List of pending Matters raised under Rule 377 in the

Commissioner (SPR) (15 Matters)

S.No. Date on Date on which Name of the M.P. Subject Concerned Wing/Section Status which received in matter was the Ministry raised in the from LS/RS House Secretariat 1 7/7/2014 9/7/2014 Shri Virendra Need to start work on Ken Betwa Original letter sent to Com Kumar River Link Project (SPR ) on 9/7/2014

2 25/11/2014 27/11/2014 Shri Sanjay Kaka Need to provide adequate irrigation Original letter sent to Com Patil facilities in Sangli district of (SPR) on 27/11/2014 Maharashtra

3 25/2/2015 26/2/2015 Shri Ganesh Singh Need to include Bargi Dam project in Original letter sent to Com Jabalpur, MP in the scheme of (SPR ) on 26/2/2015 national project

4 16/3/2015 18/3/2015 Shtri C.R. Need to provide adequate grant to Original letter sent to Com Chaudhary armers on drip irrigation system and (SPR ) on 18/3/2015 solar system to give impetus to farm production in the country 5. 08/05/2015 18/11/2015 Shri Nishikant Need to expedite completion of Dubey irrigation projects in Santhal Pargana Original letter sent to Com region of Jharkhand. (SPR) on 19/11/2015. 6. 05/08/2015 07/08/2015 Shri Ashok Need to provide sufficient funds for Original letter sent to Com Mahadeorao Nete Gosikhurd irrigation project in (SPR ) on 07/8/2015 Maharashtra 7. 13/08/2015 18/8/2015 Shri Sumedhanand Need to revive stepwells in Original letter sent to Com Saraswati Rajasthan particularly in Sikar, (SPR ) on 18/8/2015 Jhunjhunu and Churu districts of the State. 8. 30/11/2015 02/12/2015 Shri A.T. Nana Need to accord early approval to Original letter sent to Com Patil Padalsare Lower Tapti Project in (SPR) on 03/12/2015 Jalgaon district, Maharashtra. 9. 03/12/2015 07/12/2015 Kunwar Regarding encroachment over ponds Original letter sent to Com Pushpendra Singh and lakes in the country particularly in (SPR) on 07/12/2015 Chandel Bundelkhand region 10. 15.12.2015 18.03.2016 Shri Raj Kumar Need to conserve Braha Sarovar, an Original letter sent to Com Saini ancient water tank sacred to Hinduism (SPR) on 18 /03/2015 in Haryana and take appropriate steps for inclusion of the Sarovar in the list of UNESCO world heritage sites 11. 25.02.2016 29.02.2016 Shri Devji M. Patel Need to start work on Battisa Nala Original letter sent to Com project for providing irrigation and (SPR) on 29/02/2016 drinking water facilities to people in Sirohi district, Rajasthan. 12. 10.03.2016 16.03.2016 Shri Ganesh Singh Need to declare Bagi dam project as a Original letter sent to Com national project and provide adequate (SPR) on 16/03/2016 funds for the project 13. 25.04.2016 27.04.2016 Shri Nishikant Need to take suitable steps for Original letter sent to Dubey completion of various irrigation Commissioner (SPR) on schems in Jharkhand 27/04/2016 14. 25.07.2016 27.07.2016 Shri Bhartruhari Need for early release of Central Original letter sent to Mahtab assistance to Odisha under the Commissioner (SPR) on Accelerated Irrigation Benefit 27/07/2016 Programme 15 04.08.2016 08.08.2016 Smt. Pratyusha Need to provide funds for two Original letter sent to Rajeshwari Singh irrigation projects in Boudh District of Commissioner (SPR) on odisha 08/08/2016

List of pending Matters raised under Rule 377 in the Lok Sabha

Commissioner (Indus) (3 Matters)

S.No. Date on Date on Name of the M.P. Subject Concerned Wing/Section which which matter was received in raised in the the Ministry House from LS/RS Secretariat 1. 19.07.2016 21.07.2016 Shri Rattan Lal Need to construct dam on rivers of Original letter sent to Comm. Kataria Himachal Pradesh and Haryana (Indus ) on 21/07/2016

2. 01.08.2016 03.08.2016 Shri Rahul Kaswan Need to provide water of Ravi and Original letter sent to Comm. Beas rivers to Rajasthan as per (Indus ) on 03/08/2016 agreement 3. 08.08.2016 10.08.2016 Shri Rahul Kaswan Need to provide water of Ravi and Original letter sent to Comm. Beas rivers to Rajasthan as per (Indus ) on 10/08/2016 agreement

List of pending Matters raised under Rule 377 in the Lok Sabha

MD (NMCG) (2 Matter)

S.No. Date on Date on Name of the M.P. Subject Concerned Wing/Section Status which which matter was received in raised in the the Ministry House from LS/RS Secretariat 1. 4/12/2014 9/12/2014 Smt. Poonam Need to take suitable steps to Original letter sent to Mahajan rejuvenate Mithi River in Mumbai, JS(NMCG) on 09/12/2014 Maharashtra.

