Brampton Bierlow Parish Council |

Total Page:16

File Type:pdf, Size:1020Kb

Brampton Bierlow Parish Council | BRAMPTON BIERLOW PARISH COUNCIL Colin Earl 59 Woodfoot Road Clerk to the Council Rotherham Telephone: 07794 982 513 South Yorkshire e-mail: [email protected] S60 3DZ Report To: The Chair and Members of the Council 27th May 2020, Item 15 Covid-19 Support Provided by the Cortonwood Comeback Centre Introduction / Background This report asks members whether they wish to make a donation to the Cortonwood Comeback Centre to support the work being done by the Centre for local people during the Covid-19 virus. Details The Cortonwood Comeback Centre is a volunteer centre which provides various facilities and services for local people. During the current Covid-19 virus the Centre is providing the following services: • Hot food deliveries for the elderly and vulnerable • Food bank referrals and food parcels • Shopping Service • Prescription collections • Emergency Hygiene Packs • Dog walking • Advice – Form filling, Benefits, Housing, Money etc • Befriending service • Please see attached poster. The Centre has advised it is currently assisting around 100 to 140 people per week, the vast majority of whom live within the parish area. The Centre normally receives income from lettings, but due to the current Government restrictions the Centre has no lettings at present, so any assistance to help with the costs of providing the various, mainly, voluntary services, would be helpful. Legislation and Budget The Parish Council can make a donation to any services it deems are in the interest of some or all of its inhabitants under Section 137 of the Local Government Act 1972. The parish council budget for donations for 2020/21 is £1,400. Of this, £200 has been awarded to date. Proposals / Recommendations The parish council is asked to consider whether it wishes to make any donation to the Cortonwood Comeback Centre, under the Section 137 Local Government Act 1972 provisions. Colin Earl Clerk to the Council .
Recommended publications
  • To Registers of General Admission South Yorkshire Lunatic Asylum (Later Middlewood Hospital), 1872 - 1910 : Surnames L-R
    Index to Registers of General Admission South Yorkshire Lunatic Asylum (Later Middlewood Hospital), 1872 - 1910 : Surnames L-R To order a copy of an entry (which will include more information than is in this index) please complete an order form (www.sheffield.gov.uk/libraries/archives‐and‐local‐studies/copying‐ services) and send with a sterling cheque for £8.00. Please quote the name of the patient, their number and the reference number. Surname First names Date of admission Age Occupation Abode Cause of insanity Date of discharge, death, etc No. Ref No. Laceby John 01 July 1879 39 None Killingholme Weak intellect 08 February 1882 1257 NHS3/5/1/3 Lacey James 23 July 1901 26 Labourer Handsworth Epilepsy 07 November 1918 5840 NHS3/5/1/14 Lack Frances Emily 06 May 1910 24 Sheffield 30 September 1910 8714 NHS3/5/1/21 Ladlow James 14 February 1894 25 Pit Laborer Barnsley Not known 10 December 1913 4203 NHS3/5/1/10 Laidler Emily 31 December 1879 36 Housewife Sheffield Religion 30 June 1887 1489 NHS3/5/1/3 Laines Sarah 01 July 1879 42 Servant Willingham Not known 07 February 1880 1375 NHS3/5/1/3 Laister Ethel Beatrice 30 September 1910 21 Sheffield 05 July 1911 8827 NHS3/5/1/21 Laister William 18 September 1899 40 Horsekeeper Sheffield Influenza 21 December 1899 5375 NHS3/5/1/13 Laister William 28 March 1905 43 Horse keeper Sheffield Not known 14 June 1905 6732 NHS3/5/1/17 Laister William 28 April 1906 44 Carter Sheffield Not known 03 November 1906 6968 NHS3/5/1/18 Laitner Sarah 04 April 1898 29 Furniture travellers wife Worksop Death of two
