Request for Proposal (RFP) Due 03-27-2020 RFP# 2020HDB-NC

CER 2. Request for Pre-Offer Change or Approved Equal This form must be used for requested clarifications, changes, substitutes or approval of items equal to items specified with a brand name and must be submitted as far in advance of the Due Date, as specified in “Questions, Clarifications and Omissions.”

Piedmont Authority for Regional Transportation (PART) RFP# 2020HDB-NC

– Request #: 1

Proposer: Creative Bus Sales (CBS) / ElDorado National (California), Inc. (ENC) RFP Section: NR 3. Proposal Due Date and Submittal Requirements Page: 11 of 207

Questions/clarification or approved equal: Proposers are requested to submit to the Agency one hard copy marked “Original,” two additional printed copies, and two CDs/flash drivers, each containing an electronic PDF copy of the Proposal. IP 11.2 Proposal Format Requirements states “ Proposer shall submit one original (marked clearly as such), RFP 2020HDB-NC hard copies, and RFP 2020HDB-NC CDs/flash drive, each containing an electronice PDF copy of the Proposal to the PART Agency. Please clarify which direction is correct 1 original + 2 hard copies + 2 electronic or 1 original + 1 electronic?

– □Approved – Agency action: □ Denied □See response below □ See addendum Agency response:

Page 165 of 207 Request for Proposal (RFP) Due 03-27-2020 RFP# 2020HDB-NC

CER 2. Request for Pre-Offer Change or Approved Equal This form must be used for requested clarifications, changes, substitutes or approval of items equal to items specified with a brand name and must be submitted as far in advance of the Due Date, as specified in “Questions, Clarifications and Omissions.”

Piedmont Authority for Regional Transportation (PART) RFP# 2020HDB-NC

– Request #: 2

Proposer: CBS / ENC RFP Section: IP 11.2 Proposal Format Requirements Page: 18 of 207

Questions/clarification or approved equal: Also, included in this management plan a complete listing of vehicles sold to North America public agencies over the past five years – listed out as a total number of vehicles sold, per agency identified.

Approval requested for our standard Reference List which offers a listing of our larger contracts that have recently been delivered in lieu of all deliveries over the past five years. To ask for a complete history would put an undue burden upon the Manufacturer.

– □Approved – Agency action: □ Denied □See response below □ See addendum Agency response:

Page 165 of 207 Request for Proposal (RFP) Due 03-27-2020 RFP# 2020HDB-NC

CER 2. Request for Pre-Offer Change or Approved Equal This form must be used for requested clarifications, changes, substitutes or approval of items equal to items specified with a brand name and must be submitted as far in advance of the Due Date, as specified in “Questions, Clarifications and Omissions.”

Piedmont Authority for Regional Transportation (PART) RFP# 2020HDB-NC

– Request #: 3

Proposer: CBS / ENC RFP Section: IP 11.2 Proposal Format Requirements Page: 18 of 207

Questions/clarification or approved equal: The Contractor shall be liable for payment of all local taxes applicable to the complete bus as delivered and should add these amounts to the Proposal prices.

SP 5.2 Payment of Taxes states “Unless otherwise provided in this Contract, the Contractor shall pay all federal, state and local taxes and duties applicable to and assessable against any Work, goods, services, processes and operations incidental to or involved in the Contract, including but not limited to retail sales and use, transportation, export, import, business and special taxes.” In order for us to determine whether or not any taxes apply to this procurement, we must know if PART or other procuring agency is exempt from local, state or other taxes. Please clarify which, if any, tax exemptions are in place for this procurement.

– □Approved – Agency action: □ Denied □See response below □ See addendum Agency response:

Page 165 of 207 Request for Proposal (RFP) Due 03-27-2020 RFP# 2020HDB-NC

CER 2. Request for Pre-Offer Change or Approved Equal This form must be used for requested clarifications, changes, substitutes or approval of items equal to items specified with a brand name and must be submitted as far in advance of the Due Date, as specified in “Questions, Clarifications and Omissions.”

Piedmont Authority for Regional Transportation (PART) RFP# 2020HDB-NC

– Request #: 4

Proposer: CBS / ENC RFP Section: SP 1.1.2 Repairs by the Agency, 4. Reimbursement for Labor Page: 18 of 207

Questions/clarification or approved equal: . . . qualified mechanic at a straight time wage rate of $45 per hour, which includes fringe benefits an overhead adjusted for The Agency’s most recently published rate in effect at the time the Work is performed.

WR 2.3.5 Reimbursement for Labor and Other Related Costs states straight time wage rate of $85. Please advise which rate is applicable to this procurement.

– □Approved – Agency action: □ Denied □See response below □ See addendum Agency response:

Page 165 of 207 Request for Proposal (RFP) Due 03-27-2020 RFP# 2020HDB-NC

CER 2. Request for Pre-Offer Change or Approved Equal This form must be used for requested clarifications, changes, substitutes or approval of items equal to items specified with a brand name and must be submitted as far in advance of the Due Date, as specified in “Questions, Clarifications and Omissions.”

Piedmont Authority for Regional Transportation (PART) RFP# 2020HDB-NC

– Request #: 5

Proposer: CBS / ENC RFP Section: SP 2.3 Contract Deliverables, 18. Page: 43 of 207

Questions/clarification or approved equal: Professionally prepared mechanics’ “Bus Orientation” training video.

TS 5.6 Training has no requirement for training videos. Approval requested to supply a professionally prepared mechanics “Bus Orientation” training power point which would orient mechanics with our vehicle starting with the exterior and then the interior. The power point would show all access compartments closed/opened and all components of the vehicle with detailed descriptions provided. A power point presentation would not become obsolete like a video would since slides can be inserted/ deleted as components change for whatever reason.

– □Approved – Agency action: □ Denied □See response below □ See addendum Agency response:

Page 165 of 207 Request for Proposal (RFP) Due 03-27-2020 RFP# 2020HDB-NC

CER 2. Request for Pre-Offer Change or Approved Equal This form must be used for requested clarifications, changes, substitutes or approval of items equal to items specified with a brand name and must be submitted as far in advance of the Due Date, as specified in “Questions, Clarifications and Omissions.”

Piedmont Authority for Regional Transportation (PART) RFP# 2020HDB-NC

– Request #: 6

Proposer: CBS / ENC RFP Section: SP 2.3 Contract Deliverables, 23., 24., 25., 27. And 28. Page: 43 of 207

Questions/clarification or approved equal: Draft preventative maintenance, diagnostic procedures, parts and operators’ manuals provided with Pilot Bus for approval.

Approval requested for the referenced final manuals to be provided within 30 days of first bus delivery. This will allow adequate generation time as ENC does not generate parts/service/operators’ manuals until the vehicle has completed production and the bus has shipped, guaranteeing that all last-minute revisions are accounted for. Sample manuals can be provided for PART’s review upon request.

– □Approved – Agency action: □ Denied □See response below □ See addendum Agency response:

Page 165 of 207 Request for Proposal (RFP) Due 03-27-2020 RFP# 2020HDB-NC

CER 2. Request for Pre-Offer Change or Approved Equal This form must be used for requested clarifications, changes, substitutes or approval of items equal to items specified with a brand name and must be submitted as far in advance of the Due Date, as specified in “Questions, Clarifications and Omissions.”

Piedmont Authority for Regional Transportation (PART) RFP# 2020HDB-NC

– Request #: 7

Proposer: CBS / ENC RFP Section: SP 11. Sustainability Page: 48 of 207

Questions/clarification or approved equal: Contractor will provide the Agency with a statement indicating that responsible parties have read and understand the Agency’s sustainability policies and it agrees to use reasonable efforts to conduct its work and operations in a manner that is consistent with them.

Clarification requested whether this statement is to be submitted with the proposal or upon receipt of award? If with proposal can Agency supply Sustainability Policy for review?

– □Approved – Agency action: □ Denied □See response below □ See addendum Agency response:

Page 165 of 207 Request for Proposal (RFP) Due 03-27-2020 RFP# 2020HDB-NC

CER 2. Request for Pre-Offer Change or Approved Equal This form must be used for requested clarifications, changes, substitutes or approval of items equal to items specified with a brand name and must be submitted as far in advance of the Due Date, as specified in “Questions, Clarifications and Omissions.”

Piedmont Authority for Regional Transportation (PART) RFP# 2020HDB-NC

– Request #: 8

Proposer: CBS / ENC RFP Section:TS 5.8.1 Interior Noise Page: 62 of 207

Questions/clarification or approved equal: The driver area shall not experience a noise level of more than 75 dBA.

Approval requested for Axess 35’ and 40’ diesel vehicles with a noise level of 77 dBA in the driver area.

– □Approved – Agency action: □ Denied □See response below □ See addendum Agency response:

Page 165 of 207 Request for Proposal (RFP) Due 03-27-2020 RFP# 2020HDB-NC

CER 2. Request for Pre-Offer Change or Approved Equal This form must be used for requested clarifications, changes, substitutes or approval of items equal to items specified with a brand name and must be submitted as far in advance of the Due Date, as specified in “Questions, Clarifications and Omissions.”

Piedmont Authority for Regional Transportation (PART) RFP# 2020HDB-NC

– Request #: 9

Proposer: CBS / ENC RFP Section:TS 5.8.2 Exterior Noise Page: 62 of 207

Questions/clarification or approved equal: Airborne noise generated by the bus and measured from either side shall not exceed 80 dBA under full power acceleration when operated at 0 to 35 mph at curb weight.

Approval requested for Axess 35’ and 40’ diesel vehicles with a noise level of 81 dBA on the street side.

– □Approved – Agency action: □ Denied □See response below □ See addendum Agency response:

Page 165 of 207 Request for Proposal (RFP) Due 03-27-2020 RFP# 2020HDB-NC

CER 2. Request for Pre-Offer Change or Approved Equal This form must be used for requested clarifications, changes, substitutes or approval of items equal to items specified with a brand name and must be submitted as far in advance of the Due Date, as specified in “Questions, Clarifications and Omissions.”

Piedmont Authority for Regional Transportation (PART) RFP# 2020HDB-NC

– Request #: 10

Proposer: CBS / ENC RFP Section: TS 5.8.2 Exterior Noise Page: 62 of 207

Questions/clarification or approved equal: Airborne noise generated by the bus and measured from either side shall not exceed 80 dBA under full power acceleration when operated at o to 35 mph at curb weight.

Approval requested for E-Z Rider 32’ and 35’ diesel vehicles with a noise level of 82 dBA on the street side.

– □Approved – Agency action: □ Denied □See response below □ See addendum Agency response:

Page 165 of 207 Request for Proposal (RFP) Due 03-27-2020 RFP# 2020HDB-NC

CER 2. Request for Pre-Offer Change or Approved Equal This form must be used for requested clarifications, changes, substitutes or approval of items equal to items specified with a brand name and must be submitted as far in advance of the Due Date, as specified in “Questions, Clarifications and Omissions.”

Piedmont Authority for Regional Transportation (PART) RFP# 2020HDB-NC

– Request #: 11

Proposer: CBS / ENC RFP Section: TS 5.8.2 Exterior Noise Page: 62 of 207

Questions/clarification or approved equal: The bus-generated noise at curb idle shall not exceed 65 dBA.

Approval requested for E-Z Rider 32’ and 35’ diesel vehicles with a noise level of 68 dBA on the street side.

– □Approved – Agency action: □ Denied □See response below □ See addendum Agency response:

Page 165 of 207 Request for Proposal (RFP) Due 03-27-2020 RFP# 2020HDB-NC

CER 2. Request for Pre-Offer Change or Approved Equal This form must be used for requested clarifications, changes, substitutes or approval of items equal to items specified with a brand name and must be submitted as far in advance of the Due Date, as specified in “Questions, Clarifications and Omissions.”

Piedmont Authority for Regional Transportation (PART) RFP# 2020HDB-NC

– Request #: 12

Proposer: CBS / ENC RFP Section: TS 6.8.1 Floor Height; Transit Coach Page: 66 of 207

Questions/clarification or approved equal: Height of the step above the street shall be no more than 16” measured at the centerline of the front and rear doorway.

Approval requested for E-Z Rider 30’ and 35’ diesel vehicles with a floor height of 17.88”; step height and kneeled step height are met.

– □Approved – Agency action: □ Denied □See response below □ See addendum Agency response:

Page 165 of 207 Request for Proposal (RFP) Due 03-27-2020 RFP# 2020HDB-NC

CER 2. Request for Pre-Offer Change or Approved Equal This form must be used for requested clarifications, changes, substitutes or approval of items equal to items specified with a brand name and must be submitted as far in advance of the Due Date, as specified in “Questions, Clarifications and Omissions.”

Piedmont Authority for Regional Transportation (PART) RFP# 2020HDB-NC

– Request #: 13

Proposer: CBS / ENC RFP Section: TS 6.9 Interior Headroom Page: 66 of 207

Questions/clarification or approved equal: Headroom above the aisle and at the centerline of the aisle seats . . . tapering to no less than 74 in. forward of the rear settee. At the centerline of the window seats, headroom shall be no lower than 65 in., . . .Headroom at the back of the rear bench seat may be reduced to a minimum of 56 in., . . .

Approval requested for headroom of 72 7/8 in. at the forward edge of the rear settee, 62 7/8 in. at the centerline of the window seat on the upper deck, and 53 7/8 in. at the back of the rear bench seat on the Axess 35’ and 40’ units.

– □Approved – Agency action: □ Denied □See response below □ See addendum Agency response:

Page 165 of 207 Request for Proposal (RFP) Due 03-27-2020 RFP# 2020HDB-NC

CER 2. Request for Pre-Offer Change or Approved Equal This form must be used for requested clarifications, changes, substitutes or approval of items equal to items specified with a brand name and must be submitted as far in advance of the Due Date, as specified in “Questions, Clarifications and Omissions.”

Piedmont Authority for Regional Transportation (PART) RFP# 2020HDB-NC

– Request #: 14

Proposer: CBS / ENC RFP Section: TS 7.2 Gradability Page: 67 of 207

Questions/clarification or approved equal: The propulsion system shall enable the bus to achieve and maintain a speed of 40 mph on a 2 ½ percent ascending grade and 15 mph on a 10 percent ascending grade continuous.

Approval requested for an Axess 35’ and 40’ vehicle that can achieve and maintain a speed of 12.4 mph on a 10% ascending grade continuous.

– □Approved – Agency action: □ Denied □See response below □ See addendum Agency response:

Page 165 of 207 Request for Proposal (RFP) Due 03-27-2020 RFP# 2020HDB-NC

CER 2. Request for Pre-Offer Change or Approved Equal This form must be used for requested clarifications, changes, substitutes or approval of items equal to items specified with a brand name and must be submitted as far in advance of the Due Date, as specified in “Questions, Clarifications and Omissions.”

Piedmont Authority for Regional Transportation (PART) RFP# 2020HDB-NC

– Request #: 15

Proposer: CBS / ENC RFP Section: TS 7.3.1 Acceleration, Non-Hybrid Page: 67 of 207

Questions/clarification or approved equal: 20 mph = 10 seconds 30 mph = 18 seconds 40 mph = 30 seconds

Approval requested for Axess 35’ and 40’ vehicles that achieve the following accelerations: 20 mph = 10.2 seconds 30 mph = 18.6 seconds 40 mph = 31.8 seconds Please note that ENC adds (2) seconds to account for idle throttle and vehicle brakes locked start in lieu of the computer-generated full throttle & vehicle brakes locked start times as shown on page 14 of the included iSCAAN.

