Revised FORM-I & PRE-FEASIBILITY REPORT

MADHUSALA DISTILLERIES PVT. LTD. (120 KLPD Grain based Distillery Plant) at Mouza Karia & Khuleperiya, P.S. Bagnan District ,

Submitted to MoEF, New Delhi

Prepared by:

ISO 9001: 2008 Certified Accredited by NABET - QCI

6-3-652 | Flat # 7-3 | Dhruvatara Apartments | Amrutha Estates | Erramanjil | Somajiguda | Hyderabad- 500082 Madhusala Distilleries Pvt. Ltd. Form I Ethanol plant

APPENDIX I (See paragraph – 6) FORM I S. No (I) BASIC INFORMATION 1. Name of the project Madhusala Distilleries Private Limited 2. S. No. in the schedule 5 (g) 3. Proposed capacity / area / length / S.No. Units Ethanol plant Power tonnage to be handled / command area generation / lease area / number of wells to be 1 120 KLPD 5.0 MW (RS / ENA / Ethanol

drilled

4. New/Expansion/Modernization New 5. Existing capacity/Area etc. Not applicable 6. Category of project i.e. ‘A’ or ‘B’. A 7. Does it attract the general condition? If No yes, please specify. 8. Does it attract the specific condition? If No yes, please specify. 9. Location Plot/Survey/Khasra No. Refer to Annexure -1 Village Karia & Khuleperiya (Mouza) Tehsil Bagnan (P.S) District Howrah State West Bengal 10. Nearest railway station/airport along Nearest Railway station – Bagnan RS (8.0 Kms.) with distance in kms. 11. Nearest Town, City, District Nearest Railway station – Bagnan RS (8.0 Kms.) Headquarters along with distance in Kms 12. Village Panchayats,Zilla Parishad, Karia (Mouza), Bagnan (P.S), Municipal corporation, Local body (complete postal addresses with telephone no.s to be given) 13. Name of the Applicant Sarbjit Singh Johal

Page 1 Madhusala Distilleries Pvt. Ltd. Form I Ethanol plant

14. Registered Address THE MILLENIUM BUILDING 235/2A, A.J.C. Bose Road, Kolkata-700 020 15. Address for correspondence: Name Sarbjit Singh Johal Designation(owner/partner/CEO) Director Address THE MILLENIUM BUILDING 235/2A, A.J.C. Bose Road, Kolkata-700 020 Pin code 700020 E-Mail [email protected] Telephone No. 22891912 Fax No. 22891908 16. Details of Alternative sites examined, if No any. Location these sites should be shown on a topo sheet 17. Interlinked Projects No 18. Whether separate application of No interlinked project has been submitted? 19. If yes, date of submission Not applicable 20. If no, reason Not applicable 21. Whether the proposal involves Not applicable approval/clearance under; if yes, details of the same and their status to be given. (a) The Forest (conservation)Act,1980 (b) The Wildlife (protection)Act,1972 (c) The C.R.Z Notification, 1991? 22. Whether there is any a government No order/policy relevant/relating to the site? 23. Forest land involved(hectares) Not applicable 24. Whether there is any litigation pending Not applicable against the project and/or land in which the project is propose to be set up? (a)Name of the court (b)Case No. (c) Orders/directions of the court, if any and its relevance with the proposed project.

Page 2 Madhusala Distilleries Pvt. Ltd. Form I Ethanol plant

(II) ACTIVITY 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Details thereof (with approximate S.No. Information/Checklist confirmation Yes/No quantities /rates, wherever possible) with source of information data 1.1 Permanent or temporary change in Yes The proposed land is Agricultural land. land use, land cover or topography The Built-up area of the plant will be including increase in intensity of land small compared to the total area. use (with respect to local land use Moreover extensive greenbelt will be plan) developed within the plant premises. Hence there will not be any adverse impact due to the change in land use pattern due to the proposed industrial activity. 1.2 Clearance of existing land, vegetation Yes Existing land is more or less flat without and buildings? many undulations. No clearance of vegetation will be required during construction of the Plant as there is sparse vegetation. However as a part of greenbelt development, vegetation will be developed in the plant premises. 1.3 Creation of new land uses? Yes Present use of land is Agricultural. The Built-up area of the plant will be small compared to the total area. Moreover extensive greenbelt will be developed within the plant premises. 1.4 Pre-construction investigations e.g. Yes Soil at the site is black. Bore well water bore houses, soil testing? is suitable for potable purpose. 1.5 Construction works? No No construction work will be taken-up without obtaining the Prior Environmental clearance from the Ministry and Consent for Establishment from WBPCB. All required precautions will be taken- up to prevent the fugitive dust during the construction. Hence there will not be any adverse impact on environment due to the construction woks related to project. 1.6 Demolition works? No No Demolition works are involved. 1.7 Temporary sites used for construction No. The Construction workers will be taken works or housing of construction from the local areas only. Hence workers? temporary housing tents are not

