STONE DEPOSIT PROJECT IN VILLAGE AMBA OVER AANN AREAAREA---- 3.053.053.05 ACRES OR 1.23 HA IN, P.SP.SP.S-P.S --- PALOJORI, DISTRICT ––– DEOGHARDEOGHAR,, . APPLICANT: MD. SARFARAZ ANSARI & VIVEKA NAND RAY PRE FEASIBILITY REPORT

PRE- FEASIBILITY REPORT

0 STONE DEPOSIT PROJECT IN VILLAGE AMBA OVER AANN AREAAREA---- 3.053.053.05 ACRES OR 1.23 HA IN, P.SP.SP.S-P.S --- PALOJORI, DISTRICT ––– DEOGHARDEOGHAR,, JHARKHAND. APPLICANT: MD. SARFARAZ ANSARI & VIVEKA NAND RAY PRE FEASIBILITY REPORT CONTENTS

EXECUTIVE SUMMARY ...... 3 1.0 INTRODUCTION ...... 3

1.1 SALIENT FEATURES OF THE PROJECT ...... 4 1.2 PRESENT LAND USE PLAN ...... 5 1.3 PROPOSED PLANNING ...... 5 1.4 UTILIZATION ...... 5

2. INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION ...... 5

2.1 IDENTIFICATION OF PROJECT AND PROJECT PROPONENT ...... 5 2.2 BRIEF INFORMATION ABOUT THE PROJECT ...... 6 2.3 NEED FOR THE PROJECT AND ITS IMPORTANCE TO THE COUNTRY OR REGION ...... 6 2.4 DEMANDS -SUPPLY GAP ...... 6 2.5 IMPORTS VS . INDIGENOUS PRODUCTION ...... 6 2.6 EXPORT POSSIBILITY ...... 6 2.7 DOMESTIC / EXPORT MARKETS ...... 6 2.8 EMPLOYMENT GENERATION ...... 7 3. PROJECT DESCRIPTION ...... 7

3.1 TYPE OF PROJECT INCLUDING INTERLINKED AND INTERDEPENDENT PROJECTS , IF ANY ...... 7 3.2 LOCATION ...... 7 3.3 DETAILS OF ALTERNATE SITES ...... 9 3.4 SIZE OR MAGNITUDE OF OPERATION ...... 9 3.5 GENERAL GEOLOGY : ...... 10 3.6 LOCAL GEOLOGY :...... 11 3.7 SUMMARY OF THE RESERVES ...... 11 3.8 PROJECT DESCRIPTION WITH PROCESS DETAILS...... 12 3.8.1 Method of Mining ...... 12 3.8.2 PRODUCTION DETAILS ...... 13 3.9 RAW MATERIAL REQUIRED ALONG WITH ESTIMATED QUANTITY , LIKELY SOURCE , MARKETING AREA OF FINAL PRODUCT /S, MODE OF TRANSPORT OF RAW MATERIAL AND FINISHED PRODUCT ...... 13 3.10 RESOURCE OPTIMIZATION / RECYCLING AND REUSE ...... 13 3.11 AVAILABILITY OF WATER ITS SOURCE , ENERGY / POWER REQUIREMENT AND SOURCE ...... 13 3.11.1 Water Requirement ...... 13 3.11.2 POWER ...... 13 3.12 QUANTITY OF WASTES TO BE GENERATED (LIQUID AND SOLID) AND SCHEME FOR THEIR MANAGEMENT/ DISPOSAL ...... 14 3.12.1 Solid Waste Generation & its Disposal ...... 14 3.12.2 Liquid Effluent ...... 14 4. SITE ANALYSIS ...... 14

4.1 CONNECTIVITY ...... 14 4.2 LANDFORM, LAND-USE AND LAND OWNERSHIP ...... 14 4.3 TOPOGRAPHY ...... 15 4.4 EXISTING LAND USE PATTERN ...... 15

1 STONE DEPOSIT PROJECT IN VILLAGE AMBA OVER AANN AREAAREA---- 3.053.053.05 ACRES OR 1.23 HA IN, P.SP.SP.S-P.S --- PALOJORI, DISTRICT ––– DEOGHARDEOGHAR,, JHARKHAND. APPLICANT: MD. SARFARAZ ANSARI & VIVEKA NAND RAY PRE FEASIBILITY REPORT 4.5 EXISTING INFRASTRUCTURE ...... 16 4.6 SOIL CLASSIFICATION ...... 16 5.0 PLANNING BRIEF ...... 16