– □Approved – Agency action: □ Denied □See response below □ See addendum Agency response:

Page 165 of 207 2/17/2020 ISCAAN

Monday, February 17, 2020 US

Application Report Bundle

517-A203704-1 (Iteration 3 --- SC L9 AXESS 4.89 RATIO) Final

US Units | SI Units APPLICATION PROFILE

Date February 17, 2020 10:57:18

Application 517-A203704-1

Application Name ENC Transit - S Carolina -Axess L9 2021

Owner David Jung @ ElDorado National

SCAAN Analysis Type Standard Vehicle Run

Optional Analysis Type

Classification Standard

Review Status Not Submitted

Application Review  DESCRIPTION 

Vocation Bus — City / Transit Bus - U.S. Engine ISL9 (Diesel) -- 280hp / APTA — Straight Vehicle (44-65- 925lbft / 1930rpm -- 2-1652 (EPA 14) 2021)

End User S Carolina (North America, Transmission B400 Retarder Eastern)

Chassis Manufacturer ElDorado National (North America) Converter TC421

Chassis Model Axess Retarder 3000 Series Medium Capacity

Application Description Shuttle Transit Shift Calibration 1900 rpm S1 Performance OPERATING CONDITIONS 

Final Destination Type of Service

Typical Road Surface Min Ambient Temperature 0.000 °F

Max Operating Grade 0 % Max Ambient Temperature 0.000 °F

Max Side Slope 0 % Percent On-Highway 100 %

Max Altitude 0 ft Percent Off-Highway 0 % RESULTS 

https://iscaan.allisontransmission.com/view/application-report/3517/4353/bundled?ScaanResultId=4379&Uom=US 1/18 2/17/2020 ISCAAN

Primary Reviewer Sylvia Reitman Date Reviewed

Review Decision Pending Score / Summary XX

Reviewer Comments

Decision Conditions

Secondary Reviewer Travis Brown Date Reviewed

Review Decision Not Applicable

Secondary Reviewer Comments CONTACT INFORMATION - SUBMITTER 

Company ElDorado National Contact Name David Jung

Location Phone Number

Date Submitted Feb 17, 2020 Email [email protected] CONTACT INFORMATION -

Company Contact Name

Location Phone Number

Email CONTACT INFORMATION - CHASSIS MANUFACTURER 

Chassis Manufacturer ElDorado National (North America) Contact Name

Location Phone Number

Body Builder Email CONTACT INFORMATION - END USER 

Company Contact Name

Location Phone Number

Date Submitted Feb 17, 2020 Email COMMENTS - SUBMITTER 

Quantity - Prototype 1 Date - Prototype Available Jun 1, 2021

Quantity - Production 55 Date - Production Available Jun 1, 2021

Submitter Comments

Input Summary  MISSION 

https://iscaan.allisontransmission.com/view/application-report/3517/4353/bundled?ScaanResultId=4379&Uom=US 2/18 2/17/2020 ISCAAN

End User S Carolina (North America, Eastern)

Selected Vocation Bus — City / Transit Bus - U.S. APTA — Straight Vehicle (44-65-14) PLATFORM 

Vehicle Manufacturer ElDorado National (North America)

Vehicle Model Axess

Vehicle Configuration Shuttle Transit

Area and Weight Frontal Area 80.0 ft²

Height / Width 10.00 ft / 8.00 ft

Standard Wind Resistance 0.550 (no Deflector) Coefficient

User Defined Wind 0.550 (no Deflector) Resistance Coefficient

Gross Vehicle Weight 43380 lb (no Trailer)

Weight On Drive Wheels 27720 lb (63.90%)

Tires Number of Tires 6 (Standard Radial)

Selected Tire

Tire Revolutions 525 revs/mi

Tire Radius 19.21 in

Standard Surface Smooth Concrete (SC Factor = 1.0)

Selected Surface Smooth Concrete (SC Factor = 1.0)

Standard Percent Rolling 1.00% Resistance

Standard On-Road Traction 0.700 Limit Coefficient

Standard Off-Road Traction 0.000 Limit Coefficient

User Defined On-Road 0.700 Traction Limit Coefficient

User Defined Off-Road 0.000

Traction Limit Coefficient ENGINE 

https://iscaan.allisontransmission.com/view/application-report/3517/4353/bundled?ScaanResultId=4379&Uom=US 3/18 2/17/2020 ISCAAN

Number of Power Packs 1

Engine Description Cummins ISL9 (Diesel) -- 280hp / 925lbft / 1930rpm -- 2-1652 (EPA 2021) (2-L008687-E)

Certifications USA 2021

Displacement 540.0 in³

Peak Torque 925.0 lb-ft

Peak Torque Speed 1300 rpm

Peak Power 280.0 hp

Peak Power Speed 1700 rpm

Governed Power 280.0 hp

Governed Speed 1930 rpm

Number of Curves 1

Engine Curve Reference FR96242

Cruise Velocity @ Speed 65.0 mph @ 1650 rpm

Engine Retarder ENGINE CURVE - STANDARD LOSSES - COMBINED LOW & HIGH CURVES (AC ON WHERE APPLICABLE) 

Speed Gross Power Gross Torque Net Power Fan Net Torque Fan Net Power Fan Net Torque Fan Point (rpm) (hp) (lb-ft) On On Off Off Identification (hp) (lb-ft) (hp) (lb-ft)

700 69.3 520.0 60.9 456.9 62.6 469.3

800 89.9 590.0 80.5 528.3 83.0 544.6

900 114.0 665.0 103.3 603.1 106.9 623.7

1000 139.9 735.0 127.9 671.5 132.7 696.9

1100 173.8 830.0 160.0 763.8 166.4 794.6

1200 211.3 925.0 195.4 855.2 203.8 891.8

1300 229.0 925.0 210.6 850.7 221.2 893.7 Peak Torque

1400 246.6 925.0 225.4 845.5 238.7 895.3

1590 280.0 924.9 252.3 833.4 271.8 897.8

1700 280.0 865.1 247.8 765.6 271.6 839.1 Peak Power

1800 280.0 817.0 243.2 709.6 271.4 792.0

1900 280.0 774.0 238.0 658.0 271.3 749.9

1930 280.0 762.0 236.4 643.3 271.2 738.1 Governed

2100 0.0 0.0 -53.9 -134.8 -9.0 -22.6 No Load Governed

Peak Power point has been defined for the purposes of assessing Accessory Losses

https://iscaan.allisontransmission.com/view/application-report/3517/4353/bundled?ScaanResultId=4379&Uom=US 4/18 2/17/2020 ISCAAN Standard Parameters Fan On

300 1,000

900 250 Power (hp) orque (lb-ft)

800 T

200 700

600 150 500 Gross Power (hp) Net Power (hp) 100 400 Gross Torque (lb-ft Net Torque (lb-ft) 300 50 200

0 100

0 -50 -100

-100 -200 700 800 900 1,000 1,100 1,200 1,300 1,400 1,500 1,600 1,700 1,800 1,900 2,000 2,100 Speed (rpm)

Standard Parameters Fan Off

300 1,000

900

Power (hp) 250 orque (lb-ft) 800 T

200 700

600

150 Gross Power (hp) 500 Net Power (hp) Gross Torque (lb-ft 400 100 Net Torque (lb-ft)

300

50 200

100 0 0

-50 -100 700 800 900 1,000 1,100 1,200 1,300 1,400 1,500 1,600 1,700 1,800 1,900 2,000 2,100

Speed (rpm) ENGINE CURVE - USER DEFINED LOSSES - COMBINED LOW & HIGH CURVES (AC ON WHERE APPLICABLE) 

Speed Gross Power Gross Torque Net Power Fan Net Torque Fan Net Power Fan Net Torque Fan Point (rpm) (hp) (lb-ft) On On Off Off Identification (hp) (lb-ft) (hp) (lb-ft)

700 69.3 520.0 54.4 408.0 55.3 415.1

800 89.9 590.0 73.3 481.4 74.7 490.7

900 114.0 665.0 95.7 558.3 97.7 570.1 https://iscaan.allisontransmission.com/view/application-report/3517/4353/bundled?ScaanResultId=4379&Uom=US 5/18 2/17/2020 ISCAAN

1000 139.9 735.0 119.8 629.0 122.5 643.6

1100 173.8 830.0 151.6 723.8 155.3 741.5

1200 211.3 925.0 186.9 817.8 191.7 838.9

1300 229.0 925.0 202.0 816.2 208.1 840.9 Peak Torque

1400 246.6 925.0 217.0 814.0 224.6 842.6

1590 280.0 924.9 244.7 808.3 255.9 845.2

1700 280.0 865.1 241.0 744.4 254.6 786.6 Peak Power

1800 280.0 817.0 237.3 692.3 253.5 739.6

1900 280.0 774.0 233.3 644.8 252.3 697.5

1930 280.0 762.0 232.0 631.3 252.0 685.8 Governed

2100 0.0 0.0 -55.7 -139.3 -29.9 -74.9 No Load Governed

Peak Power point has been defined for the purposes of assessing Accessory Losses

https://iscaan.allisontransmission.com/view/application-report/3517/4353/bundled?ScaanResultId=4379&Uom=US 6/18 2/17/2020 ISCAAN User Defined Parameters Fan On

300 1,000

900 250 Power (hp) orque (lb-ft)

800 T

200 700

600 150 500 Gross Power (hp) Net Power (hp) 100 400 Gross Torque (lb-ft Net Torque (lb-ft) 300 50 200

0 100

0 -50 -100

-100 -200 700 800 900 1,000 1,100 1,200 1,300 1,400 1,500 1,600 1,700 1,800 1,900 2,000 2,100 Speed (rpm)

User Defined Parameters Fan Off

300 1,000

900

Power (hp) 250 orque (lb-ft) 800 T

200 700

600

150 Gross Power (hp) 500 Net Power (hp) Gross Torque (lb-ft 400 100 Net Torque (lb-ft)

300

50 200

100 0 0

-50 -100 700 800 900 1,000 1,100 1,200 1,300 1,400 1,500 1,600 1,700 1,800 1,900 2,000 2,100

Speed (rpm) ACCESSORY LOSSES (POWER @ GOVERNED SPEED) 

https://iscaan.allisontransmission.com/view/application-report/3517/4353/bundled?ScaanResultId=4379&Uom=US 7/18 2/17/2020 ISCAAN

Accessory Standard Loss (hp) User Defined Loss (hp)

Fan (Clutch Fan) 34.8 20.0

Alternator / Generator 5.6 6.0

Air Compressor 1.6 3.0

Steering Pump 1.6 2.0

Air Conditioning 0.0 17.0

Implement Drive 0.0 0.0 TRANSMISSION 

Transmission Manufacturer Allison Transmission

Transmission Family 3000 Series (1-L001243-TF)

Transmission B400 Retarder (1-L007402-T)

Transmission Rating B400 Retarder Transit Bus, Non-North America - Diesel Allison 5th Generation Controls without SEM/LRTP (1-L008359-R)

Torque Converter TC421 (1-L001255-TC) - Recommended

Transmission Retarder 3000 Series Medium Capacity (1-L001293-TR) CONTROLS 

Controls Release Production Calibration (PC) for 3000 Series (1-L001194-CR)

FuelSense® Level

FuelSense® Package

Shift Schedule Primary

DynActive No

Speed Profile Performance

Shift Speed & Strategy 1900 rpm S1 Performance

Equivalent DynActive Bias 0

Primary Mode: Gears Low = 1, Start = 1, High = 6 (1-1-6) DRIVELINE 

Driveline Protection No

Component Description Ratio Standard User Efficiency Defined (%) Efficiency (%)

Propshaft -- One Piece -- Two Joint (1-L003521-DL) Single 1.000 98.60 90.00

Axle -- On Hwy Single Red -- 4x2 (1-L003531-DL) Single 4.890 97.00 90.00 Arvin-Meritor 71162: SR, Single (n x 2), 1-spd: Single 4.89 (1-L003202-AX)

https://iscaan.allisontransmission.com/view/application-report/3517/4353/bundled?ScaanResultId=4379&Uom=US 8/18 2/17/2020 ISCAAN

Overall Driveline Ratio Description Ratio Standard User N over V Efficiency Defined Ratio (%) Efficiency rpm/mph (%)

Single 4.890 95.64 81.00 42.788

Ratings and Guidelines Check  MISSION 

End User S Carolina (North America, Eastern)

Selected Vocation Bus — City / Transit Bus - U.S. APTA — Straight Vehicle (44-65-14) PLATFORM 

Vehicle Manufacturer ElDorado National (North America)

Vehicle Model Axess

Vehicle Configuration Shuttle Transit

Engine Description Cummins ISL9 (Diesel) -- 280hp / 925lbft / 1930rpm -- 2-1652 (EPA 2021) (2-L008687-E)

Transmission B400 Retarder (1-L007402-T)

Transmission Rating B400 Retarder Transit Bus, School Bus Non-North America - Diesel Allison 5th Generation Controls without SEM/LRTP (1-L008359-R)

Vehicle Parameters

Torque Converter TC421 (1-L001255-TC) - Recommended

Transmission Retarder 3000 Series Medium Capacity (1-L001293-TR)

LRTP Status LRTP Required NOTE 

This SCAAN information is subject to the SCAAN Disclaimer set forth elsewhere. CONVERTER RATING AND GUIDELINE CHECKS SECTION SCORE - OK 

https://iscaan.allisontransmission.com/view/application-report/3517/4353/bundled?ScaanResultId=4379&Uom=US 9/18 2/17/2020 ISCAAN

Check Check Name Minimum or Maximum Rating or Actual Value Units Overall Status Recommendation

C01  Transmission /  OK: Converter Acceptable Compatibility

C02  Engine / Converter  OK: Compatibility Acceptable

C04  Engine Speed at 1551 rpm Reference Converter Stall

C05  Minimum Engine Min 1300 1595 rpm  OK: Speed Acceptable

C07  Turbine Torque at Max 1370.0 1370.0 lb-ft  OK: Converter Stall Acceptable

C08  Converter Speed Min 0.800 0.792  OK-1: OK Ratio at Engine based on pre- Governed Speed acceptance by Engineering

C03  Converter Stall 1.770 Reference Torque Ratio

Notes Check Comments

C05 Net peak torque speed (1200 rpm) + allowable variation (100 rpm). TRANSMISSION RATING AND GUIDELINE CHECKS SECTION SCORE - OK 

https://iscaan.allisontransmission.com/view/application-report/3517/4353/bundled?ScaanResultId=4379&Uom=US 10/18 2/17/2020 ISCAAN

Check Check Name Minimum or Maximum Rating or Actual Value Units Overall Status Recommendation

T01  Transmission /  OK: Vocation Acceptable Compatibility

T02  Transmission /  OK: Engine Acceptable Compatibility

T20  Engine is  OK: SEM/LRTP Capable Acceptable

T10  Transmission/Engine  OK: Prewire Acceptable Compatibility

T17  Transmission  OK: Permitted in End Acceptable User/Chassis Mfg Locations

T15  Transmission Input Max 300.0 280.0 hp  OK: Power (Gross) Acceptable

T14  Transmission Input Max 925.0 925.0 lb-ft  OK: Torque (Gross) Acceptable

T03  Transmission Input 1900 / 2800 1930 rpm  OK: Speed Acceptable

T11  Transmission Max 3600 2781 rpm  OK: Output Speed Acceptable

Notes Check Comments

T11 Check made in Range 6L at 65.0 mph VEHICLE RATING AND GUIDELINE CHECKS - STANDARD SECTION SCORE - OK 

https://iscaan.allisontransmission.com/view/application-report/3517/4353/bundled?ScaanResultId=4379&Uom=US 11/18 2/17/2020 ISCAAN

Check Check Name Minimum or Maximum Rating or Actual Value Units Overall Status Recommendation

V01  Vehicle Weight Max 45000 43380 lb  OK: Acceptable

V21  1st Range 33.09 % Reference Converter Stall Gradeability

V13  1st Range 70% 24.22 % Reference Converter Efficiency Gradeability

V14  1st Range 80% Min 16.00 20.33 %  OK: Converter Efficiency Acceptable Gradeability

V17  Maximum Geared 69.1 mph Reference Vehicle Speed at Engine Governed Speed

V43  Heat Generated in 3404 btu/min Reference 1st Range 70% Converter Efficiency

V44  Heat Generated in 2373 btu/min Reference 1st Range 80% Converter Efficiency

Notes Check Comments

V01 Vehicle Weight Rating is established by a constraint other than the GVW Rating.

V17 Check is in 6L Lockup.

V43 At 1717.7 rpm Engine Speed.

V44 At 1790.9 rpm Engine Speed. VEHICLE RATING AND GUIDELINE CHECKS - USER DEFINED SECTION SCORE - OK 

https://iscaan.allisontransmission.com/view/application-report/3517/4353/bundled?ScaanResultId=4379&Uom=US 12/18 2/17/2020 ISCAAN

Check Check Name Minimum or Maximum Rating or Actual Value Units Overall Status Recommendation

V01  Vehicle Weight Max 45000 43380 lb  OK: Acceptable

V21  1st Range 27.52 % Reference Converter Stall Gradeability

V13  1st Range 70% 19.90 % Reference Converter Efficiency Gradeability

V14  1st Range 80% Min 16.00 16.76 %  OK: Converter Efficiency Acceptable Gradeability

V17  Maximum Geared 69.1 mph Reference Vehicle Speed at Engine Governed Speed

V43  Heat Generated in 3511 btu/min Reference 1st Range 70% Converter Efficiency

V44  Heat Generated in 2457 btu/min Reference 1st Range 80% Converter Efficiency

Notes Check Comments

V01 Vehicle Weight Rating is established by a constraint other than the GVW Rating.

