Canada Bay Bike Plan Final Report

Total Page:16

File Type:pdf, Size:1020Kb

Canada Bay Bike Plan Final Report CANADA BAY BIKE PLAN FINAL REPORT FEBRUARY 2005 Jamieson Foley Traffic & Transport Pty Ltd ABN 76 092 984 953 Suite 405 5 Hunter Street Sydney NSW 2000 p +61 2 9233 1277 f +61 2 9235 2490 [email protected] www.jamiesonfoley.com.au Sustainable Transport Consultants Pty Ltd ABN 19 101 162 716 PO Box 1601 Bondi Junction NSW 1355 p +61 2 9386 4484 f +61 2 9389 5736 [email protected] TABLE OF CONTENTS 1 Introduction ............................................................................... 5 2 Previous and Related Studies ................................................. 6 3 Consultation .............................................................................. 7 4 The Bike Plan ............................................................................ 9 Figure 4.1 - Canada Bay Bike Route Map...................................................................10 4.1 Regional Routes.................................................................................11 4.1.1 RR1 - Victoria Road........................................................................................11 Figure 4.1 - Widen Pathway South of Cambridge Road .............................................11 4.1.2 RR2 - Eastwood Strathfield Rail Trail .............................................................12 Figure 4.2 - Use Spare Span adjacent to Railway ......................................................13 4.1.3 RR3 - Part Alternative to RR2 (short term).....................................................13 4.1.4 RR4 - Homebush Bay to City..........................................................................13 Figure 4.3 - Widen Bridge over Iron Cove Creek ........................................................14 4.1.5 RR5 - Safe alternative to RR4 ........................................................................14 Figure 4.4 - Opportunities at the Concord Rd / Patterson St Intersection...................15 Figure 4.5 - Provide Link around Barnwell Park Golf Course......................................15 4.2 Strategic Routes.................................................................................17 4.2.1 SR1 - Ryde Bridge to the City via Lyons Road West and Five Dock .............17 4.2.2 SR2 - North South Rail Trail ...........................................................................17 Figure 4.6 - Complete Cloverleaf.................................................................................18 4.2.3 SR3 - Bay Run Cycle Way..............................................................................18 4.2.4 SR4 - Parks Route..........................................................................................19 Figure 4.7 - Provide Bike Paths in Cintra Park............................................................19 Figure 4.8 - Mark On-Road Bike Lanes in Stanley Street ...........................................20 4.2.5 SR5 - Sydney Harbour Foreshore shared Walkway / Cycleway ....................21 Figure 4.9 - Widen Pathways in Henry Lawson Park ..................................................21 4.2.6 SR6 - Iron Cove Creek....................................................................................24 Figure 4.10 - Parramatta Road Culvert - convert to allow all-weather cycling ............24 4.3 Links to Adjacent Jurisdictions ........................................................25 4.3.1 LAJ1 - Rhodes to Homebush Bay ..................................................................25 4.3.2 LAJ2 - Sydney Olympic Park ..........................................................................26 4.3.3 LAJ3 - Cooks River Trail.................................................................................26 4.3.4 LAJ4 - Strathfield Station ................................................................................26 4.3.5 LAJ5 - Burwood Park......................................................................................27 4.3.6 LAJ6 - Burwood Station ..................................................................................27 4.3.7 LAJ7 - Croydon West......................................................................................28 Figure 4.11 - Walker Street - provide bike bypass through road closure ....................28 4.3.8 LAJ8 - Croydon East.......................................................................................29 4.3.9 LAJ9 - Ashfield................................................................................................29 4.3.10 LAJ10 - Haberfield ..........................................................................................29 4.3.11 LAJ11 - Dobroyd Point....................................................................................30 Canada Bay Bike Plan 4774 Final Report - rev01 3 4.4 Local Routes.......................................................................................31 4.4.1 