5.1 PLANNING CONCEPT ...... 16 5.2 LAND USE PLANNING ...... 17 5.3 AMENITIES /F ACILITIES ...... 17

6.0 PROPOSED INFRASTRUCTURE ...... 17

6.1 INDUSTRIAL AREA (P ROCESSING AREA ) ...... 17 6.2 RESIDENTIAL AREA (N ON PROCESSING AREA ) ...... 18 6.3 GREEN BELT ...... 18 6.4 SOCIAL INFRASTRUCTURE ...... 18 6.5 CONNECTIVITY ...... 18 6.6 DRINKING WATER MANAGEMENT ...... 19 6.7 SEWERAGE SYSTEM ...... 19 6.8 INDUSTRIAL WASTE MANAGEMENT ...... 19 6.9 SOLID WASTE MANAGEMENT ...... 19 6.10 POWER REQUIREMENT & SUPPLY /S OURCE ...... 19

7.0 REHABILITATION AND RESETTLEMENT (R&R) PLAN ...... 19

8.0 PROJECT SCHEDULE & COST ESTIMATES ...... 19

8.1 LIKELY DATE OF START OF CONSTRUCTION AND LIKELY DATE OF COMPLETION ...... 19 8.2 ESTIMATED PROJECT COST ALONG WITH ANALYSIS IN TERMS OF ECONOMIC VIABILITY OF THE PROJECT ...... 20 8.2.1 Initial cost of the project has been estimated as INR. 24.30 Lacs...... 20 8.2.2 Mine closure cost ...... 20 8.2.3 Proposed CSR cost breakup ...... 21 8.2.4 Environmental protection cost ...... 21

9.0 ANALYSIS OF PROPOSAL (FINAL RECOMMENDATIONS) ...... 22

2 STONE DEPOSIT PROJECT IN VILLAGE AMBA OVER AANN AREAAREA---- 3.053.053.05 ACRES OR 1.23 HA IN, P.SP.SP.S-P.S --- PALOJORI, DISTRICT ––– DEOGHARDEOGHAR,, JHARKHAND. APPLICANT: MD. SARFARAZ ANSARI & VIVEKA NAND RAY PRE FEASIBILITY REPORT

EXECUTIVE SUMMARY 1.0 INTRODUCTION Amba Stone Deposit, over an area of 3.05 Acres (1.23 Ha) is situated in Khata No. 28, Plot No. 19 (P) in Village Amba, Thana Palojori, District , Jharkhand. It is a fresh Mine. The Mining Office has asked for having Environment Clearance as per the judgment of honorable Supreme Court, New Delhi dated 27.02.2012. The Lease application is attached as AnnexureAnnexure----IIII. The proposed rate of production is 43740 TPA / 146 TPD of Stone. The lease area comprises of GM land. The estimated project cost is INR 24.30 lacs. The expected life of mine is 10.5 years.

This mining project falls under Category “B“B----2”2” Project or activity 1(a) as per EIA Notifications 2006, 2009 and 2011.

3 STONE DEPOSIT PROJECT IN VILLAGE AMBA OVER AANN AREAAREA---- 3.053.053.05 ACRES OR 1.23 HA IN, P.SP.SP.S-P.S --- PALOJORI, DISTRICT ––– DEOGHARDEOGHAR,, JHARKHAND. APPLICANT: MD. SARFARAZ ANSARI & VIVEKA NAND RAY PRE FEASIBILITY REPORT 1.1 Salient features of the project Project Name AMBA STONE DEPOSIT Plot No. 19 (P), Khata No. 28 Village: Amba Location of mine Thana- Palojori District- Deoghar, State- Jharkhand Latitude N 24°17’29.52’’ TO N 24°17’33.00’’ Longitude E 85°57’52.36’’ TO 85°57'58.08"E Topo sheet number 72 L/15 Land use 3.05 Acres (1.23 Ha) Minerals of mine Stone Total Mineable reserves 434205 MT Life of mine 10.5 years Proposed production of mine 43740 TPA / 146 TPD Method of mining Opencast, semi-mechanized No of working days 300 days Total water requirement is about 3.50 KLD (0.5KLD Water demand Domestic Uses) + 1.50 KLD (Dust Suppression) & 1.50 KLD (Green Belt) from nearby water sources. Water for drinking purpose will be taken out by dug Sources of water wells/ bore wells. For sprinkling & plantation water will be taken from private tanker. Man power 14 (Approx.) Chandanpahari Railway Station is about 11 km away from Nearest railway station the lease area in North direction. Ranchi airport is at the distance of approx. 200 km in Nearest airport South-West Direction. Seismic zone Zone III

