CV Bandula Kendaragama

Total Page:16

File Type:pdf, Size:1020Kb

CV Bandula Kendaragama CV of Bandula Kendaragama, Chief Technical Principal, BIDSCO, Melbourne, Australia, ABN 93 559 565 253, Page 1 of 27 Bandula Kendaragama B.Sc. Eng. (Hons) Sri Lanka, M.Eng. (AIT, Structural Engineering & Construction), MASCE, MIE Aust, CPEng NER, APEC Engineer, IntPE (Aus). Chief Technical Principal (Dam Safety) and Instrumentation Specialist, Freelance Dam Safety Consultant, Melbourne, Australia Mobile: 0403204066 (Australia), +61403204066 (In all other countries) Email: [email protected] Linkedin: https://www.linkedin.com/in/bandula-kendaragama-07a75147/ Business Name: Bandula International Dam Safety Consultant (Trading as BIDSCO) Website: www. https://www.internationaldamsafetyconsultants.com/ ABN: 93 559 565 253 CURRICULUM VITAE NAME: Bandula KENDARAGAMA DATE OF BIRTH: 25 February 1954 PROFESSION: Dam Safety Engineer. YEARS WITH THE FIRM (1) 25-Years of the service with SMEC (www.smec.com) in Australia. (2) New working as a Freelancer, International Dam Safety Consultancy firm opened on 23 January 2021. NATIONALITY Dual Citizen of Sri Lanka and Australia. POSITION IN THE FIRM Chief Executive Officer (CEO) and Principal Dam Safety Consultant, 12 Jolimont Place, Dingley Village, VIC 3172, Australia. KEY QUALIFICATIONS Bandula Kendaragama, B.Sc. Eng. (Hons) Sri Lanka, M.Eng. (Structural Engineering & Construction) AIT, MASCE, MIE Aust, CPEng NER, APEC Engineer, IntPE (Aus). • 2-years: Post Graduate Studies (Master of Engineering Degree at AIT, Bangkok, Thailand). • 9-years: Construction supervision of major projects (Kothmale CFRD and Nilambe Hydropower Project). • 31-years: Design, geotechnical investigations, numerical analysis, condition assessment of dam / dam safety inspections, dam safety, instrumentation, dam safety emergency management plans and dam upgrade projects. Dam safety engineer with experience in geotechnical and structural engineering. 42-years of experience in dam engineering, primarily in geotechnical investigations, design, supervision of construction, technical assessment, instrumentation, dam safety (surveillance, dam safety inspections / assessments, dam safety emergency management plans etc.,) associated with water supply, irrigation and hydropower projects. Worked in many water engineering projects including construction supervision of 96m high Kothmale concrete face rockfill dam (1980-1984, Sri Lanka), Nilambe Hydro-Power Project (1985-1989, Sri Lanka) and many dam rehabilitation and dam safety projects (January 1990 to January 2021 in Australia, Sudan, Botswana, China, Nigeria, Malawi, British Guyana, Uganda, Kazakhstan and Malaysia. 1) Engaged in dam safety in Australia (since 1990); Involved in annual dam safety inspections of over 75 dams in Australia. 2) Served as a member of the ANCOLD committee set-up in December 2010 for revision of “Guidelines for the Design of Dams and Appurtenant Structures for Earthquakes”. 3) Experience in numerical modelling (slope stability using Slope/W and seismic analysis using Quake/W), ground response analysis (SHAKE) and deformation analysis (FLAC, static and dynamic, Sigma/W). For further information, please contact Bandula Kendaragama. Email: [email protected] www.internationaldamsafetyconsultants.com Mobile +61403204066 (International) WhatsApp is preferred. CV of Bandula Kendaragama, Chief Technical Principal, BIDSCO, Melbourne, Australia, ABN 93 559 565 253, Page 2 of 27 4) Extensive experience in embankment instrumentation (design, installation and monitoring). 