LR1 - Homebush Bay to Brays Bay ................................................................31 4.4.2 LR2 - Liberty Grove to Bakehouse Precinct ...................................................31 4.4.3 LR3 - Homebush Bay to Mortlake Ferry .........................................................32 Figure 4.12 - Station Street Tunnel - improve safety and access for bikes.................33 4.4.4 LR4 - Majors Bay to Strathfield.......................................................................33 4.4.5 LR5 - Part Alternative to SR1 .........................................................................34 4.4.6 LR6 - North Strathfield to Cabarita .................................................................34 4.4.7 LR7 - Abbotsford to Five Dock........................................................................35 4.4.8 LR8 - Five Dock to Drummoyne .....................................................................35 4.4.9 LR9 - Chiswick to Haberfield ..........................................................................35 4.4.10 LR10 - Hen and Chicken Bay to Rodd Park ...................................................36 4.4.11 LR11 - Hen and Chicken Bay to Iron Cove Bay .............................................36 4.4.12 LR12 - Five Dock Bay to Birkenhead point.....................................................36 4.5 Bike Parking .......................................................................................38 4.5.1 PC - Bike Lockers ...........................................................................................38 4.5.2 PL - On-Street Bike Parking ...........................................................................38 5 Cost Estimates ........................................................................ 39 Table 5.1 - Cost Summary - Road Authorities.............................................................39 Table 5.2 - Cost Summary - Priorities .........................................................................39 6 Implementation Priorities....................................................... 41 Table 6.1 - Priority 1 Routes........................................................................................43 Table 6.2 - Priority 2 Routes........................................................................................44 Table 6.3 - Priority 3 Routes........................................................................................45 7 Where to From Here................................................................ 46 Appendix A Submissions From BayBUG Appendix B Comments on the Draft Report Appendix C Submission to RTA re Gladesville Bridge Approaches Appendix D Cost Estimates Canada Bay Bike Plan 4774 Final Report - rev01 4 1 INTRODUCTION At the November 2003 Bicycle Consultative Meeting of Canada Bay Council, Council invited the local bicycle user group, BayBUG, to review and consolidate of the existing Bike Plans of the former Drummoyne and Concord Councils. The brief comprised: “That the Bicycle Consultative Committee in conjunction with BayBUG develop a City of Canada Bay Bicycle Plan with at least the following objectives: E Provision of commuter bicycle routes through the City with such routes linking neighbouring bicycle routes and regional routes. E Provision of recreational bicycle routes throughout the City. E Provision of local neighbourhood and local school bicycle routes. E Provision of bicycle facilities at transport nodes, shopping centres, parks and schools. In February 2004, Council engaged Jamieson Foley Traffic & Transport Pty Ltd in conjunction with Sustainable Transport Consultants Pty Ltd to provide the bike groups with technical advice and to document the findings. This document presents those findings. Canada Bay Bike Plan 4774 Final Report - rev01 5 2 PREVIOUS AND RELATED STUDIES The Canada Bay Bike Plan was developed based on a number of previous bike plans and related studies, including: E Drummoyne Bike Plan - review and update , 1995 - Final Report, by Arup Transportation Planning and Geoplan Urban and Traffic Planning (Nov 1995) E Concord Bike Plan - Final Report, by Connell Wagner (Feb 1999) E Bay Run Cycle Way - Final Report, by Jamieson Foley & Associates and Sustainable Transport Planning (Nov 1999) E Drummoyne Traffic and Transport Strategy, by Jamieson Foley Traffic & Transport, The People for Places and Spaces, et al (ca 2000) In addition to these reports directly concerning the Canada Bay Council jurisdiction, the cost analysis relied on a number of other data sources, including: E Leichhardt Council Annual Cost Schedule for 2003/2004 E Quotes for Leichhardt Council by HVS Services on three
Recommended publications
  • Western Sydney Airport Fast Train – Discussion Paper
