<<

Design of Routes under Gramin Sewa Scheme Final Report

Acknowledgement We wish to thank Mr. R. K. Verma, Principal Secretary cum Commissioner (Transport), Mr. Joginder Sharma, Dy. Commissioner (VIU), Mr. Ramanuthan, Motor Licensing Officer, Taxi unit, all officials of Transport Department, Government of NCT of , for their constant cooperation and support in data collection and conducting of surveys.

We extend special gratitude to all operators and stakeholders who have provided their inputs and suggestions in finalization of this study.

Page 2 May 2011

Design of Routes under Gramin Sewa Scheme Final Report

TABLE OF CONTENTS ACKNOWLEDGEMENT ...... 2 CHAPTER 1. INTRODUCTION ...... 5

1.1 INTRODUCTION ...... 6 1.2 SALIENT FEATURES OF GRAMIN SEWA SCHEME (AS SPELT OUT BY TRANSPORT DEPARTMENT) ...... 6 1.2.1 Delineation of Areas of Operation ...... 7 1.3 SUBMISSION TILL DATE ...... 9 CHAPTER 2. DATA BASE DEVELOPMENT AND ANALYSIS ...... 10

2.1 BACKGROUND ...... 11 2.2 DATA COLLECTION STAGE ...... 11 2.2.1 Municipal Wards ...... 11 Population as per Census 2001 ...... 12 Population in 2011 (Projected) ...... 12 Population in 2021 (Projected) ...... 12 Total of MCD Wards under Gramin Sewa Scheme ...... 12 2.2.2 Transport Infrastructure Assessment ...... 12 2.2.3 Access to Metro Network ...... 12 2.2.4 Passenger Origin Destination cum Opinion Survey for Metro Passengers ...... 13 2.2.5 Passenger Origin Destination cum Opinion Survey for Bus Passengers ...... 14 2.2.6 Online Commuter Opinion Survey ...... 14 2.3 PROVISIONAL ROUTES PROPOSED BY TRANSPORT DEPARTMENT ...... 14 2.4 STAKEHOLDER CONSULTATION ...... 15 2.5 DATA ANALYSIS...... 15 2.6 IDENTIFICATION OF POTENTIAL ROUTES ...... 15 CHAPTER 3. PROPOSED ROUTES ...... 17

3.1 BACKGROUND ...... 18 3.1.1 Proposed Routes ...... 18 3.1.2 Zonal Distribution ...... 30 3.1.3 Estimation of Ridership and Fleet ...... 31 3.1.4 Route Operation Strategy ...... 36 ANNEXURE ...... 37

ANNEXURE 2.1...... 38 ANNEXURE 2.2...... 41 ANNEXURE 3.1...... 52

Page 3 May 2011

Design of Routes under Gramin Sewa Scheme Final Report

List of Tables

TABLE 1-1: ZONES OF DELHI ...... 7 TABLE 2-1: PRESENT AND PROJECTED POPULATION OF MCD WARDS UNDER GRAMIN SEWA SCHEME ...... 12 TABLE 2-2: LIST OF METRO STATIONS OUTSIDE INNER RING ROAD ...... 12 TABLE 3-1: PROPOSED ROUTES ...... 18 TABLE 3-2: DISTRIBUTION OF ROUTES IN EACH ZONE ...... 30 TABLE 3-3: PROPOSED GRAMIN SEWA FLEET SIZE ...... 33 TABLE 0-1: PROVISIONAL ROUTES ...... 38 TABLE 0-2: SUGGESTIONS RECEIVED FROM VARIOUS STAKEHOLDERS ...... 41 TABLE 0-3: FURTHER SUGGESTIONS RECEIVED FROM VARIOUS STAKEHOLDERS...... 49

List of Figures

FIGURE 1-1: AREA OF OPERATION OF GRAMIN SEWA SCHEME 9 FIGURE 3-1: SOME GRAMIN SEWA ROUTES IN NORTH WEST ZONE 31

Page 4 May 2011

Design of Routes under Gramin Sewa Scheme Final Report

Chapter 1. Introduction

Page 5 May 2011

Design of Routes under Gramin Sewa Scheme Final Report

1.1 Introduction The city of Delhi has expanded significantly in the recent past to a city of 19 million persons as per provisional totals published by Census of in 2011. Over time, mobility patterns in Delhi have undergone a paradigm shift with the expansion of urban areas and introduction of new modes of public transport such as MRT and BRT. However, benefits of these systems to rural areas as well as unauthorized, resettlement and JJ colonies have been limited.

A new para transit service called the “Gramin Sewa Scheme” have been initiated wherein high capacity three-wheelers with seating capacity of six passengers excluding driver and/or one helper have been given permits to ply in these areas. It is a point to point service providing sustainable, efficient, effective and environment friendly transit service that serves the needs of a locality by connecting local destinations and providing better access to popular destinations such as transport nodes, commercial centres etc.

Transport Department, Government of NCT of Delhi has awarded the study on “Designing Routes under Gramin Sewa Scheme” to Delhi Integrated Multimodal Transit System (DIMTS) Ltd. to review the existing passenger demand and connectivity options available, and based on the findings, propose certain routes on which Gramin Sewa may be plied. It would be a shuttle service that would connect these areas with major nodes in the city.

1.2 Salient Features of Gramin Sewa Scheme (as spelt out by Transport Department) 1. The scheme is open only for New motor vehicles, such as high capacity three wheelers and similar other vehicles with seating capacity of 6 (six) passengers excluding the driver and having company fitted body duly approved by ARAI or any other agency as approved by the Govt. of India for this purpose. These vehicles will be given permits to ply in rural areas, unauthorized resettlement colonies and J.J. Clusters of Delhi.

2. The vehicle shall ply on clean fuel (i.e. CNG, O.E.) complying with Bharat Stage-III Norms, fitted with Global Positioning System (GPS) and connect to the Control Room of the Transport Department as may be decided by the Government.. These vehicles shall be registered under separate series i.e. DL 2W and will be called as ‘Gramin Sewa’ and shall be granted contract carriage permit as per provisions of MV Act and rules made thereunder.

3. The vehicles will operate as ordinary transport vehicle on Contract Carriage Permits (without fare meter).

4. The colour of the vehicle registered under Gramin Sewa scheme shall be white and it should have two horizontal strips in the middle of the vehicle of 75 mm each, one in light blue colour and another in green colour with inscription of ‘Gramin Sewa’ in between the horizontal stripes.

Page 6 May 2011

Design of Routes under Gramin Sewa Scheme Final Report

5. The vehicle will be eligible for registration as Transport Vehicle and grant of Contract Carriage Permits, subject to fitness, payment of prescribed fees and taxes etc.

6. The vehicles registered as ‘Gramin Sewa’ will be allowed to ply only in rural areas, unauthorized resettlement colonies and J.J. Clusters upto the Inner Ring Road and will not in any case cross the boundary of the Ring Road.

7. The vehicles should have First-aid Box & Fire extinguisher.

8. The name, address and telephone number of permit holder shall be painted on the rear exterior body of the vehicle.

9. The Helpline Number of the Transport Department shall also be displayed on both inside and outside of the vehicle.

All vehicles shall be required to obtain certificate of fitness under Section 56 of the MV Act and conform to the prevailing tail pipe Mass Emission Standards and safety norms and mandatory compliance thereafter.

1.2.1 Delineation of Areas of Operation

The NCT of Delhi has been divided into 13 districts by Transport Department. The Gramin Sewa scheme is applicable in all, except and Central districts. The Inner Ring road is used as a cordon line and Gramin Sewa would not be permitted to operate in areas that lie within this screen-line.

Table 1-1: Zones of Delhi Sl. Name of Zonal Office Area of Jurisdiction Daryaganj, Lal Kuan, Prasha Nagar, Chandni Mahal, I.P. Estate, Rajender Nagar, Turkman Gate, LNJP Hospital, Pusa Road, Jama 2 Central District Masjid, Pahar Ganj, Sita Ram Bazar, Kamla Market, DBG Road, Sangtrashan, Shahganj, Shadipura, Nabikarim, Hauz Qazi, Govt. Qr. Dev Nagar, Ballimaran, Karol Bagh.

Kalyan Puri, Laxmi Nagar, Preet Vihar, New Ashok Nagar, 3 East District - I Patparganj, Shakarpur, Trilokpuri, Mayur Vihar - I & II, Karkardooma.

Gazipur, Gandhi Nagar, Krishna Nagar, Anand Vihar, Old 4 East District - II Seelampur, Mandawali, New Shahdara, Geeta Colony Vivek Vihar, Jheel.

