2011-12-02 - Publication editing allocated to [email protected] * Amendment to EN 61008-1-2004 following Danish request in order to modify the properties of the test button for 30mA RCDs * Formal Vote editing allocated to [email protected] dor : 2012-01-02 doa : 2012-07-02 dop : 2013-01-02 dow: 2015-01-02
EN 61009-1:2004/A14:2012 (PR=23063) CLC/TC 23E Stage : 6060 Residual current operated circuit-breakers with integral overcurrent protection for household and similar uses
(RCBO's) - Part 1: General rules NOTE: 2011-12-02 - Publication editing allocated to [email protected] * Amendment to EN 61009-1-2004 following Danish request in order to modify the properties of the test button for 30mA RCDs *Formal Vote editing allocated to [email protected] dor : 2012-01-02 doa : 2012-07-02 dop : 2013-01-02 dow: 2015-01-02
Technical committees Activities 200
CENELEC Inventory of Technical Activities
Ratified
EN 60898-1:2003/AB:201X (PR=22802) CLC/TC 23E LVD (2006/95/EC) Stage : 5099 2012-06-18 Electrical accessories - Circuit breakers for overcurrent protection for household and similar installations - Part 1:
Circuit-breakers for a.c. operation NOTE: 2012-04-18 - Publication editing allocated to [email protected]
Vote launched
EN 60934:2001/FprA2:2011 (PR=23667) IEC 60934:2000/A2:201X (23E/726/CDV) CLC/TC 23E IEC/SC 23E LVD (2006/95/EC) // Stage : 5060 2012-01-30 Circuit-breakers for equipment (CBE) NOTE: Awaiting outcome of RVC before further processing
FprEN 61008-1:2011 (PR=22787) IEC 61008-1:2010 (Modified) CLC/TC 23E IEC/SC 23E EMC (2004/108/EC) LVD (2006/95/EC) Stage : 5060 2012-06-04 Residual current operated circuit-breakers without integral overcurrent protection for household and similar uses
(RCCBs) - Part 1: General rules NOTE: 2012-05-21 - Publication editing allocated to [email protected] * Will supersede EN 61008-1:2004 +
A11:2007 + A12:2009
FprEN 61009-1:2011 (PR=22788) IEC 61009-1:2010 (Modified) CLC/TC 23E IEC/SC 23E EMC (2004/108/EC) LVD (2006/95/EC) Stage : 5060 2012-06-04 Residual current operated circuit-breakers with integral overcurrent protection for household and similar uses
(RCBOs) - Part 1: General rules NOTE: 2012-05-21 - Publication editing allocated to [email protected] * Will supersede EN 61009-1:2004 +
corr. Jul.2006 + A11:2008 + A12:2009 + A13:2009
FprEN 62423:2011 (PR=22786) IEC 62423:2009 (Modified) (corrigendum Dec. 2011) CLC/TC 23E IEC/SC 23E EMC (2004/108/EC) LVD (2006/95/EC) Stage : 5060 2012-06-05 Type F and type B residual current operated circuit-breakers with and without integral overcurrent protection for
household and similar uses NOTE: 2012-05-21 - Publication editing allocated to [email protected] * Will supersede EN 62423:2009
FprEN 62606:2012 (PR=24014) IEC 62606:201X (23B/742/CDV) CLC/TC 23E IEC/SC 23E // Stage : 5020 2012-07-06 General requirements for Arc Fault Detection Devices (AFDD)
New work item approved
prEN 50XXX (PR=22188) CLC/TC 23E EMC (2004/108/EC) LVD (2006/95/EC) Stage : 1099 - Draft for vote due at CCMC by: 2012-06-30 Time-delayed residual current operated circuit breakers type M without over-current protection or application in
circuits with rated currents greater above 32A NOTE: Endorsement of AT/NOT/019 - TC advice: Not to be offered to IEC as this project is only valid for Europe *
In hands of new WG 3 * D139/C080: Extension of tdv approved to read 2012-06-30
Technical committees Activities 201
CENELEC Inventory of Technical Activities
TC 26A
Electric arc welding equipment
To prepare harmonized standards for the construction, installation, testing, use and safety of electric arc welding equipment.
Officers Meetings Chairman: Mr Geoff MELTON ( GB) Berlin 2008-10-31 Secretary: Mr René STIEPER ( DE) Vienna 2009-06-19
Paris 2010-03-22 / 03-26 Milan 2011-10-28
Published (last 12 months)
EN 60974-12:2011 (PR=22818) IEC 60974-12:2011 CLC/TC 26A IEC/TC 26 LVD (2006/95/EC) // Stage : 6060 Arc welding equipment - Part 12: Coupling devices for welding cables NOTE: Supersedes EN 60974-12:2005 dor : 2011-06-22 doa : 2011-09-22 dop : 2012-03-22 dow: 2014-06-22
EN 60974-13:2011 (PR=22828) IEC 60974-13:2011 CLC/TC 26A IEC/TC 26 LVD (2006/95/EC) // Stage : 6060 Arc welding equipment - Part 13: Welding clamp NOTE: 2011-05-27: Publication allocated to [email protected] . dor : 2011-06-22 doa : 2011-09-22 dop : 2012-03-22 dow : 2014-06-22
Vote launched
FprEN 60974-1:2012 (PR=23183) IEC 60974-1:201X (26/472/FDIS) CLC/TC 26A IEC/TC 26 LVD (2006/95/EC) // Stage : 5060 2012-05-01 Arc welding equipment - Part 1: Welding power sources NOTE: Will supersede EN 60974-1:2005
FprEN 60974-5:2011 (PR=23887) IEC 60974-5:201X (26/468/CDV) CLC/TC 26A IEC/TC 26 // Stage : 5060 2012-05-21 Arc welding equipment - Part 5: Wire feeders NOTE: Will supersede EN 60974-5:2008 * Awaiting outcome of RVC before further processing
Vote decided
FprEN 60974-2:201X (PR=23651) IEC 60974-2:201X (26/457/CDV) CLC/TC 26A IEC/TC 26 LVD (2006/95/EC) // Stage : 3090 2012-07-31 Draft for vote due at CCMC by: - Arc welding equipment - Part 2: Liquid cooling systems NOTE: Will supersede EN 60974-2:2008 * 26/474/RVC + 26/474A/RVC established on 2012-04-20: FDIS decided
Technical committees Activities 202
CENELEC Inventory of Technical Activities
FprEN 60974-7:201X (PR=23563) IEC 60974-7:201X (26/451/CDV) CLC/TC 26A IEC/TC 26 LVD (2006/95/EC) // Stage : 3090 2012-07-31 Draft for vote due at CCMC by: - Arc welding equipment - Part 7:Torches NOTE: Will supersede EN 60974-7:2005 * This EN is to be used in conjunction with EN 60974-1 * 26/464/RVC +
26/464A/RVC established on 2012-04-13: FDIS decided
Technical committees Activities 203
CENELEC Inventory of Technical Activities
TC 26B
Electric resistance welding
To prepare harmonized standards for the construction, installation, testing and use of electrical resistance welding equipment with the aim of achieving improved electrical safety, with particular reference to the work of IEC/TC 26, TC 44, TC 64 and ISO/TC 44.
Officers Meetings Chairman: Mr Luigi SERRANTONI ( IT) Costermano 2004-09-29 / 09-30
Secretary: Mr René STIEPER ( DE)
No standardization work registered
Technical committees Activities 204
CENELEC Inventory of Technical Activities
TC 31
Electrical apparatus for potentially explosive atmospheres
To standardize the general requirements for the construction and testing of electrical apparatus for potentially explosive atmospheres and the specific requirements for the construction and testing of electrical apparatus, type of protection "o" (oil immersed) and type of protection "q" (powder filled) and types with protection for use in the presence of combustible dusts, and to co-ordinate the work of the sub-committees dealing with the standardization of specific requirements for other individual types of protection.
Officers Meetings Secretary: Dr Uwe KLAUSMEYER ( DE) Dublin 2009-10-29 / 10-30 Chairman: Mr Ron SINCLAIR ( GB) Braunschweig 2010-10-28 / 10-29
Milano 2011-11-23 / 11-24 London 2013-05-17
Published (last 12 months)
EN 60079-35-1:2011 + AC:2011 (PR=22756) IEC 60079-35-1:2011 CLC/TC 31 IEC/TC 31 ATEX (94/9/EC) // Stage : 6060 Explosive atmospheres - Part 35-1: Caplights for use in mines susceptible to firedamp - General requirements -
Construction and testing in relation to the risk of explosion NOTE: Supersedes EN 62013-1:2006 dor : 2011-06-30 doa : 2011-09-30 dop : 2012-03-30 dow: 2014-06-30
EN ISO/IEC 80079-34:2011 (PR=23257) ISO/IEC 80079-34:2011 (Modified) CLC/TC 31 IEC/SC 31M ATEX (94/9/EC) // Stage : 6060 Explosive atmospheres - Part 34: Application of quality systems for equipment manufacture NOTE: Supersedes EN 13980:2002 * Enquiry at ISO/CEN level (31M/31/CDV, CEN Project = WI 00305114) - vote on 31M/45/FDIS at IEC/CLC level (agreement between ISO and IEC, see also D130/103) * Incorporates FprAA (pr=23305) dor : 2011-05-25 doa : 2011-11-25 dop : 2012-05-25 dow : 2014-05-25
Ratified
EN 60079-0:201X (PR=22542) IEC 60079-0:2011 (Modified) CLC/TC 31 IEC/TC 31 ATEX (94/9/EC) Stage : 5099 2012-04-30 Explosive atmospheres - Part 0: Equipment - General requirements NOTE: 2012-03-09: Publication editing allocated to [email protected]*Formal Vote editing allocated to
[email protected] * Will supersede EN 60079-0:2009
EN 60079-35-2:201X (PR=23037) IEC 60079-35-2:2011 CLC/TC 31 IEC/TC 31 // Stage : 5099 2012-02-08 Explosive atmospheres - Part 35-2: Caplights for use in mines susceptible to firedamp - Performance and other
safety-related matters NOTE: 2011-12-20 - Publication editing allocated to [email protected] * Will supersede EN 62013-2:2006
Technical committees Activities 205
CENELEC Inventory of Technical Activities
Vote launched
FprEN 60079-31:2012 (PR=24107) IEC 60079-31:201X (31/985/CDV) CLC/TC 31 IEC/TC 31 ATEX (94/9/EC) // Stage : 5020 2012-08-17 Explosive atmospheres - Part 31: Equipment dust ignition protection by enclosure "t" NOTE: Will supersede EN 60079-31:1009
Vote decided
FprEN 60079-2:201X (PR=23864) IEC 60079-2:201X (31/962/CDV) CLC/TC 31 IEC/TC 31 ATEX (94/9/EC) // Stage : 3090 2012-07-31 Draft for vote due at CCMC by: - Explosive atmospheres - Part 2: Equipment protection by pressurized enclosure "p" NOTE: Will supersede EN 60079-2:2007 & EN 61241-4:2006 * 31/992/RVC established on 2012-04-27: FDIS
decided
Technical committees Activities 206
CENELEC Inventory of Technical Activities
SC 31-1
Installation rules
To standardize rules for the installation of electrical apparatus in a potentially explosive atmosphere.
Officers Meetings Chairman: Dr Heribert OBERHEM ( DE) London 1998-05-20
Secretary: Mr Mick MAGHAR ( GB)
Published (last 12 months)
EN 60079-14:2008/AC:2011 (PR=23842) CLC/SC 31-1 Stage : 6060 Explosive atmospheres - Part 14: Electrical installations design, selection and erection dor : - doa : - dop : - dow : -
Technical committees Activities 207
CENELEC Inventory of Technical Activities
SC 31-2 (dormant)
Flameproof enclosures "d"
To standardize specific requirements for the construction and testing of electrical apparatus with flameproof enclosure, type of protection "d", intended for use in potentially explosive atmospheres.
Officers Meetings Chairman: Dipl.-Ing. Gerhard SCHWARZ ( DE) Brussels 2000-05-17 / 05-18
Vote decided
FprEN 60079-1:201X (PR=23515) IEC 60079-1:201X (31/929/CDV) CLC/SC 31-2 IEC/TC 31 ATEX (94/9/EC) // Stage : 3090 2012-03-31 Draft for vote due at CCMC by: - Explosive atmospheres - Part 1: Equipment protection by flameproof enclosures "d" NOTE: Will supersede EN 60079-1:2007 * 31/979/RVC established on 2012-01-13: FDIS decided
Technical committees Activities 208
CENELEC Inventory of Technical Activities
SC 31-3 (dormant)
Intrinsically safe apparatus and systems "i"
To standardize specific requirements for construction and testing of intrinsically safe electrical apparatus, type of protection "i", intended for use in potentially explosive atmospheres.
Officers Meetings Secretary: Mr L C TOWLE ( GB) Brussels 2000-11-14 / 11-16
Chairman: Dr Ulrich JOHANNSMEYER ( DE)
Published (last 12 months)
EN 60079-11:2012 (PR=22690) IEC 60079-11:2011 + corrigendum Jan. 2012 CLC/SC 31-3 IEC/SC 31G ATEX (94/9/EC) // Stage : 6060 Explosive atmospheres - Part 11: Equipment protection by intrinsic safety "i" NOTE: Publication editing allocated to [email protected] * Supersedes EN 60079-11:2007 + EN 61241-
11:2006 + EN 60079-27:2008 dor : 2011-08-04 doa : 2011-11-04 dop : 2012-07-06 dow: 2014-08-04
Technical committees Activities 209
CENELEC Inventory of Technical Activities
SC 31-4 (dormant)
Increased safety "e"
To standardize specific requirements for the construction and testing of the following electrical apparatus intended for use in potentially explosive atmospheres : - Increased safety electrical apparatus, type of protection "e", - Caplight for mines susceptible to firedamp.
Officers Meetings Chairman: Mr Johannes RÜCKGAUER ( DE) Dortmund 1998-07-21 / 07-22
Secretary: Mr Mick MAGHAR ( GB)
No active standardization work registered
Technical committees Activities 210
CENELEC Inventory of Technical Activities
SC 31-5 (dormant)
Apparatus type of protection "n"
To standardize specific requirements for the construction and testing of electrical apparatus type of protection "n", intended for use in potentially explosive atmospheres.
Officers Meetings Chairman: Mr Ron SINCLAIR ( GB) Brussels 1997-07-02 / 07-03
Secretary: Mr Mick MAGHAR ( GB)
No active standardization work registered
Technical committees Activities 211
CENELEC Inventory of Technical Activities
SC 31-7 (dormant)
Pressurization and other techniques
To standardize specific requirements for the construction and testing of electrical apparatus, type of protection "p", including that with an internal source of flammable gas and vapour intended for use in potentially explosive atmospheres.
Officers Meetings
Oslo 2003-09-10
No active standardization work registered
Technical committees Activities 212
CENELEC Inventory of Technical Activities
SC 31-8
Electrostatic painting and finishing equipment
To standardize specific requirements for the construction, testing and use of electrostatic paint and powder equipment for spraying flammable materials.
Officers Meetings Chairman: Mr Per Ole TORKILDSEN ( NO) Graz 2009-01-29 / 01-30 Secretary: Mr Roland KNOPP ( DE) Stavanger 2010-06-24 / 06-25
St Gallen 2011-12-06 / 12-07 Traunstein 2012-03-08 / 03-09
Vote launched
EN 50177:2009/FprAA:2012 (PR=23420) CLC/SC 31-8 ATEX (94/9/EC) Stage : 5020 2012-06-15 Stationary electrostatic application equipment for ignitable coating powders - Safety requirements NOTE: 2012-01-03 - Allocated to [email protected] * D139/C001: NWI approved * Track: UAP
Enquiry launched
prEN 50050-1:2011 (PR=22512) CLC/SC 31-8 ATEX (94/9/EC) Stage : 4060 2011-12-20 Draft for vote due at CCMC by: 2012-07-01 Electrostatic hand-held spraying equipment - Safety requirements - Part 1: Hand-held spraying equipment for
ignitable liquid coating materials NOTE: D135/C144: NWI approved - Target date for vote: 2011-07-01 but to be split in 3 parts (D135/C145) * Link to ATEX (94/9/EC) added following ATEX consultant's request * In combination with EN 50050-2 (pr=23164) & EN 50050-3 (pr=23165) will supersede EN 50050:2006 * D140/C071: tdv extended to read 2012-07-01
prEN 50050-2:2011 (PR=23164) CLC/SC 31-8 ATEX (94/9/EC) Stage : 4060 2011-12-20 Draft for vote due at CCMC by: 2012-07-01 Electrostatic hand-held spraying equipment - Safety requirements - Part 2: Hand-held spraying equipment for
ignitable coating powder NOTE: D135/C145: prEN 50050 to be split into 3 parts (no NWI to be requested) * In combination with EN 50050-1 (pr=22512) & EN 50050-3 (pr=23165) will supersede EN 50050:2006 * D140/C071: tdv extended to read 2012-07- 01
prEN 50050-3:2011 (PR=23165) CLC/SC 31-8 ATEX (94/9/EC) Stage : 4060 2011-12-20 Draft for vote due at CCMC by: 2012-07-01 Electrostatic hand-held spraying equipment - Safety requirements - Part 3: Hand-held spraying equipment for
ignitable flock NOTE: D135/C145: prEN 50050 to be split into 3 parts (no NWI to be requested) * In combination with EN 50050-1 (pr=22512) & EN 50050-3 (pr=23165) will supersede EN 50050:2006 * D140/C071: tdv extended to read 2012-07- 01
Technical committees Activities 213
CENELEC Inventory of Technical Activities
New work item approved
prEN 50223 (PR=24031) CLC/SC 31-8 ATEX (94/9/EC) MD (2006/42/EC) Stage : 1099 - Draft for vote due at CCMC by: 2014-06-26 Stationary electrostatic application equipment for ignitable flock material - Safety requirements NOTE: D141/C060: NWI approved * Will supersede EN 50223:2010 Mandated: M/396
Technical committees Activities 214
CENELEC Inventory of Technical Activities
SC 31-9
Electrical apparatus for the detection and measurement of combustible gases to be used in industrial and commercial potentially explosive atmospheres
(See also TC 216) General and specific requirements for construction, safety, performance and testing of apparatus for sensing the presence of combustible gases or vapours and for measuring their concentration in industrial and commercial potentially explosive atmospheres.
Officers Meetings Secretary: Mr Nick BRADFIELD ( GB) Frankfurt 2010-03-17 Chairman: Mr Anthony Richard BANFIELD ( GB) Paris 2011-03-16
Dublin 2012-03-14 Brussels 2013-03-20
New work item approved
prEN 50270 (PR=23528) CLC/SC 31-9 EMC (2004/108/EC) Stage : 1099 - Draft for vote due at CCMC by: 2013-12-15 Electromagnetic compatibility - Electrical apparatus for the detection and measurement of combustible gases, toxic
gases or oxygen NOTE: D139/C107: NWI approved * ENQ+FV track set by default * Joint work SC 31-9 and TC 216 (SC 31-9 lead)
* Will supersede EN 50270:2006
prEN 50402 (PR=23419) CLC/SC 31-9 Stage : 1099 - Draft for vote due at CCMC by: 2013-08-15 Electrical apparatus for the detection and measurement of combustible or toxic gases or vapours or of oxygen -
Requirements on the functional safety of fixed gas detection systems NOTE: D139/C001: NWI approved * Will supersede EN 50402:2005 + A1:2008 * In hands of JWG CLC/SC 31-
9/TC 216
Technical committees Activities 215
CENELEC Inventory of Technical Activities
TC 34Z
Luminaires and associated equipment
To prepare harmonized standards based on concluded international standards in the lighting field, but excluding lamps.
Officers Meetings Chairman: Mr Ted GLENNY ( GB) Brussels 2005-06-10
Secretary: Mr Nick BRADFIELD ( GB)
Published (last 12 months)
EN 60061-1:1993/A45:2011 (PR=22738) IEC 60061-1:1969/A45:2011 CLC/TC 34Z IEC/SC 34B LVD (2006/95/EC) // Stage : 6060 Lamp caps and holders together with gauges for the control of interchangeability and safety - Part 1: Lamp caps dor : 2011-08-17 doa : 2011-11-17 dop : 2012-05-17 dow: 2014-08-17
EN 60061-1:1993/A46:2011 (PR=23071) IEC 60061-1:1969/A46:2011 CLC/TC 34Z IEC/SC 34B LVD (2006/95/EC) // Stage : 6060 Lamp caps and holders together with gauges for the control of interchangeability and safety - Part 1: Lamp caps dor : 2011-08-17 doa : 2011-11-17 dop : 2012-05-17 dow : 2014-08-17
EN 60061-1:1993/A47:2012 (PR=23276) IEC 60061-1:1969/A47:2011 CLC/TC 34Z IEC/SC 34B LVD (2006/95/EC) // Stage : 6060 Lamp caps and holders together with gauges for the control of interchangeability and safety - Part 1: Lamp caps NOTE: 2012-03-13 - Publication editing allocated to [email protected] dor : 2012-03-03 doa : 2012-06-03 dop : 2012-12-03 dow: 2015-03-03
EN 60061-2:1993/A42:2011 (PR=22739) IEC 60061-2:1969/A42:2011 CLC/TC 34Z IEC/SC 34B LVD (2006/95/EC) // Stage : 6060 Lamp caps and holders together with gauges for the control of interchangeability and safety - Part 2: Lampholders dor : 2011-10-29 doa : 2012-01-29 dop : 2012-07-29 dow: 2014-10-29
EN 60061-2:1993/A43:2011 (PR=23072) IEC 60061-2:1969/A43:2011 CLC/TC 34Z IEC/SC 34B LVD (2006/95/EC) // Stage : 6060 Lamp caps and holders together with gauges for the control of interchangeability and safety - Part 2: Lampholders dor : 2011-10-29 doa : 2012-01-29 dop : 2012-07-29 dow: 2014-10-29
EN 60061-2:1993/A44:2012 (PR=23277) IEC 60061-2:1969/A44:2011 CLC/TC 34Z IEC/SC 34B LVD (2006/95/EC) // Stage : 6060 Lamp caps and holders together with gauges for the control of interchangeability and safety - Part 2: Lampholders NOTE: 2012-01-20 - Publication editing allocated to [email protected] dor : 2012-01-19 doa : 2012-04-19 dop : 2012-10-19 dow: 2015-01-19
Technical committees Activities 216
CENELEC Inventory of Technical Activities
EN 60061-3:1993/A43:2011 (PR=22740) IEC 60061-3:1969/A43:2011 CLC/TC 34Z IEC/SC 34B LVD (2006/95/EC) // Stage : 6060 Lamp caps and holders together with gauges for the control of interchangeability and safety - Part 3: Gauges dor : 2011-10-29 doa : 2012-01-29 dop : 2012-07-29 dow: 2014-10-29
EN 60061-3:1993/A44:2011 (PR=23073) IEC 60061-3:1969/A44:2011 CLC/TC 34Z IEC/SC 34B LVD (2006/95/EC) // Stage : 6060 Lamp caps and holders together with gauges for the control of interchangeability and safety - Part 3: Gauges dor : 2011-10-29 doa : 2012-01-29 dop : 2012-07-29 dow: 2014-10-29
EN 60061-3:1993/A45:2012 (PR=23278) IEC 60061-3:1969/A45:2011 CLC/TC 34Z IEC/SC 34B LVD (2006/95/EC) // Stage : 6060 Lamp caps and holders together with gauges for the control of interchangeability and safety - Part 3: Gauges NOTE: 2012-01-20 - Publication editing allocated to [email protected] dor : 2012-01-24 doa : 2012-04-24 dop : 2012-10-24 dow: 2015-01-24
EN 60061-4:1992/A13:2011 (PR=22525) IEC 60061-4:1990/A13:2011 CLC/TC 34Z IEC/SC 34B LVD (2006/95/EC) // Stage : 6060 Lamp caps and holders together with gauges for the control of interchangeability and safety - Part 4: Guidelines and
general information dor : 2010-10-05 doa : 2011-12-09 dop : 2012-03-09 dow : 2013-10-05
EN 60061-4:1992/A14:2011 (PR=23074) IEC 60061-4:1990/A14:2011 CLC/TC 34Z IEC/SC 34B LVD (2006/95/EC) // Stage : 6060 Lamp caps and holders together with gauges for the control of interchangeability and safety - Part 4: Guidelines and
general information dor : 2011-09-26 doa : 2011-12-26 dop : 2012-06-26 dow: 2014-09-26
EN 60400:2008/A1:2011 (PR=22792) IEC 60400:2008/A1:2011 CLC/TC 34Z IEC/SC 34B LVD (2006/95/EC) // Stage : 6060 Lampholders for tubular fluorescent lamps and starterholders NOTE: Publication editing allocated to [email protected] dor : 2011-05-25 doa : 2011-08-25 dop : 2012-02-25 dow : 2014-05-25
EN 60598-2-2:2012 (PR=23108) IEC 60598-2-2:2011 CLC/TC 34Z IEC/SC 34D LVD (2006/95/EC) // Stage : 6060 Luminaires - Part 2-2: Particular requirements - Recessed luminaires NOTE: Supersedes EN 60598-2-2:1996 + A1:1997 * 2011-11-24: Publication editing allocated to
[email protected] dor : 2011-12-13 doa : 2012-03-13 dop : 2012-09-13 dow: 2014-12-13
EN 60598-2-3:2003/A1:2011 (PR=22564) IEC 60598-2-3:2002/A1:2011 CLC/TC 34Z IEC/SC 34D LVD (2006/95/EC) // Stage : 6060 Luminaires - Part 2-3: Particular requirements - Luminaires for road and street lighting NOTE: 2011-04-22: Publication text allocated to [email protected] . dor : 2011-05-19 doa : 2011-08-19 dop : 2012-02-19 dow : 2014-05-19
Technical committees Activities 217
CENELEC Inventory of Technical Activities
EN 60598-2-13:2006/A1:2012 (PR=23463) IEC 60598-2-13:2006/A1:2011 CLC/TC 34Z IEC/SC 34D LVD (2006/95/EC) // Stage : 6060 Luminaires - Part 2-13: Particular requirements - Ground recessed luminaires NOTE: 2011-12-20 - Publication editing allocated to [email protected] dor : 2012-01-11 doa : 2012-04-11 dop : 2012-10-11 dow: 2015-01-11
EN 60598-2-18:1994/A1:2012 (PR=23213) IEC 60598-2-18:1993/A1:2011 CLC/TC 34Z IEC/SC 34D // Stage : 6060 Luminaires - Part 2: Particular requirements - Section 18: Luminaires for swimming pools and similar applications NOTE: 2012-01-20 - Publication editing allocated to [email protected] dor : 2012-01-18 doa : 2012-04-18 dop : 2012-10-18 dow: 2015-01-18
EN 60929:2011 + AC:2011 (PR=22765) IEC 60929:2011 + corrigendum Sep. 2011 CLC/TC 34Z IEC/SC 34C // Stage : 6060 AC and/or DC-supplied electronic control gear for tubular fluorescent lamps - Performance requirements NOTE: 2011-05-27: Publication allocated to [email protected] * Supersedes EN 60929:2006 + corr.
Dec.2006 dor : 2011-06-23 doa : 2011-09-23 dop : 2012-03-23 dow : 2014-06-23
EN 61184:2008/A1:2011 (PR=22794) IEC 61184:2008/A1:2011 CLC/TC 34Z IEC/SC 34B LVD (2006/95/EC) // Stage : 6060 Bayonet lampholders dor : 2011-05-25 doa : 2011-08-25 dop : 2012-02-25 dow : 2014-05-25
EN 61347-2-2:2012 (PR=22162) IEC 61347-2-2:2011 CLC/TC 34Z IEC/SC 34C LVD (2006/95/EC) // Stage : 6060 Lamp controlgear - Part 2-2: Particular requirements for d.c. or a.c. supplied electronic step-down convertors for
filament lamps NOTE: 2011-12-20 - Publication editing allocated to [email protected] * Supersedes EN 61347-2-2:2001 +
A1:2006 + A2:2006 dor : 2012-01-11 doa : 2012-04-11 dop : 2012-10-11 dow: 2015-01-11
EN 61347-2-3:2011 + AC:2011 (PR=22727) IEC 61347-2-3:2011 + corrigendum Sep. 2011 CLC/TC 34Z IEC/SC 34C LVD (2006/95/EC) // Stage : 6060 Lamp control gear - Part 2-3: Particular requirements for a.c. and/or d.c. supplied electronic control gear for
fluorescent lamps NOTE: Supersedes EN 61347-2-3:2001 + corr. Jul.2003 + corr. Dec. 2010 + A1:2004 + A2:2006, EN 60925:1991 + A1:1996 + A2:2001, EN 61347-2-4:2001 + corr.Jul. 2003 + corr. Dec.2010, EN 61347-2-5:2001 + corr. Jul.
2003 + corr. Dec. 2010 and EN 61347-2-6:2001 + corr. Jul. 2003 + corr. Dec. 2010 * This EN is to be used in conjunction with EN 61347-1:2008 + A1 (pr=22943) dor : 2011-06-23 doa : 2011-09-23 dop : 2012-03-23 dow : 2014-06-23
EN 61347-2-7:2012 (PR=22594) IEC 61347-2-7:2011 CLC/TC 34Z IEC/SC 34C LVD (2006/95/EC) // Stage : 6060 Lamp controlgear - Part 2-7: Particular requirements for battery supplied electronic controlgear for emergency
lighting (self-contained) NOTE: 2011-12-20 - Publication editing allocated to [email protected] * Supersedes EN 61347-2-7:2006 dor : 2012-01-11 doa : 2012-04-11 dop : 2012-10-11 dow: 2015-01-11
Technical committees Activities 218
CENELEC Inventory of Technical Activities
EN 62034:2012 (PR=22974) IEC 62034:2012 CLC/TC 34Z IEC/SC 34D // Stage : 6060 Automatic test systems for battery powered emergency escape lighting NOTE: Supersedes EN 62034:2006*2012-03-09: Publication editing allocated to [email protected] dor : 2012-03-28 doa : 2012-06-28 dop : 2012-12-28 dow: 2015-03-28
EN 62386-209:2011 (PR=22385) IEC 62386-209:2011 CLC/TC 34Z IEC/SC 34C // Stage : 6060 Digital addressable lighting interface - Part 209: Particular requirements for control gear - Colour control (device
type 8) dor : 2011-07-29 doa : 2011-10-29 dop : 2012-04-29 dow : 2014-07-29
EN 62386-210:2011 (PR=22893) IEC 62386-210:2011 CLC/TC 34Z IEC/SC 34C // Stage : 6060 Digital addressable lighting interface - Part 210: Particular requirements for control gear - Sequencer (device type 9) dor : 2011-05-25 doa : 2011-08-25 dop : 2012-02-25 dow : 2014-05-25
EN 62442-1:2011 + AC:2012 (PR=22846) IEC 62442-1:2011 CLC/TC 34Z IEC/SC 34C // Stage : 6060 Energy performance of lamp controlgear - Part 1: Controlgear for fluorescent lamps - Method of measurement to
determine the total input power of controlgear circuits and the efficiency of the controlgear NOTE: Supersedes EN 50294:1998 + A1:2001 + A2:2003 dor : 2011-11-16 doa : 2012-02-16 dop : 2012-08-16 dow : 2014-11-16
Vote launched
EN 60061-1:1993/FprA49:2011 (PR=23948) IEC 60061-1:1969/A49:201X (34B/1635/CDV) CLC/TC 34Z IEC/SC 34B ERP (2009/125/EC) LVD (2006/95/EC) // Stage : 5060 2012-06-19 Lamp caps and holders together with gauges for the control of interchangeability and safety - Part 1: Lamp caps
EN 60061-2:1993/FprA46:2011 (PR=23949) IEC 60061-2:1969/A46:201X (34B/1635/CDV) CLC/TC 34Z IEC/SC 34B LVD (2006/95/EC) // Stage : 5060 2012-06-19 Lamp caps and holders together with gauges for the control of interchangeability and safety - Part 2: Lampholders
EN 60061-3:1993/FprA47:2011 (PR=23950) IEC 60061-3:1969/A47:201X (34B/1635/CDV) CLC/TC 34Z IEC/SC 34B LVD (2006/95/EC) // Stage : 5060 2012-06-19 Lamp caps and holders together with gauges for the control of interchangeability and safety - Part 3: Gauges
FprEN 60598-2-8:2012 (PR=24098) IEC 60598-2-8:201X (34D/1051/CDV) CLC/TC 34Z IEC/SC 34D LVD (2006/95/EC) // Stage : 5020 2012-08-10 Luminaires - Part 2-8: Particular requirements - Handlamps NOTE: Will supersede EN 60598-2-8:1997 + A1:2000 + A2:2008
Technical committees Activities 219
CENELEC Inventory of Technical Activities
FprEN 60598-2-11:2011 (PR=23928) IEC 60598-2-11:201X (34D/1046/CDV) CLC/TC 34Z IEC/SC 34D LVD (2006/95/EC) // Stage : 5060 2012-06-04 Luminaires - Part 2-11: Particular requirements - Aquarium luminaires NOTE: Will supersede EN 60598-2-11:2005 + corr. Aug.2005
FprEN 60598-2-12:2012 (PR=23960) IEC 60598-2-12:201X (34D/1047/CDV) CLC/TC 34Z IEC/SC 34D LVD (2006/95/EC) // Stage : 5020 2012-06-08 Luminaires - Part 2-12: Particular requirements - Mains socket-outlet mounted nightlights NOTE: Will supersede EN 60598-2-12:2006 + corr. Dec.2006
FprEN 60598-2-24:2011 (PR=23609) IEC 60598-2-24:201X (34D/1025/CDV) CLC/TC 34Z IEC/SC 34D LVD (2006/95/EC) // Stage : 5060 2012-05-31 Luminaires - Part 2-24: Particular requirements - Luminaires with limited surface temperatures NOTE: Will supersede EN 60598-2-24:1998 * To be read in conjunction with EN 60598-1 * 34D/1044/RVC
established on 2011-12-02: To be published without FDIS stage
EN 60927:2007/FprA1:2010 (PR=23241) IEC 60927:2007/A1:201X (34C/951/CDV) CLC/TC 34Z IEC/SC 34C // Stage : 5060 2011-06-27 Auxiliaries for lamps - Starting devices (other than glow starters) - Performance requirements NOTE: 34C/977/RVC established on 2011-05-20: To be published without FDIS stage
EN 61347-2-1:2001/FprA2:2011 (PR=23951) IEC 61347-2-1:2000/A2:201X (34C/1007/CDV) CLC/TC 34Z IEC/SC 34C // Stage : 5060 2012-06-19 Lamp controlgear - Part 2-1: Particular requirements for starting devices (other than glow starters)
FprEN 62442-2:2012 (PR=24226) IEC 62442-2:201X (34C/1016/CDV) CLC/TC 34Z IEC/SC 34C // Stage : 5020 2012-10-26 Energy performance of lamp controlgear - Part 2: Controlgear for high intensity discharge lamps (excluding
fluorescent lamps) - Method of measurement to determine the efficiency of controlgear
Vote decided
EN 60061-1:1993/FprA48:201X (PR=23687) IEC 60061-1:1969/A48:201X (34B/1618/CDV) CLC/TC 34Z IEC/SC 34B LVD (2006/95/EC) // Stage : 3090 2012-05-31 Draft for vote due at CCMC by: - Lamp caps and holders together with gauges for the control of interchangeability and safety - Part 1: Lamp caps NOTE: 34B/1637/RVC established on 2012-02-03: FDIS decided
EN 60061-2:1993/FprA45:201X (PR=23688) IEC 60061-2:1969/A45:201X (34B/1618/CDV) CLC/TC 34Z IEC/SC 34B LVD (2006/95/EC) // Stage : 3090 2012-05-29 Draft for vote due at CCMC by: - Lamp caps and holders together with gauges for the control of interchangeability and safety - Part 2: Lampholders NOTE: 34B/1637/RVC established on 2012-02-03: FDIS decided
Technical committees Activities 220
CENELEC Inventory of Technical Activities
EN 60061-3:1993/FprA46:201X (PR=23689) IEC 60061-3:1969/A46:201X (34B/1618/CDV) CLC/TC 34Z IEC/SC 34B LVD (2006/95/EC) // Stage : 3090 2012-05-31 Draft for vote due at CCMC by: - Lamp caps and holders together with gauges for the control of interchangeability and safety - Part 3: Gauges NOTE: 34B/1637/RVC established on 2012-02-03: FDIS decided
EN 61347-1:2008/FprA2:201X (PR=23697) IEC 61347-1:2007/A2:201X (34C/990/CDV) CLC/TC 34Z IEC/SC 34C LVD (2006/95/EC) // Stage : 3090 2012-07-31 Draft for vote due at CCMC by: - Lamp controlgear - Part 1: General and safety requirements NOTE: 34C/1008/RVC + 34C/1008A/RVC established on 2012-04-20: FDIS decided
FprEN 61347-2-9:201X (PR=23557) IEC 61347-2-9:201X (34C/972/CDV) CLC/TC 34Z IEC/SC 34C LVD (2006/95/EC) // Stage : 3090 2012-06-30 Draft for vote due at CCMC by: - Lamp electromagnetic controlgear - Part 2-9: Particular requirements for electromagnetic controlgear for discharge
lamps (excluding fluorescent lamps) NOTE: Will supersede EN 61347-2-9:2001 + A1:2003 + A2:2006 * This EN shall be used in conjunction with EN
61347-1:2008 + A1:2011* 34C/1000/RVC + 34C/1000A/RVC established on 2012-04-20: FDIS decided
Technical committees Activities 221
CENELEC Inventory of Technical Activities
TC 36A
Insulated bushings
To prepare harmonized standards for bushings for use in electrical apparatus, transformers and installations.
Officers Meetings Chairman: Mr Raymond VAN SCHEVENSTEEN ( BE) Brussels 2009-10-29 Secretary: Mr Roberto MORLESIN ( BE) Brussels 2010-10-28
Brussels 2011-11-24 Brussels 2012-11-22
New work item approved
EN 50180:2010/prA (PR=23286) CLC/TC 36A Stage : 1099 - Draft for vote due at CCMC by: 2013-09-01 Bushings above 1 kV up to 52 kV and from 250 A to 3,15 kA for liquid filled transformers NOTE: D138/C066: NWI approved with target date for vote: 2013-09-01
EN 50386:2010/prA (PR=23287) CLC/TC 36A Stage : 1099 - Draft for vote due at CCMC by: 2013-09-01 Bushings up to 1 kV and from 250 A to 5 kA, for liquid filled transformers NOTE: D138/C066: NWI approved with target date for vote: 2013-09-01
Technical committees Activities 222
CENELEC Inventory of Technical Activities
TC 37A
Low voltage surge protective devices
To prepare European standards (ENs), Technical specifications (TSs) and Technical reports (TRs). These documents will cover surge protective devices (SPDs) for protection against surges due to lightning and/or other transient overvoltages and their selection and application. These devices are to be used in power, telecommunication and/or signalling networks with voltages up to 1 000 V a.c. or 1 500 V d.c.
Officers Meetings Chairman: Mr Alain ROUSSEAU ( FR) Brussels 2009-03-12
Frankfurt 2011-11-16
Vote launched
FprEN 61643-11:2012 (PR=23421) IEC 61643-11:2011 (Modified) CLC/TC 37A IEC/SC 37A LVD (2006/95/EC) Stage : 5020 2012-07-20 Low-voltage surge protective devices - Part 11: Surge protective devices connected to low-voltage power systems -
Requirements and test methods NOTE: 2012-03-05 - Formal Vote editing allocated to [email protected] * Endorsement of IEC 61643-11:2011
(exempted from // procedures at CDV stage (BT135/C280)) * Will supersede EN 61643-11:2002 + A11:2007
EN 61643-21:2001/FprA2:2012 (PR=23583) IEC 61643-21:2000/A2:201X (37A/236/FDIS) CLC/TC 37A IEC/SC 37A LVD (2006/95/EC) // Stage : 5020 2012-06-08 Low voltage surge protective devices - Part 21: Surge protective devices connected to telecommunications and
signalling networks - Performance requirements and testing methods NOTE: 37A/235/RVC established on 2011-11-25: FDIS decided
Vote decided
FprEN 50539-11:2012 (PR=22527) CLC/TC 37A Stage : 4099 - Draft for vote due at CCMC by: 2012-04-12 Low-voltage surge protective devices - Surge protective devices for specific application including d.c. - Part 11:
Requirements and tests for SPDs in photovoltaic applications NOTE: 2012-03-05 - Formal Vote editing allocated to [email protected] * Former PR=16442 split in two parts to cover photovoltaic applications (PR=22527) and wind turbines applications (PR=22528) * D138/056: (Under Benchmark 3) Target date for vote extended to read 2012-04-12
New work item approved
CLC/prTS 50539-12 (PR=23884) CLC/TC 37A Stage : 1099 - Draft for vote due at CCMC by: - Low-voltage surge protective devices - Surge protective devices for specific application including d.c. - Part 12:
Selection and application principles - SPDs connected to photovoltaic installations NOTE: D140/C059: NWI approved * Track: Formal approval procedure * Will supersede CLC/TS 50539-12:2010
Technical committees Activities 223
CENELEC Inventory of Technical Activities
Work stopped (last 12 months)
prEN 50539-21 (PR=22528) CLC/TC 37A Stage : 2098 - Low-voltage surge protective devices - Surge protective devices for specific application including d.c. - Part 21:
Requirements and tests - Wind turbine applications NOTE: Former PR=16442 split in two parts to cover photovoltaic applications (PR=22527) and wind turbines applications (PR=22528) * 2011-11-16 decision: Project stopped as already covered, partly by prEN 61643-11 and partly by future amendment of EN 61643-11
Technical committees Activities 224
CENELEC Inventory of Technical Activities
TC 38
Instrument transformers
To prepare European Standards (using whenever possible IEC Standards) in the field of AC and/or DC current and/or voltage instrument transformers, including their subparts like (but not limited to) sensing devices, signal treatment, data conversion and analog or digital interfacing.
Officers Meetings Secretary: Mr Paolo MAZZA ( IT) Brussels 2011-06-22
Chairman: Mr Pascal TANTIN ( FR)
Published (last 12 months)
EN 61869-3:2011 (PR=22867) IEC 61869-3:2011 CLC/TC 38 IEC/TC 38 LVD (2006/95/EC) // Stage : 6060 Instrument transformers - Part 3: Additional requirements for inductive voltage transformers NOTE: Supersedes EN 60044-2:1999 + A1:2000 + A2:2003 * To be read in conjunction with EN 61869-1:2009 dor : 2011-08-17 doa : 2011-11-17 dop : 2012-05-17 dow: 2014-08-17
EN 61869-5:2011 (PR=22616) IEC 61869-5:2011 CLC/TC 38 IEC/TC 38 LVD (2006/95/EC) // Stage : 6060 Instrument transformers - Part 5: Additional requirements for capacitor voltage transformers NOTE: Supersedes EN 60044-5:2004 * To be read in conjunction with EN 61869-1:2009 dor : 2011-08-17 doa : 2011-11-17 dop : 2012-05-17 dow : 2014-08-17
Vote launched
FprEN 61869-2:2012 (PR=23162) IEC 61869-2:201X (38/435/FDIS) CLC/TC 38 IEC/TC 38 LVD (2006/95/EC) // Stage : 5020 2012-07-13 Instrument transformers - Part 2: Current transformers NOTE: Will supersede EN 60044-1:1999 + A1:2000 + A2:2003 + EN 60044-6:1999 * To be read in conjunction with the latest edition of EN 61869-1* Negative results at CLC level dropped - To follow IEC decision - 38/412/RVC established on 2011-04-29: FDIS decided
FprEN 61869-4:2012 (PR=24152) IEC 61869-4:201X (38/434/CDV) CLC/TC 38 IEC/TC 38 LVD (2006/95/EC) // Stage : 5020 2012-09-14 Instrument transformers - Part 4: Combined transformers NOTE: Will supersede EN 60044-3:2003
Technical committees Activities 225
CENELEC Inventory of Technical Activities
TC 40XA
Capacitors and EMI suppression components
To prepare European standards, which are required to facilitate the trading activities of European component users and manufacturers, in the following areas: a) capacitors, fixed and variable, for use in electronic equipment; b) capacitors, resistors and inductors, and combinations of these, used for electro-magnetic interference suppression, and complete electro-magnetic interference suppression filter units; c) networks and passive integrated circuits containing capacitors, or combinations of resistors, capacitors and inductors.
Close liaison is maintained with IEC TC 40 which includes parallel voting enabling IEC documents to be adopted in Europe. Liaison is also maintained whith relevant IEC Technical Committees, such as 47, 91, 104, and, in the area of safety, 61, 62 and 108, where such liaison will promote the convergence of the two systems.
Note : This committee does not deal with - lighting capacitors, which are the responsibility of CLC/TC 34Z; - power capacitors and power filters, which are covered by TC 33 in IEC, and ratified under the parallel vote procedure in Europe.
Officers Meetings Chairman: Mr Walter HUCK ( DE) Web/tele conference 2009-07-07 / 07-08 Secretary: Mr Kari KOSKINEN ( FI) Solothurn 2009-12-01 / 12-02
Brussels 2010-11-16 / 11-17 Web conference 2011-10-18
Published (last 12 months)
EN 60384-2:2012 (PR=23120) IEC 60384-2:2011 CLC/TC 40XA IEC/TC 40 // Stage : 6060 Fixed capacitors for use in electronic equipment - Part 2: Sectional specification - Fixed metallized polyethylene
terephthalate film dielectric d.c. capacitors NOTE: 2011-12-20 - Publication editing allocated to [email protected] * Supersedes EN 60384-2:2005 dor : 2012-01-13 doa : 2012-04-13 dop : 2012-10-13 dow: 2015-01-13
EN 60384-13:2012 (PR=23121) IEC 60384-13:2011 CLC/TC 40XA IEC/TC 40 // Stage : 6060 Fixed capacitors for use in electronic equipment - Part 13: Sectional specification - Fixed polypropylene film
dielectric metal foil d.c. capacitors NOTE: 2011-12-20 - Publication editing allocated to [email protected] * Supersedes EN 60384-13:2006 +
corr. Nov.2006 dor : 2012-01-13 doa : 2012-04-13 dop : 2012-10-13 dow: 2015-01-13
EN 60384-21:2012 (PR=23122) IEC 60384-21:2011 CLC/TC 40XA IEC/TC 40 // Stage : 6060 Fixed capacitors for use in electronic equipment - Part 21: Sectional specification - Fixed surface mount multilayer
capacitors of ceramic dielectric, Class 1 NOTE: 2011-12-20 - Publication editing allocated to [email protected] * Supersedes EN 60384-21:2004 dor : 2012-01-13 doa : 2012-04-13 dop : 2012-10-13 dow: 2015-01-13
Technical committees Activities 226
CENELEC Inventory of Technical Activities
EN 60384-22:2012 (PR=23123) IEC 60384-22:2011 CLC/TC 40XA IEC/TC 40 // Stage : 6060 Fixed capacitors for use in electronic equipment - Part 22: Sectional specification - Fixed surface mount multilayer
capacitors of ceramic dielectric, Class 2 NOTE: 2011-12-20 - Publication editing allocated to [email protected] * Supersedes EN 60384-22:2004 dor : 2012-01-13 doa : 2012-04-13 dop : 2012-10-13 dow: 2015-01-13
Vote launched
FprEN 60301:2012 (PR=23474) IEC 60301:201X (40/2153/FDIS) CLC/TC 40XA IEC/TC 40 // Stage : 5020 2012-06-29 Preferred diameters of wire terminations of capacitors and resistors NOTE: Will supersede HD 349 S1:1977 * 40/2121/RVC established on 2011-07-22: FDIS decided * WARNING: 3 months CDV in IEC but 5 months CDV in CLC as it was circulated before the BT decision to align the voting deadlines to the one fixed by IEC
Vote decided
FprEN 60384-14:201X (PR=23279) IEC 60384-14:201X (40/2086/CDV) CLC/TC 40XA IEC/TC 40 // Stage : 3090 2011-12-31 Draft for vote due at CCMC by: - Fixed capacitors for use in electronic equipment - Part 14: Sectional specification - Fixed capacitors for
electromagnetic interference suppression and connection to the supply mains NOTE: Will supersede EN 60384-14:2005 * 40/2120/RVC established on 2011-07-22: FDIS decided
Technical committees Activities 227
CENELEC Inventory of Technical Activities
TC 40XB
Resistors
To prepare and maintain European Standards in the field of fixed and variable resistors and networks for use in electronic equipment. These standards are for use within a suitable system for quality assessment of electronic components, and aim to support the trading activities of European component users and manufacturers. Close liaison is maintained with IEC/TC 40, which includes parallel voting on similar documents where possible and enable IEC documents to be adopted in Europe. Co-operation is also maintained with other relevant IEC Technical Committees, such as TC 91 and TC 104, where such co-operation will promote the convergence of the two systems.
Officers Meetings Chairman: Mr Joachim VON DER OHE ( DE) Frankfurt 2010-09-28 / 09-29 Secretary: Mr Dietrich GERTH ( CH) Berlin 2011-04-27 / 04-28
London 2011-09-28 / 09-29 Fehraltorf 2012-04-24 / 04-25
Published (last 12 months)
EN 60115-1:2011 (PR=21056) IEC 60115-1:2008 (Modified) CLC/TC 40XB IEC/TC 40 Stage : 6060 Fixed resistors for use in electronic equipment - Part 1: Generic specification NOTE: Supersedes EN 60115-1:2001 + A1:2001 + A11:2007 * D132/C001: Second vote on draft including the
needed CMs instead of the foreseen parallel vote on FDIS dor : 2011-08-15 doa : 2012-02-15 dop : 2012-08-15 dow: 2014-08-15
EN 140401-804:2011 + AC:2012 (PR=21905) CLC/TC 40XB Stage : 6060 Detail Specification: Fixed low power film high stability SMD resistors - Rectangular - Stability classes 0,1; 0,25 NOTE: 2011-04-07 - Publication editing allocated to [email protected] * Supersedes EN 140401-804:2005 to include the adoption of an ESD test, of test methods for lead-free soldering, and of new coding defined in EN 60062. It shall further reflect the new procedural references of IEC QC 001002-3 dor : 2011-05-09 doa : 2011-11-09 dop : 2012-05-09 dow : 2014-05-09
Vote launched
FprEN 60115-8:2012 (PR=21662) IEC 60115-8:2009 (Modified) CLC/TC 40XB IEC/TC 40 Stage : 5020 2012-07-06 Fixed resistors for use in electronic equipment - Part 8: Sectional specification - Fixed surface mount resistors NOTE: 2012-01-03 - UAP editing allocated to [email protected] * D133/C173: 40/1933/FDIS exempted
from parallel procedure * Will supersede EN 140400:2003
FprEN 60294:2012 (PR=23473) IEC 60294:201X (40/2154/FDIS) CLC/TC 40XB IEC/TC 40 // Stage : 5020 2012-06-29 Measurement of the dimensions of a cylindrical component with axial terminations NOTE: 40/2122/RVC established on 2011-07-22: FDIS decided * WARNING: 3 months CDV in IEC but 5 months
CDV in CLC as it was circulated before the BT decision to align the voting deadlines to the one fixed by IEC
Technical committees Activities 228
CENELEC Inventory of Technical Activities
FprEN 60440:2012 (PR=23152) IEC 60440:201X (40/2155/FDIS) CLC/TC 40XB IEC/TC 40 // Stage : 5020 2012-06-29 Method of measurement of non-linearity in resistors NOTE: 40/2112/RVC established on 2011-04-29: FDIS decided
At Secretariat stage
FprEN 60115-2 (PR=22899) IEC 60115-2:201X (40/2042/CDV) CLC/TC 40XB IEC/TC 40 Stage : 5092 - Fixed resistors for use in electronic equipment - Part 2: Sectional specification : Fixed low-power non-wirewound
resistors NOTE: Will supersede EN 140100:2008 * D137/C071: To stop // procedure * 2011-09 decision: Common
modifications will be prepared after finalization at IEC TC 40 (project delayed) for formal vote
FprEN 60115-8-1:2010 (PR=23004) IEC 60115-8-1:201X (40/2054/CDV) CLC/TC 40XB IEC/TC 40 Stage : 2020 - Draft for vote due at CCMC by: 2012-10-01 Fixed resistors for use in electronic equipment - Part 8-1: Blank detail specification: Fixed surface mount resistors
categorized as level G - Assessment level EZ NOTE: D137/C159: To stop ongoing // procedure - exemption from parallel procedures approved * 2011-09
decision: Common modifications will be prepared after finalization at IEC TC 40 (project delayed) for formal vote
prEN 140402 (PR=23160) CLC/TC 40XB Stage : 2020 - Draft for vote due at CCMC by: 2012-06-30 Blank Detail Specification: Fixed low power wirewound surface mount (SMD) resistors NOTE: Will supersede EN 140402:1998 * D138/C006: NWI approved * D140/C022: Extension of target date for
vote approved to read 2012-06-30
prEN 140402-801 (PR=23161) CLC/TC 40XB Stage : 2020 - Draft for vote due at CCMC by: 2012-06-30 Detail specification: Fixed low power wirewound surface mount (SMD) resistors - Rectangular - Stability classes
0,5; 1; 2 NOTE: Will supersede EN 140402-801:2005 * D138/C006: NWI approved * D140/C022: Extension of target date
for vote approved to read 2012-06-30
Technical committees Activities 229
CENELEC Inventory of Technical Activities
TC 44X
Safety of machinery: electrotechnical aspects
To prepare harmonized standards primarily relating to electrical and electronic equipment and systems of machines (including a group of machines working together in a co-ordinated manner excluding higher-level systems aspects) not portable by hand while working but which may include mobile equipment. The equipment covered commences at the point of connection of the electrical supply to the machine.
To prepare harmonized standards for safety related equipment, using electrotechnology, intended to be used to satisfy the essential safety requirements of the Council of the European Communities directives covering safety of machinery that is outside the scope of any other Technical Committee.
To co-ordinate with CEN, all matters concerning the safety of machinery.
To advise the Technical Board (BT) on all matters concerning machinery.
Officers Meetings Secretary: Mr Nick BRADFIELD ( GB) Berlin 2006-09-29 Chairman: Mr Peter STILL ( GB) Paris 2007-09-13
Landskrona (SE) 2008-12-09 Prague 2011-04-08
Vote launched
FprEN 60204-31:2011 (PR=23952) IEC 60204-31:201X (44/658/CDV) CLC/TC 44X IEC/TC 44 EMC (2004/108/EC) MD (2006/42/EC) // Stage : 5020 2012-05-25 Safety of machinery - Electrical equipment of machines - Part 31: Particular safety and EMC requirements for
sewing machines, units and systems NOTE: Will supersede EN 60204-31:1998
EN 61496-1:2004/FprA2:2010 (PR=23124) IEC 61496-1:2004/A2:201X (44/615/CDV) CLC/TC 44X IEC/TC 44 MD (2006/42/EC) // Stage : 5060 2011-07-01 Safety of machinery - Electro-sensitive protective equipment - Part 1: General requirements and tests NOTE: 44/641/RVC established on 2011-05-27: To be published without FDIS
FprEN 61496-2:2011 (PR=23788) IEC 61496-2:201X (44/651/CDV) CLC/TC 44X IEC/TC 44 // Stage : 5060 2012-03-26 Safety of machinery - Electro-sensitive protective equipment - Part 2: Particular requirements for equipment using
active opto-electronic protective devices (AOPDs) NOTE: Will supersede CLC/TS 61496-2:2006 * Awaiting outcome of RVC before further processing
EN 62061:2005/FprA1:2011 (PR=23903) IEC 62061:2005/A1:201X (44/655/CDV) CLC/TC 44X IEC/TC 44 MD (2006/42/EC) // Stage : 5060 2012-05-28 Safety of machinery - Functional safety of safety-related electrical, electronic and programmable electronic control
systems NOTE: Awaiting outcome of RVC before further processing
Technical committees Activities 230
CENELEC Inventory of Technical Activities
Work stopped (last 12 months)
CLC/FprTR 62061-1:201X (PR=22724) CLC/TC 44X Stage : 3098 - Guidance on the application of ISO 13849 1 & IEC 62061 in the design of safety-related control systems for
machinery NOTE: Duplicates work on PR=22492 (published)
Technical committees Activities 231
CENELEC Inventory of Technical Activities
TC 45AX
Instrumentation and control of nuclear facilities
To prepare the endorsement of IEC/SC45A standards as EN standards and, if necessary, common modifications. This proceeds after having confirmation that the IEC candidate standards were approved at the IEC final stage of development by the majority of the European national committees entitled to vote and that no European national committee raised significant concerns for the application of these standards in the European countries. The common modifications prepared have to be limited as far as possible and to be consistent with the WENRA (Western European Nuclear Regulators’ Association) aims for an international harmonised approach to reactor safety. All proposals for common modifications have to be justified. If a common modification proposal is controversial then the fall back position is to keep the text of the IEC/SC45A standard unchanged, given that the IEC/SC45A standards implement the IAEA (International Atomic Energy Agency) safety principles.