    [Show full text]
  • Thurlstone, Oxspring, Hunshelf, Langsett Otherwise
    Thurlstone, Oxspring, Hunshelf, Langsett Bcalby otherwise Scawby otherwise Bcawby ctlnj otherwise Langside, Thurgoland, Hoyland- Sturton in the said parts of Liudsey, in the said Swaine, Cawthorne, Silkstone, Dodworth, county of Lincoln. Darton, Barugh otherwise Bargh, Stain- And it is further proposed, by the said intended borough, otherwise Stainbrough, Barnsley, Dar- Act or Acts, to make and maintain certain field, Royston, Worsborough otherwise Wors- branches or slips from the said intended line on to brough, Monk Bretton otherwise Burton, Ards- the Midland otherwise the North Midland Rail- ley, Wombwell, Brampton Bierlow, West Melton, way, at or near to Darfield, in the parish of Dar- Wath-upon-Dearne, Hoyland, Great Hpughton field aforesaid, and in the several townships of otherwise Houghton Magna, Little Houghton Billingley and Darfield aforesaid, or one of them. otherwise Houghton Parva, Wath-upon-Dearne, Bolton-upon-Dearne, Adwick-upon-Dearne, Bil- And, in the said intended Act or Acts, power lingley, Billingley Green, Goldthorpe, Thurnscoe, will be applied for to deviate from the line or lines Clayton in the Clay, Frickley-cum-Clayton other- laid down on the plans hereinafter mentioned, and wise Clayton-with-Frickley, Hickleton, Stotfold to the extent thereon defined, and to cross, vary, otherwise Stortford, Hooton Pagnell, Bilham alter, divert, or stop up all such turnpike-roads, otherwise Billam, Barmbrough otherwise Barn- parish roads, and other highways, drains, brooks, brough, Harlington, Braithwell, Brodsworth, streams,
    [Show full text]
  • Rotherham Primary Care Estates Strategy V8
    Rotherham Clinical Commissioning Group gy Amended November 2020 Intentionally Left Blank Rotherham Primary Care Estates Strategy 1 1. EXECUTIVE SUMMARY 1. EXECUTIVE SUMMARY 6.4.2. Key Issues from Appraisal and Mapping 6.4.3. Central North Locality Estates Prioritisation 2. INTRODUCTION 6.5. Health Village / Central Locality 6.5.1. Property Assessment 3. STRATEGIC CONTEXT 6.5.2. Key Issues from Appraisal and Mapping 3.1. National Policy Context 6.5.3. Health Village / Central Locality Estate Prioritisation 3.2. Five Year Forward View 6.6. Maltby & Wickersley Locality 3.3. Delivering the Five Year Forward View 6.6.1. Premises Assessment 3.4. General Practice Forward View 6.6.2. Key Issues from Appraisal and Mapping 3.5. Next Steps on Five Year Forward View 6.6.3. Maltby & Wickersley Locality Estates Prioritisation 6.7. Wentworth South Locality 4. ROTHERHAM COMMISSIONING PRIORITIES, ORGANISATIONS AND 6.7.1. Premises Assessment STRATEGIC PARTNERS 6.7.2. Key Issues from Appraisal and Mapping 4.1. Health and Social Pen Picture of Rotherham 6.7.3. Wentworth South Locality Estates Prioritisation 4.1.1. Socio-economic Profile 6.8. Wath / Swinton Locality 4.1.2. Housing 6.8.1. Premises Assessment 4.1.3. Demographic Profile 6.8.2. Key Issues from Appraisal and Mapping 4.1.4. Health Needs 6.8.3. Wath / Swinton Locality Estates Prioritisation 4.2. Clinical Commissioning Groups 4.3. Local Authorities 7. FINANCIAL SUMMARY 4.4. Providers / Third Sector 4.5. South Yorkshire & Bassetlaw Integrated Care System (STP) 8. 2020 UPDATE 5. REVIEW OF THE PRIMARY CARE ESTATE ACROSS ROTHERHAM 5.1.
