2836-S.E AMS WM S5586.2

By Senator ESHB 2836 - S COMM AMD By Committee on Ways & Means

1 Strike everything after the enacting clause and insert the 2 following:

3 "NEW SECTION. Sec. 1. A supplemental capital budget is hereby 4 adopted and, subject to the provisions set forth in this act, the 5 several dollar amounts hereinafter specified, or so much thereof as 6 shall be sufficient to accomplish the purposes designated, are hereby 7 appropriated and authorized to be incurred for capital projects during 8 the period beginning with the effective date of this act and ending 9 June 30, 2011, out of the several funds specified in this act.

10 PART 1 11 GENERAL GOVERNMENT

12 Sec. 1001. 2009 c 497 s 1005 (uncodified) is amended to read as 13 follows: 14 FOR THE DEPARTMENT OF ((COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT)) 15 COMMERCE 16 Local and Community Projects (20064008) 17 The reappropriation in this section is subject to the following 18 conditions and limitations: (1) $64,319 of the remaining 19 reappropriation for El Centro de la raza may be used for building 20 infrastructure. (2) $10,000 of the remaining reappropriation for 21 miracle league handicapped baseball may be used for pre-grading and 22 resurfacing construction. (3) $1,394,107 of the remaining 23 reappropriation for MOBIUS/inland northwest science and technology 24 center may be used for building design ((and)), construction, and 25 renovation. (4) $500,000 of the remaining reappropriation for the 26 Soundway property preservation project may be used by the city of 27 Seattle, in cooperation with the nature consortium for habitat, 28 recreation improvements, or stewardship of the property, if the city of

Code Rev/KK:cro Official Print - 1 S-5586.2/10 1 Seattle enacts pending city legislation to preserve the property and 2 place it under the jurisdiction of city of Seattle parks and 3 recreation. (5) The reappropriation is adjusted for the transfer of 4 the Vancouver national historical reserve west barracks project to the 5 state historical society and the termination of the 6 following projects that are no longer viable: (a) Snohomish senior 7 center and (b) central area motivation program (CAMP). 8 Reappropriation: 9 State Building Construction Account--State . . . . (($10,658,000)) 10 $9,258,000 11 Prior Biennia (Expenditures) ...... $37,141,000 12 Future Biennia (Projected Costs) ...... $0 13 TOTAL ...... (($47,799,000)) 14 $46,399,000

15 Sec. 1002. 2009 c 497 s 1013 (uncodified) is amended to read as 16 follows: 17 FOR THE DEPARTMENT OF ((COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT)) 18 COMMERCE 19 Job and Economic Development Grants (20064950) 20 The ((re))appropriation in this section is subject to the following 21 conditions and limitations: 22 (1) The ((re))appropriation is subject to the provisions of section 23 107, chapter 371, Laws of 2006. 24 (2) The ((re))appropriation is subject to the project list in 25 section 107, chapter 371, Laws of 2006. 26 (3) Up to $1,000,000 of the ((re))appropriation for the Pacific 27 Northwest national labs campus infrastructure project is provided 28 solely for giga-pop infrastructure. 29 (4) Up to $2,200,000 of the ((re))appropriation is provided solely 30 for military communities infrastructure projects. Military communities 31 infrastructure projects shall include: 32 (a) Grants to counties and cities for the purchase of development 33 easements and the purchase of real property in fee simple to restrict 34 the use of accident potential zones and clear zones. The office of 35 financial management shall establish a competitive process for

Code Rev/KK:cro Official Print - 2 S-5586.2/10 1 selecting projects to receive the grants. Final allocation of these 2 grants shall be at the discretion and with the approval of the director 3 of the office of financial management. 4 The grants are subject to the following conditions: 5 (i) The county or city must be subject to and in compliance with 6 RCW 36.70A.530; 7 (ii) The grants may not be used to remove encroachments into these 8 zones allowed by county or city zoning or permitting actions; 9 (iii) The county or city must have an encroachment prevention plan 10 preventing future encroachment into these zones; and 11 (iv) The grant provided by the state must not exceed one-third of 12 the project cost with funds from local and federal sources providing 13 the balance of the funds. 14 (b) Up to $481,000 of the ((re))appropriation is provided solely 15 for improvements to a military department site on Fairchild air force 16 base. 17 Reappropriation: 18 Public Works Assistance Account--State ...... (($14,172,000)) 19 $1,733,000 20 Appropriation: 21 State Building Construction Account--State ...... $12,439,000 22 Prior Biennia (Expenditures) ...... $35,828,000 23 Future Biennia (Projected Costs) ...... $0 24 TOTAL ...... $50,000,000

25 Sec. 1003. 2009 c 497 s 1029 (uncodified) is amended to read as 26 follows: 27 FOR THE DEPARTMENT OF ((COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT)) 28 COMMERCE 29 Local and Community Projects (20084001) 30 The reappropriation in this section is subject to the following 31 conditions and limitations: 32 (1) The projects must comply with RCW 43.63A.125 and other 33 requirements for community projects administered by the department. 34 (2) The reappropriation is subject to the provisions of section 35 1008, chapter 328, Laws of 2008.

Code Rev/KK:cro Official Print - 3 S-5586.2/10 1 (3) $1,000,000 of the remaining reappropriation for the Evergreen 2 school district health and biosciences academy may be used for land 3 acquisition. If the facility is not constructed by June 30, 2015, the 4 school district shall reimburse the state an amount equal to $1,000,000 5 increased by the average percentage appreciation in property values for 6 undeveloped land in the surrounding area between the date the school 7 district acquired the property and June 30, 2015 or the date the school 8 district disposes of the property. 9 (4) $600,000 of the remaining reappropriation for the institute for 10 community leadership may be used for land acquisition. 11 (5) $250,000 of the remaining reappropriation for the Pacific 12 Northwest ilocandia association may be used for acquisition and 13 renovation. 14 (6) $200,000 of the remaining reappropriation for the library 15 connection at Greenbridge may be used for construction and equipment. 16 (7) $1,000,000 of the remaining reappropriation for the Evergreen 17 school district health and biosciences academy may be used for land 18 acquisition. 19 (8) The remaining reappropriation for the Mobius/inland northwest 20 science and technology center may be used for building design, 21 construction, and renovation. 22 (9) The reappropriation is adjusted for the transfer of the 23 Vancouver national historical reserve project to the Washington state 24 historical society; the reduction of $1,400,000 from the Tacoma narrows 25 bridge lights project; and the termination of the following projects 26 that are no longer viable: (a) Camp kilworth land acquisition - 27 Federal Way, (b) Kitsap SEED, and (c) Seatac world war I memorial 28 plaza. 29 Reappropriation: 30 State Building Construction Account--State . . . . (($61,200,000)) 31 $56,650,000 32 Prior Biennia (Expenditures) ...... $71,694,000 33 Future Biennia (Projected Costs) ...... $0 34 TOTAL ...... (($132,894,000)) 35 $128,344,000

36 Sec. 1004. 2009 c 497 s 1019 (uncodified) is amended to read as 37 follows:

Code Rev/KK:cro Official Print - 4 S-5586.2/10 1 FOR THE DEPARTMENT OF ((COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT)) 2 COMMERCE 3 Public Works Trust Fund (20074005) 4 Reappropriation: 5 Public Works Assistance Account--State ...... (($232,000,000)) 6 $132,000,000 7 State Taxable Building Construction Account-- 8 State ...... $95,000,000 9 Subtotal Reappropriation ...... (($327,000,000)) 10 $227,000,000 11 Appropriation: 12 State Taxable Building Construction Account-- 13 State ...... $100,000,000 14 Prior Biennia (Expenditures) ...... $0 15 Future Biennia (Projected Costs) ...... $0 16 TOTAL ...... $327,000,000