Page 3 Madhusala Distilleries Pvt. Ltd. Form I Ethanol plant

envisaged for the construction workers. 1.8 Above ground buildings, structures or Yes Most of the structures in the plant will earthworks including linear structures, be above the ground. However cut and fill or excavations excavations will be involved for foundations. 1.9 Underground works including mining No No mining and tunneling will be or tunneling? involved in the proposed activity. 1.10 Reclamation works? No No Reclamation work is required. 1.11 Dredging? No No Dredging activities will be involved. 1.12 Offshore structures? No No offshore structures is envisaged in the proposed activity 1.13 Production and manufacturing Yes Manufacturing of Rectified spirit / processes? Ethanol / ENA in the proposed Distillery by using grains (maize, corn, Sorghum grain, broken rice and starch based grains). Power will be generated for captive purpose. 1.14 Facilities for storage of goods or Yes Raw material for production of Rectified materials? spirit / ENA / Ethanol will be stored in grain silo or sheds. 1.15 Facilities for treatment or disposal of Yes Spent wash will be passed through solid waste or liquid effluents? decanter and then the thin slop from Decanter will be dried in Multiple Effect Evaporators (MEE) followed by Dryer up to 90% solids w/w. This solid is known as DDGS. This will be sold to outside parties.

Non process effluents like DM plant regeneration water & boiler blow down will be neutralized in neutralization tanks and will be mixed with Cooling tower blow down. This treated effluent after ensuring compliance with standards stipulated by WBPCB for wastewater for onland for irrigation, will be utilized for greenbelt development. 1.16 Facilities for long term housing of No No Housing facilities or colony is operational workers? proposed. 1.17 New road, rail or sea traffic during No There will be a slight increase in traffic construction or operation? volume during construction activities due to transportation of construction materials. During operation of the plant, the raw materials will be transported by road in covered trucks. The existing roads can handle this minor increase in traffic. Hence there will not be any

Page 4 Madhusala Distilleries Pvt. Ltd. Form I Ethanol plant

adverse impact on traffic due to the proposed project. 1.18 New road, rail, air waterborne or other No No New Transport facility is proposed. transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing No No closure or diversion of transporting transport routes or infrastructure facilities is proposed. leading to changes in traffic movements? 1.20 New or diverted transmission lines or Yes The water required for the proposed pipelines? plant will be sourced from Ground Water as well as . 1.21 Impoundment, damming, culverting, No No culverting, realignment are realignment or other changes to the envisaged. There will not be any hydrology of watercourses or changes to the hydrology of water aquifers? courses or aquifers. 1.22 Stream crossings? No No stream crossing is involved. 1.23 Abstraction or transfers of water from Yes The water required for the proposed ground or surface waters? plant will be sourced from Ground water as well as Damodar river. 1.24 Changes in water bodies or the land No No changes in water bodies and land surface affecting drainage or run-off? surface are anticipated as the site is more or less flat without many undulations. 1.25 Transport of personnel or materials for Yes A few vehicles will be provided for construction, operation or transport of personnel during decommissioning? construction of the project. Construction materials will be transported in covered trucks. The raw materials will be transported in covered trucks by road. The existing road is capable of handling the additional vehicular traffic due to the proposed Project. 1.26 Long-term dismantling or No No such works are envisaged. decommissioning or restoration works? 1.27 Ongoing activity during No No such works are envisaged decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in either Yes During construction local people will be temporarily or permanently? involved. During operation of the plant preference will be given to the local people for employment. 1.29 Introduction of alien species? No No such activity is envisaged 1.30 Loss of native species or genetic No As a part of greenbelt development plan diversity? native species that are suitable to that soil condition will be developed as per

