FY2022‐2023 Project Forecast September 2021 ‐ June 2023

Primary Work PE Dist Latest Cost Fiscal Year Primary County Project ID Short Description Type Assigned Estimated Total

Auxiliary Lanes 7 Fulton 0017130 I‐285 WB AUX LANE EXT FM SR 9 TO RIVERSIDE DR; INC MT VERNON $21,570,000

1 Gwinnett 0012884 INDIAN TRAIL‐LILBURN RD FROM WILLOW TRAIL PKWY TO BURNS RD $2,536,065 Bicycle/Ped. Cobb 0015042 ROTTENWOOD CREEK TRAIL FM ALUMNI DR TO FRANKLIN RD ‐ PHASE I $10,367,842 Facility 7 Fulton 0012638 SR 14; SR 14SO; CS 6112; CS 6113; CS 6114 & CS 6115 ‐ LCI $5,211,575 Barrow 0013819 SR 82 @ MIDDLE 5 MI NE OF STATHAM $4,329,842 Clarke 0013715 SR 10 LOOP EB & WB @ MIDDLE OCONEE RIVER 5 MI E OF BOGART $10,755,094 Dawson 0013807 SR 183 @ COCHRAN CREEK 6 MI NW OF DAWSONVILLE $2,994,162 0013887 SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON $3,172,596 Elbert 0015543 SR 77 @ COLDWATER CREEK 9.5 MI N OF ELBERTON $3,184,503 Gwinnett 0015609 PATRICK MILL RD/HARBINS RD @APALACHEE RIVER 3.6 MI S OF CARL $1,300,000 1 Habersham 0013746 SR 385 @ HAZEL CREEK IN DEMOREST $4,121,330 Hall 0013922 I‐985 @ CS 991/ELACHEE ROAD IN GAINESVILLE $6,106,130 0013811 SR 77 SPUR @ LITTLE COLDWATER CREEK 6.5 MI SE OF HARTWELL $2,315,984 Hart 0013812 SR 77 SPUR @ CEDAR CREEK 7.5 MI SE OF HARTWELL $3,204,534 Madison 0013997 SR 281 @ 8 MI N OF COMER $6,094,612 Walton 0017112 CR 433/JACKS CREEK ROAD @ JACKS CREEK $1,396,616 0013886 SR 29BU/US 441BU @ FISHING CREEK IN MILLEDGEVILLE $8,254,337 Baldwin 270900- CS 685/BARROWS FERRY RD @ TOBLER CREEK NE MILLEDGEVILLE $1,459,307 0013820 SR 23 @ BRIER CREEK OVERFLOW 2.5 MI N OF SARDIS $3,775,713 Burke 0014900 SR 23 @ BRIER CREEK 2.7 MI N OF SARDIS $3,164,000 0013603 SR 212 @ LAKE JACKSON 13.9 MI S OF COVINGTON $12,665,382 Jasper 0017419 CR 283/BAR BRIDGE ROAD @ MURDER CREEK $1,300,000 M006154 SR 49 @ 1 LOC; SR 83 @ 2 LOC & SR 212 @ 1 LOC ‐ BRIDGE REHAB $2,000,000 Jefferson 0015554 SR 78 @ $6,569,051 2022 McDuffie 0013925 SR 10 @ SWEETWATER CREEK 3.6 MI SE OF THOMSON $2,651,900 2 Morgan 0017420 CR 254/CLACK ROAD @ LITTLE RIVER $1,300,000 Bridges 0015096 CR 511/BROWN BRIDGE RD @ $6,365,213 Newton 0015097 CR 511/BROWN BRIDGE RD @SNAPPING SHOALS CRK; INC REALIGNMENT $3,520,818 0017418 CR 35/OLD WAYNESBORO ROAD @ MCBEANS CREEK $1,300,000 Richmond M006155 SR 28 @ 1 LOC; SR 231 @ 1 LOC & SR 257 @ 1 LOC‐BRIDGE REHAB $1,708,195 Taliaferro 0017421 CR 86/HILLMAN ROAD @ LITTLE RIVER $1,300,000 Treutlen 0018218 I‐16 @ SR 86 ‐ PERMANENT REPAIR $4,000,000 Washington 0017422 CR 349/LINTON ROAD @ KEG CREEK $1,300,000 Wilkinson 0013817 SR 112 @ COMMISSIONERS CREEK $3,900,000 0014896 CR 742/BASS ROAD @ NS # 718357C 2 MI W OF MACON $4,145,676 Bibb 0014897 I‐16 EB & WB @ OVERFLOW $10,376,971 Coweta 0013930 SR 54 @ SHOAL CREEK 4.4 MI N OF TURIN $5,053,357 Dooly 0013595 I‐75 @ CR 157/FINDLEY ROAD 3 MI S OF PINEHURST $3,017,567 Fayette 0013734 SR 85 @ WHITEWATER CREEK $3,603,458 Macon 0014169 SR 128 @ HORSE CREEK 8 MI NE OF IDEAL $2,000,000 Marion 0015415 CR 80/BRANTLEY ROAD @ TRIBUTARY $1,178,598 3 0014170 SR 22 SPUR @ WERACOBA CREEK IN COLUMBUS $1,170,308 Muscogee M006031 SR 22/US 80 @ 3 LOCS & SR 85/US 27 @ 1 LOC ‐ BRIDGE REHAB $1,000,000 0013928 SR 16 @ 8 MI W OF GRIFFIN $6,997,074 Spalding 0015416 CR 96/DUTCHMAN ROAD @ CABIN CREEK $1,300,000 0015417 CR 517/CR 1329/WILDWOOD ROAD @ BEAR CREEK $1,300,000 Sumter 0013752 SR 377 @ HOG #635346H IN AMERICUS $1,433,459 0015418 CR 113/LT PEED ROAD @ TIMMS CREEK $1,300,000 Taylor 0015419 CR 195/PROSPERITY CHURCH ROAD @ CEDAR CREEK $1,677,977

This Project Forecast is for planning purposes only and shows future projects of the Department as currently analyzed, September 2021. The information on this list is Subject to Change. FY2022‐2023 Project Forecast September 2021 ‐ June 2023

Primary Work PE Dist Latest Cost Fiscal Year Primary County Project ID Short Description Type Assigned Estimated Total 0013941 SR 1 @ FLAT SHOAL CREEK 8 MI SE OF LAGRANGE $4,818,916 Troup 0013942 SR 1/US 27 @ LONG CANE CREEK 3.5 MI SE OF LAGRANGE $3,599,766 3 M006265 SR 219 @ YELLOW JACKET CRK & @ ‐BRIDGE REHAB $1,400,000 Webster 0013611 SR 27 @ KINCHAFOONEE CREEK & OVERFLOW 1.5 MI W OF PRESTON $3,924,400 0017172 CR 206/COGDELL HWY @ STUMP CREEK $1,256,564 Atkinson 0017173 CR 206/COGDELL HWY @ LITTLE RED BLUFF CREEK $1,389,657 Baker 0017174 CR 59/CROSS ROAD @ BIG CYPRESS CREEK $1,530,339 Coffee 0017175 CR 560/NEW FOREST ROAD @ OTTER CREEK $1,449,573 4 Decatur 0017176 CR 123/ATTAPULGUS‐CLIMAX ROAD @ CALLAHAN BRANCH $1,677,548 0014073 SR 376 @ 4 MI W OF STATENVILLE $6,847,938 Echols 0015619 CR 96/J FRANK CULPEPPER ROAD @ ENOCH CREEK W OF STATENVILLE $1,400,000 0015420 CR 63/IVY MILL ROAD @ BEAR CREEK TRIBUTARY $1,300,000 Terrell 0017425 CR 159/MILL ROAD @ PINE HEAD CREEK $1,300,000 Appling 0017311 CR 530/PINEY GROVE ROAD @ COLEMANS CREEK $1,466,936 Bacon 0017312 CR 331/TEN MILE CHURCH ROAD @ TEN MILE CREEK $1,825,962 0013741 SR 25 @ IN PORT WENTWORTH $54,556,288 Chatham 0013742 SR 25 @ MIDDLE RIVER IN PORT WENTWORTH $32,009,508 Evans 0017313 CR 197/DAISY NEVILS HWY @ THICK CREEK $1,300,000 Bridges M005953 SR 27 @ BURNETT CREEK & @ YELLOW BLUFF CREEK ‐ BRIDGE REHAB $759,725 Glynn 5 M006262 SR 25; SR 204 & SR 520 @ 4 LOCS IN DISTRICT 5 ‐ BRIDGE REHAB $2,000,000 Jeff Davis 0017314 CR 293/BELL TELEPHONE ROAD @ WHITEHEAD CREEK $1,666,120 Liberty 0013750 SR 119 @ TAYLORS CREEK 3 MI NW OF HINESVILLE $3,906,300 McIntosh M005954 I‐95 @ 6 LOCS IN MCINTOSH COUNTY ‐ BRIDGE REHAB $4,091,829 Screven M006275 SR 73 @ 5 LOCS IN BULLOCH; EVANS & SCREVEN CO ‐ BRIDGE REHAB $2,000,000 0017315 CR 190/STANFIELD ROAD @ REEDY CREEK $1,323,541 2022 Wayne 0017316 CR 207/DIXIE ROAD @ BOGGY CREEK $1,045,506 0015537 SR 1/US 27 @ LITTLE IN CARROLLTON $9,166,592 Carroll 0016841 CS 784/ASBURY ROAD @ TRESTLE CREEK $983,144 Chattooga 0015539 SR 48 @ RACCOON CREEK 3 MI W OF SUMMERVILLE $2,913,223 6 Fannin 642170- SR 60 @ HOTHOUSE CREEK $4,180,794 Pickens 0016842 CR 85/FAIRVIEW ROAD @ POLECAT BRANCH $958,439 0016844 OLD TRION HIGHWAY @ DRY CREEK $1,680,461 Walker M006263 SR 1; SR 53; SR 193 & SR 341 @ 4 LOC IN DIST 6‐BRIDGE REHAB $1,700,000 Cobb M006029 I‐75 @ 3 LOCS IN COBB CO & 1 LOC IN FULTON CO ‐ BRIDGE REHAB $7,361,513 DeKalb 0013991 SR 42 @ S FORK 3.35 MI NW OF DECATUR $4,664,825 7 M006076 I‐75 @ SR 120 LOOP & @ MT PARAN ROAD ‐ BRIDGE REHABILITATION $2,905,011 Fulton M006199 SR 400/US 19 @ ‐ BRIDGE REHABILITATION $1,376,505

