Minutes of a Public Meeting of the Board of Directors of the Commuter Rail Division of the Regional Transportation Authority

Total Page:16

File Type:pdf, Size:1020Kb

Minutes of a Public Meeting of the Board of Directors of the Commuter Rail Division of the Regional Transportation Authority MINUTES OF A PUBLIC MEETING OF THE BOARD OF DIRECTORS OF THE COMMUTER RAIL DIVISION OF THE REGIONAL TRANSPORTATION AUTHORITY The Board of Directors of the Commuter Rail Division of the Regional Transportation Authority met in a public session for a Board Meeting on Wednesday, March 20, 2019 at 10:30 a.m. in the Metra Board Room, 547 W. Jackson Boulevard, Chicago, Illinois, pursuant to notice. ROLL CALL Members Present: R. Brown, R. Craig, D. DeGraff, S. Messerli, S. Palmer, J. Plante, J. Zediker, and Chairman Carlson. Directors Baldermann, Koehler, and Thames were absent. SAFETY BRIEFING Manuel Rangel, Capital Track Roadmaster with the Engineering’s Department, gave the Safety Briefing. Director Craig indicated that safety is a goal of the Board and recommended a safety briefing video, appropriate for a roll call, from the Police Departments. Director Craig hopes that continued support is provided for a Board Member to attend APTA Safety meetings. PUBLIC COMMENT Garland Armstrong asked Metra to alert commuters of detours when the upcoming underpass construction starts at the Elmwood Park Station. He asked Metra for assistance with municipalities that force the disabled from stations in inclement weather. He stated that the Palatine Police forced disabled persons in wheelchairs out of the train station during cold weather. Metra will talk with Palatine. MINUTES Approval of the Minutes from the February 20, 2019 Meeting of the Board. Chairman Carlson called for a vote to approve the minutes of the February 20, 2019 Board Meeting. Director Palmer moved, and Director Craig seconded. With a roll call vote the motion carried with 8 ayes. CONSENT AGENDA A. Capital Procurements from February 20, 2019, through March 19, 2019 A-1 Change Order for Metra Financial System Replacement A-2 Change Order for Hazel Crest Station Rehabilitation A-3 Contract for Radio and Messaging License Renewal A-4 Contract for Switch Ties A-5 Contract for Two-Way Radios and Accessories B. Operating Procurements from February 20, 2019, through March 19, 2019 B-1 Contract for Bi-Level Coach and High liner Wheels B-2 Contract for Track and Platform Fasteners C. Intergovernmental Agreement for Metra to Contribute to the Cost of a New Commuter Station in Clarendon Hills (BNSF) D. Intergovernmental Agreement for Oak Lawn to Contribute to the Cost of Signal Improvements Required due to Planned Changes to 95th Street (SWS) E. Grade Crossing Improvement Agreement with the State of Illinois Department of Transportation – Rock Island Line, Beverly Branch (RI-BB) – Chicago F. Grade Crossing Improvement Agreement with the State of Illinois Department of Transportation and the Village of Franklin Park – Milwaukee District West Line (MD-W) – Franklin Park Minutes of the Board Meeting March 20, 2019 Page 2 of 5 G. Ordinance for Bidding Regulations H. Resolution Approving 2020 Metra Board Meeting Schedule Chairman Carlson asked if there were items anyone wanted pulled for discussion. Director Plante pulled A-1. Director Plante out that the project is well within budget. Chairman Carlson stated for the record, Cherie Kizer, Chief Information Technology Officer, and her team, has done a good job on this significant project. Director Craig stated even with the changes in the bidding process, change orders will still come up for Board review. Director Palmer pulled A-2. He questioned if the project was underbid based on the total amount of the change orders. Chris Krakar, Chief Engineer Officer, and Janice Thomas, Senior Division Director, Diversity & Civil Rights, explained there were unforeseen issues that were beyond the contractor’s control. Director Plante emphasized the need