Road and Rail Press Briefing
#YII2016 1 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated What We Will Cover Today
• Transportation industry overview • OpenRoads CONNECT Edition • Rail around the world • OpenRail ConceptStation • Conference Highlights • Conclusion and Q&A
2 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated Introductions
Steve Cockerell Dustin Parkman Jeremy Shaffer
Industry VP Civil Design Senior Marketing and Reality Director Director – Modeling OpenRail Road and Rail
3 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated Get the Event App!
• Scan the QR Tag on any of the App conference signage
• Scan the code in the program guide
• Search for “Year in Infrastructure” in the App stores
4 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated Look out for these icons!
5 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated Software Access Programs
Technology Preview A pre-release of some or all capabilities of a software product or service, made available to Accounts for feedback, evaluation, and planning.
A Technology Preview program where a pre-release is made available by invitation only.
A Technology Preview program where a pre-release is made available to all Users.
A release of all capabilities of a software product or service, and made available to all Users.
6 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated Transportation Infrastructure Investment
Government led Airports • population growth $447
• urbanization Ports • climate change $458
Rail Project pipeline Roads $2,518 • road = $1 trillion $1,021 • rail = $2.5 trillion
Global • Asia to outperform ROW Value Of Transport Projects In • developed vs emerging Development, USD $billions • emerging dominated by rail
Source: BMI Key Projects Database 7 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated Maryland State Highway Administration’s Routing and Permitting Solution to Save Carriers USD 24 Million Annually Maryland State Highway Administration – Motor Carrier Division Maryland State Highway Administration
• Problem: • Issuance of oversize / overweight permits ensuring safe travel of permitted loads across the state
• Outcomes: • Reduced time spent on bridge analysis and permit issuance • Single point of contact for all billing and invoices
• Project Playbook: • SUPERLOAD, LARS, InspectTech
9 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated Maryland State Highway Administration
“Our new Bentley Maryland One System allows carriers anywhere in the world to use any device and browser to apply for OS/OW permits 24 hours a day, seven days a week, and have them routed, analyzed, and automatically system issued up to configurable thresholds.”
– Tina Sanders, technical support manager, Motor Carrier Division, Maryland State Highway Administration
10 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated Major Road Investment by Region
Project Pipeline Value (USDbn) By Region and Procurement Type
Source: BMI Key Projects Database 11 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated OpenRoads CONNECT Edition Advances Roadway Projects from Conception through Construction OpenRoads CONNECT Edition: Advances Roadway Projects from Conception through Construction
• Capabilities: • Rapid conception and preliminary design • Assure design intent in model sign Intent • Integrate multiple disciplines (utilities, SUE, bridge design) • Create more deliverables • Increase visibility in project performance • Automate drawing production • Key Points: The application provides complete detailed design capabilities for surveying, drainage, subsurface utilities, and roadway design.
13 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated OpenRoads From Concept through Construction Dustin Parkman, VP Civil & Reality Modeling OpenRoads
15 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated Digital Construction
Detailed Design
Conceptual Design
16 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated ContextCapture
17 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated Make Better Decisions in Planning
18 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated Design with Real World Context
19 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated Ensure Efficient Construction
20 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated Deliver Digital Data To Operations
21 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated 22 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated 23 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated Digital Construction
Detailed Design
Conceptual Design
24 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated OpenRoads ConceptStation
25 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated Create Innovative and Inspiring Designs
26 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated Rapidly Explore Design Alternatives
27 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated Understand Financial Implications Early
28 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated OpenRoads ConceptStation Transforms Preliminary Design of New I-84 / Route 8 Interchange HNTB Corporation HNTB Corporation
• Problem: • Recommend preferred alternative and develop detailed design for upgraded interchange to current standards
• Outcomes: • Optioneering on condensed site • Rapid review of scheme in a rich 3D environment
• Project Playbook: MicroStation, ProjectWise, OpenRoads ConceptStation, OpenBridge Modeler
30 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated 31 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated Digital Construction
Detailed Design
Conceptual Design
32 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated Digital Construction
Detailed Design
Conceptual Design
33 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated Converging…OpenRoads Designer is Here!