Concrete Rehab 3 Troup M006051 I‐85 FROM CS 119/UPPER BIG SPRINGS ROAD TO SR 54 $12,595,560

Drainage 4 Brooks 0017246 BOWEN MILL POND MITIGATION SITE 3 MI W OF QUITMAN $2,000,000 Improvements Guardrail 7 Fulton 0017122 OFF‐SYSTEM SAFETY IMPROVEMENTS @ 4 LOCS IN SANDY SPRINGS $161,578 1 Gwinnett 0016069 SR 20 FROM CR 288/OZORA RD TO CR 8321/BRAND RD $455,664 ITS 5 Appling 0017390 I‐95 ITS DYNAMIC MESSAGE SIGN (DMS) DEPLOYMENT $2,553,525 1Barrow0010555 WEST WINDER BYP @ SR 316 ‐ NEW INTERCHANGE ‐ PH III $36,826,626 Interchange 3Muscogee0013373 SR 22 @CR 1505/BRADLEY PARK DR‐DIVERGING DIAMOND INTERCHANGE $10,612,993 4 Lowndes 0010297 I‐75 @ SR 31 ‐ PHASE II ‐ TIA $27,776,874 Intersection 1 Gwinnett 0013375 WEST PIKE STREET FM SR 316 TO CS 1126/HURRICANE SHOALS ROAD $3,213,991 Improvement 3Upson0006967 SR 36/SR 74 @ 3 LOCS & SR 36 WE/SR 74 ALT/SR 74 WE @ 1 LOC $3,276,567 Lighting 4 Dougherty 0013620 SR 91 @ SR 133; INC SR 3 RAMPS ‐ LIGHTING $715,000 Median Work 1 Banks 0016000 SR 15/US 441 FROM JACKSON COUNTY LINE TO S OF I‐85 $2,147,144

This Project Forecast is for planning purposes only and shows future projects of the Department as currently analyzed, September 2021. The information on this list is Subject to Change. FY2022‐2023 Project Forecast September 2021 ‐ June 2023

Primary Work PE Dist Latest Cost Fiscal Year Primary County Project ID Short Description Type Assigned Estimated Total Miscellaneous 7DeKalb0009400 SR 13 FM CS 8/AFTON LANE TO CS 750/SHALLOWFORD TERRACE‐PH II $19,051,054 Improvements 5Chatham0015306 TRUMAN LINEAR PARK TRAIL ‐ PHASE II‐B $4,434,225 6Cherokee0016015 TRAIL EXTENSION FM SR 92 TO NOONDAY CREEK PARK $5,337,623 Multi‐use Trail 0015997 PATH 400 TRAIL EXTENSION FROM WIEUCA ROAD TO LORIDANS DRIVE $10,503,717 7Fulton 0015999 CS 434/LENOX RD FROM CS 3369/EAST PACES FERRY RD TO SR 141 $6,675,036 Banks 0015670 SR 15 FROM I‐85 TO CR 18/FAULKNER ROAD; INC REALIGNMENT $4,883,930 0015983 SR 140 @ SR 13 $5,770,072 1 Gwinnett 0017115 SR 140 @ CR 1911/BROOK HOLLOW PKWY $518,188 Hall 0015702 SR 53 FROM CS 921/AHALUNA DRIVE TO CS 966/SHALLOWFORD ROAD $2,110,905 Butts 0015425 SR 16 @ SR 42 IN JACKSON $1,615,345 0013721 I‐85 @ SR 34 & SR 34 FM E OF SR 34 BYP TO E OF I‐85 SB RAMP $2,704,038 Coweta 0015314 I‐85 @ SR 154 $1,462,565 Operational 3 Fayette 0013726 SR 54 @ SR 74 $6,800,042 Improvement Henry 0015916 SR 20 @ CS 992/MCGARITY ROAD & CS 608/LAWRENCEVILLE STREET $3,784,516 0016440 SR 22 @ SR 85 $1,176,474 Muscogee 0016442 SR 22 CONN @ SR 85 $782,738 6Cherokee0015923 SR 92 @ CS 990/NEESE ROAD $925,132 0015432 SR 3 CONN @ CR 392/UPPER RIVERDALE ROAD $1,327,444 Clayton 0015703 SR 331 FROM SR 85 TO I‐75 $1,778,350 7 0011845 SR 14 @ CR 1389/WASHINGTON ROAD $1,750,241 Fulton 0015318 SR 3/US 41 & SR 8 @ NORTH AVE & @ LAMBERT STREET IN ATLANTA $1,577,159 3Murray0017713 OFF‐SYSTEM SAFETY IMPROVEMENTS @ 18 LOCS IN MURRY COUNTY $310,970 Pavement 6Polk0017753 OFF‐SYSTEM SAFETY IMPROVEMENTS @ 19 LOCS IN POLK COUNTY $220,275 Markings Cobb 0017711 OFF‐SYSTEM SAFETY IMPROVEMENTS @ 2 LOCS IN CITY OF ACWORTH $35,201 2022 7 Fulton 0017714 OFF‐SYSTEM SAFETY IMPROVEMENTS @ 9 LOCS IN FULTON COUNTY $115,040 Pedestrian 6Polk0013689 PEDESTRIAN UPGRADES @ 10 LOCS IN PAULDING & POLK COUNTY $1,072,899 Crossings 7DeKalb0015071 SR 10/US 278 FM CS 721/ASHTON PLACE TO CR 5206/SAMS CROSSING $3,362,080 3Sumter0017971 SIGNING & PAVEMENT MARKING @ 79 HOG LOCS IN DISTRICT 3 $316,000 RRX Signing & Appling 0017917 SIGNING & MARKING @ 111 CSX LOCS IN DISTRICT 5 $510,000 Marking 5 Brantley 0018211 SIGNING & MARKING @ 66 CSX LOCS IN BRANTLEY; GYLNN & WARE CO $265,000 4Dougherty0011727 RAILROAD CROSSING WARNING DEVICES @ 5 NS LOCS IN ALBANY $2,823,031 RRX Warning 0013119 CS 2049/VINE ST @ CSX #050405N; INC COBB ST WIDENING $885,877 Device 7Fulton 0013709 CS 1388/WELCOME ALL ROAD @ CSX #638616P IN EAST POINT $70,600 Ramp 1 Walton 0015678 SR 10BU @ SR 10 $2,051,488 Realignment 7 Cobb 0013239 S BARRETT PKWY FROM BARRETT LAKES BLVD TO SR 5 CONN ‐ PH III $25,767,086 Clarke M006129 SR 15 FROM S OF SR 100 LOOP TO N OF CR 478/NEWTON BRIDGE RD $1,507,137 M006127 SR 17 FM N OF CS 868/SILO LN TO N OF CR 108/CLARKS CREEK RD $1,450,567 Franklin M006173 SR 328 FROM SR 17/STEPHENS TO SR 59/FRANKLIN $1,835,443 M006105 I‐85 FROM SR 140 TO 0.35 MI N OF CR 3761/OLD PEACHTREE ROAD $23,068,770 Gwinnett M006130 SR 10/US 78 FROM DEKALB COUNTY LINE TO SR 124 $3,918,368 Habersham M006183 SR 384 FROM SR 365/HABERSHAM TO SR 115/WHITE $1,859,888 Resurface & M006268 SR 53 FROM SR 53 CONN TO SR 369 $1,979,192 1 Hall Maintenance M006270 SR 53 FROM CS 630/MCEVER ROAD TO CS 656/CEDAR RIDGE DRIVE $3,639,514 M005752 SR 51 FROM N OF SR 8 TO N OF CR 540/HATTON FORD ROAD $2,032,233 Hart M006054 SR 8 FROM CR 33/ELIZABETH ROAD TO SOUTH CAROLINA STATE LINE $2,356,123 M005747 SR 98 FROM NS #717732W/BANKS TO I‐85/JACKSON $1,761,570 Jackson M006226 SR 60 FROM SR 124/JACKSON TO SR 332/HALL $1,739,478 M005745 SR 98 FROM E OF SR 8 TO W OF SR 72 $2,300,893 Madison M005751 SR 174 FROM 0.01 MI E OF SR 106 TO 0.01 MI W OF SR 8 $2,495,015

