Chelmsford City Local Highway Panel - Approved Works Programme 2017/18
Schemes Key Completed Cancelled Update
Scheme Ref Cost Code Scheme Parish Finish Scheme Stage Works Description Allocated Budget Comments Category
Approved Schemes - Prioritised for 2017/18 delivery
Subject to weather carriageway resurfacing and high friction Main Road nr j/w Erick Avenue, Broomfield - Traffic Following Road Safety Assessment, upgrade Pedestrian 1 LCHE162129 Broomfield Sep-17 Total scheme £25,000 surfacing planned June/July 2017. Infrastructure works to then Pedestrian crossing upgrade Management Crossing follow
B1418 White Elm Road j/w Bicknacre Road, 2 LCHE171005 Bicknacre Quarter 4 Safer Roads Total scheme Install Traffic island £14,000 Bicknacre - Traffic island
St Mary's Church, Ingatestone Road, Buttsbury - Traffic 3 LCHE162131 Buttsbury Apr-2017 Total scheme Install Chevron sign on traffic island £2,000 Chevron signage has now been upgraded by Maintenance team Bend sign improvements Management
Parkway A1060 Odeon RAB, Chelmsford - Traffic Chelmsford Non Traffic Traffic Management Improvements (TMI) to dedicated left turn 4 LCHE132022 Jun-17 Total scheme £41,000 management improvements Parished Management lane
Chelmsford Non Traffic 5 LCHE142004 O/s 140-147 Forest Drive Chelmsford - Lay-by Sep-17 Total scheme To construct lay-by within available verge £25,000 Parished Management
Chelmsford Non Traffic 20 mph zone/limit - Moulsham Drive/Lady Lane/Hamlet 6 LCHE152057 Old Moulsham, Chelmsford - 20mph zone/limit Quarter 4 Total scheme £26,500 Parished Management Road/St Johns Road/Vicarage Road/Moulsham Street
Improvements to existing 20 mph signage/roundel road Chelmsford Non Traffic 7 LCHE152069 Springfield Allied Estate - 20mph signage/roundels Sep-17 Total scheme markings - (Sandford Road/Chelmer Road/Springfield £3,000 Parished Management Road/Hill Road/Navigation Road)
North Avenue, Chelmsford - Pedestrian Crossing Chelmsford Non Traffic 8 LCHE162059 Quarter 4 Feasibility Study Feasibility Study/design of pedestrian crossing options £5,000 Options Parished Management
The Meades, Chelmsford - study into verge over- Chelmsford Non Traffic 9 LCHE162149 Sep-17 Feasibility Study Feasibility Study into verge over-run area £3,000 run Parished Management
Waterhouse Lane j/w Beeches Road/Forest Drive, Chelmsford Non Traffic 10 LCHE162146 Oct-17 Feasibility Study Feasibility Study into junction improvements £3,000 Chelmsford - study into junction improvements Parished Management
Kings Road Primary School, Corporation Road, Chelmsford Non School Crossing Feasibility study into moving bollards or installing continuous 11 LCHE146003 Quarter 4 Feasibility Study £3,000 Chelmsford - parking improvements study Parished Patrol footway to stop parking
Victoria Road nr Riverside Leisure Centre, Chelmsford Non School Crossing 12 LCHE156006 Quarter 4 Feasibility Study Feasibility Study into drainage improvements at crossing point £3,000 Chelmsford - Drainage study Parished Patrol
Waterson Vale, Chelmsford - 20mph Chelmsford Non Traffic Improvements to enforce 20mph zone - speed roundels and 13 LCHE142093 Aug-17 Total scheme £1,500 signs/roundels Parished Management signage improvements at start of limit
Goldlay Avenue nr j/w Burwood Court, Chelmsford - Chelmsford Non Traffic Footway bollard to stop vehicles driving over footway around 14 LCHE152102 Quarter 4 Total scheme £2,000 bollard Parished Management prohibition of traffic
