DDHC Paper No. 4/2016 (for discussion on 1.2.2016) District Development and Housing Committee, Southern District Council Progress Report on Planning Works in Southern District

Annex 1 Matters discussed at previous meetings that required follow-up actions (Progress as at 18.1.2016)

Annex 2 Planning Department-Progress Report on Planning Works in Southern District (Progress as at 31.12.2015)

Annex 3 Highways Department-Progress Report on Road Works in Southern District (Progress as at 31.12.2015)

Annex 4 Civil Engineering and Development Department-Progress Report on Other Works in Southern District (Progress as at 31.12.2015)

Annex 5 Housing Department-Progress Report on Public Housing Works in Southern District (Progress as at 31.12.2015)

Annex 6 Food and Environmental Hygiene Department-Progress Report on FEHD District Minor Works in Southern District (Progress as at 30.12.2015)

Annex 7 Lands Department-Progress Report on Lands Department Temporary Government Lands Allocation in Southern District (Progress as at 31.12.2015)

Annex 8 Follow-up on the Land Use upon MTRC Handing Back the Lands Currently Used as Work Sites (Progress as at 31.12.2015)

Abbreviations for government departments in this report: (in alphabetical order) ArchSD Architectural Services Department CEDD Civil Engineering and Development Department DSD Drainage Services Department EPD Environmental Protection Department FEHD Food and Environmental Hygiene Department HD Housing Department HyD Highways Department LandsD Lands Department LCSD Leisure and Cultural Services Department MTR Corporation Mass Transit Railway Corporation Limited PlanD Planning Department WSD Water Supplies Department

2

Annex 1

Matters discussed at previous meetings that required follow-up actions (Progress as at 18.1.2016)

Latest Progress on Matters Date of First Discussion (Date of updates) 1. Ex- Quarry 30.11.2009 PlanD/HyD/MTR Corporation The ex-Shek O Quarry site falls within an area zoned “Undetermined” on the and Shek O Outline Zoning Plan. (10.11.2014) The then Civil Engineering Department in 1994 undertook rehabilitation works with the concept of developing the rehabilitated quarry site for recreation-related uses, such as water sports centre. The site is temporarily used as a casting basin for Shatin to Central Link by MTR Corporation and will be handed-over to LandsD in 2019. PlanD will review the zoning of the subject site and consult the District Council when appropriate.

2. Request to Improve the Drainage System of the Villages in Southern District 16.5.2011 (I) On Pokfulam Village

DSD met Mr. Chu Ching-hong, District Councillor, and the Pokfulam Village Sewerage Concern Group on 2 December (18.1.2016) 2015 and discussed the latest progress of the project. Trial pit excavation within Pokfulam Village was completed in November 2015; house connection survey and manhole survey was commenced in November 2015, and that the groundwater monitoring works at the proposed SPS site will be completed in January 2016. At present, DSD is refining the sewer alignments within Pokfulam Village and the design of the proposed sewage pumping station. In addition, DSD would shortly carry out more trial pit excavations along in the vicinity of Pokfulam Village to investigate the condition of underground utilities.

3

(II) On Shek O Village, San Wai Village, Kau Wai Village and Tai Hau Wan Village

FEHD advised that LandsD consulted relevant government departments for comments on application of the land (18.1.2016) allocation for construction of Village Public Toilet on 9.12.2015. FEHD is still pending the reply from LandsD. MTRCL expected that the site concerned will be tentatively returned to LandsD on 1.7.2016. FEHD is still pending Minor Building Works Committee of ArchSD to approve the funding application for construction of the Wong Chuk Hang San Wai Village Public Toilet.

3. Short-term and Long-term Uses of the Site of Former Aberdeen Fire Station (AFS) 26.3.2012

PlanD advised that the site is zoned “Other Specified Uses” annotated “Business(2)” (“OU(B)2”) on the Approved (7.9.2015) Aberdeen & Outline Zoning Plan No. S/H15/29. According to the Notes of the “OU(B)2” zone, ‘Place of Recreation, Sports or Culture’ use, including arts and cultural facilities, is always permitted in new ‘business’ building.