This Project Forecast is for planning purposes only and shows future projects of the Department as currently analyzed, September 2021. The information on this list is Subject to Change. FY2022‐2023 Project Forecast September 2021 ‐ June 2023

Primary Work PE Dist Latest Cost Fiscal Year Primary County Project ID Short Description Type Assigned Estimated Total M006175 SR 184 FROM SR 17 TO SR 17 ALT $837,788 1 Stephens M006177 SR 63 FROM SR 17 TO SR 365 $655,941 M006180 SR 17 ALT FROM SR 17 TO SR 184 $1,144,099 M006237 SR 121/US 25 FM JENKINS COUNTY LINE TO 0.09 MI S OF SR 24 $5,203,956 Burke M006238 SR 121 & SR 121 BYPASS FROM PEACHTREE ST TO RICHMOND CO LINE $4,907,494 Columbia M006136 SR 47 FROM MCDUFFIE COUNTY LINE TO I‐20 $2,453,832 0012045 ODOMVILLE CHURCH ROAD IN EMANUEL COUNTY ‐ TIA $210,000 Emanuel 0012050 PENDLETON SPRINGS ROAD IN EMANUEL COUNTY ‐ TIA $703,943 2 Jefferson M005151 SR 24 FROM SR 4BU TO WASHINGTON COUNTY LINE $1,571,249 Johnson M006137 SR 15 FROM S OF INDUSTRIAL BLVD TO S OF GOLF CLUB ROAD $806,352 M005204 SR 212 FM ROCKDALE COUNTY LINE TO CR 239/COVERED BRIDGE ROAD $91,977 Newton M006135 SR 162 CONN FROM SR 162 TO SR 81 $424,443 Washington M006162 SR 88 FROM CR 107/ARCHER ROAD TO JEFFERSON COUNTY LINE $3,931,688 Wilkinson M006234 SR 243/SR 540 FROM CR 27/FRED HALL ROAD TO SR 29/US 441 $3,578,183 Bibb M006244 SR 11/SR 247 FM HOUSTON COUNTY LINE TO N OF CR 795/BARNES RD $5,902,382 M006097 SR 34 FROM SR 14/SR 16 NO TO FAYETTE COUNTY LINE $7,391,574 Coweta M006098 SR 34 FROM HEARD COUNTY LINE TO SR 14/SR 16 NO $3,596,705 Dooly M004974 SR 329 FROM SR 26/MACON TO SR 230/DOOLY $2,163,952 M005066 SR 49 FROM BIBB COUNTY LINE TO BALDWIN COUNTY LINE $4,531,534 Jones M006188 SR 18 FROM MONROE COUNTY LINE TO SR 11/SR 22 $3,169,275 M006189 SR 18 FROM CLINTON STREET TO WILKINSON COUNTY LINE $3,488,255 3 M005262 SR 18 FROM SR 19 TO JONES COUNTY LINE $1,917,025 Monroe M006096 SR 42 & SR 83 FROM SR 18 TO JASPER COUNTY LINE $3,555,070 M005022 SR 85 FROM SR 1 TO SR 1 $2,051,102 Muscogee Resurface & M006227 SR 22 SPUR FROM SR 1 TO CS 2111/REESE ROAD $1,058,846 2022 Maintenance Pulaski M006099 SR 11BU/US 129 FROM SR 11 TO SR 11 $649,209 Stewart M005264 SR 1 CONN FROM SR 27 TO SR 1 $217,677 Talbot M005160 SR 22 FROM S OF CR 110/CARTER ROAD TO CS 533/ADAMS STREET $1,066,357 Taylor M006101 SR 96 FROM CS 571/SUMTER STREET TO NAKOMIS CREEK $3,952,935 Baker M004828 SR 200 FROM EARLY COUNTY LINE TO SR 91 $6,188,465 Berrien M005982 SR 135 FROM LANIER COUNTY LINE TO ATKINSON COUNTY LINE $2,224,337 Coffee M006231 SR 206 FROM SR 32 TO SR 135 $1,978,323 Early M005983 SR 273 FROM SR 370 TO MILLER COUNTY LINE $2,244,596 Echols M006194 SR 376 FROM SR 7/LOWNDES TO SR 135/ECHOLS $2,404,486 Lanier M006191 SR 135 FROM SR 11 TO BERRIEN COUNTY LINE $1,297,951 4 Lee M005757 SR 377 FROM SR 195 TO SUMTER COUNTY LINE $3,751,726 M005986 SR 7/US 41 FROM SR 7BU TO CS 1268/COUNTRY CLUB DRIVE $732,170 Lowndes M006196 SR 135 FROM SR 38 TO LANIER COUNTY LINE $440,637 Rockdale M006297 SR 162 FROM NEWTON COUNTY LINE TO I‐20 $1,000,343 Tift M006190 SR 520/US 82 FM WORTH COUNTY LINE TO CR 411/SALEM CHURCH RD $3,756,076 Worth M006141 SR 300 FM 0.35 MI W OF SR 313 TO 0.07 MI W OF OLD CONLEY RD $2,650,250 Camden M006052 I‐95 FM S OF HORSE STAMP CHURCH ROAD TO LITTLE $8,339,305 Chatham M006082 SR 204 FROM BRYAN COUNTY LINE TO E OF CR 774/GATEWAY BLVD $1,691,225 McIntosh M006081 SR 25 FROM SR 251 TO $3,141,100 Tattnall M005252 SR 73 FROM SR 144 TO EVANS COUNTY LINE $3,525,833 5 M005351 SR 4 & SR 520 FROM ATKINSON COUNTY LINE TO W OF ANITA STREET $8,073,495 Ware M006079 SR 520 FROM W OF CR 13/BENNETT ROAD TO BRANTLEY COUNTY LINE $1,271,765 M006024 SR 27 FM N OF CS 513/E RAILROAD STREET TO GLYNN COUNTY LINE $13,358,161 Wayne M006085 SR 38 FM 0.60 MI W OF C W COLLINS ST TO 0.13 MI W OF SR 203 $2,267,430 6CarrollM006117 SR 166 FROM STATE LINE TO CR 280/GREENWOOD DRIVE $3,472,347

This Project Forecast is for planning purposes only and shows future projects of the Department as currently analyzed, September 2021. The information on this list is Subject to Change. FY2022‐2023 Project Forecast September 2021 ‐ June 2023

