For every USD $1 Billion spent on infrastructure 200,000 direct jobs are created. International Labour Organization Estimate for developing countries

A sustained increase in public infrastructure spending to 5% of GDP“ would add a total of 5-6% to GDP after 15 years. International Monetary Fund FOR THE FIRST TIME IN HISTORY THE MAJOR INFRASTRUCTURE AGENCIES OF THE NATIONAL GOVERNMENT ARE TALKING AND COORDINATING

NEDA DPWH DOTr BCDA The Duterte Administration’s Infrastructure Plan WE NEED TO BUILD. BUILD. BUILD. RAILWAY 1,800-KM railway that will connect Davao to Surigao and CDO to assure cheaper and high quality produce.

PHOTOS ARE FOR REFERENCE ONLY SUBIC-CLARK CARGO RAILWAY PROJECT 65-KM cargo rail connecting Subic port and Clark Airport to facilitate faster flow of goods and services.

PHOTOS ARE FOR REFERENCE ONLY -MALOLOS-CLARK RAILWAY A 92-km line that will run from Manila to Clark. Guaranteed 1 hour from Manila to Clark airport

PHOTOS ARE FOR REFERENCE ONLY MANILA – BICOL RAILWAY 581-KM South Commuter line connecting Manila and the southern most tip of

PHOTOS ARE FOR REFERENCE ONLY REGIONAL AIRPORT DEVELOPMENT Develop regional airports for better passenger experience

PHOTOS ARE FOR REFERENCE ONLY NIGHT RATING OF AIRPORTS

19 airports are already night-rated (4 in 2016). All 42 airports will be night-rated to allow them to accommodate flights after sunset

PHOTOS ARE FOR REFERENCE ONLY CLARK INTERNATIONAL AIRPORT NEW TERMINAL BUILDING A world-class airport that can accommodate 80 million passengers by 2020 and reduce traffic congestion at NAIA. RORO PORTS DEVELOPMENT

The CENTRAL SPINE RORO Identifies strategic locations. along a Maritime Highway for safe and efficient travel of passengers and goods

PHOTOS ARE FOR REFERENCE ONLY RORO PORTS DEVELOPMENT

• Modernize sea vessels and implement stricter rules to keep maritime voyage safe.

• Empower Philippine Coast Guard and upgrade their equipment.

• Modern communication, better ports and technology-dictated systems to promote safety and efficiency in our seas

PHOTOS ARE FOR REFERENCE ONLY BUS RAPID TRAIN SYSTEM Will yield on-time trips along EDSA and speedy, comfortable travel for commuters. PROJECT

Connect major business districts and ease traffic in the metropolis • • NO GIFT POLICY

No staff can accept any kinds of gifts, especially from proponents of government projects.

PHOTOS ARE FOR REFERENCE ONLY INTEGRITY PLEDGE

SIMULTANEOUS SIGNING OF THE INTEGRITY PLEDGE. Employees of DOTr commit to ethical practices and good governance.

PHOTOS ARE FOR REFERENCE ONLY ANTI-CORRUPTION

The Department has launched an Online Zero Corruption portal where the public may send their corruption-related complaints.

PHOTOS ARE FOR REFERENCE ONLY STREAMLINE BUSINESS PROCESSES

The Department of Transportation and its attached agencies with frontline services reduced their processing time and simplified their requirements for applications, clearances, and other requests.

PHOTOS ARE FOR REFERENCE ONLY STREAMLINE BUSINESS PROCESSES • Application for new driver’s licenses: From 5 hours to 3.5 hours

• Franchise verification: From 3 days to 2 hours

• Issuance of seafarer's book: From 8 hours to 4 hours

• Issuance of permit to operate ancillary service: From one week to half a day

PHOTOS ARE FOR REFERENCE ONLY Thank you