    [Show full text]
  • Gleeson Homes Residential Development Bondfield Crescent, Wombwell Travel Plan November, 2016
    Gleeson Homes Residential Development Bondfield Crescent, Wombwell Travel Plan November, 2016 Prepared for: Gleeson Homes and Regeneration Prepared by: TPS Transport Consultants Ltd Stonebridge Court, 151-153 Wakefield Road, Horbury Wakefield, WF4 5HQ Bondfield Crescent, Wombwell –Travel Plan –November, 2016 Revision Record Revision File Ref. Date Prepared Checked Status by by - 404O_2016122_Bondfield 22/11/2016 AJPR REB Draft Crescent– GleesonTravel Plan Copyright Statement This report is the copyright of Travel Plan Services Ltd. The information, ideas and other intellectual property set out in this report and supporting technical appendices are the property of Travel Plan Services and are for the sole benefit of Gleeson Homes and Regeneration in respect of development proposals for land at Bondfield Crescent, Wombwell. Travel Plan Services Ltd. requires that the information, ideas and other intellectual property set out in this report are: Not shared with third parties and particularly with direct or indirect competitors of Travel Plan Services Ltd; Not conveyed to other consultants or personnel without the prior approval of Travel Plan Services Ltd.; and Not copied in part or in whole. Bondfield Crescent, Wombwell –Travel Plan –November, 2016 Contents Chapter Title Page 1. INTRODUCTION ............................................................................................................... 1 Background .................................................................................................................... 1 Developers
    [Show full text]
  • KF Everill Gate, Wombwell 4Pp Bro V9.Indd
    TO LET Everill NEW HIGH QUALITY INDUSTRIAL / WAREHOUSE Gate DEVELOPMENT Unit 1-11 Everill Gate Business Park FROM 1,740 SQ FT TO 33,000 SQ FT Wombwell Barnsley S73 0FJ (162 SQ M TO 3,066 SQ M) Ready for Occupation Summer 2021 SPECIFICATION Units will be fi nished to a modern specifi cation to include the following:- UNITS 2-11 DESCRIPTION 6.3m - 7.2m Full height roller WC Fibre Good sized loading eaves height shutter loading door facilities enabled area and dedicated The development will car parking comprise a new industrial and warehouse development offering a detached unit of UNIT 1 33,000 sq ft along with two terraces of smaller units ranging in size from 1,740 to 3,190 sq ft. 10m eaves 3 ground level Fibre Fully fi tted offi ce WC Dedicated Secure height loading doors enabled accommodation facilities car parking yard Everill Gate EVERILL GATE SITE PLAN EVERILL GATE LANE 2 1 3 4 6 5 7 10 11 A 8 9 6 3 3 V A L EXTRA YARD AREA L E Y AVAILABILITY W A Y Unit sq ft sq m Unit sq ft sq m Unit sq ft sq m Unit 1 33,000 3,066 Unit 2 3,190 296 Unit 8 2,700 251 Unit 3 2,088 194 Unit 9 1,740 162 Unit 4 2,088 194 Unit 10 1,740 162 Unit 5 2,088 194 Unit 11 2,700 251 Unit 6 2,088 194 Total 8,880 825 Units can be combined to Unit 7 3,190 296 accommodate larger Total 14,732 1,369 requirements.
    [Show full text]
  • Proposed Main Modification MM44 Site Development Guidelines
    Proposed main modification MM44 Site Development Guidelines This document contains the deletions, additions and amendments to Chapter 5 Site Development Guidelines referred to in proposed main modification MM44. It should be read alongside the proposed Main Modifications to the Sites and Policies consultation document. It reflects the deletion of sites and the addition of new sites as set out in the proposed main modifications consultation document. When providing comments through the Council’s online consultation website, or on a response form, please specify which site and development principles your representations relate to. In the schedule below additions are shown in bold and underlined, and deletions are shown struck through. 5 Site development principles guidelines 5.1 The following sections provide more detail on the site allocations and set out some key development guidelines principles to guide future development opportunities on site. Where construction has already commenced on site, or no specific guidance is considered necessary, no further development principles are provided. No development principles have been provided for the Core Strategy strategic allocation at Bassingthorpe Farm as further detailed masterplanning work will be carried out based on the Concept Framework work undertaken at the time of preparation of the Core Strategy. The sites for which no development principles are provided are listed in the box below: The exception is where sites have been granted planning permission or development has commenced, or where a site does not require specific development guidelines. The table below provides detail of the status of these sites: Table x: Status of sites without site development guidelines Site Status Rotherham Urban Area H9 Land Adjoining Ferham Road and Specific development guidelines not Belmont Street (LDF0152) required.
    [Show full text]
  • Barnsley Strategic Housing Market Assessment 2021
    Barnsley Strategic Housing Market Assessment 2021 Barnsley Metropolitan Borough Council Final Report June 2021 Main Contact: Dr. Michael Bullock Email: [email protected] Telephone: 0800 612 9133 Website: www.arc4.co.uk © 2021 arc4 Limited (Company No. 06205180) Barnsley MBC SHMA 2021 Page 2 of 203 Table of Contents Executive Summary .................................................................................................... 11 Introduction ....................................................................................................... 11 Housing market context .................................................................................... 11 Dwelling need, type and mix ............................................................................. 13 1. Introduction ....................................................................................................... 19 Background, aims and objectives ..................................................................... 19 Geography ........................................................................................................ 19 Research methodology ..................................................................................... 22 Presentation of data ......................................................................................... 22 Report structure ................................................................................................ 22 2. Policy and strategic review ..............................................................................