Tilak Marg, R.M.L Hospital, Chanakya Puri, Parliament St.,, Sucheta 5 New Delhi District Kriplani Hospital Tughlaq Road, Boat Club, Mandi House, North Avenue Panchkuian Road, Bapa Nagar, South Avenue, Gole Market, Rabinder Nagar, Malcha Marg, Connaught Place, Kaka

Page 7 May 2011

Design of Routes under Gramin Sewa Scheme Final Report

Sl. Name of Zonal Office Area of Jurisdiction Nagar.

Seelampur, Gamri, Nand Nagri, Gokalpuri, Shahdara, Ashok Nagar, Khajuri Khas, Welcome colony, Sunder Nagar, Karawal Nagar, 6 North - East District Mansarover Park, Harsh Vihar, Bhajanpura, Seemapuri, Yamuna Vihar, G.T.B. Nagar.

Model Town, Jahangirpuri, Sangam Park, Adarsh Nagar, Vijay Nagar, Keshav Puram, Ashok Vihar, Shalimar Bagh, Wazirpur, 7 North - West District - I Saraswati Vihar, Kingsway Camp, Pitampura, Mukherjee Nagar, Rani Bagh, Azadpur, Rampura, Tri Nagar, Gujrawalan.

Sultanpuri, Mangolpuri, Samaypur Badli, Prasant Vihar, Aruchandi Border, Bawana, Alipur, Rohini, Kanjhavala, Narela, Kirari, Aman 8 North - West District - II Vihar, Mubarakpur, Qutub Garh, Jonti, Mungeshpur, Mukandpur, Khera Kalan.

Civil Lines, Pratap Bagh, Kotwali, Bela Road, Andha Mugal, Mori Gate, Majnu Ka Tila, Gulabi Bagh, Red Fort, Sant Nagar, Sarai 1 North District Rohilla, Yamuna Bazar, Roop Nagar, Inder Lok, Lahori Gate, Maurice Nagar, Sadar Bazar, Church Mission, Shakti Nagar, Ahata Kedara, Town Hall, Subzi Mandi, Kashmere Gate, Chandni Chowk.

Inderpuri, Naraina, Mayapuri, Najafgarh, Kapasera, Dabri, Zafarpur 9 South - West District - I Kalan, Dwaraka

Vasant Vihar, R.K. Puram, Sarojini Nagar, Vasant Kunj, Delhi Cantt. 10 South - West District - II Dabri

Hauz Khas, Amar Colony, C.R Park Malviya Nagar, Garhi, Ambedkar Nagar, , Okhla, Madangir, Pushp Vihar, Sunlight Colony, Sainik Farm, Mehrauli, New Friends Colony, Kalkaji, Defence 11 South District Colony, Nehru Place, Gulmohar Park, Sukhdev Vihar, Badarpur, AIIMS, Bharat Nagar, Sarita Vihar, Lodhi Colony, Hz. Nizammudin, Sangam Vihar Pragati Vihar, Jangpura, East Kidwai Nagar, Khan pur, Sarai Kale Khan, Lajpat Nagar, Greater Kailash, Panchsheel.

Janakpuri, Vikaspuri, Keshopur, , Uttam Nagar, Mohan Garden, Nawada, Kakrola, Paschim Vihar, , New 12 West District - I Multan Nagar, Nangloi, Tikri Border, Nilothi, Nangloi jat, , Baprola, Hari Nagar, Ashok Nagar, Prem Nagar, Subhash Nagar.

Anand Parbat, Moti Nagar, Patell Nagar, Punjabi Bagh, Kirti Nagar 13 West District - II

Source: Citizens’ Charter, Transport Department, GNCTD

Page 8 May 2011

Design of Routes under Gramin Sewa Scheme Final Report

Area of operation

Figure 1-1: Area of operation of Gramin Sewa Scheme 1.3 Submission till date A Draft Report has been submitted on 27.04.2011 titled “Design of Routes under Gramin Sewa Scheme- Draft Report”.

Suggestions of further routes had been received which have been reviewed on the basis of the public transport model in Cube Voyager software and incorporated in this report as far as possible.

Page 9 May 2011

Design of Routes under Gramin Sewa Scheme Final Report

Chapter 2. Data base Development and Analysis

Page 10 May 2011

Design of Routes under Gramin Sewa Scheme Final Report

2.1 Background A comprehensive database has been prepared by DIMTS from field studies and secondary sources pertaining to existing city transport network, travel demand and related socio- economic data.

Passenger Origin – Destination cum Opinion surveys were carried out among bus and metro passengers wherein modes used in all legs of the journey were documented.

An online commuter opinion survey was also conducted wherein trip characteristics of the citizens of Delhi have been documented.

2.2 Data Collection Stage The following information have been compiled and studied for areas in which the Gramin Sewa scheme is applicable:

a) Resident population, b) Employment opportunities, c) Details of road network, d) List of city bus services available, e) Accessibility to metro, f) Para transit options available, etc.

Thus, data from secondary sources as well as extensive field surveys have been used in the determination of routes for Gramin Sewa services.

2.2.1 Municipal Wards

There are 272 municipal wards (as on August 2010) under the jurisdiction of MCD, out of which Gramin Sewa Scheme is applicable in 224 wards. The populations of each of these wards have been documented from Census of India 2001, which is the latest published data. The population projections for Delhi made by Census of India have been referred to in conjunction with the report on Transport Demand Forecast Study done for NCT of Delhi, by RITES dated April 2010. The same decadal growth rates have been used to forecast the population of the individual wards for 2011 and 2021. The population of wards under Gramin Sewa scheme constitutes about 80% of the total population of Delhi. Maximum population is seen in Deoli Village, Sangam Vihar and Dakshinpuri extension while Aya Nagar and Laxmi Nagar have the lowest resident population.

The total population of wards as per Census 2001 and projected for 2011 and 2021 under the purview of MCD where said scheme is applicable has been presented in Table 2-1.

Page 11 May 2011

Design of Routes under Gramin Sewa Scheme Final Report

Table 2-1: Present and Projected Population of MCD wards under Gramin Sewa Scheme

Population as per Population in 2011 Population in 2021 Census 2001 (Projected) (Projected)

Total of MCD Wards 10,607,671 13,926,171 18,601,534 under Gramin Sewa Scheme

2.2.2 Transport Infrastructure Assessment

The transport infrastructure of a locality was studied in detail where in the major stage carriage routes passing through each locality and popular modes of para transit have been documented. Some areas have been found to have limited access to public transport and rely heavily on para transit modes and personal modes. The tendency of opportunity cost based charging by cycle rickshaw operators has been noted.

The road network and development pattern of newly developed areas and villages on the outskirts of the city have also been surveyed. The road network suitable for operation of Gramin Sewa services has been identified.

2.2.3 Access to Metro Network

Metro stations act as major attraction points. The road network leading to metro stations from nearby rural, unauthorized colonies and JJ clusters have been studied. The metro stations falling in the areas where Gramin Sewa Scheme is applicable is listed below in Table 2-2.

Table 2-2: List of metro stations outside Inner Ring Road Badarpur Yellow Line Airport Line Line Kohat Moolchan Jahangir Puri Rajouri Garden Shivaji Park Dhaula Kuan Enclave d Kailash Delhi Pitampura Adarsh Nagar Tagore Garden Madipur Colony Aerocity Paschim Vihar Nehru Rohini East AIIMS Subhash Nagar IGI Airport East Place Paschim Vihar Dwarka Rohini West Green Park Tilak Nagar Kalkaji West Sector 21 Rithala Hauz Khas Janakpuri East Peeragarhi Govindpuri

Shastri Park Malviya Nagar Janakpuri West Udyog Nagar Okhla

Jasola- Seelampur Saket Uttam Nagar East Surajmal Stadium Apollo Uttam Nagar Sarita Welcome Qutub Minar Nangloi West Vihar

Page 12 May 2011

Design of Routes under Gramin Sewa Scheme Final Report

Badarpur Red Line Yellow Line Blue Line Green Line Airport Line Line Nangloi Railway Mohan Shahdara Chhattarpur Nawada Station Estate Mansarovar Tughlakab Sultanpur Dwarka Mor Rajdhani Park Park ad Jhilmil Ghitorni Dwarka Mundka Badarpur

Dilshad Arjan Garh Dwarka Sector 14 Garden Guru Dwarka Sector 13 Dronacharya Sikandarpur Dwarka Sector 12

M G Road Dwarka Sector 11

IFFCO Chowk Dwarka Sector 10

HUDA City Dwarka Sector 9 centre Dwarka Sector 8

Dwarka Sector 21

Yamuna Bank

Akshardham

Mayur Vihar Phase I Mayur Vihar Extension New Ashok Nagar Noida Sector 15

Noida Sector 16

Noida Sector 18

Botanical Garden

Golf Course

Noida City Centre

Laxmi Nagar

Nirman Vihar

Preet Vihar

Karkarduma

Anand Vihar

2.2.4 Passenger Origin Destination cum Opinion Survey for Metro Passengers

Passenger Origin Destination cum Opinion Surveys was carried out to document the profile of metro users such as age, occupation, preferences, etc. The initial origin, boarding and alighting stations and final destination of passengers, along with travel characteristics such as distance covered, mode used, time taken, purpose and frequency of trip were also

Page 13 May 2011

Design of Routes under Gramin Sewa Scheme Final Report

documented. The ticketing system used by a person has been covered to establish the comparative popularity of smart cards and tokens.

