Design of Routes Gramin Sewa Scheme in Dlhi- Draft Report

Total Page:16

File Type:pdf, Size:1020Kb

Design of Routes Gramin Sewa Scheme in Dlhi- Draft Report Design of Routes under Gramin Sewa Scheme Final Report Acknowledgement We wish to thank Mr. R. K. Verma, Principal Secretary cum Commissioner (Transport), Mr. Joginder Sharma, Dy. Commissioner (VIU), Mr. Ramanuthan, Motor Licensing Officer, Taxi unit, all officials of Transport Department, Government of NCT of Delhi, for their constant cooperation and support in data collection and conducting of surveys. We extend special gratitude to all operators and stakeholders who have provided their inputs and suggestions in finalization of this study. Page 2 May 2011 Design of Routes under Gramin Sewa Scheme Final Report TABLE OF CONTENTS ACKNOWLEDGEMENT .............................................................................................................................................. 2 CHAPTER 1. INTRODUCTION ......................................................................................................................... 5 1.1 INTRODUCTION ............................................................................................................................................. 6 1.2 SALIENT FEATURES OF GRAMIN SEWA SCHEME (AS SPELT OUT BY TRANSPORT DEPARTMENT) ...................................... 6 1.2.1 Delineation of Areas of Operation .................................................................................................. 7 1.3 SUBMISSION TILL DATE ................................................................................................................................... 9 CHAPTER 2. DATA BASE DEVELOPMENT AND ANALYSIS ............................................................................. 10 2.1 BACKGROUND ............................................................................................................................................ 11 2.2 DATA COLLECTION STAGE ............................................................................................................................. 11 2.2.1 Municipal Wards ........................................................................................................................... 11 Population as per Census 2001 ................................................................................................................................ 12 Population in 2011 (Projected) ................................................................................................................................ 12 Population in 2021 (Projected) ................................................................................................................................ 12 Total of MCD Wards under Gramin Sewa Scheme ................................................................................................... 12 2.2.2 Transport Infrastructure Assessment ............................................................................................ 12 2.2.3 Access to Metro Network .............................................................................................................. 12 2.2.4 Passenger Origin Destination cum Opinion Survey for Metro Passengers .................................... 13 2.2.5 Passenger Origin Destination cum Opinion Survey for Bus Passengers ........................................ 14 2.2.6 Online Commuter Opinion Survey ................................................................................................. 14 2.3 PROVISIONAL ROUTES PROPOSED BY TRANSPORT DEPARTMENT ........................................................................... 14 2.4 STAKEHOLDER CONSULTATION ....................................................................................................................... 15 2.5 DATA ANALYSIS........................................................................................................................................... 15 2.6 IDENTIFICATION OF POTENTIAL ROUTES ........................................................................................................... 15 CHAPTER 3. PROPOSED ROUTES ................................................................................................................. 17 3.1 BACKGROUND ............................................................................................................................................ 18 3.1.1 Proposed Routes ........................................................................................................................... 18 3.1.2 Zonal Distribution ......................................................................................................................... 30 3.1.3 Estimation of Ridership and Fleet ................................................................................................. 31 3.1.4 Route Operation Strategy ............................................................................................................. 36 ANNEXURE ..................................................................................................................................................... 37 ANNEXURE 2.1..................................................................................................................................................... 38 ANNEXURE 2.2..................................................................................................................................................... 41 ANNEXURE 3.1..................................................................................................................................................... 52 Page 3 May 2011 Design of Routes under Gramin Sewa Scheme Final Report List of Tables TABLE 1-1: ZONES OF DELHI .......................................................................................................................................... 