4 STONE DEPOSIT PROJECT IN VILLAGE AMBA OVER AANN AREAAREA---- 3.053.053.05 ACRES OR 1.23 HA IN, P.SP.SP.S-P.S --- PALOJORI, DISTRICT ––– DEOGHARDEOGHAR,, JHARKHAND. APPLICANT: MD. SARFARAZ ANSARI & VIVEKA NAND RAY PRE FEASIBILITY REPORT 1.21.21.2 PrPrPresent Pr esent land Use Plan Category Area in hectares GM land 1.23 Ha 1.31.31.3 Proposed PlanPlannnnninginginging Mining method --- Open Cast, Semi Mechanized Project cost --- INR 24.30 lacs Production --- Stone (Granite gneiss), 43740 TPA / 146 TPD 1.41.41.4 Utilization possesses a wide spectrum of dimensional stones that include granite, marble, sandstone, limestone, slate, and quartzite, spread out all over the country. Stones are still the mainstays of civil construction in India, with stones being used extensively in public buildings, hotels, and temples. It is increasingly being used in homes, with the use of stones now penetrating amongst the burgeoning middle class of India. 2. INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION 2.1 Identification of Project and Project Proponent Amba Stone Mine, over an area of 3.05 Acres (1.23 Ha) is situated in Khata No. 28, Plot No. 19 (P) in Village Amba, Thana Palojori, District Deoghar, Jharkhand. It is a fresh Mine. The Mining Office has asked for having Environment Clearance as per the judgment of honourable Supreme Court, New Delhi dated 27.02.2012. The Lease application is attached as AnnexureAnnexure----IIII. The proposed rate of production is 43740 TPA / 146 TPD of Stone. The lease area comprises of GM land. The estimated project cost is INR 24.30 lacs. The expected life of mine is 10.5 years. The lessee is a private individual having registered address as under: Partners: 111.1... Md Sarfaraz Ansari, S/o Md. Naim Ansari, Village- Pipra, P.O. – Ramchandrapur, District – Deoghar, State – Jharkhand. 222.2... Sri Viveka Nand RayRay,, Sri Manohar Prasad Ray, Vill- Bargunia, P.O.–Madhupur, PS- Devipur, District–Deoghar, State – Jharkhand.

5 STONE DEPOSIT PROJECT IN VILLAGE AMBA OVER AANN AREAAREA---- 3.053.053.05 ACRES OR 1.23 HA IN, P.SP.SP.S-P.S --- PALOJORI, DISTRICT ––– DEOGHARDEOGHAR,, JHARKHAND. APPLICANT: MD. SARFARAZ ANSARI & VIVEKA NAND RAY PRE FEASIBILITY REPORT 2.22.22.2 Brief Information about the Project Amba Stone Deposit, over an area of 3.05 Acres (1.23 Ha) is situated in Khata No. 28, Plot No. 19 (P) in Village Amba, Thana Palojori, District Deoghar, Jharkhand. The project has been proposed for mining of 43740 TPA / 146 TPD of Stone by opencast Semi mechanised method. The mine lease area is 3.05 Acres (1.23 Ha). The expected life of the mine is 10.5 years. Total water requirement is about 3.50 KLD (0.5KLD Domestic Uses) + 1.50 KLD (Dust Suppression) & 1.50 KLD (Green Belt) from nearby water sources.

2.3 Need for the Project and Its Importance to the CountryCountry or Region Achieving a huge infrastructure as being envisaged by Government of India particularly in road and housing sector requires basic building materials. The stone is one of primary building material required for the purpose. The stone mining activities as proposed are the backbone of all construction and infrastructure projects as the raw material for construction is available only from such mining. The stone extracted is in high demand at the local market for road construction and real estate industry.

2.42.42.4 DemandsDemands- ---SupplySupply Gap The demand for stone is ever growing with the growth of the infrastructure sector in our country. The mineral is used in the construction activities like roads, buildings, bridges etc. The requirement for the mineral is always high in the nearby cities and towns. Therefore there is always a good demand of the mineral in the domestic market. 2.5 Imports vs. Indigenous Production Development needs will be met only through indigenous produced stone material against the high cost of imported material.

2.6 Export Possibility There is no proposal to export the Stone as there is huge gap in demand and production.

2.7 Domestic/ Export Markets

6 STONE DEPOSIT PROJECT IN VILLAGE AMBA OVER AANN AREAAREA---- 3.053.053.05 ACRES OR 1.23 HA IN, P.SP.SP.S-P.S --- PALOJORI, DISTRICT ––– DEOGHARDEOGHAR,, JHARKHAND. APPLICANT: MD. SARFARAZ ANSARI & VIVEKA NAND RAY PRE FEASIBILITY REPORT Domestic Market The finished product of stone chips will be used as raw materials for all construction work. Export Market The proposed mining activity is for indigenous consumption only for real estate, road making etc. 2.8 Employment Generation The proposed mining activity will provide direct employment to about 14 workers. The workers will be hired mostly from the nearby villages.

3. PROJECT DESCRIPTION 3.13.13.1 Type of Project Including Interlinked and InterdepeInterdependentndent Projects, If Any. The mine is over an area of 3.05 Acres (1.23 Ha). The proposed production is 43740 TPA / 146 TPD of Stone. This is an independent mining project and there are no interlinked projects involved. This mining project falls under Category “B“B----2”2” Project or activity 1(a) as per EIA Notifications 2006, 2009 and 2011. 3.23.23.2 Location Amba Stone Mine, over an area of 3.05 Acres (1.23 Ha) is situated in Khata No. 28, Plot No. 19 (P) in Village Amba, Thana Palojori, District Deoghar, Jharkhand.