Page 5 Madhusala Distilleries Pvt. Ltd. Form I Ethanol plant

CPCB guidelines in consultation with DFO. 1.31 Any other actions? No Nil

2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): S.No. Information/checklist confirmation Yes/No Details thereof (with approximate quantities/ rates, wherever possible) with source of information data 2.1 Land especially undeveloped or land Yes Total land in possession of management (ha) is 43.27 Acres. Out of which 25.0 acres is earmarked for proposed Distillery & Cogen. Plant. Present use of land is agricultural. The Built-up area of the plant is very small compared to the total area. Moreover extensive greenbelt will be developed within the plant premises. 2.2 Water (expected source & competing Yes The water required for the proposed users) unit: KLD plant will be sourced from Ground water as well as Damodar river. A dedicated pipeline will be laid. Total water required for the proposed project will be 1200 cum/day. 2.3 Minerals (MT) Yes Coal / Biomass 2.4 Construction material–stone, Yes All these materials will be sourced from aggregates, sand / soil (expected local area only. source – MT)

2.5 Forests and timber (source – MT) No Not Applicable 2.6 Energy including electricity and fuels Yes Biomass / Coal will be used as raw (source, competing users) Unit: fuel material for steam generation and power (MT), energy (MW) required for the Ethanol plant. 2.7 Any other natural resources (use No Not applicable. appropriate standard units)

Page 6 Madhusala Distilleries Pvt. Ltd. Form I Ethanol plant

3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health. S.No. Information/checklist confirmation Yes/No Details thereof (with approximate quantities/ rates, wherever possible) with source of information data 3.1 Use of substances or materials, which Yes HCl, NaOH will be used in D.M. Plant. The are hazardous (as per MSIHC rules) to storage will be as per guidelines only. human health or the environment (flora, fauna, and water supplies) 3.2 Changes in occurrence of disease or No Not Applicable affect disease vectors (e.g. insect or water borne diseases) 3.3 Affect the welfare of people e.g. by No Not Applicable as the proposed project changing living conditions? will create more employment opportunities in the area and thereby a substantial improvement in the socio- economic status. 3.4 Vulnerable groups of people who could No High efficiency Bag filters will be be affected by the project e.g. hospital installed to Boiler to bring down the patients, children, the elderly etc., particulate matter in the exhaust gas to less than 50 mg/Nm3 to comply with WBPCB norms. Effluent will be treated in Multiple Effect Evaporators and dried in Dryer. DDGS thus obtained will be sold to outside parties. Hence there will not be any adverse impact on vulnerable groups. 3.5 Any other causes No Not Applicable.

4. Production of solid wastes during construction or operation or decommissioning (MT/month) S.No. Information/checklist confirmation Yes/No Details thereof (with approximate quantities/ rates, wherever possible) with source of information data 4.1 Spoil, overburden or mine wastes No The dug soil during excavation will be used for filling of low-lying areas. 4.2 Municipal waste (domestic and or Yes Will be disposed as per norms commercial wastes) 4.3 Hazardous wastes (as per Hazardous Yes Waste oil generated will be disposed to Waste Management Rules) the WBPCB approved vendors. 4.4 Other industrial process wastes No Not Applicable 4.5 Surplus product No Not Applicable 4.6 Sewage sludge or other sludge from Yes Sludge from neutralization tank will be 6 effluent treatment Kg / day, which will be given to WBPCB

Page 7 Madhusala Distilleries Pvt. Ltd. Form I Ethanol plant

approved vendors. 4.7 Construction or demolition wastes Yes Construction wastes will be disposed off as per guidelines. 4.8 Redundant machinery or equipment No No redundant machinery will be kept in the premises. 4.9 Contaminated soils or other materials No Not applicable 4.10 Agricultural wastes No Not Applicable 4.11 Other solid wastes Yes DDGS will be sold outside parties. Ash generated will be given to brick manufacturers/cement plants.

5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr) S.No. Information/checklist confirmation Yes/No Details thereof (with approximate quantities/ rates, wherever possible) with source of information data 5.1 Emissions from combustion of fossil Yes Biomass / Coal will be used as fuel for fuels from stationary or mobile sources Boiler. The emissions of concern from this Boiler will be PM, SO2 and NOx. Bag filters will be provided for control of particulate matter to below 50 mg/Nm3. Adequate stack height will be provided as per CPCB norms for effective dispersion of SO2 emissions into the atmosphere. 5.2 Emissions from production processes Yes CO2 generation will be 91.2 TPD and will be recovered in CO2 recovery plant and will be given to bottling units. 5.3 Emissions from materials handling Yes Dust generated near raw material including storage or transport handling and transfer points will prevented by suppression through water. Hence there will not be any fugitive dust emissions due to raw material handling. Existing road is capable of absorbing this additional traffic. All internal roads will be asphalted. Hence there will not be any adverse effect due to transportation of raw materials. 5.4 Emissions from construction activities Yes Some dust emissions will be generated including plant and equipment during construction. Dust curtains will be provided all round the area to prevent the dust emissions. 5.5 Dust or odors from handling of No Not applicable materials including construction materials, sewage and waste 5.6 Emissions from incineration of waste No Not applicable