The Rising Sun P/H, New London Road, Chelmsford Non Traffic 15 LCHE152098 Sep-17 Total scheme Dropped kerbs to improve access in front of public house £2,500 Chelmsford - Dropped kerbs Parished Management
A138 Chelmer Road j/w Sandford Road, Chelmsford Non 16 LCHE171002 Nov-17 Safer Roads Total scheme Cycleway improvements £18,000 Chelmsford - Cycleway improvements Parished
Page 1 of 6 Chelmsford City Local Highway Panel - Approved Works Programme 2017/18
Schemes Key Completed Cancelled Update
Scheme Ref Cost Code Scheme Parish Finish Scheme Stage Works Description Allocated Budget Comments Category
Approved Schemes - Prioritised for 2017/18 delivery (Continued)
Well Lane to The Heights - Service Road, Danbury Traffic 17 LCHE162104 Danbury Quarter 4 Feasibility Study Feasibility Study into one-way road £2,000 - One-way road Management
Design of traffic management improvements - Remove centre Highwood Road, Edney Common - Traffic Traffic 18 LCHE162039 Edney Common Quarter 4 Design white line/renew SLOW road markings, build outs at play £3,000 management improvements Management ground/public house with priority flow
Traffic 19 LCHE162142 Margaretting Road, Galleywood - Footway Galleywood Sep-17 implementation Implementation of footway designed under LCHE003001 £88,000 Management
Traffic 20 LCHE152114 O/s 50-62 Shimbrooks, Great Leighs - surfacing Great Leighs Quarter 4 Total scheme Removal of existing planting area and resurfacing £13,000 Management
Design of traffic management improvements - Remove centre Highwood Road, Loves Green - Traffic Traffic 21 LCHE162038 Loves Green Quarter 4 Design white line/renew SLOW road markings/build outs at school £3,000 management improvements Management with priority flow
22 LCHE162005 Swan Lane, Stock to Margaretting - Quiet Lane Margaretting Quarter 4 Quiet Lane Total scheme Quiet Lane £3,000
Wantz Road, Roman Road, Main Road, Traffic 23 LCHE152118 Margaretting Quarter 4 Total scheme Village Gateway Treatments £15,000 Margaretting - Gateway treatments Management
Junction of Green Lane with Vicarage Road, Traffic Re-designing bennett junction road markings and See Appendix for road marking design. Design agreed by Parish 24 LCHE162112 Roxwell Jul-17 Total scheme £2,000 Roxwell - Junction improvements Management implementation Council
A1245/A132 Roundabout, Rettendon - Lane Traffic 25 LCHE142019 Rettendon Quarter 4 Total scheme Lane markings on RAB with lead in road markings £17,500 markings on RAB Management
The Street j/w Vicarage Road, Roxwell - Chevron Traffic 26 LCHE152109 Roxwell Quarter 4 Total scheme Chevron signage at bend £2,000 sign Management
Opp Railway Station, South Woodham Ferrers - South Woodham Passenger 27 LCHE165030 Quarter 4 Total scheme Raised kerbs £3,700 bus stop raised kerbs Ferrers Transport
Burnham Road near Tarbrum's Lane, South South Woodham 28 LCHE171003 Woodham Ferrers - Junction lining/traffic queue Quarter 4 Safer Roads Total scheme Junction improvements £18,000 Ferrers survey
See Appendix - Design split into two parts, Phase 1 warning signs Church Lane j/w Lawn Lane, Springfield - Cycle & advisory cycle lane across the junction, Phase 2 construct 29 LCHE161003 Springfield Jul-17 Safer Roads Design Design cycle link/junction improvements £6,000 link/junction improvements shared cycle route across park, including necessary legal process. Both phases now on Potential Schemes List
Tyrells School - Tavistock Road, Bodmin Road, Traffic Twelve additional speed surveys being undertaken to feed into 30 LCHE152066 Springfield Quarter 4 Feasibility Study Feasibility Study into 20mph zone/limit £5,000 Taunton Road, Springfield Management study