for performance measures. Director Brown had a question on Item A-5. She asked what will be done with the old radios. Chris Krakar said the radios are obsolete and will be scrapped for parts or disposed of properly. Chairman Carlson called for a vote to approve the Consent Agenda. Director DeGraff moved, Director Plante seconded. With a roll call vote the motion carried with 8 ayes. DISCUSSION WITH POSSIBLE ACTION Lynnette Ciavarella, Sr. Division Director of Strategic Capital Planning, presented an Ordinance, to amend the 2019 Capital Program, for Board approval to include: a $14,000,000 discretionary grant award from the federal Volkswagen Clean Air Act Civil Settlement, distributed to the Illinois’ EPA program to reduce emissions. This award along with $42,000,000, in RTA prior bond funds, will be used to purchase eight Tier 4 locomotives. The Positive Train Control, (PTC), project was awarded $2,058,163 under the Consolidated Rail Infrastructure & Safety Improvements, (CRISI), Program. A total of $22,500,000 in Metra retained earnings is being added to the Locomotive Purchase project. Metra is adding $6,500,000 to the Gresham Area Bridges project for concurrent construction. This amendment adds $100,000 for MED Bridges and $250,000 for MWD Bridges. Also included is $2,350,000 for ties and ballast, $1,000,000 for the MED Catenary Rehabilitation and a decrease of $1,000,000 for crossings. Federal funding added $450,000 for Chicago Union Station South Interlockers; $1,000,000 for Metra Electric Substation Improvements; and $1,550,000 for a new Communications Improvements project. Federal funding includes $500,000 for Rock Island Yard Improvements. $1,400,000 for construction of a sand tower system at the California Avenue Union Pacific Yard. Infrastructure Engineering projects were reduced by $3,400,000 and the funds were reallocated to specific capital engineering projects. Director Messerli asked if the Volkswagen Settlement grant was continuous. Jim Derwinski, Executive Director/CEO, explained this was the first competitive award program from $109,000,000 the State of Illinois received from the Department of Justice and when additional competitive programs become available, Metra will apply. Directors Craig and Palmer asked about additional costs to run the Tier 4s. Jim Derwinski replied that the grant program was under the federal Diesel Emissions Reduction Act (DERA) program. Federal requirements require all new locomotives to be Tier 4 and the locomotives will be on one line and a life cycle cost analysis will be done. Chairman Carlson asked for a motion to approve the 2019 Capital Amendment. With a leave by the prior roll call, the motion carried unanimously. RECEIVE AND FILE REPORTS A. Management Personnel Report for February 2019 B. Office of Business Diversity & Community Relations Report for February 2019 Minutes of the Board Meeting March 20, 2019 Page 3 of 5 C. Real Estate Report for February 2019 D. System Performance Dashboard for February 2019 E. Legislative Report for February 2019 Chairman Carlson asked if any Director wished to discuss the Receive and File Reports. Director Plante asked about the Legislative Report. He asked if the funding bill dropped and Sam Smith, Government Affairs Officer, replied that Local 150 Capital Bill had dropped. No discussion ensued after that. STATE OF METRA OPERATIONS REPORT Bruce Marcheschi, Deputy Executive Director of Operations, reported for the month of February 2019 on- time performance was 88.2%. There were 1803 delays. Switch and signal, weather and human error were the primary delay causes. Delays caused by PTC were attributed to PTC back office operations mostly on the Union Pacific lines due to software issues. There were 19 mechanical delays caused by locomotives and 13 mechanical delays caused by coaches. On February 28 there were 167 delays due to Amtrak s signal/switch system crash. The shutdown, caused by human error, began at 8:45AM and Amtrak