Central Valley Hydrology Study

Total Page:16

File Type:pdf, Size:1020Kb

Central Valley Hydrology Study Central Valley hydrology study November 29, 2015 Prepared for California Department of Water Resources Letter of agreement #4600007762 Prepared by US Army Corps of Engineers Sacramento District and David Ford Consulting Engineers, Inc. Contents Expectations of use .............................................................................. 7 Purpose of the hydrology .................................................................... 7 Responsibility of users ....................................................................... 7 Basic assumptions and limitations ........................................................ 7 Executive summary ............................................................................ 10 Situation ........................................................................................ 10 Analysis overview ............................................................................ 10 Requirements .............................................................................. 10 Procedure overview ...................................................................... 11 Analysis review and oversight ........................................................... 12 Results .......................................................................................... 12 Introduction ...................................................................................... 13 Authority ........................................................................................ 13 Watershed description ...................................................................... 13 Sacramento and San Joaquin river basin flood control system ................ 16 Motivation of current DWR studies of the watershed ............................. 17 Hydrology study .............................................................................. 19 Study requirements ......................................................................... 20 Potential effects of climate change on study results .............................. 20 Purpose of documentation ................................................................ 20 Approval and certification ................................................................. 20 Relevant documents ........................................................................ 20 Comparison to previous watershed study ............................................... 21 Watershed description......................................................................... 27 Sacramento River basin ................................................................... 27 Basin characteristics ..................................................................... 27 Hydrography ............................................................................... 28 Topography ................................................................................. 29 Soils 29 Vegetation .................................................................................. 29 Climate ....................................................................................... 29 Temperature ............................................................................... 30 Precipitation ................................................................................ 30 Snowpack ................................................................................... 31 San Joaquin River basin ................................................................... 31 Basin characteristics ..................................................................... 31 Hydrography ............................................................................... 32 Topography ................................................................................. 32 Soils 33 Vegetation .................................................................................. 33 Climate ....................................................................................... 33 Temperatures .............................................................................. 33 Precipitation ................................................................................ 34 Snowpack ................................................................................... 35 Analysis procedure ............................................................................. 36 3 Overview of procedure ..................................................................... 36 Mixed population analysis and integration into the CVHS ....................... 39 Mixed population analysis .............................................................. 39 Separation of events to create the time series .................................. 40 Regional skew and its use in CVHS ..................................................... 40 Term “unregulated flow” and its use in CVHS ...................................... 45 Study products and applications ........................................................... 48 Study products ............................................................................... 48 First application regulated condition products ...................................... 48 Application of study products ............................................................ 49 Unregulated flow time series development ............................................. 54 Estimate daily reservoir inflow ........................................................... 54 Situation ..................................................................................... 54 Pertinent guidance and discussion .................................................. 54 Study procedure .......................................................................... 57 Estimation of ungaged local flows ...................................................... 57 Situation ..................................................................................... 57 Pertinent guidance and discussion .................................................. 58 Study procedure .......................................................................... 59 Application and distribution of local flow ............................................. 59 Situation ..................................................................................... 59 Pertinent guidance and discussion .................................................. 59 Study procedure .......................................................................... 60 Approach for extending data or filling in gaps ...................................... 60 Situation ..................................................................................... 60 Pertinent guidance and discussion .................................................. 61 Description of methods to support flow-frequency analysis ................. 61 Methods to support assessing the effects of regulation....................... 62 Study procedure .......................................................................... 62 Smooth unregulated flow time series.................................................. 62 Situation ..................................................................................... 62 Pertinent guidance and discussion .................................................. 62 Study procedure .......................................................................... 63 Procedures for routing unregulated flows through the system ................ 63 Situation ..................................................................................... 63 Pertinent guidance and discussion .................................................. 63 Study procedure .......................................................................... 65 Unregulated frequency analysis ............................................................ 66 Separation of seasonal data .............................................................. 68 Situation ..................................................................................... 68 Pertinent guidance and discussion .................................................. 68 Study procedure .......................................................................... 69 Identify annual maximum series ........................................................ 69 Situation ..................................................................................... 69 Pertinent guidance and discussion .................................................. 69 Study procedure ............................................................................. 70 Calculate regional skew values .......................................................... 70 Situation ..................................................................................... 70 4 Pertinent guidance and discussion .................................................. 70 Study procedure .......................................................................... 70 Fit frequency curves ........................................................................ 71 Situation ..................................................................................... 71 Pertinent guidance and discussion .................................................. 71 Study procedure .......................................................................... 71 Review and adopt curves .................................................................. 72 Situation ..................................................................................... 72 Pertinent guidance and discussion .................................................