Chancellor Avenue j/w Chelmer Village Way, Traffic 31 LCHE152009 Springfield Sep-17 Feasibility Study Feasibility Study into re-profiling RAB camber £5,000 Springfield - study into RAB camber Management
Pump Lane j/w Crocus Way, Springfield - 32 LCHE171004 Springfield Quarter 4 Safer Roads Total scheme Crossing/signage/surfacing improvements £30,000 Crossing/signage/surface improvements
Page 2 of 6 Chelmsford City Local Highway Panel - Approved Works Programme 2017/18
Schemes Key Completed Cancelled Update
Scheme Ref Cost Code Scheme Parish Finish Scheme Stage Works Description Allocated Budget Comments Category
Buttsbury Bridge, Stock - Traffic improvements at Traffic 33 LCHE152080 Stock Quarter 4 Total scheme Traffic Management Improvements at bridge £17,700 bridge Management
Approved Schemes - Prioritised for 2017/18 delivery (Continued)
Public Rights of 34 LCHE158009 Footpath 30 Stock - Board walk Stock Quarter 4 Total scheme Install 80m of plastic board walk/clear vegetation £15,000 Way
Lordship Road/Ongar Road/The Green/Mayfield Traffic Feasibility Study into junction improvements, recommendation 35 LCHE162086 Road/Orchard Close, Writtle - Junction Writtle Quarter 4 Feasibility Study £5,000 Management from completed Route Enhancement Study improvements
Ongar Road j/w Eastview, Writtle - Traffic Feasibility Study into junction/carriageway improvements, 36 LCHE162085 Writtle Quarter 4 Feasibility Study £3,000 Junction/carriageway improvements Management recommendation from completed Route Enhancement Study
O/s Writtle Agricultural College, Lordship Road, 37 LCHE171001 Writtle Quarter 4 Safer Roads Total scheme Signage for College/tea rooms £7,000 Writtle - Signage
Approved Schemes - For 2018/19 Rolling Programme
Hammonds Road/Church Road, Little Traffic Flood Gauges/Flood Sensors/Verge Marker Posts, Upgraded Based on Prioritisation at March 2017 Panel meeting, this scheme 38 LCHE152010 Boreham 2018/19 Total scheme £25,000 Baddow/Boreham - flood warning Management Signs/Ditch and Vegetation works is in LHP rolling programme of works
Traffic Passing Bay signage to identify passing bay and prevent Based on Prioritisation at March 2017 Panel meeting, this scheme 39 LCHE152014 Brick House Lane, Boreham - Signs Boreham 2018/19 Total scheme £2,000 Management obstruction is in LHP rolling programme of works
Plantation Road, Main Road and Church Road, Traffic Based on Prioritisation at March 2017 Panel meeting, this scheme 40 LCHE152022 Boreham 2018/19 Feasibility Study Feasibility Study into traffic management improvements £5,000 Boreham - Study into TMI Management is in LHP rolling programme of works
Hammonds Road /Church Road, Little Baddow to Traffic Design of bend signage improvements (Chevron/bend Based on Prioritisation at March 2017 Panel meeting, this scheme 41 LCHE162055 Boreham 2018/19 Design £3,000 Boreham - Bend signs Management warning signs) is in LHP rolling programme of works
Scheme CH17 - Convert southern footway to Chelmsford Non Based on Prioritisation at March 2017 Panel meeting, this scheme 42 LCHE154007 Melbourne Avenue, Chelmsford - Cycling 2018/19 Cycling Total scheme cycleway/footway (Chignal Road to North Avenue) (Was £25,000 Parished is in LHP rolling programme of works reference LCHE134006)
Chelmsford Non Scheme CH34 - Convert and widen footway (opposite Based on Prioritisation at March 2017 Panel meeting, this scheme 43 LCHE154009 Princes Road, Chelmsford - Cycling 2018/19 Cycling Total scheme £95,000 Parished Moulsham School to Lidl) (was reference LCHE134009) is in LHP rolling programme of works