The mining lease area falls in Survey of India Toposheet is 72L/15. Latitude N 24 ᵒ17’29.52’’ TO N 24 ᵒ17’33.00’’ Longitude E 85 ᵒ57’52.36’’ TO 85°57'58.08"E

7 STONE DEPOSIT PROJECT IN VILLAGE AMBA OVER AANN AREAAREA---- 3.053.053.05 ACRES OR 1.23 HA IN, P.SP.SP.S-P.S --- PALOJORI, DISTRICT ––– DEOGHARDEOGHAR,, JHARKHAND. APPLICANT: MD. SARFARAZ ANSARI & VIVEKA NAND RAY PRE FEASIBILITY REPORT

Project site

Fig 1: Location map of proposed project site

8 STONE DEPOSIT PROJECT IN VILLAGE AMBA OVER AANN AREAAREA---- 3.053.053.05 ACRES OR 1.23 HA IN, P.SP.SP.S-P.S --- PALOJORI, DISTRICT ––– DEOGHARDEOGHAR,, JHARKHAND. APPLICANT: MD. SARFARAZ ANSARI & VIVEKA NAND RAY PRE FEASIBILITY REPORT

Fig 2: Google map of proposed project site 3.3 Details of Alternate Sites Mining is site specific project. 3.4 Size or mmagnitudeagnitude of operation The mineable reserve under proved and probable category is calculated to be 434205 tonnes and production of stone in first five years of the lease period will be about 207899 tonnes. Thus the life of mine is 10.5 years. In the first 5 years plan period it is estimated that the maximum production of Building stone would be 43740 tonnes in 2nd year. The proposed capacity of the mine will be 43740 TPA / 146 TPD of Stone (Granite gneiss). The mine will be worked on the day time only. The average number of working days in the year would be 300. For the purpose 14 persons will be employed from the nearby villages.

9 STONE DEPOSIT PROJECT IN VILLAGE AMBA OVER AANN AREAAREA---- 3.053.053.05 ACRES OR 1.23 HA IN, P.SP.SP.S-P.S --- PALOJORI, DISTRICT ––– DEOGHARDEOGHAR,, JHARKHAND. APPLICANT: MD. SARFARAZ ANSARI & VIVEKA NAND RAY PRE FEASIBILITY REPORT 3.5 General Geology:

Regional Geology: The rock type exposed in the region consist of a series of a meta sediment like mica schist, quartz schist, quartzite, garnetiferous mica gneiss, feldspathic mica gneiss intruded by granite plutons, amphibolites, dolerites, pegmatite’s and quartz veins. Large-scale migmatisation and feldspathisation is responsible for conversion of mica schist to mica- gneiss. The generalized geological succession of these rock types occurring in area is as follows: Statigraphic Succession The tentative regional stratigraphic sequence of the Jharkhand Mica Belt is as follows: Quaternary & Recent …………. Alluvium Post Lower Gondwana (Lower to Middle Jurassic) ………… Dolerite Lower Gondwana …………. Talchir Sandstone and Shale’s. BOULDER BED ------UNCONFORMITY------Intrusive Pegmatite and vein Quartz, Meta- Dolerite Meta- Gabbro, Meta- Pyroxenite and Oththoamphibole. GRANITE Pre Cambrian Upper Quartzite and micaceous Meta sedimentaries of Mica Belt Mica schist and mica gneiss with intercalated amphibolites calc gneisses and quartz schist’s of Chotanagpur granite gneiss and migmatite.

10 STONE DEPOSIT PROJECT IN VILLAGE AMBA OVER AANN AREAAREA---- 3.053.053.05 ACRES OR 1.23 HA IN, P.SP.SP.S-P.S --- PALOJORI, DISTRICT ––– DEOGHARDEOGHAR,, JHARKHAND. APPLICANT: MD. SARFARAZ ANSARI & VIVEKA NAND RAY PRE FEASIBILITY REPORT 3.63.63.6 Local Geology: The area is a part of North Chhotanagpur Plateau and is mainly composed of Archeans. The Archeans comprise granite gneiss, crystalline limestone, calc silicate and schist. They have been intruded by pegmatite and quartz vein. The geological succession of the area is as follows: Recent Intermixed Soil ------UN-CONFORMITY------ARCHEAN Chotanagpur Granite Gneiss Pegmatite/ Quartz Veins, dolerite Large scale mapping on 1:1000 scales has been carried out in and around the area of granitic rock deposit; it comprises only one type of deposit of granitic rock. Then the area was gridded according to square pattern at an interval of 50m. Effort was made to plot each and every characteristics of rock formation. A contour plan having 2m interval has been also prepared, showing relative elevation and depression from ground level. In this way a geological map is prepared (Plate No.4). The geological sequence of rock type of the area is as follows:- Intermixed Soil ------Unconformity ------Granite/Gneiss