Recommended publications
  • Attachment 1 Credentials of Trlia Board of Senior Consultants
    ATTACHMENT 1 CREDENTIALS OF TRLIA BOARD OF SENIOR CONSULTANTS FAIZ I. MAKDISI, PH.D., P.E. PRINCIPAL ENGINEER EDUCATION SKILLS AND EXPERIENCE Ph.D., Geotechnical Dr. Makdisi’s 28-year career has combined applied research and Engineering, University of professional practice in geotechnical and foundation/earthquake California, Berkeley, 1976 engineering for commercial, residential, industrial, and critical M.Sc., Geotechnical structures. Recently he has focused on geotechnical studies and safety Engineering, University of evaluations of earth and rockfill dams, embankments, and landfills. His California, Berkeley, 1971 work includes feasibility evaluations and preliminary design studies; field investigation design and planning; borrow area material studies; in B. Eng., Civil, American situ and laboratory testing; and evaluation and interpretation of static University of Beirut: and dynamic material properties of dams and their foundations. Studies Lebanon, 1970 also included stability evaluations of embankment slopes, seepage analyses, and static and dynamic stress analyses to evaluate stability REGISTRATION during earthquakes. Professional Civil Engineer, He has performed studies to determine earthquake-induced permanent CA No. C29432, 1978 deformations in slopes and embankments, and developed and published Civil Engineer, Institute of widely used simplified procedures for estimating dynamic response and Civil Engineers, Lebanon, permanent deformations in earth and rockfill dams and embankments. 1970 He is a lead participant in earthquake ground motion studies and development of seismic design criteria for key facilities such as dams AFFILIATIONS and nuclear power plants. He was principal investigator of the “Stability American Society of Civil of Slopes, Embankments and Rockfalls” chapter of the Seismic Retrofit Engineers Manual for the Federal Highway Project being prepared for the National Earthquake Engineering Center for Earthquake Engineering Research.
    [Show full text]
  • System Reoperation Study
    System Reoperation Study Phase III Report: Assessment of Reoperation Strategies California Department of Water Resources August 2017 System Reoperation Study Phase III Report This page is intentionally left blank. August 2017 | 2 Table of Contents Chapter 1. Introduction .......................................................................................................................................................................................1 -1 1.1 Study Authorization ....................................................................................................................................................................................1 -1 1.2 Study Area ..................................................................................................................................................................................................1 -2 1.3 Planning Principles .....................................................................................................................................................................................1 -4 1.4 Related Studies and Programs...................................................................................................................................................................1 -4 1.5 Uncertainties in Future Conditions ............................................................................................................................................................. 1-6 1.5.1 Climate Change ..........................................................................................................................................................................1
    [Show full text]
  • Terr–14 Mule Deer
    TERR–14 MULE DEER 1.0 EXECUTIVE SUMMARY In 2001 and 2002, the literature review, a camera feasibility study, the Mammoth Pool migration study (observation study, boat survey, and remote camera study), and a hunter access study were completed. A map of known mule deer summer and winter ranges, migration corridors, and holding areas was created based on the literature review. The camera feasibility study was conducted in the fall of 2001 to test the remote camera system for the spring 2002 remote camera study. The cameras were successful at capturing photographs of 82 animals, including photographs of six deer, during this testing period. The Mammoth Pool migration study consisted of an observation study, boat survey, and remote camera study. The study focused on documenting key migration routes across the reservoir and relative use, identifying potential migration barriers, and documenting any deer mortality in the reservoir. The observation study consisted of two observers positioned with binoculars at two observation points on Mammoth Pool at dusk and dawn in order to observe migrating deer. There were no observations of deer using the dam road. Two observations of deer were made out of a total of 51 observation periods. One observation consisted of a single deer that swam from the Windy Point Boat Launch area to the Mammoth Pool Boat Launch area. The other observation was of one group of five adult deer approaching the reservoir near the observation point by the Mammoth Pool Boat Launch, but turning back up the hill. There was no sign of difficulty in the deer swimming or exiting the reservoir and no obvious disturbance to the deer that turned back.