7 TABLE 2-1: PRESENT AND PROJECTED POPULATION OF MCD WARDS UNDER GRAMIN SEWA SCHEME ....................................... 12 TABLE 2-2: LIST OF METRO STATIONS OUTSIDE INNER RING ROAD ...................................................................................... 12 TABLE 3-1: PROPOSED ROUTES .................................................................................................................................... 18 TABLE 3-2: DISTRIBUTION OF ROUTES IN EACH ZONE ....................................................................................................... 30 TABLE 3-3: PROPOSED GRAMIN SEWA FLEET SIZE ........................................................................................................... 33 TABLE 0-1: PROVISIONAL ROUTES ................................................................................................................................ 38 TABLE 0-2: SUGGESTIONS RECEIVED FROM VARIOUS STAKEHOLDERS .................................................................................... 41 TABLE 0-3: FURTHER SUGGESTIONS RECEIVED FROM VARIOUS STAKEHOLDERS....................................................................... 49 List of Figures FIGURE 1-1: AREA OF OPERATION OF GRAMIN SEWA SCHEME 9 FIGURE 3-1: SOME GRAMIN SEWA ROUTES IN NORTH WEST ZONE 31 Page 4 May 2011 Design of Routes under Gramin Sewa Scheme Final Report Chapter 1. Introduction Page 5 May 2011 Design of Routes under Gramin Sewa Scheme Final Report 1.1 Introduction The city of Delhi has expanded significantly in the recent past to a city of 19 million persons as per provisional totals published by Census of India in 2011. Over time, mobility patterns in Delhi have undergone a paradigm shift with the expansion of urban areas and introduction of new modes of public transport such as MRT and BRT. However, benefits of these systems to rural areas as well as unauthorized, resettlement and JJ colonies have been limited. A new para transit service called the “Gramin Sewa Scheme” have been initiated wherein high capacity three-wheelers with seating capacity of six passengers excluding driver and/or one helper have been given permits to ply in these areas. It is a point to point service providing sustainable, efficient, effective and environment friendly transit service that serves the needs of a locality by connecting local destinations and providing better access to popular destinations such as transport nodes, commercial centres etc. Transport Department, Government of NCT of Delhi has awarded the study on “Designing Routes under Gramin Sewa Scheme” to Delhi Integrated Multimodal Transit System (DIMTS) Ltd. to review the existing passenger demand and connectivity options available, and based on the findings, propose certain routes on which Gramin Sewa may be plied. It would be a shuttle service that would connect these areas with major nodes in the city. 1.2 Salient Features of Gramin Sewa Scheme (as spelt out by Transport Department) 1. The scheme is open only for New motor vehicles, such as high capacity three wheelers and similar other vehicles with seating capacity of 6 (six) passengers excluding the driver and having company fitted body duly approved by ARAI or any other agency as approved by the Govt. of India for this purpose. These vehicles will be given permits to ply in rural areas, unauthorized resettlement colonies and J.J. Clusters of Delhi. 2. The vehicle shall ply on clean fuel (i.e. CNG, O.E.) complying with Bharat Stage-III Norms, fitted with Global Positioning System (GPS) and connect to the Control Room of the Transport Department as may be decided by the Government.. These vehicles shall be registered under separate series i.e. DL 2W and will be called as ‘Gramin Sewa’ and shall be granted contract carriage
Recommended publications
  • Summary Report CONTENT ABOUT THIS REPORT 2 ENVIRONMENT 26 ABOUT US 3 STAFF 28
    THE CITY UNLIMITED Sustainability Report 2016 Summary Report CONTENT ABOUT THIS REPORT 2 ENVIRONMENT 26 ABOUT US 3 STAFF 28 CHAIRMAN’S MESSAGE 4 SUPPLY CHAIN 30 CEO LETTER 6 FINANCIAL AND ECONOMIC 32 PERFORMANCE JOURNEYS IN OUR CITY 8 CORPORATE GOVERNANCE 34 SAFETY 20 BUILDING OUR FUTURE 36 CUSTOMERS 22 MAINLAND OF CHINA AND 38 INTERNATIONAL BUSINESS COMMUNITY 24 SUSTAINABILITY REPORT 2016 SUMMARY REPORT 1 THE CITY UNLIMITED ABOUT THIS REPORT Our city is full of possibilities: chance encounters that become life-long friendships, social This year we continue to report in two different but complementary ways to provide information meetings that strengthen our communities, educational opportunities that lead to successful to our stakeholders: careers. What does it take to make these possibilities realities? 1. This Summary Report features stories from our stakeholders of places that are important In Hong Kong, MTR has connected all 18 districts bringing our customers closer to their to them – places that they are connected to by the MTR. There are behind-the-scenes families and friends, their workplaces, their schools and places where they like to hang out. highlights to show how we make these connections possible. To us, our mission is to connect Whether they are building relationships, enhancing their knowledge or simply exploring the and grow communities with caring services, in a responsible and sustainable manner. city, MTR connects them with our safe and reliable service. 2. The dedicated report microsite and interactive PDF provide full details about our MTR enables our customers to seize the city’s unlimited possibilities and unleash their management approaches, programmes and key performance indicators (KPIs) across a wide potential, one smooth ride at a time.