These surveys have been conducted for one day at all individual metro stations. Surveys have been done on an unbiased random sample basis, so that all types of metro users can be represented.

Inputs from this survey were used to appreciate the user profile and their preferences and also for delineation of the catchment area of metro stations.

2.2.5 Passenger Origin Destination cum Opinion Survey for Bus Passengers

The Passenger Origin Destination cum Opinion survey was conducted on an unbiased random stratified sample basis on most of the operational routes by trained enumerators. The selection of routes have been done carefully so that the data captured is representative of the travel pattern of the city.

Details have been collected pertaining to the origin, destination of passengers, modes used, trip details such as trip frequency and purpose. The dispersal and access modes of users are studied in order to understand the relationship of the bus system with other modes, percentage of change over between routes, routes performing as substitutes between particular sections.

About 10% of passengers on a particular trip have been covered.

2.2.6 Online Commuter Opinion Survey

An online survey was designed and uploaded in the website of DIMTS. The link was also available on the websites of Transport Department, Govt of NCT of Delhi and UTTIPEC (DDA). An advertisement was published in all leading English and Hindi newspapers inviting public opinion, feedback and suggestions.

The questionnaire had been designed in a lucid and interactive manner. Moreover, a filled up format was uploaded as a sample.

Travel characteristics of the citizens of Delhi have been captured in detail. Also commuter feedback has been compiled.

2.3 Provisional Routes proposed by Transport Department 66 routes had been designed by Transport Department and 5060 permits have been issued on a provisional basis. These routes have been placed in Annexure 2.1. Feedback from operators, passengers and other stakeholders has been received pertaining to these. These have been studied in detail.

Page 14 May 2011

Design of Routes under Gramin Sewa Scheme Final Report

2.4 Stakeholder Consultation A meeting was held with officials of Transport Department and DIMTS on 15th April, 2011 to discuss the scheme in detail.

Several suggestions in the form of modifications to the temporarily allotted routes and new routes have been suggested by different stakeholders. Some operators have met DIMTS officials in person to discuss their suggestions and requests.

Each request has been examined minutely, checked for feasibility and have been incorporated in the recommendations.

2.5 Data Analysis The data from different field surveys and secondary information were collated together. The travel demand matrix, computed from analysis of the survey data, was fed into the CUBE VOYAGER software and the same have been analysed. The potential areas where there is requirement of connectivity through Gramin Sewa have been identified in light of the outputs from the model as explained below.

The existing city bus routes have been superimposed on the road network of Delhi and the areas that require connectivity and mobility options have been selected.

2.6 Identification of Potential Routes The objective of Gramin Sewa is to meet the needs of individual localities, improve general circulation within a fixed influence zone and access to higher-capacity transit systems or attraction centers.

Potential routes were generated for all origin and destinations based on shortest paths in terms of distance. The demand data on travel pattern of public transport system and para transit modes was compiled from household survey data and origin/destination surveys conducted on various operational bus routes, as well as metro stations across the city. The information on city transport network were collected from past studies and used after updation.

The route generation process included assignment of the existing trip matrix to the existing route network and calculation of shortest paths for public transport users, ensuring a specified minimum number of passengers per road link. The network represented the demand for para transit, public transport and two wheelers. In the route generation process a large number of lines were generated between each pair of existing and potential origin and destination zones in the study area subject to certain restrictions. Routes generated in earlier stages were aggregated to merge subset routes. Some of the smaller routes were grouped to form single viable route system. The aggregated route system was utilized for further analysis.

Page 15 May 2011

Design of Routes under Gramin Sewa Scheme Final Report

The routes have been checked for public transport connectivity. Those on which satisfactory connectivity has not been found but have desirable demand levels, have been selected and examined as a Gramin Sewa route.

Further, suggestions received from all stakeholders have been considered and a set of routes have been compiled in the following section in Annexure 2.2.

Page 16 May 2011

Design of Routes under Gramin Sewa Scheme Final Report

Chapter 3. Proposed Routes

Page 17 May 2011

Design of Routes under Gramin Sewa Scheme Final Report

3.1 Background The outputs of the CUBE VOYAGER software have been compiled and compared with the inputs received from different stakeholders. The suggestions have been examined in detail in terms of road network availability and estimated demand levels. Also, availability of bus routes on the links have been checked, so that there is no overprovision or competition between the modes. The final set of proposed routes have been designed based on all inputs and satisfies most of the routes requested and suggested by various stakeholders.

3.1.1 Proposed Routes

The proposed routes have been placed below.

Table 3-1: Proposed Routes

Route Route Sl. Origin Destination Via Name length

Laxmi Nagar, Mother Dairy, 13-Block Trilok Puri, 1 GS-1 Laxmi Nagar Vasundhara Enclave 5.0 Vasundhara Enclave CGHS. Mayur Vihar Ph-III, Gharoli, Kondli, Kalyanpuri Anand Vihar crossing, Ghazipur Dairy 2 GS-2 ISBT/Metro Mayur Vihar Ph-III 9.5 farm, Ghazipur - NH-24 Station crossing, Ghazipur, Anand Vihar ISBT. Jheel, Satnaam Road, Swamy Ganeshdutt Marg, 3 GS-3 Chander Nagar Yamuna Bazar 6.0 Gandhi Nagar, Kailash Nagar Baldev Park, New Rajdhani Enclave, Vikas Marg, Karkarduma Metro Station, AGCR Enclave, Dilshad Garden 4 GS-4 Baldev park Distt court, Vishwas 8.0 Metro Station Nagar, Jhilmil Colony,Vivek Vihar, Surya Nagar, Dilshad garden Metro Station. Vasundhara CGHS - East End Apptt Lal Bhadur Shastri 5 GS-5 Dharamshila Cancer 3.5 New Ashok Nagar Hospital Hospital - Kalyanpuri Jheel, Krishna Nagar, 6 GS-6 Gandhi Nagar Jhilmil Colony Karkarduma Court, 10.0 Vishwas Nagar Gharoli, Mayurvihar P-3, 7 GS-7 Ghazipur Border Akshardham 8.5 Kondli, Kalyanpuri, sanjay

Page 18 May 2011

Design of Routes under Gramin Sewa Scheme Final Report

Route Route Sl. Origin Destination Via Name length

park

8 GS-8 Kalyanpuri Anand Vihar Gazipur Dairy Farm 6.0 Mandawli, Mandawaki Rd, Urjja Vihar Aptt, Ganesh Nagar I, South L/T, Patpar ganj Rd, Ganesh Nagar Ext II, Madhuban Enclave, Shakarpur Ext, Nirman Shastri Park Metro 9 GS-9 Mandawali Vihar metro station, 8.0 Station MadhubanChowk, Guru Angad Nagar East, Khureji Khas, Geeta Colony, Jheel Gandhi Nagar Market,Shastri Park Metro Station. Mayur Vihar Phase - II, Kalyan Vas, Chand Mayur Vihar Cinema,Trilok puri 13 10 GS-10 Phase - I Metro Mayur Vihar Phase - II Block,Shahi Garden , 5.0 station Mayur Vihar Phase - I,Mayur Vihar Phase - I metro station. Mayur Vihar Phase - III, Gharoli,Kondli, Kalyanpuri, Mayur Vihar Chand Cinema, Trilokpuri 11 GS-11 Phase-I Metro Mayur Vihar Phase - III 7.0 13 Block, Mayur vihar station Phase - I,Mayur Vihar Phase - I Metro station. Mayur Vihar Phase - III, Gharoli, Kondli, DDA Sports club, Dharam Shila New Ashok Nagar 12 GS-12 Mayur VIhar Phase-III Cancer hospital, 7.5 Metro Station Vasundhara Enclave, New Ashok Nagar, New Ashok Nagar Metro Station. Rajgarh Colony,Geeta Colony,khureji khas,Gurunanak Nagar,Priyadarshni Yamuna Bank 13 GS-13 Rajgarh Colony vihar,bank enclave krishan 7.0 Metro Station kunj,Geeta Colony road(pushta),Ramesh park,Lalita park, Yamuna Bank metro station