    [Show full text]
  • STUDY of INCREASING CONVEY CAPACITY of MERCED RIVER at the CONFLUENCE with SAN JOAQUIN RIVER a Project Presented to the Faculty
    STUDY OF INCREASING CONVEY CAPACITY OF MERCED RIVER AT THE CONFLUENCE WITH SAN JOAQUIN RIVER A Project Presented to the faculty of the Department of Civil Engineering California State University, Sacramento Submitted in partial satisfaction of the requirements for the degree of MASTER OF SCIENCE in Civil Engineering (Water Resources Engineering) by Hani Nour SUMMER 2017 © 2017 Hani Nour ALL RIGHTS RESERVED ii STUDY OF INCREASING CONVEY CAPACITY OF MERCED RIVER AT THE CONFLUENCE WITH SAN JOAQUIN RIVER A Project by Hani Nour Approved by: __________________________________, Committee Chair Dr. Saad Merayyan __________________________________, Second Reader Dr. Cristina Poindexter, P.E. ___________________________ Date iii Student: Hani Nour I certify that this student has met the requirements for format contained in the University format manual, and that this project is suitable for shelving in the Library and credit is to be awarded for the project. _________________________, Department Chair ______________ Dr. Benjamin Fell, P.E. Date Department of Civil Engineering iv Abstract of STUDY OF INCREASING CONVEY CAPACITY OF MERCED RIVER AT THE CONFLUNENCE WITH SAN JOAQUIN RIVER by Hani Nour Flooding in California’s Central Valley is very common and expected to occur every year anywhere throughout the region. The climate and geography of the Central Valley, together, are responsible for over flow streams, rivers, and lakes causing water flooding, particularly at the lower elevation areas. San Joaquin Basin is located between the Sierra Nevada (on the east) and the Coast Ranges (on the west) where flooding is typically characterized by infrequent severe storms during winter season due to heavy rain and snow- melt runoff coming from the foothills, east of Merced County (Jesse Patchett 2012).
    [Show full text]
  • Sierra Vista Scenic Byway Sierra National Forest
    Sierra Vista Scenic Byway Sierra National Forest WELCOME pute. Travel six miles south on Italian Bar Road Located in the Sierra National Forest, the Sierra (Rd.225) to visit the marker. Vista Scenic Byway is a designated member of the National Scenic Byway System. The entire route REDINGER OVERLOOK (3320’) meanders along National Forest roads, from North Outstanding view can be seen of Redinger Lake, the Fork to the exit point on Highway 41 past Nelder San Joaquin River and the surrounding rugged Sierra Grove, and without stopping takes about five hours front country. This area of the San Joaquin River to drive. drainage provides a winter home for the San Joaquin deer herd. Deer move out of this area in the hot dry The Byway is a seasonal route as forest roads are summer months and mi grate to higher country to blocked by snow and roads are not plowed or main- find food and water. tained during winter months. The Byway is gener- ally open from June through October. Call ahead to ROSS CABIN (4000’) check road and weather conditions. The Ross Cabin was built in the late 1860s by Jessie Blakey Ross and is one of the oldest standing log Following are some features along the route start- cabins in the area. The log cabin displays various de- ing at the Ranger Station in North Fork, proceeding signs in foundation construction and log assembly up the Minarets road north to the Beasore Road, brought to the west, exemplifying the pioneer spirit then south to Cold Springs summit, west to Fresno and technology of the mid-nineteenth century.