Page 8 Madhusala Distilleries Pvt. Ltd. Form I Ethanol plant

5.7 Emissions from burning of waste in No Not applicable open air (e.g. slash materials, construction debris) 5.8 Emissions from any other sources No Nil

6. Generation of Noise and Vibration, and Emissions of Light and Heat: S.No. Information/checklist confirmation Yes/No Details thereof (with approximate quantities/ rates, wherever possible) with source of information data

6.1 From operation of equipment e.g. Yes Noise levels from all machinery will be in engines, ventilation plant, crushers accordance with MOEF norms. 6.2 From industrial or similar processes Yes Main source of noise generation in the proposed project will be turbine and compressors. Acoustic enclosures will be provided to turbines to regulate noise levels. The noise levels of all turbine and machinery will be in accordance with MOEF norms. Ambient noise levels will be maintained as per MoEF notification i.e. less than 75 dBA during day time and less than 70 dBA during night time. 6.3 From construction or demolition Yes Construction equipment will cause some noise. Ear plugs will be provided to construction workers who work near the noise generating equipment. 6.4 From blasting or piling No No such operations will be involved. 6.5 From construction or operational Yes Vehicles used by construction staff will traffic be minimal. The noise levels will be in accordance with MOEF notification.

6.6 From lighting or cooling systems No Not applicable 6.7 From any other sources No Not applicable

7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: S.No. Information/checklist confirmation Yes/No Details thereof (with approximate quantities/ rates, wherever possible) with source of information data 7.1 From handling, storage, use or spillage No Good housekeeping practices will be of hazardous materials followed to prevent any spillage of hazardous materials 7.2 From discharge of sewage or other No Spent wash will be passed through effluents to water or the land (expected decanter and then the thin slop from mode and place of discharge) Decanter will be dried in Multiple Effect Evaporators (MEE) followed by Dryer up

Page 9 Madhusala Distilleries Pvt. Ltd. Form I Ethanol plant

to 90% solids w/w. This solid is known as DDGS. This will be sold to outside parties. Non process effluents like DM plant regeneration water & boiler blow down will be neutralized in neutralization tanks and will be mixed with Cooling tower blow down. This treated effluent after ensuring compliance with standards stipulated by WBPCB for wastewater for onland for irrigation, will be utilized for ash conditioning and greenbelt development. Sanitary waste water will be treated in septic tank followed by soak pit. Hence there will not be any adverse impact on environment due to the proposed distillery project. 7.3 By deposition of pollutants emitted to No State-of-the-art Bag filters will be air into the land or into water installed to bring down the SPM to < 50 mg/Nm3. DDGS obtained from drying of Spent wash will be sold to outside parties. Treated non-process effluent will be used for onland for irrigation within the premises. Ash will be stored in silo and entire ash given to brick manufacturers/cement plants. Hence there will not be any deposition of pollutants into the air/land/water. 7.4 From any other sources No Not applicable 7.5 Is there a risk of long term build up of No Not applicable pollutants in the environment from these sources?

8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment: S.No. Information/checklist confirmation Yes/No Details thereof (with approximate quantities/ rates, wherever possible) with source of information data 8.1 From explosions, spillages, fires etc No Good housekeeping practices will be from storage, handling, use or maintained. Hence there will not be any production of hazardous substances spillage, due to handling and usage of hazardous chemicals 8.2 From any other causes No Not applicable 8.3 Could the project be affected by natural No Not applicable disasters causing environmental damage (e.g. floods, earthquakes,

Page 10 Madhusala Distilleries Pvt. Ltd. Form I Ethanol plant

landslides, cloudburst etc)?