Primary Work PE Dist Latest Cost Fiscal Year Primary County Project ID Short Description Type Assigned Estimated Total Carroll M006222 SR 113 FROM SR 1/US 27 TO CS 739/BILLINGS ROAD $3,337,139 Catoosa M006116 SR 151 FROM SR 3 TO TENNESSEE STATE LINE $1,377,860 Dade M006023 I‐59 FROM SR 136 TO I‐24 $12,589,850 6 Floyd M006223 SR 1/US 27 FROM S OF CR 633/BOOZE MTN ROAD TO CSX #719104X $4,156,564 Gilmer M006224 SR 2/SR 515 FM S OF MADDOX DRIVE TO N OF OLD NORTHCUTT ROAD $2,629,988 Gordon M006225 SR 53 FROM S OF CR 114/FRANKLIN ROAD TO SR 53 SPUR $3,981,083 M004842 SR 54 CONN FROM SR 54/CLAYTON TO SR 42/DEKALB $318,935 Clayton M006149 SR 331 FROM SR 85 TO SR 54 $2,274,939 M006283 SR 138 FROM FULTON COUNTY LINE TO N OF CR 1167/BAMBY LANE $4,678,602 M006147 SR 92 FROM CS 178/OLD STREET TO CS 89/COWAN ROAD $750,500 Cobb M006286 SR 3 CONN FROM CS 2860/WOOLCO DRIVE TO SR 120 $1,024,652 Resurface & M006290 SR 280 FROM FULTON COUNTY LINE TO SR 5 $5,369,484 Maintenance M005990 SR 42 FROM CS 2873/BRIARCLIFF PLACE TO SR 13/US 23 $2,518,822 M006058 I‐20 FM 0.25 MI W OF COLUMBIA DRIVE TO ROCKDALE COUNTY LINE $15,972,650 DeKalb M006108 I‐285 FROM CR 5197/SNAPFINGER DR TO W OF CR 5195/RAINBOW DR $4,000,000 7 M006287 SR 212 FROM SR 155 TO ROCKDALE COUNTY LINE $1,838,453 M006292 SR 155 FROM HENRY COUNTY LINE TO SR 10 $4,887,225 Douglas M006148 SR 5 FROM SR 166 TO CR 173/CENTRAL CHURCH ROAD $2,736,721 M005976 SR 42/US 23 FROM 0.03 MI S OF KEY ST TO 0.08 MI N OF WADE ST $1,928,477 M006050 I‐75 FROM I‐85 TO CHATTAHOOCHEE RIVER $14,472,805 M006284 SR 279 FROM FAYETTE COUNTY LINE TO SR 140 $3,512,161 Fulton M006285 SR 3/US 41 FROM CS 3498/MARIETTA STREET TO I‐75 $1,174,784 M006288 SR 120 FROM SR 141 TO GWINNETT COUNTY LINE $1,028,826 M006289 SR 139 FROM CS 1010/E ONTARIO RD TO W OF CS 2801/HARWELL RD $2,053,004 Gwinnett 0007535 CONNECTOR ST FROM HEWATT RD TO BRITT DR; INC PARKWOOD RD $9,845,806 2022 1 Walton 0000411 SR 83 CONN FROM SR 11 TO SR 83 $25,343,023 2Burke0011372 WAYNESBORO WEST BYPASS FROM SR 121 TO SR 56 ‐ TIA $1,971,942 Coweta 0013195 MADRAS CONN FM SR 14 TO HERRING RD; INC NEW CSX BRIDGE‐PH I $8,818,272 3 0011434 CR 62/CUSSETA RD FROM FORT BENNING RD TO ANTIETAM DR ‐ TIA $13,978,209 Muscogee Roadway Project 0015285 INFANTRY ROAD & FOLLOW ME TRAIL EXTENSION $1,749,368 4Dougherty0010571 WESTOVER BLVD FROM ALBANY MALL TO N OF LEDO ROAD $14,066,851 Bulloch 0017189 VETERANS MEMORIAL PKWY CONN FM SR 63 BYPASS TO LANIER DRIVE $5,300,000 5 Chatham 0006328 BRAMPTON ROAD CONN FROM SR 21/SR 25 TO SR 21 SPUR $79,613,661 6Carroll631490- VILLA RICA BYPASS FROM SR 101 TO SR 61 $15,317,965 7Fulton0015019 15TH STREET EXTENSION FROM SR 9 TO CS 673/WILLIAMS STREET $2,862,374 1Barrow0009931 SR 11 @ SR 211 $3,423,022 0013859 SR 11 @ SR 12 $2,826,970 Newton 2 0015672 CR 1840/BROWN BRIDGE ROAD @ CR 13/MAGNET ROAD $1,694,188 Richmond 0009916 SR 88 @ CR 58/BATH EDIE ROAD $2,117,373 0009960 SR 22 @ CR 715/KNOXVILLE ROAD $2,238,174 Bibb 0015686 SR 11/SR 49 @ SR 247 $2,478,430 3 0009967 SR 14 @ SR 41 $1,803,834 Coweta Roundabout 332180- SR 16 @ SR 54 $3,977,911 Henry 0013697 SR 81 @ CR 434/ ROAD/CR 656/SNAPPING SHOALS ROAD $2,350,436 4Ben Hill 0013685 SR 90 @ CR 250/LOWER REBECCA ROAD $2,438,334 5Glynn0009874 SR 25/US 17 @ SR 99 $2,144,792 6 Paulding 0016122 BURNT HICKORY ROAD @ 1 LOC ‐ OFF‐SYSTEM SAFETY IMPROVEMENTS $1,448,413 DeKalb 0013333 I‐20 EB @ CS 2776/MAYNARD TERRACE $2,600,927 7 0009989 SR 138 @ CR 6/CR 443/UNION CHURCH ROAD $2,544,445 Rockdale 0009990 SR 138 @ CR 8/CR 15/EAST FAIRVIEW ROAD $2,655,126

This Project Forecast is for planning purposes only and shows future projects of the Department as currently analyzed, September 2021. The information on this list is Subject to Change. FY2022‐2023 Project Forecast September 2021 ‐ June 2023

Primary Work PE Dist Latest Cost Fiscal Year Primary County Project ID Short Description Type Assigned Estimated Total Shoulder Work 3 Coweta 0017709 CR 103; CR 465 & CR 553 ‐ OFF‐SYSTEM SAFETY IMPROVEMENTS $312,200 1 Fannin 0017782 SR 5 FROM OLD FLOWERS ROAD TO SR 60; INC ROUNDABOUT $9,000,000 Sidewalks DeKalb 0015629 SR 236 FROM LEAFMORE PLACE TO PANGBORN ROAD $1,687,552 7 Fulton 0009640 SR 9 @ CHATTAHOOCHEE RIVER IN ROSWELL ‐ ENHANCEMENTS $5,309,637 0012817 SR 10 @ 5 LOCS IN GWINNETT $1,486,488 1 Gwinnett 0013230 SIGNAL UPGRADES @ 14 LOCS IN GWINNETT COUNTY $3,134,102 0006999 UPGRADE TRAFFIC SIGNALS @ 25 LOCATIONS IN DEKALB CO $3,681,975 DeKalb 0013196 SR 260 @ 2 LOCS & I‐20 @ 6 LOCS IN DEKALB & FULTON COUNTY $1,595,349 0012821 SR 3 @ 4 LOCS & SR 8 @ 4 LOCS IN FULTON $2,006,918 0012823 SR 3 @ 8 LOCS & SR 70 @ 4 LOCS IN FULTON $2,631,036 Signals 0012827 SR 42 @ 9 LOCS & SR 154 @ CS 2099/FLAT SHOALS AVE IN FULTON $1,941,114 7 0013207 SR 14/SR 154 @ 9 LOCS & SR 154 @ 1 LOC IN FULTON COUNTY $1,818,906 Fulton 0013208 SR 54 @ 11 LOCS IN FULTON COUNTY $2,264,079 0013211 I‐20 @ 1 LOC & SR 139 @ 9 LOCS IN FULTON COUNTY $2,006,918 0013212 I‐75; SR 42 SPUR & SR 54 @ 9 LOCS IN FULTON COUNTY $1,707,257 0013213 I‐75; I‐85; I‐285; SR 9 & SR 13 @ 11 LOCS IN FULTON $1,875,075 Banks 0017700 OFF‐SYSTEM SAFETY IMPROVEMENTS @ 29 LOCS IN BANKS COUNTY $244,748 1 Elbert 0017699 OFF‐SYSTEM SAFETY IMPROVEMENTS @ 25 LOCS IN ELBERT COUNTY $287,100 Franklin 0017704 OFF‐SYSTEM SAFETY IMPROVEMENTS @ 35 LOCS IN FRANKIN CO‐HRRR $274,506 Baldwin 0017716 OFF‐SYSTEM SAFETY IMPROVEMENTS @ 20 LOCS IN BALDWIN COUNTY $490,300 2 McDuffie 0017710 OFF‐SYSTEM SAFETY IMPROVEMENTS @ 19 LOCS IN MCDUFFIE COUNTY $390,152 Richmond 0017705 OFF‐SYSTEM SAFETY IMPROVEMENTS @ 18 LOCS IN RICHMOND COUNTY $480,192 Chattahoochee 0016914 OFF‐SYSTEM SAFETY IMPROVEMENTS @ 4 LOC IN CHATTAHOOCHEE‐HRRR $396,370 3 Henry 0017708 OFF‐SYSTEM SAFETY IMPROVEMENTS @ 14 LOCS IN HENRY COUNTY $343,800 Houston 0017707 OFF‐SYSTEM SAFETY IMPROVEMENTS @ 4 LOCS IN HOUSTON COUNTY $333,652 2022 Signing Miller 0017701 OFF‐SYSTEM SAFETY IMPROVEMENTS @ 12 LOCS IN MILLER CO ‐ HRRR $310,372 4 Randolph 0017702 OFF‐SYSTEM SAFETY IMPROVEMENTS @ 10 LOCS IN RANDOLPH CO‐HRRR $235,523 Seminole 0017703 OFF‐SYSTEM SAFETY IMPROVEMENTS @ 23 LOCS IN SEMINOLE CO‐HRRR $252,744 Liberty 0017728 OFF‐SYSTEM SAFETY IMPROVEMENTS @ 16 LOCS IN LIBERTY COUNTY $756,767 5 Toombs 0017706 CR 333 @ 1 LOC ‐ OFF‐SYSTEM SAFETY IMPROVEMENTS ‐ HRRR $480,000 6Pickens0017712 OFF‐SYSTEM SAFETY IMPROVEMENTS @ 17 LOCS IN PICKENS COUNTY $309,100 0017742 OFF‐SYSTEM SAFETY IMPROVEMENTS @ 2 LOCS IN FULTON COUNTY $232,700 Fulton 7 0017743 OFF‐SYSTEM SAFETY IMPROVEMENTS @ 3 LOCS IN FULTON COUNTY $130,000 Rockdale 0017715 OFF‐SYSTEM SAFETY IMPROVEMENTS @ 12 LOCS IN ROCKDALE COUNTY $292,675 Slope Repair 3 Stewart M006261 SR 520/US 280 @ CR 66/RED HILL ROAD $1,250,000 Streetscapes 2 Richmond 0013707 JAMES BROWN BLVD FM TWIGGS ST TO LANEY WALKER BLVD ‐ PH III $538,650 3Peach0017391 SR 7/US 341 @ SR 7 CONN $1,500,000 4 Lowndes 0014134 CS 1517/JERRY JONES DR/EAGER RD FROM BAYTREE RD TO OAK ST $12,591,656 Turn Lanes Carroll 0016110 SR 101 @ CR 352/OLD DRAKETOWN TRAIL $756,777 6 Cherokee 0016105 SR 140 @ CR 776/AVERY ROAD $1,479,894 7Fulton0013949 CR 1385/BUFFINGTON RD FROM ROYAL S PKWY TO ROCK QUARRY RD $6,489,563 Barrow 0013988 SR 211 FROM I‐85 NB RAMP TO CS 1274/PINOT NOIR DRIVE $11,720,992 0007843 SR 9 FROM FULTON COUNTY LINE TO CR 458/MCFARLAND ROAD $9,225,585 Forsyth 0007844 SR 9 FROM MCFARLAND ROAD TO POST ROAD $23,640,043 1 0008357 SR 9 FROM POST ROAD TO SR 141 $31,039,311 Widening Fulton 0004634 MCGINNIS FERRY ROAD FROM SEVEN OAKS PKWY TO E OF BIG CREEK $26,852,127 Union 122900- SR 515/US 76 FM YOUNG HARRIS ST/UNION TO TIMBERLINE DR/TOWNS $110,195,818 Putnam 0013615 SR 24/US 441 FROM EATONTON BYPASS TO MORGAN COUNTY LINE $51,988,475 2 Washington 0015878 SR 24 FM E OF CHAMBERS BROOKS SPRING RD TO W OF HELTON LN $10,478,590 3Henry0013531 SR 20 FROM I‐75 TO CS 721/PHILLIPS DRIVE $14,682,235