    [Show full text]
  • Draft Upper San Joaquin River Basin Storage Investigation
    Draft Feasibility Report Upper San Joaquin River Basin Storage Investigation Prepared by: United States Department of the Interior Bureau of Reclamation Mid-Pacific Region U.S. Department of the Interior Bureau of Reclamation January 2014 Mission Statements The mission of the Department of the Interior is to protect and provide access to our Nation’s natural and cultural heritage and honor our trust responsibilities to Indian Tribes and our commitments to island communities. The mission of the Bureau of Reclamation is to manage, develop, and protect water and related resources in an environmentally and economically sound manner in the interest of the American public. Executive Summary The Upper San Joaquin River Basin Storage This Draft Feasibility Report documents the Investigation (Investigation) is a joint feasibility of alternative plans, including a range feasibility study by the U.S. Department of of operations and physical features, for the the Interior, Bureau of Reclamation potential Temperance Flat River Mile 274 (Reclamation), in cooperation with the Reservoir. California Department of Water Resources Key Findings to Date: (DWR). The purpose of the Investigation is • All alternative plans would provide benefits to determine the potential type and extent of for water supply reliability, enhancement of Federal, State of California (State), and the San Joaquin River ecosystem, and other resources. regional interest in a potential project to • All alternative plans are technically feasible, expand water storage capacity in the upper constructible, and can be operated and San Joaquin River watershed for improving maintained. water supply reliability and flexibility of the • Environmental analyses to date suggest that water management system for agricultural, all alternative plans would be urban, and environmental uses; and environmentally feasible.
    [Show full text]
  • Ca-Sierra-Way.Pdf
    IN ANSWERING REFER TO UNITED STATES DEPARTMENT OF THE INTERIOR NATIONAL PARK SERVICE WASHINGTON I ~ how ~ yw ~ &ari.ng yov brief vial'b to ~ aaa ~ tha'b - bMi nG ~- - 4180t1Sm 'tho lllgb • ..._ "84· ~p l ltMG NOel'IOCl 1'0W ~ relio- a'bivo '° l-9~ I em entsiNlr ia ~ fllVh ucnw ata~ idlat thaA) 1e 9 1.aok of UOObQl- ot tbfJ Bil.$ Slen& ve&d bl Wa tenlteeyff" 1 was uw.tous " ~ what mowo are belng mado by the ~ Se.Mee - e~ llft onl.111ble scotloa or bhG B!c.h 8:$ona 9'Y ~ .tbe cmbift> Pff39" flfC&. KeN D.t:vur iJo "*9G er ~. I '°I.I.eve 1*ab onr wo!l hlPraJ ou'btlng t~ougti 'the VGr/ ~ of tlhe OD'bt\n 81.ern. wl~i eountey la mt GBlV ~le Wis WOtllt.\ be o ~ AfllmdiW• Yem dll ~ .U tba-t. tltlGN wu e ftJeftlf!Eil~ bl ow l'latioiml P.eeou~ "'°" to ~ ~ tdlatt -- mp &ABR ~ PaWk be ~ etft wu1d ~ ~-- nmgta Uver ~ r._,!w ad '118 ~ moumt~ ~ abow ._.. msretal "'"""- lid.-. Whtie ouh a pnpnl1Jl&a b still on11 a 180mmtm,.,~ IWVG.»llhelen• tl'lld.- "'9 flOa8Bt ~'1 w&8'sw~l1lvlllmnsmdfi)'\iea~ lbe- 11.evo -= one ot the men ~- DBaDS d ~ t1h9 doVelop_.. of web a ,an wu1d be taa. ~ of iiho mp &l.Ol'N i1'0ati. av ~ ~. haB a VfAl'T NA1 in­ tend 1n ,_, nok propeuiidon• au&. vs.en,. ls tu~ wbloh I bad '"' mimi ·whH. l apn 1Jo veu a.bout tho pe1ai'ldlltr ot our diMUosing the '6ole '"'"'• Bea L Thompaon.
    [Show full text]
  • 11234700 Mammoth Pool Reservoir Near Big Creek, CA San Joaquin River Basin
    Water-Data Report 2013 11234700 Mammoth Pool Reservoir near Big Creek, CA San Joaquin River Basin LOCATION.--Lat 37°19′40″, long 119°19′38″ referenced to North American Datum of 1927, in SE ¼ SE ¼ sec.10, T.7 S., R.24 E., Madera County, CA, Hydrologic Unit 18040006, in Sierra National Forest, in gatehouse of power tunnel intake, 0.7 mi northwest of dam on San Joaquin River, and 9.0 mi northwest of town of Big Creek. DRAINAGE AREA.--995 mi². SURFACE-WATER RECORDS PERIOD OF RECORD.--October 1959 to current year. GAGE.--Water-stage recorder. Elevation of gage is 3,354.28 ft above NGVD of 1929 (levels by Southern California Edison Co.). COOPERATION.--Records were collected by Southern California Edison Co., under general supervision of the U.S. Geological Survey, in connection with Federal Energy Regulatory Commission project no. 2085. Records not rounded to U.S. Geological Survey standards. REMARKS.--Reservoir is formed by an earth-fill dam; storage began Oct. 8, 1959. Usable capacity, 119,940 acre-ft, between elevations 3,100.00 ft, invert of power tunnel, and 3,330.00 ft, crest of spillway. Additional storage of 2,780 acre-ft is not available for release. Water is diverted from Mammoth Pool through tunnel for power development and returned to river 8.5 mi downstream from dam. Records, excluding extremes, represent usable contents at 2400 hours. See schematic diagram of lower San Joaquin River Basin available from the California Water Science Center. EXTREMES FOR PERIOD OF RECORD.--Maximum contents, 128,944 acre-ft, Jan.
