Form-1 Expansion Project of Miter & Miter
Total Page:16
File Type:pdf, Size:1020Kb
Form-1 Expansion Project of Miter & Miter Engineers Pvt. Ltd. (Introduction of PU Foam Components) at Plot No.: 04, Sector- 11,TML Vendor Park Sidcul, Rudrapur, District U.S. Nagar (Uttarakhand) Prepared By: ABC Techno Labs India Pvt. Ltd. (Accreditation No. NABET/EIA/70 001) B.O.-: CP 101, Nehru Colony, Dehradun-248001 (Uttarakhand) Ph.No-91+135-26522979, 09412058326 Form-I APPENDIX I (See paragraph-6) FORM 1 (1) Basic Information S.No Item Details 1. Name of the Project/s PU Foam Components icluding PU Steering Wheels by Miter & Miter Engineers Pvt. Ltd. 2. S. No. in the schedule Category B of activity 5 (f) 3. Proposed Capacity/area/ length/tonnage The plant is set up in land area of to be handled/ command area/lease area/ 8160m2, located at Plot No 04, number of wells to be drilled Sector- 11, SIDCUL, TML Vendor Park, Rudrapur, U. S. Nagar, Uttarakhand. Presently unit is manufacturing Injection moulding, Plastic auto component, Rubber components 375 Lakh per annum, now the unit is planning to introduce PU foam components including PU steering wheels- 50,000 Nos per Month. 4. New/ Expansion/Modernization Expansion (Manufacturing of PU Foam Components) 5. Existing Capacity/ Area etc/ Capacity of Injection moulding, plastic auto component, rubber components will remain same and PU foam components manufacturing facility will be introduced which is presently purchased from open market. 6. Category of Project i.e. A or B Category B of Project Activity 5 (f) 7. Does it attract the general condition? if No yes, please specify. 8. Does it attract the specific condition? If No yes, please specify 9. Location Plot No 04, Sector- 11, IIE SIDCUL, TML Vendor Park, Pantnagar, U.S. Nagar, Uttarakhand. Plot/Survey/Khasra No. Plot No. 04 Village Pantnagar Tehsil Rudrapur District U.S. Nagar State Uttarakhand 10. Nearest railway station/airport along with Railway Station Rudrapur (10km) distance in kms. Pantnagar Airport (12 km) 11. Nearest Town, City, District Headquarters Rudrapur along with distance in kms. 12. Village Panchayats, ZillaParishad, Rudrapur municipal Corporation, Local body ( M/s Miter & Miter Engineers Pvt. Ltd. (2.) Form-I complete postal Addresses with telephone nos. to be given) 13. Name of the applicant Mr. Nishchay Miterr 14. Registered Address 9, Cantonment, The Mall, Amritsar 15. Address for correspondence: As above Name Mr. Nishchay Miterr Designation (Owner/Partner/CEO) Mg. Director Address As above Pin Code 143001 E- mail [email protected] Telephone No. 0183-2562403 Fax No. 0183-2223522 16. Details of Alternative Site examined, if any No location of these sites should be shown on a toposheet 17. Interlinked Projects No 18. Whether separate application of NA interlinked project has been submitted 19. If yes, date of submission NA 20. If no, reason NA 12. Whether the proposal involves No approval/clearance under: if yes, details of the same and their status to be given. (a) The Forest (Conservation Act, 1980 (b) The Wildlife (Protection Act, 1972 (c) The C.R.Z notification, 1991 22. Whether there is any Government Order/ NA Policy relevant/relating to the site 23. Forest land involved (hectares) No 24. Whether there is any litigation pending No against the project and /or land in which the project is proposes to be set up (a) Name of the Court (b) Case No. (c) Orders/direction of the Court, if any and its relevance with the proposed project. Screening Category: 5 (f) • Capacity corresponding to sectoral activity (such as production capacity for manufacturing, mining lease area and production capacity for mineral production, area for mineral exploration, length for linear transport infrastructure, generation capacity for power generation etc.) M/s Miter & Miter Engineers Pvt. Ltd. (3.) Form-I (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc. S.No. Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible)with source of information data 1.1 Permanent or temporary change in No No additional land/construction is land use, land cover or topography required for the commencement of PU including increase in intensity of land Foam Components manufacturing use (with respect to local land use facility. plan) The proposed activity will not result in any permanent or temporary change in land use, land cover or topography. 1.2 Clearance of existing land, vegetation No No clearance of existing land, and buildings? vegetation or building is required, as the proposed activity will be undertaken within existing plant premises. 1.3 Creation of new land uses? No As the proposed activity will be undertaken within existing plant premises, creation of new land use is not envisaged. 1.4 Pre-construction investigations e.g. Yes N.A bore houses, soil testing? 