InRoads GEOPAK
OpenRoads
OpenRoads Designer MX
34 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated OpenRoads Designer
35 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated Rapidly Model Design Intent
36 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated Integrate Multiple Disciplines
37 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated Create More Deliverables
38 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated Live demo video OR_Designer_YII_Short.mp4 (4 Minutes)
39 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated OpenRoads Designer CONNECT Edition
Product: OpenRoads Designer Release: Early Access Release Available: December 1, 2016
40 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated Bentley’s Expanded Bridge Design Capabilities Ensure the Delivery of Safe, Economical Structures Even in Demanding Locations OpenBridge Modeler
42 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated Create Bridge Models with Ease
43 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated Adapt to Change
44 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated Create Accurate Deliverables
45 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated Live demo video OBM_YII_Short.mp4 (4 Minutes)
46 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated Bentley’s Expanded Bridge Design Capabilities OpenBridge Modeler, RM, and LEAP
Capabilities: • Access civil data to integrate with the overall infrastructure project • Interoperate with roadway design and bridge analysis applications • Enliven designs with lifelike renderings • Evaluate dynamic response caused by wind and wave loading, in time domain Availability: • General Access • Now Available
47 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated Digital Construction
Detailed Design
Conceptual Design
48 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated Digital Construction
Detailed Design
Conceptual Design
49 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated OpenRoads Navigator
50 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated Improve Office to Field Collaboration
51 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated 52 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated OpenRoads
53 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated Rail Around the World Steve Cockerell, Industry Marketing Director - Road and Rail Jeremy Shaffer, Senior Director Fastest Growing Transportation Sector
Airports $447
Ports $458
Rail Roads $2,518 $1,021
Value Of Transport Projects In Development, USD $billions
Source: BMI Key Projects Database 55 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated Global Development
China
United States
India
Japan
United Kingdom
Brazil
Saudi Arabia
Australia
Qatar
Italy
0 100 200 300 400 500 Top Ten By Value: Rail Projects In Planning, USDbn Source: BMI Key Projects Database
56 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated Bentley’s Rail and Transit Solution
57 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated Support for All Modes of Rail and Transit
58 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated Rail Around the World – Utah Transit Authority
59 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated Utah Transit Authority • Problems: • Maintain single source of truth for authorities infrastructure assets • Optimally develop programs to keep all assets in state of good repair
• Outcomes: • National exemplar for transit asset management • Strategy in place to include rail data providing greater reliability • Links field and management personnel for real-time condition reporting and future projections
• Project Playbook: • InspectTech and Optram
60 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated Utah Transit Authority
By developing risk-based asset management, UTA reduced costs, mitigated disruption of service, avoided potential loss of ridership, and experienced higher customer satisfaction.
- Paul Edwards, P.E. Senior Program Manager Utah Transit Authority Asset Management at UTA
61 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated Rail Around the World – HDR Inc
2015 Special Recognition Award for Advancing Integrated Projects
62 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated Rail Around the World – New York MTA
63 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated North America’s Largest Transit System Seeks the Best for Asset Management New York MTA
Road and Rail Forum Wednesday November 2nd 16:00 – 16:30 Blenheim New York MTA
• Problem: • One of the world’s largest transit systems • Aging and highly utilized network with significant on-going maintenance and rehab needs • Spending over $26B in next 4 years on renewal and enhancements needs
• Goals: • Identification and prevention of problems before they become serious issues • Know how best to keep system in a State of Good Repair
• Project Playbook: • MicroStation, Optram, InspectTech, AssetWise APM
65 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated Bentley’s AssetWise CONNECT Edition Connected Data Environment both Comprehensive Project Delivery and Comprehensive Asset Performance: TOTEX! AssetWise: Advancing Asset Performance
• Capabilities: • Connected Data Environment • Information in Context • Spatial & Network Aware • Dashboards & Analytics • Aligned Commercial Model • Key Points: Uniquely enables performance improvement across the asset lifecycle through the continuity of digital engineering models and new subscription options
67 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated Management of change Reduce risk of failure and throughout the asset lifecycle improved asset reliability, integrity, and performance
Asset Lifecycle Asset Information Reliability Management
Asset Performance Modeling
Enterprise Compliance Interoperability & Safety Visibility of mission-critical Achieve operational excellence asset information Operational Analytics
Better operational decisions
68 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated Rail Around the World – Crossrail Ltd
69 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated Crossrail BIM Strategy: Deliver Best Practice in Lifecycle Information Management
• Provide effective management of all information assets Crossrail Ltd. throughout the lifecycle London • Create an integrated 3D information model, facilitating United Kingdom multidisciplinary collaboration through design, construction and on to operations and maintenance
• Enable effective handover of ‘valuable information’ to form the base of the operational asset management “Exploiting the latest digital technology to ensure that detailed design system information was available for the maintenance and operation phases offered a ‘huge’ opportunity to make savings over the whole lifecycle of new infrastructure”. Crossrail is to provide its supply chain with access to the Bentley applications and design tools that it requires them to use.”