    [Show full text]
  • Bryan Kelly Director of Regulatory Compliance and Government Affairs, Water Merced Irrigation District
    Bryan Kelly Director of Regulatory Compliance and Government Affairs, Water Merced Irrigation District Testimony on H.R. 869 - To clarify the definition of flood control operations for the purposes of the operation and maintenance of Project No. 2179 on the Lower Merced River. Subcommittee on National Parks, Forests and Public Lands June 14, 2011 Chairman Bishop, Ranking Member Grijalva, and members of the Subcommittee, my name is Bryan Kelly and I am the Director of Regulatory Compliance and Government Affairs -Water for the Merced Irrigation District (MID). I am pleased to be offered this opportunity to testify in support of H.R. 869, legislation that would allow the Federal Energy Regulatory Commission (FERC) to consider proposed improvements to the spillway at New Exchequer Dam that will provide additional water supply to Merced County and the San Joaquin Valley of California. I’d like to begin by thanking Congressman Denham and the cosponsors of H.R. 869 for introducing this bipartisan bill that could improve the precarious water supply situation in California’s San Joaquin Valley without major environmental impact and at no cost to the federal government. The Merced Irrigation District is a California Public Agency under the California Irrigation District Law. MID owns, operates and maintains hydro-electric facilities on the Merced River, consisting of the New Exchequer Dam and Reservoir (Lake McClure) and McSwain Dam and Reservoir (Lake McSwain). They are located in the western foothills of the Sierra Nevada mountain range, approximately 23 miles northeast of the City of Merced. Lake McClure has a storage capacity of 1,024,600 acre feet, while Lake McSwain has a storage capacity of 9,730 acre feet and is operated principally as a regulating reservoir for MID’s hydroelectric generation facilities at New Exchequer Dam (FERC Project No.
    [Show full text]
  • Billing Code 6717-01-P
    This document is scheduled to be published in the Federal Register on 03/16/2012 and available online at http://federalregister.gov/a/2012-06402, and on FDsys.gov BILLING CODE 6717-01-P FEDERAL ENERGY REGULATORY COMMISSION Merced Irrigation District Project No. 2179-043 NOTICE OF APPLICATION TENDERED FOR FILING WITH THE COMMISSION AND ESTABLISHING PROCEDURAL SCHEDULE FOR LICENSING AND DEADLINE FOR SUBMISSION OF FINAL AMENDMENTS Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: New License b. Project No.: 2179-043 c. Date Filed: February 27, 2012 d. Applicant: Merced Irrigation District (MID) e. Name of Project: Merced River Hydroelectric Project f. Location: The existing project is located on the Merced River in Merced and Mariposa counties, California. The project would occupy 3,152.9 acres of federal land managed by the Bureau of Land Management. g. Filed Pursuant to: Federal Power Act, 16 USC 791 (a)-825(r) h. Applicant Contact: Merced Irrigation District, P.O. Box 2288, Merced CA, 95344; Telephone (209) 722-5761 i. FERC Contact: Matt Buhyoff, (202) 502-6824 or [email protected] j. This application is not ready for environmental analysis at this time. k. The Project Description: The project consists of two developments: New Exchequer Development - (1) New Exchequer Dam - a 490 feet-high dam with a crest length of 1,220 feet and a crest elevation of 879 feet; (2) an ogee-type Project No. 2179-043 2 concrete spillway located
    [Show full text]
  • Sacramento River and San Joaquin River) San Joaquin River Or Proposed San Luis Drain Extension, Sacramento River