9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality: S.No. Information/checklist confirmation Yes/No Details thereof (with approximate quantities/ rates, wherever possible) with source of information data 9.1 Lead to development of supporting utilities, ancillary development or No No ancillary developments will be development stimulated by the project anticipated due to the proposed which could have impact on the distillery. environment e.g.:  Supporting infrastructure (roads, power supply, waste or waste water treatment, etc.)  Housing development  Extractive industries  Supply industries  Other 9.2 Lead to after-use of the site, which No Not applicable could have an impact on the environment 9.3 Set a precedent for later developments Yes With the improvement in the socio- economic status of the people in the area, later developments are expected. 9.4 Have cumulative effects due to Yes There are no other similar industries are proximity to other existing or planned situated within 10 km radius projects with similar effects

Page 11 Madhusala Distilleries Pvt. Ltd. Form I Ethanol plant

(III) ENVIRONMENTAL SENSITIVITY S.No. Information/checklist confirmation Yes/No Aerial distance (within 15 km.) Proposed project location boundary 1 Areas protected under international No Not Applicable conventions, national or local legislation for their ecological, landscape, cultural or other related value 2 Areas which are important or sensitive for Yes Roopnarayan River - 3.5 Kms. ecological reasons - Wetlands, watercourses Damodar River - 3.2 Kms. or other water bodies, coastal zone, biospheres, mountains, forests 3 Areas used by protected, important or No Not applicable sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration 4 Inland, coastal, marine or underground Yes Underground available at site waters 5 State, National boundaries No Not applicable 6 Routes or facilities used by the public for No Not applicable access to recreation or other tourist, pilgrim areas 7 Defense installations No Not applicable 8 Densely populated or built-up area No Not applicable 9 Areas occupied by sensitive man-made land Yes Karia – 1 Km. uses (hospitals, schools, places of worship, community facilities) 10 Areas containing important, high quality or No Nil scarce resources (ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals) 11 Areas already subjected to pollution or No Not applicable environmental damage. (Those where existing legal environmental standards are exceeded) 12 Areas susceptible to natural hazard which No Based on the historical data, the site could cause the project to present is not likely to prone to environmental problems earthquakes, floods, etc. (Earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions)

Page 12 Madhusala Distilleries Pvt. Ltd. Form I Ethanol plant

(IV). PROPOSED TERMS OF REFERENCE FOR EIA STUDIES I. BASELINE DATA COLLECTION : A. AMBIENT AIR QUALITY  Baseline data for the proposed project.  A study area of 10 Km. radius.  6 nos. of sampling stations based on predominant wind direction, upwind direction, cross wind direction, rural area representation and urban area representation.

 Parameters PM10, SO2, NOX.  Frequency of monitoring 2 days a week for 3 months (commencing from 1st March 2014 to 31st May 2014).

B. WATER QUALITY  Ground water quality at 6 locations within the study area.  Ground water quality for parameters as per IS : 10500  Surface water quality at two location and analyzed for various parameters

C. NOISE LEVELS  Noise levels (day time & night time) at 6 locations within the study area.

D. MICRO METEOROLOGICAL DATA  Wind direction, wind speed, temperature, relative humidity and rainfall fall, cloud cover on hourly basis for one season.

E. SOCIO-ECONOMIC DETAILS  Socio economic details of people in the study area.

F. FLORA & FAUNA  List of flora & fauna in the study area.

II. PREDICTION OF IMPACTS

 Prediction of GLC’s of PM, SO2 & NOx using Air quality model.  Finding out the net resultant GLC’s by superimposing predicted incremental rise in concentrations over the baseline concentrations and comparing them with National Ambient Air Quality Standards.

Page 13 Madhusala Distilleries Pvt. Ltd. Form I Ethanol plant

 Prediction of impacts on Water environment, Land environment, Noise environment, Flora & Fauna, Socio-economic environment, Traffic etc.

III.ENVIRONMENTAL IMPACT STATEMENT  Preparation environmental impact statement comprising of Air Environment, Water Environment, Land environment, Noise environment, Flora & Fauna, Socio- economic environment.

IV. ENVIRONMENTAL MANAGEMENT PLAN  Air emission management including the control of secondary fugitive emissions  Effluent treatment & disposal  Solid waste generation, storage & disposal  Greenbelt development plan  Rain water harvesting  Post project environmental monitoring.

V. RISK ANALYSIS & DISASTER MANAGEMENT PLAN  Identification of risks  Analysis of risks  Preparation of Disaster Management Plan

VI. Preparation of Draft REIA Report as per Generic structure of EIA Notification dated 14th September, 2006.

“I hereby given undertaking that the data and information given in the application and enclosures are true to the best of my knowledge and belief and I am aware that if any part of the data and information submitted is found to be false or misleading at any stage, the project will be rejected and clearance give, if any to the project will be revoked at our risk and cost.

Date: 25th April 2014 Place: Kolkata SARBJIT SINGH JOHAL DIRECTOR MADHUSALA DISTILLERIES PVT. LTD. “MILLENIUM BUILDING” 235/2A, A J C.Bose Rd, Kolkata-700 020