V17 Check is in 6L Lockup.

V43 At 1736.6 rpm Engine Speed.

V44 At 1813.3 rpm Engine Speed. AMERICAN PUBLIC TRANSPORTATION ASSOCIATION (APTA) GUIDELINE CHECKS - STANDARD SECTION SCORE - OK 

https://iscaan.allisontransmission.com/view/application-report/3517/4353/bundled?ScaanResultId=4379&Uom=US 13/18 2/17/2020 ISCAAN

Check Check Name Minimum or Maximum Rating or Actual Value Units Overall Status Recommendation

V36  Vehicle Speed on Min 40.0 51.9 mph  OK: 2.50% Grade Acceptable (APTA)

V37  Vehicle Speed on Min 15.0 15.1 mph  OK: 10.00% Grade Acceptable (APTA)

V39  Acceleration Time, Max 5.0 2.1 sec  OK: 0-10 mph (16.1 Acceptable km/h), 0.0% Grade (APTA)

V40  Acceleration Time, Max 10.0 6.7 sec  OK: 0-20 mph (32.2 Acceptable km/h), 0.0% Grade (APTA)

V41  Acceleration Time, Max 18.0 13.5 sec  OK: 0-30 mph (48.3 Acceptable km/h), 0.0% Grade (APTA)

V42  Acceleration Time, Max 30.0 23.8 sec  OK: 0-40 mph (64.4 Acceptable km/h), 0.0% Grade (APTA)

V63  Acceleration Time, Max 60.0 38.9 sec  OK: 0-50 mph (80.5 Acceptable km/h), 0.0% Grade (APTA)

Notes Check Comments

V36 Check is in 5L.

V37 Check is in 2C.

V39 Full Throttle & Vehicle Brakes Locked Start.

V40 Full Throttle & Vehicle Brakes Locked Start.

V41 Full Throttle & Vehicle Brakes Locked Start.

V42 Full Throttle & Vehicle Brakes Locked Start.

V63 Full Throttle & Vehicle Brakes Locked Start.  AMERICAN PUBLIC TRANSPORTATION ASSOCIATION (APTA) GUIDELINE CHECKS - USER DEFINEDSECTION SCORE - C 

https://iscaan.allisontransmission.com/view/application-report/3517/4353/bundled?ScaanResultId=4379&Uom=US 14/18 2/17/2020 ISCAAN

Check Check Name Minimum or Maximum Rating or Actual Value Units Overall Status Recommendation

V36  Vehicle Speed on Min 40.0 42.7 mph  OK: 2.50% Grade Acceptable (APTA)

V37  Vehicle Speed on Min 15.0 11.3 mph  C: Consider - 10.00% Grade manufacturer (APTA) to assess

V39  Acceleration Time, Max 5.0 2.6 sec  OK: 0-10 mph (16.1 Acceptable km/h), 0.0% Grade (APTA)

V40  Acceleration Time, Max 10.0 8.2 sec  OK: 0-20 mph (32.2 Acceptable km/h), 0.0% Grade (APTA)

V41  Acceleration Time, Max 18.0 16.6 sec  OK: 0-30 mph (48.3 Acceptable km/h), 0.0% Grade (APTA)

V42  Acceleration Time, Max 30.0 29.8 sec  OK: 0-40 mph (64.4 Acceptable km/h), 0.0% Grade (APTA)

V63  Acceleration Time, Max 60.0 50.0 sec  OK: 0-50 mph (80.5 Acceptable km/h), 0.0% Grade (APTA)

Notes Check Comments

V36 Check is in 4L.

V37 Check is in 2C.

V39 Full Throttle & Vehicle Brakes Locked Start.

V40 Full Throttle & Vehicle Brakes Locked Start.

V41 Full Throttle & Vehicle Brakes Locked Start.

V42 Full Throttle & Vehicle Brakes Locked Start.

V63 Full Throttle & Vehicle Brakes Locked Start.

Vehicle Performance Summary  MISSION 

End User S Carolina (North America, Eastern)

Selected Vocation Bus — City / Transit Bus - U.S. APTA — Straight Vehicle (44-65-14) PLATFORM 

https://iscaan.allisontransmission.com/view/application-report/3517/4353/bundled?ScaanResultId=4379&Uom=US 15/18 2/17/2020 ISCAAN

Vehicle Manufacturer ElDorado National (North America)

Vehicle Model Axess

Vehicle Configuration Shuttle Transit

Engine Description Cummins ISL9 (Diesel) -- 280hp / 925lbft / 1930rpm -- 2-1652 (EPA 2021) (2-L008687-E)

Transmission B400 Retarder (1-L007402-T)

Transmission Rating B400 Retarder Transit Bus, School Bus Non-North America - Diesel Allison 5th Generation Controls without SEM/LRTP (1-L008359-R)

Vehicle Parameters User

Torque Converter TC421 (1-L001255-TC) Recommended

Transmission Retarder 3000 Series Medium Capacity (1-L001293-TR)

LRTP Status LRTP Required NOTE 

This SCAAN information is subject to the SCAAN Disclaimer set forth elsewhere. FULL THROTTLE AUTOMATIC UPSHIFTS (GRADEABILITY) - USER DEFINED, FAN ON, AC ON, AXLE RATIO = 4.890, AUX RATIO = 1 

Engine Fan On Engine Power Standard Power Curve

Air Conditioning On Vehicle Parameters User

Axle Ratio 4.890 Auxiliary Gearing Ratio 1.000

Gradeability % Grade Vehicle Speed Gear Match Point (mph) Range

Stall Gradeability 27.524 1C Stall

Launch Gradeability 25.524 1C

Low Speed Gradeability 16.762 7.6 1C 80 Percent

Maximum Speed on Grade 0.000 69.6 6L Road Load

0.250 69.0 6L

0.500 66.2 6L

1.000 60.7 6L

2.000 50.0 5L

3.000 40.5 4L

4.000 30.3 3L

5.000 28.4 3L

6.000 22.9 2L

7.000 21.4 2L

8.000 15.6 2C

9.000 13.4 2C

10.000 11.3 2C

https://iscaan.allisontransmission.com/view/application-report/3517/4353/bundled?ScaanResultId=4379&Uom=US 16/18 2/17/2020 ISCAAN

28 Stall Gradeability 26

24 Launch Gradeability Net %Grade 22

20

18

16

14 Low Speed Gradeability 12

10

8

6

4

2

0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70

Vehicle Speed (mph) FULL THROTTLE AUTOMATIC UPSHIFTS (ACCELERATION) - USER DEFINED, FAN ON, AC ON, AXLE RATIO = 4.890, AUX RATIO = 

Engine Fan On Engine Power Standard Power Curve

Air Conditioning On Vehicle Parameters User

Axle Ratio 4.890 Auxiliary Gearing Ratio 1.000

Speed Time Distance (seconds) (ft)

0 - 20 mph 8.2 148

0 - 30 mph 16.6 461

0 - 40 mph 29.8 1139

0 - 50 mph 50.0 2484

0 - 60 mph 82.1 5096

https://iscaan.allisontransmission.com/view/application-report/3517/4353/bundled?ScaanResultId=4379&Uom=US 17/18 2/17/2020 ISCAAN

90 5,500

5,000 80

4,500 Distance (ft) ime (seconds) T 70 4,000 60 3,500

50 3,000

40 2,500

2,000 30 1,500 20 1,000

10 500

0 0 20 25 30 35 40 45 50 55 60 Vehicle Speed (mph)

Converter Data 

Transmission Data 

Engine-Converter Match 

Transmission Output Performance Summary 

Vehicle Full Throttle Performance 

Vehicle Acceleration Performance 

Vehicle Closed Throttle Braking Performance 

Vehicle Wheel Power Requirements 

Acceleration Rate Management 

Fuel Economy 

https://iscaan.allisontransmission.com/view/application-report/3517/4353/bundled?ScaanResultId=4379&Uom=US 18/18 Request for Proposal (RFP) Due 03-27-2020 RFP# 2020HDB-NC

CER 2. Request for Pre-Offer Change or Approved Equal This form must be used for requested clarifications, changes, substitutes or approval of items equal to items specified with a brand name and must be submitted as far in advance of the Due Date, as specified in “Questions, Clarifications and Omissions.”

Piedmont Authority for Regional Transportation (PART) RFP# 2020HDB-NC

– Request #: 16

Proposer: CBS / ENC RFP Section: TS 6.4.1 Operating Range; Diesel Page: 67 of 207

Questions/clarification or approved equal: The operating range of the coach when run on the FTA ABD Cycle shall be at least 350 miles or 20 hours with full fuel capacity; with a minimum 165 gallons.

ENC wishes to clarify that operating range is determined by many factors outside of the manufacturer's control such as environment vehicles operated in, driver skill, and vehicle maintenance to name a few. The Cummins L9 diesel engine provides a 73-gallon tank and an approximate operating range of 290 miles for our 30’ and 35’ E-Z Rider units. This is a critical bus design element as larger fuel tanks cannot be configured in our E-Z Rider products. Approval requested for the approximate operating range and tank capacity as outlined.

– □Approved – Agency action: □ Denied □See response below □ See addendum Agency response:

Page 165 of 207 Request for Proposal (RFP) Due 03-27-2020 RFP# 2020HDB-NC

CER 2. Request for Pre-Offer Change or Approved Equal This form must be used for requested clarifications, changes, substitutes or approval of items equal to items specified with a brand name and must be submitted as far in advance of the Due Date, as specified in “Questions, Clarifications and Omissions.”

Piedmont Authority for Regional Transportation (PART) RFP# 2020HDB-NC

– Request #: 17

Proposer: CBS / ENC RFP Section: TS 6.4.1 Operating Range; Diesel Page: 67 of 207

Questions/clarification or approved equal: The operating range of the coach when run on the FTA ABD Cycle shall be at least 350 miles or 20 hours with full fuel capacity; with a minimum 165 gallons.

Approval requested for a fuel tank total capacity of 125 gallons and useable capacity of 118.75 gallons on the Axess 35’ and 40’ units. The capacity as proposed exceeds the requested operating range.

– □Approved – Agency action: □ Denied □See response below □ See addendum Agency response:

Page 165 of 207 Request for Proposal (RFP) Due 03-27-2020 RFP# 2020HDB-NC

CER 2. Request for Pre-Offer Change or Approved Equal This form must be used for requested clarifications, changes, substitutes or approval of items equal to items specified with a brand name and must be submitted as far in advance of the Due Date, as specified in “Questions, Clarifications and Omissions.”

Piedmont Authority for Regional Transportation (PART) RFP# 2020HDB-NC

– Request #: 18

Proposer: CBS / ENC RFP Section: TS 10. Cooling Systems Page: 70 of 207

Questions/clarification or approved equal: The cooling systems shall be EMP Electric Cooling Fan System with EMP Radiator MH-4.

Clarification requested if the EMP Electric Fan MH-4 is to be included in the base offering or not. Page 71, TS 10.1.3 Drive Design ALTERNATIVE specifies electric fan drive cooling system as does Pricing Schedules – Alternate Equipment for Buses. Please advise if mechanical or electric system should be priced in the base offering.

– □Approved – Agency action: □ Denied □See response below □ See addendum Agency response:

Page 165 of 207 Request for Proposal (RFP) Due 03-27-2020 RFP# 2020HDB-NC

CER 2. Request for Pre-Offer Change or Approved Equal This form must be used for requested clarifications, changes, substitutes or approval of items equal to items specified with a brand name and must be submitted as far in advance of the Due Date, as specified in “Questions, Clarifications and Omissions.”

Piedmont Authority for Regional Transportation (PART) RFP# 2020HDB-NC

– Request #: 19

Proposer: CBS / ENC RFP Section: TS 10. Cooling Systems Page: 70 of 207

Questions/clarification or approved equal: The cooling system fan controls should sense the temperatures of the operating fluids and the intake air, and if either is above safe operating conditions, the cooling fan should be engaged.

Clarification provided per EMP, the request for sense engine compartment temperature and activate fan is if maximum temperature is exceeded is outside of the normal logic of the EMP cooling system. Approval requested for their standard logic.

– □Approved – Agency action: □ Denied □See response below □ See addendum Agency response:

Page 165 of 207 Request for Proposal (RFP) Due 03-27-2020 RFP# 2020HDB-NC

CER 2. Request for Pre-Offer Change or Approved Equal This form must be used for requested clarifications, changes, substitutes or approval of items equal to items specified with a brand name and must be submitted as far in advance of the Due Date, as specified in “Questions, Clarifications and Omissions.”

Piedmont Authority for Regional Transportation (PART) RFP# 2020HDB-NC

– Request #: 20

Proposer: CBS / ENC RFP Section: TS 10.1 Engine Cooling Page: 70 of 207

Questions/clarification or approved equal: A spring-loaded, push-button type valve or lever shall be provided to safely release pressure or vacuum in the cooling system with both it and the water filler no more than ±60 in. above the ground.

Approval requested for a screw on type cap for checking the engine coolant level which is integral with the engine coolant recovery tank system. The proposed design meet Cummins’ recommended design requirement for EPA 2017 and beyond.

– □Approved – Agency action: □ Denied □See response below □ See addendum Agency response:

Page 165 of 207 Request for Proposal (RFP) Due 03-27-2020 RFP# 2020HDB-NC

CER 2. Request for Pre-Offer Change or Approved Equal This form must be used for requested clarifications, changes, substitutes or approval of items equal to items specified with a brand name and must be submitted as far in advance of the Due Date, as specified in “Questions, Clarifications and Omissions.”

Piedmont Authority for Regional Transportation (PART) RFP# 2020HDB-NC

– Request #: 21

Proposer: CBS / ENC RFP Section: TS 10.1.1 Radiator Screen Page: 70 of 207 /

Questions/clarification or approved equal: The radiator input shall be protected by an easily cleanable screen designed to collect large debris.

Approval requested for the 304 stainless steel, perforated and louvered radiator access door as shown in the attached photo and drawings. The door construction is described in the attached engineering drawings. This door will provide the debris filtering intent of your exterior auxiliary screen. This door has been Cummins tested/approved for both diesel and CNG fueled powertrains.

– □Approved – Agency action: □ Denied □See response below □ See addendum Agency response:

Page 165 of 207

9670 Galena Street Riverside, CA 92509 Phone (909) 591-9557 9670 Galena Street Request for Proposal (RFP) Due 03-27-2020 RFP# 2020HDB-NC

CER 2. Request for Pre-Offer Change or Approved Equal This form must be used for requested clarifications, changes, substitutes or approval of items equal to items specified with a brand name and must be submitted as far in advance of the Due Date, as specified in “Questions, Clarifications and Omissions.”

Piedmont Authority for Regional Transportation (PART) RFP# 2020HDB-NC

– Request #: 22

Proposer: CBS / ENC RFP Section: TS 13.1 Service Page: 73 of 207

Questions/clarification or approved equal: Engine oil and the radiator filler caps shall be hinged to the filler neck and closed with spring pressure or positive locks.

Approval requested for a non-hinged positive lock type radiator filler cap mounted on the surge tank which is integral with the engine coolant recovery tank system that utilizes a screw-on cap for checking the engine coolant level. Please note that the proposed engine coolant recovery system meets Cummins recommended design for EPA 2017 and beyond.

– □Approved – Agency action: □ Denied □See response below □ See addendum Agency response:

Page 165 of 207 Request for Proposal (RFP) Due 03-27-2020 RFP# 2020HDB-NC

CER 2. Request for Pre-Offer Change or Approved Equal This form must be used for requested clarifications, changes, substitutes or approval of items equal to items specified with a brand name and must be submitted as far in advance of the Due Date, as specified in “Questions, Clarifications and Omissions.”

Piedmont Authority for Regional Transportation (PART) RFP# 2020HDB-NC

– Request #: 23

Proposer: CBS / ENC RFP Section: TS 14.1 Fluid Lines & TS 22.1 Engine Compartment Bulkheads Page: 73 & 77 of 207

Questions/clarification or approved equal: Lines passing through a panel, frame or bulkhead shall be protected by grommets (or similar devices) that fit snugly to both the line and the perimeter of the hole that the line passes through to prevent chafing and wear.