This Project Forecast is for planning purposes only and shows future projects of the Department as currently analyzed, September 2021. The information on this list is Subject to Change. FY2022‐2023 Project Forecast September 2021 ‐ June 2023

Primary Work PE Dist Latest Cost Fiscal Year Primary County Project ID Short Description Type Assigned Estimated Total Troup 322250- SR 1/US 27/LAGRANGE FM AUBURN ST TO SR 219/MORGAN ST $14,064,856 3 Twiggs 322470- SR 96 FM 0.48 W OF SR 87 TO S OF I‐16 $43,730,763 4Dougherty0000473 SR 133 FM N OF CR 459/COUNTY LINE RD TO N OF CR 540/HOLLY DR $49,273,929 Chatham 521855- SR 26 FROM I‐516 TO CS 188/VICTORY DRIVE $25,386,991 5 Glynn 0016985 SR 25 FM CR 372/YACHT RD TO CR 415/HARRY DRIGGERS BLVD‐PH I $31,847,388 2022 Widening Cherokee 0014131 SR 20 FROM CR 281/SCOTT ROAD TO CR 762/UNION HILL ROAD $28,276,502 6 Paulding 0006857 SR 92 FROM OLD BURNT HICKORY ROAD TO PICKETTS MILL PLACE $21,348,926 Cobb 0006866 SR 92 FROM PICKETTS MILL PLACE TO SR 3/US 41 $21,251,360 7 0013948 CR 1385/BUFFINGTON ROAD FROM ROCK QUARRY ROAD TO SR 14/US 29 $16,625,053 Fulton 0015000 SR 237 FROM SR 141 CONN TO SR 141 $4,023,723 1 Gwinnett 0015088 CS 1086/MORENO ST FROM W MAIN ST TO E MAIN ST IN BUFORD $2,748,856 Bicycle/Ped. 0012637 CR 1393/NEW HOPE RD FROM E OF BOAT ROCK RD TO DANFORTH RD $2,894,529 Facility 7Fulton0012788 SR 120 FROM CS 79/PARSON ROAD TO SR 141 $19,597,512 0015023 PATH 400 TRAIL EXT FROM LORIDANS DR TO S OF JOHNSON FERRY RD $23,151,507 0013819 SR 82 @ MIDDLE OCONEE RIVER 5 MI NE OF STATHAM $4,329,842 Barrow 0017771 CR 156/ROBERTSON BRIDGE ROAD @ BARBER CREEK $1,300,000 0013806 SR 10/US 78 @ NORTH OCONEE RIVER $6,952,028 Clarke M006075 SR 10 LOOP @ 6 LOCS IN CLARKE COUNTY ‐ BRIDGE REHABILITATION $3,000,000 Dawson 0008759 CR 224/SHOAL CREEK ROAD @ SHOAL CREEK $1,400,000 Elbert 0017772 CR 96/BROWNS BRIDGE ROAD @ BUTLER CREEK $1,300,000 0013808 SR 106 @ NAILS CREEK 7 MI S OF CARNESVILLE $3,252,726 1 Franklin 0017773 CR 285/BALD EAGLE ROAD @ LITTLES CREEK $1,300,000 Gwinnett 0015609 PATRICK MILL RD/HARBINS RD @APALACHEE RIVER 3.6 MI S OF CARL $1,300,000 Hart 0013747 SR 8 @ BEAVERDAM CREEK 1.7 MI E OF ROYSTON $2,788,636 Lumpkin 0015556 SR 9/US 19 @ 10.25 MI NE OF DAHLONEGA $4,658,094 Madison 0015557 SR 8/SR 174 @ 8.8 MI N OF DANIELSVILLE $3,279,362 Union 0015567 SR 60 @ SUCHES CREEK 13.1 MI SW OF BLAIRSVILLE $2,423,209 Walton 0015568 SR 83 @ POLECAT CREEK 1 MI NW OF GOOD HOPE $1,900,735 Hancock 0015602 CR 101/WATER WORKS ROAD @ CSX #279806B 2.1 MI W OF SPARTA $1,724,575 Johnson 0013748 SR 26 @ 1.1 MI E OF ADRIAN $7,296,425 2023 Morgan 0014903 I‐20 EB & WB @ BIG INDIAN CREEK 4.9 MI SE OF RUTLEDGE $6,624,390 0013751 SR 81 @ DRIED INDIAN CREEK IN COVINGTON $2,844,809 Bridges Newton 2 M006296 I‐20 @ 9 LOCS IN DISTRICT 2 ‐ BRIDGE PRESERVATION $1,400,000 Richmond M006295 I‐20 @ 7 LOCS IN DISTRICT 2 ‐ BRIDGE PRESERVATION $1,500,000 0007057 SR 16 @ SHORT CREEK $1,435,093 Warren M006314 I‐20 @ 6 LOCS IN WARREN COUNTY ‐ BRIDGE REHAB $3,750,000 Wilkinson 0017423 CR 185/ASBURY ROAD @ CLEAR CREEK $1,300,000 M006208 I‐16 @ 1 LOC & I‐75 @ 7 LOCS ‐ BRIDGE PRESERVATION $1,750,000 Appling M006209 BRIDGE PRESERVATION @ 11 SR LOCS IN DISTRICT 3 $1,000,000 0014072 I‐16 EB & WB @ WALNUT CREEK 1 MI E OF MACON $15,678,652 Bibb 0014897 I‐16 EB & WB @ OCMULGEE RIVER OVERFLOW $10,376,971 M006161 I‐475 @ 8 LOCS IN BIBB COUNTY ‐ BRIDGE PRESERVATION $2,000,000 Harris M006163 I‐185 SB & NB @ MULBERRY CREEK ‐ BRIDGE REHAB $900,000 3 Heard 0014168 SR 34 @ CHATTAHOOCHEE RIVER TRIB & @ DANIEL SHOALS CREEK $4,846,158 Macon 0017876 CR 53/GENERAL GORDON ROAD @ GIN CREEK $1,400,000 0017774 CR 163/PINEVILLE ROAD @ KINCHAFOONEE CREEK $1,300,000 Marion 371121- CR 96/SLAUGHTER ROAD @ KINCHAFOONEE CREEK $1,700,000 0013600 SR 109 @ NS #719349N IN GREENVILLE $1,651,086 Meriwether 0013960 CR 285/DAN STRIBLING ROAD @ CSX #639372L 3.5 MI S OF GAY $1,581,163 0015558 SR 41 @ COLEMAN CREEK 4 MI S OF LUTHERSVILLE $2,000,000

This Project Forecast is for planning purposes only and shows future projects of the Department as currently analyzed, September 2021. The information on this list is Subject to Change. FY2022‐2023 Project Forecast September 2021 ‐ June 2023