– Andrew Wolstenholme, CEO Crossrail Ltd.
70 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated Vision… Build Two Railways ...Virtual - Physical Virtual World Physical World
Visualisations
Spatial
3D Models
Information & Data Linking Data Information& Assets
Documentation 71 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated Crossrail
Total Typical Registered Outcome (Mid-Project): Users Daily Usage Users 13,173 1,377 3,335 • Increased productivity (2000-2016) users (current)
• Ensures compliance to standards Database Repository Documents
• Improved cost and time certainty 50GB 5.5 TB 2,154,720 • Reduced risk Recorded Files Assets Events 2,425,046 436,633 451,656 (current)
72 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated Data Quality Control
73 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated Contract Management
74 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated Construction - BIM used for 4D Simulation
75 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated Rail Around the World – Mott MacDonald / FLO JV
2016 Innovation in Rail Finalist - Northern Line Extension
77 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated Rail Around the World – Banedanmark
2016 Innovation in Rail Finalist
78 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated Denmark's First High Speed Line Targets On-time and On-budget Delivery Using State of the Art Technology Banedanmark
Tuesday November 1st 15:30 – 16:00 Buckingham Banedanmark
• Problem: • Design and build Denmark's first high speed railway, including 60 kilometres of line, 4 tunnels, and 88 bridges
• Outcomes: • Strategic project “The Digital Railway of Future” establishing BIM methodology for use on all future projects
• Project Playbook: • MicroStation, ProjectWise, Bentley Rail Track, PowerCivil for Sweden, Bentley Map, Navigator
80 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated Banedanmark
“Bentley's commitment to providing the tools necessary to support the whole lifecycle of assets and interoperability with other design and construction software means that Banedanmark’s project information is usable, well-coordinated and well-documented.”
– Gita Mohshizadeh, CAD manager, Banedanmark
81 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated Rail Around the World – FUT - Sweco / TYPSA
2016 Innovation in Rail Finalist
82 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated Complete Lifecycle BIM Approach Enables Efficient Collaboration and Approvals for Stockholm Metro Extension FUT - Sweco / TYPSA
Tuesday November 1st 16:30 – 17:00 Buckingham FUT- Sweco / TYPSA
• Problem: • Design and build 11 kilometers of new track, rock tunnels, and 7 stations
• Outcomes: • Lifecycle BIM approach across multiple disciplines and offices, significant efficiency gains
• Project Playbook: • MicroStation, ProjectWise, Navigator, Bentley Rail Track, OpenRoads, gINT, ContextCapture, Descartes, AECOsim Building Designer
84 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated FUT - Sweco / TYPSA
“Bentley solutions support our integrated design process between all disciplines, helping us to control work frequently and in a better way to ensure quality on this megaproject. The use of a common data environment managed by ProjectWise has been key to improving the overall design process and integrating multi-discipline teams.”