Officers Meetings Secretary: Mr Jean-Paul BOUARD ( FR) Brussels 2009-11-03 / 11-04 Chairman: Dr Arndt LINDNER ( DE) Brussels 2010-11-03 / 11-04
Brussels 2011-12-06 / 12-07 Brussels 2012-12-04 / 12-05
Published (last 12 months)
EN 60671:2011 (PR=22265) IEC 60671:2007 CLC/TC 45AX IEC/SC 45A Stage : 6060 Nuclear power plants - Instrumentation and control systems important to safety - Surveillance testing dor : 2011-08-08 doa : 2012-02-08 dop : 2012-08-08 dow: 2014-08-08
EN 60965:2011 (PR=22732) IEC 60965:2009 CLC/TC 45AX IEC/SC 45A Stage : 6060 Nuclear power plants - Control rooms - Supplementary control points for reactor shutdown without access to the
main control room dor : 2011-08-08 doa : 2012-02-08 dop : 2012-08-08 dow : 2014-08-08
EN 61500:2011 (PR=22731) IEC 61500:2009 CLC/TC 45AX IEC/SC 45A Stage : 6060 Nuclear power plants - Instrumentation and control important to safety - Data communication in systems performing
category A functions dor : 2011-08-08 doa : 2012-02-08 dop : 2012-08-08 dow : 2014-08-08
PQ/UQ launched
prEN 61513 (PR=22262) IEC 61513:2011 CLC/TC 45AX IEC/SC 45A Stage : 1560 2012-01-02 Draft for vote due at CCMC by: 2013-05-31 Nuclear power plants - Instrumentation and control important to safety - General requirement for systems NOTE: D138/C043: NWI approved with target date for vote: 2013-05-31 * PQ issued after IEC publication given no
European NC opposed the document for the approval of FDIS
Technical committees Activities 232
CENELEC Inventory of Technical Activities
prEN 61772 (PR=23236) IEC 61772:2009 CLC/TC 45AX IEC/SC 45A Stage : 1560 2011-08-15 Draft for vote due at CCMC by: 2012-05-31 Nuclear power plants - Control rooms - Application of visual display units (VDUs) NOTE: D138/C043: NWI approved with target date for vote 2012-05-31 * Questionnaire procedure
New work item approved
prEN 60780 (PR=22263) IEC 60780:1998 CLC/TC 45AX IEC/SC 45A Stage : 1099 - Draft for vote due at CCMC by: 2012-09-30 Nuclear power plants - Electrical equipment of the safety system - Qualification NOTE: D138/C043: NWI approved with target date for vote = 2012-09-30 * Final decision to be taken at March
2011 meeting: PQ if no objection received from DE NC by 2011-02-28
prEN 61839 (PR=23237) IEC 61839:2000 CLC/TC 45AX IEC/SC 45A Stage : 1099 - Draft for vote due at CCMC by: 2013-05-31 Nuclear power plants - Design of control rooms - Functional analysis and assignment NOTE: D138/C043: NWI approved with target date for vote = 2013-05-31 * Final decision to be taken at March
2011 meeting: PQ if no objection received from DE NC by 2011-02-28
prEN 61888 (PR=23238) IEC 61888:2002 CLC/TC 45AX IEC/SC 45A Stage : 1099 - Draft for vote due at CCMC by: 2013-05-31 Nuclear power plants - Instrumentation important to safety - Determination and maintenance of trip setpoints NOTE: 138/C043: NWI approved with target date for vote = 2013-05-31 * Final decision to be taken at March 2011
meeting: PQ if no objection received from DE NC by 2011-02-28
Work stopped (last 12 months)
prEN 62342 (PR=21477) IEC 62342:2007 CLC/TC 45AX IEC/SC 45A Stage : 98 - Nuclear power plants - Instrumentation and control systems important to safety - Management of ageing NOTE: D130/069: BTTF 127-1 converted into CLC/TC 45A * D133/C109: PWI stage noted * 2011-12 decision:
project deleted
prEN 62566 (PR=22261) IEC 62566:2012 CLC/TC 45AX IEC/SC 45A Stage : 98 - Nuclear power plants - Instrumentation and control important to safety - Selection and use of complex electronic
components for systems performing category A functions NOTE: 2008-12 decision: NWI to be requested in due time (after IEC publication) * 2011-12 decision: Project
deleted
Technical committees Activities 233
CENELEC Inventory of Technical Activities
TC 45B
Radiation protection instrumentation
Provisional: Endorsement of IEC/SC 45B documents at European level
Officers Meetings Chairman: Dr Peter AMBROSI ( DE) Brussels 2011-03-15 / 03-16 Secretary: Mr Miroslav VOYTCHEV ( FR) Paris 2011-11-15 / 11-16
Milano 2012-04-26 / 04-27 Bern 2012-11-23 / 11-24
Published (last 12 months)
EN 62244:2011 (PR=21459) IEC 62244:2006 (Modified) CLC/TC 45B IEC/SC 45B Stage : 6060 Radiation protection instrumentation - Installed radiation monitors for the detection of radioactive and special
nuclear materials at national borders NOTE: 2011-05-25: Publication allocated to [email protected] dor : 2011-06-27 doa : 2011-12-27 dop : 2012-06-27 dow: 2014-06-27
EN 62327:2011 (PR=20663) IEC 62327:2006 (Modified) CLC/TC 45B IEC/TC 45 Stage : 6060 Radiation protection instrumentation - Hand-held instruments for the detection and identification of radionuclides
and for the indication of ambient dose equivalent rate from photon radiation NOTE: 2011-05-25: Publication allocated to [email protected] dor : 2011-06-27 doa : 2011-12-27 dop : 2012-06-27 dow : 2014-06-27
EN 62363:2011 (PR=22142) IEC 62363:2008 (Modified) CLC/TC 45B IEC/SC 45B Stage : 6060 Radiation protection instrumentation - Portable photon contamination meters and monitors NOTE: Publication editing allocated to [email protected] dor : 2011-06-20 doa : 2011-12-20 dop : 2012-06-20 dow : 2014-06-20
EN 62387-1:2012 (PR=21441) IEC 62387-1:2007 (Modified) CLC/TC 45B IEC/SC 45B Stage : 6060 Radiation protection instrumentation - Passive integrating dosimetry systems for environmental and personal
monitoring - Part 1: General characteristics and performance requirements NOTE: D130/071: BTTF 111-3 converted into CLC/TC 45B * 2011-12-02 - Publication editing allocated to
[email protected] dor : 2012-01-02 doa : 2012-07-02 dop : 2013-01-02 dow: 2015-01-02
Technical committees Activities 234
CENELEC Inventory of Technical Activities
PQ/UQ launched
prEN 60846-1 (PR=23478) IEC 60846-1:2009 CLC/TC 45B IEC/SC 45B Stage : 1560 2012-06-04 Draft for vote due at CCMC by: 2013-09-15 Radiation protection instrumentation - Ambient and/or directional dose equivalent (rate) meters and/or monitors for
beta, X and gamma radiation - Part 1: Portable workplace and environmental meters and monitors NOTE: D138/C033: NWI approved * Deadline for dispatch of 1st draft (PQ) or procedure to CCMC: 2012-05-31
prEN 61526 (PR=23289) IEC 61526:2010 CLC/TC 45B IEC/SC 45B Stage : 1560 2011-07-04 Draft for vote due at CCMC by: 2013-02-28 Radiation protection instrumentation - Measurement of personal dose equivalents Hp(10) and Hp(0,07) for X,
gamma, neutron and beta radiations - Direct reading personal dose equivalent meters NOTE: D138/C080: Circulation of PQ on IEC document approved * Target date for vote (set by default): 2013-02-
28 * Will supersede EN 61526:2007
prEN 62401 (PR=23290) IEC 62401:2007 CLC/TC 45B IEC/SC 45B Stage : 1560 2011-07-04 Draft for vote due at CCMC by: 2013-02-28 Radiation protection instrumentation - Alarming personal radiation devices (PRD) for detection of illicit trafficking
of radioactive material NOTE: D138/C079: circulation of PQ approved * Target date for vote (set by default): 2013-02-28
New work item to be approved (BT/TC)
prEN 62598 (PR=23957) IEC 62598:2011 CLC/TC 45B IEC/TC 45 Stage : 1021 2012-05-31 Draft for vote due at CCMC by: - Nuclear instrumentation - Constructional requirements and classification of radiometric gauges NOTE: Approval of circulation as a PQ requested to 141 BT meeting
Technical committees Activities 235
CENELEC Inventory of Technical Activities
TC 46X
Communication cables
To establish standards related to wires, symmetric cables, coaxial cables and waveguides with metallic conductors for use in telecommunication, data transmission, radio frequency, video communication and signalling equipment to satisfy the advances in developing technologies. Particular requirements for materials, if necessary, will be evaluated in liaison with other technical committees.
Officers Meetings Secretary: Mr Guy PERROT ( FR) Paris 2011-01-12 Chairman: Dr Lauri HALME ( FI) Paris 2011-03-23
Frankfurt 2011-12-21 London 2012-04-27
Vote launched
FprEN 50289-4-16:2012 (PR=23235) CLC/TC 46X Stage : 5020 2012-06-01 Communication cables - Specifications for test methods - Part 4-16: Environmental test methods - Circuit integrity
under fire conditions NOTE: 2012-01-06 - Formal Vote editing allocated to [email protected] Mandated: M/117; M/212; M/443
New work item approved
EN 50289-3-8:2001/prA (PR=22384) CLC/TC 46X Stage : 1099 2011-01-31 Draft for vote due at CCMC by: 2011-05-31 Communication cables - Specifications for test methods - Part 3-8: Mechanical test methods - Abrasion resistance of
cable sheath markings NOTE: D135/C050: NWI approved - Target date for vote (by default): 2011-05-31 Mandated: M/212
prEN 50290-2-X (PR=22415) CLC/TC 46X LVD (2006/95/EC) Stage : 1099 2011-01-31 Draft for vote due at CCMC by: 2011-05-31 Communication cables - Part 2-X: Common design rules and construction - New cross linked halogen free material
for fire resistance cable NOTE: New Part 2-X based on EN 50290-2-26 (in hands of JWG 2) * D135/C050: NWI approved -Target date for
vote (set by default): 2011-05-31 Mandated: M/212
EN 50290-2-23:2001/prA (PR=22879) CLC/TC 46X LVD (2006/95/EC) Stage : 1099 2010-11-01 Draft for vote due at CCMC by: 2012-04-30 Communication cables - Part 2-23: Common design rules and construction - PE insulation NOTE: D137/C014: NWI approved * Target date for vote: 2012-04-30
Technical committees Activities 236
CENELEC Inventory of Technical Activities
EN 50290-2-25:2002/prA (PR=22880) CLC/TC 46X LVD (2006/95/EC) Stage : 1099 2010-11-01 Draft for vote due at CCMC by: 2012-04-30 Communication cables - Part 2-25: Common design rules and construction - Polypropylene insulation compounds NOTE: D137/C014: NWI approved * Target date for vote: 2012-04-30
prEN 50290-2-32 (PR=22881) CLC/TC 46X LVD (2006/95/EC) Stage : 1099 2010-11-01 Draft for vote due at CCMC by: 2012-04-30 Communication cables - Part 2-32: Common design rules and construction - Halogen free insulation compounds for
flame retardant and fire resistant cables NOTE: D137/C014: NWI approved * Target date for vote: 2012-04-30
prEN 50290-2-XX (PR=23430) CLC/TC 46X Stage : 1099 - Draft for vote due at CCMC by: 2013-08-15 Communication cables - Part 2-XX: Common design rules and construction polypropylene insulation compounds to
be used for coaxial cables NOTE: D139/C010: NWI approved * Not to be offered to IEC as it is a new part of a series that has not equivalent in
IEC Mandated: M/212
prEN 50290-2-XX (PR=23431) CLC/TC 46X Stage : 1099 - Draft for vote due at CCMC by: 2013-08-15 Communication cables - Part 2-XX: Common design rules and construction polyethylene insulation compounds to be
used for coaxial cables NOTE: D139/C010: NWI approved * Not to be offered to IEC as it is a new part of a series that has not equivalent in
IEC Mandated: M/212
prEN 50290-4-1 (PR=23985) CLC/TC 46X LVD (2006/95/EC) Stage : 1099 - Draft for vote due at CCMC by: - Communication cables - Part 4-1: General considerations for the use of cables - Environmental conditions and safety
aspects NOTE: D141/C086: NWI approved * Will supersede EN 50290-4-1:2001 Mandated: M/212
prEN 50290-4-2 (PR=23986) CLC/TC 46X LVD (2006/95/EC) Stage : 1099 - Draft for vote due at CCMC by: - Communication cables - Part 4-2: General considerations for the use of cables - Guide to use NOTE: D141/C086: NWI approved * Will supersede EN 50290-4-2:2008 Mandated: M/212
prEN 50XXX (PR=23981) CLC/TC 46X Stage : 1099 - Draft for vote due at CCMC by: 2014-07-17 Balanced communication cabling in accordance with EN 50173-4 screened straight patch cords and straight work
area cords for class D applications - detail specification NOTE: D141/C086: NWI approved Mandated: M/212
Technical committees Activities 237
CENELEC Inventory of Technical Activities
prEN 50XXX (PR=23982) CLC/TC 46X Stage : 1099 - Draft for vote due at CCMC by: 2014-07-17 Balanced communication cabling in accordance with EN 50173-4 unscreened straight patch cords and straight work
area cords for class D applications - detail specification NOTE: D141/C086: NWI approved Mandated: M/412
prEN 50XXX (PR=23983) CLC/TC 46X Stage : 1099 - Draft for vote due at CCMC by: 2014-07-17 Balanced communication cabling in accordance with EN 50173-4 unscreened straight patch cords and straight work
area cords for class E applications - detail specification NOTE: D141/C086: NWI approved Mandated: M/212
prEN 50XXX (PR=23984) CLC/TC 46X Stage : 1099 - Draft for vote due at CCMC by: 2014-07-17 Balanced communication cabling in accordance with EN 50173-4 screened straight patch cords and straight work
area cords for class E applications - detail specification NOTE: D141/C086: NWI approved Mandated: M/212
Work stopped (last 12 months)
prEN 50290-2-31 (PR=21557) CLC/TC 46X LVD (2006/95/EC) Stage : 2098 - Communication cables - Part 2-31: Communication design rules and construction - Polyurethane sheathing NOTE: D132/C023: NWI approved * D135/071 (Benchmark 3): Extension of target date for vote approved by BT to
read 2010-11-18 * D139/048: BT decision to stop the project Mandated: M/212
Technical committees Activities 238
CENELEC Inventory of Technical Activities
SC 46XA
Coaxial cables
To establish and maintain European Standards regarding coaxial cables for use in telecommunication, data transmission, radio frequency, video-communication and signalling equipment.
Officers Meetings Chairman: Mr Guy PERROT ( FR) Madrid 2007-01-17 Secretary: Mr Bernhard MUND ( DE) Paris 2007-09-12
Frankfurt 2008-04-28 Paris 2010-04-21
Vote decided
prEN 50117-8:201X (PR=23695) CLC/SC 46XA Stage : 4099 2012-08-03 Coaxial cables used in cabled distribution networks - Part 8 Repair and substitute of damaged buried cables NOTE: 2012-05-24 - Editing allocated to [email protected] * D139/C156: NWI approved * Project offered to IEC in the frame of the Dresden Agreement and rejected (46A/1082/RVN) * CLC/SC 46A decision: to issue the project as a TR.
Technical committees Activities 239
CENELEC Inventory of Technical Activities
SC 46XC
Multicore, multipair and quad data communication cables
To produce European Cable Specifications for multicore and symmetrical pair/quad cables used in digital and analogue communication systems such as ISDN, LAN and data communication systems. According to the installation considerations, five categories of cables are to be considered: 1. equipment cables, 2. work area cables, 3. horizontal floor wiring cables, 4. riser cables, 5. campus cables.
Officers Meetings Secretary: Mr Paul SWEET ( GB) Brussels 2009-09-16 Chairman: Mr Neil MABBOTT ( GB) Virtual (Web) 2009-12-15
Brussels 2010-06-03 Brussels 2011-06-16
Published (last 12 months)
EN 50288-8:2012 (PR=21774) CLC/SC 46XC LVD (2006/95/EC) Stage : 6060 Multi-element metallic cables used in analogue and digital communication and control - Part 8: Specification for type
1 cables characterised up to 2 MHz NOTE: 2011-12-20 - Publication editing allocated to [email protected] Mandated: M/212 dor : 2012-01-23 doa : 2012-07-23 dop : 2013-01-23 dow: 2015-01-23
EN 50441-1:2012 (PR=20803) CLC/SC 46XC LVD (2006/95/EC) Stage : 6060 Cables for indoor residential telecommunication installations - Part 1: Unscreened cables - Grade 1 NOTE: 2011-12-20 - Publication editing allocated to [email protected] * Supersedes EN 50441-1:2006 dor : 2012-01-23 doa : 2012-07-23 dop : 2013-01-23 dow: 2015-01-23
EN 50441-2:2012 (PR=20804) CLC/SC 46XC LVD (2006/95/EC) Stage : 6060 Cables for indoor residential telecommunication installations - Part 2: Screened cables - Grade 1 NOTE: 2011-12-20 - Publication editing allocated to [email protected] * Supersedes EN 50441-2:2006 dor : 2012-01-23 doa : 2012-07-23 dop : 2013-01-23 dow: 2015-01-23
EN 50441-4:2012 (PR=20805) CLC/SC 46XC LVD (2006/95/EC) Stage : 6060 Cables for indoor residential telecommunication installations - Part 4: Cables up to 1 200 MHz - Grade 3 NOTE: 2011-12-20 - Publication editing allocated to [email protected] dor : 2012-01-23 doa : 2012-07-23 dop : 2013-01-23 dow: 2015-01-23
Technical committees Activities 240
CENELEC Inventory of Technical Activities
Vote decided
EN 50288-9-1:201X (PR=22255) CLC/SC 46XC LVD (2006/95/EC) Stage : 4099 - Draft for vote due at CCMC by: - Multi-element metallic cables used in analogue and digital communication and control - Part 9-1: Sectional
specification for screened cables characterised up to 1 000 MHz - Horizontal and building backbone cables NOTE: To be read in conjunction with EN 50288-1:2003 * Ratification cancelled - D140/032 - BT decided to
request TC to provide new text for vote following GB appeal Mandated: M/212
EN 50288-10-1:201X (PR=22455) CLC/SC 46XC LVD (2006/95/EC) Stage : 4099 - Draft for vote due at CCMC by: - Multi-element metallic cables used in analogue and digital communication and control - Part 10-1: Sectional
specification for screened cables characterized up to 500MHz - Horizontal floor and building backbone cables NOTE: To be read in conjunction with EN 50288-1:2003 * Ratification cancelled - D140/032 - BT decided to
request TC to provide new text for vote following GB appeal Mandated: M/212
EN 50288-11-1:201X (PR=22456) CLC/SC 46XC LVD (2006/95/EC) Stage : 4099 - Draft for vote due at CCMC by: - Multi-element metallic cables used in analogue and digital communication and control - Part 11-1: Sectional
specification for un-screened cables characterised up to 500 MHz - Horizontal and building backbone cables NOTE: To be read in conjunction with EN 50288-1:2003 * Ratification cancelled - D140/032 - BT decided to
request TC to provide new text for vote following GB appeal Mandated: M/212
FprEN 50289-1-17:201X (PR=20511) CLC/SC 46XC Stage : 3090 - Draft for vote due at CCMC by: 2012-10-01 Communication cables - Specifications for test methods - Part 1-17: Electrical test methods - Exogenous Crosstalk
ExNEXT NOTE: D128/C091: Voting results failed - SC 46XC to prepare revised draft for second vote * Developments within
IEC SC 46C WG 7 and ISO/IEC SC 25 WG 3 awaited * 2010-10: New draft being prepared
Enquiry launched
prEN 50288-1:2011 (PR=23166) CLC/SC 46XC LVD (2006/95/EC) Stage : 4060 2012-04-23 Draft for vote due at CCMC by: 2011-11-30 Multi-element metallic cables used in analogue and digital communication and control - Part 1: Generic specification NOTE: Will supersede EN 50288-1:2003 * Enquiry text allocated to [email protected] Mandated: M/212
prEN 50288-2-1:2011 (PR=23167) CLC/SC 46XC LVD (2006/95/EC) Stage : 4060 2012-04-23 Draft for vote due at CCMC by: 2011-11-30 Multi-element metallic cables used in analogue and digital communication and control - Part 2-1: Sectional
specification for screened cables characterised up to 100 MHz - Horizontal and building backbone cables NOTE: Will supersede EN 50288-2-1:2003 * Enquiry text allocated to [email protected] Mandated: M/212
Technical committees Activities 241
CENELEC Inventory of Technical Activities
prEN 50288-2-2:2011 (PR=23168) CLC/SC 46XC LVD (2006/95/EC) Stage : 4060 2012-04-23 Draft for vote due at CCMC by: 2011-11-30 Multi-element metallic cables used in analogue and digital communication and control - Part 2-2: Sectional
specification for screened cables characterised up to 100 MHz - Work area and patch cord cables NOTE: Will supersede EN 50288-2-2:2003 * Enquiry text allocated to [email protected] Mandated: M/212
prEN 50288-3-1:2011 (PR=23169) CLC/SC 46XC LVD (2006/95/EC) Stage : 4060 2012-04-23 Draft for vote due at CCMC by: 2011-11-30 Multi-element metallic cables used in analogue and digital communication and control - Part 3-1: Sectional
specification for unscreened cables characterised up to 100 MHz - Horizontal and building backbone cables NOTE: Will supersede EN 50288-3-1:2003 * Enquiry text allocated to [email protected] Mandated: M/212
prEN 50288-3-2:2011 (PR=23170) CLC/SC 46XC LVD (2006/95/EC) Stage : 4060 2012-04-23 Draft for vote due at CCMC by: 2011-11-30 Multi-element metallic cables used in analogue and digital communication and control - Part 3-2: Sectional
specification for unscreened cables characterised up to 100 MHz - Work area and patch cord cables NOTE: Will supersede EN 50288-3-2:2003 * Enquiry text allocated to [email protected] Mandated: M/212
prEN 50288-4-1:2011 (PR=23171) CLC/SC 46XC LVD (2006/95/EC) Stage : 4060 2012-04-23 Draft for vote due at CCMC by: 2011-11-30 Multi-element metallic cables used in analogue and digital communication and control - Part 4-1: Sectional
specification for screened cables characterised up to 600 MHz - Horizontal and building backbone cables NOTE: Will supersede EN 50288-4-1:2003 * Enquiry text allocated to [email protected] Mandated: M/212
prEN 50288-4-2:2011 (PR=23172) CLC/SC 46XC LVD (2006/95/EC) Stage : 4060 2012-04-23 Draft for vote due at CCMC by: 2011-11-30 Multi-element metallic cables used in analogue and digital communication and control - Part 4-2: Sectional
specification for screened cables characterised up to 600 MHz - Work area and patch cord cables NOTE: Will supersede EN 50288-4-2:2003 * Enquiry text allocated to [email protected] Mandated: M/212
prEN 50288-5-1:2011 (PR=23173) CLC/SC 46XC LVD (2006/95/EC) Stage : 4060 2012-04-23 Draft for vote due at CCMC by: 2011-11-30 Multi-element metallic cables used in analogue and digital communication and control - Part 5-1: Sectional
specification for screened cables characterized up to 250 MHz - Horizontal and building backbone cables NOTE: Will supersede EN 50288-5-1:2003 * Enquiry text allocated to [email protected] Mandated: M/212
prEN 50288-5-2:2011 (PR=23174) CLC/SC 46XC LVD (2006/95/EC) Stage : 4060 2012-04-23 Draft for vote due at CCMC by: 2011-11-30 Multi-element metallic cables used in analogue and digital communication and control - Part 5-2: Sectional
specification for screened cables characterized up to 250 MHz - Work area and patch cord cables NOTE: Will supersede EN 50288-5-2:2003 * Enquiry text allocated to [email protected] Mandated: M/212
Technical committees Activities 242
CENELEC Inventory of Technical Activities
prEN 50288-6-1:2011 (PR=23175) CLC/SC 46XC LVD (2006/95/EC) Stage : 4060 2012-04-23 Draft for vote due at CCMC by: 2011-11-30 Multi-element metallic cables used in analogue and digital communication and control - Part 6-1: Sectional
specification for unscreened cables characterised up to 250 MHz - Horizontal and building backbone cables NOTE: Will supersede EN 50288-6-1:2003 * Enquiry text allocated to [email protected] Mandated: M/212
prEN 50288-6-2:2011 (PR=23176) CLC/SC 46XC LVD (2006/95/EC) Stage : 4060 2012-04-23 Draft for vote due at CCMC by: 2011-11-30 Multi-element metallic cables used in analogue and digital communication and control - Part 6-2: Sectional
specification for unscreened cables characterised up to 250 MHz - Work area and patch cord cables NOTE: Will supersede EN 50288-6-2:2003 * Enquiry text allocated to [email protected] Mandated: M/212
prEN 50407-2:2012 (PR=22897) CLC/SC 46XC LVD (2006/95/EC) Stage : 4020 2012-09-21 Draft for vote due at CCMC by: 2010-12-31 Multi-pair cables used in high bite rate digital access telecommunication networks - Part 2: Indoor multi-pair/quad cables for installation in Multi Dwelling Units shaft supporting universal services, xDSL and applications up to 100 MBits over IP NOTE: D137/C014: NWI approved * Target date for vote: 2010-12-31* D139/049: Specific situation noted - project
to be maintained active
At Secretariat stage
prEN 50288-9-2 (PR=23177) CLC/SC 46XC LVD (2006/95/EC) Stage : 2020 - Draft for vote due at CCMC by: 2011-11-30 Multi-element metallic cables used in analogue and digital communication and control - Part 9-2: Sectional
specification for screened cables characterised up to 1 000 MHz - work area and patch cord cables NOTE: D138/C007: NWI approved with target date for vote: 2011-11-30 * 2011-07 TC advice: Draft to be shortly
sent to CCMC for enquiry Mandated: M/212
prEN 50288-10-2 (PR=23178) CLC/SC 46XC LVD (2006/95/EC) Stage : 2020 - Draft for vote due at CCMC by: 2011-11-30 Multi-element metallic cables used in analogue and digital communication and control - Part 10-2: Sectional
specification for screened cables characterized up to 500 MHz - Work area and patch cord cables NOTE: D138/C007: NWI approved with target date for vote: 2011-11-30 * 2011-07 TC advice: Draft to be shortly
sent to CCMC for enquiry Mandated: M/212
New work item approved
prEN 50109-2-2 (PR=23180) CLC/SC 46XC Stage : 1099 - Draft for vote due at CCMC by: 2011-11-30 Hand crimping tools - Tools for crimp termination of electric cables and wires for low frequency and radio frequency applications - Part 2-2: Particular requirements for radio frequency connectors and concentric contacts - Open throat tools with removable and interchangeable dies NOTE: D138/C007: NWI approved with target date for vote = 2011-11-30 * Will supersede EN 50109-2-2:1996 Mandated: M/212
Technical committees Activities 243
CENELEC Inventory of Technical Activities
prEN 50288-11-2 (PR=23179) CLC/SC 46XC LVD (2006/95/EC) Stage : 1099 - Draft for vote due at CCMC by: 2011-11-30 Multi-element metallic cables used in analogue and digital communication and control - Part 11-2: Sectional
specification for un-screened cables, characterised up to 500 MHz - Work area and patch cord cables NOTE: D138/C007: NWI approved with target date for vote: 2011-11-30 Mandated: M/212
Technical committees Activities 244
CENELEC Inventory of Technical Activities
TC 55
Winding wires
To follow up IEC activities in the light of European needs for the field of winding wires.
To follow up environmental aspects taking into account the European Directives.
Preparation of new European Standards, if necessary, to cover particular European aspects.
Officers Meetings Secretary: Mr Antonio MARTINENGO ( IT) Brussels 2007-09-18 Chairman: Mr Léonard DANEL ( FR) Brussels 2009-09-24
Brussels 2011-09-22 To be confirmed 2013-09-19
Published (last 12 months)
EN 60851-5:2008/A1:2011 (PR=23092) IEC 60851-5:2008/A1:2011 CLC/TC 55 IEC/TC 55 // Stage : 6060 Winding wires - Test methods - Part 5: Electrical properties NOTE: 2011-06-27: Allocated to [email protected] dor : 2011-07-26 doa : 2011-10-26 dop : 2012-04-26 dow: 2014-07-26
Vote launched
FprEN 60317-0-1:2012 (PR=24100) IEC 60317-0-1:201X (55/1314/CDV) CLC/TC 55 IEC/TC 55 // Stage : 5020 2012-08-10 Specifications for particular types of winding wires - Part 0-1: General requirements - Enamelled round copper wire NOTE: Will supersede EN 60317-0-1:2008
FprEN 60317-0-2:2012 (PR=24227) IEC 60317-0-2:201X (55/1331/CDV) CLC/TC 55 IEC/TC 55 // Stage : 5020 2012-10-26 Specifications for particular types of winding wires - Part 0-2: General requirements - Enamelled rectangular copper
wire NOTE: Will supersede EN 60317-0-2:1998 + A1:2000 + A2:2005
EN 60317-0-3:2008/FprA1:2012 (PR=24101) IEC 60317-0-3:2008/A1:201X (55/1315/CDV) CLC/TC 55 IEC/TC 55 // Stage : 5020 2012-08-10 Specifications for particular types of winding wires - Part 0-3: General requirements - Enamelled round aluminium
wire
Technical committees Activities 245
CENELEC Inventory of Technical Activities
FprEN 60317-0-7:2012 (PR=23439) IEC 60317-0-7:2012 CLC/TC 55 IEC/TC 55 // Stage : 5060 2012-04-16 Specifications for particular types of winding wires - Part 0-7: General requirements - Fully insulated (FIW) zero-
defect enamelled round copper wire with nominal conductor diameter of 0,040 mm to 1,600 mm NOTE: 2012-05-08 - Publication editing allocated to [email protected] * To be read in conjunction with EN
60851 series
FprEN 60317-0-8:2012 (PR=23300) IEC 60317-0-8:201X (55/1324/FDIS) CLC/TC 55 IEC/TC 55 // Stage : 5020 2012-06-08 Specifications for particular types of winding wires - Part 0-8: General requirements - Polyester glass-fibre wound,
resin or varnish impregnated or not impregnated, bare or enamelled rectangular copper wire NOTE: 55/1258/RVC + 55/1258A/RVC established on 2011-10-28: FDIS decided
FprEN 60317-2:2012 (PR=23525) IEC 60317-2:201X (55/1325/FDIS) CLC/TC 55 IEC/TC 55 // Stage : 5020 2012-06-08 Specifications for particular types of winding wires - Part 2: Solderable polyurethane enamelled round copper wire,
class 130, with a bonding layer NOTE: Will supersede EN 60317:1994 + A1:1998 + A2:2000 * 55/1280/RVC established on 2011-10-28: FDIS
decided
FprEN 60317-20:2012 (PR=24033) IEC 60317-20:201X (55/1304/CDV) CLC/TC 55 IEC/TC 55 // Stage : 5020 2012-07-20 Specifications for particular types of winding wires - Part 20: Solderable polyurethane enamelled round copper wire,
class 155 NOTE: Will supersede EN 60317-20:1995 + A1:1998 + A2:2000
FprEN 60317-21:2012 (PR=24034) IEC 60317-21:201X (55/1305/CDV) CLC/TC 55 IEC/TC 55 // Stage : 5020 2012-07-20 Specifications for particular types of winding wires - Part 21: Solderable polyurethane enamelled round copper wire
overcoated with polyamide, class 155 NOTE: Will supersede EN 60317-21:1995 + A1:1998 + A2:2000
FprEN 60317-23:2012 (PR=24035) IEC 60317-23:201X (55/1306/CDV) CLC/TC 55 IEC/TC 55 // Stage : 5020 2012-07-20 Specifications for particular types of winding wires - Part 23: Solderable polyesterimide enamelled round copper
wire, class 180 NOTE: Will supersede EN 60317-23:1995 + A1:1998 + A2:2000
FprEN 60317-27:2012 (PR=24228) IEC 60317-27:201X (55/1332/CDV) CLC/TC 55 IEC/TC 55 // Stage : 5020 2012-10-26 Specifications for particular types of winding wires - Part 27: Paper tape covered rectangular copper wire NOTE: Will supersede EN 60317-27:1998 + A1:2000
Technical committees Activities 246
CENELEC Inventory of Technical Activities
FprEN 60317-28:2012 (PR=24229) IEC 60317-28:201X (55/1333/CDV) CLC/TC 55 IEC/TC 55 // Stage : 5020 2012-10-26 Specifications for particular types of winding wires - Part 28: Polyesterimide enamelled rectangular copper wire,
class 180 NOTE: Will supersede EN 60317-28:1996 + A1:1998 + A2:2007
FprEN 60317-35:2012 (PR=24036) IEC 60317-35:201X (55/1307/CDV) CLC/TC 55 IEC/TC 55 // Stage : 5020 2012-07-20 Specifications for particular types of winding wires - Part 35: Solderable polyurethane enamelled round copper wire,
class 155, with a bonding layer NOTE: Will supersede EN 60317-35:1994 + A1:1998 + A2:2000
FprEN 60317-36:2012 (PR=24037) IEC 60317-36:201X (55/1308/CDV) CLC/TC 55 IEC/TC 55 // Stage : 5020 2012-07-20 Specifications for particular types of winding wires - Part 36: Solderable polyesterimide enamelled round copper
wire, class 180, with a bonding layer NOTE: Will supersede EN 60317-36:1994 + A1:1998 + A2:2000
FprEN 60317-37:2012 (PR=24038) IEC 60317-37:201X (55/1309/CDV) CLC/TC 55 IEC/TC 55 // Stage : 5020 2012-07-20 Specifications for particular types of winding wires - Part 37: Polyesterimide enamelled round copper wire, class
180, with a bonding layer NOTE: Will supersede EN 60317-37:1994 + A1:1998 + A2:2000
FprEN 60317-38:2012 (PR=24039) IEC 60317-38:201X (55/1310/CDV) CLC/TC 55 IEC/TC 55 // Stage : 5020 2012-07-20 Specifications for particular types of winding wires - Part 38: Polyester or polyesterimide overcoated with
polyamide-imide enamelled round copper wire, class 200, with a bonding layer NOTE: Will supersede EN 60317-38:1994 + A1:1998 + A2:2000
FprEN 60317-46:2012 (PR=24108) IEC 60317-46:201X (55/1316/CDV) CLC/TC 55 IEC/TC 55 // Stage : 5020 2012-08-17 Specifications for particular types of winding wires - Part 46: Aromatic polyimide enamelled round copper wire,
class 240 NOTE: Will supersede EN 60317-46:1997 * This FprEN is to be read in conjunction with EN 60317-0-1 (pr=
24100)
FprEN 60317-47:2012 (PR=24109) IEC 60317-47:201X (55/1317/CDV) CLC/TC 55 IEC/TC 55 // Stage : 5020 2012-08-17 Specifications for particular types of winding wires - Part 47: Aromatic polyimide enamelled rectangular copper
wire, class 240 NOTE: Will supersede EN 60317-47:1997
Technical committees Activities 247
CENELEC Inventory of Technical Activities
FprEN 60317-48:2012 (PR=23516) IEC 60317-48:201X (55/1326/FDIS) CLC/TC 55 IEC/TC 55 // Stage : 5020 2012-06-22 Specifications for particular types of winding wires - Part 48: Glass-fibre wound resin or varnish impregnated, bare
or enamelled round copper wire, temperature index 155 NOTE: 55/1281/RVC established on 2011-10-28: FDIS decided (CDV launched as FprA1 - FDIS circulated as ed 2)
* Will supersede EN 60317-48:2000
FprEN 60317-49:2012 (PR=23558) IEC 60317-49:201X (55/1327/FDIS) CLC/TC 55 IEC/TC 55 // Stage : 5020 2012-06-22 Specifications for particular types of winding wires - Part 49: Glass-fibre wound high temperature resin or varnish
impregnated, bare or enamelled round copper wire, temperature index 180 NOTE: Will supersede EN 60317-49:2000 * 55/1282/RVC established on 2011-10-28: FDIS decided
FprEN 60317-50:2012 (PR=23559) IEC 60317-50:201X (55/1328/FDIS) CLC/TC 55 IEC/TC 55 // Stage : 5020 2012-06-22 Specifications for particular types of winding wires - Part 50: Glass-fibre wound silicone resin or varnish
impregnated, bare or enamelled round copper wire, temperature index 200 NOTE: Will supersede EN 60317-50:2000 * 55/1283/RVC established on 2011-10-28: FDIS decided
FprEN 60317-55:2012 (PR=24110) IEC 60317-55:201X (55/1318/CDV) CLC/TC 55 IEC/TC 55 // Stage : 5020 2012-08-17 Specifications for particular types of winding wires - Part 55: Solderable polyurethane enamelled round copper wire
overcoated with polyamide, Class 180 NOTE: Will supersede EN 60317-55:2007 * This FprEN is to be read in conjunction with EN 60317-0-1 (pr=
24100)
FprEN 60317-56:2012 (PR=23440) IEC 60317-56:2012 CLC/TC 55 IEC/TC 55 // Stage : 5060 2012-05-14 Specifications for particular types of winding wires - Part 56: Solderable fully insulated (FIW) zero-defect
polyurethane enamelled round copper wire with nominal conductor diameter of 0,040 mm to 1,600 mm, class 180 NOTE: To be read in conjunction with EN 60317-0-7
FprEN 60317-60:2012 (PR=23374) IEC 60317-60:201X (55/1320/FDIS) CLC/TC 55 IEC/TC 55 // Stage : 5020 2012-06-01 Specifications for particular types of winding wires - Part 60: Polyester glass fibre wound minimum class 155 resin
or varnish impregnated or not impregnated, bare or enamelled, rectangular copper wire, temperature index 155 NOTE: 55/1267/RVC + 55/1267A/RVC established on 2011-10-28: FDIS decided
FprEN 60317-61:2012 (PR=23375) IEC 60317-61:201X (55/1322/FDIS) CLC/TC 55 IEC/TC 55 // Stage : 5020 2012-06-08 Specifications for particular types of winding wires - Part 61: Polyester glass fibre wound, minimum class 180, resin
or varnish impregnated, bare or enamelled rectangular copper wire, temperature index 180 NOTE: 55/1268/RVC + 55/1268A/RVC established on 2011-10-28: FDIS decided
Technical committees Activities 248
CENELEC Inventory of Technical Activities
FprEN 60317-62:2012 (PR=23376) IEC 60317-62:201X (55/1323/FDIS) CLC/TC 55 IEC/TC 55 // Stage : 5020 2012-06-08 Specifications for particular types of winding wires - Part 62: Polyester glass fibre wound, minimum class 200 resin
or varnish impregnated, bare or enamelled rectangular copper wire, temperature index 200 NOTE: 55/1269/RVC + 55/1269A/RVC established on 2011-10-28: FDIS decided
EN 60851-3:2009/FprA1:2012 (PR=24099) IEC 60851-3:2009/A1:201X (55/1313/CDV) CLC/TC 55 IEC/TC 55 // Stage : 5020 2012-08-10 Winding wires - Test methods - Part 3: Mechanical properties
FprEN 60851-6:2012 (PR=23526) IEC 60851-6:201X (55/1312/FDIS) CLC/TC 55 IEC/TC 55 // Stage : 5060 2012-05-21 Winding wires - Test methods - Part 6: Thermal properties NOTE: Will supersede EN 60851-6:1996 + A1:1997 + A2:2004 * 55/1297/RVC established on 2011-11-18: FDIS
decided
Technical committees Activities 249
CENELEC Inventory of Technical Activities
TC 57
Power systems management and associated information exchange
To prepare international standards for power systems control equipment and systems including EMS (Energy Management Systems), SCADA (Supervisory Control And Data Acquisition), distribution automation, teleprotection, and associated information exchange for real-time and non-real-time information, used in the planning, operation and maintenance of power systems. Power systems management comprises control within control centres, substations and individual pieces of primary equipment including telecontrol and interfaces to equipment, systems and databases, which may be outside the scope of TC 57. The special conditions in a high voltage environment have to be taken into consideration. NOTE 1: Standards prepared by other technical committees of the IEC and organizations such as ITU and ISO shall be used where applicable. NOTE 2: Although the work of TC 57 is chiefly concerned with standards for electric power systems, these standards may also be useful for application by the relevant bodies to other geographical widespread processes. NOTE3: Whereas standards related to measuring and protection relays and to the control and monitoring equipment used with these systems are treated by TC 95, TC 57 deals with the interface to the control systems and the transmission aspects for teleprotection systems. Whereas standards related to equipment for electrical measurement and load control are treated by TC 13, TC 57 deals with the interface of equipment for interconnection lines and industrial consumers and producers requiring energy management type interfaces to the control system
Officers Meetings Secretary: Dr Heiko ENGLERT ( DE) Paris 2011-10-04 Chairman: Mr Thierry LEFEBVRE ( FR) Brussels 2012-02-15
Published (last 12 months)
EN 61850-4:2011 (PR=22715) IEC 61850-4:2011 CLC/TC 57 IEC/TC 57 // Stage : 6060 Communication networks and systems for power utility automation - Part 4: System and project management NOTE: Supersedes EN 61850-4:2002 dor : 2011-05-16 doa : 2011-08-16 dop : 2012-02-16 dow: 2014-05-16
EN 61850-7-1:2011 (PR=21866) IEC 61850-7-1:2011 CLC/TC 57 IEC/TC 57 // Stage : 6060 Communication networks and systems for power utility automation - Part 7-1: Basic communication structure -
Principles and models NOTE: Supersedes EN 61850-7-1:2003 dor : 2011-08-19 doa : 2011-11-19 dop : 2012-05-19 dow : 2014-08-19
EN 61850-8-1:2011 (PR=22348) IEC 61850-8-1:2011 CLC/TC 57 IEC/TC 57 // Stage : 6060 Communication networks and systems for power utility automation - Part 8-1: Specific communication service
mapping (SCSM) - Mappings to MMS (ISO 9506-1 and ISO 9506-2) and to ISO/IEC 8802-3 NOTE: Supersedes EN 60850-8-1:2004 dor : 2011-07-22 doa : 2011-10-22 dop : 2012-04-22 dow : 2014-07-22
Technical committees Activities 250
CENELEC Inventory of Technical Activities
EN 61850-9-2:2011 (PR=22373) IEC 61850-9-2:2011 CLC/TC 57 IEC/TC 57 // Stage : 6060 Communication networks and systems for power utility automation - Part 9-2: Specific communication service
mapping (SCSM) - Sampled values over ISO/IEC 8802-3 NOTE: 2011-10-07: Publication editing allocated to [email protected] * Supersedes EN 61850-9-2:2004 dor : 2011-10-27 doa : 2012-01-27 dop : 2012-07-27 dow: 2014-10-27
EN 61970-301:2011 (PR=22683) IEC 61970-301:2011 CLC/TC 57 IEC/TC 57 // Stage : 6060 Energy management system application program interface (EMS-API) - Part 301: Common information model
(CIM) base NOTE: Supersedes EN 61970-301:2004 dor : 2011-09-30 doa : 2011-12-31 dop : 2012-06-30 dow : 2014-09-30
Vote launched
FprEN 61850-3:2012 (PR=24217) IEC 61850-3:201X (57/1246/CDV) CLC/TC 57 IEC/TC 57 // Stage : 5020 2012-10-19 Communication networks and systems for power utility automation - Part 3: General requirements NOTE: Will supersede EN 61850-3:2002
FprEN 61968-9:2012 (PR=24185) IEC 61968-9:201X (57/1243/CDV) CLC/TC 57 IEC/TC 57 // Stage : 5020 2012-10-05 Application integration at electric utilities - System interfaces for distribution management - Part 9: Interfaces for
meter reading and control NOTE: Will supersede EN 61968-9:2009
FprEN 61968-100:2012 (PR=24186) IEC 61968-100:201X (57/1244/CDV) CLC/TC 57 IEC/TC 57 // Stage : 5020 2012-10-05 Application integration at electric utilities - System interfaces for distribution management - Part 100:
Implementation profiles
FprEN 61970-301:2011 (PR=23904) IEC 61970-301:201X (57/1196/CDV) CLC/TC 57 IEC/TC 57 // Stage : 5060 2012-05-28 Energy management system application program interface (EMS-API) - Part 301: Common information model
(CIM) base NOTE: Will supersede EN 61970-301:2011 * Awaiting outcome of RVC before further processing
FprEN 62325-301:2012 (PR=24172) IEC 62325-301:201X (57/1232/CDV) CLC/TC 57 IEC/TC 57 // Stage : 5020 2012-09-21 Framework for energy market communications - Part 301: Common Information Model (CIM) extensions for
markets
FprEN 62325-351:2012 (PR=24230) IEC 62325-351:201X (57/1252/CDV) CLC/TC 57 IEC/TC 57 // Stage : 5020 2012-10-26 Framework for energy market communications - Part 351: CIM European market model exchange profile
Technical committees Activities 251
CENELEC Inventory of Technical Activities
FprEN 62325-450:2011 (PR=23858) IEC 62325-450:201X (57/1192/CDV) CLC/TC 57 IEC/TC 57 // Stage : 5060 2012-05-07 Framework for energy market communications - Part 450: Profile and context modelling rules NOTE: Awaiting outcome of RVC before further processing
FprEN 62361-100:2011 (PR=23861) IEC 62361-100:201X (57/1191/CDV) CLC/TC 57 IEC/TC 57 // Stage : 5060 2012-05-07 Harmonization of quality codes across TC 57 - Part 100: Naming and design rules for CIM profiles to XML schema
mapping NOTE: Awaiting outcome of RVC before further processing
Vote decided
FprEN 61850-5:201X (PR=23426) IEC 61850-5:201X (57/1120/CDV) CLC/TC 57 IEC/TC 57 // Stage : 3090 2012-01-31 Draft for vote due at CCMC by: - Communication networks and systems for power utility automation - Part 5: Communication requirements for
functions and device models NOTE: Will supersede EN 61850-5:2003 * 57/1206/RVC established on 2012-01-20: FDIS decided
FprEN 61850-7-410:201X (PR=23149) IEC 61850-7-410:201X (57/1091/CDV) CLC/TC 57 IEC/TC 57 // Stage : 3090 2011-05-31 Draft for vote due at CCMC by: - Communication networks and systems for power utility automation - Part 7-410: Hydroelectric power plants -
Communication for monitoring and control NOTE: Will supersede EN 61850-7-410:2007 * 57/1130/RVC established on 2011-05-20: FDIS decided
FprEN 61850-10:201X (PR=23673) IEC 61850-10:201X (57/1162/CDV) CLC/TC 57 IEC/TC 57 // Stage : 3090 2012-04-30 Draft for vote due at CCMC by: - Communication networks and systems for power utility automation - Part 10: Conformance testing NOTE: Will supersede EN 61850-10:2005 * 57/1227/RVC established on 2012-03-30: FDIS decided
FprEN 61968-1:201X (PR=23352) IEC 61968-1:201X (57/1110/CDV) CLC/TC 57 IEC/TC 57 // Stage : 3090 2012-03-31 Draft for vote due at CCMC by: - Application integration at electric utilities - System interfaces for distribution management - Part 1: Interface
architecture and general requirements NOTE: Will supersede EN 61968-1:2004 * 57/1212/RVC established on 2012-01-27: FDIS decided
FprEN 61968-11:201X (PR=23674) IEC 61968-11:201X (57/1163/CDV) CLC/TC 57 IEC/TC 57 // Stage : 3090 2012-04-30 Draft for vote due at CCMC by: - Application integration at electric utilities - System interfaces for distribution management - Part 11: Common
information model (CIM) extensions for distribution NOTE: Will supersede EN 61968-11:2010 * 57/1231/RVC established on 2012-04-06: FDIS decided
Technical committees Activities 252
CENELEC Inventory of Technical Activities
FprEN 61970-456:201X (PR=23261) IEC 61970-456:201X (57/1099/CDV) CLC/TC 57 IEC/TC 57 // Stage : 3090 2012-02-29 Draft for vote due at CCMC by: - Energy management system application program interface (EMS-API) - Part 456: Solved power system state profiles NOTE: 57/1220/RVC established on 2012-02-24: FDIS decided
FprEN 62361:201X (PR=22878) IEC 62361:201X (57/1055/CDV) CLC/TC 57 IEC/TC 57 // Stage : 3090 2012-02-29 Draft for vote due at CCMC by: - Harmonization of quality codes across TC 57 - Common list of quality codes NOTE: 57/1219/RVC established on 2012-02-17: FDIS decided
FprEN 62488-1:201X (PR=23442) IEC 62488-1:201X (57/1125/CDV) CLC/TC 57 IEC/TC 57 // Stage : 3090 2011-11-30 Draft for vote due at CCMC by: - Power line communication systems for power utility applications - Part 1: Planning of analogue and digital power
line carrier systems operating over EHV/HV/MV electricity grids NOTE: Will supersede EN 60495:1994 * 57/1195/RVC established on 2011-11-18: FDIS decided
Technical committees Activities 253
CENELEC Inventory of Technical Activities
TC 59X
Performance of household and similar electrical appliances
To prepare European standards on methods of measurement of characteristics which are of importance to determine the performance of household and similar electrical appliances and are of interest to the consumer. This may include associated aspects related to the use of the appliances and aspects such as classification, accessibility and usability of appliances, ergonomic characteristics and conditions for the information provided at the point of sale
Officers Meetings Secretary: Mr Peter RILLER ( DE) Frankfurt 2008-06-26 Chairman: Mr Alain ROUX ( FR) Brussels 2009-06-25
Brussels 2010-06-24 Brussels 2011-06-28
Published (last 12 months)
EN 60456:2011 + AC:2011 (PR=21844) IEC 60456:2010 (Modified) + corrigendum Sep. 2011 CLC/TC 59X IEC/SC 59D ECOHWM (1015/2010) ERP (2009/125/EC) Stage : 6060 Clothes washing machines for household use - Methods for measuring the performance NOTE: Supersedes EN 60456:2005 + A11:2006 + A12:2011 Mandated: M/458 dor : 2011-03-21 doa : 2011-09-21 dop : 2012-03-21 dow: 2014-03-21
EN 60704-2-10:2011 (PR=23022) IEC 60704-2-10:2011 CLC/TC 59X IEC/SC 59K // Stage : 6060 Household and similar electrical appliances - Test code for the determination of airborne acoustical noise - Part 2-10:
Particular requirements for electric cooking ranges, ovens, grills, microwave ovens and any combination of these NOTE: 2011-10-07: Publication editing allocated to [email protected] * Supersedes EN 60704-2-10:2004 *
To be used in conjunction with EN 60704-1:2010 dor : 2011-11-01 doa : 2012-02-01 dop : 2012-08-01 dow: 2014-11-01
EN 60705:2012 (PR=22332) IEC 60705:2010 (Modified) CLC/TC 59X IEC/SC 59K ERP (2009/125/EC) Stage : 6060 Household microwave ovens - Methods for measuring performance NOTE: 2012-02-09 - Publication editing allocated to [email protected] * Supersedes EN 60705:1999 +
A1:2004 + A2:2006 * Superseded by EN 60705:2012 dor : 2012-03-12 doa : 2012-09-12 dop : 2013-03-12 dow: 2015-03-12
Ratified
EN 60704-2-6:201X (PR=23393) IEC 60704-2-6:2012 CLC/TC 59X IEC/SC 59D ERP (2009/125/EC) // Stage : 5099 2012-05-29 Household and similar electrical appliances - Test code for the determination of airborne acoustical noise - Part 2-6:
Particular requirements for tumble dryer NOTE: Will supersede EN 60704-2-6:2004 * This EN is to be read in conjunction with EN 60704-1:2010
Technical committees Activities 254
CENELEC Inventory of Technical Activities
Vote launched
EN 50242:2008/FprAA:2012 (PR=23899) IEC 60436:2004/A1:2009 (Modified) + IEC 60436:2004/A2:2012 (Modified) CLC/TC 59X ECODISH (1016/2010) Stage : 5020 2012-06-29 Electric dishwashers for household use - Methods for measuring the performance NOTE: D140/C054: NWI approved * Amdt on EN ratified and published as EN 50242:2008 / EN 60436:2008 * Double numbering to be dropped end of December to read EN 60436:2008 * prA11 would then be renamed EN 60436:2008/prA11* 2012-03-15: UAP processing allocated to [email protected] . Mandated: M/481
FprEN 60312-2:2009 (PR=22767) IEC 60312-2:2010 (Modified) CLC/TC 59X IEC/SC 59F // Stage : 5061 2010-09-01 Vacuum cleaners for household use - Part 2: Wet cleaning appliances - Methods of measuring the performance NOTE: Will partly supersede EN 60312:2008 * 59F/194/RVC established on 2010-06-04: To be published without
FDIS stage * D137/C092 - BT approved CMs on this project (on TC request)
FprEN 60312-3:2011 (PR=23815) IEC 60312-3:201X (59F/209/CDV) CLC/TC 59X IEC/SC 59F // Stage : 5060 2012-04-02 Vacuum cleaners for household use - Part 3: Cleaning robots for household use - Dry cleaning - Methods of
measuring performance NOTE: Awaiting outcome of RVC before further processing
EN 60704-1:2010/FprAA:2012 (PR=23885) CLC/TC 59X EL (2010/30/EU) Stage : 5020 2012-09-07 Household and similar electrical appliances - Test code for the determination of airborne noise - Part 1: General
requirements NOTE: D140/C054: NWI approved * Track: ENQ + FV set by default changed following TC advice to UAP Mandated: M/481
EN 60704-2-4:201X (PR=23262) IEC 60704-2-4:2011 (Modified) CLC/TC 59X IEC/SC 59D ERP (2009/125/EC) // Stage : 5091 - Household and similar electrical appliances - Test code for the determination of airborne acoustical noise - Part 2-4:
Particular requirements for washing machines and spin extractors NOTE: 2012-03-13 - CM vote approved - Publication editing allocated to [email protected] * Will supersede EN 60704-2-4:2001 * This Part 2-4 is to be used in conjunction with EN 60704-1:2010 * 59D/387/RVC established on 2011-05-27: To be published without FDIS stage
FprEN 60734:2012 (PR=23377) IEC 60734:201X (59D/398/FDIS) CLC/TC 59X IEC/SC 59D // Stage : 5060 2012-06-11 Household electrical appliances - Performance - Water for testing NOTE: Will supersede EN 60734:2003 * 59D/388/RVC + 59D/338A/RVC established on 2011-09-23: FDIS decided
FprEN 61121:2011 (PR=23182) IEC 61121:2012 CLC/TC 59X IEC/SC 59D EL (2010/30/EU) // Stage : 5060 2012-02-13 Tumble dryers for household use - Methods for measuring the performance NOTE: Will supersede EN 61121:2005 * FprAA (pr=23181), covering common modifications towards 59D/385/CDV has been stopped on 2011-07-26*2012-02-24: Publication editing allocated to [email protected]
Technical committees Activities 255
CENELEC Inventory of Technical Activities
Vote decided
FprEN 50193-1:201X (PR=22960) CLC/TC 59X EL (2010/30/EU) Stage : 4099 2011-07-18 Draft for vote due at CCMC by: 2012-05-31 Electric instantaneous water heaters - Part 1: General requirements NOTE: 2012-05-22 - Formal Vote editing allocated to [email protected] * Revision of EN 50193:1997 *
Council Directive 92/75/EEC with regard to energy labelling of Electric Water Heater Mandated: M/324
FprEN 50559 (PR=22952) CLC/TC 59X Stage : 4090 - Draft for vote due at CCMC by: 2012-05-31 Electric room heating, underfloor heating, characteristics of performance - Definitions, method of testing, sizing and
formula symbols NOTE: 2011-10-05: FV editing allocated to [email protected] * To be handled by WG 12
FprEN 60704-2-6:2011/FprAA:201X (PR=23846) CLC/TC 59X ERP (2009/125/EC) Stage : 1090 - Draft for vote due at CCMC by: - Household and similar electrical appliances - Test code for the determination of airborne acoustical noise - Part 2-6:
Particular requirements for tumble dryer
FprEN 60704-2-14:201X (PR=23530) IEC 60704-2-14:201X (59M/21A/CDV) CLC/TC 59X IEC/SC 59M ERP (2009/125/EC) NOISA (86/594/EEC) // Stage : 3090 2012-03-31 Draft for vote due at CCMC by: - Household and similar electrical appliances - Test code for the determination of airborne acoustical noise - Part 2-14:
Particular requirements for refrigerators, frozen-food storage cabinets and food freezers NOTE: To be read in conjunction with EN 60704-1:2010 * Will supersede EN 28960:1993 (CEN standard) *
59M/36/RVC established on 2012-02-03: FDIS decided
FprEN 62512:201X (PR=23707) IEC 62512:201X (59D/390/CDV) CLC/TC 59X IEC/SC 59D // Stage : 3090 2012-07-31 Draft for vote due at CCMC by: - Electric clothes washer-dryers for household use - Methods for measuring the performance NOTE: Negative results at CLC level dropped - To follow IEC decision: 59D/396/RVC + 59D/396A/RVC established
on 2012-04-20: FDIS decided
FprEN 62552:2012 (PR=21652) IEC 62552:2007 (Modified) + corrigendum Mar. 2008 CLC/TC 59X IEC/TC 59 ECODORE (643/2009) EL (2010/30/EU) Stage : 4099 2012-06-29 Draft for vote due at CCMC by: - Household refrigerating appliances - Characteristics and test methods NOTE: 2012-04-10 - Formal Vote editing allocated to [email protected] * Will supersede EN 153:2006 and
EN ISO 15502:2005 + corr. Dec.2007 Mandated: M/459
Technical committees Activities 256
CENELEC Inventory of Technical Activities
Enquiry launched
prEN 50440:2005 (PR=16330) CLC/TC 59X Stage : 4091 - Draft for vote due at CCMC by: 2007-12-15 Efficiency of domestic electrical storage water heaters NOTE: Will supersede EN 60379:2004 * D128/C112: BT approved the suspension of vote until a decision on EC funding is taken * D134/095 + D135/067 + D136/036 + D137/046 + D138/061 + D139/052 (Benchmark 3 + 6): BT
noted the specific situation around this project and maintained it active * CS has debated the financing issue with the Commission * Project under EC assessment (2009-11-23) * Contract signed with the Commission on 2010-08-26 Mandated: M/324
prEN 60312-1:2011 (PR=22506) IEC 60312-1:2010 (Modified) CLC/TC 59X IEC/SC 59F EL (OLD) (92/75/EEC) Stage : 4060 2012-04-09 Draft for vote due at CCMC by: 2012-03-01 Vacuum cleaners for household use - Part 1: Dry vacuum cleaners - Methods for measuring the performance NOTE: Will partly supersede EN 60312:2008 (together with future Part 2) * D136/C051: No parallel vote on FDIS resulting from 59F/188/CDV - 2MV on IEC + CM linked to M/353 & 92/75/EEC once IEC is published * Target date for vote (set by default) = 2012-03-01 Mandated: M/353
prEN 60350-1:2012 (PR=23130) IEC 60350-1:2011 (Modified) + corrigendum Feb. 2012 CLC/TC 59X IEC/SC 59K EL (2010/30/EU) ELOV (2002/40/EC) ERP (2009/125/EC) Stage : 4020 2012-06-22 Draft for vote due at CCMC by: - Household electric cooking appliances - Part 1: Ranges, ovens, steam ovens and grills - Methods for measuring
performance NOTE: 2012-01-06 - Enquiry processing allocated to [email protected] * D137/061:BT accepted CLC/TC 59X request to stop the ongoing parallel vote noting that CMs are being prepared * prEN 60350-1:2012
(PR=23130) and prEN 60350-2:2012 (PR=23131) together will supersede EN 50304:2009/EN 60350:2009 and its amendments Mandated: M/495
prEN 60350-2:2012 (PR=23131) IEC 60350-2:2011 (Modified) CLC/TC 59X IEC/SC 59K EL (2010/30/EU) ELOV (2002/40/EC) ERP (2009/125/EC) Stage : 4020 2012-06-22 Draft for vote due at CCMC by: - Household electric cooking appliances - Part 2: Hobs - Methods for measuring performance NOTE: 2012-01-06 - Enquiry processing allocated to [email protected] * D137/061:BT accepted CLC/TC 59X request to stop the ongoing parallel vote noting that CMs are being prepared * prEN 60350-1:2012
(PR=23130) and prEN 60350-2:2012 (PR=23131) together will supersede EN 50304:2009/EN 60350:2009 and its amendments Mandated: M/495
EN 61591:1997/prAA:2011 (PR=23251) CLC/TC 59X EL (2010/30/EU) ERP (2009/125/EC) Stage : 4060 2012-03-12 Draft for vote due at CCMC by: 2013-05-31 Household range hoods and other cooking fume extractors - Methods for measuring performance NOTE: Enquiry editing allocated to [email protected] * Text prepared by WG 13 * D141/C082: Extension of the tdv approved to read 2013-05-31 - TC advice: Impossible to go to the next Step before the Commission submits the appropriate directive
Technical committees Activities 257
CENELEC Inventory of Technical Activities
At Secretariat stage
EN 50304:2009/prAB (PR=22992) CLC/TC 59X EL (2010/30/EU) ELOV (2002/40/EC) Stage : 3020 2010-11-02 Draft for vote due at CCMC by: 2012-06-30 Electric cooking ranges, hobs, ovens and grills for household use - Methods for measuring performance NOTE: D137/078: NWI approved by BT with target date for vote: 2012-06-30 * To be handled under double numbering EN 50304:2009/prAB / EN 60350:2009/prAB * 2010-08-02: TC Enquiry circulated on collaboration tool with deadline for comments 2010-11-02
PQ/UQ launched
prEN 60661 (PR=23793) IEC 60661:1999 (Modified) + A1:2003 (Modified) + A2:2005 (Modified) CLC/TC 59X IEC/SC 59L ERP (2009/125/EC) Stage : 1560 2012-05-21 Draft for vote due at CCMC by: 2014-02-15 Methods for measuring the performance of electric household coffee makers NOTE: PQ processing allocated to [email protected] * D140/C010: NWI approved * PQ based on IEC 60661:1999 + A1:2003 + A2:2005 + Common Modifications to take into acount mandates related to coffe machines and Ecodesign * Work in hands of WG 15 Mandated: M/495
New work item approved
EN 50242:2008/AC:201X (PR=23304) CLC/TC 59X Stage : 1099 - Draft for vote due at CCMC by: - Electric dishwashers for household use - Methods for measuring the performance
New work item to be approved
prEN 50193-2-1 (PR=24243) CLC/TC 59X Stage : 1000 2012-06-26 Draft for vote due at CCMC by: 2014-10-10 Electric instantaneous water heaters - Part 2-1: Efficiency and Performance for multifunctional electric instantaneous
water heaters NOTE: NWI requested to 142 BT Mandated: M/495
prEN 50193-2-2 (PR=24244) CLC/TC 59X Stage : 1000 2012-06-26 Draft for vote due at CCMC by: 2014-10-10 Electric instantaneous water heaters - Part 2-2: Single Point of Use Electric Instantaneous Showers - Efficiency NOTE: NWI requested to 142 BT Mandated: M/495
prEN 50193-2-3 (PR=24245) CLC/TC 59X Stage : 1000 2012-06-26 Draft for vote due at CCMC by: 2014-10-10 Electric instantaneous water heaters - Part 2-3: Single Point of Use Electric Instantaneous Handwash - Efficiency and
Performance NOTE: NWI requested to 142 BT
Technical committees Activities 258
CENELEC Inventory of Technical Activities
Work stopped (last 12 months)
EN 60704-2-4:201X/FprAA:2012 (PR=23569) CLC/TC 59X ERP (2009/125/EC) Stage : 5098 - Household and similar electrical appliances - Test code for the determination of airborne acoustical noise - Part 2-4:
Particular requirements for washing machines and spin extractors NOTE: This FprAA covers common modifications towards IEC 60704-2-4:2011, Ed. 3, parallel voted (pr=23262). If approved both projects will be merged and published as one single document with the implementation date of FprAA * 2011-05 TC request: Common modifications for this standard are necessary due to COMMISSION REGULATION (EU) No 1015/2010 of 10 November 2010 implementing Directive 2009/125/EC of the European Parliament and of the Council with regard to ecodesign requirements for household washing machines.