5) Involved in Roseires dam (Sudan) in monitoring during the impoundment, Lotsane Dam (Botswana). Summary I have 42 years' experience in dam engineering in supervision of construction, design, technical assessment, instrumentation, surveillance, dam safety inspections, dam safety emergency management plans (DSEMP), Training (Face-to-face training courses and Webinars (International) on Dam Safety, Instrumentation, Dam Safety Institutional Strengthening, dam safety regulations etc., in water supply, irrigation and hydropower projects in Sri Lanka, Australia, Sudan, South Sudan, Botswana, Guyana, China, Malawi, Nigeria, Uganda, Kazakhstan and Malaysia. I am a member of several leading professional organisations such as American Society of Civil Engineers (ASCE), British Dam Society (BDS), Canadian Dam Safety Association (CDA), Association of State Dam Safety Officials in USA (ASDSO), United States Society of Dams (USSD) and Australian National Committee on Large Dams (ANCOLD). Some of my showcase projects include construction supervision of the 96m high Kothmale concrete face rockfill dam (CFRD), refurbishment of instrumentation systems in Kainji and Jebba dams in Nigeria, construction of the Isimba dam in Uganda where I have served as a member of the Expert Review Panel (ERP), and instrumentation of Thwake Concrete Face Rockfill Dam (CFRD). I was a member of the committee appointed for revision of Earthquake Guidelines of the Australian National Committee of Large Dams (ANCOLD), Member of the Technical Committee B (Seismic Aspects of Dam Design of the International Commission of Large Dams (ICOLD) and engaged in industry research projects at the RMIT university and the University of Wollongong. Recent relevant assignments include: Instrumentation Specialist, Thwake Concrete Face Rockfill Dam (CFRD), 2019 to date Kenya. Member of the project team of comprehensive dam safety inspection of March 2020 to January 2021 Sugarloaf (Winneke) dam project. Member of the project team, Safety Review of Batang Ai Hydro-Electric September – December, 2018 Scheme, Kuching, Sarawak, Malaysia. Reviewer, Second Irrigation and Drainage Improvement Project (IDIP2), 2016 - 2018 Kazakhstan. Design Engineer (Instrumentation), Thwake CFRD, 80m high, 1,500m long) 2016 – January 2021 Member of the Panel of Experts (PoE), Dam Safety, Geotechnical and January to May 2016 Foundation Specialist, Isimba Dam and Hydro-Power Project, Uganda Dam Safety Engineer, Kamuzu Dams I and II, Lilongwe, Malawi ((World 2015-2016 Bank funded project) Dam Instrumentation Expert, Kainji and Jebba dams, Nigeria (World Bank 2013 - 2015 funded project). Kainji Dam is included in the 200 outstanding projects list published in July 2018 by the Institution of Civil Engineers (London)1. Review of slope stability for increased FSL, Sans Souci in Mauritius January 2013 Instrumentation and dam safety services during the first filling, after 10m September – December, 2012 raising, of Roseires dam in Blue-Nile in Sudan. Lotsane Dam, Botswana (Instrumentation and Dam Safety Specialist) June 2010 – July 2012 Dam safety surveillance of North-East Water dams 2016 Dam safety surveillance of ACT Government dams November 2010 – January 2021 Dam safety surveillance of NCA’s Scrivener Dam, Canberra November 2010 – January 2021 Dam safety surveillance of Southern Rural Water dams 1990 – January 2021 Dam safety surveillance of Grampians Wimmerra Mallee Water dams 1990 – January 2021 Dam safety surveillance of Parks Victoria dams 2002 – 2013 Roseires Dam Heightening Project, Sudan 2008 – 2014 1 https://www.hydroworld.com/articles/2018/07/institution-of-civil-engineers-includes-dams-hydro-marine-projects-in-its-200-outstanding-projects-list.html For further information, please contact Bandula Kendaragama. Email: [email protected] www.internationaldamsafetyconsultants.com Mobile +61403204066 (International) WhatsApp is preferred. CV of Bandula Kendaragama, Chief Technical Principal, BIDSCO, Melbourne, Australia, ABN 93 559 565 253, Page 3 of 27 EDUCATION 1) Bachelor of Engineering (Civil) with honours, University of Sri Lanka, Katubedde Campus, 1977. 