Chelmsford Non Public rights of Investigation into installing drainage in existing surfaced city Based on Prioritisation at March 2017 Panel meeting, this scheme 44 LCHE148002 PRoW Ftp 95 Chelmsford - Drainage 2018/19 Feasibility Study £5,000 Parished way centre footpath is in LHP rolling programme of works
O/s Parade of Shops, 90-106 Kings Road, Chelmsford Non Traffic Based on Prioritisation at March 2017 Panel meeting, this scheme 45 LCHE162004 2018/19 Design Design of parking improvements - Echelon parking £3,000 Chelmsford - Echelon Parking Parished Management is in LHP rolling programme of works
Signage at key location on entry points to urban area of Chelmsford City "Black on white" Entry Point Chelmsford Non Traffic Based on Prioritisation at March 2017 Panel meeting, this scheme 46 LCHE142023 2018/19 Total scheme Chelmsford City, reflecting status as a City and County Town £40,000 Signage Parished Management is in LHP rolling programme of works of Essex.
Waterhouse Street j/w Writtle Road, Chelmsford - Chelmsford Non Traffic Based on Prioritisation at March 2017 Panel meeting, this scheme 47 LCHE152100 2018/19 Total scheme Signage to show to show Unsuitable for HGV's £1,500 Signs Parished Management is in LHP rolling programme of works
Stump Lane, Chelmsford - Study into priority Chelmsford Non Traffic Feasibility Study into priority working and to then consider Based on Prioritisation at March 2017 Panel meeting, this scheme 48 LCHE152156 2018/19 Feasibility Study £5,000 working/widening footway Parished Management footway widening is in LHP rolling programme of works
Page 3 of 6 Chelmsford City Local Highway Panel - Approved Works Programme 2017/18
Schemes Key Completed Cancelled Update
Scheme Ref Cost Code Scheme Parish Finish Scheme Stage Works Description Allocated Budget Comments Category
Penny Royal Road/Mayes Lane to Woodhill Road, Implementation of footway/walkable verge under design Based on Prioritisation at March 2017 Panel meeting, this scheme 49 LCHE163005 Danbury 2018/19 Walking implementation £63,000 Danbury - Walkable verge LCHE153002 is in LHP rolling programme of works
Approved Schemes - For 2018/19 Rolling Programme
Traffic Based on Prioritisation at March 2017 Panel meeting, this scheme 50 LCHE142052 Danbury Vale, Danbury - Flood alleviation study Danbury 2018/19 Feasibility Study Feasibility Study into flood alleviation works £7,500 Management is in LHP rolling programme of works
Main Road nr j/w Church Road, East Hanningfield - Traffic Based on Prioritisation at March 2017 Panel meeting, this scheme 51 LCHE162141 East Hanningfield 2018/19 implementation Implementation of walkable verge design under LCHE132068 £8,000 Walkable verge Management is in LHP rolling programme of works
The Common, East Hanningfield - Study into TMI Traffic Feasibility Study into traffic calming and pedestrian video Based on Prioritisation at March 2017 Panel meeting, this scheme 52 LCHE142022 East Hanningfield 2018/19 Feasibility Study £5,000 and video survey Management survey is in LHP rolling programme of works
Stop name - Galleywood Common, Galleywood - Passenger Based on Prioritisation at March 2017 Panel meeting, this scheme 53 LCHE155027 Galleywood 2018/19 Total scheme New wooden bus shelter £10,000 Bus shelter Transport is in LHP rolling programme of works