FprEN 60705:2010/FprAA (PR=22999) CLC/TC 59X Stage : 3098 - Household microwave ovens - Methods for measuring performance NOTE: D137/C035: Ratification or FprEN 60705:2010 (PR=22332) deferred until FprAA covering common modifications needed to answer new mandate on microwave ovens is voted upon - target date for vote (set by
default): 2011-06-01 * 2010-08-02 : Secretariat enquiry circulated on collaboration tools (dl for comments 2010-11- 02)
FprEN 61121:2011/FprAA:2011 (PR=23181) CLC/TC 59X EL (2010/30/EU) Stage : 5098 - Tumble dryers for household use - Methods for measuring the performance NOTE: This FprAA covers common modifications towards 59D/385/CDV, parallel voted (pr=23182) * Stopped
Technical committees Activities 259
CENELEC Inventory of Technical Activities
TC 61
Safety of household and similar electrical appliances
To harmonize recognized international standards dealing with safety requirements for electrical appliances for household and similar purposes and, where necessary, to prepare harmonized standards for such appliances. Health and environmental requirements are to be taken into account.
Officers Meetings Chairman: Mr Fabio GARGANTINI ( IT) Brussels 2011-06-28 / 06-29 Secretary: Mr David MOLINA DE RAMON ( ES) Valetta 2011-12-12 / 12-13
Varna 2012-06-05 / 06-06 to be confirmed 2012-10-30 / 11-01
Published (last 12 months)
EN 50408:2008/A1:2011 (PR=23067) CLC/TC 61 Stage : 6060 Household and similar electrical appliances - Safety - Particular requirements for cab heaters for vehicles NOTE: 2011-03-21 - Publication editing allocated to [email protected] dor : 2011-04-25 doa : 2011-10-25 dop : 2012-04-25 dow: 2014-04-25
EN 60335-1:2002/A15:2011 (PR=23099) CLC/TC 61 LVD (2006/95/EC) MD (2006/42/EC) Stage : 6060 Household and similar electrical appliances - Safety - Part 1: General requirements dor : 2011-05-02 doa : 2011-11-02 dop : 2012-05-02 dow : 2014-05-02
EN 60335-1:2012 (PR=22056) IEC 60335-1:2010 (Modified) (corrigendum Jul. 2010 + corrigendum Apr. 2011) CLC/TC 61 IEC/TC 61 LVD (2006/95/EC) MD (2006/42/EC) Stage : 6060 Household and similar electrical appliances - Safety - Part 1: General requirements NOTE: Supersedes EN 60335-1:2002 + corr. Jul.2009 + corr. May.2010 + A11:2004 + A1:2004 + corr. Jan.2007
+ A12:2006 + corr. Feb.2007 + A2:2006 + A13:2008 + A14:2010 * Incorporates FprAA (PR=23000) Mandated: M/396 dor : 2011-11-21 doa : 2012-05-21 dop : 2012-11-21 dow: 2014-11-21
EN 60335-2-9:2003/A13:2010/AC:2011 (PR=23640) CLC/TC 61 Stage : 6060 Household and similar electrical appliances - Safety - Part 2-9: Particular requirements for grills, toasters and similar
portable cooking appliances NOTE: Allocated to [email protected] * Incorporates former AC:2011 (PR=23336) dor : - doa : - dop : - dow : -
EN 60335-2-14:2006/A11:2012 (PR=22955) CLC/TC 61 LVD (2006/95/EC) Stage : 6060 Household and similar electrical appliances - Safety - Part 2-14: Particular requirements for kitchen machines NOTE: 2011-12-20 - Publication editing allocated to [email protected] Mandated: M/392 dor : 2012-01-23 doa : 2012-07-23 dop : 2013-01-23 dow: 2015-01-23
Technical committees Activities 260
CENELEC Inventory of Technical Activities
EN 60335-2-15:2002/A11:2012 (PR=22956) CLC/TC 61 LVD (2006/95/EC) Stage : 6060 Household and similar electrical appliances - Safety - Part 2-15: Particular requirements for appliances for heating
liquids NOTE: 2011-12-20 - Publication editing allocated to [email protected] Mandated: M/392 dor : 2012-01-23 doa : 2012-07-23 dop : 2013-01-23 dow: 2015-01-23
EN 60335-2-16:2003/A2:2012 (PR=23201) IEC 60335-2-16:2002/A2:2011 CLC/TC 61 IEC/TC 61 LVD (2006/95/EC) // Stage : 6060 Household and similar electrical appliances - Safety - Part 2-16: Particular requirements for food waste disposers NOTE: 2011-09-22: Publication editing allocated to [email protected] dor : 2011-10-18 doa : 2012-01-18 dop : 2012-09-02 dow: 2014-10-18
EN 60335-2-25:2012 (PR=21947) IEC 60335-2-25:2010 (Modified) CLC/TC 61 IEC/SC 61B LVD (2006/95/EC) Stage : 6060 Household and similar electrical appliances - Safety - Part 2-25: Particular requirements for microwave ovens,
including combination microwave ovens NOTE: Publication editing allocated to [email protected] * Supersedes EN 60335-2-25:2002 + A1:2005 + A2:2006 + A11:2010 * D136/018 (cancelling D130/054): dow = dor + 36 months * To be used in conjuction with EN 60335-1 (pr=22056) dor : 2011-11-28 doa : 2012-05-28 dop : 2012-11-28 dow: 2014-11-28
EN 60335-2-30:2009/A11:2012 (PR=23669) CLC/TC 61 LVD (2006/95/EC) Stage : 6060 Household and similar electrical appliances - Safety - Part 2-30: Particular requirements for room heaters NOTE: 2012-01-18 - Publication editing allocated to [email protected] * D135/043: Amendment prepared by
CLC/TC 61/WG 4 to answer M/392 (LVD - limitation clause) Mandated: M/392 dor : 2012-02-20 doa : 2012-08-20 dop : 2013-02-20 dow: 2015-02-20
EN 60335-2-35:2002/A2:2011 (PR=22051) IEC 60335-2-35:2002/A2:2009 (Modified) CLC/TC 61 IEC/TC 61 LVD (2006/95/EC) Stage : 6060 Household and similar electrical appliances - Safety - Part 2-35: Particular requirements for instantaneous water
heaters NOTE: D136/018 (cancelling D130/054): dow = dor + 36 months - Ratified with inclusion of FI snc (on 22.101)
provided during parallel vote on CDV dor : 2011-01-24 doa : 2011-07-24 dop : 2012-04-28 dow : 2014-01-24
EN 60335-2-36:2002/A11:2012 (PR=23593) CLC/TC 61 MD (2006/42/EC) Stage : 6060 Household and similar electrical appliances - Safety - Part 2-36: Particular requirements for commercial electric
cooking ranges, ovens, hobs and hob elements NOTE: Publication editing allocated to [email protected] dor : 2011-12-21 doa : 2012-06-21 dop : 2012-12-21 dow: 2014-12-21
EN 60335-2-37:2002/A11:2012 (PR=23584) CLC/TC 61 MD (2006/42/EC) Stage : 6060 Household and similar electrical appliances - Safety - Part 2-37: Particular requirements for commercial electric deep
fat fryers NOTE: Publication editing allocated to [email protected] dor : 2011-12-21 doa : 2012-06-21 dop : 2012-12-21 dow: 2014-12-21
Technical committees Activities 261
CENELEC Inventory of Technical Activities
EN 60335-2-40:2003/A13:2012 (PR=22548) CLC/TC 61 LVD (2006/95/EC) MD (2006/42/EC) Stage : 6060 Household and similar electrical appliances - Safety - Part 2-40: Particular requirements for electrical heat pumps,
air-conditioners and dehumidifiers NOTE: Publication editing allocated to [email protected] * D136/018 (cancelling D130/054): dow = dor + 36
months Mandated: M/392 dor : 2011-07-11 doa : 2012-01-11 dop : 2012-08-23 dow: 2014-07-11
EN 60335-2-42:2003/A11:2012 (PR=23586) CLC/TC 61 MD (2006/42/EC) Stage : 6060 Household and similar electrical appliances - Safety - Part 2-42: Particular requirements for commercial electric
forced convection ovens, steam cookers and steam-convection ovens NOTE: 2011-11-18 - Publication editing allocated to [email protected] dor : 2011-12-21 doa : 2012-06-21 dop : 2012-12-21 dow: 2014-12-21
EN 60335-2-44:2002/A2:2012 (PR=23195) IEC 60335-2-44:2002/A2:2011 CLC/TC 61 IEC/TC 61 LVD (2006/95/EC) // Stage : 6060 Household and similar electrical appliances - Safety - Part 2-44: Particular requirements for ironers NOTE: 2011-09-22: Publication editing allocated to [email protected] dor : 2011-10-04 doa : 2012-01-04 dop : 2012-09-02 dow: 2014-10-04
EN 60335-2-45:2002/A2:2012 (PR=23196) IEC 60335-2-45:2002/A2:2011 CLC/TC 61 IEC/TC 61 LVD (2006/95/EC) // Stage : 6060 Household and similar electrical appliances - Safety - Part 2-45: Particular requirements for portable heating tools
and similar appliances NOTE: 2011-09-22: Publication editing allocated to [email protected] dor : 2011-10-04 doa : 2012-01-04 dop : 2012-09-02 dow: 2014-10-04
EN 60335-2-47:2003/A11:2012 (PR=23587) CLC/TC 61 MD (2006/42/EC) Stage : 6060 Household and similar electrical appliances - Safety - Part 2-47: Particular requirements for commercial electric
boiling pans NOTE: 2011-11-18 - Publication editing allocated to [email protected] dor : 2011-12-21 doa : 2012-06-21 dop : 2012-12-21 dow: 2014-12-21
EN 60335-2-48:2003/A11:2012 (PR=23588) CLC/TC 61 MD (2006/42/EC) Stage : 6060 Household and similar electrical appliances - Safety - Part 2-48: Particular requirements for commercial electric
grillers and toasters NOTE: 2011-11-18 - Publication editing allocated to [email protected] dor : 2011-12-21 doa : 2012-06-21 dop : 2012-12-21 dow: 2014-12-21
EN 60335-2-49:2003/A11:2012 (PR=23589) CLC/TC 61 MD (2006/42/EC) Stage : 6060 Household and similar electrical appliances - Safety - Part 2-49: Particular requirements for commercial electric
appliances for keeping food and crockery warm NOTE: 2011-11-18 - Publication editing allocated to [email protected] dor : 2011-12-21 doa : 2012-06-21 dop : 2012-12-21 dow: 2014-12-21
Technical committees Activities 262
CENELEC Inventory of Technical Activities
EN 60335-2-51:2003/A2:2012 (PR=23197) IEC 60335-2-51:2002/A2:2011 CLC/TC 61 IEC/TC 61 LVD (2006/95/EC) // Stage : 6060 Household and similar electrical appliances - Safety - Part 2-51: Particular requirements for stationary circulation
pumps for heating and service water installations NOTE: 2011-09-22: Publication editing allocated to [email protected] dor : 2011-10-18 doa : 2012-01-18 dop : 2012-09-02 dow: 2014-10-18
EN 60335-2-53:2011 (PR=22702) IEC 60335-2-53:2011 CLC/TC 61 IEC/TC 61 LVD (2006/95/EC) // Stage : 6060 Household and similar electrical appliances - Safety - Part 2-53: Particular requirements for sauna heating appliances
and infrared cabins NOTE: Publication editing allocated to [email protected] * Supersedes EN 60335-2-53:2003 + A1:2007 * To
be used in conjunction with the latest edition of EN 60335-1 + AMDs dor : 2011-05-25 doa : 2011-08-25 dop : 2012-06-16 dow: 2014-05-25
EN 60335-2-66:2003/A2:2012 (PR=23198) IEC 60335-2-66:2002/A2:2011 CLC/TC 61 IEC/TC 61 LVD (2006/95/EC) // Stage : 6060 Household and similar electrical appliances - Safety - Part 2-66: Particular requirements for water-bed heaters NOTE: 2011-09-22: Publication editing allocated to [email protected] dor : 2011-10-04 doa : 2012-01-04 dop : 2012-09-02 dow: 2014-10-04
EN 60335-2-81:2003/A2:2012 (PR=23199) IEC 60335-2-81:2002/A2:2011 CLC/TC 61 IEC/TC 61 LVD (2006/95/EC) // Stage : 6060 Household and similar electrical appliances - Safety - Part 2-81: Particular requirements for foot warmers and
heating mats NOTE: 2011-09-22: Publication editing allocated to [email protected] dor : 2011-10-18 doa : 2012-01-18 dop : 2012-09-02 dow: 2014-10-18
EN 62115:2005/A2:2011 + AC:2011 (PR=22679) IEC 62115:2003/A2:2010 (Modified) CLC/TC 61 IEC/TC 61 TOYS (2009/48/EC) TOYS (OLD) (88/378/EEC) // Stage : 6060 Electric toys - Safety NOTE: Incorporates EN 62115:2005/FprAA:2011 (pr=22951) dor : 2011-01-02 doa : 2011-07-02 dop : 2012-01-02 dow : 2014-01-02
Ratified
EN 50416:2005/AA:201X (PR=17136) CLC/TC 61 MD (2006/42/EC) MD (98/37/EC) Stage : 5099 2011-01-30 Household and similar electrical appliances - Safety - Particular requirements for commercial electric conveyor
dishwashing machines NOTE: 2011-02-16 - TC request publication to be put on hold
EN 50416:2005/AB:201X (PR=23594) CLC/TC 61 MD (2006/42/EC) Stage : 5099 2012-01-18 Household and similar electrical appliances - Safety - Particular requirements for commercial electric conveyor
dishwashing machines NOTE: 2011-11-18 - Publication editing allocated to [email protected]
Technical committees Activities 263
CENELEC Inventory of Technical Activities
EN 60335-2-3:201X (PR=23190) IEC 60335-2-3:2012 CLC/TC 61 IEC/TC 61 LVD (2006/95/EC) // Stage : 5099 2012-05-17 Household and similar electrical appliances - Safety - Part 2-3: Particular requirements for electric irons NOTE: Will supersede EN 60335-2-3:2002 + A1:2005 + A2:2008 + A11:2010 * A FprAA covering future common modifications towards FprEN 60335-2-3:201X is circulated simultaneously. If approved both projects will be
merged and published as one single document (see PR=23492)*2012-04-06: Publication allocated to [email protected]
EN 60335-2-6:2003/AC:201X (PR=23096) CLC/TC 61 LVD (2006/95/EC) Stage : 5099 2011-07-04 Household and similar electrical appliances - Safety - Part 2-6: Particular requirements for stationary cooking ranges,
hobs, ovens and similar appliances NOTE: Publication editing allocated to [email protected]
EN 60335-2-7:2010/A1:201X (PR=23192) IEC 60335-2-7:2008/A1:2011 CLC/TC 61 IEC/TC 61 LVD (2006/95/EC) // Stage : 5099 2012-02-08 Household and similar electrical appliances - Safety - Part 2-7: Particular requirements for washing machines NOTE: 2012-03-14 - Publication editing allocated to [email protected] * EN 60335-2-7:2010/FprAB (PR=23494) covering CMs to FprA1 will be circulated when received from CLC/TC 61, intended to be merged with this FprA1 and published as one single document, with the implementation dates of FprAB
EN 60335-2-17:201X (PR=23193) IEC 60335-2-17:2012 CLC/TC 61 IEC/TC 61 LVD (2006/95/EC) // Stage : 5099 2012-05-28 Household and similar electrical appliances - Safety - Part 2-17: Particular requirements for blankets, pads, clothing
and similar flexible heating appliances NOTE: Will supersede EN 60335-2-17:2002 + A1:2006 + A2:2009*2012-04-06: Publication editing allocated to
EN 60335-2-27:201X (PR=23100) IEC 60335-2-27:2009 (Modified) CLC/TC 61 IEC/TC 61 LVD (2006/95/EC) Stage : 5099 2011-09-19 Household and similar electrical appliances - Safety - Part 2-27: Particular requirements for appliances for skin
exposure to ultraviolet and infrared radiation NOTE: 2011-07-18: Allocated to [email protected] * Will supersede EN 60335-2-27:2010 * Endorsement of IEC 60335-2-27:2009 + CMs (parallel vote on IEC 60335-2-27 failed) * This EN is to be read in conjunction with EN 60335-1:2002 + AMDs
EN 60335-2-39:2003/AA:201X (PR=23585) CLC/TC 61 MD (2006/42/EC) Stage : 5099 2012-01-18 Household and similar electrical appliances - Safety - Part 2-39: Particular requirements for commercial electric
multi-purpose cooking pans NOTE: 2011-11-18 - Publication editing allocated to [email protected]
EN 60335-2-54:2008/A11:201X (PR=23670) CLC/TC 61 LVD (2006/95/EC) Stage : 5099 2012-03-19 Household and similar electrical appliances - Safety - Part 2-54: Particular requirements for surface-cleaning
appliances for household use employing liquids or steam NOTE: 2012-01-18 - Publication editing allocated to [email protected] * D135/043: Amendment prepared by
CLC/TC 61/WG 4 to answer M/392 (LVD - limitation clause) Mandated: M/392
Technical committees Activities 264
CENELEC Inventory of Technical Activities
EN 60335-2-58:2005/AC:201X (PR=23590) CLC/TC 61 MD (2006/42/EC) Stage : 5099 2012-01-18 Household and similar electrical appliances - Safety - Part 2-58: Particular requirements for commercial electric
dishwashing machines NOTE: 2011-11-18 - Publication editing allocated to [email protected]
EN 60335-2-64:2000/AB:201X (PR=23591) CLC/TC 61 MD (2006/42/EC) Stage : 5099 2012-01-18 Safety of household and similar electrical appliances - Part 2-64: Particular requirements for commercial electric
kitchen machines NOTE: 2011-11-18 - Publication editing allocated to [email protected]
EN 60335-2-65:2003/AA:201X (PR=23592) CLC/TC 61 MD (2006/42/EC) Stage : 5099 2012-01-18 Household and similar electrical appliances - Safety - Part 2-65: Particular requirements for air-cleaning appliances NOTE: 2011-11-18 - Publication editing allocated to [email protected]
EN 60335-2-67:201X (PR=23202) IEC 60335-2-67:2012 (Modified) CLC/TC 61 IEC/SC 61J MD (2006/42/EC) // Stage : 5099 2012-05-31 Household and similar electrical appliances - Safety - Part 2-67: Particular requirements for floor treatment machines
for commercial use NOTE: Will supersede EN 60335-2-67:2009 * A FprAA (PR=23827) covering common modifications towards this document is circulated simultaneously. If approved both projects will be merged and published as one single document*2012-04-06: Publication allocated to [email protected]
EN 60335-2-68:201X (PR=23203) IEC 60335-2-68:2012 (Modified) CLC/TC 61 IEC/SC 61J MD (2006/42/EC) // Stage : 5099 2012-05-31 Household and similar electrical appliances - Safety - Part 2-68: Particular requirements for spray extraction
machines for commercial use NOTE: 2012-04-16 - Publication editing allocated to [email protected] * Will supersede EN 60335-2-68:2009 * FprAA (PR=23898) covering common modifications to this document is to be circulated simultaneously. If
approved, both projects will be merged and published as one single document, with the implementation dates of FprAA.
EN 60335-2-69:201X (PR=23204) IEC 60335-2-69:2012 (Modified) CLC/TC 61 IEC/SC 61J MD (2006/42/EC) // Stage : 5099 2012-04-25 Household and similar electrical appliances - Safety - Part 2-69: Particular requirements for wet and dry vacuum
cleaners, including power brush for commercial use NOTE: Will supersede EN 60335-2-69:2009 * FprAA (PR=23897) covering CMs to FprEN 60335-2-69:2011 is circulated simultaneously. If approved, both documents are intended to be merged and published as one single
document, with the implementation dates of FprAA*2012-03-09: Publication editing allocated to [email protected]
EN 60335-2-72:201X (PR=23205) IEC 60335-2-72:2012 (Modified) CLC/TC 61 IEC/SC 61J MD (2006/42/EC) // Stage : 5099 2012-05-31 Household and similar electrical appliances - Safety - Part 2-72: Particular requirements for floor treatment machines
with or without traction drive for commercial use NOTE: Will supersede EN 60335-2-72:2009 * FprAA (PR=23936) covering common modifications to this document is circulated simultaneously. If approved, both projects will be merged and published as one single document, with the implementation dates of FprAA.*2012-04-06: Publication allocated to [email protected]
Technical committees Activities 265
CENELEC Inventory of Technical Activities
EN 60335-2-79:201X (PR=23206) IEC 60335-2-79:2012 (Modified) CLC/TC 61 IEC/SC 61J MD (2006/42/EC) // Stage : 5099 2012-05-01 Household and similar electrical appliances - Safety - Part 2-79: Particular requirements for high pressure cleaners
and steam cleaners NOTE: Will supersede EN 60335-2-79:2009 * FprAA (PR=23935) covering CMs to FprEN 60335-2-79:2011 is circulated. If approved, both documents will be merged and published as one single document, with the implementation dates of FprAA*2012-03-14: Publication editing allocated to [email protected]
Vote launched
EN 50571:201X (PR=23605) CLC/TC 61 MD (2006/42/EC) Stage : 5091 - Household and similar electrical appliances - Safety - Particular requirements for commercial electric washing
machines NOTE: 2011-12-02 - Publication editing allocated to [email protected] * Project needed as reference
for tests and compliance of products with the new MD
EN 60335-1:201X/FprA1:2011 (fragment 7) (PR=23905) IEC 60335-1:2010/A1:201X (fragment 7) (61/4303/CDV) CLC/TC 61 IEC/TC 61 LVD (2006/95/EC) MD (2006/42/EC) // Stage : 5060 2012-05-28 Household and similar electrical appliances - Safety - Part 1: General requirements
EN 60335-1:201X/FprA1:2011 (fragment 8) (PR=23906) IEC 60335-1:2010/A1:201X (fragment 8) (61/4304/CDV) CLC/TC 61 IEC/TC 61 LVD (2006/95/EC) MD (2006/42/EC) // Stage : 5060 2012-05-28 Household and similar electrical appliances - Safety - Part 1: General requirements
EN 60335-2-2:2010/FprA1:2011 (PR=23907) IEC 60335-2-2:2009/A1:201X (61/4305/CDV) CLC/TC 61 IEC/TC 61 LVD (2006/95/EC) // Stage : 5060 2012-05-28 Household and similar electrical appliances - Safety - Part 2-2: Particular requirements for vacuum cleaners and
water-suction cleaning appliances
EN 60335-2-2:2010/FprAA:2012 (PR=24041) CLC/TC 61 LVD (2006/95/EC) Stage : 5020 2012-06-01 Household and similar electrical appliances - Safety - Part 2-2: Particular requirements for vacuum cleaners and
water-suction cleaning appliances NOTE: D135/043: Amendment prepared by CLC/TC 61/WG 4 to answer M/392 (LVD - limitation clause) * 2012-02-
16 - 3M UAP editing allocated to [email protected] Mandated: M/392
EN 60335-2-4:2010/FprA1:2011 (PR=23908) IEC 60335-2-4:2008/A1:201X (61/4306/CDV) CLC/TC 61 IEC/TC 61 LVD (2006/95/EC) // Stage : 5060 2012-05-28 Household and similar electrical appliances - Safety - Part 2-4: Particular requirements for spin extractors
EN 60335-2-5:2003/FprAB:2012 (PR=24042) CLC/TC 61 LVD (2006/95/EC) Stage : 5020 2012-06-01 Household and similar electrical appliances - Safety - Part 2-5: Particular requirements for dishwashers NOTE: D135/043: Amendment prepared by CLC/TC 61/WG 4 to answer M/392 (LVD - limitation clause) * 2012-02-
16 - 3M UAP editing allocated to [email protected] Mandated: M/392
Technical committees Activities 266
CENELEC Inventory of Technical Activities
FprEN 60335-2-5:2011 (PR=23915) IEC 60335-2-5:201X (61/4313/CDV) CLC/TC 61 IEC/TC 61 LVD (2006/95/EC) // Stage : 5060 2012-05-28 Household and similar electrical appliances - Safety - Part 2-5: Particular requirements for dishwashers NOTE: Will supersede EN 60335-2-5:2003 + A1:2005 + A2:2008 + A11:2009
FprEN 60335-2-6:2010 (PR=23191) IEC 60335-2-6:201X (61/4094/CDV) CLC/TC 61 IEC/TC 61 LVD (2006/95/EC) // Stage : 5091 2011-06-30 Household and similar electrical appliances - Safety - Part 2-6: Particular requirements for stationary cooking ranges,
hobs, ovens and similar appliances NOTE: Will supersede EN 60335-2-6:2003 + A1:2005 + A2:2008 + A11:2010 + AC:201X (pr=23096) + FprAD:2012 (pr=24047) * CLC voting results dropped - To follow IEC decision - 61/4159/RVC established on
2011-04-15: Comments to be discussed during TC 61 June 2011 meeting * If new CDV or FDIS is decided, FprAA covering CMs to be circulated simultaneously (see PR=23493)
EN 60335-2-7:2010/FprAC:2012 (PR=24043) CLC/TC 61 LVD (2006/95/EC) Stage : 5020 2012-06-01 Household and similar electrical appliances - Safety - Part 2-7: Particular requirements for washing machines NOTE: D135/043: Amendment prepared by CLC/TC 61/WG 4 to answer M/392 (LVD - limitation clause) * 2012-02-
16 - 3M UAP editing allocated to [email protected] Mandated: M/392
FprEN 60335-2-8:2011 (PR=23916) IEC 60335-2-8:201X (61/4314/CDV) CLC/TC 61 IEC/TC 61 LVD (2006/95/EC) // Stage : 5060 2012-05-28 Household and similar electrical appliances - Safety - Part 2-8: Particular requirements for shavers, hair clippers and
similar appliances NOTE: Will supersede EN 60335-2-8:2003 + A1:3005 + A2:2008
FprEN 60335-2-9:2009 (PR=21516) IEC 60335-2-9:2008 (Modified) CLC/TC 61 IEC/TC 61 LVD (2006/95/EC) Stage : 5091 2010-04-17 Household and similar electrical appliances - Safety - Part 2-9: Particular requirements for grills, toasters and similar
portable cooking appliances NOTE: Will supersede EN 60335-2-9:2003 + A1:2004 + A2:2006 + A12:2007 * 2MV on IEC + CMs (=Content of EN 60335-2-9:2003/A12:2007) * D135/023: Ratification postponed pending review of comments at next TC 61
meeting after which, and based on the decisions taken by TC, the document will proceed to next steps * D136/018 (cancelling D130/054): dow = dor + 36 months
FprEN 60335-2-9:2009/FprA1:2011 (PR=23909) IEC 60335-2-9:2008/A1:201X (61/4307/CDV) CLC/TC 61 IEC/TC 61 LVD (2006/95/EC) // Stage : 5060 2012-05-28 Household and similar electrical appliances - Safety - Part 2-9: Particular requirements for grills, toasters and similar
portable cooking appliances
EN 60335-2-11:2010/FprA1:2011 (PR=23910) IEC 60335-2-11:2008/A1:201X (61/4308/CDV) CLC/TC 61 IEC/TC 61 LVD (2006/95/EC) // Stage : 5060 2012-05-28 Household and similar electrical appliances - Safety - Part 2-11: Particular requirements for tumble dryers
Technical committees Activities 267
CENELEC Inventory of Technical Activities
EN 60335-2-11:2010/FprAB:2012 (PR=24045) CLC/TC 61 LVD (2006/95/EC) Stage : 5020 2012-06-01 Household and similar electrical appliances - Safety - Part 2-11: Particular requirements for tumble dryers NOTE: D135/043: Amendment prepared by CLC/TC 61/WG 4 to answer M/392 (LVD - limitation clause) * 2012-02-
16 - 3M UAP editing allocated to [email protected] Mandated: M/392
EN 60335-2-13:2010/FprAA:2012 (PR=24046) CLC/TC 61 LVD (2006/95/EC) Stage : 5020 2012-06-01 Household and similar electrical appliances - Safety - Part 2-13: Particular requirements for deep fat fryers, frying
pans and similar appliances NOTE: D135/043: Amendment prepared by CLC/TC 61/WG 4 to answer M/392 (LVD - limitation clause) * 2012-02-
16 - 3M UAP editing allocated to [email protected] Mandated: M/392
EN 60335-2-14:2006/FprA2:2011 (PR=23911) IEC 60335-2-14:2006/A2:201X (61/4309/CDV) CLC/TC 61 IEC/TC 61 LVD (2006/95/EC) // Stage : 5060 2012-05-28 Household and similar electrical appliances - Safety - Part 2-14: Particular requirements for kitchen machines
FprEN 60335-2-15:2011 (PR=23924) IEC 60335-2-15:201X (61/4317/CDV) CLC/TC 61 IEC/TC 61 LVD (2006/95/EC) // Stage : 5060 2012-06-04 Household and similar electrical appliances - Safety - Part 2-15: Particular requirements for appliances for heating
liquids NOTE: Will supersede EN 60335-2-15:2002 + A1:2005 + A2:2008 + A11:2012
FprEN 60335-2-21:2011 (PR=23925) IEC 60335-2-21:201X (61/4318/CDV) CLC/TC 61 IEC/TC 61 LVD (2006/95/EC) // Stage : 5060 2012-06-04 Household and similar electrical appliances - Safety - Part 2-21: Particular requirements for storage water heaters NOTE: Will supersede EN 60335-2-21:2003 + corr. Oct.2007 + corr. Oct.2010 + A1:2005 + A2:2008
EN 60335-2-23:2003/FprA2:2011 (PR=23194) IEC 60335-2-23:2003/A2:2012 CLC/TC 61 IEC/TC 61 LVD (2006/95/EC) // Stage : 5091 - Household and similar electrical appliances - Safety - Part 2-23: Particular requirements for appliances for skin or
hair care NOTE: EN 60335-2-23:2003/FprAB covering CMs to FprA2 to be circulated simultaneously (see PR=23495) -->
Text not yet received
EN 60335-2-23:2003/FprAC:2012 (PR=24051) CLC/TC 61 LVD (2006/95/EC) MD (2006/42/EC) Stage : 5020 2012-09-07 Household and similar electrical appliances - Safety - Part 2-23: Particular requirements for appliances for skin or
hair care NOTE: D134/C045: No NWI request needed for Amdts aligning existing standards prepared by CLC/TC 61 to the essential requirements of the Machinery Directive (2006/42/EC) * In hands of WG 6 * 2012-02-23 - UAP editing allocated to [email protected]
EN 60335-2-24:2010/FprA1:2012 (PR=23354) IEC 60335-2-24:2010/A1:201X (61C/506/FDIS) CLC/TC 61 IEC/SC 61C LVD (2006/95/EC) // Stage : 5060 2012-04-23 Household and similar electrical appliances - Safety - Part 2-24: Particular requirements for refrigerating appliances,
ice-cream appliances and ice makers NOTE: 61C/502/RVC + 61C/502A/RVC established on 2011-10-14: FDIS decided
Technical committees Activities 268
CENELEC Inventory of Technical Activities
EN 60335-2-27:2010/FprAA:2012 (PR=24053) CLC/TC 61 LVD (2006/95/EC) MD (2006/42/EC) Stage : 5020 2012-09-07 Household and similar electrical appliances - Safety - Part 2-27: Particular requirements for appliances for skin
exposure to ultraviolet and infrared radiation NOTE: D134/C045: No NWI request needed for Amdts aligning existing standards prepared by CLC/TC 61 to the essential requirements of the Machinery Directive (2006/42/EC) * In hands of WG 6 * 2012-02-23 - UAP editing allocated to [email protected]
EN 60335-2-27:201X/FprA1:2011 (PR=23914) IEC 60335-2-27:2009/A1:201X (61/4312/CDV) CLC/TC 61 IEC/TC 61 LVD (2006/95/EC) // Stage : 5060 2012-05-28 Household and similar electrical appliances - Safety - Part 2-27: Particular requirements for appliances for skin
exposure to ultraviolet and infrared radiation
EN 60335-2-30:2009/FprA1:2011 (PR=23912) IEC 60335-2-30:2009/A1:201X (61/4310/CDV) CLC/TC 61 IEC/TC 61 LVD (2006/95/EC) // Stage : 5060 2012-05-28 Household and similar electrical appliances - Safety - Part 2-30: Particular requirements for room heaters
FprEN 60335-2-31:2011 (PR=23926) IEC 60335-2-31:201X (61/4319/CDV) CLC/TC 61 IEC/TC 61 LVD (2006/95/EC) // Stage : 5060 2012-06-04 Household and similar electrical appliances - Safety - Part 2-31: Particular requirements for range hoods and other
cooking fume extractors NOTE: Will supersede EN 60335-2-31:2003 + corr. Dec.2005 + A1:2006 + A2:2009
FprEN 60335-2-34:2012 (PR=23353) IEC 60335-2-34:201X (61C/508/FDIS) CLC/TC 61 IEC/SC 61C LVD (2006/95/EC) // Stage : 5060 2012-05-14 Household and similar electrical appliances - Safety - Part 2-34: Particular requirements for motor-compressors NOTE: Will supersede EN 60335-2-34:2002 + A1:2005 + A2:2009 + A11:2004 * To be used with EN 60335-1:201X
(pr=22056)
FprEN 60335-2-35:2011 (PR=23918) IEC 60335-2-35:201X (61/4316/CDV) CLC/TC 61 IEC/TC 61 LVD (2006/95/EC) // Stage : 5060 2012-05-28 Household and similar electrical appliances - Safety - Part 2-35: Particular requirements for instantaneous water
heaters NOTE: Will supersede EN 60335-2-35:2002 + A1:2007 + A2:2011
EN 60335-2-37:2002/A2:201X (PR=22737) IEC 60335-2-37:2002/A2:2011 CLC/TC 61 IEC/SC 61E LVD (2006/95/EC) // Stage : 5091 - Household and similar electrical appliances - Safety - Part 2-37: Particular requirements for commercial electric deep
fat fryers NOTE: 2011-05-27: Publication allocated to [email protected] .
FprEN 60335-2-39:2012 (PR=22758) IEC 60335-2-39:2012 CLC/TC 61 IEC/SC 61E LVD (2006/95/EC) MD (2006/42/EC) // Stage : 5091 - Household and similar electrical appliances - Safety - Part 2-39: Particular requirements for commercial electric
multi-purpose cooking pans NOTE: Will supersede EN 60335-2-39:2003 + corr. Sep.2007 + A1:2004 + A2:2008 + FprAA:2011 * 61E/674/RVC
+ 61E/674A/RVC established on 2010-08-27: FDIS decided
Technical committees Activities 269
CENELEC Inventory of Technical Activities
FprEN 60335-2-40:2012 (PR=23972) IEC 60335-2-40:201X (61D/195/CDV) CLC/TC 61 IEC/SC 61D LVD (2006/95/EC) MD (2006/42/EC) // Stage : 5020 2012-06-15 Household and similar electrical appliances - Safety - Part 2-40: Particular requirements for electrical heat pumps,
air-conditioners and dehumidifiers NOTE: Will supersede EN 60335-2-40:2003 + corr. Apr.2006 + corr. Aug.2010 + A1:2006 + A2:2009 + AC:2005
+ FprAD:2011 + A11:2004
FprEN 60335-2-41:2011 (PR=23917) IEC 60335-2-41:201X (61/4315/CDV) CLC/TC 61 IEC/TC 61 LVD (2006/95/EC) // Stage : 5060 2012-05-28 Household and similar electrical appliances - Safety - Part 2-41: Particular requirements for pumps NOTE: Will supersede EN 60335-2-41:2003 + A1:2004 + A2:2010
EN 60335-2-45:2002/FprAA:2012 (PR=24054) CLC/TC 61 LVD (2006/95/EC) MD (2006/42/EC) Stage : 5020 2012-09-07 Household and similar electrical appliances - Safety - Part 2-45: Particular requirements for portable heating tools
and similar appliances NOTE: D134/C045: No NWI request needed for Amdts aligning existing standards prepared by CLC/TC 61 to the essential requirements of the Machinery Directive (2006/42/EC) * In hands of WG 6 * 2012-02-23 - UAP editing allocated to [email protected]
EN 60335-2-70:2002/FprA2:2012 (PR=23988) IEC 60335-2-70:2002/A2:201X (61H/267/CDV) CLC/TC 61 IEC/SC 61H // Stage : 5020 2012-06-22 Household and similar electrical appliances - Safety - Part 2-70: Particular requirements for milking machines
EN 60335-2-71:2003/FprA2:2012 (PR=23989) IEC 60335-2-71:2002/A2:201X (61H/268/CDV) CLC/TC 61 IEC/SC 61H LVD (2006/95/EC) // Stage : 5020 2012-06-22 Household and similar electrical appliances - Safety - Part 2-71: Particular requirements for electrical heating
appliances for breeding and rearing animals
EN 60335-2-75:2004/A13:201X (PR=22549) CLC/TC 61 LVD (2006/95/EC) MD (2006/42/EC) Stage : 5091 - Household and similar electrical appliances - Safety - Part 2-75: Particular requirements for commercial dispensing
appliances and vending machines NOTE: D136/018 (cancelling D130/054): dow = dor + 36 months Mandated: M/392
FprEN 60335-2-75:2011 (PR=23927) IEC 60335-2-75:201X (61/4320/CDV) CLC/TC 61 IEC/TC 61 LVD (2006/95/EC) // Stage : 5060 2012-06-04 Household and similar electrical appliances - Safety - Part 2-75: Particular requirements for commercial dispensing
appliances and vending machines NOTE: Will supersede EN 60335-2-75:2004 + A1:2005 + A2:2008 + A11:2006 + A12:2010 + A13:201X
EN 60335-2-76:2005/FprA2:2012 (PR=23990) IEC 60335-2-76:2002/A2:201X (61H/269/CDV) CLC/TC 61 IEC/SC 61H // Stage : 5020 2012-06-22 Household and similar electrical appliances - Safety - Part 2-76: Particular requirements for electric fence energizers
Technical committees Activities 270
CENELEC Inventory of Technical Activities
EN 60335-2-86:2003/FprA2:2012 (PR=23991) IEC 60335-2-86:2002/A2:201X (61H/270/CDV) CLC/TC 61 IEC/SC 61H LVD (2006/95/EC) // Stage : 5020 2012-06-22 Household and similar electrical appliances - Safety - Part 2-86: Particular requirements for electric fishing machines
EN 60335-2-86:2003/FprAB:2012 (PR=24055) CLC/TC 61 LVD (2006/95/EC) MD (2006/42/EC) Stage : 5020 2012-09-07 Household and similar electrical appliances - Safety - Part 2-86: Particular requirements for electric fishing machines NOTE: D134/C045: No NWI request needed for Amdts aligning existing standards prepared by CLC/TC 61 to the essential requirements of the Machinery Directive (2006/42/EC) * In hands of WG 6 * 2012-02-23 - UAP editing allocated to [email protected]
EN 60335-2-87:2002/FprA2:2012 (PR=23992) IEC 60335-2-87:2002/A2:201X (61H/271/CDV) CLC/TC 61 IEC/SC 61H LVD (2006/95/EC) // Stage : 5020 2012-06-22 Household and similar electrical appliances - Safety - Part 2-87: Particular requirements for electrical animal-
stunning equipment
EN 60335-2-89:2010/FprA1:2012 (PR=23355) IEC 60335-2-89:2010/FprA1:201X (61C/507/FDIS) CLC/TC 61 IEC/SC 61C // Stage : 5060 2012-04-23 Household and similar electrical appliances - Safety - Part 2-89: Particular requirements for commercial refrigerating
appliances with an incorporated or remote refrigerant condensing unit or compressor NOTE: 61C/503/RVC + 61C/503A/RVC established on 2011-10-14: FDIS decided
FprEN 60335-2-95:2010 (PR=23200) IEC 60335-2-95:2011 CLC/TC 61 IEC/TC 61 LVD (2006/95/EC) // Stage : 5091 - Household and similar electrical appliances - Safety - Part 2-95: Particular requirements for drives for vertically
moving garage doors for residential use NOTE: 2011-09-22: Publication editing allocated to [email protected] * Will supersede EN 60335-2-95:2004
EN 60335-2-99:2003/FprAA:2012 (PR=24056) CLC/TC 61 LVD (2006/95/EC) MD (2006/42/EC) Stage : 5020 2012-09-07 Household and similar electrical appliances - Safety - Part 2-99: Particular requirements for commercial electric
hoods NOTE: D134/C045: No NWI request needed for Amdts aligning existing standards prepared by CLC/TC 61 to the essential requirements of the Machinery Directive (2006/42/EC) * In hands of WG 6 * 2012-02-23 - UAP editing allocated to [email protected]
EN 60335-2-102:2006/FprA2:2011 (PR=23913) IEC 60335-2-102:2004/A2:201X (61/4311/CDV) CLC/TC 61 IEC/TC 61 LVD (2006/95/EC) // Stage : 5060 2012-05-28 Household and similar electrical appliances - Safety - Part 2-102: Particular requirements for gas, oil and solid-fuel
burning appliances having electrical connections
FprEN 60335-2-110:2012 (PR=24064) IEC 60335-2-110:201X (61B/448/CDV) CLC/TC 61 IEC/SC 61B LVD (2006/95/EC) // Stage : 5020 2012-07-27 Household and similar appliances - Safety - Part 2-110: Particular requirements for commercial microwave
appliances with insertion or contacting applicators
Technical committees Activities 271
CENELEC Inventory of Technical Activities
EN 62115:2005/FprAB:2012 (PR=23097) CLC/TC 61 TOYS (2009/48/EC) Stage : 5060 2012-05-21 Electric toys - Safety NOTE: 2012-02-14 - 2ndFV editing allocated to [email protected] * This FprAB has been developed to answer the concerns expressed by the European Commission regarding EN 62115:2005 and its links with M/445 and with the Toys Directives 88/378/EEC & 2009/48/EC (see D136/061 and BT136/DG8024/DC). Mandated: M/445
Vote decided
FprEN 50569:201X (PR=23603) CLC/TC 61 MD (2006/42/EC) Stage : 4099 - Draft for vote due at CCMC by: 2013-09-08 Household and similar electrical appliances - Safety - Particular requirements for commercial electric spin extractors NOTE: 2012-04-13 - New text for 2nd UAP - Sent to Consultant prior to 2nd UAP * This FprEN is to be read in conjunction with EN 60335-1(PR=22056) + AMDs * Project needed as reference for tests and compliance of products with the new MD
FprEN 50570:201X (PR=23604) CLC/TC 61 MD (2006/42/EC) Stage : 4099 - Draft for vote due at CCMC by: 2013-09-08 Household and similar electrical appliances - Safety - Particular requirements for commercial electric tumble dryers NOTE: 2012-04-13 - New text for 2nd UAP - Sent to Consultant prior to 2nd UAP 2011-11-23 - Publication editing allocated to [email protected] * This FprEN is to be read in conjunction with EN 60335-1(PR=22056) * Project needed as reference for tests and compliance of products with the new MD
FprEN 60335-2-3:2011/FprAA:201X (PR=23492) CLC/TC 61 LVD (2006/95/EC) Stage : 1090 2011-09-30 Draft for vote due at CCMC by: - Household and similar electrical appliances - Safety - Part 2-3: Particular requirements for electric irons NOTE: This FprAA covers future common modifications towards FprEN 60335-2-3:201X (FDIS decided -
pr=23190). If approved both projects will be merged and published as one single document
FprEN 60335-2-6:2010/FprAA:201X (PR=23493) CLC/TC 61 LVD (2006/95/EC) Stage : 1090 - Draft for vote due at CCMC by: - Household and similar electrical appliances - Safety - Part 2-6: Particular requirements for stationary cooking ranges,
hobs, ovens and similar appliances NOTE: This FprAA covers future common modifications towards FprEN 60335-2-6:2010 (decision on CDV deferred
- pr=23191). If approved both projects will be merged and published as one single document
EN 60335-2-7:2010/FprAB:201X (PR=23494) CLC/TC 61 LVD (2006/95/EC) Stage : 1090 2011-09-30 Draft for vote due at CCMC by: - Household and similar electrical appliances - Safety - Part 2-7: Particular requirements for washing machines NOTE: This FprAB, covering common modifications, is intended to be merged with FprA1 (PR=23192), both
documents will be published as one single document, with the implementation dates of FprAB
EN 60335-2-8:2003/FprAB:201X (PR=24052) CLC/TC 61 LVD (2006/95/EC) MD (2006/42/EC) Stage : 1090 - Draft for vote due at CCMC by: - Household and similar electrical appliances - Safety - Part 2-8: Particular requirements for shavers, hair clippers and
similar appliances NOTE: D134/C045: No NWI request needed for Amdts aligning existing standards prepared by CLC/TC 61 to the essential requirements of the Machinery Directive (2006/42/EC) * In hands of WG 6 * 2012-02-23 - UAP editing allocated to [email protected]
Technical committees Activities 272
CENELEC Inventory of Technical Activities
FprEN 60335-2-9:2009/FprA (PR=24049) CLC/TC 61 LVD (2006/95/EC) Stage : 4099 2012-03-02 Draft for vote due at CCMC by: - Household and similar electrical appliances - Safety - Part 2-9: Particular requirements for grills, toasters and similar
portable cooking appliances NOTE: 2012-02-16 - 3M UAP editing allocated to [email protected]
FprEN 60335-2-9:2009/FprA:201X (PR=24044) CLC/TC 61 LVD (2006/95/EC) Stage : 4099 2012-03-02 Draft for vote due at CCMC by: - Household and similar electrical appliances - Safety - Part 2-9: Particular requirements for grills, toasters and similar
portable cooking appliances NOTE: 2012-02-16 - 3M UAP editing allocated to [email protected]
EN 60335-2-23:2003/FprAB:201X (PR=23495) CLC/TC 61 LVD (2006/95/EC) Stage : 1090 2011-09-30 Draft for vote due at CCMC by: - Household and similar electrical appliances - Safety - Part 2-23: Particular requirements for appliances for skin or
hair care NOTE: This FprAB covers future common modifications towards EN 60335-2-23:2003/FprA2:201X (FDIS decided - pr=23194). If approved both projects will be merged and published as one single document with the implementation dates of this FprAB
EN 60335-2-102:2006/FprA11:201X (PR=24104) CLC/TC 61 MD (2006/42/EC) Stage : 4099 - Draft for vote due at CCMC by: 2014-06-16 Household and similar electrical appliances - Safety - Part 2-102: Particular requirements for gas, oil and solid-fuel
burning appliances having electrical connections NOTE: Amdt to EN to align the standard with 60335-1/prAX and to cover the Essential Safety and Health
Requirements of new Machinery Directive 2006/42/EC to be sent to shorter 3-month UAP
Enquiry launched
EN 60335-2-35:2002/prAA:2012 (PR=24068) CLC/TC 61 LVD (2006/95/EC) Stage : 4020 2012-10-12 Draft for vote due at CCMC by: 2014-05-31 Household and similar electrical appliances - Safety - Part 2-35: Particular requirements for instantaneous water
heaters NOTE: D135/043: Amendment prepared by CLC/TC 61/WG 4 to answer M/392 (LVD - limitation clause) * 2012-03-
05 - Enquiry processing allocated to [email protected] Mandated: M/392
EN 60335-2-76:2005/prAE:2011 (PR=23101) CLC/TC 61 Stage : 4060 2012-01-03 Draft for vote due at CCMC by: 2011-06-30 Household and similar electrical appliances - Safety - Part 2-76: Particular requirements for electric fence energizers NOTE: NWI requested to 141 BT (March 21, 2012) * Enquiries for prAE (PR=23101), prAF (PR=24113) and prAG
(PR=24114) to be circulated together with same limit dates for comments
Technical committees Activities 273
CENELEC Inventory of Technical Activities
At Secretariat stage
EN 62233:2008/prA (PR=23102) CLC/TC 61 LVD (2006/95/EC) Stage : 2020 - Draft for vote due at CCMC by: 2011-06-30 Measurement methods for electromagnetic fields of household appliances and similar apparatus with regard to
human exposure NOTE: D137/C170: NWI approved with target date for vote: 2011-06-30 * CLC/TC 106X interested in the work *
2012-01 TC advice: Draft for vote to be sent to CCMC February 2012
New work item approved
EN 60335-2-2:2003/A11:2010/AC:201X (PR=24193) CLC/TC 61 Stage : 1099 - Draft for vote due at CCMC by: - Household and similar electrical appliances - Safety - Part 2-2: Particular requirements for vacuum cleaners and
water-suction cleaning appliances NOTE: D141/C104: Corrigendum to EN 60335-2-2:2003/A11:2010 Clause 7.12.Z101
EN 60335-2-3:2002/A11:2010/AC:201X (PR=24194) CLC/TC 61 Stage : 1099 - Draft for vote due at CCMC by: - Household and similar electrical appliances - Safety - Part 2-3: Particular requirements for electric irons NOTE: D141/C104: Corrigendum to EN 60335-2-3:2002/A11:2010 Clause 7.12.Z101
EN 60335-2-6:2003/FprAD:201X (PR=24047) CLC/TC 61 LVD (2006/95/EC) Stage : 1099 - Draft for vote due at CCMC by: - Household and similar electrical appliances - Safety - Part 2-6: Particular requirements for stationary cooking ranges,
hobs, ovens and similar appliances NOTE: D141/C096: NWI approved * UAP track
EN 60335-2-6:2003/A11:2010/AC:201X (PR=24195) CLC/TC 61 Stage : 1099 - Draft for vote due at CCMC by: - Household and similar electrical appliances - Safety - Part 2-6: Particular requirements for stationary cooking ranges,
hobs, ovens and similar appliances NOTE: D141/C104: Corrigendum to EN 60335-2-6:2003/A11:2010 Clause 7.12.Z101
EN 60335-2-7:2003/prA (PR=22017) CLC/TC 61 Stage : 1099 2009-05-01 Draft for vote due at CCMC by: 2011-10-31 Household and similar electrical appliances - Safety - Part 2-7: Particular requirements for washing machines NOTE: D134/C014: NWI approved with target date for vote: 2009-09-01 * D137/038: (Under BM3) extension of the
tdv approved to read: 2011-10-31
EN 60335-2-7:2003/A11:2010/AC:201X (PR=24196) CLC/TC 61 Stage : 1099 - Draft for vote due at CCMC by: - Household and similar electrical appliances - Safety - Part 2-7: Particular requirements for washing machines NOTE: D141/C104: Corrigendum to EN 60335-2-7:2003/A11:2010 Clause 7.12.Z101
Technical committees Activities 274
CENELEC Inventory of Technical Activities
EN 60335-2-9:2003/A13:2010/AC:201X (PR=24197) CLC/TC 61 Stage : 1099 - Draft for vote due at CCMC by: - Household and similar electrical appliances - Safety - Part 2-9: Particular requirements for grills, toasters and similar
portable cooking appliances NOTE: D141/C104: Corrigendum to EN 60335-2-9:2003/A13:2010 Clause 7.12.Z101
EN 60335-2-23:2003/A11:2010/AC:201X (PR=24198) CLC/TC 61 Stage : 1099 - Draft for vote due at CCMC by: - Household and similar electrical appliances - Safety - Part 2-23: Particular requirements for appliances for skin or
hair care NOTE: D141/C104: Corrigendum to EN 60335-2-23:2003/A11:2010 Clause 7.12.Z101
EN 60335-2-25:2002/A11:2010/AC:201X (PR=24199) CLC/TC 61 Stage : 1099 - Draft for vote due at CCMC by: - Household and similar electrical appliances - Safety - Part 2-25: Particular requirements for microwave ovens,
including combination microwave ovens NOTE: D141/C104: Corrigendum to EN 60335-2-25:2002/A11:2010 Clause 7.12.Z101
EN 60335-2-52:2003/A11:2010/AC:201X (PR=24200) CLC/TC 61 Stage : 1099 - Draft for vote due at CCMC by: - Household and similar electrical appliances - Safety - Part 2-52: Particular requirements for oral hygiene appliances NOTE: D141/C104: Corrigendum to EN 60335-2-52:2003/A11:2010 Clause 7.12.Z101
Work stopped (last 12 months)
EN 60335-1:201X/AA:201X (PR=23000) CLC/TC 61 LVD (2006/95/EC) MD (2006/42/EC) Stage : 4098 - Household and similar electrical appliances - Safety - Part 1: General requirements NOTE: FprAA tackling comments raised and Consultants' negative assessment on FprEN 60335-1:2010 (PR=22056) * TC request: no DOW * FprAA merged with FprEN 60335-1:2010 (pr=22056) for publication as one single document with the implementation dates of this FprAA
EN 60335-2-24:2003/AC (PR=22957) CLC/TC 61 LVD (2006/95/EC) Stage : 5098 - Household and similar electrical appliances - Safety - Part 2-24: Particular requirements for refrigerating appliances,
ice-cream appliances and ice-makers NOTE: Project ratified February 2011 and cancelled on TC request in October 2011 due to the publication of EN
60335-2-14:2010 Mandated: M/392
FprEN 60335-2-67:2012/FprAA:2012 (PR=23827) CLC/TC 61 MD (2006/42/EC) Stage : 5098 - Household and similar electrical appliances - Safety - Part 2-67: Particular requirements for floor treatment machines
for commercial use NOTE: FV editing allocated to [email protected] * This FprAA covers common modifications towards FprEN 60335-2-67:2012 (pr=23202) (IEC 60335-2-67:201X (61J/489/FDIS)). If approved, both projects will be merged and published as one single document, with the implementation dates of FprAA.