Primary Work PE Dist Latest Cost Fiscal Year Primary County Project ID Short Description Type Assigned Estimated Total Muscogee 0013926 SR 85/US 27 ALT SB & NB @ CR 1660/MILLER ROAD IN COLUMBUS $7,860,952 Pike 0017424 CR 333/CONCORD ROAD @ BIRCH CREEK $1,300,000 3 0015564 SR 22 @ SOUTH FORK UPATOI CREEK 1 MILE E OF GENEVA $2,201,876 Talbot 0015565 SR 22 @ RICHLAND CREEK 6.7 MI E OF TALBOTTON $2,333,168 Troup 0017878 CR 179/TUCKER ROAD @ POLECAT CREEK $1,400,000 0013802 SR 122 @ BRICE POND TRIB & @ $9,307,401 Brooks M006197 SR 3 @ 2 LOC & SR 333 @ 2 LOC ‐ BRIDGE REHAB $2,000,000 Echols 0015619 CR 96/J FRANK CULPEPPER ROAD @ ENOCH CREEK W OF STATENVILLE $1,400,000 Irwin 0017776 CR 118/BIG CREEK ROAD @ BIG CREEK $1,400,000 4 Lowndes 0015614 CR 136/OLD QUITMAN ROAD @ CSX #637487Y 6 MI W OF VALDOSTA $1,400,000 Randolph 0015563 SR 41 @ BARGE CREEK 12 MI NE OF CUTHBERT $2,802,810 Tift M006198 SR 52/US 82 @ LITTLE RIVER & OVERFLOW ‐ BRIDGE PRESERVATION $1,100,000 Turner 0017777 CR 251/WARDLOW ROAD @ WEST FORK DEEP CREEK $1,400,000 0015536 SR 520 @ SATILLA RIVER OVERFLOW 14 MI E OF HOBOKEN ‐ TIA $7,864,996 Brantley M006210 SR 4; SR 23 & SR 25 @ 7 LOCS ‐ BRIDGE PRESERVATION $1,000,000 Bryan M006311 I‐95 @ SR 25 & I‐95 SB & NB @ ‐ BRIDGE REHAB $3,500,000 Camden M006310 I‐95 SB & NB @ ‐ BRIDGE REHAB $1,000,000 Chatham 0017415 SR 26/US 80 @ LAZARETTO CREEK $20,798,854 5 Evans 0013596 SR 169 @ 4 MI N OF CLAXTON $3,564,281 Liberty M006312 I‐95 SB & NB @ BULL TOWN SWAMP & @ CAY CRK TRIB‐BRIDGE REHAB $1,500,000 Long 0013719 SR 38/US 84 @ DOCTORS CREEK 3 MI E OF LUDOWICI $3,375,080 Toombs 0017779 CR 115/HARDEN CHAPEL ROAD @ ROCKY CREEK $1,300,000 Bridges Ware 0013605 SR 38/US 84 @ SATILLA RIVER & @ OVERFLOW IN SUNNYSIDE ‐ TIA $18,903,742 Bartow 0015535 SR 3/US 41 SB @ SR 293/CSX #340429D IN EMERSON $6,250,007 2023 Carroll M006164 SR 1; SR 2; SR 5; SR 92 & SR 166 @ 7 LOC‐BRIDGE PRESERVATION $900,000 Dade M006156 I‐59 @ 6 LOCS IN DADE COUNTY ‐ BRIDGE REHAB $3,000,000 Fannin 0014167 CR 38/SHALLOWFORD BRIDGE ROAD @ TOCCOA RIVER S OF MORGANTON $2,192,784 0013937 SR 1/US 27 @ BIG DRY CREEK/ IN ROME $5,672,451 Floyd 0015544 SR 293 @ DYKES CREEK 5.4 MI E OF ROME $6,569,051 0017775 CR 10/REHOBETH ROAD @ SPRING CREEK $1,300,000 6 Gilmer 0015547 SR 2/SR 515/US 76 @ BIG TURNIPTOWN CREEK IN ELLIJAY $4,340,372 0013888 SR 156 @ SALACOA CREEK & OVERFLOW 6 MI NW OF RANGER $10,609,755 Gordon 0013994 SR 136 @ & TRIBUTARY E OF NICKELSVILLE $3,000,000 M006090 SR 136 @ ‐ BRIDGE REHABILITATION $500,000 Paulding 0015604 CR 591/MORNINGSIDE DR @ MILL CREEK/LICK LOG CREEK S OF HIRAM $3,703,208 0014906 SR 1/US 27 @ LAKE CREEK IN CEDARTOWN $3,000,000 Polk 0015561 SR 101 @ EUHARLEE CREEK TRIB IN ROCKMART $3,190,643 Whitfield M005955 SR 2 @ 2 LOCS & SR 52 @ 2 LOCS IN DISTRICT 6 ‐ BRIDGE REHAB $4,500,000 0015530 CR 1529/COCHRAN ROAD @ CAMP CREEK $1,923,252 0017780 CS 435/GARRETTS FERRY ROAD @ CHATTAHOOCHEE RIVER TRIBUTARY $1,300,000 M005878 SR 400 @ JUSTIN C MARTIN BUILDING ‐ TUNNEL BRIDGE REHAB $500,000 Fulton 7 M006109 SR 400 @ 9 LOCS IN FULTON COUNTY ‐ BRIDGE PRESERVATION $3,000,000 M006110 I‐85 @ 8 LOCS IN FULTON COUNTY ‐ BRIDGE PRESERVATION $2,000,000 M006313 I‐75; I‐85 & I‐285 @ 3 LOCS IN FULTON COUNTY ‐ BRIDGE REHAB $3,500,000 Rockdale 0015100 CR 505/HONEY CREEK ROAD @ SNAPPING SHOALS CREEK $2,755,358 3MuscogeeM006060 I‐185 FM 0.07 MI S OF SR 1 TO 0.10 MI S OF CR 1379/ARMOUR RD $11,183,175 Concrete Rehab 7CobbM006061 I‐75 FROM 0.42 MI N OF CS 3905/ALLGOOD ROAD TO SR 5 CONN $6,917,450 Drainage 4 Miller M006300 SR 91 FROM AVENUE ROAD TO GRIFFIN SHEFFIELD ROAD $1,450,000 Improvements 6PickensM006301 SR 53 @ 1 LOC & SR 136 @ 6 LOCS IN PICKENS COUNTY $2,468,357

This Project Forecast is for planning purposes only and shows future projects of the Department as currently analyzed, September 2021. The information on this list is Subject to Change. FY2022‐2023 Project Forecast September 2021 ‐ June 2023

Primary Work PE Dist Latest Cost Fiscal Year Primary County Project ID Short Description Type Assigned Estimated Total

Frontage Roads 2 Warren 0008680 I‐20 ACCESS ROAD FROM CUL‐DE‐SAC TO W OF CADLEY ROAD‐TIA $9,334,464

1 Gwinnett 0017999 CR 557/STEVE REYNOLDS BLVD FROM OLD NORCROSS RD TO SR 378 $1,500,000 ITS 5 Appling 0017411 I‐95 FM STATE LINE TO S CAROLINA STATE LINE‐ITS EXP $35,500,000 0010352 SR 8/SR 316/US 29 @ SR 211 $37,100,000 Barrow 0013910 SR 8/SR 316 @ CR 329/BARBER CREEK ROAD $71,700,000 1 Clarke 122890- SR 10LP @ SR 10 IN ATHENS $39,902,960 Interchange Gwinnett 0013104 I‐85 @ MCGINNIS FERRY ROAD ‐ NEW INTERCHANGE ‐ PHASE I $13,493,642 0016054 I‐85 @ SR 42 $17,900,000 DeKalb 7 713300- I‐285 @ BOULDERCREST ROAD $55,408,998 Fulton 0007841 I‐85 @ SR 74/SENOIA ROAD $53,396,291 Forsyth 0016066 SR 9 @ CR 184/JEWELL BENNETT ROAD $1,737,324 1 Walton 0016386 SR 20 @ 3 LOCS IN WALTON COUNTY $13,109,481 0012866 CR 601/WHEELER ROAD @ CR 124/CR 2157/ROBERT C DANIEL PKWY $706,822 Intersection 2Richmond 0012867 CR 601/WHEELER ROAD FROM I‐20 TO CR 804/AUGUSTA WEST PKWY $2,887,500 Improvement 4Mitchell0015696 SR 3 @ SR 93 $1,266,671 5 Bulloch 0010428 CR 248/LANGSTON CHAPEL ROAD @ CR 585/HARVILLE ROAD $2,456,968 6Cherokee0017982 SR 140 @ SR 5 CONN $1,753,219 Lighting 7 Fulton 0016824 SR 154/SR 166 FROM I‐85 TO I‐285 ‐ LIGHTING $3,500,000 Median Work 7 Fulton 0017926 SR 8/US 278 FROM SR 280 TO CS 6701/STIFF STREET $2,500,000 Miscellaneous DeKalb 0018221 OFF‐SYSTEM SAFETY IMPROVEMENTS @ 11 LOCS IN DEKALB COUNTY $680,000 7 Improvements Fulton 0015890 CS 654/10TH ST @ I‐75/I‐85; INC WILLIAMS ST & TECHWOOD DR $5,428,193 1 Gwinnett 0016067 NORCROSS GREENWAY ‐ LCI $7,977,063 Multi‐use Trail Cobb 0012808 BOB CALLAN TRUNK TRAIL ‐ PHASE II ‐ SEGMENT B $2,855,925 7 Fulton 0017980 PATH 400 TRAIL FROM LORIDANS DR TO SANDY SPRINGS CITY LIMITS $4,045,000 2023 Gwinnett 0016615 SR 140 @ 3 LOCS & CR 1955/SPALDING DRIVE @ 1 LOC $1,442,855 1 Hall 0016921 SR 53 @ SR 369 $706,790 2Newton0013860 SR 162 @ SR 212 $1,595,671 4 Lowndes 0015445 SR 7 BU FROM CS 188/NORTH OAK STREET TO SR 7 ALT $4,049,438 Bryan 0016618 I‐16 @ SR 30/US 280 $2,603,900 5 Operational Chatham 0015675 I‐16 @ CS 647/CS 2289/CHATHAM PKWY $1,985,587 Improvement 6 Catoosa 0016617 SR 2 @ SR 3 $2,119,641 Clayton 0016928 SR 3/US 19 @ CR 1337/FLINT RIVER ROAD $822,512 DeKalb 0015956 SR 155/US 23 FROM I‐85 TO CR 1482/AUDUBON DRIVE $2,731,046 7 0015288 SR 3/US 41 FROM CS 1704/TECH PKWY TO CS 696/HEMPHILL AVE $1,949,456 Fulton 0016362 SR 13 @ CS 520/MONROE DRIVE $1,748,660 0016443 SR 372 @ CR 4/BIRMINGHAM ROAD $1,221,772 2 Greene 0013723 SR 15 FROM N OF COLD SPRINGS ROAD TO S OF MACEDONIA ROAD $3,260,021 Passing Lanes 4 Lowndes 0014485 SR 31 @ 4 LOCS FROM SR 7/LOWNDES TO SR 135/LANIER $8,599,500 1JacksonM006070 I‐85 FROM POSSUM CREEK ROAD/JACKSON TO SR 15/BANKS $783,000 2NewtonM006065 I‐20 FROM SR 162 TO 0.35 MI W OF CR 1044/ALCHOY ROAD $507,950 Coweta M006068 I‐85 FROM SR 54 TO FULTON COUNTY LINE $8,430,400 3 Harris M006072 I‐185 FROM CR 98/SMITH ROAD/MUSCOGEE TO I‐85/TROUP $783,000 Monroe M006067 I‐75 FROM 0.55 MI N OF CR 85/ARKWRIGHT ROAD TO I‐475 $956,785 Pavement 4 Lowndes M006066 I‐75 FROM FLORIDA STATE LINE TO 0.32 MI S OF SOUTHWALL BLVD $5,483,950 Markings 5 Tattnall 0018053 OFF‐SYSTEM SAFETY IMPROVEMENTS @ 2 LOC IN TATTNALL CO ‐ HRRR $626,250 Dade M006071 I‐59 FROM SR 136 TO I‐24 $246,500 6 Haralson M006064 I‐20 FM ALABAMA STATE LINE TO 0.37 MI E OF PLEASANT RIDGE RD $1,573,780 0017677 OFF‐SYSTEM SAFETY IMPROVEMENTS @ 1 LOC IN ATLANTA $152,480 7Fulton M006073 I‐285 FROM CHATTAHOOCHEE RIVER TO W OF SR 400 $209,200