The Home Affairs Bureau (HAB) is studying the feasibility of reserving about 20,000 square feet of usable floor area in the future development of the site to provide space for supporting arts development through the Arts Development Council (ADC). Under the initial plan, there will be facilities including a number of arts studios for lease to visual artists and media artists at affordable rent, as well as ancillary facilities such as exhibition gallery, arts information centre/multi-purpose activity room, etc. Separately, it is also planned to set up the office of ADC in the site.

4. Planning Application for the “Comprehensive Development Area” Site in Wong Chuk Hang 26.11.2012

Updates on the item will be reported when there is further progress.

5. Provision of Facilities in the Convenience of Residents at the Government Land Adjacent to Jumbo Pier 4.2.2013

Proposal 2: Construction of public lavatory

FEHD advised that there is no updating for the suggested construction of a public toilet near Jumbo Pier. (18.1.2016)

4

Annex 2

District Development and Housing Committee, Southern District Council Progress Report on Planning Works in Southern District (As at 31.12.2015) I. Outline Zoning Plan

District Plan No. Project Description Remarks

The Town Planning Board (TPB) on 24.12.2015 gazetted the draft Aberdeen & Ap Details of the amendments Lei Chau Outline Zoning Plan (OZP) No. S/H15/30 under section 5 of the Town please refer to DDEC Paper Planning Ordinance for public inspection for two months. The OZP amendments No. 2/2016. mainly involve the rezoning of a site at Lee Nam Road, Ap Lei Chau, from “Other Specified Uses” annotated “Cargo Handling Area” (“OU(Cargo Handling Area)”), Aberdeen & “Government, Institution or Community” and “Industrial” (“I”) to “Residential S/H15/30 Ap Lei Chau (Group A)4” for residential development; rezoning of a strip of land fronting Ap Lei Chau West Industrial Area from “OU(Cargo Handling Area)” to “Open Space”; and rezoning the Ap Lei Chau West Industrial Area from “I” to “OU” annotated “Business(3)” and “Business(4)” to enhance the transformation of the area to business uses. Any person may make written representation in respect of the amendments to the Secretary of the TPB on or before 24.2.2016.

5

II. Planning Application Application submitted for Town Planning Board’s Consideration (1.11.2015 to 31.12.2015)

District Application No. Applied Use Location Consideration / Result Remarks

Pok Fu A/H10/89 Proposed Minor No. 138-138A, On 4.12.2015, the Metro Planning Committee (MPC) Lam Relaxation of Pok Fu Lam Road, of the Town Planning Board (TPB) agreed to defer a Site Coverage Pok Fu Lam decision on the application as requested by the Restriction for applicant. Permitted House Use and Proposed House Use

Pok Fu A/H10/90 Proposed School Shop No. 101, Chi On 6.11.2015, the MPC of TPB agreed to defer a Lam (Kindergarten Fu Landmark, Chi decision on the application as requested by the and Nursery) Fu Fa Yuen, Pok applicant. Fu Lam, Hong Kong

Wong A/H15/263 Proposed Shop Storage Unit, G/F, On 20.11.2015, the MPC of TPB decided to approve During the first three Chuk Hang and Services Union Industrial the planning application subject to the following weeks of the statutory Building, 48 Wong conditions: publication period Chuk Hang Road, (a) the submission and implementation of the proposal which ended on Hong Kong for fire safety measures, including the provision of 28.8.2015, no public a means of escape completely separated from the comment was received. industrial portion and fire service installations in the application premises, to the satisfaction of the Director of Fire Services or of the TPB before operation of the use; and (b) if the above planning condition is not complied with before the operation of the use, the approval hereby given shall cease to have effect and shall on the same date be revoked without further notice.

6

District Application No. Applied Use Location Consideration / Result Remarks

Wong A/H15/264 Proposed Hotel 43 Heung Yip On 6.11.2015, the MPC of TPB agreed to defer a Chuk Hang Road, Wong Chuk decision on the application as requested by the Hang applicant.