17 Sec. 1005. 2009 c 497 s 1023 (uncodified) is amended to read as 18 follows: 19 FOR THE DEPARTMENT OF ((COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT)) 20 COMMERCE 21 Job Development Fund Grants (20074010) 22 The ((re))appropriation in this section is subject to the following 23 conditions and limitations: 24 (1) The ((re))appropriation is subject to the provisions of section 25 1032, chapter 520, Laws of 2007. 26 ((The appropriation in this section is subject to the following 27 conditions and limitations: The)) (2) $3,000,000 of the appropriation 28 is provided solely for a grant to the port of Grays Harbor for the bulk 29 liquid facility project. 30 Reappropriation: 31 Job Development Account--State ...... (($22,228,000)) 32 $4,298,000 33 Appropriation: 34 ((Job Development Account--State ...... $3,000,000)) 35 State Building Construction Account--State ...... $20,930,000

Code Rev/KK:cro Official Print - 5 S-5586.2/10 1 Prior Biennia (Expenditures) ...... $24,702,000 2 Future Biennia (Projected Costs) ...... $0 3 TOTAL ...... $49,930,000

4 Sec. 1006. 2009 c 497 s 1030 (uncodified) is amended to read as 5 follows: 6 FOR THE DEPARTMENT OF ((COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT)) 7 COMMERCE 8 Community Development Fund (20084850) 9 The reappropriation in this section is subject to the following 10 conditions and limitations: 11 (1) The reappropriation is subject to the provisions of section 12 1014, chapter 328, Laws of 2008. 13 (2) $105,521 of the remaining reappropriation for El Centro de la 14 raza center may be used for building infrastructure. 15 (3) $1,000,000 of the remaining reappropriation for the Salishan 16 housing community project may be used for infrastructure and housing. 17 (4) The reappropriation is adjusted for the termination of the 18 homesight center project which is no longer viable. 19 Reappropriation: 20 State Building Construction Account--State . . . . . (($9,715,000)) 21 $9,465,000 22 Prior Biennia (Expenditures) ...... $11,451,000 23 Future Biennia (Projected Costs) ...... $0 24 TOTAL ...... (($21,166,000)) 25 $20,916,000

26 Sec. 1007. 2009 c 497 s 1031 (uncodified) is amended to read as 27 follows: 28 FOR THE DEPARTMENT OF ((COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT)) 29 COMMERCE 30 Belfair Sewer Improvements (20084852) 31 Reappropriation: 32 State Building Construction Account--State ...... $5,500,000 33 ((Public Works Assistance Account--State ...... $4,800,000 34 Subtotal Reappropriation ...... $10,300,000)) 35 Appropriation:

Code Rev/KK:cro Official Print - 6 S-5586.2/10 1 State Building Construction Account--State ...... $4,800,000 2 Prior Biennia (Expenditures) ...... $0 3 Future Biennia (Projected Costs) ...... $0 4 TOTAL ...... $10,300,000

5 Sec. 1008. 2009 c 497 s 1034 (uncodified) is amended to read as 6 follows: 7 FOR THE DEPARTMENT OF ((COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT)) 8 COMMERCE 9 Quillayute Valley Wood-Fire Boiler (20084858) 10 Reappropriation: 11 Energy Freedom Account--State ...... (($1,000,000)) 12 $20,000 13 Appropriation: 14 State Building Construction Account--State ...... $980,000 15 Prior Biennia (Expenditures) ...... $0 16 Future Biennia (Projected Costs) ...... $0 17 TOTAL ...... $1,000,000

18 Sec. 1009. 2009 c 497 s 1035 (uncodified) is amended to read as 19 follows: 20 FOR THE DEPARTMENT OF ((COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT)) 21 COMMERCE 22 Snohomish County Biodiesel (20084859) 23 Reappropriation: 24 Energy Freedom Account--State ...... (($500,000)) 25 $419,000 26 Appropriation: 27 State Building Construction Account--State ...... $81,000 28 Prior Biennia (Expenditures) ...... $0 29 Future Biennia (Projected Costs) ...... $0 30 TOTAL ...... $500,000

31 Sec. 1010. 2009 c 497 s 1039 (uncodified) is amended to read as 32 follows: 33 FOR THE DEPARTMENT OF ((COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT))

Code Rev/KK:cro Official Print - 7 S-5586.2/10 1 COMMERCE 2 Drinking Water State Revolving Fund Loan Program (30000005) 3 Appropriation: 4 Drinking Water Assistance Account--State ...... (($8,000,000)) 5 $10,930,000 6 Drinking Water Assistance Repayment Account--State . . $31,201,000 7 Subtotal Appropriation ...... (($39,201,000)) 8 $42,131,000 9 Prior Biennia (Expenditures) ...... $0 10 Future Biennia (Projected Costs) ...... $215,974,000 11 TOTAL ...... (($255,175,000)) 12 $258,105,000

13 Sec. 1011. 2009 c 497 s 1040 (uncodified) is amended to read as 14 follows: 15 FOR THE DEPARTMENT OF ((COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT)) 16 COMMERCE 17 Building for the Arts Grants (30000006) 18 The appropriation in this section is subject to the following 19 conditions and limitations: 20 (1) Projects must be selected based on their readiness to proceed. 21 (2) The appropriation is provided solely for the following list of 22 projects:

23

24 Admiral Theatre-No Theatre Left $140,000 25 Behind 26 ((Artspace Everett Lofts $1,000,000)) 27 Building a Foundation for Discovery $250,000 28 Campus Consolidation (Cornish) $375,000 29 Convert Key Bank to Everett's Plaza $500,000 30 Theatre 31 Cottage Renovation (Hedgebrook) $20,000 32 Downstairs at the 5th $800,000 33 Federal Way Performing Arts Center $325,000 34 Gateway Center (Lummi) $150,000

Code Rev/KK:cro Official Print - 8 S-5586.2/10 1 James Center for the Performing Arts $150,000 2 (Sequim) 3 Langston Hughes Performing Arts $475,000 4 Center 5 Legacy Project (Imagine) $200,000 6 Modular Classrooms for Dance $30,000 7 (Gladish) 8 Mt. Baker Theatre $1,000,000 9 Museum Expansion (Maryhill) $1,500,000 10 New Hands On Children's Museum $1,000,000 11 Reconstruction of First Stage $400,000 12 (Issaquah) 13 Seattle Opera Center $650,000 14 Stage Two (Whidbey) $450,000 15 Vashon Arts Center $1,115,000 16 Visual Arts Education Center $1,000,000 17 (Snohomish County) 18 Viva Vera Capital Campaign $70,000 19 20 Total (($11,600,000)) $10,600,000

21 Appropriation: 22 State Building Construction Account--State . . . . (($11,600,000)) 23 $10,600,000 24 Prior Biennia (Expenditures) ...... $0 25 Future Biennia (Projected Costs) ...... $48,000,000 26 TOTAL ...... (($59,600,000)) 27 $58,600,000

28 Sec. 1012. 2009 c 497 s 1045 (uncodified) is amended to read as 29 follows: 30 FOR THE DEPARTMENT OF ((COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT)) 31 COMMERCE 32 Housing Assistance, Weatherization, and Affordable Housing 33 (30000013) 34 The appropriations in this section are subject to the following 35 conditions and limitations:

Code Rev/KK:cro Official Print - 9 S-5586.2/10 1 (1) $7,000,000 of the appropriations is provided solely for 2 facilities housing low-income migrant, seasonal, or temporary 3 farmworkers. The operation of the facilities built under this section 4 shall be in compliance with 8 U.S.C. Sec. 1342. The department shall 5 work with the farmworker housing advisory committee to prioritize 6 funding of projects to the areas of highest need. Funding may also be 7 provided, to the extent qualified projects are submitted, for health 8 and safety projects. Any of this appropriation that is not obligated 9 by June 30, 2011, shall be added to the amount appropriated for the 10 general pool of projects. 11 (2) $3,000,000 of the appropriations is provided solely to promote 12 development of safe and affordable housing units for persons eligible 13 for services from the division of developmental disabilities within the 14 department of social and health services. 15 (3) $10,000 of the appropriations is provided solely to the 16 ((Ballard food bank/Ballard homes for all coalition)) St. Luke's 17 Lutheran Church/Interfaith Task Force on Homelessness for the 18 construction of a mobile camp facility. 19 (4) $2,500,000 of the appropriations is provided solely for the 20 development of farm infrastructure improvements. Any of this 21 appropriation that is not obligated by June 30, 2011, must be added to 22 the amount appropriated for the general pool of projects. 23 (5) $1,000,000 from the taxable bonds account is provided solely 24 for the development or preservation of farmworker housing for migrant 25 and seasonal farmworkers located on private farms. 26 (6) $5,000,000 of the appropriation from the state building 27 construction account is provided solely to build low- income housing 28 units in underserved communities and to concurrently develop capacity 29 in these same communities. Underserved communities of concern are 30 those that have high levels of poverty, specifically, thirty percent of 31 the local median income; experience chronic homelessness; and lack 32 affordable housing. Underserved communities include veterans, 33 immigrants, refugees, and those communities of color disproportionately 34 impacted by chronic homelessness and lack of affordable housing. The 35 department shall collaborate with representatives of underserved 36 communities and organizations committed to assistance in these efforts 37 to prioritize and plan distribution of funding.