2) Master of Engineering (Division of Structural Engineering & Construction, Major field Construction Engineering and Management), Asian Institute of Technology (AIT), Bangkok, Thailand, 1980. TRAINING COURSES 1) Seminar on “Post-Tensioned Anchors for Dams”, 20 February 2020. 2) A short course on “Internal Erosion and Piping of Dams and their Foundations”, organised by Australian National Committee on Large Dams (ANCOLD), 17 October 2013. 3) A short course on Safety Evaluation of Existing Dams (SEED), organised by ANCOLD and conducted by staff members of the United States Bureau of Reclamations (USBR), April 2012, Perth, Australia. 4) Advanced PLAXIS course, Griffith University, Gold Coast, November 21-25, 2011. 5) A short course in Earthquake Geotechnical Engineering, presented by Prof. Ikuo Towhata (currently in University of Tokyo, Japan), April 2006, Monash University, Melbourne, Australia. 6) A Short course on “Geotechnical Engineering of Dams”, 9-13, August 1999, The University of New South Wales, Sydney, Australia. 7) Earthquake Engineering Short Course ‘94, 25-26 July 1994, The University of Melbourne, Australia. 8) International Training Course on “Environmental Impacts of Reservoirs and Its Assessments”, 20 February – 20 April 1987, Hehai University, Nanjing, China. PROFESSIONAL MEMBERSHIPS 1) Member of the American Society of Civil Engineers (M. ASCE); Joined ASCE in 1981 (No. 200646). 2) Member of the Institute of Engineers, Australia (MIE.Aust), C. PEng. Membership No. 130112. 3) Member of the South African National Committee on Large Dams, SANCOLD (No. 2-143). 4) Associate Member of the Australian National Committee on Large Dams (ANCOLD); Membership No 273. 5) Member of the Canadian Dam Safety Association (CDA). 6) Member of the British Dam Society (BDS). 7) Member of the United States Dam Society (USSD). 8) Member of the Association of State Dam Safety Officials (ASDSO)
Recommended publications
  • Plan of Management for Spring Creek Reservoir
    PLAN OF MANAGEMENT FOR SPRING CREEK RESERVOIR ORANGE CITY COUNCIL DATE OF ADOPTION: 3 December 2007 GENERAL MANAGER D07/15538 1. LAND COVERED UNDER THIS PLAN OF MANAGEMENT This Plan of Management applies to land comprising Spring Creek Reservoir as indicated on Map 1. Each parcel of land covered by this plan is detailed in Schedule 1 to the plan. 2. CATEGORY AND CLASSIFICATION OF LAND The land is classified as community land under the Local Government Act 1993 (“the Act”). The following community land categories apply to the land: • General Community Use • Natural Area - wetland The Natural Area category applies to that part of the dam and foreshores identified for the protection of bird habitats and breeding areas in the report prepared by Dr J Beard and Professor D Goldney in April 2000 to assess the potential for recreational activities on Spring Creek Reservoir as indicated in Map 2. 3. LAND OWNERSHIP The Land is owned by Orange City Council. 4. LOCATION & AREA The land comprises about 143.5 hectares of land adjacent to Lone Pine Avenue, Calton Road, Louie Lane and Shepherd Road in the locality of Summer Hill. The reservoir is located about 400 metres south of the edge of the Orange urban area defined by the Leewood Industrial Estate. 5. BACKGROUND Spring Creek Reservoir was constructed in 1931 at the confluence of the Gosling and Spring Creeks as the City’s third water supply reservoir after Gosling and Meadow Creek Reservoirs (Lake Canobolas). The reservoir was located downstream of Gosling Dam. The Spring Creek dam wall was raised in 1947 which increased the full supply level (FSL) by 1.8 metres.