2. 09/08/2016 12/08/2016 Shri Ashwini Kumar Regarding implementation of Original letter sent to Choubey Namami Gange Project MD(NMCG) on 12/08/2016

List of pending Matters raised under Rule 377 in the Lok Sabha

Commissioner (Pen. River) (7 Matters)

S.No Date on Date on Name of the M.P. Subject Concerned Wing/Section Status . which matter which was raised in received in the House the Ministry from LS/RS Secretariat 1. 14/12/2015 16/12/2015 Shri A.P. Jithender Need to accord National Project Matter has been transferred from Reddy status to Dr. B.R. Ambedkar Pen. Riv. Wing to Sr. JC(SPR-I) Pranhita-Chevella Sujala vide letter dated 04.01.2016. Sravanthi Irrigation Project in Acceptance is still awaited Telangana 2. 16/12/2015 21/12/2015 Shri Sunil Kumar Need to take steps for early Original letter sent to Com (Pen- Singh completion of North Koel River ) on 22/12/2015 Reservoir Project and other irrigation projects in Jharkhand. 3. 16/03/2016 21/05/2016 Dr. Shrikant Eknath Need to declare river cleaning 1. Original letter sent to Shinde projects as National Projects MD(NMCG) on 21/06/2016.

2. Matter has been transferred from NMCG to Pen. Rive Division.

3. Matter has been transferred from Pen. Riv. Wing to Advisor, National River Conservation Directorate, M/o Environment, Forest and Climate Change vide letter No. 11011/53/2016- Pen. River dated 20.07.2016.

4. 21.07.2016 25.07.2016 Shri Anto Antony Need to construct a new dam at Original letter sent to Com (Pen- the site of Mullaperiyar dam River ) on 25/07/2016

5. 21.07.2016 25.07.2016 Shri B. Need to ensure adequate Original letter sent to Com (Pen- Senguttuvan availability of water in Palar River ) on 25/07/2016 River in Tamil Nadu and also expedite Pennayar-Palar Link Canal Project 6. 28.07.2016 02.08.2016 Shri C. Need for early clearance to start 1. Original letter sent to Gopalakrishnan strengthening works of Mullai Comm. (Pen-River ) on Periyar dam in Tamil Nadu 02/08/2016.

2. Matter has been transferred from Pen. Riv. Wing to, M/o Environment, Forest and Climate Change vide letter No. 11011/77/2016 -Pen. River dated 12.08.2016.

7. 09.08.2016 12.08.2016 Shri Ashok Need to construct dams on Original letter sent to Com (Pen- Mahadeorao Nete tributaries of Wainganga in River ) on 12/08/2016 Gadchiroli-Chimur Parliamentary Constituency, Maharashtra

List of pending Matters raised under Rule 377 in the Lok Sabha

(GW) ( 3 Matters)

S.No. Date on Date on which Name of the M.P. Subject Concerned Wing/Section Status which received in matter was the Ministry raised in the from LS/RS House Secretariat 1. 26.04.2016 28.04.2016 Shri Kaushalendra Need to undertake measures for Original letter sent to Kumar ground water recharge and rainwater JS(A&GW) on 28/04/2016 harvesting in the country to address the problem of water scarcity in various parts of the country 2. 03.05.2016 05.05.2016 Shri Satya Pal Singh Need to take adequate measures to Original letter sent to check the dwindling water level in JS(A&GW) on 05/05/2016 rivers and other water resources in the country 3. 03.08.2016 05.05.2016 Shri B. Sreeramulu Need to restore old wells and water Original letter sent to tanks for conservation of water AS(A&GW) on 05/08/2016

List of pending Matters raised under Rule 377 in the Lok Sabha

Commissioner (FM) (41 Pending Matters)