Approval requested for Nelson’s Fire Stop Putty to seal minimal hole openings. The rear engine bulkhead is constructed of steel with minimal openings to the passenger compartment treated with the putty. The openings are limited to water lines, airlines, and electrical harnesses. Please reference attached brochure.

– □Approved – Agency action: □ Denied □See response below □ See addendum Agency response:

Page 165 of 207

Request for Proposal (RFP) Due 03-27-2020 RFP# 2020HDB-NC

CER 2. Request for Pre-Offer Change or Approved Equal This form must be used for requested clarifications, changes, substitutes or approval of items equal to items specified with a brand name and must be submitted as far in advance of the Due Date, as specified in “Questions, Clarifications and Omissions.”

Piedmont Authority for Regional Transportation (PART) RFP# 2020HDB-NC

– Request #: 24

Proposer: CBS / ENC RFP Section: TS 16. Oil and Hydraulic Lines Page: 74 of 207

Questions/clarification or approved equal: Approval requested for hydraulic lines and reservoir supply lines to be Parker 206 Transportation Hose and the Hydraulic pump output hose to be Parker 471ST high impulse hose. Reference attached brochures.

– □Approved – Agency action: □ Denied □See response below □ See addendum Agency response:

Page 165 of 207 Transportation Hose 200-3000 PSI - 201 Hose | Parker NA http://ph.parker.com/us/en/rubber-cover-transportation-hose-201

Home Products Hose, Piping, Tubing and T-Slot Framing Hose Hydraulic Hose Transportation Hose 200-3000 PSI - 201 Hose

Email Print

Reset Attributes

Please choose from the product attributes above to continue. Parker’s 201 hose is a transportation hose that has a pressure range of 200-3000 PSI and is reinforced with one steel braid and one fiber braid making it excellent for rugged transportation applications.

Print Product Overview

Parker’s 201 hose is a transportation hose that has a pressure range of 200-3000 PSI and is reinforced with one steel braid and one fiber braid making it excellent for rugged transportation applications. The braided fiber cover provides additional protection. The 201 hose is designed, built, and tested to meet SAE J517 100R5 / SAE J1402 AII / DOT FMVSS 106 AIR BRAKE - AII performance specifications. Sizes range from 3/16” to 3” in diameter to fit the requirements of various markets.

Markets: • Transportation • Military

1 of 3 1/24/2018, 8:47 AM Transportation Hose 200-3000 PSI - 201 Hose | Parker NA http://ph.parker.com/us/en/rubber-cover-transportation-hose-201

• Agriculture

Features/Benefits: • 200-3000 PSI in different sizes • Field attachable or Parkrimp fittings to fit your specific needs • D.O.T. FMVSS 106-AIR BRAKE-AII certification

Applications: • Petroleum base hydraulic fluids and lubricating oils • Diesel fuels and antifreeze solutions

Compatible Fittings: • 26 series fittings (for -4 to -40) • 20 series fittings (for -4 to -48) • 22 series fittings (for -4 to -48)

Print Product Overview

Hose Crimpers Hose & Fitting Caps - Hose Cut-Off Machine Clean Seal Caps

2 of 3 1/24/2018, 8:47 AM Transportation Hose 200-3000 PSI - 201 Hose | Parker NA http://ph.parker.com/us/en/rubber-cover-transportation-hose-201

Parker Hannifin Corporation Phone Fax Hose Products Division +1 (440) 943-5700 +1 (440) 943-3129 30240 Lakeland Boulevard Wickliffe, OH 44092 USA

3 of 3 1/24/2018, 8:47 AM Parker Hose Products Division || 471ST Part Detail

Products Markets Operations Worldwide Distributors Investors Company Info

Fluid Connectors Group Products Services Divisions Literature Markets What's New

Hose Products Products Services Literature Markets What's New

bookmark this page | email this page Back | Part Detail | Search

471ST Hose Use with Parkrimp 43 Series Fittings. 471ST Hydraulic Hose - No Skive "Super Tough" - EN 857 Type 2SC High Abrasion Resistant Cover

Minimum Hose I. Hose O. Working Burst Bend Vacuum D. D. Pressure Pressure Radius Weight Rating Part lbs/ kg/ inches Number inch mm inch mm psi MPa psi MPa inch mm ft m of Hg kPa 471ST-4 1/4 6,3 .510 13 5800 40,0 23200 160,0 2 50 0.20 0,30 28 95 471ST-6 3/8 10 0.67 17 5000 35,0 20000 140,0 2-1/2 65 0.28 0,42 28 95 471ST-8 1/2 12,5 0.80 20 4250 29,7 17000 119,0 3-1/2 90 0.35 0,52 28 95 471ST-10 5/8 16 0.94 24 3625 25 14500 100 4 100 0.44 0.66 28 95 471ST-12 3/4 19 1.10 28 3125 21,5 12500 86 4-3/4 120 0.58 0,86 24 80 471ST-16 1 25 1.38 35 2500 17,5 10000 70 6 150 0.79 1,17 24 80

Construction: Inner tube of oil resistant Nitrile-based synthetic rubber, two braids of high tensile steel wire reinforcement, and an oil and weather resistant, black, synthetic rubber and UHMWPE abrasion resistant cover. Application and Temperature Range: The hose is designed for use with:

petroleum base hydraulic fluids and lubricating oils within a temperature range - 40°C to +100°C (-40°F to +212°F)

water, water/oil emulsion and water/glycol hydraulic fluids up to +85°C (+185° F)

air up to +70°C (+158°F) Note: Additional Information: Safety and technical data must be reviewed when selecting a product. See Technical Support section for more information. For crimp specifications and information, see Crimpsource. For fluid media compatibility information, see Chemical Resistance Chart. (+) Denotes non-standard part.

http://www.parker.com/hpd/products/search/detail.asp?catdesc=471ST (1 of 2)5/3/2005 6:51:23 AM Parker Hose Products Division || 471ST Part Detail

1-800-C •Contact• •Careers Search: Parker

•Privacy •Safety © Parker Hannifin Corp 2004 Advanced Search

http://www.parker.com/hpd/products/search/detail.asp?catdesc=471ST (2 of 2)5/3/2005 6:51:23 AM Request for Proposal (RFP) Due 03-27-2020 RFP# 2020HDB-NC

CER 2. Request for Pre-Offer Change or Approved Equal This form must be used for requested clarifications, changes, substitutes or approval of items equal to items specified with a brand name and must be submitted as far in advance of the Due Date, as specified in “Questions, Clarifications and Omissions.”

Piedmont Authority for Regional Transportation (PART) RFP# 2020HDB-NC

– Request #: 25

Proposer: CBS / ENC RFP Section: TS 27.1 Floor; Design Page: 79 of 207

Questions/clarification or approved equal: The vehicle floor in the area of the entrance and exit doors shall have a lateral slope not exceeding 2 degrees to allow for drainage.

Approval requested for 30’ and 35’ E-Z Rider II vehicles with a 4-degree slope. The 4-degree slope is a critical design element of the bus that provides for superior moisture drainage performance and cannot be changed. The Axess 35’ and 40’ vehicles meet the 2-degree lateral slope requirement.

– □Approved – Agency action: □ Denied □See response below □ See addendum Agency response:

Page 165 of 207 Request for Proposal (RFP) Due 03-27-2020 RFP# 2020HDB-NC

CER 2. Request for Pre-Offer Change or Approved Equal This form must be used for requested clarifications, changes, substitutes or approval of items equal to items specified with a brand name and must be submitted as far in advance of the Due Date, as specified in “Questions, Clarifications and Omissions.”

Piedmont Authority for Regional Transportation (PART) RFP# 2020HDB-NC

– Request #: 26

Proposer: CBS / ENC RFP Section: TS 31.1 Wheels Page: 83 of 207

Questions/clarification or approved equal: Clarification requested whether the tire-pressure monitoring is to be internal to the tire, e.g. SmarTire, or external, e.g., EJ Ward system. Please advise so that appropriate pricing can be provided to the Agency.

– □Approved – Agency action: □ Denied □See response below □ See addendum Agency response:

Page 165 of 207 Request for Proposal (RFP) Due 03-27-2020 RFP# 2020HDB-NC

CER 2. Request for Pre-Offer Change or Approved Equal This form must be used for requested clarifications, changes, substitutes or approval of items equal to items specified with a brand name and must be submitted as far in advance of the Due Date, as specified in “Questions, Clarifications and Omissions.”

Piedmont Authority for Regional Transportation (PART) RFP# 2020HDB-NC

– Request #: 27

Proposer: CBS / ENC RFP Section: TS 32.2.3 Steering Column Tilt Page: 85 of 207

Questions/clarification or approved equal: The steering column shall have full tilt capability with an adjustment range of no less than 40 deg from the vertical and easily adjustable by the driver and shall be accessible by a 5th percentile female and 95th percentile male.

Approval requested to provide our standard steering column with an adjustment range of 35 degrees.

– □Approved – Agency action: □ Denied □See response below □ See addendum Agency response:

Page 165 of 207 Request for Proposal (RFP) Due 03-27-2020 RFP# 2020HDB-NC

CER 2. Request for Pre-Offer Change or Approved Equal This form must be used for requested clarifications, changes, substitutes or approval of items equal to items specified with a brand name and must be submitted as far in advance of the Due Date, as specified in “Questions, Clarifications and Omissions.”

Piedmont Authority for Regional Transportation (PART) RFP# 2020HDB-NC

– Request #: 28

Proposer: CBS / ENC RFP Section: TS 32.2.4 Steering Wheel Telescopic Adjustment & TABLE 4 Page: 85 of 207

Questions/clarification or approved equal: Approval requested for our standard Douglas brand steering column that provides a minimum low-end adjustment of 28.87” in lieu of the requested 29” and a maximum telescopic adjustment of 2.5 inches on all angles of slope in lieu of the requested 5 inches. This is a critical supplier issue, which cannot be modified.

– □Approved – Agency action: □ Denied □See response below □ See addendum Agency response:

Page 165 of 207 Request for Proposal (RFP) Due 03-27-2020 RFP# 2020HDB-NC

CER 2. Request for Pre-Offer Change or Approved Equal This form must be used for requested clarifications, changes, substitutes or approval of items equal to items specified with a brand name and must be submitted as far in advance of the Due Date, as specified in “Questions, Clarifications and Omissions.”

Piedmont Authority for Regional Transportation (PART) RFP# 2020HDB-NC

– Request #: 29

Proposer: CBS / ENC RFP Section: TS 34.1 Service Brake Page: 85 of 207

Questions/clarification or approved equal: Approval requested for the deletion of push rod brake wear indicators. Push rods are not available on drum brakes. This is a critical design element, which cannot be modified. Per Arvin Meritor, drum brakes can be supplied with an electronic wear indication which provides a dash-mounted visual indicator. The indicator provides a 3-stage signal – Good Pads, 3mm Remaining and <3mm Remaining. Messages are sent on the J1939 databus. Clarification requested on whether the electronic visual indicator is desired by PART for drum brakes so that appropriate pricing can be developed

– □Approved – Agency action: □ Denied □See response below □ See addendum Agency response:

Page 165 of 207 Request for Proposal (RFP) Due 03-27-2020 RFP# 2020HDB-NC

CER 2. Request for Pre-Offer Change or Approved Equal This form must be used for requested clarifications, changes, substitutes or approval of items equal to items specified with a brand name and must be submitted as far in advance of the Due Date, as specified in “Questions, Clarifications and Omissions.”

Piedmont Authority for Regional Transportation (PART) RFP# 2020HDB-NC

– Request #: 30

Proposer: CBS / ENC RFP Section: TS 36.3 Air Lines and Fittings Page: 88 of 207

Questions/clarification or approved equal: Approval requested to supply Parker – Super-Tough 919 PTFE hoses meeting SAE 100R14A in lieu of the braided stainless-steel lines as specified. See attached specification sheets for hose details.

– □Approved – Agency action: □ Denied □See response below □ See addendum Agency response:

Page 165 of 207 Applications/Markets 919/919B –PTFEHose at 73°F(23°C) Min. Burst Pressure is4xMax. Working Pressure Change inlength at working pressure is+2%to -4% Temperature Range: Operating Parameters 304Stainless Steel braidReinforcement: Tube: 919-Natural FDA Compliant PTFE Construction Natural -100°F to +450°F (-73°C to +232°C 919B-Black S Parker Hannifin Corporation |Parflex 1- 1/8 - 919-3 1- 1B43/16 919B-4 919-4 1- 1B51/4 919B-5 919-5 1- 1B65/16 919B-6 919-6 1-0-1-1/8 7/8 - 5/8 - 1/2 919-20 - 919-16 - 919-12 13/32 919B-8 919-10 919-8 Number Part Conductive For detailedordering information,pleaseconsultpricelistor contactParflex tatic-Dissipative PTFE nhm nhm psi mm inch mm inch Nominal I.D. 29 22 16 13 10 3 5 6 8 1.28 1.03 Maximum .25 .32 .38 .44 .75 .63 .53 ) O.D. ® Division | Ravenna,Ohio| parker.com/pfd 10 11 33 26 19 16 13 6 8 3,000 3,000 3,000 1,000 1,200 1,500 2,000 2,500 625 www.comoso.com Maximum Pressure Working MPa 20.7 20.7 20.7 10.3 13.8 17.2 6.9 8.3 4.3 16.00 nhm inch mm inch 1.50 2.00 3.00 9.00 7.50 6.50 5.00 4.00 steam, etc. conveying non-conducting fluidssuch asoils, paints, fuels, static-dissipative 919Bwith Use type hose core tube when Notes Parker products, at www.parker.com/crimpsource informationCrimp can found be online, for most For pgs. charts see DieSelection G-30:G-41 Crimp –pg. E-52 91N Series –pg. E-52 91 Series –pg. E-45 90 Series Fittings ƒ ƒ ƒ ƒ ƒ ƒ ƒ ƒ Certifications Features Minimum ƒ ƒ ƒ ƒ ƒ ƒ ƒ ƒ Radius Bend FDA CFR177.1550(Nat Meets orEx SAEMeets 100R14A- 919 orExceeds minimiz friction Low Resists mois Environmen Handles extr chemicalExcellent compatibility ƒ ƒ ƒ ƒ ƒ ƒ Compres hyGeneral Chemical transfer lines 229 191 165 127 102 406 38 51 76 ® Division. Hg./73˚F Rating Vac. 8.04 28 8.06 28 8.09 28 4.27 .19 14 .15 12 .13 28 .10 28 28 0.39 10 ceeds SAE 100R14B- ceeds 919B sed air/gases sed ture tally safe eme temperatures to +450°F draulics b.f.kg./mtr. lbs./ft. lbs es pressure drops and deposits Weight ural tube) .06 .09 .13 .40 .28 .22 .19 .15 .58 Permanent ƒ ƒ ƒ Fitting Series ƒ ƒ ƒ 1 90 91N 1 90 91N 1 90 90 91N 90 91N 90 91N 90 91N 91N Medical G Coolan Adhesive dis 1– 91 190 91 t Lines t Lines Attachable Series Field ases ases pensing A-65 G C D F B A Tooling, Equipment E Coiled Air Hose General Technical & Accessories Fittings Transportation & Fittings Tubing Hose Request for Proposal (RFP) Due 03-27-2020 RFP# 2020HDB-NC

CER 2. Request for Pre-Offer Change or Approved Equal This form must be used for requested clarifications, changes, substitutes or approval of items equal to items specified with a brand name and must be submitted as far in advance of the Due Date, as specified in “Questions, Clarifications and Omissions.”

Piedmont Authority for Regional Transportation (PART) RFP# 2020HDB-NC

– Request #: 31

Proposer: CBS / ENC RFP Section: TS 36.4 Air Reservoirs Page: 88 of 207

Questions/clarification or approved equal: All air reservoirs . . . shall be equipped with clean-out plugs and guarded or flush type drain valves.

Approval requested for our standard air tank design where the wet tank is stored within the engine compartment and the auxiliary tanks are stored above the rear engine deck. These locations remove the air tanks from the elements; therefore, we have not experienced a high level of moisture with other providers who operate our vehicles. Please accept our standard design that has an automatic drain valve on the wet tank only.

– □Approved – Agency action: □ Denied □See response below □ See addendum Agency response:

Page 165 of 207 Request for Proposal (RFP) Due 03-27-2020 RFP# 2020HDB-NC

CER 2. Request for Pre-Offer Change or Approved Equal This form must be used for requested clarifications, changes, substitutes or approval of items equal to items specified with a brand name and must be submitted as far in advance of the Due Date, as specified in “Questions, Clarifications and Omissions.”