Code Rev/KK:cro Official Print - 10 S-5586.2/10 1 (7) The department may not make loans from capital bond proceeds 2 appropriated in this section if the appropriations are also obligated 3 for other grants or loans or if the anticipated repayments of the loans 4 are from future state legislative appropriations. 5 (8) The legislature recognizes and supports the housing priorities 6 reflected in the American recovery and reinvestment act of 2009 with 7 the estimated amount of $144,000,000 provided solely for the following 8 programs: 9 (a) The community development fund's neighborhood stabilization 10 fund to purchase and rehabilitate foreclosed vacant properties and to 11 help create affordable housing and stabilize neighborhoods. 12 (b) The public housing capital fund to assist housing authorities 13 build and rehabilitate low-income housing stock. Housing authorities 14 are required to give priority consideration to the rehabilitation of 15 vacant rental units and capital projects that are already underway or 16 included in the five-year capital fund plans. 17 (c) HOME funding to the Washington state housing finance commission 18 for a competitive program pursuant to the qualified allocation plan to 19 owners of projects who have received or receive simultaneously an award 20 of low-income housing tax credits under section 42(h) of the internal 21 revenue code of 1986. 22 (d) Weatherization appropriated in section 1052 of this act for 23 grants and loans to local energy programs for weatherization of 24 multifamily and single family homes. 25 (9) $5,000,000 is provided solely for two geographically diverse 26 projects that serve security lifeline clients who are homeless and have 27 a mental or behavioral health disorder. This housing must be provided 28 in coordination with community agencies who can offer supportive 29 services. 30 (10) Up to $25,000,000 of the appropriation is for the department 31 of commerce to contract with the Washington state housing finance 32 commission to provide equity funding and administration necessary to 33 implement the Washington works housing program and to facilitate 34 nonprofit entities' use of tax-exempt multifamily bonds issued by the 35 Washington state housing finance commission. The projects receiving 36 these funds shall meet the affordability requirement for the period 37 after initial bond indebtedness, as established in section 2(2) of 38 chapter 6, Laws of 2010.

Code Rev/KK:cro Official Print - 11 S-5586.2/10 1 Appropriation: 2 State Building Construction Account--State . . . . (($30,000,000)) 3 $34,500,000 4 State Taxable Building Construction 5 Account--State ...... (($60,000,000)) 6 $85,500,000 7 Washington Housing Trust Account--State ...... $10,000,000 8 Subtotal Appropriation ...... (($100,000,000)) 9 $130,000,000 10 Prior Biennia (Expenditures) ...... $0 11 Future Biennia (Projected Costs) ...... $400,000,000 12 TOTAL ...... (($500,000,000)) 13 $530,000,000

14 Sec. 1013. 2009 c 497 s 1046 (uncodified) is amended to read as 15 follows: 16 FOR THE DEPARTMENT OF ((COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT)) 17 COMMERCE 18 Community Schools (91000002) 19 The appropriation in this section is subject to the following 20 conditions and limitations: The appropriation in this section is 21 provided solely for the following: 22 (1) The acquisition, rehabilitation, expansion, or improvement of 23 surplus school buildings to be converted into community facilities for 24 the delivery of nonresidential coordinated services for children and 25 families. 26 (a) Eligible applicants include local governments, nonprofit 27 organizations, nonprofit early learning providers, and tribal 28 governments. Only the following surplus schools may be eligible for 29 grant funding under this section: Fauntleroy school, University 30 Heights school, and Martin Luther King elementary school. 31 (b) As part of the grant process, applicants must submit a 32 comprehensive plan for the use of the surplus school that includes 33 information on the following: 34 (i) A list of partner entities that will assist the lead eligible 35 applicant to provide or coordinate services for children and families;

Code Rev/KK:cro Official Print - 12 S-5586.2/10 1 (ii) A memorandum of understanding between the lead eligible 2 applicant and each partner; and 3 (iii) An examination of capital and operating funding sources that 4 applicants intend to apply to the project and coordinated services at 5 each school to be served, whether such funding is derived from grants 6 under this section or from other federal, state, local, or private 7 sources. 8 (c) Project applicants must demonstrate that the proposed project 9 is ready to proceed, will make timely use of the funds, and requires 10 state funding to accomplish a discrete, usable phase of the project 11 that may include acquisition. 12 (d) If grant funds under this subsection are used for the 13 acquisition of surplus school facilities, the sale proceeds must be 14 used by the local school board disposing of such property for 15 renovation, replacement, or new construction of school facilities in 16 the district, but shall not be used as local match for projects 17 receiving state school construction assistance grants. 18 (e) In contracts for grants authorized under this subsection, the 19 department shall include provisions that require that capital 20 improvements must be held by the grantee for a specified period of time 21 appropriate to the amount of the grant and that facilities must be used 22 for the express purpose of the grant. If the grantee is found to be 23 out of compliance with provisions of the contract, the grantee shall 24 repay to the state general fund the principal amount of the grant plus 25 interest calculated at the rate of interest on state of Washington 26 general obligation bonds issued most closely to the date of 27 authorization of the grant. 28 (2) The construction of a non-mobile facility, accessible to 29 students in central and eastern Washington for the purpose of financial 30 literacy education, for the eastern and western Washington junior 31 achievement world initiative. 32 (3) $1,500,000 of the appropriation in this section is provided 33 solely for acquisition of the Martin Luther King elementary school. 34 This is in addition to the amount provided for the Martin Luther King 35 elementary school in section 1033, chapter 497, Laws of 2009. 36 Appropriation: 37 State Building Construction Account--State . . . . . (($5,000,000)) 38 $6,500,000

Code Rev/KK:cro Official Print - 13 S-5586.2/10 1 Prior Biennia (Expenditures) ...... $0 2 Future Biennia (Projected Costs) ...... $0 3 TOTAL ...... (($5,000,000)) 4 $6,500,000

5 Sec. 1014. 2009 c 497 s 1048 (uncodified) is amended to read as 6 follows: 7 FOR THE DEPARTMENT OF ((COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT)) 8 COMMERCE 9 Local and Community Projects (30000019) 10 The appropriation in this section is subject to the following 11 conditions and limitations: 12 (1) Prior to receiving funds, project recipients must demonstrate 13 that the project site is under control for a minimum of ten years, 14 either through ownership or a long-term lease. This requirement does 15 not apply to appropriations for preconstruction activities or 16 appropriations whose sole purpose is to purchase real property that 17 does not include a construction or renovation component. 18 (3) Projects funded in this section may be required to comply with 19 Washington's high performance building standards as required by chapter 20 39.35D RCW. 21 (4) Project funds are available on a reimbursement basis only, and 22 shall not be advanced under any circumstances. 23 (5) Projects funded in this section must be held by the recipient 24 for a minimum of ten years and used for the same purpose or purposes 25 intended by the legislature as required in RCW 43.63A.125(2)(c). 26 (6) Projects funded in this section, including those that are owned 27 and operated by nonprofit organizations, are generally required to pay 28 state prevailing wages. 29 (7) Except as directed otherwise prior to the effective date of 30 this section, the department shall not expend the appropriations in 31 this section unless and until the nonstate share of project costs have 32 been either expended, or firmly committed, or both, in an amount 33 sufficient to complete the project or a distinct phase of the project 34 that is useable to the public for the purpose intended by the 35 legislature. 36 (8) The appropriation is provided solely for the following list of 37 projects:

Code Rev/KK:cro Official Print - 14 S-5586.2/10 1 Local Community Projects 2 3 7th St. Theater $330,000 4 Arc of Tri-Cities $900,000 5 Bellevue Clinic--Seattle Children's Hospital $2,000,000 6 Blessed Sacrament Food and Emergency Facilities Renovation $200,000 7 Children's Village Expansion Project $500,000 8 Clark County Food Distribution Facility $1,500,000 9 Coal Creek YMCA (Newcastle) $800,000 10 Dawson Place Child Advocacy Center $1,000,000 11 Federal Way National Little League Field Lighting Project and Monument Entry Sign $177,000 12 Harlequin Theater $235,000 13 Home Dialysis Center and Professional Workforce Training $250,000 14 Kirkland Park Place Redevelopment $2,000,000 15 Livingston Baker Fire and Life Safety $750,000 16 Marshland Diking District $500,000 17 Marysville Boys & Girls Club $500,000 18 McClure Middle School Energy Saving Performance Contract Demonstration Project $1,000,000 19 Mountains to Sound Greenway $100,000 20 Mukilteo Boys & Girls Club $150,000 21 Neighborcare Health Clinic and Rainier Beach Medical Clinic $1,000,000 22 Parkland at Japanese Gulch $1,000,000 23 Petrovitsky Park Upgrade $750,000 24 Phoenix House $200,000 25 Poulsbo Marine Center $500,000 26 Public Broadcasting Frequency Expansion $223,000 27 ((Ready by Five Early Learning Center $1,000,000)) 28 Renovations to Mill Creek City Annex Building $30,000 29 Snohomish County Emergency Center $1,000,000 30 South Tacoma Community Center $1,000,000 31 Whatcom Hospice House $700,000 32 Zina Linnik $950,000

33 Appropriation: 34 State Building Construction Account--State . . . . (($21,245,000)) 35 $20,245,000

Code Rev/KK:cro Official Print - 15 S-5586.2/10 1 Prior Biennia (Expenditures) ...... $0 2 Future Biennia (Projected Costs) ...... $0 3 TOTAL ...... (($21,245,000)) 4 $20,245,000

5 NEW SECTION. Sec. 1015. A new section is added to 2009 c 497 6 (uncodified) to read as follows: 7 FOR THE DEPARTMENT OF COMMERCE 8 2010 Local and Community Projects (30000082) 9 The appropriation in this section is subject to the following 10 conditions and limitations: 11 (1) Prior to receiving funds, project recipients must demonstrate 12 that the project site is under control for a minimum of ten years, 13 either through ownership or a long-term lease. This requirement does 14 not apply to appropriations for preconstruction activities or 15 appropriations whose sole purpose is to purchase real property that 16 does not include a construction or renovation component. 17 (2) Projects funded in this section may be required to comply with 18 Washington's high performance building standards as required by chapter 19 39.35D RCW. 20 (3) Project funds are available on a reimbursement basis only, and 21 shall not be advanced under any circumstances. 22 (4) Projects funded in this section must be held by the recipient 23 for a minimum of ten years and used for the same purpose or purposes 24 intended by the legislature as required in RCW 43.63A.125(6). 25 (5) Projects funded in this section, including those that are owned 26 and operated by nonprofit organizations, are generally required to pay 27 state prevailing wages. 28 (6) Except as directed otherwise prior to the effective date of 29 this section, the department shall not expend the appropriations in 30 this section unless and until the nonstate share of project costs have 31 been either expended, or firmly committed, or both, in an amount 32 sufficient to complete the project or a distinct phase of the project 33 that is useable to the public for the purpose intended by the 34 legislature. 35 (7) The appropriation is provided solely for the following list of 36 projects:

Code Rev/KK:cro Official Print - 16 S-5586.2/10 1 Local Community Projects 2 Aviation High School $2,000,000 3 Children's Village Expansion $250,000 4 East King County Performing Arts Center (PACE) $2,000,000 5 Hanford Reach Interpretive Center $500,000 6 Junior Achievement (Statewide JA World Initiative) $1,500,000 7 Lake Boren Park - Replace Unsafe Playground $325,000 8 Museum of Flight Space Gallery $3,000,000 9 Pike Market Workforce Childcare Facility $1,000,000 10 Rainier Beach Medical & Dental Clinic (Neighborcare Health) $500,000 11 Relocation of NAVES Mental Health Center in Brien $1,000,000 12 Restoration of Historic Piciform Theater $250,000 13 San Juan Island Farmers Market - Purchase Historic Building $375,000 14 South King County Multi service Center $300,000 15 Spokane Aerospace Technology Center Design $400,000 16 Urban League Village at Colman School/NW African American Museum $100,000 17 West Hill/Skyway Area Infrastructure $250,000

18 Appropriation: 19 State Building Construction Account--State ...... $13,750,000 20 Prior Biennia (Expenditures) ...... $0 21 Future Biennia (Projected Costs) ...... $0 22 TOTAL ...... $13,750,000

23 NEW SECTION. Sec. 1016. A new section is added to 2009 c 497 24 (uncodified) to read as follows: 25 FOR THE DEPARTMENT OF COMMERCE 26 Jobs Act for K-12 Public Schools and Higher Education Institutions 27 (91000085) 28 The appropriation in this section is subject to the following 29 conditions and limitations: 30 (1) The appropriation is provided solely for grants to public 31 school districts and public higher education institutions for 32 operational cost savings improvements to public school district and 33 higher education facilities and related projects that result in energy 34 and operational cost savings. Related projects are those projects that

Code Rev/KK:cro Official Print - 17 S-5586.2/10 1 must be completed in order for the energy efficiency improvements to be 2 effective. Grants may also be used for loan interest payments over the 3 term of a loan. 4 (2) The department of commerce, in consultation with the department 5 of general administration, the office of the superintendent of public 6 instruction, and the Washington State University energy program shall 7 establish a competitive process to solicit and evaluate applications 8 from public school districts and public higher education institutions. 9 Final grant awards shall be determined by the department of commerce. 10 (3) The definitions in this section apply throughout this section. 11 (a) "Cost-effectiveness" means that the present value to public 12 school districts and public higher education institutions of the energy 13 reasonably expected to be saved or produced by a facility, activity, 14 measure, or piece of equipment over its useful life, including any 15 compensation received from a utility or the Bonneville power 16 administration, is greater than the net present value of the costs of 17 implementing, maintaining, and operating such facility, activity, 18 measure, or piece of equipment over its useful life, when discounted at 19 the cost of public borrowing. 20 (b) "Energy equipment" means energy management systems and any 21 equipment, materials, or supplies that are expected, upon installation, 22 to reduce the energy use or energy cost of an existing building or 23 facility, and the services associated with the equipment, materials, or 24 supplies, including but not limited to design, engineering, financing, 25 installation, project management, guarantees, operations, and 26 maintenance. Reduction in energy use or energy cost may also include 27 reductions in the use or cost of water, wastewater, or solid waste. 28 (c) "Energy cost savings" means savings realized in expenses for 29 energy use and expenses associated with water, wastewater, or solid 30 waste systems. 31 (d) "Energy savings performance contracting" means the process 32 authorized by chapter 39.35C RCW by which a company contracts with a 33 public agency to conduct energy audits and guarantee energy savings 34 from energy efficiency. 35 (e) "Operational cost savings" means savings realized from parts, 36 service fees, capital renewal costs, and other measurable annual 37 expenses to maintain and repair systems. This definition does not mean 38 labor savings related to existing facility staff.