had the system up and running around 5:30 PM, but it inconvenienced over 60,000 passengers. The Board expressed their dissatisfaction with Amtrak, stating that Amtrak had harmed Metra’s customers’ trust and Metra’s brand. The Board communicated the need to have control over trackage to provide reliable end to end service for its passengers. Director Craig added that customers with families expect reliable service when children must be picked up from daycare, schools, or activities. Director Palmer expressed his dissatisfaction with Amtrak’s apology and asked what Amtrak is doing for Metra customers. Jim Derwinski replied that he and Bruce Marcheschi are meeting with Amtrak, CN and UP leadership to address those and other issues and will convey the Board’s concern. Jim Derwinski stated that nationally, Metra still has the best on time performance and does so in a complicated territory. Partnerships have kept Metra on top. Director Palmer asked why a squash tournament was in a space used for overflow at Chicago Union Station. Jim Derwinski replied that Metra was not consulted. MONTHLY FINANCIAL REPORT Tom Farmer, Chief Financial Officer, discussed the January results. Fare Revenue was under budget ($3.0M) or (9.6%). Mr. Farmer then asked Lynnette Ciavarella to comment on January Ridership. Lynnette Ciavarella described three main factors contributing to the decline in January ridership. First was the partial government shutdown that affected Jan. 1 to Jan 25. 29,000 federal employees are in the Chicago area, and about 16,000 in Chicago proper. Second, we did not have a fare increase so January stockpiling of 10 ride tickets did not occur. Staff attempted to adjust for this, but since there has not been a year without a fare increase for a while, the adjustment suffered from a lack of recent data. Finally, the biggest impact to ridership was the impact of the polar vortex, with ridership about half of a typical week. Tom Farmer resumed presenting. Other revenue was $0.3 million favorable ($0.2 million in leases and trackage and $0.1 million in Other Revenue), making total revenue $2.7 million unfavorable for the month. In the expense budget, Transportation was $0.7 million under budget, mainly labor-related.
Recommended publications
  • Southeast Corridor Alternatives Analysis Locally Preferred Alternative Report
    SOUTHEAST CORRIDOR ALTERNATIVES ANALYSIS DOCUMENT #9 LOCALLY PREFERRED ALTERNATIVE REPORT PREPARED BY AUGUST 2011 METRA – SOUTHEAST CORRIDOR LOCALLY PREFERRED ALTERNATIVE REPORT ALTERNATIVES ANALYSIS DOCUMENTS 1. Detailed Work Scope 2. Purpose & Need 3. Initial Alternatives, Part I: Modes & Technologies 4. Evaluation Methodology 5. Initial Alternatives, Part I Screening and Part II: Conceptual Design 6. Screening of Initial Alternatives, Part II 7. Feasible Alternatives 8. Screening of Feasible Alternatives 9. Locally Preferred Alternative Report AECOM AUGUST 2011 I METRA – SOUTHEAST CORRIDOR LOCALLY PREFERRED ALTERNATIVE REPORT TABLE OF CONTENTS I. INTRODUCTION.......................................................................................................... 1 A. PURPOSE.................................................................................................................. 1 B. BACKGROUND ......................................................................................................... 1 II. SUMMARY OF ALTERNATIVES ANALYSIS.............................................................. 5 A. INITIAL SCREENING, PART I................................................................................... 5 B. DEFINITION AND SCREENING OF INITIAL ALTERNATIVES, PART II.................. 7 C. DEFINITION OF FEASIBLE ALTERNATIVES ........................................................ 10 D. DETAILED FINAL SCREENING.............................................................................. 11 III. PUBLIC INVOLVEMENT SUMMARY.......................................................................