Piedmont Authority for Regional Transportation (PART) RFP# 2020HDB-NC

– Request #: 32

Proposer: CBS / ENC RFP Section: TS 39.3 Low Voltage/Low Current Wiring and Terminals & TS 39.4 Electrical Components Page: 92 & 93

Questions/clarification or approved equal: EMP provides the following clarifications: their harnesses are color coded but not number coded; harnesses do not include excess wires for spares, are easily serviced as a complete unit; they use brushless fans that have been tested to 20,000 hours in maximum temperature environment without failure. The L10 life of EMP brushless fans is expected to be a minimum of 40,000 hours; and it utilizes electric fans with integrated DC brushless electric motors that are easily serviced as a complete unit. Please approve

– □Approved – Agency action: □ Denied □See response below □ See addendum Agency response:

Page 165 of 207 Request for Proposal (RFP) Due 03-27-2020 RFP# 2020HDB-NC

CER 2. Request for Pre-Offer Change or Approved Equal This form must be used for requested clarifications, changes, substitutes or approval of items equal to items specified with a brand name and must be submitted as far in advance of the Due Date, as specified in “Questions, Clarifications and Omissions.”

Piedmont Authority for Regional Transportation (PART) RFP# 2020HDB-NC

– Request #: 33

Proposer: CBS / ENC RFP Section: TS 39.3 Low Voltage/Low Current Wiring and Terminals Page: 92 of 207

Questions/clarification or approved equal: When a T-splice is used, it shall meet these additional requirements: it shall include a mechanical clamp in addition to solder on the splice.

Approval requested for any required splices to be sonically welded.

– □Approved – Agency action: □ Denied □See response below □ See addendum Agency response:

Page 165 of 207 Request for Proposal (RFP) Due 03-27-2020 RFP# 2020HDB-NC

CER 2. Request for Pre-Offer Change or Approved Equal This form must be used for requested clarifications, changes, substitutes or approval of items equal to items specified with a brand name and must be submitted as far in advance of the Due Date, as specified in “Questions, Clarifications and Omissions.”

Piedmont Authority for Regional Transportation (PART) RFP# 2020HDB-NC

– Request #: 34

Proposer: CBS / ENC RFP Section: TS 43.5 TABLE 6 Transit Bus Instruments & Alarms Page: 98 of 207

Questions/clarification or approved equal: Clarification provided that the listing of Transit Bus Instruments and Alarms is a composite listing of all possible alarms. For example, a Farebox Interface or Methane Detection would only be provided if that specific option were selected by the end user. As such, not every device listed will be provided on the baseline bus.

– □Approved – Agency action: □ Denied □See response below □ See addendum Agency response:

Page 165 of 207 Request for Proposal (RFP) Due 03-27-2020 RFP# 2020HDB-NC

CER 2. Request for Pre-Offer Change or Approved Equal This form must be used for requested clarifications, changes, substitutes or approval of items equal to items specified with a brand name and must be submitted as far in advance of the Due Date, as specified in “Questions, Clarifications and Omissions.”

Piedmont Authority for Regional Transportation (PART) RFP# 2020HDB-NC

– Request #: 35

Proposer: CBS / ENC RFP Section: TS 43.5 TABLE 6 Transit Bus Instruments & Alarms Page: 99 of 207

Questions/clarification or approved equal: Driver’s Ventilation; Rotary, three-position detent

Approval requested for a 3-position toggle switch – high/off/low – for the driver’s ventilation in lieu of a rotary switch.

– □Approved – Agency action: □ Denied □See response below □ See addendum Agency response:

Page 165 of 207 Request for Proposal (RFP) Due 03-27-2020 RFP# 2020HDB-NC

CER 2. Request for Pre-Offer Change or Approved Equal This form must be used for requested clarifications, changes, substitutes or approval of items equal to items specified with a brand name and must be submitted as far in advance of the Due Date, as specified in “Questions, Clarifications and Omissions.”

Piedmont Authority for Regional Transportation (PART) RFP# 2020HDB-NC

– Request #: 36

Proposer: CBS / ENC RFP Section: TS 43.5 TABLE 6 Transit Bus Instruments & Alarms Page: 99of 207

Questions/clarification or approved equal: Approval requested for a 3-position toggle switch with High/Off/Low for the defroster fan.

– □Approved – Agency action: □ Denied □See response below □ See addendum Agency response:

Page 165 of 207 Request for Proposal (RFP) Due 03-27-2020 RFP# 2020HDB-NC

CER 2. Request for Pre-Offer Change or Approved Equal This form must be used for requested clarifications, changes, substitutes or approval of items equal to items specified with a brand name and must be submitted as far in advance of the Due Date, as specified in “Questions, Clarifications and Omissions.”

Piedmont Authority for Regional Transportation (PART) RFP# 2020HDB-NC

– Request #: 37

Proposer: CBS / ENC RFP Section: TS 43.5 TABLE 6 Transit Bus Instruments & Alarms Page: 99 of 207

Questions/clarification or approved equal: Approval requested for the windshield wiper rotary switch to be housed in the right wing in lieu of the requested left wing.

– □Approved – Agency action: □ Denied □See response below □ See addendum Agency response:

Page 165 of 207 Request for Proposal (RFP) Due 03-27-2020 RFP# 2020HDB-NC

CER 2. Request for Pre-Offer Change or Approved Equal This form must be used for requested clarifications, changes, substitutes or approval of items equal to items specified with a brand name and must be submitted as far in advance of the Due Date, as specified in “Questions, Clarifications and Omissions.”

Piedmont Authority for Regional Transportation (PART) RFP# 2020HDB-NC

– Request #: 38

Proposer: CBS / ENC RFP Section: TS 43.5 TABLE 6 Transit Bus Instruments & Alarms Page: 99 of 207

Questions/clarification or approved equal: Approval requested for the windshield washer to be integrated into the windshield wiper switch in lieu of a push button.

– □Approved – Agency action: □ Denied □See response below □ See addendum Agency response:

Page 165 of 207 Request for Proposal (RFP) Due 03-27-2020 RFP# 2020HDB-NC

CER 2. Request for Pre-Offer Change or Approved Equal This form must be used for requested clarifications, changes, substitutes or approval of items equal to items specified with a brand name and must be submitted as far in advance of the Due Date, as specified in “Questions, Clarifications and Omissions.”

Piedmont Authority for Regional Transportation (PART) RFP# 2020HDB-NC

– Request #: 39

Proposer: ENC / CBS RFP Section: TS 43.5 TABLE 6 Transit Bus Instruments & Alarms Page: 100 of 207

Questions/clarification or approved equal: Approval requested to provide the fire warning indicator light located left and in reach of the driver in an overhead driver’s switch panel.

– □Approved – Agency action: □ Denied □See response below □ See addendum Agency response:

Page 165 of 207 Request for Proposal (RFP) Due 03-27-2020 RFP# 2020HDB-NC

CER 2. Request for Pre-Offer Change or Approved Equal This form must be used for requested clarifications, changes, substitutes or approval of items equal to items specified with a brand name and must be submitted as far in advance of the Due Date, as specified in “Questions, Clarifications and Omissions.”

Piedmont Authority for Regional Transportation (PART) RFP# 2020HDB-NC

– Request #: 40

Proposer: CBS / ENC RFP Section: TS 43.5 TABLE 6 Transit Bus Instruments & Alarms Page: 101 of 207

Questions/clarification or approved equal: Approval requested for the use of a 12-volt auxiliary power device in lieu of the 110-volt power receptacle as listed. A 12-volt auxiliary power receptacle is standard on heavy-duty shuttle buses.

– □Approved – Agency action: □ Denied □See response below □ See addendum Agency response:

Page 165 of 207 Request for Proposal (RFP) Due 03-27-2020 RFP# 2020HDB-NC

CER 2. Request for Pre-Offer Change or Approved Equal This form must be used for requested clarifications, changes, substitutes or approval of items equal to items specified with a brand name and must be submitted as far in advance of the Due Date, as specified in “Questions, Clarifications and Omissions.”

Piedmont Authority for Regional Transportation (PART) RFP# 2020HDB-NC

– Request #: 41

Proposer: CBS / ENC RFP Section: TS 43.6 Driver Foot Controls Page: 102 of 207

Questions/clarification or approved equal: Tab A Price Page – Bus states in Base Bus Pricing that this component should be Williams Controls 41 Degree Throttle and Brake Pedal (Non-Adjustable). Approval requested for the use of our proven standard Industrial Electronic Controls model 10459 Floor Mount Electronic Throttle. The pedal provides a 35-degree treadle angle. Please reference attached brochure.

– □Approved – Agency action: □ Denied □See response below □ See addendum Agency response:

Page 165 of 207 8 7 6 5 4 3 2 1

**THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF INDUSTRIAL ELECTRONIC CONTROLS ANY REPRODUCTION IN PART OR AS A WHOLE WITHOUT THE WRITTEN PERMISSION OF INDUSTRIAL ELECTRONIC CONTROLS IS PROHIBITED.**

SPECIFICATIONS 1. MECHANICAL SPECIFICATIONS • TRAVEL (°): 17±1 • PEDAL FORCE (N): SEE FIGURE 2 • WEIGHT (g): 1526 • LIFE (CYCLES): 3,000,000 • MAXIMUM STATIC LOAD (N): 1520

F F 2. ELECTRICAL SPECIFICATIONS • SENSOR TYPE: HALL • OUTPUT TYPE: DUAL ANALOG • WORKING VOLTAGE (VDC): 5±0.1 • MAXIMUM CURRENT (mA): 10 • INDEPENDANT LINEARITY: ±2% • ELECTRICAL OUTPUT (VDC): SEE FIGURE 1

3. ENVIRONMENTAL SPECIFICATIONS • TEMPERATURE (°C): -40 TO 85 • PROTECTION CLASS: IP66

4. STANDARDS MET • SAEJ1843 • FMVSS124 • CUMMINS AEB 15.67

5. MATERIALS • TREADLE: CAST ALUMINUM • PEDAL BASE: STEEL PLATED WITH ZINC E • SENSOR BODY: NYLON COLORED BLACK E • SPRINGS: 304 STAINLESS STEEL • HARDWARE: STEEL PLATED WITH ZINC • WIRE: AEX OR AVX 0.5 mm^2 • OTHER PLASTIC PARTS: NYLON 80 • OTHER METAL PARTS: STEEL PLATED WITH ZINC 3.15 • TREADLE COVER: RUBBER INJECTED

6. ORANGE WIRE CAN BE SUBSTITUTED FOR YELLOW. 17.0° TRAVEL 7. LOOM SHALL BE INSIDE CLAMPING AND HARNESS WIRING WILL HAVE MINIMAL WIRE EXPOSURE.

8. PROGRAM PEDAL PER CAL-5174-1184 B 45.0° STARTING POSITION

100% [5] 203.6 D 8.02 D 84±3% [4.20±0.15] OUT1

31.8 30.3 ACCEL 26.2

42±3% [2.10±0.15] OUT2 22.4 RETURN 228.5 16.7 9.00 249.1 VOLTAGE OUTPUT (VDC) 22±3% [1.10±0.15] FORCE (N) 9.807

11±3% [0.55±0.15] 899.72 2.9 DELPHI WEATHER PACK CONNECTOR DELPHI WEATHER PACK CONNECTOR 35.422 CONNECTOR: 1X 12015793 0 0 CONNECTOR: 1X 12010717 C C TERMINAL: 3X 12089188 TERMINAL: 3X 12089040

0 WIRE SEAL: (DELPHI #12015323) 0 WIRE SEAL: (DELPHI #12015323) 17 17 0.8 16.2 PEDAL POSITION (°) FIGURE 1 PEDAL POSITION (°) OUTPUT CHARACTERISTICS PEDAL FORCE CURVE FIGURE 2

B C B A 98 3.858

89 A 3.504

B 2X 69 B 2.717

61 CONNECTOR 12015793 PINOUT 2.402 PIN COLOR FUNCTION A ORG / YEL OUT2 6 B BLU COM2- C GRN VCC2+

24.5 A B C .965 64 2.520 DETAIL A 2X 16 SCALE 1 : 1 .630 24.5 A .965 A INITIALS DATE UNLESS OTHERWISE SPECIFIED DRAWN BY WAT 12/7/2017 DIMENSIONS ARE IN METRIC mm INDUSTRIAL ELECTRONIC DUAL DIM [] ARE IN ENGLISH in CHECKED BY JDK 12/7/2017 ANGULAR MACH ------CONTROLS ANGULAR BEND ------ROCKFORD, IL 61109 MATERIAL ZERO PLACE DECIMAL --- - CONNECTOR 12010717 PINOUT PER BOM ONE PLACE DECIMAL ---- - TITLE TWO PLACE DECIMAL --- - PIN COLOR FUNCTION OTHER PEDAL ASSEMBLY, 45 DEG FLOOR MOUNT HALL 4X 9 0.354 THRU ALL - INTERPRET GEOMETRIC EFFECT A WHT COM1- TOLERANCES PER ASME Y14.5 B 440 ADDED PROGRAM CALIBRATION NOTE WSH 10/4/2018 SIZE DRAWING # REVISION B BLK OUT1 FINISH 10 0.394 THRU ALL A 399 RELEASE WAT 12/7/17 - DO NOT SCALE DRAWING C RED VCC1+ REV CIP DESCRIPTION BY DATE SCALE: 1:2 SHEET 1 OF 1 D 10459-45P-H0531-1184 B 8 7 6 5 4 3 2 1 Thursday, October 4, 2018 8:18:51 AM Z:\CIP Work In Progress\P000440 - Volboff Harness Part Change\CAD\VERSION_2 - 10459-XXXX- XXX-H0536-1184\H0531 NOTE UPDATE\10459-45P-H0531-1184 B Request for Proposal (RFP) Due 03-27-2020 RFP# 2020HDB-NC

CER 2. Request for Pre-Offer Change or Approved Equal This form must be used for requested clarifications, changes, substitutes or approval of items equal to items specified with a brand name and must be submitted as far in advance of the Due Date, as specified in “Questions, Clarifications and Omissions.”

Piedmont Authority for Regional Transportation (PART) RFP# 2020HDB-NC

– Request #: 42

Proposer: CBS / ENC RFP Section: TS 45.2 Windshield Washers Page: 104 of 207

Questions/clarification or approved equal: Approval requested to supply a 2.6-gallon windshield washer reservoir in lieu of the requested 3-gallon. This is the largest windshield washer reservoir that can be accommodated in our low floor design. This is a critical design element, which cannot be modified.

– □Approved – Agency action: □ Denied □See response below □ See addendum Agency response:

Page 165 of 207 Request for Proposal (RFP) Due 03-27-2020 RFP# 2020HDB-NC

CER 2. Request for Pre-Offer Change or Approved Equal This form must be used for requested clarifications, changes, substitutes or approval of items equal to items specified with a brand name and must be submitted as far in advance of the Due Date, as specified in “Questions, Clarifications and Omissions.”

Piedmont Authority for Regional Transportation (PART) RFP# 2020HDB-NC

– Request #: 43

Proposer: CBS / ENC RFP Section: TS 46.8.1 Exterior Mirrors Page: 107 of 207

Questions/clarification or approved equal: Approval requested to provide SafeFleet (Hadley) exterior mirrors that are fully adjustable 15" x 8", two- part mirrors. The upper section utilizes an 8 1/2" section of flat glass. The lower section is 5 1/2" convex adjustable diminishing glass. The mirrors installed with quick mount disconnects and are supported by rigid adjustable black power-coated arms. The proposed mirrors have been designed specifically for our bus to accommodate our BRT swept front end and thus, are an integral part of the overall design. There are no commercial alternatives to the proposed exterior mirrors. Please reference attached drawings but note that turn signals are not included in the base offering. This is a critical design element, which cannot be modified.

