OMAHA-COUNCIL BLUFFS METROPOLITAN AREA PLANNING AGENCY 2222 Cuming Street, Omaha (402) 444-6866

BOARD OF DIRECTORS MEETING Thursday, June 30, 2016 1:30 p.m.

AGENDA

This meeting of the Metropolitan Area Planning Agency Board of Directors will be conducted in compliance with the Nebraska Statues of the Open Meeting Act. For reference, the Open Meeting Act is posted on the wall of the Board Room.

A. ROLL CALL / INTRODUCTIONS

B. BOARD MINUTES of the May 26, 2016 meeting. (ACTION) Item B

C. FINANCE COMMITTEE MINUTES of the June 22, 2016 meeting. (ACTION) Item C

D. AGENCY REPORTS & PRESENTATIONS – (INFO)

1. Executive Director’s Report a. Monthly Report Item D.1.a

2. Heartland 2050 Report

E. PUBLIC COMMENTS – See Footnote

F. CONSENT AGENDA –

Any individual item may be removed by a Board Member for special discussion and consideration. Unless there is an exception, these items will be approved as one with a single vote of the Board of Directors.

1. CONTRACT FINAL PAYMENTS – (ACTION)

a. City of Omaha Public Works – Final Payment - $13,272.35 Item F.1.a

2. CONTRACT AMENDMENTS –

a. EDA Amendment $12,000.00 for Fiscal Years 2015 – 2017 Item F.2.a

3. APPOINTMENT OF THE FY 2017 SECRETARY / TREASURER – (Action)

The Board will be requested to ratify the Chairman’s appointment of Patrick Bloomingdale as Secretary/Treasurer for FY 2017

4. FY 2017 LEGAL COUNSEL – (Action)

The Board will be requested to ratify the Chairman’s appointment of Paul Kratz as Legal Counsel for the FY 2017.

5. FY 2017 DEPOSITORY – DEPOSITARY RESOLUTION – (Action) Item F.5

The Finance Committee recommends Nebraska Public Agency Investment Trust (NPAIT) and American National Bank as Depositories for FY 2017 and the Executive Director, Director of Finance and Operations and Treasurer as Depositary for MAPA FY 2017.

G. OLD BUSINESS

1. 2040 LONG RANGE TRANSPORTATION PLAN (LRTP) AMENDMENT – (ACTION) Item G.1 The Board will consider approval of the 2040 LRTP Amendment.

2. FY 2016 – 2019 TRANSPORTATION IMPROVEMENT PROGRAM (TIP) AMENDMENT #12 – (ACTION)

The Board will consider approval of amendments to the FY 2016 - 2019 TIP. Item G.2

3. FINAL FY 2017 – 2010 TRANSPORTATION IMPROVEMENT PROGRAM (TIP) – (ACTION) Item G.3

The Board will consider approval of the FY 2017 – 2020 TIP final draft to be released for a 30 Day public review period.

H. NEW BUSINESS

1. NEW CONTRACTS – (ACTION)

a. Department of Defense JLUS Implementation Agreement $140,000.00 Item H.1.a b. Treynor Comp plan $18,000.00 Item H.1.b

2. FY 2017 SALARY ADJUSTMENT – (Action) Item H.2

The FY 2017 MAPA budget contains funds for a 3% salary adjustment. The Finance Committee recommended for Board approval a salary adjustment for FY 2017 of a 1% cost of living adjustment for all staff members effective July 1, 2016. In addition, a 2% merit pool is requested for FY 2017.

3. FY 2017 MAPA COMMITTEES – (Action) Item H.3

The FY 2017 committee members will be appointed.

4. HEARTLAND 2050 ACTION PLAN – (Action) Item H.4

The Board will consider approval of the Heartland 2050 Action Plan to be released for a 30 Day public review period.

5. RECORD RETENTION POLICY AMENDMENT – (Action) Item H.5

The Board will consider approval of the Record Retention Policy amendment.

I. ADDITIONAL BUSINESS

J. DISCUSSION

K. ADJOURNMENT

Future Meetings:

Council of Officials Luncheon – Wednesday, July 13, 2016 – Bass Pro Shop Uncle Buck’s Fishbowl & Grill Restaurant, Council Bluffs, Iowa Speaker – Council Bluffs Police Chief, Tim Carmody

Finance Committee: Wednesday, July 20, 2016

Board of Directors: Thursday, July 28, 2016

Heartland 2050 Summer Summit – August 2, 2016 7:30 a.m. – 12:00 p.m. at the Harper Center, Creighton University

* Individuals interested in addressing the MAPA Board of Directors during the Public Comment period about agenda items should identify themselves by name and address before speaking. Individuals interested in addressing the MAPA Board of Directors regarding non-agenda items must sign the request to speak list located in the Board Room prior to the beginning of the meeting.

Requests to speak may also be made to MAPA in writing by regular U.S. mail or email ([email protected]) provided that requests are received by close of business on the day prior to the meeting. Speakers will be limited to three minutes. The presiding officer shall have authority to limit discussion or presentation by members and non-members of the Board of Directors or to take other appropriate actions necessary to conduct all business in an orderly manner.

OMAHA-COUNCIL BLUFFS METROPOLITAN AREA PLANNING AGENCY BOARD OF DIRECTORS REGULAR MEETING Minutes May 26, 2016

The Board of Directors met at the MAPA offices, 2222 Cuming Street, Omaha. Chairman Kohn called the meeting to order at 1:33 p.m.

A. ROLL CALL/INTRODUCTIONS

Members/Officers Present Patrick Bloomingdale MAPA Secretary/Treasurer, Douglas County Clare Duda Douglas County Commissioner Tom Hanafan (arrived @1:39 p.m.) Pottawattamie County Board of Supervisors Ron Kohn IA Small Cities/Counties Representative (Mills County Board of Supervisors) Rita Sanders Mayor, City of Bellevue Jean Stothert (arrived @1:37 p.m.) Mayor, City of Omaha Matt Walsh Mayor, City of Council Bluffs

Members/Officers Absent Ben Gray Omaha City Council Doug Kindig NE Small Cities/Counties Representative (Mayor, City of La Vista) Tom Richards Sarpy County Commissioner

Guests Donna Barry Office of Senator Chuck Grassley

MAPA Staff Christina Brownell Sue Cutsforth Lynn Dittmer Melissa Engel Michael Felschow Mike Helgerson Trang Hoang Karna Loewenstein Fabiola Nomenyo Owen Stuckey Greg Youell

B. APPROVAL OF THE MINUTES of the April 28, 2016 meeting – (Action)

MOTION by Sanders, SECOND by Duda to approve the minutes of the April 28, 2016 meeting of the Board of Directors.

AYES: Duda, Kohn, Sanders, Walsh NAYS: None. ABSTAIN: None. MOTION CARRIED. A Quorum was obtained with the Douglas County Commissioner vote counting as two votes, per By-Laws.

C. APPROVAL OF FINANCE COMMITTEE MINUTES AND REPORT – (Action)

Mr. Patrick Bloomingdale reported that the Finance Committee met on May 18, 2016 and approved bills for April, reviewed March financial statements and approved contract payments. Items were forwarded to the Board of Directors for approval.

MOTION by Sanders, SECOND by Duda to approve the minutes of the May 18, 2016 Finance Committee meeting.

AYES: Duda, Kohn, Sanders, Walsh NAYS: None. ABSTAIN: None. MOTION CARRIED. A Quorum was obtained with the Douglas County Commissioner vote counting as two votes, per By-Laws.

Approved by______Patrick Bloomingdale, Secretary/Treasurer

D. AGENCY REPORTS

1. Monthly Report – (Info)

Mr. Greg Youell provided an update to the Board on MAPA activities for the month of April. Mr. Youell introduced MAPA’s new interns, Fabiola Nomenyo who will be assisting with Community Development and transportation planning projects and Owen Stuckey, who will be assisting with data and GIS projects. Trang Hoang, a graduate student from UNMC, will be assisting with the ‘Little Steps. Big Impact.’ air quality project. On June 1, Chuck Karpf will begin as MAPA’s housing specialist and will assist communities with housing related projects. MAPA is working with the Department of Defense to submit an application to fund the implementation phase of the recommendations in the Joint Land Use Study. MAPA staff has wrapped up the facilitation work with Pottawattamie County and after three meetings a recommendation has emerged for a new waste management facility on the eastern side of the county. The Platteview Road Corridor Study has been completed and the Final Report is available on MAPA’s website. MAPA staff will be hosting a series of stakeholder meetings around the LRTP scenario packages being developed as part of the MAPA-NDOR Metro Area Travel Improvement Study (MTIS). Mr. Youell, Mr. Felschow & three board members (Supervisor Kohn, Mayor Sanders and Councilmember Ben Gray) will be attending the NARC 50 Annual Conference in Salt Lake City, Utah. Mr. Youell has scheduled a site visit with Dan Lofgren, President of the Cowboy Properties.

2. Heartland 2050 Report – (Info)

Ms. Karna Loewenstein provided an update to the Board on Heartland 2050 activities. The Executive Committee met on May 11th and reviewed and discussed the action steps that were recommended by the implementation committees and moved to approve the Action Plan. The draft will be out for public comment June 8th – July 8th. Committees are transitioning and will be developed into work teams to focus on specific projects. Mr. Jeff Spiehs recently attended a Fair Housing and Assessment training in Kansas City and Mr. Loewenstien attended a Collective Impact learning lab in , CA. The Summer Summit is approaching and there are currently 100 RSVPs.

E. PUBLIC COMMENT –

None.

F. CONSENT AGENDA –

1. FY 2016 Year End Budget Revision –

a. Line Item Budget Amendment b. UPWP Revision

2. Travel –

a. Economic Development Conference, Denver, CO – July 31, 2016 – August 3, 2016 – Michael Felschow & Grant Anderson – $3,232

3. FY 2107 General Insurance Renewal –

The Board considered renewal of MAPA’s current Business Owner’s Package, workers compensation, directors and officers, commercial auto and crime bond insurance.

MOTION by Walsh, SECOND by Hanafan to approve all items listed on the Consent Agenda.

AYES: Duda, Hanafan, Kohn, Sanders, Stothert, Walsh NAYS: None. ABSTAIN: None. MOTION CARRIED

G. OLD BUSINESS

1. Contract Amendments – (Action)

Mr. Greg Youell presented to the Board for approval the contract amendment listed below.

a. Olsson Associates – Sarpy County Transit Plan Budget Amendment

MOTION by Stothert, SECOND by Duda to approve the Olsson Associates – Sarpy County Transit Plan contract amendment.

AYES: Duda, Hanafan, Kohn, Sanders, Stothert, Walsh NAYS: None. ABSTAIN: None. MOTION CARRIED.

2. FY 2017 BUDGET SCHEDULE – (Action)

Mr. Youell presented FY 2017 Budget items listed below to the Board for approval.

a. Funds Budget b. Line Item c. Program Budget d. Final Draft FY 2017 Work Program (UPWP) e. Authorization for Director to approve UPWP and PL agreement.

MOTION by Stothert, SECOND by Sanders to approve all items of the FY 2017 Budget Schedule.

AYES: Duda, Hanafan, Kohn, Sanders, Stothert, Walsh NAYS: None. ABSTAIN: None. MOTION CARRIED.

3. FY 2016 – 2017 Transportation Improvement Program (TIP) Amendment #11 –

Mr. Mike Helgerson presented the FY 2016 – 2019 TIP amendment #11 to the Board for approval. The amendment includes a change to the location description for the Council Bluffs project, Kanesville Blvd Adaptive Traffic Signal Control.

MOTION by Duda, SECOND by Sanders to approve the FY 2016 – 2019 Transportation Improvement Program (TIP) Amendment.

AYES: Duda, Hanafan, Kohn, Sanders, Stothert, Walsh NAYS: None. ABSTAIN: None. MOTION CARRIED.

H. NEW BUSINESS

1. NEW CONTRACTS – (Action)

Mr. Youell presented to the Board for approval new contracts listed below.

a. JEO – Mills County Comp Plan - $14,100 b. HDR On-Call Travel Demand Modeling - $25,000 c. Douglas County GIS - $82,000 - Federal; $35,260 – Match; 5% Admin Fee d. Omaha Public Works - $63,000 – Federal; $27,090 – Match; 5% Admin Fee

e. Omaha Planning - $60,000 – Federal; $25,800 – Match; 5% Admin Fee f. Sarpy County - $65,000 – Federal; $27,950 – Match; 5% Admin Fee g. Pottawattamie County GIS - $35,000 – Federal; $15,050 – Match; 5% Admin Fee h. Metro Transit - $98,000 – Federal; $42,000 – Match; 5% Admin Fee

MOTION by Walsh, SECOND by Sanders to approve new contracts listed above.

AYES: Duda, Hanafan, Kohn, Sanders, Stothert, Walsh NAYS: None. ABSTAIN: None. MOTION CARRIED.

2. Heartland 2050 Communications (up to $20,000) – (Action)

Mr. Youell requested approval from the Board authorizing the Executive Director to contract with a firm to assist with the educational communications and materials related to the Heartland 2050 Actions Steps.

MOTION by Sanders, SECOND by Duda to authorize the Executive Director to contract with a firm for Heartland 2050 Communications up to $20,000.

AYES: Duda, Hanafan, Kohn, Sanders, Stothert, Walsh NAYS: None. ABSTAIN: None. MOTION CARRIED.

3. Draft FY 2017 – 2020 Transportation Improvement Program (TIP) – (Action)

Mr. Michael Felschow presented to the Board for approval the Draft FY 2017 – 2010 TIP to go to 30-Day public review period.

MOTION by Duda, SECOND by Stothert to approve the Draft FY 2017 – 2010 TIP to go to 30-Day public review period.

AYES: Duda, Hanafan, Kohn, Sanders, Stothert, Walsh NAYS: None. ABSTAIN: None. MOTION CARRIED.

4. Project Case Review – (ACTION)

Ms. Lynn Dittmer requested approval from the Board to provide favorable comment on the project cases from Nebraska Department of Environmental Quality listed below.

a. Case 2016-03 NDEQ – Nebraska Department of Environmental Quality (NDEQ) – Water Supplemental Monitoring b. Case 2016-04 NDEQ – Nebraska Department of Environmental Quality (NDEQ) – Water 319 Grant – Nonpoint Source Management Program

MOTION by Sanders, SECOND by Hanafan to approve commenting on the two project cases listed above from the Nebraska Department of Environmental Quality

AYES: Duda, Hanafan, Kohn, Sanders, Stothert, Walsh NAYS: None. ABSTAIN: None. MOTION CARRIED

5. Election of Officers – (ACTION)

Chairman Kohn announced to the Board that, as specified in the Interlocal Agreement, the FY 2017 Chair and Vice-Chair of the MAPA Board of Directors will be elected. They will take office July 1, 2016.

Commissioner Duda nominated Mayor Sanders as Chair and Supervisor Kohn as Vice-Chair, seconded by Mayor Walsh. Sanders and Kohn accepted the respective nominations.

AYES: Duda, Hanafan, Kohn, Sanders, Stothert, Walsh NAYS: None. ABSTAIN: None. MOTION CARRIED to elect Mayor Sanders as Chair and Supervisor Kohn as Vice-Chair effective July 1, 2016.

I. ADDITIONAL BUSINESS

The Board had some discussion around the Emerald Ash Borer, how the communities are dealing with the issue and how MAPA could help regionally.

J. DISCUSSION

None.

K. ADJOURNMENT

Chairman Kohn adjourned the meeting at 2:15 p.m.

METROPOLITAN AREA PLANNING AGENCY 2222 Cuming Street Omaha NE 68102-4328 FINANCE COMMITTEE MEETING June 17, 2015

The MAPA Finance Committee met June 17, 2015 in the MAPA conference room. Patrick Bloomingdale called the meeting to order at 8:30 a.m.

ROLL CALL

Members Present Staff Patrick Bloomingdale, Secretary/Treasurer Natasha Barrett Ron Kohn, Mills County Lynn Dittmer Carl Lorenzen, Washington County Melissa Engel Tom Richards, Sarpy County Michael Felschow Amanda Morales Greg Youell

Members Absent Clare Duda, Douglas County Tom Hanafan, Pottawattamie County

A. MONTHLY FINANCIAL STATEMENTS (April)

1. Bank Reconciliation (American National Bank) and Statements on Investments 2. Receipts and Expenditures 3. Schedule of Accounts Receivable/Accounts Payable 4. Consolidated Balance Sheet 5. Program Status Report/Line Item Status Report

Ms. Engel presented the financial statements for April.

B. FOR FINANCE COMMITTEE APPROVAL

1. Contract Payments: (Action) a. SWIPCO – PMT # 4 - $780.80 b. LSC – PMT # 4 - $8,731.10 c. FHU – PMT # 7 - $93.64

Mr. Youell presented the above contract payments for the Finance Committee’s approval.

MOTION by Richards SECOND by Kohn to approve the contract payments under B. 1. MOTION CARRIED.

2. Travel (Action) a. Lynn Dittmer – NADO Annual Conference – New Orleans, LA – Oct. 24 – 27, 2015, $1,707.00

Mr. Youell presented Ms. Dittmers travel for the Finance Committee’s approval.

MOTION by Kohn SECOND by Lorenzen to approve the travel as presented. MOTION CARRIED.

C. RECOMMENDATION TO THE BOARD

1. Contracts: a. 5310 Operations Contracts i. Black Hills Works - $51,166 – FY 13 funds ii. Intercultural Senior Center - $15,450 – FY 13 funds iii. City of Council Bluffs - $75,000 – FY 15 funds

Mr. Youell presented item C. 1. Contracts all of which are Federal Transit funds for operational expenses with 50% matching funds. The Black Hills Workshop contract is for July 1, 2015 through June 30, 2016. They will continue to provide transportation services to individuals with disabilities employed at Offutt Air Force Base. The contract period for Intercultural Senior Center is May 28, 2015 through June 30, 2016. The Intercultural Senior Center will provide paratransit services for seniors and disabled individuals to their center. The City of Council Bluffs contract is for their contracted services with Council Bluffs Special Transit Service, who provides paratransit services to the elderly and disabled citizens of Council Bluffs. They provide transportation within the city limits of Council Bluffs and to three medical facilities in Omaha. The city has received funding for these contracted services for many years, but until recently the 5310 funds were ran through the state.

The current contract is for October 14, 2014 through September 30, 2015.

MOTION Kohn SECOND by Richards to recommend to the Board of Directors approval of the contracts as presented. MOTION CARRIED.

2. Contract Amendments a. LSC: One Call Center Research extension of time to September 30, 2015

MAPA has asked LSC to complete additional peer analysis as part of their research, which has created a need to extend the contract date to September 30, 2015.

MOTION Lorenzen SECOND by Kohn to recommend that the Board of Directors approve the contract amendment as presented. MOTION CARRIED.

3. FY 2016 Depository Resolution

Annually the Depository Resolution is signed to designate depositories for all agency funds. The designated depositories are the Executive Director, Director of Finance and Operations, and the MAPA Treasurer.

MOTION Kohn SECOND by Lorenzen to recommend that the Board of Directors approve the FY 2016 depository resolution as presented. MOTION CARRIED.

4. FY 2016 Salary Adjustment a. MAPA management requests a 1% cost of living adjustment to be provided to all employees effective July 1, 2015. In addition, a 2% merit pool is requested for FY 16. An allowance for this salary adjustment was included in the FY 16 budget.

Mr. Youell presented the proposed salary adjustment. Utilizing a current IARC survey MAPA management compared the salaries of ten positions in the survey to MAPA’s current salaries. The agencies salaries on average were 3% - 6% lower than those in the survey. A 1% increase allows the agency to competitively recruit and retain employees.

MOTION Lorenzen SECOND by Kohn to recommend to the Board of Directors approval of FY 2016 salary adjustment. MOTION CARRIED.

D. DISCUSSION/INFORMATION

1. Nebraska State Funding Update

Mr. Youell updated the committee on the anticipated $81,000 of funding to be received from the State of Nebraska. MAPA will be reaching out to local jurisdictions in Nebraska for projects that may utilize the funding.

2. Heartland 2050 Local Funding Request

Mr. Youell presented the Committee with a list of local jurisdictions that were sent funding requests for Heartland 2050. The list included the population (the bases of the request) of each jurisdiction and the monetary contribution requested from each jurisdiction.

E. OTHER

F. ADJOURNMENT The meeting adjourned at 8:50 a.m. MAPA Monthly Progress Report | May 2016 – June 2016 Page | 1

Metropolitan Area Planning Agency Transportation Planning Activities | Monthly Progress Report

Reporting Period: May 16, 2016 – June 17, 2016

Transportation Forums (140) – Objective: To provide a forum for coordination and cooperation between MAPA and agencies, organizations and stakeholders involved and interested in planning, designing, maintaining and providing transportation services.

Program Activity ● Prepared materials for the May and June Transportation Technical Advisory Committee meetings ● Held the May Transportation Technical Advisory Committee

140 End Products Schedule

01 Transportation Technical Advisory Committee Monthly

02 Nebraska Department of Roads (NDOR) Statewide MPO Meeting Twice / year

03 Iowa Department of Transportation (Iowa DOT) MPO and RPA Quarterly Meeting

Summit and Working Groups (150) –

Objective: MAPA will convene a semi-annual summit and several subcommittees or working groups around specific transportation-related topics.

Program Activity ● Held six stakeholder workshops for the development of the Long Range Transportation Plan

150 End Products Schedule

01 Transportation Summit and Working Groups Fall 2015, Spring 2016 MAPA Monthly Progress Report | May 2016 – June 2016 Page | 2

02 Project Review Committee comments to State and Federal agencies Ongoing

Technical and Policy Education (170) –

Objective: To provide ongoing technical and policy education for planning and research activities.

Program Activity ● Attended federal-aid overview webinar ● Attended public participation training and certification through IAP2 ● Attended IDOT Transportation Incident Management conference ● Attended United Way Symposium Series: The Impact of Widening Opportunity Gaps 170 End Products Schedule

01 Technical and Policy Education Events Ongoing

01 Webinars (FHWA, FTA, etc.) Ongoing

02 Related Association Participation (NROC, IARC, NADO, NARC, etc.) Ongoing

03 Professional Certifications and Memberships Ongoing

Public Forums and Workshops (180) –

Objective: To provide and support public forums and workshops that identify and discuss timely topics or high visibility special subjects of a regional significance.

Program Activity ● Preparing for the summer summit to be held August 2

180 End Products Schedule

July 2015, 01 Heartland 2050 Stakeholder Summits Feb. 2016

01 2015 Heartland Active Transportation Summit Spring 2016 MAPA Monthly Progress Report | May 2016 – June 2016 Page | 3

01 Support and Host Public Events, Forums and Workshops As Needed

Policy and Administrative Forums (190) –

Objective: To maintain and coordinate policy and administrative forums. Work includes but is not limited to creating agendas, supporting materials, conduct meetings and communications with committee members.

Program Activity ● Reviewed invoices for the May and June finance Committee meetings ● Prepared materials for the monthly Finance Committee and Board of Directors Meeting ● Sent invitations for the July Council of Officials meeting 190 End Products Schedule

01 Council of Officials Administration Ongoing

02 Board of Directors Administration Ongoing

03 Finance Committee Administration Ongoing

Short Range Planning (410) –

Objective: To develop and refine the short range transportation planning process; develop and maintain the Transportation Improvement Program (TIP); collect and maintain data (land use, population, employment, housing, traffic, etc.) to analyze trends and growth patterns; utilize and coordinate Geographic Information Systems (GIS) and aerial photography activities; assist local jurisdictions in the programming, funding and delivery of transportation improvements; develop and maintain performance measures to track progress toward regional goals; support short range active transportation activities.

Program Activity ● Set up and conducted a public meeting on the draft 20817-2022 TIP ● Sent out information to stakeholders and interested parties on the draft TIP ● Worked with Live Well Omaha and other stakeholders to promote LSBI and the Commuter Challenge at all MAPA events and meetings ● Finalized TIP graphics ● Prepared final review of Aerial Photography product for delivery in June ● Invoiced and collected member jurisdiction contributions for the Aerial Photography project MAPA Monthly Progress Report | May 2016 – June 2016 Page | 4

410 End Products for Work Activities Schedule

01 FY 2017-22 TIP Spring 2016

02 Funding / needs data and analysis Ongoing

Technical support for Local Project Assistance (LPA) and local and 03 Ongoing state planning activities

04 2014 Traffic Flow map and associated report preparation Fall 2015

05 Updated land use, employment, economic, and population data Ongoing

05 Census data and growth analysis Ongoing

06 Map production and data analysis Ongoing

07 NIROC aerial photography delivery and administration Spring 2016

08 Performance measure coordination and development Ongoing

09 Health and safety activities Ongoing

16 Convene ProSe-Com to prepare FY-17 TIP Fall 2015-Winter 2016

17 Convene TAP-C to prepare FY-17 TIP Fall 2015-Winter 2016

18 Omaha Active Transportation Activities Ongoing

Long Range Planning (420) –

Objective: To conduct the long range transportation planning process; implement and maintain the regional Long Range Transportation Plan; develop medium and long range growth forecasts and traffic simulations or forecasts at a regional and/or subregional level; develop local and corridor-level planning studies; and support the development of Complete Streets and active transportation as recommended by the LRTP.

Program Activity ● Set up and conducted a public meeting for a 2040 LRTP amendment ● Conducted stakeholder meetings and outreach for the 2050 LRTP ● Held public meetings and sent out online surveys for the 2050 LRTP ● Received final model update files from HDR. Upgraded to TransCAD 7 and began converting MAPA Monthly Progress Report | May 2016 – June 2016 Page | 5

2040 LRTP model to new format ● Refined TAZ SE Data with input from Sarpy County jurisdictions ● Coordinated with the MTIS project team (NDOR) to develop weights and scoring for the performance measures ● Administered the Bike Education Safety project with Live Well Omaha

420 End Products Schedule

01 LRTP 2035 maintenance and amendment (as needed) Ongoing

Planned Summer 01 LRTP 2040 2015, Due March 2016

02 Long-Range Planning Activities Ongoing

02 LRTP 2050 Preparation Kick-off Fall-Winter 2015

03 Travel Demand Model Refinement Ongoing

04 Population and Employment Forecast Refinement Ongoing

05 Land Use Allocation Model maintenance and refinement Ongoing

06 Metro Bike Safety Education 2015-2016

06 Regional Bicycle-Pedestrian Plan Summer 2015

06 Convene multi-modal working group at summits Semi-annual

07 Passenger Rail Planning Ongoing

08 Freight and Goods Movement Participation Ongoing

09 Heartland 2050 Implementation Activities for Transportation Ongoing

11 Metro Area Travel Improvement Study (MTIS) Ongoing

12 Platteview Road Corridor Study 2015

Public Participation Activities (430) –

Objective: To conduct public involvement activities in accord with MAPA Public Participation Plan in order to MAPA Monthly Progress Report | May 2016 – June 2016 Page | 6

effectively and continuously engage public input in the transportation planning process.

Program Activity

● Published public notices and created and disseminated news release and meeting flyers announcing 3rd round of 2050 Long Range Transportation Plan (LRTP) public meetings and Draft FY 2017-FY 2022 Transportation Improvement Program (TIP) and 2040 LRTP Amendment ● Held region wide public meetings for the 2050 LRTP ● Attended Environment Justice training in Kansas City (3 staff members)

430 End Products Schedule

01 Public Participation Plan maintenance and revision Ongoing

01 Public Participation Annual Activities Report Annual

02 Public Involvement and Engagement Activities Ongoing

03 Citizen’s Academy for Omaha’s Future Semi-annual

04 Civil Rights / Title VI Plan maintenance and activities Ongoing

04 Annual DBE Goal development and monitoring 2015

05 Convene Citizen’s Advisory Committee Ongoing

Transit and Human Service Transportation (440) –

Objective: To conduct and coordinate planning for mass transit and paratransit in the MAPA region.

Program Activity ● Continued coordination with Metro Transit and the VA on the creation of a region wide One Call One Click resource ● Attended and promoted Metro Transit meetings on BRT design ● Volunteered in public meetings on the BRT at UNO and First National Bank ● Olsson associates continues work on the Sarpy County Transit Plan. MAPA staff provides assistance and review. 440 End Products Schedule

01 Transit Service Planning and Evaluation Ongoing MAPA Monthly Progress Report | May 2016 – June 2016 Page | 7

02 Coordinated Transportation Plan Committee Ongoing

03 JARC, New Freedom, 5310 Administration Ongoing

04 FTA VTCLI Grant Mobility Coordination Activities Ongoing

05 Central Omaha Bus Rapid Transit / Urban Circulator 2015-2016

06 Metro Transit Planning Activities Ongoing

01 Transit Service Planning and Evaluation Ongoing

Air Quality / Environmental (450) –

Objective: To improve air quality and take proactive measures to reduce environmental impacts and improve energy conservation as related to transportation.

Program Activity ● Conducted Little Steps Big Impact campaign meetings as well as began outreach to schools and employers ● Provided prizes donated for Commuter Challenge to Live Well Omaha ● Coordinated with NDOR and community partners on the MAPA electrical vehicle CMAQ grant

450 End Products Schedule

01 Metro Rideshare Website Administration Ongoing

02/ Little Steps, Big Impact Ozone Reduction Campaign (CMAQ) 2015, 2016 03

02 Education for alternative fuel vehicles to reduce emissions Ongoing

02 Convene air quality working group at summits At least 2/year

03 Work with grants for electric vehicle infrastructure 2015-2016

04 Commuter Challenge 2015, 2016

Iowa Regional Planning Affiliation (460) – MAPA Monthly Progress Report | May 2016 – June 2016 Page | 8

Objective: To provide administration for Iowa RPA-18 and develop a regional TIP and LRTP for Harrison, Mills, and Shelby counties and the non-urbanized portion of Pottawattamie County that can be integrated into the State Transportation Improvement Plan (STIP) and State Transportation Plan.

Program Activity ● Prepared Draft FY 2017 Transportation Improvement Program ● Held two June meetings of the Policy & Technical Committees ● Finalized FY 2017 Transportation Planning Work Program (TPWP) and distributed the TPWP to state and federal partners ● Workin on the Pottawattamie County transportation plan

460 End Products Schedule

461 Transportation Forums/Committee Administration Ongoing

462 Transportation Planning Work Program Spring 2016

Regional Transportation Improvement Program (RTIP) / Short Spring 2016 463 Range Planning

464 Long Range Transportation Plan (LRTP) / Long Range Planning Ongoing

465 Public Participation Plan (PPP) and Activities Ongoing

466 Human Services Transportation Coordination Ongoing

Congestion Management / Safety and Technology (470) –

Objective: To monitor traffic congestion levels in the metro area through the Congestion Management Process; to promote a safe and efficient transportation system through the development of management and operations, safety, and technological strategies and solutions.

Program Activity

● Updated Metro Area Motorist Assist (MAMA) Program database ● Pay MAMA invoices ● Prepare for volunteer recognition dinner to be held in July

MAPA Monthly Progress Report | May 2016 – June 2016 Page | 9

470 End Products Schedule

471 CMP Improvements 2015-2016

471 Congestion working group at summits At least 2/year

472 MAMA Program Administration Ongoing

472 TIM Committee Ongoing

473 Regional ITS Architecture Maintenance Ongoing

474 Safety Planning and Crash Analysis Ongoing

474 Congestion working group at summits At least 2/year

475 Regional Signal Coordination and Implementation Ongoing

Community Development Assistance (710) –

Objective: To provide technical assistance to jurisdictions in identifying community development needs and the resources to meet those needs.

Program Activity

● City of Crescent Comprehensive Plan draft currently being reviewed by the public. Working to update zoning ordinances. ● Continuing CDBG administration for the cities of Hancock, Henderson, and Macedonia. ● Continuing CDBG administration for Walnut Downtown. Completed and submitted SHPO request for comments. ● Research and writing the City of Gretna Downtown Revitalization Application. ● Researching and collecting information for Macedonia Downtown Revitalization Application. ● Working on Brownfields Coalition Assessment Grant. Partnering with the Omaha Housing Authority to complete assessments and redevelopment work on Southside Terrace. ● Working with Community Improvements to Increase Economic Stability (CITIES) Program on program administration. ● Administering American Heroes Park concept design project in Bellevue; EXis Design Shop is the project architect. ● Drafting JLUS Implementation Scope of Work and Budget. Completing the JLUS application ready for late May submittal. ● Working with the Southwest Iowa Nature Trails, Inc. Board of Directors to update Bylaws and MAPA Monthly Progress Report | May 2016 – June 2016 Page | 10

Articles of Incorporation. ● Working with Carter Lake on funding options for sewer improvements. ● Working with Greater Omaha Economic Development Partnership to regional data needs and opportunities for collaboration. ● Working with Mills County Trails Board on organizational and funding needs. ● Provided information/technical assistance to Greater Omaha Chamber staff. ● Participating in Human Centered Design training. ● Attended Housing and Urban Development Disaster Resiliency Kickoff meeting in Glenwood for the East and West Nishnabotna watersheds. ● Attended and participated in MAPA Staff Retreat. ● Attended Organizational Ethics: When Right and Wrong is Not Black and White Confirmation webinar. ● Presented grant writing basics to Southwest Iowa Clerk Administrator Association in Coin, IA. ● Updated City of Carson’s strategic plan.

Economic Development Assistance (720) –

Objective: To provide technical assistance to jurisdictions to identify economic development needs and the resources to meet those needs.

Program Activity

● Continued work on distressed area economic profile for areas that meet EDA’s distressed criteria based on per capita income and unemployment - reviewing draft. ● Met with executive director of north Omaha-based non-profit and other stakeholders to discuss program and financial/technical assistance needs. ● Met with Greater Omaha Chamber staff to discuss a potential entrepreneurial conditions study for the region. ● Began preparation of MAPA Economic Development District annual report and Comprehensive Economic Development Strategy (CEDS) update.

Heartland 2050 Regional Vision (730) –

Objective: To oversee Implementation of the Heartland 2050 Regional Vision project, moving the work forward through development of a committee structure, hosting semi-annual summits, convening workgroups to select and complete projects and developing metrics to measure and show progress. Program Activity MAPA Monthly Progress Report | May 2016 – June 2016 Page | 11

● Convened Executive Committee, and the following Implementation Committees: Economic Development, Education, Health and Safety, Housing and Development, Infrastructure, Natural Resources, Equity and Engagement. ● Made a presentation and request for funding to Ashland City Council. ● Finalizing details on the Summer Summit August 2. ● Finalizing details on the reception for the Jeff Speck August 1. ● Met with Zach Mannheimer and discussed plans for September Speaker Series event. ● Met with funders from Iowa West Foundation and Peter Kiewit Foundation ● Attended a Collective Impact Workshop ● Submitted a request for funding to the City of Omaha ● Continued to coordinate with NDOR for the development of a grant program using STP funding for the Heartland 2050 implementation. ● Selected a firm and prepared agreement to provide messaging and branding services for H2050 summits and initiatives

Revolving Loan Funds (760) –

Objective: To administer CDBG re-use funds on behalf of local jurisdictions in Douglas, Sarpy and Washington counties, and to oversee MAPA Nonprofit Development Organization Revolving Loan Fund.

Program Activity ● Continued to service CDBG re-use loan made to KB Quality Meats, LLC in Blair. ● Provided Blair re-use fund information to Gateway Economic Development Corporation; discussed potential funding opportunity with Executive Director. ● Continued administration of MAPA Nonprofit Development Organization Revolving Loan Fund program; working with Nebraska Department of Economic Development to “de-federalize” original loan fund balance.

Management Assistance (790) –

Objective: To provide management and administrative assistance to member jurisdictions such as Personnel Policies, Job Descriptions, etc.

Program Activity ● No activity this month

MAPA Monthly Progress Report | May 2016 – June 2016 Page | 12

Publications (810) –

Objective: To publicize MAPA activities and accomplishments to MAPA member jurisdictions, state and local officials and the public.

Program Activity ● Created content for May/June edition of What’s Happening newsletter ● Worked on Regional Directory update

810 End Products Schedule

811 What's Happening Newsletter Bi-monthly

812 Annual Report October 2015

813 Regional Officials Directory Website Updated Spring 2016

814 Product Development Ongoing

Public Information and Communications (840) –

Objective: To provide transportation-related data to public and private sector representatives.

Program Activity ● Set up interview with KIOS for stories regarding 2050 LRTP development process ● Created and disseminated news releases on 2nd round of public outreach for 2050 LRTP, Draft FY 2017-FY 2022 TIP and Ozone Action Days ● Made multiple posts to Facebook and Twitter regarding public meetings and projects ● Added stories and documents on MAPA projects to website

840 End Products Schedule

841 Transportation Information to Public/Private Sector Ongoing

842 Libraries Ongoing

843 Website and Social Media Ongoing

MAPA Monthly Progress Report | May 2016 – June 2016 Page | 13

Community Development Administration (920) –

Objective: To provide for administration of MAPA’s Community / Economic Development programs.

Program Activity ● Amended EDA grant for an additional $12,000 for FY 17 and 18. ● Revising scope and staffing plan of EDA grant for housing program ● Prepared Treynor Comp Plan agreement Transportation Program Administration (940) –

Objective: To provide for efficient administration of MAPA’s Transportation programs.

Program Activity ● Received final UPWP acceptance form FHWA ● Prepared pass through contracts for FY17 ● Met with sub recipient on the use of an indirect cost plan 940 End Products Schedule

941 Program Administration Ongoing

942 Contracts Ongoing

943 Unified Work Program (UPWP) Ongoing

944 Agreements Ongoing

945 Certification Review and Process Ongoing

Employee Benefit Administration (970) –

Objective: Provide management of agency benefits, retirement, health and life insurance program.

Program Activity ● Held benefit committee meeting to discuss implications of the new FLSA salary requirement ● Held July open enrollment period and education meeting on AFLAC benefits ● Met with the benefits committee to review fund offering performance in the Pension Plan and Deferred Compensation Plans. Voted to remove under performing plans and replace with recommended plans. ● Attended FLSA webinars MAPA Monthly Progress Report | May 2016 – June 2016 Page | 14

Fiscal Management (980) –

Objective: Develop the annual budget and cost allocation plan, track revenues and expenditures, prepare invoices, and assist with the annual audit and other fiscal activities.

Program Activity ● Communicated billing issues to MAPA’s sub recipients and consultants. ● Prepared and presented financial reports to the finance committee. ● Prepared quarterly reimbursement requests for grants. ● Attended Uniform Guidance webinar

General Administration (990) –

Objective: Undertake administrative activities including personnel, computer and technology support, clerical activities and support.

Program Activity ● Added phone system capacity ● Ordered and installed new laptop ● Provided administrative support to the agency ● Orientated summer interns and new housing coordinator ● Attended an ethics webinar ● Hosted a full day employee retreat at Mahoney State Park. Performed assessments and learned about how generations perform in the workplace. Participated in multiple team building activities. ● Worked with a business equipment provider to analyze current business equipment use and costs. ● Prepared record retention policy for Board approval

Metropolitan Area Planning Agency Long Range Transportation Plan 2040

TABLE 7.1 ANTICIPATED FEDERAL REVENUES Nebraska Federal Highway Administration (FHWA) Revenues (in $1,000s) Funding Annual 2016-2019 2020- 2026- 2031- Category Average (TIP) 2025 2030 2035 2036-2040 Total CMAQ $750 $1,930 $4997 $4897 $5044 $5195 $22,063 DPU $1,000 $4,360 $0 $0 $0 $0 $4,360 HSIP $1,600 $6,248 $10660 $10447 $10761 $11084 $49,200 NHPP $18,500 $82,267 $0 $0 $0 $0 $82,267 STP-MAPA $15,071 $96,003 $100,410 $98407 $101359 $104400 $500,579 STP-HBP $1,000 $5,000 $6662 $6530 $6725 $6927 $31,844 STP-State $2,500 $9,735 $0 $0 $0 $0 $9,735 TAP-MAPA $1,000 $4,730 $6662 $6530 $6725 $6927 $31,574 Total $41,421 $210,273 $129,391 $126,811 $130,614 $134,533 $731,622

Iowa Federal Highway Administration (FHWA) Revenues (in $1,000s) Funding Annual 2016-2019 2020- 2026- 2031- Category Average (TIP) 2025 2030 2035 2036-2040 Total CMAQ $150 $864 $946 $879 $897 $915 $4,501 DPS $1,150 $4,662 $0 $0 $0 $0 $4,662 NHPP $98,000 $388,309 $84,681 $0 $0 $0 $472,990 STP-MAPA $1,700 $15,600 $10,724 $9,963 $10,162 $10,366 $56,815 STP-HBP $2,700 $0 $6,308 $5,861 $5,978 $6,097 $24,244 STP-State $5,000 $0 $6,557 $18,400 $0 $0 $24,957 TAP-MAPA $300 $700 $1,892 $1,758 $1,793 $1,829 $7,972 Total $109,000 $410,135 $111,108 $36,861 $18,830 $19,207 $596,141

Total Regional Federal Highway Administration (FHWA) Revenues (in $1,000s) Funding Annual 2016-2019 2020- 2026- 2031- Category Average (TIP) 2025 2030 2035 2036-2040 Total CMAQ $900 $2,794 $5,943 $5,776 $5,941 $6,110 $26,564 DPS & DPU $2,150 $9,022 $0 $0 $0 $0 $9,022 HSIP $1,600 $6,248 $10,660 $10,447 $10,761 $11,084 $49,200 NHPP $116,500 $470,576 $105,851 $0 $0 $0 $576,427 STP-MAPA $16,771 $111,603 $111,134 $108,370 $111,521 $114,766 $557,394 STP-HBP $3,700 $5,000 $12,970 $12,391 $12,703 $13,024 $56,088 STP-State $7,500 $9,735 $6,557 $18,400 $0 $0 $34,692 TAP-MAPA $1,300 $5,430 $8,554 $8,288 $8,518 $8,756 $39,546 Total $150,421 $620,408 $240,499 $163,672 $149,444 $153,740 $1,348,933

Page | 7-6

Metropolitan Area Planning Agency Long Range Transportation Plan 2040

7.6 REGIONALLY SIGNIFICANT TRANSPORTATION INVESTMENTS

The list of street and highway projects eligible for Federal aid funding following in this section is fiscally-constrained to reasonably available local, state, and federal revenues. Project costs take inflation into account and appear in year-of-expenditure dollars. Therefore, project costs for future years appear higher than what they would cost if constructed today. As is described in Section 7.3, federal funding levels were identified based on past trends within the Omaha-Council Bluffs region. Local revenues were identified based on local financial reports and identified operations & maintenance costs.

These projects listed in this LRTP are considered eligible for Federal-Aid funding by the MPO. Projects will be selected for Federal aid funding as they go through the MPO’s project selection and prioritization process for the TIP, while some projects may be advanced using solely local funding sources. The following sections divide the projects between Regionally Significant Roadway & Trail Projects, Regionally Significant Transit Investments, and Illustrative Projects.

7.5.1– REGIONALLY SIGNIFICANT ROADWAY & TRAIL INVESTMENTS The tables that follow this section include regionally significant roadway and trail projects identified from the 2035 Long Range Transportation Plan and the scenario planning process described earlier in this chapter. These investments represent the federal-aid eligible portion of this LRTP as the total funding for both local and state projects has been

The FY2016-2019 Transportation Improvement Program serves as the four-year implementation program of this plan. Projects identified in this TIP are included in the first band of projects within this project list.

A summary of the fiscally constrained Roadway & Trail program is included in Table 7.8 below.

TABLE 7.8 SUMMARY OF REGIONALLY SIGNIFICANT ROADWAY & TRAIL PROJECTS

2016-2019 (TIP) 2020-2025 2026-2030 2031-2035 2036-2040 Total Iowa $467,444 $120,273 $37,320 $59,884 $35,153 $720,074 Nebraska $331,667 $122,760 $151,710 $147,222 $148,488 $901,847 Total $799,111 $243,033 $189,030 $207,106 $183,641 $1,621,921 (Figures in $1,000s)

Page | 7-15

Nebraska TIP Projects | FY 2016-2019

TIP ID Lead Agency Project Name Improvement Location Project Cost (FY2016-2019) Total Project Cost 2015-048 Bellevue 36th Street Phase N-370 - Sheridan 36th St - N-370 to Sheridan $9,618,500 $10,871,620 2015-050 Bellevue 36th Street Phase II Sheridan to Platteview Rd $956,130 $9,911,130 2015-046 Bennington 156th Street Bennington $2,208,750 $2,929,446 2015-039 Douglas 180th Street (Phase 1) HWS Cleveland Blvd to Blondo St and Blondo St .25 mile East and West to 180th St $28,520,000 $31,185,000 2016-037 La Vista Applewood Creek Trail From Giles Road north along Applewood Creek between Giles and Harrison $163,000 $1,830,500 2016-038 MAPA Heartland B-Cycle Expansion Various locations throughout the City of Omaha $1,162,909 $1,162,909 2015-021 Metro Metro Rolling Stock Metro Transit service area $3,052,500 $4,466,250 2015-139 Metro Bus Rapid Transit Along Dodge/Farnham corridor, from Westroads Mall $2,232,500 $36,012,500 2015-005 NDOR I-680/US-6 Interchange DMS Along I-680/US-6 in Omaha. Begin R.P. – 2.29 $712,000 $760,000 2015-006 NDOR N-370: US-75 West, Bellevue N-370 sections from 1.6 mi east of 72nd Street east 3.15 mi $5,474,000 $5,670,000 2015-008 NDOR I-80/680 'Q'-'L' CD Rds, Omaha (WB) WB I-80 CD roads and ramps in the I-80/I-680 interchange area in Omaha. Begin R.P. – 444.23 $4,197,000 $4,237,000 2015-015 NDOR US-75: Plattsmouth - Bellevue, North of Platte River US-75 from Platte River bridge, north 3.1 miles. Begin R.P. – 76.30 $32,016,000 $32,016,000 2015-023 NDOR I-80: 24th Street - 13th Street I-80 from 24th Street to 10th Street. Begin R.P. – 453.37 $13,446,000 $13,446,000 2015-024 NDOR Platte River Bridges East of Yutan On Highway N-92, two bridges over the Platte River 1.5 and 1.8 miles east of Yutan. Begin R.P. – 462.56 $947,000 $962,000 2015-025 NDOR Schramm Park South N-31, 4.2 miles south of Schramm Park Recreational Area. Begin R.P. – 4.18 $1,870,000 $1,925,000 2015-026 NDOR Giles Road Interchange Ramps I-80 ramps at Giles Road interchange. Begin R.P – 442.0 $2,483,000 $2,541,000 2015-027 NDOR Jct N-31/N-36 Intersection Improvements Junction of Highways N-31 and N-36. Begin R.P. – 30.93 $2,092,000 $2,092,000 2015-028 NDOR Elkhorn River West On N-36 from Old Highway 275/Reicmuth Road, east to just west of the Elkhorn River $3,030,000 $3,080,000 2015-029 NDOR N-64 at SE Jct US-275 - Omaha N-64 (W Maple Road) at junction of US-275 east to Ramblewood Drive/Elkhorn Drive. Begin R.P. – 59.21 $3,250,000 $3,360,000 2015-034 NDOR N-92: Platte River East Structures Nebraska Highway 92 (W Center Road) at the Platte River. Begin R.P. – 463.30 $715,000 $740,000 2015-036 NDOR EB I-80 at I-680 EB I-80 at interchange with I-680. Begin R.P. – 445.74 $1,342,000 $1,342,000 2015-037 NDOR Ralston Viaduct N-85/BNSF viaduct in Ralston. Begin R.P. – 4.02 $5,174,000 $5,364,000 2015-068 NDOR N-133: Thomas Creek Bridge North (SB) On southbound lanes of N-133 from just north of Thomas Creek crossing, north 0.12 miles. Begin R.P. – 5.94 $532,000 $534,000 2015-152 NDOR I-680 / US-6 Bridges On I-680 at US-6. Begin R.P. – 2.89 $8,213,000 $8,213,000 2016-001 NDOR I-480: Bancroft - Dewey On I-480, from 0.1 miles north of 1-80/US-75, north to miles south of Harney Street. Begin R.P. – 0.50 $6,692,000 $6,700,000 2016-002 NDOR N-31: Schramm Park - US-6 On N-31 from near Schramm Park entrance to south junction with US-6 $2,548,000 $2,553,000 2016-003 NDOR US-275: Waterloo Viaduct On US-275 from Valley to viaduct at Waterloo. Begin R.P. – 165.74 $7,570,000 $7,570,000 2016-004 NDOR US-275: West Papillion Creek Bridge West On US-275 from 1.6 mile east of the west limits of Omaha to east of West Papillion Creek bridge. Begin R.P. – 176.33 $1,556,000 $1,556,000 2016-005 NDOR I-680: Fort Street to Missouri River On I-680 from near Fort Street northeast to Missouri River Bridge. Begin R.P. – 6.04 $155,000 $155,000 2016-006 NDOR I-80/I-480 Bridges I-80 bridges at I-480 Interchange. Begin R.P. – 451.00 $4,800,000 $4,800,000 2016-007 NDOR I-80/I-480/US-75 Interchange I-80 and I-480 bridges at I-80/I-480/US-75 Interchange. Begin R.P. – 452.98 $12,970,000 $12,970,000 2016-008 NDOR I-480: 20th Street - Missouri River Bridges (EB) On eastbound I-480 (including ramps) from 20th Street to the Missouri River. Begin R.P. – 2.95 $8,600,000 $8,600,000 2016-009 NDOR I-480: 20th Street - Missouri River Bridges (WB) On westbound I-480 (including ramps) from 20th Street to the Missouri River. Begin R.P. – 2.95 $9,350,000 $9,350,000 2016-010 NDOR N-31 Bridges North of N-36 On N-31, approximately 0.7 miles and 5.2 miles north of N-36. Begin R.P. – 31.75 $2,271,000 $2,271,000 2016-011 NDOR US-75: J Street & Gilmore Ave Bridge (SB) Viaduct on US-75 at Gilmore/Union Pacific Rail Road and bridge at J Street. Begin R.P. – 85.80 $2,619,000 $2,619,000 2016-012 NDOR US-75: Off Ramp to N-64 (NB) On northbound US-75 off-ramp to N-64 (Cuming Street). Begin R.P. – 91.09 $258,000 $258,000 2016-013 NDOR US-75: Big Papillion Creek, Bellevue On US-75 over Big Papillion Creek, approximately 0.3 miles south of Bellevue. Being R.P. – 80.03 $250,000 $250,000 2016-014 NDOR District 2 CCTV Cameras On I-680, at three (3) locations in the Omaha area. Begin R.P. – 9.94 $131,000 $136,000 2016-015 NDOR US-75 Fiber-Optic Along US-75 from Fort Crook Road to south Junction with I-480 $755,000 $759,000 2016-016 NDOR US-6 Fiber-Optic Along US-6 from N-31 to Westroads Mall Road in Omah $922,000 $922,000 2016-017 NDOR I-80/I-480/I-680 Barriers, Omaha Along I-80, I-480, and I-680 bridge locations in Omaha $864,000 $864,000 2016-018 NDOR I-80, N-31, N-370, & N-50 Ramps I-80 interchange ramps at N-31, N-370, and N-50 $710,000 $710,000 2016-019 NDOR US-275: 25th Street - 23rd Street On US-275 from 1/2 block west of 25th Street to 1/2 block east of 23rd Street. Begin R.P. – 189.14 $1,668,000 $1,668,000 2016-020 NDOR I-680: Mormon Bridge Painting On I-680 at Mormon Bridge over Missouri River. Begin R.P. – 13.43 $6,710,000 $6,710,000 2016-021 NDOR I-680: Mormon Bridge Deck Overlay On I-680 at Mormon Bridge over Missouri River. Begin R.P. – 13.43 $1,610,000 $1,610,000 2016-022 $4,436,000 $4,436,000 NDOR US-75 Bridge Approaches, Bellevue US-75 bridges approaches from approximately 0.3 miles south Bellevue, north to Chandler Road. Begin R.P. – 80.03 2016-023 NDOR 24th Street Interstate Bridge On 24th Street over I-80. Begin R.P. – 453.37 $460,000 $460,000 2016-024 $4,500,000 $4,500,000 NDOR N-31: Elkhorn Viaduct On N-31, viaduct over Park/Papio/Union Pacific Railroad approximately 0.7 miles south of N-64. Begin R.P. – 24.40 2016-025 NDOR I-680: West Center Road Bridge On I-680 at West Center Road. Begin R.P. – 0.83 $1,520,000 $1,520,000 2016-026 NDOR I-80: I-480 to 24th Street On I-80 from I-480 to 24th Street. Begin R.P. – 453.01 $1,050,000 $1,050,000 2016-027 NDOR N-370: I-80 to Bellevue On N-370 from I-80 to NB US-75 ramp terminal in Bellevue. Begin R.P. – 4.19 $500,000 $500,000 2016-028 NDOR District 2 I-80 Fiber-Optic Along I-80 from near Mahoney interchange east to the Iowa State line. Begin R.P. – 426.90 $2,426,000 $2,426,000 2016-029 NDOR District 2 I-680 Fiber-Optic Along I-680 in Omaha $1,300,000 $1,300,000 2016-030 NDOR District 2 I-480 Fiber-Optic Along I-480 in Omaha $467,000 $467,000 2016-031 $688,000 $688,000 NDOR US-75: Dynamic Message Signs, Omaha Along northbound and southbound US-75 from approximately J Street to west of F Street in Omaha. Begin R.P. – 87.33 2016-032 NDOR District 2 DMS Along I-80, US-75, and US-34 in District 2. Begin R.P. – 428.92 $2,065,000 $2,065,000 2016-033 NDOR District 2 CCTV Camera Towers At eleven locations along I-80, I-680, US-75, US-34, and N-370 in District 2 $485,000 $485,000 2015-001 Omaha North Downtown Riverfront Pedestrian Bridge 10th and Fahey Drive $5,848,500 $6,558,500 2015-013 Omaha Omaha Signal Infrastructure - Phase A Various Locations Throughout City $4,447,500 $4,447,500 2015-016 Omaha Omaha ATMS Central System Software Citywide $655,000 $1,573,750 2015-017 Omaha Omaha Signal Network - System Management Various locations throughout the City of Omaha $500,000 $500,000 2015-040 Omaha 156th Street Phase Two Pepperwood Dr. to Corby St. $10,355,000 $12,222,556 2015-044 Omaha Q Street Bridge Q St. between 26th St. and 27th St. $9,575,000 $11,187,000 2015-051 Omaha 108th Street Madison St to Q Street $6,431,250 $6,771,250 2015-052 Omaha 168th Street West Center Rd to Poppleton $5,908,750 $6,466,250 2015-053 Omaha 114th Street Burke to Pacific St $4,583,750 $5,556,250 2015-054 Omaha 168th Street West Center Rd to Q Street $12,292,500 $12,959,190 2015-055 Omaha 120th Street Stonegate Dr to Fort St $10,732,500 $11,957,500 2015-065 Omaha 24th Street Road Diet From L Street to Leavenworth Street. $3,395,000 $3,395,000 2015-132 Omaha 132nd at West Center Road Safety Project 132nd Street from Kingswood to Arbor Plaza and West Center Road from 133rd Plaza to 130th Ave $2,001,000 $2,313,500 Nebraska TIP Projects | FY 2016-2019

TIP ID Lead Agency Project Name Improvement Location Project Cost (FY2016-2019) Total Project Cost 2015-157 Omaha Omaha Signal Infrastructure - Phase B Various Locations Throughout City $3,278,750 $3,278,750 2015-158 Omaha Omaha Signal Infrastructure - Phase C Various Locations Throughout City $1,970,000 $1,970,000 2015-159 Omaha Omaha Signal Infrastructure - Phase D Various Locations Throughout City $1,448,750 $1,448,750 2016-045 Omaha Omaha Resurfacing Program Various locations throughout the City of Omaha $12,000,000 $12,000,000 2015-010 Papillion Schram Road 84th Street to 90th Street Schram Road 84th Street to 90th Street $437,500 $5,522,500 2015-041 PMRNRD Western Douglas County Trail Phase 2 City of Valley to Village of Waterloo $2,224,910 $2,543,228 2015-042 PMRNRD Western Douglas County Trail Phase 1 City of Valley to Twin Rivers YMCA $3,224,655 $3,586,055 2015-058 Sarpy 132nd and Giles 132nd and Giles Road $2,585,000 $3,057,713 2015-062 Sarpy 66th and Giles Harrison St. to 400ft. South of Giles Road and Giles Road from 69th St. to 66th St. $1,233,750 $11,761,250 2015-138 Valley Valley D.C. Safe Routes to School Portion of Meigs Street in Valley, NE $225,000 $270,000 Total $331,667,354 $408,925,847

Iowa TIP Projects | FY 2016-2019

TIP ID Lead Agency Project Name Improvement Location Total Cost 2015-007 Pottawattamie Pottawattamie County Multi-Use Trail - Phase 1 From Council Bluffs north to 330th Street along the Railroad Highway, approximately 7 miles $281,250 2015-014 Council Bluffs Iowa Riverfront Trail III Recreation Trail Connection Along Missouri River $286,250 2015-045 Council Bluffs East Beltway Segments A-D US-6 to IA-92 $12,060,250 2015-056 Iowa DOT I-80 I-80/I-29/I-480 Interstate Reconstruction $431,454,000 2015-060 Council Bluffs River Rd. Trail River Rd to Nebraska Ave. $307,500 2015-075 Council Bluffs Interstate Utility Relocation On I-29 at Mosquito Creek $1,863,000 2015-077 Council Bluffs Kanesville Blvd Adaptive Traffic Signal Control On Kanesville Boulevard, from 16th Street to North Avenue $486,000 2015-078 Council Bluffs East Broadway Realignment at Kanesville Blvd On Kanesville Boulevard from Frank Street to North Broadway $593,500 2015-079 Iowa DOT US 275 Bridge Over Missouri River US Highway 275 Bridge over Missouri River $1,236,000 2015-081 Iowa DOT I-680 Bridge Over Missouri River - Westbound On I-680 3.1 miles west of I-29 $1,679,000 2015-082 Iowa DOT I-680 Bridge Over Missouri River - Eastbound On I-680 3.1 miles west of I-29 $1,558,000 2015-085 Iowa DOT I-80 Missouri River to Cass County On I-80 from Missouri River to Cass County line $1,200,000 2015-086 Iowa DOT I-29 Bridge at 9th Avenue - Southbound I-29 at 9th Ave in Council Bluffs $250,000 2015-087 Iowa DOT I-29 Bridge at 9th Avenue - Northbound On I-29 at 9th Avenue in Council Bluffs $250,000 2016-034 Council Bluffs North 16th Street Reconstruction On 16th Street (Highway 192) from Avenue G to Nash Boulevard $5,625,000 2016-035 Council Bluffs South Expressway Reconstuction - Phase 1 On Highway 192 from I-80 north to 21st Street $5,781,500 2016-039 Iowa DOT I-80 Missouri River Bridge - Eastbound On I-80 at Missour River crossing in Council Bluffs $48,000 2016-040 Iowa DOT I-80 Missouri River Bridge - Westbound On I-80 at Missour River crossing in Council Bluffs $48,000 2016-041 Iowa DOT I-29: Mills County to Iowa 92 On I-29 from Mills County line to Iowa Highway 92 in Council Bluffs $250,000 2016-042 Iowa DOT US-275 Missouri River Bridge On US-275 at Missouri River crossing $572,000 2016-043 Iowa DOT I-480: Missouri River to I-29 On I-480 from the Missouri River to I-29 in Council Bluffs $400,000 2016-044 Iowa DOT I-480 Missouri River Bridge On I-480 at the Missouri River crossing in Council Bluffs $1,218,000 Total $467,447,250 Metropolitan Area Planning Agency Long Range Transportation Plan 2040

7.7 FISCAL CONSTRAINT OVERVIEW FOR ROADWAY & TRAIL PROJECTS

In order to demonstrate fiscal constraint of the projects and revenues identified in this chapter, MAPA has included Tables 7.13 (below) and & 7.14 (next page). These tables correlates the anticipated federal-aid highway revenues, local revenues, and estimated project costs to summarize the analysis conducted within this chapter. The positive balances shown in Table 7.13 below demonstrates that the identified Federal-Aid program of projects is fiscally constrained. Balances in the short-term bucket reflects the inability to program funding by year for non-regional sources of federal funding.