    FIGURES Selenium source Organic carbon-enriched sediment deposits Depositional environments Freshwater Seawater Geologic sources Coal Soils and Alluvium Oil Phosphorite Anthropogenic Power Generation Irrigation Refining Mining activity Pollutants Ash, Flue Gas Scrubbing Subsurface drainage Wastewater Tailings, runoff Kesterson NWR, San Francisco Blackfoot San Joaquin River, Receiving waters Belews Lake, Bay-Delta River watershed, (examples) North Carolina Tulare Basin, California Estuary, California Idaho scoter, scaup, coot, duck, grebe Species of bluegill, sunfish, sturgeon, splittail, trout, coot, horse, concern bass, bullhead avocet, stilt, sculpin, splittail, salmon flounder, salmon, sheep, elk, cow Dungeness crab Figure 1. Conceptual model of Se pollution with examples of source deposits, anthropogenic activities, receiving water bodies, and biota at risk. Bay-Delta Selenium Model Composite Source Load ¸ Composite Volume (oil refinery discharges, agricultural drainage via (Sacramento River and San Joaquin River) San Joaquin River or proposed San Luis Drain extension, Sacramento River Composite Freshwater Endmember Concentration (head of estuary) Transformation Phytoplankton, algae, bacteria Dissolved species Partitioning (Kd) suspended particulate material and bed sediment (selenate, selenite, organo-Se) (elemental Se, particulate organo-Se, adsorbed selenite/selenate) bioaccumulation prey clams zooplankton amphipods trophic transfer sturgeon splittail striped bass predators diving ducks flounder splittail effects Impaired reproduction, teratogenesis, selenosis Figure 2. Conceptual model describing linked factors that determine the effects of selenium on ecosystems. The sequence of relations links environmental concentrations to biological effects. The general term “bioaccumulation” can be applied to all of the biological levels of selenium transfer through the food web, but in this report we use the term explicitly in reference to particulate/invertebrate bioaccumulation. 122°30' 122°00' .
    [Show full text]
  • Oroville Dam Citizens Advisory Commission
    OROVILLE DAM CITIZENS ADVISORY COMMISSION Hosted by the California Natural Resources Agency ITEM 1: WELCOME AND INTRODUCTIONS ITEM 2: NOVEMBER MEETING RECAP AND UPDATES ITEM 3: U.S. ARMY CORP OF ENGINEERS BRIEFING USACE ROLE IN NORTHERN CA FLOOD CONTROL OPERATIONS 237 217 200 80 252 237 217 200 119 174 237 217 200 27 .59 255 0 163 131 239 110 112 62 102 130 255 Oroville0 Dam163 Citizens132 Advisory65 Commission135 92 102 56 120 255 Southside0 163 Oroville122 Community53 Center120 56 130 48 111 Oroville, CA February 21, 2020 Joe Forbis, P.E. Chief, Water Management Section Sacramento District, U.S. Army Corps of Engineers “The views, opinions and findings contained in this report are those of the authors(s) and should not be construed as an official Department of the Army position, policy or decision, unless so designated by other official documentation.” AGENDA • USACE Sacramento District Overview • Authorities, Roles, and Responsibilities • Water Control Manuals – Folsom Example • Pilot Project - FIRO Spillway Fuse Gates at Terminus Dam SOUTH PACIFIC DIVISION SACRAMENTO DISTRICT FC PROJECTS 8 SACRAMENTO DISTRICT (SPK) WATER MANAGEMENT USACE – 14 Section 7 – 31 Total – 45 SPK RESERVOIR EXAMPLES Largest Reservoir Shasta Dam and Lake 4,500,000 acre-feet Smallest Reservoir Mountain Dell Dam and Reservoir 3,200 acre-feet FLOOD OPS PARTNERS • Irrigation Districts – Stockton East Water District • Flood Control Districts – Fresno Metro Flood Control District • Federal Water Masters – Truckee River Basin Reservoirs • Water Storage Districts – Tulare Lakebed • Government Agencies – DWR – USBR Black Butte Dam USACE AUTHORITY FOR FLOOD OPS • Section 7 of the Flood Control Act of 1944 (58 Stat.
    [Show full text]