– Daniel Ahnsjö, Business Area Manager VDC for Sweco
85 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated Rail Around the World – Doha Metro Red Line
2015 Innovation in Rail Submission - Atkins
86 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated Rail Around the World – Guangzhou Metro
2016 Innovation in Rail Submission
87 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated Guangzhou Metro Design Establishes BIM Processes on New Line’s First Subway Loop Guangzhou Metro Design and Research Institute Co., Ltd Guangzhou Metro Design and Research Institute
• Problem: • Design and build 32,000 m2 underground station, linked with Shiliugang Station via 1.5 kilometers of new track
• Outcomes: • Significant time, effort and CNY 1.6 million in project costs saved using BIM models
• Project Playbook: • MicroStation, ProjectWise, Navigator, OpenRoads, AECOsim Building Designer, ProStructures, Bentley Raceway and Cable Management, Bentley Substation, ConstructSim Work Package Server
89 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated Guangzhou Metro Design and Research Institute
“Three-dimensional collaborative design using Bentley software has helped Guangzhou Metro Design and Research Institute improve design efficiency and quality.”
– Wang Jian, director of structure, Guangzhou Metro Design and Research Institute
90 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated Rail Around the World – India
91 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated Top Ten Indian Metro Projects
Project Name Value Size (km) Start Date End Date Status (USD mn) Mumbai Metro Rail 8,030.00 146.5 2008 2021 Under construction Project, Maharashtra Delhi Metro Rail – 7,500.00 103.93 2018 2021 Approved Phase IV Gurgaon – Manesar – 4,268.00 108 - - Planning Bawai Metro Rail Bangalore Metro Rail 4,160.00 15.5 - 2019 Planning Project Phase II Namma Metro 4,044.00 72 2015 2023 Under construction Phase II – Bangalore Hyderabad Metro Rail - 4,000.00 72 2012 2018 Under construction Phase I Prime Minister Modi has declared an Namma Metro 2,200.00 42.3 2007 2016 Under construction Phase I – Bangalore intention to have metros in at least 50 cities across the country - expanding Chennai Metro Rail 2,187.00 45.1 2009 2016 Under construction Project - Phase I from the current eight systems Chandigarh Metro 2,070.00 37.57 - 2018 Planning operating in the country Railway Project Lucknow Metro Rail - 2,055.00 23 2014 2017 Under construction Uttar Pradesh $40 billion USD
Source: BMI Key Projects Database 92 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated OpenRail ConceptStation CONNECT Edition Accelerate Rail and Transit Design with OpenRail ConceptStation OpenRail ConceptStation
• Powerful tool for rail planners and designers • Rapid 3D engineering sketches of railways, roads, bridges, intersection, ramps, and other structures • Integration of all context data • Fast cost and quantities estimation • Real-time high-end, game-like visualization • Seamless interoperability with OpenRoads and other Bentley civil products for multi- modal products
94 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated ConceptStation – India 1
• Alignment and bridges plus buildings
95 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated ConceptStation – India 1
• Alignment and bridges plus buildings
96 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated 97 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated ConceptStation – India 2
98 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated 99 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated OpenRail ConceptStation CONNECT Edition
Product: OpenRail ConceptStation Release: Limited Access Release Available: Q1, 2017
100 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated Bentley Rail Summary
• Covers all modes of rail from high speed to transit to freight • Supports standards and requirements around the world • Bentley is advancing BIM through the entire lifecycle • Conceptual Planning • Detailed Design • Construction • Operations and Maintenance • Connected Data Environment • Delivering on time projects and better performing assets
101 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated Conference Highlights Conference Schedule Highlights