Wong A/H15/265 Proposed Hotel 41-43 Wong Chuk On 6.11.2015, the Metro Planning Committee (MPC) During the first three Chuk Hang Hang Road, of the Town Planning Board (TPB) decided to approve weeks of the statutory Aberdeen, Hong the planning application subject to the following public inspection Kong conditions: period, which ended on (a) the proposed hotel development is subject to a 23.10.2015, no public maximum gross floor area (GFA) of 7,969m2. Any comment was received. floor space that is constructed or intended for use as additional plant rooms and back of house facilities as specified under Regulation 23A(3)(b) of the Building (Planning) Regulations shall be included in the GFA calculation; (b) the design and provision of parking facilities, loading/unloading spaces and lay-bys for the proposed development to the satisfaction of the Commissioner for Transport or of TPB; (c) the submission of a Sewerage Impact Assessment (SIA) to the satisfaction of the Director of Environmental Protection or of TPB; (d) the implementation of the local sewerage upgrading/sewerage connection works identified in the SIA to the satisfaction of the Director of Drainage Services or of TPB; (e) the submission and implementation of a landscape proposal to the satisfaction of the Director of Planning or of TPB; and (f) the provision of fire service installations and water supplies for fire-fighting being provided to the satisfaction of the Director of Fire Services or of TPB.

7

III. Hotel Developments in Wong Chuk Hang Business Area Approved by Town Planning Board with Planning Permission Still Valid

Location Remarks

Planning permission valid until Sep 2017. [The previous lease modification application for non-industrial use (including hotel) was 1. 39 Wong Chuk Hang Road withdrawn by the applicant in 11/2012. The existing lease is for industrial use and hotel is not permitted.] The lot owner is currently applying lease modification for proposed covered footbridge link.

Planning permission valid until Nov 2019. [The previous lease modification application for non-industrial use (including hotel) was 2. 41-43 Wong Chuk Hang Road withdrawn by the applicant in 11/2012. The existing lease is for industrial use and hotel is not permitted.]

8

Annex 3

District Development and Housing Committee, Southern District Council Progress Report on Road Works in Southern District (As at 31.12.2015)

I. Preliminary Project Plan of Construction Works

Project Est. (Actual) Start Est. (Actual) PWP No. / Cat. Type Agency Progress / Remarks Description Date Completion Date

N.A. – Junction Transport Chung Hom Kok Road and Stanley Gap Under review Under review Improvement at Department Road junction is confined by the adjacent Chung Hom Kok slopes, with limited road space. Junction Road / Stanley improvement works will require substantial Gap Road slope works, transplanting a large number of trees, and temporary closure of traffic lanes. Transport Department advised that they have recently carried out traffic survey in the area and the traffic condition is considered acceptable. If other works are to be carried out at the above area in future, such as slope upgrading works, or new private development, Transport Department will request the project proponent to carry out the junction improvement works.

9

Annex 4

District Development and Housing Committee, Southern District Council Progress Report on Other Works in Southern District (As at 31.12.2015)

I. Works Commenced

Est. (Actual) Est. (Actual) PWP No. / Cat. Project Description Agency Progress / Remarks [Completion rate (%)] Start Date Completion Date 186WC/A Replacement and WSD Water mains replacement and rehabilitation works in (3.2009) 6.2016 Rehabilitation of Water Southern District under Contract No. 18/WSD/08 Mains Stage 3 commenced on 18 March 2009. Works currently being carried out in Southern District include:

(a) Pok Fu Lam Road Footpath and Carriageway (8.2010) 6.2016 (connection works in progress) [93%]; (b) Road Footpath (Pending for XP issue for (7.2011) 6.2016 remaining connection works) [99%]; (c) Red Hill Service Reservoir (connection works in (10.2010) 3.2016 progress) [98%]; (d) Stanley Gap Road Carriageway (connection works in (3.2010) 6.2016 progress) [95%]; (e) Stanley Village Road Footpath and Carriageway (9.2010) 6.2016 (connection works in progress) [95%]; (f) Area in the vicinity of Pok Fu Lam Service Reservoir (11.2011) 3.2016 (connection works in progress) [96%]; (g) Repulse Bay Road Carriageway (Pending for XP issue (2.2012) 6.2016 for remaining connection works) [99%]; and (h) Pok Fu Lam Village (connection works in progress) (11.2011) 3.2016 [98%].