Great Baddow Footpaths 11, 12 & 67 - Public rights of Unsurfaced urban path - Drainage improvements, lay all Based on Prioritisation at March 2017 Panel meeting, this scheme 54 LCHE168008 Great Baddow 2018/19 Total scheme £22,000 Surfacing/drainage improvements way weather surfacing and remove vegetation is in LHP rolling programme of works
School Lane, Great Leighs - Speed limit repeater Traffic Improvements to speed limit repeater signage Based on Prioritisation at March 2017 Panel meeting, this scheme 55 LCHE152015 Great Leighs 2018/19 Total scheme £12,000 signs Management (size/frequency) is in LHP rolling programme of works
South Street, Great Waltham - Speed Indicator Traffic Based on Prioritisation at March 2017 Panel meeting, this scheme 56 LCHE142073 Great Waltham 2018/19 implementation SID Pole £3,000 Device (SID) pole Management is in LHP rolling programme of works
Paper Mill Bridge, North Hill/Moden Hall Lane, Traffic Flood Gauges/Flood Sensors/Verge Marker Posts, Upgraded Based on Prioritisation at March 2017 Panel meeting, this scheme 57 LCHE152003 Little Baddow 2018/19 Total scheme £25,000 Little Baddow - Flood warning Management Signs/Ditch and Vegetation works is in LHP rolling programme of works
Public Rights of Based on Prioritisation at March 2017 Panel meeting, this scheme 58 LCHE158004 Bridleway 11, Margaretting - PRoW Link Margaretting 2018/19 Total scheme To create a link between Bridleway 11 and Bridleway 44/54 £35,000 Way is in LHP rolling programme of works
Chalk Street/warren Road/Hoe Lane, Rettendon - Traffic Based on Prioritisation at March 2017 Panel meeting, this scheme 59 LCHE152091 Rettendon 2018/19 Total scheme Horse and Rider signage £2,000 Signs Management is in LHP rolling programme of works
Mayes Lane, Sporhams Lane, Butts Green Road, Traffic Based on Prioritisation at March 2017 Panel meeting, this scheme 60 LCHE152081 Sandon 2018/19 Total scheme Horse and Rider Signage £3,500 Sandon - Signs Management is in LHP rolling programme of works
Springfield Green, Springfield - Pedestrian Traffic Based on Prioritisation at March 2017 Panel meeting, this scheme 61 LCHE162060 Springfield 2018/19 Total scheme Zebra crossing, with lighting improvements £60,000 crossing improvements Management is in LHP rolling programme of works
Pump Lane and Colchester Road, Springfield - Traffic Based on Prioritisation at March 2017 Panel meeting, this scheme 62 LCHE162144 Springfield 2018/19 Total scheme Improved Gateway Signage £2,000 Signs Management is in LHP rolling programme of works
Mill Road to j/w Downham Road, Stock - 40mph Traffic Based on Prioritisation at March 2017 Panel meeting, this scheme 63 LCHE162130 Stock 2018/19 Total scheme Speed reduction from 60mph to 40mph £15,000 speed limit Management is in LHP rolling programme of works
Stock Road/Ship Road, Holiday Hill/Blind Lane, Traffic Based on Prioritisation at March 2017 Panel meeting, this scheme 64 LCHE162137 Church Road, Middlemead/Broadmead, West West Hanningfield 2018/19 Total scheme Water depth marker posts £6,000 Management is in LHP rolling programme of works Hanningfield - Depth makers
Page 4 of 6 Chelmsford City Local Highway Panel - Approved Works Programme 2017/18
Schemes Key Completed Cancelled Update
Scheme Ref Cost Code Scheme Parish Finish Scheme Stage Works Description Allocated Budget Comments Category
Passenger Based on Prioritisation at March 2017 Panel meeting, this scheme 65 LCHE165026 Main Road, Woodham Ferrers Woodham Ferrers 2018/19 Total scheme New wooden bus shelter £9,000 Transport is in LHP rolling programme of works
Page 5 of 6
Blank Page
Page 6 of 6