This Project Forecast is for planning purposes only and shows future projects of the Department as currently analyzed, September 2021. The information on this list is Subject to Change. FY2022‐2023 Project Forecast September 2021 ‐ June 2023

Primary Work PE Dist Latest Cost Fiscal Year Primary County Project ID Short Description Type Assigned Estimated Total 1 Gwinnett 0016107 SR 378 FROM CR 823/LIGHT CIRCLE TO SR 13 $852,732 Baldwin 0013260 SR 24 @ 10 LOCS & SR 29 @ 2 LOCS ‐ PED UPGRADES $717,478 Pedestrian 2 Greene 0013258 SR 12; SR 17 & SR 44 @ 9 LOCS ‐ PEDESTRIAN UPGRADES $968,781 Crossings Putnam 0013259 PEDESTRIAN UPGRADES @ 15 LOCS IN NEWTON & PUTNAM COUNTY $562,540 7Fulton0013724 SR 279 FROM CS 567/SULLIVAN ROAD TO CS 1615/JOLLY ROAD $1,446,380 Pedestrian 7Fulton0017994 CS 665/PEACHTREE STREET FROM SR 154 TO ALABAMA STREET ‐ LCI $3,500,000 Facilities RRX Warning 3Monroe0017088 CR 34/RUMBLE ROAD @ NS #718345H $550,000 Device Gwinnett 0013894 SR 316 @ CR 186/CEDARS ROAD $3,489,615 Ramp 1 Walton 0015421 SR 138 @ SR 10/US 78 $2,746,293 Realignment 2 Newton 0015095 ACCESS RD @ I‐20 FM W OF CROWELL RD TO E OF HAROLD DOBBS RD $4,186,365 Dawson M006176 SR 136 FROM PICKENS COUNTY LINE TO SR 183 $1,199,436 Forsyth M006272 SR 9 FROM SR 20 TO 0.05 MI N OF CR 741/BANNISTER ROAD $5,271,131 Franklin M006172 SR 145 FROM SR 8 TO SR 59/SR 106 $1,962,816 Gwinnett M006181 SR 20 FROM CS 1227/S LEE STREET TO CR 105/LAUREL DRIVE $5,451,293 M006179 SR 11/US 129 FROM SR 323 TO CS 719/MONROE DRIVE $1,951,697 1Hall M006182 SR 13 FROM SR 347 TO 0.10 MI N OF CS 630/CANTRELL ROAD $1,318,484 Madison M006171 SR 106 FROM S OF SR 98/MADISON TO SR 51/FRANKLIN $3,536,660 Stephens M006174 SR 184 FROM BANKS COUNTY LINE TO SR 17 $1,603,765 Towns M006169 SR 2/US 76 FROM SR 515 TO HIAWASSEE RIVER $3,871,294 Walton M006271 SR 81 FROM SR 10/WALTON TO SR 316/BARROW $4,588,864 Laurens M006187 SR 117/US 441 BYPASS FROM SR 31/US 319 TO SR 29/US 441 $3,875,040 M005204 SR 212 FM ROCKDALE COUNTY LINE TO CR 239/COVERED BRIDGE ROAD $91,977 Newton M006186 SR 81 FROM HENRY COUNTY LINE TO SR 162 CONN $1,702,116 2 Richmond M006242 SR 121/US 25 FROM BURKE COUNTY LINE TO SR 88 $3,261,075 2023 M006184 SR 12 BYPASS FROM SR 12 TO SR 12 $374,400 Warren M006185 SR 12 FROM NS# 732960W TO MCDUFFIE COUNTY LINE $1,141,920 Bibb M006246 SR 49 FROM SR 11 TO JONES COUNTY LINE $1,728,542 Coweta M006249 SR 34 BYPASS FROM SR 16 TO SR 34 $2,181,694 Henry M006251 SR 3/US 19 FROM SPALDING COUNTY LINE TO CLAYTON COUNTY LINE $4,348,228 Resurface & 3 Spalding M006247 SR 3/US 19 FROM 0.14 MI S OF SR 7 TO HENRY COUNTY LINE $9,057,237 Maintenance Troup M006250 SR 14 FROM E OF SR 14 SPUR TO COWETA COUNTY LINE $3,824,219 Twiggs M006252 SR 19 FROM 0.06 MI W OF SR 18 TO BIBB COUNTY LINE $3,526,186 Decatur M006279 SR 253 SPUR FROM SR 253 TO SR 38 IN BAINBRIDGE $308,216 Echols M006280 SR 135 FROM FLORIDA STATE LINE TO LOWNDES COUNTY LINE $2,983,527 M006193 SR 376 FROM SR 31 TO 0.10 MI W OF CR 783/LOCH LAUREL ROAD $1,346,700 Lowndes M006277 SR 38 FROM CR 778/ROCKY FORD RD TO N OF CS 897/N OAK ST $2,692,089 4 M006282 SR 31 FROM CR 312/CARROLL ROAD TO SR 7 $1,909,187 Terrell M006276 SR 32 FROM DAWSON CITY LIMITS TO LEE COUNTY LINE $2,207,979 M006192 SR 35/US 319 FROM COLQUITT COUNTY LINE TO SR 520 $3,103,694 Tift M006278 SR 125 FROM BERRIEN COUNTY LINE TO IRWIN COUNTY LINE $4,358,448 Turner M006281 SR 90 FROM SR 159 TO WILCOX COUNTY LINE $988,538 Glynn M006080 SR 303 FROM S OF WEST FANCY BLUFF ROAD TO N OF SCOUTEN LANE $1,990,375 5 McIntosh M006063 I‐95 FROM YOUNGS SWAMP CREEK TO SOUTH NEWPORT RIVER $10,060,115 Screven M006083 SR 21 FROM EFFINGHAM COUNTY LINE TO SR 21BU $5,609,100 Bartow M006062 I‐75 FROM SR 61/BARTOW TO CR 373/DEW POND ROAD/GORDON $30,930,450 6 Catoosa 0017740 CATOOSA RESURFACING @ 6 LOCS IN RINGGOLD $654,705 Chattooga M006260 SR 1/US 27 FROM TO CHATTOOGA RIVER $3,530,717 Clayton M006291 SR 3 CONN FROM SR 3 TO N OF CR 392/UPPER RIVERDALE ROAD $375,694 7 Cobb M006298 I‐285 FROM PACES FERRY ROAD/COBB TO LONG ISLAND ROAD/FULTON $10,000,000

This Project Forecast is for planning purposes only and shows future projects of the Department as currently analyzed, September 2021. The information on this list is Subject to Change. FY2022‐2023 Project Forecast September 2021 ‐ June 2023