– □Approved – Agency action: □ Denied □See response below □ See addendum Agency response:

Page 165 of 207

X449ASY-1 BRKT ASY INCLUDES: REVISIONS X449-1, X449C & 172-5 (2) REV. DESCRIPTION DATE APPROVED A ADDED NEW PART NOTE: 204-34 3/12/2009 GRJ B REVISED DRAWING, ADDED TURN SIGNAL NOTE 5/29/2009 JAH ADDED MNTG SCREWS, CHANGED X95 TO X95-3 & C CHANGED MOTOR & BTM CX TO ' -SP" FOR SM PLT. 4/1/2010 DC D ADDE PARTS TO BAG/ SEND LOOSE PARTS NOTE PER 2/14/11 MS PRR 1907 X449C CVR PLATE

52B X449-1 BRKT X231-NABI BRT ARM NOTE: BAG 122-2 & 52B/ DO NOT INSTALL BRACKET 396-15MLR-H TO ARM; SHIP LOOSE 913 DWN TF W/ HEAT

559-8STD-24V-SP C 24V DUAL MTR ASY MNT W/ 133-1 (7) X220-GASKET

396-16SP-H 913 DWN CVX C W/ HEAT A 204-34& 242-80 C 506-1 BALL SHAFT W/PLATE & COLLET MED MTR PLATE MNT 204-34 W/ 92-4 (6) MOUNT W/ #30 (4)

506-2R KIT INCLUDES: SM MTR PLATE X608-4R 54" HARNESS MOUNT W/ 92-1 (3) B C X95-3 30' HARNESS R913-1 C TURN SIGNAL: 9X13 HD AMBER TOWARDS FRONT X528ASY-24VS 6" LED OTS RED TOWARDS BACK C W/ 132, X156 & 82 (2) EA.

DRAWN BY: DATE: SCALE: 1:10 SHEET NUMBER: 1 OF 1 ALL DIMENSIONS IN INCHES 2503 MARINA DR. ELKHART, IN 46514 MODEL: ELD3007-OTS --- 1/16/2009 TOLERANCES UNLESS PHONE: 574.266.3700 OTHERWISE SPECIFIED: CHECKED BY: DATE: THIS DOCUMENT AND THE DATA SHOWN ON IT ARE THE OTHERWISE SPECIFIED: FAX: 574.266.3747 PROPERTY OF HADLEY PRODUCTS AND MAY NOT BE www.hadley-products.com --- USED IN ANY WAY THAT IS DETRIMENTAL TO HADLEY DECIMAL 2 PLC. .010 --- PRODUCTS, AND MUST BE RETURNED ON DEMAND. DECIMAL 3 PLC. .005 DESCRIPTION: CAD DRW SIZE: DRW NO: DDDR DRRRWWWW RRREREEEVVVV:::: ACCEPTANCE OF THIS DOCUMENT CONSTITUTES FRACTIONAL 1/32 Solid ACCEPTANCE OF THESE CONDITIONS BY THE RECIPIENT. ANGULAR .5.5.5 CS-23-D913HRFHRCX-OTS Works A ELD3007-OTS C REVISIONS REV. DESCRIPTION DATE APPROVED A CHANGED 448S RACE TO 448S-1, ADDED 122-2 1/23/2009 DC B ADDED TURN SIGNAL ORIENTATION NOTE 5/28/2009 JAH ADDED MNTG SCREWS AND A NOTE TO ADD 204-32 BALL SHAFT R913-1 C 4/21/2010 DC C MNT W/ 92-4 (6) 9X13 HEAD THE X112 ADDED THE 79-4, X528ASY-12VS WAS -12V D and 448S-1 WAS 448-1 6/8/2010 DLC

506-1 559-8STD-24V E ADDED 181, 52B, & HARDWARE 5/3/11 MS MED MTR PLATE 24V DUAL MTR ASY C MNT W/ #30 (4) MNT W/ 133-1 (7) C X528ASY-24VS D 6" LED TS 506-2R 396-10MLR-H SM MTR PLATE 913 UP TF MNT W/ 92-1 (3) C W/ HEAT

242-8 396-8SLR-H COLLET 913 UP CVX W/ HEAT 75-6 GASKET

140-5C PHIL. HD SCREW (X2) 52B CAP D 181, 1/2-13X3.25" BOLT 79-4 495RS-2D SS SET SCREW (X2) BRT ARM C

NOTE: ADD AN X112 TO 448S-1 476-2D HEAD TO TIE DOWN WIRES. RACE EURO BRKT W/ 192-1 (X2)

TURN SIGNAL: 115 WASHER(2), KIT INCLUDES: AMBER TOWARDS FRONT 112 LOCKNUT, X608-3R 36" HARNESS COMPLETED P/N: ------RED TOWARDS BACK & 122-2 ACORN NUT X94 11' HARNESS MACHINED P/N: ------COATED P/N: ------RAW P/N: ------B COATING: ------MATERIAL: ------DRAWN BY: DATE: SCALE: 1:20 SHEET NUMBER: 1 OF 1 ALL DIMENSIONS IN INCHES 2503 MARINA DR. ELKHART, IN 46514 MODEL: ELD3006-OTS A TW 1/16/2009 TOLERANCES UNLESS PHONE: 574.266.3700 OTHERWISE SPECIFIED: CHECKED BY: DATE: THIS DOCUMENT AND THE DATA SHOWN ON IT ARE THE OTHERWISE SPECIFIED: FAX: 574.266.3747 PROPERTY OF HADLEY PRODUCTS AND MAY NOT BE www.hadley-products.com --- USED IN ANY WAY THAT IS DETRIMENTAL TO HADLEY DECIMAL 2 PLC. .010 --- PRODUCTS, AND MUST BE RETURNED ON DEMAND. DECIMAL 3 PLC. .005 DESCRIPTION: CAD DRW SIZE: DRW NO: DDDR DRRRWWWW RRREREEEVVVV:::: ACCEPTANCE OF THIS DOCUMENT CONSTITUTES FRACTIONAL 1/32 Solid ACCEPTANCE OF THESE CONDITIONS BY THE RECIPIENT. ANGULAR .5.5.5 RS-7-U913HRFHRCX-OTS Works A ELD3006-OTS D Request for Proposal (RFP) Due 03-27-2020 RFP# 2020HDB-NC

CER 2. Request for Pre-Offer Change or Approved Equal This form must be used for requested clarifications, changes, substitutes or approval of items equal to items specified with a brand name and must be submitted as far in advance of the Due Date, as specified in “Questions, Clarifications and Omissions.”

Piedmont Authority for Regional Transportation (PART) RFP# 2020HDB-NC

– Request #: 44

Proposer: CBS / ENC RFP Section: TS 49. Driver’s Side Window Page: 109 of 207

Questions/clarification or approved equal: Approval requested for a driver’s side window where the front half slides and latches. The front latching window allows the driver to access the exterior rear-view mirror from his seat.

– □Approved – Agency action: □ Denied □See response below □ See addendum Agency response:

Page 165 of 207 Request for Proposal (RFP) Due 03-27-2020 RFP# 2020HDB-NC

CER 2. Request for Pre-Offer Change or Approved Equal This form must be used for requested clarifications, changes, substitutes or approval of items equal to items specified with a brand name and must be submitted as far in advance of the Due Date, as specified in “Questions, Clarifications and Omissions.”

Piedmont Authority for Regional Transportation (PART) RFP# 2020HDB-NC

– Request #: 45

Proposer: CBS / ENC RFP Section: TS 51. Capacity and Performance Page: 112 of 207

Questions/clarification or approved equal: The HVAC section provided no direction on refrigerant to be utilized. Tab A Price Page – Bus BASE Bus Pricing details stated that the refrigerant should be R357C. According to the ASHRAE Refrigerant Designations Listing and Thermo King, R357C is not an approved refrigerant. Approval requested for the use of refrigerant R407C which provides a 20% increase in cooling efficiency at no upcharge over R134a which is the other available refrigerant from Thermo King.

– □Approved – Agency action: □ Denied □See response below □ See addendum Agency response:

Page 165 of 207 Request for Proposal (RFP) Due 03-27-2020 RFP# 2020HDB-NC

CER 2. Request for Pre-Offer Change or Approved Equal This form must be used for requested clarifications, changes, substitutes or approval of items equal to items specified with a brand name and must be submitted as far in advance of the Due Date, as specified in “Questions, Clarifications and Omissions.”

Piedmont Authority for Regional Transportation (PART) RFP# 2020HDB-NC

– Request #: 46

Proposer: CBS / ENC RFP Section: TS 55. Roof Ventilators & TS 78.7 Roof Ventilation/Escape Hatches Page: 116 of 207 & 140 of 207 Questions/clarification or approved equal: TS 55. states one ventilator provided in the roof at the rear of the bus as base; and two roof ventilators to be priced as ALTERNATIVE. TS 78.7 states two ventilators provided in the base; and one roof ventilator to be priced as ALTERNATIVE. Tab B Price Page – Alt Equip shows both TS 55 and TS 78.7’s alternatives.

Clarification requested on what is to be shown in the base pricing – one ventilator or two? Please advise so that appropriate pricing can be provided.

– □Approved – Agency action: □ Denied □See response below □ See addendum Agency response:

Page 165 of 207 Request for Proposal (RFP) Due 03-27-2020 RFP# 2020HDB-NC

CER 2. Request for Pre-Offer Change or Approved Equal This form must be used for requested clarifications, changes, substitutes or approval of items equal to items specified with a brand name and must be submitted as far in advance of the Due Date, as specified in “Questions, Clarifications and Omissions.”

Piedmont Authority for Regional Transportation (PART) RFP# 2020HDB-NC

– Request #: 47

Proposer: CBS / ENC RFP Section: TS 67.2 Front Bumper Page: 119 of 207

Questions/clarification or approved equal: No provisions for installing a bike rack shall be made.

Clarification requested on whether a bike rack is to be priced in the base or not. Tab A Price Page – Bus BASE Bus Pricing details stated that a Sportworks APEX 2, 2-Position, Stainless Steel is to be provided. Tab C Price Page – Opt Equip shows the APEX 2, 2-Position, Stainless Steel as optional. Please advise what should be shown in the base so that appropriate pricing can be provided.

– □Approved – Agency action: □ Denied □See response below □ See addendum Agency response:

Page 165 of 207 Request for Proposal (RFP) Due 03-27-2020 RFP# 2020HDB-NC

CER 2. Request for Pre-Offer Change or Approved Equal This form must be used for requested clarifications, changes, substitutes or approval of items equal to items specified with a brand name and must be submitted as far in advance of the Due Date, as specified in “Questions, Clarifications and Omissions.”

Piedmont Authority for Regional Transportation (PART) RFP# 2020HDB-NC

– Request #: 48

Proposer: CBS / ENC RFP Section: TS 68. Finish and Color Page: 120 of 207

Questions/clarification or approved equal: Based on previous AE responses it is understood that each agency’s paint scheme is to be quoted. Should PART’s paint scheme be utilized in the base pricing and other agency’s schemes be listed as part of Tab B Alternatives? Further, if we could be supplied a paint/graphics scheme or photos for the remaining consortium agencies not previously provided this would allow appropriate pricing for each agency.

– □Approved – Agency action: □ Denied □See response below □ See addendum Agency response:

Page 165 of 207 Request for Proposal (RFP) Due 03-27-2020 RFP# 2020HDB-NC

CER 2. Request for Pre-Offer Change or Approved Equal This form must be used for requested clarifications, changes, substitutes or approval of items equal to items specified with a brand name and must be submitted as far in advance of the Due Date, as specified in “Questions, Clarifications and Omissions.”

Piedmont Authority for Regional Transportation (PART) RFP# 2020HDB-NC

– Request #: 49

Proposer: CBS / ENC RFP Section: TS 68. Finish and Color Page: 120 of 207

Questions/clarification or approved equal: Base coat/clear coat paint system.

Clarification requested whether this is to be priced in the base unit since Tab C Price Page – Opt Equip, Line 228 is to Add-Clear Coat. Please advise whether clear coat is a base price or optional price so that appropriate pricing can be submitted with our proposal.

– □Approved – Agency action: □ Denied □See response below □ See addendum Agency response:

Page 165 of 207 Request for Proposal (RFP) Due 03-27-2020 RFP# 2020HDB-NC

CER 2. Request for Pre-Offer Change or Approved Equal This form must be used for requested clarifications, changes, substitutes or approval of items equal to items specified with a brand name and must be submitted as far in advance of the Due Date, as specified in “Questions, Clarifications and Omissions.”

Piedmont Authority for Regional Transportation (PART) RFP# 2020HDB-NC

– Request #: 50

Proposer: CBS / ENC RFP Section: TS 72.1.1 Driver Barrier – Transit Coach Page: 123 of 207

Questions/clarification or approved equal: Clarification provided that a driver barrier will not be provided as an Electronic Cabinet will be provided on the street side wheel well directly behind the driver as provided for in Tab A Price Page – Bus BASE Bus Pricing details.

– □Approved – Agency action: □ Denied □See response below □ See addendum Agency response:

Page 165 of 207 Request for Proposal (RFP) Due 03-27-2020 RFP# 2020HDB-NC

CER 2. Request for Pre-Offer Change or Approved Equal This form must be used for requested clarifications, changes, substitutes or approval of items equal to items specified with a brand name and must be submitted as far in advance of the Due Date, as specified in “Questions, Clarifications and Omissions.”

Piedmont Authority for Regional Transportation (PART) RFP# 2020HDB-NC

– Request #: 51

Proposer: CBS / ENC RFP Section: TS 72.1.1 Driver Barrier – Transit Coach Page: 123 of 207

Questions/clarification or approved equal: The partition shall have a side return and stanchion to prevent passengers from reaching the driver by standing behind the driver’s seat.

Clarification requested on whether a driver’s barrier side return is to be priced in the base or not as Tab A Price Page – Bus BASE Bus Pricing details stated that no driver barrier is to be provided but an Electrical Equipment Cabinet shall be provided. Please note that a side return can be added with the Electrical Equipment Cabinet.

– □Approved – Agency action: □ Denied □See response below □ See addendum Agency response:

Page 165 of 207 Request for Proposal (RFP) Due 03-27-2020 RFP# 2020HDB-NC

CER 2. Request for Pre-Offer Change or Approved Equal This form must be used for requested clarifications, changes, substitutes or approval of items equal to items specified with a brand name and must be submitted as far in advance of the Due Date, as specified in “Questions, Clarifications and Omissions.”

Piedmont Authority for Regional Transportation (PART) RFP# 2020HDB-NC

– Request #: 52

Proposer: CBS / ENC RFP Section:TS 75.1 Arrangements and Seat Style Page: 127 of 207

Questions/clarification or approved equal: Standard inclusion for all seats installed shall be USB charging port at each seat installed.

Clarification requested whether USB ports are to be in the base since Tab C Price Page – Opt Equip, Line 237 is an option to add USB charging ports at passenger locations. Please advise whether USB ports are a base price or optional price so that appropriate pricing can be provided.

– □Approved – Agency action: □ Denied □See response below □ See addendum Agency response:

Page 165 of 207 Request for Proposal (RFP) Due 03-27-2020 RFP# 2020HDB-NC

CER 2. Request for Pre-Offer Change or Approved Equal This form must be used for requested clarifications, changes, substitutes or approval of items equal to items specified with a brand name and must be submitted as far in advance of the Due Date, as specified in “Questions, Clarifications and Omissions.”

Piedmont Authority for Regional Transportation (PART) RFP# 2020HDB-NC

– Request #: 53

Proposer: CBS / ENC RFP Section: TS 75.1 Arrangements and Seat Style Page:127 of 207

Questions/clarification or approved equal: Clarification provided that Freedman High-Back seats are not compatible with the Q’Pod restraint system. Therefore, Diablo seats will be utilized in the wheelchair position areas. Per Freedman Seating the Diablo provides approximately 3” cushion which would be compatible with the High-Back seats.

– □Approved – Agency action: □ Denied □See response below □ See addendum Agency response:

Page 165 of 207 Request for Proposal (RFP) Due 03-27-2020 RFP# 2020HDB-NC

CER 2. Request for Pre-Offer Change or Approved Equal This form must be used for requested clarifications, changes, substitutes or approval of items equal to items specified with a brand name and must be submitted as far in advance of the Due Date, as specified in “Questions, Clarifications and Omissions.”

Piedmont Authority for Regional Transportation (PART) RFP# 2020HDB-NC

– Request #: 54

Proposer: CBS / ENC RFP Section: TS 75.1 Arrangements and Seat Style Page:127 of 207

Questions/clarification or approved equal: Approval requested for the provision of one (1) Q'Pod restraint system on the streetside only of the 30' vehicle. Due to the forward placement of the fuel tank we are unable to utilize a curbside Q'Pod restraint system. Please reference attached floorplan.

– □Approved – Agency action: □ Denied □See response below □ See addendum Agency response:

Page 165 of 207 9670 Galena Street Riverside, CA 92509 Phone (909) 591-9557 Request for Proposal (RFP) Due 03-27-2020 RFP# 2020HDB-NC

CER 2. Request for Pre-Offer Change or Approved Equal This form must be used for requested clarifications, changes, substitutes or approval of items equal to items specified with a brand name and must be submitted as far in advance of the Due Date, as specified in “Questions, Clarifications and Omissions.”