10

Est. (Actual) Est. (Actual) PWP No. / Cat. Project Description Agency Progress / Remarks [Completion rate (%)) Start Date Completion Date 191WC/A Replacement and WSD Contract No.12/WSD/10, which consists of construction (7.2011) 3.2017 Rehabilitation of Water works in Southern District, commenced on 18 July 2011. Mains Stage 4 Phase 1 Works are being carried out. Works in Southern District are as below:

(a) Consort Rise Footpath and Carriageway (in progress) (1.2012) 6.2016 [92%] [Reason: The alignment was required to be further reviewed due to congested UU. TTA was required to be revised.]; (b) Bisney Road Footpath and Carriageway (in progress) (1.2012) 6.2016 [90%] [Reason: The alignment was required to be further reviewed due to congested UU. TTA was required to be revised.]; (c) Area in the vicinity of Aberdeen Water Treatment (4.2012) 4.2016 Works (in progress) [98%] [Reason: Water suspension required for water connection works involved a large affected area which included sensitive consumers (i.e. Hospitals). Therefore, extra coordination work is required with the affected premises. The pressure logging for connection works is in progress.]; (d) Deep Water Bay Road Footpath and Carriageway (in (11.2012) 5.2016 progress) [98%] [Reason: Water suspension required for water connection works involved a large affected area which included Fresh Water Service Reservoir. Therefore, extra coordination work is required with the affected premises. ]; (e) Wah King Street Footpath and Carriageway (in (1.2014) 9.2016 progress) [85%] [Reason: Additional mainlaing works are required to facilitate the connection works as the original connection point is covered by electric cables excavation permits are granted.];

11

Est. (Actual) Est. (Actual) PWP No. / Cat. Project Description Agency Progress / Remarks [Completion rate (%)) Start Date Completion Date (f) Victoria Road Footpath and Carriageway (in progress) (1.2014) 3.2017 [90%] [Reason: There was interface with Towngas at Shek Pai Wan Road and RMO did not allow concurrent TTA to be implemented within 300m. The excavation permit has been expired and the new excavation permit is targeted to be granted in June 2016]; (g) Repulse Bay Road Carriageway near Belleview Drive (1.2016) 12.2016 (in progress) [3%] (h) Aberdeen Praya Road Carriageway (in progress) [40%] (10.2015) 3.2017 (i) Wong Chuk Hang Road footpath (in progress) [50%] (10.2015) 8.2016

12

Contract No.3/WSD/12, which consists of construction (3.2013) 4.2016 works in Southern District, commenced on 15 March 2013. Works are being carried out. Works in Southern District are as below:

(a) Pok Fu Lam Road near Pok Fu Lam Garden Footpath (8.2013) 4.2016 and Carriageway (in progress) [70%] [Reason: We experienced substantial amount of hard materials (e.g. rocks and boulders) during excavation. Hence, the progress of works was affected.]; and (b) Shek O Village Road Footpath and Carriageway (8.2013) (12.2015) (Completed) [100%]. (c) Aberdeen Praya Road near Fish Marketing (11.2015) 4.2016 Organization at Footpath and Carriageway (in progress) [80%].