    [Show full text]
  • DELHI METRO RAIL CORPORATION LIMITED Contract CE-32: “Design, Manufacture, Supply, Installation, Testing and Commissioning
    CONTRACT CE-32: “Design, Manufacture, Supply, Installation, Testing and Commissioning (including Integrated Testing and Commissioning) of Escalators including Maintenance of 02 Years During Defect Liability Period for IICC Dwarka Metro Station and different Metro Stations of Phase-I, II & III). DELHI METRO RAIL CORPORATION LIMITED Contract CE-32: “Design, Manufacture, Supply, Installation, Testing and Commissioning (including Integrated Testing and Commissioning) of Escalators including Maintenance of 02 Years During Defect Liability Period for IICC Dwarka Metro Station and different Metro Stations of Phase-I, II & III). CONTRACT NO: CE-32 TENDER DOCUMENTS VOLUME 1 NOTICE INVITING TENDER (NIT) INSTRUCTIONS TO TENDERER (ITT) FORM OF TENDER (FOT) DELHI METRO RAIL CORPORATION LTD. 5th Floor, A-Wing, Metro Bhawan, Fire Brigade Lane, Barakhamba Road, New Delhi –110 001 CONTRACT CE-32: “Design, Manufacture, Supply, Installation, Testing and Commissioning (including Integrated Testing and Commissioning) of Escalators including Maintenance of 02 Years During Defect Liability Period for IICC Dwarka Metro Station and different Metro Stations of Phase-I, II & III”. NOTICE INVITING TENDER (NIT) 1.1 GENERAL (e-Tender) 1.1.1 Name of Work: Delhi Metro Rail Corporation (DMRC) Ltd. invites online open e-tenders from eligible applicants, who fulfil qualification criteria as stipulated in Clause 1.1.3 of NIT, for the work “CONTRACT CE-32: “Design, Manufacture, Supply, Installation, Testing and Commissioning (including Integrated Testing and Commissioning) of Escalators including Maintenance of 02 Years During Defect Liability Period and 03 Years Comprehensive Annual Maintenance beyond Defect Liability Period for IICC Dwarka Metro Station and different Metro Stations of Phase-I, II & III”.
    [Show full text]
  • Operations and Maintanence Syetems for Metro Railways
    GOVERNMENT OF INDIA MINISTRY OF URBAN DEVELOPMENT REPORT OF THE SUB-COMMITTEE ON OPERATIONS AND MAINTANENCE SYETEMS FOR METRO RAILWAYS NOVEMBER 2013 Sub-Committee on Operation & Maintenance Practices Ministry of Urban Development Final Report PREFACE 1) In view of the rapid urbanization and growing economy, the country has been moving on the path of accelerated development of urban transport solutions in cities. The cities of Kolkata, Delhi and Bangalore have setup Metro Rail System and are operating them successfully. Similarly the cities of Mumbai, Hyderabad and Chennai are constructing Metro Rail system. Smaller cities like Jaipur, Kochi and Gurgaon too are constructing Metro Rail system. With the new policy of Central Government to empower cities and towns with more than two million population With Metro Rail System, more cities and towns are going to plan and construct the same. It is expected that by the end of the Twelfth Five Year Plan, India will have more than 400 Km of operational metro rail network (up from present 223 Km Approximate). The National Manufacturing Competitiveness Council (NMCC) has been set up by the Government of India to provide a continuing forum for policy dialogue to energise and sustain the growth of manufacturing industries in India. A meeting was organized by NMCC on May 03, 2012 and one of the agenda items in that meeting was “Promotion of Manufacturing for Metro Rail System in India as well as formation of Standards for the same”. In view of the NMCC meeting and heavy investments planned in Metro Rail Systems, Ministry of Urban Development (MOUD) has taken the initiative of forming a Committee for “Standardization and Indigenization of Metro Rail Systems” in May 2012.