Piedmont Authority for Regional Transportation (PART) RFP# 2020HDB-NC

– Request #: 55

Proposer: CBS / ENC RFP Section: TS 75.1 Arrangements and Seat Style Page: 128 of 207

Questions/clarification or approved equal: Freedman High-back reclining seats, fabric level 5, footrest, side grab rail on aisle seat. ALTERNATIVE Perimeter seating to maximize standing room.

Clarification requested if the Agency wants Freedman High-back non-reclining seats in the perimeter seating configuration or a more appropriate seat like a CitiSeat. Please advise so that appropriate pricing can be provided for this ALTERNATIVE item.

– □Approved – Agency action: □ Denied □See response below □ See addendum Agency response:

Page 165 of 207 Request for Proposal (RFP) Due 03-27-2020 RFP# 2020HDB-NC

CER 2. Request for Pre-Offer Change or Approved Equal This form must be used for requested clarifications, changes, substitutes or approval of items equal to items specified with a brand name and must be submitted as far in advance of the Due Date, as specified in “Questions, Clarifications and Omissions.”

Piedmont Authority for Regional Transportation (PART) RFP# 2020HDB-NC

– Request #: 56

Proposer: CBS / ENC RFP Section: TS 75.2 Padded Inserts/Cushioned Seats Page: 128 of 207

Questions/clarification or approved equal: The passenger seats shall be equipped with non-upholstered inserts throughout the bus.

Clarification provided that the specification calls out for Freedman High-back reclining seats with Level 5 fabric which does not provide for inserts. Approval requested for the deletion of non- upholstered inserts in the base.

– □Approved – Agency action: □ Denied □See response below □ See addendum Agency response:

Page 165 of 207 Request for Proposal (RFP) Due 03-27-2020 RFP# 2020HDB-NC

CER 2. Request for Pre-Offer Change or Approved Equal This form must be used for requested clarifications, changes, substitutes or approval of items equal to items specified with a brand name and must be submitted as far in advance of the Due Date, as specified in “Questions, Clarifications and Omissions.”

Piedmont Authority for Regional Transportation (PART) RFP# 2020HDB-NC

– Request #: 57

Proposer: CBS / ENC RFP Section: TS 75.2 Padded Inserts/Cushioned Seats, ALTERNATIVE Page: 128 of 207

Questions/clarification or approved equal: TS 75.2 Padded Inserts/Cushioned Seats, ALTERNATIVE

Approval requested for the deletion of all listed ALTERNATIVE items in this section. Reasoning: fully cushioned seats is what you would receive with the High-back seats in base pricing. In addition, the other ALTERNATIVE options call out for insert variances which don’t apply to the High-back base seat. In lieu of these ALTERNATIVE options we recommend that the optional seats (CitiSeats, etc.) be priced off the base floorplan utilizing appropriate optional seats in Tab C. All other variables related to inserts and miscellaneous preferences could be handled through quotes at the time of order.

– □Approved – Agency action: □ Denied □See response below □ See addendum Agency response:

Page 165 of 207 Request for Proposal (RFP) Due 03-27-2020 RFP# 2020HDB-NC

CER 2. Request for Pre-Offer Change or Approved Equal This form must be used for requested clarifications, changes, substitutes or approval of items equal to items specified with a brand name and must be submitted as far in advance of the Due Date, as specified in “Questions, Clarifications and Omissions.”

Piedmont Authority for Regional Transportation (PART) RFP# 2020HDB-NC

– Request #: 58

Proposer: CBS / ENC RFP Section: TS 76.3 Vestibule & TS 76.5 Overhead Assist Page: 136 of 207

Questions/clarification or approved equal: Approval requested for the overhead assist to start after the electronics cabinet since it reaches to the ceiling. Grab rails are provided on either side of the electronics cabinet. Please reference attached photos.

– □Approved – Agency action: □ Denied □See response below □ See addendum Agency response:

Page 165 of 207

Request for Proposal (RFP) Due 03-27-2020 RFP# 2020HDB-NC

CER 2. Request for Pre-Offer Change or Approved Equal This form must be used for requested clarifications, changes, substitutes or approval of items equal to items specified with a brand name and must be submitted as far in advance of the Due Date, as specified in “Questions, Clarifications and Omissions.”

Piedmont Authority for Regional Transportation (PART) RFP# 2020HDB-NC

– Request #: 59

Proposer: CBS / ENC RFP Section: TS 77.3.1 Transit Coach Page: 136 of 207

Questions/clarification or approved equal: Approval requested for a front door clear width opening of 32” in lieu of 34 1/2" which is the largest Vapor, dual panel, air operated, slide-glide front door available that can be utilized with our standard BRT front end vehicle. This is a critical design element that cannot be modified. Please reference attached floorplan.

– □Approved – Agency action: □ Denied □See response below □ See addendum Agency response:

Page 165 of 207

Request for Proposal (RFP) Due 03-27-2020 RFP# 2020HDB-NC

CER 2. Request for Pre-Offer Change or Approved Equal This form must be used for requested clarifications, changes, substitutes or approval of items equal to items specified with a brand name and must be submitted as far in advance of the Due Date, as specified in “Questions, Clarifications and Omissions.”

Piedmont Authority for Regional Transportation (PART) RFP# 2020HDB-NC

– Request #: 60

Proposer: CBS / ENC RFP Section: TS 77.3.1 Transit Coach Page: 136 of 207

Questions/clarification or approved equal: Rear door opening clear width shall be a minimum of 24 in. with doors fully opened. . . 34 ½ with ramp placement.

Approval requested for a Vapor, dual panel, air operated, slide-glide rear door opening clear width of 34” when a rear door ramp is requested.

– □Approved – Agency action: □ Denied □See response below □ See addendum Agency response:

Page 165 of 207 Request for Proposal (RFP) Due 03-27-2020 RFP# 2020HDB-NC

CER 2. Request for Pre-Offer Change or Approved Equal This form must be used for requested clarifications, changes, substitutes or approval of items equal to items specified with a brand name and must be submitted as far in advance of the Due Date, as specified in “Questions, Clarifications and Omissions.”

Piedmont Authority for Regional Transportation (PART) RFP# 2020HDB-NC

– Request #: 61

Proposer: CBS / ENC RFP Section: TS 77.4 Door Glazing Page: 136 of 207 Questions/clarification or approved equal: Glazing material in the rear doorway door panels shall be defined by the Agency.

Approval requested for the glazing material in the rear doorway to match the front doorway which is a nominal ¼” thick laminated safety glass. This will allow for appropriate pricing to be provided.

– □Approved – Agency action: □ Denied □See response below □ See addendum Agency response:

Page 165 of 207 Request for Proposal (RFP) Due 03-27-2020 RFP# 2020HDB-NC

CER 2. Request for Pre-Offer Change or Approved Equal This form must be used for requested clarifications, changes, substitutes or approval of items equal to items specified with a brand name and must be submitted as far in advance of the Due Date, as specified in “Questions, Clarifications and Omissions.”

Piedmont Authority for Regional Transportation (PART) RFP# 2020HDB-NC

– Request #: 62

Proposer: CBS / ENC RFP Section: TS 82.3 Automatic Passenger Counter Page: 143 of 207

Questions/clarification or approved equal: Clarification requested on whether the UTA APC system as described is to be priced in the base or not as Tab A Price Page – Bus BASE Bus Pricing details stated that UTA APC sensors, cabling and CPU only should be provided and integrated with the ITS system. Further the UTA system as described in this section is also listed on Tab C Price Page – Opt Equipment as a line item. Please provide direction so that appropriate pricing can be provided in both base and optional sections.

– □Approved – Agency action: □ Denied □See response below □ See addendum Agency response:

Page 165 of 207 Request for Proposal (RFP) Due 03-27-2020 RFP# 2020HDB-NC

CER 2. Request for Pre-Offer Change or Approved Equal This form must be used for requested clarifications, changes, substitutes or approval of items equal to items specified with a brand name and must be submitted as far in advance of the Due Date, as specified in “Questions, Clarifications and Omissions.”

Piedmont Authority for Regional Transportation (PART) RFP# 2020HDB-NC

– Request #: 63

Proposer: CBS / ENC RFP Section: WR 1.1.6 Subsystems Page: 146 of 207

Questions/clarification or approved equal: Fire suppression system including tank and extinguishing agent dispensing system. 5 years / 200,000 miles, whichever comes first.

Approval requested for a three (3) year warranty, parts only, as provided by Kidde. See attached limited warranty from Kidde. In addition, when seeking the alternative vendor quotes, Amerex also provides a three (3) year warranty with the exception of backup batteries which are warranted for 1-year only.

– □Approved – Agency action: □ Denied □See response below □ See addendum Agency response:

Page 165 of 207 LIMITED WARRANTY FOR KIDDE AEROSPACE AND DEFENSE COMMERCIAL GROUND VEHICLES

AUTOMATIC FIRE/GAS DETECTION AND SUPPRESSION SYSTEMS INSTALLED IN COMMERCIAL VEHICLES

APPLICABILITY

This warranty shall apply in lieu of the clauses entitled “WARRANTY” in the Kidde Aerospace and Defense (“KAD”) Standard Terms and Conditions of Sale.

WARRANTY

KAD hereby warrants the components of its Kidde Automatic Fire/Gas Detection and Suppression System (“Product”) to the original retail purchaser or end user (herein referred to as “Customer”) when installed properly according to KAD’s installation requirement documentation in new or in-service Commercial Vehicles (“Vehicles”). This warranty is specifically conditioned upon the proper installation, handling, use, and maintenance of the products by the Customer.

WHAT IS WARRANTED

New Product supplied by KAD under any purchase order, not otherwise warranted per a separate agreement, are warranted to be free from defects in material and workmanship at the time of delivery, and for a period of thirty six (36) months thereafter, with the exception of gas sensors, which are warranted to be free from defects in material and workmanship at the time of delivery, and for a period of twelve (12) months thereafter.

This warranty is valid if the system has been installed and maintained in strict accordance with KAD Installation, Operation and/or Maintenance Manuals.

KAD will, at its option, repair or replace any Product covered by this warranty that is confirmed to be defective in material or workmanship. Any Product repaired or replaced under this warranty will remain under warranty until the end of the original warranty period described above or for sixty (60) days from the date of repair or replacement, whichever is longer.

Defective Product shall be repaired or replaced without charge for parts and labor to the Customer. Customer shall be responsible for any premium for overtime labor requested by Customer and charges for any service or maintenance not directly related to a warranted defect.

ITEMS NOT COVERED BY WARRANTY

Excluded from the warranty are products modified in any way without prior written approval of KAD, products disassembled or tampered with by anyone other than KAD or a KAD Authorized system installer, products damaged by negligence, vandalism, misuse, accident or road hazard and products damaged by the Customer or by any other third party, including a Vehicle dealer while servicing the Vehicle.

OBTAINING WARRANTY SERVICE

Warranty service must be performed by properly trained personnel in accordance with KAD Installation, Operation, and/or Maintenance Manuals. The warranted defect must be reported by the Customer to KAD or its Authorized system installer within the warranty period. The Customer must provide documentation of the warranty period commencement date.

COMPLETE WARRANTY

The only warranties made by KAD are those expressly provided for herein. Any other statements expressed in a contract or in proposals, specifications, drawings, or manuals shall not be deemed to constitute a warranty of the Product.

September 11, 2017 CON-17-0099

THE WARRANTIES SET FORTH HEREIN ARE EXCLUSIVE AND IN LIEU OF ALL OTHER WARRANTIES. NO OTHER WARRANTIES OF ANY KIND, WHATSOEVER, WHETHER EXPRESS OR IMPLIED, OR ARISING FROM COURSE OF DEALING, COURSE OF PERFORMANCE, USAGE OF TRADE, OR OTHERWISE, INCLUDING WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE, SHALL APPLY.

ADDITIONALLY, THE CUSTOMER AGREES THAT THE USE OR INCORPORATION OF ANY ARTICLE OR REPAIRS INTO KAD’S PRODUCT WHICH ARE NOT KAD APPROVED WILL RESULT IN A DISCLAIMER BY KAD OF RELATED WARRANTY OBLIGATIONS AND AN INDEMNIFICATION OF KAD FOR ANY AND ALL DAMAGES AND LIABILITY RESULTING FROM THE USE OR INCORPORATION OF SUCH ARTICLES OR REPAIRS.

THE REMEDIES SET FORTH HEREIN ARE THE SOLE AND EXCLUSIVE REMEDIES OF CUSTOMER FOR ANY CLAIMS, EXPENSES OR DAMAGE ARISING OUT OF OR RELATED TO PRODUCT DELIVERED. IN NO EVENT SHALL KAD BE LIABLE IN TORT OR CONTRACT OR UNDER ANY OTHER LEGAL OR EQUITABLE THEORY OF LAW, FOR ANY INCIDENTAL, SPECIAL, INDIRECT, OR CONSEQUENTIAL DAMAGES INCLUDING, BUT ARE NOT LIMITED TO, DAMAGE TO OR LOSS OF VEHICLE OR ANY PORTION THEREOF, LABOR EXPENSES OR LOST PROFITS ARISING OUT OF INABILITY TO USE THE VEHICLE, DOWNTIME EXPENSES SUCH AS SERVICE CALLS, TOWING COSTS, LODGING, MEALS, RENTAL VEHICLES OR ANY OTHER DOWNTIME- RELATED EXPENSES.

AUTHORITY TO MODIFY WARRANTY

Only KAD Authorized Contracts Personnel have the authority to modify the conditions, rights, obligations or limitations of this warranty. KAD Authorized system installers have no such authority, nor are they authorized to make any representation or promise on behalf of KAD.

September 11, 2017 CON-17-0099

Request for Proposal (RFP) Due 03-27-2020 RFP# 2020HDB-NC

CER 2. Request for Pre-Offer Change or Approved Equal This form must be used for requested clarifications, changes, substitutes or approval of items equal to items specified with a brand name and must be submitted as far in advance of the Due Date, as specified in “Questions, Clarifications and Omissions.”

Piedmont Authority for Regional Transportation (PART) RFP# 2020HDB-NC

– Request #: 64

Proposer: CBS / ENC RFP Section: WR 1.1.7 Serial Numbers Page: 146 of 207

Questions/clarification or approved equal: Clarification provided that ENC will provide a list of serialized units as readily available from the OEM vendor.

– □Approved – Agency action: □ Denied □See response below □ See addendum Agency response:

Page 165 of 207 Request for Proposal (RFP) Due 03-27-2020 RFP# 2020HDB-NC

CER 2. Request for Pre-Offer Change or Approved Equal This form must be used for requested clarifications, changes, substitutes or approval of items equal to items specified with a brand name and must be submitted as far in advance of the Due Date, as specified in “Questions, Clarifications and Omissions.”

Piedmont Authority for Regional Transportation (PART) RFP# 2020HDB-NC

– Request #: 65

Proposer: CBS / ENC RFP Section: WR 1.1.8 Extension of Warranty Page: 146 of 207

Questions/clarification or approved equal: If, during the warranty period, repairs or modifications on any bus are made necessary by defective design, materials or workmanship but are not completed due to lack of material or inability to provide the proper repair for thirty (30) calendar days, the applicable warranty period shall be extended by the number of days equal to the delay period.

Approval requested for the deletion of the extension of warranty as ENC does not have the authority to extend the warranty of components for OEM vendors.

– □Approved – Agency action: □ Denied □See response below □ See addendum Agency response:

Page 165 of 207 Request for Proposal (RFP) Due 03-27-2020 RFP# 2020HDB-NC

CER 2. Request for Pre-Offer Change or Approved Equal This form must be used for requested clarifications, changes, substitutes or approval of items equal to items specified with a brand name and must be submitted as far in advance of the Due Date, as specified in “Questions, Clarifications and Omissions.”

Piedmont Authority for Regional Transportation (PART) RFP# 2020HDB-NC

– Request #: 66

Proposer: CBS / ENC RFP Section: Page:

Questions/clarification or approved equal: Should the Contractor elect to not administer warranty claims on certain components and wish to transfer this responsibility to the sub‐Suppliers, or to others, the Contractor shall request this waiver.