    Western Sydney Airport Fast 2 March 2016 Train - Discussion Paper Reference: 250187 Parramatta City Council & Sydney Business Chamber - Western Sydney Document control record Document prepared by: Aurecon Australasia Pty Ltd ABN 54 005 139 873 Australia T +61 2 9465 5599 F +61 2 9465 5598 E [email protected] W aurecongroup.com A person using Aurecon documents or data accepts the risk of: a) Using the documents or data in electronic form without requesting and checking them for accuracy against the original hard copy version. b) Using the documents or data for any purpose not agreed to in writing by Aurecon. Disclaimer This report has been prepared by Aurecon at the request of the Client exclusively for the use of the Client. The report is a report scoped in accordance with instructions given by or on behalf of Client. The report may not address issues which would need to be addressed with a third party if that party’s particular circumstances, requirements and experience with such reports were known and may make assumptions about matters of which a third party is not aware. Aurecon therefore does not assume responsibility for the use of, or reliance on, the report by any third party and the use of, or reliance on, the report by any third party is at the risk of that party. Project 250187 DRAFT REPORT: NOT FORMALLY ENDORSED BY PARRAMATTA CITY COUNCIL Parramatta Fast Train Discussion Paper FINAL DRAFT B to Client 2 March.docx 2 March 2016 Western Sydney Airport Fast Train - Discussion Paper Date 2 March 2016 Reference 250187 Aurecon
    [Show full text]
  • To View More Samplers
    This sampler file contains various sample pages from the product. Sample pages will often include: the title page, an index, and other pages of interest. This sample is fully searchable (read Search Tips) but is not FASTFIND enabled. To view more samplers click here www.gould.com.au www.archivecdbooks.com.au The widest range of Australian, English, · Over 1600 rare Australian and New Zealand Irish, Scottish and European resources · books on fully searchable CD-ROM 11000 products to help with your research · Over 3000 worldwide A complete range of Genealogy software · · Including: Government and Police 5000 data CDs from numerous countries · gazettes, Electoral Rolls, Post Office and Subscribe to our weekly email newsletter Specialist Directories, War records, Regional FOLLOW US ON TWITTER AND FACEBOOK histories etc. www.unlockthepast.com.au · Promoting History, Genealogy and Heritage in Australia and New Zealand · A major events resource · regional and major roadshows, seminars, conferences, expos · A major go-to site for resources · free information and content, newsletters and blogs, speaker www.familyphotobook.com.au biographies, topic details www.findmypast.com.au · Includes a team of expert speakers, writers, organisations and commercial partners · Free software download to create 35 million local and family records for throughout Australia and New Zealand · professional looking personal photo books, Australian, New Zealand, Pacific Islands, and calendars and more Papua New Guinea New South Wales Government Gazette 1866 Ref. AU2100-1866 ISBN: 978 1 74222 694 1 This book was kindly loaned to Archive Digital Books Australasia by the University of Queensland Library www.library.uq.edu.au Navigating this CD To view the contents of this CD use the bookmarks and Adobe Reader’s forward and back buttons to browse through the pages.
    [Show full text]
  • Parramatta River
    anchorage anchorage ail far enough along the Parramatta River held at Homebush Bay in 2000, there has wetlands, vast stretches of open space, sailing Sand you can’t fail to notice a broken white been a dramatic rise in activity on the river. and rowing clubs, unit blocks and posh parramatta column mounted on a rock near the water’s On any given day, it bustles with yachts and waterfront mansions. Yaralla House, in Concord edge at Henley. powerboats, tinnies, canoes, kayaks and (pictured here) is one of the oldest and largest This simple monument is dedicated to the RiverCat ferries (seven low-wash catamarans and has considerable historical significance. short but spectacular life of Henry Searle, one of named after famous Australian sportswomen). There are four islands along the river: Australia’s greatest scullers, who died in 1889 at The river, which is tidal to Charles Street Rodd Island in Iron Cove, and Cockatoo, just 23. The column also marks the finish line Weir at Parramatta, is jam-packed with things to Spectacle and Snapper islands huddled between where, a year earlier, Searle comprehensively see – if you know what to look for. Woolwich and Birchgrove. In the late 19th defeated the world rowing champion. century, Rodd Island was used as a biological Searle’s Monument is one of the landmarks colonial History laboratory by a team from the Pasteur Institute along the Parramatta River, which officially As a key link between the settlements of Sydney in France, and also as a temporary quarantine merges with Sydney Harbour at Longnose Point, and Parramatta, the Parramatta River played an area for a pet dog that French actress Sarah Birchgrove and Manns Point, Greenwich.