Code Rev/KK:cro Official Print - 18 S-5586.2/10 1 (f) "Public facilities" means buildings, building components, and 2 major equipment or systems owned by public school districts and public 3 higher education institutions. 4 (g) "Innovative measures" means advanced or emerging technologies, 5 systems or approaches that may not yet be in common practice but 6 improve energy efficiency, accelerate deployment, or reduce energy 7 usage, and become widely commercially available in the future if proven 8 successful in demonstration programs without compromising the 9 guaranteed performance or measurable energy and operational cost 10 savings anticipated. Examples of innovative measures include, but are 11 not limited to, advanced energy and systems operations monitoring, 12 diagnostics and controls systems for buildings; novel heating, cooling, 13 ventilation and water heating systems; advanced windows and insulation 14 technologies, highly efficient lighting technologies, designs, and 15 controls; and integration of renewable energy sources into buildings, 16 and energy savings verification technologies and solutions. 17 (4) Grants must be awarded in competitive rounds, based on demand 18 and capacity, with at least five percent of each grant round awarded to 19 small public school districts with fewer than 1,000 full-time 20 equivalent students, based on demand and capacity. 21 (5) Within each competitive round, projects must be weighted and 22 prioritized based on the following criteria and in the following order: 23 (a) Leverage ratio: In each round, the higher the leverage ratio 24 of nonstate funding sources to state jobs act grant, the higher the 25 project ranking. 26 (b) Energy savings: In each round, the higher the energy savings, 27 the higher the project ranking. Applicants must submit documentation 28 that demonstrates energy and operational cost savings resulting from 29 the installation of the energy equipment and improvements. The energy 30 savings analysis shall be performed by a licensed engineer, and the 31 documentation must include but is not limited to the following: 32 (i) A description of the energy equipment and improvements; 33 (ii) A description of the energy and operational cost savings; and 34 (iii) A description of the extent to which the project employs 35 collaborative and innovative measures and encourages demonstration of 36 new and emerging technologies with high energy-savings or energy cost- 37 reductions.

Code Rev/KK:cro Official Print - 19 S-5586.2/10 1 (c) Expediency of expenditure: Project readiness to spend funds 2 must be prioritized so that the legislative intent to expend funds 3 quickly is met. 4 (6) Projects that do not use energy savings performance contracting 5 must: (a) Verify energy and operational cost savings for ten years or 6 until the energy and operational costs savings pay for the project, 7 whichever is shorter; (b) follow the department of general 8 administration's energy savings performance contracting project 9 guidelines; and (c) employ a licensed engineer for the energy audit and 10 construction. The department of commerce may require third-party 11 verification of savings if a project is not implemented by an energy 12 savings performance contractor selected by the department of general 13 administration through the request of qualifications process. Third- 14 party verification must be conducted either by an energy savings 15 performance contractor selected by the department of general 16 administration through a request for qualifications, a licensed 17 engineer that is a certified energy manager, a project resource 18 conservation manager, or educational service district resource 19 conservation manager. 20 (7) To intensify competition, the department of commerce may only 21 award funds to the top eighty-five percent of projects applying in a 22 round until the department of commerce determines a final round is 23 appropriate. Projects that do not receive a grant award in one round 24 may reapply in subsequent rounds. 25 (8) To match federal grants and programs that require state 26 matching funds and produce significantly higher efficiencies in 27 operations and utilities, the level of innovation criteria may be 28 increased for the purposes of weighted scoring to capture those federal 29 dollars for selected projects that require a higher level of innovation 30 and regional collaboration. 31 (9) Grant amounts awarded to each project must allow for the 32 maximum number of projects funded with the greatest energy and cost 33 benefit. 34 (10)(a) The department of commerce must use bond proceeds to pay 35 one-half of the preliminary audit, up to five cents per square foot, if 36 the project does not meet the school district's and higher education 37 institution's predetermined cost-effectiveness criteria. Public school

Code Rev/KK:cro Official Print - 20 S-5586.2/10 1 districts and public higher education institutions must pay the other 2 one-half of the cost of the preliminary audit if the project does not 3 meet their predetermined cost-effectiveness criteria. 4 (b) The energy savings performance contractor shall not charge for 5 an investment grade audit if the project does not meet the school 6 district's and higher education institution's predetermined cost- 7 effectiveness criteria. Public school districts and public higher 8 education institutions must pay the full price of an investment grade 9 audit if they do not proceed with a project that meets the school 10 district's and higher education institution's predetermined cost- 11 effectiveness criteria. 12 (11) The department of commerce may charge projects administrative 13 fees and may pay the department of general administration, the 14 Washington State University energy program, and the office of the 15 superintendent of public instruction administration fees in an amount 16 determined through a memorandum of understanding. 17 (12) The department of commerce and the department of general 18 administration must submit a joint report to the appropriate committees 19 of the legislature and the office of financial management on the timing 20 and use of the grant funds, program administrative function, compliance 21 with apprenticeship utilization requirements in RCW 39.04.320, 22 compliance with prevailing wage requirements, and administration fees 23 by the end of each fiscal year, until the funds are fully expended and 24 all savings verification requirements are fulfilled. 25 Appropriation: 26 State Building Construction Account--State ...... $50,000,000 27 Prior Biennia (Expenditures) ...... $0 28 Future Biennia (Projected Costs) ...... $0 29 TOTAL ...... $50,000,000

30 NEW SECTION. Sec. 1017. A new section is added to 2009 c 497 31 (uncodified) to read as follows: 32 FOR THE DEPARTMENT OF COMMERCE 33 Energy Regional Innovation Cluster Match (91000080) 34 The appropriation in this section is subject to the following 35 conditions and limitations: The appropriation is provided solely to 36 support facilities to be located in Washington state to increase the

Code Rev/KK:cro Official Print - 21 S-5586.2/10 1 competitiveness of state or regional proposals for federal energy 2 innovation and research funding. State funding must not exceed twenty 3 percent of the total program or project funds. If a Washington state 4 research organization is not awarded federal funding for energy 5 innovation and research by June 30, 2011, the remaining appropriation 6 in this section may be allotted for export assistance as provided in 7 section 1018 of this act. 8 Appropriation: 9 Public Facility Construction Loan Revolving 10 Account--State ...... $5,500,000 11 Prior Biennia (Expenditures) ...... $0 12 Future Biennia (Projected Costs) ...... $0 13 TOTAL ...... $5,500,000

14 NEW SECTION. Sec. 1018. A new section is added to 2009 c 497 15 (uncodified) to read as follows: 16 FOR THE DEPARTMENT OF COMMERCE 17 CERB - Export Assistance Grants and Loans (92000069) 18 The appropriation in this section is subject to the following 19 conditions and limitations: The appropriation is provided solely for 20 loans and grants to local governments and public institutions of higher 21 education for technical assistance and infrastructure to support growth 22 of export of Washington state products and services. 23 Appropriation: 24 Public Facility Construction Loan Revolving 25 Account--State ...... $3,000,000 26 Prior Biennia (Expenditures) ...... $0 27 Future Biennia (Projected Costs) ...... $0 28 TOTAL ...... $3,000,000

29 Sec. 1019. 2009 c 497 s 1054 (uncodified) is amended to read as 30 follows: 31 FOR THE OFFICE OF FINANCIAL MANAGEMENT 32 Cowlitz River Dredging (20082856) 33 Reappropriation: 34 State Building Construction Account--State ...... $313,000

Code Rev/KK:cro Official Print - 22 S-5586.2/10 1 Appropriation: 2 State Building Construction Account--State ...... $500,000 3 Prior Biennia (Expenditures) ...... $687,000 4 Future Biennia (Projected Costs) ...... $0 5 TOTAL ...... (($1,000,000)) 6 $1,500,000