3.73.73.7 Summary of the reserves Mineable Reserves Category of ResResourceource Non Mineable in Tonnes in Tonnes Proved (121) 299935 Feasibility Mineral Resources (221) 175908 Pre Feasibility Mineral Resources Probable (122) 134270 163053 (222) TOTAL 434205 338961

11 STONE DEPOSIT PROJECT IN VILLAGE AMBA OVER AANN AREAAREA---- 3.053.053.05 ACRES OR 1.23 HA IN, P.SP.SP.S-P.S --- PALOJORI, DISTRICT ––– DEOGHARDEOGHAR,, JHARKHAND. APPLICANT: MD. SARFARAZ ANSARI & VIVEKA NAND RAY PRE FEASIBILITY REPORT 3.3.3.83. 888 PROJECT DESCRIPTION WITH PROCESS DETAILS

3.8.1 Method of Mining The whole area is highly potential area. The work will be started from the North portion of the area with an appropriate haul road and further extend in all direction. The mound is gently rising. The benching system 3mX3m will be practiced in the area in order to comply with the provisions of Metalliferous Mines Regulations, 1961. Since the deposit in this area is massive in nature, it is proposed to carry out only opencast semi-mechanized mining during this plan period, i.e. five years. The operations like drilling of shot holes, sorting of stone and breaking of large sized boulders will be excavated using hydraulic rock breakers and excavators with deploying of Jack hammer drilling (50.8 mm dia) will be practice in this area, having burden and spacing of 2m x 2.5m in stagger grid pattern. To avoid fly rock problem at the edge of the hill, light charged muffle blasting shall be under taken. OB dumping is done in the North Western portion of the lease area from 1st to 5th year of plan period which was then used for the backfilling of the mined area (0.35 Ha). Mining operation is proposed to be semi mechanized in general shifting only. 14 unskilled & semi-skilled workers will be deployed. The following mininminingg parameters are proposed Type of working : Opencast, Semi mechanised Bench height : 3 m Bench width : 3 m Overall pit slope : 45 o maximum from vertical

12 STONE DEPOSIT PROJECT IN VILLAGE AMBA OVER AANN AREAAREA---- 3.053.053.05 ACRES OR 1.23 HA IN, P.SP.SP.S-P.S --- PALOJORI, DISTRICT ––– DEOGHARDEOGHAR,, JHARKHAND. APPLICANT: MD. SARFARAZ ANSARI & VIVEKA NAND RAY PRE FEASIBILITY REPORT 3.8.2 PRODUCTION DETAILS The Proposed Production of Stone in the plan period:

Generation of O.B. Generation of Total waste Production of Year Intermixed Soil in intercalated waste in in CuM stone in Tonnes CuMCuMCuM CuMCuMCuM 1st1st1st 41650 5750 1714.0 7464 2nd2nd2nd 43740 NIL 1800.0 1800.0 3rd3rd3rd 41978 NIL 1727.5 1727.5 4th4th4th 43376 NIL 1785.0 1785.0 5th5th5th 37155 NIL 1529.0 1529.0 Total 207899 NILNILNIL 8555.5 14305.5

3.93.93.9 Raw Material Required Along With Estimated QuantityQuantity,, Likely Source, MarketingM arketing Area of Final Product/sProduct/s,, Mode of Transport of Raw MaterialMaterial anandd Finished ProductProduct No raw material will be required for production of stone. In the operation phase stone will be excavated by Opencast, Semi mechanised method and sent to approve crusher for further processing into required shape and size from where it is loaded directly into trucks/trolleys to consumer. Eventually the finished product will be supplied to the market. 3.103.103.10 Resource Optimization/ Recycling and Reuse Entire Product will be used for construction activities. 3.113.113.11 Availability of Water Its SourcSource,e, Energy/ Power RequirementRequirement and Source

3.11.1 Water Requirement Total water requirement is about 3.50 KLD (0.5 KLD Domestic Uses) + 1.50 KLD (Dust Suppression) & 1.50 KLD (Green Belt) from nearby water sources.

3.11.2 POWER No electrical energy will be required. However 100 liters/day of HSD will be required for the operation of jack hammer, rock breaker etc.

13 STONE DEPOSIT PROJECT IN VILLAGE AMBA OVER AANN AREAAREA---- 3.053.053.05 ACRES OR 1.23 HA IN, P.SP.SP.S-P.S --- PALOJORI, DISTRICT ––– DEOGHARDEOGHAR,, JHARKHAND. APPLICANT: MD. SARFARAZ ANSARI & VIVEKA NAND RAY PRE FEASIBILITY REPORT 3.123.123.12 QUANTITY OF WASTES TO BE GENERATED (LIQUID AND SOLISOLID)D) AND SCHEME FOR THEIR MANAGEMENT/ DISPOSAL

3.12.1 Solid Waste Generation & its Disposal Total (14305.5 Cu.M) waste shall be temporarily dumped on the South-Western Side within lease area and will be used for backfilling of the lease area (0.35 Ha).