    [Show full text]
  • MELBOURNE SEWERAGE SYSTEM Nineteenth Century Scheme
    Engineers Australia Engineering Heritage Victoria Nomination for the Engineering Heritage Australia Heritage Recognition Program MELBOURNE SEWERAGE SYSTEM Nineteenth Century Scheme July 2014 Front Cover Photograph Captions Top Left: Lord Hopetoun inspecting Spotswood Pumping Station, 1895. Image: Public Records Office Victoria Top Right: Tunnelling excavation of the North Yarra Main Sewer. Image: Water Services Association of Australia Bottom Left: Main Outfall Sewer. Image: Culture Victoria Bottom Right: Spotswood Pumping Station shortly after it was constructed. Image: Museum Victoria Engineering Heritage nomination - Melbourne Sewerage 2 TABLE OF CONTENTS PAGE 1 Introduction 5 2 Heritage Nomination Letter 7 3 Heritage Assessment 8 3.1 Basic Data for Melbourne Sewerage System 8 3.1.1 Basic Data – Spotswood Pumping Station 8 3.1.2 Basic Data – Western Treatment Plant 11 3.1.3 Basic Data – Main Outfall Sewer 12 3.1.4 Basic Data – Sewerage Reticulation system 13 3.1.5 Historical Notes 15 3.1.6 Heritage Listings 20 3.2 Assessment of Significance 21 3.2.1 Historical significance 21 3.2.2 Historic Individuals or Association 22 3.2.3 Creative or Technical Achievement 22 3.2.4 Research Potential 23 3.2.5 Social 23 3.2.6 Rarity 23 3.2.7 Representativeness 24 3.2.8 Integrity/Intactness 24 3.2.9 Comparison with other systems 24 4 Statement of Significance 31 4.1 Area of Significance 31 5 Interpretation Plan 32 5.1 Interpretation Strategy 32 5.2 Date for the event 32 5.3 The Interpretation Panels 32 5.4 Design Process for the Panel Content 34 5.5
    [Show full text]
  • Dubbo Zirconia Project
    Dubbo Zirconia Project Aquatic Ecology Assessment Prepared by Alison Hunt & Associates September 2013 Specialist Consultant Studies Compendium Volume 2, Part 7 This page has intentionally been left blank Aquatic Ecology Assessment Prepared for: R.W. Corkery & Co. Pty Limited 62 Hill Street ORANGE NSW 2800 Tel: (02) 6362 5411 Fax: (02) 6361 3622 Email: [email protected] On behalf of: Australian Zirconia Ltd 65 Burswood Road BURSWOOD WA 6100 Tel: (08) 9227 5677 Fax: (08) 9227 8178 Email: [email protected] Prepared by: Alison Hunt & Associates 8 Duncan Street ARNCLIFFE NSW 2205 Tel: (02) 9599 0402 Email: [email protected] September 2013 Alison Hunt & Associates SPECIALIST CONSULTANT STUDIES AUSTRALIAN ZIRCONIA LTD Part 7: Aquatic Ecology Assessment Dubbo Zirconia Project Report No. 545/05 This Copyright is included for the protection of this document COPYRIGHT © Alison Hunt & Associates, 2013 and © Australian Zirconia Ltd, 2013 All intellectual property and copyright reserved. Apart from any fair dealing for the purpose of private study, research, criticism or review, as permitted under the Copyright Act, 1968, no part of this report may be reproduced, transmitted, stored in a retrieval system or adapted in any form or by any means (electronic, mechanical, photocopying, recording or otherwise) without written permission. Enquiries should be addressed to Alison Hunt & Associates. Alison Hunt & Associates RW CORKERY & CO. PTY. LIMITED AUSTRALIAN ZIRCONIA LTD Dubbo Zirconia Project Aquatic Ecology Final September 2013 SPECIALIST CONSULTANT STUDIES AUSTRALIAN ZIRCONIA LTD Part 7: Aquatic Ecology Assessment Dubbo Zirconia Project Report No. 545/05 SUMMARY Alison Hunt & Associates Pty Ltd was commissioned by RW Corkery & Co Pty Limited, on behalf of Australian Zirconia Limited (AZL), to undertake an assessment of aquatic ecology for the proposed development of the Dubbo Zirconia Project (DZP), which would be located at Toongi, approximately 25 km south of Dubbo in Central West NSW.