Page 19 May 2011

Design of Routes under Gramin Sewa Scheme Final Report

Route Route Sl. Origin Destination Via Name length

Nangli Poonam, Budhpur, Khera Kalan, Khera Khurd, 14 GS-14 Badli GT Road, Ghoga Village 12.5 Holambi Kalan, Sanout Crossing GTB NAGAR, BATRA COMPLEX, MUKHRJI 15 GS-15 GTB NAGAR Gandhi Vihar 4.5 NAGAR BANDH, GANDHI VIHAR Gtb Nagar, Nirankari Cly, Jharoda Dairy Crossing, Burari Village./ 16 GS-16 GTB NAGAR Burari Village, Loniyan 12.0 Mukhmel Pur Ind., Ibrahim Pur, Hiranki, Mukhmel Pur Nangloi Poonam, Budhpur, Alipur, Bakoli 17 GS-17 Hiran Ki Village Badli GT Road 10.0 Crossing, Bakhtawarpur, Mohd. Pur Sangam Vihar, Vishwavidhyalaya 18 GS-18 Jagatpur Waziarabad, Timarpur, 9.0 Metro Station Road 19 GS-19 Jyonti Border Kanjawala Jyonti village - Ladpur 5.5 Khera Kalan, Khera Khurd, Holumbi Khurd, Holumbi 20 GS-20 Khera Kalan Narela 15.0 Kalan, Shahpur Garhi, Bhore Garh, Narela Khera Kalan, Khera Khurd, Holumbi Khurd, Holumbi 21 GS-21 Khera Kalan Ghoga Village 18.0 Kalan, Sanoth Crossing , Ghoga Village Jindpur, Alipur, Budhpur, 22 GS-22 Mukhmail pur Badli GT Road 7.0 Nangli Poonam 23 GS-23 Bhajanpura Karawal Nagar Dayalpur 6.0 Sonia Vihar E Block, 24 GS-24 Chauhan Patti Wazirabad 7.5 Nanaksar Harsh Vihar, Gagan Cinema, Sunder Nagari, Tahir pur Chowk, Tahir Dilshad garden 25 GS-25 Harsh Vihar pur, New Seemapuri, 6.0 Metro Station Dilshad Colony, J&k Block Dilshad garden, Dilshad Garden Metro Station. Shiv vihar - Wazirabad 26 GS-26 Indrapuri (Loni) Harsh Vihar Road Crossing - 8 HarshVihar

Page 20 May 2011

Design of Routes under Gramin Sewa Scheme Final Report

Route Route Sl. Origin Destination Via Name length

Shiv vihar - Wazirabad 27 GS-27 Indrapuri (Loni) Nandnagri 9 Road Crossing - Nandnagri Saboli/Mandoli, Mandoli Ext Crossing, Bank Colony, Gagan Cinema, Nand Jhilmil Metro Nagri (T), GTB Enclave, 28 GS-28 Saboli/Mandoli 7.0 Station GTB Hospital Crossing, Dilshad Garden, Dilshad Garden GT Rd, Bagirathi Vihar, Brijpuri, Mangal Pandey Marg, Seelampur Metro Gokulpuri, Ambedkar 29 GS-29 Old Mustafabad 6.0 Station College More, C-4 Yamuna Vihar, Jaffrabad Road, Seelampur Yamuna Vihar depot, Atul Marg, Kardampuri, Kabir Seelampur Metro Nagar, Babar 30 GS-30 Yamuna Vihar Depot 5.0 Station pur,Jaffrabad,Subhash Park, Seelampur, . Karawal Nagar East, Dayal Pur, Mustafa bad, Brij Puri, Yamuna Vihar Depot, Seelampur Metro 31 GS-31 Karawal Nagar East Ghonda Chowk, Mauj Pur, 7.0 Station Gautam Puri, Chouhan Banger, SeelamPur Metro Station. Saboli/Mandoli, Mandoli crossing, Nand Nagri Shahdra Metro Depot, Ashok Nagar, 32 GS-32 Saboli/Mandoli 7.5 Station Mandoli Road,Ram Nagar, Mansarover Park, Shahdra Metro Station Karawal Nagar East, Shiv Vihar, Johri pur, Loni Rd, Shahdra Metro LIG flats, Loni Rd, Durga 33 GS-33 Karawal Nagar East 7.5 Station puri, Ram Nagar, Kabul Nagar, Shahdra Metro Station.

Page 21 May 2011

Design of Routes under Gramin Sewa Scheme Final Report

Route Route Sl. Origin Destination Via Name length

Karawal Nagar West , Sadatpur, Delhi Police Training Complex, Viharipur, Rajeev Nagar, Khajoori Khas, Wazirabad Crossing , Bhajan pura, Shastri Park Metro 34 GS-34 Karawal Nagar West Gamri Ext, Pushta 5, 7.5 Station Kartar Nagar, New Usmanpur, zero pusta, Shastri park, Buland masjid/J. Bridge East, Shastri Park Metro Station. Wp Depot-I, Kd Block Maurya Enclave, Raja Pur 35 GS-35 Wp Depot-I Raja Pur Prashant Vihar 4.5 (Prashant Vihar ), ESI Hospital Rohini W.P. Depot, KD-Block Pitam Pura, Rohini Sector- Rohini Sector 25(Deep 7 & 8 Crossing, Rohini 36 GS-36 Wp Depot-I 5.5 Vihar) Sector-6 (T) (Rohini Depot- I), Rithala Village Main Rd., Rohini Sector-25 Wazirpur Depot-I, KD Block Pitam Pura, Rohini 37 GS-37 Wazirpur Depot-I Rohini Sector.18 Sector-7,8,9 Crossing, 7.5 Vidya Vihar Marg Crossing, Rohini Sector-18. Shani Bazar Road, Harijan 38 GS-38 Aman Vihar Surajmal Stadium Colony, Nangloi-Sultanpuri 3.5 Road Alipur, Bakoli Crossing, Khampur, Tikri Khurd , 39 GS-39 Badli GT Road Tikri Khurd 14.5 Raja Harish Chandra Hospital , Narela (A-7) Badli Industrial Rohini Suraj Park, Rohini 40 GS-40 Rohini East 5.5 Area Sector 18,15,13,9 Bawana JJ Colony, DSIDC, 41 GS-41 Bajit Pur Alipur 18.0 Holumbi Kalan JJ Colony Shiv Vihar, Shahbad Dairy, 42 GS-42 Barwala Rithala 8.5 Rohini Sector25,24 Bawana DSIDC, Puth 43 GS-43 Bawana JJ Colony Rithala Khurd, Bhagvan Mahaveer 18.5 Marg

Page 22 May 2011

Design of Routes under Gramin Sewa Scheme Final Report

Route Route Sl. Origin Destination Via Name length

Bhalaswa J.J. Shraddhanand Park, New 44 GS-44 Jahangirpuri 6.5 Colony. Swarup Nagar, GT Road Timar Pur/Mall Sant Nagar, Gopal Nagar, 45 GS-45 Burari 15.0 Authority Wazirabad, Timar Pur 46 GS-46 Daulatpur Rithala Rohini Sector 11,12 5.5 Rohini Sector 16,17, Guru Delhi College of 47 GS-47 Rohini West Nanak Dev Marg, Rohini 5.0 Engineering Sector10,12,9 Ghewra Village, Nizampur 48 GS-48 Ghewra More Nizampur Garhi 9.0 Village Electronic Colony, Poorvi 49 GS-49 Haiderpur Netaji Subhash Place 5.5 Shalimar Bagh, Singlapur ESI Hospital, Rohini Sector-16, Shahbad Haiderpur Water 50 GS-50 Sultanpur Dabas Daulatpur, St. Michael 7.0 Tank School, Prahladpur, Barwala, Puth Khurd Bawana JJ Colony, DSIDC, Holumbi Kalan JJ 51 GS-51 Shahbad Dairy Rajiv Ratna Yojna, 9.5 Colony Barwala, Prahladpur Nangli Poonam, Swarup Nagar, New Swarup 52 GS-52 Kadipur Jahangirpuri 6.0 Nagar, Sanjay Gandhi Transport Nagar Kanjhawala, Chandpur, Prem Pio, Bajitpur Crossing, Bawana, Ghoga 53 GS-53 Kanjhawala Narela 16.5 A/F Station, Sannoth Crossing, Vishal Bagh, Narela Kirari More, Ratan Vihar, Jalebi Chowk, Sultan Puri, Paschim Vihar Water S-Block Mangolpuri, Q- 54 GS-54 Kirari Village 5.0 Tank Block Mangolpuri, Peeragarhi, Paschim Vihar Water Tank Maharshi Balmiki Bawana, Daryapur, 55 GS-55 Qutubgarh 12.0 Hospital Auchandi Border Rohini Sector 2,3, Pradeep 56 GS-56 Mangolpur Khurd Rohini East Bhatia Road, Rohini Sector 4.0 7,8 Rohini Sector2,3, Avantika 57 GS-57 Mangolpuri Rohini West 3.0 Road

Page 23 May 2011

Design of Routes under Gramin Sewa Scheme Final Report

Route Route Sl. Origin Destination Via Name length

Mubarakpur, Agar Nagar, Gorakh Nagar, Kirari Bhagwan Mahvir Nahar, Prem Nagar II, 58 GS-58 Meer Vihar 8.0 hospital Kirari Village, Shani Bazar Road, Sultanpuri, Sanjay Gandhi Hospital Agar Nagar, Inder Enclave- II, Kirari Nahar, Kirari Mor, Pratap Vihar, Nithari Village, Inder Enclave Bus Stand, Sharma Enclave, 59 GS-59 Mubarakpur Ambedkar Hospital Vikas Vihar, Dhruv 12.0 Enclave, Laxmi Ram Park, Aman Vihar Police Station, Rohini Sector 20, Puth Kalan, Rohini Sector 24, 60 GS-60 Mukundpur Azadpur Azadpur Road, Majlis Park 4.5 Nangloi, rly, Fatak, Kirari Mor, Station Block Metal Chowk, July Public School, Rajdhani Park Metro Dayanath Mishra Chowk, 61 GS-61 Nangloi 8.0 Station Janaki Vihar Mandir, Vakil Chowk, Pandey Chowk, Hindu Vihar, Mundka Phatak, Mundka Factory Nangloi, Nithari, Mubarakpur Dabas, Rani 62 GS-62 Nangloi Khanjawala Khera Crossing, 10.5 Madanpur, Karala, Kanjhawala. Nangloi Jj Cly, Kamruddin Nagar Crossing, Mundka, Hiran Kudna Crossing, 63 GS-63 Nangloi Jj Cly Majra Dabas Ghewar Village, 16.5 Kanjhawala School, Kanjhawala Village, Chand Pur, Majra Dabas Sultanpuri, Puth Nangloi Metro Kalan,Budh Vihar P1,Vijay 64 GS-64 Rohini West 7.5 station Vihar Phase 1,2,Rohini Sector 5,6 Maharshi Balmiki Sannoth, Bawana JJ 65 GS-65 Narela 12.5 Hospital Colony, DSIDC Burari,Baba Nagar , Sant 66 GS-66 Nathupura GTB Nagar 7.5 Nagar,Nirankari Colony,

Page 24 May 2011

Design of Routes under Gramin Sewa Scheme Final Report

Route Route Sl. Origin Destination Via Name length

Bhai Parmanand Marg

Outer Ring Road,Parwana Peeragarhi metro 67 GS-67 Kohat Enclave Road, Saraswati Vihar 6.0 station Road,Ashram Vihar Road 68 GS-68 Rama Vihar Rithala Rohini Sector22,21,23,24 8.0 Rohini Sector-7&8, Rohii Sector-9/10 Sector- 3,4,5,6 Crossing, Mangol 69 GS-69 Rohini Sector-7&8 Sultan Puri 9.0 Pur Khurd, Mangolpuri Y- Block, Mangolpuri Q- Block,Sultan Puri Shalimar Village,Shalimar 70 GS-70 Rohini Sector 18 Adarsh Nagar 5.5 Road,Sanjay Nagar Guru Nanak Marg - Rohini Netaji Subhash Place Sector 13 - Pitampura 71 GS-71 Rohini Sector 11 7 Metro Station Road - Uttari Pitampura - Purvi Pitampura Rana Park, Bhagat Singh 72 GS-72 Siraspur Jahangirpuri 6.5 Park, Samaipur D-Block Okhla Industrial Estate, Hindustan Steel, D-Block.Okhla Tughlakabad Railway 73 GS-73 CWS-II , Prahladpur, 7.0 Industrial Estate Colony Tughlakabad Railway Colony DDA Flats Kalkaji, Hamdard Nagar, Badarpur (New M. B. 74 GS-74 DDA Flats Kalkaji Tughlakabad Village, 8.0 Road) Prahladpur, Badarpur New MB Road Hamdard Nagar, Tughlakabad Fort, 75 GS-75 Alaknanda Badarpur 7.0 Container Depot, Railway Colony, Pulpehladpur Viswas Park, Uttam Vihar, 76 GS-76 Bindapur Dwarka Sector-13 Subhash Park, Dwarka 5.5 Sector 4 Dwarka Dwarka Sector- 77 GS-77 Dwarka Sector-9 4.0 Sec16/17/18/19 16,17,18,19 Tughlakabad Extension, 78 GS-78 Hamdard Nagar Govindpuri Tara Apartment, 5.0 Govindpuri, Giri Nagar Jaitpur Pushta Road, 79 GS-79 Jaitpur Badarpur Kalindi Kunj - Meethapur 5.0 Road

Page 25 May 2011

Design of Routes under Gramin Sewa Scheme Final Report

Route Route Sl. Origin Destination Via Name length

Chitta Ranjan Park, Kalkaji 80 GS-80 Kalkaji Nehru Place 3.0 Main Road Samalkha, Dwarka Link 81 GS-81 Kapasera Border Dwarka Sector-9 Road, Dwarka 9.5 Sector26,22,23,20 Zakir Nagar, New Friends Khijarabad Colony, Holy Family 82 GS-82 Bhogal/New Jasola-Apollo Hospital, Jamia Milia 5.0 Friends Colony Islamia Gate, Sukhdev Vihar, CRRI Madanpur Khadar Madanpur Khadar, Sarita 83 GS-83 Sarita Vihar 4.5 Extension. Vihar Shekhawati Lines, Dwarka Road, Raj Nagar, Palam 84 GS-84 Maude Lines Dwarka Sector-9 8.0 Extension, Dwarka Sector 9 Meethapur Meethapur, Om Nagar, 85 GS-85 Badarpur 4.0 Extension Tajpur, Tajpur Pahari Abul Fazal Enclave, Kalindi 86 GS-86 Okhla Extension Jasola-Apollo Kunj, Jasola Vihar, Sarita 6.0 Vihar Qutub, Neb Sarai, Maidan 87 GS-87 Qutub Maidan Garhi 6.0 Garhi Raj Nagar Dwarka Sector-8, Palam 88 GS-88 Dwarka Sector-9 7.5 Extension Extension Rajan Vikas Nagar, Mohan 89 GS-89 Enclave/Vikas Dwarka Mor/ NSIT 5.0 Garden, Rama Park Nagar Rajpur Khurd IGNOU, Neb Sarai Road, 90 GS-90 Saket 3.5 Colony Mehrauli Badarpur road Mangolpuri-II, Palam - 91 GS-91 Sadh Nagar Dwarka Sector-11 Najafgarh Road, Madhu 4.0 Vihar, Sector 5 Sangam Vihar, Hasthal 92 GS-92 Sangam Vihar Saket 4.0 Mandir, Saket Qutub Minar Metro 93 GS-93 Sangam Vihar Holi Chowk, MB Road 7.0 Station Sangam Vihar I- Lal Kuan, Tughlakabad 94 GS-94 Badarpur 8.0 Block Colony Shahbad 95 GS-95 Dwarka Sector 9 Dwarka Sector 21,8 5.5 Mohammadpur Goela Khurd, Goela Dairy, 96 GS-96 Shyam Enclave Dwarka Sector-9 Samta Enclave, Dwarka 7.0 Sector 19,20

Page 26 May 2011

Design of Routes under Gramin Sewa Scheme Final Report

Route Route Sl. Origin Destination Via Name length

Benito Juarej Marg, BalakRam Marg, Rao Tularam Marg, Major 97 GS-97 South Campus Hauz Khas Somnath Marg, Tamil 7.5 Sangam Marg, Venkateshwara Marg, Africa Avenue, IIT Virat Cinema, Hamdard Nagar, Govind 98 GS-98 Nehru Place 8.0 Ambedkar Nagar Puri, Kalkaji R.K.Puram –I, N.I.H.F.W, 99 GS-99 R. K. PuramSec-I Vasant Kunj Sector.-A B-3 Vasant Kunj, Vasant 7.0 Kunj Sect-A R. K. Puram Sector-I, S.M. Temple , V.V Depot, R. K. Puram 100 GS-100 Vasant Kunj Sector.C-9 Power House, Manav 8.0 Sector-I Sthali School, Vasant Kunj C-9. Katarina Shaheed Jeet Singh Marg, 101 GS-101 Sarai/Qutub Inst Qutub Minar Aurobindo Marg, Qutub 7.0 Area Minar Bharthal Village , Bijwasan School, Kapasera 102 GS-102 Bharthal Village Nangal Dairy 11.5 Crossing, Samalkha, Nangal Dairy Palam Air Port - Prahladpur -Palam Colony 103 GS-103 Dhul Siras Palam Airport - Palam Village - Abraham 7 Crossing - Barolo Crossing -Pochanpur - Dhul Siras Madhu Vihar - Mahavir Colony - Pankha Road - C3 104 GS-104 Dwarka More DDU Hospital Road - Lal Sain Mandir 12 Marg - Hari Nagar Road - Hari Nagar Clock Tower Sat Bari, Rajpur Khurd, 105 GS-105 Fatehpur Beri Chhatarpur 7.5 Chhatarpur Mandir 106 GS-106 JNU Chhatarpur Vasant Kunj, Kishan Garh 7.5 Bijwasan, Bamroli, 107 GS-107 Kapasera Border Jhatikra village Chhawla Camp, Chhawla 20 village, Jhatikra village Ghuman Hera Crossing , 108 GS-108 Najafgarh Zafarpur Kalan Mitral, Surerhra Crossing , 6.0 Rawta Crossing Roshanpura, Jhatikra 109 GS-109 Najafgarh Pandawla Kalan 6.5 More, Rewla Khanpur,

Page 27 May 2011

Design of Routes under Gramin Sewa Scheme Final Report

Route Route Sl. Origin Destination Via Name length

Oandwala Crossing

Roshanpura, Ghewra 110 GS-110 Najafgarh Goela Dairy 8.0 Crossing 111 GS-111 Najafgarh Khera Dawar Ghuman Hera Crossing 9.0 Najafgarh, Ghuman Hera Crossing, Kair Village 112 GS-112 Najafgarh Ghalibpur Kharkhari Nahar, 14.0 Hasanpur, Ghuman Hera Amaravati Piao Ghuman Hera Crossing, Mitrau, Surerhra Crossing, 113 GS-113 Najafgarh Ishapur Temple Rawta Crossing, Mundela 16.0 Crossing, Kadipur, Ishapur M.C. School Palam Village, Amrohi Crossing, Bagrola Crossing, Pochanpur, Dhul Siras 114 GS-114 Palam Village Bijwasan Border Crossing , Bharathal 12.5 Village, Bijwasan Railway Colony Station, Bijwasan Border. Shastri Bazar, More Line, Palam Air Port , N.H.W 8 Crossing, Mahipalpur, 115 GS-115 Shastri Bazar Kapasera Border 17.0 Rang Puri, Samalkha, Kapasera Crossing, Kapasera Border Ranhola, Rishala Garden, Bakarwala JJ 116 GS-116 Nangloi Dhaka Colony, Naresh 4.0 Colony Park Nilothi, Syed Village, 117 GS-117 Chander Vihar Uttam Nagar Meera Bagh, District 8.5 Centre D-Block Janakpuri, Dabri Village, Dwarka Crossing, 118 GS-118 D-Block Janakpuri Kakrola JJ Colony Madhu Vihar, Netaji 12.5 Subhash Engineering College, Kakrola JJ Colony Samalkha, Under Pass, Harijan Basti, 119 GS-119 Sector 21,22, Geetanjali 11.0 Rajokri Enclave Nangli Extension., Nangli 120 GS-120 Jai Vihar Kakrola More 8.0 Dairy Rama Vihar, Qutub Garh- 121 GS-121 Karala Nangloi 9.0 Kanjhawala Road, Rohini

Page 28 May 2011

Design of Routes under Gramin Sewa Scheme Final Report

Route Route Sl. Origin Destination Via Name length

Sector-22,21, Ratan Bagh

Keshopur Road, Vishnu Garden, Paschim Vihar 122 GS-122 Khyala Peeragarhi 4.5 GH-II, Paschim Vihar Water Tank Subhash Park, Mansram 123 GS-123 Matiyala Nawada 4.5 Park, Sukhram Park Inder Enclave, Mubarakpur Mubarakpur Main Road, 124 GS-124 Nangloi 6.0 Dabas Indira Gandhi Chowk, Friends Enclave 125 GS-125 Mundka Najafgarh Hiran Kudna Village 12.0 Nilothi Crossing, Ranhola 126 GS-126 Nangloi Uttam Nagar Village, Vikas Nagar, 13.0 Kakrola Nala Village Jharoda Crossing, Jharoda 127 GS-127 Najafgarh CRPF, Jharoda Kalan 5.5 Camp Mitrau, Surehra, Rawata 128 GS-128 Najafgarh Rao Tula Ram Hospital 7.5 Crossing Paschim Vihar East Naresh Park, Laxmi Park, 129 GS-129 Nangloi 5.5 Metro Station Nihal Vihar, Paschim Vihar Rajdhani Park, Mundka 130 GS-130 Nangloi Rani Khera 7.5 Railway Phatak Adyapak Nagar, Shivram Janakpuri District 131 GS-131 Nangloi Park, 50 Foota road, Nihal 8.0 Centre Vihar, Paschim Vihar 132 GS-132 Nangloi Nilwal Mundka, Ghewra Crossing 10.5 Raja Garden, Raghubir Nagar, Gurudwara Road No 29 &30 Crossing , 133 GS-133 Nangloi Raja Garden 11.0 Paschim Vihar W/T, Peeragarhi, Jwala Puri, Nangloi Geetanjali Park, Vaishali, 134 GS-134 Nasirpur Janakpuri West 5.0 Janakpuri Nangloi Syed, Sunder 135 GS-135 Nilothi Udyog Nagar Vihar, Paschim Vihar, 6.5 Inder Enclave 136 GS-136 Nizampur Village Nangloi Ghewra, Mundka 9.0 Paschim Vihar Paschim Vihar Extension, 137 GS-137 Tagore Garden 5.0 East metro station Paschimpuri

Page 29 May 2011

Design of Routes under Gramin Sewa Scheme Final Report

Route Route Sl. Origin Destination Via Name length

Qutub Garh, Punjab Khor, Jyonti, Garhi Randhala, 138 GS-138 Qutub Garh Mundka Nizampur, Saved, Ghewra 19.5 Village, Hiran Kudna Crossing, Mundka Khyala, Vishnu Garden, Shyam Nagar, Mukherjee Raghubir Nagar, 139 GS-139 Tagore Garden Park, Meenakshi Garden, 6.0 Hari Kunj Subhash Nagar, Hari Nagar Clock Tower Shiv Vihar, LIG Flats 140 GS-140 Ranhola Uttam Nagar East Hastal, Vikaspuri C block, 5.0 Uttam Nagar C Block Janakpuri Road, 141 GS-141 Sagarpur Janakpuri East 5.5 Virendra Nagar Tilak Nagar, District Sant Garh (Major Centre, C-Block Vikas Puri, 142 GS-142 Tilak Nagar 5.0 Bhupinder Singh Nagar) Sant Garh (M B Singh Nagar ) 143 GS-143 Vikas Puri H-3 Uttam Nagar East Budhela, Krishna Park 4.0 Paschim Vihar, Jalap Heir 144 GS-144 Vishnu Garden Paschim Vihar West Market, Ch. Balbir Singh 4.5 Marg

3.1.2 Zonal Distribution

The distribution of routes in each zone is provided below.

Table 3-2: Distribution of Routes in each Zone Zone Number of Routes North 9 South 26 East 13 West 29 North East 12 North West 38 South West 17 TOTAL 144

The maximum number of routes have been proposed in the North Western Zone. The spread and coverage of some routes in the zone has been presented below in Figure 3-1 as an example.

Page 30 May 2011

Design of Routes under Gramin Sewa Scheme Final Report

The routes shown in this figure connect the nearby areas to the Red, Yellow and Green Lines of the metro network.

Figure 3-1: Some Gramin Sewa Routes in North West zone

3.1.3 Estimation of Ridership and Fleet

The frequency of operation has been designed based on demand levels that have been estimated for each of these routes. Routes with high demand have been proposed to be operated with a frequency of 1.5 minutes, while a headway of 2 minutes and 4 minutes have been proposed for routes with moderate and fair levels of demand. The fleet sizes that are required for each route have been presented in

Page 31 May 2011

Design of Routes under Gramin Sewa Scheme Final Report

Table 3-3. The total fleet size requirement has been worked out as 6,167 Gramin Sewa vehicles.

Page 32 May 2011

Design of Routes under Gramin Sewa Scheme Final Report

Table 3-3: Proposed Gramin Sewa Fleet Size Operating Frequency Fleet size Sl. Route Name (Min) Required 1 GS-1 4 15 2 GS-2 2 57 3 GS-3 2 36 4 GS-4 1.5 64 5 GS-5 2 21 6 GS-6 4 30 7 GS-7 2 51 8 GS-8 4 18 9 GS-9 2 48 10 GS-10 2 30 11 GS-11 1.5 56 12 GS-12 2 45 13 GS-13 2 42 14 GS-14 4 37 15 GS-15 4 14 16 GS-16 2 72 17 GS-17 4 30 18 GS-18 4 27 19 GS-19 2 33 20 GS-20 4 45 21 GS-21 2 108 22 GS-22 4 21 23 GS-23 2 36 24 GS-24 2 45 25 GS-25 1.5 48 26 GS-26 2 48 27 GS-27 2 54 28 GS-28 2 42 29 GS-29 2 36 30 GS-30 4 15 31 GS-31 2 42 32 GS-32 2 45 33 GS-33 2 45 34 GS-34 2 45 35 GS-35 2 27 36 GS-36 2 33 37 GS-37 2 45 38 GS-38 2 21 39 GS-39 2 87 40 GS-40 1.5 44 41 GS-41 2 108 42 GS-42 2 51 43 GS-43 4 56 44 GS-44 1.5 52 45 GS-45 2 90 Page 33 May 2011

Design of Routes under Gramin Sewa Scheme Final Report

Operating Frequency Fleet size Sl. Route Name (Min) Required 46 GS-46 4 17 47 GS-47 1.5 40 48 GS-48 4 27 49 GS-49 2 33 50 GS-50 2 42 51 GS-51 4 29 52 GS-52 1.5 48 53 GS-53 2 99 54 GS-54 4 15 55 GS-55 4 36 56 GS-56 1.5 32 57 GS-57 1.5 24 58 GS-58 4 24 59 GS-59 2 72 60 GS-60 2 27 61 GS-61 4 24 62 GS-62 4 32 63 GS-63 2 99 64 GS-64 1.5 60 65 GS-65 4 38 66 GS-66 1.5 60 67 GS-67 2 36 68 GS-68 2 48 69 GS-69 2 54 70 GS-70 2 33 71 GS-71 2 42 72 GS-72 1.5 52 73 GS-73 2 42 74 GS-74 2 48 75 GS-75 1.5 56 76 GS-76 2 33 77 GS-77 4 12 78 GS-78 2 30 79 GS-79 4 15 80 GS-80 2 18 81 GS-81 4 29 82 GS-82 1.5 40 83 GS-83 2 27 84 GS-84 2 48 85 GS-85 2 24 86 GS-86 1.5 48 87 GS-87 4 18 88 GS-88 2 45 89 GS-89 1.5 40 90 GS-90 1.5 28 91 GS-91 2 24

Page 34 May 2011

Design of Routes under Gramin Sewa Scheme Final Report

Operating Frequency Fleet size Sl. Route Name (Min) Required 92 GS-92 2 24 93 GS-93 2 42 94 GS-94 4 24 95 GS-95 2 33 96 GS-96 2 42 97 GS-97 2 45 98 GS-98 2 48 99 GS-99 2 42 100 GS-100 4 24 101 GS-101 2 42 102 GS-102 4 35 103 GS-103 2 42 104 GS-104 2 72 105 GS-105 1.5 60 106 GS-106 2 45 107 GS-107 2 120 108 GS-108 4 18 109 GS-109 4 20 110 GS-110 4 24 111 GS-111 4 27 112 GS-112 2 84 113 GS-113 4 48 114 GS-114 2 75 115 GS-115 2 102 116 GS-116 2 24 117 GS-117 2 51 118 GS-118 2 75 119 GS-119 4 33 120 GS-120 4 24 121 GS-121 2 54 122 GS-122 2 27 123 GS-123 2 27 124 GS-124 2 36 125 GS-125 2 72 126 GS-126 2 78 127 GS-127 2 33 128 GS-128 2 45 129 GS-129 4 16 130 GS-130 4 23 131 GS-131 2 48 132 GS-132 2 63 133 GS-133 2 66 134 GS-134 2 30 135 GS-135 4 20 136 GS-136 2 54 137 GS-137 1.5 40

Page 35 May 2011

Design of Routes under Gramin Sewa Scheme Final Report

Operating Frequency Fleet size Sl. Route Name (Min) Required 138 GS-138 2 117 139 GS-139 1.5 48 140 GS-140 1.5 40 141 GS-141 2 33 142 GS-142 4 15 143 GS-143 1.5 32 144 GS-144 2 27

As per letter placed at Annexure 3.1, the total number of vehicles registered under the Gramin Sewa scheme as on 16th May, 2011 is 6,153. Since the total fleet requirement has been estimated marginally higher than the registered vehicles, a total of 14 permits may be kept on hold temporarily on routes which have high assignment.

3.1.4 Route Operation Strategy

Following suggestions shall be considered while operating proposed routes

1. The origin and destination of a route should be displayed on a vehicle to avoid deviations in operation. 2. All the routes identified in study shall be tested on the ground initially and necessary modification can be made based on actual ridership data received during trial period of few months in ramp up phase. 3. There should be proper marketing and awareness campaign launched while implementing proposed routes. This will help in building of ridership. 4. Strong enforcement of rules is necessary pertaining to a. Avoid overcrowding of a vehicle at any time of the day. b. Adherence to design frequency. c. Prescribed fare structure 5. On proposed feeder routes, 4 Gramin Sewa vehicles may be replaced by 1 RTV (18 seater + 6 standing) to provide same capacity.

Page 36 May 2011

Design of Routes under Gramin Sewa Scheme Final Report

Annexure

Page 37 May 2011

Design of Routes under Gramin Sewa Scheme Final Report

Annexure 2.1 Table 0-1: Provisional Routes S.No. From To Route 1 Najafgarh CRPF, Jharoda Kalan Jharoda Crossing, Jharoda Camp 2 Rajokri, Harijan Basti Chattarpur Mandir Mahipalpur, Masoodpur, Vasant Kunj Nilothi Crossing, Ranhola Village, Vikas 3 Nangloi Uttam Nagar Nagar, Kakrola Nala Village 4 Madhu Vihar Uttam Nagar DPS School, NSIT, Dwarka More Uttam Nagar, Pankha Road, Janakpuri C-1, 5 Kakrola More Din Deal Hospital C-2B, Hari Nagar Depot, Hari Nagar Clock Tower Nilothi, Syed Village, Meera Bagh, Dist. 6 Chander Vihar Uttam Nagar Centre Nirankari Colony, Nirankari Bhawan, Sant 7 Burari ISBT Nagar Timar Pur/Mall Sant Nagar, Gopal Nagar, Wazirabad, Timar 8 Burari Authority Pur 9 Najafgarh Rao Tula Ram Hospital Mitrau, Surehra, Rawata Crossing Inder Enclave, Surajmal Metro Station, Nangloi, Railway, Fatak, Kirari Mor, Station Swarn Park Metro Block Metal Chowk, July Public School, 10 Peeragarhi Station Dayanath Mishra Chowk, Janaki Vihar Mandir, Vakil Chowk, Pandey Chowk, Hindu Vihar, Mundka Phatak, Mundka Factory 11 Nangloi Nithari Village Railway, Fatak, Kirari More Kirari More, Ratan Vihar, Jalebi Chowk, 12 Kirari Village Peeragarhi Sultan Puri, S-Block Mangolpuri, Q-Block Mangolpuri, Peeragarhi Sultan Puri Fatak, Jalebi Chowk, C-Block, 13 Nangloi Budh Vihar Sultan Puri, Puth Kalan Village Budh Vihar Punjabi Bagh (General Naresh Park, Laxmi Park, Nihal Vihar, 14 Nangloi Store) Paschim Vihar Nihal Vihar, Paschim Vihar, Meera Bagh, 15 Nangloi Janakpuri District Centre Vikas Puri Adyapak Nagar, Shivram Park, 50 Foota 16 Nangloi Janakpuri District Centre road, Nihal Vihar, Paschim Vihar 17 Shahdara Apsara Border G.T. Road Shastri Park, Metro Usmanpur, Gamri Extension Pushta No.-5, 18 Karawal Nagar Station Bhajanpura Rohini Metro Station East, Rajiv Gandhi 19 Madhuban Chowk Avantika Cancer hospital, Vishram Chowk 20 Ghewra More Nizampur Garhi Ghewra Village, Nizampur Village 21 Majlis Park School Burari Mukundpur, Sant Nagar Mukherjee Nagar 22 G.T. B Nagar BBM Depot, Mukherjee Nagar Baandh Inder Enclave, Surajmal Metro Station, Durga Chowk Prem 23 Peeragarhi Nangloi Railway Fatak, Kirari Mor, UGR Nagar-II Block, Nag Mandir, U Block. Transformer Page 38 May 2011

Design of Routes under Gramin Sewa Scheme Final Report

S.No. From To Route 24 Nangloi Rani Khera Rajdhani Park, Mundka Railway Phatak 25 Nangloi Nilothi Extension. Shivram Park, Nilothi Village 26 Kanjhawla Qutub Garh Ladpur, Jonti Village Nirankari Colony, Jharoda Dairy Crossing, 27 G.T. B Nagar Nathupura Kushak Enclave Jawahar Nagar, Loni Crossing, Yamuna 28 Loni No.2 Bhajanpura Vihar C4 29 Loni No.2 Seelampur Jawahar Nagar, Loni Crossing, Babarpur 30 Bhajanpura Karawal Nagar Dayalpur Mangolpuri A Block, Mangolpuri School, 31 Peeragarhi RG Cancer Hosp. Avantika, Vishram Chowk Roshanpura, Jhatikra More, Rewla 32 Najafgarh Pandawla Kalan Khanpur, Oandwala Crossing Ghuman Hera Crossing , Mitrau, Surerhra 33 Najafgarh Zafarpur Kalan Crossing , Rawta Crossing Ghuman Hera Crossing, Mitrau, Surerhra 34 Najafgarh Ishapur Temple Crossing, Rawta Crossing, Mundela Crossing, Kadipur, Ishapur M.C. School 35 Najafgarh Khera Dawar Ghuman Hera Crossing Nangloi, Najafgarh, Ghuman Hera Crossing, 36 Kakrola Crossing Ghalibpur Kair Village Kharkhari Nahar, Hasanpur, Ghuman Hera Amaravati Piao 37 Najafgarh Goela Dairy Roshanpura, Ghewra Crossing 38 Mundka Najafgarh Hiran Kudna Village 39 Nangloi Nilwal Mundka, Ghewra Crossing B Block Mangolpuri, Q Block Mangolpuri, S Block. Mangolpuri Jalebi Chowk, Kakkar Durga Chowk Prem 40 Peeragarhi Market, Ratan Vihar, 70 Foota Rd, UGR Nagar-II Block, Mubarak Pur Rd, MO Block, Nag Mandir, U Block, Transformer Nangloi Poonam, Budhpur, Alipur, Bakoli 41 Badli GT Road, Tikri Khurd Crossing, Khampur Nangloi Poonam, Budhpur, Alipur, Bakoli 42 Hiranki Village Badli GT Road Crossing, Bakhtawarpur, Mohammadpur ESI Hospital, Rohini Sector-16, Shahbad Haiderpur Water 43 Sultanpur Dabas Daulatpur, St. Michael School, Prahladpur, Tank Barwala, Puth Khurd Nangloi Poonam, Budhpur, Khera Kalan, 44 Badli GT Road Ghoga Village Khera Khurd, Holambi Kalan, Sannoth Crossing 45 Mandoli Shahdara Nathu Chowk, Indira Piao, Tikona Park 46 Chauhan Patti Wazirabad Sonia Vihar E Block, Nanaksar Karawal Nagar, Govt. Model School, Pushta Seelampur Metro 47 Sabapur Village No.5, Gamri Extension., Pushta No.2, Station Usmanpur Jawahar Nagar, Loni Crossing, Durgapuri 48 Loni No.2 Shahdara Chowk, Rathi Mill 49 Mukhmelpur Badli GT Road Jindpur, Alipur, Budhpur, Nangli Poonam

Page 39 May 2011

Design of Routes under Gramin Sewa Scheme Final Report

S.No. From To Route 50 Laxmi Nagar Mandawali Mother Dairy, Vinod Nagar, Kalyanpuri 51 Seemapuri Dilshad Garden GTB Hospital, Tahirpur 52 Shahdara Nand Nagri Loni road, Durgapuri Chowk, Nathu Chowk 53 Kalyanpuri Anand Vihar Gazipur Dairy Farm Preet Vihar Metro Jagatpuri, Karkar Dooma Court, Yamuna 54 New Seemapuri Station Sports Complex, Vivek Vihar Virat Cinema, 55 Nehru Place Hamdard Nagar, Govindpuri, Kalkaji Ambedkar Nagar 56 Sangam Vihar Badarpur Lal Kuan, Tughlakabad colony Qutub Minar Metro Ambedkar Terminal, Asian Market, Lado 57 Sangam Vihar Station Sarai Samalkha, Under Pass, Sector 21,22, 58 Harijan Basti, Rajokri Dwarka Metro Station Geetanjali Encl. Ambedkar Nagar Terminal., Asian Market, 59 Sangam Vihar Saket Saket J Block Apollo hospital, Kalkaji Flyover, Kalkaji 60 Madanpur Khadar Nehru Place Mandir Rohini East Metro Tarun Vihar CGHS, Farmer, Goodwill 61 Rohini Sector-28,29 Station Apartment, Sector-11, Shahbad Dairy Tarun Vihar CGHS, Farmer, Goodwill Rohini East Metro DCE, Rohini Sector- 62 Apartment, Sector-18-19, Badli Industrial Station 17/19 Area, Shahbad Dairy Kauri Chowk, Nanaksar Gurudwara, 63 Karawal Nagar Timar Pur Wazirabad Pul Tarun Vihar, Goodwill Apart,, Sector-11, Rohini East Metro HMR Engineering 64 Shahbad Dairy, Sector-18, Badli Railway Station College, Hamurpur Phatak, Nangli Poonam, Budhpur, Alipur Shastri Park, MCD Flats, North India Seelampur Metro North India Engineering 65 Engineering College, Jag Parvesh MCD Station College Hospital Maharaja Agrasen Pal Colony, Sector-24 Rohini, Sector-23, 66 Rithala Metro Station College Sector-22 Source: Transport Department, GNCTD

Page 40 May 2011

Design of Routes under Gramin Sewa Scheme Final Report

Annexure 2.2 Table 0-2: Suggestions received from various stakeholders

Page 41 May 2011

Design of Routes under Gramin Sewa Scheme Final Report

Page 42 May 2011

Design of Routes under Gramin Sewa Scheme Final Report

Page 43 May 2011

Design of Routes under Gramin Sewa Scheme Final Report

Page 44 May 2011

Design of Routes under Gramin Sewa Scheme Final Report

Page 45 May 2011

Design of Routes under Gramin Sewa Scheme Final Report

Page 46 May 2011

Design of Routes under Gramin Sewa Scheme Final Report

Page 47 May 2011

Design of Routes under Gramin Sewa Scheme Final Report

Page 48 May 2011

Design of Routes under Gramin Sewa Scheme Final Report

Some further suggestions for routes have been received:

Table 0-3: Further Suggestions received from various stakeholders

Page 49 May 2011

Design of Routes under Gramin Sewa Scheme Final Report

Page 50 May 2011

Design of Routes under Gramin Sewa Scheme Final Report

Page 51 May 2011

Design of Routes under Gramin Sewa Scheme Final Report

Annexure 3.1

Page 52 May 2011

Design of Routes under Gramin Sewa Scheme Final Report

Page 53 May 2011