3.12.2 Liquid Effluent No effluent will be generated. Some amount of sewage /domestic waste will be generated due to temporary sanitary facilities at the site which will be treated in septic tank followed by soak-pit. 4. SITE ANALYSIS 4.1 Connectivity Amba Stone Deposit is situated in and Chandanpahari Railway Station is about 11 km away from the lease area in North direction. The nearest highway NH-114A is approx 12 Km in North-East direction and nearest airport Ranchi is about 200 Km away from the lease area in South-West direction. The nearest town Madhupur is about 34 Km in West direction. Survey of India Toposheet No. 72L/15.

4.24.24.2 LANDFORM, LANDLAND----USEUSE AND LAND OWNERSHIP LANDFORM The applied area is generally a flat undulating like topography. The Maximum R.L. is 250 meter.

14 STONE DEPOSIT PROJECT IN VILLAGE AMBA OVER AANN AREAAREA---- 3.053.053.05 ACRES OR 1.23 HA IN, P.SP.SP.S-P.S --- PALOJORI, DISTRICT ––– DEOGHARDEOGHAR,, JHARKHAND. APPLICANT: MD. SARFARAZ ANSARI & VIVEKA NAND RAY PRE FEASIBILITY REPORT LANDUSE Existing 555ththth Year Conceptual Details %age In Ha In Ha In Ha Quarry 0 0.51 Road 0.04 0.02 0.87 (0.35 Ha area backfilling+ 0.52 Ha Dump 0 0.22 71.00 area water reservoir for Parapet Wall 0 0.01 Rain water harvesting) Garland Drain 0 0.01 Plantation 0 0.20 0.36* 29.00 Unused 1.19 0.26 0 0 Total 1.231.231.23 1.231.231.23 1.231.231.23 100.00

*Rest plantation will be done around lease area to full fill necessary 33% plantation. LAND OWNERSHIP The proposed lease area is GM land. 4.34.34.3 TOPOGRAPHY The topography of the area is predominantly undulating with hard rocks. The entire area has topography with small ridges and undulating terrain with rocky outgrowths. Based on the topographical map 72L/15 the Deoghar district, hills are widely scattered with Undulatory topography. Amba Stone Deposit is situated in Deoghar District and Chandanpahari Railway Station is about 11 km away from the lease area in North direction. The nearest highway NH-114A is approx 12 Km in North-East direction and nearest airport Ranchi is about 200 Km away from the lease area in South-West direction. The nearest town Madhupur is about 34 Km in West direction. Survey of India Toposheet No. 72L/15. 4.4 EXISTING LAND USE PATTERN At present the land in the area is not occupied for any other use. There is no inhabitation. Also there is no agricultural activity in the area at present. The existing land use pattern is as under:

15 STONE DEPOSIT PROJECT IN VILLAGE AMBA OVER AANN AREAAREA---- 3.053.053.05 ACRES OR 1.23 HA IN, P.SP.SP.S-P.S --- PALOJORI, DISTRICT ––– DEOGHARDEOGHAR,, JHARKHAND. APPLICANT: MD. SARFARAZ ANSARI & VIVEKA NAND RAY PRE FEASIBILITY REPORT

Category Area in hectares GM land 1.23 444.54.5.5.5 Existing Infrastructure No existing infrastructure within lease area. 4.6 Soil Classification The soils of the district are mostly of the residual type. High temperature and high rainfall have led to the formation of lateritic type of soils from rocks of Archean metamorphic complex exposed in the greater part of the district. Texturally the soils of the district have been classified into four classes- ‹ Stony and gravelly soils: - These are low grade soils having a large admixture of cobbles, pebbles and gravels generally found at the base of the hills. ‹ Red and yellow soils: - This soil is formed by the decomposition of crystalline metamorphic rocks like granite- gneiss etc. These rocks contain mineral particles like biotite, hornblende and iron. ‹ Lateritic soils: - This type of soil has dark red or brown color. It has high iron content and has been formed by the process of lateralization of the weathered material in the favorable climate and topography. ‹ Alluvial soils: - River channels in the district are covered with alluvial soils consisting mainly of coarse sand and gravel mixed with silt and clay.