1.5 Construction works? No No additional construction works will be required in the project site for proposed project activity. 1.6 Demolition works? No No demolition works will be done in the project site for proposed enhancement. 1.7 Temporary sites used for No N.A. construction works or housing of construction workers? 1.8 Above ground buildings, structures or No N.A. land fill or excavations 1.9 Underground works including mining No N.A. or tunneling? 1.10 Reclamation works? No N.A. 1.11 Dredging? No N.A. 1.12 Offshore structures? No N.A. 1.13 Production and manufacturing Attached as Annexure-1 processes? 1.14 Facilities for storage of goods or Yes Separate store yard for storage of raw materials? materials (Polyol and Isocyanate), which shall be brought from supplier in sealed drums, stored in separate storage area near the manufacturing facility of PU Foam. Pre conditioning will be done for storage of drums in between 150C to 250Cand the area will M/s Miter & Miter Engineers Pvt. Ltd. (4.) Form-I be dedicated with sand bed to absorb any kind of spillage. 1.15 Facilities for treatment or disposal of No Waste generated from PU Foam will solid waste or liquid effluents be given to TSDF. 1.16 Facilities for long term housing of No The operational workers come from operational workers? nearby area. Hence no facilities are required for long term housing of operational workers. 1.17 New road, rail or sea traffic during No No, as the proposed activity will be construction or operation? undertaken within existing plant premises. 1.18 New road, rail, air waterborne or No No, as the proposed activity will be other transport infrastructure undertaken within existing plant including new or altered routes and premises. stations, ports, airports etc? 1.19 Closure or diversion of existing No No, as the proposed activity will be transport routes or infrastructure undertaken within existing plant leading to changes in traffic premises. movements? 1.20 New or diverted transmission lines or No No, as the proposed activity will be pipelines? undertaken within existing plant premises. 1.21 Impoundment, damming, culver ting, No No, as the proposed activity will be realignment or other changes to the undertaken within existing plant hydrology of watercourses or premises. aquifers? 1.22 Stream crossings? No N.A. 1.23 Abstraction or transfers of water form Yes Total water requirement shall be 12 ground or surface waters? KLD for industrial / domestic consumption only. No additional requirement of water in proposed process. This water requirement shall be met from existing tube well. 1.24 Changes in water bodies or the land No No effluent is being discharged to surface affecting drainage or run-off? water body as no additional requirement of water in proposed process. 1.25 Transport of personnel or materials No The workers and staff come to work for construction, operation or by their own means. decommissioning? 1.26 Long-term dismantling or No No long term dismantling or decommissioning or restoration decommissioning or restoration works? works will be done. 1.27 Ongoing activity during No N.A. decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in either No Influx of people in an area is temporarily or permanently? temporary as workers work during day hours only. 1.29 Introduction of alien species? No N.A. 1.30 Loss of native species or genetic No N.A. diversity? 1.31 Any other actions? No N.A M/s Miter & Miter Engineers Pvt. Ltd. (5.) Form-I 2. Use of natural resources for construction or operation of the project (such as land, water, materials or energy, especially any resources which are non – renewable or in short supply): S.No. Information/checklist confirmation Yes/No Details thereof (with approximate quantities /rates, wherever possible) with source of information date 2.1 Land especially undeveloped or No The proposed activity will be agricultural land (ha) undertaken in the existing plant premises hence no extra land will be acquired. 2.2 Water (expected source &competing No Ground Water will be extracted from users) unit: KLD tube well. About 05 KLD fresh water is required (for Domestic/ industrial purpose). 2.3 Minerals(MT) No No minerals are being used as the proposed activity will be undertaken within existing plant premises. 2.4 Construction material – stone, N.A. No, as the proposed activity will be aggregates, and /soil (expected undertaken within existing plant source-MT) premises. 2.5 Forests and timber (source –MT) No No, as the proposed activity will be undertaken within existing plant premises. 2.6 Energy including electricity and fuels Yes Power supply from Uttarakhand Power (source, competing users) unit: fuel Corporation Ltd. connected load 300KW (MT), energy (MW) And at the time of power failure DG set of 500 KVA existing & 380 KVA DG set proposed for the proposed expansion.