    [Show full text]
  • Brampton Bierlow Christ Church in the Mission Partnership of Wath, Wombwell and Brampton Bierlow
    Brampton Bierlow Christ Church In the Mission Partnership of Wath, Wombwell and Brampton Bierlow Releasing the Whole People of God for the Whole Mission of God If you have a passion for Setting God’s People Free, then perhaps the Lord is calling you to be the interim priest in charge at Christ Church, Brampton Bierlow. Here in the Diocese of Sheffield, we are currently re-configuring stipendiary incumbency, as the priestly ministry of enabling every member of the people of God to enter the full dignity of their baptism, by playing a full part in the service of God in the whole of life. This ministry is therefore one of nurturing, developing and fostering the gifts and especially the leadership potential of others — it is a ministry of experimentation and risk-taking, of pioneering, and of sharing in the responsibility of the Bishop for the oversight of the body of Christ ‘delighting in its beauty and rejoicing in its wellbeing’. In the Dearne Valley we have a once in a generation opportunity, through a successful Strategic Development Funding bid, to invest in the future of the church as we seek to ‘transform our society and God’s world’. The post of priest of Christ Church, Brampton Bierlow is integral to this challenge and opportunity. We are, therefore, seeking to appoint an able and resourceful priest whose heart will lift at the invitation to support this congregation, and the Mission Partnership generally, through a transition to a greater degree of every-member confidence and competence, so that the whole people of God are released (in the name of Jesus Christ and in the power of the Holy Spirit) for the whole mission of God in that locality.
    [Show full text]
  • $Asqlocal Transport Capital Programme 08-09 App 5 08-09 Planned Outputs
    Appendix 5 2007/08 OUTPUTS - BARNSLEY MBC October update SCHEME SCHEME STAGE ANTICIPATED SCHEME TITLE DELAY NOTES REF DIMENSIONS CURRENT AMENDMENT COMPLETION BI3 Improveemnts to existing bus stops Planned = 1 Total = 1 Dodworth bus and environmental Not started - March 2009 Planned Output improvements prep works BI4 Other bus infrastructure scheme Planned = 1 Total = 1 Eldon Street, Market Hill to Midland Street In Design - March 2010 Done in conjunction with bigger project phase 2 Eldon Street, Market Hill to Midland Street In Design - March 2010 Done in conjunction with bigger project phase 1 A61 Wakefield Road bus boxes In Design - June 2008 Staff / Contractor Issues Planned Output CY6 New cycle parking facilities Planned = 5 Total = 5 Town Centre Pedestrian zone cycle access & Not started - March 2009 Planned Output parking improvements Willowgarth High School Not started - March 2009 Planned Output Kingstone High School Not started - March 2009 Planned Output High View plc Not started - March 2009 Planned Output St Michaels and All Angels Catholic school Not started - March 2009 Planned Output CY7 Other cycling schemes Planned = 1 Total = 1 Town Centre Pedestrian zone cycle access & Not started - March 2009 Planned Output parking improvements WA1 New or improved footways WA2 (m) Planned = 3 Total = 3 Eldon Street, Market Hill to Midland Street In Design - March 2010 Done in conjunction with bigger project phase 2 Eldon Street, Market Hill to Midland Street In Design - March 2010 Done in conjunction with bigger project phase 1 New
    [Show full text]
  • Coronavirus Leads to the Cancellation of Key Parish Events Popular Events Have Had to Be Curtailed Following Government Restrictions, Necessary Due to the Virus
    Parish NEWS Coronavirus Leads to the Cancellation of Key Parish Events Popular events have had to be curtailed following Government restrictions, necessary due to the virus The beginning of the year saw the ending able start again. Keep a look out on the parish of the first phase of Brexit and most people council’s website and facebook page for news breathed a sigh of relief. However, that seems on these. almost a long time ago now, because the remainder of the year has been dominated by the Details of the various activities available at the coronavirus. This virus is the biggest threat parish hall, including contacts for bookings, are to our lifestyles since the second World War. included on page 6 of this newsletter. Rates for Everyone is having to adapt to ensure as far as the use of the parish hall have been kept at possible we can stay safe. But, by doing so, this 2019/20 levels. is having a major impact on individuals’ and businesses’ livelihoods. At the time of drafting this newsletter, all parish council facilities were open. Demand Government restrictions relating to the for allotment plots has soared during the coronavirus meant that planned celebrations lockdown. Unfortunately, we cannot at this earlier in the year relating to VE Day 75 (May) time satisfy the level of demand and there is and Yorkshire Day (August) had to be cancelled. currently a lengthy waiting list (parishioners These should have been significant events in can still add their names to the waiting list this year’s calendar but sadly and inevitably by contacting the parish council).