    [Show full text]
  • Contaminant Chemistry and Toxicity of Sediments in Sydney Harbour, Australia: Spatial Extent and Chemistry–Toxicity Relationships
    Vol. 363: 71–87, 2008 MARINE ECOLOGY PROGRESS SERIES Published July 15 doi: 10.3354/meps07445 Mar Ecol Prog Ser Contaminant chemistry and toxicity of sediments in Sydney Harbour, Australia: spatial extent and chemistry–toxicity relationships Gavin F. Birch1,*, Stephanie McCready1, Edward R. Long2, Stuart S. Taylor1, 3, Gina Spyrakis1 1School of Geosciences, Environmental Geology Group, The University of Sydney, New South Wales, 2006, Australia 2ERL Environmental, 3691 Cole Road South, Salem, Oregon 97306, USA 3URS, 116 Miller St., North Sydney, New South Wales, 2060, Australia ABSTRACT: The spatial distribution of chemical contamination and toxicity of surficial sediments in Sydney Harbour, Australia, was investigated in a 3-tiered, hierarchical approach. An initial chemical investigation throughout the entire estuary (Stage 1) indicated wide ranges and different spatial patterns in sediment chemical concentrations. Sediment quality guidelines (SQGs) were used as a preliminary estimate of possible toxicity in Stage 2 of the investigation. Assessment of chemical mixtures indicated that sediments in a small part (~2%) of the harbour had the highest probability of being toxic (~75%), whereas sediment in almost 25% of the port was estimated to have an inter- mediate (~50%) probability of being toxic. The SQG assessment in Stage 2 enabled careful stratifica- tion of the harbour into areas with different toxicity risks, reducing cost and time commitments in the final tier of assessment. The spatial survey carried out in Stage 3 involved concurrent chemical and ecotoxicological analyses. In this final stage, the degree of response in tests of amphipod survival in whole sediment samples, as well as in tests of microbial metabolism (Microtox©) and sea urchin egg fertilisation and embryo development in pore waters, generally increased with increasing chemical concentrations.
    [Show full text]
  • 7 a Short Geological and Environmental History of the Sydney
    View metadata,citationandsimilarpapersatcore.ac.uk effect on floods and droughts in Australia', Climatic change, vol. 25, pp. 289–317. 7 Wilby R L, 2005. 'Uncertainty in water resource model parameters used for climate change impact assessment', Hydrological Processes, vol. 19, pp. 3201–3219. Young P, 2003. 'Top-down and data-based mechanistic modelling of rainfall-flow dynamics at the catchment scale', Hydrological Processes, A short geological and environmental history vol. 17, pp. 2195–2217. of the Sydney estuary, Australia Young W, Brandis K & Kingsford R, 2006. 'Modelling monthly streamflows in two Australian dryland rivers: matching model complexity to spatial scale and data availability', Journal of Hydrology, Gavin Birch vol. 331, pp. 242–256. Zhang L, Dawes W R & Walker G R, 2001. 'Response of mean annual evapotranspiration to vegetation changes a catchment scale', Water Abstract Resources Research, vol. 37, pp. 701–708. Zhang L, Walker G R & Fleming M, 2002. 'Surface water balance for Sydney is blessed with one of the most beautiful harbours in the world. recharge estimation', CSIRO publishing, Collingwood, Victoria. However, like many large, capital ports world-wide, this environment has been exposed to relentless stress due to a rapidly increasing population density and extensive residential, commercial and industrial expansion. In this chapter, we explain why the coastal zone is such an important environment, especially for the people of Australia, and describe changes to the Sydney estuary as an example of environmental transformation due to anthropogenic pressure. The geologic development of the Sydney estuary is briefly traced, showing how the feature was eroded into the Hawkesbury Sandstone, mainly during low sea levels of the glacial periods.