    [Show full text]
  • Metra's 2002 Program and Budget Has Been Reformatted for The
    Metra’s 2002 Program and Budget has been reformatted for the Web 547 West Jackson Boulevard Chicago, Illinois 60661-5717 Phone (312) 322-6900 Web http://www.metrarail.com CREATING CAPACITY FOR GROWTH FINAL 2002 PROGRAM AND BUDGET NOVEMBER 2001 Board of Directors Jeffrey R. Ladd, Chairman Appointing Authority: County Board Chairmen, Kane, Lake, McHenry and Will Counties Lowell E. Anderson, Treasurer Appointing Authority: Suburban Members, Cook County Board Larry A. Huggins, Director Appointing Authority: City of Chicago W. Warren Nugent, Secretary Appointing Authority: Suburban Members, Cook County Board Gerald L. Porter, Vice-Chairman Appointing Authority: County Board Chairman, DuPage County Joseph A. Tecson, Director Appointing Authority: Suburban Members, Cook County Board Donald A. Udstuen, Director Appointing Authority: County Board Chairmen, Kane, Lake, McHenry and Will Counties Philip A. Pagano, Executive Director TO FRIENDS OF COMMUTER RAIL: Chairman’s Welcome to Metra’s 2002 Program and Budget. It Message describes good news such as further ridership growth, steady progress on our three New Start projects, and ongoing capital improvements including orders for badly needed new cars and locomotives. Meanwhile, the costs of providing safe, reliable, convenient and comfortable commuter rail service have steadily increased. Thus, our proposed 2002 operating budget envisions our first fare increase in six years, 5%, which will likely take effect June 1. I think it’s important to note that this will be only the fourth fare increase in the 18 years of Metra’s management of the Northeast Illinois commuter rail system. And it will be only the third one for operations. A fare hike that took effect in 1989 was dedicated solely to capital projects, namely the physical improvements that preserve and improve our serv- ice — and in turn reduce operating costs.
    [Show full text]
  • (Metra) Train 504, Chicago, Illinois, September 17, 2005
    RAN S P T O L R A T LURIBUS A N P UNUM E National Transportation Safety Board O T I I O T Washington, D.C. 20594 A N N S A D FE R T Y B OA Railroad Accident Brief Accident No.: DCA-05-MR-013 Location: Chicago, Illinois Date: September 17, 2005 Time: 8:35 a.m. central daylight time1 Railroad: Northeast Illinois Regional Commuter Railroad Corporation (Metra) Property Damage: $6.35 million Fatalities: 2 Injuries: 117 Type of Accident: Derailment The Accident On Saturday, September 17, 2005, about 8:35 a.m., eastbound (inbound) Northeast Illinois Regional Commuter Railroad Corporation (Metra) train 504 derailed one locomotive and five cars at milepost (MP) 4.7 near West 47th and South Federal Street in Chicago, Illinois.2 The train was being operated in the push mode from a cab control car at the lead end. The train had departed Joliet, Illinois, at 7:24 a.m. en route to the LaSalle Street station in downtown Chicago. The train crew consisted of an engineer in the cab control car and a conductor, an assistant conductor, and a collector in the passenger cars. The train derailed as it traversed a crossover from track 2 to track 1 that had a prescribed maximum operating speed of 10 mph. (See figure 1.) The train was traveling 69 mph as it entered the crossover. The second through the fifth cars from the lead end of the train struck a steel girder that was part of a bridge that carried the tracks over 47th Street.
    [Show full text]
  • Existing Conditions, Needs, & Deficiencies
    Existing Conditions, Needs, & Deficiencies TECHNICAL MEMORANDUM South Halsted Bus Corridor Enhancement Project August 2018 Prepared for: Prepared by: g PAGE LEFT INTENTIONALLY BLANK d EXISTING CONDITIONS, NEEDS, & DEFICIENCIES DEFICINCIES TECHNICAL MEMORANDUM Table of Contents d i EXISTING CONDITIONS, NEEDS, & DEFICIENCIES DEFICINCIES TECHNICAL MEMORANDUM d ii EXISTING CONDITIONS, NEEDS, & DEFICIENCIES DEFICINCIES TECHNICAL MEMORANDUM Figures d iii EXISTING CONDITIONS, NEEDS, & DEFICIENCIES DEFICINCIES TECHNICAL MEMORANDUM Tables d iv EXISTING CONDITIONS, NEEDS, & DEFICIENCIES TECHNICAL MEMORANDUM Project Overview OVERVIEW OF SOUTH HALSTED CORRIDOR The South Halsted Bus Corridor Enhancement Project was initiated by the Chicago Transit Authority (CTA) in partnership with Pace Suburban Bus to improve transit along approximately 11 miles of South Halsted Street, from the Pace Harvey Transportation Center to 79th Street. The corridor also includes segments of 79th and 95th Streets that provide connections to the CTA Red Line 79th and 95th Street Stations. This study will explore potential transit improvements for the corridor’s transit riders. On an average weekday, 11,600 trips are made along the corridor. Improvements being considered as part of the project may include: Enhanced coordinated service plans Realigned bus stops Roadway treatments Updated passenger amenities Traffic signal optimization and transit signal priority Potential Pace Pulse stations south of 95th Street Transit improvements developed in this study will complement CTA’s planned extension of the Red Line to 130th Street from 95th Street, which is currently undergoing the federal environmental review and planning process. The study corridor crosses jurisdictional boundaries, including the Cook County communities of Harvey, Phoenix, Calumet Park, Riverdale, Dixmoor, and the City of Chicago neighborhoods of West Pullman, Morgan Park, Roseland, Washington Heights, and Auburn Gresham.