7 Sec. 1020. 2009 c 497 s 1055 (uncodified) is amended to read as 8 follows: 9 FOR THE OFFICE OF FINANCIAL MANAGEMENT 10 Catastrophic Flood Relief (20084850) 11 The reappropriation in this section is subject to the following 12 conditions and limitations: 13 (1) $1,640,000 of the reappropriation is provided solely for 14 nonfederal matching funds and state agency costs associated with the 15 army corps of engineers flood hazard mitigation projects for the 16 Chehalis river basin. 17 (2) $1,200,000 of the total reappropriation is provided solely for 18 the Chehalis basin flood control authority to develop governance 19 agreements for development, operation, and maintenance of flood hazard 20 mitigation measures throughout the basin. The development of the 21 governance agreements shall include preliminary estimates of local 22 property tax options necessary to support the maintenance and operation 23 of the twin city levy project and tax options necessary to support 24 other possible flood control measures throughout the basin. The 25 agreements must be executed by July 1, 2011. 26 (3)(a) $2,000,000 of the reappropriation is provided solely for the 27 following studies of flood mitigation measures: (i) Studies contracted 28 prior to the effective date of this act; (ii) a study to evaluate the 29 feasibility of a combination of the United States' army corps of 30 engineers twin city project, with other retention structures, and 31 nonstructural flood mitigation measures to be completed by June 30, 32 2011; (iii) a study to determine how ecosystem services, including 33 nonstructural alternatives, would likely mitigate downstream flooding 34 to be completed by December 2010; (iv) continuation of the general 35 investigation of basin wide flood control measures by the United 36 States' army corps of engineers; (v) an independent peer review of 37 completed geotechnical and hydrological studies of possible upper basin

Code Rev/KK:cro Official Print - 23 S-5586.2/10 1 retention structures to be completed by October 2010; (vi) a study of 2 the effect of possible retention structures and other flood control 3 measures on fish in the basin to be completed by June 2011, provided 4 that the fish study shall not examine options for retention structures 5 that the peer review in this section determines is not feasible. 6 (b) From the effective date of this act and prior to any 7 expenditure on new studies, the Chehalis basin flood authority must 8 submit any new study proposal to the basinwide general investigation 9 project manager of the United States army corps of engineers for 10 review. Based upon the United States army corps of engineers review of 11 the proposal, the Chehalis basin flood authority must develop a 12 proposed scope of work for the study that ensures, to the fullest 13 extent possible, that the study will be eligible for federal work-in- 14 kind credit. 15 (c) The Chehalis basin flood authority must: (i) In consultation 16 with the department of ecology, select qualified experts to conduct the 17 peer review of geotechnical and hydrological studies; and (ii) consult 18 with the Washington state department of fish and wildlife, the 19 confederated tribes of the Chehalis reservation, and the Lewis county 20 public utility district to develop and agree upon a scope of work for, 21 and select a qualified expert to, conduct the fish study. The peer 22 review must be submitted to the office of financial management before 23 funds are allotted for the fish study. 24 (4) $300,000 of the reappropriation is provided solely for an early 25 flood warning system. 26 (5) It is the intent of the legislature to fulfill the commitment 27 of section 101, chapter 179, Laws of 2008 and chapter 180, Laws of 28 2008, by appropriating funds when the federal match requirement is 29 needed. 30 Reappropriation: 31 State Building Construction Account--State . . . . (($47,351,000)) 32 $5,140,000 33 Prior Biennia (Expenditures) ...... (($2,649,000)) 34 $3,450,000 35 Future Biennia (Projected Costs) ...... (($0)) 36 $41,410,000 37 TOTAL ...... $50,000,000

Code Rev/KK:cro Official Print - 24 S-5586.2/10 1 NEW SECTION. Sec. 1021. A new section is added to 2009 c 497 2 (uncodified) to read as follows: 3 FOR THE OFFICE OF FINANCIAL MANAGEMENT 4 Risk Pool (91000001) 5 The appropriation in this section is subject to the following 6 conditions and limitations: The appropriation is provided solely for 7 a risk pool to complete projects within the scope described in budget 8 documents submitted as part of the governor's capital budget request 9 and consistent with legislative history. This section only applies to 10 projects included in this 2010 supplemental capital budget with reduced 11 appropriations. The office of financial management may allot portions 12 of this appropriation ten days after notifying the senate ways and 13 means committee and the house of representatives capital budget 14 committee. The notification must include an explanation of the need 15 and the amount for the allotment to complete the scope of an approved 16 project. 17 Appropriation: 18 State Building Construction Account--State ...... $4,000,000 19 Prior Biennia (Expenditures) ...... $0 20 Future Biennia (Projected Costs) ...... $0 21 TOTAL ...... $4,000,000

22 NEW SECTION. Sec. 1022. A new section is added to 2009 c 497 23 (uncodified) to read as follows: 24 FOR THE OFFICE OF FINANCIAL MANAGEMENT 25 Port Angeles Economic Development Agreement (30000024) 26 The appropriation in this section is subject to the following 27 conditions and limitations: The appropriation is provided solely to 28 carry out paragraph 2.C. of the economic development agreement 29 associated with the case of Lower Elwha Klallam Tribe et al v. State et 30 al, Thurston county superior court, cause No. 05-2-01595-8. The state 31 has already provided $250,000 to carry out that paragraph. After 32 disbursement of the appropriation in this section, the state will 33 provide no further funding under the economic development agreement. 34 Appropriation: 35 State Building Construction Account--State ...... $250,000

Code Rev/KK:cro Official Print - 25 S-5586.2/10 1 Prior Biennia (Expenditures) ...... $0 2 Future Biennia (Projected Costs) ...... $0 3 TOTAL ...... $250,000

4 NEW SECTION. Sec. 1023. A new section is added to 2009 c 497 5 (uncodified) to read as follows: 6 FOR THE OFFICE OF FINANCIAL MANAGEMENT. (1) Due to the downturn of 7 the economy and the direct effects on the state bond debt limit, the 8 legislature intends to reduce bond debt while focusing resources on 9 maintaining and creating jobs. Therefore, the legislature directs the 10 office of financial management to work with state agencies to achieve 11 savings in the amount of $50,000,000 by reducing previously approved 12 allotments or by withholding approval of planned allotments for those 13 projects that have not shown substantial progress under the criteria 14 established in subsection (2) of this section or from projects with 15 savings identified pursuant to section 6012 of this act. 16 (2) A project is subject to allotment reduction or non-approval of 17 a planned allotment under this section if: 18 (a)(i) It is a state project administered by a state agency; or 19 (ii) It is a grant or a loan project for which a state agency 20 allocates funding to a non-state entity; 21 (b) Appropriations for the project were made in the 2009-11 or 22 previous omnibus capital appropriations acts from the state building 23 construction account, state taxable building construction account, or 24 any other debt limit bond account, not including projects receiving 25 2010 supplemental capital budget appropriations, minor works projects, 26 or the school construction assistance grant program; and 27 (c) The project has failed to secure all required and appropriate 28 transaction elements necessary to execute contracts with the 29 administering state agency by November 30, 2010. Required and 30 appropriate transaction elements may include, but are not limited to, 31 matching funds, permits, environmental reviews, and required contracts 32 and partnership agreements. 33 (3) Amounts attributable to allotment reductions or non-approval of 34 planned allotments made under this section must be placed in or remain 35 in unallotted status and remain unexpended. 36 (4) By December 31, 2010, the office of financial management must 37 report to the house of representatives capital budget committee and the

Code Rev/KK:cro Official Print - 26 S-5586.2/10 1 senate ways and means committee on the projects for which allotments 2 were reduced or for which approval was withheld, including a list of 3 the specific projects and related funds remaining in unallotted status. 4 (5) Agencies and prospective grant or loan recipients are 5 encouraged to reapply or request funds in the 2011-13 biennial capital 6 appropriations act for projects for which allotments were reduced or 7 not approved under this section.