    [Show full text]
  • AN OVERVIEW of the CITY WEST CYCLE-LINK Prepared By: Ecotransit Sydney Date: 1 June 2010 Authorised by the Executive Committee O
    AN OVERVIEW OF THE CITY WEST CYCLE-LINK Prepared by: EcoTransit Sydney Date: 1 June 2010 Authorised by the Executive Committee of EcoTransit Sydney The submission (including covering letters) consists of: 14 pages Contact person for this submission: John Bignucolo 02 9713 6993 [email protected] Contact details for EcoTransit Sydney, Inc.: PO Box 630 Milsons Point NSW 1565 See our website at: www.ecotransit.org.au City West Cycle-Link 1 EcoTransit Sydney An Overview of the City West Cycle-Link Summary This document presents a proposal for the City West Cycle-Link, a new cycling facility that would: 1. Provide a cycling and walking tunnel running across and under the City West Link Road, from Darley Road in the west to Derbyshire Road in the east; 2. Offer a safe alternative to crossing the slip lane running from the City West Link Road onto Darley Road; 3. Closely integrate with the proposed Norton 2 (James St) light rail stop, increasing the flow of people in the vicinity of the stop, and thereby enhancing the sense of safety of light rail commuters; 4. Allow cyclists to bypass the climb up Lilyfield Road between the Hawthorne Canal and James Street; 5. Connect with and extend the cycling route along Darley Road proposed as part of the GreenWay project; 6. Provide a grade-separated alternative to Lilyfield Road by creating a comparatively flat and direct connection to the Anzac Bridge cycleway at White Bay via the Lilyfield rail cutting and the Rozelle rail lands. In order to determine its scope and feasibility, EcoTransit Sydney requests that the NSW government via the Department of Transport and Infrastructure (NSWTI) undertake an investigation of the proposal as it has the required technical skills and resources for the task.
    [Show full text]
  • 4.1.2 Iron Cove Atn Link
    4.1.2 IRON COVE ATN LINK The active transport link at Iron Cove is shown in Figure 4.5 and is a key connector that would: • Connect northern suburbs of Drummoyne [and Russell Lea and Five Dock via the Bay Run] to The Bays Precinct and the CBD • Connect the existing retail centres on Darling Street Balmain and Victoria Road as well as local schools and other community services • Provide a direct route, notwithstanding significant gradient changes, from Iron Cove Bridge towards Darling Street • Capitalise on the amenity uplifts potentially assisted by forecast traffic volume reductions on Victoria Iron Cove Road Victoria Road • Connect to ATN routes on local roads • Link significant open space from the Bay Run, Callan Park and the future open space at Rozelle Rail Yards and foreshore along The Bays Precinct. The key route requirements are to: Callan Rozelle Glebe • Provide a separated cycleway and footpath on the Park Island southern side of Victoria Road along the extent of White Bay M4-M5 Link works Power Station • Provide a template for the treatment of cycleways and footpaths along the remainder of Victoria Road. Anzac Bridge Balmain Road The Crescent Rozelle Bay Rozelle Bay Light Rail City West Link Glebe Point Road LEGEND Lilyfield Road Lilyfield Upgraded - ATN path [M4-M5 Link] Light Rail New separated cycle way [by others] Existing - major cycle routes Jubilee Park Light Rail Regional route - inner city Whites Regional route - Council existing Creek Regional route - Council proposed Local route - low vehicle interaction Local route - medium vehicle interaction Johnston St N Interchanges Figure 4.5 Victoria Road Iron Cove ATN link ACTIVE TRANSPORT STRATEGY 21 PROPOSED INITIATIVES AND FUTURE LINKS 4.1.3 PROJECT INTERFACES The M4-M5 Link interfaces with the M4 East and New M5 at Haberfield and St Peters respectively.