    [Show full text]
  • Environmental Audit of the Goulburn River – Lake Eildon to the Murray River
    ENVIRONMENTAL AUDIT ENVIRONMENTAL AUDIT OF THE GOULBURN RIVER – LAKE EILDON TO THE MURRAY RIVER ENVIRONMENTAL AUDIT OF THE GOULBURN RIVER – LAKE EILDON TO THE MURRAY RIVER EPA Victoria 40 City Road, Southbank Victoria 3006 AUSTRALIA September 2005 Publication 1010 ISBN 0 7306 7647 1 © Copyright EPA Victoria 2005 This publication is copyright. No part of it may be reproduced by any process except in accordance with the provisions of the Copyright Act 1968. ENVIRONMENTAL AUDIT OF THE GOULBURN RIVER – LAKE EILDON TO THE MURRAY RIVER Environmental audit of the Goulburn River Lake Eildon to the Murray River I, John Nolan, of Nolan-ITU Pty Ltd, an environmental auditor appointed pursuant to the Environment Act 1970 (‘the Act’), having: i. been requested by the Environment Protection Authority Victoria on behalf of the Minister for Environment and Water to undertake an environmental audit of the Goulburn River— Lake Eildon to the Murray River—with the primary objective of obtaining the information and understanding required to guide the management of the Goulburn River towards providing a healthier river system. This included improvements towards meeting the needs of the environment and water users, thereby reducing the likelihood of further fish kill events in the future ii. had regard to, among other things, the: • Environment Protection Act 1970 (the Act) • Water Act 1989 • Catchment and Land Protection Act 1994 • Flora and Fauna Guarantee Act 1998 • Fisheries Act 1995 • Heritage River Act 1992 • Safe Drinking Water Act 2003 • Emergency Management Act 1986 • Agricultural and Veterinary Chemicals (Control of Use) Act 1992 • Environment Protection and Biodiversity Conservation Act 1999 • State Environment Protection Policy (Water of Victoria) 2003 and the following relevant documents • Victorian River Health Strategy • Goulburn Broken Regional Catchment Strategy • Draft Goulburn Broken Regional River Health Strategy • Murray-Darling Basin Commission’s (MDBC) Native Fish Strategy • Goulburn Eildon Fisheries Management Plan iii.
    [Show full text]
  • 3 March 2020
    INFRASTRUCTURE POLICY COMMITTEE AGENDA 3 MARCH 2020 Notice is hereby given, in accordance with the provisions of the Local Government Act 1993 that an INFRASTRUCTURE POLICY COMMITTEE MEETING of ORANGE CITY COUNCIL will be held in the GLENROI COMMUNITY CENTRE, GAREMA ROAD, ORANGE on Tuesday, 3 March 2020. David Waddell CHIEF EXECUTIVE OFFICER For apologies please contact Administration on 6393 8218. INFRASTRUCTURE POLICY COMMITTEE 3 MARCH 2020 Contents AGENDA 1 INTRODUCTION .................................................................................................... 3 1.1 Declaration of pecuniary interests, significant non-pecuniary interests and less than significant non-pecuniary interests .......................................... 3 2 GENERAL REPORTS ............................................................................................... 5 2.1 Current Works ................................................................................................ 5 Page 2 INFRASTRUCTURE POLICY COMMITTEE 3 MARCH 2020 1 Intr oducti on 1 INTRODUCTION 1.1 DECLARATION OF PECUNIARY INTERESTS, SIGNIFICANT NON-PECUNIARY INTERESTS AND LESS THAN SIGNIFICANT NON-PECUNIARY INTERESTS The provisions of Chapter 14 of the Local Government Act, 1993 (the Act) regulate the way in which Councillors and designated staff of Council conduct themselves to ensure that there is no conflict between their private interests and their public role. The Act prescribes that where a member of Council (or a Committee of Council) has a direct or indirect financial (pecuniary) interest in a matter to be considered at a meeting of the Council (or Committee), that interest must be disclosed as soon as practicable after the start of the meeting and the reasons given for declaring such interest. As members are aware, the provisions of the Local Government Act restrict any member who has declared a pecuniary interest in any matter from participating in the discussion or voting on that matter, and requires that member to vacate the Chamber.