Technical committees Activities 275
CENELEC Inventory of Technical Activities
FprEN 60335-2-68:2012/FprAA:2012 (PR=23898) CLC/TC 61 MD (2006/42/EC) Stage : 5098 - Household and similar electrical appliances - Safety - Part 2-68: Particular requirements for spray extraction
machines for commercial use NOTE: This FprAA covers common modifications towards FprEN 60335-2-68:2012 (pr=23203) (IEC 60335-2- 68:201X (61J/490/FDIS)). If approved, both projects will be merged and published as one single document, with the implementation dates of FprAA.*2012-04-06: Publication allocated to [email protected]
FprEN 60335-2-69:2011/FprAA:2011 (PR=23897) CLC/TC 61 MD (2006/42/EC) Stage : 5098 - Household and similar electrical appliances - Safety - Part 2-69: Particular requirements for wet and dry vacuum
cleaners, including power brush for commercial use NOTE: This FprAA, covering common modifications, is intended to be merged with FprEN 60335-2-69:2011 (PR=23204). If approved, both documents will be published as one single document, with the implementation dates of FprAA
FprEN 60335-2-72:2012/FprAA:2012 (PR=23936) CLC/TC 61 MD (2006/42/EC) Stage : 5098 - Household and similar electrical appliances - Safety - Part 2-72: Particular requirements for floor treatment machines
with or without traction drive for commercial use NOTE: 2011-12-08 - Allocated to [email protected] * This FprAA covers common modifications towards FprEN 60335-2-72:2012 (pr=23205) (IEC 60335-2-72:201X (61J/491/FDIS)). If approved, both projects will be merged and published as one single document, with the implementation dates of FprAA.
FprEN 60335-2-79:2011/FprAA:2012 (PR=23935) CLC/TC 61 MD (2006/42/EC) Stage : 5098 - Household and similar electrical appliances - Safety - Part 2-79: Particular requirements for high pressure cleaners
and steam cleaners NOTE: This FprAA covers common modifications towards FprEN 60335-2-79:2011 (PR=23206) (IEC 60335-2- 79:201X (61J/485/FDIS)). If approved, both documents will be merged and published as one single document, with the implementation dates of FprAA*2012-03-09: Publication editing allocated to [email protected]
New work item to be approved (BT/TC)
EN 60335-2-9:2003/prA (PR=24010) CLC/TC 61 LVD (2006/95/EC) Stage : 1000 2012-04-03 Draft for vote due at CCMC by: 2014-07-17
EN 60335-2-76:2005/prAF (PR=24113) CLC/TC 61 Stage : 1000 2012-04-17 Draft for vote due at CCMC by: 2014-07-31 Household and similar electrical appliances - Safety - Part 2-76: Particular requirements for electric fence energizers NOTE: NWI requested to 141 BT (March 21, 2012) * Enquiries for prAE (PR=23101), prAF (PR=24113) and prAG
(PR=24114) to be circulated together with same limit dates for comments
EN 60335-2-76:2005/prAG (PR=24114) CLC/TC 61 Stage : 1000 2012-04-17 Draft for vote due at CCMC by: 2014-07-31 Household and similar electrical appliances - Safety - Part 2-76: Particular requirements for electric fence energizers NOTE: NWI requested to 141 BT (March 21, 2012) * Enquiries for prAE (PR=23101), prAF (PR=24113) and prAG
(PR=24114) to be circulated together with same limit dates for comments
Technical committees Activities 276
CENELEC Inventory of Technical Activities
TC 62
Electrical equipment in medical practice
To establish harmonized standards concerning the manufacture of electrical equipment in human and veterinary medical practice in order to remove and prevent trade barriers. Medical practice in this context comprises surgery, dentistry and other specialities.
Officers Meetings Chairman: Dr Peter LINDERS ( NL) Brussels 2009-06-19 Secretary: Mr Nick BRADFIELD ( GB) Brussels 2010-06-14 / 06-15
Copenhagen 2011-06-21 / 06-22 London 2012-05-02 / 05-03
Published (last 12 months)
EN 60601-1:2006/A11:2011 (PR=23800) CLC/TC 62 AIMD (90/385/EEC) MDD (93/42/EEC) Stage : 6060 Medical electrical equipment - Part 1: General requirements for basic safety and essential performance NOTE: D139/C149: BT approved the modified Annex ZZ for EN 60601-1:2006 dor : 2011-10-01 doa : 2012-04-01 dop : 2012-10-01 dow: 2014-10-01
EN 60601-2-2:2009/A11:2011 (PR=23801) CLC/TC 62 MDD (93/42/EEC) Stage : 6060 Medical electrical equipment - Part 2-2: Particular requirements for the basic safety and essential performance of
high frequency surgical equipment and high frequency surgical accessories NOTE: D139/C149: BT approved the modified Annex ZZ for EN 60601-2-2:2009 dor : 2011-10-01 doa : 2012-04-01 dop : 2012-10-01 dow : 2014-10-01
EN 60601-2-4:2011 (PR=22219) IEC 60601-2-4:2010 CLC/TC 62 IEC/SC 62D // Stage : 6060 Medical electrical equipment - Part 2-4: Particular requirements for the basic safety and essential performance of
cardiac defibrillators NOTE: Supersedes EN 60601-2-4:2003 Mandated: M/295 dor : 2011-01-12 doa : 2011-04-12 dop : 2012-04-12 dow: 2014-01-12
EN 60601-2-19:2009/A11:2011 (PR=23802) CLC/TC 62 MDD (93/42/EEC) Stage : 6060 Medical electrical equipment - Part 2-19: Particular requirements for the basic safety and essential performance of
infant incubators NOTE: D139/C149: BT approved the modified Annex ZZ for EN 60601-2-19:2009 dor : 2011-10-01 doa : 2012-04-01 dop : 2012-10-01 dow : 2014-10-01
EN 60601-2-20:2009/A11:2011 (PR=23803) CLC/TC 62 MDD (93/42/EEC) Stage : 6060 Medical electrical equipment - Part 2-20: Particular requirements for the basic safety and essential performance of
infant transport incubators NOTE: D139/C149: BT approved the modified Annex ZZ for EN 60601-2-20:2009 dor : 2011-10-01 doa : 2012-04-01 dop : 2012-10-01 dow : 2014-10-01
Technical committees Activities 277
CENELEC Inventory of Technical Activities
EN 60601-2-21:2009/A11:2011 (PR=23804) CLC/TC 62 MDD (93/42/EEC) Stage : 6060 Medical electrical equipment - Part 2-21: Particular requirements for the basic safety and essential performance of
infant radiant warmers NOTE: D139/C149: BT approved the modified Annex ZZ for EN 60601-2-21:2009 dor : 2011-10-01 doa : 2012-04-01 dop : 2012-10-01 dow : 2014-10-01
EN 60601-2-29:2008/A11:2011 (PR=23805) CLC/TC 62 MDD (93/42/EEC) Stage : 6060 Medical electrical equipment - Part 2-29: Particular requirements for the basic safety and essential performance of
radiotherapy simulators NOTE: D139/C149: BT approved the modified Annex ZZ for EN 60601-2-29:2008 dor : 2011-10-01 doa : 2012-04-01 dop : 2012-10-01 dow : 2014-10-01
EN 60601-2-31:2008/A1:2011 (PR=22895) IEC 60601-2-31:2008/A1:2011 CLC/TC 62 IEC/SC 62D // Stage : 6060 Medical electrical equipment - Part 2-31: Particular requirements for the basic safety and essential performance of
external cardiac pacemakers with internal power source Mandated: M/295 dor : 2011-08-03 doa : 2011-11-03 dop : 2012-05-03 dow: 2014-08-03
EN 60601-2-33:2010/A11:2011 (PR=23806) CLC/TC 62 MDD (93/42/EEC) Stage : 6060 Medical electrical equipment - Part 2-33: Particular requirements for the basic safety and essential performance of
magnetic resonance equipment for medical diagnosis NOTE: D139/C149: BT approved the modified Annex ZZ for EN 60601-2-33:2010 dor : 2011-10-01 doa : 2012-04-01 dop : 2012-10-01 dow : 2014-10-01
EN 60601-2-37:2008/A11:2011 (PR=23808) CLC/TC 62 MDD (93/42/EEC) Stage : 6060 Medical electrical equipment - Part 2-37: Particular requirements for the basic safety and essential performance of
ultrasonic medical diagnostic and monitoring equipment NOTE: D139/C149: BT approved the modified Annex ZZ for EN 60601-2-37:2008 dor : 2011-10-01 doa : 2012-04-01 dop : 2012-10-01 dow : 2014-10-01
EN 60601-2-39:2008/A11:2011 (PR=23809) CLC/TC 62 MDD (93/42/EEC) Stage : 6060 Medical electrical equipment - Part 2-39: Particular requirements for basic safety and essential performance of
peritoneal dialysis equipment NOTE: D139/C149: BT approved the modified Annex ZZ for EN 60601-2-39:2008 dor : 2011-10-01 doa : 2012-04-01 dop : 2012-10-01 dow : 2014-10-01
EN 60601-2-41:2009/A11:2011 (PR=23810) CLC/TC 62 MDD (93/42/EEC) Stage : 6060 Medical electrical equipment - Part 2-41: Particular requirements for basic safety and essential performance of
surgical luminaires and luminaires for diagnosis NOTE: D139/C149: BT approved the modified Annex ZZ for EN 60601-2-41:2009 dor : 2011-10-01 doa : 2012-04-01 dop : 2012-10-01 dow : 2014-10-01
Technical committees Activities 278
CENELEC Inventory of Technical Activities
EN 60601-2-44:2009/A11:2011 (PR=23811) CLC/TC 62 MDD (93/42/EEC) Stage : 6060 Medical electrical equipment - Part 2-44: Particular requirements for the basic safety and essential performance of X-
ray equipment for computed tomography NOTE: D139/C149: BT approved the modified Annex ZZ for EN 60601-2-44:2009 dor : 2011-10-01 doa : 2012-04-01 dop : 2012-10-01 dow : 2014-10-01
EN 60601-2-46:2011 (PR=22193) IEC 60601-2-46:2010 CLC/TC 62 IEC/SC 62D // Stage : 6060 Medical electrical equipment - Part 2-46: Particular requirements for the basic safety and essential performance of
operating tables NOTE: Supersedes EN 60601-2-46:1998 Mandated: M/295 dor : 2011-01-20 doa : 2011-04-20 dop : 2012-04-20 dow: 2014-01-20
EN 60601-2-50:2009/A11:2011 (PR=23812) CLC/TC 62 MDD (93/42/EEC) Stage : 6060 Medical electrical equipment - Part 2-50: Particular requirements for the basic safety and essential performance of
infant phototherapy equipment NOTE: D139/C149: BT approved the modified Annex ZZ for EN 60601-2-50:2009 dor : 2011-10-01 doa : 2012-04-01 dop : 2012-10-01 dow : 2014-10-01
EN 60731:2012 (PR=22709) IEC 60731:2011 CLC/TC 62 IEC/SC 62C // Stage : 6060 Medical electrical equipment - Dosimeters with ionization chambers as used in radiotherapy NOTE: Supersedes EN 60731:1997 + A1:2002*2012-03-14: Publication editing allocated to
[email protected] dor : 2012-03-14 doa : 2012-06-14 dop : 2012-12-14 dow: 2015-03-14
EN 61217:2012 (PR=22904) IEC 61217:2011 CLC/TC 62 IEC/SC 62C MDD (93/42/EEC) // Stage : 6060 Radiotherapy equipment - Coordinates, movements and scales NOTE: 2011-12-20 - Publication editing allocated to [email protected] * Supersedes EN 61217:1996 +
A1:2001 + A2:2008 Mandated: M/295 dor : 2012-01-11 doa : 2012-04-11 dop : 2012-10-11 dow: 2015-01-11
EN 80601-2-35:2009/A11:2011 (PR=23807) CLC/TC 62 MDD (93/42/EEC) Stage : 6060 Medical electrical equipment - Part 2-35: Particular requirements for the basic safety and essential performance of
heating devices using blankets, pads and mattresses and intended for heating in medical use NOTE: D139/C149: BT approved the modified Annex ZZ for EN 80601-2-35:2009 dor : 2011-10-01 doa : 2012-04-01 dop : 2012-10-01 dow : 2014-10-01
EN 80601-2-58:2009/A11:2011 (PR=23813) CLC/TC 62 MDD (93/42/EEC) Stage : 6060 Medical electrical equipment - Part 2-58: Particular requirements for the basic safety and essential performance of
lens removal devices and vitrectomy devices for ophthalmic surgery NOTE: D139/C149: BT approved the modified Annex ZZ for EN 80601-2-58:2009 dor : 2011-10-01 doa : 2012-04-01 dop : 2012-10-01 dow : 2014-10-01
Technical committees Activities 279
CENELEC Inventory of Technical Activities
Under withdrawal procedure
EN 61223-3-4:2000 (PR=12943) IEC 61223-3-4:2000 CLC/TC 62 IEC/SC 62B Stage : 9500 2007-09-01 Evaluation and routine testing in medical imaging departments - Part 3-4: Acceptance tests - Imaging performance of
dental X-ray equipment NOTE: D129/C071: Withdrawal procedure to be launched as soon as IEC 61223-3-4:2000 is withdrawn
Ratified
EN 60601-2-3:201X (PR=23125) IEC 60601-2-3:2012 CLC/TC 62 IEC/SC 62D MDD (93/42/EEC) // Stage : 5099 2012-06-22 Medical electrical equipment - Part 2-3: Particular requirements for the basic safety and essential performance of
short-wave therapy equipment NOTE: 2012-05-08 - Publication editing allocated to [email protected] * Will supersede EN 60601-2-3:1993
+ A1:1998 Mandated: M/295
EN 60601-2-16:201X (PR=23248) IEC 60601-2-16:2012 CLC/TC 62 IEC/SC 62D MDD (93/42/EEC) // Stage : 5099 2012-05-10 Medical electrical equipment - Part 2-16: Particular requirements for basic safety and essential performance of
haemodialysis, haemodiafiltration and haemofiltration equipment NOTE: 2012-03-14: Publication editing allocated to [email protected] Mandated: M/295
EN 60601-2-27:201X (PR=22194) IEC 60601-2-27:2011 CLC/TC 62 IEC/SC 62D MDD (93/42/EEC) // Stage : 5099 2011-12-09 Medical electrical equipment - Part 2-27: Particular requirements for the basic safety and essential performance of
electrocardiographic monitoring equipment NOTE: Publication editing allocated to [email protected] * Will supersede EN 60601-2-27:2006 * To
be read in conjunction with EN 60601-1:2006 Mandated: M/295
EN 60601-2-34:201X (PR=22292) IEC 60601-2-34:2011 CLC/TC 62 IEC/SC 62D MDD (93/42/EEC) // Stage : 5099 2011-12-09 Medical electrical equipment - Part 2-34: Particular requirements for the basic safety and essential performance of
invasive blood pressure monitoring equipment NOTE: Publication editing allocated to [email protected] * Will supersede EN 60601-2-34:2000 * To
be used in conjunction with EN 60601-1:2006 Mandated: M/295
EN 60601-2-47:201X (PR=22367) IEC 60601-2-47:2012 CLC/TC 62 IEC/SC 62D MDD (93/42/EEC) // Stage : 5099 2012-04-19 Medical electrical equipment - Part 2-47: Particular requirements for the basic safety and essential performance of
ambulatory electrocardiographic systems NOTE: Will supersede EN 60601-2-47:2001 Mandated: M/295
Technical committees Activities 280
CENELEC Inventory of Technical Activities
EN 80601-2-60:201X (PR=23009) IEC 80601-2-60:2012 CLC/TC 62 IEC/SC 62D MDD (93/42/EEC) // Stage : 5099 2012-04-23 Medical electrical equipment - Part 2-60: Particular requirements for basic safety and essential performance of dental
equipment NOTE: IEC 80601-2-60 prepared by ISO/TC 106 and IEC/SC 62D/JWG 11 with IEC lead
Vote launched
EN 60601-1:2006/FprA1:2012 (PR=23401) IEC 60601-1:2005/A1:201X (62A/805/FDIS) CLC/TC 62 IEC/SC 62A AIMD (90/385/EEC) MDD (93/42/EEC) // Stage : 5020 2012-06-29 Medical electrical equipment - Part 1: General requirements for basic safety and essential performance NOTE: 62A/780/RVC + 62A/780A/RVC established on 2012-01-06: FDIS decided Mandated: M/295; M/432
FprEN 60601-1-2:2012 (PR=24111) IEC 60601-1-2:201X (62A/801A/CDV) CLC/TC 62 IEC/SC 62A MDD (93/42/EEC) // Stage : 5020 2012-08-17 Medical electrical equipment - Part 1-2: General requirements for basic safety and essential performance - Collateral
standard: Electromagnetic disturbances - Requirements and tests NOTE: Will supersede EN 60601-1-2:2007 + corr. Mar.2010 * 62A/801A/CDV cancels and replaces 62A/801/CDV
circulated on 2012-03-16. The voting deadline remains unchanged
EN 60601-1-6:2010/FprA1:2012 (PR=24231) IEC 60601-1-6:2010/A1:201X (62A/814/CDV) CLC/TC 62 IEC/SC 62A AIMD (90/385/EEC) MDD (93/42/EEC) // Stage : 5020 2012-10-26 Medical electrical equipment - Part 1-6: General requirements for basic safety and essential performance - Collateral
standard: Usability
FprEN 60601-1-12:2012 (PR=23973) IEC 60601-1-12:201X (62A/796/CDV) CLC/TC 62 IEC/SC 62A MDD (93/42/EEC) // Stage : 5020 2012-06-15 Medical electrical equipment - Part 1-12: General requirements for basic safety and essential performance - Collateral standard: Requirements for medical electrical equipment and medical electrical systems intended for use in the emergency medical services environment NOTE: Dual logo IEC/ISO but under IEC lead
EN 60601-2-1:201X (PR=21823) IEC 60601-2-1:2009 CLC/TC 62 IEC/SC 62C MDD (93/42/EEC) // Stage : 5091 - Medical electrical equipment - Part 2-1: Particular requirements for the basic safety and essential performance of
electron accelerators in the range 1 MeV to 50 MeV NOTE: Will supersede EN 60601-2-1:1998 + A1:2002 * Amendment being prepared in IEC/SC 62C (PR=23825) *
D139/C150: CLC/TC 62 to prepare modified text for Annex ZZ without delay Mandated: M/295
EN 60601-2-1:201X/FprA1:2011 (PR=23825) IEC 60601-2-1:2009/A1:201X (62C/532/CDV) CLC/TC 62 IEC/SC 62C MDD (93/42/EEC) // Stage : 5060 2012-04-09 Medical electrical equipment - Part 2-1: Particular requirements for the basic safety and essential performance of
electron accelerators in the range 1 MeV to 50 MeV NOTE: Awaiting outcome of RVC before further processing
Technical committees Activities 281
CENELEC Inventory of Technical Activities
EN 60601-2-5:201X (PR=21936) IEC 60601-2-5:2009 CLC/TC 62 IEC/SC 62D MDD (93/42/EEC) // Stage : 5091 - Medical electrical equipment - Part 2-5: Particular requirements for the basic safety and essential performance of
ultrasonic physiotherapy equipment NOTE: Will supersede EN 60601-2-5:2000 * 62D/766/RVC established on 2009-03-06: To be published without FDIS stage * TC advice: A proposal for a corrigendum has been issued as 62D/841/DC closing on 18th June 2010. Corrigendum delayed. See 62D/916/inf await corrigendum. Published document to be sent by CCMC to MDD consultant for assessment. Results to be passed to 62D MT 17 for meeting Sept 2011 to be drafted into corrigendum to allow listing under MDD Mandated: M/295
FprEN 60601-2-6:2012 (PR=23126) IEC 60601-2-6:2012 CLC/TC 62 IEC/SC 62D MDD (93/42/EEC) // Stage : 5060 2012-05-07 Medical electrical equipment - Part 2-6: Particular requirements for the basic safety and essential performance of
microwave therapy equipment NOTE: 2012-05-08 - Publication editing allocated to [email protected]
EN 60601-2-8:201X (PR=22435) IEC 60601-2-8:2010 CLC/TC 62 IEC/SC 62C MDD (93/42/EEC) // Stage : 5091 - Medical electrical equipment - Part 2-8: Particular requirements for the basic safety and essential performance of
therapeutic X-ray equipment operating in the range 10 kV to 1 MV NOTE: Will supersede EN 60601-2-8:1997 + A1:1997 Mandated: M/295
FprEN 60601-2-10:2012 (PR=23127) IEC 60601-2-10:201X (62D/1003/FDIS) CLC/TC 62 IEC/SC 62D MDD (93/42/EEC) // Stage : 5020 2012-06-08 Medical electrical equipment - Part 2-10: Particular requirements for the basic safety and essential performance of
nerve and muscle stimulators NOTE: Will supersede EN 60601-2-10:2000 + A1:2001
FprEN 60601-2-16:2008 (PR=20652) IEC 60601-2-16:2008 + corrigendum Oct. 2008 CLC/TC 62 IEC/SC 62D MDD (93/42/EEC) // Stage : 5091 2009-03-01 Medical electrical equipment - Part 2-16: Particular requirements for basic safety and essential performance of
haemodialysis, haemodiafiltration and haemofiltration equipment NOTE: Will supersede EN 60601-2-16:1998 * D133/C090: Ratification deferred until IEC has published a corrigendum to correct editorial errors and address the concerns raised by the MDD consultant (to allow EN to be listed in the OJEC under the MDD) * An amendment has been developed in IEC/SC 62D/MT 20 it is expected that it will be established as a project and submitted for vote as CDV.*2012-02-07: Publication editing allocated to [email protected] Mandated: M/295
EN 60601-2-18:201X (PR=21838) IEC 60601-2-18:2009 CLC/TC 62 IEC/SC 62D MDD (93/42/EEC) // Stage : 5091 - Medical electrical equipment - Part 2-18: Particular requirements for basic safety and essential performance of
endoscopic equipment NOTE: Will supersede EN 60601-2-18:1996 + A1:2000 * 62D/743/RVC established on 2009-01-09: To be published without FDIS * TC advice: Situation has not progressed due to a change of convenor to the IEC/SC 62D WG. A
solution, possibly an amendment for CDV, will be considered * 2011-07 TC advice: Amendment still under consideration Mandated: M/295
Technical committees Activities 282
CENELEC Inventory of Technical Activities
EN 60601-2-23:201X (PR=22290) IEC 60601-2-23:2011 CLC/TC 62 IEC/SC 62D MDD (93/42/EEC) // Stage : 5091 - Medical electrical equipment - Part 2-23: Particular requirements for basic safety and essential performance of
transcutaneous partial pressure monitoring equipment NOTE: Will supersede EN 60601-2-23:2000 * Negative assessment from MDD consultant Mandated: M/295
EN 60601-2-25:201X (PR=22291) IEC 60601-2-25:2011 CLC/TC 62 IEC/SC 62D MDD (93/42/EEC) // Stage : 5091 - Medical electrical equipment - Part 2-25: Particular requirements for basic safety and essential performance of
electrocardiographs NOTE: Will supersede EN 60601-2-25:1995 + A1:1999 + EN 60601-2-51:2003 * TC advice on VR on CDV: Negative assessment should be resolved for FDIS stage - IEC/TC 62 kept informed --> negative assessment on FDIS too Mandated: M/295
FprEN 60601-2-26:2012 (PR=22410) IEC 60601-2-26:201X (62D/990/FDIS) CLC/TC 62 IEC/SC 62D MDD (93/42/EEC) // Stage : 5060 2012-06-04 Medical electrical equipment - Part 2-26: Particular requirements for the basic safety and essential performance of
electroencephalographs NOTE: Will supersede EN 60601-2-26:2003 * TC advice on VR on CDV: Negative assessment should be resolved
for FDIS stage - IEC/TC 62 kept informed Mandated: M/295
EN 60601-2-41:2009/FprA1:2011 (PR=23618) IEC 60601-2-41:2009/A1:201X (62D/934/CDV) CLC/TC 62 IEC/SC 62D MDD (93/42/EEC) // Stage : 5060 2011-12-19 Medical electrical equipment - Part 2-41: Particular requirements for basic safety and essential performance of
surgical luminaires and luminaires for diagnosis NOTE: Awaiting outcome of RVC before further processing
EN 60601-2-44:2009/FprA1:2012 (PR=23378) IEC 60601-2-44:2009/A1:201X (62B/879/FDIS) CLC/TC 62 IEC/SC 62B MDD (93/42/EEC) // Stage : 5020 2012-07-20 Medical electrical equipment - Part 2-44: Particular requirements for the basic safety and essential performance of X-
ray equipment for computed tomography NOTE: 62B/872/RVC established on 2012-03-09: FDIS decided Mandated: M/295
EN 60601-2-49:201X (PR=22293) IEC 60601-2-49:2011 CLC/TC 62 IEC/SC 62D MDD (93/42/EEC) // Stage : 5091 - Medical electrical equipment - Part 2-49: Particular requirements for the basic safety and essential performance of
multifunction patient monitoring equipment NOTE: Will supersede EN 60601-2-49:2001 Mandated: M/295
FprEN 60601-2-62:2011 (PR=23954) IEC 60601-2-62:201X (62D/970/CDV) CLC/TC 62 IEC/SC 62D MDD (93/42/EEC) // Stage : 5060 2012-06-19 Medical electrical equipment - Part 2-62: Particular requirements for basic safety and essential performance of high
intensity therapeutic ultrasound (HITU) systems
Technical committees Activities 283
CENELEC Inventory of Technical Activities
FprEN 60601-2-63:2011 (PR=23427) IEC 60601-2-63:201X (62B/837/CDV) CLC/TC 62 IEC/SC 62B MDD (93/42/EEC) // Stage : 5060 2011-09-26 Medical electrical equipment - Part 2-63: Particular requirements for basic safety and essential performance of dental
extra-oral x-ray equipment NOTE: Awaiting outcome of RVC before further processing Mandated: M/295
FprEN 60601-2-65:2011 (PR=23428) IEC 60601-2-65:201X (62B/838/CDV) CLC/TC 62 IEC/SC 62B MDD (93/42/EEC) // Stage : 5060 2011-09-26 Medical electrical equipment - Part 2-65: Particular requirements for basic safety and essential performance of dental
intra-oral x-ray equipment NOTE: This FprEN is to be read in conjunction with EN 60601-1:2006 * Awaiting outcome of RVC before further
processing Mandated: M/295
FprEN 60627:2011 (PR=23735) IEC 60627:201X (62B/858/CDV) CLC/TC 62 IEC/SC 62B MDD (93/42/EEC) // Stage : 5060 2012-03-05 Diagnostic X-ray imaging equipment - Characteristics of general purpose and mammographic anti-scatter grids NOTE: Will supersede EN 60627:2001 * Awaiting outcome of RVC before further processing
FprEN 61331-1:2012 (PR=24173) IEC 61331-1:201X (62B/875/CDV) CLC/TC 62 IEC/SC 62B // Stage : 5020 2012-09-21 Protective devices against diagnostic medical X-radiation - Part 1: Determination of attenuation properties of
materials NOTE: Will supersede EN 61331-1:2002
FprEN 61331-2:2012 (PR=24174) IEC 61331-2:201X (62B/876/CDV) CLC/TC 62 IEC/SC 62B // Stage : 5020 2012-09-21 Protective devices against diagnostic medical X-radiation - Part 2: Translucent protective plates NOTE: Will supersede EN 61331-2:2002
FprEN 61331-3:2012 (PR=24175) IEC 61331-3:201X (62B/877/CDV) CLC/TC 62 IEC/SC 62B // Stage : 5020 2012-09-21 Protective devices against diagnostic medical X-radiation - Part 3: Protective clothing, eyewear and protective
patient shields NOTE: Will supersede EN 61331-3:1999
EN 62467-1:201X (PR=21537) IEC 62467-1:2009 CLC/TC 62 IEC/SC 62C MDD (93/42/EEC) // Stage : 5091 - Medical electrical equipment - Dosimetric instruments as used in brachytherapy - Part 1: Instruments based on well-
type ionization chambers NOTE: TC advice: MDD consultant still investigating qualification as medical device cf. MDD and, hence, link to
MDD and recommendation for listing is pending * Awaiting further advice from IEC/SC 62C Secretary
Technical committees Activities 284
CENELEC Inventory of Technical Activities
FprEN 62570:2009 (PR=22680) IEC 62570:201X (62B/764/CDV) CLC/TC 62 IEC/SC 62B MDD (93/42/EEC) // Stage : 5060 2010-03-29 Magnetic resonance equipment for medical imaging - Instructions for marking items within the controlled access
area NOTE: Awaiting outcome of RVC before further processing Mandated: M/295
EN 80601-2-30:2010/FprA1:2012 (PR=24008) IEC 80601-2-30:2009/A1:201X (62D/979/CDV) CLC/TC 62 IEC/SC 62D MDD (93/42/EEC) // Stage : 5020 2012-06-29 Medical electrical equipment - Part 2-30: Particular requirements for the basic safety and essential performance of
automated non-invasive sphygmomanometers
Vote decided
EN 60601-1-8:2007/FprA1:201X (PR=23611) IEC 60601-1-8:2006/A1:201X (62A/761/CDV) CLC/TC 62 IEC/SC 62A MDD (93/42/EEC) // Stage : 3090 2012-06-30 Draft for vote due at CCMC by: - Medical electrical equipment - Part 1-8: General requirements for basic safety and essential performance - Collateral Standard: General requirements, tests and guidance for alarm systems in medical electrical equipment and medical electrical systems NOTE: 62A/791/RVC + 62A/791A/RVC established on 2012-03-16: FDIS decided
FprEN 60601-2-11:201X (PR=22963) IEC 60601-2-11:201X (62C/494/CDV) CLC/TC 62 IEC/SC 62C MDD (93/42/EEC) // Stage : 3090 2011-10-15 Draft for vote due at CCMC by: - Medical electrical equipment - Part 2-11: Particular requirements for basic safety and essential performance of
gamma beam therapy equipment Mandated: M/295
FprEN 60601-2-17:201X (PR=22894) IEC 60601-2-17:201X (62C/492/CDV) CLC/TC 62 IEC/SC 62C MDD (93/42/EEC) // Stage : 3090 2011-10-15 Draft for vote due at CCMC by: - Medical electrical equipment - Part 2-17: Particular requirements for basic safety and essential performance of
automatically-controlled brachytherapy afterloading equipment NOTE: Will supersede EN 60601-2-17:2004 * 62C/520/RVC established on 2011-07-15: FDIS decided Mandated: M/295
FprEN 60601-2-24:201X (PR=22587) IEC 60601-2-24:201X (62D/786/CDV) CLC/TC 62 IEC/SC 62D MDD (93/42/EEC) // Stage : 3090 2012-05-31 Draft for vote due at CCMC by: - Medical electrical equipment - Part 2-24: Particular requirements for basic safety and essential performance of
infusion pumps and controllers NOTE: Will supersede EN 60601-2-24:1998 * 62D/834/RVC + 62D/834A/RVC established on 2012-03-16: FDIS decided * TC advice on VR on CDV: Negative assessment should be resolved for FDIS stage - IEC/TC 62 kept informed Mandated: M/295
Technical committees Activities 285
CENELEC Inventory of Technical Activities
FprEN 61674:201X (PR=23242) IEC 61674:201X (62C/507/CDV) CLC/TC 62 IEC/SC 62C // Stage : 3090 2011-09-30 Draft for vote due at CCMC by: - Medical electrical equipment - Dosimeters with ionization chambers and/or semi-conductor detectors as used in X-
ray diagnostic imaging NOTE: Will supersede EN 61674:1997 + A1:2002 * 62C/519/RVC established on 2011-05-27: FDIS decided
Technical committees Activities 286
CENELEC Inventory of Technical Activities
TC 64
Electrical installations and protection against electric shock
To prepare harmonized standards (HDs and ENs) - concerning protection against electric shock arising from equipment, from installations and from systems without limit of voltage; - for the design, erection and verification of all kinds of low-voltage electrical installations, except those installations covered by the following CENELEC Technical Committees : TC 9X, TC 44X; - in co-ordination with TC 99X, concerning requirements additional to those of TC 99X for the design, erection and verification of electrical installations of buildings above 1 kV up to 35 kV.
The objects of the standards shall be - to lay down requirements for the safety aspects of the design, erection and verification of electrical installations and co-ordination of electrical equipment; - to lay down safety requirements for protection against electric shock; - to lay down safety requirements for protection against other hazards arising from the use of electricity and - to facilitate European exchanges that may be hampered by differences in national regulations.
The standards will not cover individual items of electrical equipment other than their selection and erection in an installation.
Officers Meetings Secretary: Dipl.-Ing. Reinhard PELTA ( DE) Oslo 2009-03-31 / 04-02 Chairman: Mr Etienne TISON ( FR) Brussels 2010-04-19 / 04-21
Berlin 2011-04-04 / 04-06 Frankfurt 2012-04-23 / 04-25
Published (last 12 months)
HD 60364-4-442:2012 (PR=21347) IEC 60364-4-44:2007 (CLAUSE 442) (Modified) CLC/TC 64 IEC/TC 64 Stage : 6060 Low-voltage electrical installations - Part 4-442: Protection for safety - Protection of low-voltage installations against
temporary overvoltages due to earth faults in the high-voltage system and due to faults in the low voltage system NOTE: Publication editing allocated to [email protected] * Formal vote on Clause 442 only (Clauses 443 &
445 remaining unchanged - Clause 444 being handled by pr=16993) dor : 2011-12-07 doa : 2012-06-07 dop : 2012-12-07 dow: 2014-12-07
HD 60364-4-444:2010/AC:2012 (PR=23970) CLC/TC 64 Stage : 6060 Low-voltage electrical installations - Part 4-444: Protection for safety - Protection against voltage disturbances and
electromagnetic disturbances dor : - doa : - dop : - dow : -
HD 60364-5-54:2011 (PR=22820) IEC 60364-5-54:2011 CLC/TC 64 IEC/TC 64 // Stage : 6060 Low-voltage electrical installations - Part 5-54: Selection and erection of electrical equipment - Earthing
arrangements and protective conductors NOTE: Supersedes HD 60364-5-54:2007 * Incorporates FprHD 60364-5-54:2010/FprAA:2011 (pr=23335) with the
implementation dates of FprAA dor : 2011-04-27 doa : 2011-10-27 dop : 2012-04-27 dow : 2014-04-27
Technical committees Activities 287
CENELEC Inventory of Technical Activities
HD 60364-5-56:2010/A1:2011 (PR=23186) CLC/TC 64 Stage : 6060 Low-voltage electrical installations - Part 5-56: Selection and erection of electrical equipment - Safety services NOTE: Publication editing allocated to [email protected] * UAP editing allocated to
[email protected] dor : 2011-12-12 doa : 2012-06-12 dop : 2012-12-12 dow: 2014-12-12
HD 60364-5-559:2012 (PR=23208) IEC 60364-5-55:2011 (Modified) CLC/TC 64 IEC/TC 64 // Stage : 6060 Low-voltage electrical installations - Part 5-559: Selection and erection of electrical equipment - Luminaires and
lighting installations NOTE: Supersedes HD 60364-5-559:2005 + corr. Oct.2007 * HD based only on Clause 559 of IEC 60364-5- 55:2001/A3 which became new edition at FDIS * Incorporates FprAA (PR=23624) covering CMs * 2012-03-14: Publication editing allocated to [email protected] dor : 2012-03-14 doa : 2012-09-14 dop : 2013-03-14 dow: 2015-03-14
HD 60364-7-701:2007/AC:2011 (PR=23794) CLC/TC 64 Stage : 6060 Low-voltage electrical installations - Part 7-701: Requirements for special installations or locations - Locations
containing a bath or shower NOTE: D139/C136: to delete the Austrian A deviation in HD 60364-7-701:2007 (PR=16051), Subclause 701.55 dor : - doa : - dop : - dow : -
HD 60364-7-701:2007/A11:2011 (PR=23672) CLC/TC 64 Stage : 6060 Low-voltage electrical installations - Part 7-701: Requirements for special installations or locations - Locations
containing a bath or shower NOTE: 2011-10-18: Publication editing allocated to [email protected] dor : 2011-11-01 doa : 2012-02-01 dop : 2012-05-01 dow : 2012-08-01
HD 60364-7-709:2009/A1:2012 (PR=23207) IEC 60364-7-709:2007/A1:2012 CLC/TC 64 IEC/TC 64 // Stage : 6060 Low-voltage electrical installations - Part 7-709: Requirements for special installations or locations - Marinas and
similar locations NOTE: 2012-02-24: Publication editing allocated to [email protected] dor : 2012-03-21 doa : 2012-06-21 dop : 2012-12-21 dow: 2015-03-21
HD 60364-7-710:2012 (PR=2282) IEC 60364-7-710:2002 (Modified) CLC/TC 64 IEC/TC 64 Stage : 6060 Low-voltage electrical installations - Part 7-710: Requirements for special installations or locations - Medical
locations NOTE: 2011-12-05 - Publications editing allocated to [email protected] * Formal Vote editing
allocated to [email protected] dor : 2012-01-09 doa : 2012-07-09 dop : 2013-01-09 dow: 2015-01-09
HD 60364-7-714:2012 (PR=23155) IEC 60364-7-714:2011 CLC/TC 64 IEC/TC 64 // Stage : 6060 Low-voltage electrical installations - Part 7-714: Requirements for special installations or locations - External
lighting installations NOTE: Supersedes HD 384.7.714 S1:2000*2012-03-14: Publication editing allocated to
[email protected] dor : 2012-03-14 doa : 2012-06-14 dop : 2012-12-14 dow: 2015-03-14
Technical committees Activities 288
CENELEC Inventory of Technical Activities
HD 60364-7-715:2012 (PR=23156) IEC 60364-7-715:2011 (Modified) CLC/TC 64 IEC/TC 64 // Stage : 6060 Low-voltage electrical installations - Part 7-715: Requirements for special installations or locations - Extra-low-
voltage lighting installations NOTE: 2012-01-20 - Publication editing allocated to cpalagi@cencenelec. * Supersedes HD 60364-7-715:2005 *
Incorporates FprAA (PR=23623) covering CMs dor : 2012-01-18 doa : 2012-07-18 dop : 2013-01-18 dow: 2015-01-18
HD 60364-7-722:2012 (PR=23274) CLC/TC 64 Stage : 6060 Low voltage electrical installations - Part 7-722: Requirements for special installations or locations - Supply of
electric vehicle NOTE: 2011-12-20 - Publication editing allocated to [email protected] * D138/C044: NWI approved
with target date for vote: 2013-01-31 * Urgent project linked to future mandate on charging of electric vehicles dor : 2012-01-23 doa : 2012-07-23 dop : 2013-01-23 dow: 2015-01-23
Vote launched
FprHD 60364-5-557:2011 (PR=23606) IEC 60364-5-55:2001/A3:201X (fragment 2) (64/1795/CDV (CLAUSE 557)) CLC/TC 64 IEC/TC 64 // Stage : 5060 2011-12-07 Low-voltage electrical installations - Part 5-557: Selection and erection of electrical equipment - Auxiliary circuits NOTE: HD based only on Clause 557 of IEC 60364-5-55:2001/A3:200X * Awaiting outcome of RVC before further
processing
FprHD 60364-7-718:2010 (PR=22868) IEC 60364-7-718:2011 CLC/TC 64 IEC/TC 64 // Stage : 5091 - Low-voltage electrical installations - Part 7-718: Requirements for special installations or locations - Communal
facilities and workplaces NOTE: 2011-03-25 - Publication editing allocated to [email protected] * 2011-04-11 - Ratification on hold
until voting results of the amendment (PR=23746) are available
Enquiry launched
prHD 50573-5-57:2011 (PR=22526) CLC/TC 64 Stage : 4060 2012-05-07 Draft for vote due at CCMC by: 2013-12-15 Electrical devices coordination NOTE: April 2010 decision: Project to be developed as future HD 60364-5-57
HD 60364-5-51:2009/prAA:2012 (PR=23185) CLC/TC 64 Stage : 4020 2012-07-13 Draft for vote due at CCMC by: 2014-05-08 Electrical installations of buildings - Part 5-51: Selection and erection of electrical equipment - Common rules NOTE: 2012-01-25 - Enquiry processing allocated to [email protected] * D138/017: Voting results to be
dropped - CLC/TC 64 to revise the text for subsequent shortened enquiry of 3 months prior to formal vote
Technical committees Activities 289
CENELEC Inventory of Technical Activities
FprHD 60364-7-718:2010/prAA:2012 (PR=23746) CLC/TC 64 Stage : 4020 2012-09-14 Draft for vote due at CCMC by: 2013-09-15 Low-voltage electrical installations - Part 7-718: Requirements for special installations or locations - Communal
facilities and workplaces NOTE: 2012-01-31 - Enquiry processing allocated to [email protected] Common Modifications to PR = 22868 under parallel procedure * Both prHD and prAA to be ratified and merged into 1 document when Amendment voting results are available) * Track: ENQ + FV
prHD 60364-7-719:2011 (PR=21733) CLC/TC 64 Stage : 4060 2012-03-05 Draft for vote due at CCMC by: 2013-10-31 Low-voltage installations - Part 7-719: Requirements for special installations or locations - Lighting installations for advertising signs with a rated output voltage not exceeding 1 000 V, which are illuminated by hot-cathode-
fluorescent-lamps, luminous-discharge tubes (neon-tubes), inductive discharge lamps, light emitting diodes (LED) and/or LED modules NOTE: 2nd Enquiry editing allocated to [email protected] * April 2011 decision: Project to be split in 2
parts, " Installation" part being handled by TC 64 and "Product" part being offered to TC 34Z.