    [Show full text]
  • July 2010 Rundown.Ppp
    The WOODSTOCK RUNDOWN July 2010 Internet addres s: www.woodstockrunners.org.au Email : [email protected] Facebook Group : http://www.facebook.com/group.php?gid=30549208990 Email Results and Contributions to : [email protected] Memberships : https://www.registernow.com.au/secure/Register.aspx?ID=66 Uniform Orders : https://www.registernow.com.au/secure/Register.aspx?ID=503 Postal Address : PO Box 672, BURWOOD NSW 1805 The Rundown On Members Thank you to all involved in our forthcoming 30 year publication. It is something to which we can all look forward and it will be all the better with a contribution from YOU. Any photos, stories, cartoons, inspirational pieces, whatever, may be forwarded to Chaia at the Rundown address, [email protected] Congratulations to Barry Cole on receiving Rotary’s prestigious Paul Harris Fellow Award for his massive commitment in organising the Bridge to Bridge Run over many years, raising thousands of dollars for selected charities. He joins Ken Murray as a former winner of the Award. Bev Edwards retired recently and we wish her the very best of times as a “lady of leisure”. Our good wishes also go to Lloyd who is undergoing treatment and will spend some time in hospital. We are thinking of you, Lloyd. Many members travelled west to the Woodford to Glenbrook Run and Deirdre remarked how happy all looked as they approached the finish line. Maybe it was sheer relief it was over. Deirdre felt tired driving the distance. There were many excellent results. Brendan’s 2nd overall should be applauded.
    [Show full text]
  • Spatial and Temporal Variability of Particulate Trace Metals in Port Jackson Estuary, Australia
    Estuarine, Coastal and Shelf Science (2001) 53, 63–77 doi:10.1006/ecss.2001.0792, available online at http://www.idealibrary.com on Spatial and Temporal Variability of Particulate Trace Metals in Port Jackson Estuary, Australia V. Hatjea,c, G. F. Bircha and D. M. Hillb aEnvironmental Geology Group, University of Sydney, NSW 2006, Australia bEnvironment Division, ANSTO, Lucas Heights, NSW 2234, Australia Received 27 June 2000 and accepted in revised form 20 February 2001 Major elements (Al, Ca, Fe and Mn) and trace elements (Cu, Cr, Pb, Zn and Ni) in operationally defined available and total particulate phases have been determined along an axial transect of the Port Jackson Estuary during twelve surveys between 1998 and 1999. Salinity, temperature, pH, dissolved oxygen and suspended particulate material (SPM) were also measured. Temporal and spatial variability were tested by two-factor analysis of variance. Throughout the estuary Zn and Ni exhibited a uniform distribution. It is suggested that the low reactivity of these elements may be a result of the water physicochemistry, low SPM concentrations and long residence time in the Port Jackson Estuary. Anthropogenic sources of Zn and Ni are widespread in the Port Jackson catchment, and also contribute to the spatial distribution observed in the estuary. The distributions of particulate Cu and Pb are significantly affected by anthropogenic inputs, particularly, from the southern embayments in the lower estuary. It is suggested that the increase of Cu and Pb seaward is also related to sorption of these elements on Fe-Mn oxides. Mixing, however, can largely account for the distribution of Cr, which was the only element that presented significant decrease in concentration with increasing salinity.
    [Show full text]
  • Agenda of Local Traffic Committee Meeting
    AGENDA R LOCAL TRAFFIC COMMITTEE MEETING APRIL 2020 The April 2020 meeting of the Inner West Local Traffic Committee will be held electronically with the Agenda emailed to Members for review. All comments are requested to be returned to Council by 5.00pm Monday 6 April 2020. Local Traffic Committee Meeting 6 April 2020 Function of the Local Traffic Committee Background Roads and Maritime Services (RMS) is legislated as the Authority responsible for the control of traffic on all NSW Roads. The RMS has delegated certain aspects of the control of traffic on local roads to councils. To exercise this delegation, councils must establish a local traffic committee and obtain the advice of the RMS and Police. The Inner West Council Local Traffic Committee has been constituted by Council as a result of the delegation granted by the RMS pursuant to Section 50 of the Transport Administration Act 1988. Role of the Committee The Local Traffic Committee is primarily a technical review and advisory committee which considers the technical merits of proposals and ensures that current technical guidelines are considered. It provides recommendations to Council on traffic and parking control matters and on the provision of traffic control facilities and prescribed traffic control devices for which Council has delegated authority. These matters are dealt with under Part A of the agenda and require Council to consider exercising its delegation. In addition to its formal role as the Local Traffic Committee, the Committee may also be requested to provide informal traffic engineering advice on traffic matters not requiring Council to exercise its delegated function at that point in time, for example, advice to Council’s Development Assessment Section on traffic generating developments.