    [Show full text]
  • Sr. No. Name of the Recovery Agent
    SR. NAME OF THE RECOVERY AGENT ADDRESS NO. AHMEDABAD ZONE 1 RAJVANSHI & ASSOCIATES h- 15, chitranjan marg, c- scheme, jaipur – 302 001. 2 CHINTAN MANAGEMENT SERVICES PVT LTD a/ 1 sukit appartment, sonal char rasta, gurukul road, memnagar, ahmedabad 380052 3 HONEY AGENCY s/18, pramukhdham complex ,malpur road, modasa-383315 4 ASSETS & FINANCE RESOLUTION SERVICES 33 8th floor jhabua tower 170 rnt marg indore mp 5 SAIBABA RECORERY AGENCY 5/56 mochilene, jujna bazar, opp old my own high school, himatnagar 6 VISHWA CONSLUTNACY 44/a, jivrajparja society, jivrajpark, ahmedabad 380051 7 ASIAN DETECTIVE & INTELLIGENCY SERVICE b-709, sheth heights, off. r.c.marg, chembur, mumbai-400074 8 ADEPT DETECTIVE AGENCY 207 2nd floor loha bhavan old high court road navrangpura ahmrdabad 382215 9 ZENIT RECOVERY AGENCY 402 madhav mahel co op soceity opp nova apex nr. snes sankul vadi surat 10 EXCELLENT FINCARE PRIVATE LIMITED 25/a,second floor ajanta commercial centre, rbi, income tax ,ahmrdabad- 380009 11 KAWACH SECURITY AND TRADING SERVICE PVT. LTD. flat no. 102, 4th floor, second tower, ridhi sidhi residency, ramnagariya jagatpura, jaipur 302033 12 SAI KRIPA ENFORCEMENT CONSULTANT PVT.LTD. 24,201,kothari complex,seva-ashram,udaipur(rajasthan)-313001 13 B.KUMAR FINMAN PVT..LTD. 9/d,10th floor,sumeru center,nr.parimal crossing,c.g.road,paldi,ahmedabad 380007 14 J V D RECOVERY AGENCY LTD 4th floor, d. k. house, opp. mithakhali village garden, ellisbride, ahmedabad.- 380 006 15 SAFAL PROFESSIONAL SERVICES PVT LTD 23, swastik house, nr stadium circle opp muktajivan navrangpura, ahmedabad 380 009 16 SUKOBA ADVISORY LLP a4, jai triroop chs, kopar road, shastri nagar dombivli west thane maharashtra 421202 17 RAMEST THE SOLUTION a-503,rudra plaza, near jusges bunglow, bodakdev, ahmedabad- 15 18 LEX RECOVERY AGENCY 202 satyam 64 s g highway ahmedabad BARODA ZONE 1 M/S.