    [Show full text]
  • 200 Mexborough Swinton Manvers Wath Upon Dearne Cortonwood Wombwell
    What’s changed Full Timetable From Saturday 1 September 2012, changes will be 200 made to the route and times of service 200. Mexborough Swinton Manvers Wath upon Dearne Cortonwood We aim to provide information which Wombwell is as accurate as possible. We cannot accept responsibility for errors, or for any service that does not operate to the times shown. From 01/09/2012 Also serves: Dearne Valley College 24 hour clock Throughout South Yorkshire our timetables use Ventura House the 24 hour clock to avoid confusion between am and pm times. For example: 9.00am is shown as 0900 Also available online at 2.15pm is shown as 1415 travelsouthyorkshire.com 10.25pm is shown as 2225 Operated by: 24 hour times 12 hour times Stopping points for service 200 Mexborough, Bus Station Hartley Street Swinton Rowms Lane Bridge Street Swinton Interchange Station Street Church Street Golden Smithies Lane Manvers Manvers Way Wath Upon Dearne Station Road Montgomery Road Station Road Old Moor Manvers Way Cortonwood Corton Wood Hemingfi eld Hemingfi eld Road Wood Walk Hough Lane Church Street Wombwell, Station Road Wombwell , Station Road Hough Lane Hemingfi eld Road Hemingfi eld Cortonwood Corton Wood Old Moor Manvers Way Manvers Wath Upon Dearne Station Road Montgomery Road Station Road Manvers Manvers Way Golden Smithies Lane Swinton Church Street Swinton Interchange Station Street Rowns Lane Rowms Lane Mexborough, Bus Station (0# ! * &$-##&&#"&$-##*% !##!%#/ &#* &(' P&R &$-##**!&%!((/ #&&( &#*&%+'&% (% %,()/
    [Show full text]
  • Building 1, Callflex Business Park, Dearne Valley, Rotherham, S63 7ER to Let
    PRELIMINARY MARKETING PARTICULARS Two Storey Self Contained Office Building 1, Callflex Business Park, Dearne Valley, Rotherham, S63 7ER To Let Up to 35,513 sq. ft. Grade A specification, including raised access floors and air conditioning Car parking ratio of 1:230 sq. ft., i.e. 156 spaces Well located with good access to Yorkshire region, including Rotherham, Barnsley, Doncaster and Sheffield Good access to M1 Junction 36 0114 272 9750 Fountain Precinct, 7th Floor Balm Green, Sheffield, S1 2JA email: [email protected] Location Accommodation The property is situated on Callflex Business Park Description Sq. M Sq. Ft in Rotherham, South Yorkshire. Other occupiers Ground Floor 745.20 8,021 on site include Keepmoat regeneration, South West Yorkshire Police, Origin Broadband and Land Ground Floor 750.19 8,075 Securities Trillium. East Canteen and 214.72 2,311 The thriving Cortonwood Retail Park is nearby, Reception with Tenants including Boots, B&Q, Morrisons, First Floor 752.07 8095 Asda, Next and Halfords. West First Floor 747.14 8042 Nearby at Waterfront is Park Inn Hotel and Costa East Coffee. Breakout 89.95 968 Space The location provides good accessibility to TOTAL 3,299.27 35,513 Junction 36 of the M1 and Junction 36 and 37 of the A1(M). Terms / Availability There is a regular bus service that runs from the The property is available to rent on a new lease at centre of Rotherham to the Business Park. a rental of £8.50 per sq. ft. per annum exclusive. Description Viewing & Further Information The property briefly comprises a two storey Please contact Joint Sole Agents:- purpose built office / call centre, with central core, with reception and amenities off.
    [Show full text]