    [Show full text]
  • Environmental Resources Impacts and Mitigation
    Chapter 3. Environmental Resources, Impacts, and Mitigation This chapter discusses the social, economic, and environmental resources within the project vicinity and the project alternatives’ potential impacts and benefits to those resources. The following sections address each general resource category and describe the current setting. The potential impacts and benefits of the project Build and No-Build Alternatives are then evaluated against these existing baseline conditions. The chapter concludes with a summary of the anticipated impacts of the Preferred Alternative and a summary of the environmental commitments to address those impacts. Chapter 3 has been updated to reflect further development of the additional mitigation measures evaluated due to Environmental Justice concerns. In addition, updates were made to the air quality standards and reference to the Transportation Improvement Program (TIP), information was added to summarize the noise barrier viewpoint solicitation process, and minor corrections or updates were made to other sections. Consideration was also given to updating demographic data, most of which is from the 2010 Census or American Community Survey. Because conditions in the study area are not likely to have changed in a way that would affect decision-making for the project, it was determined that this effort was not needed. Changes and additions since the publication of the DEIS are shown in double underline. 3.1 Study Area Project “Study Area” The 75th Street CIP “study area” is Throughout this document, the evaluations focus within defined geographic areas appropriate for the specific resources being based on the linear project limits addressed. For most resources discussed in this document, a defined in the CREATE Program’s project “study area” has been defined and is used throughout, Final Preliminary Screening Report except where specifically noted otherwise.
    [Show full text]
  • South Suburban Commuter Rail Corridor Phase I & II
    South Suburban Commuter Rail Feasibility Study APPENDICES and April 1999 Appendix A Downtown Terminals and Candidate Alignments Dropped from Further Consideration Metra’s RFP for this project identified three potential alternative routes [i.e., “alignments”; one each serving Randolph Street Station (designated as Alignment A), LaSalle Street Station (Alignment B) and Union Station (Alignment C)], leaving the consultant to identify connections to downtown terminals and any other alignment possibilities. The UP/CSX portion, of course, was common. ICF Kaiser’s proposal developed four additional alignments, designated Alignments D through G. Alignments D and E would be routed into LaSalle Street, while Alignments F and G would be routed into Randolph Street. After initiation of the contract, identification of other alternative routes continued, with new Alignments CA, EA, and FA defined as alternatives to Alignments C, E, and F, respectively, resulting in a total of ten different candidate alignments. This Appendix is a compilation of support material regarding terminals and rail facility upgrades for those potential alignments and segments that were dropped from further consideration after joint discussions of their potential utilities and difficulties. A schematic map of the locations of the different alignment options can be found at the end of this Appendix. The matrix listing each of the original ten short- listed alignment alternatives is also provided there. Downtown Terminals Dropped from Further Consideration In the course of studying the alternative routings and terminals with Metra, it was agreed that the potential SouthEast Service (SES) should complement, rather than compete with, the existing Metra route structure. Use of the Metra Electric District (MED) to enter Chicago would not fulfill this goal.