Table 7.14 (next page) summarizes non-federal-aid revenue and expenditures identified within this plan. The maps that follow this section show identified Federal-Aid investments, non-federal-aid projects, and all projects together.

TABLE 7.13 MAPA FEDERAL-AID FISCAL CONSTRAINT OVERVIEW (IN $1,000S)

Anticipated Federal-Aid Revenues (in $1,000s) TIP Short Term Medium Term Long Term 2016-2019 2020-2025 2026-2030 2031-2035 2036-2040 Total Iowa Federal-Aid $410,135 $111,108 $36,861 $18,830 $19,207 $596,141 Nebraska Federal-Aid $210,273 $129,391 $126,811 $130,614 $134,533 $731,622 Sub-Total $620,408 $240,499 $163,672 $149,444 $153,740 $1,327,763 Iowa Match $57,309 $24,055 $7,464 $23,423 $15,946 $128,197 Nebraska Match $121,394 $24,552 $28,759 $16,608 $13,955 $205,268 Sub-Total $178,703 $48,607 $36,223 $40,031 $29,901 $333,465

Iowa Total $467,444 $135,163 $44,325 $59,884 $35,153 $741,969 Nebraska Total $331,667 $153,943 $157,153 $147,222 $148,488 $938,473 Total Revenues $799,111 $289,106 $201,478 $207,106 $183,641 $1,680,442

Total Federal-Aid Project Costs (in $1,000s) TIP Short Term Medium Term Long Term 2016-2019 2020-2025 2026-2030 2031-2035 2036-2040 Total Federal-Aid - IA $467,444 $120,273 $37,320 $59,884 $35,153 $720,074 Federal-Aid - NE $331,667 $122,760 $151,710 $147,222 $148,488 $901,847 Sub Total $799,111 $243,033 $189,030 $207,106 $183,641 $1,621,921

Balance of Federal-Aid Revenues & Expenditures (in $1,000s) TIP Short Term Medium Term Long Term 2016-2019 2020-2025 2026-2030 2031-2035 2036-2040 Total Iowa Balance $0 $14,890 $7,005 $0 $0 $21,895 Nebraska Balance $0 $31,183 $5,443 $0 $0 $36,626 Regional Balance $0 $46,073 $12,448 $0 $0 $58,521

Page | 7-28

Metropolitan Area Planning Agency FY2016-2021 Transportation Improvement Program Revision Summary - Amendment 12

Control # Project Name Lead Agency Revision Note IA-34865 Eastern Hills Drive - Segment C Council Bluffs Update project description to "In the city of Council Bluffs, Eastern Hills Dr: Cedarbrook Dr to Cedar Ln and Cedar Ln: From Eastern Hill Dr West 700’"; reduce DPS funding in FY2016 for ROW to $672,000 and reduce DPS funding in FY2017 for UTIL-CON-CE to $2,254,000

Control # Project Name Lead Agency Revision Note NE-22506 24th Street Road Diet Omaha Remove State-Nebraska funding from PE-NEPA-FD and UTIL-CON-CE phases

Control # Project Name Lead Agency Revision Note NE-22595 I-80/I-480/US-75 Interchange NDOR Increase NHPP funding for UTIL-CON-CE in FY2016 to $11,418,000

Control # Project Name Lead Agency Revision Note NE-22528 I-480: Bancroft - Dewey NDOR Increase NHPP funding for UTIL-CON-CE in FY2016 to $6,023,000

17-Jun-16 Metropolitan Area Planning Agency FY2016-2021 Transportation Improvement Program

TIP ID Project Name 2016-069 Eastern Hills Drive - Segment C Control Number IA-34865

Lead Agency Council Bluffs Project Type Road Widening County Pottawattamie Length (mi) 0.00 Total Project Cost* $3,658.00 Location In the city of Council Bluffs, Eastern Hills Dr: Cedarbrook Dr to Cedar Ln and Cedar Ln: From Eastern Hill Dr West 700’

Description Widening of roadway to 4-lanes

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2016 ROW DPS $840.00 $672.00 $0.00 $168.00

2017 UTIL-CON-CE DPS $2,818.00 $2,254.00 $0.00 $564.00 * Amounts in thousands of U.S. dollars

Revision History 3/31/2016 Amendment 9 Program $739,000 of DPS in FY2016 for UTIL-CON-CE and program $2,500,000 of DPS funding in FY2017 for UTIL-CON-CE 6/30/2016 Amendment 12 Update project description to "In the city of Council Bluffs, Eastern Hills Dr: Cedarbrook Dr to Cedar Ln and Cedar Ln: From Eastern Hill Dr West 700’"; reduce DPS funding in FY2016 for ROW to $672,000 and reduce DPS funding in FY2017 for UTIL-CON-CE to $2,254,000

2016-069 17-Jun-16 Page 1 of 4 Metropolitan Area Planning Agency FY2016-2021 Transportation Improvement Program

TIP ID Project Name 2015-065 24th Street Road Diet Control Number NE-22506

Lead Agency Omaha Project Type Multi-Modal Improvement County Douglas Length (mi) 2.75 Total Project Cost* $3,419.10 Location From L Street to Leavenworth Street.

Description Reduce excess capacity with 4-lane to 3-lane road diet and facilitate multi-modal options.

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2016 PE-NEPA-FD HSIP $331.01 $297.91 $0.00 $33.10

2018 ROW HSIP $79.00 $71.10 $0.00 $7.90

2019 UTIL-CON-CE HSIP $3,009.09 $2,708.18 $0.00 $300.91 * Amounts in thousands of U.S. dollars

Revision History 10/29/2015 Amendment 1 Eliminate FY2017 TAP-MAPA funding; program $297,909 of HSIP funding in FY2016 for PE-NEPA-FD, program $71,100 of HSIP funding in FY2017 for ROW, and program $2,639,327 of HSIP funding in FY2018 for CON 12/21/2015 Administrative Modification 5 HSIP funding increased in FY2018 to $2,708,179 for UTIL-CON-CE

3/31/2016 Amendment 9 Reprogram PE-NEPA-FD phase to FY2018, program $91,550 of State funding for PE-NEPA- FD in FY2018, reprogram ROW phase to FY2018, reporgram UTIL-CON-CE phase to FY2019, and program $1,397,550 of state funding for UTIL-CON-CE in FY2019 to merge project with NE-22635 5/3/2016 Administrative Modification 10 Reprogram PE-NEPA-FD phase from FY2018 to FY2016

6/30/2016 Amendment 12 Remove State-Nebraska funding from PE-NEPA-FD and UTIL-CON-CE phases

2015-065 17-Jun-16 Page 2 of 4 Metropolitan Area Planning Agency FY2016-2021 Transportation Improvement Program

TIP ID Project Name 2016-007 I-80/I-480/US-75 Interchange Control Number NE-22595

Lead Agency NDOR Project Type Bridge County Douglas Length (mi) Total Project Cost* $12,970.00 Location I-80 and I-480 bridges at I-80/I-480/US-75 Interchange. Begin R.P. – 452.98

Description Bridge repair and overlay

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2016 PE-NEPA-FD State-Nebraska $283.00 $0.00 $283.00 $0.00

2019 UTIL-CON-CE NHPP $12,687.00 $11,418.00 $1,269.00 $0.00 * Amounts in thousands of U.S. dollars

Revision History 6/30/2016 Amendment 12 Increase NHPP funding for UTIL-CON-CE in FY2016 to $11,418,000

2016-007 17-Jun-16 Page 3 of 4 Metropolitan Area Planning Agency FY2016-2021 Transportation Improvement Program

TIP ID Project Name 2016-001 I-480: Bancroft - Dewey Control Number NE-22528

Lead Agency NDOR Project Type Resurfacing County Douglas Length (mi) 1.60 Total Project Cost* $6,700.00 Location On I-480, from 0.1 miles north of 1-80/US-75, north to miles south of Harney Street. Begin R.P. – 0.50

Description Mill, concrete repair, resurfacing of existing roadway, ramps and shielding

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2015 PE-NEPA-FD State-Nebraska $8.00 $0.00 $8.00 $0.00

2016 UTIL-CON-CE NHPP $6,692.00 $6,023.00 $669.00 $0.00 * Amounts in thousands of U.S. dollars

Revision History 6/30/2016 Amendment 12 Increase NHPP funding for UTIL-CON-CE in FY2016 to $6,023,000

2016-001 17-Jun-16 Page 4 of 4 Transportation

2022 - Improvement 7 Program FY 201

(Page intentionally left blank)

INSERT MPO SELF CERTIFICATION ONCE APPROVED

INSERT RESOLUTION ONCE APPROVED

Table of Contents MPO Self Certification ...... i Resolution of Approval ...... ii Definitions ...... vi Introduction ...... 1-1 1.1 Metropolitan Area Planning Agency Overview ...... 1-1 1.1.1 MAPA as a Metropolitan Planning Organization ...... 1-1 1.1.2 MAPA Committee Structure ...... 1-2 1.2 The Transportation Planning Process ...... 1-3 1.2.1 Long Range Transportation Plan ...... 1-3 1.2.2 Transportation Improvement Program ...... 1-4 1.2.3 Unified Planning Work Program ...... 1-5 1.2.4 Congestion Management Process ...... 1-5 1.2.5 Coordinated Transit Plan ...... 1-5 1.3 Public Involvement ...... 1-6 1.3.1 MAPA Public Involvement Strategies ...... 1-6 1.3.2 Involvement through the MAPA Committee Structure ...... 1-7 1.3.3 Draft TIP Development Public Involvement ...... 1-8 Programming Process ...... 2-1 2.1 Introduction ...... 2-1 2.1.1 Legislative Requirements ...... 2-1 2.1.2 Maintenance of the Transportation Improvement Program ...... 2-1 2.2 Regional Transportation Funding ...... 2-2 2.2.1 Surface Transportation Program (STP) ...... 2-2 2.2.2 Transportation Alternatives Program (TAP) ...... 2-4 2.2.3 Section 5310 Funding ...... 2-4 2.3 MAPA Project Selection Responsibilities ...... 2-5 2.3.1 Project Selection Subcommittee...... 2-6 2.3.2 Transportation Alternatives Program Committee (TAP-C) ...... 2-8 2.3.3 Coordinated Transit Committee (CTC) ...... 2-10 2.3.4 MAPA Project Selection Results ...... 2-11 2.4 Development & Implementation of TIP Projects ...... 2-12 2.4.1 Lifecycle of a Typical Project in the MAPA Region ...... 2-12 2.4.2 Funding Implementation: A Two Gate Process ...... 2-13 2.5 Other Federal Transportation Programs ...... 2-13 2.5.1 Federal Transit Authority Funded Projects ...... 2-13 2.5.2 Federal Aviation Administration Programs ...... 2-15 2.6 Revisions the TIP ...... 2-15 2.6.1 TIP Amendments ...... 2-15 2.6.2 TIP Administrative Modifications ...... 2-15 2.6.3 Emergency TIP Amendments ...... 2-17 Fiscal Constraint ...... 3-1 3.1 Introduction ...... 3-1 3.1.1 Year of Expenditure Calculations ...... 3-1 3.1.2 Revenue Estimation ...... 3-1

MAPA FY2017-2022 Transportation Improvement Program iv

3.2 Fiscal Constraint and Federal Funding Tables ...... 3-3 3.3 Apportionment and Obligation Flexibility ...... 3-11 3.4 Operations and Maintenance ...... 3-11 3.5 Federal Transit Administration Programs ...... 3-12 Environmental Justice ...... 4-1 4.1 Environmental Justice Populations ...... 4-1 4.1.1 Identification of Environmental Justice Areas ...... 4-2 4.1.2 Identification of the Transit Shed…………………………………………………………………………………………………………4-4 4.1.3 Identification of Funding Levels in EJ Areas and the Transit Shed (TS)………………………………………………….4-5 4.2 Funding Equity within the TIP Program ...... 4-6 4.2.1 Methodology ...... 4-6 4.3 Analysis ...... 4-7 4.3.1 Distribution of Funding ...... 4-8 4.3.2 Benefits & Burdens of the TIP Program ...... 4-9 4.4 Findings ...... 4-10 4.4.1 Transit Shed & Metro Transit Findings ...... 4-10 4.4.2 Highway and Road Findings ...... 4-14 4.4.3 Conclusion of Findings ...... 4-14 Project Tables ...... 5-1 5.1 Regionally Significant Project Information ...... 5-1 5.1.1 Regionally Significant Roadway & Trail Projects ...... 5-1 5.1.2 Regionally Significant Transit Projects ...... 5-51 5.1.3 Regionally Significant Aviation Projects ...... 5-51 5.2 FY2015 Project Status Update ...... 5-59 Public Involvement ...... 6-1 6.1 Public Participation Methodology ...... 6-1 6.2 Public Comment ...... 6-14 6.3 Project Selection Approval ...... 6-20 6.3.1 Project Selection Subcommittee (ProSeCom),...... 6-20 6.3.2 Transportation Alternatives Program Committee (TAP-C) ...... 6-20 6.3.2 Coordinated Transit Committee (CTC) ...... 6-20 Appendices ...... 1 Appendix A - CTC Project Selection Meeting Minutes ...... A-1 Appendix B - CTC Regular Meeting Minutes ...... B-1 Appendix C - TTAC Meeting Minutes ...... C-1

The preparation of this document was financed in part with funding from the United States Department of Transportation (USDOT), administered by the Nebraska Department of Roads (NDOR) and Iowa Department of Transportation (Iowa DOT). The opinions, findings, and conclusions expressed in this publication are those of the authors and do not necessarily represent USDOT, NDOR, or Iowa DOT.

MAPA TTAC Approval: MAPA Board of Directors Approval:

MAPA FY2017-2022 Transportation Improvement Program v

Definitions Apportionment – Yearly funds allocated to each state by Congress to design and construct federal aid transportation projects.

Carryover – Federal funds which were not spent in a past fiscal year that can be used to pay for projects in future fiscal years.

Coordinated Transit Committee (CTC) – Manages the transit funds from FTA and approves and selects transit projects for disabled citizens, veterans, and seniors throughout the Omaha-Council Bluffs transportation management area.

Environmental Justice (EJ) – The fair treatment and meaningful involvement of all people regardless of race, color, national origin, or income with respect to federal law. An EJ area or region within the Omaha-Council Bluffs area is an area that has higher than the regional average of lower income or higher minority populations.

Fiscal Constraint - the ability of a government agency to maintain its current project spending over the course of several fiscal years within the funding available while still keeping a positive budget as well as delivering promised projects.

Fiscal Year – A period used for calculating annual costs and expenditures involving budgeted phases of projects. The beginning of a fiscal year usually differs from a calendar year.

Federal Aid Process – A program administered by the Federal Highway Administration which provides funding for the majority of a transportation project (usually 80% but the percentage can differ) that is constructed by a local public agency while following the rules and regulations involved in receiving federal funds.

Federal Transit Authority (FTA) – is the agency within the US Department of Transportation that provides financial and technical assistance to local public transit systems.

Federal Highway Administration (FHWA) - is a division of the US Department of Transportation that specializes in highway transportation and provides guidance and approval for all of the regions federal funds as well as the Federal Aid Process.

Intelligent Transportation Systems (ITS) – Systems that use computer, electronics, and communications technologies and management strategies – in an integrated manner – to provide traveler information that increases the safety and efficiency of the surface transportation system. ITS also provides useful, real-time information to system operators.

Iowa Department of Transportation (IDOT) - The statewide agency that administers federal funding allocation and apportionment for FHWA for all federally funded projects in the State of Iowa.

Long Range Transportation Plan (LRTP) - A comprehensive plan projecting the transportation needs for the Omaha-Council Bluffs metro area over the next 25 years through projects, plans, projections, and proposed solutions to improve movement of goods and people throughout the area. Additionally, in order to be eligible for federal funding and projects must be listed in the LRTP as required by the Federal Highway Administration.

MAPA FY2017-2022 Transportation Improvement Program vi

MAP-21- Moving Ahead for Progress in the 21st Century Act (MAP-21) is the funding and authorization bill that governs federal surface transportation spending and is the source of all federal funds that the region receives.

Metropolitan Planning Organization (MPO) – a planning body required by the federal government which is responsible for the transportation planning and project selection in its region. It provides a forum for cooperative decision making for the metropolitan planning area. The governor designates an MPO in every urbanized area with a population of more than 50,000. MAPA has been designated this area’s MPO by the governors of both Nebraska and Iowa.

National Environmental Protection Act (NEPA) – Law signed by Congress in 1969 that guides all federal government agencies to prepare documentation of the environmental effects of proposed federal aid projects.

Nebraska Department of Roads (NDOR) – The statewide agency that administers federal funding allocation and apportionment for FHWA for all federally funded projects in the State of Nebraska.

Obligation – Money that has been approved by the Federal Highway Administration and either NDOR or IDOT and set aside for a particular project. The money is usually reserved for several years as long as the project it was reserved for is still active.

Project Selection Committee (ProSeCom) - Manages the surface transportation funds from FHWA and approves and selects road, bridge, and maintenance projects throughout the Omaha-Council Bluffs transportation management area.

Surface Transportation Program (STP) Funding – The transportation funds apportioned by Congress and designated to MAPA through NDOR and IDOT to construct road, bridge, and maintenance projects in the transportation management area.

Title VI – Part of the Civil Rights Act of 1964 that says “No person in the United States shall, on the grounds of race, color or national origin be excluded from participation in, be denied the benefits of, or be subjected to discrimination under any program or activity receiving federal financial assistance”

Transit - a shared public passenger transport service which is available for use by the general public, as (distinct from modes such as taxis or carpooling) that follow prescribed routes or regular schedules. Public transport modes include buses, trolleys, bus rapid transit, trams, trains, airlines, and light rail systems.

Transportation Alternatives Program (TAP) Funding – The transportation alternative funds (formerly the Transportation Enhancement program) designated to MAPA through NDOR and IDOT to construct projects in the transportation management area.

Transportation Alternatives Program Committee (TAP-C) - Manages the transportation alternative funds from FHWA and approves and selects trail, bicycle, pedestrian, and multi-modal projects throughout the Omaha-Council Bluffs transportation management area.

Transportation Improvement Program (TIP) - A 6-year financial program that describes the schedule for obligating federal funds to state and local projects. State, regional and local transportation agencies update the program each year to reflect priority projects in the metro area. The TIP has four years of fiscally constrained projects and two later years called illustrative years where the projects have not been ranked or scored.

MAPA FY2017-2022 Transportation Improvement Program vii

Transportation Management Area (TMA) – The area within the greater Omaha-Council Bluffs Metropolitan Area where MAPA administers federally funded projects. The area is defined as Douglas and Sarpy Counties in Nebraska and the urbanized areas of western Pottawattamie County in Iowa.

Transportation Technical Advisory Committee (TTAC) – A committee of local experts and elected officials that guides continuing, comprehensive and coordinated transportation planning in the Omaha-Council Bluffs area. The committee also coordinates with its subcommittees such as the CTC and ProSeCom and participating state and federal agencies to implement the transportation improvement program by giving recommendations to the MAPA Board of Directors.

U.S. Department of Transportation (DOT) – The federal cabinet-level agency with responsibility for highways, mass transit, aviation, and ports. It is headed by the Secretary of Transportation. The DOT includes the FHWA and FTA among others.

MAPA FY2017-2022 Transportation Improvement Program viii

Introduction

1.1 Metropolitan Area Planning Agency Overview The Omaha-Council Bluffs Metropolitan Area Planning Agency (MAPA) is a voluntary association of local governments in the greater Omaha-Council Bluffs region. Chartered in 1967, the MAPA Council of Governments (COG) performs planning and development work to address problems that are regional in scope and multijurisdictional in nature. The general MAPA COG region covers five counties in Nebraska and Iowa. These counties include Douglas, Sarpy, and Washington Counties in Nebraska and Pottawattamie and Mills Counties in Iowa.

Organizationally, MAPA is led by an executive director who is supported by a staff of 18 full time employees. MAPA is split into four departments: Finance and Operations, Transportation, Heartland 2050, and Community/Economic Development. MAPA’s planners, administrators, and support staff work to implement regionally significant projects within the MAPA TMA boundary.

1.1.1 MAPA as a Metropolitan Planning Organization MAPA serves as the designated Metropolitan Planning Organization (MPO) for the Omaha-Council Bluffs region. MPOs are mandated to exist by Federal transportation legislation to serve five (5) core functions:

1. Establish a fair and impartial setting for regional decision-making in the metropolitan area 2. Evaluate transportation alternatives, scaled to the size and complexity of the region, to the nature of its transportation issues, and to the realistically available options, 3. Develop and maintain a fiscally constrained long-range transportation plan for the jurisdictional with a planning horizon of at least twenty (20) years that fosters: a. Mobility and access for people and goods b. Efficient system performance and preservation, and c. Quality of life 4. Develop a fiscally constrained program based on the long range transportation plan and designed to serve regional goals 5. Involve the general public and all significantly affected sub-groups in each of the four functions as shown above

The MAPA MPO planning area is a sub-area of the MAPA COG region. MAPA’s Transportation Management Area (TMA) is the area in which federal funding apportioned to the MAPA MPO may be used. Federal legislation requires that the TMA include the entire US Census Urbanized Area. The Census Urbanized Area is updated with every decennial census to include areas that meet the character and nature of adjacent urbanized areas.

The MAPA TMA is shown in Figure 1.1 and includes the entirety of Douglas and Sarpy Counties in Nebraska along with the western portion of Pottawattamie County surrounding Council Bluffs, Iowa. Recently, the MAPA TMA boundary has extended into northeastern Cass County, Nebraska based upon the expanded 2010 US Census Urbanized Area Boundary.

MAPA FY2017-2022 Transportation Improvement Program 1-1

Figure 1.1 – MAPA Transportation Management Area (TMA)

MAPA FY2017-2022 Transportation Improvement Program 1-2

Based on information from the 2010-2014 American Community Survey, the MAPA TMA is home to approximately 767,000 people. The Transportation Management Area covers the core urbanized portion of the largest metropolitan area in Nebraska and Iowa. 1.1.2 MAPA Committee Structure The governing body for MAPA is a 64 member Council of Officials, with members representing cities, counties, school districts, resource agencies, and numerous other governmental bodies within the MAPA region. The MAPA Board of Directors is a nine-member board that serves as the Council of Officials’ executive committee.

The Board of Directors is comprised of elected officials representing cities and counties from the larger five-county MAPA region. The MAPA Transportation Technical Advisory Committee (TTAC) reviews and makes recommendations related to transportation to the MAPA Board. Various other committees listed below are involved in MAPA’s planning process and provide input and recommendations to the MAPA Board. The MAPA committee structure is displayed below in Figure 1.2.

 Coordinated Transit Committee (CTC),  Project Selection Committee (ProSeCom),  Transportation Alternatives Program Committee (TAP-C);

The Citizens’ Advisory Council (CAC) is a thirteen member council that was formed in 2014 to provide active public participation in the transportation planning process. The CAC reviews and provides feedback on planning activities presented to TTAC for approval and it informs TTAC of public concerns related to transportation projects and issues.

Figure 1.2 – MAPA Transportation Committee Structure

MAPA FY2017-2022 Transportation Improvement Program 1-3

Council of Officals (64 Members)

MAPA Board (9 Members)

TTAC

TAP-C 5310 STP (Transportation (Coordinated Transit Working Groups (Project Selection) Alternatives Commitee) Program Commitee)

Freight Multi-Modal Safety/TIM ITS Data Resources TMAC

1.2 The Transportation Planning Process To implement the five core functions of an MPO (referenced in Section 1.1.1), MAPA undertakes a continuous planning process that involves stakeholder outreach, public participation, and coordination with federal, state and local government organizations. The following subsections outline these ongoing planning processes. 1.2.1 Long Range Transportation Plan The transportation planning process begins with the Long Range Transportation Plan (LRTP). LRTPs serve as the guiding documents for transportation improvements in MPO regions. The MAPA 2040 LRTP, completed in October 2015, includes regional goals, objectives and strategies for implementation of projects over the next 25 years.

An LRTP must demonstrate fiscal constraint based upon a reasonably expected revenue projection to cover the cost of anticipated improvement projects that have been inflated to anticipated year of expenditure (YOE) costs. This means that the future cost of a project has been estimated based upon trend data for raw materials, engineering, and property acquisition, as well as construction costs. Figure 1.3 illustrates the Long Range Planning process.

MAPA FY2017-2022 Transportation Improvement Program 1-4

Figure 1.3 – Long Range Plan Development Process

Traffic/ Public Meetings Regional Goals Congestion Trends

Bicycle/ MTIS Heartland 2050 Pedestrian Plan

Long Range Plan

The MAPA 2040 Long Range Transportation Plan (LRTP) was developed in a cooperative and coordinated effort with state, local, and federal agencies along with the general public and private industry. In order for a project to be implemented through the Transportation Improvement Program (TIP), it first must be evaluated, prioritized, and programmed in the LRTP. Regionally significant projects must be listed in the LRTP to be eligible for federal aid funding. However, projects that meet specific criteria (are regionally significant and/or on a priority corridor) and abide by the goals of the LRTP may be eligible for federal funding and listed in the TIP.

A transportation project is regionally significant if it is on a facility which serves regional transportation needs; access to and from the area outside the region, service to major activity centers in the region, or connections to major planned developments and would normally be included in the modeling of the metropolitan area's transportation network1. At a minimum, this includes all principal arterial highways and all fixed transit facilities that offer a significant alternative to regional highway travel.

1.2.2 Transportation Improvement Program A Transportation Improvement Program (TIP) is, in simple terms, a list of upcoming transportation projects covering a period of at least four years. It is a financial programming document that displays the schedule for the obligation of funding for the four-year program of various improvement projects that are funded through the administrations of the United States Department of Transportation (USDOT). MAPA updates this document annually.

1.2.3 Unified Planning Work Program Each year, MAPA is responsible for creating a Unified Planning Work Program (UPWP). The UPWP identifies MAPA’s work items, guides MAPA’s efforts, and allocates budget to specific task items for the upcoming fiscal year. The Work Program also documents expenditures of transportation planning funds and gives the end results for each work item.

1 As defined in 23 CFR 450.104

MAPA FY2017-2022 Transportation Improvement Program 1-5

1.2.4 Congestion Management Process The Congestion Mitigation Plan (CMP) aims to provide effective management and operation of the transportation system to increase mobility and efficiency by more effectively utilizing the region’s resources. The eight steps of the CMP are listed below, a more detailed plan can be found in the MAPA 2040 LRTP.

Figure 1.4 – Congestion Management Process

Develop Develop Congestion Identify Area of Define System/ Performance Management Application Network of Interest Measures Objectives

Implement Institute System Monitor Strategy Selected Identify/Evaluate Performance Effectiveness Strategies/Manage Strategies Monitoring Plan Strategies

1.2.5 Coordinated Transit Plan The Coordinated Transit Plan is developed by MAPA and the local Coordinated Transit Committee (CTC). The CTP outlines the key obstacles, stakeholders, and strategies to better coordinate public transportation service in the MAPA region. The Coordinated Transit Committee guides the project development and selection of federal-aid eligible coordinated transportation projects to be implemented in this region.

MAP-21 legislation revised Section 5310 Grants- Enhanced Mobility for Seniors and Individuals with Disabilities - funding to allow for specific apportionments to metropolitan areas; MAPA, Iowa Department of Transportation and the Nebraska Department of Roads are the Designed Recipients of the Section 5310 program by the governors of Nebraska and Iowa.

As the Designated Recipient of 5310, MAPA, in conjunction with NDOR and IDOT, completed an FTA approved Program Management Plan (PMP) in 2014, which details how MAPA plans to manage the 5310 process. In addition, MAPA develops an annual Program of Projects (POP), which delineates funding to specific projects per funding year (Table 5.3).

1.3 Public Involvement Public involvement and participation is necessary to ensure a vibrant and meaningful planning process. MAPA’s Public Participation Plan (located at http://mapacog.org/reports/2015-public-participation-plan/) details the public outreach process and public participation opportunities. Specifically, the Public Participation Plan (PPP) details how MAPA involves the public early and often in the TIP planning and implementation process, helps to ensure that decisions are made in consideration of public opinion and

MAPA FY2017-2022 Transportation Improvement Program 1-6 preference to meet the needs of the public. The public involvement process creates a collaborative environment, which builds trust and understanding between the public and those who serve them.

1.3.1 MAPA Public Involvement Strategies MAPA strives to involve the public and provide opportunities for participation in a variety of ways. The list below details the general public involvement strategies utilized by MAPA for this TIP document, please see Chapter 6 for the complete public involvement process.

● MAPA’s website (www.mapacog.org) was utilized to announce meetings, draft TIPs, public comment periods, and, upon approval, the TIP document itself. It also provided contact information to reach MAPA staff with comments.  Following MAPA staff review of applications a prioritized list by funding category was developed for project selection. This list was published on the MAPA website and posted for review at the MAPA offices. It was also send in a press release to local media.  Public comments were accepted for 30 days prior to the final selection committee review and approval of the prioritized lists for inclusion into the draft TIP. ● MAPA’s newsletter, What’s Happening, is available to the public free of charge and provides up-to- date news on the status of planning activities. The newsletter contained a story about the opportunity to comment on the TIP. ● Press releases were sent to local media to help inform the public of the opportunity to comment on the draft TIP. ● MAPA established a Citizens Advisory Council (CAC) to assist with the transportation public involvement process. MAPA also utilized its extensive network of contacts to share announcements with neighborhood groups, organizations representing or working with historically disadvantaged groups, business groups, transportation advocates, and others who are interested in local transportation planning. MAPA placed particular importance in reaching out to the traditionally underserved, including low-income and minority groups.

MAPA continually solicits and receives participation from members of the public as a part of its transportation planning process. Input and participation for MAPA’s TIP are encouraged as early as possible as the TIP is one of the last stages in the project development process. Public involvement is requested as early as the beginning of the Long Range Transportation Plan (LRTP) process. The ideas for most projects listed in the LRTP eventually become construction projects as they are proposed by sponsor jurisdictions and added to the TIP. The public has several opportunities to become involved in the transportation planning process as projects are selected for inclusion in the TIP every fiscal year.

The public can review and comment when the draft list of projects is submitted to the public for feedback and then again when the draft TIP is released in its entirety. An overview of this process is shown in Figure 1.5.

MAPA FY2017-2022 Transportation Improvement Program 1-7

Figure 1.5 – MAPA’s TIP Review Process

Criteria Review Call for Projects Project Scoring Project Selection

Draft List of Projects to the Fiscal Constraint Draft TIP EJ Analysis Public for Analysis Comment

Draft Released to State and Federal MAPA Board the Public for Review of Draft Final TIP Approval Comment TIP

State Approval

1.3.2 Involvement through the MAPA Committee Structure MAPA’s public and stakeholder involvement through committees brings together a broad array of groups, advocates, and interests to provide input and comments to MAPA staff and the MAPA Board of Directors. The MAPA Board of Directors, TTAC, CTC, and CAC meetings are open to the public. Many of MAPA’s committees provide key input into the planning process through diversity in membership. The organization of MAPA’s transportation-related committees can be viewed previously in Figure 1.2 on page 1-3. 1.3.3 TIP Development Public Involvement Following the completion of the Draft TIP, MAPA published a notice of its availability for public review and comment. The Draft MAPA TIP is made available to the public for review and comment for 30 days following the approval of the draft for public comment by the MAPA Board. MAPA utilized the following strategies to encourage public involvement in the TIP process:

● Published a notice in local newspapers of the availability for public review and comment. ● Post the document on the MAPA website along with an announcement of its availability for review and comment. ● Discuss the document and its availability for review and comment in the MAPA newsletter, which was distributed to an extensive mailing list including many community groups. ● Presented the draft document to select committees, including the Citizens’ Advisory Council (CAC), for comment and community engagement.

MAPA FY2017-2022 Transportation Improvement Program 1-8

MAPA addressed public comments and included public comments (if any) that MAPA received in Chapter 6, Section 6.2 in the final approved MAPA TIP.

MAPA FY2017-2022 Transportation Improvement Program 1-9

Programming Process

2.1 Introduction MAPA’s TIP includes projects funded by the US Department of Transportation (USDOT) and its associated administrations. The Federal Highway Administration, Federal Transit Administration, and Federal Aviation Administration provide funding for roadways & trails, public transit, and aviation projects respectively. The MAPA TIP includes basic project information such as the anticipated cost estimates, proposed funding sources, and schedule for each phase of federally-funded projects. Non-federal projects are shown with less-detailed listings that provide basic project information. 2.1.1 Legislative Requirements The current authorized federal transportation legislation is the Fixing America’s Surface Transportation Act (FAST). FAST charges MPOs with the creation and maintenance of a fiscally-constrained Transportation Improvement Program (TIP).1 Creating a fiscally constrained TIP requires MAPA to allocate an amount of projects (based upon reasonable estimates) within the limits of reasonably available future revenues (based upon historical trends). MAPA cooperates and coordinates with state and local governments and public transit operators to create a TIP that prioritizes and lists all federally-funded and regionally significant transportation projects programmed for at least the next four fiscal years. Federal regulations require only four years but MAPA has chosen to program six years to better coordinate with local 1 & 6 Year Plans.

The projects listed in the TIP must be financially realistic and achievable; as such, this TIP is fiscally- constrained for fiscal years 2017 through 2020. Projects are also listed for 2021 and 2022 for illustrative purposes, indicating that there are long-term plans to move forward with the projects, but they are not part of the four-year, fiscally-constrained program.

Illustrative projects are not guaranteed to be awarded the funding that they have been assigned and are not fiscally constrained. Illustrative projects are shown in the TIP to allow for earlier project phases (such as preliminary engineering and environmental compliance) to occur. Projects are included in the TIP when full funding can reasonably be anticipated to be available for the project before its predicted completion date. Project development schedules require timelines that sometimes exceed the four year period of the TIP. When this occurs, projects that extend beyond the first four-year (fiscally constrained) period are shown in the illustrative years. Some projects may list construction phases beyond 2021 as they are not anticipated to begin construction until beyond the six year period encompassed by the MAPA TIP. 2.1.2 Maintenance of the Transportation Improvement Program Federal regulations require a TIP be updated every four years. NDOR and IDOT administrative policy necessitates that MAPA update the TIP annually. After approval by the MAPA Board of Directors, the TIP is sent for approval by the governors of Nebraska and Iowa (typically represented by NDOR and Iowa DOT). The Federal Highway Administration (FHWA) and Federal Transit Administration (FTA) also review and approve the TIP and have final approval of State Transportation Improvement Plans (STIP) which include all local TIPs.

1 Per 23 CFR Part 450

MAPA FY2017-2022 Transportation Improvement Program 2-1

2.2 Regional Transportation Funding The FAST Act and previous transportation authorizations use the term suballocation to refer to portions of the federal funds apportioned to a State that must be used in specific areas within the State. Under FAST, suballocation is required for a portion of each State's apportionment under Surface Transportation Program Block Grants (STBG) and the Transportation Alternatives Set-Aside Funding (TAP). Specific Federal Transit Administration Programs (such as Section 5310 funding) utilize similar formulas to suballocate funding. MAPA receives an annual suballocation of funds for each of these programs. 2.2.1 Surface Transportation Program Block Grants (STBG) The Surface Transportation Program Block Grant funds a wide range of projects including construction, maintenance, and other projects on streets, highways, and bridges. STBG funding is extremely flexible and can be utilized for other projects including capital transit projects, enhancement projects, transportation demand management projects (e.g. carpool and vanpool), safety improvements, planning studies, natural habitat and wetlands mitigation efforts, and intelligent transportation systems (ITS) improvements, among others.

STBGSTBG funding is distributed by formula to various programs and jurisdictions inside the states. Under the FAST Act, the USDOT sets two percent aside nationally for the Transportation Alternatives Program (TAP). Additionally, States receive two percent off the top to assist in funding State Planning and Research (SPR). The funding available after these set-asides is available for suballocation based upon the following formulas:

 50 Percent of STBGSTBG – States may allocate this funding to any eligible jurisdiction in the state  50 Percent of STBGSTBG – States suballocate funding based upon population into three silos o Areas under 5,000 o Areas 5,001 to 200,000 o Areas over 200,000

Each eligible silo receives funding based upon its population as a percentage of total state population. In Nebraska, TMAs (areas over 200,000 in population) had a combined population of 961,357 as of the 2010 Census. This equates to 51 percent of the total state population of 1,826,341 and affords TMAs 51 percent of Nebraska’s STBGSTBG apportionment each year

The MAPA Region receives funding from both the Nebraska and Iowa allocations of STBGSTBG. This funding cannot be transferred across state lines. Figures 2.1a and 2.1b on the following page the sources of Nebraska STBGSTBG-MAPA funds and the Iowa funding portion of the MAPA MPO area based upon the formulas contained in MAP-21. These figures illustrate the flow of STBGSTBG funds from Congress beginning with apportionment to Nebraska and Iowa and resulting in suballocation to the MAPA region. Note that the period of availability of these funds runs for the year of apportionment (FY2017) plus three subsequent fiscal years. Therefore, funding apportioned to the MAPA region in FY2017 is available to be spent from FY2017 to FY2020.

MAPA FY2017-2022 Transportation Improvement Program 2-2

Figure 2.1a – Nebraska STBGSTBG-MAPA Funding Pathway

Figure 2.1b – Iowa STBGSTBG-MAPA Funding Pathway

MAPA FY2017-2022 Transportation Improvement Program 2-3

2.2.2 Transportation Alternatives Program (TAP) Transportation Alternatives (TAP) are federally funded, community-based projects that expand travel choices and enhance the transportation experience by integrating modes and improving the cultural, historic, and environmental aspects of our transportation infrastructure. Much like the STBGSTBG-MAPA program, funding for these projects is suballocated to the MAPA region by the states. TAP projects must be one of several eligible activities and must relate to surface transportation, including the following:  Pedestrian and Bicycle Facilities (including ADA improvements)  Safe Routes for Non-Drivers  Conversion of Abandoned Railway Corridors to Trails  Scenic Turn-Outs and Overlooks  Outdoor Advertising Management  Historic Preservation & Rehabilitation of Historic Transportation Facilities  Vegetation Management  Archaeological Activities  Environmental Mitigation  Stormwater Mitigation  Wildlife Management

The TAP project sponsor must illustrate the project's relationship to surface transportation in the project proposal. Each state Department of Transportation (DOT) works with a Federal Highway Administration representative (FHWA) to ensure that projects meet the criteria of relating to surface transportation.

2.2.3 Section 5310 Funding Section 5310, Federal Transit Act (49 U.S.C. §5310), authorizes the Secretary of the USDOT to make grants for the provision of transportation services meeting the special needs of seniors and individuals with disabilities. Generally, funds from this program can be used for operating expense by coordinated transit providers and for capital expenditures such as new vehicles, automatic vehicle location (AVL) systems, and other equipment purchases.

MAPA has been designated by the governors of Nebraska and Iowa to administer the Section 5310 program for the Omaha-Council Bluffs region. The Coordinated Transit Committee oversees the development of MAPA’s Coordinated Transportation Plan (CTP) – the guiding document for the Section 5310 program’s administration.

Under the FAST Act MAPA receives approximately $530,000 of Section 5310 funding from FTA to fund these kinds of projects through the metropolitan region.

MAPA FY2017-2022 Transportation Improvement Program 2-4

2.3 MAPA Project Selection Responsibilities The transportation planning processes described above inform the project selection process for the MAPA TIP. In general, projects are chosen on the basis of public input, Long Range Transportation Plan goals, the Congestion Management Process, and continuous efforts by MAPA jurisdictions to monitor and address needs such as safety, signalization, and operations and maintenance. Project selection methodology differs depending on the funding program and location. Table 2.1 below displays the general timeline for selecting projects for inclusion in the FY2017 TIP. Project selection processes differ based upon the jurisdiction leading the process but all Federal-Aid projects in the MAPA MPO area must ultimately be approved by the Transportation Technical Advisory Committee and the MAPA Board of Directors. Please note that the funding programs listed are not all inclusive.

The Project Selection Subcommittee (ProSeCom), Transportation Alternatives Program Committee (TAP- C), and the Coordinated Transit Committee (CTC) all evaluate projects for their respective funding streams. The timeline and process for project application and review for the FY2017 Application Cycle is shown in Figure 2.2 (next page).

Table 2.1 – FY2017 Project Selection Cycle Date Task December 5, 2015 Call for Projects

January 8, 2016 Project Applications Due

January 15, 2016 MAPA Staff Screening

January 28 – February 4, 2015 Committee Review of Project Ranking

February 5, 2016 Project Selection Workshop

March 2, 2016 Appeals Hearing

March 20, 2015 Publication of Selected Project List

February – March 2016 Incorporation into Draft FY2017-22 MAPA TIP

April – May 2016 State Review & Public Comment Period

June 2016 TTAC Approval of Final Draft FY2017-22 MAPA TIP

June 2016 MAPA Board of Directors Approval of Final FY2017-22 TIP

July 2016 Distribution of Final TIP to State & Federal Partners

MAPA FY2017-2022 Transportation Improvement Program 2-5

Figure 2.2 – FY2017 Project Selection Cycle

Project Committee Call for MAPA Staff Applications Review of Projects Screening Due Ranking

Publication of Project TTAC Approval Incorporation Selected Selection of Draft TIP into Draft TIP Project List Workshop

Public Board Approval Board Approval TTAC Approval Comment of Final TIP & of Draft TIP of Final TIP Period Distribution

MAPA staff members compile the project rankings and present them to each committee (Project Selection Committee for STBGSTBG, TAP-C for TAP funding, and the CTC for 5310 funds) for review during the Final Review Workshop. During this workshop, committees may also consider additional criteria that may be relevant to the project selection (existing network continuity, phasing feasibility, equity, etc.), and selects a list of projects. Jurisdictions whose projects are rejected have the opportunity to appeal this decision at subsequent appeals hearings for ProSeCom, TAP-C, and the CTC.

Following the appeals hearings, MAPA staff works to program the selected projects into the TIP based upon the ranking, available funding, and realistic project phasing. Projects are presented for public comment and included in the draft TIP.

For the FY2017 application cycle, project applications were due to MAPA by January 8, 2016. Projects were screened and scored using the approved committee methodology. A final review workshop was held on February 5, 2016 to determine the final project scores and to prioritize project rankings based on a discussion of proper phasing. Finally, an appeals hearing was held on March 2 for the CTC, where applicants could explain why their project deserved a higher rank. No appeals hearing was needed for TAP-C and ProSeCom for the FY2017 TIP cycle.

2.3.1 Project Selection Subcommittee The Project Selection Subcommittee (ProSeCom) is a twelve member sub-committee to the Transportation Technical Advisory Committee (TTAC) that includes planners, engineers, local or state staff, and public representatives. A majority of its membership of the Project Selection Committee is composed of members of the larger TTAC. Appointments to ProSeCom are made by the TTAC Chairperson. Surface Transportation Program improvement projects in the MAPA TMA are subject to the evaluation and selection of the MAPA Project Selection Committee (ProSeCom).

MAPA FY2017-2022 Transportation Improvement Program 2-6

ProSeCom representative slots are shown below:  Iowa DOT District 4 Representative  Nebraska DOR District 2 Representative  Metro Transit Representative  Douglas County Engineer (Also represents Douglas County 2nd Class Cities)  Sarpy County Engineer  Sarpy County Municipalities Public Works Representative  Omaha/Douglas County Municipalities Public Works Representative  Omaha/Douglas County Municipalities Planning Representative  Council Bluffs Public Works Representative  All Metro Open Planning Representative  Bicycle-Pedestrian Representative  At large small cities representative

The new criteria are summarized in Table 2.2 and utilize a mixture of qualitative and quantitative data to score project applications in three project categories:  General Roadway  Alternative Transportation  Systems Management

Table 2.2 – STBGSTBG-MAPA Project Selection Criteria Application Type Project Selection Criteria General Roadway Priority Corridors (High, Medium, Low) Future Year Level of Service Reliability Index Environmental Justice (EJ) Areas Redevelopment Areas Pavement Condition Percentage Local Match (points awarded over 30% match) Ability to Advance Construct (AC) Project Crashes per Million Vehicles & Crash Severity Index Bridge Sufficiency Bridge Status (Structurally Deficient and/or Functionally Obsolete) Bridge Detour Length Transportation Emphasis Areas Alternative Transportation Public Health Benefits Percentage Local Match (points awarded over 30% match) Air Quality Benefits Walkability, Access, & Equity Community Neighborhood Facilities & Land Use Connectivity Link-Node Ratio Bicycle & Pedestrian Safety Systems Management Delay Reduction (2040 Level of Service Improvement) Percentage Local Match Benefits of Proposed Study Multi-Jurisdictional Impacts

In an effort to foster additional implementation of Alternative Transportation and Systems Management (technology driven) solutions in the MAPA region, projects in these two categories receive priority over General Roadway projects. The flexible target allocation for a given fiscal year for these projects is between 10 – 25 percent of MAPA’s annual apportionment balance. This means that selected Alternative

MAPA FY2017-2022 Transportation Improvement Program 2-7

Transportation and Systems Management projects are funded first (up to the 10-25 percent cap) followed selected General Roadway projects.

Projects submitted to MAPA for funding consideration are evaluated by the members of the Project Selection Subcommittee (ProSeCom). MAPA staff evaluates each project based upon the scoring methodology contained in the STBG-MAPA Policy Guide and makes programming recommendations to the Transportation Technical Advisory Committee.

For a full description of the MAPA STBG project selection process please visit the address below: http://mapacog.org/images/stories/Trans_General/ FY2014_ProSeCom_Policy_Guide.pdf 2.3.2 Transportation Alternatives Program Committee (TAP-C) Under the FAST Act, projects funded under the Transportation Alternatives Program (TAP) must be competitively selected by a documented and transparent process. Each year, MAPA convenes a Transportation Alternatives Program Committee (TAP-C) to competitively select new TAP-funded projects for the region. This committee is comprised of representatives from cities, counties, state departments of transportation, public health professionals, bicycle advocates, and parks & recreation officials. Ultimately, the recommendations of this committee were formalized into the policy guide used to select projects for the development of this TIP.

Organizations which participated in the development of the TAP policy guide and criteria included:  Iowa DOT District 4  Nebraska DOR District 2  Metro Transit  Douglas County Engineer  Sarpy County Engineer  City of La Vista  City of Papillion  City of Springfield  Omaha Bicycle-Pedestrian Advisory Committee  City of Omaha Bicycle-Pedestrian Coordinator  City of Omaha Public Works  Council Bluffs Public Works  Council Bluffs Parks & Recreation  Papio-Missouri-River Natural Resources District  Douglas County Health Department  ModeShift Omaha  Live Well Omaha  Omaha Bicycle Company  Public Representative

MAPA coordinated with local stakeholders on its Regional Bicycle-Pedestrian Plan to identify and prioritize corridors for bicycle and pedestrian infrastructure. During the fall of 2014, the TAP-C updated MAPA’s TAP criteria using a prioritization model developed as a part of the Regional Bicycle-Pedestrian Plan. These criteria are based upon a diverse set of socioeconomic and transportation-related data that assist the TAP- C with funding decisions.