• Tuesday • 8:30 Meet the Be Inspired finalists • 10:30 Finalists presentations • 12:00 Lunch • 13:30 Technology keynote • 15:30 Finalist presentations • 19:30 Welcome reception
• Wednesday • 9:00 Bentley keynote: Converging and Connecting • 10:00 Executive keynote panel • 10:45 Executive keynote • 11:30 Lunch • 13:00 Industry Forums • 18:00 Be Inspired Awards Reception • 19:00 Be Inspired Awards Dinner and Ceremony
103 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated Conference Schedule Highlights
• Thursday • 9:00 Industry Forums • 11:30 Lunch • 13:00 Industry Forums • 15:30 Close
104 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated Must See Rail and Road Forum Sessions
• Transportation Technology Consumption Report • Mark Hansford – New Civil Engineer • Rail Asset Management • Mike Salvato - New York MTA • The Very Model of a Railway • Ted Stephens – Solution Exec (Retired) • Improving Asset Management on Indian Railways • Mr Awasthi – Indian Railways • The Culture of Innovation • Bill Vavrik, Ph.D., P.E. - Applied Research Associates, Inc. • Road Process Advancement • Krzysztof Ciacka - CH2M • James Colclough - MSc CMILT CGeog (GIS)
105 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated Innovation in Road Finalists
• Beta 2 Engenharia • Roundabout of Ribeirão Preto • Ribeirão Preto, São Paulo, Brazil • Costain Carillion Joint Venture • A5 - M1 Link, Dunstable Northern Bypass • Dunstable, United Kingdom • Inspec Nederland BV • A27/A12 Ring Utrecht • Utrecht, Netherlands
Tuesday November 1st 10:30 – 12:00 Buckingham
106 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated Innovation in Rail Finalists
• Banedanmark • The New Line Copenhagen-Ringsted • Copenhagen, Denmark • Mott MacDonald / FLO Joint Venture • Northern Line Extension • London, United Kingdom • FUT - Sweco / TYPSA • Metro Extension in Stockholm • Stockholm, Sweden
Tuesday November 1st 15:30 – 17:00 Buckingham
107 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated Innovation in Bridge Finalists
• Guizhou Transportation Planning Survey & Design Academy Co., Ltd • Guizhou Ping-Luo Expressway Pingtang Bridge • Qiannan, Guizhou, China • MCC TianGong Group Tianjin Corporation, Ltd • BIM Technology Application in Bageng Bridge Project of Guangxi Baijing Expressway • Baise City, Guangxi Zhuang, China • Ministerio Obras Publicas de Chile • Chacao Bridge • Island of Chiloe, Llanquihue, Chile
Tuesday November 1st 17:30 – 19:00 Park
108 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated Innovation in Land Development Finalists
• Beijing Shougang International Engineering Technology Co., Ltd • Xishi Winter Olympics Square Project of Shougang Industrial Area Transformation • Shijingshan, Beijing, China • Tract Consultants Pty., Ltd • Phillip Island Penguin Viewing Platform • Phillip Island, Victoria, Australia • Voyants Solutions Pvt., Ltd • Feasibility Study and Associated Preliminary and Detail Designs in Secondary Cities and Agatare Informal Settlement • Kigali, Nyarugenge District, Rwanda
Tuesday November 1st 15:30 – 17:00 Park
109 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated Innovation in Reality Modeling Finalists
• CH2M Fairhurst Joint Venture • A9 Dualing Program • Glengarry to Dalraddy, Scotland • City of Helsinki • Helsinki 3D+ • Helsinki, Finland
Tuesday November 1st 17:30 – 19:00 Blenheim
110 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated Summary Highlights for Press
• OpenRoads CONNECT Edition • OpenRoads Designer is here! • From Conception through Construction • Rail Around the World • Enabling BIM for Rail • OpenRail ConceptStation Connect Edition • Advancement Insights • Banedanmark: Denmark’s first high speed railway • Sweco/TYPSA JV: Stockholm Metro extension • Guangzhou Metro Design: BIM on first subway loop • Maryland State Highways Administration: USD 24 million saving • HNTB: Transforming preliminary design in Connecticut
112 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated Important Media Day Reminders!
• English Pub Dinner – Tonight Press Members & Be Inspired Finalists • Busses Departs at 5:30pm from the West Wing Foyer
• Twitter : #YII2016
• Check out Bentley’s Virtual Press Kit www.bentley.com/yiivpk
The Counting House Built in 1893
113 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated Thank You! 114 | #YII2016 THE YEAR IN INFRASTRUCTURE 2016 ©2016 Bentley Systems, Incorporated