341DS/A Harbour Area Drainage The item comprises upgrading of the Stonecutters Island (8.2011) 9.2016 Treatment Scheme, Services Sewage Treatment Works and eight numbers of stage 2A - Department preliminary treatment works at . The Upgrading of project has been fully commissioned in November 2015. Stonecutters Island sewage treatment Contract DC/2009/24 (Harbour Area Treatment Scheme works and Stage 2A Upgrading of Preliminary Treatment Works preliminary (PTWs) at Sandy Bay, , , Aberdeen and treatment works Ap Lei Chau), being part of the works of the above item, has commenced on 31/8/2011. The works mainly include the upgrading of the sewage treatment and de-odourisation facilities in these PTWs. About 78% of works under the contract has been completed. 13

Progress Report on Landslip Prevention and Mitigation Works I. Works Commenced PWP No. Project Description Agency Progress / Remarks [Completion rate (%)] Est. (Actual) Est. (Actual) / Cat. Start Date Completion Date Head 705 Landslip Prevention CEDD Landslip prevention and mitigation works for 102 man-made slopes and 3 Subhead and Mitigation natural hillside study areas 11SW-C/SA3, 15NW-B/SA1 and 11SW-C/SA4 are 5001BX Programme (LPMitP) completed. Landslip prevention and mitigation works for 12 man-made slopes and 8 natural hillside study areas are currently in progress.

1. Slope No. 15NE-A/C96 at South Bay Road [50%] (3.2014) 4.2016 2. Slope No. 15NE-A/C115 at Repulse Bay Road [50%] (3.2014) 4.2016 3. Slope No. 15NE-A/F68 at Repulse Bay Road [40%] (3.2014) 7.2016 4. Slope No. 11SW-C/F210 at East of Electric Sub-station, along Victoria (6.2014) (10.2015) Road [100%] (Works Completed) 5. Slope No. 11SW-C/F222 at Victoria Road [100%] (Works Completed) (8.2014) (11.2015) 6. Slope No. 11SW-C/FR350 at Waterfall Bay Park, Pok Fu Lam (8.2014) (11.2015) [100%] (Works Completed) 7. Slope No. 15NE-B/C26 at Shek O Road [100%] (Works Completed) (12.2014) (10.2015) 8. Slope No. 15NW-B/C117 at Island Road [100%] (Works Completed) (11.2014) (9.2015) 9. Slope No. 11SW-A/C477 at Pok Fu Lam Road (1.2015) (9.2015) [100%] (Works Completed) 10. Slope No. 15NE-A/CR40 at Repulse Bay Road [60%] (2.2015) 2.2016* 11. Slope No. 11SW-C/F443 at Pok Fu Lam Road [60%] (3.2015) 2.2016* 12. Slope No. 11SW-C/F444 at Pok Fu Lam Road [60%] (3.2015) 2.2016* 13. Slope No. 15NE-A/CR603 at Tai Tam Reservoir Road (3.2015) (9.2015) [100%] (Works Completed) 14

PWP No. Project Description Agency Progress / Remarks [Completion rate (%)] Est. (Actual) Est. (Actual) / Cat. Start Date Completion Date 14. Slope No. 15NE-B/C27 at Shek O Road [60%] (3.2015) 2.2016* 15. Slope No. 15NE-B/C72 at Big Wave Bay Road (3.2015) (11.2015) [100%] (Works Completed) 16. Slope No. 15NW-B/FR42 at Lee Chi Road, Ap Lei Chau (3.2015) (12.2015) [100%] (Works Completed) 17. Slope No. 11SE-D/C406 near the junction between Shek O Road & Cape (4.2015) (12.2015) Collinson Road [100%] (Works Completed) 18. Slope No. 15NE-C/C309 at Tung Tau Wan Road [60%] (6.2015) 2.2016* 19. Slope No. 15NE-B/C28 at Shek O Road [10%] (9.2015) 3.2016 20. Slope No. 15NE-B/C145 at Big Wave Bay Picnic Area [10%] (10.2015) 3.2016 21. Slope No. 11SW-D/CR141 at Shouson Hill Road [5%] (11.2015) 2.2016 22. Slope No. 15NW-B/C136 at Main Street, Ap Lei Chau [5%] (11.2015) 7.2016 23. 2 Natural hillside study areas behind Queen Mary Hospital (1.2012) 3.2016 (Study Area Numbers 11SW-C/SA1 and 11SW-C/SA2) [90%] 24. 1 Natural hillside study area above Ap Lei Chau Bridge Road (1.2014) 3.2016* (Study Area Number 15NW-B/SA5) [95%] 25. 1 Natural hillside study area above Ruby Court at South Bay Road (3.2014) 9.2016 (Study Area Number 15NE-A/SA3) [40%] 26. 1 Natural hillside study area at Shouson Hill (4.2014) 3.2016* (Study Area Number 11SW-D/SA12) [70%] 27. 1 Natural hillside study area above Pok Fu Lam Road (11.2014) 3.2017* (Study Area Number 11SW-C/SA5) [20%] 28. 1 Natural hillside study area at Shek Pai Wan Road, Aberdeen (9.2015) 3.2017 (Study Area Number 11SW-C/SA5) [5%]