MAPA FY2017-2022 Transportation Improvement Program 2-8

The revised criteria are summarized in Table 2.3 below and are comprised of measures in the following categories:

 Support  Connectivity  Safety  Equity  Demand

Table 2.3 – TAP-MAPA Project Selection Criteria Buffer Factor Weight Selection Criteria Data Source (if applicable) Local Match % Project Application – Support 5 Multi-Jurisdictional/ Project Application and Partnerships Documentation – Physical Separation of Project Application and MAPA Proposed Facility Review – Density of Pedestrian Crashes NDOR Highway Safety (Pedestrian Crashes (2011- Improvement Database; – Safety 7 2013)/Route Length) INTRANS Crash Database Posted Speed Limit Project Application and MAPA Review – Future Traffic Volume (ADT) MAPA Travel Demand Model Volume within Project Corridor Population density within 1/2 MAPA Land Use Activity 1/2 Mile mile Allocation Model (LUAAM) Employment density within 1/2 MAPA Land Use Activity 1/2 Mile Demand 6 mile Allocation Model (LUAAM) Proximity to Schools (Including INFOGROUP data and MAPA 1/4 Mile Universities) Review Level of Transit Service Metro Transit 1/4 Mile Connectivity to Existing MAPA Regional Bicycle- 1/4 Mile Facilities Pedestrian Master Plan Connectivity 9 Connectivity to MAPA Priority MAPA Project Selection 1/4 Mile Corridors Committee (ProSeCom) Proximity to Environmental MAPA Transportation Within EJ Area; Justice Areas Improvement Program (TIP) partially within EJ Equity 6 area Community Access to a Vehicle 2012 American Community 1/2 Mile (% No Vehicle Households) Survey

Selected TAP projects were accepted into the MAPA TIP using an interim qualitative evaluation process to select TAP projects from existing Transportation Enhancement (TE) projects in February of 2013. This process was based upon input from sponsoring jurisdictions, NDOR, and FHWA-Nebraska Division and was led by MAPA and members of TAP-C

The Guidance Document for TAP-MAPA Project Selection is available online at the address below: http://www.mapacog.org/images/stories/Trans_General/ MAPA_TAP_Policy_Guide_FINAL.pdf

MAPA FY2017-2022 Transportation Improvement Program 2-9

2.3.3 Coordinated Transit Committee (CTC) MAPA, the Nebraska Department of Roads, and the Iowa Department of Transportation are designated by the States of Nebraska and Iowa as the recipients of federal funding for transit under Section 5310 – Enhanced Mobility of Seniors and Individuals with Disabilities. This means MAPA receives a direct annual apportionment from FTA without going through the states. MAPA coordinates with the two state agencies based on memorandums of understanding.

The CTC develops the selection criteria, scoring rubric, and application for agencies requesting 5310 funding. The following membership assisted in this development:  AARP  Iowa DOT  Black Hills Workshop  Lutheran Family Services  Catholic Charities  Mayor’s Commission for Citizen’s  City of Bellevue with Disabilities  City of Council Bluffs  Metro Transit  City of LaVista/Ralston  Nebraska Department of Roads  City of Omaha  Nebraska Veterans of Foreign Wars  City of Papillion  Neighborhood Works Home  Crossroads of Western Iowa Solutions  Developmental Services of  Omaha Association of the Blind Nebraska, Inc.  Omaha Home for Boys  Disabled American Veterans  Papio-Missouri River Natural  Eastern Nebraska Community Resources District Action Partnership  Paralyzed Veterans of America  Employment First  Ponca Tribe of Nebraska  Empowerment Network  Pottawattamie County Veteran  Eastern Nebraska Human Services Affairs Agency  Sarpy County  Eastern Nebraska Office on Aging  Sherwood Foundation  Florence Home  Southern Sudan Community  Friendship Program Association  Goodwill Industries  Southwest Iowa Transit Agency  Heartland Family Service (SWITA)  Heartland Workforce Solutions  United Way of the Midlands  Intercultural Senior Center  University of Nebraska at Lincoln

MAPA’S 5310 project selection process is a competitive screening similar to the STBG and TAP processes. Section 5310 selection criteria are summarized in Table 2.4. There are two funding tracts within 5310 – Traditional-Capital and Other/New Freedom-Capital and Operations.

Projects submitted for 5310 funding consideration are evaluated by MAPA staff based upon the scoring methodology contained in the CTC Selection Criteria available at the following address: http://mapacog.org/images/stories/CTC/FY2016/FY16_CTC_5310_PolicyGuide_Final.pdf. The CTC reviews the scores and makes a recommendation to TTAC, which then makes a final recommendation to the MAPA Board of Directors.

MAPA FY2017-2022 Transportation Improvement Program 2-10

Traditional - Capital Other/New Freedom – Capital & Operations Geographic Coverage – Increased service areas for Geographic Coverage – Expand area beyond ADA applicant agency requirements Accessibility Improvements – Veterans, Seniors, Accessibility Improvements – Veterans, Seniors, Citizens Citizens with Disabilities, etc. with Disabilities, etc. Operation of Service – Increase ridership, improve Operation of Service – Expansion of service beyond ADA response time, improve efficiency, etc. requires while maintaining existing service levels Interagency Coordination – Number of project Interagency Coordination – Number of project partners partners Ridership – Increases in transit ridership Ridership – Increase or maintain transit ridership Reliability & Service Quality – Reduce travel time Reliability & Service Quality – Reduce travel time for for vehicles & riders, improve response time vehicles & riders, improve response time Transportation Service Availability – Increase Transportation Service Availability – Increase Hours of Hours of Operation, reduce coverage gaps, etc. Operation, reduce coverage gaps, etc. Life Cycle of Vehicles – Extend vehicle life, energy Life Cycle of Vehicles – Extend vehicle life, energy efficient vehicles, reduce operating costs efficient vehicles, reduce operating costs Sustainability (Bonus) – Identifies funding to Sustainability (Bonus)– Identifies funding to support support program if MAPA funding decreases program if MAPA funding decreases 2.3.4 MAPA Project Selection Results Table 2.5 shows the final list of new STBG-MAPA, TAP-MAPA, and 5310 projects for the FY 2017-2022 TIP.

Table 2.5 –FY2017 Project Selection Cycle – Final Rankings Project Rankings Traditional 5310 Funding Projects Rank Bryant Resource Center 1 Housing Authority of the City of Omaha 2 Crossroads of Western Iowa 3 Florence Home for the Aged 4 City of Papillion 5 City of Bellevue 6 Heartland Family Service 7 Region 5 Services 8 SWITA 9 Notre Dame Housing 10 City of La Vista 11 New Cassel Retirement Center 12 City of Council Bluffs 13 Other/New Freedom 5310 Funding Projects Bryant Resource Center 1 Florence Home for the Aged 2 Heartland Family Service 3 New Cassel Retirement Center 4 Black Hills Works 5 City of Council Bluffs 6 Nebraska General Roadway STBG Project Rankings 180th Street Phase II 1 36th Street Phase II 2 66th and Giles 3 Nebraska Systems Management STBG Project Rankings Omaha Signal Network Implementation 1 Nebraska & Iowa TAP Project Rankings West Papio Trail – Millard Connection 1 Council Bluffs City/County Connector Trail 2

MAPA FY2017-2022 Transportation Improvement Program 2-11

Recommendations regarding award amounts and project programming were determined by the ProSeCom, TAP-C, and the CTC during Programming Workshops for each program on February 5, 2016. In some cases, projects that were ranked higher during the evaluation process will be programmed at a later date due to the necessary phasing of projects (i.e., PE/NEPA phase must be completed before ROW phase can begin) and the ability to program less costly phases and remain in fiscal constraint.

2.4 Development & Implementation of TIP Projects Based on federal, state, and local regulations, projects must navigate a process to move from concept to reality. The project lifecycle can be a complex process that may take years to complete. This section provides an overview of a generic federal-aid project and the tools MAPA utilizes to program projects accurately. 2.4.1 Lifecycle of a Typical Project in the MAPA Region A diagram and narrative of the lifecycle of a given transportation improvement project are outlined below and shown in Figure 2.3. Public involvement and participation will occur at each phase of the project’s life.

Figure 2.3 – Lifecycle of a Typical TIP Project

Project concepts must first be locally developed and included in locally developed planning documents to be eligible to be entered into the MAPA Long Range Transportation Plan (LRTP). Once the project has been included in the fiscally constrained portion of the MAPA LRTP, the project sponsor must apply to ProSeCom, TAP-C, or the CTC for inclusion in the 4th year of the fiscally constrained MAPA TIP. If it scores in the top tier of project applications, it may be included in the 4th year of the current TIP. Projects that do not make it into the top tier will be reevaluated with any new applications in subsequent application cycles.

Once the project has been included in the 4th year of the TIP it will continue to flow forward to year 3, year 2, and finally year 1 in subsequent TIP documents. Projects can only expend funding on those phases that are listed in year 1 of the TIP.

It is important to note that if a project is listed in a city or county plan with federal funding as a revenue source it may not actually have federal funding directed toward it. The MAPA TIP displays all USDOT projects in the MAPA region that are funded with federal dollars. In order to secure STBG-MAPA, TAP, or 5310 funding (federal funding), a project must navigate the above process and be included in the TIP.

MAPA FY2017-2022 Transportation Improvement Program 2-12

2.4.2 Funding Implementation: A Two Gate Process To streamline the STBG, TAP, and 5310 project selection process and to ensure the effective use of federal funds, MAPA will allocate funding of projects in the TIP using a two gate process to move projects into the implementation year. The implementation year, or year one of the TIP, is the fiscal year during which funding for a project or project phase can be obligated. In addition to ranking projects based on criteria, projects will also be evaluated based on each project’s timeline of implementation and fiscal constraint within the TIP. The two gate process will allow projects to advance from the illustrative years to the implementation year of the TIP:

First Gate – New projects and projects wanting to move from the illustrative years to the fiscal constraint years are ranked and placed in the TIP based on each individual project’s ranking, timelines, and the available funding per year.

Second Gate - Projects that can be obligated within the first 8 months of the fiscal year will be moved to the implementation year of the TIP based on NDOR timelines and fiscal constraints.

Each project that will be programmed in the TIP must submit an attainable timeline, be ranked by MAPA staff, and approved by the relevant committee before it will be placed in the TIP. Each committee (ProSeCom, TAP-C or the CTC) will have flexibility in selecting projects that are deemed higher priority to the committee. Projects will be allowed to present an argument for implementation before the committee if the project sponsor wishes to challenge the points total or scoring of the project. No project will be allowed to move into the implementation year unless the project timeline has been approved by the Project Selection Committee (either ProSeCom, TAP-C, or CTC), TTAC, and MAPA’s Board of Directors and fits within the fiscal year as coordinated with either NDOR or Iowa DOT for each state’s projects respectively.

MAPA’s project funds are allowed to be carried over in the TIP from one Federal fiscal year to another if MAPA has not obligated all of its apportionment for that fiscal year. Only project phases that can be obligated within the first 8 months of the fiscal year based on MAPA’s programming guidelines will be eligible to be moved to the first year of the TIP. In order to ensure implementation and effective use of STBG, TAP, and 5310 funding, projects are limited to two years in the implementation year (most recent year) of the TIP. If a project cannot be obligated within two years, the project phase or phases will be moved to Advanced Construction, a later year within the TIP, or funding will be reallocated to another project. This will help ensure that deadlines will be met and help those projects that have been moved forward most effectively to proceed to construction and completion.

2.5 Other Federal Transportation Programs The majority of Federal Highway Administration (FHWA) program funds in the TIP are not directly suballocated to MAPA. In general, NDOR and Iowa DOT make programming decisions for these funding programs and MAPA cooperates with the states and local jurisdictions to program the projects in the TIP appropriately. A detailed tabulation of the funding programmed from these funding sources can be found in Chapter 3.

Funding for Federal Transit Administration (FTA) and Federal Aviation Administration (FAA) programs are also programmed in the TIP. Descriptions of these programs are found in the following sections. 2.5.1 Federal Transit Authority Funded Projects Federal-aid transit projects in the MAPA region are funded through the Federal Transit Administration (FTA) of the USDOT. Federal funding for transit projects under Sections 5309 - Bus and Bus Facilities -

MAPA FY2017-2022 Transportation Improvement Program 2-13

and 5307 - Urbanized Area Formula - are directed to Metro Transit to support their operations. For a listing of FTA projects receiving funding awards through MAPA’s project selection process, please refer back to Table 2.5 on page 2-11.

Metro Transit is responsible for the operation of fixed route, express/commuter bus, and Americans with Disabilities Act Complementary Paratransit Service within the city limits of Omaha, Douglas County, NE. Additionally, Metro has contracts with five contiguous political jurisdictions for the operation of transit services as part of the Metro bus system:  Ralston (NE)  La Vista (NE)  Bellevue (NE)  Papillion (NE)  Council Bluffs (IA)

Figure 2.4 below shows Metro’s fixed route bus transit coverage throughout the region.

Figure 2.4 – Regional Metro Transit Route Coverage

MAPA has also received a Veterans Transportation and Community Living Initiative (VTCLI) 5309 grant for a one-call center/system in 2012. This grant is being used to develop a centralized one-call dispatch center for the large number of agencies, which currently provides disjointed paratransit services. The one-call center/system would improve the efficiency and effectiveness of the ride experience in the Metro area.

MAPA FY2017-2022 Transportation Improvement Program 2-14

2.5.2 Federal Aviation Administration Programs In addition to surface transportation projects, the MAPA TIP also includes a list of projects programmed by the Federal Aviation Administration (FAA) of the USDOT. Under MAP-21, federally funded airport improvement projects are must be contained in the regional Transportation Improvement Plan. For that purpose, MAPA coordinates annually with the Omaha Airport Authority to ensure that regionally significant projects are included within the Transportation Improvement Program. A listing of the Airport Improvement Program projects for the Omaha-Council Bluffs Metropolitan Area is included in Table 5-2 in Section 5.1.4 on page 5-47. 2.6 Revisions to the TIP It is sometimes necessary to revise the TIP during the time between annual approvals. The two types of revisions are a TIP Amendment and a TIP Administrative Modification. General guidelines are described in the sections below and a summary table with examples is provided on the next page. 2.6.1 TIP Amendments An amendment is a revision to the TIP that involves a major change to a project. This includes an addition or deletion of a project, a major change in project cost, moving a project in or out of the fiscally-constrained four years, or a major change in design concept or scope change. A “major” change is defined by MAPA by four main components, which are summarized in Table 2.6 (next page).

Amendments require public review and re-demonstration of fiscal constraint. Formal amendments should be submitted to MAPA staff at least two weeks prior to one of the eleven regularly scheduled meetings of the Transportation Technical Advisory Committee (TTAC). Staff will review the amendment for impact on fiscal constraint and other factors and present the proposed amendment to TTAC. The amendment is then considered by the MAPA Board of Directors and submitted to the states and FHWA/FTA for final approval and incorporation into the Statewide Transportation Improvement Programs (STIP).

TIP amendment requests which may drastically alter the fiscal constraint of MAPA’s regional funding and/or constitute a “new project” based on major scope changes may be recommended to MAPA’s project selection committees to be prioritized in the next application cycle. In general, reconsideration of a project in this way would only occur when requests would greatly exceed the base TIP amendment thresholds identified in Table 2.6 or when construction costs increase 100% or more. 2.6.2 TIP Administrative Modifications An Administrative Modification is a revision to the TIP that involves a minor change to a project. This includes any change that does not meet the criteria listed above for an amendment. For instance, if a project is moved from the third year to the second year within the fiscally-constrained TIP it would not constitute a “major” change and thus, would not trigger an amendment. Other examples of revisions that would be eligible for an administrative modification include changes that are less than project cost amounts described above, minor changes to project descriptions, or splitting an entry already in the TIP, where the intent is not to add a new project that is distinct from the original TIP entry, but to more smoothly implement the original TIP entry.

To process the Administrative Modification, MAPA submits a letter with the proposed project change to NDOR and FHWA/FTA, and for projects in Iowa, MAPA submits proposed project modifications through the Transportation Project Management System (TPMS). After approval, the changes will be made in the MAPA TIP document and the Statewide Transportation Improvement Programs (STIP).

MAPA FY2017-2022 Transportation Improvement Program 2-15

Projects that are eligible as administrative modifications can still be changed as an amendment. MAPA staff reserve the right to process a proposed revision as an amendment even if a project qualifies as an administrative modification. For changes in Iowa, both amendments and administrative modifications will be entered into the TPMS for review by Iowa DOT.

Table 2.6 – Summary of Requirements for Amendments & Administrative Modifications Circumstance for Revision Requirements for Each Revision Type Changes to Project Costs Amendment* Nebraska Projects: An amendment is required when Federal-Aid for a project changes by more than 20% or $2 million dollars (whichever is greater) Iowa Projects: An amendment is required when Federal-Aid for a project increases by more than 30% or $2 million dollars (whichever is greater) Example: Increasing Federal-Aid for a project from $1 million to $1.5 million would require a TIP Amendment in both Iowa and Nebraska Administrative Modification Administrative Modifications may be used to change the Federal-Aid for a project change below the thresholds identified for a TIP Amendment Example: Increasing Federal-Aid for a project from $1 million to $1.1 million may be approved with an Administrative Modification Schedule Changes Amendment* An Amendment is required to program a project phase within the first four years of the TIP if it is not a part of the existing fiscal constraint Example 1: Programming a new project within the fiscally constrained portion of the TIP would require a TIP Amendment (FY2016-FY2019) Example 2: Reprogramming a new phase of an existing TIP project into the fiscally constrained portion of the TIP (FY2016-FY2019) Administrative Modification An Administrative Modification may be used to reprogram an existing project phase within the fiscally constrained portion of the TIP Example: Reprogramming a project phase from FY2017 to FY2016 may be approved with an Administrative Modification Change in Funding Source Amendment* An Amendment is required when the source for Federal-Aid for a project is changed Example: Changing the funding source for a project from the Surface Transportation Program (STBG) to the Highway Safety Improvement Program (HSIP) would require a TIP Amendment Scope & Termini Changes Amendment* Project Scope: An Amendment is required when the project scope and description within the TIP do not match the activities identified during project design. Termini: An Amendment is required to change project termini identified in the TIP or to eliminate inconsistences with the Long Range Transportation Plan (LRTP) Example: Changing a terminus of a project from “1st Street” to “3rd Street” would require a TIP Amendment * Emergency TIP Amendments have the same requirements as a TIP Amendment in addition to the public notice and meeting guidelines detailed in Section 2.7.3

MAPA FY2017-2022 Transportation Improvement Program 2-16

2.6.3 Emergency TIP Amendments Occasionally, situations may arise when an emergency amendment to the TIP is necessary. These are processed on an expedited basis due to circumstance which cannot wait for the next TTAC or MAPA Board meeting. For example, the American Recovery and Reinvestment Act of 2009 (“Stimulus”) required several changes to cost estimates in the TIP to be made in an expedited manner in order to meet deadlines and remain eligible for federal funding. Such amendments are only allowed by MAPA in cooperation with the States of Nebraska and Iowa, FHWA/FTA, and the local jurisdictions involved with the project(s). Emergency amendments are not used as a means of circumventing review by TTAC or the public, but are only utilized in response to truly extraordinary circumstances in which expedited processing of an amendment of a non-controversial matter is necessary.

If all parties involved with a project agree that an emergency amendment is necessary, then the amendment and documentation will be prepared by MAPA staff. TTAC voting members will be notified of the proposed emergency amendment and a meeting will be scheduled. In accordance with the Open Meetings Laws of both Iowa and Nebraska, MAPA will provide 24 hours of advance notice of any emergency meeting in public places and on the MAPA website. Following the emergency TTAC meeting, the MAPA Board of Directors will consider any emergency amendments. Emergency amendments may be considered at a regularly scheduled Board or TTAC meeting, specially-convened meetings, or by voice vote via telephone or a videoconference. If teleconferencing or videoconferencing technology is to be used to conduct a voice vote, locations at which the public can hear and participate in the emergency meeting will be noted in the meeting notice. Teleconferencing or videoconferencing will only be used when a meeting of the full Board or TTAC is impractical, and at least one Board or TTAC member will be present at the location where the public is gathering the participate in the meeting. In all cases, the emergency circumstances necessitating the meeting and the use of teleconferencing or videoconferencing technology will be noted in the meeting agenda and minutes.

MAPA FY2017-2022 Transportation Improvement Program 2-17

Fiscal Constraint 3.1 Introduction MAPA’s Transportation Improvement Program (TIP) includes a financial plan that provides reasonable estimates for costs, revenues, and strategies for the projects and programs identified in the TIP. This section of the FY 2017-2020 TIP assesses the project costs by funding program and compares them to the anticipated revenues in each funding program. The MAPA TIP must be fiscally-constrained, meaning that project costs must not exceed reasonably anticipated funding revenues.

The fiscal constraint analysis in this TIP is dependent upon figures provided by the USDOT, the Federal Highway Administration (FHWA), the Federal Transit Administration (FTA), the Iowa Department of Transportation (Iowa DOT), and the Nebraska Department of Roads (NDOR). For Federal-Aid projects in the MAPA region, local jurisdictions are identified and the specific matching funds required for the Federal-Aid program are allocated by project.

This TIP also identifies the “operations and maintenance” expenditures by jurisdiction as required by the FAST Act, the current authorizing legislation for the Federal-Aid Highways Program (FAHP). Operations and maintenance expenditures are the total of the day to day cost to keep the system functioning. Example operations and maintenance projects include resurfacing, restoration and rehabilitation projects (3R projects) and other incidental capital and operations costs necessary to deliver an efficient and effective transportation system. 3.1.1 Year of Expenditure Calculations To give the public a clear picture of what can be expected (in terms of project cost) as well as to properly allocate future resources, projects beyond the first year of this TIP are adjusted for inflation. When project costs have been inflated to a level that corresponds to the expected year of project delivery this means that the project has been programmed with year of expenditure (YOE) dollars. YOE programming is required by federal law and the MPO is responsible for programming costs in the YOE. MAPA anticipates a 3 percent annual rate of inflation over the period of this TIP (2017-2022). This estimate is based upon the Consumer Price Index, published by the US Bureau of Labor Statistics. This 3 percent rate is added to each project’s costs annually and can be seen in the fiscal constraint tables for each fiscal year for both FTA and FHWA’s funding programs. During the period of 2012-2014, the CPI grew nationally by 2.0 percent annually. MAPA is using discretion in estimating a more aggressive rate of inflation to create a more conservative estimate of project costs. 3.1.2 Revenue Estimation Revenue estimates for STBG-MAPA funding are also included in this document. MAPA relies upon estimates from Iowa DOT and NDOR for annual apportionments of federal funding. These estimates are based upon formulas in the FAST Act and are further subject to the obligation limitation. The obligation limitation is a percentage of the overall federal apportionment that can be spent in a given year. For the previous 5 years, the obligation limitation has been between 92% and 98% of the total apportionment level. This means that of the total funding apportioned to a state in a given year the state may only spend a between 92% and 98% of that total balance in its various programs. This obligation limitation is a safeguard that is utilized to ensure that funding exists for all states and programs in a given year.

MAPA FY2017-2022 Transportation Improvement Program 3-1

3.2 Fiscal Constraint and Federal Funding Tables Tables 3.1a and 3.1b (below and next page) lists the total federal funding amounts programmed in the FY 2017-20 MAPA TIP for each federal funding program by year and demonstrates fiscal constraint across all of MAPA’s federal programs. The tables list the expected revenues (annual obligation) and expenditures (programmed funds) for FY 2017 – FY 2020, the four fiscally constrained years of the MAPA TIP. Funding targets are provided annually by Iowa DOT and NDOR to use for programming purposes. Please note, the Spending Authority includes the beginning balance.

Table 3.1a – Federal Project Programming Tables Nebraska Roadway & Trail Projects by Federal Program (in $1,000s) Federal Non-Fed Total Project Spending 2017 2018 2019 2020 Balance Program Match Cost Authority* CMAQ 992 76 0 0 233 1301 1,068 0 DPU 4,360 0 0 0 1,090 5,450 4,360 0 HSIP 8,545 9,628 6,641 0 2,988 27,802 24,814 0 NHPP 26,193 15,387 5,440 39,136 13,414 99,570 86,156 0 SRTS 180 0 0 0 45 225 180 0 STBG-MAPA 36,318 36,964 22,676 11,540 26,788 134,286 112,811 5,313 STBG-State 12,232 4,029 2,409 1,314 5,140 25,124 19,984 0 TAP-MAPA 0 1,060 1,312 1,334 3,789 7,495 4,203 497 TOTAL 88,820 67,144 38,478 53,324 52,374 295,692 253,576 5,810 Iowa Roadway & Trail Projects by Federal Program (in $1,000s) Federal Non-Fed Total Project Spending 2017 2018 2019 2020 Balance Program Match Cost Authority* CMAQ 0 0 0 0 0 0 0 0 DPS 5,649 1,417 0 0 1,875 8,941 7,066 0 NHPP 98,568 113,832 60,561 127,881 44,538 445,380 400,842 0 STBG-MAPA 4,760 5,747 4,631 2,868 4,501 22,507 18,218 212 TAP-MAPA 246 225 0 393 201 1,065 1,023 159 PL 213 133 133 133 153 765 612 0 TOTAL 109,436 121,354 65,325 131,275 51,268 478,658 427,761 371 Total Regional Roadway & Trail Project Program (in $1,000s) Federal Non-Fed Total Project Spending 2017 2018 2019 2020 Balance Program Match** Cost Authority* CMAQ 992 76 0 0 233 1,301 1,068 0 DPU 4,360 0 0 0 1,090 5,450 4,360 0 DPS 5,649 1,417 0 0 1,875 8,941 7,066 0 HSIP 8,474 6,991 9,349 0 2,988 27,802 24,814 0 NHPP 124,761 129,219 66,001 167,017 57,952 544,950 486,998 0 SRTS 180 0 0 0 45 225 180 0 STBG-MAPA 41,078 42,711 27,307 14,408 31,289 156,793 131,029 5,525 STBG-State 12,232 4,029 2,409 1,314 5,140 25,124 19,984 0 TAP-MAPA 246 1,285 1,312 1,727 3,990 8,560 5,226 656 PL 213 133 133 133 153 765 612 0 TOTAL 198,256 188,498 103,803 184,599 104,755 779,911 681,337 6,181

MAPA FY2017-2022 Transportation Improvement Program 3-2

Table 3.1b – Federal Project Programming Tables for Iowa Federal-Aid Projects

2017 2018 2019 2020 Federal Fed. Aid Total Cost Fed. Aid Total Cost Fed. Aid Total Cost Fed. Aid Total Cost Program DPS 5,649 7,170 1,417 1771.25 0 0 0 0 NHPP 98,568 109,520 113,832 126,480 60,561 67,290 127,881 142,090 STBG-MAPA 4760 5950 5747 7183 4,631 5,789 2,868 3585 TAP-MAPA 246 307.5 225 281.25 0 0 393 476 PL 213 266 133 166 133 166 133 166 TOTAL 109,436 123,214 121,354 135,882 65,325 73,245 131,275 146,317

MAPA FY2017-2022 Transportation Improvement Program 3-3

Tables 3.2a and 3.2b show the STBG and TAP funding balances for both Nebraska and Iowa per fiscal year and carrying over the ending balances (or deficits) to the next year’s program balances. Table 3.2c shows the FTA funding balances for Metro Transit and the 5310 program per fiscal year and carrying over the ending balances (or deficits) to the next year’s program balances.

Table 3.2a shows NDOR estimates for MAPA’s regional STBG and TAP funding for FY2017-2020– totaling more than $15.5 million each year. In Table 3.2b, Iowa DOT estimates that approximately $2.1 million in spending authority would be available to the Iowa portion of the MAPA MPO for FY 2016 and beyond. Table 3.2c shows the FTA funding summary table for Metro Transit’s 5307 and 5339 and MAPA’s 5310 and 5309 funds. Metro Transit estimates receiving approximately $9 million in spending authority (5307 and 5339 combined). MAPA estimates receiving $530,000 a year in 5310 spending authority.

Table 3.2a – NDOR Funding Summary Table (in thousands) NDOR STBG Program 2017 2018 2019 2020 STBG Beginning Balance $52,747 $30,995 $9,197 $1,687 STBG Spending Authority $14,566 $15,166 $15,166 $15,166 STBG Project Program (Cost) $36,318 $36,964 22,676 $11,540 STBG Ending Balance $30,995 $9,197 $1,687 $5,313

NDOR TAP Program 2017 2018 2019 2020 TAP Beginning Balance $0 $1,020 $1,021 $770 TAP Spending Authority $1,020 $1,061 $1,061 $1,061 TAP Project Program (Cost) $0 $1,060 $1,312 $1,334 TAP Ending Balance $1,020 $1,021 $770 $497

Table 3.2b– Iowa DOT Funding Summary Table (in thousands) Iowa DOT STBG Program 2017 2018 2019 2020 STBG Beginning Balance $10,302 $7,460 $3,713 $1,081 STBG Apportionment $1,919 $1,999 $1,999 $1,999 STBG Project Program (Cost) $4,760 $5,747 $4,631 $2,868 STBG Ending Balance $7,460 $3,713 $1,081 $212

Iowa DOT TAP Program 2017 2018 2019 2020 TAP Beginning Balance $248 $195 $164 $358 TAP Apportionment $111 $112 $112 $112 TAP Flex $82 $82 $82 $82 TAP Project Program (Cost) $246 $225 $0 $393 TAP Ending Balance $195 $164 $358 $159

MAPA FY2017-2022 Transportation Improvement Program 3-4

Table 3.2c– FTA Funding Summary Table (in thousands) Metro 5307 / 5339 2017 2018 2019 2020 FTA Beginning Balance $5,586 $5,677 $5,689 $5,633 FTA Spending Authority $8,973 $9,152 $9,336 $9,523 FTA Project Program (Cost) $8,882 $9,140 $9,392 $9,467 FTA Ending Balance $5,677 $5,689 $5,633 $5,688

FTA 5310 / 5309 2017 2018 2019 2020 FTA Beginning Balance $1,204 $73 $59 $71 FTA Spending Authority $530 $530 $530 $530 FTA Project Program (Cost) $1,552 $544 $518 $574 FTA Ending Balance $82 $68 $80 $36

The tables on the following pages (Tables 3.3 through 3.8) show the fiscal constraint for the Nebraska and Iowa STBG programs, the Nebraska and Iowa TAP programs, the FTA 5310 funding program, and the Metro Transit 5307/5339 funding programs by project and fiscal year for only the federal funding for each project. The bolded funding amounts in the TIP are MAPA’s OA flexibility projects which can also be seen in Table 3.9. The additional $1.2 million programming amount comes from a yearly 3% increase from NDOR and enables MAPA to program projects in the event that funding becomes available in order to utilize MAPA’s apportionment balance and account for project slippage. The available funding depends on further acts of Congress.

MAPA FY2017-2022 Transportation Improvement Program 3-5

Fiscally Constrained portion Fiscally Constrained Fiscally Constrained portion Illustrative Years LEGEND Table 3.3 – Nebraska Fiscally Constrained STBG Funding Table (in $1,000's) of the TIP portion of the TIP of the TIP (not fiscally constrained)

FISCALLY CONSTRAINED YEARS ILLUSTRATIVE YEARS Lead Agency 2017 2018 2019 2020 2021 2022 Project Name Project Number Funding Source Funding Phase AC Funding Phase AC Funding Phase AC Funding Phase AC Funding Phase AC Funding Phase AC Grand Total Bellevue 36th Street Phase 1-370 - Sheridan NE-22276-1 STP-MAPA $ 364 PE/ROW $ 7,563 C $ - $ - $ - $ - $ 8,281 36th Street Phase II NE-22288 STP-MAPA $ 788 PE/ROW $ - $ - $ 8,063 C $ - $ - $ 9,616 Bennington 156th Street NE-22233 STP-MAPA $ 1,770 ROW/C $ - $ 70 ACC 15 $ 70 ACC 15 $ - $ 2,151 Douglas 180th St (Phase 2) NE-22224A STP-MAPA $ - $ - $ - $ 765 ROW $ 8,300 C $ - $ 9,066 180th Street (Phase 1) NE-22224 STP-MAPA $ 1,410 ROW $ - $ 21,447 C $ - $ - $ 24,225 Omaha 108th Street NE-22237 STP-MAPA $ 5,173 ROW/U/C $ - $ - $ - $ - $ 6,158 114th Street (Pacific Street to Burke Street) NE-22236 STP-MAPA $ - $ 3,667 C $ - $ - $ - $ 4,051 120th Street (Stonegate Drive to Roanoke Circle) NE-22277 STP-MAPA $ 1,270 PE/ROW/UTIL $ 8,019 C $ - $ - $ - $ 9,722 156th Street (Phase 2) NE-22376 STP-MAPA $ 8,284 C $ - $ - $ - $ - $ 8,799 168th Street (Q Street to West Center Road) NE-22209 STBG-MAPA $ 507 ROW $ 9,553 C $ - $ - $ - $ 10,273 168th Street (West Center Rd to Poppleton Street) NE-22210 STBG-MAPA $ 567 ROW $ 4,520 C $ - $ - $ - $ 5,300 72nd Street & D Street Viaduct ACC-Local $ - $ - $ - $ - $ - ROW / C $ 6,227 $ - 42nd St Bridge C to D street ACC-Local $ - $ - $ - $ - ROW/C $ 4,869 $ - $ 4,869 Q Street Bridge NE-22325 STBG-MAPA $ 7,200 C $ - $ - $ - $ - $ 7,327 Omaha Signal Network / Signal Infrastructure A-E NE-22608 A- E STBG-MAPA $ 5,414 C $ 1,576 C $ 1,159 C $ 2,712 C $ 2,701 C $ 2,782 C $ 16,344 Omaha Signal Infrastructure Phase 0 NE-22608 STBG-MAPA $ - $ - $ - $ - $ - $ 372 Omaha ATMS Central System Software NE-22591 STBG-MAPA $ - $ - $ - $ - $ - $ 1,000 Omaha Signal Network - System Management NE-22587 STBG-MAPA $ 206 PE $ - $ - $ - $ - $ 1,006 Metro Rolling Stock MET-03202014-001 STBG-MAPA $ - $ 1,866 $ - $ - $ - $ 1,866 2014 Omaha Resurfacing Package NE-22605 STBG-MAPA $ - $ - $ - $ - $ 2,578 ACC14 $ 3,313 City Re-surface project STBG-MAPA $ - AC $ 3,000 $ - AC $ 3,000 $ 3,000 $ 3,000 $ 4,869 AC/ACC16 $ 6,227 ACC17/18 $ 26,096 Sarpy 132nd and Giles NE-22283 STBG-MAPA $ 2,377 UTIL/C $ - $ - $ - $ - $ - $ 4,765 66th and Giles NE-22570 STBG-MAPA $ 987 PE $ 200 ROW $ - $ - $ 8,474 C $ - $ 9,661 MAPA/NDOR Metro Area Travel Improvement Study NE-22547 STBG-MAPA STBG Project Program (Cost) $ 36,318 $ 36,964 $ 22,676 $ 11,540 $ 24,415 $ 11,588 $ 174,259 MAPA STP Spending Authority (MAPA est.) $ 14,566 $ 15,166 $ 15,166 $ 15,166 $ 15,166 $ 15,166 STP Transfer to FTA NDOR Obligation Authority $ 28,380

Definitions AC Advance Construction (funded locally but eligible for future conversion) PE/NEPA Professional Engineering and NEPA Compliance ROW Right of Way Acquisition De-Obligation C Construction STBG Beginning Balance $ 52,747 $ 30,995 $ 9,197 $ 1,688 $ 5,314 $ (3,935) ACC XX* Advance Construction Conversion (Fiscal Year of original expenditure) Sur / Def $ (21,752) $ (21,798) $ (7,510) $ 3,626 $ (9,249) $ 3,578 Final Appointionment Balance $ 30,995 $ 9,197 $ 1,688 $ 5,314 $ (3,935) $ (357) Inflation Factor (3% annualized) 1.093 1.126 1.159 1.194 1.230 1.230

Bolded Costs by year identifies STP past Appointionment STBG Past Appointionment Use $ 21,752 $ 21,798 $ 7,510 $ (3,626) ($30.4 million) STP Past Appointionment Balance $ 25,797 $ 3,998 $ (3,511) $ 115 Inflation of 3% on both cost and revenue was included NDOR Obligation Authority

MAPA FY2017-2022 Transportation Improvement Program Fiscally Constrained Fiscally Constrained portion of Illustrative Years LEGEND Table 3.4 – Iowa Fiscally Constrained STBG Funding Table (in $1,000's) portion of the TIP the TIP (not fiscally constrained)

FISCALLY CONSTRAINED YEARS ILLUSTRATIVE YEARS 2017 2018 2019 2020 2021 2022 Funding Lead Agency Project Number Project Name Source Comments Funding Phase Funding Phase Funding Phase Funding Phase Funding Phase Funding Phase Grand Total Council Bluffs IA-13414 East Beltway Segments A-D STBG-MAPA $ - $ - $ - $ - $ - $ - Iowa 92 Intersection $ - $ - $ - $ - $ - $ - $ - Eastern Hills Dr - Seg C $ - $ - $ - $ - $ - $ - $ - Stevens Rd - East Seg $ - $ - $ - $ - $ - $ - $ - Eastern Hills Dr - Seg D $ 2,922 C $ - $ - $ - $ - $ 2,922 Greenview Rd - East Seg $ 108 PE/ROW $ - $ 1,265 C $ - $ - $ - $ 1,373 Greenview Rd - West Seg $ 433 PE $ - $ 2,339 C $ - $ - $ 2,772 Stevens Rd - West Seg $ 251 PE $ 128 ROW $ 1,421 C $ - $ 1,799 Council Bluffs IA-15903 Interstate Reconstruction Utility Relocation STBG-MAPA $ - $ - $ - $ - $ - $ - $ - 29th Ave Sanitary - West $ - $ - $ - $ - $ - $ - $ 298 I-29 and Mo. Creek Sanitary $ - $ - $ - $ - $ - $ - $ 304 Interstate Reconstruction Utility Relocation STBG-MAPA $ 367 C $ 378 C $ 390 C $ 401 C $ 413 C $ - $ 2,652 Council Bluffs West Broadway Reconstruction, Phase 1 STBG-MAPA $ - $ - $ - $ - $ - $ - $ - Council Bluffs CB-040313-001 Harrison Street Reconstruction STBG-MAPA $ - $ - $ - $ - $ 4,612 C $ - $ 4,612 Council Bluffs CB-040313-002 W Graham Ave Reconstruction STBG-MAPA $ - $ 2,014 C $ - $ - $ - $ - $ 2,014 Council Bluffs CB-033115-002 South Expressway Reconstruction Phase 1 STBG-MAPA $ 2,725 C $ - $ - $ - $ 2,725 Council Bluffs CB-033115-003 South Expressway Reconstruction Phase 2 STBG-MAPA $ 3,503 C $ - $ 3,503 Council Bluffs CB-033115-001 N 16th Street Reconstruction, Ave G to Nash STBG-MAPA $ 4,285 C $ - $ - $ 4,285 STBG Project Program $ 4,760 $ 5,747 $ 4,631 $ 2,868 $ 9,949 $ - $ 30,124

STBG Spending Authority $ 1,919 $ 1,999 $ 1,999 $ 1,999 $ 1,999 $ 1,999 CMAQ Spending Authority STBG Beginning Balance 10,302 7,460 3,713 1,081 212 $ (7,739) Sur / Def (2,841) (3,748) (2,632) (869) (7,950) 1,999 STBG Ending Balance $ 7,460 $ 3,713 $ 1,081 $ 212 $ (7,739) $ (5,740)

$ 18,218

Inflation Factor (3% annual) 1.09 1.13 1.16 1.19 1.23 1.27 Fiscally Constrained portion Fiscally Constrained portion Illustrative Years LEGEND Table 3.5 – Nebraska Fiscally Constrained TAP Funding Table (in $1,000's) of the TIP of the TIP (not fiscally constrained)

FISCALLY CONSTRAINED YEARS ILLUSTRATIVE YEARS 2017 2018 2019 2020 2021 2022 Lead Agency Project Name Project Number Funding Source Funding Phase Funding Phase AC Funding Phase Funding Phase Funding Phase Funding Phase Grand Total Metro BRT MET-11242014-001 TAP $ - $ - $ 89 $ 89 ACC $ - $ - $ - $ 1,450 LaVista Applewood Creek LV-033115-001 TAP $ 130 PE $ 1,334 C $ - $ - $ 1,464 Omaha North Downtown Ped Bridge NE-22571 TAP $ 1,060 C $ 1,093 C $ - $ 2,231 PMRNRD West Papio Trail - Millard Connection TAP $ 1,762 $ 1,762 $ - $ - $ - $ - $ - $ - $ - TAP Project Program $ - $ - $ 1,060 $ - $ 1,312 $ - $ 1,334 $ - $ 1,762 $ - $ 6,907 S

TAP Spending Authority (MAPA est.) $ 1,020 $ 1,061 $ 1,061 $ 1,061 $ 1,061 $ 1,061 TAP Beginning Balance (0) 1,020 1,021 770 497 (204) Sur / Def 1,020 1 (251) (273) (701) 1,061 TAP Ending Balance $ 1,020 $ 1,021 $ 770 $ 497 $ (204) $ 857 Inflation Factor (FY 2016) 1.03 1.06 1.09 1.13 1.16 1.16 Inflation Factor (FY 2015) 1.06 1.09 1.13 1.16 1.19 1.23 Inflation of 3% on both cost and revenue was included Inflation Factor (FY 2014) 1.09 1.13 1.16 1.19 1.23 1.23

Fiscally Constrained portion Fiscally Constrained portion Illustrative Years LEGEND Table 3.6 – Iowa Fiscally Constrained TAP Funding Table (in $1,000's) of the TIP of the TIP (not fiscally constrained)

FISCALLY CONSTRAINED YEARS ILLUSTRATIVE YEARS 2017 2018 2019 2020 2021 2022 Lead Agency Project Name Project Number Funding Source Funding Phase Funding Phase Funding Phase Funding Phase Funding Phase Funding Phase Grand Total Council Bluffs Ia Riverfront Trail III IA-1581 TAP $ - $ - $ - $ - $ - $ - $ 229 Council Bluffs River Rd. Trail IA-21087 TAP $ 246 C $ - $ - $ - $ - $ - $ 246 Pottawattamie CountyMulti Use Trail Phase 1 IA-29802 TAP $ - $ 225 $ - $ - $ - $ - $ 225 Council Bluffs City County Connector Trail N/A TAP $ - $ - $ - $ 393 $ - $ - $ 393

TAP Project Program $ 246 $ 225 $ - $ 393 $ - $ - $ 1,093

TAP Spending Authority 111 112 112 112 112 112 TAP Flex Funding $ 82 $ 82 $ 82 $ 82 $ 82 $ 82

Beginning Balance $ 248 $ 195 $ 164 $ 358 $ 159 $ 353 Sur /def (53) (31) 194 (199) 194 194 TAP Ending Balance $ 195 $ 164 $ 358 $ 159 $ 353 $ 547

Inflation of 3% on cost was included, revenue was not inflated Inflation Factor 1.09 1.13 1.16 1.19 1.23 1.23

MAPA FY2017-2022 Transportation Improvement Program Table 3.7 - FTA Fiscally Constrained 5310 & 5309 Funding Table (in $1,000s) Fiscally Constrained Years Illustrative Years

55% or Funding 2017 2018 2019 2020 2021 2022 Lead Agency Project Name 45% Source Funding Phase Funding Phase Funding Phase Funding Phase Funding Phase Funding Phase HFS Heartland Family Services (ESN Grant) 5316 $ - $ - $ - $ - $ - $ - $ - MAPA Veteran Grant NA 5309 $ 984 C $ - $ - $ - $ - $ - $ 984 Region Veteran Grant Reseach Grant NA 5309 $ - $ - $ - $ - $ - $ - $ 50 Development Services of Nebraska Demand Response Vehicles 55% 5310 $ - $ - $ - $ - $ - $ - $ 30

Friendship Program Demand Response Vehicles 55% 5310 $ 32 C $ 49 C $ - $ - $ - $ 204 Crossroads of Western Iowa/SWITA Demand Response Vehicles 55% 5310 $ 32 C $ 33 C $ 94 C $ - $ - $ 222 Intercultural Senior Center Demand Response Vehicles 55% 5310 $ - $ - $ 49 C $ - $ - $ - $ 95 Florence Home for the Aged Demand Response Vehicles 55% 5310 $ 48 C $ 33 C $ - $ 84 $ - $ 242 Omaha Housing Authority Demand Response Vehicles 55% 5310 $ - $ - $ - $ 52 $ - $ 52 Eastern Nebraska Human Service Agency Demand Response Vehicles 55% 5310 $ 94 C $ 97 C $ 66 C $ - $ - $ - $ 339 Eastern Nebraska Community Action PartnershipDemand Response Vehicles 55% 5310 $ 47 C $ 48 C $ - $ 51 C $ - $ - $ 191 Bryant Resource Center Demand Response Vehicles 55% 5310 $ - $ - $ - $ 52 $ - $ 52 City of LaVista Demand Response Vehicles 55% 5310 $ - $ - $ 49 C $ - $ - $ 53 $ 103 SWITA Demand Response Vehicles 55% 5310 $ - $ - $ - $ 35 $ - $ - $ 176 City of Bellevue Demand Response Vehicles 55% 5310 $ 47 C $ 48 C $ - $ - $ - $ 53 $ 193 City of Ralston Demand Response Vehicles 55% 5310 $ - $ - $ - $ - $ - $ - $ 45

Sarpy County Capitalized Cost of Contracting 55% 5310 $ - $ - $ - $ - $ - $ - $ 103

City of Council Bluffs Demand Response Vehicles 55% 5310 $ 87 C $ - $ - $ 95 C $ - $ 36 $ 388 City of Papillion Demand Response Vehicles 55% 5310 $ 47 C $ - $ - $ 51 C $ 52 $ - $ 149 Heartland Family Service Demand Response Vehicles 55% 5310 $ - $ - $ - $ - $ 53 $ 53 Region 5 Services Demand Response Vehicles 55% 5310 $ - $ - $ - $ 52 $ - $ 52 Notre Dame Housing Demand Response Vehicles 55% 5310 $ - $ - $ - $ - $ 48 $ 48 New Cassel Retirement Center Demand Response Vehicles 55% 5310 $ - $ - $ - $ - $ 53 $ 53 Metro Demand Response Vehicles 55% 5310 $ - $ - $ - $ - $ - $ - $ 118 MAPA MAPA Mobility Coordination/Admin 45% 5310 $ 50 M $ 50 M $ 50 M $ 50 M $ 50 M $ 50 M $ 470

City of Council Bluffs Operations 45% 5310 $ 77 O $ 72 O $ 71 O $ 91 O $ 89 O $ 15 O $ 582

Intercultural Senior Center Operations 45% 5310 $ 16 O $ 20 O $ 20 O $ - $ - $ - $ 71

Florence Home for the Aged Operations 45% 5310 $ 46 O $ 43 O $ 43 O $ 13 $ 29 $ 82 $ 299

Black Hills Works Operations 45% 5310 $ 58 O $ 54 O $ 54 O $ 65 O $ 5 $ 33 $ 407 New Cassel Retirement Center Operations 45% 5310 $ 4 $ 12 $ 57 $ 74 Heartland Family Service Operations 45% 5310 $ 8 $ 18 $ - $ 27 Bryant Resource Center Operations 45% 5310 $ 18 $ 35 $ - $ 53

Metro Metro AVL 45% 5310 $ - $ - $ - $ - $ - $ - $ 411 Total Project Cost $ 1,552 $ 544 $ 518 $ 574 $ 530 $ 535 $ 6,337 Total 5310 Cost $ 568 $ - $ 544 $ - $ 518 $ - $ 574 $ - $ 530 $ 535 $ 5,303 55% Traditional Capital FTA 5310 Projects $ 321 $ 305 $ 280 $ 325 $ 291 $ 298 45% Other/New Freedom FTA 5310 Projects $ 247 $ 239 $ 238 $ 249 $ 238 $ 237

FTA 5310 Funding 530 530 530 530 530 530 FTA 5316 Carryover $ - $ - $ - $ - FTA 5310 Carryover $ 121 $ 82 $ 68 $ 80 $ 36 $ 36 FTA 5309 Carryover $ (0) $ - $ - $ - $ - $ - Obligation grant amounts ------Total FTA 5310 Funding Level 651 612 598 610 566 566 Total FTA 5310 Projects 568 544 518 574 530 535 5310 Ending Balance $ 82 $ 68 $ 80 $ 36 $ 36 $ 32

55% Traditional Capital 5310 Funding $ 292 $ 292 $ 292 $ 292 $ 292 $ 292 55% Traditional Capital 5310 Carryover $ 98 $ 68 $ 54 $ 65 $ 32 $ 32 55% Traditional Capital 5310 Total Funding $ 389 $ 359 $ 346 $ 357 $ 323 $ 324 55% Traditional Capital Project Cost $ 321 $ 305 $ 280 $ 325 $ 291 $ 298 55% Traditional Capital Remaining Balance $ 68 $ 54 $ 65 $ 32 $ 32 $ 26 45% Other/New Freedom 5310 Funding $ 239 $ 239 $ 239 $ 239 $ 239 $ 239 45% Other/New Freedom 5310 Carryover $ 23 $ 14 $ 14 $ 15 $ 4 $ 4 45% Other/New Freedom 5310 Total Funding $ 261 $ 253 $ 252 $ 253 $ 242 $ 243 45% Other/New Fredom Project Cost $ 247 $ 239 $ 238 $ 249 $ 238 $ 237 45% Other/New Freedom Remaining Balance $ 14 $ 14 $ 15 $ 4 $ 4 $ 6

Inflation Rate (2014) 1.09 1.12 1.15 1.18 1.21 1.24 Inflation Rate (2015) 1.06 1.09 1.12 1.15 1.18 1.21 Fiscally Constrained portion Fiscally Constrained Illustrative Years LEGEND Table 3.8 – Metro Fiscally Constrained 5307 and 5339 Funding Table (in $1,000's) of the TIP portion of the TIP (not fiscally

FISCALLY CONSTRAINED YEARS ILLUSTRATIVE YEARS Lead Funding 2017 2018 2019 2020 2021 2022 Agency Project Name Source Funding Phase Funding Phase Funding Phase Funding Phase Funding Phase Funding Phase Grand Total Metro Rolling Stock 5307 $ - $ 191 $ 132 $ - $ 132 $ 67 $ 455 Metro Shop Equipment 5307 $ 20 $ 12 $ 12 $ 8 $ 8 $ 12 $ 72 Metro Computer Hardware/Software 5307 $ 136 $ 24 $ 32 $ 16 $ 16 $ 24 $ 248 Metro Security Project 5307 $ 80 $ 83 $ 85 $ 87 $ 89 $ 91 $ 515 Metro Office Equipment 5307 $ 8 $ 6 $ 8 $ 8 $ 8 $ 12 $ 50 Metro Transit Planning Activities 5307 $ 1,174 $ 1,209 $ 1,245 $ 1,283 $ 1,321 $ 1,361 $ 7,593 Metro Transit Enhancement (Shelters/Signage) 5307 $ 80 $ 83 $ 85 $ 87 $ 89 $ 90 $ 514 Metro Education & Training /Management Education & Training 5307 $ 52 $ 53 $ 61 $ 62 $ 63 $ 64 $ 356 Metro Preventive Maintenance 5307 $ 5,670 $ 5,789 $ 6,022 $ 6,163 $ 6,138 $ 6,314 $ 36,096 Metro ADA 5307 $ 809 $ 826 $ 842 $ 859 $ 876 $ 893 $ 5,103 Metro Project Administration 5307 $ 60 $ 69 $ 71 $ 64 $ 76 $ 88 $ 428 Metro Rolling Stock 5339 $ 793 $ 795 $ 797 $ 831 $ 903 $ 883 $ 5,002 Total Cost $ 8,882 $ - $ 9,140 $ - $ 9,392 $ - $ 9,467 $ - $ 9,718 $ - $ 9,899 $ 56,499

FTA 5307 Funding $ 8,180 $ 8,344 $ 8,511 $ 8,681 $ 8,855 $ 9,032 FTA 5307 Carryover $ 5,586 $ 5,677 $ 5,675 $ 5,591 $ 5,636 $ 5,676 FTA 5307 Total Funding $ 13,766 $ 14,021 $ 14,186 $ 14,272 $ 14,491 $ 14,707 FTA 5307 Projects $ 8,089 $ 8,345 $ 8,595 $ 8,636 $ 8,815 $ 9,016 Surplus/Deficit $ 5,677 $ 5,675 $ 5,591 $ 5,636 $ 5,676 $ 5,691

FTA 5339 Funding $ 793 $ 809 $ 825 $ 842 $ 858 $ 876 Flexed FTA 5339 Funding $ - $ - $ - $ - $ - $ - FTA 5339 Carryover $ - $ 14 $ 42 $ 52 $ 8 FTA 5339 Total Funding $ 793 $ 809 $ 839 $ 883 $ 911 $ 883 FTA 5339 Projects $ 793 $ 795 $ 797 $ 831 $ 903 $ 883 Surplus/Deficit $ - $ 14 $ 42 $ 52 $ 8 $ 0

Total FTA Funding Level $ 14,559 $ 14,829 $ 15,025 $ 15,155 $ 15,401 $ 15,591 Total FTA Projects $ 8,882 $ 9,140 $ 9,392 $ 9,467 $ 9,718 $ 9,899 Surplus/Deficit $ 5,677 $ 5,689 $ 5,633 $ 5,688 $ 5,683 $ 5,692

MAPA FY2017-2022 Transportation Improvement Program 3.3 Apportionment and Obligation Flexibility MAPA’s annual obligation authority from the State of Nebraska had been approximately $12.5 million per fiscal year in recent years. Due to project schedules and funding shifts, MAPA spent less than had been allocated to the region over the last several fiscal years resulting in an obligation surplus of around $30 million. As a result, in 2014 MAPA entered into an agreement with NDOR, which provided MAPA with flexibility to program projects within the fiscally constrained portion of the TIP in order to spend these extra funds. With this Obligation Authority flexibility, NDOR will make obligation authority available to MAPA in years in which MAPA programs more than its annual obligation authority limit.

Additionally, this agreement made available over $30 million dollars of MAPA’s apportionment balance, and this balance was distributed across several regionally significant projects. This information is shown in Table 3.9 below.