    [Show full text]
  • Annual Report 2005/06 OUR MISSION
    goulburn-murray water annual report 2005/06 OUR MISSION To deliver sustainable water services that meet customer and stakeholder needs and support regional economic growth, while balancing social, economic and environmental considerations. OUR VALUES Human safety, the environment and customer service are our highest priorities Sustainability is our commitment to future generations Cooperation based on the involvement of people is the key to progress Openness builds trust, knowledge and understanding Integrity, respect and pride are valued characteristics of our people Continual improvement is essential and underpins our future Contents OUR PERFORMANCE AT A GLANCE - 2005/06 4 GOVERNANCE 9 ECONOMIC SUSTAINABILITY 13 SOCIAL SUSTAINABILITY 25 ENVIRONMENTAL SUSTAINABILITY 39 FINANCIAL STATEMENTS 59 GOULBURN-MURRA APPENDICES 83 Y W A TER Annual Repor t 2005/06 1 Report from the Chairperson scheme (which won the prestigious media reports the excellent work of National Salinity prize and diverts our farmers as they increase water use 22,000 tonnes of salt from the Murray efficiency. Our new information each year), are either finished or caravan, ‘Water Wheels’, now informs nearing completion. both our customers and the public of these changes. The new Water Storage Amenity Unit and our revised approach to leasing We accept our responsibilities to and maintenance of recreation and support regional development and will public use assets have won great use the reconfiguration plans already support from local government and piloted in the Pyramid-Boort irrigation local communities. Essentially, our area as a model in all irrigation policy is to offer longer leases and districts to allow a clear vision to security in return for more investment emerge in each community about the This Board is now in the last year of its by business owners to enhance the future of water use and associated three-year appointment and it is timely appearance and customer satisfaction land zoning and channel maintenance.
    [Show full text]
  • Maroondah Water Supply System (Upper and Central Sections) H2381
    HERITAGE COUNCIL DETERMINATION Determination Date 7 December 2017 Place/Object Name Maroondah Water Supply System (Upper and Central Sections) Location Healesville, Yarra Glen, Christmas Hills, Greensborough VHR Number H2381 Place Category Heritage Place At a meeting of the Heritage Council on 7 December 2017 it was determined to include the above place in the Victorian Heritage Register and make certain amendments to the registration material that had been proposed in the Executive Director’s Recommendation, namely amendments to the Statement of Cultural Heritage Significance and to the description of the Extent of Registration for the Place as compared with what had been proposed by the Executive Director. The Heritage Council endorses the attached registration information for the above place. Professor Stuart Macintyre AO Chair, Heritage Council of Victoria Page | 1 Recommendation of the Executive Director and assessment of cultural heritage significance under s.32 of the Heritage Act 1995 Place: Maroondah Water Supply System (Upper and Central Sections) Location: Healesville, Yarra Glen, Christmas Hills, Greensborough VHR Number: H2381 Category: Heritage Place Hermes Number: 197552 Heritage Overlays: Yarra Ranges Shire HO141: Former township of Fernshaw HO156: Badger Creek Weir and Park HO173: Grace Burn Weir and Aqueduct HO174: Maroondah Catchment, Reservoir & Park HO177: Donnelly's Creek Weir, Condon’s Gully HO178: Mt Juliet Cairn Nillumbik Shire HO2: Maroondah Aqueduct; Entire Length (within Nillumbik) at various sites from Skyline Road, Christmas Hills to Allendale Road, Diamond Creek HO56: Maroondah aqueduct pipe track 23 Whittlesea Shire HO89: Maroondah Aqueduct over Plenty River Bridge Other listings: National Trust: Black Spur, Maroondah Highway EXECUTIVE DIRECTOR RECOMMENDATION TO THE HERITAGE COUNCIL: Recommendation That the Maroondah Water Supply System (Upper and Central Sections) be included as a Heritage Place in the Victorian Heritage Register under the Heritage Act 1995 [Section 32 (1)(a)].