15

PWP No. Project Description Agency Progress / Remarks [Completion rate (%)] Est. (Actual) Est. (Actual) / Cat. Start Date Completion Date 29. 1 Natural hillside study area above Ap Lei Chau fronting the Aberdeen (12.2015) 1.2017 Channel (Study Area Number 15NW-B/SA2) [5%]

* Anticipated completion date is revised as the works have been affected by inclement weather

Head 705 Landslip Prevention CEDD In the coming year, CEDD is planning to progressively commence the landslip Subhead and Mitigation prevention and mitigation works for other 14 man-made slopes and 1 natural 5001BX Programme (LPMitP) hillside study area.

1. Slope No. 15NE-A/C13 at Repulse Bay Road @ @ 2. Slope No. 15NE-A/C70 at Repulse Bay Road @ @ 3. Slope No. 15NW-B/C54 at Island Road @ @ 4. Slope No. 15NE-A/CR45 at Repulse Bay Road @ @ 5. Slope No. 15NE-B/C235 at Shek O Road @ @ 6. Slope No. 11SW-D/C2259 at Deep Water Bay Drive 4.2016 9.2016 7. Slope No. 11SW-C/CR874 at Victoria Road 5.2016# 9.2016# 8. Slope No. 11SW-C/R407 at Aberdeen Praya Road 4.2016# 12.2016 9. Slope No. 11SW-D/C1058 at Hong Kong Police College Lower Range, 1.2016 12.2016 Police School Road, Aberdeen 10. Slope No. 11SW-D/R1222 at Near Lamppost No. 35053, Aberdeen 8.2016 1.2017 Reservoir Road 11. Slope No. 11SW-D/R1223 at Near Lamppost No. 35053, Aberdeen 8.2016 1.2017 Reservoir Road 12. Slope No. 15NE-C/FR154 at Behind Correctional Services Department 8.2016 4.2017 Staff Quarters (Front Block), Stanley 16

PWP No. Project Description Agency Progress / Remarks [Completion rate (%)] Est. (Actual) Est. (Actual) / Cat. Start Date Completion Date 13. Slope No. 11SW-D/C1440 at Yue Kwong Road 4.2016 9.2016 14. Slope No. 15NE-A/R244 at Repulse Bay Main Sewage Pumping Station 4.2016 9.2016 15. 1 Natural hillside study area at Ap Lei Chau 2.2016# 8.2017# (Study Area Number 15NW-B/SA6)

# # # Anticipated start date and completion date are revised due to reschedule of works programme @ Anticipated start date and completion date will be re-scheduled due to re-programming of works

17

Annex 5

District Development and Housing Committee, Southern District Council Progress Report on Public Housing Works in Southern District (As at 31.12.2015)

I. Works Commenced (up to the end of two financial years later)

Project Description Est. (Actual) PWP / Estate Responsible Team Est. (Actual) Start Date Remarks Completion Date Lift Modernisation BSE/CM2 May 2014 (May 2014) June 2017 The lift modernisation project for Ap Lei for Ap Lei Chau Chau Estate involves four sections of works. Estate The works for the five lifts in Section I (Lei Yee House L2; Lei Ning House L4; and Lei Chak House L8, L11 and L14) were completed. The works for the ten lifts in Section II (Lei Yee House L3; Lei Ning House L5; Lei Chak House L7, L10 and L15; Lei Tim House L16; Lei Fook House L20 and L24; and Lei Moon House L26 and L30), commencing in mid-April 2015 in phases, will be completed in the first quarter of 2016.