Table 3.9 –MAPA OA Flexibility Projects ($1,000’s) Funds Utilizing Funds from OA Total Funds Project FY New OA Balance Programmed 156th Street (Phase 2) $ 2,096 $ 6,188 $ 8,284 2017 108th Street $ 198 $ 4,141 $ 4,220 2017 168th Street (West Center Rd to Poppleton St) $ 379 $ 4,141 $ 4,520 2018 Omaha Signal Network $ 142 $ 1,576 $ 1,576 2018 114th Street (Pacific Street to Burke Street) $ 1,108 $ 2,417 $ 3,667 2018 TOTAL $ 18,463 Beginning OA Balance $ 30,447 Ending OA Balance $ 11,984

MAPA FY2017-2022 Transportation Improvement Program 3-11

The Advance Construction (AC) conversion program gives the flexibility and opportunity to locally fund projects and later convert the funding for federal funds. Projects are ranked through the STBG selection process, but are elected to be funded locally. This process is shown in Table 3.10 and is available for all members of MAPA.

Table 3.10 – MAPA Advance Construction Conversion Projects ($1,000’s)

AC Funding Advance Construction Project FY2016 FY2017 FY2018 FY2019 FY2020

2016 Omaha Resurfacing $ 4,080 $ - $ - $ - City of Omaha Resurfacing $ - $ 3,000 $ 3,000 $ 924 $ 3,000 30th Street Road Diet $ - $ - $ - $ 996 $ - Annual Total $ 4,080 $ 3,000 $ 3,000 $ 1,920 $ 3,000 Total Total Balance $ 4,080 $ 7,080 $ 10,080 $ 12,000 $ 15,000 $13,920

STBG Funding Illustrative Projects AC Conversion Projects FY2017 FY2018 FY2019 FY2020 FY2021 FY2022 Omaha City Conversion 1 $ - $ - $ - $ - $4,869 $ - Omaha City Conversion 2 $ - $ - $ - $ - $ - $6,227 Annual Total $ - $ - $ - $ - $4,869 $6,227

Remaining AC Balance $7,080 $10,080 $12,000 $15,000 $10,131 $3,904

Local Funded Projects TIP TIP Year of Projects Rank Programmed Expenditure 42nd Street Bridge: C to D Street 5 FY15 FY2021 72nd Street & D Street Viaduct 2 FY15 FY2022

3.4 Operations and Maintenance MAP-21 directs MPOs to consider operation and maintenance (O & M) of the system as part of fiscal constraint, in addition to capital projects. O & M costs represent what is required to operate and maintain existing transportation facilities, shown in Table 3.11 (next page). To support this assessment, MPOs are charged with providing credible cost estimates in the TIP. The figures below were developed in consultation with state and local governments. Federal-aid and non-federal-aid estimates were derived by dividing the total operations and maintenance costs based on the mileage on the federal-aid system, as is the practice by Iowa DOT. For the basis of this TIP, MAPA estimates an inflation rate of 3 percent per year for operations and maintenance costs. Estimated revenues assume a more conservative growth rate of 2 percent per year.

MAPA FY2017-2022 Transportation Improvement Program 3-12

Table 3.11 – Operations and Maintenance Tables ($1,000’s) PROJECTED OPERATIONS & MAINTENANCE (FY 2017) Non-Federal O&M Federal O&M Total O&M FY 2017 FY 2017 FY 2017 Iowa O&M 5,268,221 1,700,033 6,968,254 Nebraska O&M 91,396,525 37,330,975 128,727,500 MAPA O&M 96,664,746 39,031,008 135,695,754 PROJECTED OPERATIONS & MAINTENANCE (FY 2018) Non-Federal O&M Federal O&M Total O&M FY 2018 FY 2018 FY 2018 Iowa O&M 5,426,268 1,751,034 7,177,302 Nebraska O&M 93,224,455 38,077,594 131,302,050 Total O&M 98,650,723 39,828,628 138,479,352

PROJECTED OPERATIONS & MAINTENANCE (FY 2019) Non-Federal O&M Federal O&M Total O&M FY 2019 FY 2019 FY 2019 Iowa O&M 5,589,056 1,803,565 7,392,621 Nebraska O&M 95,088,944 38,839,146 133,928,091 Total O&M 100,678,000 40,642,711 141,320,712

PROJECTED OPERATIONS & MAINTENANCE (FY 2020) Non-Federal O&M Federal O&M Total O&M FY 2020 FY 2020 FY 2020 Iowa O&M 5,756,728 1,857,672 7,614,400 Nebraska O&M 97,941,612 40,004,320 137,945,934 Total O&M 103,698,340 41,861,992 145,560,333

PROJECTED TOTAL NON-FEDERAL-AID REVENUES FY 2017 FY 2018 FY 2019 FY 2020 Iowa $19,944,530 $20,343,421 $20,750,289 $21,165,295 Nebraska $208,802,272 $212,978,317 $217,237,883 $221,582,641 Total O&M $228,746,802 $233,321,738 $237,988,172 $242,747,936

3.5 Federal Transit Administration Programs Federal-aid transit projects in the MAPA region are funded through the Federal Transit Administration (FTA) of the USDOT. The anticipated FTA funding allocations are displayed in Table 3.12 as well as Metro’s projected operating funding (Table 3.14). Federal funding for transit projects under Sections 5339 - Bus and Bus Facilities and 5307 - Urbanized Area Formula - are directed to Metro Transit to support their operations, while MAPA receives 5310 – Enhanced Mobility of Seniors and Individuals with Disabilities –

MAPA FY2017-2022 Transportation Improvement Program 3-13

funding. The list of individual 5310 projects is shown in Table 3.7 on page 3-9; in addition, the 5310 carryover for each fiscal year is shown. Federally funded transit improvement projects must be contained in the regional Transportation Improvement Plan and Metro’s Transportation Improvement Program is included in Table 3.13 and Metro’s fiscally constrained projects are shown in Table 3.8 on page 3-10.

Table 3.12 – Anticipated FTA Funding Type 2017 2018 2019 2020 2021 2022 5307 (Metro) $8,180,000 $8,344,000 $8,511,000 $8,681,000 $8,855,000 $9,032,000 5310 (MAPA) $530,000 $530,000 $530,000 $530,000 $530,000 $530,000 5339 (Metro) $793,000 $809,000 $825,000 $842,000 $858,000 $876,000

Table 3.13 – Metro Transportation Improvement Program (in $1,000s) Rolling Stock Capital/Maintain/Planning Projected Year Federal Share Total Costs Federal Share Total Costs Apportionment 2017 $793.00 $932.94 $8089.57 $10111.95 $8882.57 2018 $986.00 $1160.00 $8155.49 $10419.34 $9141.49 2019 $928.63 $1092.51 $8463.84 $10734.81 $9392.47 2020 $830.88 $977.51 $8636.23 $10795.27 $9467.11 2021 $1034.69 $1217.28 $8683.33 $11009.17 $9718.02 2022 $980.90 $1154.00 $8948.72 $11264.90 $9929.62

Table 3.14 – Metro Transit’s Projected Operating Funding (in $1,000s) 2017 TO 2022 Year Location Farebox (a) State Federal (b) Local (c) Total 2017 Omaha $3665.70 $2500.00 $7492.15 $16578.85 $30236.77 Council Bluffs $200.00 $175.00 $273.00 $704.00 $1352.00 2018 Omaha $3775.74 $2500.00 $7673.58 $17159.11 $31108.43 Council Bluffs $200.00 $175.00 $273.00 $704.00 $1352.00 2019 Omaha $3889.01 $2500.00 $7968.88 $17759.77 $32117.57 Council Bluffs $200.00 $175.00 $273.00 $704.00 $1352.00 2020 Omaha $4005.69 $2500.00 $8157.59 $18381.26 $33044.53 Council Bluffs $200.00 $175.00 $273.00 $704.00 $1352.00 2021 Omaha $4125.86 $2500.00 $8201.23 $19024.61 $33851.98 Council Bluffs $200.00 $175.00 $273.00 $704.00 $1352.00 2022 Omaha $4249.63 $0.00 $8447.07 $1960.47 $23387.18 Council Bluffs $200.00 $175.00 $273.00 $704.00 $1352.00 (a) Omaha = 3% increase (b) Omaha = 3% increase (c) Omaha = 3.5% increase

MAPA FY2017-2022 Transportation Improvement Program 3-14

Environmental Justice 4.1 Environmental Justice Populations ENVIRONMENTAL JUSTICE In 1997, the United States Department of PRINCIPALS Transportation (USDOT) issued its Order to Address Environmental Justice in Minority Populations and Low- Income Populations (USDOT Order). The USDOT 1. Avoiding, minimizing, or Order addresses the requirements of Executive Order mitigating disproportionately 12898 and sets forth USDOT's policy to promote the high and adverse effects, principles of environmental justice in all programs, including social and policies and activities under its jurisdiction. Since the DOT Order was issued, the Federal Highway economic effects, on Administration (FHWA) and Federal Transit minority and low income Administration (FTA) have been working with their populations state and local transportation partners to make sure 2. Ensuring the full and fair that the principles of environmental justice are integrated into every aspect of their mission. participation by all affected communities in the In order to identify EJ populations in the area, MAPA transportation making mapped out the areas of high poverty and high rates of minority populations and deemed the areas with an process intersection of these two groups as being EJ areas. Areas 3. Preventing the denial of, with concentrations of households without vehicles, reduction of, or significant those completely dependent on transit, were also delay in the receipt of mapped out; all of the areas with concentrations of households without vehicles also overlap EJ areas. The benefits by minority and low correlation between populations in EJ areas and those income populations without access to their own vehicles means that many in EJ areas are dependent on transit to access jobs, education, and social safety nets.

In order to effectively determine the impact that upcoming transportation programs will have on those living in EJ areas MAPA considered several levels of analysis. Table 4.1 (next page) has a breakout of the funding analysis.  Funding within environmental justice areas o The amount of funds that are spent on projects in or around EJ areas o The proportion of funding assigned to projects is calculated based on the area of the project within or touching EJ areas  Funding within the transit shed o Projects that are in or near the transit shed o The proportion of funding assigned to projects is calculated based on the area of the project within or touching the transit shed  Travel Time

MAPA FY2017-2022 Transportation Improvement Program 4-1

o Determining the change in the Vehicle Hours Traveled (VHT) created by the transportation program in the travel shed o Measures the improvements to travel time of those using the bus system  Metro Transit Funding o The percentage of Metro Transit funding considered EJ is directly correlated to the percentage of their ridership that fall below the poverty line

Table 4.1 – Environmental Justice Analysis Types Distribution of Funding Environmental Transit-shed Travel Time Metro Transit Justice Areas Investments Analysis Funding Funding Travel time % funding within EJ % funding within Transit- corresponding to improvement within Area shed level of riders below the transit shed poverty line

4.1.1 Identification of Environmental Justice Areas To identify environmentally sensitive populations, MAPA conducted an analysis of census data at the tract level (2010 US Census and 2013 American Community Survey). The analysis reviewed MAPA TMA populations to evaluate whether areas of disproportionate minority and low-income populations exist. The percentage of the population within each census tract identified as low-income or minority was compared to the TMA average, using a normal range of one standard deviation above and below the average; 68 percent of all measurements fall within one standard deviation of the average in a normally distributed dataset. The remaining 32 percent is above and below this regional average. The MAPA TMA Percent Minority and Percent Poverty data sets are positively skewed and not normally distributed. To account for this, the data square root value was used to transform the dataset into a normal distribution. Those census tracts with a score greater than one standard deviation above the average (square root value) have a concentrated minority or low income population.

Figure 4.1 (next page) illustrates the locations of the aforementioned areas within the TMA. The map indicates census tracts with a ratio of minority and/or low-income populations significantly higher than the TMA average. The concentrations of minority or low-income, and zero vehicle populations were defined by the above mentioned methodology. These census tracts were determined to be environmentally sensitive areas of concern for evaluation purposes.

MAPA FY2017-2022 Transportation Improvement Program 4-2

Figure 4.1 – Environmental Justice Areas in the MAPA TMA

MAPA FY2017-2022 Transportation Improvement Program 4-3

4.1.2 Identification of the Transit Shed A transit shed is the area around transit service line that is considered a walkable distance from a route. MAPA determined that for the Omaha area, in compliance with ADA transit service standards, this was three quarters of a mile buffer around all transit routes. Due to the close and compacted nature of bus services this creates a comprehensive area in which transit service is easily available. North and South Omaha have the densest concentrations of transit routes in the city, coinciding with the largest EJ areas in the region, as shown in Figure 4.3.

Figure 4.3 – MAPA Transit Shed

MAPA FY2017-2022 Transportation Improvement Program 4-4

4.1.3 Identification of Funding Levels in EJ areas and the Transit Shed (TS) Funding Equity The MAPA FY2017 TIP projects were mapped using Geographic Information System (GIS) and spatially analyzed for proximity and location within the environmental justice areas and the transit shed. EJ funding was assigned based on the proportions of the project in or near EJ areas and the transit shed. The various spatial relationships and funding distributions are outlined below:

 Portion of Project Within EJ Area o The percentage of the TIP project within the EJ area, weighted at 85%, is used in combination with its transit shed relation to determine the percentage of its funding attributed to EJ  Portion of Project Within Transit Shed o The percentage of the TIP project within the transit shed, weighted at 85%, is used in combination with its EJ area relation to determine the percentage of its funding attributed to EJ

Relation to Transit Projects falling within the TS are looked at for how they affect travel time. MAPA staff determined that projects that benefited level of service, improving travel time, in the transit shed had a positive impact on EJ populations and those that decreased the level of service could negatively affect EJ populations due to the impact of the mobility of those who depend the bus system.

 How Project Relates to Transit o If Project Reduces Travel Time – 10% of funding attributed to EJ

Non-Spatial Projects Many projects do not have a single spatial location or a location specific impact. For example, a traffic control center impacts the complete jurisdiction with technology and system management. Furthermore, a traffic signal project may occur at various locations throughout a jurisdiction and these locations cannot be explicitly determined. These types of projects have the funding distributed based on geographic area proportions of the lead agency jurisdiction boundaries, the TS, and EJ areas within that jurisdiction. That is to say that if a non-spatial project from a lead agency that has ten square miles of total incorporated area and EJ areas or TS of two square miles, 20 percent of the project funds will be allocated to the EJ areas or TS based on this proportion. Metro Transit funding for nonspecific projects falls into the non-spatial projects category since Metro Transit’s service area covers a considerable portion of the region.

Metro Transit Projects Metro transit projects are an important form of the non-spatial project type. These are considered for their impact on sensitive populations and the levels of connectivity that the Metro system provides for EJ populations, especially those without cars. All of the Omaha region’s EJ areas are covered by the existing transit shed and the transit shed provides connections between EJ areas and important employment and social service areas as shown in Figure 4.3. According to Metro statistics, close to 60% of their ridership is at or below the poverty line and the vast majority of the trip destinations and origins are in EJ areas and areas with high densities of service sector employment. In keeping with the proportional method of EJ funding determination for non-spatial projects, 60% of Metro Transit funding would be considered EJ funding to match the percentage of Metro’s ridership who fall under the poverty line.

MAPA FY2017-2022 Transportation Improvement Program 4-5

 Metro Funding o Total Metro funding is $56,499,000 o Portion of Metro funding considered EJ is $33,899,400

Figure 4.4 displays all projects in the 2017-2020 TIP that are located within environmental justice areas and/or the transit shed. Table 4.2 shows the assignment of EJ funding portions for the projects shown in Figure 4.4.

Figure 4.4 – TIP Projects in EJ Areas

MAPA FY2017-2022 Transportation Improvement Program 4-6

Table 4.2 – TIP Projects EJ Percentage Determination

Map % Project % Project in Travel Time EJ Funding TIP ID Number Project Project Type Total Funding in EJ Area Transit Shed Decrease Percentage North Downtown Riverfront 2015- Pedestrian Multi-Modal 001 1 Bridge Improvement $ 5,575 100 100 0 85% I-80/680 'Q'-'L' 2015- CD Rds, Omaha 008 3 (WB) Resurfacing $ 5,820 0 100 0 43%

2015- Harrison Street Road 011 4 Reconstruction Improvement $ 2,518 0 100 0 43%

2015- W Graham Ave Road 012 5 Reconstruction Improvement $ 2,333 0 100 0 43%

2015- Metro Rolling Transit 021 6 Stock Capital $ 6,087 55 100 0 66% 42nd Street 2015- Bridge, C to D 022 7 Street Bridge $ 14,770 0 100 0 43%

2015- I-80: 24th Street Road 023 8 - 13th Street Widening $ 1,340 0 100 0 43%

2015- 036 14 EB I-80 at I-680 Bridge $ 9,575 0 100 0 43%

2015- 72nd & D Street 043 20 Viaduct Bridge $ 6,466 0 100 0 43%

2015- 044 21 Q Street Bridge Bridge $ 4,584 100 100 0 85%

2015- Road 051 25 108th Street Widening $ 445,380 93 45 0 59%

2015- Road 053 27 114th Street Widening $ 308 92 18 0 47%

2015- 056 86 I-80 Bridge $ 4,486 60 100 0 68%

2015- Multi-Modal 060 31 River Rd. Trail Improvement $ 1,919 62 73 0 57%

2015- 24th Street Road 065 33 Road Diet Widening $ 1,315 100 100 0 85%

MAPA FY2017-2022 Transportation Improvement Program 4-7

Map % Project % Project in Travel Time EJ Funding TIP ID Number Project Project Type Total Funding in EJ Area Transit Shed Decrease Percentage US 275 Bridge 2015- Over Missouri 079 87 River Resurfacing $ 178 0 100 0 43% 132nd at West 2015- Center Road 132 35 Safety Project Intersection $ 295 0 100 0 43%

2015- Bus Rapid Transit 139 36 Transit Capital $ 6,692 45 100 0 62%

2015- I-680 / US-6 152 37 Bridges Bridge $ 4,525 0 100 0 43%

2016- I-480: Bancroft - 001 38 Dewey Resurfacing $ 12,687 95 100 0 83%

2016- I-80/I-480 006 43 Bridges Bridge $ 8,500 50 100 0 64%

2016- I-80/I-480/US- 007 44 75 Interchange Bridge $ 8,500 100 100 0 85% I-480: 20th Street - Missouri 2016- River Bridges 008 45 (EB) Bridge $ 2,669 100 74 0 74% I-480: 20th Street - Missouri 2016- River Bridges 009 46 (WB) Bridge $ 217 100 74 0 74% US-75: J Street 2016- & Gilmore Ave 011 48 Bridge (SB) Bridge $ 1,628 100 100 0 85%

2016- US-75: Off Ramp Road 012 49 to N-64 (NB) Improvement $ 12,402 100 100 0 85% US-275: 25th 2016- Street - 23rd ITS/Signalizati 019 51 Street on $ 702 100 100 0 85%

2016- I-680: Mormon 020 52 Bridge Painting Bridge $ 460 0 100 0 43% I-680: Mormon 2016- Bridge Deck 021 53 Overlay Bridge $ 1,510 0 100 0 43% 24th Street 2016- Interstate 023 55 Bridge Bridge $ 6,547 100 100 0 85%

MAPA FY2017-2022 Transportation Improvement Program 4-8

Map % Project % Project in Travel Time EJ Funding TIP ID Number Project Project Type Total Funding in EJ Area Transit Shed Decrease Percentage I-680: West 2016- Center Road 025 57 Bridge Bridge $ 920 0 100 0 43%

2016- I-80: I-480 to 026 58 24th Street Resurfacing $ 5,356 100 100 0 85% US-75: Dynamic 2016- Message Signs, ITS/Signalizati 031 59 Omaha on $ 3,406 100 100 0 85% North 16th 2016- Street Road 034 60 Reconstruction Improvement $ 400 78 84 0 69% South Expressway 2016- Reconstuction - Road 035 61 Phase 1 Improvement $ 1,380 50 100 0 64% South Expressway 2016- Reconstuction - Road 036 62 Phase 2 Improvement $ 1,122 50 100 0 64%

2016- I-480: Missouri Road 043 89 River to I-29 Improvement $ 4,194 0 100 0 43% 2016- Adaptive Traffic 047 65 Signal Control $ 100 100 0 0 43% 144th Street 2016- Adaptive Traffic 048 66 Signal Control $ 7,700 100 0 0 43% 84th Street 2016- Adaptive Traffic ITS/Signalizati 063 67 Signal Control on $ 2,860 46 0 0 20% US-275 & 72nd 2017- Street 001 69 Interchange Interchange $ 2,810 100 0 0 43%

2017- I-80/480/US-75 005 73 Bridge Painting Bridge $ 476 100 0 0 43%

2017- I-480, 20th-12th 006 74 Bridge Painting Bridge $ 1,200 100 0 0 43%

2017- South Omaha 007 75 Veterans Bridge Bridge $ 1,306 100 0 0 43%

2017- N-64 Concrete 008 76 Repair Resurfacing $ 2,921 100 0 0 43%

MAPA FY2017-2022 Transportation Improvement Program 4-9

Map % Project % Project in Travel Time EJ Funding TIP ID Number Project Project Type Total Funding in EJ Area Transit Shed Decrease Percentage West Papio Trail 2017- - Millard Multi-Modal 015 81 Connection Project $ 2,924 13 0 0 6%

2017- City/County Multi-Modal 018 82 Connector Trail Project $ 48 74 0 0 31%

2017- I-80 Missouri 022 91 River to Cass Co Resurfacing $ 48 46 0 0 20%

2017- 023 92 I-480 Bridge Bridge $ 5,575 100 0 0 43%

2017- 024 93 I-680 Bridge WB Bridge $ 5,820 100 0 0 43%

2017- 025 94 I-680 Bridge EB Bridge $ 2,518 100 0 0 43%

2017- 026 95 I-80 Bridge EB Bridge $ 2,333 100 0 0 43%

2017- 027 96 I-80 Bridge WB Bridge $ 6,087 100 0 0 43%

4.2 Findings 4.2.1 Transit Shed and Metro Transit Findings Based on the analysis presented above, including evaluating transit change effects, environmentally sensitive populations are not being adversely affected by the FY2017-2020 TIP Program. At a program level, there are no adverse impacts anticipated for environmental justice populations in relation Metro’s funding or to travel time within the transit shed, preserving or improving the mobility of those in EJ areas. Table 4.3 shows the projects in Environmental Justice and Transit Shed areas. Table 4.5 lists Federal-Aid projects not located within, adjacent to, or abutting an environmental justice area. Project funding is restricted to only the fiscally constrained portion of the MAPA TIP (FY2017 – FY2020).

Table 4.3 displays the listing of Metro Transit projects for the duration of the FY2017 – FY2020 MAPA TIP. MAPA used the percentage of Metro’s ridership which fall under the federal poverty line (60%) to determine the percentage of Metro’s funding that would be considered as EJ funds, a corresponding 60%.

MAPA FY2017-2022 Transportation Improvement Program 4-10

Table 4.3–Transit Funding Metro Funding EJ TS Non-EJ Total Lead EJ Funding Control Number Project Name Funding Funding Funding Funding Agency (1,000s) Percent Percent (1,000s) (1,000s) MET-03202014-001 Metro Rolling Stock Metro 60% 100% $22,129 $14,752 $36,881

4.2.2 Highway and Road Findings Based on the analysis presented above, environmentally sensitive populations are not being adversely affected by the FY2017-2020 TIP. The funding distribution for road projects and the modeled travel time impacts are not anticipated to disproportionately adversely affect those living in EJ areas, as can be seen in Tables 4.2 which shows the projects in the EJ areas. Table 4.4 summarizes the proportion of EJ funding for spatial projects in the FY2017-2020 TIP.

Table 4.4 – Environmental Justice Conclusion Environmental Justice Projects

Total Percent of Percent of Funding (1,000s) Project Type Projects Fed Funding Population EJ Non-EJ Total Project Funding Funding Cost Non-Environmental Justice Projects 42 25% 79% - $225,747 $225,747

Environmental Justice Projects 49 75% 21% $408,213 $212,723 $620,936

Total 91 100% 100% $408,213 $438,470 $846,683

4.4.3 Conclusion of Findings In examining the funding and geographic allocation of projects, and their potential impacts on users of the transit, road, and trail systems, in the 2017-2020 TIP there were anticipated to be no disproportionate impacts to EJ areas. Funding allocation across the entire program was found to be higher in all categories for EJ areas with 75% of funding going to projects linked to EJ populations and in or near EJ areas compared to 21% of the population living in EJ areas, as shown in Table 4.4. The inclusion of Transit Shed projects and Metro service to EJ areas examines the connectivity for those who do not have access to vehicles, as demonstrated in earlier sections these connections are not anticipated to be harmed in this TIP.

MAPA FY2017-2022 Transportation Improvement Program 4-11

Project Tables 5.1 Regionally Significant Project Information This section of the TIP includes detailed programming information for all regionally-significant transportation projects identified for the MAPA region. The projects are divided between sub-sections of this chapter based on the following categories:  Roadway & Trail Projects  Transit Projects  Aviation Projects These categories generally correspond to the three major agencies responsible for funding transportation projects in the MAPA region: the Federal Highway Administration (FHWA), the Federal Transit Administration (FTA), and the Federal Aviation Administration (FAA). 5.1.1 Regionally Significant Roadway & Trail Projects The next pages include project tables for roadway, trail, and other projects generally eligible for FHWA funding programs. Projects in this section include those selected through MAPA’s project selection process, in addition to programs for which the two state departments of transportation (NDOR and Iowa DOT) make decisions. Regionally significant state- and locally-funded projects are included in this section as well. Table 5.1 lists the corresponding numbered projects that match the map in Figure 5.1 on page 5- 2.

MAPA FY2017-2022 Transportation Improvement Program 5-1

Figure 5.1 – TIP Projects

MAPA FY2017-2022 Transportation Improvement Program 5-2

Table 5.1 – TIP Project List Primary Funding Map TIP ID Project Name Lead Agency Source Number 2015-048 36th Street Phase N-370 - Sheridan Bellevue STBG-MAPA 23 2015-050 36th Street Phase II Bellevue STBG-MAPA 24 2015-046 156th Street Bennington STBG-MAPA 22 2015-011 Harrison Street Reconstruction Council Bluffs TAP-MAPA 4 2015-012 W Graham Ave Reconstruction Council Bluffs STBG-MAPA 5 2015-060 River Rd. Trail Council Bluffs STBG-MAPA 31 2015-075 Interstate Utility Relocation Council Bluffs STBG-MAPA 34 2016-034 North 16th Street Reconstruction Council Bluffs STBG-MAPA 60 2016-035 South Expressway Reconstruction - Phase 1 Council Bluffs STBG-MAPA 61 2016-036 South Expressway Reconstruction - Phase 2 Council Bluffs STBG-MAPA 62 2016-069 East Beltway: Eastern Hills Drive - Segment C Council Bluffs TAP-MAPA 68 2017-013 East Beltway: Stevens Road - East Segment Council Bluffs DPS 97 DPS/STBG- 2017-014 East Beltway: Eastern Hills Drive - Segment D Council Bluffs 80 MAPA 2017-018 City/County Connector Trail Council Bluffs DPS 82 2017-019 East Beltway: Greenview Road - West Segment Council Bluffs STBG-MAPA 83 2017-020 East Beltway: Stevens Road - West Segment Council Bluffs STBG-MAPA 84 2017-021 East Beltway: Greenview Road - East Segment Council Bluffs STBG-MAPA 85 2015-038 180th St (Phase 2) Douglas STBG-MAPA 15 2015-039 180th Street (Phase 1) Douglas STBG-MAPA 16 2015-056 I-80 Iowa DOT NHPP 86 2015-079 US 275 Bridge Over Missouri River Iowa DOT State-Iowa 87 2016-042 US-275 Missouri River Bridge Iowa DOT State-Iowa 88 2016-043 I-480: Missouri River to I-29 Iowa DOT State-Iowa 89 2017-022 I-80: Missour River to Cass County Iowa DOT State-Iowa 91 2017-023 I-480: Missouri River in Council Bluffs Iowa DOT State-Iowa 92 2017-024 I-680: Missouri River in Council Bluffs - WB Iowa DOT State-Iowa 93 2017-025 I-680: Missouri River in Council Bluffs - EB Iowa DOT State-Iowa 94 2017-026 I-80: Missouri River in Council Bluffs - EB Iowa DOT State-Iowa 95 2017-027 I-80: Missouri River in Council Bluffs - WB Iowa DOT State-Iowa 96 2017-028 US 6: BNSF Railroad Bridge - EB & WB Iowa DOT State-Iowa 98 2016-037 Applewood Creek Trail La Vista TAP-MAPA 63 2015-021 Metro Rolling Stock Metro STBG-MAPA 6 2015-139 Bus Rapid Transit Metro TIGER VI 36 2015-008 I-80/680 'Q'-'L' CD Rds, Omaha (WB) NDOR NHPP 3 2015-023 I-80: 24th Street - 13th Street NDOR State-Nebraska 8 2015-026 Giles Road Interchange Ramps NDOR State-Nebraska 9 2015-027 Jct N‐31/N‐36 Intersection Improvements NDOR State-Nebraska 10 2015-028 Elkhorn River West NDOR State-Nebraska 11 2015-029 N-64 at SE Jct US‐275 ‐ Omaha NDOR State-Nebraska 12 2015-034 N-92: Platte River East Structures NDOR State-Nebraska 13 2015-036 EB I-80 at I-680 NDOR State-Nebraska 14 2015-152 I-680 / US-6 Bridges NDOR NHPP 37 2016-001 I-480: Bancroft - Dewey NDOR NHPP 38 2016-002 N-31: Schramm Park - US-6 NDOR STBG-State 39

MAPA FY2017-2022 Transportation Improvement Program 5-3

Table 5.1 – TIP Project List (continued) Lead Map TIP ID Project Name Agency Primary Funding Source Number 2016-003 US-275: Waterloo Viaduct NDOR NHPP 40 2016-004 US-275: West Papillion Creek Bridge West NDOR NHPP 41 2016-005 I-680: Fort Street to Missouri River NDOR State-Nebraska 42 2016-006 I-80/I-480 Bridges NDOR NHPP 43 2016-007 I-80/I-480/US-75 Interchange NDOR NHPP 44 2016-008 I-480: 20th Street - Missouri River Bridges (EB) NDOR NHPP 45 2016-009 I-480: 20th Street - Missouri River Bridges (WB) NDOR NHPP 46 2016-010 N-31 Bridges North of N-36 NDOR STBG-State 47 2016-011 US-75: J Street & Gilmore Ave Bridge (SB) NDOR NHPP 48 2016-012 US-75: Off Ramp to N-64 (NB) NDOR HSIP 49 2016-018 I-80, N-31, N-370, & N-50 Ramps NDOR NHPP 50 2016-019 US-275: 25th Street - 23rd Street NDOR HSIP 51 2016-020 I-680: Mormon Bridge Painting NDOR NHPP 52 2016-021 I-680: Mormon Bridge Deck Overlay NDOR NHPP 53 2016-022 US-75 Bridge Approaches, Bellevue NDOR NHPP 54 2016-023 24th Street Interstate Bridge NDOR NHPP 55 2016-024 N-31: Elkhorn Viaduct NDOR NHPP 56 2016-025 I-680: West Center Road Bridge NDOR NHPP 57 2016-026 I-80: I-480 to 24th Street NDOR State-Nebraska 58 2016-031 US-75: Dynamic Message Signs, Omaha NDOR NHPP 59 2017-001 US-275 & 72nd Street Interchange NDOR NHPP 69 2017-002 N-36 Resurfacing NDOR STBG-State 70 2017-003 N-50 Concrete Repair NDOR NHPP, STBG-State 71 2017-004 US-75 Resurfacing NDOR NHPP 72 2017-005 I-80/480/US-75 Bridge Painting NDOR NHPP 73 2017-006 I-480, 20th-12th Bridge Painting NDOR NHPP 74 2017-007 South Omaha Veterans Bridge NDOR State-Nebraska 75 2017-008 N-64 Concrete Repair NDOR NHPP 76 2017-009 N-64 Pavement Neark Elkhorn River Bridge NDOR NHPP 77 2017-010 N-85 Intersection with Ralston Avenue NDOR HSIP 78 2017-012 US-75 Bridge Approaches in Bellevue NDOR NHPP 79 2017-029 I-680: I-80 to Fort Street NDOR NHPP 99 2017-030 US-6 Bridges at I-680 NDOR NHPP 100 2015-001 North Downtown Riverfront Pedestrian Bridge Omaha TAP-MAPA 1 2015-022 42nd Street Bridge, C to D Street Omaha ACC-Local 7 2015-040 156th Street Phase Two Omaha STBG-MAPA 17 2015-043 72nd & D Street Viaduct Omaha ACC-Local 20 2015-044 Q Street Bridge Omaha STBG-MAPA, STBG-State 21 2015-051 108th Street Omaha STBG-MAPA 25 2015-052 168th Street Omaha STBG-MAPA 26 2015-053 114th Street Omaha STBG-MAPA 27 2015-054 168th Street Omaha STBG-MAPA 28 2015-055 120th Street Omaha STBG-MAPA 29 2015-065 24th Street Road Diet Omaha HSIP, STBG-MAPA 33

MAPA FY2017-2022 Transportation Improvement Program 5-4

Table 5.1 – TIP Project List (continued) Primary Map TIP ID Project Name Lead Agency Funding Source Number 2015-132 132nd at West Center Road Safety Project Omaha HSIP 35 2016-046 132nd Street Adaptive Traffic Signal Control Omaha HSIP 64 2016-047 Dodge Street Adaptive Traffic Signal Control Omaha HSIP 65 2016-048 144th Street Adaptive Traffic Signal Control Omaha HSIP 66 2016-063 84th Street ASCT Omaha HSIP 67 2017-015 Omaha Signal Infrastructure - Phase F Omaha STBG-MAPA 81 2015-041 Western Douglas County Trail Phase 2 PMRNRD DPU 18 2015-042 Western Douglas County Trail Phase 1 PMRNRD DPU 19 2015-007 Pottawattamie County Multi-Use Trail - Phase 1 Pottawattamie TAP-MAPA 2 2015-058 132nd and Giles Sarpy STBG-MAPA 30 2015-062 66th and Giles Sarpy STBG-MAPA 32 2015-138 Valley D.C. Safe Routes to School Valley SRTS 90

5.1.2 Local Projects Figure 5.2 on the following page displays the locations of projects from local jurisdictions throughout the TMA. These projects are found within local planning documents, primarily capital improvement plans.

MAPA FY2017-2022 Transportation Improvement Program 5-5

Figure 5.2 – Local Projects

MAPA FY2017-2022 Transportation Improvement Program 5-6

Metropolitan Area Planning Agency FY2017-2022 Transportation Improvement Program

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2015-048 NE-22276 36th Street Phase N-370 - Sheridan Bellevue 2.00 $11,163.12 Location 36th St - N-370 to Sheridan Description Widen 2 lane Rural to 4 lane Urban.

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2008 PE-NEPA-FD STBG-MAPA $593.12 $469.10 $0.00 $124.02

2012 PE-NEPA-FD STBG-MAPA $260.00 $208.00 $0.00 $52.00

2012 ROW STBG-MAPA $400.00 $320.00 $0.00 $80.00 2017 PE-NEPA-FD STBG-MAPA $132.50 $106.00 $0.00 $26.50

2017 ROW STBG-MAPA $322.50 $258.00 $0.00 $64.50

2018 UTIL-CON-CE STBG-MAPA $9,455.00 $7,563.00 $0.00 $1,892.00

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2015-050 NE-22288 36th Street Phase II Bellevue 1.45 $11,063.56 Location Sheridan to Platteview Rd Description Widen 2 lane Rural to 4 lane Urban.

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2017 PE-NEPA-FD STBG-MAPA $405.51 $324.41 $0.00 $81.10

2017 ROW STBG-MAPA $579.30 $463.44 $0.00 $115.86

2020 UTIL-CON-CE STBG-MAPA $10,078.75 $8,063.00 $0.00 $2,015.75

* Amounts in thousands of U.S. dollars 5-7 Metropolitan Area Planning Agency FY2017-2022 Transportation Improvement Program

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2015-046 NE-22233 156th Street Bennington 1.00 $2,938.33 Location Bennington Description Replace existing road from Papio Creek to Spur 28F.

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2007 PE-NEPA-FD STBG-MAPA $304.34 $233.70 $0.00 $70.64

2008 PE-NEPA-FD STBG-MAPA $124.93 $94.95 $0.00 $29.98

2009 PE-NEPA-FD STBG-MAPA $53.92 $38.96 $0.00 $14.96 2015 PE-NEPA-FD (AC) Local $70.00 $0.00 $0.00 $70.00

2016 PE-NEPA-FD STBG-MAPA $172.53 $138.02 $0.00 $34.51

2017 ROW STBG-MAPA $132.61 $106.09 $0.00 $26.52

2017 UTIL-CON-CE STBG-MAPA $2,080.00 $1,664.00 $0.00 $416.00 2019 AC Conversion STBG-MAPA $0.00 $70.00 $0.00 ($70.00)

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2016-034 CB-033115-001 North 16th Street Reconstruction Council Bluffs 1.00 $5,356.25 Location On 16th Street (Highway 192) from Avenue G to Nash Boulevard Description Reconstruction of roadway and utility work

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2017 UTIL-CON-CE STBG-MAPA $5,356.25 $4,285.00 $0.00 $1,071.25

* Amounts in thousands of U.S. dollars 5-8 Metropolitan Area Planning Agency FY2017-2022 Transportation Improvement Program

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2016-035 CB-033115-002 South Expressway Reconstuction - Phase 1 Council Bluffs 0.70 $3,406.25 Location On Highway 192 from I-80 north to 21st Street Description Reconstruciton of roadway and utility work

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2019 UTIL-CON-CE STBG-MAPA $3,406.25 $2,725.00 $0.00 $681.25

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2016-036 CB-033115-003 South Expressway Reconstuction - Phase 2 Council Bluffs $4,378.75 Location On Highway 192 from 21st Street north to 16th Street Description Reconstruciton of roadway and utility work

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2021 UTIL-CON-CE STBG-MAPA $4,378.75 $3,503.00 $0.00 $875.75

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2015-060 IA-21087 River Rd. Trail Council Bluffs $307.50 Location River Rd to Nebraska Ave. Description Replace existing roadside trail with levy trail

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2017 UTIL-CON-CE TAP-MAPA $307.50 $246.00 $0.00 $61.50

* Amounts in thousands of U.S. dollars 5-9 Metropolitan Area Planning Agency FY2017-2022 Transportation Improvement Program

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2015-012 IA-25419 W Graham Ave Reconstruction Council Bluffs $2,517.50 Location High Street to Fairmont Avenue Description Reconstruction of street and utilities

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2018 UTIL-CON-CE STBG-MAPA $2,517.50 $2,014.00 $0.00 $503.50

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2015-011 IA-25422 Harrison Street Reconstruction Council Bluffs $5,765.00 Location Kanesville Boulevard to Morgan Street Description Reconstruction of streets and utilities

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2021 UTIL-CON-CE STBG-MAPA $5,765.00 $4,612.00 $0.00 $1,153.00

* Amounts in thousands of U.S. dollars 5-10 Metropolitan Area Planning Agency FY2017-2022 Transportation Improvement Program

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2015-075 IA-29716 Interstate Utility Relocation Council Bluffs $3,693.00 Location On I-29 at Mosquito Creek Description Sanitary sewer relocation in coordination with interstate relocation project

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2015 UTIL-CON-CE STBG-MAPA $812.50 $650.00 $0.00 $162.50

2016 UTIL-CON-CE STBG-MAPA $445.00 $356.00 $0.00 $89.00

2017 UTIL-CON-CE STBG-MAPA $458.75 $367.00 $0.00 $91.75 2018 UTIL-CON-CE STBG-MAPA $471.75 $378.00 $0.00 $93.75

2019 UTIL-CON-CE STBG-MAPA $487.50 $390.00 $0.00 $97.50

2020 UTIL-CON-CE STBG-MAPA $501.25 $401.00 $0.00 $100.25

2021 UTIL-CON-CE STBG-MAPA $516.25 $413.00 $0.00 $103.25

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2016-069 IA-34865 East Beltway: Eastern Hills Drive - Segment C Council Bluffs 0.00 $3,658.00 Location In the city of Council Bluffs, Eastern Hills Dr: Cedarbrook Dr to Cedar Ln and Cedar Ln: From Eastern Hill Dr West 700’ Description Widening of roadway to 4-lanes

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2016 PE-NEPA-FD DPS $840.00 $672.00 $0.00 $168.00

2017 UTIL-CON-CE DPS $2,818.00 $2,254.00 $0.00 $564.00

* Amounts in thousands of U.S. dollars 5-11 Metropolitan Area Planning Agency FY2017-2022 Transportation Improvement Program

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2017-018 IA-35677 City/County Connector Trail Council Bluffs 1.05 $476.00 Location Along Railroad Highway from Kanesville Boulevard to the Council Bluffs Corporate Limits Description Trail connection between the City of Council Bluffs trail system and the Pottawattamie County Trail system

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2020 UTIL-CON-CE TAP-MAPA $476.00 $393.00 $0.00 $83.00

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2017-020 IA-35678 East Beltway: Stevens Road - West Segment Council Bluffs 0.00 $2,250.00 Location On Stevens Road from State Orchard Road to intersection with Norwood Drive Description Construction of roadway on new alignment

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2019 PE-NEPA-FD STBG-MAPA $313.75 $251.00 $0.00 $62.75

2020 ROW STBG-MAPA $160.00 $128.00 $0.00 $32.00

2021 UTIL-CON-CE STBG-MAPA $1,776.25 $1,421.00 $0.00 $355.25

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2017-019 IA-35679 East Beltway: Greenview Road - West Segment Council Bluffs 0.00 $3,465.00 Location Along Greenwood Road from State Orchard Drive to Ridgewood Drive Description Reconstruction of existing roadway

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2018 PE-NEPA-FD STBG-MAPA $541.25 $433.00 $0.00 $108.25 2020 UTIL-CON-CE STBG-MAPA $2,923.75 $2,339.00 $0.00 $584.75

* Amounts in thousands of U.S. dollars 5-12 Metropolitan Area Planning Agency FY2017-2022 Transportation Improvement Program

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2017-013 IA-35680 East Beltway: Stevens Road - East Segment Council Bluffs 0.00 $2,880.00 Location On Cedar Lane from Eastern Hills Drive to State Orchard Road Description Construction of roadway on new alignment

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2016 PE-NEPA-FD DPS $50.00 $40.00 $0.00 $10.00

2016 ROW DPS $390.00 $312.00 $0.00 $78.00

2017 UTIL-CON-CE DPS $2,440.00 $1,952.00 $0.00 $488.00

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2017-014 IA-35681 East Beltway: Eastern Hills Drive - Segment D Council Bluffs 1.05 $7,712.75 Location From intsersection of State Orchard Drive and Highway 92 to intersection of Eastern Hills Drive and State Orchard Road Description Construction of four-lane roadway on new alignment

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2016 PE-NEPA-FD DPS $485.00 $388.00 $0.00 $97.00

2017 ROW DPS $1,804.00 $1,443.00 $0.00 $361.00

2018 UTIL-CON-CE STBG-MAPA $3,652.50 $2,922.00 $0.00 $730.50 2018 UTIL-CON-CE DPS $1,771.25 $1,417.00 $0.00 $354.25

* Amounts in thousands of U.S. dollars 5-13 Metropolitan Area Planning Agency FY2017-2022 Transportation Improvement Program

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2017-021 IA-35682 East Beltway: Greenview Road - East Segment Council Bluffs 0.00 $1,716.25 Location Along Greenwood Road from Ridgewood Drive to Cottonwood Drive Description Reconstruction of existing roadway

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2017 PE-NEPA-FD STBG-MAPA $125.00 $100.00 $0.00 $25.00

2017 ROW STBG-MAPA $10.00 $8.00 $0.00 $2.00

2019 UTIL-CON-CE STBG-MAPA $1,581.25 $1,265.00 $0.00 $316.25

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2015-039 NE-22224 180th Street (Phase 1) Douglas 1.30 $31,691.25 Location HWS Cleveland Blvd to Blondo St and Blondo St .25 mile East and West to 180th St Description 4 Lane Urban New Bridge over Old , Union Pacific Railroad, and Papillion Creek

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2008 PE-NEPA-FD STBG-MAPA $860.00 $688.00 $0.00 $172.00

2009 PE-NEPA-FD STBG-MAPA $1,180.00 $944.00 $0.00 $236.00

2014 PE-NEPA-FD STBG-MAPA $625.00 $500.00 $0.00 $125.00 2016 PE-NEPA-FD STBG-MAPA $455.00 $364.00 $0.00 $91.00

2017 ROW STBG-MAPA $1,762.50 $1,410.00 $0.00 $352.50

2019 UTIL-CON-CE STBG-MAPA $26,808.75 $21,447.00 $0.00 $5,361.75

* Amounts in thousands of U.S. dollars 5-14 Metropolitan Area Planning Agency FY2017-2022 Transportation Improvement Program

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2015-038 NE-22224A 180th St (Phase 2) Douglas 1.30 $11,331.25 Location Blondo to Maple Description 4 lane Urban

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2020 ROW STBG-MAPA $956.25 $765.00 $0.00 $191.25

2021 UTIL-CON-CE STBG-MAPA $10,375.00 $8,300.00 $0.00 $2,075.00

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2015-056 IA-1193 I-80 Iowa DOT 4.00 $1,083,896.00 Location I-80/I-29/I-480 Interstate Reconstruction Description Grade and pave, Bridge replacement, ROW.

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2011 UTIL-CON-CE IM $64,881.00 $58,393.00 $6,488.00 $0.00

2012 UTIL-CON-CE IM $65,197.00 $58,677.00 $6,520.00 $0.00

2013 UTIL-CON-CE IM $93,862.00 $84,476.00 $9,386.00 $0.00 2014 UTIL-CON-CE NHPP $131,363.00 $118,227.00 $13,136.00 $0.00

2015 UTIL-CON-CE NHPP $137,623.00 $123,861.00 $13,762.00 $0.00

2016 UTIL-CON-CE NHPP $145,590.00 $131,031.00 $14,559.00 $0.00

2017 UTIL-CON-CE NHPP $109,520.00 $98,568.00 $10,952.00 $0.00 2018 UTIL-CON-CE NHPP $126,480.00 $113,832.00 $12,648.00 $0.00

2019 UTIL-CON-CE NHPP $67,290.00 $60,561.00 $6,729.00 $0.00

2020 UTIL-CON-CE NHPP $142,090.00 $127,881.00 $14,209.00 $0.00

* Amounts in thousands of U.S. dollars 5-15 Metropolitan Area Planning Agency FY2017-2022 Transportation Improvement Program

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2015-079 IA-20924 US 275 Bridge Over Missouri River Iowa DOT $1,315.00 Location US Highway 275 Bridge over Missouri River Description Bridge deck overlay on US Highway 275 Bridge (NBIS: 043570)

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2017 UTIL-CON-CE State-Iowa $1,144.00 $0.00 $1,144.00 $0.00

2018 UTIL-CON-CE State-Iowa $57.00 $0.00 $57.00 $0.00

2019 UTIL-CON-CE State-Iowa $57.00 $0.00 $57.00 $0.00 2020 UTIL-CON-CE State-Iowa $57.00 $0.00 $57.00 $0.00

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2016-042 IA-34079 US-275 Missouri River Bridge Iowa DOT $572.00 Location On US-275 at Missouri River crossing Description Bridge Painting

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2017 UTIL-CON-CE State-Iowa $572.00 $0.00 $572.00 $0.00

* Amounts in thousands of U.S. dollars 5-16 Metropolitan Area Planning Agency FY2017-2022 Transportation Improvement Program

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2016-043 IA-34080 I-480: Missouri River to I-29 Iowa DOT 0.80 $400.00 Location On I-480 from the Missouri River to I-29 in Council Bluffs Description Patching

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2017 UTIL-CON-CE State-Iowa $100.00 $0.00 $100.00 $0.00

2018 UTIL-CON-CE State-Iowa $100.00 $0.00 $100.00 $0.00

2019 UTIL-CON-CE State-Iowa $100.00 $0.00 $100.00 $0.00 2020 UTIL-CON-CE State-Iowa $100.00 $0.00 $100.00 $0.00

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2017-028 IA-35496 US 6: BNSF Railroad Bridge - EB & WB Iowa DOT 0.00 $822.00 Location On US-6 over the BNSF Railroad 1.0 west of I-80 in Council Bluffs Description Bridge cleaning (Iowa state share)

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2020 UTIL-CON-CE State-Iowa $822.00 $0.00 $822.00 $0.00

* Amounts in thousands of U.S. dollars 5-17 Metropolitan Area Planning Agency FY2017-2022 Transportation Improvement Program

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2017-026 IA-35584 I-80: Missouri River in Council Bluffs - Eastbound Iowa DOT 0.00 $48.00 Location On I-80 over the Missouri River Description Bridge cleaning (Iowa state share)

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2017 UTIL-CON-CE State-Iowa $12.00 $0.00 $12.00 $0.00

2018 UTIL-CON-CE State-Iowa $12.00 $0.00 $12.00 $0.00

2019 UTIL-CON-CE State-Iowa $12.00 $0.00 $12.00 $0.00 2020 UTIL-CON-CE State-Iowa $12.00 $0.00 $12.00 $0.00

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2017-027 IA-35585 I-80: Missouri River in Council Bluffs - Westbound Iowa DOT 0.00 $48.00 Location On I-80 over the Missouri River Description Bridge cleaning (Iowa state share)

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2017 UTIL-CON-CE State-Iowa $12.00 $0.00 $12.00 $0.00

2018 UTIL-CON-CE State-Iowa $12.00 $0.00 $12.00 $0.00

2019 UTIL-CON-CE State-Iowa $12.00 $0.00 $12.00 $0.00 2020 UTIL-CON-CE State-Iowa $12.00 $0.00 $12.00 $0.00

* Amounts in thousands of U.S. dollars 5-18 Metropolitan Area Planning Agency FY2017-2022 Transportation Improvement Program

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2017-022 IA-35586 I-80: Missour River to Cass County Iowa DOT 49.70 $1,200.00 Location On I-80 from the Missouri River to Cass County Description Patching

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2017 UTIL-CON-CE State-Iowa $300.00 $0.00 $300.00 $0.00

2018 UTIL-CON-CE State-Iowa $300.00 $0.00 $300.00 $0.00

2019 UTIL-CON-CE State-Iowa $300.00 $0.00 $300.00 $0.00 2020 UTIL-CON-CE State-Iowa $300.00 $0.00 $300.00 $0.00

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2017-023 IA-35588 I-480: Missouri River in Council Bluffs Iowa DOT 0.00 $1,306.00 Location On I-480 over the Missouri River Description Bridge deck overlay and bridge cleaning (Iowa state share)

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2017 UTIL-CON-CE State-Iowa $30.00 $0.00 $30.00 $0.00

2018 UTIL-CON-CE State-Iowa $30.00 $0.00 $30.00 $0.00

2019 UTIL-CON-CE State-Iowa $1,216.00 $0.00 $1,216.00 $0.00 2020 UTIL-CON-CE State-Iowa $30.00 $0.00 $30.00 $0.00

* Amounts in thousands of U.S. dollars 5-19 Metropolitan Area Planning Agency FY2017-2022 Transportation Improvement Program

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2017-024 IA-35589 I-680: Missouri River in Council Bluffs - Westbound Iowa DOT 0.00 $2,921.00 Location On I-680 over the Missouri River Description Bridge deck overlay, bridge painting, and bridge cleaning (Iowa state share)

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2017 UTIL-CON-CE State-Iowa $24.00 $0.00 $24.00 $0.00

2018 UTIL-CON-CE State-Iowa $24.00 $0.00 $24.00 $0.00

2019 UTIL-CON-CE State-Iowa $2,849.00 $0.00 $2,849.00 $0.00 2020 UTIL-CON-CE State-Iowa $24.00 $0.00 $24.00 $0.00

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2017-025 IA-35590 I-680: Missouri River in Council Bluffs - Eastbound Iowa DOT 0.00 $2,924.00 Location On I-680 over the Missouri River Description Bridge deck overlay, bridge painting, and bridge cleaning (Iowa state share)

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2017 UTIL-CON-CE State-Iowa $24.00 $0.00 $24.00 $0.00

2018 UTIL-CON-CE State-Iowa $24.00 $0.00 $24.00 $0.00

2019 UTIL-CON-CE State-Iowa $2,852.00 $0.00 $2,852.00 $0.00 2020 UTIL-CON-CE State-Iowa $24.00 $0.00 $24.00 $0.00

* Amounts in thousands of U.S. dollars 5-20 Metropolitan Area Planning Agency FY2017-2022 Transportation Improvement Program

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2016-037 LV-033115-001 Applewood Creek Trail La Vista 0.70 $1,830.50 Location From Giles Road north along Applewood Creek between Giles and Harrison Description Construction of multi-use trail, ten-foot (10') box culvert under Giles Road, utility relocation

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2019 PE-NEPA-FD TAP-MAPA $163.00 $130.00 $0.00 $33.00

2020 UTIL-CON-CE TAP-MAPA $1,667.50 $1,334.00 $0.00 $333.50

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2015-021 MET-03202014-001 Metro Rolling Stock Metro $4,466.25 Location Metro Transit service area Description Purchase of rolling stock for fixed-route transit service. STP-MAPA funding will be transferred to FTA Section 5307 funding.

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2015 CON FTA 5307 (FY15) $2,133.75 $1,707.00 $0.00 $426.75

2018 CON STBG-MAPA $2,332.50 $1,866.00 $0.00 $466.50

* Amounts in thousands of U.S. dollars 5-21 Metropolitan Area Planning Agency FY2017-2022 Transportation Improvement Program

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2015-139 MET-11242014-001 Bus Rapid Transit Metro 7.00 $34,839.25 Location Along Dodge/Farnham corridor, from Westroads Mall Description Construction of Bus Rapid Transit facilities on Dodge corridor and purchase of transit buses

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2016 Capital Expenditures FTA 5307 (FY16) $1,701.25 $1,361.00 $0.00 $340.25

2016 Capital Expenditures TIGER VI (FTA) $32,960.00 $14,960.00 $0.00 $18,000.00

2018 Capital Expenditures (AC) ACC-Local $89.00 $0.00 $0.00 $89.00 2019 AC Conversion TAP-MAPA $89.00 $89.00 $0.00 $0.00

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2016-066 NE-00955 Nebraska Statewide Van Pool NDOR 0.00 $441.12 Location Statewide (Nebraska) Description MPO portion of the statewide van pool contracting opportunity being administered by the Nebraska Department of Roads

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2016 UTIL-CON-CE FTA 5311 (FY) $60.00 $48.00 $0.00 $12.00

2016 UTIL-CON-CE CMAQ $48.00 $48.00 $0.00 $0.00

2017 UTIL-CON-CE FTA 5311 (FY) $90.00 $72.00 $0.00 $18.00 2017 UTIL-CON-CE CMAQ $61.80 $61.80 $0.00 $0.00

2018 UTIL-CON-CE FTA 5311 (FY) $105.00 $84.00 $0.00 $21.00

2018 UTIL-CON-CE CMAQ $76.32 $76.32 $0.00 $0.00

* Amounts in thousands of U.S. dollars 5-22 Metropolitan Area Planning Agency FY2017-2022 Transportation Improvement Program

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2015-049 NE-21597 US6: Linoma Beach-N-31 NDOR 4.20 $7,494.00 Location US-6 from 0.6 mi east of the Platte River northeast to N-31 south of Gretna. Description Mill and resurface pavement, 24-foot roadway with 10-foot shoulder, 8-inch surface

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2018 PE-NEPA-FD State-Nebraska $170.00 $0.00 $170.00 $0.00

2019 ROW State-Nebraska $100.00 $0.00 $100.00 $0.00

2021 UTIL-CON-CE STBG-State $7,224.00 $5,630.00 $1,594.00 $0.00

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2015-023 NE-22132A I-80: 24th Street - 13th Street NDOR 0.90 $15,160.00 Location I-80 from 24th Street to 10th Street. Begin R.P. – 453.37 Description Grade, culvert, additional lane (EB & WB) through 13th Street, and ramps

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2016 PE-NEPA-FD State-Nebraska $390.00 $0.00 $390.00 $0.00

2017 UTIL-CON-CE State-Nebraska $14,770.00 $0.00 $14,770.00 $0.00

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2017-001 NE-22469 US-275 & 72nd Street Interchange NDOR 0.00 $1,100.00 Location US-275 & 72nd Street Interchange Description Interchange improvements

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2018 PE-NEPA-FD State-Nebraska $100.00 $0.00 $90.00 $10.00

2021 UTIL-CON-CE NHPP $1,000.00 $900.00 $0.00 $100.00

* Amounts in thousands of U.S. dollars 5-23 Metropolitan Area Planning Agency FY2017-2022 Transportation Improvement Program

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2015-026 NE-22524 Giles Road Interchange Ramps NDOR $2,385.00 Location I-80 ramps at Giles Road interchange. Begin R.P – 442.0 Description Resurfacing, bridge deck overlay. Local funding contributed by Sarpy County

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2015 PE-NEPA-FD State-Nebraska $58.00 $0.00 $58.00 $0.00

2017 UTIL-CON-CE State-Nebraska $2,327.00 $0.00 $1,787.00 $540.00

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2015-008 NE-22526 I-80/680 'Q'-'L' CD Rds, Omaha (WB) NDOR 3.80 $5,945.00 Location WB I-80 CD roads and ramps in the I-80/I-680 interchange area in Omaha. Begin R.P. – 444.23 Description Mill, concrete repair, resurfacing, and bridge repair

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2016 PE-NEPA-FD State-Nebraska $125.00 $0.00 $125.00 $0.00

2017 UTIL-CON-CE State-Nebraska $5,820.00 $0.00 $5,820.00 $0.00

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2016-001 NE-22528 I-480: Bancroft - Dewey NDOR 1.60 $6,700.00 Location On I-480, from 0.1 miles north of 1-80/US-75, north to miles south of Harney Street. Begin R.P. – 0.50 Description Mill, concrete repair, resurfacing of existing roadway, ramps and shielding

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2016 PE-NEPA-FD State-Nebraska $8.00 $0.00 $8.00 $0.00 2017 UTIL-CON-CE NHPP $6,692.00 $6,023.00 $669.00 $0.00

* Amounts in thousands of U.S. dollars 5-24 Metropolitan Area Planning Agency FY2017-2022 Transportation Improvement Program

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2015-027 NE-22530 Jct N‐31/N‐36 Intersection Improvements NDOR 0.70 $2,092.00 Location Junction of Highways N-31 and N-36. Begin R.P. – 30.93 Description Intersection improvements at the intersection of N-31 and N-36

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2017 PE-NEPA-FD State-Nebraska $92.00 $0.00 $92.00 $0.00

2019 UTIL-CON-CE HSIP $2,000.00 $1,800.00 $200.00 $0.00

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2015-028 NE-22532 Elkhorn River West NDOR 6.40 $5,234.00 Location On N-36 from Old Highway 275/Reicmuth Road, east to just west of the Elkhorn River Description Concrete repair, mill, resurface, repair 2 bridges, replace 1 bridge

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2016 PE-NEPA-FD State-Nebraska $201.00 $0.00 $201.00 $0.00

2016 ROW State-Nebraska $10.00 $0.00 $10.00 $0.00

2017 UTIL-CON-CE STBG-State $5,023.00 $3,898.00 $1,125.00 $0.00

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2015-029 NE-22533 N-64 at SE Jct US‐275 ‐ Omaha NDOR 2.90 $3,498.00 Location N-64 (W Maple Road) at junction of US-275 east to Ramblewood Drive/Elkhorn Drive. Begin R.P. – 59.21 Description Concrete repair, mill, resurface, bridge repair

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2016 PE-NEPA-FD State-Nebraska $110.00 $0.00 $110.00 $0.00

2017 UTIL-CON-CE STBG-State $3,388.00 $2,710.00 $678.00 $0.00

* Amounts in thousands of U.S. dollars 5-25 Metropolitan Area Planning Agency FY2017-2022 Transportation Improvement Program

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2015-034 NE-22561 N-92: Platte River East Structures NDOR $845.00 Location Nebraska Highway 92 (W Center Road) at the Platte River. Begin R.P. – 463.30 Description Replace one bridge, repair one bridge, and replace one non-bridge sized structure

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2016 PE-NEPA-FD State-Nebraska $45.00 $0.00 $45.00 $0.00

2017 UTIL-CON-CE STBG-State $800.00 $624.00 $176.00 $0.00

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2016-002 NE-22567 N-31: Schramm Park - US-6 NDOR 5.40 $5,088.00 Location On N-31 from near Schramm Park entrance to south junction with US-6 Description Rehabilitate concrete pavement and reconstruct bridge approach slabs

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2017 PE-NEPA-FD State-Nebraska $55.00 $0.00 $55.00 $0.00

2017 ROW State-Nebraska $40.00 $0.00 $40.00 $0.00

2018 UTIL-CON-CE STBG-State $4,993.00 $3,994.00 $999.00 $0.00

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2015-036 NE-22575 EB I-80 at I-680 NDOR $1,340.00 Location EB I-80 at interchange with I-680. Begin R.P. – 445.74 Description Repair and overlay two (2) bridges and associated approach work

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2017 PE-NEPA-FD State-Nebraska $5.00 $0.00 $5.00 $0.00

2018 UTIL-CON-CE State-Nebraska $1,335.00 $0.00 $1,335.00 $0.00

* Amounts in thousands of U.S. dollars 5-26 Metropolitan Area Planning Agency FY2017-2022 Transportation Improvement Program

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2016-003 NE-22577 US-275: Waterloo Viaduct NDOR 1.40 $5,910.00 Location On US-275 from Valley to viaduct at Waterloo. Begin R.P. – 165.74 Description Reconstruct concrete pavement

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2016 PE-NEPA-FD State-Nebraska $210.00 $0.00 $210.00 $0.00

2017 UTIL-CON-CE NHPP $5,700.00 $4,560.00 $1,140.00 $0.00

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2016-004 NE-22578 US-275: West Papillion Creek Bridge West NDOR 1.30 $1,564.00 Location On US-275 from 1.6 mile east of the west limits of Omaha to east of West Papillion Creek bridge. Begin R.P. – 176.33 Description Concrete repair, asphalt resurfacing, bridge repair, approach repair

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2017 PE-NEPA-FD State-Nebraska $10.00 $0.00 $10.00 $0.00

2020 UTIL-CON-CE NHPP $1,554.00 $1,243.00 $311.00 $0.00

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2016-005 NE-22584 I-680: Fort Street to Missouri River NDOR 6.04 $205.00 Location On I-680 from near Fort Street northeast to Missouri River Bridge. Begin R.P. – 6.04 Description Crack seal on roadway

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2018 PE-NEPA-FD State-Nebraska $5.00 $0.00 $5.00 $0.00 2018 UTIL-CON-CE NHPP $200.00 $180.00 $20.00 $0.00

* Amounts in thousands of U.S. dollars 5-27 Metropolitan Area Planning Agency FY2017-2022 Transportation Improvement Program

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2017-029 NE-22585 I-680: I-80 to Fort Street NDOR 5.80 $200.00 Location On I-680 from I-80 to Fort Street in Omaha Description Joint sealing on roadway (Begin R.P. - 0.11)

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2021 UTIL-CON-CE NHPP $200.00 $180.00 $20.00 $0.00

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2015-152 NE-22593 I-680 / US-6 Bridges NDOR $3,700.00 Location On I-680 at US-6. Begin R.P. – 2.89 Description High friction surface course on bridges over I-680

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2020 PE-NEPA-FD State-Nebraska $295.00 $0.00 $295.00 $0.00

2021 UTIL-CON-CE NHPP $3,405.00 $3,065.00 $340.00 $0.00

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2017-030 NE-22593A US-6 Bridges at I-680 NDOR 0.00 $4,500.00 Location On US-6 at I-680 in Omaha Description Bridge repair and deck overlay (Begin R.P. - 363.76)

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2017 UTIL-CON-CE NHPP $4,500.00 $3,600.00 $900.00 $0.00

* Amounts in thousands of U.S. dollars 5-28 Metropolitan Area Planning Agency FY2017-2022 Transportation Improvement Program

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2016-006 NE-22594 I-80/I-480 Bridges NDOR $4,525.00 Location I-80 bridges at I-480 Interchange. Begin R.P. – 451.00 Description Bridge repair, approach work, bridge painting, and mechanically stabilized earth (MSE) wall

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2017 PE-NEPA-FD State-Nebraska $147.00 $0.00 $147.00 $0.00

2018 UTIL-CON-CE NHPP $4,378.00 $3,941.00 $437.00 $0.00

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2016-007 NE-22595 I-80/I-480/US-75 Interchange NDOR $12,970.00 Location I-80 and I-480 bridges at I-80/I-480/US-75 Interchange. Begin R.P. – 452.98 Description Bridge repair and overlay

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2016 PE-NEPA-FD State-Nebraska $283.00 $0.00 $283.00 $0.00

2017 UTIL-CON-CE NHPP $12,687.00 $11,418.00 $1,269.00 $0.00

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2017-002 NE-22598 N-36 Resurfacing NDOR 0.00 $1,653.00 Location N-36 from .4 mi east of N-133 east to I-680 Description Resurfacing

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2019 PE-NEPA-FD State-Nebraska $10.00 $0.00 $10.00 $0.00 2020 UTIL-CON-CE STBG-State $1,643.00 $1,314.00 $329.00 $0.00

* Amounts in thousands of U.S. dollars 5-29 Metropolitan Area Planning Agency FY2017-2022 Transportation Improvement Program

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2017-003 NE-22602 N-50 Concrete Repair NDOR 0.00 $1,693.00 Location N-50 from just south of N-370 north to US-275/N-92 Description Concrete repair, grinding

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2018 PE-NEPA-FD State-Nebraska $10.00 $0.00 $10.00 $0.00

2019 UTIL-CON-CE STBG-State $276.00 $276.00 $0.00 $0.00

2019 UTIL-CON-CE NHPP $1,407.00 $1,071.00 $336.00 $0.00

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2017-004 NE-22603 US-75 Resurfacing NDOR 0.00 $8,622.00 Location US-75 from just north of N-36 in Omaha north to the Washington Co line Description Resurfacing

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2019 PE-NEPA-FD State-Nebraska $300.00 $0.00 $300.00 $0.00

2020 UTIL-CON-CE NHPP $8,322.00 $6,658.00 $1,664.00 $0.00

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2017-005 NE-22609 I-80/480/US-75 Bridge Painting NDOR 0.00 $7,700.00 Location I-80 bridges at I-480/US-75 interchange in Omaha Description Bridge Painting

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2020 UTIL-CON-CE NHPP $7,700.00 $6,930.00 $770.00 $0.00

* Amounts in thousands of U.S. dollars 5-30 Metropolitan Area Planning Agency FY2017-2022 Transportation Improvement Program

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2017-006 NE-22610 I-480, 20th-12th Bridge Painting NDOR 0.00 $18,602.00 Location I-480 bridge from 20th Street to 12th Street in Omaha & (EB) exit ramp to 14th Description Bridge Painting

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2021 UTIL-CON-CE NHPP $18,602.00 $16,742.00 $1,860.00 $0.00

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2016-008 NE-22611 I-480: 20th Street - Missouri River Bridges (EB) NDOR $8,700.00 Location On eastbound I-480 (including ramps) from 20th Street to the Missouri River. Begin R.P. – 2.95 Description Bridge repair and overlay

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2019 PE-NEPA-FD State-Nebraska $200.00 $0.00 $200.00 $0.00

2020 UTIL-CON-CE NHPP $8,500.00 $7,650.00 $850.00 $0.00

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2016-009 NE-22611A I-480: 20th Street - Missouri River Bridges (WB) NDOR $9,350.00 Location On westbound I-480 (including ramps) from 20th Street to the Missouri River. Begin R.P. – 2.95 Description Bridge repair and overlay

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2019 PE-NEPA-FD State-Nebraska $850.00 $0.00 $850.00 $0.00

2020 UTIL-CON-CE NHPP $8,500.00 $7,650.00 $850.00 $0.00

* Amounts in thousands of U.S. dollars 5-31 Metropolitan Area Planning Agency FY2017-2022 Transportation Improvement Program

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2016-010 NE-22612 N-31 Bridges North of N-36 NDOR $2,761.00 Location On N-31, approximately 0.7 miles and 5.2 miles north of N-36. Begin R.P. – 31.75 Description Replace one bridge, rehabilitate on bridge

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2018 PE-NEPA-FD State-Nebraska $90.00 $0.00 $90.00 $0.00

2019 ROW State-Nebraska $5.00 $0.00 $5.00 $0.00

2019 UTIL-CON-CE STBG-State $2,666.00 $2,133.00 $533.00 $0.00

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2016-011 NE-22614 US-75: J Street & Gilmore Ave Bridge (SB) NDOR $2,669.00 Location Viaduct on US-75 at Gilmore/Union Pacific Rail Road and bridge at J Street. Begin R.P. – 85.80 Description Bridge repair and overlay

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2018 PE-NEPA-FD State-Nebraska $50.00 $0.00 $50.00 $0.00

2019 UTIL-CON-CE NHPP $2,619.00 $2,095.00 $524.00 $0.00

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2016-012 NE-22615 US-75: Off Ramp to N-64 (NB) NDOR $227.00 Location On northbound US-75 off-ramp to N-64 (Cuming Street). Begin R.P. – 91.09 Description Ramp improvement

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2016 PE-NEPA-FD State-Nebraska $10.00 $0.00 $10.00 $0.00

2017 UTIL-CON-CE HSIP $217.00 $195.00 $22.00 $0.00

* Amounts in thousands of U.S. dollars 5-32 Metropolitan Area Planning Agency FY2017-2022 Transportation Improvement Program

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2016-014 NE-22620 District 2 CCTV Cameras NDOR $135.00 Location On I-680, at three (3) locations in the Omaha area. Begin R.P. – 9.94 Description Deploy CCTV Cameras

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2017 PE-NEPA-FD State-Nebraska $5.00 $0.00 $5.00 $0.00

2018 UTIL-CON-CE NHPP $130.00 $104.00 $26.00 $0.00

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2016-015 NE-22621 US-75 Fiber-Optic NDOR 9.50 $759.00 Location Along US-75 from Fort Crook Road to south Junction with I-480 Description Connect ITS devices with fiber-optic cable and replace routers. Begin R.P. – 78.66

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2017 PE-NEPA-FD State-Nebraska $4.00 $0.00 $4.00 $0.00

2017 UTIL-CON-CE State-Nebraska $755.00 $0.00 $755.00 $0.00

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2016-016 NE-22622 US-6 Fiber-Optic NDOR $922.00 Location Along US-6 from N-31 to Westroads Mall Road in Omah Description Connect ITS devices with fiber-optic cable and replace routers. Begin R.P. – 356.93

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2017 PE-NEPA-FD State-Nebraska $4.00 $0.00 $4.00 $0.00 2017 UTIL-CON-CE State-Nebraska $918.00 $0.00 $918.00 $0.00

* Amounts in thousands of U.S. dollars 5-33 Metropolitan Area Planning Agency FY2017-2022 Transportation Improvement Program

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2016-017 NE-22623 I-80/I-480/I-680 Barriers, Omaha NDOR $874.00 Location Along I-80, I-480, and I-680 bridge locations in Omaha Description Wash and seal bridge rail and bridge piers. Begin R.P. – 438.66

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2021 PE-NEPA-FD State-Nebraska $10.00 $0.00 $10.00 $0.00

2022 UTIL-CON-CE NHPP $864.00 $778.00 $86.00 $0.00

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2016-018 NE-22624 I-80, N-31, N-370, & N-50 Ramps NDOR $661.00 Location I-80 interchange ramps at N-31, N-370, and N-50 Description Concrete repair, joint repair and grinding. Begin R.P. – 432.47

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2016 PE-NEPA-FD State-Nebraska $3.00 $0.00 $3.00 $0.00

2017 UTIL-CON-CE NHPP $658.00 $592.00 $66.00 $0.00

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2016-019 NE-22630 US-275: 25th Street - 23rd Street NDOR 0.20 $1,628.00 Location On US-275 from 1/2 block west of 25th Street to 1/2 block east of 23rd Street. Begin R.P. – 189.14 Description Traffic signal upgrade for dual left-turn lanes

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2017 PE-NEPA-FD State-Nebraska $10.00 $0.00 $10.00 $0.00 2018 UTIL-CON-CE HSIP $1,618.00 $1,456.00 $162.00 $0.00

* Amounts in thousands of U.S. dollars 5-34 Metropolitan Area Planning Agency FY2017-2022 Transportation Improvement Program

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2017-007 NE-22631 South Omaha Veterans Bridge NDOR 0.00 $2,951.00 Location US-275 Veteran's Memorial bridge over MO River at Nebraska/Iowa state line Description Epoxy polymer overlay bridge deck & sidewalk, paint splash zone on bridge truss

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2016 PE-NEPA-FD State-Nebraska $39.00 $0.00 $39.00 $0.00

2016 PE-NEPA-FD State-Iowa $52.00 $0.00 $52.00 $0.00

2017 UTIL-CON-CE State-Nebraska $1,224.00 $0.00 $1,224.00 $0.00 2017 UTIL-CON-CE State-Iowa $1,636.00 $0.00 $1,636.00 $0.00

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2016-020 NE-22632 I-680: Mormon Bridge Painting NDOR $12,412.00 Location On I-680 at Mormon Bridge over Missouri River. Begin R.P. – 13.43 Description Bridge painting

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2016 PE-NEPA-FD State-Nebraska $10.00 $0.00 $10.00 $0.00

2018 UTIL-CON-CE State-Iowa $6,584.00 $0.00 $6,584.00 $0.00

2018 UTIL-CON-CE NHPP $5,818.00 $5,236.00 $582.00 $0.00

* Amounts in thousands of U.S. dollars 5-35 Metropolitan Area Planning Agency FY2017-2022 Transportation Improvement Program

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2016-021 NE-22633 I-680: Mormon Bridge Deck Overlay NDOR $1,498.00 Location On I-680 at Mormon Bridge over Missouri River. Begin R.P. – 13.43 Description Bridge deck overlay

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2017 UTIL-CON-CE State-Nebraska $10.00 $0.00 $10.00 $0.00

2019 UTIL-CON-CE State-Iowa $796.00 $0.00 $796.00 $0.00

2019 UTIL-CON-CE NHPP $692.00 $623.00 $69.00 $0.00

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2016-022 NE-22634 US-75 Bridge Approaches, Bellevue NDOR 0.90 $1,643.00 Location US-75 bridges approaches from approximately 0.3 miles south Bellevue, north to Chandler Road. Begin R.P. – 80.03 Description Rebuild seventeen (17) bridge approach slabs

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2017 PE-NEPA-FD State-Nebraska $1.00 $0.00 $1.00 $0.00

2018 UTIL-CON-CE NHPP $1,642.00 $1,314.00 $328.00 $0.00

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2016-023 NE-22635 24th Street Interstate Bridge NDOR $460.00 Location On 24th Street over I-80. Begin R.P. – 453.37 Description Bridge repair and overlay

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2017 PE-NEPA-FD State-Nebraska $10.00 $0.00 $10.00 $0.00

2018 UTIL-CON-CE NHPP $450.00 $405.00 $45.00 $0.00

* Amounts in thousands of U.S. dollars 5-36 Metropolitan Area Planning Agency FY2017-2022 Transportation Improvement Program

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2016-024 NE-22636 N-31: Elkhorn Viaduct NDOR $6,071.00 Location On N-31, viaduct over Park/Papio/Union Pacific Railroad approximately 0.7 miles south of N-64. Begin R.P. – 24.40 Description Viaduct replacement

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2019 PE-NEPA-FD State-Nebraska $200.00 $0.00 $200.00 $0.00

2020 UTIL-CON-CE NHPP $5,871.00 $4,697.00 $1,174.00 $0.00

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2016-025 NE-22638 I-680: West Center Road Bridge NDOR $1,510.00 Location On I-680 at West Center Road. Begin R.P. – 0.83 Description Replace bridge approach slabs

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2018 PE-NEPA-FD State-Nebraska $10.00 $0.00 $10.00 $0.00

2018 UTIL-CON-CE NHPP $1,500.00 $1,350.00 $150.00 $0.00

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2016-026 NE-22646 I-80: I-480 to 24th Street NDOR 0.30 $6,762.00 Location On I-80 from I-480 to 24th Street. Begin R.P. – 453.01 Description Mill, inlay, and restripe for three-lane section

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2016 PE-NEPA-FD State-Nebraska $215.00 $0.00 $215.00 $0.00 2017 UTIL-CON-CE State-Nebraska $6,547.00 $0.00 $6,547.00 $0.00

* Amounts in thousands of U.S. dollars 5-37 Metropolitan Area Planning Agency FY2017-2022 Transportation Improvement Program

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2016-027 NE-22648 N-370: I-80 to Bellevue NDOR $597.00 Location On N-370 from I-80 to NB US-75 ramp terminal in Bellevue. Begin R.P. – 4.19 Description Traffic signals

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2019 UTIL-CON-CE HSIP $597.00 $537.00 $60.00 $0.00

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2017-008 NE-22649 N-64 Concrete Repair NDOR 0.00 $2,810.00 Location N-64 from L-28K to Cuming Street in Omaha Description Concrete repair, asphalt resurfacing

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2019 PE-NEPA-FD State-Nebraska $10.00 $0.00 $10.00 $0.00

2020 UTIL-CON-CE NHPP $2,800.00 $2,240.00 $560.00 $0.00

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2016-028 NE-22650 District 2 I-80 Fiber-Optic NDOR $2,332.00 Location Along I-80 from near Mahoney interchange east to the Iowa State line. Begin R.P. – 426.90 Description Connect ITS devices to fiber-optic cable

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2016 PE-NEPA-FD State-Nebraska $2.00 $0.00 $2.00 $0.00

2017 UTIL-CON-CE State-Nebraska $2,330.00 $0.00 $2,330.00 $0.00

* Amounts in thousands of U.S. dollars 5-38 Metropolitan Area Planning Agency FY2017-2022 Transportation Improvement Program

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2016-029 NE-22651 District 2 I-680 Fiber-Optic NDOR $1,190.00 Location Along I-680 in Omaha Description Connect ITS devices to fiber-optic cable

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2016 PE-NEPA-FD State-Nebraska $1.00 $0.00 $1.00 $0.00

2017 UTIL-CON-CE State-Nebraska $1,189.00 $0.00 $1,189.00 $0.00

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2016-030 NE-22652 District 2 I-480 Fiber-Optic NDOR $427.00 Location Along I-480 in Omaha Description Connect ITS devices to fiber-optic cable

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2016 PE-NEPA-FD State-Nebraska $1.00 $0.00 $1.00 $0.00

2017 UTIL-CON-CE State-Nebraska $426.00 $0.00 $426.00 $0.00

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2016-031 NE-22653 US-75: Dynamic Message Signs, Omaha NDOR $920.00 Location Along northbound and southbound US-75 from approximately J Street to west of F Street in Omaha. Begin R.P. – 87.33 Description Install new dynamic message signs (DMS)

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2017 PE-NEPA-FD State-Nebraska $153.00 $0.00 $153.00 $0.00 2018 UTIL-CON-CE NHPP $767.00 $614.00 $153.00 $0.00

* Amounts in thousands of U.S. dollars 5-39 Metropolitan Area Planning Agency FY2017-2022 Transportation Improvement Program

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2016-032 NE-22654 District 2 DMS NDOR $2,272.00 Location Along I-80, US-75, and US-34 in District 2. Begin R.P. – 428.92 Description Install new dynamic message signs (DMS)

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2017 PE-NEPA-FD State-Nebraska $81.00 $0.00 $81.00 $0.00

2018 UTIL-CON-CE NHPP $2,191.00 $1,899.00 $292.00 $0.00

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2016-033 NE-22655 District 2 CCTV Camera Towers NDOR $491.00 Location At eleven locations along I-80, I-680, US-75, US-34, and N-370 in District 2 Description Deploy eleven (11) Closed-Circuit Television (CCTV) camera towers

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2017 PE-NEPA-FD State-Nebraska $17.00 $0.00 $17.00 $0.00

2018 UTIL-CON-CE STBG-State $35.00 $35.00 $0.00 $0.00

2018 UTIL-CON-CE NHPP $439.00 $344.00 $95.00 $0.00

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2017-009 NE-22656 N-64 Pavement Neark Elkhorn River Bridge NDOR 0.00 $2,064.00 Location N-64 (EB)from just east Elkhorn River bridge, to just east of west lmts Omaha Description Concrete pavement

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2019 UTIL-CON-CE NHPP $2,064.00 $1,651.00 $413.00 $0.00

* Amounts in thousands of U.S. dollars 5-40 Metropolitan Area Planning Agency FY2017-2022 Transportation Improvement Program

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2017-010 NE-22660 N-85 Intersection with Ralston Avenue NDOR 0.00 $122.00 Location N-85 at intersection with Ralston Avenue in Ralston Description Intersection improvements

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2016 PE-NEPA-FD State-Nebraska $10.00 $0.00 $10.00 $0.00

2017 UTIL-CON-CE HSIP $112.00 $101.00 $11.00 $0.00

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2017-011 NE-22682 District 2 Shoulder Resurfacing NDOR 0.00 $3,159.00 Location US-30, US-6 and N-370 at various locations in District 2 Description Mill, resurface, install rumble strips on surfaced shoulders

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2016 PE-NEPA-FD State-Nebraska $15.00 $0.00 $15.00 $0.00

2017 UTIL-CON-CE HSIP $3,144.00 $2,829.00 $315.00 $0.00

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2017-012 NE-22697 US-75 Bridge Approaches in Bellevue NDOR 0.00 $2,585.00 Location US-75 at Papillion Creek, at Capehart Rd and at Mud Creek Description Replace bridge approach slabs

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2020 UTIL-CON-CE NHPP $2,585.00 $2,068.00 $517.00 $0.00

* Amounts in thousands of U.S. dollars 5-41 Metropolitan Area Planning Agency FY2017-2022 Transportation Improvement Program

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2015-054 NE-22209 168th Street Omaha 2.00 $12,575.45 Location West Center Rd to Q Street Description Widen 2 Lane to 4 Lane Urban Divided with Turn Lanes

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2017 PE-NEPA-FD STBG-MAPA $272.95 $218.36 $0.00 $54.59

2017 ROW STBG-MAPA $361.25 $289.00 $0.00 $72.25

2018 UTIL-CON-CE STBG-MAPA $11,941.25 $9,553.00 $0.00 $2,388.25

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2015-052 NE-22210 168th Street Omaha 0.90 $6,359.20 Location West Center Rd to Poppleton Description Widen 2 Lane to 4 Lane Urban Divided with Turn Lanes

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2017 PE-NEPA-FD STBG-MAPA $272.95 $218.36 $0.00 $54.59

2017 ROW STBG-MAPA $436.25 $349.00 $0.00 $87.25

2018 UTIL-CON-CE STBG-MAPA $5,650.00 $4,520.00 $0.00 $1,130.00

* Amounts in thousands of U.S. dollars 5-42 Metropolitan Area Planning Agency FY2017-2022 Transportation Improvement Program

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2015-053 NE-22236 114th Street Omaha 0.70 $5,811.25 Location Burke to Pacific St Description Widen 2 Lane to 3 Lane Urban Undivided with TWLTL on Center Lane

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2007 PE-NEPA-FD STBG-MAPA $500.00 $400.00 $0.00 $100.00

2014 PE-NEPA-FD STBG-MAPA $247.50 $198.00 $0.00 $49.50

2016 ROW STBG-MAPA $480.00 $384.00 $0.00 $96.00 2018 UTIL-CON-CE STBG-MAPA $4,583.75 $3,667.00 $0.00 $916.75

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2015-051 NE-22237 108th Street Omaha 0.80 $6,880.94 Location Madison St to Q Street Description Widen 2 Lane to 4 Lane Urban Divided with Turn Lanes

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2014 PE-NEPA-FD STBG-MAPA $340.00 $272.00 $0.00 $68.00

2016 PE-NEPA-FD STBG-MAPA $75.00 $60.00 $0.00 $15.00

2017 ROW STBG-MAPA $818.85 $655.08 $0.00 $163.77 2017 UTIL-CON-CE STBG-MAPA $5,275.00 $4,220.00 $0.00 $1,055.00

2017 UTIL-CON-CE STBG-MAPA $372.09 $297.67 $0.00 $74.42

* Amounts in thousands of U.S. dollars 5-43 Metropolitan Area Planning Agency FY2017-2022 Transportation Improvement Program

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2015-055 NE-22277 120th Street Omaha 1.40 $11,611.25 Location Stonegate Dr to Fort St Description Widen 2 Lane to 4 Lane Urban Divided with Turn Lanes

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2017 PE-NEPA-FD STBG-MAPA $557.50 $446.00 $0.00 $111.50

2017 ROW STBG-MAPA $515.00 $412.00 $0.00 $103.00

2017 UTIL-CON-CE STBG-MAPA $515.00 $412.00 $0.00 $103.00 2018 UTIL-CON-CE STBG-MAPA $10,023.75 $8,019.00 $0.00 $2,004.75

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2015-044 NE-22325 Q Street Bridge Omaha $16,870.75 Location Q St. between 26th St. and 27th St. Description Replacement of existing bridge.

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2013 PE-NEPA-FD STBG-MAPA $1,462.00 $1,169.60 $0.00 $292.40

2016 ROW STBG-MAPA $158.75 $127.00 $0.00 $31.75

2017 UTIL-CON-CE STBG-State $6,250.00 $5,000.00 $0.00 $1,250.00 2017 UTIL-CON-CE STBG-MAPA $9,000.00 $7,200.00 $0.00 $1,800.00

* Amounts in thousands of U.S. dollars 5-44 Metropolitan Area Planning Agency FY2017-2022 Transportation Improvement Program

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2015-040 NE-22376 156th Street Phase Two Omaha 0.95 $12,241.31 Location Pepperwood Dr. to Corby St. Description 4 Lane Urban Section

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2010 PE-NEPA-FD STBG-MAPA $419.02 $335.22 $0.00 $83.80

2011 PE-NEPA-FD STBG-MAPA $257.29 $205.83 $0.00 $51.46

2015 PE-NEPA-FD STBG-MAPA $566.25 $353.00 $0.00 $213.25 2016 ROW STBG-MAPA $643.75 $515.00 $0.00 $128.75

2017 UTIL-CON-CE STBG-MAPA $10,355.00 $8,284.00 $0.00 $2,071.00

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2016-046 NE-22438 132nd Street Adaptive Traffic Signal Control Omaha 0.00 $857.74 Location On 132nd Street from the Jewish Community Center to Cuming Street Description Installation of Adaptive Traffic Signal Control System on seven (7) traffic signals in 132nd Street Corridor

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2018 UTIL-CON-CE HSIP $857.74 $771.97 $0.00 $85.77

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2016-048 NE-22449 144th Street Adaptive Traffic Signal Control Omaha 0.00 $1,122.31 Location On 144th Street from Arbor to "F" Street, West Center Road from 140th Street/Oak View Drive to 148th Street, and on Oak View Drive between Description Installation of Adaptive Traffic Signal Control System in and around Oak View Mall area

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2018 UTIL-CON-CE HSIP $1,122.31 $1,010.08 $0.00 $112.23

* Amounts in thousands of U.S. dollars 5-45 Metropolitan Area Planning Agency FY2017-2022 Transportation Improvement Program

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2016-047 NE-22482 Dodge Street Adaptive Traffic Signal Control Omaha $1,380.00 Location On Dodge Street/West Dodge Road from 69th to 93rd Streets and at adjacent intersections on major cross streets (72nd St, 84th St, and 90th St) Description Installation of Adaptive Traffic Signal Control System twenty-one (21) traffic signals in Dodge Street/West Dodge Road corridor (72nd St, 84th St, and 90th St) between 69th and 93rd Streets. The adaptive traffic control system will extend up to two signals on either side of the corridor on these cross streets Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2017 UTIL-CON-CE HSIP $1,380.00 $1,237.41 $0.00 $142.59

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2015-065 NE-22506 24th Street Road Diet Omaha 2.75 $3,419.10 Location From L Street to Leavenworth Street. Description Reduce excess capacity with 4-lane to 3-lane road diet and facilitate multi-modal options.

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2016 PE-NEPA-FD HSIP $331.01 $297.91 $0.00 $33.10

2018 ROW HSIP $79.00 $71.10 $0.00 $7.90

2019 UTIL-CON-CE HSIP $3,009.09 $2,708.18 $0.00 $300.91

* Amounts in thousands of U.S. dollars 5-46 Metropolitan Area Planning Agency FY2017-2022 Transportation Improvement Program

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2015-001 NE-22571 North Downtown Riverfront Pedestrian Bridge Omaha $6,375.00 Location 10th and Fahey Drive Description Pedestrian bridge to connect the western terminus of the Bob Kerry Pedestrian Bridge spanning Riverfront Drive and Union Pacific Railroad.

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2014 PE-NEPA-FD TCSP $660.00 $500.00 $0.00 $160.00

2016 PE-NEPA-FD TAP-MAPA $90.00 $78.00 $0.00 $12.00

2016 ROW Local $50.00 $0.00 $0.00 $50.00 2018 UTIL-CON-CE TAP-MAPA $4,482.00 $1,060.00 $0.00 $3,422.00

2018 UTIL-CON-CE (AC) TAP-MAPA $1,093.00 $0.00 $0.00 $1,093.00

2019 AC Conversion TAP-MAPA $0.00 $1,093.00 $0.00 ($1,093.00)

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2015-017 NE-22587 Omaha Signal Network - System Management Omaha $1,257.23 Location Various locations throughout the City of Omaha Description Professional design services for Projects 22608A through 22608E

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2016 PE-NEPA-FD STBG-MAPA $1,000.00 $800.00 $0.00 $200.00

2017 PE-NEPA-FD STBG-MAPA $257.23 $205.78 $0.00 $51.45

* Amounts in thousands of U.S. dollars 5-47 Metropolitan Area Planning Agency FY2017-2022 Transportation Improvement Program

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2015-019 NE-22605 2014 Omaha Resurfacing Package Omaha 0.00 $4,140.96 Location Various locations Description Package of resurfacing projects on eligible Federal-aid roadways.

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2014 UTIL-CON-CE (AC) Local $828.19 $0.00 $0.00 $828.19

2014 UTIL-CON-CE (AC) Local $3,312.77 $0.00 $0.00 $3,312.77

2016 AC Conversion STBG-MAPA $0.00 $735.00 $0.00 ($735.00) 2022 AC Conversion STBG-MAPA $0.00 $2,577.77 $0.00 ($2,577.77)

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2015-013 NE-22608A Omaha Signal Infrastructure - Phase A Omaha $3,489.13 Location Various Locations Throughout City Description Deployment of traffic signal network and traffic management system.

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2017 UTIL-CON-CE STBG-MAPA $3,489.13 $2,791.30 $0.00 $697.83

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2015-157 NE-22608B Omaha Signal Infrastructure - Phase B Omaha $3,278.75 Location Various Locations Throughout City Description Deployment of traffic signal network and traffic management system.

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2017 UTIL-CON-CE STBG-MAPA $3,278.75 $2,623.00 $0.00 $655.75

* Amounts in thousands of U.S. dollars 5-48 Metropolitan Area Planning Agency FY2017-2022 Transportation Improvement Program

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2015-158 NE-22608C Omaha Signal Infrastructure - Phase C Omaha $1,970.00 Location Various Locations Throughout City Description Deployment of traffic signal network and traffic management system.

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2018 UTIL-CON-CE STBG-MAPA $1,970.00 $1,576.00 $0.00 $394.00

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2015-159 NE-22608D Omaha Signal Infrastructure - Phase D Omaha $1,448.75 Location Various Locations Throughout City Description Deployment of traffic signal network and traffic management system.

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2019 UTIL-CON-CE STBG-MAPA $1,448.75 $1,159.00 $0.00 $289.75

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2015-160 NE-22608E Omaha Signal Infrastructure - Phase E Omaha $3,390.00 Location Various Locations Throughout City Description Deployment of traffic signal network and traffic management system.

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2020 UTIL-CON-CE STBG-MAPA $3,390.00 $2,712.00 $0.00 $678.00

* Amounts in thousands of U.S. dollars 5-49 Metropolitan Area Planning Agency FY2017-2022 Transportation Improvement Program

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2017-015 NE-22608F Omaha Signal Infrastructure - Phase F Omaha $3,376.25 Location Various Locations Throughout City Description Deployment of traffic signal network and traffic management system.

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2021 UTIL-CON-CE STBG-MAPA $3,376.25 $2,701.00 $0.00 $675.25

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2017-016 NE-22608G Omaha Signal Infrastructure - Phase G Omaha $3,477.50 Location Various Locations Throughout City Description Deployment of traffic signal network and traffic management system.

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2022 UTIL-CON-CE STBG-MAPA $3,477.50 $2,782.00 $0.00 $695.50

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2015-022 NE-22627 42nd Street Bridge, C to D Street Omaha $6,087.00 Location On 42nd Street between C and D streets Description The replacement of two adjacent pin-and-hanger bridges

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2019 ROW Local ACC $746.00 $0.00 $0.00 $746.00

2019 ROW Omaha $187.00 $0.00 $0.00 $187.00

2019 UTIL-CON-CE Local ACC $4,123.00 $0.00 $0.00 $4,123.00 2019 UTIL-CON-CE Omaha $1,031.00 $0.00 $0.00 $1,031.00

* Amounts in thousands of U.S. dollars 5-50 Metropolitan Area Planning Agency FY2017-2022 Transportation Improvement Program

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2015-043 NE-22628 72nd & D Street Viaduct Omaha 0.10 $7,782.00 Location On 72nd Street just south of I-80, at about D Street Description Replacement and widening of existing bridge structure

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2022 ROW Local ACC $1,061.00 $0.00 $0.00 $1,061.00

2022 ROW Omaha $265.00 $0.00 $0.00 $265.00

2022 UTIL-CON-CE Local ACC $5,165.00 $0.00 $0.00 $5,165.00 2022 UTIL-CON-CE Omaha $1,291.00 $0.00 $0.00 $1,291.00

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2015-132 NE-22629 132nd at West Center Road Safety Project Omaha $4,035.50 Location 132nd Street from Kingswood to Arbor Plaza and West Center Road from 133rd Plaza to 130th Ave Description Widening of roadway to provid for dual left and singular right turn lanes on all four legs, removal and reconstruction of existing medians

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2015 PE-NEPA-FD HSIP $312.50 $281.00 $0.00 $31.50

2016 ROW HSIP $223.00 $200.00 $0.00 $23.00

2018 UTIL-CON-CE HSIP $3,500.00 $3,150.00 $0.00 $350.00

* Amounts in thousands of U.S. dollars 5-51 Metropolitan Area Planning Agency FY2017-2022 Transportation Improvement Program

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2016-071 NE-22681 2016 Omaha Resurfacing Program Omaha 0.00 $5,100.00 Location Various locations throughout the City of Omaha Description Resurfacing of federal-aid eligible roadways in the City of Omaha

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2016 UTIL-CON-CE Omaha $1,020.00 $0.00 $0.00 $1,020.00

2016 UTIL-CON-CE (AC) Omaha $4,080.00 $0.00 $0.00 $4,080.00

2021 AC Conversion STBG-MAPA $0.00 $4,080.00 $0.00 ($4,080.00)

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2016-038 NE-22694 Heartland B-Cycle Expansion Omaha $1,162.91 Location Various locations throughout the City of Omaha Description Purchase and installation of up to forty (40) bike-sharing stations

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2017 General Planning CMAQ $1,162.91 $930.33 $0.00 $232.58

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2016-063 NE-22695 84th Street ASCT Omaha 5.50 $4,568.67 Location On 84th St., W Center rd to Lincoln St.; 83rd St & Harrison St, Pkwy & Brentwood Dr, and 84th St & Giles Rd Description Installation of an adaptive traffic control system along the 84th St Corridor

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2017 PE-NEPA-FD HSIP $288.80 $259.92 $0.00 $28.88 2017 UTIL-CON-CE HSIP $4,279.87 $3,851.88 $0.00 $427.99

* Amounts in thousands of U.S. dollars 5-52 Metropolitan Area Planning Agency FY2017-2022 Transportation Improvement Program

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2016-068 NE-22702 72nd & Maple Intersection Improvement Omaha 0.45 $3,619.50 Location At the intersection of 72nd Street and Maple Street in Omaha Description Construction of dual left-turn lanes on N-64 (Maple Street) at the intersection of 72nd and Maple.

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2016 PE-NEPA-FD HSIP $249.05 $224.14 $0.00 $24.91

2018 ROW HSIP $231.90 $208.71 $0.00 $23.19

2018 UTIL-CON-CE HSIP $115.94 $104.34 $0.00 $11.59 2019 UTIL-CON-CE HSIP $3,022.61 $2,742.96 $0.00 $279.65

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2016-070 NE-22706 30th Street Road Diet Omaha 2.15 $3,246.44 Location On 30th Street, from Cuming Street to Ames Street Description Restriping of the roadway to three lanes and striping of bicycle lanes

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2016 PE-NEPA-FD HSIP $266.40 $211.62 $0.00 $54.78

2019 UTIL-CON-CE HSIP $1,983.83 $1,561.30 $0.00 $422.53

2019 UTIL-CON-CE (AC) Omaha $996.22 $0.00 $0.00 $996.22 2021 AC Conversion STBG-MAPA $0.00 $996.22 $0.00 ($996.22)

* Amounts in thousands of U.S. dollars 5-53 Metropolitan Area Planning Agency FY2017-2022 Transportation Improvement Program

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2016-045 OMA-051515-001 Omaha Resurfacing Program Omaha 0.00 $9,924.00 Location Various locations throughout the City of Omaha Description Resurfacing of federal-aid eligible roadways in the City of Omaha

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2017 UTIL-CON-CE (AC) Omaha $3,000.00 $0.00 $0.00 $3,000.00

2018 UTIL-CON-CE (AC) Omaha $3,000.00 $0.00 $0.00 $3,000.00

2019 UTIL-CON-CE (AC) Omaha $924.00 $0.00 $0.00 $924.00 2020 UTIL-CON-CE (AC) Omaha $3,000.00 $0.00 $0.00 $3,000.00

2021 AC Conversion STBG-MAPA $0.00 $789.00 $0.00 ($789.00)

2022 AC Conversion STBG-MAPA $0.00 $6,227.00 $0.00 ($6,227.00)

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2016-067 NE-22704 N-370 & 96th Street Intersection Project Papillion 0.53 $275.90 Location At the intersection of 96th Street and N-370 in Papillion Description Addition of a right-turn lane on 96th Street, creation of dual, southbound left-turn lanes, and restriping on N-370 to create dual protected left-turn lane.

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2016 PE-NEPA-FD HSIP $32.80 $29.52 $0.00 $3.28

2018 PE-NEPA-FD HSIP $25.70 $23.13 $0.00 $2.57

2018 UTIL-CON-CE HSIP $217.40 $195.66 $0.00 $21.74

* Amounts in thousands of U.S. dollars 5-54 Metropolitan Area Planning Agency FY2017-2022 Transportation Improvement Program

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2017-017 West Papio Trail - Millard Connection PMRNRD 1.10 $2,202.50 Location Along West Papillion Creek from near 137th & Millard to Harry Anderson Drive Description Connection of northern and southern portions of the West Papio Trail in the Millar neighborhood

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2021 UTIL-CON-CE TAP-MAPA $2,202.50 $1,762.00 $0.00 $440.50

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2015-042 NE-22227 Western Douglas County Trail Phase 1 PMRNRD $3,586.05 Location City of Valley to Twin Rivers YMCA Description Install new 10' wide bicycle and pedestrain trail, including railroad overpass

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2013 PE-NEPA-FD DPU $361.40 $361.40 $0.00 $0.00

2017 UTIL-CON-CE DPU $3,224.65 $2,579.72 $0.00 $644.93

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2015-041 NE-22227A Western Douglas County Trail Phase 2 PMRNRD $2,543.23 Location City of Valley to Village of Waterloo Description Install new 10' wide bicycle/pedestrain trail

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2014 PE-NEPA-FD DPU $318.32 $254.65 $0.00 $63.66

2017 UTIL-CON-CE DPU $2,224.91 $1,779.93 $0.00 $444.98

* Amounts in thousands of U.S. dollars 5-55 Metropolitan Area Planning Agency FY2017-2022 Transportation Improvement Program

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2015-007 IA-29802 Pottawattamie County Multi-Use Trail - Phase 1 Pottawattamie $281.25 Location From Council Bluffs north to 330th Street along the Railroad Highway, approximately 7 miles Description Multi-use recreational trail

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2018 UTIL-CON-CE TAP-MAPA $281.25 $225.00 $0.00 $56.25

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2015-058 NE-22283 132nd and Giles Sarpy $3,544.26 Location 132nd and Giles Road Description Reconfigure 132nd and Giles Road south intersection and interim relocation of north intersection with signalized "T" intersection to allow for turning truck traffic and improved traffic flow. Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2010 PE-NEPA-FD STBG-MAPA $213.84 $171.07 $0.00 $42.77

2011 PE-NEPA-FD STBG-MAPA $51.73 $41.39 $0.00 $10.34 2012 PE-NEPA-FD STBG-MAPA $207.15 $165.72 $0.00 $41.43

2016 ROW STBG-MAPA $100.00 $80.00 $0.00 $20.00 2017 UTIL-CON-CE STBG-MAPA $2,971.55 $2,377.24 $0.00 $594.31

* Amounts in thousands of U.S. dollars 5-56 Metropolitan Area Planning Agency FY2017-2022 Transportation Improvement Program

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2015-062 NE-22570 66th and Giles Sarpy 1.30 $12,076.25 Location Harrison St. to 400ft. South of Giles Road and Giles Road from 69th St. to 66th St. Description Road imporvements will decrease delay and congestion for vehicular travel by providing an alternate north-south connection between Harrison Street and Cornhusker Road. Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2017 PE-NEPA-FD STBG-MAPA $1,233.75 $987.00 $0.00 $246.75

2018 ROW STBG-MAPA $250.00 $200.00 $0.00 $50.00 2021 UTIL-CON-CE STBG-MAPA $10,592.50 $8,474.00 $0.00 $2,118.50

TIP ID Control Number Project Name Lead Agency Miles Total Project Cost* 2015-138 NE-22411 Valley D.C. Safe Routes to School Valley 0.00 $281.25 Location Portion of Meigs Street in Valley, NE Description Install sidewalk to connect school to nearby apartment and housing complex along Meigs street where no sidewalk currently exists.

Fiscal Year Project Phase Funding Source Total Funds* Federal Funds* State Funds* Local Funds* 2016 ROW SRTS $56.25 $45.00 $0.00 $11.25

2017 UTIL-CON-CE SRTS $225.00 $180.00 $0.00 $45.00

* Amounts in thousands of U.S. dollars 5-57

5.1.3 Regionally Significant Transit Projects FTA requires that MAPA submit a Program of Projects (POP) for all FTA-funded transit projects, as each recipient of a Section 5310 grant shall develop, publish, afford an opportunity for a public hearing on, and submit for approval a POP. The Program of Projects table is shown in Table 5.3 on the page 5-48.

Table 5.4 on pages 5-53 and 5-54 provide detailed project information about regionally significant transit investments in the MAPA region. These projects constitute the Transportation Improvement Program for Metro Transit’s Federal Transit Administration projects. Projects in the following tables include capital, operations, safety, and security projects based on MAPA’s LRTP goals. In general, these projects are programmed with funds from two Federal Transit Administration formula grant programs: • Section 5307 Urbanized Area Formula Funding • Section 5339 Bus and Bus Facilities Funding

5.1.4 Regionally Significant Aviation Projects This section includes a listing of the airport improvement projects funded under the programs of the Federal Aviation Administration of the USDOT. Federally funded airport improvement projects are must be contained in the regional Transportation Improvement Plan. For that purpose, the following projects have been programmed by the Omaha Airport Authority.

Table 5.2 – Omaha Airport Authority Improvement Program Fiscal Funding Sources ($1,000s) Project Description Year Federal AIP Local Match Total 2015 Reconstruct Terminal Ramp – Phase II $13,400 $4,400 $17,800 2016 Reconstruct Terminal Ramp – Phase III $12,700 $4,200 $16,900 2017 Reconstruct Cargo Apron A $5,200 $1,700 $6,900 2018 Deicing Pad $16,500 $5,500 $22,000 2020 Terminal Central Plan $30,000 $10,000 $40,000 TOTAL $77,800 $25,800 $103,600

MAPA FY2017-2022 Transportation Improvement Program 5-58

Table 5.3a - MAPA's 5310 Program of Projects FY2017 State: Nebraska & Iowa Agency: Metropolitan Area Planning Agency (MAPA)

FY 17 Apportionment $ 530 55% Capital $ 292 45% Operations $ 239 Figures shown in $1000s

Meets 55% Public/ Local Project Capital/ Capital Congressional Private Rural/ Tribes Federal Total Match % Agency Number Operating Traditional City State District Counties Served Non-Profit Urban Served Project Description Scope/ALI Share Local Share Amount for ALI

MAPA-FY17- Douglas, Sarpy, & 44200/ MAPA 5310-009 Admin No Omaha NE 1, 2, & 3 Pottawattamie Public Urban NA Project Administration & Mobility Coordination 442421 $ 50 $ - $ 50 0% Public/ Lump sum of vehicle purchasing, the listing of possible sub- Douglas, Sarpy, & Private recipients are below, will do a budget revision with extra 60000/ Vehicle Purchase Lump Sum Capital Yes Omaha NE 1, 2, & 3 Pottawattamie Non-Profit Urban NA narrative to separate out vehicle type 111315 $ 292 $ 73 $ 364 20% Public/ Lump sum of operations, the listing of possible sub-recipients are Douglas, Sarpy, & Private below, may do a budget revision to allocate funding to specific 30000/ Operations Lump Sum Operations No Omaha NE 1, 2, & 3 Pottawattamie Non-Profit Urban NA agencies 300901 $ 189 $ 189 $ 377 50%

Total Funds Expended $ 530 Total 5310 Funds Available $ 530 Remaining Balance $ -

MAPA FY2017-2022 Transportation Improvement Program Table 5.3b - MAPA's 5310 Program of Projects FY2018 State: Nebraska & Iowa Agency: Metropolitan Area Planning Agency (MAPA)

FY 18 Apportionment $ 530 55% Capital $ 292 45% Operations $ 239 Figures shown in $1000s

Meets 55% Public/ Local Project Capital/ Capital Congressional Private Rural/ Tribes Federal Total Match % Agency Number Operating Traditional City State District Counties Served Non-Profit Urban Served Project Description Scope/ALI Share Local Share Amount for ALI

MAPA-FY18- Douglas, Sarpy, & 44200/ MAPA 5310-011 Admin No Omaha NE 1, 2, & 3 Pottawattamie Public Urban NA Project Administration & Mobility Coordination 442421 $ 50 $ - $ 50 0% Public/ Lump sum of vehicle purchasing, the listing of possible sub- Douglas, Sarpy, & Private recipients are below, will do a budget revision with extra 60000/ Vehicle Purchase Lump Sum Capital Yes Omaha NE 1, 2, & 3 Pottawattamie Non-Profit Urban NA narrative to separate out vehicle type 111315 $ 292 $ 73 $ 364 20%

Public/ Lump sum of operations, the listing of possible sub-recipients Douglas, Sarpy, & Private are below, may do a budget revision to allocate funding to 30000/ Operations Lump Sum Operations No Omaha NE 1, 2, & 3 Pottawattamie Non-Profit Urban NA specific agencies 300901 $ 189 $ 189 $ 377 50%

Total Funds Expended $ 530 Total 5310 Funds Available $ 530 Remaining Balance $ -

MAPA FY2017-2022 Transportation Improvement Program Table 5.3c - MAPA's 5310 Program of Projects FY2019

State: Nebraska & Iowa Agency: Metropolitan Area Planning Agency (MAPA)

FY 19 Apportionment $ 530 55% Capital $ 292 45% Operations $ 239 Figures shown in $1000s

Meets 55% Public/ Local Project Capital/ Capital Congressional Private Rural/ Tribes Total Match % Agency Number Operating Traditional City State District Counties Served Non-Profit Urban Served Project Description Scope/ALI Federal Share Local Share Amount for ALI

Douglas, Sarpy, 44200/ MAPA MAPA-FY19-5310-011Admin No Omaha NE 1, 2, & 3 & Pottawattamie Public Urban NA Project Administration & Mobility Coordination 442421 $ 50 $ - $ 50 0%

Public/ Lump sum of vehicle purchasing, the listing of possible sub- Douglas, Sarpy, Private recipients are below, will do a budget revision with extra 60000/ Vehicle Purchase Lump Sum Capital Yes Omaha NE 1, 2, & 3 & Pottawattamie Non-Profit Urban NA narrative to separate out vehicle type 111315 $ 292 $ 73 $ 364 20%

Public/ Lump sum of operations, the listing of possible sub-recipients Douglas, Sarpy, Private are below, may do a budget revision to allocate funding to 30000/ Operations Lump Sum Operations No Omaha NE 1, 2, & 3 & Pottawattamie Non-Profit Urban NA specific agencies 300901 $ 189 $ 189 $ 377 50%

Total Funds Expended $ 530 Total 5310 Funds Available $ 530 Remaining Balance $ -

MAPA FY2017-2022 Transportation Improvement Program Table 5.3d - MAPA's 5310 Program of Projects FY2020

State: Nebraska & Iowa Agency: Metropolitan Area Planning Agency (MAPA)

FY 20 Apportionment $ 530 55% Capital $ 292 45% Operations $ 239 Figures shown in $1000s

Meets 55% Public/ Local Project Capital/ Capital Congressional Private Rural/ Tribes Total Match % Agency Number Operating Traditional City State District Counties Served Non-Profit Urban Served Project Description Scope/ALI Federal Share Local Share Amount for ALI

Douglas, Sarpy, & 44200/ MAPA MAPA-FY20-5310-006Admin No Omaha NE 1, 2, & 3 Pottawattamie Public Urban NA Project Administration & Mobility Coordination 442421 $ 50 $ - $ 50 0%

Public/ Lump sum of vehicle purchasing, the listing of possible sub- Douglas, Sarpy, & Private recipients are below, will do a budget revision with extra 60000/ Vehicle Purchase Lump Sum Capital Yes Omaha NE 1, 2, & 3 Pottawattamie Non-Profit Urban NA narrative to separate out vehicle type 111315 $ 292 $ 73 $ 364 20%

Public/ Lump sum of operations, the listing of possible sub-recipients Douglas, Sarpy, & Private are below, may do a budget revision to allocate funding to 30000/ Operations Lump Sum Operations No Omaha NE 1, 2, & 3 Pottawattamie Non-Profit Urban NA specific agencies 300901 $ 189 $ 189 $ 377 50%

Total Funds Expended $ 530 Total 5310 Funds Available $ 530 Remaining Balance $ -

MAPA FY2017-2022 Transportation Improvement Program Table 5.3e - MAPA's 5310 Program of Projects FY2021

State: Nebraska & Iowa Agency: Metropolitan Area Planning Agency (MAPA)

FY 21 Apportionment $ 530 55% Capital $ 292 45% Operations $ 239 Figures shown in $1000s

Meets 55% Public/ Local Project Capital/ Capital Congressional Private Rural/ Tribes Total Match % Agency Number Operating Traditional City State District Counties Served Non-Profit Urban Served Project Description Scope/ALI Federal Share Local Share Amount for ALI

Douglas, Sarpy, & 44200/ MAPA MAPA-FY21-5310-002Admin No Omaha NE 1, 2, & 3 Pottawattamie Public Urban NA Project Administration & Mobility Coordination 442421 $ 50 $ - $ 50 0%

Public/ Lump sum of vehicle purchasing, the listing of possible sub- Douglas, Sarpy, & Private recipients are below, will do a budget revision with extra 60000/ Vehicle Purchase Lump Sum Capital Yes Omaha NE 1, 2, & 3 Pottawattamie Non-Profit Urban NA narrative to separate out vehicle type 111315 $ 292 $ 73 $ 364 20%

Public/ Lump sum of operations, the listing of possible sub-recipients Douglas, Sarpy, & Private are below, may do a budget revision to allocate funding to 30000/ Operations Lump Sum Operations No Omaha NE 1, 2, & 3 Pottawattamie Non-Profit Urban NA specific agencies 300901 $ 189 $ 189 $ 377 50%

Total Funds Expended $ 530 Total 5310 Funds Available $ 530 Remaining Balance $ -

MAPA FY2017-2022 Transportation Improvement Program Table 5.3f - MAPA's 5310 Program of Projects FY2022

State: Nebraska & Iowa Agency: Metropolitan Area Planning Agency (MAPA)

FY 22 Apportionment $ 530 55% Capital $ 292 45% Operations $ 239 Figures shown in $1000s

Meets 55% Public/ Local Project Capital/ Capital Congressional Private Rural/ Tribes Federal Total Match % Agency Number Operating Traditional City State District Counties Served Non-Profit Urban Served Project Description Scope/ALI Share Local Share Amount for ALI

Douglas, Sarpy, & 44200/ MAPA Admin No Omaha NE 1, 2, & 3 Pottawattamie Public Urban NA Project Administration & Mobility Coordination 442421 $ 50 $ - $ 50 0%

Public/ Lump sum of vehicle purchasing, the listing of possible sub- Douglas, Sarpy, & Private recipients are below, will do a budget revision with extra 60000/ Vehicle Purchase Lump Sum Capital Yes Omaha NE 1, 2, & 3 Pottawattamie Non-Profit Urban NA narrative to separate out vehicle type 111315 $ 266 $ 66 $ 332 20%

Public/ Lump sum of operations, the listing of possible sub-recipients are Douglas, Sarpy, & Private below, may do a budget revision to allocate funding to specific 30000/ Operations Lump Sum Operations No Omaha NE 1, 2, & 3 Pottawattamie Non-Profit Urban NA agencies 300901 $ 183 $ 183 $ 365 50%

Total Funds Expended $ 498 Total 5310 Funds Available $ 530 Remaining Balance $ 32

MAPA FY2017-2022 Transportation Improvement Program Table 5.4 - Metro Program of Projects Tables

METRO TRANSPORTATION IMPROVEMENT PROGRAM Calendar Year 2017 Element Federal Project Location Improvement Type Jurisdiction Funding Federal State Local Total Source Maintenance of Existing Services Omaha UZA/NE METRO Sec. 5307 $7,492.15 $2,500.00 $16,578.85 $26,571.00

Maintenance of Existing Services Omaha UZA/IA METRO Sec. 5307 $273.00 $175.00 $704.00 $1,152.00

Support Equipment/Facilities, Planning, Capitalized Capital Expenditures Omaha UZA/NE Operations METRO Sec. 5307 $2,339.68 $0.00 $584.92 $2,924.60

Capital Expenditures Omaha UZA/NE Revenue Rolling Stock METRO Sec. 5339 $793.00 $0.00 $139.94 $932.94

METRO TRANSPORTATION IMPROVEMENT PROGRAM Calendar Year 2018 Element Federal Project Location Improvement Type Jurisdiction Funding Federal State Local Total Source Maintenance of Existing Services Omaha UZA/NE METRO Sec. 5307 $7,673.58 $2,500.00 $17,159.11 $27,332.69

Maintenance of Existing Services Omaha UZA/IA METRO Sec. 5307 $273.00 $175.00 $704.00 $1,152.00

Capital Expenditures Omaha UZA Revenue Rolling Stock METRO Sec. 5307 $191.25 $0.00 $33.75 $225.00

Support Equipment, Facilities, Planning & Capital Expenditures Omaha UZA/NE Capitalized Operations METRO Sec. 5307 $2,282.35 $0.00 $570.59 $2,852.94

Capital Expenditures Omaha UZA/NE Revenue Rolling Stock METRO Sec. 5339 $794.75 $0.00 $140.25 $935.00

METRO TRANSPORTATION IMPROVEMENT PROGRAM Calendar Year 2019 Element Federal Project Location Improvement Type Jurisdiction Funding Federal State Local Total Source Maintenance of Existing Services Omaha UZA/NE METRO Sec. 5307 $7,968.88 $2,500.00 $17,759.77 $28,228.65

Maintenance of Existing Services Omaha UZA/IA METRO Sec. 5307 $273.00 $175.00 $704.00 $1,152.00

Capital Expenditures Omaha UZA Revenue Rolling Stock METRO Sec. 5307 $131.75 $0.00 $23.25 $155.00

Support Equipment, Facilities, Planning & Capital Expenditures Omaha UZA/NE Capitalized Operations METRO Sec. 5307 $2,356.65 $0.00 $589.16 $2,945.81

Capital Expenditures Omaha UZA/NE Revenue Rolling Stock METRO Sec. 5339 $796.88 $0.00 $140.63 $937.50

MAPA FY2017-2022 Transportation Improvement Program 5-64 Table 5.4 - Metro Program of Projects Tables (continued)

METRO TRANSPORTATION IMPROVEMENT PROGRAM Calendar Year 2020 Element Federal Project Location Improvement Type Jurisdiction Funding Federal State Local Total Source Maintenance of Existing Services Omaha UZA/NE METRO Sec. 5307 $8,157.59 $2,500.00 $18,381.26 $29,038.85

Maintenance of Existing Services Omaha UZA/IA METRO Sec. 5307 $273.00 $175.00 $704.00 $1,152.00

Support Equipment, Facilities, Planning & Capital Expenditures Omaha UZA/NE Capitalized Operations METRO Sec. 5307 $2,386.14 $0.00 $596.53 $2,982.67

Capital Expenditures Omaha UZA/NE Revenue Rolling Stock METRO Sec. 5339 $830.88 $0.00 $146.63 $977.50

METRO TRANSPORTATION IMPROVEMENT PROGRAM Calendar Year 2021 Element Federal Project Location Improvement Type Jurisdiction Funding Federal State Local Total Source Maintenance of Existing Services Omaha UZA/NE METRO Sec. 5307 $8,201.23 $2,500.00 $19,024.61 $29,725.84

Maintenance of Existing Services Omaha UZA/IA METRO Sec. 5307 $273.00 $175.00 $704.00 $1,152.00

Capital Expenditures Omaha UZA Revenue Rolling Stock METRO Sec. 5307 $131.75 $0.00 $23.25 $155.00

Support Equipment, Facilities, Planning & Capital Expenditures Omaha UZA/NE Capitalized Operations METRO Sec. 5307 $2,456.72 $0.00 $614.18 $3,070.91

Capital Expenditures Omaha UZA/NE Revenue Rolling Stock METRO Sec. 5339 $902.94 $0.00 $159.34 $1,062.29

METRO TRANSPORTATION IMPROVEMENT PROGRAM Calendar Year 2022 Element Federal Project Location Improvement Type Jurisdiction Funding Federal State Local Total Source Maintenance of Existing Services Omaha UZA/NE METRO Sec. 5307 $8,447.07 $0.00 $1,960.47 $10,407.54

Maintenance of Existing Services Omaha UZA/IA METRO Sec. 5307 $273.00 $175.00 $704.00 $1,152.00

Capital Expenditures Omaha UZA Revenue Rolling Stock METRO Sec. 5307 $67.15 $0.00 $11.82 $78.97

Support Equipment, Facilities, Planning & Capital Expenditures Omaha UZA/NE Capitalized Operations METRO Sec. 5307 $2,544.39 $0.00 $636.10 $3,180.49

Capital Expenditures Omaha UZA/NE Revenue Rolling Stock METRO Sec. 5339 $913.75 $0.00 $161.25 $1,075.00

MAPA FY2017-2022 Transportation Improvement Program 5-65

5.2 FY2016 Project Status Update Per FHWA and FTA regulations, MAPA has included a status update on the projects programmed within its current FY2016-2021 Transportation Improvement Program. Information included in this section of the TIP provides a current characterization of the progress made during the current fiscal year for both FHWA- and FTA-funded projects. Table 5.5 below provides a status update for Roadway & Trail projects in the FY2016-2021 Transportation Improvement Program. Table 5.6 (page 5-56) provides status updates for Metro Transit’s FY2015 projects.

Status updates included in this section generally fall into the following categories:

In Progress - Work on currently programmed phase is underway or nearing completion and an obligation of funding is expected within the current year

Delayed – Work on currently programmed phase is underway, but completion of the project phase and obligation of federal funding is not anticipated within the current fiscal year

Other Status Notes – Other project status details including programming changes, the removal of projects from FY2015 TIP, or the decision to fund a project locally

Table 5.5 – Status of FY2016 Federal-Aid Roadway & Trail Projects

Total FY2016 Lead FY2016 Funding TIP ID Project Name Funding Funding Status Agency Phase Program ($1,000s) ($1,000s) 36th Street Phase N-370 - PE-NEPA- STBG- Delayed to 2015-048 $129 $103 Sheridan FD MAPA FY17 STBG- Delayed to $312.5 ROW $250 MAPA FY17 Bellevue PE-NEPA- STBG- Delayed to 2015-050 36th Street Phase II $393.7 $314.96 FD MAPA FY17 STBG- Delayed to $562.43 ROW $449.94 MAPA FY17 STBG- Delayed to 2015-046 156th Street $128.75 ROW $103 MAPA FY17 Bennington PE-NEPA- STBG- $172.53 $138.02 Complete FD MAPA UTIL-CON- TAP- 2015-014 Iowa Riverfront Trail III $286.25 $229 In Progress CE MAPA PE-NEPA- Broken Into 2015-045 East Beltway Segments A-D $948 DPS $758 FD Phases 9th and 10th Street Bridge UTIL-CON- STBG- 2015-072 $2,814.2 $2,000 Complete Council Replacement CE State Bluffs UTIL-CON- STBG- 2015-075 Interstate Utility Relocation $445 $356 In Progress CE MAPA Kanesville Blvd Adaptive UTIL-CON- 2015-077 $486 CMAQ $388.2 In Progress Traffic Signal Control CE East Broadway Realignment UTIL-CON- 2015-078 $593.5 CMAQ $474.8 In Progress at Kanesville Blvd CE

MAPA FY2017-2022 Transportation Improvement Program 5-67

Table 5.5 – Status of FY2016 Federal-Aid Roadway & Trail Projects (Continued)

Total FY2016 FY2016 Funding Lead Agency TIP ID Project Name Funding Funding Status Phase Program ($1,000s) ($1,000s) North 16th Street Delayed to 2016-034 $5,625 UTIL-CON-CE STBG-MAPA $4,500 Reconstruction FY17 Council Bluffs Eastern Hills Drive - 2016-069 $840 ROW DPS $672 In Progress Segment C 2015-039 180th Street (Phase 1) $455 PE-NEPA-FD STBG-MAPA $364 Complete Douglas Delayed to

$1,711.25 ROW STBG-MAPA $1,369 FY17 Iowa DOT 2015-056 I-80 $145,590 UTIL-CON-CE NHPP $131,031 Let 2015-079 US 275 Bridge Over $23 UTIL-CON-CE $23 State-Iowa Let Missouri River 2015-081 I-680 Bridge Over Missouri $7 UTIL-CON-CE State-Iowa $7 Let River - Westbound 2015-082 I-680 Bridge Over Missouri $7 UTIL-CON-CE State-Iowa $7 Let River - Eastbound 2015-085 I-80 Missouri River to Cass $300 UTIL-CON-CE State-Iowa $300 Let

County 2016-039 I-80 Missouri River Bridge - $12 UTIL-CON-CE State-Iowa $12 Let

Eastbound 2016-040 I-80 Missouri River Bridge - $12 UTIL-CON-CE State-Iowa $12 Let

Westbound 2016-041 I-29: Mills County to Iowa $250 UTIL-CON-CE State-Iowa $250 Let

92 2016-043 I-480: Missouri River to I- $100 UTIL-CON-CE State-Iowa $100 Let

29 2016-044 I-480 Missouri River Bridge $8 UTIL-CON-CE State-Iowa $8 Let Heartland B-Cycle General Delayed to 2016-038 $1162.91 CMAQ $930.327 Expansion Planning FY17 Metro Travel General MAPA 2016-050 $1,600 STBG-MAPA $1,280 In Progress Improvement Study Planning MAPA Ozone Awareness General 2016-064 $348.5 CMAQ $278.8 In Progress Campaign Planning 2015-005 I-680/US-6 Interchange $712 UTIL-CON-CE NHPP $641 In Progress DMS 2015-006 N-370: US-75 West, $5,474 UTIL-CON-CE NHPP $4,270 Complete Bellevue 2015-037 Ralston Viaduct $5,174 UTIL-CON-CE NHPP $4,139 In Progress NDOR 2016-001 I-480: Bancroft - Dewey $1,665 UTIL-CON-CE NHPP $1,498 In Progress 2016-014 District 2 CCTV Cameras $131 UTIL-CON-CE NHPP $105 Delayed to FY17 2016-066 Nebraska Statewide Van $48 UTIL-CON-CE CMAQ $48 In Progress Pool $60 UTIL-CON-CE FTA 5311 $48 In Progress Omaha 2015-001 North Downtown 90 PE-NEPA-FD TAP-MAPA 78 Riverfront Pedestrian Complete Bridge

MAPA FY2017-2022 Transportation Improvement Program 5-68

Table 5.5 – Status of FY2016 Federal-Aid Roadway & Trail Projects (Continued)

Total FY2015 FY2016 Funding Lead Agency TIP ID Project Name Funding Funding Status Phase Program ($1,000s) ($1,000s) 2015-013 Omaha Signal Infrastructure 3387.5 UTIL-CON- STBG- 2710 Delayed to - Phase A CE MAPA FY17 2015-016 Omaha ATMS Central $1,250 UTIL-CON- STBG- $1,000 Complete System Software CE MAPA 2015-017 Omaha Signal Network - $1,000 PE-NEPA- STBG- $800 In Progress System Management FD MAPA 2015-019 2014 Omaha Resurfacing $735 AC Local $0 In Progress Package Conversion 2015-040 156th Street Phase Two $643.75 ROW STBG- $515 In Progress MAPA 2015-044 Q Street Bridge $158.75 ROW STBG- $127 In Progress MAPA 2015-047 Riverfront Trail - Phase 4 $1,523 UTIL-CON- DPS $694.73 In Progress CE 2015-051 108th Street $75 PE-NEPA- STBG- $60 In Progress FD MAPA $361.25 UTIL-CON- STBG- $289 Delayed to CE MAPA FY17 PE-NEPA- STBG- Delayed to 2015-052 168th Street $265 $212 FD MAPA FY17 STBG- Delayed to $423.75 ROW $339 MAPA FY17 Omaha STBG- 2015-053 114th Street $480 ROW $384 Complete MAPA PE-NEPA- STBG- Delayed to 2015-054 168th Street $265 $212 FD MAPA FY17 STBG- Delayed to $351.25 ROW $281 MAPA FY17 STBG- Delayed to 2015-055 120th Street $500 ROW $400 MAPA FY17 UTIL-CON- STBG- Delayed to $500 $400 CE MAPA FY17 PE-NEPA- STBG- Delayed to $541.25 $433 FD MAPA FY17 OPS McMillan Middle UTIL-CON- 2015-063 $175 SRTS $140 In Progress School SRTS Project CE Westbrook Safe Routes To UTIL-CON- 2015-064 $316.25 SRTS $253 In Progress School CE PE-NEPA- 2015-065 24th Street Road Diet $331.01 HSIP $297.91 In Progress FD 132nd at West Center Road Delayed to 2015-132 $223 ROW HSIP $200 Safety Project FY18 Omaha Resurfacing UTIL-CON- 2016-045 $3,000 Omaha $0 In Progress Program CE (AC)

MAPA FY2017-2022 Transportation Improvement Program 5-69

Table 5.5 – Status of FY2016 Federal-Aid Roadway & Trail Projects (Continued)

Total FY2015 FY2016 Funding Lead Agency TIP ID Project Name Funding Funding Status Phase Program ($1,000s) ($1,000s) Omaha 132nd Street Adaptive UTIL-CON- Delayed to 2016-046 $857.74 HSIP $771.97 Traffic Signal Control CE FY18 Dodge Street Adaptive UTIL-CON- Delayed to 2016-047 $1,380 HSIP $1237.41 Traffic Signal Control CE FY18 144th Street Adaptive UTIL-CON- Delayed to 2016-048 $1122.31 HSIP $1,010.08 Traffic Signal Control CE FY18 UTIL-CON- 2016-049 Sign Management Inventory $333 HSIP $300 Complete CE Omaha Signal Infrastructure UTIL-CON- STBG- 2016-051 $465 $372 In Progress - Phase 0 CE MAPA PE-NEPA- 2016-063 84th Street ASCT $10 HSIP $9 In Progress FD Omaha Sign Management UTIL-CON- 2016-065 $333.33 HSIP 300 In Progress Inventory CE 2016-068 72nd & Maple Intersection $249.048 PE-NEPA- HSIP 224.143 In Progress Improvement FD 2016-070 30th Street Road Diet $266.39 PE-NEPA- HSIP 211.617 In Progress FD Papillion 2016-067 N-370 & 96th Street 32.8 PE-NEPA- HSIP 29.52 Delayed to Intersection Project FD FY18 PMRNRD 2015-041 Western Douglas County 2224.91 UTIL-CON- DPU $1,779.93 Delayed to Trail Phase 2 CE FY17 2015-042 Western Douglas County 3224.65 UTIL-CON- DPU $2,579.72 Delayed to Trail Phase 1 CE FY17 Sarpy 2015-058 132nd and Giles $100 ROW STBG- $80 In Progress MAPA $2,885 UTIL-CON- STBG- $2,308 Delayed to CE MAPA FY17 Valley 2015-138 Valley D.C. Safe Routes to 56.25 ROW SRTS 45 In Progress School

Table 5.6 Status of FY2016 Metro Transit Projects Federal Federal Project Location Project Type Status Program ($1,000s) Maintenance of Omaha Sec. 5307 $5,219.20 In Progress Existing Services UZA/NE Maintenance of Omaha Sec. 5307 $273.00 In Progress Existing Services UZA/IA Capital Omaha UZA Revenue Rolling Stock Sec. 5307 $468.50 Complete Expenditures Support Equipment/Facilities, Capital Omaha Planning, Capitalized Sec. 5307 $2,234,23 In Progress Expenditures UZA/NE Operations Capital Omaha Revenue Rolling Stock Sec. 5339 $903.87 In Progress Expenditures UZA/NE

MAPA FY2017-2022 Transportation Improvement Program 5-70

Table 5.7 Status of FY2016 5310 Transit Projects Federal FY2015 Funding Lead Agency Project Status Program ($1,000s) Friendship Program Demand Response Vehicles 5310 $46.640 In Progress Crossroads of Demand Response Vehicles 5310 $31.376 In Progress Western Iowa Sarpy County, NE Capitalized Cost of Contracting 5310 $96.000 In Progress

Metro Demand Response Vehicles 5310 $118.450 In Progress

City of Council Bluffs Operations 5310 $75.190 In Progress

Metro Operations 5310 $75.000 In Progress

MAPA FY2017-2022 Transportation Improvement Program 5-71

Public Involvement 6.1 Public Participation Methodology The FY2017–2022 Transportation Improvement Program (TIP) was developed through collaboration between MAPA transportation staff, Metro Transit staff, City/County government, NDOR and Iowa DOT, and members of various committees and subcommittees including the Transportation Technical Advisory Committee (TTAC), the Project Selection Subcommittee (ProSeCom), Transportation Alternatives Program Committee (TAP-C), and the Coordinated Transit Committee (CTC). Furthermore, Resource Agencies/Interested Parties and the MAPA Board of Directors were consulted in plan development.

As shown in Figure 6.1, the draft project list was released for public review and comment for 30 days on. Announcements of the availability for comment of the draft TIP were made through the MAPA website (www.mapacog.org), Facebook, Twitter, a paid public notice, a press release, the MAPA’s What’s Happening newsletter and several email lists targeting groups that have previously expressed interest or serve historically disadvantaged populations. Staff also gave presentations to stakeholder boards including the CAC and CTC. MAPA also sent memos and flyers to area libraries and local jurisdictions discussing the availability of the draft plan for public comment and posted the plan in the lobby of the shared MAPA and Metro building on MAPA’s bulletin board,

Following the Board approval of the final draft plan on, the last round of outreach took place. Comments were accepted on the final draft plan until. Announcements of the availability of the final draft TIP were made through all of the same means as the preliminary draft. However, Paper copies of the final draft plan were distributed to libraries and flyers were sent to local jurisdictions. Once the plan was approved and certified by NDOR and Iowa DOT, the final TIP document was distributed to the libraries.

Figure 6.1 – Participation Methodology

TTAC Recommends to Project Selection Release Draft Project Draft Project List the Board the Draft TIP Meetings List for Public Development to go to Public Comment (2/10/15) Comment

Draft TIP Released for Final Draft with Public Final Draft with Public Public Comment Comments Presented Comments Presented Stakeholder Meeting Process to Board to TTAC (30 Days)

Final Draft Released to TTAC Reccomendation NDOR and Iowa DOT Public for Comment for Approval of Final Board Approval of TIP Approval of Final TIP Process TIP

MAPA FY2017-2022 Transportation Improvement Program 6-1

Documentation for the outreach activities discussed above is displayed on the following pages. A listing of the information are shown below:

 Selection Meeting  Exhibit 1 – Screenshot of the MAPA Website for the TIP Selection Meetings (subcommittee) on February 5.

 Draft Project List  Exhibit 2 – Screenshots of the MAPA Facebook, Twitter, and website from the draft project list announcement  Exhibit 3 – Press release for the draft project list announcement

 Draft Public Comment Period  Exhibit 4 – Screenshots of the MAPA Facebook, Twitter, and website  Exhibit 5 – Public notice and press release for the preliminary draft TIP 30 day public comment period  Exhibit 6 – Copy of the Title VI population/Public Participation List targeted outreach email o Distribution list for this email  Exhibit 7 – Copy of the March/April 2014 What’s Happening newsletter  Exhibit 8 – Copy of the memo and flyer sent to local libraries/local governments regarding the availability of the preliminary draft TIP for public comment o Distribution list for these letters

 Final Approved TIP  Exhibit 9 – Copy of the memo sent to the local libraries and local governments asking for the approved document to be displayed.  Exhibits 10 and 10a – Copy of the public comments received  Exhibit 11and 11a – MAPA’s response to the comment

MAPA FY2017-2022 Transportation Improvement Program 6-2

Selection Meetings Announcement MAPA held project selection meetings with each of the three project selection subcommittees. Notices of these meetings were posted on MAPA’s online calendar for 30 days prior to the meetings (Exhibit 1).

Exhibit 1 – Meeting Notices

Draft Project List Announcement The project list was released on March 31, 2016. This was posted on the MAPA website, the MAPA Facebook, and the MAPA Twitter (Exhibit 2). These notices remained on the various media sites through the end of the draft TIP development in June

Exhibit 2 – Project List Release

MAPA FY2017-2022 Transportation Improvement Program 6-3

MAPA FY2017-2022 Transportation Improvement Program 6-4

The draft project list press release was distributed to local media on April 1st (Exhibit 3).

Exhibit 3 – Project List Press Release

MAPA FY2017-2022 Transportation Improvement Program 6-5

30 day Draft TIP Public Comment Period The 30 day Draft TIP public comment period was advertised on the MAPA website, Facebook, and Twitter beginning on May 26th, 2016(Exhibit 4). These advertisements were on the various sites until the 30 day period ended on June 23rd, 2016.

Exhibit 4 – Public Comment Advertisement

MAPA FY2017-2022 Transportation Improvement Program 6-6

A press release regarding the availability of the preliminary draft for public comment was released to the media on May 26th, 2016. Furthermore, a paid public notice was published in The Daily Record. These are shown in Exhibit 5.

Exhibit 5 – TIP Draft Public Comment

MAPA FY2017-2022 Transportation Improvement Program 6-7

On May 27th, 2016, MAPA emailed the Title VI and Public Participation List, libraries, and resource agencies regarding the availability for public comment on the preliminary draft TIP (Exhibit 6). The Title VI and Public Participation contact lists are listed below in Exhibits 6.2 and 6.3.

Exhibit 6 – Outreach lists

MAPA FY2017-2022 Transportation Improvement Program 6-8

Exhibit 6.2 - Title VI Outreach List

Title VI Outreach List 100 Black Men of Omaha Native Omahans Club American Legion of South Omaha Nebraska Hispanic Chamber of Commerce Assembly of God South Side Ollie Webb Inc. Bellevue Chamber Omaha Area Health Education Center Building Bright Futures Omaha Chamber of Commerce Calvary Christian Church Omaha Community Foundation Church of Christ - Council Bluffs Omaha Economic Development Corporation Church of the Nazarene Omaha Empowerment Network Council Bluffs Chamber of Commerce Omaha Together One Community Developmental Services of Iowa Open Door Mission Downtown Improvement District Paralyzed Veterans of America - Great Plains Dundee Presbyterian Church - Omaha Pilgrim Baptist Church - Omaha Family Housing Authority Ponca Tribe of Nebraska First Assembly of God Presbyterian Church of the Master Florence Christian Church South Omaha Business Association Goodwill Omaha St. Andrews Episcopal Church Heartland Family Service St. Bernards Church Iowa West Foundation St. Joan of Arc Church Justice for Our Neighbors St. Matthew Lutheran Church Keep Omaha Beautiful TRI United Methodist Church Midlands Bible Baptist Church United Way of the Midlands Midlands Latino Community Development Corporation Urban League of Nebraska Miracle Hills Community Baptist VODEC Omaha Mount View Boys & Girls Club YMCA

MAPA FY2017-2022 Transportation Improvement Program 6-9

Exhibit 6.3 - Public Participation Outreach List

Public Participation Outreach List Southern Sudanese Community Assn Urban League of Nebraska Bellevue Human Services Department Nebraska Statewide Independent Living Council Heartland Family Service United Way Greater Omaha Workforce Development City of La Vista Douglas County Housing Authority Greater Omaha Chamber of Commerce Sudanese National Community of Nebraska Jewish Family Services Salvation Army Skyline Retirement Center Iowa Department of Transportation Christ Child North Center Metro Transit Open Door Mission Siena Francis House VODEC Easter Seals Latino Center of the Midlands City of Papillion Omaha Housing Authority Nebraska Workforce Development McCauley Bergen Center NOVA Omaha Public Schools League of Human Dignity Happy Cab Quality Living Immanuel Courtyard Lutheran Family Services of Nebraska Iowa West Foundation City of Omaha Mayor’s Office & Planning Department Nebraska Aids Project Black Hills Workshop New Cassel Paralyzed Veterans of America Ollie Webb, Inc. Ponca Tribe of Nebraska Omaha Opportunities Industrialization Center Mayor’s Commission for Citizens with Disabilities Rose Blumkin Jewish Home Council Bluffs Chamber of Commerce Madonna School Vocational Rehabilitation Southwest Iowa Transit

MAPA FY2017-2022 Transportation Improvement Program 6-10

Exhibit 8.4 – Library and Clerk Contact Lists

City and County Clerks Mailing List Jurisdiction Street Address City

Omaha City 1819 Farnam Street Omaha

Douglas County 1819 Farnam Street, Room H08 Omaha Ralston 5500 S. 77th St. Ralston Valley 203 N. Spruce St. Valley Bennington PO Box 221 Bennington

Council Bluffs 209 Pearl St., Suite 102 Council Bluffs

Crescent 102 W. Florence St. PO Box 16 Crescent Pottawattamie County 227 S. 6th St. Council Bluffs La Vista 8116 Park View Blvd. La Vista Papillion 122 East Third St. Papillion

Bellevue 210 W. Mission Ave. Bellevue Gretna 204 N. McKenna Ave. Gretna Springfield 170 N. 3rd St., PO Box 189 Springfield Sarpy County 1210 Golden Gate Dr. #1250 Papillion Local Libraries Mailing List Jurisdiction Branch Address City

W. Dale Clark Library 215 S 15th St Omaha Milton R. Abrahams Branch 5111 N 90th Street Omaha Benson Branch 6015 Binney Street Omaha Bess Johnson Elkhorn Branch 2100 Reading Plz. Elkhorn

Florence Branch 2920 Bondesson St Omaha

City of Omaha Millard Branch 13214 Westwood Ln, Omaha Saddlebrook Branch 14850 Laurel Ave Omaha South Omaha Library 2808 Q St Omaha W. Clarke Swanson Branch 9101 W Dodge Rd Omaha

Charles B. Washington Branch 2868 Ames Ave Omaha Willa Cather Branch 1905 S 44th Street Omaha LaVista La Vista Public Library 9110 Giles Road LaVista Papillion Sump Memorial Library 222 North Jefferson St. Papillion

Bellevue Bellevue Public Library 1003 Lincoln Road Bellevue

Council Bluffs Council Bluffs Public Library 400 Willow Ave Council Bluffs Bennington Bennington Public Library PO Box 32 Bennington Gretna Gretna Public Library (Main) 736 South St Gretna Springfield Springfield Memorial Library PO Box 40 Springfield

Waterloo Agnes Robinson Waterloo Public Library 23704 Cedar Drive Waterloo

Valley Valley Public Library 210 Locust Street Valley Ralston Baright Public Library 5555 South 77th Street Ralston

MAPA FY2017-2022 Transportation Improvement Program 6-11

The MAPA March/April 2016 edition of the What’s Happening newsletter included an article regarding the draft projects selected for inclusion in the TIP and the preliminary draft TIP comment period. The TIP articles from the newsletter are displayed in Exhibit 7.

Exhibit 7 – TIP Newsletter Article

MAPA FY2017-2022 Transportation Improvement Program 6-12

Final Approved TIP After the final TIP was approved by the MAPA Board of Directors, NDOR, and Iowa DOT, MAPA mailed memo and a hard copy of the final approved TIP to the local libraries and jurisdictions (Exhibit 9). (The local library and local jurisdiction contact lists are listed previously in Exhibit 8.)

Exhibit 9 – Memo of Distribution

6.2 Public Comment MAPA has received no public comments on the FY2017-2022 TIP.

MAPA FY2017-2022 Transportation Improvement Program 6-13

6.3 Project Selection Approval The Project Selection Subcommittee (ProSeCom), Transportation Alternatives Program Committee (TAP-C), and the Coordinated Transit Committee (CTC) all evaluate projects for their respective funding streams. Project selection meeting minutes for each of the committees can be found in the following sections. 6.3.1 Project Selection Subcommittee (ProSeCom) No STP call for project was completed due to the funding already programed in previous years. 6.3.2 Transportation Alternatives Program Committee (TAP-C) The Transportation Alternatives Program Committee met on February 10th and selected TAP projects. 6.3.2 Coordinated Transit Committee (CTC) The Coordinated Transit Committee (CTC) met to select 5310 projects on February 5th. There was an appeals meeting held on March 2nd. The Iowa Department of Transportation requires two sets of meeting minutes; therefore, two are located below in Appendices A and B.

The Transportation Technical Advisory Committee (TTAC), of which TAP-C and the CTC are subcommittees, made the official approval decision of all project selection (TAP and 5310) at the March 25, 2016 TTAC meeting. These minutes are located in Appendix C.

MAPA FY2017-2022 Transportation Improvement Program 6-14

Appendices Appendix A - CTC Project Selection Meeting Minutes

Date: Wednesday, March 2, 2016 10:30 a.m. Location: MAPA Offices, Omaha, NE – Downstairs Training Room In Attendance:

Voting Members: Chair: Lisa Picker, Heartland Family Services Vice Chair: Ann Grober, City of Council Bluffs Ann Marie Kudlacz, SSCA Dan Freshman, City of Ralston Darlene McMartin, Pott County VA Erin Porterfield, HWS Fred Conley, Papio-Missour River NRD Karen Jackson, City of Bellevue Kelly Shaden, Metro Lillian Rush, Friendship Program, Inc. Lois Jordan, Florence Home Lori Hansen, City of Papillion Mark Lander, SWITA Mark Peterson, ENCAP Randy Stonys, ENHSA Rich Surber, Lutheran Family Services Vicki Quaites-Ferris, Empowerment Network

Non-Voting: Cindy Petrich, New Cassel Clint Sargent, Crossroads of Western Iowa Jill Dewey, Region V Services Rachelle Tucker, Omaha Housing Authority Scot Adams, Notre Dame Housing Stephanie Little, Crossroads of Western Iowa Tabitha Kube, Omaha Housing Authority Wendy Sliva, Region V Services

MAPA Staff Court Barber Megan Walker Michael Felschow

For CTC Approval

1. Introductions and Roll Call

Ms. Lisa Picker called the meeting to order at 9:30 a.m. She welcomed the committee and introductions were made. Ms. Picker explained that the appeals process would include a roll call vote and stated who the voting members are.

2. Voting on Funding Allocation

Ms. Walker reviewed what was voted on at the previous meeting. The CTC voted to go with proportional distribution against staff recommendation of one vehicle un-proportional distribution. This resulted in a number of agencies receiving less than a portion of a vehicle and many contacted MAPA with their concerns about this. As a result of the concern, this is being brought to the committee again for a re-vote.

Discussion Items

3. Appeals Process

Mr. Rich Surber, City of La Vista, explained why he felt the committee should re-vote. Ms. Ann Marie Kudlacz commented that with the option that the committee selected, some agencies received less funding and to be able to get a vehicle they would have to come up with additional funding in addition to the match which can be very difficult. The question was asked at how the original vote resulted in some agencies getting less than what they needed for a vehicle. The committee voted on the option to distribute funds based on rankings and in some cases this left less funding for other agencies. Mr. Michael Felschow explained how that decision affected the funding allocation for the agencies. Mr. Felschow also explained that the 80/20 was not a federal requirement. MAPA staff further explained how the un-proportional distribution would allocate funding to the agencies. The staff decided that in future meetings votes will be taken as a roll call vote to ensure that each voting member understands what they are voting for and this process will allow questions and discussion. Mr. Court Barber reviewed with the committee how the funding allocation would be affected (increases and decreases in funding) for each agency if the committee chooses un-proportional distribution [please see attached Item A for details].

After discussion, it was clarified to the committee that if they would like to keep the original vote of proportional distribution, signal by a vote of Aye or put it to a re-vote, signal by a vote of Nay.

MOTION by Ann Grober, SECOND by Ann Marie Kudlacz to keep the original vote of the committee on funding allocation as proportional distribution.

YAYS: McCurdy, McMartin, Jackson, Jordan, Quaites-Ferris NAYS: Freshman, Grober, Hansen, Kudlacz, Picker, Shadden, Stonys, Surber ABSTAIN: Conley, Peterson, Porterfield, Rush MOTION FAILED.

Ms. Megan Walker explained that with a vote of 5 Yays and 8 Nays that the committee has chosen to reject the original decision of proportional funding.

MOTION by Rich Surber, SECOND by Ann Grober to accept the staff recommendation of un-proportional funding.

Chairman Picker asked if there were any questions or discussion. Mr. Mark Peterson stated that the committee would like to know more about the scope of the projects. Chairman Picker stated that the committee did vote on and approve the scoring rubric and agreed as a committee that MAPA would be allowed to score and rank the projects. The question was brought up on whether or not this vote could be tabled. It was discussed on whether or not the committee should table the conversation or the vote. Mr. Surber stated that he would like to proceed and vote on the motion. Chairman Picker proceeded with the roll call vote.

YAYS: Conley, Freshman, Grober, Hansen, Jackson, Jordan, Kudlacz, McMartin, Peterson, Picker, Shadden, Stonys, Surber NAYS: Lander, Quaites-Ferris ABSTAIN: Porterfield, Rush MOTION PASSED.

Ms. Ann Grober, requested that the committee revisit the scoring rubric for the next year.

MOTION by Ann Grober, SECOND by Vicki Quaites-Ferris to revisit the scoring rubric in a separate committee meeting in September.

Mr. Rich Surber asked about the points distribution on the scoring rubric. Chairman Picker stated that the committee would not be creating a new rubric, only reviewing the current rubric and how points are assessed. Chairman Picker also reminded the committee that Ms. Walker stated that in 2023 that MAPA will only have access to one year of funding to distribute to the agencies. Mr. Fred Conley commented that the meeting will only be to review the rubric and that this does not mean there will be changes to it.

YAYS: Conley, Freshman, Grober, Hansen, Jackson, Jordan, Lander, McMartin, Peterson, Picker, Porterfield, Shadden, Stonys, Surber, Quaites-Ferris NAYS: Kudlacz ABSTAIN: Rush MOTION PASSED.

4. Next Meeting Chairman Picker stated that the next meeting will be held on Wednesday, March 16, 2016 at 10:30 a.m. in the MAPA Training Room.

5. Adjourn

Ms. Picker adjourned the meeting at 11:00 a.m. Coordinated Transit Committee Minutes Appendix B - CTC Regular Meeting Minutes

Date: Wednesday, September 16, 2015, 10:30 a.m.

Location: MAPA Offices, Omaha, NE – Downstairs Training Room

In Attendance: Chair: Lisa Picker, Heartland Family Service Mary Angus, Mayor's Commission on Citizens with Vice-Chair: Ann Grober, City of Council Bluffs Disabilities Ann Marie Kudlacz, Southern Sudan Community Randy Stoneys, Eastern Nebraska Human Service Association Agency Clint Sargent, Crossroads of Western Iowa Rich Surber, Lutheran Family Services Dan Freshman, City of Ralston Shauna Dahlgren, VNA/ESN Darlene McMartin, Pottawattamie County VA McNally, Sheltering Tree, Inc. Daurine Petersen, SWITA Stephanie Little, Crossroads of Western Iowa David Jameson, Metro Transit Traci Shobe, Omaha Public Schools Erin Porterfield, Heartland Workforce Solutions Vicki Quaites-Ferris, Empowerment Network Fred Conley, Papio Missouri River NRD

Karen Jackson, City of Bellevue MAPA Staff Kelly Shadden, Metro Transit Ashley Myers Lee Myers, AARP Megan Walker Lois Jordan, Florence Home Michael Felschow Mark Bulger, Omaha Association the Blind Mark Lander, SWITA

1. Introductions Ms. Lisa Picker called the meeting to order at 10:35 a.m. She welcomed the committee and introductions were made.

2. Approval of Minutes Ms. Picker introduced the August 19, 2015 minutes and asked if there were any changes or additions.

Mr. Mark Lander MOTIONED to approve the August 19, 2015 minutes. Ms. Erin Porterfield SECONDED. Motion passed.

3. Agency Spotlight Presentation by Heartland Workforce Solutions. Ms. Erin Porterfield provided an overview of HWS “American Job Centers” and how they assist the community. Heartland Workforce Solutions is a small non-profit and a quasi-governmental agency. HWS currently serves Douglas, Sarpy, and Washington Counties and will be adding three more counties in July (Dodge, Saunders, and Cass Counties). Heartland Workforce Solutions is a collective impact agency that works to coordinate goals and strategies with other agencies. The agency serves 18,000 people a month and approximately 120 per day.

4. 5310 Project Selection Committee

9/16/15 4

Ms. Ashley Myers presented an update on the 5310 project selection. There will be another call for projects for 5310 funding. Ashley reviewed the timeline for the 5310 project selection and the rubric for the two grant types and applications: Traditional - Capital Only Applications and Other/New Freedom Applications. This year, rather than having two applications, there will only be one application and using the scoring rubric, MAPA staff will use the correct rubric to score the project. The point categories did not change, only a few of the points were reduced to equal 100 points. After discussing the points, the committee proposed a change to the Ridership criteria for both applications, increasing the “Increased 4.99%” score to 5 points rather than 3.

Ms. Mary Angus MOTIONED to approve the MAPA staff proposed changes and the Ridership critera on both applications. Mr. Mark Lander SECONDED. Motion passed.

Ms. Myers said the final application, rubrics, and policy guide will be brought before the CTC at the October meeting.

5. 5310 Vehicle Update Ms. Ashley Myers presented an update on the 5310 program. FTA has recommended that MAPA not buy vehicles, instead NDOR and IDOT will purchase vehicles. MAPA will continue to receive applications and the CTC will select the projects. MAPA will then forward the money and projects to NDOR and IDOT who will purchase the vehicles. A meeting will be held to explain the process to those who received vehicle funds. The operations grants will still be handled through MAPA.

6. Informal Coordination Due to lack of time, the committee did not have time to complete the informal coordination activity.

7. Results of the Call Center Research Study Due to lack of time, MAPA staff will provide an update on the Call Center Research Study results at the October meeting.

8. Additional Business Next month’s agency spotlight will be Heartland Family Service and Goodwill.

9. Next Meeting The next CTC meeting is scheduled for Wednesday, October 21 at 10:30 a.m.

10. Adjourn Ms. Picker adjourned the meeting at 11:30 a.m.

9/16/15 2

Appendix C - TTAC Meeting Minutes OMAHA-COUNCIL BLUFFS METROPOLITAN AREA PLANNING AGENCY Transportation Technical Advisory Committee Minutes of March 25, 2016 Meeting

The Transportation Technical Advisory Committee met on Friday, March 25, 2016, at Metro, 2222 Cuming Street, Omaha, Nebraska. Mr. Denny Wilson opened the meeting at 10:00 a.m.

VOTING MEMBERS

Denny Wilson Sarpy County Public Works Dan Kutilek Douglas County Engineers Office Jeff Roberts City of Bellevue Public Works Greg Reeder City of Council Bluffs Public Works Kris Faris City of Gretna Public Works Joe Soucie City of La Vista Public Works Bob Stubbe City of Omaha Public Works Murthy Koti City of Omaha Public Works Todd Pfitzer City of Omaha Public Works Derek Miller City of Omaha Planning Department Marty Leming City of Papillion Public Works Mark Stursma City of Papillion Planning Department Dan Freshman City of Ralston Public Works Bruce Fountain Sarpy County Planning Department Scott Suhr Iowa Department of Transportation Maurice Hinchey Nebraska Department of Roads – District 2 Brad Zumwalt Nebraska Department of Roads – Lincoln Eric Williams Papio-Missouri River NRD Curt Simon Metro Transit

NON-VOTING MEMBERS

Greg Youell Metropolitan Area Planning Agency John Kottmann City of La Vista Public Works Bryan Guy City of Omaha Public Works Stephen Osberg City of Omaha Planning Department Justin Luther (via speakerphone) FHWA – Nebraska Division Jeff Soula Nebraska Department of Roads – Lincoln Bill Herr Sarpy County Public Works

GUESTS

Lee Myers AARP Jim Kollbaum AECOM Jason Carbee HDR, Inc. Nick Weander Olsson Associates Ernest Wesolowski Citizen

STAFF

Michael Felschow Metropolitan Area Planning Agency Court Barber Metropolitan Area Planning Agency Mike Helgerson Metropolitan Area Planning Agency

MAPA FY2017-2022 Transportation Improvement Program C-1

Megan Walker Metropolitan Area Planning Agency

A. Approval of Minutes

Motion #1: Approval of the minutes of the February 19, 2016 Transportation Technical Advisory Committee Meeting.

Motion by: Greg Reeder Second by: Marty Leming Motion Carried

B. FY 2016 – 2019 Transportation Improvement Program (TIP) Amendments

Mr. Helgerson presented Amendment 9 of the TIP. Projects included in this amendment are:

Nebraska Statewide Van Pool NDOR N-370 and 96th Street Intersection Papillion 72nd & Maple Street Intersection Omaha Bus Rapid Transit Metro Transit 9th & 10th Streets Bridge Council Bluffs East Beltway Segments A-D Council Bluffs 30th Street Road Diet Omaha 24th Street Road Diet Omaha

Motion #2: Seeking approval of the MAPA Board of Directors at their March 31, 2016 meeting of FY 2016 – 2019 Transportation Improvement Program Amendment 9.

Motion by: Marty Leming Second by: Dan Kutilek Motion Carried

C. FY 2017 – 2020 Transportation Improvement Program (TIP) Draft Project List

Mr. Helgerson and Ms. Walker presented to the Committee the Draft Project List for the FY 2017 – 2020 TIP. From the ProSeCom and TAP Committees, the following projects are the outcome of the call for projects with their selections/rankings.

Nebraska General Roadway STP Project Rankings Rank 180th Street Phase II 1 36th Street Phase II 2 66th and Giles 3

Nebraska Systems Management STP Project Rankings Rank

Omaha Signal Network Implementation 1 TAP Project Rankings Rank West Papio Trail – Millard Connection 1 Council Bluffs City/County Connector Trail 2 Traditional 5310 Funding Projects Rank Bryant Resource Center 1 Housing Authority of the City of Omaha 2

MAPA FY2017-2022 Transportation Improvement Program C-2

Crossroads of Western Iowa 3 Florence Home for the Aged 4 City of Papillion 5 City of Bellevue 6 Heartland Family Service 7 Region 5 Services 8 SWITA 9 Notre Dame Housing 10 City of La Vista 11 New Cassel Retirement Center 12 City of Council Bluffs 13 Other/New Freedom 5310 Funding Projects Rank Bryant Resource Center 1 Florence Home for the Aged 2 Heartland Family Service 3 New Cassel Retirement Center 4 Black Hills Works 5 City of Council Bluffs 6

Mr. Helgerson said included in the Committee’s packets are the state projects that were submitted from NDOR as part of the development of the FY 2017 TIP.

Motion #3: Seeking approval of the MAPA Board of Directors at their March 31, 2016 meeting of the FY 2017 – 2020 Transportation Improvement Program Draft Project List.

Motion by: Todd Pfitzer Second by: Curt Simon Motion Carried

D. Funding Obligation and Project Status

Mr. Felschow said obligations have not changed significantly from the previous month. Nebraska’s STP balance is $12.5 million and TAP is $800,000. Iowa’s Highway Program balance is at $7.26 million and its Enhancement Program balance is $566,000 with Obligation at the same balances. The Fiscal Constraint numbers have only slightly changed since last month. Mr. Felschow asked the Nebraska jurisdictions take a look at their individual projects on the MAPA Regional STP Funding chart and to please let the MAPA staff know if a project will be delayed until the next year. Mr. Felschow said on the TAP projects, Metro’s BRT funds are being transferred over to FTA and should be complete by the end of April.

MAPA FY2017-2022 Transportation Improvement Program C-3

E. 2050 Long-Range Transportation Plan (LRTP) / Vision Plan

Ms. Walker said the public meetings for the 2050 LRTP / Vision Plan are nearly complete with 390 responses received through the meetings and surveys. She moved the Committee into a Goal Setting exercise and instructed them to rank the goals from 1 to 6.

Results from the TTAC exercise placed

MAPA FY2017-2022 Transportation Improvement Program C-4

#1 (highest ranking) at “Preserve existing infrastructure…” #2 (tie) “Improve safety across all modes of transportation…” and “Maximize the mobility and accessibility…” #4 “Keep all costs reasonable and sustainable…” #5 “Improve the ease of access to employment centers…” #6 “Improve the mobility and transportation access…”

Next the Committee was asked to rank the Strategies and again they were instructed to rank them from 1 to 6.

Results from the Strategy exercise placed “Traffic demand management…” at the highest ranking.

F. Transportation Activities

Mr. Barber gave the CMAQ grant update. He said they’re receiving letters of support and working with NDOR on grant submission for electric vehicles. With ozone, they’ve begun marketing strategies for 2017 and are working on obtaining the last on the required local match. In discussions with OPPD, it was reported they’re working on charging stations with vehicles and solar panels for homes.

Mr. Barber continued with an update on Phase 2 of MTIS. There has not been much change since the previous month although HDR continues to work on the strategy packages.

He said MAPA has contracted with Olsson Associates to complete a feasibility transit study for Sarpy County. Public meetings began the end of February and stakeholder and steering committee meetings will be held the first week of April.

G. Subcommittee Report Back

Ms. Walker said the Coordinated Transit Committee (CTC) has completed their project selection of 5310 funding with the coordination of activities including the call center grant which is ongoing. ProSeCom voted on their project list and TAP-C will not meet again until the next fiscal year.

Ms. Walker said the Citizens’ Advisory Council has become more informal. They voted to make themselves plan-oriented and will review the Public Participation Plan as well as other plans.

H. Additional Business

For Nebraska funding, Mr. Youell said LB960 has moved forward and has support. Instead of the $150 million transfer, it’s gone down to $50 million out of cash reserves. There will be $400 million over the course of the Bill which will go out to FY 2033. It will be the amount of LB610 and then go into this bill which will equal $400 million plus $50 million from the cash reserves that will happen this year. Of that, $40 million will be earmarked for the county bridge program, $20 million for the new economic opportunity program which is similar to the RISE program in Iowa and part for expressways around the state. A big part of the bill is the design bill and the general contractor instruction manager portions of the bill.

Applications are out for the TIGER program which runs through April 29, 2016. The FAST Lane program is part of the FAST Act and will be the last round of TIGER. It’s oriented towards large freight projects and includes planning stages and NEPA.

MAPA FY2017-2022 Transportation Improvement Program C-5

A list of earmark repurposings from FHWA was handed out and are part of the FAST Act. There are several in the MAPA region although Mr. Youell said some of the amounts may be somewhat misleading as it refers to the contract authority and not necessarily the OA.

Upcoming Meetings: March 31 Board of Directors April 20 CTC April 22 TTAC

I. Adjournment

Motion #4: Motion to adjourn:

Motion by: Marty Leming Second by: Scott Suhr Motion Carried

The meeting was adjourned at 11:00 a.m.

MAPA FY2017-2022 Transportation Improvement Program C-6

Offutt JLUS Draft Application Narrative Goals related to the OEA mission

As with the initial JLUS, the goals continue to be the following:

• Prevent incompatible development that may jeopardize the viability of the base mission.

• Protect health, safety, and welfare of the surrounding communities.

• Enhance communications between the base and surrounding communities. Grant Introduction/Background

Located in the heart of the nation, Offutt’s 4,000 acres reside in the rolling hills of southeastern Nebraska. The base, which is located in eastern Sarpy County, Nebraska, borders the City of Bellevue, Nebraska. It is also located approximately 10 miles south of , Nebraska and 17 miles south of the City of Councils Bluff, Iowa. The base falls within the Greater Omaha-Council Bluffs Metropolitan Statistical Area. Offutt’s host unit is the 55th Wing, the largest wing within the Air Force’s Air Combat Command. Additionally, the base is home to many significant associate units, including US Strategic Command Headquarters, the Air Force Weather Agency, the Omaha operating location of the Defense Finance and Accounting Service, and many others.

Offutt's heritage began with the construction of Fort Crook between 1894 and 1896, some 10 miles south of Omaha and two miles west of the Missouri River. Many of the original structures built on the post before 1900, including the guard house and various enlisted and officers' quarters, are still in use today. Fort Crook, later named and redesigned as Offutt Air Force Base, spurred Bellevue's largest growth. Offutt became home to the huge Martin bomber plant during World War II and, shortly after the war, housed the headquarters of the Strategic Air Command. It attracted thousands of workers, both civilian and military, who made Bellevue their home. Bellevue's population grew from less than 1200 in 1940 to almost 4000 in 1950 and then almost 9000 ten years later. A decade later, Bellevue's population again more than doubled, to more than 20,000.

The 55th SRW moved to Offutt AFB, in August 1966. That same year the 55th’s 38th Strategic Reconnaissance Squadron assumed responsibility for SAC’s airborne command and control system. The 2nd Airborne Command and Control Squadron inherited this mission after activation on April 1, 1970. The 1st Airborne Command and Control Squadron, flying E-4A aircraft, transferred to the 55th on November 1, 1975, bringing with it the National Emergency Airborne Command Post, now called the National Airborne Operations Center. On March 1, 1986, the 55th SRW became the host unit at Offutt after the inactivation of the 3902nd Air Base Wing.

Offutt faced monumental changes in 1992 when the easing of world tensions allowed the United States to reorganize its Air Force. The Strategic Air Command was disestablished here June 1, 1992, and the new, unified command, U.S. Strategic Command was activated. With this historical change, the operational control of Offutt became the responsibility of Air Combat Command, another of the Air Force's new commands. One of nine unified warfighting commands, USSTRATCOM is responsible for the planning, targeting, and wartime employment of the United States’ nuclear forces.

Offutt Air Force Base is home to the United States Air Force’s premiere reconnaissance and command- and-control operations. Among the base’s numerous and diverse units and missions, all branches of the U.S. armed forces are represented in a workforce that exceeds 10,000 military and civilian personnel. The base’s fleet of RC-135, OC-135, and WC-135 aircraft are in constant demand around the world to provide global situational awareness to military leaders and government officials. Additionally, its E-4B aircraft provide transport and command and control for the President, the Secretary of Defense, and Secretary of State.

Air Force Weather Agency is a field operating agency of the Headquarters U.S. Air Force Office of the Deputy Chief of Staff for Air and Space Operations, Weather Directorate (AF/XOW). Each day, AFWA builds the world’s most comprehensive weather database to provide forecast products to Air Force and Army warfighters, the National Command Authorities, base and post weather stations, the National Reconnaissance Office, and others. It was formed October 15, 1997, and is located at Offutt Air Force Base. Air Force Weather Agency was formed as part of a reengineering effort to streamline and improve the structure of the former Air Weather Service. This was a result of the realignment of Air Weather Service headquarters staff from Scott AFB, Ill. and the former Air Force Global Weather Center [Central], DOD's primary centralized weather production facility at Offutt. AFWA is organized into a headquarters element with two subordinate centers. Nearly 574 of the agency's 729 members are located at Offutt AFB, Neb. AFWA is not an automated production center. It is a computer-based operation heavily reliant on the interaction between people and computers to produce accurate and complete services in support of operational requirements. AFWA products and services support the war fighter, the base or post weather station, national programs, command and control agencies and systems, and other validated operational and planning functions. As new requirements emerge, AFWA applies information from the central database to the task. Need for Assistance

Offutt AFB is located in eastern Sarpy County, Nebraska, 10 miles south of the City of Omaha and adjacent to the City of Bellevue. Four miles north of the base lies Interstate 80 (I‐80), it connects to US Highway 75 which borders the installation on the west and I‐29 on the east. The US Highway 75 and I‐29 then connect to US Highway 34 which lies directly south of Offutt AFB. The installation comprises 4,041 acres; it also operates Capehart Housing Area as well as transmitter and receiver sites that are located various communities across Nebraska.

In 2014, a JLUS Policy Committee was formed that included jurisdictions in the State of Nebraska (Sarpy County, Douglas County, Cass County, City of Bellevue, City of La Vista, City of Plattsmouth) and the State of Iowa (Mills County, Pottawattamie County, City of Council Bluffs ) representatives from Offutt AFB, and a number of other regional stakeholders. In collaboration with the Committee, the MAPA procured services of a qualified consultant to support the JLUS efforts. In August 2015, the JLUS final report was completed. The report assessed compatibility factors relative to sustaining the mission at Offutt AFB and balancing the continued growth that is occurring in the region. The JLUS identified numerous implementation strategies for both the base and the local jurisdictions that would foster compatible land uses between the military and community growth. To continue the momentum and work established in completing the JLUS, it is necessary to request grant assistance to implement the strategies outlines within the JLUS.

The main objective is to complete a number of key strategy recommendations from the Offutt AFB JLUS completed and accepted in August 2015.

MAPA will develop the technical tools required to implement these key recommendations. Based on the JLUS Committee as well as community and public input, MAPA will create and / or modify policy and regulatory tools including maps and diagrams for each jurisdiction to enable user-friendly, planning tools to be implemented by each jurisdiction in a timely manner. The tools will be subject to each jurisdiction’s public process for review and adoption.

MAPA will develop the strategies so that they achieve the following primary compatible land use goals:

1. Ensuring the public’s health, safety, and welfare; 2. Recognizing private land owners’ current property rights and 3. Ensuring the continued viability of current and future mission activities on Offutt AFB.

Task 1: Project Mobilization

MAPA shall develop and present a public participation strategy that will be used throughout the duration of the project and within various jurisdictions. The proposed public involvement plan (see Task 3) shall include a recommended number and schedule of public workshops that will be based on the MAPA’s plan for completing this Scope of Work. MAPA will facilitate discussions to review implementation Scope of Work and expectations. Follow up meetings will be scheduled with jurisdiction staff to understand and address specific needs. These task items will be reviewed and approved by the JLUS Policy Committee.

Task 2: Formalize Coordination

The creation of intergovernmental agreements through an MOU to formalize the coordination and communication efforts between all participating jurisdictions and Offutt AFB. This task will provide the setting for each jurisdiction to develop a formal and continuing relationship. This includes, but not limited to, Offutt AFB as a stakeholder in regional planning discussions related to transportation, land use, future development, and ordinances affecting effecting Offutt and its mission.

Task 3: Community Involvement

MAPA will develop a Public Involvement Plan that includes Policy and Technical Committee meetings, public meetings, and public hearings. It is expected that the Plan will include meetings at each milestone of the project (kickoff, draft plans, and final plans). Meetings may be countywide or with individual jurisdictions. The Public Involvement Plan will be reviewed and approved by the Policy Committee.

Task 4: Development of Draft Strategies

Each jurisdiction will consider the following recommendations. As part of adopting these recommendations, MAPA will follow each jurisdictions public process.

Subtask 4.1: Military Compatibility Area Overlay District

This recommendation creates a Military Compatibility Area Overlay District to be used as part of a jurisdictions zoning ordinance. This strategy seeks to delineate an overlay district where military operations can impact the activities of adjacent communities and where the communities’ future development may impact the military mission. Within this overlay district, properties would be subject to land use regulations that promote compatibility, protect the public health, safety and welfare, and preserve the military mission. A draft overly district would be created and then tailored to fit each jurisdiction.

Subtask 4.2: Comprehensive Plan Recommendations

This subtask will would provide recommendations for all new and updated comprehensive plans to include military compatibility policies that support and promote compatible land uses. These updates would enable the sustainability of the Offutt AFB mission while also allowing for the continued growth of each jurisdiction. Specific policies and language will be drafted for comprehensive plans and land use regulations, then tailored to fit each city / county.

Task 5: Public Awareness

The purpose of addressing this strategy during implementation is to provide additional venues to enhance and increase awareness of the Offutt AFB mission to the public within the surrounding jurisdictions. This recommendation would assess various methods to increase public awareness as well as potential audiences to ensure the communication protocol is effective and appropriate for each jurisdiction and stakeholder group. Such awareness methods may include:

 Informational brochures to be available in city and county administration offices;  Public and military websites;  Involve JLUS communities staff in AICUZ revisions

Task 6: JLUS IMPLEMENTATION EXECUTIVE SUMMARY REPORTS

MAPA will prepare a JLUS Implementation Program document that will record the steps required to implement recommendations from the Offutt AFB JLUS. Some of these recommendations may be implemented as part of this scope while others may be in a following phase.

Based on comments from the administrative draft report, a draft report will be developed and circulated to the public for comments. The administrative and draft plans will provide the detail and specific language for the proposed implementation strategies. A presentation on the Draft Report will be provided to the JLUS Committee for their review and comment.

Subtask 6.1: Prepare Draft JLUS Executive Summary

MAPA will prepare a report on the JLUS Implementation process. This report will provide an overview of how strategies were accomplished by documenting the steps - committee meetings, public and stakeholder engagement, and accomplishments. This report will be reviewed and by the Technical Advisory Committee.

Subtask 5.2 Prepare Draft Jurisdictional Executive Summaries

MAPA will prepare a draft set of strategies to implement the JLUS based upon reviewing relevant data and the comments and suggestions received from jurisdiction staff and leadership. Each jurisdiction will review the draft report create for them. This review will include public comment.

Subtask 5.3: Prepare Final JLUS Implementation Executive Summary Report

MAPA will include all comments from Subtask 5.1 and provide a final executive summary report to the Policy Committee for approval.

Subtask 5.4 Prepare Final JLUS Executive Summaries

MAPA will prepare the final set of strategies based upon the comments and suggestions received from the draft document. These comments will be included in the final executive summaries report. MAPA will provide the final report to the affected jurisdictions in a format that provides a step by step instruction package for strategic implementation adoption where appropriate. Grant Abstract

The Omaha-Council Bluffs Metropolitan Area Planning Agency with the assistance from the JLUS Policy Committee will carry out the JLUS Implementation of Offutt Airforce Base. MAPA will serve as the JLUS Implementation sponsor and will oversee the completion of deliverables and carry out administrative tasks associated with the OEA grant. Results or Benefits Expected

The Implementation of the Offutt JLUS will benefit the communities and the military installation by providing recommended strategies where land use conflicts exists or have the potential to occur, where mitigation or prevention activities can be recommended and implemented. Such actions will support the long-term viability of the installation while at the same time support community growth and development.

Approach and Timeline

The MAPA, with assistance from the JLUS Policy Committee, will develop a Scope of Work, Budget and Timeline to carry out the JLUS Implementation tasks as outlined in the scope of work. The MAPA will serve as both the grant administrator of the OEA grant, over see the implementation of the scope of work, and act as JLUS Implementation project manager.

The Policy Committee will continue to provide overall guidance and leadership. MAPA, a unit of local government, under the terms of an interlocal agreement as authorized by State of Nebraska Statute §13-801 will continue serve as the grant administrator.

September 2015 Pre-Award Project Coordination and Administration

July 2016 Receive Grant Award.

August 2016 Conduct JLUS Implementation Kick Meeting. Conduct JLUS Policy Meeting and Implement Item F in Scope of Work: JLUS Coordination Committee Items

September 2016 Start Item C in Scope of Work: Comprehensive Plan and Amendment Recommendations and Item E: Informational Maps

October 2016 Start Item A in Scope of Work: Brochures

April 2017 Complete Item A and C in scope of work, Begin Item B: JLUS Implementation Executive Summary

June 2017 Complete Item B: JLUS Implementation Executive Summary

Scope of Work/Work Program

A. Education Brochures

Description: Educational brochures will be produced for various topics and made available to the public. All completed brochures will be available in electronic form on the MAPA website.

Deliverables: The following are a list of brochures that will be created to inform the public on various topics listed below.

a. Brochure identifying critical parcels, legal description, and height limits. b. Educational brochure on reducing bird and wildlife attractants that may impede safe aircraft operations. c. Resources Management Reference Guide d. Offutt Air Force Base Informational Brochure i. Informational brochure describing the Air Force mission and the land needed to effectively conduct the mobilization mission. e. Informational brochure on Frequency interference impacts f. Informational brochure on drone usage

B. JLUS Implementation Executive Summary

Description: A JLUS Implementation Executive summary will be tailored to each participating jurisdiction. After the analysis of each jurisdictions comprehensive plan, recommendations on zoning ordinances, subdivision regulations, and building codes will be presented in an executive summary.

Deliverables: An executive summary for each participating jurisdiction that will cover zoning ordinance recommendations, subdivision regulations recommendations, and building code recommendations.

a. Zoning Ordinances Update Recommendations i. Conduct a review of the zoning ordinance of each jurisdiction and provide recommended policies outlined as part of MCAOD (Military Compatibility Area Overlay District) outlined in the Offutt Air Force Base JLUS. b. Sub Division Regulation Update Recommendations i. Conduct a review of the subdivision regulation of each jurisdiction and provide recommended policies outlined as part of MCAOD (Military Compatibility Area Overlay District) outlined in the Offutt Air Force Base JLUS. Building Code Amendments c. Amendments to Building Codes i. Conduct a review of the building codes of each jurisdiction and provide recommended policies outlined as part of MCAOD (Military Compatibility Area Overlay District) outlined in the Offutt Air Force Base JLUS.

C. Comprehensive Plan Amendment Recommendations

Description: A document for each participating jurisdiction will provide an overview of findings and recommendations regarding each jurisdictions comprehensive plan and land use regulations.

Deliverables: Comprehensive Plan Recommendations Document

a. Update Comprehensive Plans for Military Compatibility for the renewable energy industry (where applicable). b. Update housing elements in comprehensive plans (where applicable). c. Update Comp Plans with AICUZ recommended land uses (where applicable). d. Update Comp Plans to include military compatibility policies that support and promote compatible land use (where applicable). e. Update comp plan for military compatibility overlay district (where applicable). f. Update comp plans to comply with 1992 Offutt AICUZ noise contours (where applicable).

D. Military Compatibility Overlay District (MCAOD) Zoning Maps

Description: A MCAOD Zoning Map will be tailored to each of the participating jurisdictions. The MCAOD will include the multiple MCA’s outlines in the Offutt JLUS as applicable to each participating jurisdiction.

Deliverables: MCAOD Zoning Map applicable to each jurisdiction that includes:

a. Zone for Bird Wildlife Aircraft Strike Hazard (BASH) MCA b. Zone for Noise MCA c. Zone for Imaginary Surfaces MCA d. Zone for Safety MCA e. Zone for Land MCA

E. Informational Maps

Description: Other information maps will be created to help decision makers comply with compatible development around Offutt.

Deliverables: Multiple information maps that will cover the following topics:

a. Map identifying critical parcels i. Will be accompanied by a view shed analysis to prioritize list of critical parcels. b. Map of areas that generally require planned burns i. Include a directory of entities that oversee controlled burns in Nebraska and Iowa. c. Map of locations suitable for wind energy d. Imaginary Surfaces Map e. Noise Military Compatibility Map f. Safety Military Compatibility Map g. Map for Bird Wildlife Aircraft Strike Hazard (BASH) h. Map for Military Compatibility Area

F. JLUS Coordination Committee Items

Description: A JLUS Coordination Committee will be formed and provide recommendations during the JLUS implementation process.

Deliverables: MOU’s and bylaws a. Memorandum of Understanding – JLUS Communities will collaborate through the JLUS Coordination Committee to facilitate the development of an MOU that delineates the roles and responsibilities for each agency in the JLUS Study Area. i. Point of Contact ii. Responsibility in addressing compliancy issues iii. Community and military response items iv. Triggers for coordination/communication b. JLUS Coordination Committee Bylaws c. MOU between Offutt and the local jurisdiction that enhances or establishes a process that provides copies of certain types of development proposals, rezoning, and other land use or regulatory changes for land located with the MCA’s to Offutt for review and comment.

Personnel Executive Director – 100 hours at $54.18/hr for an estimated project total of $5,418.00

Executive Director Responsibilities:  Act as Authorizing Official  Evaluate the scope of work to accomplish the implementation tasks.  Attend JLUS Policy Committee meetings, as necessary.

Community & Economic Development Manager- 150 hours at $34.88/hr for an estimated project total of $5,232.00

Community & Economic Development Manager Responsibilities:  Review JLUS Implementation Application before AO signature  Report directly to the Executive Director  Perform appropriate tasks assigned by the Executive Director.  Attend JLUS Policy Committee Meetings  Act as liaison between Policy/Technical Committee members and Consultant.  Facilitate and document meetings.

Associate Planner-1,400 hours at $23.54/hr for an estimated project total of $32,956.00

Associate Planner Responsibilities:  Facilitate and document meetings.  Attend JLUS Policy Committee Meetings  Attend JLUS Implementation public workshops  Provide support to the established committees  Coordinate with technical professionals to provide relevant data to planning consultant.  Preparing progress report.  Track progress of the study and prepare pay requests for project.  Write and review draft and final executive summaries outlined in the scope of work.  Review draft and final maps.

Communications Coordinator- 150 hours at $25.76/hr for an estimated project total of $4,508.00

Communications Coordinator Responsibilities:

 Contact media to promote JLUS Implementation  Create public notices and press releases for JLUS Implementation workshops  Attend JLUS Implementation workshops

Graphics Assistant- 190 hours at $21.29/hr for an estimated project total of $4,045.10

Graphics Assistant Responsibilities:

 Design, format, and create graphics for executive summaries  Create signs for public workshops  Attend JLUS Implementation pubic workshops

GIS Coordinator- 150 hours at $27.04/hr for an estimated project total of $4,056.00

GIS Coordinator Responsibilities:

 Create Military Compatibility Overlay District maps tailored to every participating jurisdiction  Create other overlay maps as outline in the JLUS and scope of work  Work with planners in each participating jurisdiction to ensure accuracy of maps

GIS Technician -100 hours at $25.31/hr for an estimated project total of $2,531.00

Assistant Planner Responsibilities:

 Assist the GIS Coordinator in creating Military Compatibility Overlay District maps tailored to every participating jurisdiction  Work with planners in each participating jurisdiction to ensure accuracy of maps

Total Personnel Expenses: $64,746.10

Planning Intern- 182.5 hours per intern at $12.00/hr for an estimated project total of $2,190.00  Assist with data collection and GIS mapping  Assist with public workshops  Perform appropriate tasks assigned by Associate Planner

Benefits - $30,392.00 Benefits include FICA, healthcare insurance, retirement contributions, vacation, , sick leave. MAPA charges actual fringe rates to the projects based on the percentage of time spent on the project.

Travel Local travel will include attending meetings in various locations in the study area in order to attend Policy Committee meetings as well as public outreach meetings.

Total Travel: $2,000.00

Supplies Supplies will consist of standard white paper, photocopying, postage, black color printer ink cartridges, color printer ink cartridges, large banner size paper rolls for GIS maps, writing tablets, public workshop supplies, professional printing costs, binders, and various binder accessories.

Standard public workshop supplies include maps, handouts, easels, foam core boards, large writing tablets, and writing instruments (may include pencils, pens, color pencils, or markers).

Total Supplies: $2,000.00

Other Advertising for Public Workshops – $1,500.00 Printing -$3,000.00 Postage -$500.00 Public Forums – $2,000.00 Translation Services – $945.26

Total Other: $18,529.00

Indirect Costs Indirect expenses are shown using MAPA’s negotiated, the accepted indirect cost rate (34.6%) as shown on the July 2015 MAPA FY 16 Cost Allocation, which is applied to the base of all direct expenses. That rate has been reviewed and approved by The Federal Highway Administration, which is MAPA’s cognizant federal agency. The base all direct expenses include direct salary plus non contractual benefits. The type of rate used to calculate the indirect cost in the proposed budget is the indirect cost allocation rate. This rate is equivalent to the indirect personnel costs over direct personnel costs. There is no duplication of indirect costs.

Total Indirect Costs: $23,285.00

Local Match (Non Federal Match) Match will be provided by the implementation partners and the Omaha Council Bluffs Metropolitan Area Planning Agency (MAPA). The chart below lists the partners and the in-kind amounts pledged. MAPA will provide a cash match of $4,001.41

Pottawattamie Sarpy County $1,000.00 County $1,000.00 City of Bellevue $1,000.00 City of Plattsmouth $1,000.00 Mills County $1,000.00 City of Council Bluffs $1,000.00 City of Omaha $1,000.00 Douglas County $1,000.00 Cass County $1,000.00 Omaha Chamber $1,000.00 MAPA $4,001.41 Total $14,001.41

All procurement for contractual services will be in accordance with applicable State and local laws and regulations, and applicable Federal laws and standards in accordance with 32 CFR Part 33.36 “Uniform Administrative Requirements for Grants and Cooperative Agreements to State and Local Governments.” Contractor selection criteria will be included in any RFP that is issued and cost will be a factor in selection.

Total OEA Grant Amount: $140,000.00

Total Match: $14,001.41

Total Project Cost: $154,001.41

MAPA CONTRACT COVER PLATE

CONTRACT IDENTIFICATION

Contract Parties: MAPA and City of Treynor, Iowa

Project Number and Title: 17TREY01 – City of Treynor Iowa Comprehensive Plan Update

Effective Date: July 1, 2016

Completion Date: August 31, 2017

CONTRACT PARTIES

Contractor Name and Address Omaha-Council Bluffs Metropolitan Area Planning Agency 2222 Cuming Street Omaha NE 68102-4328

City of Treynor Iowa 7 S Eyberg Treynor, IA 51575

ACCOUNTING DATA

Contract - For an amount not to exceed $ 18,000

DATES OF SIGNING AND MAPA BOARD APPROVAL

Date of Legal Review:

Date of MAPA Finance Committee Approval:

Date of City Approval:

AGREEMENT

THIS CONTRACT, effective this first day of July, 2016 by and between City of Treynor, Iowa, 7 S. Eyberg, Treynort, Iowa 51575 (herein called the "City") and the Omaha-Council Bluffs Metropolitan Area Planning Agency, 2222 Cuming Street, Omaha, Nebraska 68102 (herein called the "Planning Agency"),

WITNESSETH THAT:

WHEREAS, the City desires to engage the Planning Agency to render certain technical and professional services hereafter described by City of Treynor Iowa in carrying out the Scope of Service of a Comprehensive Plan update.

NOW, THEREFORE, the parties hereto do mutually agree as follows:

1. Employment of Planning Agency. The City hereby agrees to engage the Planning Agency and the Planning Agency hereby agrees to perform services herein set forth.

2. Area Covered. The Planning Agency shall perform all of the necessary services provided under this Contract in connection with and respecting the following area, herein called the "planning area": Treynor, Iowa.

3. Scope of Work. The Planning Agency shall do, perform and carry out in a satisfactory and proper manner, all of the services as stated. Said services shall include, but not be limited to the following:

A. Objective. The objective of this program is to assist the City with Comprehensive Plan Update.

B. Work Activity. The Planning Agency will complete the following activities for City of Treynor Iowa Comprehensive Plan update. See Attachment A.

4. Personnel. The Planning Agency shall furnish the necessary personnel, materials and services, equipment and transportation and otherwise do all things necessary for or incidental to the performance of the work set forth in the Scope of Work.

All of the services required hereunder shall be performed by the Planning Agency or under its supervision and all personnel engaged in the work shall be fully qualified and shall be authorized by the Planning Agency to perform such services.

None of the work or services covered by this Contract shall be subcontracted by the Planning Agency without prior written approval by the City.

5. Time of Performance. The services of the Planning Agency are to commence July 1, 2016 and end August 31, 2017.

6. Compensation. The City agrees to compensate the Planning Agency according to the following schedule:

A. Senior - hourly rate $100 per hour multiplied by number of hours; B. Principal - hourly rate of $88 per hour multiplied by number of hours; C. Professional - hourly rate of $62 per hour multiplied by number of hours; D. Support staff - hourly rate of $42 per hour multiplied by number of hours; E. Mileage - 54 cents per mile or IRS rate.

2

F. Printing expenses, long distance telephone toll charges, supplies, postage, and miscellaneous expenses - actual cost.

The total charge to the City for salaries and expenses shall not exceed $18,000 (eighteen thousand dollars). See Attachment A.

7. Method of Payment. The Planning Agency may request partial payment for services performed under this Contract on a quarterly schedule. Such requests shall be based on the percentage of work completed to date of such requests, as determined by the Planning Agency. Final payment of services under this contract shall be made by the City within sixty (60) days following satisfactory completion of the Planning Agency's obligations under this Contract.

8. Records and Audits. The Planning Agency shall maintain accounts and records, including personnel, property and financial records, adequate to identify and account for all costs pertaining to the Contract and such other records as may be deemed necessary by the City to assure proper accounting for all project funds, both federal and non-federal shares. These records will be made available for audit purposes to the City, the Inspector General, the Government Accounting Office, the State Auditor's Office, the Iowa Department of Economic Development, or any authorized representative, and will be retained for five years after the expiration of this Contract unless permission to destroy them is granted, in writing, by the City.

9. Civil Rights Provisions.

A. Discrimination in Employment - The Planning Agency shall not discriminate against any qualified employee or applicant for employment because of race, color, religion, sex, national origin, age, or disability. The Planning Agency shall take affirmative action to ensure that applicants are employed and that employees are treated without regard to their race, color, religion, sex, national origin, age or disability. Such action shall include but may not be limited to the following: employment, upgrading, demotion or transfers, recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including an apprenticeship. The Planning Agency agrees to post notices setting forth the provisions of the nondiscrimination clause in conspicuous places so as to be available to employees.

B. Considerations for Employment - The Planning Agency shall, in all solicitations or advertisements for employees placed by or on behalf of the Grantee, state that all qualified applicants will receive consideration for employment without regard to race, color, religion, sex, national origin, age, or disability.

Solicitation and Advertisement - The Planning Agency shall list all suitable employment openings with the State Employment Service local offices.

C. Civil Rights Compliance in Employment - The Planning Agency shall comply with all relevant provisions of the Federal Executive Order 11246, as amended by Federal Executive Order 11375, Title VII of the U.S. Civil Rights Act of 1964, as amended, the Fair Labor Standards Act (29 USC Section 201 et. seq.), Section 504 of the Vocational Rehabilitation Act of 1973, the Age Discrimination in Employment Act of 1967, as amended, and the Vietnam Veterans Readjustment Act of 1974. The Planning Agency will furnish all information and reports requested by the State of Iowa or required by or pursuant to the rules and regulations thereof and will permit access to payroll and employment records by the State of Iowa to investigate compliance with these rules and regulations.

D. Program Nondiscrimination - The Planning Agency shall conform with requirements of Title VI of the Civil Rights Act of 1964 (42 USC 2000d et seq.) and DHUD regulations issued pursuant thereto contained in 24 CFR Part 1. No person in the United States shall on the ground of race,

3

color, national origin, or sex be excluded from participation in, be denied the benefits of, or be subjected to discrimination under any program or activity funded in whole or in part with funds made available through this contract. Any prohibition against discrimination on the basis of age under the Age Discrimination Act of 1975 (42 USC 6101 et. seq.) or with respect to an otherwise qualified disabled individual as provided in Section 504 of the Vocational Rehabilitation Act of 1973, (29 USC Section 794) shall also apply to any such program or activity.

E. Fair Housing - The Planning Agency (if applicable) shall comply with Title VIII of the Civil Rights Act of 1968 (42 USC 3601 et seq.), generally known as the Fair Housing Act, and with DHUD regulations found at 24 CFR Part 107, issued in compliance with Federal Executive Order 11063, as amended by Federal Executive Order 12259. The Planning Agency shall also comply with Section 109, Title I of the Housing and Community Development Act of 1974, as amended.

F. Training and Employment - The Planning Agency shall comply with provisions for training, employment, and contracting in accordance with Section 3 of the Housing and Urban Development Act of 1968 (12 USC 1701u).

G. Noncompliance with the Civil Rights Laws - In the event of The Planning Agency's noncompliance with the nondiscrimination clauses of this contract or with any of the aforesaid rules, regulations, or requests, this contract may be canceled, terminated, or suspended either wholly or in part. In addition, the State of Iowa may take further action, imposing other sanctions and invoking additional remedies as provided.

10. Termination of Contract for Cause. If, through any cause, the Planning Agency shall fail to fulfill in a timely and proper manner its obligations under this Contract, or if the Planning Agency shall violate any of the covenants, agreements, or stipulations of this Contract, the City shall thereupon provide the Planning Agency an opportunity to cure. Should the Planning Agency not cure within a reasonable time, the City shall have the right to terminate this Contract by giving written notice to the Planning Agency of such termination and specifying the effective date thereof, at least five (5) working days before the effective date of such termination. In that event, the Planning Agency shall be compensated for work performed and expenses incurred to date in accordance with the schedule set forth in paragraph 6.

11. Changes. The City may, from time to time, require changes in the scope of the services of the Planning Agency to be performed hereunder. Such changes, including any increase or decrease in the amount of the Planning Agency's compensation, which are mutually agreed upon by and between the City and the Planning Agency, shall be incorporated in written amendments to this Contract.

12. Interest of Members of the City and Others. No employee of the City and no members of its governing body, and no other public official of the governing body of the locality in which the Project is situated or being carried out who exercises any functions or responsibilities in the review or approval of the undertaking or carrying out of this Project, shall participate in any decision relating to this Contract which affects a personal interest or have any personal or pecuniary interest, direct or indirect, in this Contract or the proceeds thereof.

13. Interest of the Planning Agency. The Planning Agency covenants that it presently has no interest and shall not acquire any interest, direct or indirect, which would conflict in any manner or degree with the performance of services required to be performed under this Contract. The Planning Agency further covenants that in the performance of this Contract no person having any such interest shall be employed.

14. The Planning Agency hereby agrees to comply with all federal, state and local laws, rules and ordinances applicable to the Scope of Work and to this Agreement.

15. This Agreement shall be binding on successors and assigns of either party.

4

16. The Planning Agency warrants that it has not employed or retained any company, or persons, other than a bona fide employee working solely for the Planning Agency to solicit or secure this Contract, and that it has not paid or agreed to pay any company or person, other than bona fide employees working solely for the Planning Agency, any fee, commission, percentage, brokerage fee, gifts or any other consideration, contingent upon or resulting from the award or making of this Contract. For breach or violation of this warranty the City shall have the right to annul this Contract without liability.

17. Equal Employment Opportunity. During the performance of this contract, the Planning Agency agrees as follows:

(A) The Planning Agency will not discriminate against any employee or applicant for employment because of race, color, religion, sex, or national origin. The Planning Agency will take affirmative action to ensure that applicants are employed, and that employees are treated during employment, without regard to their race, color, religion, sex, or national origin. Such action shall include, but not be limited to the following: employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. The Planning Agency agrees to post in conspicuous places, available to employees and applicants for employment, notices to be provided by the contracting officer setting forth the provisions of this nondiscrimination clause.

(B) The Planning Agency will, in all solicitations or advertisements for employees placed by or on behalf of the Planning Agency, state that all qualified applicants will receive consideration for employment without regard to race, color, religion, sex, or national origin.

(C) The Planning Agency will send to each labor union or representative of workers with which he has a collective bargaining agreement or other contract or understanding, a notice, to be provided by the agency contracting officer, advising the labor union or workers' representative of the Planning Agency's commitments under Section 202 of the Executive Order No. 11246 of September 24, 1965, and shall post copies of the notice in conspicuous places available to employees and applicants for employment.

(D) The Planning Agency will comply with all provisions of Executive Order No. 11246 “Equal Employment Opportunity” (30 FR 12319, 12935, 3 CFR, 1964-1965 Comp., p. 339), as amended by E.O. 11375, “Amending Executive Order 11246 Relating to Equal Employment Opportunity,” and as supplemented by regulations at 41 CFR part 60, “Office of Federal Contract Compliance Programs, Equal Employment Opportunity, Department of Labor.”

(E) The Planning Agency will furnish all information and reports required by Executive Order No. 11246 of September 24, 1965, and by the rules, regulations, and order of the Secretary of Labor, or pursuant thereto, and will permit access to his books, records, and accounts by the contracting agency and the Secretary of Labor for purposes of investigation to ascertain compliance with such rules, regulations, and orders.

(F) In the event of the Planning Agency's non-compliance with the nondiscrimination clause of this contract or with any of such rules, regulations, or orders, this contract may be canceled, terminated or suspended in whole or in part and the Planning Agency may be declared ineligible for further Government contracts in accordance with procedures authorized in Executive Order No. 11246 of September 24, 1965, and such other sanctions may be imposed and remedies invoked as provided in Executive Order No. 11246 of September 24, 1965, or by rule, regulation, or order of the Secretary of Labor, or as otherwise provided by law.

(G) The Planning Agency will include the provisions of Paragraphs (A) through (G) in every subcontract or purchase order unless exempted by rules, regulations, or orders of the Secretary of Labor issued pursuant to Section 204 of Executive Order No. 11246 of September 24, 1965, so that such provisions

5

will be binding upon each subcontractor or vendor. The Planning Agency will take such action with respect to any subcontract or purchase order as the contracting agency may direct as a means of enforcing such provisions including sanctions for noncompliance: Provided, however, that in the event the Planning Agency becomes involved in, or is threatened with, litigation with a subcontractor or vendor as a result of such direction by the contracting agency, the Planning Agency may request the United States to enter into such litigation to protect the interests of the United States.

18. Copeland “Anti-Kickback” Act (18 U.S.C. 874 and 40 U.S.C. 276c)—The Planning Agency or subcontractor shall be prohibited from inducing, by any means, any person employed in the construction, completion, or repair of public work, to give up any part of the compensation to which he is otherwise entitled. The recipient shall report all suspected or reported violations to the Federal awarding agency.

19. Davis-Bacon Act, as amended (40 U.S.C. 276a to a-7)—The Planning Agency and subcontractors shall be required to pay wages to laborers and mechanics at a rate not less than the minimum wages specified in a wage determination made by the Secretary of Labor. In addition, contractors shall be required to pay wages not less than once a week. The recipient shall place a copy of the current prevailing wage determination issued by the Department of Labor in each solicitation and the award of a contract shall be conditioned upon the acceptance of the wage determination. The recipient shall report all suspected or reported violations to the Federal awarding agency.

20. Contract Work Hours and Safety Standards Act (40 U.S.C. 327-333)—The Planning Agency and subcontractors shall be required to compute the wages of every mechanic and laborer on the basis of a standard work week of 40 hours. Work in excess of the standard work week is permissible provided that the worker is compensated at a rate of not less than 11/2 times the basic rate of pay for all hours worked in excess of 40 hours in the work week. Section 107 of the Act is applicable to construction work and provides that no laborer or mechanic shall be required to work in surroundings or under working conditions which are unsanitary, hazardous or dangerous. These requirements do not apply to the purchases of supplies or materials or articles ordinarily available on the open market, or contracts for transportation or transmission of intelligence.

21. Rights to Inventions Made Under a Contract or Agreement—Any performance of experimental, developmental, or research work shall provide for the rights of the Federal Government and the recipient in any resulting invention in accordance with 37 CFR part 401, “Rights to Inventions Made by Nonprofit Organizations and Small Business Firms Under Government Grants, Contracts and Cooperative Agreements,” and any implementing regulations issued by the awarding agency.

22. Debarment and Suspension (E.O.s 12549 and 12689)—The Planning Agency and all subcontractors assert the organization or individuals are not listed on the government-wide Excluded Parties List System, in accordance with the OMB guidelines at 2 CFR part 180 that implement E.O.s 12549 (3 CFR, 1986 Comp., p. 189) and 12689 (3 CFR, 1989 Comp., p. 235), “Debarment and Suspension.” The Excluded Parties List System contains the names of parties debarred, suspended, or otherwise excluded by agencies, as well as parties declared ineligible under statutory or regulatory authority other than E.O. 12549.[69 FR 26281, May 11, 2004, as amended at 70 FR 51879, Aug. 31, 2005]

23. Hold Harmless. The Planning Agency agrees to and shall indemnify, save and hold harmless the Planning Agency, its members, officers, employees, and agents, from all claims and liability of whatsoever kind or character due to or arising out of the acts and conduct of the Planning Agency, its officers, agents, employees, subcontractors, and others acting for or under the direction of the Planning Agency doing the work herein contracted for, or by or in consequence of any negligence in the performance of this Agreement, or by or on account of any omission in the performance of this Agreement, and also from all claims of damage for infringement of any patent in fulfilling this Agreement. The Planning Agency will procure and maintain adequate public liability and property damage insurance to protect the Planning Agency, its members, officers, employees, and agents, and will, upon request of the Planning Agency, furnish proof of compliance with this requirement.

6

24. Entire Agreement. This Agreement contains the entire agreement of the Parties. The provisions of this Agreement may not be explained, supplemented, or qualified through evidence of trade usage or prior course of dealings. No representations were made or relied upon by either Party other than those that are expressly set forth herein. No agent, employee or other representative of either Party is empowered to alter any of the terms hereof except as provided herein.

7

IN WITNESS WHEREOF, the City and the Planning Agency have executed this Contract as of the date first above written.

CITY OF TREYNOR IOWA

Attest By Date: Mayor

OMAHA-COUNCIL BLUFFS METROPOLITAN

AREA PLANNING AGENCY

Attest______By Date: Chairman, Board of Directors

Approved as to Legal Form

Date:

Signed MAPA Legal Counsel

8

Attachment A

CITY OF TREYNOR COMPREHENSIVE PLAN UPDATE PROPOSED SCOPE OF SERVICES V.2

MAPA shall perform and carry out in a satisfactory manner as determined by the Planning and Zoning Commission and the Treynor City Council, the following activities necessary to complete an update to the Treynor Comprehensive Plan, Zoning Ordinance, and Subdivision Regulations:

A. COMPREHENSIVE PLAN COMPONENTS

CITIZEN PARTICIPATION During the planning process, it is estimated that a series of four to six public meetings will be held. Attendance at various meetings will include Treynor Planning and Zoning Commission, Treynor City Council and city staff throughout the planning period. All meetings of the major component reports will include public notice and full public participation.

As the government body charged with providing recommendations regarding zoning and land use in the city, the Treynor Planning and Zoning Commission will serve as the steering committee for the planning process. While planning commission meetings are regularly open to the public, the commission should actively seek additional stakeholders to participate in the plan process, including business owners, interested citizens, and city staff. Furthermore, since ultimate approval of a plan is granted by the City Council, regular updates on the process and input from that body is encouraged as well.

A project kick-off meeting will be conducted for the public that will consist of a briefing on the proposed planning process, followed by a public visioning session. The purpose of the visioning session will be for community leaders and citizens to discuss a long-range vision for the City of Treynor and some of the perceived obstacles to achieving that vision. It is expected that information gathered in the visioning sessions will result in the identification of additional stakeholders and citizens interested in taking an active role in the planning process, and will also provide the groundwork for the key elements of the comprehensive plan. Following the project kick-off meeting, MAPA staff will discuss the outcomes of that meeting with city officials to determine if community survey work is necessary.

Upon completion of the community visioning component of the process, MAPA staff will work with the Planning Commission to update necessary components of the comprehensive plan. Since much of the data gathered for the original comprehensive plan is still largely relevant, the focus of this task will be to identify factors of change over the last decade, replace obsolete data where possible, and most importantly, to incorporate the results of community visioning into the plan. To complete this task, MAPA staff will identify elements of the plan where newer data is available and work with city officials to update locally generated data. The following are key components of the comprehensive plan process:

LAND USE/DATA ANALYSIS

Existing Land Use A detailed land use study will be prepared based on existing documents, but also including an update and field check of existing land use within the city’s jurisdiction. In addition, a review of agricultural land for preservation, conditions of natural environment, information on soil, climate, vegetation and topography will be provided. Floodplain information Attachment A

obtained from the Federal Emergency Management Agency and other sources will also be examined to show its effect on the community’s existing and potential land use.

Existing land use data inventories analyses and projections will be utilized to the fullest extent possible. MAPA will conduct additional field surveys according to standard accepted practices to inventory existing land uses in Treynor’s planning jurisdiction.

Future Land Use Plans Based on existing land use factors, environmental constrains, physical features, the economic base study, population projections, community goals and policies, and experience in similar communities, future use plans will be developed to indicate the category, future location, extent, and intensity of land use to the year 2035. These plans will be presented in both narrative and graphic form. During the presentation of the plans, consideration shall be given to potential and adverse environmental effects resulting from proposed development. Methods to ensure adequate and reasonable protection of the public from adverse environmental influences will be discussed. Land use policy statements shall be developed regarding future development within the county. This effort will provide the major basis for developing other elements of the comprehensive plan for the City of Treynor.

The plan will also analyze the extraterritorial jurisdiction (ETJ or 2-mile area) and future land uses. The city, MAPA, and Pottawattamie County Planning will work together to regulate land use within an area up to two-miles from city limits.

TRANSPORTATION Work on this segment will include a review of the network of major roads in the city’s planning jurisdiction, which create a functional system to manage growth. Highway plans prepared by the Iowa Department of Transportation will be utilized to the fullest extent possible. MAPA will also consider findings from the Pottawattamie County Transportation Plan. This task will include the following:

1. An inventory will be taken of the major streets and highways in the city. Inventory information will include street and highway rights-of-way, width, traffic counts, and roadway conditions. The inventory information will be compiled from available data and field observations.

2. Existing major transportation facilities will be analyzed for service, capacity, volume, and deficiencies.

3. Street classification data developed by the Iowa Department of Transportation will be used in the street and highway planning. The major street and highway system will be classified on the methodology utilized by the Department of Transportation and applicable local criteria.

4. Street and roadway standards will be established that will conform to the requirements of the City of Treynor and the Iowa Department of Transportation.

5. A major thoroughfare plan will be prepared based on preliminary land use plans and describing and delineating arterial and collector streets. A review and examination of the possibility of alternative roadways designed for floodplain areas will also be made. Attachment A

6. Review of public transportation needs and services will be provided.

HOUSING This work element will appraise current problems associated with the provision of adequate housing for all residents of the City of Treynor and determine what efforts have been made by the city to address these problems in the recent past, and outline specific objectives in planning activities appropriate for the immediate future. This element will be undertaken to include nondiscrimination, conservation, evaluation, historical preservation, equal opportunity, and citizen involvement requirements.

PUBLIC INFRASTRUCTURE, UTILITIES AND COMMUNITY FACILITIES A review, with the assistance of the City Engineer, will be made of existing public facilities in the city and will include any pending engineering studies. Information will also be obtained from meetings with appropriate local officials such as the fire chief, public works employees, and school officials. These facilities will be evaluated, with assistance from the City Engineer, with respect to their adequacy to meet the needs of the area throughout the planning period, and recommendations will be made to coordinate projected facility needs with the future physical development of the city. The city facilities and utilities plan will place special emphasis on the following broad categories.

Water A review of the capacities of existing water systems will be made with respect to serving projected population and land use patterns. Existing plans for facilities will be integrated into the policies for future development within the city’s planning area. The projected service area will be determined to accommodate recommended areas of future development.

A review of the water system supply will be undertaken for the area and water demands will be projected consistent with population and economic projections, including a review of the water supply distribution system’s expansion and development.

Sanitary Sewer Systems A review of the capacities of the existing sanitary sewer system will be made with respect to serving projected population and land use patterns. Existing plans for such facilities will be coordinated with future development policies for the planning jurisdiction. Projected service areas will be determined to accommodate recommended areas of future development.

Storm Sewer Systems A review of the capacities of the existing storm sewer system will be made with respect to serving projected population and land use patterns. Recommendations will be made that pertain to existing and future needs of the city.

Solid Waste Disposal MAPA will review the present method of disposing of solid waste and generally indicate future needs to accommodate future development, including known activities in the surrounding area.

Attachment A

Other Public Facilities A review of existing public service facilities and capabilities of the existing locations and sites with respect to projected population and land use patterns will be examined. Recommendations will be developed for improvements needed, additional facility needs, and service capacity changes as deemed necessary.

Other Non-Municipal Utilities and Facilities A review of the capacities of existing electrical utilities, gas utilities, and cable television and Internet services will be made with respect to serving projected population and land use patterns. Recommendations will be made pertaining to existing and future needs of the area for the delivery of these non-municipal utilities including rights-of-way (transmission overhead and pipeline) and/or necessary land and location requirements for substations, pumping stations, etc.

Parks and Recreation The adequacy of parks and recreation areas will be determined for the city’s planning area. Open space and recreational standards will be developed that are applicable to local needs and sizes of recreation areas within the jurisdiction. Future expansion needs for specific facilities will be assessed as well.

CONSIDERATION OF IOWA SMART PLANNING PRINCIPLES These principles provide guidance concerning important elements local plans should include. Iowa Smart Planning Principles and Elements (per Iowa State Code Chapter 18B: Land Use – Smart Planning) in all aspects of the Comprehensive Plan Update.

These principles should be considered and may be applied when local governments and state agencies deliberate all appropriate planning, zoning, development, and resource management decisions. Application of these principles is intended to produce greater economic opportunity, enhance environmental integrity, improve public health outcomes, and safeguard Iowa’s quality of life. The principles also address the need for fair and equitable decision-making processes.

CAPITAL IMPROVEMENTS PROGRAM A review of capital improvement needs in each plan element will be made and a listing of all such items required will be presented as it pertains to the comprehensive plan. MAPA will undertake a capital improvement program, which will enable the city to take a long-range overall look at public improvement needs as compared with the resources available to satisfy those needs. The CITIES Strategic Plan will be considered for this.

1. Governmental services now being provided within the planning area;

2. The financial condition of the city and its revenue and expenditures pattern; and

3. The statutory authorization for capital improvements and for constructing improvements.

A list of pending capital needs will be estimated and established. The resources available to satisfy those needs, including possible non-local funding, will be estimated on the basis of state statutes and local policies that establish the limits of funds available to the city Attachment A

through taxation, service charges and borrowing. The capital improvement program will be prepared with various improvement needs prioritized. The first six years of the program will be developed and a wish list will be included as part of the capital improvement program.

ECONOMIC DEVELOPMENT Existing efforts will be reviewed in order to determine the city’s economic development base in relationship to infrastructure, land use, transportation, and labor force. Project staff will determine needs and make general recommendations as part of a local economic development strategy.

FINAL REPORT MAPA will prepare the Draft Comprehensive Plan for review by the Planning Commission. A summary of the public involvement process that was conducted by MAPA will be included in the Draft Plan. The Draft Plan will be put out for a 30-day public comment period in which comments from local, county, and state officials will be solicited. A presentation of the Draft Plan to the City Council will commence the 30-day comment period and a public meeting will be held during this time as well.

Based on the public and stakeholder feedback received during the comment period, MAPA will develop the final plan for review and approval by the Planning Commission and City Council. MAPA will provide the Planning Commission and Board of Supervisors a copy of the final report, for a total of 15 copies. Final plan documents will be provided in multiple file formats, with key graphics, tables and maps being provided separately as requested.

B. ZONING ORDINANCE AND SUBDIVISION REGULATIONS REVIEW AND UPDATE

Staff will review the city’s zoning ordinance and subdivision regulations. Based on any changes to the comprehensive plan that may cause conflicts with existing codes, staff will recommend changes to these ordinances and to the city’s zoning map as deemed appropriate.

C. PROJECT TIMELINE Month Work Element 1 2 3 4 5 6 7 8 9 10 11 12 Land Use P X X P Transportation X X X Housing X X X Facilities/Utilities X X X Capital Improvements X X Economic Development X X Final Report X X P X P Zoning Ordinances X X X P Subdivision Regulations X X X P X - Work Time P - Public Hearing

Attachment A

D. PROJECT BUDGET

The following is a summary of each of the scope of service tasks to be performed by MAPA for completion of the project. Each task is identified with the estimated hours of time involved to complete the project and a final cost estimate of the project.

Elements Hours

Land Use/Data Analysis ...... 40 Transportation ...... 20 Housing ...... 10 Public Infrastructure, Utilities and Community Facilities ...... 10 Consideration of Iowa Smart Planning Principles ...... 10 Capital Improvement Program ...... 10 Economic Development ...... 10 Final Report ...... 40 Total ...... 150

Review Zoning Ordinance and Subdivision Regulations ...... 50 Committee and Staff Meetings ...... 30 Total ...... 80

SUBTOTAL ...... 230 STAFF TIME COST ESTIMATE ...... $15,150

Expenses Mileage ...... $500 Mapping ...... $2,000 Publication of Final Report ...... $250 Postage ...... $100 Expenses Total ...... $2,850

COST ESTIMATE TOTAL ...... $18,000

The estimated project cost of $18,000 was calculated by MAPA and presented to city staff on March 16, 2016. If the proposal submitted is accepted by the city, MAPA will prepare a “Not to Exceed” Contract for the project and submit it for city approval. In addition, MAPA will prepare detailed invoices documenting actual project expenses on a quarterly basis. In the event that the project can be completed for an amount lower than the contracted amount, the city will only be responsible for actual costs as documented on project invoices. If MAPA’s cost for completing the project exceeds the contracted amount, the city will not be responsible for any costs incurred beyond the “Not to Exceed” total specified in the contract.

FY 2017 MAPA BOARD OF DIRECTORS

Members/Officers Affiliation Patrick Bloomingdale Secretary/Treasurer Clare Duda, representing Mary Ann Borgeson Douglas County Ben Gray Omaha City Council Tom Hanafan, representing Lynn Grobe Pottawattamie County Doug Kindig NE Small Communities/Counties Ron Kohn Iowa Small Communities/Counties (Vice-Chair) Tom Richards, representing Don Kelly Sarpy County Rita Sanders City of Bellevue, Mayor (Chair) Jean Stothert City of Omaha, Mayor Matt Walsh City of Council Bluffs, Mayor

Effective July 1, 2016 FY 2017 MAPA FINANCE COMMITTEE

Member Affiliation Tom Hanafan Pottawattamie County Patrick Bloomingdale Chair, Secretary/Treasurer, Douglas County Clare Duda Douglas County Ron Kohn Mills County Tom Richards Sarpy County Carl Lorenzen Washington County

Effective July 1, 2016 FY 2017 TRANSPORTATION TECHNICAL ADVISORY COMMITTEE

Dennis Wilson, Chairman Sarpy County Public Works Director

Voting Members

Member / Alternate Affiliation Chris Shewchuk Bellevue Planning Jeff Roberts / Dean Dunn Bellevue Public Works Don Gross / Rose Brown Council Bluffs Planning Greg Reeder / Matt Cox Council Bluffs Public Works Dan Kutilek / Tom Doyle / Tom McDonald Douglas County Kris Faris / Dan Giittinger Gretna Public Works / Development Services Scott Suhr / Scott Schram Iowa DOT – District 4 Chris Solberg La Vista Planning Joe Soucie / John Kottman La Vista Public Works Curt Simon / Lauren Cencic Metro Transit Brandie Neemann / Noel Salac / Brad Zumwalt NDOR Lincoln Tim Weander / Maurice Hinchey Nebraska DOR – District 2 Dan Owens Omaha Airport Authority Derek Miller / Chad Weaver Omaha Planning Todd Pfitzer Omaha Public Works City Engineer Bob Stubbe Omaha Public Works Director Murthy Koti / Bryan Guy Omaha Public Works Traffic Engineer Mark Stursma / Jeff Thompson Papillion Public Works Director / City Engineer Eric Williams Papio-Missouri River NRD John Rasmussen Pottawattamie County Engineer Dan Freshman Ralston Public Works Bruce Fountain / Donna Lynam Sarpy County Planning / Building Director Dennis Wilson / Bill Herr Sarpy County Public Works Janet McCartney Cass County District 2 Commissioner / Board Chair

Associates

Member Affiliation Jim Jussel Alfred Benesch & Company Bob Mundt Council Bluffs Chamber of Commerce Mark Bechtal (representing Mokhtee Ahmad) Federal Transit Administration – Region VII Kyle Anderson Felsburg Holt & Ullevig Tracy Troutner FHWA – Iowa Division Justin Luther FHWA – Nebraska Division Jamie Berglund Greater Omaha Chamber of Commerce John Jorgensen HGM Associates, Inc. Jason Carbee HDR Engineering, Inc. Mike Malone Iteris, Inc. Sorin Juster Kirkham Michael Associates Matt Kruse Lamp, Rynearson & Associates, Inc. Greg Youell MAPA Executive Director Mike Piernicky Olsson Associates Karl Fredrickson Parsons Brinckerhoff Todd Cochran / Charles Huddleston The Schemmer Associates Bill Troe SRF Consulting

Effective July 1, 2016

FY 2017 ECONOMIC DEVELOPMENT DISTRICT

Member Affiliation Robert Blair University of Nebraska at Omaha Clare Duda Douglas County Tom Hanafan Pottawattamie County Doug Kindig NE Small Communities/Counties Ron Kohn IA Small Communities/Counties (Chair) Vicki Quaites-Ferris Empowerment Network Tom Richards Sarpy County Rich Pahls Omaha City Council Rita Sanders Bellevue Mayor (Vice Chair) Matt Selinger HDR Jean Stothert Omaha Mayor Ron Tekippe HGM Randy Thelen Greater Omaha Chamber of Commerce Matt Walsh Mayor, Council Bluffs

Effective July 1, 2016 FY 2017 MAPA CEDS COMMITTEE

Member Affiliation Ann Birch Community Development Director, City of La Vista, NE Matt Garst Vice President, Security National Bank Paula Hazlewood Senior Director – Business, Greater Omaha Economic Development Partnership Sean Johnson Executive Director, Gateway Development Corporation Scott Keep President of Metropolitan Utilities District Randy Lenhoff President of Seldin Co. Bill Luttrell Senior Locations Strategist, Werner Enterprises Matt Mancuso Director of Corporate Training, Iowa Western Community College Lonnie Mayberry Vice President, Land Surveying Services Inc. Tim O’Brien Manager, Omaha Public Power District Julia Parker Executive Director, Omaha Small Business Network Ron Tekippe, Chair Vice President of HGM Associates

Effective July 1, 2016 FY 2017 COORDINATED TRANSIT COMMITTEE

Member Affiliation Mary Angus Mayor’s Committee for Citizens with Disabilities Mark Bulger Omaha Association for the Blind Rich Carstensen/Dan Freshman City of La Vista/City of Ralston Fred Conley Papio-Missouri River Natural Resources District Elizabeth Donner Goodwill Industries Ann Grober City of Council Bluffs (Vice Chair) Martha Holmes Eastern Nebraska Community Action Partnership Karen Jackson City of Bellevue Lois Jordan Florence Home Ann Marie Kudlacz Southern Sudan Community Association Mark Lander SWITA/SWIPCO Bob Matthews Black Hills Works Darlene McMartin Pottawattamie County Veterans Affairs Erin Porterfield Heartland Workforce Solutions Lisa Picker Heartland Family Service (Chair) Vicky Quaites-Ferris Empowerment Network Kelly Shadden / David Jameson Metro Transit Susan Stolinkski Friendship Program Randy Stonys Eastern Nebraska Human Service Agency Rich Surber Lutheran Family Services Heather Tomczak United Way of the Midlands

Non-Voting Members Affiliation Lee Myers American Association of Retired Persons John Synowiecki Catholic Charities Derek Miller City of Omaha Mark Stursma / Lori Hansen City of Papillion John Liebsack Nebraska Veterans of Foreign Warn Amanda Vasquez Paralyzed Veterans of America Tess Larson Sherwood Foundation

Effective July 1, 2016 FY 2017 RPA COMMITTEE MEMBERS

Policy Committee Members

Russell Kurth Policy Committee Chair, Supervisor, Harrison County Terry Cox City Administrator, City of Harlan Richard Crouch Supervisor, Mills County Melvin Houser Supervisor, Pottawattamie County Brian Kissel, representing Kim Clark City Administrator, Glenwood Charles Parkhurst Supervisor, Shelby County

Technical Committee Members

Daniel Ahart Technical Committee Chair, County Engineer, Shelby County

Voting Members John McCurdy Executive Director, SWIPCO/SWITA Perry Cook Public Works Director, City of Glenwood Terry Cox City Administrator, City of Harlan Kevin Mayberry County Engineer, Mills County Steve Struble County Engineer, Harrison County John Rasmussen County Engineer, Pottawattamie County

Non-Voting Members Mark Bechtel Transportation Planner, Region 7, Federal Transit Administration Tracy Troutner Transportation Planner, Federal Highway Administration Michelle Wodtke-Franks Executive Director, Golden Hills R C & D Andrea White RPA Coordinator, Iowa Department of Transportation Scott Suhr District 4 Planner, Iowa Department of Transportation

Effective July 1, 2016

FY 2017 CITIZENS ADVISORY COMMITTEE MEMBERS

Representing Name Term Douglas County Dan Park- Chair 2014-2018 Sarpy County Steve Ziemba 2014-2018 Pottawattamie County Barry Cleaveland 2014-2017 Council Bluffs Sheryl Garst- Vice Chair 2014-2018 Omaha Jay Leighter 2014-2017 Omaha Cindi Goff 2014-2018 Omaha Tim O’Bryan 2014-2018 Omaha Kenneth Bé 2014-2017 Omaha Robert Hamer 2014-2018 Bellevue Curtis Bryant 2014-2018 Small Communities under 50,000 Vacant 3 year term Small Communities under 50,000 Vacant 3 year term Small Communities under 50,000 Vacant 3 year term

Effective July 1, 2016

FY 2017 TRANSPORTATION ALTERNATIVES COMMITTEE MEMBERS

Nominated Transportation Alternative Committee Officers Todd Pfitzer, City of Omaha, Chair Sarah Johnson, Omaha Bicycle Company/Pedal Happy, Vice-Chair

Recommendation for Transportation Alternatives Committee Membership City of Omaha Public Works Todd Pfitzer City of Omaha Planning Derek Miller City of Omaha Parks Dennis Bryers City of Council Bluffs Larry Foster City of Bellevue Chris Shewchuk City of Springfield Kathleen Gottsch City of La Vista Chris Solsberg City of Papillion Mark Stursma Douglas County Dan Kutilek Sarpy County Denny Wilson PMRNRD Eric Williams Metro Transit Evan Schweitz NDOR Brad Zumwault IDOT Scott Suhr Douglas County Health Department Andy Wessel Alternative Transportation Advocate Sarah Johnson (ModeShift Omaha) Public Health Advocate Julie Harris (Live Well Omaha) Public Representatives Chris Behr/Mark Meisinger

Effective July 1, 2016

FY 2017 PROJECT SELECTION COMMITTEE (ProSeCom) MEMBERS

Member Affiliation

Scott Suhr Iowa DOT District 4 Representative Tim Weander Nebraska DOR District 2 Representative Curt Simon Metro Transit Representative Dan Kutilek Douglas County Engineer (Also represents Douglas County 2nd Class Cities) Denny Wilson Sarpy County Engineer John Kottman Sarpy County Municipalities Public Works Representative Todd Pfitzer Omaha/Douglas County Municipalities Public Works Representative Chad Weaver Omaha/Douglas County Municipalities Planning Representative Greg Reeder Council Bluffs Public Works Representative Mark Stursma All Metro Open Planning Representative Derek Miller Bicycle-Pedestrian Representative

Effective July 1, 2016

T

2015-2020 5THE FIRS Action Plan JUNE 2016 Growing Together. Responsibly.

Ensuring the Vision reflects the voice of our residents, now and into the future, is critical. The Core Values and Guiding Principles have guided plan development.

Core Values of Heartland Residents Starting with the research and input compiled at the beginning of the planning process, the Steering Committee refined a list of core values to serve the vision and its implementation activities moving forward. These elements have been identified as the most important to our future happiness. Working together, we will strive to protect and preserve these values to make our communities stronger.  Retain a high quality of life  Maintain affordable and fair housing  Use public resources efficiently for low taxes  Enhance safety, reduce crime and eliminate poverty  Attract good quality jobs  Attract and retain young professionals  Maintain excellent educational opportunities  Ensure high quality health care  Maintain our strong network of neighborhoods and communities  Retain small town values that make our region inclusive, family-friendly, welcoming and accessible  Expand and enhance transportation choices  Plan for future which is sustainable and resilient economically

Guiding Principles for the Vision Along with the core values, a set of guiding principles were created also through the work of the Steering and Stakeholder Committees, and the Equity and Engagement Committee. The Guiding Principles go beyond the core values and create overarching themes or principles used to guide the vision goals, and the strategies and actions included in the Heartland 2050 Action Plan.

Equity – All individuals, regardless of ability, and communities within the region will have full and equal access to the opportunities that enable them to attain their full potential. Efficiency – Public infrastructure and services will be provided efficiently and cost- effectively.

Draft/June 2016 1 Growing Together. Responsibly.

Inclusivity – Decision making and the implementation of solutions in the region will be done in a way that ensures that all of the region’s residents have an opportunity to participate in the process, implementation, and evaluation. Local Control/Regional Benefit – It is critical that cities and counties within the region maintain local control over their communities while also working together collectively to ensure that local decisions enhance rather than affect other neighborhoods, communities or the region as a whole adversely.

Visioning Committees How this document was developed

In 2014 Visioning Committees occupied the middle ground between the organizational and content-generating elements of Heartland 2050. Committee members provided invaluable depth of knowledge and collective content and review of the outcomes, and strategies that are found in this Action Plan. Committees were formed around the six goal themes (Transportation and Infrastructure, Housing and Development, Resources, Economic Development, Education, and Health and Safety) and were comprised of individuals and organizations representing the spectrum of expertise, community type, sector, and position on the value chain (e.g. producer, consumer). Three rounds of meetings were held with more than 100 people participating in each session. The Vision Committee meetings served as forums for discussion, interpretation, and networking. Ultimately, the Vision Committees were responsible for crafting the outcomes and strategies (elements of the Heartland 2050 Action Plan). Their recommendations were the outcomes of thorough analysis and detailed discussions about the region’s strengths, weaknesses, opportunities, and threats. Similar committees will continue as part of implementation.

Implementation Committees How this document was vetted

From August 2015 to April 2016 Implementation Committees for each goal theme vetted the Outcomes, Strategies and Action Steps and this document represents their revisions and updates. The Outcomes were presented to the Executive Committee for review and were approved with minor changes in January 2016. Strategies and Action Steps from the original document were vetted using the same process and approved by the Executive Committee in May of 2016. The Action Plan was presented to the Metrpolitan Area Planning Agency Board for approval and to be released for a 30 day public comment period in June 2016. The development of Metrics will be ongoing as initial projects are selected for execution.

Draft/June 2016 2 Growing Together. Responsibly.

Goals, and Outcomes How this document is structured

The Heartland Vision and its six goals were created from the region’s core values, discussions with the committees and research teams, and input from the thousands of people who participated in regional workshops and the “Shape Our Future” scenario survey. To transition into action, and to move the region towards the Heartland 2050 vision, the Visioning Committee met to finalize potential strategies to achieve these goals. In 2015-2016, Implementation Committees reviewed and revised the work, and the Action Plan was approved by the Executive Committee. The outcomes presented here are organized by the Vision goals. It is important to understand that the six Heartland goals are interrelated, resulting in connected and overlapping strategies in some areas. The goals, and outcomes, are organized using the following format:

provide a definition of the six main goal areas (Resources, Infrastructure, Development, Health, and Education and Economic Development)

Outcomes provide specific aspirations within each topical area

Strategies provide an overarching approach to achieving the outcomes

Action Steps tactical efforts to execute strategies and outcomes

Draft/June 2016 3 Growing Together. Responsibly.

o Regional plan for site development/market analysis o Capital investment inventory for entrepreneurs, emerging businesses o Place making o Transit to work Implementation Committee Suggestion: . (New) Business toolkit

o Educate minorities and immigrants in programs leading to sustained economic prosperity. o Transit to post-secondary education or training o Expand and increase capacity of existing early childhood programs to Heartland 2050 region o Expand existing B-16 education consortia to Heartland 2050 region o Increase postsecondary degree attainment in high demand careers in the Heartland 2050 region Implementation Committee Suggestion: . Increase access to education and job training (boot camps, apprenticeships, career academies, certifications) for high demand careers in the Heartland 2050 region - Education/marketing piece needed - Centralized database for education and job training for jobs in the region - High profile demonstration projects

o Regional Equity Profile update o Regional Equity Profile presented at each community leadership program o Community leadership program recruitment including scholarships o Transit oriented development coordinated with affordable housing

o Accountable health community

Draft/June 2016 4 Growing Together. Responsibly.

 Integrated care model . Trauma informed care region  Community health worker model o Developer toolkit o Main Street toolkit o Nodes and corridors o Transit oriented development o Affirmatively Furthering Fair Housing (AFH)

o Regional transportation vision o Complete streets polices throughout the region o Transit oriented development o Implementation of Heartland Connection Studies o Coordination between Economic Development and Infrastructure Implementation Committee Suggestions: . Education Pieces - Nodes and Corridors - (Multimodal) Transit Oriented Development - Dense Development, Land Use - Complete Streets

o Regional trail branding/promotion o Local foods assessment o Natural resources inventory Implementation Committee Suggestions: . Produce power without pollution (sustainable energy methods, clean up Nebraska gas mix) . Yard waste reduction, “Bag No More”

Draft/June 2016 5 Growing Together. Responsibly.

Economic Development

We want our children and grandchildren to have the opportunity to stay in the Heartland region and enjoy the same low cost of living, high quality of services, and strong economy that the majority of people enjoy today. Throughout the region, but especially in areas suffering from inequality and marginalization, we want to see quality skills training programs and incentives, employment growth and support for jobs that are either close to where people live or accessible by transit. Addressing job inequality and attracting and retaining the next generation of skilled workers to the region is paramount to the long- term economic success of the place we call home. To meet this goal, advancing equity should be a driving force to strengthen the region’s economic growth and competitiveness. This includes prioritizing regional investments in quality education and workforce development, housing, transit, and revitalization in key neighborhoods. Local governments should support emerging business sectors including infrastructure, transportation, health- care, medical research, agriculture and food processing, military, insurance, and finance.

Draft/June 2016 6 Growing Together. Responsibly.

Outcome 1.1: By 2050, we have strengthened and expanded businesses in existing clusters. Examples include the freight and logistics, finance, insurance, real estate, corporate headquarters, health care, creative industries, agriculture, food production, construction, advanced manufacturing and defense sectors. Strategies: Heartland 2050 will promote, support, and/or facilitate: a) public and private actions and investments to strengthen competitive advantages of the region, working with chambers of commerce, industry leaders and other stakeholders. 1. Coordinate efforts among governmental agencies, chambers of commerce, industry leaders and other community stakeholders. 2. Identify and obtain innovative cross-jurisdictional financing mechanisms. 3. Provide incentives to businesses that take into account paying a living wage. Reward companies that pay higher wages and increase economic activity with higher incentive benefits. 4. Leverage the economic power of large employers and institutions for community economic development. o develop strategies to hire jobseekers facing barriers to employment o create on-the-job training opportunities o purchase more goods and services from local and minority-owned businesses that provide local jobs b) needed infrastructure critical to the identified industry. 5. Develop effective utilization of assets by taking advantage of land, physical infrastructure, transit assistance programs, and tools to help existing business clusters expand and cultivate the next generation of clusters. 6. Convene public economic development agencies (local and state), foundations, industrial brokers/developers to explore various ways to purchase and prepare strategic sites in an intentional and consistent manner. 7. Identify sources of development funding to purchase and control sites for future industrial developments. 8. Convene a H2050 task force to investigate opportunities for existing organizations (such as the Omaha Land Bank and the Greater Omaha Economic Development Partnership) or interlocal agreements to expand regional entities to acquire and prepare land for industrial development.

Draft/June 2016 7 Growing Together. Responsibly.

Outcome 1.2: By 2050, we have a physical and cultural environment that attracts, retains, and develops a high skill, high paying workforce across business clusters. Strategies: Heartland 2050 will promote, support and/or facilitate: a) education and training needed to reduce the skills gap for well-paying and high demand jobs for all individuals. 9. Develop apprenticeships and other educational training opportunities for individuals from diverse socio-economic backgrounds. 10. Implement sectoral workforce strategies that connect workers with low education levels and /or reentry workers to high-quality training programs that lead to gainful employment in growing sectors of the economy. b) new ideas that make the region more successful in attracting and retaining a young talented workforce. 11. Create a welcoming culture and environment with amenities, diverse housing, educational opportunities, thriving arts community, and multi-modal transportation. Outcome 1.3: By 2050, we will have improved our business environment that will be attractive to entrepreneurial development and attraction of new businesses to diversify and strengthen the regional economy. Strategies: Heartland 2050 will promote, support, and/or facilitate: a) flexible local regulatory and land use planning systems that establish needed controls while facilitating growth. Support infrastructure that allows for balanced multi-use development. 12. Utilize committee representatives to promote the H2050 plan and how land use planning can coincide with the plan’s desired outcomes. b) strengthening the capacity of local entities to provide capital assistance to businesses/entrepreneurs to build economic activity throughout the region. 13. Convene a task force of large regional entities in various sectors (including companies, higher education and area foundations) to explore best practices nation-wide.

Draft/June 2016 8 Growing Together. Responsibly.

o develop a series of actions for the next five years to cultivate more entrepreneurship within their companies o cultivate greater innovation opportunities for startups in the region 14. Expand assistance programs for very small business start-ups (i.e. business planning, financing options, etc.). c) building business capacity/knowledge in underserved areas. 15. Promote the REACH program to underserved areas in the region as a way to increase the number of companies who have adequate business and the financial capacity to compete in the marketplace. Expand the REACH program or duplicate in other areas outside the City of Omaha. d) connections between various entrepreneurial efforts to strengthen its eco- system to encourage innovation, creative financing, and mentorship. 16. Identify best practices such as the Oregon Entrepreneurs Network led by Linda Weston and analyzing what can be replicated or customized to Heartland 2050. 17. Leverage and support existing efforts to establish a Heartland 2050 Region Entrepreneurs Network. e) proactive marketing and branding efforts to promote the region as a profitable location for businesses/entrepreneurs.

Draft/June 2016 9 Growing Together. Responsibly.

Education

We want all residents living in the Heartland to have access to high- quality education that prepares individuals with the skills needed to participate in a growing and changing economy and attracts potential employers to a well-trained workforce. Expanding educational opportunities from a comprehensive ‘cradle to career’ strategy, including early childhood development, through higher education and career entry will not only boost our region’s economic competitiveness, but it will also contribute to residents’ capacity to participate in civic and political discourse as diversity increases. Our region’s shared future depends on reducing the achievement gap in educational attainment. Focusing on post-secondary education that grows the appropriate skills will ensure a wide variety of options for Heartland residents.

Draft/June 2016 10 Growing Together. Responsibly.

Outcome 2.1: By 2050, we have aligned education systems and community support that ensures all students throughout the region succeed regardless of race, class, ability, or geography. Strategies: Heartland 2050 will promote, support, and/or facilitate: a) quality comprehensive early childhood development services to ensure all children are ready for school. b) programs to enhance home environments and the ability for children to obtain educational support in and out of the classroom. 1. Provide high-quality after-school, youth development, and family activities which provide learning and positive social opportunities for children and families outside of the school day. c) educational supports for vulnerable youth* from birth through career. 2. Coordinate alignment of the B-5 (Birth through 5 yrs of age) education programs that serve B-5 to ensure successful preparation to enter kindergarten. 3. Advocate for equitable funding for public schools to ensure schools attended by at- risk students provide an education preparing for college and careers. 4. Ensure access to a quality education that helps vulnerable youth achieve progress in skills and competencies, leading to sustained economic prosperity for all youth in the H2050 region. 5. Acknowledge and address the disproportionately high levels of high school dropout and lack of high school degrees for vulnerable youth. 6. Acknowledge and address disproportionate levels of opportunity youth.** d) post-secondary education and training to develop regional workforce skills through partnerships between public, private and non-profit organizations. 7. Increase access to education and job training in existing and emerging sectors that lead to job opportunities providing a living wage (such as apprenticeships, boot camps, career academies, certifications). 8. Increase the number of STEM (Science, Technology, Engineering, Math) graduates within the region. 9. Acknowledge and address the disproportionate levels of continued professional development and post secondary attainment to low and moderate income adults and families. *https://www.fas.org/sgp/crs/misc/RL33975.pdf **https://www.fas.org/sgp/crs/misc/R40535.pdf

Draft/June 2016 11 Growing Together. Responsibly.

Together, our region has addressed the social determinants of health, including neighborhood Health and Safety and built environment, health and health care, social and community context, economic stability and education.

For residents in the Heartland region, our quality of life greatly depends on the places we live, whether we feel safe and secure, and having convenient options for a healthy lifestyle. We want to promote active lifestyles and have nearby options for quality health care services. In addition to accessible, quality primary healthcare, it is important that the region create exceptional healthcare facilities for research and advanced level of services and implement policies that address lingering health disparities among low-income residents and communities. As our region grows, we must develop new neighborhoods and revitalize existing ones to create places that are safe, active, healthy and desirable for our residents.

Draft/June 2016 12 Growing Together. Responsibly.

Outcome 3.1: By 2050, we will have a healthier population reflected in the community, neighborhoods and built environments with improvement in physical and behavioral health. Strategies: Heartland 2050 will promote, support, and/or facilitate: a) neighborhoods that encourage active living and healthy lifestyles by providing walking and biking access, as well as access all, to parks, trails, public institutions and community services. 1. Establish guidelines to advance cities and towns so that active living is a natural part of their culture (i.e. conducting a health impact assessment). 2. Establish regional complete streets guidelines. b) partnerships with schools, community centers, nonprofits, faith-based organizations, and the private sector to address and educate regarding physical, social, and emotional health and well-being that begins in early childhood and continue through the life span. 3. Educate regional partners on the concept of an Accountable Health Community. 4. Support the development of Accountable Health Communities within each county. 5. Coordinate the county efforts as a region. 6. Disseminate and share best practices within the region and seek opportunity for partnership. c) development of quality neighborhoods and supporting infrastructure. 7. Through the Health Impact Assessment process, apply a health lens in the development and enhancement of housing, parks, trails, streets, and community services. Outcome 3.2: By 2050, we have equity in access and availability to physical and behavioral health services and have eliminated disparities. Strategies: Heartland 2050 will promote, support, and/or facilitate: a) a comprehensive strategy focused on preventative health care access that is evidence-based and coordinated across systems and communities. 8. Inventory providers and enlist their cooperation.

Draft/June 2016 13 Growing Together. Responsibly.

9. Educate healthcare providers across the region on integrated care models (SAMSHA: Substance Abuse and Mental Health Services Administration). 10. Support development of these models. b) health services with locations, hours, delivery methods, etc. that are accessible for all, especially vulnerable and historically underserved populations. 11. Identify gaps in health services based on local data across the region. - support actions based on gap analysis. c) Adequate financial support (e.g. funding and affordable services) for all residents to receive care. 12. Estimate financial support needed to close identified service gaps and inform policy makers. Outcome 3.3: By 2050, we have a region where all neighborhoods benefit equitably from a prosperous economy. Strategies: Heartland 2050 will promote, support, and/or facilitate: a) development of a community that is resilient to overcome the traumatic effects of poverty. 13. Utilizing existing coalitions, educate and train all sectors in the community, on trauma, the effects, and the concept of Trauma-Informed Care. 14. Support the development of a Trauma-Informed region. 15. Support existing businesses and recruit new businesses that pay a living wage (see Outcome 1.1 in Economic Development). b) integration of a community health worker workforce into the health system and community organizations. 16. Educate the health provider community on the concept of the community health worker model. 17. Support the development of the community health worker model within healthcare systems across the region. c) equitable access to healthy, affordable food. 18. See Outcome 6.5 in Natural Resources.

Draft/June 2016 14 Growing Together. Responsibly.

Housing and Development

Strong communities and neighborhoods are vital to people living in the Heartland and contribute to the quality of life we enjoy. People want a variety of housing options, both in the city as well as our suburban and rural communities, meeting the needs and preferences of the whole community. People want to be able to bike and walk to neighborhood stores, businesses and schools so they can be less dependent on cars and cultivate healthy lifestyles. Heartland residents are concerned about high taxes, environmental issues, housing segregation and areas of concentrated poverty, and want to see well-designed growth which makes the most efficient use of existing and planned infrastructure and public monies. As our region grows, new homes, employment areas and places to shop should be encouraged to locate in areas that are already developed in both smaller towns and larger cities, while ensuring that new development on the edge of the region is contiguous, well- planned, efficient, and affordable. This can be accomplished by revitalizing existing and creating new “town center” developments or “main streets” that include a mix of housing sizes and types while providing amenities to accommodate families as well as our growing baby boomer population.

Draft/June 2016 15 Growing Together. Responsibly.

Outcome 4.1: By 2050, infill and adaptive reuse is prevalent throughout the region to supply a significant portion of new growth. By 2050, development in the region will center on nodes and corridors, which provide and facilitate connectivity, multimodal transportation, a mix of easily accessible housing, and economic, employment, civic, educational and recreational opportunities. Development within nodes and corridors should encourage sustainable infill development and reuse of existing resources within existing developed areas. Heartland 2050 will identify needs and remove barriers to achieving the outcome through the following strategies: a) Planning and Regulatory a. Encourage regulatory flexibility for existing and new development 1. Advocate for zoning and building codes throughout the region that offer greater flexibility for the size of lots and housing by applying state legislative efforts. 2. Address rural code compliance enforcement. b. Encourage development in existing nodes and corridors 3. Identify best practices for infill development that align with H2050 Vision. c. Identify priority nodes and corridors for new development 4. Map areas that have infill opportunities, and that need stabilization and renewal through infill investment. 5. Gather existing data and help embrace and share. Rank, prioritize, and align with specific goals. d. Public and private partnerships for infill development 6. Coordinate with existing efforts through areas plans such as Omaha by Design, chambers and regional cities. 7. Convene regional and for- and non- profit development entities and public agencies in a developer’s forum to review best practices, identify barriers and ways to successfully implement infill development. 8. Identify partners and target sites for catalyst projects that can be initiated in the short term. Use private and public sector resources to implement prototype buildings and simplify infill development. 9. Meet with neighborhood associations or host town halls in different areas of the region to make sure that citizens are involved in the infill development process that

Draft/June 2016 16 Growing Together. Responsibly.

impact their neighborhoods. Utilize foundations representing urban and rural, such as Harman County Foundation, Fremont Area Foundation, HCDC, etc. e. Multimodal transportation options connecting nodes and corridors f. Affirmatively further fair housing throughout the region g. Encourage rehabilitation, preservation, restoration and adaptive reuse of existing and historic structures 10. Create a toolkit of development resources such as guidelines for infill development; model codes that can be used throughout the region to incentivize infill development; and house plans for small lot residential infill. 11. Identify neighborhood resources, such as agencies or organizations, that can help neighborhood leaders and their teams with the use of the regional toolkit. b) Funding a. Expand use of existing redevelopment financing tools 12. Work with local officials to facilitate inventory of all pertinent public agencies in the region to procure an inventory of redevelopment financing tools and explore how these can be best leveraged to secure local and regional goals. b. Leverage redevelopment financing tools with private investment c. Encourage incentives and related policies that further the broad goals (nodes and corridors) d. Seek new federal, state, and local funding sources 13. Research/Implement other hybrid metro development funding options. Review and advocate TIF policies and implementation. e. Leverage private and philanthropic funding opportunities 14. Convene regional foundations and private funding resources to examine realistic steps they can take to enhance the tool kit. f. Allocate existing funding towards infill and priority nodes and corridors 15. Identify/Utilize existing funding for infrastructure. c) Education a. Educate decision makers and other influencing forces regarding the Heartland 2050 Action Plan 16. Improve awareness of the true and long term costs and benefits of various types of development. 17. Share the plan at community and neighborhood associations/alliance meetings to ensure that community members are aware and involved.

Draft/June 2016 17 Growing Together. Responsibly.

b. Broaden awareness of an interest in issues related to node and corridor center development c. Ensure awareness and understanding of available development finance tools 18. Develop a centralized data base. 19. Connect funders with funding opportunities. d. Educating lenders and real estate professionals about modern housing typologies e. Improve awareness of historical and cultural aspects of communities f. Promoting regional cooperation g. Achieve active and widespread community engagement 20. Educate real estate professionals, lenders, developers, foundations, political bodies, neighborhood associations and appraisers on the benefits and financial value of infill development and the public costs of greenfield. d) Political and Civic Outcome 4.2: By 2050, the region’s nodes and corridors provide inclusive opportunities for active and meaningful engagement and participation without limitation. Heartland 2050 will identify needs and remove barriers to achieving the outcome through the following strategies: a) Housing affordability/ Fair Housing a. A comprehensive mixed income and affordable housing program that assures coordinated delivery of services to address housing needs 21. Convene a coalition of public and private stakeholders in a task force to develop a preliminary comprehensive approach toward addressing housing affordability. 22. Establish an ongoing building and land use code coordinating committee among jurisdictions to examine best regional practices, and where and how various jurisdictions can agree on unified code provisions. - In areas of agreement, amend building land use codes to remove barriers and begin implementing affordable and workforce housing in targeted areas. 23. Evaluate review processes for all federal, state, and local financing programs, to include LIHTC, CDBG, HOME, and NAHTF. b. Educate economic developers, city officials, private developers, and architects on low income tax credits, CDBG and HOME funds

Draft/June 2016 18 Growing Together. Responsibly.

c. Encourage regional programs to affirmatively further fair housing practices and eliminate practice that has discriminatory or exclusionary outcomes 24. Implement recommendations in the Fair Housing and Equity Assessment (FHEA). 25. Encourage state and federal housing financing programs for the development of affordable housing with program requirements that uphold the goals of fair housing. 26. Identify whether impediments to fair housing goals exist in the statutory program requirements of state and federal financing resources for the development of affordable housing. b) Neighborhood Assessment – Improvement a. Convene stakeholders to create a regional toolkit and partnership program that stabilizes and strengthens neighborhoods currently in decline where incentives can have the greatest gains 27. Review and coordinate existing programs and partnerships. b. Neighborhood revitalization programs including land banking, code enforcement, rehab and demolition 28. Expand and enhance effective neighborhood revitalization programs. 29. Expand multi-modal transportation options to better connect all neighborhoods. c. Partnership of local governments, neighborhood associations and the private sector to work together to identify elements of successful neighborhoods 30. Coordinate strategies and actions in education, health, and safety to create desirable neighborhoods. 31. Identify standard desirable neighborhood indicators/milestones/markers. c) Outreach/Engagement a. Create a framework for inclusion in city, area, and neighborhood planning processes 32. Coordinate efforts and incentives to expand and offer housing to “Returning Citizens.” b. Programs for integrating new arrivals, including immigrants and refugees, into the community 33. Locate social services near neighborhoods that have a high immigrant population. 34. Identify entrepreneurial opportunities for immigrants.

Draft/June 2016 19 Growing Together. Responsibly.

35. Convene agencies dealing with immigrant populations and encourage collaboration of efforts. c. Education and awareness of the cultural diversity of the region

Draft/June 2016 20 Growing Together. Responsibly.

Infrastructure

We want our leaders to make fiscally sound investments in the transportation system, utilities, renewable energy and new technology to support prosperity for all residents. We want to ensure that existing roads, highways and transit systems are maintained properly, improved, and implemented in a fair and equitable manner. We also want more options for getting around the region, like expanded bike and pedestrian facilities and new forms of transit, coordinating with Metro’s transit system improvements underway already. The transportation sector (rail and truck logistics) is a major part of our region’s economy and regional investments that balance new transportation options, advance workforce development for disadvantaged neighborhoods, and support existing networks are needed. New sites for industrial development will benefit from access to highway, railroad, freight, and air transportation. The US 34/Platteview Road corridor which opened a new $100+ million bridge recently across the Missouri River is an example of how new industrial development can be linked to existing highways. Other investments in infrastructure, such as broadband, will also support our communities and workforce.

Draft/June 2016 21 Growing Together. Responsibly.

Outcome 5.1: By 2050, we have a transportation system that allows for efficient movement of people, goods and services throughout the region by all modes. We have developed an efficient and effective scale of infrastructure that meets the constant evolution of human needs. Development patterns will have a greater focus on walking, biking, and transit. Strategies: Heartland 2050 will promote, support, and/or facilitate: a) a regional transportation plan for the eight-county area that provides for regional coordination, with inclusive local representation in decision making. Modes in the transportation plan will include roads and auto, freight and logistics, biking and walking, and local and regional transit. Plan will consider emerging future technologies such as autonomous connected vehicles and drones. 1. Explore structures to address transportation issues regionally. Expand existing inter-local cooperation agreements to include members from MAPA, Nebraska, Iowa, the eight counties, and local governments - with representation from urban, suburban, and rural areas. 2. Develop a coordinated staff team led by MAPA with executive and technical staff borrowed from other organizations, such as the states, counties, and private industries. Agencies and organizations will commit to an annual leadership-sharing program targeted to achieving specific programs. 3. Review options for regional bond issues and a funding compact in each state; with close coordination between state funding packages. Coordinate timing and projects between states. b) coordinated local and regional capital improvement programs highlighting regionally significant projects that are adopted and implemented by each of the eight counties and local jurisdictions. 4. Create a phased capital improvement plan and a coordinated capital improvement program that has multiple sources of funding to implement the regional vision. 5. Fund the regional transportation effort through public and private sector funding. c) in coordination with Heartland 2050 regional land use plan, transportation improvements (existing system and expansion) to complete physical links between town centers, employment centers and areas of concentrated poverty. Walking, biking and transit facilities integrated into all areas of the

Draft/June 2016 22 Growing Together. Responsibly.

region so that they are safe, efficient and offer convenient connections. Aesthetics considered from a local and regional perspective. 6. Adopt a regional complete streets policy that addresses providing for all users and modes and considers the context of the land use when planning, improving, and maintaining the region’s roadways. Monitor progress in achieving complete street goals, and celebrate successes throughout the region to encourage implementation of complete streets. 7. Prepare model policies for local jurisdictions to adopt that provide for all users and modes in transportation projects. Prepare design guidelines for implementation throughout the region. 8. Coordinate transportation, housing and economic development investments to foster more equitable development patterns and healthy opportunity-rich neighborhoods across the region. 9. Make transportation investments that increase mobility and access to jobs for low- income transit-dependent residents and expands employers’ access to workers. Outcome 5.2: By 2050, we have efficient, sustainable, and affordable utility systems that foster health and prosperity and incorporate advanced technologies to better serve residents and businesses. Strategies: Heartland 2050 will promote, support, and/or facilitate: a) infrastructure planning across political boundaries, based on land topography and natural areas, and managed growth so that new development is contiguous and directed to areas where adequate public infrastructure and services exist already or are planned. 10. Conduct a regional market assessment in coordination with property inventory. b) coordinated water and waste water strategies with strong local representation in decision making, recognizing geographic and political barriers. 11. Joint services and tools across the region, enabling local jurisdictions to work together. c) Regional guidelines for water, waste water, storm water and solid waste management that are consistent with the Heartland 2050 regional land use plans. 12. Develop a regional, consolidated service plan which enables shared resources with water and treatment facilities provided for multiple cities within the drainage service area.

Draft/June 2016 23 Growing Together. Responsibly.

d) regional energy strategies to provide efficient access to a diverse portfolio of reliable energy sources, including a larger portion of renewable energy sources, distributed energy generation and conservation practices.

Draft/June 2016 24 Growing Together. Responsibly.

Resources

Our region benefits from its proximity to productive and valuable farmland, clean air and high-quality water sources, and good access to green space and parks. The Loess Hills region of Iowa is also significant geologically, featuring unusually deep deposits of glacial silt and home to many of the largest prairie remnants of the state. Maintaining these features, including access to fresh, locally grown foods and preservation of pristine landscapes for future generations is important. Taking advantage of new opportunities to invest in and expand our renewable energy sources, providing a new economic base for our region, is also highly desired. In the future, the impact of natural disasters will be mitigated by limiting development in floodplains such as the Missouri and Platte River floodplains and careful storm-water management in other flood prone areas. Expanding the wealth of existing recreational trails and green spaces will create a connected green network of recreational opportunities and provide places for healthy, active recreation. Just as important are the connections between these natural areas, which create a connected green network of recreational opportunities.

Draft/June 2016 25 Growing Together. Responsibly.

Outcome 6.1: By 2050, we have enhanced human and ecological benefits for our quality of life and preservation of our natural resources through a safe regional trail, park, and green space system. The system serves and connects all areas of the region, providing access to nature and transportation options. Natural areas, streams and rivers, and agricultural land are protected through a combination of parks, greenways, and development policies which respect property rights. Strategies: Heartland 2050 will promote, support, and/or facilitate: a) a coordinated regional green space master plan by a regional park and trail partnership. 1. Complete a coordinated regional Bicycle & Pedestrian Plan. 2. Complete a regional Natural Resources Inventory. 3. Using an ongoing Natural Resources Inventory process, complete a regional green space and land use assessment to identify long-term needs for natural resource protection, recreation, agriculture, and industry; and to identify and improve integration. 4. Create a Heartland 2050 regional park and trail partnership. b) model ordinances and codes. 5. Research codes and ordinances. 6. Implement code and ordinaces that support Outcome 6.1. c) policies and mechanisms to implement the green space master plan. 7. Provide support for local governments during implementation, including adapting the model ordinances(s) for local resources and conditions; identifying staffing needs for implementation; and initial administration and interpretation assistance. 8. Draft enabling legislation for a regional organization or authority, and funding program; and lobby for passage in the Iowa and Nebraska legislative bodies. 9. Shepherd the green space master plan through adoption at the county and city levels. d) a financing program which includes public, private, and foundation funding. 10. Identify seed money from parks and recreation, environmental, transportation, and foundation funding; for initial analysis, planning, branding and policy development.

Draft/June 2016 26 Growing Together. Responsibly.

e) regional branding promotion and education to create one cohesive identity for all regional parks and trails. 11. Create a regional and integrated greenways and trails brand and marketing plan. 12. Support re-signing major, existing regional trails. 13. Through outreach and education, create a regional culture where people value natural resources, wellness and participate in outdoors activities. Outcome 6.2: By 2050, we have implemented a regional strategy that manages and conserves water as a beneficial resource. The strategy addresses water management including flood and drought risk, water quality and water supply-to both adapt to changing conditions and limit the impact of natural disasters. Strategies: Heartland 2050 will promote, support, and/or facilitate: a) a regional organization or partnership to conserve water supplies, improve water quality, and consider rain fall and storm water management. 14. Create a Heartland 2050 Water Resources Coordinating Committee to convene existing water resource –related organization, evaluate existing roles and responsibilities, and formalize and strengthen regional cooperation in support of the Heartland 2050 outcomes and strategies. 15. Increase coordination on drinking water supply issues with surrounding regions and states. b) reduce flooding and flood risks through existing organizations. 16. Facilitate and pilot cooperative storm water management projects including flood risk management, floodplain buyout, water quality protection, and drinking water supply protection and development; incorporate green Infrastructure, green space protection, and recreation. c) model storm water management and green infrastructure codes and ordinances. 17. Assess current stormwater/green infrastructure codes in the region; identify areas where new codes should be adopted and how those that already exist can be improved. d) policies and mechanisms. 18. Work with agencies in the region to identify current policies and mechanisms associated with this outcome; make recommendations on how they can be updated or improved.

Draft/June 2016 27 Growing Together. Responsibly.

19. Implement mechanisms to remove existing development from floodplains when opportunities arise. 20. Shepherd the regional water strategy through adoption at the county and city levels. e) a financing program which includes public, private, and foundation funding. 21. Identify and compile a list of funding sources available for projects related to this outcome and agencies in the region that have applied for them. 22. Heartland 2050 Water Coordinating Committee develops and implements funding strategy. f) protect undeveloped floodplains and stream or river corridors as natural areas. 23. Review existing studies regarding structural improvements for communities along the Missouri River. 24. Using the Natural Resources Inventory, identify those undeveloped floodplains, streams, and river corridors that will be protected from future development. Codify regulations/ordinances to ensure the protection of these areas. Outcome 6.3: By 2050, we protect and enhance air quality as an essential resource for human health, economic development, natural environment, and quality of life. Strategies: Heartland 2050 will promote, support, and/or facilitate: a) a Clean Air Action Plan. 25. Develop a Clean Air Action Plan that incorporates strategies and policies across multiple sectors to protect air quality; and prepares contingencies for Clean Air Act non-attainment. 26. Identify and incentivize installation of alternative fuel stations (ethanol, plug in vehicles, etc). 27. Create a Heartland 2050 clean air partnership. b) prepare for changing conditions and regulatory requirements. 28. Clean Air Action Plan will identify opportunities to beta-test technologies, programs, and policies to meet changing regulatory requirements. 29. Shepherd the Clean Air Action Plan through adoption at the county and city levels. c) regional air quality education campaign.

Draft/June 2016 28 Growing Together. Responsibly.

30. Incorporate Clean Air Action Plan policies and implementation strategies into sector plans, policies, capital improvement projects, permits, and educational programs. Work with business community on wellness programs and impacts of air quality. 31. Develop and implement an education and outreach program to promote regional air quality. 32. Use the Environmental Health objectives of the Healthy People 2020 plan as a guideline. https://www.healthypeople.gov/2020/topics-objectives/topic/environmental-health/objectives d) a financing program which includes public, private, and foundation funding. 33. Identify seed money from public health, environmental, transportation, public utility, and foundation funding; for initial analysis, planning, and policy development. 34. Define SMART (Specific, Measurable, Attainable, Relevant, Time-Bound) objectives for action, projects/interventions for achieving them, and teams to pursue them. Outcome 6.4: By 2050, we are working together effectively as a region to reduce and manage solid waste and landfills. Strategies: Heartland 2050 will promote, support, and/or facilitate: a) regional policies and mechanisms for integrated solid waste management. 35. Consistent with the Integrated Solid Waste Management Act, maintain Waste Management areas that utilize regional landfills and minimize transportation impacts. 36. Develop policy(ies) that reduce/eliminate yard waste collection and disposal and incentivize better landscape management practices and soil improvement practices on residential properties. 37. Regional adoption of the integrated solid waste hierarchy in coordination with the Integrated Solid Waste Management Plan (ISWMP) Task Force as overriding policy. (reduce, reuse, rethink: http://en.envirocitiesmag.com/articles/pdf/waste_management_eng_art2.pdf) 38. Identify and support a “Source Reduction Leader” as identified in the most current ISWMP. http://www.sarpy.com/landfill/documents/MAPA_ISWMP_Update_June_2012.pdf 39. Develop policies that encourages waste reduction. 40. Use methane generated by solid waste treatment facilties for energy purposes.

Draft/June 2016 29 Growing Together. Responsibly.

b) regional branding and education promoting waste reduction. 41. Develop and implement an education and outreach program to promote a culture of solid waste hierarchy: reduce, reuse, rethink. 42. Develop and implement residential yard waste reduction diversion education and outreach program. c) a financing program which includes public, private, and foundation funding. 43. Identify existing public funding sources. 44. Identify potential private and foundation funding sources. 45. Consistent with the funding sources, provide dedicated funding for waste reduction education and outreach. 46. Provide Increased access to recycling pick-up or drop-off centers. Outcome 6.5: By 2050, the region has a sustainable system of local agriculture that provides food to the region. The system includes means to promote and protect agricultural land use. Strategies: Heartland 2050 will promote, support, and/or facilitate:

a) equitable access to healthy local foods. 47. Develop a local, self-reliant food economy that provides convenient and affordable farm to table system - in which local food production, distribution, and consumption is integrated. 48. Farm to school program 49. Conduct land use/land owner survey to identify land potentially available for local food production. Identify strategies to promote and implement local food/farmer/land owner partnerships bank to ensure equitable access to these lands. 50. Create a Heartland 2050 Local Food Coordinating Council to support collaboration of entities engaged in local food systems work. https://www.ams.usda.gov/sites/default/files/media/Regional%20Food%20Hub%20Resou rce%20Guide.pdf (need to map existing foods hubs and their area of focus) 51. Expand local food access year-round (greenhouses, urban gardening, meat and dairy farms, etc.) b) biodiverse and sustainable agriculture and food systems. 52. Use of curriculum, more expansive and inclusive, for sustainable agriculture in the classroom.

Draft/June 2016 30 Growing Together. Responsibly.

53. Implement a plan to produce and provide equitable access to fresh local food. 54. Identify and support local examples of best practices for food systems. 55. Create a “closed loop” system by establishing and prioritizing the best use of food.* 56. Identify and support best practices to enhance soil fertility and remove this waste stream from landfilling.* c) model ordinances and codes. 57. Research barriers that effect outcome 6.5. 58. Shepherd the local foods plan through adoption at the county and city levels.

d) regional branding and education promoting waste reduction. 59. Implement an education program on how to properly grow, use, prepare, and store fresh local foods.* 60. Develop a catalog of educational programs and distribute throughout the region. 61. Develop a Buy Local initiative to promote local food purchasing. 62. Seek PSA for food waste reduction.

e) a financing program which includes public, private, and foundation funding. 63. Identify a centralized grant and funding facilitator (Heartland 2050 Local Food Coordinating Council). *https://www.epa.gov/sustainable-management-food/food-recovery-hierarchy

Draft/June 2016 31 SECTION VIII RECORD RETENTION

A. GENERAL ​

MAPA records are divided into three categories: 1) program and project material which would include federal grants and/or contracts; 2) financial material which would include all accounting data, worksheets, warrants, and Finance Committee records, ledgers, journals, personnel and tax information; and 3) additional materials consisting of Minutes of the Board of Directors, Council of Officials, Finance and all other committees, Executive Order 12372 cases, and non­project related correspondence.

B. PROGRAM AND PROJECT RELATED MATERIALS ​

MAPA shall maintain program and project books, records, documents and all materials related to federal contracts and grants for three years from the date of final payment or for the time period specified in 2 CFR, Part 200.333, whichever expires later. Generally, this would require that records, books and documents be maintained three years from the date of final audit clearance or final payment. Documents and records which relate to disputes, litigation or appeals shall be maintained until such dispute, litigation or appeal, has been disposed of.

C. FINANCIAL MATERIALS ​

Financial and accounting materials shall be retained for the following periods:

Document Retention Period Position or Department Responsible

Accounts Receivable invoices 5 years Fiscal Officer

Purchase Orders 5 years Fiscal Officer

Accounts Payable records to support 5 years Fiscal Officer disbursements of funds for materials, equipment, supplies and services,

1099 Forms 6 years Fiscal Officer

Contracts and documents supporting 5 years after the close of the Director of Finance grant funding contract or grant and Operations

Purchases of Property, Plant and 5 years after disposal of asset Fiscal Officer Equipment (PPE) Fiscal Audit Permanent Director of Finance and Operations

Fiscal Audit Records including 3 years after close of the audit Fiscal Officer Depreciation Schedules

Cash Receipts 5 years Fiscal Officer

Bank Security Records 5 years after termination, Fiscal Officer expiration, or release of contractual obligations

Annual budgets (including amendments) Permanent budget statement Director of Finance included in fiscal audit is and Operations sufficient documentation

Budget Working Papers 3 years after fiscal year end Director of Finance and Operations

Monthly Financial Reports 5 years after fiscal year end Fiscal Officer

Ledgers Journals and Entry For fiscal years with an annual Fiscal Officer Documentation financial audit report, 5 years after fiscal year end. If no audit, permanent.

D. PAYROLL AND HUMAN RESOURCES MATERIALS ​ ​

Payroll materials shall be retained for the following periods:

Document Retention Period Position or Department Responsible

Selection, hiring & employment records 2 years after creation of the Director of Finance document or the hire/no hire and Operations decision whichever is later

Payroll sheets, registers, or their 5 years after fiscal year end Fiscal Officer equivalent of salaries and wages paid to individual employees for each payroll period and tax withholding statements

Form I­9 3 years after date of hire or one Director of Finance year after date of termination and Operations whichever is later Time and attendance sheets 5 years after fiscal year end Fiscal Officer

Paid checks, receipts for wages paid in 5 years after fiscal year end Fiscal Officer cash, or other evidence of payments for services rendered by employees

Employee Pension and Benefits Records 1 year after plan termination Director of Finance and Operations

Annual reports from a pension system of Permanent Director of Finance fund and Operations

Family Medical Leave Act Records 5 years Director of Finance and Operations

Personnel files 7 years after termination Director of Finance and Operations

Medical/benefits 6 years after plan year Director of Finance and Operations

W­4 Forms 4 years after separation Director of Finance and Operations

W­2 Forms 4 years after tax due date Fiscal Officer

E. ADDITIONAL MATERIALS ​

For retention purposes electronic files such as e­mail shall be treated the same. E­mail shall be searchable and organized.

Document Retention Period Position or Department Responsible

Agendas (Open Meetings), if the 2 years Director of minutes describe each matter Finance and considered by the governing body Operations and reference to the agenda is not required

Agendas (Certified Closed Meetings) 2 years Director of Finance and Operations Minutes – Written of Open Meetings Permanent Director of Finance and Operations

Meeting notes taken during the 90 days after approval of Director of meetings from which written minutes minutes by the governing Finance and are prepared body Operations

Audiovisual recordings of open 90 days after approval of Director of meetings for which written minutes minutes by the governing Finance and are prepared body Operations

Open meeting notices 5 years Information Officer

Resolutions Permanent Director of Finance and Operations

Public Comment Forms 2 years Program Director

Public Information Act Requests Date of request for records Information Officer fulfilled or withdrawn plus 1 year. Denied requests 10 years.

Contracts, Leases and Agreements 5 years after the expiration or Director of termination of the instrument Finance and Operations

Administrative Correspondence – 4 years Executive Director Incoming/outgoing and internal and Program correspondence pertaining to the Director formulation, planning, implementation, modification, or redefinition of the programs, services, or projects of a local government and the administrative regulations, policies, and procedures that govern them. May also include subject files, which are collections of correspondence, memos and printed materials on various individuals, activities, and topics.

General – Incoming/outgoing and 2 years Executive Director internal correspondence pertaining and Program to the regular operation of the Director policies, programs, services, or projects of a local government. May also include subject files, which are collections of correspondence, memos and printed materials on various individuals, activities, and topics.

Public Relations Records: News, 2 years or when no longer of Information Officer press releases or any public relations reference value, whichever is files maintained or issued by an longer agency. Includes print, electronic, audio and audiovisual records.

Annual Reports Permanent Information Officer

Conflict Disclosure Statements and Date of filing plus 3 years Director of Conflict of Interest Questionnaires Finance and Operations

Bids and Bid Documentation for 5 years, if paid with federal Program Director successful and rejected bids and grant 5 years after the close requests for proposals, including out of the grant. invitations to bid, affidavits of Unsuccessful bids 5 years. publication of call for bids, bid sheets and similar supporting documentation

Mileage and postal logs used for cost 5 years Director of allocation Finance and Operations

General Liability Insurance Policies 5 years after lapse of the Director of policy and all claims have Finance and been settled. Operations

Sources: https://www.acquisition.gov/?q=browsefar ­ Federal Acquisition Regulation ​ https://www.tsl.texas.gov/slrm/recordspubs/gr.html#top ­ Texas Archives Commission ​ http://www.sos.ne.gov/records­management/pdf/guideline_e_mail_march_2003.pdf ­ State of Nebraska ​ Records Administration

Administrative Procedures Amended May 28, 2015

Consultant Selection and Contracting Procedures. Audit firms selected must follow Federal Audit Guidelines.

B. FINANCIAL

The Financial Audit of the agency shall be performed annually for the year ending June 30. This audit must be available for distribution to the Board of Directors by the following October.

C. PROGRAM COMPLIANCE

A Program Compliance Audit of the agency will be performed as needed. This audit must be available for distribution to agency officials and grantors by the following October.

D. SUBCONTRACTS

Audits of agency subcontracts shall be performed on a timely basis. Subcontract audits shall be available to agency officials, contractors and grantors within nine (9) months following completion of the contract.

SECTION VIII RECORD RETENTION

A. GENERAL

MAPA records are divided into three categories: 1) program and project material which would include federal grants and/or contracts; 2) financial material which would include all accounting data, worksheets, warrants, and Finance Committee records, ledgers, journals, personnel and tax information; and 3) additional materials consisting of Minutes of the Board of Directors, Council of Officials, Finance and all other committees, Executive Order 12372 cases, and non-project related correspondence.

B. PROGRAM AND PROJECT RELATED MATERIALS

MAPA shall maintain program and project books, records, documents and all materials related to federal contracts and grants for three years from the date of final payment or for the time period specified in 2 CFR, Part 200.333, whichever expires later. Generally, this would require that records, books and documents be maintained three years from the date of final audit clearance or final payment. Documents and records which relate to disputes, litigation or appeals shall be maintained until such dispute, litigation or appeal, has been disposed of.

C. FINANCIAL MATERIALS

Financial and accounting materials shall be retained for the following periods:

Permanent Deposit Receipts Expense Vouchers on Capitalized Assets Ledgers Personnel Files (including insurance records) W-2 Forms

Seven Years Warrant Listing

Employee Earning Records after Termination

Two Years Monthly Worksheets for Financial Reporting Budget Worksheets

16 Administrative Procedures Amended May 28, 2015

D. ADDITIONAL MATERIALS

Permanent Board of Directors Minutes Council of Officials Minutes Finance Committee Minutes and Reports Committee Minutes Resolutions, Board of Directors and Council of Officials

Five Years Project Review Files

One Year Tape Recordings of Closed Sessions

Varying Miscellaneous, non-project related correspondence. Varies from two to five years.

(See internal MAPA Record Retention Policy Memo.)

SECTION IX PUBLIC ACCESS TO AGENCY DATA, INFORMATION AND RECORDS

A. GENERAL

Records and data retained by this agency, other than material produced for general distribution or sale, shall be available during normal business hours for inspection and reproduction at a reasonable rate upon request.

This policy shall apply to all information, records and data of the agency with the exception of matters specifically exempt from disclosure by U.S. public law or state statutes.

The following procedures and fee schedules shall be adopted and made public to expedite public access to agency records. A flat rate charge shall be imposed by the agency for staff time, file search and monitoring of those who access records and data.

B. PROCEDURES

MAPA maintains information, data and records in a variety of media including typewritten, handwritten, statistical tables, technical memoranda, maps, microfiche, cassette audiotapes and magnetic storage media. 1. Information retained by MAPA may be examined at the MAPA offices, 2222 Cuming, Omaha, Nebraska, during normal business hours, weekdays 8:00 a.m. to 4:30 p.m.

2. Prior to any search, a "Request for Information" form must be completed at the MAPA Office specifying, in as much detail as possible, the material to be accessed, the reason for use, along with the name, address and telephone number of the person requesting the information.

3. An appointment schedule will be determined for on-site inspection.

4. A staff member shall be available at the appointed time to assist in the identification of information to be examined and to obtain and provide the requested or the specific items for examination.

5. For the first half hour of the search, one half of the current non-member technical assistance hourly fee will be charged for each MAPA staff member participating. A minimum of one half hour will be charged. Each half hour beyond the initial 30 minutes will be assessed at the current non- member technical assistance fee schedule of the appropriate MAPA staff member.

6. Information, records, maps, data or other material in original or draft form may not be removed from the MAPA office.

17