    [Show full text]
  • Metra-Budget-2006.Pdf
    1 2006 Metra Program and Budget Table of Contents Board of Directors................................................................................................2 Letter from the Chairman ....................................................................................4 Introduction..........................................................................................................9 Capital Improvements........................................................................................14 City of Chicago ....................................................................................16 Cook County South & Southwest Region............................................18 Cook County North & Northwest Region ............................................20 Cook County West Region ..................................................................22 DuPage County ....................................................................................24 Kane County ........................................................................................26 Lake County..........................................................................................28 McHenry County ..................................................................................30 Will County ..........................................................................................32 Appendix............................................................................................................34 2 2006 Metra Program and Budget Board of Directors Jeffrey
    [Show full text]
  • Auburn Gresham for Its Quality-Of-Life Plan
    Greater Auburn Gresham Development Corporation | LISC Chicago New Communities Network QUALITY-OF-LIFE PLAN 2016 AUBURN GRESHAM: YOUR VOICE MATTERS STEERING COMMITTEE TASK FORCE Lashandra Eison Gene Linton James L. Pruitt BRAVE YOUTH MEMBERS DeAndre Estes Edward E. Lomax, Jr. Lisa Ramsey LEADERS TASK Cynthia Boyd, University of Illinois at Chicago Pamela Aldridge Wendy Evans Juanita Love Bobbie Rawls FORCE Diane Faust Anthony Lovelace Albert Reece Howard Brookins, 21st Ward Alderman Byam Alexander Kiera Avant Jason Feldman Martha Lowry Ruby Reed Rasheed Ansar Trevon Bosley Revin Fellows Mariah Mack Alicia Roberts Ronald Browne, North Beverly Civic Association Kiera Avant Timothy Boyd Shirley Fleming Alene Mason Felicia Roberts Jeff Baker Lashandra Eison Rodney Blissett, 6th Police District Commander Glenda Franklin Walter Matthews Sheenita Robinson Arlecta Beard Dana Griffin Domini Gamble Melvinia Mayo Norma Sanders Jacqueline Collins, State Senator Kham Beard Asante Hamilton Narineh Gharashor Jasmine McCalpin Mark Sciacca Robert Beck Amani Johnson Derrick Curtis, 18th Ward Alderman Kwadjo Glenn Nigel McClain Janece Simmons Brenda Bell Jessica Jones Nicole Grant Sharron McCoy Seye Simpkins Monique Dockery, Principal, Westcott Elementary Ta Benz Orland Lewis Dana Griffin Marc McLeod Augusta Smith Dale Bledsoe Anthony Lovelace Asante Hamilton Kalyssa McMillian Lillie Smith Robert Lee, Illinois State University Pam Bosley Mariah Mack Shelia Harmon Jah Ranu Menab Myshawn Smith Trevon Bosley Nigel McClain Winston McGill, 6th Ward Office Cecelia
    [Show full text]
  • 75Th St CIP FEIS
    Appendix J DEIS Public Comment Period and Public Hearing Summary J3 AGENCY COMMENTS THIS PAGE INTENTIONALLY BLANK Table J-3-1: Agency Comments Received during the DEIS Comment Period Comment Code Commenter Comment(s) Response L 1 United States Department of the Interior The Department of the Interior stated that they had No response required. Office of the Secretary no comment on the Draft Environmental Impact Office of Environmental Policy and Statement for the 75th Street Corridor Compliance Improvement Project located in Chicago, IL. Custom House, Room 244 200 Chestnut Street Philadelphia, Pennsylvania 19106-2904 L 2 U.S. Department of Transportation FRA had several questions about how the P2 The concept for the P2 project was born out of many years of discussions Federal Railroad Administration Project will change railroad operations including: at Metra intending to address congestion in the 75th Street corridor as well Environment and Systems Planning as to better balance the distribution of demand at Metra’s terminal stations Division Is there sufficient capacity in LaSalle in downtown Chicago. This project will improve reliability of Metra SWS 1200 New Jersey Avenue, SE Street terminal to handle the additional trains as well as relieve capacity at the South side of Chicago Union Washington, DC 20590 Southwest Corridor METRA trains? Station through the shift of SWS trains to LaSalle Street Station. Metra is Is there capacity on the existing double committed to bringing this project to fruition to achieve those goals, while track main line to handle the additional helping move the agency toward a state of good repair.
    [Show full text]