    [Show full text]
  • Bandula Kendaragama
    Bandula Kendaragama (Principal, Freelance International Dam Safety Consultant, Melbourne, Australia, ABN 93 559 565 253) - Chronology of projects undertaken from 1978 to 2021. Note: Details of these projects are available in the detailed CV (World Bank format). 165 2020 to 2021 India – Drafting methodology sections of (1) Dam Safety Institutional Strengthening and (2) Dam Instrumentation of the proposal for the World Bank funded Dam Rehabilitation and Improvement Project (DRIP), phases 2 and 3, involving approximately 700 dams in 19 states. 164 20 January 2021 Inspections of Mulligan Flat Dam (20 January 2021). 163 19 January 2021 Quarterly dam safety inspection of Scrivener dam, Canberra, Australia. 162 16 December 2020 Training course on Dam Safety Emergency Management Plans (DSEMP) to staff of Thwake CFRD and SMEC Malaysia. 161 September 2020 Safety and Surveillance Services of Scrivener Dam, Canberra (September 2020), Australia. 160 November 2020 Queanbeyan Pond Embankment - Seepage Investigations, ACT, January 2021 Canberra, Australia 159 November 2020 Inspections of 38 Retarding Basins of Melbourne Water, Melbourne, Australia. 158 October to 2020 Annual Dam Safety Inspections of 7 dams, AGL, Victoria, November 2020 Australia. 157 October 2020 Geotechnical investigations of Pond 2 of Queanbeyan - Palerang Regional Council, NSW, Australia. 156 14 October 2020 Training course on Concrete Face Rockfill Dams (CFRD), Site staff of Thwake Dam, SMEC (Malaysia), Irrigation Department (Sri Lanka), Mahaweli Authority (Sri Lanka) and Central Engineering Consultancy Review (Sri Lanka). 155 30 September 2020 Training course on Instrumentation of Concrete Face Rockfill Dams (CFRD), Site staff of Thwake Dam, SMEC (Malaysia), Irrigation Department (Sri Lanka), Mahaweli Authority (Sri Lanka) and Central Engineering Consultancy Review (Sri Lanka).
    [Show full text]
  • Chapter 3. Landscape, People and Economy
    Chapter 3. Landscape, people and economy Department of Environment, Land, Water and Planning 3. Landscape, people and economy This chapter provides a brief description of the landscape, people and economic drivers in the water resource plan areas. Working rivers The rivers of these water resource plan areas provide many environmental, economic, and social benefits for Victorian communities. Most of northern Victoria’s rivers have been modified from their natural state to varying degrees. These modifications have affected hydrologic regimes, physical form, riparian vegetation, water quality and instream ecology. Under the Basin Plan it is not intended that these rivers and streams be restored to a pre-development state, but that they are managed as ‘working rivers’ with agreed sustainable levels of modification and use and improved ecological values and functions. 3.1 Features of Victorian Murray water resource plan area The Victorian Murray water resource plan area covers a broad range of aquatic environments from the highlands streams in the far east, to the floodplains and wetlands of the Murray River in the far west of the state. There are several full river systems in the water resource plan area, including the Kiewa and Mitta Mitta rivers. Other rivers that begin in different water resource plan areas converge with the River Murray in the Victorian Murray water resource plan area. There are a significant number of wetlands in this area, these wetlands are managed by four catchment management authorities (CMAs): North East, Goulburn Broken, North Central and Mallee and their respective land managers. The Victorian Murray water resource plan area extends from Omeo in the far east of Victoria to the South Australian border in the north west of the state.