5.0 PLANNING BRIEF 5.1 Planning Concept The deposit in the area is quite good in respect of quality and quantity with a considerable width and continuing in depth. This mine is planned to develop with the production capacity of 43740 TPA / 146 TPD and the life of the mine is 10.5 years. The operations like drilling of shot holes, sorting of stone and breaking of large sized boulders will be excavated using hydraulic rock breakers and excavators with deploying

16 STONE DEPOSIT PROJECT IN VILLAGE AMBA OVER AANN AREAAREA---- 3.053.053.05 ACRES OR 1.23 HA IN, P.SP.SP.S-P.S --- PALOJORI, DISTRICT ––– DEOGHARDEOGHAR,, JHARKHAND. APPLICANT: MD. SARFARAZ ANSARI & VIVEKA NAND RAY PRE FEASIBILITY REPORT of Jack hammer drilling. The development of the faces shall be carried out keeping the bench height at 3 m and width 3 m. The average number of working day in a year would be 300 days. The work will be started from the North portion of the area with an appropriate haul road and further extend in all direction. 5.25.25.2 Land use Planning Details of land use Existing after end of mine life is given below: Existing 555ththth Year Conceptual Details %age In Ha In Ha In Ha Quarry 0 0.51 Road 0.04 0.02 0.87 (0.35 Ha area backfilling+ 0.52 Ha area Dump 0 0.22 71.00 water reservoir for Rain Parapet Wall 0 0.01 water harvesting) Garland Drain 0 0.01 Plantation 0 0.20 0.36 29.00 Unused 1.19 0.26 0 0 Total 1.231.231.23 1.231.231.23 1.231.231.23 100.00

5.5.5.35. 333 Amenities/Facilities Mines Office, Workshop etc. Proper site services such as First Aid arrangement, temporary rest shelter, Drinking Water facilities, toilets etc. will be provided to the mine workers.

Transport of Men and Material: Workers from nearby villages will be engaged for mining and transportation purposes. They will come for work on foot. The material from the mine will be transported by trucks / dumpers. 6.0 PROPOSED INFRASTRUCTURE 6.1 Industrial Area (Processing Area) No infrastructure is proposed.

17 STONE DEPOSIT PROJECT IN VILLAGE AMBA OVER AANN AREAAREA---- 3.053.053.05 ACRES OR 1.23 HA IN, P.SP.SP.S-P.S --- PALOJORI, DISTRICT ––– DEOGHARDEOGHAR,, JHARKHAND. APPLICANT: MD. SARFARAZ ANSARI & VIVEKA NAND RAY PRE FEASIBILITY REPORT 6.2 Residential Area (Non Processing Area) As local workers from nearby areas will be engaged for the mining activity, no residential area/ housing are proposed. 6.3 Green Belt Plantation will be done in the 7.50 m barrier zone along the periphery of the mining lease area and on the backfilled area after final closure of the mines.

Sl. Year of Target of Ass umed Area to be Area of Plantation No. Plantation Plantation Survival (80%) covered in Ha

1 First 300 240 0.12 Safety/Barrier Zone 2 Second 300 240 0.12 Safety/Barrier Zone 3 Third 300 240 0.12 Safety/Barrier Zone th th - - - Maintenance of 4 4 & 5 planted trees TOTAL 900 720 0.36*

*Rest plantation will be done around lease area to full fill necessary 33% plantation. 6.4 Social Infrastructure The following rural activities are being proposed to be done in the region under Rural Development Programme. • Rural Health service • Educational Development Programme • Self-employment, resource development • Conservation of cultural activities of Jharkhand • Agricultural development & environmental protection 6.56.56.5 Connectivity Amba Stone Deposit is situated in Deoghar District and Chandanpahari Railway Station is about 11 km away from the lease area in North direction. The nearest highway NH-114A is approx 12 Km in North-East direction and nearest airport Ranchi

18 STONE DEPOSIT PROJECT IN VILLAGE AMBA OVER AANN AREAAREA---- 3.053.053.05 ACRES OR 1.23 HA IN, P.SP.SP.S-P.S --- PALOJORI, DISTRICT ––– DEOGHARDEOGHAR,, JHARKHAND. APPLICANT: MD. SARFARAZ ANSARI & VIVEKA NAND RAY PRE FEASIBILITY REPORT is about 200 Km away from the lease area in South-West direction. The nearest town Madhupur is about 34 Km in West direction. Survey of India Toposheet No. 72L/15. 6.6 Drinking Water Management Water for Domestic purposes is required to be 0.50 KLD. It is proposed to obtain water from nearby source (ground & surface source). 6.7 Sewerage System Domestic waste water will be treated into septic tank followed by soak pit. 6.86.86.8 Industrial Waste Management Not applicable 6.9 Solid Waste management Total (14305.5 Cu.M) waste shall be temporarily dumped on the South-Western Side within lease area and will be used for backfilling of the lease area (0.35 Ha). 6.106.106.10 Power Requirement & Supply/Source No electrical energy will be required. However 100 liters of HSD will be required for daily operation of the machines such as jack hammer, rock breakers etc. 7.0 REHABILITATION AND RESETTLEMENT (R&R) PLAN Not Applicable as no. person or family will be up rooted, needing any resettlement of rehabilitation.