    [Show full text]
  • Westconnex M4 East 4-26 Westconnex Delivery Authority Non-Aboriginal Heritage Impact Assessment
    Figure 4.22 1886 subdivision of Edward Powell’s land into 367 residential allotments. (Source: DP 1835 Department of Lands) WestConnex M4 East 4-26 WestConnex Delivery Authority Non-Aboriginal Heritage Impact Assessment Figure 4.23 1896 Sydney Water plan of part of Powell’s land showing development along Concord Road and Sydney, Carrington, Princess and Queen streets. (Source: Sydney Water PWDS Sheet 23 Concord) Figure 4.24 1896 Sydney Water plan showing development on part of Powell’s land along the southern side of Sydney Street, including Young Street, Park Street, Concord Road and Parramatta Road. (Source: Sydney Water PWDS Sheet 24 Concord) WestConnex M4 East 4-27 WestConnex Delivery Authority Non-Aboriginal Heritage Impact Assessment Figure 4.25 Sydney Water Blackwattle sheet circa 1910–1920 showing development on part of Powell’s land along the southern side of Sydney, Park and Young streets as well as along Parramatta and Concord roads. (Source: Sydney Water Plan Room BLKWTL249 Concord 24) WestConnex M4 East 4-28 WestConnex Delivery Authority Non-Aboriginal Heritage Impact Assessment Figure 4.26 Sydney Water Blackwattle Sheet (not dated but more recent than Figure 2.25) showing development along the southern side of Sydney, Park and Young streets, and Parramatta and Concord roads. (Source: Sydney Water Plan Room BLKWTL249 Concord 24) Figure 4.27 Four Ways Garage which stood on the corner of Parramatta and Concord roads. (Source: Concord Library) WestConnex M4 East 4-29 WestConnex Delivery Authority Non-Aboriginal Heritage Impact Assessment Figure 4.28 1943 aerial view showing development within the Powell’s Estate subdivision at this time.
    [Show full text]
  • Hunters Hill Bike Plan Municipality of Hunters Hill Final Draft Report
    Draft Hunters Hill Bike Plan Municipality of Hunters Hill Final Draft Report Prepared by: GTA Consultants (NSW) Pty Ltd for Municipality of Hunters Hill on 25/08/2020 Reference: N189290 Issue #: A Hunters Hill Bike Plan Municipality of Hunters Hill Final Draft Report Client: Municipality of Hunters Hill on 25/08/2020 Reference: N189290 Issue #: A Final Draft Quality Record Issue Date Description Prepared By Checked By Approved By Signed A 25/08/2020 Final Draft Liam Clark Volker Buhl Volker Buhl © GTA Consultants (NSW) Pty Ltd [ABN 31 131 369 376] 2020 The information contained in this document is confidential and intended solely for the use of the client for the purpose for which it has been prepared and no representation is made or is to be implied as being made to any third party. Use or copying of this document in whole or in part without the written permission of GTA Consultants constitutes an infringement of copyright. The intellectual property Melbourne | Sydney | Brisbane contained in this document remains the property of GTA Consultants. GTA Report Adelaide | Perth CONTENTS 1. Introduction 1 1.1. Introduction 1 2. Background Review 2 2.1. Regional Context 2 2.2. Hunters Hill 6 3. Existing Conditions 9 3.1. Key Land Use and Locations 9 3.2. Travel Patterns and Journey to Work 11 3.3. Safety 13 3.4. Topography 14 3.5. Existing Cycling Facilities 16 4. Stakeholder Engagement 25 4.1. Community Consultation 25 4.2. Engagement with Adjoining Councils 27 5. Strategic Route Network 28 5.1. Introduction 28 5.2.
    [Show full text]