Enquiry decided
prHD 60364-5-552:201X (PR=23766) IEC 60364-5-55:2001 (Modified) CLC/TC 64 IEC/TC 64 Stage : 3099 - Draft for vote due at CCMC by: 2014-05-15 Low-voltage electrical installations - Part 5-55: Selection and erection of electrical equipment - Other electrical
equipment - Clause 552: Low-voltage generating sets - stand-alone NOTE: D140/020: NWI approved * ENQ+FV track
New work item approved
HD 60364-7-705:2007/AC:201X (PR=24246) CLC/TC 64 Stage : 1099 - Draft for vote due at CCMC by: - Low-voltage electrical installations - Part 7-705: Requirements for special installations or locations - Agricultural
and horticultural premises
Work stopped (last 12 months)
FprHD 60364-5-559:2011/FprAA:2011 (PR=23624) CLC/TC 64 Stage : 5098 - Low-voltage electrical installations - Part 5-559: Selection and erection of electrical equipment - Luminaires and
lighting installations NOTE: FprAA covering common modifications merged with FprHD 60364-5-559:201X (pr=23208)
FprHD 60364-7-715:2011/FprAA:2011 (PR=23623) CLC/TC 64 Stage : 5098 - Low-voltage electrical installations - Part 7-715: Requirements for special installations or locations - Extra-low-
voltage lighting installations NOTE: This FprAA covering common modifications towards 64/1807/FDIS merged (pr=23156)
Technical committees Activities 290
CENELEC Inventory of Technical Activities
TC 65X
Industrial-process measurement, control and automation
To contribute, support and coordinate the preparation of international standards for systems and elements used for industrial process measurement, control and automation at CENELEC level. To coordinate standardisation activities which affect integration of components and functions into such systems including safety and security aspects. This CENELEC work of standardisation is to be carried out for equipment and systems and closely coordinated with IEC TC65 and its subcommittees with the objective of avoiding any duplication of work while honouring standing agreements between CENELEC and IEC
Officers Meetings Secretary: Dr Marcus ADAMS ( DE) Frankfurt 2009-05-26 Chairman: Mr Regnar SCHULTZ ( DK) Brussels 2010-03-09
Milano 2011-03-09 Zürich 2012-02-23
Published (last 12 months)
EN 60534-8-2:2011 (PR=22412) IEC 60534-8-2:2011 CLC/TC 65X IEC/SC 65B // Stage : 6060 Industrial-process control valves - Part 8-2: Noise considerations - Laboratory measurement of noise generated by
hydrodynamic flow through control valves NOTE: 2011-10-18: Publication editing allocated to [email protected] * Supersedes EN 60534-8-2:1993 dor : 2011-11-16 doa : 2012-02-16 dop : 2012-08-16 dow: 2014-11-16
EN 61158-3-12:2012 (PR=22479) IEC 61158-3-12:2010 CLC/TC 65X IEC/SC 65C // Stage : 6060 Industrial communication networks - Fieldbus specifications - Part 3-12: Data-link layer service definition - Type 12
elements NOTE: Project launched as FprEN 61158-300 based on 65C/604/FDIS and to be ratified as EN 61158-3-12 - Initial
project split into 5 subparts i.e. EN 61158-3-12, 14, 19, 21 and 22 * Supersedes EN 61158-3-12:2008 dor : 2012-03-28 doa : 2012-06-28 dop : 2012-12-28 dow : 2015-03-28
EN 61158-3-14:2012 (PR=24075) IEC 61158-3-14:2010 CLC/TC 65X IEC/SC 65C Stage : 6060 Industrial communication networks - Fieldbus specifications - Part 3-14: Data-link layer service definition - Type 14
elements NOTE: 2012-03-22 - Publication editing allocated to [email protected] * Project handled under parallel procedures as FprEN 61158-300 and split into 5 parts to be published as EN 61158-3-12, 14, 19, 21 and 22. Supersedes EN 61158-3-14:2008 dor : 2012-03-28 doa : 2012-06-28 dop : 2012-12-28 dow : 2015-03-28
Technical committees Activities 291
CENELEC Inventory of Technical Activities
EN 61158-3-19:2012 (PR=24076) IEC 61158-3-19:2010 CLC/TC 65X IEC/SC 65C Stage : 6060 Industrial communication networks - Fieldbus specifications - Part 3-19: Data-link layer service definition - Type 19
elements NOTE: 2012-03-22 - Publication editing allocated to [email protected] * Project handled under parallel procedures as FprEN 61158-300 and split into 5 parts to be published as EN 61158-3-12, 14, 19, 21 and 22. Supersedes EN 61158-3-19:2008 dor : 2012-03-28 doa : 2012-06-28 dop : 2012-12-28 dow : 2015-03-28
EN 61158-3-21:2012 (PR=24077) IEC 61158-3-21:2010 CLC/TC 65X IEC/SC 65C Stage : 6060 Industrial communication networks - Fieldbus specifications - Part 3-21: Data-link layer service definition - Type 21
elements NOTE: 2012-03-22 - Publication editing allocated to [email protected] * Project handled under parallel
procedures as FprEN 61158-300 and split into 5 parts to be published as EN 61158-3-12, 14, 19, 21 and 22. dor : 2012-03-28 doa : 2012-06-28 dop : 2012-12-28 dow : 2015-03-28
EN 61158-3-22:2012 (PR=24078) IEC 61158-3-22:2010 CLC/TC 65X IEC/SC 65C Stage : 6060 Industrial communication networks - Fieldbus specifications - Part 3-22: Data-link layer service definition - Type 22
elements NOTE: 2012-03-22 - Publication editing allocated to [email protected] * Project handled under parallel
procedures as FprEN 61158-300 and split into 5 parts to be published as EN 61158-3-12, 14, 19, 21 and 22. dor : 2012-03-28 doa : 2012-06-28 dop : 2012-12-28 dow : 2015-03-28
EN 61158-4-2:2012 (PR=22480) IEC 61158-4-2:2010 CLC/TC 65X IEC/SC 65C // Stage : 6060 Industrial communication networks - Fieldbus specifications - Part 4-2: Data-link layer protocol specification - Type
2 elements NOTE: Project launched as FprEN 61158-400 based on 65C/605/FDIS and to be ratified as EN 61158-4-2 - Initial
project split into 9 subparts i.e. EN 61158-4-2, 3, 11, 12, 14, 18, 19, 21 and 22 * Supersedes EN 61158-4-2:2008 dor : 2012-03-28 doa : 2012-06-28 dop : 2012-12-28 dow : 2015-03-28
EN 61158-4-3:2012 (PR=24079) IEC 61158-4-3:2010 CLC/TC 65X IEC/SC 65C Stage : 6060 Industrial communication networks - Fieldbus specifications - Part 4-3: Data-link layer protocol specification - Type
3 elements NOTE: 2012-03-22 - Publication editing allocated to [email protected] * Project handled under parallel procedures as FprEN 61158-400 and split into 9 subparts to be published as EN 61158-4-2, 3, 11, 12, 14, 18, 19, 21 and 22 * Supersedes EN 61158-4-3:2008 dor : 2012-03-28 doa : 2012-06-28 dop : 2012-12-28 dow : 2015-03-28
EN 61158-4-11:2012 (PR=24080) IEC 61158-4-11:2010 CLC/TC 65X IEC/SC 65C Stage : 6060 Industrial communication networks - Fieldbus specifications - Part 4-11: Data-link layer protocol specification -
Type 11 elements NOTE: 2012-03-22 - Publication editing allocated to [email protected] * Project handled under parallel procedures as FprEN 61158-400 and split into 9 subparts to be published as EN 61158-4-2, 3, 11, 12, 14, 18, 19, 21 and 22 * Supersedes EN 61158-4-11:2008 dor : 2012-03-28 doa : 2012-06-28 dop : 2012-12-28 dow : 2015-03-28
Technical committees Activities 292
CENELEC Inventory of Technical Activities
EN 61158-4-12:2012 (PR=24081) IEC 61158-4-12:2010 CLC/TC 65X IEC/SC 65C Stage : 6060 Industrial communication networks - Fieldbus specifications - Part 4-12: Data-link layer protocol specification -
Type 12 elements NOTE: 2012-03-22 - Publication editing allocated to [email protected] * Project handled under parallel procedures as FprEN 61158-400 and split into 9 subparts to be published as EN 61158-4-2, 3, 11, 12, 14, 18, 19, 21 and 22 * Supersedes EN 61158-4-12:2008 dor : 2012-03-28 doa : 2012-06-28 dop : 2012-12-28 dow : 2015-03-28
EN 61158-4-14:2012 (PR=24082) IEC 61158-4-14:2010 CLC/TC 65X IEC/SC 65C Stage : 6060 Industrial communication networks - Fieldbus specifications - Part 4-14: Data-link layer protocol specification -
Type 14 elements NOTE: 2012-03-22 - Publication editing allocated to [email protected] * Project handled under parallel procedures as FprEN 61158-400 and split into 9 subparts to be published as EN 61158-4-2, 3, 11, 12, 14, 18, 19, 21 and 22 * Supersedes EN 61158-4-14:2008 dor : 2012-03-28 doa : 2012-06-28 dop : 2012-12-28 dow : 2015-03-28
EN 61158-4-18:2012 (PR=24083) IEC 61158-4-18:2010 CLC/TC 65X IEC/SC 65C Stage : 6060 Industrial communication networks - Fieldbus specifications - Part 4-18: Data-link layer protocol specification -
Type 18 elements NOTE: 2012-03-22 - Publication editing allocated to [email protected] * Project handled under parallel procedures as FprEN 61158-400 and split into 9 subparts to be published as EN 61158-4-2, 3, 11, 12, 14, 18, 19, 21 and 22 * Supersedes EN 61158-4-18:2008 dor : 2012-03-28 doa : 2012-06-28 dop : 2012-12-28 dow : 2015-03-28
EN 61158-4-19:2012 (PR=24084) IEC 61158-4-19:2010 CLC/TC 65X IEC/SC 65C Stage : 6060 Industrial communication networks - Fieldbus specifications - Part 4-19: Data-link layer protocol specification -
Type 19 elements NOTE: 2012-03-22 - Publication editing allocated to [email protected] * Project handled under parallel procedures as FprEN 61158-400 and split into 9 subparts to be published as EN 61158-4-2, 3, 11, 12, 14, 18, 19, 21 and 22 * Supersedes EN 61158-4-19:2008 dor : 2012-03-28 doa : 2012-06-28 dop : 2012-12-28 dow : 2015-03-28
EN 61158-4-21:2012 (PR=24085) IEC 61158-4-21:2010 CLC/TC 65X IEC/SC 65C Stage : 6060 Industrial communication networks - Fieldbus specifications - Part 4-21: Data-link layer protocol specification -
Type 21 elements NOTE: 2012-03-22 - Publication editing allocated to [email protected] * Project handled under parallel procedures as FprEN 61158-400 and split into 9 subparts to be published as EN 61158-4-2, 3, 11, 12, 14, 18, 19, 21 and 22. dor : 2012-03-28 doa : 2012-06-28 dop : 2012-12-28 dow : 2015-03-28
Technical committees Activities 293
CENELEC Inventory of Technical Activities
EN 61158-4-22:2012 (PR=24086) IEC 61158-4-22:2010 CLC/TC 65X IEC/SC 65C Stage : 6060 Industrial communication networks - Fieldbus specifications - Part 4-22: Data-link layer protocol specification -
Type 22 elements NOTE: 2012-03-22 - Publication editing allocated to [email protected] * Project handled under parallel procedures as FprEN 61158-400 and split into 9 subparts to be published as EN 61158-4-2, 3, 11, 12, 14, 18, 19, 21 and 22. dor : 2012-03-28 doa : 2012-06-28 dop : 2012-12-28 dow : 2015-03-28
EN 61784-3-18:2011 (PR=22483) IEC 61784-3-18:2011 CLC/TC 65X IEC/SC 65C // Stage : 6060 Industrial communication networks - Profiles - Part 3-18: Functional safety fieldbuses - Additional specifications for
CPF 18 NOTE: 2011-05-12: Allocated to [email protected] dor : 2011-05-25 doa : 2011-08-25 dop : 2012-02-25 dow : 2014-05-25
EN 61784-5-2:2012 (PR=22420) IEC 61784-5-2:2010 CLC/TC 65X IEC/SC 65C // Stage : 6060 Industrial communication networks - Profiles - Part 5-2: Installation of fieldbuses - Installation profiles for CPF 2 NOTE: Vote launched on 65C/602/FDIS split into 9 subparts to be published separately at IEC and CLC levels *
Supersedes EN 61784-5-2:2008 dor : 2011-10-19 doa : 2012-01-19 dop : 2012-10-20 dow: 2014-10-19
EN 61784-5-3:2012 (PR=23849) IEC 61784-5-3:2010 CLC/TC 65X IEC/SC 65C Stage : 6060 Industrial communication networks - Profiles - Part 5-3: Installation of fieldbuses - Installation profiles for CPF 3 NOTE: Vote launched on 65C/602/FDIS split into 9 subparts to be published separately at IEC and CLC levels *
Supersedes EN 61784-5-3:2008 dor : 2011-10-19 doa : 2012-01-19 dop : 2012-10-20 dow: 2014-10-19
EN 61784-5-4:2012 (PR=23850) IEC 61784-5-4:2010 CLC/TC 65X IEC/SC 65C Stage : 6060 Industrial communication networks - Profiles - Part 5-4: Installation of fieldbuses - Installation profiles for CPF 4 NOTE: Vote launched on 65C/602/FDIS split into 9 subparts to be published separately at IEC and CLC levels dor : 2011-10-19 doa : 2012-01-19 dop : 2012-10-20 dow: 2014-10-19
EN 61784-5-6:2012 (PR=23851) IEC 61784-5-6:2010 CLC/TC 65X IEC/SC 65C Stage : 6060 Industrial communication networks - Profiles - Part 5-6: Installation of fieldbuses - Installation profiles for CPF 6 NOTE: Vote launched on 65C/602/FDIS split into 9 subparts to be published separately at IEC and CLC levels *
Supersedes EN 61784-5-6:2008 dor : 2011-10-19 doa : 2012-01-19 dop : 2012-10-20 dow: 2014-10-19
EN 61784-5-10:2012 (PR=23852) IEC 61784-5-10:2010 CLC/TC 65X IEC/SC 65C Stage : 6060 Industrial communication networks - Profiles - Part 5-10: Installation of fieldbuses - Installation profiles for CPF 10 NOTE: Vote launched on 65C/602/FDIS split into 9 subparts to be published separately at IEC and CLC levels *
Supersedes EN 61784-5-10:2008 dor : 2011-10-19 doa : 2012-01-19 dop : 2012-10-20 dow: 2014-10-19
Technical committees Activities 294
CENELEC Inventory of Technical Activities
EN 61784-5-11:2012 (PR=23853) IEC 61784-5-11:2010 CLC/TC 65X IEC/SC 65C Stage : 6060 Industrial communication networks - Profiles - Part 5-11: Installation of fieldbuses - Installation profiles for CPF 11 NOTE: Vote launched on 65C/602/FDIS split into 9 subparts to be published separately at IEC and CLC levels *
Supersedes EN 61784-5-11:2008 dor : 2011-10-19 doa : 2012-01-19 dop : 2012-10-20 dow: 2014-10-19
EN 61784-5-12:2012 (PR=23854) IEC 61784-5-12:2010 CLC/TC 65X IEC/SC 65C Stage : 6060 Industrial communication networks - Profiles - Part 5-12: Installation of fieldbuses - Installation profiles for CPF 12 NOTE: Vote launched on 65C/602/FDIS split into 9 subparts to be published separately at IEC and CLC levels dor : 2011-10-19 doa : 2012-01-19 dop : 2012-10-20 dow: 2014-10-19
EN 61784-5-14:2012 (PR=23855) IEC 61784-5-14:2010 CLC/TC 65X IEC/SC 65C Stage : 6060 Industrial communication networks - Profiles - Part 5-14: Installation of fieldbuses - Installation profiles for CPF 14 NOTE: Vote launched on 65C/602/FDIS split into 9 subparts to be published separately at IEC and CLC levels dor : 2011-10-19 doa : 2012-01-19 dop : 2012-10-20 dow: 2014-10-19
EN 61784-5-15:2012 (PR=23856) IEC 61784-5-15:2010 CLC/TC 65X IEC/SC 65C Stage : 6060 Industrial communication networks - Profiles - Part 5-15: Installation of fieldbuses - Installation profiles for CPF 15 NOTE: Vote launched on 65C/602/FDIS split into 9 subparts to be published separately at IEC and CLC levels dor : 2011-10-19 doa : 2012-01-19 dop : 2012-10-20 dow: 2014-10-19
EN 61987-10:2009/AC:2011 (PR=23747) CLC/TC 65X Stage : 6060 Industrial-process measurement and control - Data structures and elements in process equipment catalogues - Part 10: Lists of properties (LOPs) for industrial-process measurement and control for electronic data exchange - Fundamentals dor : - doa : - dop : - dow : -
EN 62264-5:2012 (PR=21963) IEC 62264-5:2011 CLC/TC 65X IEC/SC 65E // Stage : 6060 Enterprise system integration - Part 5: Business to manufacturing transactions NOTE: 2012-03-14 - Publication editing allocated to [email protected] * 65E/156/RVC established on
2010-01-08: To be published without FDIS stage dor : 2012-02-03 doa : 2012-05-03 dop : 2012-11-03 dow: 2015-02-03
EN 62337:2012 (PR=23066) IEC 62337:2012 CLC/TC 65X IEC/SC 65E // Stage : 6060 Commissioning of electrical, instrumentation and control systems in the process industry - Specific phases and
milestones NOTE: Supersedes EN 62337:2007*2012-03-09: Publication editing allocated to [email protected] dor : 2012-03-28 doa : 2012-06-28 dop : 2012-12-28 dow: 2015-03-28
Technical committees Activities 295
CENELEC Inventory of Technical Activities
EN 62381:2012 (PR=23065) IEC 62381:2012 CLC/TC 65X IEC/SC 65E // Stage : 6060 Automation systems in the process industry - Factory acceptance test (FAT), site acceptance test (SAT) and site
integration test (SIT) NOTE: Supersedes EN 62381:2007*2012-03-09: Publication editing allocated to [email protected] dor : 2012-03-28 doa : 2012-06-28 dop : 2012-12-28 dow: 2015-03-28
EN 62439-4:2010/A1:2012 (PR=23218) IEC 62439-4:2010/A1:2012 CLC/TC 65X IEC/SC 65C // Stage : 6060 Industrial communication networks - High availability automation networks - Part 4: Cross-network Redundancy
Protocol (CRP) NOTE: 2012-03-09: Publication editing allocated to [email protected] dor : 2012-03-30 doa : 2012-06-30 dop : 2012-12-30 dow: 2015-03-30
EN 62439-7:2012 (PR=23216) IEC 62439-7:2011 CLC/TC 65X IEC/SC 65C // Stage : 6060 Industrial communication networks - High availability automation networks - Part 7: Ring-based Redundancy
Protocol (RRP) NOTE: 2012-01-20 - Publication editing allocated to [email protected] dor : 2012-01-20 doa : 2012-04-20 dop : 2012-10-20 dow: 2015-01-20
EN 62541-4:2011 (PR=21959) IEC 62541-4:2011 CLC/TC 65X IEC/SC 65E // Stage : 6060 OPC unified architecture - Part 4: Services NOTE: 2011-10-28: Publication editing allocated to [email protected] dor : 2011-11-24 doa : 2012-02-24 dop : 2012-08-24 dow: 2014-11-24
EN 62541-5:2011 (PR=21960) IEC 62541-5:2011 CLC/TC 65X IEC/SC 65E // Stage : 6060 OPC unified architecture - Part 5: Information model NOTE: 2011-10-28: Publication editing allocated to [email protected] dor : 2011-11-22 doa : 2012-02-22 dop : 2012-08-22 dow: 2014-11-22
EN 62541-6:2011 (PR=21961) IEC 62541-6:2011 CLC/TC 65X IEC/SC 65E // Stage : 6060 OPC unified architecture - Part 6: Mappings NOTE: 2011-10-28: Publication editing allocated to [email protected] dor : 2011-11-22 doa : 2012-02-22 dop : 2012-08-22 dow: 2014-11-22
EN 62541-8:2011 (PR=21962) IEC 62541-8:2011 CLC/TC 65X IEC/SC 65E // Stage : 6060 OPC unified architecture - Part 8: Data Access NOTE: 2011-10-28: Publication editing allocated to [email protected] dor : 2011-11-22 doa : 2012-02-22 dop : 2012-08-22 dow: 2014-11-22
Technical committees Activities 296
CENELEC Inventory of Technical Activities
CLC/TR 62685:2011 (PR=23434) IEC/TR 62685:2010 CLC/TC 65X IEC/SC 65C Stage : 6060 Industrial communication networks - Profiles - Assessment guideline for safety devices using IEC 61784-3
functional safety communication profiles (FSCPs) NOTE: Endorsement of IEC/TR at European level dor : 2011-10-03 doa : - dop : - dow : -
Ratified
EN 61158-5-2:201X (PR=22481) IEC 61158-5-2:2010 CLC/TC 65X IEC/SC 65C // Stage : 5099 2012-05-28 Industrial communication networks - Fieldbus specifications - Part 5-2: Application layer service definition - Type 2
elements NOTE: Project launched as FprEN 61158-500 based on 65C/606/FDIS and to be ratified as EN 61158-5-2 - Initial project split into 11 subparts i.e. EN 61158-5-2, 3, 10, 12, 14, 15, 18, 19, 21 and 22 * Will supersede EN 61158-5- 2:2008
EN 61158-5-3:201X (PR=24087) IEC 61158-5-3:2010 CLC/TC 65X IEC/SC 65C Stage : 5099 2012-07-28 Industrial communication networks - Fieldbus specifications - Part 5-3: Application layer service definition - Type 3
elements NOTE: 2012-03-22 - Publication editing allocated to [email protected] * Project handled under parallel procedures as FprEN 61158-500 and split into 11 subparts i.e. EN 61158-5-2, 3, 10, 12, 14, 15, 18, 19, 21 and 22 * Will supersede EN 61158-5-3:2008
EN 61158-5-10:201X (PR=24088) IEC 61158-5-10:2010 CLC/TC 65X IEC/SC 65C Stage : 5099 2012-07-28 Industrial communication networks - Fieldbus specifications - Part 5-10: Application layer service definition - Type
10 elements NOTE: 2012-03-22 - Publication editing allocated to [email protected] * Project handled under parallel procedures as FprEN 61158-500 and split into 11 subparts i.e. EN 61158-5-2, 3, 10, 12, 14, 15, 18, 19, 21 and 22 * Will supersede EN 61158-5-10:2008
EN 61158-5-12:201X (PR=24089) IEC 61158-5-12:2010 CLC/TC 65X IEC/SC 65C Stage : 5099 2012-07-28 Industrial communication networks - Fieldbus specifications - Part 5-12: Application layer service definition - Type
12 elements NOTE: 2012-03-22 - Publication editing allocated to [email protected] * Project handled under parallel procedures as FprEN 61158-500 and split into 11 subparts i.e. EN 61158-5-2, 3, 10, 12, 14, 15, 18, 19, 21 and 22 * Will supersede EN 61158-5-12:2008
EN 61158-5-14:201X (PR=24090) IEC 61158-5-14:2010 CLC/TC 65X IEC/SC 65C Stage : 5099 2012-07-28 Industrial communication networks - Fieldbus specifications - Part 5-14: Application layer service definition - Type
14 elements NOTE: 2012-03-22 - Publication editing allocated to [email protected] * Project handled under parallel procedures as FprEN 61158-500 and split into 11 subparts i.e. EN 61158-5-2, 3, 10, 12, 14, 15, 18, 19, 21 and 22 * Will supersede EN 61158-5-14:2008
Technical committees Activities 297
CENELEC Inventory of Technical Activities
EN 61158-5-15:201X (PR=24091) IEC 61158-5-15:2010 CLC/TC 65X IEC/SC 65C Stage : 5099 2012-07-28 Industrial communication networks - Fieldbus specifications - Part 5-15: Application layer service definition - Type
15 elements NOTE: 2012-03-22 - Publication editing allocated to [email protected] * Project handled under parallel procedures as FprEN 61158-500 and split into 11 subparts i.e. EN 61158-5-2, 3, 10, 12, 14, 15, 18, 19, 21 and 22 * Will supersede EN 61158-5-15:2008
EN 61158-5-18:201X (PR=24092) IEC 61158-5-18:2010 CLC/TC 65X IEC/SC 65C Stage : 5099 2012-07-28 Industrial communication networks - Fieldbus specifications - Part 5-18: Application layer service definition - Type
18 elements NOTE: 2012-03-22 - Publication editing allocated to [email protected] * Project handled under parallel procedures as FprEN 61158-500 and split into 11 subparts i.e. EN 61158-5-2, 3, 10, 12, 14, 15, 18, 19, 21 and 22 * Will supersede EN 61158-5-18:2008
EN 61158-5-19:201X (PR=24093) IEC 61158-5-19:2010 CLC/TC 65X IEC/SC 65C Stage : 5099 2012-07-28 Industrial communication networks - Fieldbus specifications - Part 5-19: Application layer service definition - Type
19 elements NOTE: 2012-03-22 - Publication editing allocated to [email protected] * Project handled under parallel procedures as FprEN 61158-500 and split into 11 subparts i.e. EN 61158-5-2, 3, 10, 12, 14, 15, 18, 19, 21 and 22 * Will supersede EN 61158-5-19:2008
EN 61158-5-20:201X (PR=24094) IEC 61158-5-20:2010 CLC/TC 65X IEC/SC 65C Stage : 5099 2012-07-28 Industrial communication networks - Fieldbus specifications - Part 5-20: Application layer service definition - Type
20 elements NOTE: 2012-03-22 - Publication editing allocated to [email protected] * Project handled under parallel procedures as FprEN 61158-500 and split into 11 subparts i.e. EN 61158-5-2, 3, 10, 12, 14, 15, 18, 19, 21 and 22 * Will supersede EN 61158-5-20:2008
EN 61158-5-21:201X (PR=24095) IEC 61158-5-21:2010 CLC/TC 65X IEC/SC 65C Stage : 5099 2012-07-28 Industrial communication networks - Fieldbus specifications - Part 5-21: Application layer service definition - Type
21 elements NOTE: 2012-03-22 - Publication editing allocated to [email protected] * Project handled under parallel
procedures as FprEN 61158-500 and split into 11 subparts i.e. EN 61158-5-2, 3, 10, 12, 14, 15, 18, 19, 21 and 22
EN 61158-5-22:201X (PR=24096) IEC 61158-5-22:2010 CLC/TC 65X IEC/SC 65C Stage : 5099 2012-07-28 Industrial communication networks - Fieldbus specifications - Part 5-22: Application layer service definition - Type
22 elements NOTE: 2012-03-22 - Publication editing allocated to [email protected] * Project handled under parallel
procedures as FprEN 61158-500 and split into 11 subparts i.e. EN 61158-5-2, 3, 10, 12, 14, 15, 18, 19, 21 and 22
Technical committees Activities 298
CENELEC Inventory of Technical Activities
EN 61158-6-2:201X (PR=22482) IEC 61158-6-2:2010 CLC/TC 65X IEC/SC 65C // Stage : 5099 2012-05-28 Industrial communication networks - Fieldbus specifications - Part 600: Application layer protocol specification NOTE: 65C/607/FDIS includes 12 subparts (IEC 61158-6-2, 6-3, 6-9, 6-10, 6-12, 6-14, 6-15, 6-18, 6-19, 6-20, 6-21,
6-22) which will be published separately
EN 61158-6-3:201X (PR=24116) IEC 61158-6-3:2010 CLC/TC 65X IEC/SC 65C Stage : 5099 2012-07-28 Industrial communication networks - Fieldbus specifications - Part 6-3: Application layer protocol specification -
Type 3 elements NOTE: 2012-03-22 - Publication editing allocated to [email protected] * Project handled under parallel procedures as FprEN 61158-600 and split into 12 subparts i.e. EN 61158-6-2, 3, 9, 10, 12, 14, 15, 18, 19, 20, 21and 22 * Will supersede EN 61158-6-3:2008
EN 61158-6-9:201X (PR=24117) IEC 61158-6-9:2010 CLC/TC 65X IEC/SC 65C Stage : 5099 2012-07-28 Industrial communication networks - Fieldbus specifications - Part 6-9: Application layer protocol specification -
Type 9 elements NOTE: 2012-03-22 - Publication editing allocated to [email protected] * Project handled under parallel procedures as FprEN 61158-600 and split into 12 subparts i.e. EN 61158-6-2, 3, 9, 10, 12, 14, 15, 18, 19, 20, 21and 22 * Will supersede EN 61158-6-9:2008
EN 61158-6-10:201X (PR=24118) IEC 61158-6-10:2010 CLC/TC 65X IEC/SC 65C Stage : 5099 2012-07-28 Industrial communication networks - Fieldbus specifications - Part 6-10: Application layer protocol specification -
Type 10 elements NOTE: 2012-03-22 - Publication editing allocated to [email protected] * Project handled under parallel procedures as FprEN 61158-600 and split into 12 subparts i.e. EN 61158-6-2, 3, 9, 10, 12, 14, 15, 18, 19, 20, 21and 22 * Will supersede EN 61158-6-10:2008
EN 61158-6-12:201X (PR=24119) IEC 61158-6-12:2010 CLC/TC 65X IEC/SC 65C Stage : 5099 2012-07-28 Industrial communication networks - Fieldbus specifications - Part 6-12: Application layer protocol specification -
Type 12 elements NOTE: 2012-03-22 - Publication editing allocated to [email protected] * Project handled under parallel procedures as FprEN 61158-600 and split into 12 subparts i.e. EN 61158-6-2, 3, 9, 10, 12, 14, 15, 18, 19, 20, 21and 22 * Will supersede EN 61158-6-12:2008
EN 61158-6-14:201X (PR=24120) IEC 61158-6-14:2010 CLC/TC 65X IEC/SC 65C Stage : 5099 2012-07-28 Industrial communication networks - Fieldbus specifications - Part 6-14: Application layer protocol specification -
Type 14 elements NOTE: 2012-03-22 - Publication editing allocated to [email protected] * Project handled under parallel procedures as FprEN 61158-600 and split into 12 subparts i.e. EN 61158-6-2, 3, 9, 10, 12, 14, 15, 18, 19, 20, 21and 22 * Will supersede EN 61158-6-14:2008
Technical committees Activities 299
CENELEC Inventory of Technical Activities
EN 61158-6-15:201X (PR=24121) IEC 61158-6-15:2010 CLC/TC 65X IEC/SC 65C Stage : 5099 2012-07-28 Industrial communication networks - Fieldbus specifications - Part 6-15: Application layer protocol specification -
Type 15 elements NOTE: 2012-03-22 - Publication editing allocated to [email protected] * Project handled under parallel procedures as FprEN 61158-600 and split into 12 subparts i.e. EN 61158-6-2, 3, 9, 10, 12, 14, 15, 18, 19, 20, 21and 22 * Will supersede EN 61158-6-15:2008
EN 61158-6-18:201X (PR=24122) IEC 61158-6-18:2010 CLC/TC 65X IEC/SC 65C Stage : 5099 2012-07-28 Industrial communication networks - Fieldbus specifications - Part 6-18: Application layer protocol specification -
Type 18 elements NOTE: 2012-03-22 - Publication editing allocated to [email protected] * Project handled under parallel procedures as FprEN 61158-600 and split into 12 subparts i.e. EN 61158-6-2, 3, 9, 10, 12, 14, 15, 18, 19, 20, 21and 22 * Will supersede EN 61158-6-18:2008
EN 61158-6-19:201X (PR=24123) IEC 61158-6-19:2010 CLC/TC 65X IEC/SC 65C Stage : 5099 2012-07-28 Industrial communication networks - Fieldbus specifications - Part 6-19: Application layer protocol specification -
Type 19 elements NOTE: 2012-03-22 - Publication editing allocated to [email protected] * Project handled under parallel procedures as FprEN 61158-600 and split into 12 subparts i.e. EN 61158-6-2, 3, 9, 10, 12, 14, 15, 18, 19, 20, 21and 22 * Will supersede EN 61158-6-19:2008
EN 61158-6-20:201X (PR=24124) IEC 61158-6-20:2010 CLC/TC 65X IEC/SC 65C Stage : 5099 2012-07-28 Industrial communication networks - Fieldbus specifications - Part 6-20: Application layer protocol specification -
Type 20 elements NOTE: 2012-03-22 - Publication editing allocated to [email protected] * Project handled under parallel procedures as FprEN 61158-600 and split into 12 subparts i.e. EN 61158-6-2, 3, 9, 10, 12, 14, 15, 18, 19, 20, 21and 22 * Will supersede EN 61158-6-20:2008
EN 61158-6-21:201X (PR=24125) IEC 61158-6-21:2010 CLC/TC 65X IEC/SC 65C Stage : 5099 2012-07-28 Industrial communication networks - Fieldbus specifications - Part 6-21: Application layer protocol specification -
Type 21 elements NOTE: 2012-03-22 - Publication editing allocated to [email protected] * Project handled under parallel procedures as FprEN 61158-600 and split into 12 subparts i.e. EN 61158-6-2, 3, 9, 10, 12, 14, 15, 18, 19, 20, 21and 22
EN 61158-6-22:201X (PR=24126) IEC 61158-6-22:2010 CLC/TC 65X IEC/SC 65C Stage : 5099 2012-07-28 Industrial communication networks - Fieldbus specifications - Part 6-22: Application layer protocol specification -
Type 22 elements NOTE: 2012-03-22 - Publication editing allocated to [email protected] * Project handled under parallel procedures as FprEN 61158-600 and split into 12 subparts i.e. EN 61158-6-2, 3, 9, 10, 12, 14, 15, 18, 19, 20, 21and 22
Technical committees Activities 300
CENELEC Inventory of Technical Activities
Vote launched
FprEN 60584-1:2011 (PR=23893) IEC 60584-1:201X (65B/813/CDV) CLC/TC 65X IEC/SC 65B // Stage : 5060 2012-05-21 Thermocouples - Part 1: EMF specifications and tolerances NOTE: Will supersede EN 60584-1:1995 and EN 60584-2:1993 * Awaiting outcome of RVC before further
processing
FprEN 60770-3:2012 (PR=24148) IEC 60770-3:201X (65B/828/CDV) CLC/TC 65X IEC/SC 65B // Stage : 5020 2012-09-07 Transmitters for using in industrial-process control systems - Part 3: Methods for performance evaluation of
intelligent transmitters NOTE: Will supersede EN 60770-3:2006
FprEN 61131-9:2011 (PR=23930) IEC 61131-9:201X (65B/815/CDV) CLC/TC 65X IEC/SC 65B // Stage : 5060 2012-06-04 Programmable controllers - Part 9: Single-drop digital communication interface for small sensors and actuators
(SDCI)
FprEN 61158-1:2012 (PR=24206) IEC 61158-1:201X (65C/696/CDV) CLC/TC 65X IEC/SC 65C // Stage : 5020 2012-10-12 Industrial communication networks - Fieldbus specifications - Part 1: Overview and guidance for the IEC 61158 and
IEC 61784 series NOTE: Will supersede CLC/TR 61158-1:2010 * 65C/695/NP and 65C/696/CDV circulated simultaneously at IEC
level * Project to be cancelled if 65C/695/NP is not approved
FprEN 61158-2:2012 (PR=24207) IEC 61158-2:201X (65C/697/CDV) CLC/TC 65X IEC/SC 65C // Stage : 5020 2012-10-12 Industrial communication networks - Fieldbus specifications - Part 2: Physical layer specification and service
definition NOTE: Will supersede EN 61158-2:2010
FprEN 61158-3-X:2012 (PR=24218) IEC 61158-3-X:201X (65C/698/CDV) CLC/TC 65X IEC/SC 65C // Stage : 5020 2012-10-19 Industrial communication networks - Fieldbus specifications - Part 3-x: Data-link layer service definition - Type x
elements NOTE: 65C/698/CDV includes 11 subparts (IEC 61158-3-1, 3-2, 3-3, 3-4, 3-12, 3-13, 3-14, 3-19, 3-20, 3-22, 3-24)
which will be published separately
FprEN 61158-4-X:2012 (PR=24219) IEC 61158-4-X:201X (65C/699/CDV) CLC/TC 65X IEC/SC 65C // Stage : 5020 2012-10-19 Industrial communication networks - Fieldbus specifications - Part 4-x: Data-link layer protocol specification - Type
x elements NOTE: 65C/699/CDV includes 12 subparts (IEC 61158-4-1, 4-2, 4-3, 4-4, 4-11, 4-12, 4-13, 4-14, 4-19, 4-20, 4-22,
4-24) which will be published separately
Technical committees Activities 301
CENELEC Inventory of Technical Activities
FprEN 61158-5-X:2012 (PR=24220) IEC 61158-5-X:201X (65C/700/CDV) CLC/TC 65X IEC/SC 65C // Stage : 5020 2012-10-19 Industrial communication networks - Fieldbus specifications - Part 5-x: Application layer service definition - Type x
elements NOTE: 65C/700/CDV includes 14 subparts (IEC 61158-5-2, 5-3, 5-4, 5-5, 5-9, 5-10, 5-12, 5-13, 5-14, 5-19, 5-20, 5-
22, 5-23, 5-24) which will be published separately
FprEN 61158-6-X:2012 (PR=24221) IEC 61158-6-X:201X (65C/701/CDV) CLC/TC 65X IEC/SC 65C // Stage : 5020 2012-10-19 Industrial communication networks - Fieldbus specifications - Part 6-x: Application layer protocol specification -
Type x elements NOTE: 65C/701/CDV includes 14 subparts (IEC 61158-6-2, 6-3, 6-4, 6-5, 6-9, 6-10, 6-12, 6-13, 6-14, 6-19, 6-20, 6-
22, 6-23, 6-24) which will be published separately
FprEN 61207-7:2011 (PR=23895) IEC 61207-7:201X (65B/814/CDV) CLC/TC 65X IEC/SC 65B // Stage : 5060 2012-05-21 Expression of performance of gas analyzers - Part 7: Tunable semiconductor laser gas analyzers (utilizing tunable
semiconductor laser absorption spectroscopy) NOTE: Awaiting outcome of RVC before further processing
FprEN 61326-1:2012 (PR=23326) IEC 61326-1:201X (65A/628/FDIS) CLC/TC 65X IEC/SC 65A EMC (2004/108/EC) // Stage : 5020 2012-06-08 Electrical equipment for measurement, control and laboratory use - EMC requirements - Part 1: General
requirements NOTE: Will supersede EN 61326-1:2006 * 65A/607/RVC established on 2011-09-09: FDIS decided
FprEN 61326-2-3:2012 (PR=23329) IEC 61326-2-3:201X (65A/629/FDIS) CLC/TC 65X IEC/SC 65A EMC (2004/108/EC) // Stage : 5020 2012-06-08 Electrical equipment for measurement, control and laboratory use - EMC requirements - Part 2-3: Particular requirements - Test configurations, operational conditions and performance criteria for transducers with integrated or remote signal conditioning NOTE: Will supersede EN 61326-2-3:2006 * To be read in conjunction with EN 61326-1 (PR=23326) *
65A/610/RVC established on 2011-09-09: FDIS decided
FprEN 61326-2-4:2012 (PR=23330) IEC 61326-2-4:201X (65A/630/FDIS) CLC/TC 65X IEC/SC 65A EMC (2004/108/EC) // Stage : 5020 2012-06-08 Electrical equipment for measurement, control and laboratory use - EMC requirements - Part 2-4: Particular requirements - Test configurations, operational conditions and performance criteria for insulation monitoring devices according to IEC 61557-8 and for equipment for insulation fault location according to IEC 61557-9 NOTE: Will supersede EN 61326-2-4:2006 * To be read in conjunction with EN 61326-1 (PR=23326) *
65A/611/RVC established on 2011-09-09: FDIS decided
FprEN 61326-2-6:2012 (PR=23332) IEC 61326-2-6:201X (65A/631/FDIS) CLC/TC 65X IEC/SC 65A IVD (98/79/EC) // Stage : 5020 2012-06-08 Electrical equipment for measurement, control and laboratory use - EMC requirements - Part 2-6: Particular
requirements - In vitro diagnostic (IVD) medical equipment NOTE: Will supersede EN 61326-2-6:2006 * To be read in conjunction with EN 61326-1 (PR=23326) *
65A/613/RVC established on 2011-09-09: FDIS decided
Technical committees Activities 302
CENELEC Inventory of Technical Activities
FprEN 61784-1:2012 (PR=24204) IEC 61784-1:201X (65C/693/CDV) CLC/TC 65X IEC/SC 65C // Stage : 5020 2012-10-12 Industrial communication networks - Profiles - Part 1: Fieldbus profiles NOTE: Will supersede EN 61784-1:2010
FprEN 61784-2:2012 (PR=24205) IEC 61784-2:201X (65C/694/CDV) CLC/TC 65X IEC/SC 65C // Stage : 5020 2012-10-12 Industrial communication networks - Profiles - Part 2: Additional fieldbus profiles for real-time networks based on
ISO/IEC 8802-3 NOTE: Will supersede EN 61784-2:2010
FprEN 61784-5-X:2011 (PR=23941) IEC 61784-5-X:201X (65C/679/CDV) CLC/TC 65X IEC/SC 65C // Stage : 5060 2012-06-11 Industrial communication networks - Profiles - Part 5-X: Installation of fieldbuses - Installation profiles for CPF X NOTE: 65C/679/CDV consists of 12 subparts - Once approved these parts will be published separately at IEC and
CLC levels and will supersede the relevant IEC and EN publications
FprEN 61918:2011 (PR=23956) IEC 61918:201X (65C/678A/CDV) CLC/TC 65X IEC/SC 65C // Stage : 5060 2012-06-11 Industrial communication networks - Installation of communication networks in industrial premises NOTE: Will supersede EN 61918:2008 * FprAA (PR=24004) covering common modifications to this document is circulated simultaneously. If approved, both projects will be merged and published as one single document, with the implementation dates of FprAA.
FprEN 61918:2011/FprAA:2012 (PR=24004) CLC/TC 65X Stage : 5020 2012-06-29 Industrial communication networks - Installation of communication networks in industrial premises NOTE: UAP processing allocated to [email protected] * This FprAA covers common modifications towards FprEN 61918:2011 (pr=23956) (IEC 61918:201X (65C/678A/CDV)). If approved, both projects will be merged and published as one single document, with the implementation dates of FprAA.
FprEN 61987-11:2012 (PR=23128) IEC 61987-11:201X (65E/245/FDIS) CLC/TC 65X IEC/SC 65E // Stage : 5020 2012-07-13 Industrial-process measurement and control - Data structures and elements in process equipment catalogues - Part
11: Lists of properties (LOP) for measuring equipment for electronic data exchange - Generic structures NOTE: 65E/185/RVC established on 2011-03-04: FDIS decided
FprEN 62264-1:2012 (PR=24022) IEC 62264-1:201X (65E/229/CDV) CLC/TC 65X IEC/SC 65E // Stage : 5020 2012-07-13 Enterprise system integration - Part 1: Models and terminology NOTE: Revision of EN 62264-1:2008 (handled under SR 65A)
FprEN 62264-2:2012 (PR=24023) IEC 62264-2:201X (65E/230/CDV) CLC/TC 65X IEC/SC 65E // Stage : 5020 2012-07-13 Enterprise system integration - Part 2: Object models and attributes NOTE: Will supersede EN 62264-2:2008 (handled under SR 65A)
Technical committees Activities 303
CENELEC Inventory of Technical Activities
EN 62439-1:2010/FprA1:2012 (PR=23217) IEC 62439-1:2010/A1:201X (65C/684/FDIS) CLC/TC 65X IEC/SC 65C // Stage : 5060 2012-05-21 Industrial communication networks - High availability automation networks - Part 1: General concepts and
calculation methods NOTE: 65C/653/RVC established on 2011-06-24: FDIS decided
FprEN 62439-3:2012 (PR=23219) IEC 62439-3:201X (65C/687/FDIS) CLC/TC 65X IEC/SC 65C // Stage : 5060 2012-06-11 Industrial communication networks - High availability automation networks - Part 3: Parallel Redundancy Protocol
(PRP) and High-availability Seamless Redundancy (HSR) NOTE: CDV had been launched as FprA1 * This FprEN is to be read in conjunction with EN 62439-1:2010
FprEN 62541-7:2012 (PR=23157) IEC 62541-7:201X (65E/242/FDIS) CLC/TC 65X IEC/SC 65E // Stage : 5020 2012-07-13 OPC unified architecture - Part 7: Profiles NOTE: 65E/200/RVC established on 2011-07-29: FDIS decided
FprEN 62541-9:2012 (PR=23158) IEC 62541-9:201X (65E/243/FDIS) CLC/TC 65X IEC/SC 65E // Stage : 5020 2012-07-13 OPC unified architecture - Part 9: Alarms and conditions NOTE: 65E/201/RVC established on 2011-07-29: FDIS decided
FprEN 62541-10:2012 (PR=23159) IEC 62541-10:201X (65E/244/FDIS) CLC/TC 65X IEC/SC 65E // Stage : 5020 2012-07-13 OPC unified architecture - Part 10: Programs NOTE: 65E/217/RVC + 65E/217A/RVC established on 2011-10-21: FDIS decided.
FprEN 62601:201X (PR=22948) IEC 62601:2011 CLC/TC 65X IEC/SC 65C Stage : 5091 2012-02-23 Industrial communication networks - Fieldbus specifications - WIA-PA communication network and communication
profile NOTE: Negative voting results of parallel vote on CDV at CLC level dropped * 65C/627/RVC established on 2010- 09-24: FDIS decided * D138/031: Temporary exemption confirmed until CLC/TC 65CX February 2012 meeting * Project on hold
FprEN 62603-1:2011 (PR=23789) IEC 62603-1:201X (65B/809/CDV) CLC/TC 65X IEC/SC 65B // Stage : 5060 2012-03-26 Industrial process control systems - Guidelines for evaluating process control systems - Part 1: Specifications NOTE: Awaiting outcome of RVC before further processing
FprEN 62703:2012 (PR=24074) IEC 62703:201X (65B/823/CDV) CLC/TC 65X IEC/SC 65B // Stage : 5020 2012-08-03 Expression of performance of fluorometric oxygen analyzers in liquid media
Technical committees Activities 304
CENELEC Inventory of Technical Activities
Vote decided
FprEN 61010-2-201:201X (PR=23626) IEC 61010-2-201:201X (65/484/CDV) CLC/TC 65X IEC/TC 65 LVD (2006/95/EC) // Stage : 3090 2012-04-30 Draft for vote due at CCMC by: - Safety requirements for electrical equipment for measurement, control, and laboratory use - Part 2-201: Particular
requirements for control equipment NOTE: Will supersede the safety requirements of Clauses 11 to 14 of EN 61131-2:2007 * To be read in conjunction
with EN 61010-1:2010 * 65/492/RVC + 65/492A/RVC established on 2012-03-23: FDIS decided
FprEN 61131-3:201X (PR=23726) IEC 61131-3:201X (65B/807/CDV) CLC/TC 65X IEC/SC 65B // Stage : 3090 2012-04-30 Draft for vote due at CCMC by: - Programmable controllers - Part 3: Programming languages NOTE: Will supersede EN 61131-3:2003 * 65B/825/RVC established on 2012-03-09: FDIS decided
FprEN 61131-6:201X (PR=23565) IEC 61131-6:201X (65B/797/CDV) CLC/TC 65X IEC/SC 65B // Stage : 3090 2011-12-31 Draft for vote due at CCMC by: - Programmable controllers - Part 6: Functional safety NOTE: 65B/818/RVC + 65B/818A/RVC established on 2012-01-27: FDIS decided
FprEN 61326-2-1:201X (PR=23327) IEC 61326-2-1:201X (65A/590/CDV) CLC/TC 65X IEC/SC 65A EMC (2004/108/EC) // Stage : 3090 2011-12-31 Draft for vote due at CCMC by: - Electrical equipment for measurement, control and laboratory use - EMC requirements - Part 2-1: Particular requirements - Test configurations, operational conditions and performance criteria for sensitive test and measurement equipment for EMC unprotected applications NOTE: Will supersede EN 61326-2-1:2006 * To be read in conjunction with EN 61326-1 (PR=23326) *
65A/608/RVC established on 2011-09-09: FDIS decided
FprEN 61326-2-2:201X (PR=23328) IEC 61326-2-2:201X (65A/591/CDV) CLC/TC 65X IEC/SC 65A EMC (2004/108/EC) // Stage : 3090 2011-12-31 Draft for vote due at CCMC by: - Electrical equipment for measurement, control and laboratory use - EMC requirements - Part 2-2: Particular requirements - Test configurations, operational conditions and performance criteria for portable test, measuring and monitoring equipment used in low-voltage distribution systems NOTE: Will supersede EN 61326-2-2:2006 * To be read in conjunction with EN 61326-1 (PR=23326) *
65A/609/RVC established on 2011-09-09: FDIS decided
FprEN 61326-2-5:201X (PR=23331) IEC 61326-2-5:201X (65A/594/CDV) CLC/TC 65X IEC/SC 65A EMC (2004/108/EC) // Stage : 3090 2011-12-31 Draft for vote due at CCMC by: - Electrical equipment for measurement, control and laboratory use - EMC requirements - Part 2-5: Particular requirements - Test configurations, operational conditions and performance criteria for devices with field bus interfaces according to IEC 61784-1 NOTE: Will supersede EN 61326-2-5:2006 * To be read in conjunction with EN 61326-1 (PR=23326) *
65A/612/RVC established on 2011-09-09: FDIS decided
Technical committees Activities 305
CENELEC Inventory of Technical Activities
FprEN 61499-1:201X (PR=23612) IEC 61499-1:201X (65B/799/CDV) CLC/TC 65X IEC/SC 65B // Stage : 3090 2012-02-29 Draft for vote due at CCMC by: - Function blocks - Part 1: Architecture NOTE: Will supersede EN 61499-1:2005 * 65B/817/RVC established on 2011-12-09: FDIS decided
FprEN 61499-2:201X (PR=23633) IEC 61499-2:201X (65B/800/CDV) CLC/TC 65X IEC/SC 65B // Stage : 3090 2012-03-31 Draft for vote due at CCMC by: - Function blocks - Part 2: Software tool requirements NOTE: Will supersede EN 61499-2:2005 * 65B/824/RVC established on 2012-03-02: FDIS decided
FprEN 61499-4:201X (PR=23690) IEC 61499-4:201X (65B/805/CDV) CLC/TC 65X IEC/SC 65B // Stage : 3090 2012-05-31 Draft for vote due at CCMC by: - Function blocks - Part 4: Rules for compliance profiles NOTE: Will supersede EN 61499-4:2006 * 65B/830/RVC established on 2012-05-04: FDIS decided
EN 61514-2:2004/FprA1:201X (PR=23443) IEC 61514-2:2004/A1:201X (65B/766/CDV) CLC/TC 65X IEC/SC 65B // Stage : 3090 2012-07-31 Draft for vote due at CCMC by: - Industrial process control systems - Part 2: Methods of evaluating the performance of intelligent valve positioners
with pneumatic outputs NOTE: 65B/819/RVC established on 2011-12-09: FDIS decided (FprA1 to be handled as new edition)
FprEN 62382:201X (PR=23064) IEC 62382:201X (65E/163/CDV) CLC/TC 65X IEC/SC 65E // Stage : 3090 2011-12-31 Draft for vote due at CCMC by: - Electrical and instrumentation loop check NOTE: Will supersede EN 62382:2007 * 65E/218/RVC established on 2011-10-14: FDIS decided
Work stopped (last 12 months)
prEN 61918 (PR=22619) IEC 61918:2010 (Modified) CLC/TC 65X IEC/SC 65C Stage : 4098 - Industrial communication networks - Installation of communication networks in industrial premises NOTE: 2012-01-24 TC decision: Project stopped as covered by FprEN on IEC ed 3 (PR=23956) modified
(PR=24004)
Technical committees Activities 306
CENELEC Inventory of Technical Activities
TC 69X
Electrical systems for electric road vehicles
To prepare European standards related to electrical systems for road vehicles, totally or partly propelled from self- contained power sources
Officers Meetings Chairman: Mr Malcolm MULLINS ( GB) Brussels 2011-06-10 Secretary: Mr Peter VAN DEN BOSSCHE ( BE) Brussels 2011-10-14
Published (last 12 months)
EN 61851-1:2011 (PR=22334) IEC 61851-1:2010 CLC/TC 69X IEC/TC 69 LVD (2006/95/EC) // Stage : 6060 Electric vehicle conductive charging system - Part 1: General requirements NOTE: Supersedes EN 61851-1:2001 dor : 2011-04-12 doa : 2011-07-01 dop : 2012-01-01 dow: 2014-04-01
New work item approved
EN 61851-1:2011/prA (PR=23552) CLC/TC 69X Stage : 1099 - Draft for vote due at CCMC by: 2013-09-27 Electric vehicle conductive charging system - Part 1: General requirements NOTE: D138/014 decision: BT invited CLC/TC 69X to consider the national comments made during the parallel vote on IEC 61851-1:201X (PR=22334) and to prepare the needed European common modifications to IEC 61851 1:2010, for submission as an amendment
Technical committees Activities 307
CENELEC Inventory of Technical Activities
TC 72
Automatic controls for household use
To prepare harmonized standards for rules related to inherent safety, to the operating characteristics where such are associated with applicational safety and to the testing of automatic electrical control devices used in appliances and other apparatus, electrical and non-electrical for household and similar purposes such as those for central heating, air conditioning etc. including the following:
1. Automatic electrical control devices mechanically, electro-mechanically, electrically or electronically operated responsive to or controlling such parameters as temperature, pressure, passage of time, humidity, light, electrostatic effect, flow or liquid level. 2. Automatic electrical control devices serving the starting of small motors that are used principally in appliances and apparatus for household and similar purposes. Such control devices may be built into or be separate from the motor. 3. Non-automatic control devices when such are associated with automatic control devices.
Officers Meetings Chairman: Mr Khai TU ( GB) Milan 2008-12-01 / 12-02 Secretary: Mr Nick BRADFIELD ( GB) Zurich 2009-10-09
Berlin 2010-11-18 / 11-19 Brussels 2011-10-17 / 10-18
Published (last 12 months)
EN 60730-1:2011 (PR=22882) IEC 60730-1:2010 (Modified) CLC/TC 72 IEC/TC 72 EMC (2004/108/EC) LVD (2006/95/EC) RTTED (1999/5/EC) Stage : 6060 Automatic electrical controls for household and similar use - Part 1: General requirements NOTE: Publication editing allocated to [email protected] * IEC 60730 series exempted from parallel vote by D126/C042 * D137/C024: Vote on IEC + common modifications * TC request: No dow (EN 60730 1:2000 to remain valid until all the Part 2's which are used in conjunction with it have been withdrawn) * Supersedes EN
60730-1:2000 + corr. Aug.2007 + A1:2004 + A2:2008 + A12:2003 + A13:2004 + A14:2005 + A16:2007 + corr. Mar.2010 No dow (EN 60730-1:2000 to remain valid until all the Part 2’s which are used in conjunction with it have been withdrawn) dor : 2011-10-24 doa : 2012-04-24 dop : 2012-10-24 dow : -
EN 60730-2-7:2010/AC:2011 (PR=23883) CLC/TC 72 Stage : 6060 Automatic electrical controls for household and similar use - Part 2-7: Particular requirements for timers and time
switches NOTE: 2011-11-23 - Corrigendum editing allocated to [email protected] dor : - doa : - dop : - dow : -
Vote launched
FprEN 60730-1:2011 (PR=23857) IEC 60730-1:201X (72/854/CDV) CLC/TC 72 IEC/TC 72 EMC (2004/108/EC) LVD (2006/95/EC) RTTED (1999/5/EC) // Stage : 5060 2012-05-01 Automatic electrical controls for household and similar use - Part 1: General requirements NOTE: Will supersede EN 60730-1:201X (ed 4) * Awaiting outcome of RVC before further processing
Technical committees Activities 308
CENELEC Inventory of Technical Activities
FprEN 60730-2-5:2011 (PR=23859) IEC 60730-2-5:201X (72/855/CDV) CLC/TC 72 IEC/TC 72 EMC (2004/108/EC) LVD (2006/95/EC) // Stage : 5060 2012-05-07 Automatic electrical controls for household and similar use - Part 2-5: Particular requirements for automatic
electrical burner control systems NOTE: Will supersede EN 60730-2-5:2002 + A1:2004 + A2:2010 + A11:2005 * Awaiting outcome of RVC before
further processing
New work item approved
prEN 50344 (PR=23881) CLC/TC 72 LVD (2006/95/EC) Stage : 1099 - Draft for vote due at CCMC by: 2014-05-15 Routine tests for controls within the scope of the EN 60730 series - General requirements NOTE: D140/C066: NWI approved * Track: ENQ + FV * Will supersede EN 50344-1:2001 * To be listed under the
LVD and reference EN 60730-1:2011
EN 60730-1:2000/prA (PR=22752) CLC/TC 72 EMC (2004/108/EC) LVD (2006/95/EC) PED (97/23/EC) Stage : 1099 2010-09-01 Draft for vote due at CCMC by: 2012-06-30 Automatic electrical controls for household and similar use - Part 1: General requirements NOTE: D136/C094: NWI approved - Target date for vote: 2012-06-30 * Amendment for listing under the PED * In
hands of WG 2
EN 60730-1:2011/prA (PR=23882) CLC/TC 72 Stage : 1099 - Draft for vote due at CCMC by: - Automatic electrical controls for household and similar use - Part 1: General requirements NOTE: D140/C066: NWI approved * Track: UAP * To be offered to IEC
Technical committees Activities 309
CENELEC Inventory of Technical Activities
TC 76
Optical radiation safety and laser equipment
To prepare harmonized standards in the field of equipment incorporating lasers (and light emitting diodes) or intended only for use with lasers. Also covered are those factors introduced by the use of lasers which are needed to characterize the equipment and/or which are essential to safe use. The scope includes the preparation of standards defining limits for human exposure to optical radiation (100 nm to 1 mm) from artificial sources.
Officers Meetings Chairman: Mr Roy HENDERSON ( GB) Munich 2009-06-15 Secretary: Dr Ernst SUTTER ( DE) London 2010-06-21 / 06-22
Munich 2011-05-25 London 2012-05-31
Vote launched
prEN 60601-2-22:2007 (PR=16881) IEC 60601-2-22:2007 CLC/TC 76 IEC/TC 76 // Stage : 5091 - Medical electrical equipment - Part 2-22: Particular requirements for basic safety and essential performance of
surgical, therapeutic and diagnostic laser equipment NOTE: Will supersede EN 60601-2-22:1996 * Ongoing discussions between MDD consultant and IEC officers *
2011-04: A1 at CDV stage (PR=23464)
prEN 60601-2-22:2007/FprA1:2011 (PR=23464) IEC 60601-2-22:2007/A1:201X (76/444/CDV) CLC/TC 76 IEC/TC 76 MDD (93/42/EEC) // Stage : 5060 2011-10-03 Medical electrical equipment - Part 2-22: Particular requirements for basic safety and essential performance of
surgical, therapeutic and diagnostic laser equipment NOTE: Awaiting outcome of RVC before further processing
Technical committees Activities 310
CENELEC Inventory of Technical Activities
TC 78
Equipment and tools for live working
To prepare CENELEC standards for work equipment, devices and tools, including personal protective equipment used for work on or near live electrical systems or installations.
Officers Meetings Chairman: Mr Tony PIERCE ( GB) Brussels 2007-06-05 Secretary: Mr Guillaume HEROIN ( FR) Brussels 2009-03-19
Brussels 2010-09-21 Brussels 2012-05-08
Vote launched
FprEN 60743:2011 (PR=23896) IEC 60743:201X (78/929/CDV) CLC/TC 78 IEC/TC 78 PPE (89/686/EEC) // Stage : 5060 2012-05-21 Live working - Terminology for tools, devices and equipment NOTE: Will supersede EN 60743:2001 + A1:2008
FprEN 60855-1:2009 (PR=21807) IEC 60855-1:2009 CLC/TC 78 IEC/TC 78 // Stage : 5091 2010-09-30 Live working - Insulating foam-filled tubes and solid rods - Part 1: Tubes and rods of a circular cross-section NOTE: Will supersede EN 60855:1996 * TC advice to BT: Safety issues identified by FR (preparing paper) - D137/C034 Ratification deferred * 2010-09 TC advice: Result of discussion with IEC TC 78 for defining a way how to proceed scheduled March 2011
FprEN 60900:2012 (PR=23527) IEC 60900:201X (78/947/FDIS) CLC/TC 78 IEC/TC 78 // Stage : 5060 2012-06-11 Live working - Hand tools for use up to 1000 V a.c. and 1500 V d.c. NOTE: Will supersede EN 60900:2004 * 78/933/RVC established on 2011-12-23: FDIS decided
FprEN 61472:2011 (PR=23931) IEC 61472:201X (78/932/CDV) CLC/TC 78 IEC/TC 78 // Stage : 5060 2012-06-04 Live working - Minimum approach distances for AC systems in the voltage range 72,5 kV to 800 kV - A method of
calculation NOTE: Will supersede EN 61472:2004
FprEN 61482-2:2009 (PR=21521) IEC 61482-2:2009 CLC/TC 78 IEC/TC 78 // Stage : 5062 2010-11-16 Live working - Protective clothing against the thermal hazards of an electric arc - Part 2: Requirements NOTE: D137/006: CLC/TC 78 to develop the common modifications required by the PPE Consultant in order to
circulate the draft to voting procedure
Technical committees Activities 311
CENELEC Inventory of Technical Activities
TC 79
Alarm systems
To prepare harmonized standards for detection, alarm and monitoring systems for protection of persons and property, and for elements used in these systems. The scope includes in particular intruder and hold-up alarm systems, access control systems, periphery protection systems, combined alarm - fire alarm systems, social alarm systems, CCTV-systems, other monitoring and surveillance systems related to security applications, as well as associated and dedicated transmission and communication systems.
The standards shall specify conformity tests.
Officers Chairman: Mr Carlo LOI ( IT) Secretary: Ms Sharon CUMBERBATCH ( GB)
Published (last 12 months)
EN 50130-4:2011 (PR=22803) CLC/TC 79 EMC (2004/108/EC) Stage : 6060 Alarm systems - Part 4: Electromagnetic compatibility - Product family standard: Immunity requirements for
components of fire, intruder, hold up, CCTV, access control and social alarm systems NOTE: Supersedes EN 50130-4:1995 + A1:1998 + A2:2003 + corr. Mar.2003 dor : 2011-06-13 doa : 2011-12-13 dop : 2012-06-13 dow: 2014-06-13
EN 50130-5:2011 (PR=22701) CLC/TC 79 Stage : 6060 Alarm systems - Part 5: Environmental test methods NOTE: Supersedes EN 50130-5:1998 dor : 2011-06-13 doa : 2011-12-13 dop : 2012-06-13 dow : 2014-06-13
CLC/TS 50131-2-8:2012 (PR=22572) CLC/TC 79 Stage : 6060 Alarm systems - Intrusion and hold-up systems - Part 2-8: Intrusion detectors - Shock detectors NOTE: 2011-12-20 - Publication editing allocated to [email protected] * To be handled by WG 2 dor : 2012-01-23 doa : 2012-07-23 dop : - dow : -
EN 50132-5-1:2011 (PR=22579) CLC/TC 79 Stage : 6060 Alarm systems - CCTV surveillance systems for use in security applications - Part 5-1: Video transmission - General
video transmission performance requirements NOTE: Publication editing allocated to [email protected] * Supersedes EN 50132-5:2001 together with future EN 50132-5-2 (PR=22580) and EN 50132-5-3 (PR=22581) - These future EN and the present one cover the work on prEN 50132-5 (pr=21915) dor : 2011-10-31 doa : 2012-04-30 dop : 2012-10-31 dow: 2014-10-31
Technical committees Activities 312
CENELEC Inventory of Technical Activities
EN 50132-5-2:2011 (PR=22580) CLC/TC 79 Stage : 6060 Alarm systems - CCTV surveillance systems for use in security applications - Part 5-2: IP Video Transmission
Protocols NOTE: Publication editing allocated to [email protected] * Supersedes EN 50132-5:2001 together with EN 50132-5-1 (PR=22579) and EN 50132-5-3 (PR=22581) - These future ENs and the present one cover the work on prEN 50132-5 (pr=21915) dor : 2011-10-31 doa : 2012-04-30 dop : 2012-10-31 dow: 2014-10-31
EN 50134-3:2012 (PR=21316) CLC/TC 79 Stage : 6060 Alarm systems - Social alarm systems - Part 3: Local unit and controller NOTE: 2012-02-09 - Publication editing allocated to [email protected] * Supersedes EN 50134-3:2001 dor : 2012-03-12 doa : 2012-09-12 dop : 2013-03-12 dow: 2015-03-12
EN 50136-1:2012 (PR=21534) CLC/TC 79 Stage : 6060 Alarm systems - Alarm transmission systems and equipment - Part 1: General requirements for alarm transmission
systems NOTE: 2011-11-23 - Publication editing allocated to [email protected] * Supersedes EN 50136-1-1:1998 +
A1:2001 + A2:2008, EN 50136-1-2:1998, EN 50136-1-3:1998, EN 50136-1-4:1998 and EN 50136-1-5:2008 dor : 2011-12-26 doa : 2012-06-26 dop : 2012-12-26 dow: 2014-12-26
Ratified
CLC/TS 50131-5-4:201X (PR=22577) CLC/TC 79 Stage : 5099 2012-06-25 Alarm systems - Intrusion and hold-up systems - Part 5-4: System compatibility testing for I&HAS equipments
located in supervised premises NOTE: 2012-04-24 - Publication editing allocated to [email protected] * Handled by WG 3
EN 50132-5-3:201X (PR=22581) CLC/TC 79 Stage : 5099 2012-06-12 Alarm systems - CCTV surveillance systems for use in security applications - Part 5-3: Video transmission -
Analogue and digital video transmission NOTE: 2012-04-10 - Publication editing allocated to [email protected] * Will supersede EN 50132-5:2001 together with future EN 50132-5-1 (PR=22579) and EN 50132-5-2 (PR=22580) - These future EN and the present
one cover the work on prEN 50132-5 (pr=21915) * D137/C166: Extension of the target date for vote approved to read: 2011-09-30
Vote launched
FprEN 50131-2-7-1:2012 (PR=22568) CLC/TC 79 Stage : 5020 2012-07-06 Alarm systems - Intrusion and hold-up systems - Part 2-7-1: Intrusion detectors - Glass break detectors (acoustic) NOTE: 2012-01-03 - UAP editing allocated to [email protected] * Will supersede CLC/TS 50131-2-7-1:2009
FprEN 50131-2-7-2:2012 (PR=22569) CLC/TC 79 Stage : 5020 2012-07-06 Alarm systems - Intrusion and hold-up systems - Part 2-7-2: Intrusion detectors - Glass break detectors (passive) NOTE: 2012-01-03 - UAP editing allocated to [email protected] * Will supersede CLC/TS 50131-2-7-2:2009 *
Technical committees Activities 313
CENELEC Inventory of Technical Activities
FprEN 50131-2-7-3:2012 (PR=22570) CLC/TC 79 Stage : 5020 2012-07-06 Alarm systems - Intrusion and hold-up systems - Part 2-7-3: Intrusion detectors - Glass break detectors (active) NOTE: 2012-01-03 - UAP editing allocated to [email protected] * Will supersede CLC/TS 50131-2-7-3:2009
FprEN 50131-10:2012 (PR=23035) CLC/TC 79 Stage : 5020 2012-07-20 Alarm systems - Intrusion and hold-up systems - Part 10: Application specific requirements for Supervised Premises
Transceiver (SPT) NOTE: 2012-02-16 - Formal Vote editing allocated to [email protected]
CLC/FprTS 50131-11:2012 (PR=23847) CLC/TC 79 Stage : 5020 2012-06-01 Alarm systems - Intrusion and hold-up systems - Part 11: Hold-up devices NOTE: D140/C025: NWI approved * 2011-12-14 - Vote processing allocated to [email protected]
FprEN 50132-7:2012 (PR=21916) CLC/TC 79 Stage : 5060 2012-06-04 Alarm systems - CCTV surveillance systems for use in security applications - Part 7: Application guidelines NOTE: 2012-05-21 - Publication editing allocated to [email protected] * Will supersede EN 50132-
7:1996
FprEN 60839-11-1:2012 (PR=23993) IEC 60839-11-1:201X (79/358A/CDV) CLC/TC 79 IEC/TC 79 // Stage : 5060 2012-06-19 Alarm systems - Part 11-1: Electronic access control systems - System and components requirements NOTE: 2012-01-17: Parallel vote on IEC 60839-11-1:201X (79/358A/CDV) requested by CLC/TC 79
FprEN 62676-2-1:2012 (PR=24232) IEC 62676-2-1:201X (79/381/CDV) CLC/TC 79 IEC/TC 79 // Stage : 5020 2012-10-26 Video surveillance systems for use in security applications - Part 2-1: Video transmission protocols - General
requirements
FprEN 62676-2-2:2012 (PR=24233) IEC 62676-2-2:201X (79/382/CDV) CLC/TC 79 IEC/TC 79 // Stage : 5020 2012-10-26 Video surveillance systems for use in security applications - Part 2-2: Video transmission protocols - IP
interoperability implementation based on HTTP and REST services
FprEN 62676-2-3:2012 (PR=24234) IEC 62676-2-3:201X (79/383/CDV) CLC/TC 79 IEC/TC 79 // Stage : 5020 2012-10-26 Video surveillance systems for use in security applications - Part 2-3: Video transmission protocols - IP
interoperability implementation based on web services
Technical committees Activities 314
CENELEC Inventory of Technical Activities
Vote decided
CLC/FprTR 50131-9:201X (PR=22571) CLC/TC 79 Stage : 4099 2012-04-27 Draft for vote due at CCMC by: - Alarm systems - Intrusion and hold-up systems - Part 9: Alarm verification - Methods and principles NOTE: 2012-02-16 - Formal Vote editing allocated to [email protected] * 2011-09 decision: to be issued as a TR * D140/C029: BT approved the change of deliverable from EN to TR * New Audit procedure to be used (TS/TR FV track)
CLC/FprTS 50136-9:2012 (PR=22700) CLC/TC 79 Stage : 4099 2012-06-15 Draft for vote due at CCMC by: - Alarm systems - Alarm transmission systems and equipment - Part 9: Requirements for common protocol for alarm
transmission using the Internet protocol NOTE: 2012-04-04 - Formal Vote editing allocated to [email protected] * D140/C028: Renumbering of prEN 50136-1-7 into CLC/prTS 50136-9 with modified title approved by BT * New Audit procedure to be used (TS/TR FV track)
Enquiry launched
EN 50131-6:2008/prAA:2011 (PR=22620) CLC/TC 79 Stage : 4060 2012-01-03 Draft for vote due at CCMC by: 2011-06-01 Alarm systems - Intrusion and hold-up systems - Part 6: Power supplies NOTE: Target date for vote: 2011-06-01 * Amdt to align EN 50131-6:2008 with the requirements in EN 50131-
3:2009
prEN 50136-2:2011 (PR=21535) CLC/TC 79 Stage : 4060 2011-10-10 Draft for vote due at CCMC by: 2012-04-12 Alarm systems - Alarm transmission systems and equipment - Part 2: Requirements for Supervised Premises
Transceiver (SPT) NOTE: D131/C081: NWI approved * Merger of prEN 50136-2-1 (PR=17064), -2-2 (PR=17065), -2-3 (PR=17066) and -2-4 (PR=17067) * Will supersede EN 50136-2-1:1998 + corr. Apr.1998 + A1:2001, EN 50136-2-2:1998
(PR=4982), EN 50136-2-3:1998 (PR=4981) and EN 50136-2-4:1998 (PR=4983) * D138/056: (Under Benchmark 3) Target date for vote extended to read 2012-04-12
prEN 50136-3:2011 (PR=23703) CLC/TC 79 Stage : 4060 2012-06-04 Draft for vote due at CCMC by: 2014-01-15 Alarm systems - Alarm transmission systems and equipment - Part 3: Requirements for Receiving Centre
Transceiver (RCT) NOTE: D139/C155: NWI approved - Proposed Track: ENQ+FV
At Secretariat stage
CLC/prTS 50131-2-X (PR=23033) CLC/TC 79 Stage : 2020 - Draft for vote due at CCMC by: 2012-12-31 Alarm systems - Intrusion and hold-up systems - Part 2-X: Lock state contacts (magnetic) NOTE: D137/C165: NWI approved with target date for vote: 2012-05-31 * 2011-09 decision: to be handled as a
prTS * D140/C027: Extension of target date for vote approved to read: 2012-12-31
Technical committees Activities 315
CENELEC Inventory of Technical Activities
CLC/prTS 50131-2-Y (PR=23034) CLC/TC 79 Stage : 2020 - Draft for vote due at CCMC by: 2012-12-31 Alarm systems - Intrusion and hold-up systems - Part X: Bolt contacts - Requirements for bolt contacts monitoring
the lock status of doors NOTE: D137/C165: NWI approved with target date for vote: 2012-05-31 * 2011-09 decision: To be handled as a
prTS * D140/C027: Extension of target date for vote approved to read: 2012-12-31
New work item approved
prEN 50131-1 (PR=23831) CLC/TC 79 Stage : 1099 - Draft for vote due at CCMC by: 2014-03-15 Alarm systems - Intrusion and hold-up systems - Part 1: System requirements NOTE: D140/C025: NWI approved * D140/047: Project not to be offered to IEC * Will supersede EN 50131-1:2006
+ A1:2009
CLC/prTS 50131-2-9 (PR=23848) CLC/TC 79 Stage : 1099 - Draft for vote due at CCMC by: - Alarm systems - Intrusion and hold-up systems - Part 2-9: Intrusion detectors - Active infrared detectors NOTE: D140/025: NWI approved
CLC/prTS 50131-5-1 (PR=22578) CLC/TC 79 Stage : 1099 2010-04-01 Draft for vote due at CCMC by: 2012-10-05 Alarm systems - Intrusion and hold-up systems - Part 5-1: Requirements for wired Interconnection for I&HAS
equipments located in supervised premises NOTE: D135/C196: NWI approved - Target date for vote: 2010-12-31 * To be handled by WG 3 * D139/047:
Extension of tdv approved to read 2012-10-05
prEN 50131-5-3 (PR=23575) CLC/TC 79 Stage : 1099 - Draft for vote due at CCMC by: 2013-10-15 Alarm systems - Intrusion systems - Part 5-3: Requirements for interconnections equipment using radio frequency
techniques NOTE: D139/C062: NWI approved * Proposed track: ENQ + FV * Will supersede EN 50131-5-3:2005 + A1:2008
prEN 50131-XXX (PR=22576) CLC/TC 79 Stage : 1099 2010-04-01 Draft for vote due at CCMC by: 2011-06-30 Alarm systems - Intrusion and hold-up systems - Part XXX: Junction boxes NOTE: D135/C196: NWI approved - Target date for vote: 2010-06-30 * To be handled by WG 3 * D137/C166:
Extension of the target date for vote approved to read: 2011-06-30
prEN 50134-2 (PR=23829) CLC/TC 79 Stage : 1099 - Draft for vote due at CCMC by: 2014-03-15 Alarm systems - Social alarm systems - Part 2: Trigger devices NOTE: D140/C025: NWI approved * ENQ + FV track * Will supersede EN 50134-2:1999
Technical committees Activities 316
CENELEC Inventory of Technical Activities
prEN 50134-7 (PR=23828) CLC/TC 79 Stage : 1099 - Draft for vote due at CCMC by: 2014-03-15 Alarm systems - Social alarm systems - Part 7: Application guidelines NOTE: D140/C025: NWI approved * ENQ + FV track * Will supersede CLC/TS 50134-7:2003
prEN 50136-4 (PR=23032) CLC/TC 79 Stage : 1099 - Draft for vote due at CCMC by: 2012-05-31 Alarm systems - Alarm transmission systems and equipment - Part 4: Annunciation equipment NOTE: D137/C165: NWI approved with target date for vote: 2012-05-31* Revision of CLC/TS 50136-4:2004
prEN 50518-1 (PR=23576) CLC/TC 79 Stage : 1099 - Draft for vote due at CCMC by: 2013-10-15 Monitoring and alarm receiving centre - Part 1: Requirements NOTE: D139/C062: NWI approved * Proposed track: ENQ + FV * Will supersede EN 50518-1:2010
prEN 50518-2 (PR=23577) CLC/TC 79 Stage : 1099 - Draft for vote due at CCMC by: 2013-10-15 Monitoring and alarm receiving centre - Part 2: Technical requirements NOTE: D139/C062: NWI approved * Proposed track: ENQ + FV * Will supersede EN 50518-2:2010
prEN 50518-3 (PR=23578) CLC/TC 79 Stage : 1099 - Draft for vote due at CCMC by: 2013-10-15 Monitoring and alarm receiving centre - Part 3: Procedures and requirements for operation NOTE: D139/C062: NWI approved * Proposed track: ENQ + FV * Will supersede EN 50518-3:2011
CLC/prTR 50531 (PR=23832) CLC/TC 79 Stage : 1099 - Draft for vote due at CCMC by: - Alarm systems - Terms and definitions NOTE: D140/C025: NWI approved * Will supersede CLC/TR 50531:2009
prEN 50XXX-1 (PR=23830) CLC/TC 79 Stage : 1099 - Draft for vote due at CCMC by: 2014-03-15 External perimeter security systems - Part 1: System requirements NOTE: D140/C025: NWI approved * New series * D140/047: Project not to be offered to IEC
Technical committees Activities 317
CENELEC Inventory of Technical Activities
TC 81X
Lightning protection
To prepare European Standards or, where not possible, guides for lightning protection for structures and buildings as well as for persons, services and contents.