S.No. Date on Date on which Name of the M.P. Subject Concerned Wing/Section Status which received in matter was the Ministry raised in the from LS/RS House Secretariat 1. 17/7/2014 22/7/2014 Shri Rajesh Verma Need to build a dam on river Original letter sent to Com Ghaghara in Sitapur district, UP to (Ganga) on 22/7/2014 prevent annual flood and erosion caused by the river in the district 2. 23.07.2014 25.07.2014 Smt. Rama Devi Need to raise the height and Original letter sent to strengthening of embankments on Comm.(FM) on 25/07/2014 Sikrahna Budhi Gadak river, and other embankments of Budhi Gandak river covering East Champrana, West Champaran and Muzzafarpur districts of Bihar 3. 02/12/2014 5/12/2014 Sadhvi Savitri Bai Need to provide a special package Original letter sent to Com Phule for removal of boulders from the (Ganga) on 5/12/2014 riverbed of Geruwa and ghagra rivers & 1/1/2015 causing flooding of the adjoining areas in Bahraish Parliamentary Constituency, UP 4. 10/12/2014 12/12/2014 Shri Daddan Mishra Need to float tenders for removal of Original letter sent to Com boulders, mortars and sand deposited (Ganga) on 12/12/2014 in rivers and drains originating from Nepal causing inundation and erosion of land along with river course in Shrawasti Parliamentary Constituency, UP

5. 11/12/2014 16/12/2014 Shri Rajesh Verma Need to construct a dam on river Original letter sent to Com Sharada in Sitapur Parliamentary (Ganga) on 16/12/2014 Constituency, UP

6. 3.3.2015 10/3/2015 Smt. Rama Devi Need to conduct an inquiry into the Original letter sent to Com alleged misappropriation of funds (FM) on 10/3/2015 during 2005 earmarked for Bagmati flood control programme in Bihar. 7. 29/4/2015 01/05/2015 Dr. Nepal Singh Need to take suitable measures to Original letter sent to Com prevent flooding of agricultural lands (FM) on 01/5/2015 by rivers under Rampur Parliamentary Constituency, UP

8. 06.05.2015 07.05.15 Shri Rajesh Verma, Need to construct embankment in Original letter sent to Com MP Sitapur parliamentary constituency, (FM) on 08/05/2015 over river Sharda to control flood in the region. 9. 03.08.2015 5/8/2015 Shri Vishnu Dayal Need to take immediate remedial Original letter sent to Ram measures to check land erosion Comm(FM) on 05/8/2015 caused by river Amanat and Sone in villages in Garhwa and Palamu districts in Jharkhand. 10. 06/08/2015 14/08/2015 Shri Rajesh Ranjan Need to take necessary measures to alias Pappu Yadav expedite Bharat-Nepal Panchshwar and Saptkoshi multipurpose scheme 11. 11/08/2015 18/11/2015 Shri Ajay Mishra Need to construct embankments on Original letter sent to Com Teni rivers originating from Nepal causing (FM) on 18/11/2015 land erosion in Kheri Parliamentary Constituency, Uttar Pradesh 12. 21/12/2015 28/12/2015 Mohammed Need to take stes to check erosion to Original letter sent to Com Badaruddoza Khan the banks of Bhagirathi river (FM) on 30/12/2015

13. 08.03.2016 11.03.2016 Smt. Ranjeet Ranjan Need to construct dam on river Kosi Original letter sent to Com in Supaul Parliamentary (FM) on 11/03/2016 Constituency in Bihar 14. 25.04.2016 27.04.2016 Shri Sunil Kumar Need to expedite the construction of Original letter sent to Singh North Koel Reservoir Project and Commissioner(FM) on other irrigation Projects in Jharkhand 27/04/2016 15. 27.04.2016 28.04.2016 Smt. Rama Devi Need to take suitable measures for Original letter sent to flood management in North Bihar Commissioner(FM) on 29/04/2016 16. 28.04.2016 02.05.2016 Shri Need to check alleged irregularities Original letter sent to in construction of irrigation canals in Commissioner(FM) on districts of Eastern Uttar Pradesh 02/05/2016 17. 02.05.2016 04.05.2016 Shri Pankaj Need to undertake reconstruction of Original letter sent to Chowdhary barrage gate on river Rohini in Commissioner(FM) on Maharajganj district, Uttar Pradesh 04/05/2016 18. 03.05.2016 05.05.2016 Smt. Bijoya Need to provide assistance to flood 1. Original letter has Chakravorty affected people of Assam been sent to Commissioner(B&B) on 05.05.2016 2. Matter has been transferred from B&B Wing to FM Wing vide B&B Wing’s letter dated 10.05.2015. 19. 05.05.2016 09.05.2016 Shri Sushil Kumar Need to Provide water to Sone canal Original letter sent to Singh in Bihar from Rihand dam as per the Commissioner(FM) on norms fixed by Joint Operation 10/05/2016 Committee set up for the purpose 20. 05.05.2016 09.05.2016 Shri Chhedi Need to start work on Belwai Original letter sent to Matter has Paswan Reservoir Project in Sasaram Commissioner(FM) on been Parliamentary Constituency, Bihar 10/05/2016 transferred to M/o EF&CC vide letter dated 26.05.2016. Acceptance is still awaited. 21. 09.05.2016 11.05.2016 Shri Ravindra Babu Need to take measures to address the Original letter sent to Pandula problem of land subsidence in East Commissioner(FM) on Godavari district of Andhra Pradesh 11/05/2016 22. 15.03.2016 21.06.2016 Dr. Tapas Mandal Need to undertake dredging in Original letter sent to Ichhamati River in West Bengal Commissioner(FM) on 21/06/2016 23. 11.05.2016 21.06.2016 Shri Need to formulate a plan to check Original letter sent to land erosion caused by rivers in Commissioner(FM) on Farrukhabad Parliamentary 21/06/2016 Constituency, Uttar Pradesh 24. 19.07.2016 21.07.2016 Dr. Shashi Tharoor Need to take steps to prevent coastal Original letter sent to Comm. erosion in the Country (FM ) on 21/07/2016