18

II. Works with Tender Value above $1Million in 2009-2010

Project Description Est. (Actual) PWP / Estate Responsible Team Est. (Actual) Start Date Completion Date Remarks

Lift Modernisation BSE/HW (June 2011) February 2016 The lift modernisation work for Wah Fu (I) and for Wah Fu (I) & (II) Estates involves five sections of works. (II) Estates Five lifts involved in Section I had been completed in 2012. Another five lifts involved in Section II were completed and put into operation in October 2013.

The works for four lifts in Section III and IV (Wah Chui House L2, Wah King House L6, Wah Cheong House L12 and Wah Chun House L8) were completed. Wah Chun House L8 was put into operation in October 2014 while the other lifts were also completed in advance and put into operation in late December 2014.

The works for three lifts in Section V (Wah Chui House L1, Wah King House L5 and Wah Cheong House L11) were completed and had been put into operation in mid -January 2016.

19

Annex 6

District Development and Housing Committee, Southern District Council Progress Report on FEHD District Minor Works in Southern District (As at 31.12.2015)

Estimated Estimated Completion Item Proposed Start Date Date FEHD Contact ASD Contact Location Remarks No. Minor Works [Actual [Actual Person Person Start Date] Completion Date]

------

20

Annex 7

District Development and Housing Committee, Southern District Council Progress Report on Lands Department Temporary Government Lands Allocation in Southern District (As at 31.12.2015) Type of TGLA Remarks Item TGLA No./ (New/ Proposed Proposed Proposed User Dept. Date of Date of (Current No. File Ref. Renewal) Location Area (m2) User Term (Allocatee) Allocation Withdrawn Situation)

1. GLA-THK 1981 New Government land 52 RCP From the FEHD - - Departmental 612/SHGS/82 opposite to 18-21 date of circulation Bisney Road approval for completed. 5 years Being considered.

2. GLA-THK 1753 Renewal Government land 126 Car parking Extend up to C of P Departmental 504/SHGS/82 between No.24 and spaces 11.2.2018 circulation 25 Shum Wan completed. Road, Wong Chuk Pending Hang approval.

3. GLA-THK1853 Renewal Northern Coastline 1,550 Works Area Extend up to DSD - - DSD submitted 546/SHGS/82 of Ap Lei Chau 16.5.2016 this proposal next to Ap Lei for DDEC’s Chau Park (i.e. the present DDHC) consideration 21

Type of TGLA Remarks Item TGLA No./ (New/ Proposed Proposed Proposed User Dept. Date of Date of (Current No. File Ref. Renewal) Location Area (m2) User Term (Allocatee) Allocation Withdrawn Situation)

during meeting on 20.7.2015 who supported the proposal. Under departmental circulation. 4. GLA-THK1892 Renewal Tin Wan Praya 820 Works Area Extend up to DSD - - Departmental L/M Road, Aberdeen 30.6.2016 circulation 988/SHMS/82 A completed. Pending approval.

GLA-THK1550 Renewal Hok Tsui Village 667 Sitting out area Extend up to HAD, - - Departmental 5. 413/SHGS/82 and meeting 30.6.2017 DO(S) circulation venue completed. Pending approval.

22

Type of TGLA Remarks Item TGLA No./ (New/ Proposed Proposed Proposed User Dept. Date of Date of (Current No. File Ref. Renewal) Location Area (m2) User Term (Allocatee) Allocation Withdrawn Situation)

6. GLA-THK950 Renewal At Stanley Gap 127 Manoeuvring Extend up to WSD - - Departmental 177/HGS/82 Road and/or Parking of 31.5.2020 circulation Waterworks completed. Vehicles to/from Pending Stanley Mound approval. Fresh Water Pumping Station & Extension

7. GLA-THK 2003 New Sandy Bay, 3,590 Works Area From the CEDD - - Departmental 3/SHGS/2015 Pok Fu Lam date of circulation possession completed. for 4 years Objections being handled by CEDD.