Officers Meetings Secretary: Mr Giovanni LO PIPARO ( IT) Brussels 2007-06-06 Chairman: Prof. Christian BOUQUEGNEAU ( BE) Brussels 2009-09-02
Brussels 2010-06-01 Limassol 2011-06-23
Published (last 12 months)
EN 50536:2011 + AC:2011 (PR=16035) CLC/TC 81X Stage : 6060 Protection against lightning - Thunderstorm warning systems NOTE: Based on BT(ES/NOT)11 * WG 5 dor : 2011-02-14 doa : 2011-08-14 dop : 2012-02-14 dow: 2014-02-14
EN 62305-2:2012 (PR=22661) IEC 62305-2:2010 (Modified) CLC/TC 81X IEC/TC 81 Stage : 6060 Protection against lightning - Part 2: Risk management NOTE: 2012-02-14 - Publication editing allocated to [email protected] * Supersedes EN 62305-2:2006 +
corr. Nov.2006 dor : 2012-03-19 doa : 2012-09-19 dop : 2013-03-19 dow: 2014-01-13
EN 62561-5:2011 (PR=22869) IEC 62561-5:2011 (Modified) CLC/TC 81X IEC/TC 81 // Stage : 6060 Lightning protection system components (LPSC) - Part 5: Requirements for earth electrode inspection housings and
earth electrode seals NOTE: Publication editing allocated to [email protected] * Supersedes EN 50164-5:2009 * D137/026: dow fixed to dor + 36 months (TC request for 72 months refused) * Incorporates PR=23342 covering common modifications towards 81/391/FDIS dor : 2011-07-28 doa : 2012-01-28 dop : 2012-07-28 dow : 2014-07-28
EN 62561-6:2011 (PR=22870) IEC 62561-6:2011 (Modified) CLC/TC 81X IEC/TC 81 // Stage : 6060 Lightning protection system components (LPSC) - Part 6: Requirements for lightning strike counters (LSC) NOTE: Supersedes EN 50164-6:2009 * D137/026: dow fixed to dor+ 36 months (TC request for 72 months refused)
* Incorporates EN 62561-6:2011/AA (pr=23488) dor : 2011-07-28 doa : 2012-01-28 dop : 2012-07-28 dow : 2014-07-28
Technical committees Activities 318
CENELEC Inventory of Technical Activities
EN 62561-7:2012 (PR=23144) IEC 62561-7:2011 (Modified) CLC/TC 81X IEC/TC 81 // Stage : 6060 Lightning Protection System Components (LPSC) - Part 7: Requirements for earthing enhancing compounds NOTE2011-12-20 - Publication editing allocated to [email protected] * Supersedes EN 50164-7:2008 * Incorporates FprAA (pr= 23489) circulated simultaneously with this FprEN * D137/026: BT decided to fix the dow = dor + 36 months for the EN 62561 series dor : 2012-01-02 doa : 2012-07-02 dop : 2013-01-02 dow: 2015-01-02
Ratified
EN 62561-1:201X (PR=23243) IEC 62561-1:2012 (Modified) CLC/TC 81X IEC/TC 81 // Stage : 5099 2012-04-13 Lightning Protection System Components (LPSC) - Part 1: Requirements for connection components NOTE: 2012-03-27 - Publication editing allocated to [email protected] * Will supersede EN 50164- 1:2008 * FprAA covering future common modifications towards FprEN 62561-1:2011 is to be circulated simultaneously. If approved both projects will be merged and published as one single document (see PR=23963)
EN 62561-2:201X (PR=23244) IEC 62561-2:2012 (Modified) CLC/TC 81X IEC/TC 81 // Stage : 5099 2012-04-13 Lightning Protection System Components (LPSC) - Part 2: Requirements for conductors and earth electrodes NOTE: 2012-03-27 - Publication editing allocated to [email protected] * Will supersede EN 50164- 2:2008 * FprAA covering future common modifications towards FprEN 62561-2:2011 is to be circulated simultaneously. If approved both projects will be merged and published as one single document (see PR=23964)
EN 62561-3:201X (PR=23245) IEC 62561-3:2012 (Modified) CLC/TC 81X IEC/TC 81 // Stage : 5099 2012-04-13 Lightning Protection System Components (LPSC) - Part 3: Requirements for isolating spark gaps NOTE: 2012-03-27 - Publication editing allocated to [email protected] * Will supersede EN 50164- 3:2006 + A1:2009 * FprAA covering future common modifications towards FprEN 62561-3:2011 is to be circulated simultaneously. If approved both projects will be merged and published as one single document (see PR=23965)
Vote launched
EN 50536:2011/FprAA:2012 (PR=23987) CLC/TC 81X Stage : 5020 2012-07-06 Protection against lightning - Thunderstorm warning systems NOTE: 2012-02-28 - UAP editing allocated to [email protected] * D141/C033: NWI approved * Amdt
submitted to CLC/BT for the launch of 3 Months UAP Procedure, in English only (based on D139/016)
New work item approved
prEN 50XXX (PR=23705) CLC/TC 81X Stage : 1099 - Draft for vote due at CCMC by: 2014-10-19 Lightning protection system performance NOTE: 9-month extension requested by TC secretary * D139/C044: NWI approved by BT * ENQ+FV track
Technical committees Activities 319
CENELEC Inventory of Technical Activities
Work stopped (last 12 months)
FprEN 62561-1:2011/FprAA:2012 (PR=23963) CLC/TC 81X Stage : 5098 - Lightning Protection System Components (LPSC) - Part 1: Requirements for connection components NOTE: This FprAA covers common modifications towards FprEN 62561-1:2011 (pr=23243) (IEC 62561-1:201X (81/416/FDIS). If approved, both projects will be merged and published as one single document, with the implementation dates of FprAA and superseding EN 50164-1:2008.
FprEN 62561-2:2011/FprAA:2012 (PR=23964) CLC/TC 81X Stage : 5098 - Lightning Protection System Components (LPSC) - Part 2: Requirements for conductors and earth electrodes NOTE: This FprAA covers common modifications towards FprEN 62561-2:2011 (pr=23244) (IEC 62561-2:201X (81/417/FDIS). If approved, both projects will be merged and published as one single document, with the implementation dates of FprAA and superseding EN 50164-2:2008.
FprEN 62561-3:2011/FprAA:2012 (PR=23965) CLC/TC 81X Stage : 5098 - Lightning Protection System Components (LPSC) - Part 3: Requirements for isolating spark gaps NOTE: This FprAA covers common modifications towards FprEN 62561-3:2011 (pr=23245) (IEC 62561-3:201X (81/418/FDIS). If approved, both projects will be merged and published as one single document, with the implementation dates of FprAA and superseding EN 50164-3:2006 + A1:2009.
EN 62561-5:201X/AA:201X (PR=23342) CLC/TC 81X Stage : 5098 - Lightning protection system components (LPSC) - Part 5: Requirements for earth electrode inspection housings and
earth electrode seals NOTE: This FprAA covers common modifications towards 81/391/FDIS, parallel voted (pr=22869). Merged and
published as one single document with the implementation date of FprAA
FprEN 62561-6:2011/FprAA:2011 (PR=23488) CLC/TC 81X Stage : 5098 - Lightning protection system components (LPSC) - Part 6: Requirements for lightning strike counters (LSC) NOTE: Merged in FprAA (PR=22870)
EN 62561-7:201X/AA:201X (PR=23489) CLC/TC 81X Stage : 5098 - Lightning Protection System Components (LPSC) - Part 7: Requirements for earthing enhancing compounds NOTE: This FprAA is circulated simultaneously with FprEN 62561-7 (PR=23144), with the intention to be merged with FprEN 62561-7 and published as one single document, with the implementation dates of FprAA * D137/026: BT decided to fix the dow = dor + 36 months for the EN 62561 series
Technical committees Activities 320
CENELEC Inventory of Technical Activities
TC 82
Solar photovoltaic energy systems
To prepare European Standards for systems of and components for photovoltaic conversion of solar energy into electrical energy and for all elements in the entire photovoltaic energy system. The standards will deal with EMC, Machine, CPD and LVD directives. The CLC/TC 82 will especially develop standards in areas where there are special European concerns. The CLC/TC 82 will cooperate closely with IEC TC 82 and the National Committees. The aim will be to support the accelerated market introduction by harmonization of standards.
Officers Meetings Secretary: Mr Salvatore GUASTELLA ( IT) Brussels 2010-02-18 Chairman: Dr Werner KNAUPP ( DE) Brussels 2011-02-17
Brussels 2012-02-09 Brussels 2013-02-14
Published (last 12 months)
EN 50548:2011 (PR=22418) CLC/TC 82 Stage : 6060 Junction boxes for photovoltaic modules dor : 2011-02-14 doa : 2011-08-14 dop : 2012-02-14 dow: 2014-02-14
EN 61701:2012 (PR=23090) IEC 61701:2011 CLC/TC 82 IEC/TC 82 // Stage : 6060 Salt mist corrosion testing of photovoltaic (PV) modules NOTE: 2012-01-20 - Publication editing allocated to cpalagi@cencenelec * Supersedes EN 61701:1999 dor : 2012-01-19 doa : 2012-04-19 dop : 2012-10-19 dow: 2015-01-19
EN 61730-1:2007/A1:2012 (PR=22436) IEC 61730-1:2004/A1:2011 CLC/TC 82 IEC/TC 82 LVD (2006/95/EC) // Stage : 6060 Photovoltaic (PV) module safety qualification - Part 1: Requirements for construction NOTE: 82/659A/FDIS cancels and replaces 82/659/FDIS circulated on 2011-08-12, the deadline for vote remains
unchanged*2011-11-24: Publication editing allocated to [email protected] dor : 2011-12-19 doa : 2012-03-19 dop : 2012-09-19 dow: 2014-12-19
EN 61730-2:2007/A1:2012 (PR=22437) IEC 61730-2:2004/A1:2011 CLC/TC 82 IEC/TC 82 LVD (2006/95/EC) // Stage : 6060 Photovoltaic (PV) module safety qualification - Part 2: Requirements for testing NOTE: 2011-11-24: Publication editing allocated to [email protected] dor : 2011-12-19 doa : 2012-03-19 dop : 2012-09-19 dow: 2014-12-19
EN 62109-2:2011 (PR=22622) IEC 62109-2:2011 CLC/TC 82 IEC/TC 82 LVD (2006/95/EC) // Stage : 6060 Safety of power converters for use in photovoltaic power systems - Part 2: Particular requirements for inverters NOTE: To be read in conjunction with EN 62109-1:2010 dor : 2011-07-28 doa : 2011-10-28 dop : 2012-04-28 dow : 2014-07-28
Technical committees Activities 321
CENELEC Inventory of Technical Activities
EN 62253:2011 (PR=23093) IEC 62253:2011 CLC/TC 82 IEC/TC 82 LVD (2006/95/EC) // Stage : 6060 Photovoltaic pumping systems - Design qualification and performance measurements dor : 2011-08-19 doa : 2011-11-19 dop : 2012-05-19 dow : 2014-08-19
EN 62509:2011 (PR=22213) IEC 62509:2010 CLC/TC 82 IEC/TC 82 // Stage : 6060 Battery charge controllers for photovoltaic systems - Performance and functioning NOTE: To be used in conjunction with EN 62093 dor : 2011-01-20 doa : 2011-04-20 dop : 2012-03-02 dow : 2014-01-20
Vote launched
EN 50521:2008/FprAA:2012 (PR=23550) CLC/TC 82 Stage : 5060 2012-06-11 Connectors for photovoltaic systems - Safety requirements and tests NOTE: 2012-01-31 - UAP editing allocated to [email protected]
EN 61730-1:2007/FprA2:2012 (PR=23994) IEC 61730-1:2004/A2:201X (82/687/CDV) CLC/TC 82 IEC/TC 82 LVD (2006/95/EC) // Stage : 5020 2012-06-22 Photovoltaic (PV) module safety qualification - Part 1: Requirements for construction
FprEN 61829:2012 (PR=24024) IEC 61829:201X (82/693/CDV) CLC/TC 82 IEC/TC 82 // Stage : 5020 2012-07-13 Crystalline silicon photovoltaic (PV) array - On-site measurement of I-V characteristics NOTE: Will supersede EN 61829:1998
FprEN 62116:2012 (PR=24112) IEC 62116:201X (82/705/CDV) CLC/TC 82 IEC/TC 82 // Stage : 5020 2012-08-17 Test procedure of islanding prevention measures for utility-interconnected photovoltaic inverters NOTE: Will supersede EN 62116:2011
FprEN 62548:2011 (PR=23483) IEC 62548:201X (82/646/CDV) CLC/TC 82 IEC/TC 82 // Stage : 5060 2011-10-10 Design requirements for photovoltaic (PV) arrays NOTE: Awaiting outcome of RVC before further processing
Technical committees Activities 322
CENELEC Inventory of Technical Activities
Vote decided
FprEN 61853-2:201X (PR=23038) IEC 61853-2:201X (82/606/CDV) CLC/TC 82 IEC/TC 82 // Stage : 3090 2011-12-31 Draft for vote due at CCMC by: - Photovoltaic (PV) module performance testing and energy rating - Part 2: Spectral response, incidence angle and
module operating temperature measurements NOTE: 82/670/RVC established on 2011-09-30: FDIS decided
Enquiry decided
prEN 50XXX:201X (PR=23051) CLC/TC 82 Stage : 3099 - Draft for vote due at CCMC by: 2011-09-15 Photovoltaics in buildings NOTE: 2012-05-29 - Enquiry processing allocated to [email protected] * D137/C141: NWI approved with
target date for vote: 2011-09-15 * In hands of WG 1
New work item approved
EN 50530:2010/prA (PR=23549) CLC/TC 82 Stage : 1099 - Draft for vote due at CCMC by: 2013-10-15 Overall efficiency of grid connected photovoltaic inverters NOTE: D139/C061: NWI approved * Proposed track: ENQ+FV
EN 50548:2011/prA (PR=24137) CLC/TC 82 Stage : 1099 - Draft for vote due at CCMC by: - Junction boxes for photovoltaic modules NOTE: D141/C112: NWI approved
Technical committees Activities 323
CENELEC Inventory of Technical Activities
TC 86A
Optical fibres and optical fibre cables
To prepare and maintain specifications for optical fibres and optical fibre cables, excluding image transmission types
Officers Meetings Chairman: Dr Hans-Detlef LEPPERT ( DE) Paris 2011-05-05 / 05-06 Secretary: Mr Ladji DIAKITE ( FR) Brussels 2011-12-07
Web Conference 2012-05-08 to be confirmed 2012-12-13
Published (last 12 months)
EN 60793-1-44:2011 (PR=22681) IEC 60793-1-44:2011 CLC/TC 86A IEC/SC 86A // Stage : 6060 Optical fibres - Part 1-44: Measurement methods and test procedures - Cut-off wavelength NOTE: Supersedes EN 60793-1-44:2002 dor : 2011-05-25 doa : 2011-08-25 dop : 2012-02-25 dow: 2014-05-25
EN 60793-2:2012 (PR=23402) IEC 60793-2:2011 CLC/TC 86A IEC/SC 86A // Stage : 6060 Optical fibres - Part 2: Product specifications - General NOTE: 2011-12-20 - Publication editing allocated to [email protected] * Supersedes EN 60793-2:2008 dor : 2012-01-02 doa : 2012-04-02 dop : 2012-10-02 dow: 2015-01-02
EN 60794-1-1:2011 (PR=23214) IEC 60794-1-1:2011 + corrigendum Jan. 2012 CLC/TC 86A IEC/SC 86A // Stage : 6060 Optical fibre cables - Part 1-1: Generic specification - General NOTE: 2011-09-22: Publication editing allocated to [email protected] * Supersedes EN 60794-1-1:2002 dor : 2011-10-18 doa : 2012-01-18 dop : 2012-07-18 dow: 2014-10-18
EN 60794-2-10:2011 (PR=23059) IEC 60794-2-10:2011 CLC/TC 86A IEC/SC 86A // Stage : 6060 Optical fibre cables - Part 2-10: Indoor optical fibre cables - Family specification for simplex and duplex cables NOTE: Supersedes EN 60794-2-10:2003 * To be used in conjunction with EN 60794-1-1, EN 60794-1-2 and EN
60794-2 dor : 2011-09-14 doa : 2011-12-14 dop : 2012-06-14 dow : 2014-09-14
Technical committees Activities 324
CENELEC Inventory of Technical Activities
Vote launched
CLC/FprTR 50510:2012 (PR=22855) CLC/TC 86A Stage : 5020 2012-09-07 Draft for vote due at CCMC by: 2012-03-31 Fibre optic access to end-user - A guideline to building of FTTX fibre optic network NOTE2012-02-21 - Voting procedure editing allocated to [email protected] * Will supersede CLC/TR
50510:2007
FprEN 60793-1-42:2011 (PR=23749) IEC 60793-1-42:201X (86A/1419/CDV) CLC/TC 86A IEC/SC 86A // Stage : 5060 2012-04-13 Optical fibres - Part 1-42: Measurement methods and test procedures - Chromatic dispersion NOTE: Will supersede EN 60793-1-42:2007 * 86A/1443/RVC established on 2012-03-09: To be published without
FDIS stage
FprEN 60793-1-54:2011 (PR=23675) IEC 60793-1-54:201X (86A/1413/CDV) CLC/TC 86A IEC/SC 86A // Stage : 5060 2012-02-29 Optical fibres - Part 1-54: Measurement methods and test procedures - Gamma irradiation NOTE: Will supersede EN 60793-1-54: 2003 * 86A/1433/RVC established on 2012-01-13: To be published without
FDIS stage
FprEN 60793-2-30:2011 (PR=23676) IEC 60793-2-30:201X (86A/1414/CDV) CLC/TC 86A IEC/SC 86A // Stage : 5060 2012-02-29 Optical fibres - Part 2-30: Product specifications - Sectional specification for category A3 multimode fibres NOTE: Will supersede EN 60793-2-30:2009 * 86A/1434/RVC established on 2012-01-13: To be published without
FDIS stage
FprEN 60794-1-22:2011 (PR=23817) IEC 60794-1-22:201X (86A/1424/CDV) CLC/TC 86A IEC/SC 86A // Stage : 5060 2012-04-10 Optical fibre cables - Part 1-22: Generic specification - Basic optical cable test procedures - Environmental test
methods NOTE: Will partly supersede EN 60794-1-2:2003 together with future Parts 1-2, 1-20, 1-21, 1-23 & 1-24 *
86A/1445/RVC established on 2012-03-23: To be published without FDIS
FprEN 60794-1-24:2012 (PR=24153) IEC 61794-1-24:201X (86A/1448/CDV) CLC/TC 86A IEC/SC 86A // Stage : 5020 2012-09-14 Optical fibre cables - Part 1-24: Generic specification - Basic optical cable test procedures - Electrical test methods NOTE: Will partly supersede EN 60794-1-2:2003 together with future Parts 1-2, 1-20, 1-21, 1-22 & 1-23
FprEN 60794-2-11:2012 (PR=23634) IEC 60794-2-11:2012 CLC/TC 86A IEC/SC 86A // Stage : 5060 2012-05-21 Optical fibre cables - Part 2-11: Indoor optical fibre cables - Detailed specification for simplex and duplex cables for
use in premises cabling NOTE: Will supersede EN 60794-2-11:2005
Technical committees Activities 325
CENELEC Inventory of Technical Activities
FprEN 60794-2-21:2012 (PR=23635) IEC 60794-2-21:2012 CLC/TC 86A IEC/SC 86A // Stage : 5060 2012-05-21 Optical fibre cables - Part 2-21: Indoor optical fibre cables - Detailed specification for multi-fibre optical distribution
cables for use in premises cabling NOTE: Will supersede EN 60794-2-21:2006
FprEN 60794-2-31:2011 (PR=23636) IEC 60794-2-31:201X (86A/1410/CDV) CLC/TC 86A IEC/SC 86A // Stage : 5060 2012-01-02 Optical fibre cables - Part 2-31: Indoor optical fibre cables - Detailed specification for optical fibre ribbon cables for
use in premises cabling NOTE: Will supersede EN 60794-2-31:2006 * Awaiting outcome of RVC before further processing
FprEN 60794-3-12:2011 (PR=23867) IEC 60794-3-12:201X (86A/1430/CDV) CLC/TC 86A IEC/SC 86A // Stage : 5060 2012-05-14 Optical fibre cables - Part 3-12: Outdoor optical fibre cables - Detailed specification for duct and directly buried
optical telecommunication cables for use in premises cabling NOTE: Will supersede EN 60794-3-12:2006 * Awaiting outcome of RVC before further processing
Vote decided
FprEN 60793-2-50:201X (PR=23750) IEC 60793-2-50:201X (86A/1420A/CDV) CLC/TC 86A IEC/SC 86A // Stage : 3090 2012-05-31 Draft for vote due at CCMC by: - Optical fibres - Part 2-50: Product specifications - Sectional specification for class B single-mode fibres NOTE: Will supersede EN 60793-2-50:2008 * 86A/1444/RVC established on 2012-03-09: FDIS decided
FprEN 60794-1-23:201X (PR=23818) IEC 60794-1-23:201X (86A/1425/CDV) CLC/TC 86A IEC/SC 86A // Stage : 3090 2012-05-31 Draft for vote due at CCMC by: - Optical fibre cables - Part 1-23: Generic specification - Basic optical cable test procedures - Cable elements test
methods NOTE: Will partly supersede EN 60794-1-2:2003 together with future Parts 1-2, 1-20, 1-21, 1-22 & 1-24 *
86A/1446/RVC established on 2012-03-23: FDIS decided.
FprEN 60794-4-20:201X (PR=23790) IEC 60794-4-20:201X (86A/1423/CDV) CLC/TC 86A IEC/SC 86A // Stage : 3090 2012-04-30 Draft for vote due at CCMC by: - Optical fibre cables - Part 4-20: Aerial optical cables along electrical power lines - Family specification for ADSS
(All Dielectric Self Supported) optical cables NOTE: 86A/1442/RVC established on 2012-03-09: FDIS decided
Enquiry launched
prEN 50551-2:2010 (PR=22751) CLC/TC 86A Stage : 4060 2010-10-26 Draft for vote due at CCMC by: 2012-10-31 Simplex and duplex cables to be used for cords - Part 2: Detailed Specification and minimum requirements for
simplex ruggedized single mode cables to be used for patchcord/cords Category U NOTE: Project in collaboration with CLC/TC 86BXA * D141/C061: Extension of tdv to read 2012-10-31 and second
enquiry (2 months enquiry) approved
Technical committees Activities 326
CENELEC Inventory of Technical Activities
prEN 50582:2012 (PR=23364) CLC/TC 86A Stage : 4020 2012-10-19 Draft for vote due at CCMC by: 2013-07-15 Method of test for resistance to fire of unprotected optical fibre cables for use in emergency circuits (diameter less
than or equal to 20 mm) Mandated: M/443
Technical committees Activities 327
CENELEC Inventory of Technical Activities
TC 86BXA
Fibre optic interconnect, passive and connectorised components
To prepare and maintain European Standards and specifications for fibre optic interconnect, passive and connectorised components, including the tubes, closures and interconnect components used for blown fibre
Officers Meetings Chairman: Mr Philip LONGHURST ( GB) Turin 2011-06-21 / 06-22 Secretary: Mrs Rosemary McGlashon ( GB) Brussels 2011-12-06 / 12-08
Istanbul 2012-05-30 / 05-31 Brussels 2012-12-12 / 12-13
Published (last 12 months)
EN 50377-14-1:2011 (PR=23044) CLC/TC 86BXA Stage : 6060 Connector sets and interconnect components to be used in optical fibre communication systems - Product
specifications - Part 14-1: Cords with IEC 60793-2-50 singlemode category B1.1 and B1.3 fibre for category C NOTE: Project developed within a JWG with ETSI dor : 2011-05-02 doa : 2011-11-02 dop : 2012-05-02 dow: 2014-05-02
EN 50377-16-1:2011 (PR=22857) CLC/TC 86BXA Stage : 6060 Connector sets and interconnect components to be used in optical fibre communication systems - Product specifications - Part 16-1: Type LF3 APC simplex terminated on IEC 60793-2-50 category B1.1 and B1.3 singlemode fibre with titanium composite ferrule for category C NOTE: Publication editing allocated to [email protected] dor : 2011-10-31 doa : 2012-04-30 dop : 2012-10-31 dow: 2014-10-31
EN 50411-2-2:2012 (PR=23048) CLC/TC 86BXA Stage : 6060 Fibre organisers and closures to be used in optical fibre communication systems - Product specifications - Part 2-2:
Sealed pan fibre splice closures Type 1, for category S & A NOTE: 2011-11-18 - Publication editing allocated to [email protected] * Supersedes EN 50411-2-
2:2007 dor : 2011-12-21 doa : 2012-06-21 dop : 2012-12-21 dow: 2012-12-21
EN 50411-2-3:2012 (PR=23049) CLC/TC 86BXA Stage : 6060 Fibre organisers and closures to be used in optical fibre communication systems - Product specifications - Part 2-3:
Sealed inline fibre splice closures Type 1, for category S & A NOTE: 2011-11-18 - Publication editing allocated to [email protected] * Supersedes EN 50411-2-
3:2007 dor : 2011-12-21 doa : 2012-06-21 dop : 2012-12-21 dow: 2012-12-21
Technical committees Activities 328
CENELEC Inventory of Technical Activities
EN 50411-2-4:2012 (PR=23050) CLC/TC 86BXA Stage : 6060 Fibre organisers and closures to be used in optical fibre communication systems - Product specifications - Part 2-4:
Sealed dome fibre splice closures Type 1, for category S & A NOTE: 2011-11-18 - Publication editing allocated to [email protected] * Supersedes EN 50411-2-
4:2006 dor : 2011-12-21 doa : 2012-06-21 dop : 2012-12-21 dow: 2012-12-21
EN 50411-3-1:201X (PR=22859) CLC/TC 86BXA Stage : 5099 2012-06-25 Fibre organisers and closures to be used in optical fibre communication systems - Product specifications - Part 3-1:
Fibre management system, splice wall box, for category C & G NOTE: 2012-04-24 - Publication editing allocated to [email protected]
EN 50411-3-3:2011 (PR=21888) CLC/TC 86BXA Stage : 6060 Fibre organisers and closures to be used in optical fibre communication systems - Product specifications - Part 3-3:
Singlemode optical fibre fusion splice protectors NOTE: Publication editing allocated to [email protected] dor : 2011-11-14 doa : 2012-05-14 dop : 2012-11-14 dow: 2014-11-14
EN 50411-6-1:2011 (PR=21470) CLC/TC 86BXA Stage : 6060 Fibre organisers and closures to be used in optical fibre communication systems - Product specifications - Part 6-1:
Unprotected microduct for category S and A dor : 2011-03-21 doa : 2011-09-21 dop : 2012-03-21 dow : 2014-03-21
EN 50516-1-1:2011 (PR=22321) CLC/TC 86BXA Stage : 6060 Industrial connector sets and interconnect components to be used in optical fibre control and communication systems - Product specifications - Part 1-1: Type SC-RJ PC industrial terminated on EN 60793-2-10 category A1a and A1b multimode fibre to meet the requirements of category I (industrial environments) as specified in IEC 61753-1-3 dor : 2011-07-19 doa : 2012-01-19 dop : 2012-07-19 dow : 2014-07-19
EN 50516-2-1:2011 (PR=21984) CLC/TC 86BXA Stage : 6060 Industrial connector sets and interconnect components to be used in optical fibre control and communication systems - Product specifications - Part 2-1: Type ODVA PC industrial terminated on EN 60793-2-10 category A1a and A1b
multimode fibre to meet the requirements of category I (industrial environments) as specified in EN 50173-1 and IEC 61753-1-3 dor : 2011-07-19 doa : 2012-01-19 dop : 2012-07-19 dow : 2014-07-19
EN 60874-1:2012 (PR=23264) IEC 60874-1:2011 CLC/TC 86BXA IEC/SC 86B // Stage : 6060 Fibre optic interconnecting devices and passive components - Connectors for optical fibres and cables - Part 1:
Generic specification NOTE: 2011-12-20 - Publication editing allocated to [email protected] * Supersedes EN 60874-1:2007 dor : 2011-12-29 doa : 2012-03-29 dop : 2012-09-29 dow: 2012-12-29
Technical committees Activities 329
CENELEC Inventory of Technical Activities
EN 60874-1-1:2012 (PR=23265) IEC 60874-1-1:2011 CLC/TC 86BXA IEC/SC 86B // Stage : 6060 Fibre optic interconnecting devices and passive components - Connectors for optical fibres and cables - Part 1-1:
Blank detail specification NOTE: Supersedes EN 60874-1-1:2007 * 2011-11-24: Publication editing allocated to [email protected] dor : 2011-12-22 doa : 2012-03-22 dop : 2012-09-22 dow: 2012-12-22
EN 61274-1:2012 (PR=23266) IEC 61274-1:2011 CLC/TC 86BXA IEC/SC 86B // Stage : 6060 Fibre optic interconnecting devices and passive components - Adaptors for fibre optic connectors - Part 1: Generic
specification NOTE: 2011-12-20 - Publication editing allocated to [email protected] * Supersedes EN 61274-1:2008 dor : 2011-12-29 doa : 2012-03-29 dop : 2012-09-29 dow: 2012-12-29
EN 61274-1-1:2012 (PR=23273) IEC 61274-1-1:2011 CLC/TC 86BXA IEC/SC 86B // Stage : 6060 Fibre optic interconnecting devices and passive components - Adaptors for fibre optic connectors - Part 1-1: Blank
detail specification NOTE: Supersedes EN 61274-1-1:2006*2011-11-24: Publication editing allocated to [email protected] dor : 2011-12-22 doa : 2012-03-22 dop : 2012-09-22 dow: 2012-12-22
EN 61300-3-7:2012 (PR=21571) IEC 61300-3-7:2009 (Modified) CLC/TC 86BXA IEC/SC 86B // Stage : 6060 Fibre optic interconnecting devices and passive components - Basic test and measurement procedures - Part 3-7:
Examinations and measurements - Wavelength dependence of attenuation and return loss of single mode components NOTE: Publication editing allocated to [email protected] * Supersedes EN 61300-3-5:2001 & EN 61300-3-
7:2001 * FprAA taking into account agreed national comments to be incorporated dor : 2011-12-07 doa : 2012-03-07 dop : 2012-09-07 dow: 2012-12-07
EN 61300-3-28:2012 (PR=23301) IEC 61300-3-28:2012 CLC/TC 86BXA IEC/SC 86B // Stage : 6060 Fibre optic interconnecting devices and passive components - Basic test and measurement procedures - Part 3-28:
Examinations and measurements - Transient loss NOTE: Supersedes EN 61300-3-28:2002 * 86B/3260/RVC established on 2011-07-15: FDIS decided * D133/C027: dow=dor + 12 months for revisions of standards*2012-03-21: Publication processing allocated to [email protected] dor : 2012-04-19 doa : 2012-07-19 dop : 2013-01-19 dow: 2013-04-19
EN 61300-3-33:2012 (PR=23560) IEC 61300-3-33:2012 CLC/TC 86BXA IEC/SC 86B // Stage : 6060 Fibre optic interconnecting devices and passive components - Basic test and measurement procedures - Part 3-33:
Examinations and measurements - Withdrawal force from a resilient alignment sleeve using gauge pins NOTE: Supersedes EN 61300-3-33:1999 * 86B/3289/RVC established on 2011-09-16: To be published without
FDIS*2012-03-09: Publication editing allocated to [email protected] dor : 2012-03-28 doa : 2012-06-28 dop : 2012-12-28 dow: 2013-03-28
Technical committees Activities 330
CENELEC Inventory of Technical Activities
EN 61300-3-39:2012 (PR=22996) IEC 61300-3-39:2011 CLC/TC 86BXA IEC/SC 86B // Stage : 6060 Fibre optic interconnecting devices and passive components - Basic test and measurement procedures - Part 3-39: Examinations and measurements - Physical contact (PC) optical connector reference plug selection for return loss measurements NOTE: 2011-12-20 - Publication editing allocated to [email protected] * Supersedes EN 61300-3-39:1997 dor : 2011-12-27 doa : 2012-03-27 dop : 2012-09-27 dow: 2012-12-27
EN 61300-3-45:2011 (PR=22824) IEC 61300-3-45:2011 CLC/TC 86BXA IEC/SC 86B // Stage : 6060 Fibre optic interconnecting devices and passive components - Basic test and measurement procedures - Part 3-45:
Examinations and measurements - Attenuation of random mated multi-fibre connectors NOTE: 2011-05-27: Publication allocated to [email protected] . dor : 2011-06-16 doa : 2011-09-16 dop : 2012-03-16 dow : 2014-06-16
EN 61300-3-46:2011 (PR=23077) IEC 61300-3-46:2011 CLC/TC 86BXA IEC/SC 86B // Stage : 6060 Fibre optic interconnecting devices and passive components - Basic test and measurement procedures - Part 3-46:
Measurement - Bore diameter for guide pin in MT ferrules dor : 2011-07-21 doa : 2011-10-21 dop : 2012-04-21 dow : 2014-07-21
EN 61314-1:2012 (PR=23267) IEC 61314-1:2011 CLC/TC 86BXA IEC/SC 86B // Stage : 6060 Fibre optic interconnecting devices and passive components - Fibre optic fan-outs - Part 1: Generic specification NOTE: 2011-12-20 - Publication editing allocated to [email protected] * Supersedes EN 61314-1:2009 dor : 2011-12-29 doa : 2012-03-29 dop : 2012-09-29 dow: 2012-12-29
EN 61314-1-1:2012 (PR=23268) IEC 61314-1-1:2011 CLC/TC 86BXA IEC/SC 86B // Stage : 6060 Fibre optic interconnecting devices and passive components - Fibre optic fan-outs - Part 1-1: Blank detail
specification NOTE: Supersedes EN 61314-1-1:2006 * 2011-11-24: Publication editing allocated to [email protected] dor : 2011-12-22 doa : 2012-03-22 dop : 2012-09-22 dow: 2012-12-22
EN 61753-087-6:2012 (PR=23645) IEC 61753-087-6:2012 CLC/TC 86BXA IEC/SC 86B // Stage : 6060 Fibre optic interconnecting devices and passive components - Performance standard - Part 087-6: Non-connectorised single-mode bidirectional 1310 nm upstream and 1490 nm downstream WWDM devices for category O - Uncontrolled environment NOTE: 86B/3328/RVC established on 2011-11-18: To be published without FDIS stage*2012-02-24: Publication
editing allocated to [email protected] dor : 2012-03-27 doa : 2012-06-27 dop : 2012-12-27 dow: 2015-03-27
EN 61753-141-2:2011 (PR=22849) IEC 61753-141-2:2011 CLC/TC 86BXA IEC/SC 86B // Stage : 6060 Fibre optic interconnecting devices and passive components - Performance standard - Part 141-2: Fibre optic passive chromatic dispersion compensator using single-mode dispersion compensating fibre for category C - Controlled environments dor : 2011-05-25 doa : 2011-08-25 dop : 2012-02-25 dow : 2014-05-25
Technical committees Activities 331
CENELEC Inventory of Technical Activities
EN 61755-3-6:2006/A1:2012 (PR=23263) IEC 61755-3-6:2006/A1:2012 CLC/TC 86BXA IEC/SC 86B // Stage : 6060 Fibre optic connector optical interfaces - Part 3-6: Optical interface - 2,5 mm and 1,25 mm diameter cylindrical 8
degrees angled-PC composite ferrule using Cu-Ni-alloy as fibre surrounding material, single mode fibre NOTE: 86B/3229/RVC + 86B/3229A/RVC established on 2011-11-11: FDIS decided*2012-03-09: Publication
editing allocated to [email protected] dor : 2012-03-29 doa : 2012-06-29 dop : 2012-12-29 dow: 2015-03-29
Ratified
EN 61754-20:201X (PR=22750) IEC 61754-20:2012 CLC/TC 86BXA IEC/SC 86B // Stage : 5099 2012-06-07 Fibre optic interconnecting devices and passive components - Fibre optic connector interfaces - Part 20: Type LC
connector family NOTE: 2012-04-16 - Publication editing allocated to [email protected] * Will supersede EN 61754-20:2002
EN 61754-29:201X (PR=23619) IEC 61754-29:2012 CLC/TC 86BXA IEC/SC 86B // Stage : 5099 2012-06-21 Fibre optic interconnecting devices and passive components - Fibre optic connector interfaces - Part 29: Type
BLINK connector series NOTE: 2012-05-08 - Publication editing allocated to [email protected]
Vote launched
FprEN 60876-1:2011 (PR=23691) IEC 60876-1:201X (86B/3276/CDV) CLC/TC 86BXA IEC/SC 86B // Stage : 5060 2012-03-31 Fibre optic interconnecting devices and passive components - Fibre optic spatial switches - Part 1: Generic
specification NOTE: Will supersede EN 60876:2001 * 86B/3339/RVC established on 2011-12-02: To be published without FDIS
stage
FprEN 61300-2-10:2012 (PR=23281) IEC 61300-2-10:201X (86B/3439/FDIS) CLC/TC 86BXA IEC/SC 86B // Stage : 5020 2012-07-20 Fibre optic interconnecting devices and passive components - Basic test and measurement procedures - Part 2-10:
Tests - Crush resistance NOTE: Will supersede EN 61300-2-10:1997 * 86B/3247/RVC + 86B/3247A/RVC established on 2012-04-20: FDIS
decided * D133/C027: dow=dor + 12 months for revisions of standards within CLC/TC 86BXA
FprEN 61300-2-19:2012 (PR=23996) IEC 61300-2-19:201X (86B/3368/CDV) CLC/TC 86BXA IEC/SC 86B // Stage : 5060 2012-05-14 Fibre optic interconnecting devices and passive components - Basic test and measurement procedures - Part 2-19:
Tests - Damp heat (steady state) NOTE: Will supersede EN 61300-2-19:2005 * Awaiting outcome of RVC before further processing
Technical committees Activities 332
CENELEC Inventory of Technical Activities
FprEN 61300-2-28:2012 (PR=24150) IEC 61300-2-28:201X (86B/3419/CDV) CLC/TC 86BXA IEC/SC 86B // Stage : 5020 2012-07-06 Fibre optic interconnecting devices and passive components - Basic test and measurement procedures - Part 2-28:
Tests - Industrial atmosphere (sulphur dioxide) NOTE: Will supersede EN 61300-2-28:1997 * D133/C027: dow=dor + 12 months for revisions of standards within CLC/TC 86BXA. * D138/086: Shortened CDV period of 3 months for documents prepared by IEC/TC 40, IEC/TC 86 and IEC/TC 100.
FprEN 61300-2-33:2011 (PR=23890) IEC 61300-2-33:201X (86B/3330/CDV) CLC/TC 86BXA IEC/SC 86B // Stage : 5060 2012-04-02 Fibre optic interconnecting devices and passive components - Basic test and measurement procedures - Part 2-33:
Tests - Assembly and disassembly of fibre optic mechanical splices, fibre management systems and closures NOTE: Will supersede EN 61300-2-33:2007 * D133/C027: dow=dor + 12 months for revisions of standards within CLC/TC 86BXA * D138/086: Shortened CDV period of 3 months for documents prepared by IEC/TC 40, IEC/TC 86 and IEC/TC 100 * 86B/3406/RVC established on 2012-03-16: To be published without FDIS
FprEN 61300-3-4:2012 (PR=24009) IEC 61300-3-4:201X (86B/3370/CDV) CLC/TC 86BXA IEC/SC 86B // Stage : 5060 2012-05-21 Fibre optic interconnecting devices and passive components - Basic test and measurement procedures - Part 3-4:
Examinations and measurements - Attenuation NOTE: Will supersede EN 61300-3-4:2011 * D133/C027: dow=dor + 12 months for revisions of standards within CLC/TC 86BXA * D138/086: Shortened CDV period of 3 months for documents prepared by IEC/TC 40, IEC/TC 86 and IEC/TC 100 * Awaiting outcome of RVC before further processing
FprEN 61300-3-29:2012 (PR=24130) IEC 61300-3-29:201X (86B/3411/CDV) CLC/TC 86BXA IEC/SC 86B // Stage : 5020 2012-06-29 Fibre optic interconnecting devices and passive components - Basic test and measurement procedures - Part 3-29:
Examinations and measurements - Spectral transfer characteristics of DWDM devices NOTE: Will supersede EN 61300-3-29:2006 * D133/C027: dow=dor + 12 months for revisions of standards within CLC/TC 86BXA D138/086: Shortened CDV period of 3 months for documents prepared by IEC/TC 40, IEC/TC 86 and IEC/TC 100
FprEN 61300-3-38:2012 (PR=23284) IEC 61300-3-38:201X (86B/3394/FDIS) CLC/TC 86BXA IEC/SC 86B // Stage : 5060 2012-05-28 Fibre optic interconnecting devices and passive components - Basic test and measurement procedures - Part 3-
38:Examinations and measurements - Group delay, chromatic dispersion and phase ripple
FprEN 61300-3-44:2012 (PR=23700) IEC 61300-3-44:201X (86B/3424/FDIS) CLC/TC 86BXA IEC/SC 86B // Stage : 5020 2012-06-22 Fibre optic interconnecting devices and passive components - Basic test and measurement procedures - Part 3-44:
Examinations and measurements - Fibre optic transceiver receptacle endface visual and automated inspection NOTE: D133/C027: dow=dor + 12 months for revisions of standards * 86B/3352/RVC established on 2012-01-06:
FDIS decided
Technical committees Activities 333
CENELEC Inventory of Technical Activities
FprEN 61300-3-49:2012 (PR=24187) IEC 61300-3-49:201X (86B/3437/CDV) CLC/TC 86BXA IEC/SC 86B // Stage : 5020 2012-08-10 Fibre optic interconnecting devices and passive components - Basic test and measurement procedures - Part 3-49:
Measurement: Guide pin retention force for rectangular ferrule multi-fibre connectors NOTE: D138/086: Shortened CDV period of 3 months for documents prepared by IEC/TC 40, IEC/TC 86 and
IEC/TC 100.
FprEN 61753-021-3:2012 (PR=23974) IEC 61753-021-3:201X (86B/3361/CDV) CLC/TC 86BXA IEC/SC 86B // Stage : 5060 2012-05-07 Fibre optic interconnecting devices and passive components - Performance standard - Part 021-3: Single-mode fibre
optic connectors for category U - Uncontrolled environment NOTE: Shortened CDV period of 3 months for documents prepared by IEC/TC 40, IEC/TC 86 and IEC/TC 100
approved by CLC/BT in D138/086. * Awaiting outcome of RVC before further processing
FprEN 61753-061-2:2012 (PR=23975) IEC 61753-061-2:201X (86B/3362/CDV) CLC/TC 86BXA IEC/SC 86B // Stage : 5060 2012-05-07 Fibre optic interconnecting devices and passive components - Performance standard - Part 061-2: Non-connectorised
single-mode fibre optic pigtailed isolators for category C - Controlled environment NOTE: Shortened CDV period of 3 months for documents prepared by IEC/TC 40, IEC/TC 86 and IEC/TC 100
approved by CLC/BT in D138/086 * Awaiting outcome of RVC before further processing
FprEN 61753-088-2:2012 (PR=23976) IEC 61753-088-2:201X (86B/3363/CDV) CLC/TC 86BXA IEC/SC 86B // Stage : 5060 2012-05-07 Fibre optic interconnecting devices and passive components -Performance standard - Part 088-2: Non connectorised single-mode fibre optic LAN WDM devices with channel spacing of 800 GHz for category C - Controlled environment NOTE: Shortened CDV period of 3 months for documents prepared by IEC/TC 40, IEC/TC 86 and IEC/TC 100
approved by CLC/BT in D138/086 * Awaiting outcome of RVC before further processing
FprEN 61753-091-2:2012 (PR=23977) IEC 61753-091-2:201X (86B/3364/CDV) CLC/TC 86BXA IEC/SC 86B // Stage : 5060 2012-05-07 Fibre optic interconnecting devices and passive components - Performance standard - Part 091-2: Non-connectorised
single-mode fibre optic pigtailed circulators for category C - Controlled environment NOTE: Shortened CDV period of 3 months for documents prepared by IEC/TC 40, IEC/TC 86 and IEC/TC 100
approved by CLC/BT in D138/086 * Awaiting outcome of RVC before further processing
FprEN 61754-4:2012 (PR=24131) IEC 61754-4:201X (86B/3413/CDV) CLC/TC 86BXA IEC/SC 86B // Stage : 5020 2012-06-29 Fibre optic interconnecting devices and passive components - Fibre optic connector interfaces - Part 4: Type SC
connector family NOTE: Will supersede EN 61754-4:1997 + A1:1999 + A2:2001 * D133/C027: dow=dor + 12 months for revisions of standards within CLC/TC 86BXA D138/086: Shortened CDV period of 3 months for documents prepared by IEC/TC 40, IEC/TC 86 and IEC/TC 100
Technical committees Activities 334
CENELEC Inventory of Technical Activities
FprEN 61754-6:2012 (PR=24132) IEC 61754-6:201X (86B/3414/CDV) CLC/TC 86BXA IEC/SC 86B // Stage : 5020 2012-06-29 Fibre optic interconnecting devices and passive components - Fibre optic connector interfaces - Part 6: Type MU
connector family NOTE: Will supersede EN 61754-6:1997 + A1:2001 + A2:2005 * D133/C027: dow=dor + 12 months for revisions of standards within CLC/TC 86BXA D138/086: Shortened CDV period of 3 months for documents prepared by IEC/TC 40, IEC/TC 86 and IEC/TC 100
FprEN 61754-20-100:2012 (PR=22825) IEC 61754-20-100:201X (86B/3386/FDIS) CLC/TC 86BXA IEC/SC 86B // Stage : 5060 2012-05-07 Fibre optic interconnecting devices and passive components - Fibre optic connector interfaces - Part 20-100:
Interface standard for LC connectors with protective housings related to IEC 61076-3-106 NOTE: 86B/3090/RVC established on 2010-09-03: FDIS decided
FprEN 61754-26:2012 (PR=23254) IEC 61754-26:201X (86B/3433/FDIS) CLC/TC 86BXA IEC/SC 86B // Stage : 5020 2012-06-22 Fibre optic interconnecting devices and passive components - Fibre optic connector interfaces - Part 26: Type SF
connector family NOTE: 86B/3283/RVC established on 2011-08-19: FDIS decided
FprEN 61754-28:2012 (PR=23580) IEC 61754-28:2012 CLC/TC 86BXA IEC/SC 86B // Stage : 5060 2012-05-07 Fibre optic interconnecting devices and passive components - Fibre optic connector interfaces - Part 28: Type LF3
connector family NOTE: 86B/3287/RVC + 86B/3287A/RVC established on 2013-01-13: FDIS decided
Vote decided
FprEN 60869-1:201X (PR=23868) IEC 60869-1:201X (86B/3324/CDV) CLC/TC 86BXA IEC/SC 86B // Stage : 3090 2012-08-31 Draft for vote due at CCMC by: - Fibre optic interconnecting devices and passive components - Fibre optic passive power control devices - Part 1:
Generic specification NOTE: Will supersede EN 60869-1:2000 * Justification for dow = dor + 12 months: see BT decision D133/C027 *
86B/3398/RVC established on 2012-03-09: FDIS decided
FprEN 61300-2-7:201X (PR=23962) IEC 61300-2-7:201X (86B/3350/CDV) CLC/TC 86BXA IEC/SC 86B // Stage : 3090 2012-10-30 Draft for vote due at CCMC by: - Fibre optic interconnecting devices and passive components - Basic test and measurement procedures - Part 2-7:
Tests - Bending moment NOTE: Will supersede EN 61300-2-7:1997 * D133/C027: dow= dor + 12 months for revisions of standards within CLC/TC 86BXA * Shortened CDV period of 3 months for documents prepared by IEC/TC 40, IEC/TC 86 and IEC/TC 100 approved by CLC/BT in D138/086 * 86B/3425/RVC established on 2012-04-13: FDIS decided
Technical committees Activities 335
CENELEC Inventory of Technical Activities
FprEN 61300-2-11:201X (PR=23698) IEC 61300-2-11:201X (86B/3280/CDV) CLC/TC 86BXA IEC/SC 86B // Stage : 3090 2012-08-31 Draft for vote due at CCMC by: - Fibre optic interconnecting devices and passive components - Basic test and measurement procedures - Part 2-11:
Tests - Axial compression NOTE: Will supersede EN 61300-2-11:1997 * D133/C027: dow=dor + 12 months for revisions of standards *
86B/3349/RVC established on 2011-12-23: FDIS decided
FprEN 61300-2-14:201X (PR=23889) IEC 61300-2-14:201X (86B/3329/CDV) CLC/TC 86BXA IEC/SC 86B // Stage : 3090 2012-09-30 Draft for vote due at CCMC by: - Fibre optic interconnecting devices and passive components - Basic test and measurement procedures - Part 2-14:
Tests - Optical power NOTE: Will supersede EN 61300-2-14:2006 * D133/C027: dow=dor + 12 months for revisions of standards within CLC/TC 86BXA * D138/086: Shortened CDV period of 3 months for documents prepared by IEC/TC 40, IEC/TC 86 and IEC/TC 100 * 86B/3405/RVC established on 2012-03-16: FDIS decided
FprEN 61300-2-52:201X (PR=23891) IEC 61300-2-52:201X (86B/3331/CDV) CLC/TC 86BXA IEC/SC 86B // Stage : 3090 2012-09-30 Draft for vote due at CCMC by: - Fibre optic interconnecting devices and passive components - Basic test and measurement procedures - Part 2-52:
Tests - Bending test for cords NOTE: 86B/3407/RVC established on 2012-03-16: FDIS decided
FprEN 61753-022-2:201X (PR=23285) IEC 61753-022-2:201X (86B/3155/CDV) CLC/TC 86BXA IEC/SC 86B // Stage : 3090 2011-12-31 Draft for vote due at CCMC by: - Fibre optic interconnecting devices and passive components - Performance standard - Part 022-2: Fibre optic
connectors terminated on multimode fibre for category C - Controlled environment NOTE: Will supersede EN 61753-022-2:2003 * 86B/3258/RVC established on 2011-07-15: FDIS decided
FprEN 61753-051-3:201X (PR=23919) IEC 61753-051-3:201X (86B/3337/CDV) CLC/TC 86BXA IEC/SC 86B // Stage : 3090 2012-09-30 Draft for vote due at CCMC by: - Fibre optic interconnecting devices and passive components - Performance standard - Part 051-3: Single mode fibre
plug style optical attenuator for category U - Uncontrolled environment NOTE: Will supersede EN 61753-051-3:2002 * D133/C027: dow=dor + 12 months for revisions of standards within CLC/TC 86BXA * D138/086: Shortened CDV period of 3 months for documents prepared by IEC/TC 40, IEC/TC 86 and IEC/TC 100 * 86B/3408/RVC established on 2012-03-16: FDIS decided
FprEN 61753-056-2:201X (PR=23870) IEC 61753-056-2:201X (86B/3325/CDV) CLC/TC 86BXA IEC/SC 86B // Stage : 3090 2012-08-31 Draft for vote due at CCMC by: - Fibre optic interconnecting devices and passive components - Performance standard - Part 056-2: Single mode fibre
pigtailed style optical fuse for category C - Controlled environment NOTE: 86B/3399/RVC established on 2012-03-09: FDIS decided
Technical committees Activities 336
CENELEC Inventory of Technical Activities
FprEN 61753-057-2:201X (PR=23871) IEC 61753-057-2:201X (86B/3326/CDV) CLC/TC 86BXA IEC/SC 86B // Stage : 3090 2012-08-31 Draft for vote due at CCMC by: - Fibre optic interconnecting devices and passive components - Performance standard - Part 057-2: Single mode fibre
plug-recptacle-receptacle style optical fuse for category C - Controlled environment NOTE: 86B/3400/RVC established on 2012-03-09: FDIS decided
FprEN 61753-058-2:201X (PR=23872) IEC 61753-058-2:201X (86B/3327/CDV) CLC/TC 86BXA IEC/SC 86B // Stage : 3090 - Fibre optic interconnecting devices and passive components - Performance standard - Part 058-2: Single mode fibre
pigtailed style optical power limiter for category C - Controlled environment NOTE: 86B/3401/RVC established on 2012-03-09: FDIS decided
FprEN 61753-059-2:201X (PR=23920) IEC 61753-059-2:201X (86B/3338/CDV) CLC/TC 86BXA IEC/SC 86B // Stage : 3090 2012-09-30 Draft for vote due at CCMC by: - Fibre optic interconnecting devices and passive components - Performance standard - Part 059-2: Single mode fibre
plug-receptacle style optical power limiter for category C - Controlled environment NOTE: D138/086: Shortened CDV period of 3 months for documents prepared by IEC/TC 40, IEC/TC 86 and
IEC/TC 100 * 86B/3409/RVC established on 2012-03-16: FDIS decided
FprEN 61753-143-2:201X (PR=23869) IEC 61753-143-2:201X (86B/3323/CDV) CLC/TC 86BXA IEC/SC 86B // Stage : 3090 Fibre optic interconnecting devices and passive components - Performance standard - Part 143-2: Optical passive
VIPA-based dispersion compensator of single-mode fibre transmission for category C - Controlled environments NOTE: 86B/3402/RVC established on 2012-03-09: FDIS decided
FprEN 61754-27:201X (PR=23961) IEC 61754-27:201X (86B/3351/CDV) CLC/TC 86BXA IEC/SC 86B // Stage : 3090 2012-10-30 Draft for vote due at CCMC by: - Fibre optic interconnecting devices and passive components - Fibre optic connector interfaces - Part 27: Type M12-
FO connector famlily NOTE: Shortened CDV period of 3 months for documents prepared by IEC/TC 40, IEC/TC 86 and IEC/TC 100
approved by CLC/BT in D138/086 * 86B/3426/RVC established on 2012-04-13: FDIS decided
FprEN 62664-1-1:201X (PR=23699) IEC 62664-1-1:201X (86B/3281/CDV) CLC/TC 86BXA IEC/SC 86B // Stage : 3090 2012-08-31 Draft for vote due at CCMC by: - Fibre optic interconnecting devices and passive components - Fibre optic connector product specifications - Part 1-1:
LC-PC duplex multi mode connectors terminated on IEC 60793-2 category A1a fibre NOTE: D133/C027: dow=dor + 12 months for revisions of standards * 86B/3348/RVC established on 2011-12-23:
FDIS decided
Technical committees Activities 337
CENELEC Inventory of Technical Activities
Enquiry launched
prEN 50411-3-6:2010 (PR=22858) CLC/TC 86BXA Stage : 4060 2011-07-05 Draft for vote due at CCMC by: 2011-06-30 Fibre organisers and closures to be used in optical fibre communication systems - Product specifications - Part 3-6:
Multimode mechanical fibre splice NOTE: D136/C147: NWI approved
At Secretariat stage
prEN 50377-7-1 (PR=23045) CLC/TC 86BXA Stage : 2020 - Draft for vote due at CCMC by: 2011-12-15 Connector sets and interconnect components to be used in optical fibre communication systems - Product
specifications - Part 7-1: Type LC-PC duplex terminated on IEC 60793-2 category A1a and A1b multimode fibre NOTE: Will supersede EN 50377-7-1:2004 * D137/C156: NWI approved with target date for vote: 2011-12-15 *
2010-12 decision: Text to be sent to CCMC for 5ME
prEN 50377-7-2 (PR=23046) CLC/TC 86BXA Stage : 2020 - Draft for vote due at CCMC by: 2011-12-15 Connector sets and interconnect components to be used in optical fibre communication systems - Product
specifications - Part 7-2: LC-PC duplex terminated on IEC 60793-2 category B1.1 and B1.3 singlemode fibre NOTE: Will supersede EN 50377-7-2:2004 * D137/C156: NWI approved with target date for vote: 2011-12-15 *
2010-12 decision: Text to be sent to CCMC for 5ME
prEN 50377-7-3 (PR=23047) CLC/TC 86BXA Stage : 2020 - Draft for vote due at CCMC by: 2011-12-15 Connector sets and interconnect components to be used in optical fibre communication systems - Product
specifications - Part 7-3: Type LC-APC duplex terminated on IEC 60793-2 category B1.1 and B1.3 singlemode fibre NOTE: Will supersede EN 50377-7-3:2004 * D137/C156: NWI approved with target date for vote: 2011-12-15 *
2010-12 decision: Text to be sent to CCMC for 5ME
New work item approved
EN 50377-14-1:2011/prA (PR=24000) CLC/TC 86BXA Stage : 1099 - Draft for vote due at CCMC by: 2014-06-19 Connector sets and interconnect components to be used in optical fibre communication systems - Product
specifications - Part 14-1: Cords with IEC 60793-2-50 singlemode category B1.1 and B1.3 fibre for category C NOTE: D141/C043: NWI approved * Urgent amendment requested to correct many errors in EN (PR=23044)
prEN 50377-17-1 (PR=23997) CLC/TC 86BXA Stage : 1099 - Draft for vote due at CCMC by: 2014-06-19 Type FPFT( factory polished field terminated) simplex connector factory terminated with EN 60793-2-50 category
B1.3 fibre and field mounted onto IEC 60793-2-50 category B1.3 or B6a1 or B6a 2 single mode fibre, Category C NOTE: D141/C043: NWI approved * Product specification specifically requested by Telecom Italia to meet its
market needs
Technical committees Activities 338
CENELEC Inventory of Technical Activities
prEN 50411-3-8 (PR=23998) CLC/TC 86BXA Stage : 1099 - Draft for vote due at CCMC by: 2014-06-19 Fibre organisers and closures to be used in optical fibre communication systems - Product specifications - Part 3-6:
Terminal Equipment Box that houses an ENTI and terminal equipment NOTE: D141/C043: NWI approved * Product specification requested by TC 215
prEN 50516-3-1 (PR=23999) CLC/TC 86BXA Stage : 1099 - Draft for vote due at CCMC by: 2014-06-19 Industrial connector sets and interconnect components to be used in optical fibre control and communication systems - Product specifications - Part 3-1: Type ODVA APC terminated on EN 60793-2-50 category B1.1 and B1.3
singlemode fibre to meet the requirements of category I (industrial environments) as specified in EN 50173-1 and IEC 61753-1-3 NOTE: D141/C043: NWI approved
Work stopped (last 12 months)
FprEN 61300-3-7:201X/FprAA:2011 (PR=22343) CLC/TC 86BXA Stage : 5098 - Fibre optic interconnecting devices and passive components - Basic test and measurement procedures - Part 3-7:
Examinations and measurements - Wavelength dependence of attenuation and return loss of single mode components NOTE: Merged with FprEN 61300-3-7:2008 (pr=21571)
Technical committees Activities 339
CENELEC Inventory of Technical Activities
TC 88
Wind turbines
To prepare draft standards on wind turbine systems on the basis of a detailed work programme for the execution of the mandated tasks to be performed for the standardization in this field.
Officers Meetings Secretary: Mr Martijn GEERTZEN ( NL) Charlottenlund 2007-03-27
Chairman: Mr Mike WÖBBEKING ( DE)
Vote launched
FprEN 61400-12-2:2011 (PR=23692) IEC 61400-12-2:201X (88/409/CDV) CLC/TC 88 IEC/TC 88 // Stage : 5060 2012-02-06 Wind turbines - Part 12-2: Power performance of electricity producing wind turbines based on nacelle anemometry
FprEN 61400-23:2011 (PR=23873) IEC 61400-23:201X (88/420/CDV) CLC/TC 88 IEC/TC 88 // Stage : 5060 2012-05-14 Wind turbine generator systems - Part 23: Full-scale structural testing of rotor blades NOTE: Awaiting outcome of RVC before further processing
Vote decided
FprEN 50308:201X (PR=21340) CLC/TC 88 MD (2006/42/EC) Stage : 4099 2012-06-08 Draft for vote due at CCMC by: 2012-04-12 Wind turbines - Protective measures - Requirements for design, operation and maintenance NOTE: 2012-05-24 - UAP editing allocated to [email protected] * D130/C124: NWI approved * D138/056:
(Under Benchmark 3) Target date for vote extended to read 2012-04-12
FprEN 61400-4:201X (PR=23269) IEC 61400-4:201X (88/390/CDV) CLC/TC 88 IEC/TC 88 // Stage : 3090 2012-05-31 Draft for vote due at CCMC by: - Wind turbines - Part 4: Design requirements for wind turbine gearboxes NOTE: 88/413/RVC + 88/413A/RVC established on 2012-03-16: FDIS decided
FprEN 61400-11:201X (PR=23234) IEC 61400-11:201X (88/384/CDV) CLC/TC 88 IEC/TC 88 // Stage : 3090 2012-01-31 Draft for vote due at CCMC by: - Wind turbines - Part 11: Acoustic noise measurement techniques NOTE: Will supersede EN 61400-11:2003 + A1:2006 * 88/414/RVC + 88/414A/RVC established on 2011-12-09:
FDIS decided
Technical committees Activities 340
CENELEC Inventory of Technical Activities
New work item approved
EN 61400-1:2005/prA (PR=21342) CLC/TC 88 Stage : 1099 2007-09-30 Draft for vote due at CCMC by: 2012-04-12 Wind turbines - Part 1: Design requirements NOTE: D130/C124: NWI approved * Amendment to include a link between IEC 61400-1 and Eurocode structural codes, which could be a "national annex" for wind turbines specifying the partial safety factors to be used in wind turbine design * D138/056: (Under Benchmark 3) Target date for vote extended to read 2012-04-12
Technical committees Activities 341
CENELEC Inventory of Technical Activities
TC 94 (dormant)
Relays
To prepare and maintain specifications relating to electrical relays in accordance with the requirements of document CECC 00 111, for use within the CECC system for the quality assessment of electronic components.
Officers Meetings Chairman: Mr Werner JOHLER ( CH) Zug 2002-01-25
Secretary: Mr Bernhard SPALT ( AT)
Published (last 12 months)
EN 61812-1:2011 (PR=22705) IEC 61812-1:2011 CLC/TC 94 IEC/TC 94 EMC (2004/108/EC) LVD (2006/95/EC) // Stage : 6060 Time relays for industrial and residential use - Part 1: Requirements and tests NOTE: Supersedes EN 116000-2:1992 and EN 61812-1:1996 + corr. Feb.1999 + A11:1999 dor : 2011-06-29 doa : 2011-09-29 dop : 2012-03-29 dow: 2014-06-29
Vote launched
FprEN 62246-1-1:2011 (PR=23921) IEC 62246-1-1:201X (94/339/CDV) CLC/TC 94 IEC/TC 94 // Stage : 5060 2012-05-28 Reed switches - Part 1-1: Quality assessment specification NOTE: Awaiting outcome of RVC before further processing
Technical committees Activities 342
CENELEC Inventory of Technical Activities
TC 97
Electrical installations for lighting and beaconing of aerodromes
To prepare standards for design, installation, operation and maintenance of aeronautical ground lighting of aerodromes. The activity covers requirements which apply to the whole system from the power source up to and including the luminaries used in aeronautical ground lighting.
The activity will not cover - electrical installations already standardised by TC 64; - luminaries not used as aeronautical ground lights standardised by TC 34; - special cables for the constant current series circuit standardised by TC 20.
Note : Operational requirements for aeronautical ground lights are specified in Annex 14 to the Convention on International Civil Aviation (Volume I, Aerodrome Design and Operations).
Officers Meetings Chairman: Mr Marta PRADEL ( ES) Brussels 2005-12-05 / 12-06 Secretary: Mr Luca SANDRO ( IT) Brussels 2007-06-14 / 06-15
Barcelona 2008-09-18 / 09-19 Madrid 2009-06-24
Published (last 12 months)
EN 61821:2011 (PR=23005) IEC 61821:2011 CLC/TC 97 IEC/TC 97 // Stage : 6060 Electrical installations for lighting and beaconing of aerodromes - Maintenance of aeronautical ground lighting
constant current series circuits NOTE: Supersedes EN 61821:2003 dor : 2011-11-03 doa : 2012-02-03 dop : 2012-08-03 dow: 2014-11-03
New work item approved
CLC/prTR 50XXX (PR=21558) CLC/TC 97 Stage : 1099 2008-08-01 Draft for vote due at CCMC by: 2011-01-31 EMC requirements for visual aids systems NOTE: D132/C012: NWI approved * Replaces PR=14935 "EMC - Aerodrome environment" (cancelled by
D127/115)
Work stopped (last 12 months)
CLC/prTS 50235 (PR=22204) CLC/TC 97 Stage : 1098 - Electrical installations for lighting and beaconing of aerodromes - Signs - Technical specifications and tests NOTE: D134/C120: NWI approved - Target date for vote 2010-09-18 * Incorporates PR=14135 * 2011-08 (Under
Benchmark 3): TC decision: to stop the project * NWI to be requested later on if appropriate
Technical committees Activities 343
CENELEC Inventory of Technical Activities
prEN 50XXX (PR=22202) CLC/TC 97 Stage : 1098 - Electrical installations for lighting and beaconing of aerodromes - AGL field photometric testing NOTE: D134/C120: NWI approved - Target date for vote: 2010-09-18 * Incorporates PR=12374 * 2011-08 (Under
Benchmark 3): TC decision: to stop the project * NWI to be requested later on if appropriate
prEN 50XXX (PR=22205) CLC/TC 97 Stage : 1098 - Electrical installations for lighting and beaconing of aerodromes - Flashing lights, inset and elevated luminaires NOTE: D134/C120: NWI approved - Target date for vote 2010-09-18 * 2011-08 (Under Benchmark 3): TC decision:
to stop the project * NWI to be requested later on if appropriate
Technical committees Activities 344
CENELEC Inventory of Technical Activities
TC 99X
Power installations exceeding 1 kV a.c. (1,5 kV d.c.)
To prepare harmonized standards for high voltage power installations (exceeding 1 kV a.c. or 1,5 kV d.c.) located indoors or outdoors, including earthing. The standards will specify the design requirements of the installations, and the selection and erection of electrical equipment in order to ensure the safety of persons and the proper operation of the installations. The standards will not be applicable to factory built and type tested equipment, but will be relevant to the installation of this equipment. The standards will not be applicable to overhead and underground lines between separate installations.
Officers Meetings Secretary: Dr Oliver SCHMITT ( DE) Brussels 2009-09-29
Chairman: Mr Fahd SULTANEM ( FR)
Published (last 12 months)
EN 61936-1:2010/AC:2012 (PR=24028) CLC/TC 99X Stage : 6060 Power installations exceeding 1 kV a.c. - Part 1: Common rules dor : - doa : - dop : - dow : -
Technical committees Activities 345
CENELEC Inventory of Technical Activities
TC 100X
Audio, video and multimedia systems and equipment and related sub-systems
To monitor the adoption in CENELEC of the technical work from IEC/TC 100 standards in the field of audio, video and multimedia systems and equipment. These standards include specification of the performance, methods of measurement for consumer and professional equipment and their system application as well as interoperability with other systems and equipment. To ensure that any deviation from the IEC standards, such as common modifications, special national conditions and A- deviations, is only in response to a clear and justifiable European need, such as European and national legislative requirements. To keep IEC/TC 100 informed of European requirements so that they may be considered for inclusion in IEC standards. To coordinate the work with other standardisation organisations on European level, taking responsibility for applicable mandates from the European Commission and developing its own standards only when necessary. Standards and other deliverables prepared by Technical Area 5 (TA5) of IEC/TC 100 do not fall under the scope of CLC/TC 100X but are covered on European level by CLC/TC 209.
Officers Meetings
Secretary: Mr Gerhard HENNINGER ( DE)
Published (last 12 months)
EN 50563:2011 (PR=23095) CLC/TC 100X ECOPOCO (278/2009) ERP (2009/125/EC) Stage : 6060 External a.c. - d.c. and a.c. - a.c. power supplies – Determination of no-load power and average efficiency of active
modes NOTE: Publication editing allocated to [email protected] * Work initially handled by CLC/TC
108X/JWG TC 108X/TC 59X * D141/C101: transferred to new TC 100X Mandated: M/450 dor : 2011-10-10 doa : 2012-04-10 dop : 2012-10-10 dow: 2014-10-10
EN 61937-10:2011 (PR=23043) IEC 61937-10:2011 CLC/TC 100X IEC/TC 100 // Stage : 6060 Digital audio - Interface for non-linear PCM encoded audio bitstreams applying IEC 60958 - Part 10: Non-linear
PCM bitstreams according to the MPEG-4 Audio Lossless Coding (ALS) format NOTE: Initially handled by TC 206 (disbanded) * D141/C101: Transferred to new TC 100X dor : 2011-05-25 doa : 2011-08-25 dop : 2012-02-25 dow : 2014-05-25
EN 62087:2012 (PR=23522) IEC 62087:2011 CLC/TC 100X IEC/TC 100 ECOSET (107/2009) ECOTV (642/2009) ERP (2009/125/EC) Stage : 6060 Methods of measurement for the power consumption of audio, video and related equipment NOTE: Publication editing allocated to [email protected] * IEC 62087:2011 ed 3 which erroneously missed the IEC/CENELEC parallel procedure endorsed through UAP without modifications * Work on CMs to fulfil M/451
needed for future Ed 4 to be handled under // procedure * Supersedes EN 62087:2009 * Initially handled by TC 206 (disbanded) * D141/C101: Transferred to new TC 100X Mandated: M/451 dor : 2012-02-13 doa : 2012-08-13 dop : 2013-02-13 dow: 2015-02-13
Technical committees Activities 346
CENELEC Inventory of Technical Activities
Vote launched
EN 62227:2008/FprA1:2012 (PR=24065) IEC 62227:2008/A1:201X (100/1953/CDV) CLC/TC 100X IEC/TC 100 // Stage : 5020 2012-06-01 Multimedia home server systems - Digital rights permission code NOTE: D138/086: Shortened CDV period of 3 months for documents prepared by IEC/TC 40, IEC/TC 86 and
IEC/TC 100
FprEN 62481-1:2012 (PR=24236) IEC 62481-1:201X (100/1992/CDV) CLC/TC 100X IEC/TC 100 // Stage : 5020 2012-08-17 Digital living network alliance (DLNA) home networked device interoperability guidelines - Part 1: Architecture and
protocols NOTE: D138/086: Shortened CDV period of 3 months for documents prepared by IEC/TC 40, IEC/TC 86 and
IEC/TC 100
FprEN 62481-2:2012 (PR=24237) IEC 62481-2:201X (100/1993/CDV) CLC/TC 100X IEC/TC 100 // Stage : 5020 2012-08-17 Digital living network alliance (DLNA) home networked device interoperability guidelines - Part 2: DLNA media
formats NOTE: D138/086: Shortened CDV period of 3 months for documents prepared by IEC/TC 40, IEC/TC 86 and
IEC/TC 100.
FprEN 62481-3:2012 (PR=24238) IEC 62481-3:201X (100/1994/CDV) CLC/TC 100X IEC/TC 100 // Stage : 5020 2012-08-17 Digital living network alliance (DLNA) home networked device interoperability guidelines - Part 3: Link protection NOTE: Will supersede EN 62481-3:2011* D138/086: Shortened CDV period of 3 months for documents prepared by
IEC/TC 40, IEC/TC 86 and IEC/TC 100.
FprEN 62481-4:2012 (PR=24239) IEC 62481-4:201X (100/1995/CDV) CLC/TC 100X IEC/TC 100 // Stage : 5020 2012-08-17 Digital living network alliance (DLNA) home networked device interoperability guidelines - Part 4: DRM
interoperability solutions NOTE: D138/086: Shortened CDV period of 3 months for documents prepared by IEC/TC 40, IEC/TC 86 and
IEC/TC 100
FprEN 62481-5:2012 (PR=24240) IEC 62481-5:201X (100/1996/CDV) CLC/TC 100X IEC/TC 100 // Stage : 5020 2012-08-17 Digital living network alliance (DLNA) home networked device interoperability guidelines - Part 5 -1: DLNA device
profile guidelines - General NOTE: D138/086: Shortened CDV period of 3 months for documents prepared by IEC/TC 40, IEC/TC 86 and
IEC/TC 100.
FprEN 62680-1:2012 (PR=24189) IEC 62680-1:201X (100/1981/CDV) CLC/TC 100X IEC/TC 100 // Stage : 5020 2012-08-10 Universal Serial Bus interfaces for data and power - Part 1: Universal Serial Bus specification NOTE: D138/086: Shortened CDV period of 3 months for documents prepared by IEC/TC 40, IEC/TC 86 and
IEC/TC 100.
Technical committees Activities 347
CENELEC Inventory of Technical Activities
FprEN 62680-2:2012 (PR=24190) IEC 62680-2:201X (100/1982/CDV) CLC/TC 100X IEC/TC 100 // Stage : 5020 2012-08-10 Universal Serial Bus interfaces for data and power - Part 2: USB micro-USB cables and connectors specification NOTE: D138/086: Shortened CDV period of 3 months for documents prepared by IEC/TC 40, IEC/TC 86 and
IEC/TC 100.
FprEN 62680-3:2012 (PR=24191) IEC 62680-3:201X (100/1983/CDV) CLC/TC 100X IEC/TC 100 // Stage : 5020 2012-08-10 Universal Serial Bus interfaces for data and power - Part 3: USB battery charging specification NOTE: D138/086: Shortened CDV period of 3 months for documents prepared by IEC/TC 40, IEC/TC 86 and
IEC/TC 100.
FprEN 62680-4:2012 (PR=24192) IEC 62680-4:201X (100/1984/CDV) CLC/TC 100X IEC/TC 100 // Stage : 5020 2012-08-10 Universal Serial Bus interfaces for data and power - Part 4: Universal Serial Bus cables and connectors class NOTE: D138/086: Shortened CDV period of 3 months for documents prepared by IEC/TC 40, IEC/TC 86 and
IEC/TC 100.
FprEN 62698:2012 (PR=24026) IEC 62698:201X (100/1947/CDV) CLC/TC 100X IEC/TC 100 // Stage : 5060 2012-05-28 Multimedia home server systems - Rights information interoperability for IPTV NOTE: D138/086: Shortened CDV period of 3 months for documents prepared by CLC/TC 100 * Initially handled by TC 206 (disbanded) * D141/C101: Transferred to new TC 100X * Awaiting outcome of RVC before further processing
FprEN 62731:2012 (PR=24048) IEC 62731:201X (100/1950/CDV) CLC/TC 100X IEC/TC 100 // Stage : 5060 2012-06-11 Text-to-Speech for television - General requirements NOTE: D138/086: Shortened CDV period of 3 months for documents prepared by IEC/TC 40, IEC/TC 86 and
IEC/TC 100
New work item to be approved (BT/TC)
CLC/prTR 62002-3 (PR=22534) IEC/TR 62002-3:2008 CLC/TC 100X IEC/TC 100 Stage : 1020 2009-07-23 Draft for vote due at CCMC by: - Mobile and portable DVB-T/H radio access - Part 3: Measurement interface NOTE: Initially handled by TC 206 (disbanded) * D141/C101: Transferred to new TC 100X
CLC/prTR 62002-4 (PR=22535) IEC/TR 62002-4:2009 CLC/TC 100X IEC/TC 100 Stage : 1020 2009-07-23 Draft for vote due at CCMC by: - Mobile and portable DVB-T/H radio access - Part 4: Measurement methods for total radiated sensitivity in hand-held
broadcast terminals NOTE: Initially handled by TC 206 (disbanded) * D141/C101: Transferred to new TC 100X
Technical committees Activities 348
CENELEC Inventory of Technical Activities
CLC/prTR 62291 (PR=22536) IEC/TR 62291:2009 CLC/TC 100X IEC/TC 100 Stage : 1020 2009-07-23 Draft for vote due at CCMC by: - Multimedia data storage - Application program interface for UDF based file systems NOTE: Initially handled by TC 206 (disbanded) * D141/C101: Transferred to new TC 100X
Technical committees Activities 349
CENELEC Inventory of Technical Activities
TC 106X
Electromagnetic fields in the human environment
TC 106X deals with various aspects of the exposure of people to electromagnetic fields from 0 Hz to 300 GHz.
Officers Meetings Secretary: Dr Thomas FISCHER ( DE) Madrid 2008-04-02 Chairman: Dr Philip CHADWICK ( GB) Dublin 2009-03-31
Espoo 2010-05-05 Brussels 2012-04-26
Published (last 12 months)
EN 50360:2001/A1:2012 (PR=23365) CLC/TC 106X RTTED (1999/5/EC) Stage : 6060 Product standard to demonstrate the compliance of mobile phones with the basic restrictions related to human
exposure to electromagnetic fields (300 MHz - 3 GHz) NOTE: Publication editing allocated to [email protected] * Formal Vote editing allocated to
[email protected] Mandated: M/305 dor : 2012-02-13 doa : 2012-08-13 dop : 2013-02-13 dow: 2015-02-13
EN 50400:2006/AC:2011 (PR=23797) CLC/TC 106X Stage : 6060 Basic standard to demonstrate the compliance of fixed equipment for radio transmission (110 MHz - 40 GHz) intended for use in wireless telecommunication networks with the basic restrictions or the reference levels related to general public exposure to radio frequency electromagnetic fields, when put into service NOTE: D139/C139: To modify the Swiss A-deviation in EN 50400:2006 (PR=15349) in accordance with
BT139/CH0115/NCP dor : - doa : - dop : - dow : -
EN 50401:2006/A1:2011 (PR=21907) CLC/TC 106X RTTED (1999/5/EC) Stage : 6060 Product standard to demonstrate the compliance of fixed equipment for radio transmission (110 MHz - 40 GHz) intended for use in wireless telecommunication networks with the basic restrictions or the reference levels related to general public exposure to radio frequency electromagnetic fields, when put into service NOTE: In hands of WG 1 Mandated: M/305 dor : 2011-08-29 doa : 2012-02-29 dop : 2012-08-29 dow: 2014-08-29
EN 50527-2-1:2011 (PR=16682) CLC/TC 106X EMF (2004/40/EC) Stage : 6060 Procedure for the assessment of the exposure to electromagnetic fields of workers bearing active implantable medical
devices - Part 2-1: Specific assessment for workers with cardiac pacemakers NOTE: 2011-03-29 - Publication editing allocated to [email protected] * Numbering scheme analogue to EN
45502-2-1 Mandated: M/351 dor : 2011-05-02 doa : 2011-11-02 dop : 2012-05-02 dow: 2014-05-02
Technical committees Activities 350
CENELEC Inventory of Technical Activities
Vote launched
EN 50400:2006/AA:201X (PR=21906) CLC/TC 106X Stage : 5091 - Basic standard to demonstrate the compliance of fixed equipment for radio transmission (110 MHz - 40 GHz) intended for use in wireless telecommunication networks with the basic restrictions or the reference levels related to general public exposure to radio frequency electromagnetic fields, when put into service NOTE: Publication editing allocated to [email protected] * In hands of WG 1 * D139/054: Ratification
cancelled - CLC/TC 106X to submit a revised version of Amendment A to vote if need be
FprEN 61786-1:2012 (PR=24103) IEC 61786-1:201X (106/249/CDV) CLC/TC 106X IEC/TC 106 // Stage : 5020 2012-08-10 Measurement of DC magnetic fields, AC magnetic and electric fields from 1 Hz to 100 kHz with regard to exposure
of human beings - Requirements for instruments
FprEN 62209-1:2011 (PR=23702) IEC 62209-1:201X (106/233/CDV) CLC/TC 106X IEC/TC 106 // Stage : 5060 2012-02-13 Human exposure to radio frequency fields from hand-held and body-mounted wireless communication devices human models, instrumentation, and procedures - Part 1: Procedure to determine the specific absorption rate (sar) for devices used next to the ear (frequency range of 300 mhz to 6 ghz) NOTE: Will supersede EN 62209-1:2006
Vote decided
FprEN 62209-3:201X (PR=22469) IEC 62209-3:201X CLC/TC 106X IEC/TC 106 // Stage : 3090 - Draft for vote due at CCMC by: - Determining the Peak Spatial-Average Specific Absorption Rate (SAR) in the Human Body from Wireless Communications Devices, 30 MHz - 6 GHz: General Requirements for using the Finite-Difference Time-Domain (FDTD) Method for SAR Calculations NOTE: D135/C093 (CENELEC enquiry to be launched simultaneously with CDV) cancelled by D135/034:
Exceptional parallel procedure on future IEC 62209-3
FprEN 62209-4:201X (PR=22470) IEC 62209-4:201X CLC/TC 106X IEC/TC 106 // Stage : 3090 - Draft for vote due at CCMC by: - Specific Absorption Rate (SAR) in the Human Body from Wireless Communications Devices: Specific
Requirements for Finite Difference Time Domain (FDTD) Modelling of Exposure from Vehicle Mounted Antennas NOTE: D135/C093 (CENELEC enquiry to be launched simultaneously with CDV) cancelled by D135/034:
Exceptional parallel procedure on future IEC 62209-4
FprEN 62209-5:201X (PR=22471) IEC 62209-5:201X CLC/TC 106X IEC/TC 106 // Stage : 3090 - Draft for vote due at CCMC by: - Determining the Peak Spatial-Average Specific Absorption Rate (SAR) in the Human Body from Wireless Communications Devices, 30 MHz - 6 GHz: Specific Requirements for using the Finite-Difference Time-Domain (FDTD) Method for SAR Calculations of Mobile Phones NOTE: D135/C093 (CENELEC enquiry to be launched simultaneously with CDV) cancelled by D135/034:
Exceptional parallel procedure on future IEC 62209-5
Technical committees Activities 351
CENELEC Inventory of Technical Activities
Enquiry launched
prEN 50566:2011 (PR=22457) CLC/TC 106X RTTED (1999/5/EC) Stage : 4060 2012-05-16 Draft for vote due at CCMC by: 2011-12-31 Product standard to demonstrate compliance of radio frequency fields from handheld and body-mounted wireless
communication devices (30 MHz - 6 GHz) NOTE: Enquiry editing allocated to [email protected] * Reactivation of project set back to PWI stage pending publication of IEC 62209-2 as both documents are linked * D135/C096: NWI approved - Target date for vote = 2011-12-31 Mandated: M/305
New work item approved
EN 50492:2008/prA (PR=23018) CLC/TC 106X Stage : 1099 - Draft for vote due at CCMC by: 2013-05-31 Basic standard for the in-situ measurement of electromagnetic field strength related to human exposure in the vicinity
of base stations NOTE: D137/C111: NWI approved with target date for vote: 2013-05-01 * Linked to EMF * In hands of WG 1
prEN 50XXX (PR=23958) CLC/TC 106X EMF (2004/40/EC) Stage : 1099 - Draft for vote due at CCMC by: 2014-05-22 Measurement and calculation of the EMF exposure of electrical welding workers NOTE: D141/C005: NWI approved Mandated: M/351
New work item to be approved (BT/TC)
prEN 50XXX (PR=21908) CLC/TC 106X RTTED (1999/5/EC) Stage : 1091 - Draft for vote due at CCMC by: 2011-12-31 EMF requirements of ground based air traffic management equipment NOTE: D133/C113: NWI approved with target date for vote 2011-12-31 * Letter from CLC sent to the European Commission following 135BT regarding overlap of M/305 and M/405. Advice expected * Target date for vote not predictable as it depends on EU response Mandated: M/305; M/351; M/405
Technical committees Activities 352
CENELEC Inventory of Technical Activities
TC 107X (dormant)
Process management for avionics
To develop process management standards on systems, components and equipment used in the field of avionics. Avionics includes electronics used in commercial, civil and military aerospace applications. The work of TC 107X will take into account the special European needs e.g. in the field of ecological and environmental concerns such as disposal or recycling of electronic equipment, including the previous work items of BTTF 91-3 and BTTF 101-3. Furthermore, CLC/TC 107X is to ensure that the specific European requirements will adequately be reflected in IEC/TC 107.
Officers Meetings
London 2005-02-17
No active standardization work registered
Technical committees Activities 353
CENELEC Inventory of Technical Activities
TC 108X
Safety of electronic equipment within the fields of Audio/Video, Information Technology and Communication Technology
1. To deal with the adoption in CENELEC of technical work of IEC/TC 108 and to coordinate the work with other technical Bodies at European level e.g. ETSI. To make own Standards where a particular need arises. Note : The field of application of IEC/TC 108 is as follows: Standardization in the field of safety for audio/video and similar technology, information technology and communication technology equipment, including environmental aspects. Additionally, to prepare requirements for methods of measurement of energy efficiency of information technology and communication technology equipment. Consideration of energy efficiency includes power conservation. 2. To ensure that any deviation from the IEC standards, such as common modifications, special national conditions and A-deviations, is only in response to a clear and justifiable European need, such as European and national legislative needs. 3. To resolve application questions e.g. raised by CCA Operational Staff Meetings relative to standards within the responsibility of CLC/TC 108. 4. To keep IEC/TC 108 informed of European requirements so that they may be considered for inclusion in IEC standards within the responsibility of IEC/TC 108.
Officers Meetings Chairman: Mr Dieter LUGINSLAND ( DE) Brussels 2009-11-24 / 11-25 Secretary: Mr Bart WAMS ( NL) Brussels 2010-11-24 / 11-25
Brussels 2011-11-17 / 11-18 Brussels 2012-11-07 / 11-08
Published (last 12 months)
EN 60950-1:2006/AC:2011 (PR=23796) CLC/TC 108X Stage : 6060 Information technology equipment - Safety - Part 1: General requirements NOTE: D139/C138: To modify the Swiss A-deviation in EN 60950-1:2006 (PR=16298) in accordance with
BT139/CH0114/NCP dor : - doa : - dop : - dow : -
CLC/TS 62441:2012 (PR=23363) IEC/TS 62441:2011 CLC/TC 108X IEC/TC 108 Stage : 6060 Safeguards against accidentally caused candle flame ignition for audio/video, communication and information
technology equipment NOTE: 2011-12-20 - Publication editing allocated to [email protected] * Supersedes CLC/TS 62441:2007 dor : 2012-01-23 doa : 2012-07-23 dop : - dow : -
Vote launched
FprEN 60065:2011 (PR=23357) IEC 60065:201X (108/478A/CDV) CLC/TC 108X IEC/TC 108 GPSD (2001/95/EC) LVD (2006/95/EC) RTTED (1999/5/EC) // Stage : 5060 2012-06-11 Audio, video and similar electronic apparatus - Safety requirements NOTE: Will supersede EN 60065:2002 + corr. Mar.2006 + corr. Aug.2007 + A1:2006 + A2:2010 + A11:2008 + A12:2011 * FprAA (PR=23358) covering CMs to FprEN 60065:2011 is circulated simultaneously. If approved, both documents are intended to be merged and published as one single document, with the implementation dates of FprAA
Technical committees Activities 354
CENELEC Inventory of Technical Activities
FprEN 60065:2011/FprAA:2011 (PR=23358) CLC/TC 108X GPSD (2001/95/EC) LVD (2006/95/EC) RTTED (1999/5/EC) Stage : 5060 2012-06-11 Audio, video and similar electronic apparatus - Safety requirements NOTE: This FprAA covers CMs to FprEN 60065:2011 (PR=23357), both projects will be merged at ratification
stage and published as one single document with the implementation dates of FprAA
EN 60950-1:2006/FprA2:2011 (PR=23359) IEC 60950-1:2005/A2:201X (108/477/CDV) CLC/TC 108X IEC/TC 108 GPSD (2001/95/EC) LVD (2006/95/EC) RTTED (1999/5/EC) // Stage : 5060 2012-06-11 Information technology equipment - Safety - Part 1: General requirements NOTE: FprAE (PR=23360) covering CMs to EN 60950-1:2006/FprA2:2011 circulated simultaneously. If approved, both documents are intended to be merged and published as one single document, with the implementation dates of FprAE
FprEN 62075:2011 (PR=23485) IEC 62075:201X (108/448/CDV) CLC/TC 108X IEC/TC 108 // Stage : 5060 2011-11-04 Audio/video, information and communication technology equipment - Environmentally conscious design NOTE: Will supersede EN 62075:2008 * 108/466/RVC established on 2011-09-30: To be published without FDIS
stage
FprEN 62368-1:2011 (PR=23361) IEC 62368-1:201X (108/479/CDV) CLC/TC 108X IEC/TC 108 GPSD (2001/95/EC) LVD (2006/95/EC) RTTED (1999/5/EC) // Stage : 5060 2012-06-11 Audio/video, information and communication technology equipment - Part 1: Safety requirements NOTE: FprAA (PR=23362) covering CMs to FprEN 62368-1:2011 circulated simultaneously. If approved, both
documents are intended to be merged and published as one single document, with the implementation dates of FprAA Mandated: M/452
FprEN 62368-1:2011/FprAA:2011 (PR=23362) CLC/TC 108X GPSD (2001/95/EC) LVD (2006/95/EC) RTTED (1999/5/EC) Stage : 5060 2012-06-11 Audio/video, information and communication technology equipment - Part 1: Safety requirements NOTE: This FprAA covers CMs to FprEN 62368-1:2011 (PR=23361), both projects will be merged at ratification
stage and published as one single document with the implementation dates of FprAA Mandated: M/452
Vote decided
FprEN 62623:201X (PR=23388) IEC 62623:201X (108/446/CDV) CLC/TC 108X IEC/TC 108 // Stage : 3090 2012-03-31 Draft for vote due at CCMC by: - Measuring the energy consumption of desktop and notebook computers NOTE: 108/467/RVC established on 2011-11-04: FDIS decided
New work item approved
prEN 50332-1 (PR=23966) CLC/TC 108X Stage : 1099 - Draft for vote due at CCMC by: - Sound system equipment: Headphones and earphones associated with portable audio equipment - Maximum sound pressure level measurement methodology and limit considerations - Part 1: General method for "one package equipment" NOTE: Will supersede EN 50332-1:2000 * D142/C025: NWI approved
Technical committees Activities 355
CENELEC Inventory of Technical Activities
prEN 50332-2 (PR=23967) CLC/TC 108X Stage : 1099 - Draft for vote due at CCMC by: - Sound system equipment: Headphones and earphones associated with portable audio equipment - Maximum sound pressure level measurement methodology and limit considerations - Part 2: Matching of sets with headphones if either or both are offered separately NOTE: Will supersede EN 50332-2:2003 * NWI requested to 140 BT
prEN 50514 (PR=23968) CLC/TC 108X Stage : 1099 - Draft for vote due at CCMC by: - Audio, video and information technology equipment - Routine electrical safety testing in production NOTE: Will supersede EN 50514:2008 * D141/C025: NWI approved
Work item stopped/merged
EN 60950-1:2006/FprAE:2011 (PR=23360) CLC/TC 108X GPSD (2001/95/EC) LVD (2006/95/EC) RTTED (1999/5/EC) Stage : 5098 Information technology equipment - Safety - Part 1: General requirements NOTE: This FprAE covering CMs to EN 60590-1:2006/FprA2:2011 (PR=23359), merged and to be published as
one single document with the implementation dates of FprAE
Technical committees Activities 356
CENELEC Inventory of Technical Activities
TC 111X
Environment
To deal with environmental aspects for electrical and electronic products and systems. To promote activities in CENELEC relevant to reducing detrimental impacts of electrotechnical activities/products/systems on the natural environment (In this context "reducing" means a process of continual environment improvement aimed towards an optimum balance with social, economic, safety and performance requirements). To enhance CENELEC's environmental links with the European legal framework, particularly in the context of standardization aspects of EU environmental regulations and directives. To improve energy and resource efficiency of electrotechnical products and systems as important aspects in order to reduce impacts on the environment (for example climate changes and resource depletion) To prepare the necessary standards framework and in co-operation with other CENELEC Technical Bodies co-ordinate the development of, or when necessary produce, the needed standardization deliverables. Product TCs remain autonomous in dealing with environmental aspects relevant to the products included in their scope. To assist product committees in the elaboration of environmental requirements of product standards in order to foster common technical approaches and solutions for similar problems and thus promote consistency in CENELEC standards. To cooperate with recognized standardization bodies and other relevant organizations for matters of common environmental interest. To communicate with and to give advice to CENELEC BT and Technical Committees on questions related to work on environmental issues. EMC and EMF aspects are excluded, but relevant developments will be noted.
Officers Meetings Secretary: Mr Andrea LEGNANI ( IT) Brussels 2011-05-19 Chairman: Dr Herbert MROTZEK ( DE) Brussels 2011-11-24
Brussels 2012-03-29 Brussels 2012-11-08
Published
EN 50574:2012 (PR=22383) CLC/TC 111X WEEE (2002/96/EC) Stage : 6060 Collection, logistics & treatment requirements for end-of-life household appliances containing volatile fluorocarbons
or volatile hydrocarbons NOTE: 2012-02-20 - Publication editing allocated to [email protected]
Ratified
EN 62474:201X (PR=23061) IEC 62474:2012 CLC/TC 111X IEC/TC 111 // Stage : 5099 2012-05-24 Material declaration for products of and for the electrotechnical industry NOTE: 111/224/RVC established on 2011-06-03: FDIS decided*2012-04-06: Publication allocated to
Technical committees Activities 357
CENELEC Inventory of Technical Activities
Vote launched
FprEN 50581:2012 (PR=23432) CLC/TC 111X ROHS (2011/65/EU) Stage : 5020 2012-06-08 Technical documentation for the assessment of electrical and electronic products with respect to the restriction of
hazardous substances NOTE: 2012-02-14 UAP editing allocated to [email protected] * prEN based on IEC/TR 62476:2010 * EN to be used to give presumption of conformity to the RoHs (recast) Directive * 2012-01-23 PM request: to change track ENQ + FV into short UAP (3 months) Mandated: M/499
FprEN 62321-1:2011 (PR=23874) IEC 62321-1:201X (111/235/CDV) CLC/TC 111X IEC/TC 111 // Stage : 5060 2012-05-14 Determination of certain substances in electrotechnical products - Part 1: Introduction and overview NOTE: Will partially supersede EN 62321:2009 together with future parts of EN 62321 series * Awaiting outcome of
RVC before further processing
FprEN 62321-2:2011 (PR=23875) IEC 62321-2:201X (111/236/CDV) CLC/TC 111X IEC/TC 111 // Stage : 5060 2012-05-14 Determination of certain substances in electrotechnical products - Part 2: Disassembly, disjunction and mechanical
sample preparation NOTE: Will partially supersede EN 62321:2009 together with future parts of EN 62321 series * Awaiting outcome of
RVC before further processing
FprEN 62321-3-1:2011 (PR=23876) IEC 62321-3-1:201X (111/237/CDV) CLC/TC 111X IEC/TC 111 // Stage : 5060 2012-05-14 Determination of certain substances in electrotechnical products - Part 3-1: Screening electrotechnical products for
lead, mercury, cadmium, total chromium and total bromine using X-ray Fluorescence Spectrometry NOTE: Will partially supersede EN 62321:2009 together with future parts of EN 62321 series * Awaiting outcome of
RVC before further processing
FprEN 62321-3-2:2011 (PR=23877) IEC 62321-3-2:201X (111/238/CDV) CLC/TC 111X IEC/TC 111 // Stage : 5060 2012-05-14 Determination of certain substances in electrotechnical products - Part 3-2: Screening of total bromine in electric and
electronic products by combustion-ion chromatography (C-IC) NOTE: Will partially supersede EN 62321:2009 together with future parts of EN 62321 series * Awaiting outcome of
RVC before further processing
FprEN 62321-4:2011 (PR=23878) IEC 62321-4:201X (111/239/CDV) CLC/TC 111X IEC/TC 111 // Stage : 5060 2012-05-14 Determination of certain substances in electrotechnical products - Part 4: Determination of mercury in polymers,
metals and electronics by CV-AAS, CV-AFS, ICP-OES and ICP-MS NOTE: Will partially supersede EN 62321:2009 together with future parts of EN 62321 series * Awaiting outcome of
RVC before further processing
Technical committees Activities 358
CENELEC Inventory of Technical Activities
FprEN 62321-5:2011 (PR=23879) IEC 62321-5:201X (111/240/CDV) CLC/TC 111X IEC/TC 111 // Stage : 5060 2012-05-14 Determination of certain substances in electrotechnical products - Part 5: Determination of cadmium, lead and
chromium in polymers and electronics, and cadmium and lead in metals by AAS, AFS, ICP-OES and ICP-MS NOTE: Will partially supersede EN 62321:2009 together with future parts of EN 62321 series * Awaiting outcome of
RVC before further processing
FprEN 62542:2012 (PR=22976) IEC 62542:201X (111/260/CDV) CLC/TC 111X IEC/TC 111 // Stage : 5020 2012-07-13 Environmental standardization for electrical and electronic products and systems - Standardization of environmental
aspects - Glossary of terms NOTE: 2nd CDV - 2 months voting
New work item approved
prEN 50XXX (PR=23677) CLC/TC 111X Stage : 1099 - Draft for vote due at CCMC by: 2014-01-15 WEEE recycling standards - General technical requirements for treatment of WEEE NOTE: D139/C164: NWI approved * ENQ + FV track
Technical committees Activities 359
CENELEC Inventory of Technical Activities
TC 116
Safety of motor-operated electric tools
To prepare European safety standards for hand-held and transportable motor-operated electric tools and gardening appliances
Officers Meetings Secretary: Mr Klaus GREEFE ( DE) Brussels 2009-11-04 Chairman: Mr Tony HOYLAND ( GB) Stockholm 2010-06-02
Offenbach 2010-12-08 Offenbach 2011-09-05 / 09-06
Published (last 12 months)
EN 50580:2012 (PR=23389) CLC/TC 116 MD (2006/42/EC) Stage : 6060 Safety of hand-held electric motor operated tools - Particular requirements for spray guns NOTE: 2011-12-05 - Publications editing allocated to [email protected] * Renumbered from prEN 50144-2-7 to EN 50580 * Supersedes EN 50260-1:2002, EN 50144-2-7:2000, EN 50260-2-7:2002 and EN 50144- 1:1998 (+A1:2002 +A2:2003) dor : 2012-01-09 doa : 2012-07-09 dop : 2013-01-09 dow: 2015-01-09
EN 60745-2-4:2009/A11:2011 (PR=23383) CLC/TC 116 MD (2006/42/EC) Stage : 6060 Hand-held motor-operated electric tools - Safety - Part 2-4: Particular requirements for sanders and polishers other
than disk type NOTE: Publication editing allocated to [email protected] * D138/042: TC rationale for not offering the
project to IEC approved: Vibration measurement is not handled in IEC standards dor : 2011-11-14 doa : 2012-05-14 dop : 2012-11-14 dow: 2014-11-14
EN 60745-2-22:2011 (PR=21555) IEC 60745-2-22:2011 (Modified) CLC/TC 116 IEC/TC 116 MD (2006/42/EC) // Stage : 6060 Hand-held motor-operated electric tools - Safety - Part 2-22: Particular requirements for cut-off machines NOTE: Incorporates FprAA circulated simultaneously (pr=21556) * This Part 2-22 is to be used in conjunction with
EN 60745-1:2009 Mandated: M/396 dor : 2011-04-18 doa : 2011-10-18 dop : 2012-04-18 dow: 2014-04-18
EN 61029-2-3:2011 (PR=4179) IEC 61029-2-3:1993 (Modified) + A1:2001 CLC/TC 116 IEC/TC 116 MD (2006/42/EC) Stage : 6060 Safety of transportable motor-operated electric tools - Part 2-3: Particular requirements for planers and thicknessers NOTE: To be read in conjunction with EN 61029-1:2009 Mandated: M/396 dor : 2011-02-14 doa : 2011-08-14 dop : 2012-02-14 dow: 2014-02-14
Technical committees Activities 360
CENELEC Inventory of Technical Activities
EN 61029-2-5:2011 (PR=23008) IEC 61029-2-5:1993 (Modified) + A1:2001 (Modified) CLC/TC 116 IEC/TC 116 MD (2006/42/EC) Stage : 6060 Safety of transportable motor-operated electric tools - Part 2-5: Particular requirements for band saws NOTE: D137/C102: NWI approved by BT with deadline: 2011-02-28 * Will supersede EN 61029-2-5:2002 * To be
used in conjunction with EN 61029-1:2009 dor : 2011-10-10 doa : 2012-04-10 dop : 2012-10-10 dow: 2014-10-10
Ratified
EN 60335-2-107:201X (PR=22682) IEC 60335-2-107:2012 CLC/TC 116 IEC/TC 116 MD (2006/42/EC) // Stage : 5099 2012-04-24 Household and similar electrical appliances - Safety - Part 2-107: Particular requirements for robotic battery powered
electrical lawnmowers NOTE: 116/39/RVC established on 2010-03-19: FDIS decided * prAA to bring the EN in line with the 5th edition of EN 60335-1 to be circulated simultaneously with FprEN 60335-2-107 (PR=23765) - Both projects to be merged at ratification stage Mandated: M/396
EN 61029-2-8:201X (PR=23012) IEC 61029-2-8:1995 (Modified) + A1:1999 (Modified) + A2:2001 (Modified) CLC/TC 116 IEC/TC 116 MD (2006/42/EC) Stage : 5099 2011-11-07 Safety of transportable motor-operated electric tools - Part 2-8: Particular requirements for single spindle vertical
moulders NOTE: Publication editing allocated to [email protected] * Will supersede EN 61029-2-8:2010 * To be used
in conjunction with EN 61029-1:2009
Vote launched
FprEN 50434:2009 (PR=4164) CLC/TC 116 MD (2006/42/EC) Stage : 5091 - Safety of household and similar appliances - Particular requirements for mains operated shredders and chippers NOTE: To be used in conjunction with EN 60335-1:2002 * 4th vote on revised draft, taking into account the
Consultant's comments Mandated: M/396
prEN 60335-2-91:2007 (PR=20595) IEC 60335-2-91:2008 CLC/TC 116 IEC/TC 116 MD (2006/42/EC) // Stage : 5091 - Household and similar electrical appliances - Safety - Part 2-91: Particular requirements for walk-behind and hand-
held lawn trimmers and lawn edge trimmers NOTE: Will supersede EN 60335-2-91:2003 * D133/C018: Ratification deferred until those CMs developed to answer the MD Consultant's comments are voted upon (as a FprAA), with a view to include them in a single document*2012-03-09: Publication editing allocated to [email protected] Mandated: M/396
prEN 60335-2-91:2007/AA:201X (PR=21912) CLC/TC 116 MD (2006/42/EC) Stage : 5091 - Household and similar electrical appliances - Safety - Part 2-91: Particular requirements for walk-behind and hand-
held lawn trimmers and lawn edge trimmers NOTE: FprAA to cover CMs needed to answer MD consultant's comments * To be presented to ratification together
with prEN 60335-2-91:2007 (pr=20595) for further publication as one single document Mandated: M/396
Technical committees Activities 361
CENELEC Inventory of Technical Activities
EN 60335-2-92:201X (PR=22676) IEC 60335-2-92:2002 (Modified) + corrigendum May 2003 CLC/TC 116 MD (2006/42/EC) Stage : 5091 - Household and similar electrical appliances - Safety - Part 2-92: Particular requirements for pedestrian-controlled
mains-operated lawn scarifiers and aerators NOTE: To be read in conjunction with EN 60335-1:2002 * Will supersede EN 60335-2-92:2005 * Outstanding
negative assessment. Mandated: M/396
EN 60335-2-94:201X (PR=20658) IEC 60335-2-94:2008 (Modified) CLC/TC 116 IEC/TC 116 MD (2006/42/EC) Stage : 5091 - Household and similar electrical appliances - Safety - Part 2-94: Particular requirements for scissors type grass shears NOTE: 2011-01-17: Outstanding negative assessment from Mr Kurtz, Noise Consultant Mandated: M/396
EN 60335-2-100:201X (PR=22677) IEC 60335-2-100:2002 (Modified) CLC/TC 116 IEC/TC 116 MD (2006/42/EC) Stage : 5091 - Household and similar electrical appliances - Safety - Part 2-100: Particular requirements for hand-held mains-
operated garden blowers, vacuums and blower vacuums NOTE: 2011-01-17: Outstanding negative assessment from Mr Kurtz, Noise consultant Mandated: M/396
EN 60745-2-3:2011/FprA2:2012 (PR=23649) IEC 60745-2-3:2006/A2:201X (116/89/FDIS) CLC/TC 116 IEC/TC 116 MD (2006/42/EC) // Stage : 5060 2012-06-11 Hand-held motor-operated electric tools - Safety - Part 2-3: Particular requirements for grinders, polishers and disk-
type sanders
FprEN 60745-2-23:2011 (PR=23934) IEC 60745-2-23:201X (116/80/CDV) CLC/TC 116 IEC/TC 116 MD (2006/42/EC) // Stage : 5060 2012-06-04 Hand-held motor-operated electric tools - Safety - Part 2-23: Particular requirements for die grinders and small rotary
tools
FprEN 61029-2-1:2012 (PR=23011) IEC 61029-2-1:1993 (Modified) + A1:1999 + A2:2001 CLC/TC 116 IEC/TC 116 MD (2006/42/EC) Stage : 5020 2012-07-27 Safety of transportable motor-operated electric tools - Part 2-1: Particular requirements for circular saw benches NOTE: Will supersede EN 61029-2-1:2010 * Mainly a rewording of Clause 7 and change of Subclause 13.1 into
Annex ZD * 2012-02-06 - Second UAP editing allocated to [email protected]
FprEN 61029-2-9:2012 (PR=23007) IEC 61029-2-9:1995 (Modified) CLC/TC 116 IEC/TC 116 MD (2006/42/EC) Stage : 5020 2012-07-27 Safety of transportable motor-operated electric tools - Part 2-9: Particular requirements for mitre saws NOTE: Will supersede EN 61029-2-9:2009 * Rewording of some clauses and improvement/clarification of Clause
18*2012-02-06 - Second UAP editing allocated to [email protected]
Technical committees Activities 362
CENELEC Inventory of Technical Activities
FprEN 61029-2-11:2012 (PR=23013) IEC 61029-2-11:2001 (Modified) CLC/TC 116 IEC/TC 116 MD (2006/42/EC) Stage : 5020 2012-07-27 Safety of transportable motor-operated electric tools - Part 2-11: Particular requirements for combined mitre and
bench saws NOTE: Will supersede EN 61029-2-11:2009 * 2011-03-01: Document not ratified. Pending resolution of the
consultants negative assessment. 2012-02-06 - Second UAP editing allocated to [email protected]
Vote decided
EN 60745-2-22:2011/FprAB:201X (PR=23671) CLC/TC 116 MD (2006/42/EC) Stage : 4099 - Draft for vote due at CCMC by: - Hand-held motor-operated electric tools - Safety - Part 2-22: Particular requirements for cut-off machines NOTE: 2012-05-04 - UAP text received - for sending to Consultant UAP editing allocated to [email protected]
* D139/C154: NWI approved * Amendment to the existing CMs
FprEN 60745-2-23:2011/FprAA:201X (PR=24241) CLC/TC 116 MD (2006/42/EC) Stage : 1090 - Draft for vote due at CCMC by: - Hand-held motor-operated electric tools - Safety - Part 2-23: Particular requirements for die grinders and small rotary
tools NOTE: Common Modification based on GB comments on CDV
Enquiry decided
FprEN 60335-2-107:201X/FprAA:201X (PR=23765) CLC/TC 116 MD (2006/42/EC) Stage : 3099 2011-11-30 Draft for vote due at CCMC by: 2014-02-15 Household and similar electrical appliances - Safety - Part 2-107: Particular requirements for robotic battery powered
electrical lawnmowers NOTE: prAA to bring the EN in line with the 5th edition of EN 60335-1 - to be circulated simultaneously with FprEN
60335-2-107 (PR=22682) - Both projects to be merged at ratification stage * ENQ+FV track Mandated: M/396
New work item approved
EN 50580:2012/prA (PR=24067) CLC/TC 116 MD (2006/42/EC) Stage : 1099 - Draft for vote due at CCMC by: - Safety of hand-held electric motor operated tools - Particular requirements for spray guns NOTE: In hands of WG 2 * D141/C079: NWI approved * New amendment to include cordless spray guns in EN
EN 60335-2-77:2010/prA (PR=23764) CLC/TC 116 MD (2006/42/EC) Stage : 1099 - Draft for vote due at CCMC by: 2014-02-15 Safety of household and similar appliances - Part 2-77: Particular requirements for pedestrian-controlled walk-behind
electrically powered lawn mowers NOTE: D140/C009: NWI approved * ENQ+FV track * Amdt to EN to bring it in line with the 5th edition of EN
60335-1 and EN ISO 5395 Mandated: M/396
Technical committees Activities 363
CENELEC Inventory of Technical Activities
EN 60745-1:2009/prA (PR=23758) CLC/TC 116 MD (2006/42/EC) Stage : 1099 - Draft for vote due at CCMC by: 2014-02-15 Hand-held motor-operated electric tools - Safety - Part 1: General requirements NOTE: D140/C009: NWI approved * ENQ + FV track * In hands of newly set up WG 4 Mandated: M/396
EN 60745-2-1:2010/prA (PR=23759) CLC/TC 116 MD (2006/42/EC) Stage : 1099 - Draft for vote due at CCMC by: 2014-02-15 Hand-held motor-operated electric tools - Safety - Part 2-1: Particular requirements for drills and impact drills NOTE: D140/C009: NWI approved * ENQ + FV track * In hands of newly set up WG 4 Mandated: M/396
EN 60745-2-3:2011/prA (PR=23760) CLC/TC 116 MD (2006/42/EC) Stage : 1099 - Draft for vote due at CCMC by: 2014-02-15 Hand-held motor-operated electric tools - Safety - Part 2-3: Particular requirements for grinders, polishers and disk-
type sanders NOTE: D140/C009: NWI approved * ENQ + FV track * In hands of newly set up WG 4 Mandated: M/396
EN 60745-2-4:2009/prA (PR=23761) CLC/TC 116 MD (2006/42/EC) Stage : 1099 - Draft for vote due at CCMC by: 2014-02-15 Hand-held motor-operated electric tools - Safety - Part 2-4: Particular requirements for sanders and polishers other
than disk type NOTE: D140/C009: NWI approved * ENQ + FV track * In hands of newly set up WG 4 Mandated: M/396
EN 60745-2-6:2010/prA (PR=23762) CLC/TC 116 MD (2006/42/EC) Stage : 1099 - Draft for vote due at CCMC by: 2014-02-15 Hand-held motor-operated electric tools - Safety - Part 2-6: Particular requirements for hammers NOTE: D140/C009: NWI approved * ENQ + FV track * In hands of newly set up WG 4 Mandated: M/396
EN 60745-2-22:2011/prA (PR=23763) CLC/TC 116 MD (2006/42/EC) Stage : 1099 - Draft for vote due at CCMC by: 2014-02-15 Hand-held motor-operated electric tools - Safety - Part 2-22: Particular requirements for cut-off machines NOTE: D140/C009: NWI approved * ENQ + FV track * In hands of newly set up WG 4 Mandated: M/396
EN 61029-2-10:2010/prA (PR=24066) CLC/TC 116 MD (2006/42/EC) Stage : 1099 - Draft for vote due at CCMC by: - Safety of transportable motor-operated electric tools - Part 2-10: Particular requirements for cutting-off grinders NOTE: In hands of WG 2 * D141/C079: NWI approved * Amendment to existing CMs
Technical committees Activities 364
CENELEC Inventory of Technical Activities
TC 204
Safety of electrostatic painting and finishing equipment
To standardize the specific requirements for the protection against high voltage electric shocks in the construction, test and use of electrostatic painting and finishing equipment for spraying non-flammable material.