25. 19.07.2016 21.07.2016 Shri Ashwini Kumar Need to ensure adequate supply of Original letter sent to Comm. Choubey water from Ban Sagar Dam to Bihar (FM ) on 21/07/2016 as per agreement 26. 21.07.2016 25.07.2016 Shri Raghav Need to impress upon Government Original letter sent to Comm. Lakhanpal of Uttar Pradesh to provide irrigation (FM ) on 25/07/2016 facilities to farmers in Nanauta block in Saharanpur district of the State 27. 25.07.2016 27.07.2016 Dr. Shashi Tharoor Need for an ‘Emergency Fund’ to Original letter sent to Comm. assist States during unprecedented (FM ) on 27/07/2016 floods 28. 27.07.2016 29.07.2016 Shri Mullappally Need to provide assistance to Kerala Original letter sent to Comm. Ramachandran for completing the seawall along its (FM ) on 29/07/2016 coastline 29. 28.07.2016 02.08.2016 Smt. Mala Rajya Need to rehabilitate people affected Original letter sent to Comm. Laxmi Shah due to Tehri dam lake in Tehri (FM ) on 02/08/2016 Garhwal Parliamentary Constituency, 30. 28.07.2016 02.08.2016 Shri Sushil Kumar Need to construct a sluice gate on Original letter sent to Comm. Singh Kutku dam on Bihar-Jharkhand (FM ) on 02/08/2016 border 31. 01.08.2016 03.08.2016 Shri Kanwar Singh Need to construct embankment on Original letter sent to Comm. Tanwar river Ganga in Amroha (FM ) on 03/08/2016 Parliamentary Constituency, Uttar Pradesh to prevent looming threat of flood in the region 32. 01.08.2016 03.08.2016 Shri Adhir Ranjan Regarding implementation of Kandi Original letter sent to Comm. Chowdhury Master Plan in Murshidabad district (FM ) on 03/08/2016 of West Bengal 33. 01.08.2016 03.08.2016 Smt. Rekha Arun Need to construct a wall along Original letter sent to Comm. Verma village Ratauli in Sitapur district, (FM ) on 03/08/2016 Uttar Pradesh to regulate the course of river Sharada 34. 02.08.2016 04.08.2016 Shri Need to rejuvenate Tamsa, Tilodaki Original letter sent to Comm. Ganga, Kalyani and Bisuhi Rivers in (FM ) on 04/08/2016 easter Uttar Pradesh 35. 04.08.2016 08.08.2016 Shri George Baker Need to dredging of rivers in Assam Original letter sent to Comm. and West Bengal (FM ) on 08/08/2016

36. 04.08.2016 08.08.2016 Shri Rameswar Teli Regarding devastation caused by Original letter sent to Comm. floods and erosion in Rohmoria in (FM ) on 08/08/2016 Assam 37. 03.08.2016 05.08.2016 Shri Yogi Aditya Need to take suitable measures to Original letter sent to Comm. Nath prevent annual floods occurring in (FM ) on 05/08/2016 districts of eastern Uttar Pradesh 38. 08.08.2016 10.08.2016 Shri Birendra Kumar Need to construct sluice gates on Original letter sent to Comm. Chaudhary rivers originating from Nepal and (FM ) on 10/08/2016 flowing through Bihar 39. 09.08.2016 12.08.2016 Shri Santosh Kumar Need to tackle floods caused by Original letter sent to Comm. rivers originating from Nepal (FM ) on 12/08/2016