8.0 PROJECT SCHEDULE & COST ESTIMATES 8.1 Likely Date of Start of Construction and Likely DatDatee of Completion No construction activities are proposed. The mining activity will commence only after receiving environmental clearance and other statutory clearance.

19 STONE DEPOSIT PROJECT IN VILLAGE AMBA OVER AANN AREAAREA---- 3.053.053.05 ACRES OR 1.23 HA IN, P.SP.SP.S-P.S --- PALOJORI, DISTRICT ––– DEOGHARDEOGHAR,, JHARKHAND. APPLICANT: MD. SARFARAZ ANSARI & VIVEKA NAND RAY PRE FEASIBILITY REPORT

8.2 Estimated PProjectroject Cost Along With Analysis In Terms of EconomiEconomicc Viability of the Project

8.2.1 Initial cost of the project has been estimated as INR. 24.30 Lacs.

Sl. No. HEAD CAPITAL 111 Land 1,00,000.00 222 Road & Temporary structures 1,00 ,000.00 333 Tools & Machinery 15 ,00,000.00 444 Mobile Sprinkler 1,0 0,000.00 666 Garland drains and plantation 5,50 ,000.00 777 Miscellaneous 50,000.00 888 Safety tools including PPE’s 30,000.00 TOTAL 242424, 24 ,,,33330000,,,,000000.0000.00

8.2.2 Mine closure cost ITEMS 1st year 2nd year ConcConceptualeptual Stage Construction of settling Pond 20,000.00 20,000.00 60,000.00 (Garland drain) Construction of Parapet walls/ 20,000.00 20,000.00 60,000.00 Retaining Walls at toe of Dumps Green Belt 90,000.00 90,000.00 2,70,000.00 EMP 50,000.00 50,000.00 1,50,000.00 TOTAL 1,81,81,80 1,8 000,0,0,0,000.0000.00 1,81,81,80 1,8 000,000.00,000.00 5,405,405,40,0 5,40 ,0,0,000000000.00.00.00.00

20 STONE DEPOSIT PROJECT IN VILLAGE AMBA OVER AANN AREAAREA---- 3.053.053.05 ACRES OR 1.23 HA IN, P.SP.SP.S-P.S --- PALOJORI, DISTRICT ––– DEOGHARDEOGHAR,, JHARKHAND. APPLICANT: MD. SARFARAZ ANSARI & VIVEKA NAND RAY PRE FEASIBILITY REPORT

8.2.3 Proposed CSR cost breakup ACTIVITIES COST

School infrastructure including furniture, books and computer & sports kit 50 ,000.00 & educating girl child of Primary School, Amba, Deoghar. Financial help to poor for blankets, clothing and other social needs. 15 ,000.00 Maintenance & Construction of village roads of Amba 30,000.00 Medical camp & free medicines to poor 10,000.00 Water supply arrangement & sanitation for local villagers 20 ,000.00 Total 1,251,251,25 ,000.00 Total for five years i.e. 5%of project cost 1,211,211,21 ,500,500,500 .00.00.00 *Funds will be provided as per Government CSR Policy 8.2.4 Environmental protection cost Sl. No. HEAD ANNUAL EXPENDITURE 1 Environmental Monitoring 1) AAQ-Twice in a year Rs. 15000/- 50,000.00 2) Water quality twice in a year Rs.30,000/- 3) ANL once in a season 5000/- 2 Water sprinklers 20,000.00 3 Tree plantation 90,000.00 4 Progressive reclamation of Mine pits including OB dumps 10,000.00 5 Garland drains 20,000.00 6 Miscellaneous expenditure 10,000.00 Total 2,00,000.00

21 STONE DEPOSIT PROJECT IN VILLAGE AMBA OVER AANN AREAAREA---- 3.053.053.05 ACRES OR 1.23 HA IN, P.SP.SP.S-P.S --- PALOJORI, DISTRICT ––– DEOGHARDEOGHAR,, JHARKHAND. APPLICANT: MD. SARFARAZ ANSARI & VIVEKA NAND RAY PRE FEASIBILITY REPORT

Total Financial assurance for mine closure activities will be minimum Rs. 2, 00,00000,000////---- and be deposited to the state authority. AAdditionaldditional land required during plan period in hectares which will be paid in terms of bank guarantee to ththee concerned authority by the PPPP....

9.0 ANALYSIS OF PROPOSAL (FINAL RECOMMENDATIONS) The proposed mine will bring economical benefits to the state by the way of Royalty for mineral and to the local people by way of direct and secondary employment opportunities. The mining activities as proposed are the backbone of all construction and infrastructure projects as the raw material for construction is available only from such mining. The stone material is in high demand at the local market for real estate industry. The project will bring about socio-economic improvement of the area and will prove beneficial to the area.