8. GLA-THK 1785 Renewal Cyberport Road, 7,010 Sewage Extended up DSD - - Departmental 394/SHGS/82 Pok Fu Lam Treatment Plant to circulation 31.12.2017 completed. Being considered.

23

Type of TGLA Remarks Item TGLA No./ (New/ Proposed Proposed Proposed User Dept. Date of Date of (Current No. File Ref. Renewal) Location Area (m2) User Term (Allocatee) Allocation Withdrawn Situation)

9. GLA-THK 1875 Renewal Sandy Bay, 1,480 Works Area Extended up DSD - - Under 988/SHMS/82B Pok Fu Lam to 30.6.2016 departmental circulation.

10. GLA-THK 1538 Renewal Pak Sha Wan, Ap 799 Works Area for Extended up LCSD - - Under L/M 7/SHGS/82 Lei Chau installation and to 30.6.2018 departmental (68) maintenance of circulation. Shark Prevention Nets

11. GLA-THK 1922 Renewal Ap Lei Chau Praya 666 Works Area for Extended up HyD - - Departmental 574/SHGS/82 Road, Ap Lei Chau management and to 30.6.2021 circulation for maintenance of renewal is Roads under processing

12. GLA-THK 2007 New Chung Hom Kok 4,580 Works Areas and From the WSD Under 6/SHGS/2015 Storage date of departmental Compounds approval to circulation. 31.12.2017

24

Annex 8 District Development and Housing Committee, Southern District Council Follow-up on the Land Use upon MTRC Handing Back the Lands Currently Used as Work Sites (As at 31.12.2015)

Location Anticipated Approximate Managing Planned Use/Follow-up Actions Date of First Discussion Handover Area Size Agent (Provided by Managing Department/Agent) Date (m2) (Date of updates) Site next to 2Q-3Q 2016 5,800 LandsD Long-term planned use of the land is to be advised by 26.1.2015 Ocean Park (Proposed (Subject to PlanD. LandsD would facilitate any application for Extension) MTRCL’s use of the land in accordance with applicable (19.1.2016) confirmation procedures. of the boundary of (PlanD’s comments: The subject site falls within an the subject area zoned “Government, Institution or Community” site) (“G/IC”) on the approved Aberdeen & Ap Lei Chau Outline Zoning Plan No. S/H15/29 and is reserved for provision of GIC facilities.)

25

Location Anticipated Approxim Managing Planned Use/Follow-up Actions Date of First Discussion Handover ate Area Agent (Provided by Managing Department/Agent) Date Size (Date of updates) (m2) Chung Hom Handed over 2,500 LandsD Long-term planned use of the land is to be advised by 26.1.2015 Shan Magazine PlanD. LandsD would facilitate any application for Site use of the land in accordance with applicable (26.1.2015) procedures.

(PlanD’s comments: The subject site falls within an area zoned “Other Specified Uses” annotated “Composite Signals Organization Station Complex” on the approved Stanley Outline Zoning Plan No. S/H19/10 intended primarily to provide land for composite signals organization station complex and its ancillary facilities.) Chung Hom 2nd Half 2017 6,400 LandsD Long-term planned use of the land is to be advised by 26.1.2015 Shan Nursery (To tie in with the PlanD. LandsD would facilitate any application for Site next to latest progress of use of the land in accordance with applicable (10.9.2015) Magazine Site the reprovisioning procedures. works at Harcourt Garden, some of (PlanD’s comments: The subject site falls within an the trees area zoned “Other Specified Uses” annotated temporarily “Composite Signals Organization Station Complex” transplanted from on the approved Stanley Outline Zoning Plan No. Harcourt Garden S/H19/10 intended primarily to provide land for at the Chung Hom composite signals organization station complex and 26

Shan Nursery Site its ancillary facilities.) need to be maintained for a longer period. The reprovisioning is expected to be substantially completed by the end of 2017.)

27