40. 11.08.2016 23.08.2016 Shri Kunwar Need to take remedial measures to Original letter sent to Comm. regulate the course of Ganga and (FM ) on 23/08/2016 Sonali rivers causing flood in villages under Parliamentary Constituency, Uttar Pradesh. 41. 11.08.2016 23.08.2016 Shri Gaurav Gagoi Regarding tackling floods in Assam Original letter sent to Comm. (FM ) on 23/08/2016

List of pending Matters raised under Rule 377 in the Lok Sabha

JS (PP) (4 Matters)

S.No. Date on Date on which Name of the M.P. Subject Concerned Wing/Section Status which received in matter was the Ministry raised in the from LS/RS House Secretariat 1. 05/08/2015 7/8/2015 Dr. Virendra Kumar Need to expedite work on Original letter sent to JS(PP ) interlinking of Ken and Betwa on 7/8/2015 rivers. 2. 02.03.2016 04.03.2016 Shri Keshav Prasad Need to undertake rivers inter- Original letter sent to JS(PP) Maurya linking project and construct dams on 04/03/2016 in Phulur Parliamentary constituency, Uttar Pradesh 3. 25.04.2016 27.04.2016 Dr. Udit Raj Need for laying emphasis on Original letter sent to JS(PP) rainswater harvesting and inter- on 27/04/2016 linking of rivers to overcome water scarcity in the country 4. 02.08.2016 04.08.2016 Shri Kaushalendra Need for accord approval to the Original letter sent to JS(PP) Kumar proposal of inter-linking of river on 04/08/2016 projects in Bihar and also provide adequate funds for the purpose

List of pending Matters raised under Rule 377 in the Lok Sabha

Comm. (B&B) ( 1 Matter)

S.No. Date on Date on which Name of the M.P. Subject Concerned Wing/Section Status which received in matter was the Ministry raised in the from LS/RS House Secretariat 1. 02.08.2016 04.08.2016 Kumari Sushmita Need for flood management in 1. Original letter has Dev Assam been sent to Commissioner(B&B) on 04.08.2016

2. Matter has been transferred to E.III Division vide B&B Wing’s letter dated 08.08.2016. Acceptance is still awaited.

*****

Pending Matters raised by way of Special Mention in the Rajya Sabha

Commissioner (FM) ( 3 Matters)

S.No. Date on which Date on which Name of the M.P. Subject Current Status & Concerned Wing matter was raised received in the in the House Ministry from LS/RS Secretariat

1. 02/12/2015 07/12/2015 Shri Paul Manoj (Demand for special allocation of funds Original letter sent to Com(FM) Pandian for cement lining and desalting of on 07/12/2015.

channels and tanks in Tirunelveli district in Tamil Nadu

2. 17/12/2015 21/12/2015 Dr. K.P. Ramalingam Demand to bring an ordinance to remove Original letter sent to Com(FM) Encroachment from all waterways in on 22/12/2015.

Country

3. 26/07/2016 29/07/2016 Shri Vishambhar Demand for construction of canal by Original letter sent to Com(FM) Prasad Nishad making embankment on river Yamuna at on 29/07/2016.

village Augasi in Banda District of Bunderlkhand region.

Pending Matters raised by way of Special Mention in the Rajya Sabha

MD (NMCG) ( 5 Matters)

S.No. Date on which Date on which Name of the M.P. Subject Current Status & Concerned Wing matter was raised received in the in the House Ministry from LS/RS Secretariat

1. 24/4/2015 29/4/2015 Chaudhary Munvvar Demand to Formulate Comprehensive Plan Original letter sent to JS(NMCG) Saleem for Cleaning and Beautification of Betwa on 29/4/2015. River in Vidisha.