    [Show full text]
  • Basic Statistics of Delhi
    BASIC STATISTICS OF DELHI Page No. 1. Names of colonies/properties, structures and gates in Eighteenth Century 2 1.1 Sheet No.1 Plan of the City of Delhi 2 1.2 Sheet No.2 Plan of the City of Delhi 2 1.3 Sheet No.5 Plan of the City of Delhi 3 1.4 Sheet No.7 Plan of the City of Delhi 3 1.5 Sheet No.8 Plan of the City of Delhi 3 1.6 Sheet No.9 Plan of the City of Delhi 3 1.7 Sheet No.11 Plan of the City of Delhi 3 1.8 Sheet No.12 Plan of the City of Delhi 4 2. List of built up residential areas prior to 1962 4 3. Industrial areas in Delhi since 1950’s. 5 4. Commercial Areas 6 5. Residential Areas – Plotted & Group Housing Residential colonies 6 6. Resettlement Colonies 7 7. Transit Camps constructed by DDA 7 8. Tenements constructed by DDA/other bodies for Slum Dwellers 7 9. Group Housing constructed by DDA in Urbanized Villages including on 8 their peripheries up to 1980’s 10. Colonies developed by Ministry of Rehabilitation 8 11. Residential & Industrial Development with the help of Co-op. 8 House Building Societies (Plotted & Group Housing) 12. Institutional Areas 9 13. Important Stadiums 9 14. Important Ecological Parks & other sites 9 15. Integrated Freight Complexes-cum-Wholesale markets 9 16. Gaon Sabha Land in Delhi 10 17. List of Urban Villages 11 18. List of Rural Villages 19. List of 600 Regularized Unauthorized colonies 20.
    [Show full text]
  • 801STL Bus Time Schedule & Line Route
    801STL bus time schedule & line map 801STL Kapashera Border View In Website Mode The 801STL bus line (Kapashera Border) has 2 routes. For regular weekdays, their operation hours are: (1) Kapashera Border: 7:30 AM - 10:10 PM (2) Uttam Nagar Terminal: 6:10 AM - 9:40 PM Use the Moovit App to ƒnd the closest 801STL bus station near you and ƒnd out when is the next 801STL bus arriving. Direction: Kapashera Border 801STL bus Time Schedule 50 stops Kapashera Border Route Timetable: VIEW LINE SCHEDULE Sunday 7:30 AM - 10:10 PM Monday 7:30 AM - 10:10 PM Uttam Nagar Terminal Tuesday 7:30 AM - 10:10 PM Vikas Puri Crossing Najafgarh Road, New Delhi Wednesday 7:30 AM - 10:10 PM Dholi Piao Thursday 7:30 AM - 10:10 PM Friday 7:30 AM - 10:10 PM District Centre Najafgarh Road Saturday 7:30 AM - 10:10 PM Janakpuri East Metro Station/ Nangli Zalib Check Post Janak Puri Tilak Nagar Crossing (Najafgarh Road) 801STL bus Info Direction: Kapashera Border Tilak Nagar Jail Road Stops: 50 Trip Duration: 61 min Fateh Nagar Line Summary: Uttam Nagar Terminal, Vikas Puri Crossing, Dholi Piao, District Centre Najafgarh Road, Janakpuri East Metro Station/ Nangli Zalib, Check G Block Hari Nagar Post Janak Puri, Tilak Nagar Crossing (Najafgarh Road), Tilak Nagar Jail Road, Fateh Nagar, G Block Hari Nagar Depot Hari Nagar, Hari Nagar Depot, Virender Nagar/ Dilli Haat, Bharti College, C2b Janak Puri, C2b Janak Virender Nagar/ Dilli Haat Puri, C4e Janakpuri, C2d Janakpuri, Dabri Crossing, Dabri Village, Vijay Enclave (Palam-Dabri Road), Bharti College Dashrath Puri, Mahaveer
    [Show full text]
  • List of Contracts Awarded by Tender Cell(O & M)
    LIST OF CONTRACTS AWARDED BY TENDER CELL(O & M) (FROM 01.07.2020 to 30.09.2020) Whether contract Schedule date Mode of Date of Approx, Tech bid No of No. and name of parties No. and name of parties awarded to lowest Awarded S.N of completion Hyperlink of Letter of Tender No. and Item/Nature of work Tender Publication of Cost (in opening tender qualified after tech. not qualified after tech. tenderer(Highest in case Date of LOA Name of Contractor value (in o. of supplies/ Acceptance (LOA)/Work Order Enquiry NIT received evaluation evaluation of PD or earning related lakhs INR) lakhs) date works tender's) 1. CXL TITON 1. SOMBANSI ENVIRO OEM-672: Comprehensive Annual Maintenance of 01 ELECTRONICS PVT. LTD ENGG PVT LTD http://www.delhimetrorail.com/othe no. RO Plant at Naraina Vihar UG station of L-7 and 2. CAPRICANS AQUA PVT M/s Sombansi Enviro 1 Open 31-12-2019 312.70 31-01-2020 6 2. VOLTAS LIMITED Yes 03-07-2020 237.65 09-07-2022 rdocuments/tendercell/LOA7/672- LTD Engg. Pvt Ltd Operation contract of Water Softening Plant at 26 UG 3. Kemflw Water Treatment LOA.pdf 3. WOG TECHNOLOGIES stations of Line-7&8 (P) ltd PRIVATE LIMITED OCW-711:- Providing MS/GI railing Viaduct & at 1. CREATORS ENGINEERS grade & steel structure painting including & INTERIORS M/s Creators Engineers http://www.delhimetrorail.com/othe 2 repair/alteration of MS/GI railing and replacement of Open 05-02-2020 135.56 09-03-2020 5 2. BHAVAN ENTERPRISES 1.
    [Show full text]
  • Roster of 05.09.2021(Sunday)
    ROSTER OF 05.09.2021(SUNDAY) SR. NAME OF CENTRE ADDRESS NO. 1. DGD BEGUMPUR 2- GURU GOVIND SINGH ROAD, NEW DELHI – 110017. 2. M&CW MEHRAULI NEAR BHULIYAN, WARD -1ST , MEHRAULI, NEW DELHI- 110030. 3. SPUHC AYA NAGAR HOUSE NO. 32, GHODA MOHALLA, BIHIND HIGH SEC. SCHOOL, AYA NAGAR, NEW DELHI 110047. 4. M&CW HAUZ KHAS MCD PRIMARY SCHOOL, OPP. FATHER ANGEL SCHOOL, HAUZ KHAS, NEW DELHI – 110016. 5. CHHATTERPUR ANSAL VILLAS, CHHATTARPUR MANDIR, NEW DELHI– MANDIR 110074. 6. GHITORNI METRO GATE NO.2, GHITORNI METRO STATION, NEW DELHI STATION 7. SAKET METRO GATE NO. 2, SAKET METRO STATION, NEW DELHI STATION 8. CONTAINMENT ZONE CONTAINMENT ZONE TEAM DPMU 1 TEAM DPMU 1 9. CONTAINMENT ZONE CONTAINMENT ZONE TEAM DPMU 2 TEAM DPMU 2 10. CONTAINMENT ZONE CONTAINMENT ZONE TEAM DPMU 3 TEAM DPMU 3 11. CONTAINMENT ZONE-1 (CONTACT TO MR. DEVENDER SINGH 7838414381 12. CONTAINMENT ZONE-2 (CONTACT TO MR. DEVENDER SINGH 7838414381 13. DGD PVR COMPLEX PVR ANUPAM, COMMUNITY CENTER, ASHOK VIHAR, SAKET, NEW DELHI, DELHI 110017 14. DGD JONAPUR RATIYA PRADHAN RD, JUNAPUR VILLAGE, JUANAPUR, NEW DELHI- 110047. 15. SPUCH NEB SARAI D61, POCKET A, JAWAHAR PARK, KHANPUR, NEW DELHI, 110062. 16. M&CW DEVLI 811, BLOCK A, TIGRI EXTENSION, SANGAM VIHAR, NEW DELHI, DELHI 110062 17. DGD MADANGIR BLOCK-J-2, JJ COLONY, PH-2, MADANGIR, NEW DELHI– 110062. 18. DGD KHANPUR B-23, KHANPUR COLONY, BLOCK B, JJ COLONY, KHANPUR, NEWDELHI- 110062 19. SPUHC JAWAR PARK D-61, POCKET A, JAWAHAR PARK, KHANPUR, NEW DELHI 110062 20. DGD CHATTARPUR VILLAGE CHHATTARPUR, NEW DELHI – 110074.
    [Show full text]
  • International. Reservoirs Gnl Sur Inclusions Rigides Au Koweit
    REVUE TECHNIQUE DES ENTREPRISES DE TRAVAUX PUBLICS INTERNATIONAL. RESERVOIRS GNL SUR INCLUSIONS RIGIDES AU KOWEIT. SHEIKH JABER AL HAMAD AL SABAH CAUSEWAY AU KOWEIT. LE NOUVEAU PONT CHAMPLAIN AU CANADA. NAMHANGANG BRIDGE IN KOREA. LUCKNOW METRO 1 IN INDIA. EXTENSION DE LA MINE D’OR DU TASIAST EN MAURITANIE. UN CHANTIER D’ENVERGURE AU MONTENEGRO. TESTIMONIO II A MONACO. RAFFINERIE D’AL-ZOUR AU KOWEIT N° 945 OCTOBRE 2018 INTERNATIONAL 2018 OCTOBRE 945 LE PONT MORACICA AU MONTÉNÉGRO © CRBC REVUE TECHNIQUE DES ENTREPRISES DE TRAVAUX PUBLICS PUBLICS REVUE TECHNIQUE DES ENTREPRISES DE TRAVAUX REVUE TECHNIQUE DES ENTREPRISES DE TRAVAUX PUBLICS ÉDITORIAL N° 945 OCTOBRE 2018 Directeur de la publication Bruno Cavagné Directeur délégué LA PLACE DE L’INGÉNIERIE FRANÇAISE Rédacteur en chef Michel Morgenthaler À L’INTERNATIONAL. 3, rue de Berri - 75008 Paris Tél. +33 (0)1 44 13 31 03 [email protected] PEUT- ON FAIRE MIEUX ? Comité de rédaction Erica Calatozzo (Systra), Jean-Bernard Datry (Setec tpi), Philippe Gotteland (Fntp), Jean-Christophe Goux-Reverchon françaises ont toujours eu un haut niveau de techni- (Fntp), Florent Imberty (Razel-Bec), Nicolas Law de Lauriston (Léon Grosse), cité, offrant ainsi aux ingénieries et constructeurs la Claude Le Quéré (Egis), Véronique possibilité d’un véritable dialogue technique pouvant Mauvisseau (Ingerop), Stéphane Monleau aller au-delà de l’application stricte et parfois très (Soletanche Bachy), Jacques Robert (Arcadis), Claude Servant (Eiffage tp), conservatrice des codes. Les entreprises françaises Philippe Vion (Vinci Construction Grands ont pu innover bien plus que nos partenaires ou Projets), Nastaran Vivan (Artelia), Michel Morgenthaler (Fntp) concurrents internationaux. Prenons le cas des Ont collaboré à ce numéro ponts.
    [Show full text]
  • 1 the “Missing Middle”: Participatory Urban Governance in Delhi's Unauthorized Colonies Charlotte Lemanski
    The “missing middle”: Participatory urban governance in Delhi’s unauthorized colonies Charlotte Lemanski (University College London)* Stéphanie Tawa Lama-Rewal (CNRS-EHESS) *Corresponding author: [email protected] ***DRAFT PAPER: DO NOT CITE WITHOUT CONTACTING AUTHOR*** Challenging Orthodoxies: Critical Governance Studies University of Warwick, 13-14 December 2010 Abstract This research challenges orthodox theories of class and urban governance, and is empirically located in Delhi, India. The paper critiques orthodox theories of urban participatory governance in the global South, which polarise urban citizens and their civic strategies into the elite, typically understood as guilty of ‘capturing’ participatory structures, and the poor, largely conceptualized as excluded from formal governance mechanisms but active in more politicized forms of civic mobilization, arguing that these orthodox theories are incomplete. This research identifies urban citizens who fit neither the ‘elite’ not ‘poor’ orthodox conceptual binary, and explores how such citizens engage in participatory urban governance. Empirically, research addresses Delhi’s unauthorized colonies (UCs), residential areas that have evolved mostly on private land that is not classified “residential” in the Delhi Master Plan. Housing roughly half of Delhi’s population and comprising a mix of class type, UCs are technically illegal locations for residential development, and are consequently excluded from Delhi’s network of basic urban services (water, roads, electricity) and face potential eviction. Unauthorized colonies are conceptualised as representing India’s ‘missing middle’: comprising the ‘real’ middle class; revealing the failure of orthodox binary concepts to accurately describe participatory urban governance for those in ‘the middle’; and highlighting how UCs’ invisibility (linked to their heterogeneity – i.e.
    [Show full text]
  • Police Station for Dmrc Metro Network in Ncr
    POLICE STATION FOR DMRC METRO NETWORK IN NCR DELHI POLICE (METRO) Spl. CP Transport/Training 8130099002 Jt CP/Transport 011-23490245 9818099039 DCP (Metro) 011-23222114 8130099090 Police Station office Mobile Metro Police Control Room SHPK Police Control for DMRP 1511, 011-221839030, 11-22183904 8800294695 North OFFICE/ Police Station Mobile ACP. METRO (North) 011-23925500, 011-26501231 9718450002 SHO RI 011-27058384, 011-27058283 9958097236 SHO KG 011-23923015, 011-23923016 8750871323 SHO SHKP 011-22173623(DO), 011-22173624 8750871322 SHO RG 011-25150008(DO), 011-25150002 8750871327 SHO RCK 011-23279036,38 9868896452 SHO AZU 011-27428025, 011-27428025 9818542888 SHO NNOI 011-25962200 8750871321 SHO NSHP 011-27312827, 011-27312826 9968003125 South OFFICE/ Police Station Mobile ACP. METRO (South) 011-26501321 8750871208 SHO IGA 7290007616 8750871326 9810470765 SHO YB 011-22486281(DO), 011-22483660 8750871328 8800294695 SHO PTDM 011-22486281(DO) 9810270796 SHO NP 011-26984547 8750871325 9654203965 SHO INA 011-26880100, 011-26880200 7011902856 SHO OVM 011-26984548 8750871324 9811711786 SHO GTNI 011-26501325 9268111170 SHO JP 8800294693 9999659947 GURGOAN POLICE OFFICE/ Police Station Mobile Email CP GURUGRAM 2311200, 2312200 [email protected] DCP.EAST & Metro 0124-2573659, 2573659 9999981804 [email protected] ACP HQ/Taffic & Metro 0124-2577185 9999981814 [email protected] ACP DLF 0124-2577057 9999981813 [email protected] SHO METRO IFFCO 0124-2570800 9999981829 [email protected] FARIDABAD POLICE OFFICE/ Police Station Mobile
    [Show full text]
  • CONCRETE PRODUCTS DIVISION (Gurugram-Haryana) P R O D U C T S INDEX
    CONCRETE PRODUCTS DIVISION (Gurugram-Haryana) P r o d u c t s INDEX • About CPD • Detailed Product Description – Engineered Concrete Blocks – Pavers – Kerb Stones – Readymix Concrete • Contact Us ABOUT CPD Sobha Concrete Products represent Quality & Detail in every Block with State of the Art Technology, World Class Imported Machinery and Sobha’s stringent quality standards. Since inception, Sobha Concrete Products has always strived for benchmark quality, customer-centric approach, robust engineering, in-house research, uncompromising business ethics, timeless values and transparency in all spheres of business conduct, which have contributed in making Sobha a preferred real estate brand in India. A ‘BIG PICTURE’ approach to Building Performance! Engineered Concrete Blocks With Sobha Engineered concrete blocks, it is not that hard to make a strong quality statement. Because, at Sobha we make sure that every single concrete block is crafted to perfection using state-of-the-art technology and imported machinery from REIT Engineered concrete solid block Engineered concrete cellular/hollow block Engineered Concrete Solid Blocks Typical usage for concrete block - Foundation walls - typically rock faced. - Basement walls. - Partition walls - usually plain faced. - Exterior walls - usually plain faced and then often covered with stucco. - Most concrete block was used as a back-up material or for cavity wall construction. Engineered Concrete Solid Blocks ADVANTAGES • Weather Resistance: Very low water absorbing quality and they offer stronger resistance to water leakage and also withstand adverse weather conditions. • Saving Raw Material: Up to 60% reduction in cement mortar consumption (Compare to conventional bricks). It saves on time of labor, raw material and result in more rapidly construction.
    [Show full text]