Officers Meetings Chairman: Mr Per Ole TORKILDSEN ( NO) Stavangar 2010-06-23 / 06-25 Secretary: Mr Roland KNOPP ( DE) St Gallen 2011-12-06 / 12-07
Traunstein 2012-03-08 / 03-09 Graz 2012-07-02 / 07-03
Enquiry launched
prEN 50059:2011 (PR=22521) CLC/TC 204 MD (2006/42/EC) Stage : 4060 2011-12-20 Draft for vote due at CCMC by: 2012-07-01 Electrostatic hand-held spraying equipment - Safety requirements - Hand-held spraying equipment for non-ignitable
coating materials NOTE: D135/C143: NWI approved - Target date for vote: 2011-07-01 * D140/C072: tdv extended to read 2012-07-
01 * Will supersede EN 50059:1990
Technical committees Activities 365
CENELEC Inventory of Technical Activities
TC 205
Home and Building Electronic Systems (HBES)
To prepare standards for all aspects of home and building electronic systems in relation to the Information Society.
In more detail: To prepare standards to ensure integration of a wide spectrum of control applications and the control and management aspects of other applications in and around homes and buildings, including the gateways to different transmission media and public networks taking into account all matters of EMC and electrical and functional safety. TC 205 will not prepare device standards but the necessary performance requirements and necessary hardware and software interfaces.
The standards should specify conformity tests.
TC 205 will perform the work in close co-operation with relevant CENELEC TCs and those in CEN and ETSI.
Officers Meetings Secretary: Mr Jürgen TRETTER ( DE) Brussels 2011-05-23 / 05-24 Chairman: Mr Dominique BECK ( FR) Brussels 2011-11-24 / 11-25
Brussels 2012-04-11 / 04-12 Brussels 2012-11-19 / 11-20
Published (last 12 months)
EN 50491-4-1:2012 (PR=23184) CLC/TC 205 LVD (2006/95/EC) Stage : 6060 General requirements for Home and Building Electronic Systems (HBES) and Building Automation and Control Systems (BACS) - Part 4-1: General functional safety requirements for products intended to be integrated in Building Electronic Systems (HBES) and Building Automation and Control Systems (BACS) NOTE: 2012-01-18 - Publication editing allocated to [email protected] * Supersedes EN 50090-2-3:2005 dor : 2012-02-20 doa : 2012-08-20 dop : 2013-02-20 dow: 2015-02-20
CLC/TR 50491-6-3:2011 (PR=23293) CLC/TC 205 Stage : 6060 General requirements for Home and Building Electronic Systems (HBES) and Building Automation and Control
Systems (BACS) - Part 6-3: HBES installations - Assessment and definition of levels NOTE: 2011-10-17: Publication editing allocated to [email protected] dor : 2011-11-21 doa : - dop : - dow : -
Enquiry launched
prEN 50491-6-1:2011 (PR=23292) CLC/TC 205 LVD (2006/95/EC) Stage : 4060 2012-04-12 Draft for vote due at CCMC by: 2012-12-01 General requirements for Home and Building Electronic Systems (HBES) and Building Automation and Control
Systems (BACS) - Part 6-1: HBES installations - Installation and planning NOTE: 2011-03-21 - Enquiry editing allocated to [email protected]
Technical committees Activities 366
CENELEC Inventory of Technical Activities
New work item approved
prEN 50491-1 (PR=22632) CLC/TC 205 Stage : 1099 2010-04-01 Draft for vote due at CCMC by: 2011-06-01 General requirements for Home and Building Electronic Systems (HBES) and Building Automation and Control
Systems (BACS) - Part 1: General requirements NOTE: D135/C211: NWI approved - Target date for vote: 2011-06-01
Technical committees Activities 367
CENELEC Inventory of Technical Activities
SC 205A
Mains communicating systems
To prepare harmonized standards for communication systems using electricity supply lines or the wiring of buildings as a transmission medium and using frequencies above 3 kHz. This includes the allocation of frequency bands for signal transmissions on the mains
Officers Meetings Secretary: Mr John RYAN ( GB) London 2010-04-27 Chairman: Mr Guillaume BLONDEL ( FR) Brussels 2011-03-29
Paris 2011-11-17 Brussels 2012-11-29
Enquiry launched
prEN 50412-4:2012 (PR=23696) CLC/SC 205A EMC (2004/108/EC) Stage : 4020 2012-09-07 Draft for vote due at CCMC by: 2014-01-15 Power line communication apparatus and systems used in low-voltage installations in the frequency range 1,6 MHz to 30 MHz - Part 4: Low rate wide band services (LRWBS) operating between 2 MHz and 4 MHz - Channel allocations NOTE: 2011-12-05 - Enquiry processing allocated to [email protected] * Not to be offered to IEC as this WI
references prEN 50561-1 for EMC emission which will be a European only standard - Complementary work in ETSI Mandated: M/490
Technical committees Activities 368
CENELEC Inventory of Technical Activities
TC 206
Consumer equipment for entertainment and information and related sub-systems
To develop standards for audio, video and multimedia sub-systems and equipment for consumer use.
This includes - receiving equipment for satellite, terrestrial and cable broadcasting services including associated data, - imaging, recording and reproducing equipment and components, - interfaces and interconnections between equipment, - user interfaces, - infrared systems and equipment, - methods of measurement, - harmonization of relevant IEC standards.
Officers Meetings Secretary: Mr Richard VALENTA ( AT) Brussels 2009-02-02
Brussels 2009-04-16 / 04-17 Brussels 2009-10-15 / 10-16 Brussels 2010-05-28
Published (last 12 months)
EN 61937-10:2011 (PR=23043) IEC 61937-10:2011 CLC/TC 206 IEC/TC 100 // Stage : 6060 Digital audio - Interface for non-linear PCM encoded audio bitstreams applying IEC 60958 - Part 10: Non-linear
PCM bitstreams according to the MPEG-4 Audio Lossless Coding (ALS) format dor : 2011-05-25 doa : 2011-08-25 dop : 2012-02-25 dow: 2014-05-25
EN 62087:2012 (PR=23522) IEC 62087:2011 CLC/TC 206 IEC/TC 100 ECOSET (107/2009) ECOTV (642/2009) ERP (2009/125/EC) Stage : 6060 Methods of measurement for the power consumption of audio, video and related equipment NOTE: Publication editing allocated to [email protected] * TC proposal: to urgently endorse IEC 62087:2011 ed 3 which erroneously missed the IEC/CENELEC parallel procedure through UAP without modifications * Work on CMs to fulfil M/451 needed for future Ed 4 to be handled under // procedure * Supersedes EN 62087:2009 Mandated: M/451 dor : 2012-02-13 doa : 2012-08-13 dop : 2013-02-13 dow: 2015-02-13
Vote launched
FprEN 62698:2012 (PR=24026) IEC 62698:201X (100/1947/CDV) CLC/TC 206 IEC/TC 100 // Stage : 5060 2012-05-28 Multimedia home server systems - Rights information interoperability for IPTV NOTE: D138/086: Shortened CDV period of 3 months for documents prepared by CLC/TC 100 * Awaiting outcome
of RVC before further processing
Technical committees Activities 369
CENELEC Inventory of Technical Activities
New work item to be approved (BT/TC)
CLC/prTR 62002-3 (PR=22534) IEC/TR 62002-3:2008 CLC/TC 206 IEC/TC 100 Stage : 1020 2009-07-23 Draft for vote due at CCMC by: - Mobile and portable DVB-T/H radio access - Part 3: Measurement interface
CLC/prTR 62002-4 (PR=22535) IEC/TR 62002-4:2009 CLC/TC 206 IEC/TC 100 Stage : 1020 2009-07-23 Draft for vote due at CCMC by: - Mobile and portable DVB-T/H radio access - Part 4: Measurement methods for total radiated sensitivity in hand-held
broadcast terminals
CLC/prTR 62291 (PR=22536) IEC/TR 62291:2009 CLC/TC 206 IEC/TC 100 Stage : 1020 2009-07-23 Draft for vote due at CCMC by: - Multimedia data storage - Application program interface for UDF based file systems
Technical committees Activities 370
CENELEC Inventory of Technical Activities
TC 209
Cable networks for television signals, sound signals and interactive services
To develop harmonised and other European standards and deliverables relating to cable networks including equipment and associated methods of measurement for headend reception, processing and distribution of television and sound signals and for processing, interfacing and transmitting all kinds of data signals for interactive services using all applicable transmission media. These signals are typically transmitted in networks by frequency-multiplexing techniques. This includes for instance • regional and local broadband cable networks, • extended satellite and terrestrial television distribution systems, • individual satellite and terrestrial television receiving systems, and all kinds of equipment, systems and installations used in such cable networks, distribution and receiving systems. The extent of this standardization work is from the antennas and/or special signal source inputs to the headend or other interface points to the network up to the terminal input of the customer premises equipment. The standardization work will consider coexistence with users of the RF spectrum in wired and wireless transmission systems. The standardization of any user terminals (i.e. tuners, receivers, decoders, multimedia terminals etc.) as well as of any coaxial, balanced and optical cables and accessories thereof is excluded.
Officers Meetings Secretary: Dipl.-Ing. Eberhard GAUGER ( DE) Brussels 2010-11-17 Chairman: Mr Volker LEISSE ( BE) Frankfurt 2011-05-20
Brussels 2011-12-01 Brussels 2012-05-10
Published (last 12 months)
EN 50083-2:2012 (PR=22804) CLC/TC 209 EMC (2004/108/EC) Stage : 6060 Cable networks for television signals, sound signals and interactive services - Part 2: Electromagnetic compatibility
for equipment NOTE: 2011-11-18 - Publication editing allocated to [email protected] * Supersedes EN 50083-2:2006 dor : 2011-12-21 doa : 2012-06-21 dop : 2012-12-21 dow: 2013-06-21
EN 60728-6:2011 (PR=22798) IEC 60728-6:2011 CLC/TC 209 IEC/TC 100 // Stage : 6060 Cable networks for television signals, sound signals and interactive services - Part 6: Optical equipment NOTE: 2011-04-22: Publication text allocated to [email protected] * Supersedes EN 60728-6:2003 dor : 2011-05-16 doa : 2011-08-16 dop : 2012-02-16 dow : 2014-05-16
Vote launched
FprEN 60728-3-1:2012 (PR=23736) IEC 60728-3-1:201X (100/1969/FDIS) CLC/TC 209 IEC/TC 100 // Stage : 5020 2012-06-08 Cable networks for television signals, sound signals and interactive services - Part 3-1: Methods of measurement of
non-linearity for full digital channel load with DVB-C signals NOTE: 100/1932/RVC established on 2012-01-20: FDIS decided
Technical committees Activities 371
CENELEC Inventory of Technical Activities
FprEN 60728-13-1:2011 (PR=23343) IEC 60728-13-1:2012 CLC/TC 209 IEC/TC 100 // Stage : 5060 2012-02-24 Cable networks for television signals, sound signals and interactive services - Part 13-1: Brandwith expansion for
broadcast signal over FTTH system NOTE: 100/1931/RVC established on 2012-01-20: To be published without FDIS stage
At Secretariat stage
prEN 50083-8 (PR=23014) CLC/TC 209 Stage : 3020 2012-03-30 Draft for vote due at CCMC by: 2013-06-30 Cable networks for television signals, sound signals and interactive services - Part 8: Electromagnetic compatibility
for networks NOTE: D137/C105: NWI approved * Will supersede EN 50083-8:2002 + A11:2008 * Secretariat enquiry with deadline for comments: 2012-03-30 * D141/C031: Extension of the target date for vote approved to read: 2013-06- 30
New work item approved
CLC/prTR 50083-10-1 (PR=23291) CLC/TC 209 Stage : 1099 - Draft for vote due at CCMC by: 2012-12-31 Cable networks for television signals, sound signals and interactive services - Part 10-1: Guidelines for the
implementation of return paths in cable networks NOTE: D138/C062: NWI approved * Linked to new edition of IEC 60728-10 (IEC 100/TA5) * Will supersede
CLC/TR 50083-10-1:2009 * D141/C031: Extension of the target date for vote approved to read: 2012-12-31
Technical committees Activities 372
CENELEC Inventory of Technical Activities
TC 210
Electromagnetic Compatibility (EMC)
To prepare EMC standards and guidelines with particular emphasis on the application of the EMC Directive and other EC Directives that contain EMC references and to coordinate all EMC activities in CENELEC.
Officers Meetings Chairman: Mr Christian VERHOLT ( DK) Delft 2011-05-10 / 05-11 Secretary: Mr Brian JONES ( GB) Brussels 2011-12-06 / 12-07
2012-05-15 / 05-16
Brussels 2012-11-27 / 11-28
Published (last 12 months)
EN 55014-1:2006/A2:2011 (PR=22618) CISPR 14-1:2005/A2:2011 CLC/TC 210 IEC/SC CISPR/F EMC (2004/108/EC) // Stage : 6060 Electromagnetic compatibility - Requirements for household appliances, electric tools and similar apparatus - Part 1:
Emission dor : 2011-08-16 doa : 2011-11-16 dop : 2012-05-16 dow: 2014-08-16
EN 55016-4-2:2011 (PR=22995) CISPR 16-4-2:2011 CLC/TC 210 IEC/SC CISPR/A // Stage : 6060 Specification for radio disturbance and immunity measuring apparatus and methods - Part 4-2: Uncertainties,
statistics and limit modelling - Measurement instrumentation uncertainty NOTE: Supersedes EN 55016-4-2:2004 dor : 2011-07-13 doa : 2011-10-13 dop : 2012-04-13 dow : 2014-07-13
EN 55017:2011 (PR=22839) CISPR 17:2011 CLC/TC 210 IEC/SC CISPR/A // Stage : 6060 Methods of measurement of the suppression characteristics of passive EMC filtering devices dor : 2011-07-15 doa : 2011-10-15 dop : 2012-04-15 dow : 2014-07-15
EN 55020:2007/A11:2011 (PR=23250) CLC/TC 210 EMC (2004/108/EC) Stage : 6060 Sound and television broadcast receivers and associated equipment - Immunity characteristics - Limits and methods
of measurement NOTE: D137/C019: Amendment to EN 55020 resulting from D137/C018 * To be implemented by all countries
except CH Mandated: M/404 dor : 2011-06-27 doa : 2011-12-27 dop : 2012-06-27 dow: 2013-01-01
EN 55022:2010/AC:2011 (PR=23823) CLC/TC 210 EMC (2004/108/EC) RTTED (1999/5/EC) Stage : 6060 Information technology equipment - Radio disturbance characteristics - Limits and methods of measurement dor : - doa : - dop : - dow : -
Technical committees Activities 373
CENELEC Inventory of Technical Activities
EN 55032:2012 (PR=23015) CISPR 32:2012 (corrigendum Mar. 2012) CLC/TC 210 IEC/SC CISPR/I EMC (2004/108/EC) // Stage : 6060 Electromagnetic compatibility of multimedia equipment - Emission requirements NOTE: 2012-02-24: Publication editing allocated to [email protected] dor : 2012-03-05 doa : 2012-06-05 dop : 2012-12-05 dow: 2015-03-05
EN 61000-3-12:2011 (PR=22617) IEC 61000-3-12:2011 CLC/TC 210 IEC/SC 77A EMC (2004/108/EC) RTTED (1999/5/EC) // Stage : 6060 Electromagnetic compatibility (EMC) - Part 3-12: Limits - Limits for harmonic currents produced by equipment
connected to public low-voltage systems with input current > 16 A and <= 75 A per phase NOTE: Publication editing allocated to [email protected] * Supersedes EN 61000-3-12:2005 dor : 2011-06-16 doa : 2011-09-16 dop : 2012-06-16 dow: 2014-06-16
EN 61000-4-15:2011 (PR=22369) IEC 61000-4-15:2010 + corrigendum Mar. 2012 CLC/TC 210 IEC/SC 77A // Stage : 6060 Electromagnetic compatibility (EMC) - Part 4-15: Testing and measurement techniques - Flickermeter - Functional
and design specifications NOTE: Supersedes EN 61000-4-15:1998 + A1:2003 dor : 2011-01-02 doa : 2011-04-02 dop : 2011-10-02 dow : 2014-01-02
EN 61000-4-25:2002/A1:2012 (PR=23394) IEC 61000-4-25:2001/A1:2012 CLC/TC 210 IEC/SC 77C // Stage : 6060 Electromagnetic compatibility (EMC) - Part 4-25: Testing and measurement techniques - HEMP immunity test
methods for equipment and systems NOTE: 2012-03-14: Publication editing allocated to [email protected] dor : 2012-04-12 doa : 2012-07-12 dop : 2013-01-12 dow: 2015-04-12
Vote launched
FprEN 55013:2009 (PR=21809) CISPR 13:2009 CLC/TC 210 IEC/SC CISPR/I EMC (2004/108/EC) // Stage : 5091 2011-12-07 Sound and television broadcast receivers and associated equipment - Radio disturbance characteristics - Limits and
methods of measurement NOTE: Will supersede EN 55013:2001 (+ IS1:2009) + A1:2003 + A2:2006 * 2011-05: Ratification still pending * Task force (which includes the consultant) to continue discussions, and to produce a recommendation for consideration by TC210 at its December 2011 meeting.
EN 55015:2006/FprA3:2011 (PR=23333) CISPR 15:2005/A3:201X (CISPR/F/533/CDV) CLC/TC 210 IEC/SC CISPR/F EMC (2004/108/EC) // Stage : 5060 2011-07-18 Limits and methods of measurement of radio disturbance characteristics of electrical lighting and similar equipment NOTE: This FprA3 will result in a new edition at later stage * Awaiting outcome of RVC before further processing
EN 55016-1-2:2004/FprA3:2012 (fragment 1) (PR=24157) CISPR 16-1-2:2003/A3:201X (fragment 1) (CISPR/A/998/CDV) CLC/TC 210 IEC/SC CISPR/A // Stage : 5020 2012-09-14 Specification for radio disturbance and immunity measuring apparatus and methods - Part 1-2: Radio disturbance and
immunity measuring apparatus - Ancillary equipment - Conducted disturbances
Technical committees Activities 374
CENELEC Inventory of Technical Activities
EN 55016-1-2:2004/FprA3:2012 (fragment 2) (PR=24180) CISPR 16-1-2:2003/A3:201X (fragment 2) (CISPR/A/1000/CDV) CLC/TC 210 IEC/SC CISPR/A // Stage : 5020 2012-09-28 Specification for radio disturbance and immunity measuring apparatus and methods - Part 1-2: Radio disturbance and
immunity measuring apparatus - Ancillary equipment - Conducted disturbances
EN 55016-1-4:2010/FprA1:2012 (PR=23246) CISPR 16-1-4:2010/A1:201X (CISPR/A/995/FDIS) CLC/TC 210 IEC/SC CISPR/A // Stage : 5060 2012-06-11 Specification for radio disturbance and immunity measuring apparatus and methods - Part 1-4: Radio disturbance and
immunity measuring apparatus - Antennas and test sites for radiated disturbance measurements
EN 55016-1-5:2004/FprA1:2012 (PR=23270) CISPR 16-1-5:2003/A1:201X (CISPR/A/994A/FDIS) CLC/TC 210 IEC/SC CISPR/A // Stage : 5060 2012-06-11 Specification for radio disturbance and immunity measuring apparatus and methods - Part 1-5: Radio disturbance and
immunity measuring apparatus - Antenna calibration test sites for 30 MHz to 1 000 MHz
EN 55016-2-1:2009/FprA2:2011 (PR=23638) CISPR 16-2-1:2008/A2:201X (CISPR/A/958/CDV) CLC/TC 210 IEC/SC CISPR/A // Stage : 5060 2012-01-02 Specification for radio disturbance and immunity measuring apparatus and methods - Part 2-1: Methods of
measurement of disturbances and immunity - Conducted disturbance measurements NOTE: Awaiting outcome of RVC before further processing
EN 55016-2-1:2009/FprA3:2012 (PR=24181) CISPR 16-2-1:2008/A3:201X (CISPR/A/1001/CDV) CLC/TC 210 IEC/SC CISPR/A // Stage : 5020 2012-09-28 Specification for radio disturbance and immunity measuring apparatus and methods - Part 2-1: Methods of
measurement of disturbances and immunity - Conducted disturbance measurements
EN 55016-2-3:2010/FprA2:2011 (fragment 1) (PR=23955) CISPR 16-2-3:2010/FprA2:201X (fragment 1) (CISPR/A/986/CDV) CLC/TC 210 IEC/SC CISPR/A // Stage : 5060 2012-06-19 Specification for radio disturbance and immunity measuring apparatus and methods - Part 2-3: Methods of
measurement of disturbances and immunity - Radiated disturbance measurements
EN 55016-2-3:2010/FprA2:2011 (fragment 2) (PR=23650) CISPR 16-2-3:2010/FprA2:201X (fragment 2) (CISPR/A/961/CDV) CLC/TC 210 IEC/SC CISPR/A // Stage : 5060 2012-01-30 Specification for radio disturbance and immunity measuring apparatus and methods - Part 2-3: Methods of
measurement of disturbances and immunity - Radiated disturbance measurements NOTE: Awaiting outcome of RVC before further processing
EN 55103-2:2009/FprISA:2011 (PR=23521) CLC/TC 210 Stage : 5060 2011-11-28 Electromagnetic compatibility - Product family standard for audio, video, audio-visual and entertainment lighting
control apparatus for professional use - Part 2: Immunity NOTE: Publication editing allocated to [email protected] * 2010-12 decision: Interpretation sheet needed for
clarification of a reference in EN 55103-2
Technical committees Activities 375
CENELEC Inventory of Technical Activities
FprEN 61000-3-3:2012 (PR=24040) IEC 61000-3-3:201X (77A/785/CDV) CLC/TC 210 IEC/SC 77A EMC (2004/108/EC) RTTED (1999/5/EC) // Stage : 5020 2012-07-20 Electromagnetic compatibility (EMC) - Part 3-3: Limits - Limitation of voltage changes, voltage fluctuations and flicker in public low-voltage supply systems, for equipment with rated current <= 16 A per phase and not subject to conditional connection NOTE: Will supersede EN 61000-3-3:2008
FprEN 61000-4-4:2012 (PR=23089) IEC 61000-4-4:2012 CLC/TC 210 IEC/SC 77B // Stage : 5060 2012-04-23 Electromagnetic compatibility (EMC) - Part 4-4: Testing and measurement techniques - Electrical fast transient/burst
immunity test NOTE: 2012-05-08 - Publication editing allocated to [email protected] * Will supersede EN 61000-4-4:2004
+ A1:2010 * Negative results at CLC level dropped (vote launched on FDIS)
Vote decided
FprEN 50561-1:201X (PR=23145) CLC/TC 210 EMC (2004/108/EC) RTTED (1999/5/EC) Stage : 4099 - Draft for vote due at CCMC by: 2013-03-23 Power line communication apparatus used in low voltage installations - Radio disturbance characteristics - Limits
and methods of measurement - Part 1: Apparatus for in-home use NOTE: In hands of WG 11 * 2011-05 decision: Vote failed * New draft sent to CCMC March 2012 - sent to
consultant
EN 55103-1:2009/FprAA:201X (PR=23520) CLC/TC 210 EMC (2004/108/EC) Stage : 4099 - Draft for vote due at CCMC by: - Electromagnetic compatibility - Product family standard for audio, video, audio-visual and entertainment lighting
control apparatus for professional use - Part 1: Emissions NOTE: 2012-05-11 - UAP editing allocated to [email protected]
New work item approved
prEN 50561-2 (PR=23146) CLC/TC 210 EMC (2004/108/EC) RTTED (1999/5/EC) Stage : 1099 - Draft for vote due at CCMC by: 2011-12-31 Power line telecommunications modems - Radio disturbance characteristics - Limits and methods of measurement -
Part 2: Modems for access networks NOTE: In hands of WG 11 * D138/C010: NWI approved with target date for vote: 2011-12-31
CLC/prTR 50XXX (PR=22889) CLC/TC 210 Stage : 1099 2010-11-01 Draft for vote due at CCMC by: 2012-04-30 Description of the current and expected future electromagnetic environment and identification of the relevant
immunity tests NOTE: D137/C018: NWI approved - Target date for vote = 2012-04-30 * TR developed as a first step to answer EC
requirements (BT136/DG7986/INF) - Amendment to other immunity standards to be developed separately later on
EN 55011:2009/prA (PR=23519) CLC/TC 210 EMC (2004/108/EC) Stage : 1099 - Draft for vote due at CCMC by: - Industrial, scientific and medical equipment - Radio-frequency disturbance characteristics - Limits and methods of
measurement NOTE: D139/C074: NWI approved * Proposed track: UAP
Technical committees Activities 376
CENELEC Inventory of Technical Activities
Withdrawn (last 12 months)
New work item to be approved (BT/TC)
FprEN 55013:2009/prAA:201X (PR=24158) CLC/TC 210 EMC (2004/108/EC) Stage : 1000 2012-05-15 Draft for vote due at CCMC by: - Sound and television broadcast receivers and associated equipment - Radio disturbance characteristics - Limits and
methods of measurement NOTE: NWI requested to 141 BT (April 18, 2012)
Technical committees Activities 377
CENELEC Inventory of Technical Activities
TC 213
Cable management systems
To prepare European standardization publications for products and systems used to the management of all types of cables, information and communication lines, electrical power distribution conductors and associated accessories. Management includes support and/or containment and/or retention and/or protection against external influences.
Officers Meetings Secretary: Mr Alan COOPER ( GB) Brussels 2010-03-18 Chairman: Mr Emmanuel PETIT ( FR) Brussels 2011-03-03
Brussels 2012-03-14 / 03-15 Brussels 2013-03-14
Published (last 12 months)
EN 50085-2-1:2006/A1:2011 (PR=22775) CLC/TC 213 LVD (2006/95/EC) Stage : 6060 Cable trunking systems and cable ducting systems for electrical installations - Part 2-1: Cable trunking systems and
cable ducting systems intended for mounting on walls and ceilings NOTE: Publication editing allocated to [email protected] dor : 2011-10-10 doa : 2012-04-10 dop : 2012-10-10 dow: 2014-10-10
EN 61386-25:2011 (PR=22945) IEC 61386-25:2011 CLC/TC 213 IEC/SC 23A LVD (2006/95/EC) // Stage : 6060 Conduit systems for cable management - Part 25: Particular requirements - Conduit fixing devices NOTE: To be read in conjunction with EN 61386-1:2008 dor : 2011-10-27 doa : 2012-01-27 dop : 2012-07-27 dow : 2014-10-27
EN 62549:2011 (PR=22379) IEC 62549:2011 CLC/TC 213 IEC/SC 23A LVD (2006/95/EC) // Stage : 6060 Articulated systems and flexible systems for cable guiding NOTE: 2011-10-28: Publication editing allocated to [email protected] *Initial project offered to IEC in the
frame of the Dresden Agreement dor : 2011-11-28 doa : 2012-02-28 dop : 2012-08-28 dow: 2014-11-28
Vote launched
FprEN 61534-21:2012 (PR=23971) IEC 61534-21:201X (23A/645/CDV) CLC/TC 213 IEC/SC 23A LVD (2006/95/EC) // Stage : 5020 2012-06-15 Powertrack systems - Part 21: Particular requirements for powertrack systems intended for wall and ceiling mounting NOTE: Will supersede EN 61534-21:2006
Technical committees Activities 378
CENELEC Inventory of Technical Activities
Enquiry launched
EN 50085-1:2005/prAA:2011 (PR=22989) CLC/TC 213 LVD (2006/95/EC) Stage : 4060 2012-03-28 Draft for vote due at CCMC by: 2012-05-31 Cable trunking systems and cable ducting systems for electrical installations - Part 1: General requirements NOTE: D137/073: NWI approved by BT with target date for vote: 2012-05-31
Work stopped (last 12 months)
FprEN 62549:201X/prA:201X (PR=23020) CLC/TC 213 LVD (2006/95/EC) Stage : 1098 - Articulated systems and flexible systems for cable guiding NOTE: TC 213 advice (2011-08-03): After final examination of the FDIS no CMs needed * In hands of CLC/TC 213
WG 12
Technical committees Activities 379
CENELEC Inventory of Technical Activities
TC 215
Electrotechnical aspects of telecommunication equipment
- To address standardization in the field of electrotechnical aspects of telecommunication equipment and associated infrastructures and liaise with other standardization bodies as appropriate. - To prepare harmonized standards (EN, TS or TR) covering all aspects of generic and application-specific telecommunications cabling (e.g. ISDN, LAN and others) within all types of premises. - These documents also cover the requirements and recommendations for building infrastructures related to the effective installation and operation of associated telecommunication equipment by reference to the existing or forthcoming standards provided by the relevant committees or using technical inputs from them. - To provide contributions to ETSI standards (EN and/or other deliverables) in areas related to those detailed above. - To serve as a mediator in those cases where in accordance with the CENELEC-ETSI-Agreement ETSI indicates to CENELEC the need of standardization activities (EN/TS/TR or contributions to ETSI deliverables) of electrotechnical aspects related to its work. - Identification of the appropriate TC within CENELEC, thereby providing proper assignment of the technical work to the responsible group of experts. - Where an appropriate TC within CENELEC cannot be identified, TC 215 may decide to establish a Working Group to resolve a specific task. - To review international standardization results of ISO/IEC JTC1 as far as telecommunication equipment with respect to Customer Premises Cabling is concerned. This includes coordination of harmonization and assignment to the responsible organisation in close cooperation with CEN bearing in mind JTC 1 being a joint ISO/IEC-Committee.
Officers Meetings Secretary: Dipl.-Ing. Thomas WEGMANN ( DE) Brussels 2010-04-21 Chairman: Mr Dominique ROCHE ( FR) Brussels 2011-03-16
Brussels 2012-03-14 Brussels 2013-03-13
Published (last 12 months)
EN 50173-1:2011 (PR=21326) CLC/TC 215 Stage : 6060 Information technology - Generic cabling systems - Part 1: General requirements NOTE: Former A2 consolidated with EN 50173-1:2007 and EN 50173-1:2007/A1:2009 and published as new
edition dor : 2011-04-01 doa : 2011-10-01 dop : 2012-04-01 dow: 2014-04-01
CLC/TR 50173-99-3:2012 (PR=21331) CLC/TC 215 Stage : 6060 Information technology - Generic cabling systems - Part 99-3: Home cabling infrastructures up to 50 m in length to
support simultaneous and non simultaneous provision of applications NOTE: 2012-01-18 - Publication editing allocated to [email protected] * Vilamoura notification
BT/FR0178/NOT referred to CLC/TC 215 dor : 2012-02-20 doa : - dop : - dow : -
Technical committees Activities 380
CENELEC Inventory of Technical Activities
Enquiry launched
FprEN 50600-1:201X (PR=21921) CLC/TC 215 Stage : 4099 2012-08-03 Draft for vote due at CCMC by: 2012-06-30 Information technology - Data centre facilities and infrastructures - Part 1: General concepts NOTE: 2012-05-29 - Formal Vote editing allocated to [email protected] * TC 215 info: BTWG 132-3 "Green
Data Centre" has received preliminary information on the intended work and has appreciated the TC 215 initiative Mandated: M/462
Enquiry launched
EN 50173-4:2007/prAB:2011 (PR=23002) CLC/TC 215 Stage : 4060 2012-03-28 Draft for vote due at CCMC by: 2013-07-31 Information technology - Generic cabling systems - Part 4: Homes NOTE: March 2012 TC advice: Document to be sent to Formal Vote when draft is available
EN 50173-5:2007/prAB:2011 (PR=23539) CLC/TC 215 Stage : 4060 2012-03-26 Draft for vote due at CCMC by: 2013-10-15 Information technology - Generic cabling systems - Part 5: Data centres NOTE: D139/C071: NWI approved by BT * March 2012 TC advice: Document to be sent to Formal Vote when draft
is available
prEN 50173-6:2012 (PR=23540) CLC/TC 215 Stage : 4020 2012-09-07 Draft for vote due at CCMC by: 2013-10-15 Information technology - Generic cabling systems - Part 6: Distributed building services NOTE: D139/C071: NWI approved by BT * ENQ+FV track * 2012-01-23 - Enquiry processing allocated to
prEN 50174-3:2012 (PR=22446) CLC/TC 215 Stage : 4020 2012-09-07 Draft for vote due at CCMC by: 2012-06-30 Information technology - Cabling installation - Part 3: Installation planning and practices outside buildings NOTE: Will supersede EN 50174-3:2003 * Target date for vote: 2012-06-30 * 2012-01-23: Enquiry processing
allocated to [email protected]
New work item approved
prEN 50XXX (PR=23541) CLC/TC 215 Stage : 1099 - Draft for vote due at CCMC by: 2013-10-15 Information technology - Premises distribution access network cabling to support deployment of optical broadband
networks NOTE: D139/C071: NWI approved by BT * ENQ+FV track * Also of interest for CLC/TC 86A, CLC/TC 86BXA,
ETSI ATTM and others * March 2012 TC advice: Revised draft in preparation for CLC enquiry
Work stopped (last 12 months)
CLC/prTR 50173-99-2 (PR=23001) CLC/TC 215 Stage : 1098 - Information technology - Implementation of BCT applications using cabling in accordance with EN 50173-4 NOTE: 2012-03-26 EMA: March 2012: TC decided to stop work (D/215/18/16). * D137/C100: NWI approved with
target date for vote: 2012-09-30
Technical committees Activities 381
CENELEC Inventory of Technical Activities
New work item to be approved (BT/TC)
prEN 50600-2-1 (PR=23542) CLC/TC 215 Stage : 1000 2012-05-31 Draft for vote due at CCMC by: 2014-10-11 Data centre facilities and infrastructures - Part 2-1: Building construction NOTE: 2012-03-26 EMA: NWI requested (2012-04-04) to 141 BT meeting Mandated: M/462
prEN 50600-2-2 (PR=23543) CLC/TC 215 Stage : 1000 2012-05-31 Draft for vote due at CCMC by: 2014-10-11 Data centre facilities and infrastructures - Part 2-2: Power distribution NOTE: 2012-03-26 EMA: NWI requested (2012-04-04) to 141 BT meeting Mandated: M/462
prEN 50600-2-3 (PR=23544) CLC/TC 215 Stage : 1000 2012-05-31 Draft for vote due at CCMC by: 2014-10-11 Data centre facilities and infrastructures - Part 2-3: Environmental control NOTE: 2012-03-26 EMA: NWI requested (2012-04-04) to 141 BT meeting Mandated: M/462
CLC/prTR 50XXX (PR=24138) CLC/TC 215 Stage : 1000 2012-05-31 Draft for vote due at CCMC by: - Information technology - CENELEC/ETSI Glossary of terms and definitions on broadband deployment NOTE: 2012-03-26 EMA: NWI requested to 141 BT (2012-04-04) Mandated: M/462
Technical committees Activities 382
CENELEC Inventory of Technical Activities
TC 216
Gas detectors
To standardize general and specific requirements for the construction, safety, performance and testing for electrical apparatus for sensing the presence of gas or vapour and for providing an indication, alarm and/or other output function, the purpose of which is to give a warning of explosion hazard, fire hazard or health hazard. The standardization work of TC 216 concerns domestic gas detectors and those industrial and commercial gas detectors that are not included in the scope of CLC/SC 31-9.
To provide information and guidance, as appropriate, on the selection, installation and operation of such apparatus.
Officers Meetings Secretary: Mr Nick BRADFIELD ( GB) Frankfurt 2010-03-18 Chairman: Mr Anthony Richard BANFIELD ( GB) Paris 2011-03-17
Dublin 2012-03-15 Brussels 2013-03-21
Published (last 12 months)
EN 50379-1:2012 (PR=22970) CLC/TC 216 Stage : 6060 Specification for portable electrical apparatus designed to measure combustion flue gas parameters of heating
appliances - Part 1: General requirements and test methods NOTE: 2012-02-14 - Publication editing allocated to [email protected] * Supersedes EN 50379-1:2004 dor : 2012-03-19 doa : 2012-09-19 dop : 2013-03-19 dow: 2015-03-19
EN 50379-2:2012 (PR=22971) CLC/TC 216 Stage : 6060 Specification for portable electrical apparatus designed to measure combustion flue gas parameters of heating
appliances - Part 2: Performance requirements for apparatus used in statutory inspections and assessment NOTE: 2012-02-14 - Publication editing allocated to [email protected] * Supersedes EN 50379-2:2004 dor : 2012-03-19 doa : 2012-09-19 dop : 2013-03-19 dow: 2015-03-19
EN 50379-3:2012 (PR=22972) CLC/TC 216 Stage : 6060 Specification for portable electrical apparatus designed to measure combustion flue gas parameters of heating appliances - Part 3: Performance requirements for apparatus used in non-statutory servicing of gas fired heating appliances NOTE: 2012-02-14 - Publication editing allocated to [email protected] * Supersedes EN 50379-3:2004 dor : 2012-03-19 doa : 2012-09-19 dop : 2013-03-19 dow: 2015-03-19
EN 50543:2011/AC:2011 (PR=23666) CLC/TC 216 Stage : 6060 Electronic portable and transportable apparatus designed to detect and measure carbon dioxide and/or carbon
monoxide in indoor ambient air - Requirements and test methods NOTE: Corrigendum editing allocated to [email protected] dor : - doa : - dop : - dow : -
Technical committees Activities 383
CENELEC Inventory of Technical Activities
EN 50545-1:2011 (PR=22532) CLC/TC 216 Stage : 6060 Electrical apparatus for the detection and measurement of toxic and combustible gases in car parks and tunnels - Part 1: General performance requirements and test methods for the detection and measurement of carbon monoxide and nitrogen oxides NOTE: 2011-07-11 - Allocated to [email protected] * TC 216 agreed that there was no need to draft any further parts to this standard at present (see report of 2012-03-15 meeting * Handled by WG 05 * TC 216 is currently gathering further information on tunnels dor : 2011-08-15 doa : 2012-02-15 dop : 2012-08-15 dow : 2014-08-15
Ratified
EN 50291-1:2010/AA:201X (PR=23548) CLC/TC 216 Stage : 5099 2012-06-04 Electrical apparatus for the detection of carbon monoxide in domestic premises - Part 1: Test methods and
performance requirements NOTE: 2012-04-03 - Publication editing allocated to [email protected]
Enquiry launched
prEN 50292:2012 (PR=22969) CLC/TC 216 Stage : 4020 2012-06-15 Draft for vote due at CCMC by: 2012-03-31 Electrical apparatus for the detection of carbon monoxide in domestic premises, caravans and boats - Guide on the
selection, installation, use and maintenance NOTE: Enquiry processing allocated to [email protected] * Will supersede EN 50292:2001 * D137/076:
NWI approved by BT with target date for vote: 2012-03-31
New work item approved
prEN 50XXX (PR=23959) CLC/TC 216 Stage : 1099 - Draft for vote due at CCMC by: 2014-07-03 Portable electrical apparatus for the measurement of combustion flue gas parameters of gas-fired boilers in domestic
premises - Guide on the selection and use for commissioning, servicing and maintenance NOTE: D141/C064: NWI approved
Work stopped (last 12 months)
EN 50291-1:2010/FprA (PR=22968) CLC/TC 216 Stage : 3098 - Electrical apparatus for the detection of carbon monoxide in domestic premises - Part 1: Test methods and
performance requirements NOTE: Project deleted as it will be replaced by a full revision PR=24177 (see TC 216 report of 2012-04-15
meeting).
New work item to be approved (BT/TC)
prEN 50291-1 (PR=24177) CLC/TC 216 CPD (89/106/EEC) Stage : 1000 2012-05-29 Draft for vote due at CCMC by: 2014-09-12 Electrical apparatus for the detection of carbon monoxide in domestic premises - Part 1: Test methods and
performance requirements NOTE: Will supersede EN 50291-1:2010 * This revision replaces EN 50291-1:2010/prA - PR=22968 (see TC 216
report of 2012-04-15).
Technical committees Activities 384
CENELEC Common CEN/CENELEC Activities
Common CEN/CENELEC Activities
Technical committees activities
TC 1
Criteria for conformity assessment bodies
Preparation of standards on criteria for bodies involved in testing calibration, certification, inspection, accreditation, their operation and assessment, and other related standards.
Officers Meetings Chairman: Dr Monika WLOKA ( DE) Brussels 2004-10-19
Secretary: Mr Mick MAGHAR ( GB)
Published (last 12 months)
EN ISO/IEC 17020:2012 (PR=23288) ISO/IEC 17020:2012 CEN/CLC/TC 1 // Stage : 6060 Conformity assessment - General criteria for the operation of various types of bodies performing inspection
(ISO/IEC/FDIS 17020:2011) NOTE: // vote at CEN level * Will supersede EN ISO/IEC 17020:2004 dor : 2012-02-18 doa : 2012-06-30 dop : 2012-09-30 dow: 2012-09-30
Technical Committee Activities 385
CENELEC Common CEN/CENELEC Activities
TC 2
CEN/CENELEC Joint Technical Group Power Engineering
Joint CEN/CENELEC steering coordination and programming group entrusted: a) with the task to manage the different project teams to develop guides for procurement and submit them through the secretariat to the common CEN/CENELEC procedures. b) and with the task to make a survey of supporting standards needed, identifying the existing and missing standards as well as the responsible CEN or CENELEC technical committee for their drafting or redrafting.
Officers Meetings
Chairman: Dr Lynton MOGRIDGE ( GB) Secretary: Mr Bernd BORCHERT ( GB)
No standardization work registered
Technical Committee Activities 386
CENELEC Common CEN/CENELEC Activities
TC 3
Quality management and corresponding general aspects for medical devices
The objective of the joint Technical Committee is to contribute to, and where necessary draft, suitable standards for "Quality management and corresponding general aspects for medical devices" that are applicable internationally and relevant to the essential requirements of EU Directives. The joint Technical Committee closely cooperates with ISO/TC 210 "Quality management and corresponding general aspects for medical devices" in the development of standards and revisions. The objective of the joint Technical Committee is to contribute to a further global harmonization of standards in close co-operation with ISO/TC 210. In principle the standards are drafted by ISO/TC 210 under the Vienna agreement with ISO-lead, including the joint work programme with IEC/SC 62. The joint Technical Committee will liaise with other Technical Committees - to achieve a coherent set of horizontal and product standards; - to minimize the necessity for additional European requirements; - to advise on aspects concerning quality management and risk management to ensure an optimal use of EN ISO 13485 and EN ISO 14971.
Officers Meetings
Chairman: Mr Robert GEERTSMA ( NL) Secretary: Mrs Marieke van't ROOT ( NL)
Published (last 12 months)
EN ISO 13485:2012 + AC:201X (PR=24011) ISO 13485:2003 CEN/CLC/TC 3 IEC/SC 62A AIMD (90/385/EEC) IVD (98/79/EC) MDD (93/42/EEC) Stage : 6060 Medical devices - Quality management systems - Requirements for regulatory purposes NOTE: Will supersede EN ISO 13485:2003 Mandated: M/023 dor : 2012-01-24 doa : 2012-05-31 dop : 2012-08-31 dow: 2012-08-31
New work item approved
EN ISO 13485:2012/AC:201X (PR=24183) CEN/CLC/TC 3 Stage : 1099 - Draft for vote due at CCMC by: - Medical devices - Quality management systems - Requirements for regulatory purposes
prEN ISO 14971:201X (PR=24225) ISO 14971:2007 CEN/CLC/TC 3 IEC/SC 62A AIMD (90/385/EEC) MDD (93/42/EEC) Stage : 1099 - Draft for vote due at CCMC by: - Medical devices - Application of risk management to medical devices
Technical Committee Activities 387
CENELEC Common CEN/CENELEC Activities
TC 4
Project committee - Services for fire safety and security systems
The Project Committee should develop a basic standard for services for fire safety and security systems. The basic standard specifies the requirements for quality of services supplied by companies and the competencies of their involved staff charged with the planning and design, engineering, installation and hand over, maintenance and repair of fire safety and/or security systems*. * Examples of fire safety and/or security systems, are fire detection-, fire extinguishing -, voice alarm-, intruder alarm-, hold up-, access control-, social alarm-, smoke and heat exhaust ventilation-, CCTV systems, control equipment for escape and evacuation route, and combination of such systems as mentioned before.
Officers Meetings
Secretary: Mr Matthias KRITZLER-PICHT ( DE)
No standardization work registered
Technical Committee Activities 388
CENELEC Common CEN/CENELEC Activities
TC 5
Space
This TC covers all standardization activities in CEN and CENELEC related to space, including dual use aspects, systems of systems, as well as upstream and downstream applications, in as much as these topics are not covered by any other existing technical body in CEN or CENELEC or by the European Cooperation for Space Standardization (ECSS). It is also important and necessary that it coordinates its work with relevant technical bodies in ETSI as much as possible. It should in particular develop European Standards that are needed to support the implementation of EU-level space projects, such as Galileo or GMES
Officers Meetings
Secretary: Mr Jan DITTBERNER ( DE)
No standardization work registered
Technical Committee Activities 389
CENELEC Common CEN/CENELEC Activities
Joint Working Group activities
JWG 1
Energy audits
Officers Meetings
Secretary: Mr David HYDE ( GB)
No standardization work registered
Joint Working Group Activities 390
CENELEC Common CEN/CENELEC Activities
JWG 2
Guarantees of origin and energy certificates
Standardization on guarantees of origin for trading and/or disclosure/labelling of electricity and CHP and on energy certificates
Officers Meetings Chairman: Mrs Inge PIERRE ( SE) Brussels 2010-09-10 Secretary: Mrs Maria GUSTAFSSON ( SE) Brussels 2010-11-30 / 12-01
Brussels 2010-12-16 Brussels 2011-04-13 / 04-14
New work item approved
prEN 50XXX (PR=23227) CEN/CLC/JWG 2 Stage : 1099 - Draft for vote due at CCMC by: 2012-11-17 Guarantees of origin related to energy - Guarantees of origin for electricity NOTE: D137/052: BT approved the CEN/CLC/JWG 2 work programme
Joint Working Group Activities 391
CENELEC Common CEN/CENELEC Activities
JWG 3
Energy Management and related services - General requirements and qualification procedures
To elaborate EN standards in the energy management and related services field: - Energy Management Systems: definition and requirements - Energy Service Companies (ESCO): definition, requirements and qualification procedures - Energy Managers and Experts: roles, professional requirements and qualification Procedures
Officers Meetings
Chairman: Mr Ettore PIANTONI ( IT) Secretary: Mr Antonio PANVINI ( IT)
Published (last 12 months)
EN ISO 50001:2011 (PR=23639) CEN/CLC/JWG 3 Stage : 6060 Energy management systems - Requirements with guidance for use dor : 2011-10-25 doa : 2012-01-31 dop : 2012-04-30 dow: 2012-04-26
Joint Working Group Activities 392
CENELEC Common CEN/CENELEC Activities
JWG 4
Energy Efficiency and Saving Calculations
Standards for common methods of calculation of energy consumption, energy efficiencies and energy savings and for a common measurement and verification of protocol and methodology for energy use indicators
Officers Meetings
Chairman: Mr Jean-Louis PLAZY ( FR) Secretary: Mr Bert DIJKSTRA ( NL)
No standardization work registered
Joint Working Group Activities 393
CENELEC Common CEN/CENELEC Activities
JWG AIMD
CEN/CENELEC Joint Working Group Active Implantable Medical Devices
To standardize all active implantable medical devices and their accessories.
Officers Meetings Convenor: Dr Matthias NEUMANN ( DE) Frankfurt 2004-09-01 / 09-02
Secretary: Dr Klaus NEUDER ( DE)
Enquiry launched
prEN 45502-1:2010 (PR=22891) CEN/CLC/JWG AIMD AIMD (90/385/EEC) Stage : 4060 2011-03-21 Draft for vote due at CCMC by: 2012-04-30 Active implantable medical devices - Part 1: General requirements for safety, marking and information to be
provided by the manufacturer NOTE: D137/C020: NWI approved - Target date for vote: 2012-04-30 * Will supersede EN 45502-1:1997 Mandated: M/432
Joint Working Group Activities 394
CENELEC Common CEN/CENELEC Activities
JWG CBU
Underground plastic conduits for protection of cables
To reconsider the structure and technical contents of EN 50086-2-4:1994 "Conduit systems for cable management - Part 2-4: Particular requirements for conduit systems buried underground"; prEN 14280 "Plastic piping systems for buried cable ducting - Unplasticized poly(venyl chloride) (PVC-U) - Specifications for pipes, fittings and the system"; prEN 14821 "Plastic piping systems for buried cable ducting - Polyethylene (PE) - Specifications for pipes, fittings and the system" and prEN 14282 "Plastic piping systems for buried cable ducting - Polypropylene (PP) - Specifications for pipes, fittings and the system", in order to achieve (a) common CEN/CENELEC draft standard(s).
Officers Meetings
Convenor: Mr Hervé CONTOUX ( FR)
No standardization work registered
Joint Working Group Activities 395
CENELEC Common CEN/CENELEC Activities
JWG CMI
CEN/CENELEC Joint Working Group Continuous Measuring Instruments
To review the EN 45544 series "Workplace atmospheres - Electrical apparatus used for the direct detection and direct concentration measurement of toxic gases and vapours"
Officers Meetings
Convenor: Dr Peter WALSH ( GB)
New work item approved
prEN 45544-1 (PR=23415) CEN/CLC/JWG CMI Stage : 1099 - Draft for vote due at CCMC by: 2013-09-15 Workplace atmospheres - Electrical apparatus used for the direct detection and direct concentration measurement of
toxic gases and vapours - Part 1: General requirements and test methods NOTE: D139/C051: NWI approved and allocated to CEN/CLC/JWG CMI * Will supersede EN 45544-1:1999 * CLC
lead
prEN 45544-2 (PR=23416) CEN/CLC/JWG CMI Stage : 1099 - Draft for vote due at CCMC by: 2013-09-15 Workplace atmospheres - Electrical apparatus used for the direct detection and direct concentration measurement of toxic gases and vapours - Part 2: Performance requirements for apparatus used for measuring concentrations in the region of limit values NOTE: D139/C051: NWI approved and allocated to CEN/CLC/JWG CMI * Will supersede EN 45544-2:1999 * CLC
lead
prEN 45544-3 (PR=23417) CEN/CLC/JWG CMI Stage : 1099 - Draft for vote due at CCMC by: 2013-09-15 Workplace atmospheres - Electrical apparatus used for the direct detection and direct concentration measurement of toxic gases and vapours - Part 3: Performance requirements for apparatus used for measuring concentrations well above limit values NOTE: D139/C051: NWI approved and allocated to CEN/CLC/JWG CMI * Will supersede EN 45544-3:1999 * CLC
lead
prEN 45544-4 (PR=23418) CEN/CLC/JWG CMI Stage : 1099 - Draft for vote due at CCMC by: 2013-09-15 Workplace atmospheres - Electrical apparatus used for the direct detection and direct concentration measurement of
toxic gases and vapours - Part 4: Guide for selection, installation, use and maintenance NOTE: D139/C051: NWI approved and allocated to CEN/CLC/JWG CMI * Will supersede EN 45544-4:1999 * CLC
lead
Joint Working Group Activities 396
CENELEC Common CEN/CENELEC Activities
JWG FCGA
Fuel cell gas appliances
Product standards are to be elaborated for gas fired appliances with combined heating and power to be harmonised with the essential requirements of the Gas Appliance Directive (90/396/EC). To avoid overlapping with other technical bodies, the focus of the standards to be elaborated is materials, design, construction of the appliances to ensure safe operation and performance
Officers Meetings Convenor: Dipl.-Ing. Jörg ENDISCH ( DE) Bonn 2006-10-24
Enquiry launched
prEN 50465:2011 (PR=21817) CEN/CLC/JWG FCGA GAD (2009/142/EC) Stage : 4060 2012-03-05 Draft for vote due at CCMC by: 2010-04-16 Gas appliances - Combined heat and power appliance of nominal heat input inferior or equal to 70 kW NOTE: CENELEC lead under DE convenorship * Will supersede EN 50465:2008 Mandated: M/BC/CEN/89/6
Joint Working Group Activities 397
CENELEC Common CEN/CENELEC Activities
JWG FPR
Fire protection for railway applications
Officers Meetings Secretary: Mr Udo SONNENBURG ( DE) Vienna 2004-09-02 / 09-03
Vote decided
prEN 45545-5:201X (PR=22841) CEN/CLC/JWG FPR RAIL (2008/57/EC) Stage : 4099 2012-09-07 Draft for vote due at CCMC by: 2012-04-01 Railway applications - Fire protection on railway vehicles - Part 5: Fire safety requirements for electrical equipment
including that of trolley buses, track guided buses and magnetic levitation vehicles NOTE: 2012-04-23 - Formal Vote editing allocated to [email protected] * Will supersede CLC/TS 45545-5:2009 * Target date for vote (set by default) = 2012-04-01 * Enquiries on 5 other parts launched by CEN/TC 256 in April 2010 Mandated: M/275; M/334; M/483
Joint Working Group Activities 398
CENELEC Common CEN/CENELEC Activities
JWG NAWI
Non automatic weighing instruments
Revision of EN 45501:1992
Officers Meetings
Convenor: Mr John ANTHONY ( GB)
Vote launched
FprEN 45501:2011 (PR=21602) CEN/CLC/JWG NAWI NAWI (2009/23/EC) Stage : 5060 2012-05-07 Metrological aspects of non-automatic weighing instruments NOTE: 2011-08-12: Allocated to [email protected] * D130/C152: M/412 accepted * D130/C155: CENELEC lead due to EMC aspects in this revision (approved by CEN/BT through resolution BT C47/2007) * Will supersede EN 45501:1992 (which was under CEN lead) Mandated: M/412
Joint Working Group Activities 399
CENELEC Common CEN/CENELEC Activities
JWG PPE
Electrostatic risks
To develop a guidance document on selection, use, care and maintenance of PPE against electrostatic risks
Officers Meetings
Secretary: Mr Steven VAN DER MINNE ( NL)
No standardization work registered
Joint Working Group Activities 400
CENELEC Common CEN/CENELEC Activities
JWG RRM
CEN/CENELEC Joint Working Group Remote Reading of Meters
To prepare standards for the physical media and for the protocols for communication systems to be used for the remote reading of all kinds of meters (electricity, water, gas, heat, etc).
Officers Meetings
Convenor: Mr D FUCHS ( DE)
No standardization work registered
Joint Working Group Activities 401