    [Show full text]
  • Water Politics in Victoria: the Impact of Legislative Design, Policy
    Water Politics in Victoria The impact of legislative design, policy objectives and institutional constraints on rural water supply governance Benjamin David Rankin Thesis submitted in total fulfilment of the requirements for the Degree of Doctor of Philosophy Swinburne Institute for Social Research Faculty of Health, Arts and Design Swinburne University of Technology 2017 i Abstract This thesis explores rural water supply governance in Victoria from its beginnings in the efforts of legislators during the late nineteenth and early twentieth centuries to shape social and economic outcomes by legislative design and maximise developmental objectives in accordance with social liberal perspectives on national development. The thesis is focused on examining the development of Victorian water governance through an institutional lens with an intention to explain how the origins of complex legislative and administrative structures later come to constrain the governance of a policy domain (water supply). Centrally, the argument is concentrated on how the institutional structure comprising rural water supply governance encouraged future water supply endeavours that reinforced the primary objective of irrigated development at the expense of alternate policy trajectories. The foundations of Victoria’s water legislation were initially formulated during the mid-1880s and into the 1890s under the leadership of Alfred Deakin, and again through the efforts of George Swinburne in the decade following federation. Both regarded the introduction of water resources legislation as fundamentally important to ongoing national development, reflecting late nineteenth century colonial perspectives of state initiated assistance to produce social and economic outcomes. The objectives incorporated primarily within the Irrigation Act (1886) and later Water Acts later become integral features of water governance in Victoria, exerting considerable influence over water supply decision making.
    [Show full text]
  • Lake Eildon Land and On-Water Management Plan 2012 Table of Contents
    Lake Eildon Land and On-Water Management Plan 2012 Table of Contents Executive Summary ....................................................3 3.5 Healthy Ecosystems ...........................................24 1. Objectives of the Plan ..........................................4 3.5.1 Native Flora and Fauna ............................24 2. Context .......................................................................4 3.5.2 Foreshore Vegetation Management .........25 3.5.3 Pest and Nuisance Plants ........................26 2.1 Lake Eildon Development ....................................4 3.5.4 Pest Animals .............................................27 2.2 Lake Eildon as a Water Supply ............................4 3.5.5 References ...............................................27 2.3 Storage Operations ..............................................5 2.4 Land Status ...........................................................5 3.6 Land Management ..............................................28 2.5 Legal Status ..........................................................5 3.6.1 Permits, Licences and Lease Arrangements ................................28 2.6 Study Area .............................................................5 3.6.2 Fire ............................................................29 3. A Plan for the Management 3.6.3 Foreshore Erosion ....................................30 of Lake Eildon ..........................................................5 3.6.4 Stream Bank Erosion ................................31 3.1 Plan
    [Show full text]
  • Meeting Communique – 12 June 2019
    Critical Water Advisory Panel Communique Contents Community drought information sessions .................................................................................... 2 Roles of various forums in providing advice to the CWAPs.......................................................... 2 Drought relief package and regional water strategies .................................................................. 2 Drought Situation and Potential Management Responses ........................................................... 3 General outlook ....................................................................................................................... 3 Scenarios ................................................................................................................................. 3 Lachlan .................................................................................................................................... 4 Murrumbidgee .......................................................................................................................... 4 NSW Murray ............................................................................................................................ 4 Barwon-Darling/Lower Darling ................................................................................................. 5 Macquarie ................................................................................................................................ 5 Peel ........................................................................................................................................
    [Show full text]