Primary Work PE Dist Latest Cost Fiscal Year Primary County Project ID Short Description Type Assigned Estimated Total M004417 I‐285 FROM ASHFORD DUNWOODY ROAD TO HENDERSON MILL ROAD $12,073,840 DeKalb M006293 SR 141 FROM FULTON COUNTY LINE TO CR 7955/PEACHTREE ROAD $3,145,021 Resurface & 7 M006294 SR 141 FROM SR 9 TO DEKALB COUNTY LINE $1,812,949 Maintenance Fulton M006299 I‐285 FM LONG ISLAND RD/FULTON TO ASHFORD‐DUNWOODY RD/DEKALB $5,000,000 Rockdale M006059 I‐20 FROM DEKALB COUNTY LINE TO NEWTON COUNTY LINE $12,560,450 3Henry0014482 WESTERN PARALLEL CONNECTOR FM HUDSON BRIDGE TO JONESBORO RD $43,974,000 Roadway Project 5Chatham0017975 CR 76/CHEVIS ROAD FROM SR 25 TO CR 73/WILD HERON ROAD $4,196,260 7Cobb0018193 I‐285 FROM CS 843/COLLIER DRIVE TO CR 2838/PACES FERRY ROAD $147,762,102 Forsyth 0016348 SR 9 @ CR 3705/AC SMITH RD $1,797,177 Gwinnett 0016352 SR 84 @ CR 556/LAKEVIEW ROAD $3,300,000 1 Habersham 0013861 SR 105 @ SR 115 $2,785,467 0015592 SR 11 @ SR 124 $2,498,885 Jackson 0016065 SR 53 @ CR 433/NEW CUT ROAD $2,646,820 Laurens 0016357 SR 26 @ CR 68/BETHLEHEM CHURCH ROAD ‐ HRRR $2,562,050 2 0009928 SR 11 @ SR 142 $2,584,837 Newton 0016356 SR 162 @ CR 228/ROCKY PLAINS ROAD $2,577,489 Bibb 0015692 SR 87 @ CR 742/BASS ROAD/CR 85/ARKWRIGHT ROAD $2,200,586 0009966 SR 42 @ SR 87 $2,159,826 0013696 SR 42 @ CS 716/ENGLAND CHAPEL ROAD/BURG ROAD $1,954,322 Butts 0015685 SR 42 @ CR 295/OLD BETHEL ROAD $1,200,000 0015688 SR 16 @ CR 291/ENGLAND CHAPEL ROAD $2,355,222 3 Roundabout Coweta 0015844 SR 14/US 29 @ CS 2334/CORINTH ROAD IN NEWNAN $2,458,075 Meriwether 0016113 SR 41 @ CR 174/JUDSON BULLOCH ROAD $1,850,837 Monroe 0013120 SR 74 @ SR 42 $2,612,336 Peach 0016117 SR 247 CONN @ CR 83/CS 668/HOUSERS MILL ROAD $2,288,098 2023 Sumter 0016112 SR 30 @ CR 311/LAMAR ROAD $2,030,816 4 Lowndes 0016109 SR 122 @ SR 125 $2,271,789 5Wayne0013197 CR 396/RAYONIER ROAD @ CR 392/SPRING GROVE ROAD ‐ HRRR $2,429,572 0015694 SR 16 @ CR 212/CR 833/BEULAH CHURCH ROAD $2,848,601 Carroll 0016108 SR 16 @ CS 1110/COLUMBIA DR/CS 1120/BRUMBELOW RD $2,030,395 6 Paulding 0013760 SR 6BU/SR 61 @ CS 610/LEGION ROAD $2,844,273 Polk 0016106 SR 6 @ SR 100 $1,572,382 Douglas 0015679 SR 8 @ CS 352/CS 968/CONNERS ROAD $2,188,656 7 Fulton 0015593 SR 92 @ CR 1374/BUTNER ROAD $2,361,532 Rockdale 0006935 SR 20 @ CR 98/WEST HIGHTOWER TRAIL & CHANDLER RD $2,278,282 Sidewalks 7 Fulton 0015624 SR 279 FROM SR 138 TO CR 1391/FLAT SHOALS ROAD ‐ PHASE II $2,455,483 4Dougherty0017843 SR 133; SR 234; SR 520 & SR 520 BU @ 13 LOCS $2,475,000 6Carroll0017842 SR 8 @ 8 LOCS & SR 61 @ 4 LOCS $2,700,000 Signals DeKalb 0002669 UPGRADE TRAFFIC SIGNALS @ 40 LOCATIONS IN DEKALB CO $7,354,196 7 Fulton 0013204 SR 3 CONN; SR 14/SR 154; SR 139 & SR 154 @ 10 LOCS IN FULTON $1,879,436 Dawson 0018043 OFF‐SYSTEM SAFETY IMPROVEMENTS @ 3 LOCS IN DAWSON COUNTY $507,670 1 Hall 0018042 OFF‐SYSTEM SAFETY IMPROVEMENTS @ 4 LOCS IN HALL COUNTY $496,170 Burke 0018041 OFF‐SYSTEM SAFETY IMPROVEMENTS @ 10 LOC IN BURKE COUNTY‐HRRR $368,200 2 Columbia 0018040 OFF‐SYSTEM SAFETY IMPROVEMENTS @ 23 LOCS IN COLUMBIA COUNTY $410,000 Newton 0018039 OFF‐SYSTEM SAFETY IMPROVEMENTS @ 16 LOCS IN NEWTON COUNTY $374,360 Signing Bibb 0018038 OFF‐SYSTEM SAFETY IMPROVEMENTS @ 60 LOCS IN BIBB COUNTY $248,725 3 Fayette 0018037 OFF‐SYSTEM SAFETY IMPROVEMENTS @ 37 LOCS IN FAYETTE COUNTY $341,455 Jones 0018036 OFF‐SYSTEM SAFETY IMPROVEMENTS @ 16 LOCS IN JONES COUNTY $258,150 Atkinson 0018049 OFF‐SYSTEM SAFETY IMPROVEMENTS @ 17 LOCS IN ATKINSON CO‐HRRR $323,461 4 Baker 0018050 OFF‐SYSTEM SAFETY IMPROVEMENTS @ 21 LOCS IN BAKER CO‐HRRR $328,501

This Project Forecast is for planning purposes only and shows future projects of the Department as currently analyzed, September 2021. The information on this list is Subject to Change. FY2022‐2023 Project Forecast September 2021 ‐ June 2023

Primary Work PE Dist Latest Cost Fiscal Year Primary County Project ID Short Description Type Assigned Estimated Total 4Lanier0018051 OFF‐SYSTEM SAFETY IMPROVEMENTS @ 17 LOCS IN LANIER CO ‐ HRRR $184,567 5Evans0018052 OFF‐SYSTEM SAFETY IMPROVEMENTS @ 1 LOC IN EVANS CO ‐ HRRR $700,000 Fannin 0018177 OFF‐SYSTEM SAFETY IMPROVEMENTS @ 19 LOCS IN FANNIN CO ‐ HRRR $400,100 Signals 6 Gordon 0018048 OFF‐SYSTEM SAFETY IMPROVEMENTS @ 14 LOCS IN GORDON COUNTY $255,530 Paulding 0018046 OFF‐SYSTEM SAFETY IMPROVEMENTS @ 13 LOCS IN PAULDING COUNTY $270,970 Douglas 0018092 OFF‐SYSTEM SAFETY IMPROVEMENTS @ 13 LOCS IN DOUGLAS COUNTY $315,856 7 Fulton 0018212 OFF‐SYSTEM SAFETY IMPROVEMENTS @ 7 LOCS IN FULTON COUNTY $168,000 Slope Repair 6 Chattooga 0015413 SR 1/US 27 @ TAYLORS RIDGE ‐ PHASE II $8,750,000 Streetscapes 3 Houston 0015953 SR 247 CONN FROM CS 1/CS 545/DAVIS DRIVE TO SR 247 $1,261,339 2Richmond0012868 CR 1502/BARTON CHAPEL ROAD @ SR 10/US 78 $1,904,147 Turn Lanes 6Cherokee0016365 SR 92 @ CR 387/TRICKUM ROAD $3,508,960 0003682 SR 20 FROM POST ROAD TO E OF NORTH CORNERS PKWY $71,850,665 Forsyth 121690- SR 9 FROM N OF SR 141 TO N OF SR 20 $20,908,973 2023 1 Gwinnett 0015439 SR 20 FROM CR 1954/PEACHTREE INDUSTRIAL BLVD TO SR 13 $17,525,553 Rabun 122090- SR 15/US 441 FM NORTH CL/CLAYTON TO NORTH CAROLINA LINE $67,131,345 2Newton231210- SR 162 FROM CR 511/BROWN BRIDGE ROAD TO CR 34/OLD SALEM ROAD $19,371,488 0015090 ROCK QUARRY ROAD FROM EAGLES LANDING PKWY TO SR 42/SR 138 $24,612,570 Henry 0015823 SR 42 FROM CS 636/BILL GARDNER PKWY TO CS 645/PEEKSVILLE RD $1,259,292 3 Widening 322050- SR 42 FROM 0.15 MI S OF SR 138/HENRY TO I‐675/CLAYTON $25,969,605 Muscogee 0006446 SR 1 FM CS 2661/TURNBERRY LANE/MUSCOGEE TO SR 315/HARRIS‐TIA $33,287,575 Atkinson 422380- SR 31/SR 89 FROM N OF CR 303/COUNTY ROAD 225 TO N OF SR 520 $33,095,081 4 Worth 0000519 SR 133 FM N OF COLQUITT COUNTY LINE TO N OF SR 112 $35,348,764 Cherokee 0002862 SR 20 FROM SR 369/CHEROKEE TO POST ROAD/FORSYTH $69,054,976 6 Floyd 650540- SR 1/SR 101 FROM OOSTANAULA RIVER TO N OF SR 20 $9,884,834 Clayton 721290- SR 85 FROM SR 279/FAYETTE TO CR 820/ROBERTS DR/CLAYTON $35,144,624 7 Fulton 0007838 SR 9 FROM WINDWARD PKWY TO FORSYTH COUNTY LINE $28,914,878

This Project Forecast is for planning purposes only and shows future projects of the Department as currently analyzed, September 2021. The information on this list is Subject to Change.