Approval requested to delegate warranty claims responsibility for the following components whereas these suppliers only allow for warranty claims to be submitted directly to their respective authorized dealer or distributor:

1. Cummins Engine 2. Allison Transmission 3. Thermo King HVAC 4. Meritor Axles ENC will be responsible for all warranty restitution on the balance of the bus.

– □Approved – Agency action: □ Denied □See response below □ See addendum Agency response:

Page 165 of 207 Request for Proposal (RFP) Due 03-27-2020 RFP# 2020HDB-NC

CER 2. Request for Pre-Offer Change or Approved Equal This form must be used for requested clarifications, changes, substitutes or approval of items equal to items specified with a brand name and must be submitted as far in advance of the Due Date, as specified in “Questions, Clarifications and Omissions.”

Piedmont Authority for Regional Transportation (PART) RFP# 2020HDB-NC

– Request #: 67

Proposer: CBS / ENC RFP Section: WR 2.2 Repairs by the Contractor Page: 148 of 207

Questions/clarification or approved equal: Approval requested for revision of the requirement for work to begin within five (5) working days to include the caveat that ENC will work with the Agency to either begin the work or provide a developed plan to begin/complete work when additional time is required to engineer a proper repair or replace a long lead time component. Clarification provided that frequent, high usage, and fast-moving parts will be stocked and readily available.

– □Approved – Agency action: □ Denied □See response below □ See addendum Agency response:

Page 165 of 207 Request for Proposal (RFP) Due 03-27-2020 RFP# 2020HDB-NC

CER 2. Request for Pre-Offer Change or Approved Equal This form must be used for requested clarifications, changes, substitutes or approval of items equal to items specified with a brand name and must be submitted as far in advance of the Due Date, as specified in “Questions, Clarifications and Omissions.”

Piedmont Authority for Regional Transportation (PART) RFP# 2020HDB-NC

– Request #: 68

Proposer: CBS / ENC RFP Section: WR 2.3.5 Reimbursement for Labor and Other Related Costs Page: 149 of 207

Questions/clarification or approved equal: Approval requested to delete the reimbursement for vehicle recovery and towing. This is not part of our vehicle warranty coverage.

– □Approved – Agency action: □ Denied □See response below □ See addendum Agency response:

Page 165 of 207 Request for Proposal (RFP) Due 03-27-2020 RFP# 2020HDB-NC

CER 2. Request for Pre-Offer Change or Approved Equal This form must be used for requested clarifications, changes, substitutes or approval of items equal to items specified with a brand name and must be submitted as far in advance of the Due Date, as specified in “Questions, Clarifications and Omissions.”

Piedmont Authority for Regional Transportation (PART) RFP# 2020HDB-NC

– Request #: 69

Proposer: CBS / ENC RFP Section: Pricing Schedules Page: All Tabs

Questions/clarification or approved equal: Clarification requested how the Manufacturer Comments, Notes from manufacturers, Notes – Include Model # for product columns are to be included in the hard copy submittal. Agency has the printing parameters set to only include the section of the form with pricing included. Based on the Pre-Proposal meeting comments these columns will be critical to the fair evaluation of vendor offerings. Please advise.

– □Approved – Agency action: □ Denied □See response below □ See addendum Agency response:

Page 165 of 207 Request for Proposal (RFP) Due 03-27-2020 RFP# 2020HDB-NC

CER 2. Request for Pre-Offer Change or Approved Equal This form must be used for requested clarifications, changes, substitutes or approval of items equal to items specified with a brand name and must be submitted as far in advance of the Due Date, as specified in “Questions, Clarifications and Omissions.”

Piedmont Authority for Regional Transportation (PART) RFP# 2020HDB-NC

– Request #: 70

Proposer: CBS / ENC RFP Section: Tab A Price Page – Bus Page: Tab A

Questions/clarification or approved equal: In details related to base pricing under ITS System it lists a Hanover AVL/GPS/CAD/Automatic Stop Annunciation System.

Clarification requested if this is to be included in the base pricing as there is no description for this line item in the specification. In addition, it is not listed as an ALTERNATIVE nor an optional equipment. If this is to be included in the base pricing, please advise and provide configuration details of the system. If optional, please advise as well.

– □Approved – Agency action: □ Denied □See response below □ See addendum Agency response:

Page 165 of 207 Request for Proposal (RFP) Due 03-27-2020 RFP# 2020HDB-NC

CER 2. Request for Pre-Offer Change or Approved Equal This form must be used for requested clarifications, changes, substitutes or approval of items equal to items specified with a brand name and must be submitted as far in advance of the Due Date, as specified in “Questions, Clarifications and Omissions.”

Piedmont Authority for Regional Transportation (PART) RFP# 2020HDB-NC

– Request #: 71

Proposer: CBS / ENC RFP Section: Tab C Price Page – Opt Equip Page: Tab C

Questions/clarification or approved equal: Line 231, Passenger Seating, American Seating - Citiseat Line 233, Passenger Seating, USSC 4One Angel

Clarification provided that the CitiSeat is a product of Freedman. Clarification provided that the Angel seat has been discontinued by the OEM.

– □Approved – Agency action: □ Denied □See response below □ See addendum Agency response:

Page 165 of 207 Request for Proposal (RFP) Due 03-27-2020 RFP# 2020HDB-NC

CER 2. Request for Pre-Offer Change or Approved Equal This form must be used for requested clarifications, changes, substitutes or approval of items equal to items specified with a brand name and must be submitted as far in advance of the Due Date, as specified in “Questions, Clarifications and Omissions.”

Piedmont Authority for Regional Transportation (PART) RFP# 2020HDB-NC

– Request #: 72

Proposer: CBS / ENC RFP Section: Tab C Price Page – Opt Equip Page: Tab C

Questions/clarification or approved equal: Approval requested for the addition of American Seating Insight Prime along with the already listed Insight and Insight Prime+. Please reference attached brochure.

– □Approved – Agency action: □ Denied □See response below □ See addendum Agency response:

Page 165 of 207

Your INSIGHT® drives our innovation

The INSIGHT product offering combines lightweight design with superior strength, durability and comfort.

INSIGHT® INSIGHT-PRIME+® INSIGHT-PRIME® Cushion Onserts Color Inserts Textured Module

INSIGHT-PRIME+ INSIGHT-PRIME

Color-coordinating inserts available in seven standard colors. No back panel required. Seat module specifically engineered for cleanability.

INSIGHT’s Construction

Grab Handle A large, sophisticated injection mold is able to produce a sleek, one-piece seat module made of a super-dense, composite resin with an integral grab handle. Seat Module Each seat module hooks over the back side of the upper extrusion and is securely held in place by two front bolts. On two-pass transverse seats, one bolt secures Back Panel the front V-filler to the back side of the upper extrusion. This five-bolt assembly simplifies any retrofit opportunities or rare cases of maintenance needs.

Cushion Onsert INSIGHT-PRIME and INSIGHT-PRIME+ model types are built with a one-piece seat module, while INSIGHT adds a single back insert with a seat and a back cushion onserts that accept permanently bonded foam and/or upholstery. The back panel insert is held in place by six fasteners hidden by the cushion onserts. These onserts are secured to the perimeter of the seat with a quick-release system of hardware technology that does not require tools to efficiently remove and replace when required. Options

Cushion Onserts Back Extension Textured Seat Module Inserts Grab Rail Cover Without Grab Rail Plastic Back Panel Stainless-Steel Back Panel

INSIGHT PRIME PRIME+ Module Color Selection Custom colors also available, minimum order quantities and additional costs may apply Cushion Onserts •

Back Extension •

Color-Coordinating Inserts • 1471 980 989 Charcoal Grey Blue Drain Hole (Excludes Plush Pad) • • •

Grab Rail • • • Back Panel Selection Thermoplastic Grab Rail Cover • • •

Without Grab Rail • • • 1471C 980C 989C Textured Back Panel (18" only) • Charcoal Grey Blue Stainless Steel Docket 90A • • •

(Standard Materials FMVSS 302 Compliant) Insert Color Selection

Prime+ Module: Docket 90A, Prime+ Inserts: Small components are exempt 36" 36" 25" 25" 36" 36" 25" 25" 2" 2" 5 5 51" 51" 22 /8"22 /8" 200C 2169 321C 533C 368C Go 3 3 Cardinal Dark Cool Grey Teal 31 31 Navy 1 1 Cushion Onsert Selection 21 /3221" /32" 16 /1616" /16" 22 /"16 22 /"16 20 1/2" 20 1/2" 23 23 16 /1632" /32" 7 7 Standard padded cushion with optional drain hole 25 /8 "25 /8" 3 3 15 /8 "15 /8" 36" 36" Plush padded cushion 980 989 Grey Blue 16" to16" 20" to 20" 16" TO16" 18" TO 18" VR-50® Vandal-resistant cushion with optional drain hole 16" to16" 20" to 20"

25 25 CR-50® Cut-resistant cushion; available on standard and plush padded Dimensions 22 /32 22" /32"

1 1 Docket 90A foam and fabric available 36" 36" 25" 25" 36" 36" 49 /449" /4" 1-2 1-2Passenger Passenger back back op op

11 11 31 31 31 31 16 32 16 32 21 /3221" /32" 21 /3221" /32" 3 3 / " / " 13 13 7 7 31 31 49 4916" 16" 7 /8"7 /8" 22 / 822" /8" 13 13 50 5032" 32" 23 23 / / 2 /32 2" /32" / / Features 16 /1632" /32"

1 1 Contemporary Styling 19 / 1619" /16" 1MHA48L####N###1MHA48L####N### 16" to16" 20" to 20" Seat module specifically engineered for cleanability. Individual sculpted seat module with integral grab rail and back 16" to16" 18" to 18"

15 15 panel in complementary colors, with no unsightly welds or 36 /3632" /32" 18" Seat Modules 1 1 1 1 11 /3211" /32" 23 /32 23" /32" 23 23 exposed fasteners. 36" 25" 22 /2232" /32" 36" 25" 2" 2-4 2-4Passenger Passenger Back Back to Back to Back 18" to 18" 20" to 20" 85" 85" 5 51" 22 /8" 17" 17" 7 7 25 /825" /8" 36" 36" Modular Design 1 1 16 16 3 18 / 18" / " 31 1 Replacement of a single seat or21 major/32" component if necessary 16 /16" 22 /"16 20 1/2" is quicker and more economical. The23 one-piece molded seat 16 /32" 3 3 5 5 7 7 7 22 /422" /4" 10 /810" /8" 24 /3224" /32" 25 /8" module with minimal parts is unmatched in the industry. 15 15 21 21 3 36" 15 15 10 /1610" /16" 23 /2332 " 15 /32/8" 54" 54" 17 /3217" /32" 5 5 16 /16 16" /16" 16" to 20" 16" TO 18" Superior Comfort 16" to 20" 1VHA04L5#######1VHA04L5####### 94" 94" 3 3 17 /417" /4" Ergonomic seat design features the largest personal seating area, 17" Seat Modules18" 18" 25 22 /32"

increased spaciousness in legroom and back height, and padded 1 1 16 /216" /2" 1 1-2 Passenger back op seat and back cushions36" for enhanced comfort. 25" Model Types 36" 49 /4" 2-4 2-4Passenger Passenger Flip F-Uplip-Up INSIGHTINSIGHT (1) 1QKA08L####N### (1) 1QKA08L####N### • Transverse Detailed reference document 16" to16" 20" to 20"

Superior Vandal and Corrosion Resistance 31 11 31 • Transverse Flip-up 21 32" available for each model type. 16 /32" 21 /32" / 3 7 13 7 /8" 31 23 49 /16" 22 /8" 13 50 /32" Seat module constructed of advanced16 /technology32" composite • Individual (Seat) Transverse Flip-up 2 /32" resin that is colored throughout and corrosion resistant • Longitudinal (17" & 18") 36" 36"

materials. Mounting design incorporates anodized aluminum. • Longitudinal Flip-up (17" & 18") 1 3 Pa3ssenger Passenger 18 in18 longitudinal in longitudinal 19 /16" 1MHA48L####N### 11 11 26 /2616" /16" 16" to 20" • Back-to-back 16" to 18" 13 13 • Rear Cross 15 /1516" /16" 15 12 3/32"12 3/32" 36 /32" 1 1 11 /32" 23 /32" 23 5" 5" 22 /32" 2-4 Passenger Back to Back 39" 39" 18" to 20" 85"

17" 7 25 /8" 36" 1 18 /16"

14 1/4"14 1/4" 6 7/8" 6 7/8" to to 3 22 /4" 5 7 16 1/2"16 1/2" 1 1 10 /8" 24 /32" 3 /4"3 /4" 15 21 15 10 /16" 23 /32" 54" 38" +38" 1" + 1" 17 /32" 5 WEBBINGWEBBING 16 /16" 3 3 15 /1615" /16" FULLYFULLY 1VHA04L5####### EXTENDEEXTENDED D 4" 4" TransverseTransverse Barrier Barrier 21 21 1 1 94" 11 11 12 /1232" /32" 1 /4"1 /4" 26 /2616" /16" 3 18" 17 /4"

1 16 /2" 7 7 23 /823" /8" 1 1 10 /4"10 /4" 13 13 INSIGHT (1) 1QKA08L####N### 23 /2332" /32" 51" 51" 15 15 15 15 22 /2216" /16" 2" 2" 54" 54" 36 /3632" /32" 2-4 Passenger Flip-Up 16" to 20" 3 3 14 /414" /4" 1 1 17 /1617" /16" 13 13 16 /16" /16" 36"

25 25 17 17 3 Passenger 18 in longitudinal 3 /323" /32" 2 /32"2 /32" 5 7/16"5 7/16" 11 26 /16" 15 15 7 " 7 " 38 /3816" /16" 16" to16" 20" to 20" 16" to16" 20" to 20" 1 /8 1 /8 3 3 13 2 /16"2 /16" 15 /16" 8 11 /32"8 11 /32" 12 3/32" 16 1/2"16 1/2" 5" 2 25 /322"25 /32" 39" 1-3 1-3Passenger Passenger

8" 8" 16" 16"

14 1/4" 6 7/8" to 16 1/2" INSIGHTINSIGHT (2) 1MMA29L1###N#N (2) 1MMA29L1###N#NN N 1 3 /4" 38" + 1" WEBBING 3 15 /16" FULLY Transverse Barrier EXTENDED 4" 11 21 1 26 /16" 12 /32" 1 /4"

7 23 /8" 1 10 /4" 13 23 /32" 51" 15 15 22 /16" 2" 54" 36 /32"

3 14 /4" 1 17 /16" 13 16 /16"

25 17 3 /32" 2 /32" 5 7/16" 15 16" to 20" 1 7/8" 38 /16" 16" to 20" 3 2 /16" 8 11 /32" 16 1/2" 2 25 /32" 1-3 Passenger

8" 16"

INSIGHT (2) 1MMA29L1###N#NN Our Mission Since 1886, American Seating has set the standard for product design, durability and comfort. Our first transportation seat was introduced in 1931, and today we remain committed to exceeding the expectations of our customers. Our achievements serve as the platform for new and innovative products that are the benchmarks of our industry.

InSight is an iF Product Design award winner

801 Broadway Avenue NW, Grand Rapids, MI 49504-4499 Phone 616-732-6600 800-748-0268 FAX 616-732-6401 All products designed, engineered, manufactured, and tested in the USA. americanseating.com American Seating, INSIGHT, INSIGHT-PRIME and INSIGHT-PRIME+ are registered American Seating is committed to lessening our impact on the planet trademarks of American Seating Company through responsible stewardship of our environment. Form No. T-INSIGHT-18 ©2018 American Seating Company Request for Proposal (RFP) Due 03-27-2020 RFP# 2020HDB-NC

CER 2. Request for Pre-Offer Change or Approved Equal This form must be used for requested clarifications, changes, substitutes or approval of items equal to items specified with a brand name and must be submitted as far in advance of the Due Date, as specified in “Questions, Clarifications and Omissions.”

Piedmont Authority for Regional Transportation (PART) RFP# 2020HDB-NC

– Request #: 73

Proposer: Creative / ENC RFP Section: Tab C Price Page – Opt Equip Page: Tab C

Questions/clarification or approved equal: American Seating requests that the following changes be made to Optional Equipment listing:

Item 306 should read American Seating - Dual Auto Lok with Sure-Lok belt system Item 307 should read American Seating - Advanced Restraint Module (ARM) Add new item that reads American Seating - Remote Belt Release

American Seating feels that is a more accurate representation of their offering.

– □Approved – Agency action: □ Denied □See response below □ See addendum Agency response: