Development Consent Order Application

Total Page:16

File Type:pdf, Size:1020Kb

Development Consent Order Application THE PLANNING ACT 2008 M4 (JUNCTIONS 3 TO 12) (SMART MOTORWAY) DEVELOPMENT CONSENT ORDER APPLICATION TR010019 Response to First Written Questions Section 9: Appendix L - Table of plots to which Article 30 applies Deadline II - 8 October 2015 List of plots to which Article 30 applies Plot Local authority Description number boundary 02-02a District of West Public road (Bath Road, A4) and pylon and overhead electricity lines Berkshire 02-05 District of West Public road, roundabout, verge and footways (Bath Road, A4) Berkshire 02-08 District of West Field and agricultural land (Dorking Way) Berkshire 02-09 District of West Footway (Dorking Way) Berkshire 02-10 District of West Public road, verge and hardstanding (Dorking Way) Berkshire 02-11 District of West Public verge and footway (Dorking Way) Berkshire 02-12 District of West Field, agricultural land and woodland (Dorking Way) Berkshire 02-16 District of West Railway (Reading and Plymouth), works and land Berkshire 02-18 District of West Railway (Reading and Plymouth), works and land Berkshire 02-20a District of West River (Holy Brook), banks and bed thereof Berkshire 02-20b District of West River (Holy Brook), banks and bed thereof Berkshire 02-22a District of West River (Kennet River), banks and bed thereof Berkshire 02-22b District of West River (Kennet River), banks and bed thereof Berkshire 02-23a District of West Tow path carrying public footpath (BURG/24/5) (Kennet & Avon Berkshire Canal) 02-23b District of West Tow path carrying public footpath (BURG/24/5) (Kennet & Avon Berkshire Canal) 02-25a District of West Waterway and tow path (Kennet & Avon Canal) Berkshire 02-25b District of West Waterway and tow path (Kennet & Avon Canal) Berkshire 03-07 District of West Access roads and land (Reading Motorway Service Area) Berkshire 03-12 District of West Access roads and land (Reading Motorway Service Area) Berkshire 04-03 District of West Field and woodland (Berrys Lane) Berkshire 04-04 District of West Field and woodland (Amners Farm Road) Berkshire 04-06 District of West Railway (Reading and Southampton) works and land Berkshire 04-10 District of West Railway (Reading and Southampton) works and land Berkshire 05-11 Borough of Public road, verges and drain (Mereoak Lane) Wokingham 05-12 Borough of Field, hardstanding and construction site (Mereoak Lane) Plot Local authority Description number boundary Wokingham 05-13 Borough of Field, hardstanding and construction site (Mereoak Lane) Wokingham 06-03 Borough of Reading Slip road and verge (M4) 06-04 Borough of Reading Slip road and verge (Basingstoke Road, A33) 06-05 Borough of Reading Slip road and verge (Basingstoke Road, A33) 06-08 Borough of Reading Land, stairway, hardstanding and footbridge (Basingstoke Road) 06-09b Borough of Motorway verge and embankment (M4) Wokingham 06-10 Borough of Reading Public road, footway and verge (B3270) 06-10a Borough of Reading Public road, footway and verge (B3270) 06-10b Borough of Public road, footway and verge (B3270) Wokingham 06-12 Borough of Reading Public verge (Whitley Wood Lane) 06-12a Borough of Reading Public verge (Whitley Wood Lane) 06-12b Borough of Reading Public road and verge (Whitley Wood Lane) 06-13 Borough of Public road, footway and verge (Whitley Wood Lane) Wokingham 06-14 Borough of Public road, verge and footway (B3270) Wokingham 06-14a Borough of Public road and verge (B3270) Wokingham 06-14b Borough of Public verge (B3270) Wokingham 06-20 Borough of Public footway and verge (B3270) Wokingham 07-04 Borough of Footway carrying public footpath (no 11), and cycle path and drain Wokingham (Lower Earley Way (West), B3270) 07-05 Borough of Public road (Lower Earley Way (West), B3270) Wokingham 07-06 Borough of Public road and verge (Lower Earley Way (West), B3270) Wokingham 07-08 Borough of Private access road (Cutbush Lane) Wokingham 07-11 Borough of Motorway verge, refuge area, hardstanding and drain (M4) Wokingham 10-07 Borough of Railway (London Waterloo and Reading), works and land Wokingham 10-09 Borough of Railway (London Waterloo and Reading), works and land Wokingham 17-12 Royal Borough of Land and woodland (Ascot Road) Windsor and Maidenhead 18-02 Royal Borough of Field, agricultural land, hedgerow, hardstanding and disused car park Windsor and (Ascot Road) Maidenhead 18-03 Royal Borough of Public road, verge and footway (Ascot Road, A330) Windsor and Maidenhead Plot Local authority Description number boundary 18-07 Royal Borough of Car park and hardstanding (Priors Way Industrial Estate) Windsor and Maidenhead 18-08 Royal Borough of Industrial unit (Unit 6, Priors Way Industrial Estate) Windsor and Maidenhead 18-09 Royal Borough of Land (Ascot Road) Windsor and Maidenhead 18-10 Royal Borough of Fields, agricultural land, tracks and telecommunications masts and Windsor and apparatus (Moor Farm) Maidenhead 18-17 Royal Borough of Field and agricultural land and hedgerows (Stroud Farm) Windsor and Maidenhead 18-17a Royal Borough of Access track (Stroud Farm) Windsor and Maidenhead 18-17b Royal Borough of Field, agricultural land and hedgerows (Stroud Farm) Windsor and Maidenhead 18-19 Royal Borough of Land and woodland (Aysgarth Park) Windsor and Maidenhead 19-02 Royal Borough of Field and agricultural land, telecommunications mast and hedgerows Windsor and (off Monkey Island Lane) Maidenhead 19-02a Royal Borough of Field and agricultural land (off Old Mill Lane) Windsor and Maidenhead 19-02b Royal Borough of Field and agricultural land and hedgerows (off Monkey Island Lane) Windsor and Maidenhead 19-06 Royal Borough of Woodland (off Monkey Island Lane) Windsor and Maidenhead 19-10 Royal Borough of Field, agricultural land and hedgerow (off Old Mill Lane) Windsor and Maidenhead 19-11 Royal Borough of Field and agricultural land (off Old Mill Lane) Windsor and Maidenhead 19-11a Royal Borough of Field, agricultural land and hedgerow (off Monkey Island Lane) Windsor and Maidenhead 19-14 Royal Borough of Field and agricultural land and hedgerows (off Monkey Island Lane) Windsor and Maidenhead 19-14a Royal Borough of Field and agricultural land and hedgerows (off Monkey Island Lane) Windsor and Maidenhead 19-16 Royal Borough of Land and woodland (off Monkey Island Lane) Plot Local authority Description number boundary Windsor and Maidenhead 19-18 Royal Borough of River (River Thames), bed and banks thereof Windsor and Maidenhead 19-21 Royal Borough of Land and hardstanding (Bray Business Centre) Windsor and Maidenhead 19-22 Royal Borough of River (River Thames), bed and banks thereof Windsor and Maidenhead 19-23 Royal Borough of Island (River Thames) Windsor and Maidenhead 19-24 Royal Borough of Island (River Thames) Windsor and Maidenhead 19-26 Royal Borough of River (River Thames), bank and bed thereof Windsor and Maidenhead 19-28 Royal Borough of Island (Pigeonhill Eyot) Windsor and Maidenhead 19-29 Royal Borough of Island (Pigeonhill Eyot) Windsor and Maidenhead 19-31 Royal Borough of Island (Pigeonhill Eyot) Windsor and Maidenhead 19-32 Royal Borough of River (River Thames), bank and bed thereof Windsor and Maidenhead 19-34 County of River (River Thames) and bed thereof Buckinghamshire, District of South Bucks 19-36 County of River (River Thames), bank and bed thereof Buckinghamshire, District of South Bucks 19-40 County of River (River Thames), bank and bed thereof Buckinghamshire, District of South Bucks 19-41 County of Verge and public footpath (nos TAP/16/4 and DOR/18/5) Buckinghamshire, District of South Bucks 19-45 County of Tow path carrying public footpath (DOR/18/5) Buckinghamshire, District of South Bucks Plot Local authority Description number boundary 19-46 County of Verge, tow path and public footpath (DOR/18/5) Buckinghamshire, District of South Bucks 19-47 County of Field, woodland and access track (Amerden Caravan and Camping Buckinghamshire, Park) District of South Bucks 19-49 County of Playing field (Trumpers Field), recreation area (Dorney School) Buckinghamshire, District of South Bucks 19-51 County of Field, agricultural land, manège and fence (Dorney Meadows) Buckinghamshire, District of South Bucks 19-53 County of Private road (Amerden Lane) and public bridleway (no TAP/19/2) Buckinghamshire, District of South Bucks 19-54 County of Private road (Amerden Lane) and public bridleway (no TAP/19/2) Buckinghamshire, District of South Bucks 19-55 County of Public road and verges (Old Marsh Lane) Buckinghamshire, District of South Bucks 19-56 County of Access track (Dorney Village Hall) Buckinghamshire, District of South Bucks 19-57 County of Public road and verge (Oak Stubbs Lane) Buckinghamshire, District of South Bucks 19-57a County of Public road and verge (Oak Stubbs Lane) Buckinghamshire, District of South Bucks 19-58 County of Field and woodland (10, Old Marsh Lane) Buckinghamshire, District of South Bucks 19-59 County of Field, agricultural land and buildings (Oak Stubbs Lane) Buckinghamshire, District of South Bucks 19-61 County of Field and agricultural land (Marsh Lane) Buckinghamshire, District of South Bucks Plot Local authority Description number boundary 19-62 County of Field and agricultural land (Marsh Lane), woodland and garden (1, Buckinghamshire, Glebe Close) District of South Bucks 19-65 County of Field and agricultural land (Marsh Lane) Buckinghamshire, District of South Bucks 19-73 County of Public road, footway and verge (Oak Stubbs Lane) Buckinghamshire, District of South Bucks 19-75 County of Field and agricultural land (Marsh Lane) Buckinghamshire, District of South Bucks 19-76 County of Field and agricultural land
Recommended publications
  • HA16 Rivers and Streams London's Rivers and Streams Resource
    HA16 Rivers and Streams Definition All free-flowing watercourses above the tidal limit London’s rivers and streams resource The total length of watercourses (not including those with a tidal influence) are provided in table 1a and 1b. These figures are based on catchment areas and do not include all watercourses or small watercourses such as drainage ditches. Table 1a: Catchment area and length of fresh water rivers and streams in SE London Watercourse name Length (km) Catchment area (km2) Hogsmill 9.9 73 Surbiton stream 6.0 Bonesgate stream 5.0 Horton stream 5.3 Greens lane stream 1.8 Ewel court stream 2.7 Hogsmill stream 0.5 Beverley Brook 14.3 64 Kingsmere stream 3.1 Penponds overflow 1.3 Queensmere stream 2.4 Keswick avenue ditch 1.2 Cannizaro park stream 1.7 Coombe Brook 1 Pyl Brook 5.3 East Pyl Brook 3.9 old pyl ditch 0.7 Merton ditch culvert 4.3 Grand drive ditch 0.5 Wandle 26.7 202 Wimbledon park stream 1.6 Railway ditch 1.1 Summerstown ditch 2.2 Graveney/ Norbury brook 9.5 Figgs marsh ditch 3.6 Bunces ditch 1.2 Pickle ditch 0.9 Morden Hall loop 2.5 Beddington corner branch 0.7 Beddington effluent ditch 1.6 Oily ditch 3.9 Cemetery ditch 2.8 Therapia ditch 0.9 Micham road new culvert 2.1 Station farm ditch 0.7 Ravenbourne 17.4 180 Quaggy (kyd Brook) 5.6 Quaggy hither green 1 Grove park ditch 0.5 Milk street ditch 0.3 Ravensbourne honor oak 1.9 Pool river 5.1 Chaffinch Brook 4.4 Spring Brook 1.6 The Beck 7.8 St James stream 2.8 Nursery stream 3.3 Konstamm ditch 0.4 River Cray 12.6 45 River Shuttle 6.4 Wincham Stream 5.6 Marsh Dykes
    [Show full text]
  • Written Evidence Submitted by Colne Valley Fisheries Consultative
    Colne Valley Fisheries Consultative WQR0011 Written evidence submitted by Colne Valley Fisheries Consultative 1. The Colne Valley Fisheries Consultative is based in the Colne Valley, Hertfordshire and represents fishery and conservation interests in the waterscapes of the River Colne, Mimmshall Brook, Upper Colne, Ellen Brook, R Ver, R Bulbourne, R Gade, R Chess, R Misbourne, Shires Ditch, Alder Bourne, Pymmes Brook, R Brent or Crane, Frays River, R Pinn, Bigley Ditch, Poyle Channel, Colne Brook, Wraysbury River, Bonehead Ditch, Duke of Northumberland’s River, Longford River, R Ash and the many lakes which hold water in the lands surrounding the rivers. 2. The rivers to the west of the catchment are all important chalk streams draining the Chilterns. The same chalk aquifer provides much of the water for consumption to Affinity Water, the supply company, and to Thames Water which has responsibility for waste water and sewage. 3. The Grand Union Canal runs into and out of the rivers Bulbourne, Gade and Colne and the whole system is a tributary of the River Thames. 4. Membership of the Consultative is open and presently it represents about forty angling clubs with local water holdings with a combined individual membership in the regions of 50,000. Many Londoners use the Colne Valley as their local wild place for angling, walking, sailing, boating, running and cycling with good communication links to and from the city. 5. The Consultative works in partnership with many stakeholders; the individual river groups, Herts & Middlesex Wildlife Trust, London Wildlife Trust, Colne Valley Regional Park, The Environment Agency, TW and AW, Angling Trust, Fish Legal, Wild Trout Trust and many others.
    [Show full text]
  • South Colne Sub-Area 3
    SOUTH COLNE DETAILED STRATEGIES SUB-AREA 3 South Colne character South Colne is characterised by flatter topography as the River Colne approaches its confluence with the Thames. Braided watercourses and flood meadows typify the landscape, which is dominated in aerial views by a series of large reservoirs, the product of historic gravel extraction industry in the area. The South West London Reservoirs are internationally significant for the populations of overwintering birds they support, some from as far afield as the Arctic. This area also includes Heathrow airport and the extensive associated transport infrastructure. In close proximity to the airport lie some significant heritage assets including Harmondsworth Barn, the largest timber- framed building in England. © Brian Robert Marshall CC Andreas Trepte, www.photo-natur.net Harmondsworth Barn River Colne flowing through Staines Moor Lakes and reservoirs important for SOUTH COLNE overwintering wildfowl DETAILED SUB-AREA 3 STRATEGIES © Stefan Czapski The Causeway at Staines Reservoir Ankerwycke Priory - home to the Ankerwycke Colne Brook at Wraysbury - important for Yew wildlife Colne & Crane valleys green infrastructure strategy 51 South Colne area strategy overview The strategy for South Colne and Heathrow associated opportunities for education and is to improve and repair the landscape and interpretation and new viewpoints. connectivity for people and wildlife, conserve INTERWOVEN RIVERS and enhance valuable ecological habitats and Water and biodiversity enhancements should aim promote access for all to new and improved to restore floodplains and focus on the benefits of RECREATION landscape destinations. natural landscapes to contribute to natural flood LOCAL + GLOBAL management in this low lying landscape. The Roads and other major infrastructure in this area Duke of Northumberland’s River and Longford WATER SPORTS create particular severance and impair the River close to Heathrow could be enhanced TRANSFORM quality of the user experience.
    [Show full text]
  • 15 Road Drainage and the Water Environment
    HIGHWAYS AGENCY – M4 JUNCTIONS 3 TO 12 SMART MOTORWAY 15 ROAD DRAINAGE AND THE WATER ENVIRONMENT 15.1 Introduction 15.1.1 This chapter assesses the impacts of the Scheme on road drainage and the water environment during construction and operation, focussing on the effects of highway drainage on the quality and hydrology of receiving waters. In view of the long design-life of the Scheme (30 years for new gantries, 40 years for new carriageway construction, and 120 years for new bridges), the decommissioning phase of the Scheme has not been considered in this chapter because its effects are not predicted to be worse than the effects assessed during the construction and operational phases. The chapter assesses four principal impacts: a) effects of routine runoff on surface water bodies; b) effects of routine runoff on groundwater; c) pollution impacts from spillages; and d) flood impacts. 15.1.2 Although Interim Advice Note (”IAN”) 161/13 ‘Managed Motorways, All lane running’ (Ref 15-1) has scoped out the assessment of ‘Road Drainage and the Water Environment’ for smart motorway schemes, the assessment is required to ensure the protection of the water environment, to prevent its degradation, and ensure adequate mitigation measures are in place to prevent any adverse impacts. 15.1.3 The road drainage and water environment assessment for the Scheme has been undertaken in accordance with standard industry practice and statutory guidance. 15.1.4 This chapter details the methodology followed for the assessment, and summarises the regulatory and policy framework relating to road drainage and the water environment.
    [Show full text]
  • Royal Borough of Windsor and Maidenhead
    Contents 1.0 FLOOD RISK MANAGEMENT 1.1 Strategic Flood Risk Assessment 1.2 Winter 2012 Floods 1.2.1 Maidenhead Windsor and Eton FAS 1.2.2 Temporary defences in Windsor 1.2.3 Old Windsor 1.2.4 Datchet 1.2.5 Wraysbury 1.3 Recovery Projects 1.3.1 Taplow Washout 1.3.2 Cookham and North Maidenhead Flood Wall Repairs 1.3.3 Black Potts Washout 1.3.4 Eton End School Bund, Datchet 1.3.5 Bund Removal, Datchet 1.4 Community Engagement 1.4.1 Cookham Parish 1.4.2 Bisham Flood Alleviation Scheme 1.4.3 Datchet 1.4.4 Wraysbury 1.4.5 Ham Island 1.4.6 River Level Data and ‘Parishes Live’ 1.4.7 Environment Agency.Gov Website Live 1.5 Insurance Related Information 1.6 River Maintenance 1.7 River Bed levels surveys 1.8 Flooded Land at Little Common Farm, Eton Wick 1.9 Flood and Water Management Act 2.0 PLANNING 2.1 Planning Charge 2.2 Maidenhead Waterways Restoration and Town Centre Regeneration 2.3 Travellers Site - Datchet 2.4 Bray Road Maidenhead – proposed school 2.5 RBWM Borough Local Plan 2014 Preferred options consultation 2.6 Position Statement for replacement dwellings 3.0 WASTE 3.1 Brayfield Farm 3.2 Horton Brook Quarry – Colnbrook 4.0 HYDROPOWER 5.0 WATERWAYS 5.1 Speed and Wash campaign 5.2 Waterways Volunteers 5.3 Magna Carta Celebrations 6.0 WATER FRAMEWORK DIRECTIVE 7.0 WATER RESOURCES 1 OFFICIAL 1.0 FLOOD RISK MANAGEMENT 1.1 Strategic Flood Risk Assessment We recently met to discuss the River Thames Scheme (Datchet to Teddington), which is included in the Royal Borough’s SFRA.
    [Show full text]
  • COLNE VALLEY – LANDSCAPE on the EDGE Landscape Conservation Action Plan - March 2018
    COLNE VALLEY – LANDSCAPE ON THE EDGE Landscape Conservation Action Plan - March 2018 Chair of Landscape Partnership Lead Partner Colne Valley Park Community Interest Company Friends of the Colne Valley Park Spelthorne Natural History Society Front cover photo of Stockers Lake – Greg Townsend provide an essential project management tool for effective and efficient delivery. The partnership involved in preparing this LCAP considers it to be a compelling, innovative and realistic bid, with a range of projects which will connect people, biodiversity and access. ‘Colne Valley – Landscape on the Edge’ meets all the objectives of the Heritage Lottery Landscape The Landscape Partnership programme, run by the Heritage Lottery Partnership programme, with each of the projects proposed under the Fund, seeks to ‘conserve areas of distinctive landscape character’ and Scheme meeting at least one objective. promote a ‘holistic and balanced approach to the management of landscape heritage at a landscape scale’. Landscape Conservation Action Covering parts of Berkshire, Buckinghamshire, Greater London, Plans (LCAPs) required as part of this programme, provide the foundation Hertfordshire and Surrey, ‘Colne Valley – Landscape on the Edge’ will for planned work to benefit heritage, people and communities and are harness and stimulate organisations and communities across the area to needed in order to secure the Heritage Lottery Fund grant towards the support and sustain delivery. Residents and visitors will gain positive proposed work. perceptions about the area, will learn more about the landscape and feel more confident about exploring it. They will be supported to assist in Our LCAP, ‘Colne Valley – Landscape on the Edge’, comprises a suite of ‘shaping their place’, and feel more motivated to venture out and enjoy exciting projects (the Scheme), and seeks to: set these in the landscape the area, and to participate in efforts to improve and maintain it.
    [Show full text]
  • Neolithic to Early Bronze Age Buckinghamshire: a Resource Assessment
    Neolithic to Early Bronze Age Buckinghamshire: a resource assessment Inheritance Mobility Although Neolithic populations are thought to have had continued mobility, more and more evidence for Neolithic settlement has come to light. In Buckinghamshire the most important evidence comes from excavations in advance of the construction of Eton Rowing Course (ERC) and the Maidenhead to Windsor and Eton Flood Alleviation Scheme (MWEFAS), mainly in the parish of Dorney in South Bucks on the Thames. The evidence points to intensive use of the area by people in the Early Neolithic but it is not certain that it represents year-round sedentary occupation rather than seasonal re-use (Allen et al 2004). Other evidence does point to continued mobility, such as the artefact scatters at Scotsgrove Mill, Haddenham (Mitchell 2004) and East Street, Chesham (Collard 1990) for example, reflecting visits over a long period of time. Persistent places Mesolithic persistent places continue to have meaning for Early and later Neolithic populations. These persistent places include East Street, Chesham (Collard 1990, 18) and Late Neolithic to Early Bronze Age activity at Chessvale Bowling Club nearby (Halsted 2006, 23-8). Another persistent place seems to have been the lower reaches of the River Colne. Recent excavations at the Sanderson Site, Denham (Halsey 2005) continued the activity from nearby Three Ways Wharf, Uxbridge (Lewis 1991). Other persistent places include the attractive river valley location at Bancroft in Milton Keynes (Williams 1993, 5), and Scotsgrove Mill, Haddenham, where the River Thame meets one of its tributaries (Mitchell 2004, 1). These persistent places may have been the basis of evolving ideas about land tenure.
    [Show full text]
  • 200922 Wgfc Report Final Cb
    Active Travel in The Ivers Parish A Report to the Highways & Infrastructure Committee of The Ivers Parish Council September 2020 1 200922_WGFC_Report_Final Abbreviations & Definitions Active Travel - making journeys by physically active means, such as walking, cycling or use of a wheelchair. AQMA – Air Quality Management Area. AQMP – Air Quality Management Plan. DfT – Department for Transport Footway – paved footpath, usually adjacent to a road. PRoW – Public Right of Way established in law. A right of way is a path that anyone has the legal right to use on foot, and sometimes using other forms of transport. • Public footpaths are normally open only to walkers; • Public bridleways are open to walkers, horse-riders and cyclists; • Restricted byways are open to walkers, horse-riders, and drivers/riders of non- mechanically propelled vehicles (such as horse-drawn carriages and pedal cycles); • Byways Open to All Traffic (BOATs) are open to all classes of traffic including motor vehicles, though they may not be maintained to the same standard as ordinary roads. ROWIP Rights of Way Improvement Plan Sustrans – charitable organisation established to promote and facilitate walking, cycling and other physically active means of travel. 2 200922_WGFC_Report_Final Table of Contents Abbreviations & Definitions ................................................................................... 2 Key messages ......................................................................................................... 5 1 Purpose and Aims of the Report.......................................................................
    [Show full text]
  • 05: Water Quality and Hydro-Ecology Assessment
    Heathrow Airport Limited Heathrow’s North-West Runway Water Quality and Hydro-ecology Assessment 16 June 2014 AMEC Environment & Infrastructure UK Limited 5 Copyright and Non-Disclosure Notice The contents and layout of this report are subject to copyright owned by AMEC (©AMEC Environment & Infrastructure UK Limited 2014). save to the extent that copyright has been legally assigned by us to another party or is used by AMEC under licence. To the extent that we own the copyright in this report, it may not be copied or used without our prior written agreement for any purpose other than the purpose indicated in this report. The methodology (if any) contained in this report is provided to you in confidence and must not be disclosed or copied to third parties without the prior written agreement of AMEC. Disclosure of that information may constitute an actionable breach of confidence or may otherwise prejudice our commercial interests. Any third party who obtains access to this report by any means will, in any event, be subject to the Third Party Disclaimer set out below. Third-Party Disclaimer Any disclosure of this report to a third party is subject to this disclaimer. The report was prepared by AMEC at the instruction of, and for use by, our client named on the front of the report. It does not in any way constitute advice to any third party who is able to access it by any means. AMEC excludes to the fullest extent lawfully permitted all liability whatsoever for any loss or damage howsoever arising from reliance on the contents of this report.
    [Show full text]
  • Newsletter 70
    Registered Charity No : 1075175 Issue 70 WYCOMBE Contents and Chairman’s chat 2 SOUTH BUCKS New members E-mail version of newsletter 3 Burnham Beeches walk Above: Jay, seen regularly in members’ gardens W Life in ponds and streams 4 recently (see page 12) Below: Ash - will it survive Fungus walk at Holtspur Bank 5 ash dieback? (see page11) NI The Honey Bee and its relations 6 Recommended bee plants 7 L Successful day with Earthworks 8 EReviving the Wye 9 D Other Revive the Wye news 10 Ash dieback 11 L Member comments W COPY DATE FOR THE Wildlife observations 12 NEXT ISSUE I Contact and membership details Friday 5th April 2013 Wycombe Wildlife Newsis published 3 times a year to promote the S Group and wildlife issues and inform members and the public of its F activities. Produced by: Roger Wilding Photographs:Earthworks (Gomm’s Wood), Penny Cullington (fungi) and Roger Wilding (others) E Drawings: Frances Wilding Printed by : Design & Print, Wycombe District Council. Views expressed in this newsletter are those of the authors and not necessarily those of the Group. For the purposes of management of the Group, membership information is held on computer. JANUARY 2013 Chairman’s Chat n the last issue of our newsletter, I referred to the advice I had received that if I couldn’t Ithink of anything else to say, I could always rely on the weather as a talking point. On this occasion, so much is happening that I don’t have time to even think about the weather. First of all, we have been debating the rising costs of posting our newsletter to members to whom we cannot deliver by hand, and we have been experimenting with other methods of distribution, as well as reviewing some of the hand delivery rounds.
    [Show full text]
  • MILL LANE, TAPLOW Otter Survey and River Corridor Survey (RCS) Report
    MILL LANE, TAPLOW Otter Survey and River Corridor Survey (RCS) Report 20/08/2014 Quality Management Issue/revision Issue 1 Revision 1 Revision 2 Revision 3 Remarks Final for Comment FINAL – updated figures and camera survey dates Date 20th June 2014 20th August 2014 Prepared by S Foot and E S Foot and E Austin Austin Signature Checked by H Spray H Spray Signature Authorised by T Selwyn T Selwyn Signature Project number 62002667 62002667 Report number File reference Project number: 62002667 Dated: 20/08/2014 2 Revised: Mill Lane, Taplow Otter Survey and River Corridor Survey (RCS) Report 20/08/2014 Client Berkeley Homes (Three Valleys) Ltd Berkeley House Farnham Lane Farnham Royal SL2 3RQ Consultant WSP UK Ltd Mountbatten House Basingstoke RG21 4HJ UK Tel: +44 (0)12 5631 8617 Fax: +44 1256 318 700 www.wspgroup.co.uk Registered Address WSP UK Limited 01383511 WSP House, 70 Chancery Lane, London, WC2A 1AF WSP Contacts Karen McAllister 3 Table of Contents 1 Executive Summary ............................................................... 5 2 Introduction ............................................................................ 6 2.1 Project Background ............................................................... 6 2.2 Ecological Background .......................................................... 7 2.3 Brief and Objectives............................................................... 8 3 Methods ................................................................................. 8 3.1 Otter Survey .........................................................................
    [Show full text]
  • Sediment Impact Anaysis for the Lower Thames Flood Strategy Study
    PROCEEDINGS of the Eighth Federal Interagency Sedimentation Conference (8thFISC), April2-6, 2006, Reno, NV, USA SEDIMENT IMPACT ANAYSIS FOR THE LOWER THAMES FLOOD STRATEGY STUDY Ian M Tomes, SE Area Flood Risk Manager, Environment Agency (Thames Region), Frimley, Surrey, UK, [email protected]; Oliver P. Harmar, Consultant Geomorphologist, Halcrow Group, Leeds, UK, [email protected]; Colin R. Thorne, Professor of Physical Geography, University of Nottingham, Nottingham, UK, [email protected], INTRODUCTION Sediment impact assessment was performed during the Lower Thames Flood Strategy Study to assess the geomorphological sustainability of river-bed re-profiling to reduce flood risk in the reach between Datchet and Teddington. The specific objectives of the sediment study were to: i. estimate how much sediment is likely to be deposited in, or eroded from, the study reach by flows up to and including long return interval flood events for ‘do minimum’ and ‘bed reprofiling’ options that would lower the bed by 0.5 to 1 m; ii. estimate an average annual rate of sedimentation for the ‘do minimum’ and ‘bed reprofiling’ options. MORPHOLOGY OF THE RIVER THAMES The study reach of the River Thames has the characteristics of a mature, lowland river with well developed meanders and reaches divided by stable, mid-channel islands. The movement of water and sediment along the river has been controlled by locks and weirs for over a century. These structures present obstructions to the natural movement of sediment and dredging was, historically, required to maintain a navigable channel. The banks along much of the navigable river have been stabilised by revetment and, therefore, the river is unable to adjust its planform.
    [Show full text]