2. 29/04/2015 05/05/2015 Sh. Narendra Kumar Demand for taking steps for thorough Original letter sent to JS(NMCG) Kashyap cleaning of River Hindon so as to make its on 05/05/2015. Water Fit for Drinking

3. 02.03.2015 19/11/2015 Shrimati Kahkashan Demand for Beautification of Places of Original letter sent to AMD Perween Historical and Religious importance on (NMCG) on 19/11/2015. banks of river Ganga

4. 02/12/2015 07/12/2015 Chaudhary Munvvar Demand for taking effective measures Original letter sent to AMD Saleem to make river betwa in Vidisha (NMCG) on 07/12/2015. Pollution free

5. 14/12/2015 18/03/2016 Chaudhary Munvvar Demand for early Sanctioning of funds Original letter sent to AMD Saleem for cleaning or river Ganga in Uttar (NMCG) on 18/03/2016. Pradesh

Pending Matters raised by way of Special Mention in the Rajya Sabha

JS(PP) ( 3 Matters)

S.No. Date on which Date on which Name of the M.P. Subject Current Status & Concerned Wing matter was raised received in the in the House Ministry from RS Secretariat

1. 07.05.2015 13.05.15 Shri Ahmed Patel Demand for formulating a concrete policy Original letter sent to JS(PP) on to maintain ground-water level in the 13.05.2015. country.

2. 09.03.2016 14.03.2016 Shri S. Thangavelu Demand for allocating Central Funds for Original letter sent to JS(PP) on diversion or surplus water from 14.03.2016. Tamiraparani River to water deficit area or Tirunelveli and Thoothukudi Districts in Tamil Nadu

3. 08.08.2016 12.08.2016 Shri T. Rathinavel Demand for expediting process of Original letter sent to JS(PP) on Interlinking of Peninsular Rivers and 12.08.2016. Nationalize all Inter-State Rivers

Pending Matters raised by way of Special Mention in the Rajya Sabha

Commissioner (SPR) ( 4 matters)

S.No. Date on which Date on which Name of the M.P. Subject Current Status & Concerned Wing matter was raised received in the in the House Ministry from LS/RS Secretariat

1. 10/12/2015 16/12/2015 Chaudhary Munvvar Demand to implement small Irrigation Original letter sent to Com (SPR) Saleem Projects to provide relief to Farmers of on 17/12/2015.

Vidisha in Madhya Pradesh.

2. 23/12/2015 30/12/2015 Smt. Vijila Demand for sanctioning necessary Original letter sent to Com (SPR) Sathyananth funds for construction of flood carrier on 31/12/2015.

canal from Kannadian Channel to drought prone area in Tamil Nadu

3 15/03/2016 21/03/2016 Shri Anubhav Demand for addressing issue relating to Original letter sent to Com (SPR) Mohanty rehabilitation cultivable land and on 21/03/2016.

environment arising out of Polavaram Dam Project

4. 11/03/2016 21/06/2016 Shri Palvai Concern over exclusion of thousands of Original letter sent to Govardhan Reddy children from rehabilitation process at Comm.(SPR) on 21/06/2016.

Polavaram dam

Pending Matters raised by way of Special Mention in the Rajya Sabha

Director (E.III) (1 Matter)

S.No. Date on which Date on which Name of the M.P. Subject Current Status & Concerned Wing matter was raised received in the in the House Ministry from LS/RS Secretariat

1. 27/04/2016 02/05/2016 Ripun Bora Demand for taking immediate steps for Original letter sent to JS (A) on restructuring of Brahmaputra Board and 02/05/2016. constitution of Brahmaputra River Basin Authority

Pending Matters raised by way of Special Mention in the Rajya Sabha

Commissioner (Pen River) ( 2 Matters)

S.No. Date on which Date on which Name of the M.P. Subject Current Status & Concerned Wing matter was raised received in the in the House Ministry from LS/RS Secretariat

1. 18/07/2016 20/07/2016 Dr. V. Maitreyan Need to protect rights for lower riparian Original letter sent to Com(Pen. State of Tamil Nadu in matter of Palar River) on 20/07/2016.

river water

2. 27/07/2016 01/08/2016 Shri S. Demand for establishment of Cauvery Original letter sent to Comm.(PR) Muthukaruppan Management Board and Cauvery Water on 01/08/2016.

Regulation Committee

Pending Matters raised by way of Special Mention in the Rajya Sabha

Commissioner (Indus) ( 1 Matters)

S.No. Date on which Date on which Name of the M.P. Subject Current Status & Concerned Wing matter was raised received in the in the House Ministry from LS/RS Secretariat

1. 02/08/2016 05/08/2016 Shrimati Viplove Demand for taking steps to give share of Original letter sent to Com(Indus) Thakur Himachal Pradesh in Vyas Bhakhra on 05/08/2016.

Management Board 2. Matter has been transferred from Indus Wing to Director BBMB, M/o Power vide letter No. H-11014/11/2016-IT dated 11.08.2016.

*****