8 Sec. 1024. 2009 c 497 s 1065 (uncodified) is amended to read as 9 follows: 10 FOR THE DEPARTMENT OF GENERAL ADMINISTRATION 11 O'Brien Building Improvements (20081007) 12 The appropriation in this section is subject to the following 13 conditions and limitations: Upon completion of the project, temporary 14 modular buildings shall be removed, and the parking lot shall be 15 restored and landscaped within budget. 16 Reappropriation: 17 State Building Construction Account--State ...... $1,500,000 18 Appropriation: 19 State Building Construction Account--State . . . . . (($9,671,000)) 20 $8,220,000 21 Prior Biennia (Expenditures) ...... $1,481,000 22 Future Biennia (Projected Costs) ...... (($5,329,000)) 23 $0 24 TOTAL ...... (($17,981,000)) 25 $11,201,000

26 Sec. 1025. 2009 c 497 s 1071 (uncodified) is amended to read as 27 follows: 28 FOR THE DEPARTMENT OF GENERAL ADMINISTRATION 29 Capital Lake Plan Completion (20082953) 30 The reappropriation in this section is subject to the following 31 conditions and limitations: The reappropriation is provided for lake 32 management efforts to control invasive species. The Capital Lake 33 adaptive management planning process must be suspended. 34 Reappropriation: 35 State Building Construction Account--State ...... (($200,000))

Code Rev/KK:cro Official Print - 27 S-5586.2/10 1 $100,000 2 Prior Biennia (Expenditures) ...... $300,000 3 Future Biennia (Projected Costs) ...... $0 4 TOTAL ...... (($500,000)) 5 $400,000

6 Sec. 1026. 2009 c 497 s 1075 (uncodified) is amended to read as 7 follows: 8 FOR THE DEPARTMENT OF GENERAL ADMINISTRATION 9 Powerhouse: Improvements and Preservation (30000056) 10 Appropriation: 11 State Building Construction Account--State . . . . . (($1,459,000)) 12 $1,240,000 13 Prior Biennia (Expenditures) ...... $0 14 Future Biennia (Projected Costs) ...... $0 15 TOTAL ...... (($1,459,000)) 16 $1,240,000

17 Sec. 1027. 2009 c 497 s 1060 (uncodified) is amended to read as 18 follows: 19 FOR THE DEPARTMENT OF GENERAL ADMINISTRATION 20 Transportation Building Preservation (20021008) 21 Reappropriation: 22 Thurston County Capital Facilities Account--State . (($2,500,000)) 23 $395,000 24 Appropriation: 25 State Building Construction Account--State ...... $2,105,000 26 Prior Biennia (Expenditures) ...... $7,116,000 27 Future Biennia (Projected Costs) ...... $22,706,000 28 TOTAL ...... $32,322,000

29 Sec. 1028. 2009 c 497 s 1061 (uncodified) is amended to read as 30 follows: 31 FOR THE DEPARTMENT OF GENERAL ADMINISTRATION 32 Highway-License Building Repair and Renewal (20061013) 33 Reappropriation:

Code Rev/KK:cro Official Print - 28 S-5586.2/10 1 Thurston County Capital Facilities Account--State . . (($100,000)) 2 $76,000 3 Appropriation: 4 State Building Construction Account--State ...... $24,000 5 Prior Biennia (Expenditures) ...... $3,423,000 6 Future Biennia (Projected Costs) ...... $0 7 TOTAL ...... $3,523,000

8 Sec. 1029. 2009 c 497 s 1063 (uncodified) is amended to read as 9 follows: 10 FOR THE DEPARTMENT OF GENERAL ADMINISTRATION 11 Natural Resources Building Repairs and Renewal (20061014) 12 Reappropriation: 13 State Vehicle Parking Account--State ...... $30,000 14 Thurston County Capital Facilities Account--State . . (($100,000)) 15 $22,000 16 Subtotal Reappropriation ...... (($130,000)) 17 $52,000 18 Appropriation: 19 State Building Construction Account--State ...... $78,000 20 Prior Biennia (Expenditures) ...... $2,853,000 21 Future Biennia (Projected Costs) ...... $4,520,000 22 TOTAL ...... $7,503,000

23 Sec. 1030. 2009 c 497 s 1064 (uncodified) is amended to read as 24 follows: 25 FOR THE DEPARTMENT OF GENERAL ADMINISTRATION 26 Minor Works - Infrastructure Preservation (20081004) 27 Reappropriation: 28 ((Thurston County Capital Facilities Account--State . . $136,000)) 29 State Building Construction Account--State ...... $584,000 30 ((Subtotal Reappropriation ...... $720,000)) 31 Appropriation: 32 State Building Construction Account--State ...... $136,000 33 Prior Biennia (Expenditures) ...... $4,401,000 34 Future Biennia (Projected Costs) ...... $0

Code Rev/KK:cro Official Print - 29 S-5586.2/10 1 TOTAL ...... $5,121,000

2 Sec. 1031. 2009 c 497 s 1068 (uncodified) is amended to read as 3 follows: 4 FOR THE DEPARTMENT OF GENERAL ADMINISTRATION 5 Minor Works - Facility Preservation (20081015) 6 Reappropriation: 7 State Building Construction Account--State ...... $380,000 8 ((Thurston County Capital Facilities Account--State . . . $723,000 9 Subtotal Reappropriation ...... $1,103,000)) 10 Appropriation: 11 State Building Construction Account--State ...... $723,000 12 Prior Biennia (Expenditures) ...... $5,583,000 13 Future Biennia (Projected Costs) ...... $0 14 TOTAL ...... $6,686,000

15 Sec. 1032. 2009 c 497 s 1073 (uncodified) is amended to read as 16 follows: 17 FOR THE DEPARTMENT OF GENERAL ADMINISTRATION 18 Minor Works Preservation (30000012) 19 Appropriation: 20 State Building Construction Account--State . . . . . (($2,800,000)) 21 $3,400,000 22 Prior Biennia (Expenditures) ...... $0 23 Future Biennia (Projected Costs) ...... $34,109,000 24 TOTAL ...... (($36,909,000)) 25 $37,509,000

26 NEW SECTION. Sec. 1033. A new section is added to 2009 c 497 27 (uncodified) to read as follows: 28 FOR THE DEPARTMENT OF GENERAL ADMINISTRATION 29 Capitol Campus Heating System Improvements (30000486) 30 Appropriation: 31 State Building Construction Account--State ...... $200,000 32 33 Prior Biennia (Expenditures) ...... $0 34 Future Biennia (Projected Costs) ...... $1,800,000

Code Rev/KK:cro Official Print - 30 S-5586.2/10 1 TOTAL ...... $2,000,000

2 Sec. 1034. 2009 c 497 s 1081 (uncodified) is amended to read as 3 follows: 4 FOR THE DEPARTMENT OF GENERAL ADMINISTRATION 5 Pro Arts Building (91000002) 6 ((The appropriation in this section is subject to the following 7 conditions and limitations: Predesign and design funds are provided 8 solely to develop a new office building. Up to $225,000 may be used to 9 develop the predesign for the Pro Arts site to include a new office 10 building that may house tenants from the general administration 11 building including the office of financial management, the Puget Sound 12 partnership, the office of the state treasurer, and other small 13 commissions and agencies. The predesign shall be developed with 14 representatives from the capitol campus design advisory committee, the 15 department of general administration, and the office of financial 16 management. The predesign shall be used to develop the optimum use of 17 space for the Pro Arts site, identify any required mitigation, parking 18 requirements, schedule of construction, and cost of construction. The 19 predesign shall be provided to the appropriate fiscal committees of the 20 legislature and the office of financial management by February 1, 2010. 21 The allotment for design funds will be made after the predesign is 22 approved by the office of financial management and the appropriate 23 fiscal committees of the legislature.)) 24 Appropriation: 25 State Building Construction Account--State . . . . . (($2,000,000)) 26 $225,000 27 Prior Biennia (Expenditures) ...... $0 28 Future Biennia (Projected Costs) ...... $0 29 TOTAL ...... (($2,000,000)) 30 $225,000

31 NEW SECTION. Sec. 1035. A new section is added to 2009 c 497 32 (uncodified) to read as follows: 33 FOR THE MILITARY DEPARTMENT 34 Camp Murray New Primary Gate Entrance (30000482) 35 Appropriation:

Code Rev/KK:cro Official Print - 31 S-5586.2/10 1 General Fund--Federal ...... $3,270,000 2 Military Department Capital Account--State ...... $1,657,000 3 Subtotal Appropriation ...... $4,927,000 4 Prior Biennia (Expenditures) ...... $0 5 Future Biennia (Projected Costs) ...... $0 6 TOTAL ...... $4,927,000

7 Sec. 1036. 2009 c 497 s 1086 (uncodified) is amended to read as 8 follows: 9 FOR THE MILITARY DEPARTMENT 10 Minor Works Preservation (30000002) 11 Appropriation: 12 General Fund--Federal ...... (($3,069,000)) 13 $8,672,000 14 State Building Construction Account--State ...... $1,709,000 15 Subtotal Appropriation ...... (($4,778,000)) 16 $10,381,000 17 Prior Biennia (Expenditures) ...... $0 18 Future Biennia (Projected Costs) ...... $18,700,000 19 TOTAL ...... (($23,478,000)) 20 $29,081,000

21 Sec. 1037. 2009 c 497 s 1087 (uncodified) is amended to read as 22 follows: 23 FOR THE MILITARY DEPARTMENT 24 Minor Works Program (30000003) 25 Appropriation: 26 General Fund--Federal ...... (($679,000)) 27 $3,139,000 28 Prior Biennia (Expenditures) ...... $0 29 Future Biennia (Projected Costs) ...... $10,229,000 30 TOTAL ...... (($10,908,000)) 31 $13,368,000

32 NEW SECTION. Sec. 1038. A new section is added to 2009 c 497 33 (uncodified) to read as follows:

Code Rev/KK:cro Official Print - 32 S-5586.2/10 1 FOR THE MILITARY DEPARTMENT 2 Combined Support Maintenance Shop (20082006) 3 Appropriation: 4 General Fund--Federal ...... $4,736,000 5 Prior Biennia (Expenditures) ...... $0 6 Future Biennia (Projected Costs) ...... $22,164,000 7 TOTAL ...... $26,900,000

(End of part)

Code Rev/KK:cro Official Print - 33 S-5586.2/10 1 PART 2 2 HUMAN SERVICES

3 Sec. 2001. 2009 c 497 s 2001 (uncodified) is amended to read as 4 follows: 5 FOR THE CRIMINAL JUSTICE TRAINING COMMISSION 6 Replace Hawthorne Hall Dormitory (20082001) 7 ((The appropriation in this section is subject to the following 8 conditions and limitations: The office of financial management shall 9 allot funds for the dormitory construction at the criminal justice 10 training commission only after the recommendation of the steering 11 committee participating in the analysis in section 1057 of this act has 12 been provided to the legislative fiscal committees and submitted to the 13 office of financial management for review. 14 15 Appropriation: 16 State Building Construction Account--State . . . . . $16,745,000)) 17 Reappropriation: 18 State Building Construction Account--State ...... $632,000 19 Prior Biennia (Expenditures) ...... $1,293,000 20 Future Biennia (Projected Costs) ...... (($0)) 21 $16,934,000 22 TOTAL ...... (($18,670,000)) 23 $18,859,000

24 Sec. 2002. 2009 c 497 s 2002 (uncodified) is amended to read as 25 follows: 26 FOR THE CRIMINAL JUSTICE TRAINING COMMISSION 27 School Mapping (30000011) 28 The appropriation in this section is subject to the following 29 conditions and limitations: The legislature intends to complete half 30 of the remaining community and technical college mapping with this 31 appropriation ((and to appropriate funding for the remaining half of 32 unmapped square feet in community and technical colleges in the 2011-13 33 biennium)).

Code Rev/KK:cro Official Print - 34 S-5586.2/10 1 Appropriation: 2 State Building Construction Account--State ...... (($500,000)) 3 $1,100,000 4 Prior Biennia (Expenditures) ...... $0 5 Future Biennia (Projected Costs) ...... (($546,000)) 6 $0 7 TOTAL ...... (($1,046,000)) 8 $1,100,000

9 NEW SECTION. Sec. 2003. A new section is added to 2009 c 497 10 (uncodified) to read as follows: 11 FOR THE DEPARTMENT OF LABOR AND INDUSTRIES 12 Central Office Roof Replacement and Fall Restraint Upgrade 13 (30000012) 14 Appropriation: 15 Accident Account--State ...... $1,250,000 16 Medical Aid Account--State ...... $1,250,000 17 Subtotal Appropriation ...... $2,500,000 18 Prior Biennia (Expenditures) ...... $0 19 Future Biennia (Projected Costs) ...... $0 20 TOTAL ...... $2,500,000

21 Sec. 2004. 2009 c 497 s 2027 (uncodified) is amended to read as 22 follows: 23 FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES 24 Eastern State Hospital: Roof Replacements (30000846) 25 Appropriation: 26 State Building Construction Account--State . . . . . (($1,085,000)) 27 $922,000 28 Prior Biennia (Expenditures) ...... $0 29 Future Biennia (Projected Costs) ...... $1,088,000 30 TOTAL ...... (($2,173,000)) 31 $2,010,000

32 Sec. 2005. 2009 c 497 s 2014 (uncodified) is amended to read as 33 follows:

Code Rev/KK:cro Official Print - 35 S-5586.2/10 1 FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES 2 Special Commitment Center: Utility Replacements (20081504) 3 The reappropriation and appropriation in this section are subject 4 to the following conditions and limitations: It is the intent of the 5 appropriation and reappropriation to replace essential utilities, such 6 as sanitary sewer, high voltage electrical, and fiber optic 7 communications, serving the special commitment center and McNeil 8 corrections center on McNeil Island by replacing the Island's 9 electrical feed from the shoreline landing to the McNeil corrections 10 center generator building, and continuing on to the special commitment 11 center. The department shall coordinate the work with the department 12 of corrections for the most cost-effective approach to the work. 13 Reappropriation: 14 State Building Construction Account--State ...... $2,900,000 15 Appropriation: 16 State Building Construction Account--State . . . . . (($3,490,000)) 17 $2,966,000 18 Prior Biennia (Expenditures) ...... $140,000 19 Future Biennia (Projected Costs) ...... $0 20 TOTAL ...... (($6,530,000)) 21 $6,006,000

22 NEW SECTION. Sec. 2006. A new section is added to 2009 c 497 23 (uncodified) to read as follows: 24 FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES 25 Capacity to Replace Maple Lane School (92000005) 26 Appropriation: 27 State Building Construction Account--State ...... $760,000 28 Prior Biennia (Expenditures) ...... $0 29 Future Biennia (Projected Costs) ...... $1,025,000 30 TOTAL ...... $1,785,000

31 Sec. 2007. 2009 c 497 s 2034 (uncodified) is amended to read as 32 follows: 33 FOR THE DEPARTMENT OF HEALTH 34 Drinking Water Assistance Program (30000013)

Code Rev/KK:cro Official Print - 36 S-5586.2/10 1 The appropriation in this section is subject to the following 2 conditions and limitations: $38,462,000 is provided from the American 3 recovery and reinvestment act of 2009. 4 Appropriation: 5 Drinking Water Assistance Account--Federal . . . . (($24,348,000)) 6 $38,348,000 7 Drinking Water Assistance Account--Federal 8 American Recovery and Reinvestment Act ...... $38,462,000 9 Subtotal Appropriation ...... (($62,810,000)) 10 $76,810,000 11 Prior Biennia (Expenditures) ...... $0 12 Future Biennia (Projected Costs) ...... $0 13 TOTAL ...... (($62,810,000)) 14 $76,810,000

15 Sec. 2008. 2009 c 497 s 2037 (uncodified) is amended to read as 16 follows: 17 FOR THE DEPARTMENT OF VETERANS AFFAIRS 18 State Veterans Cemetery (20082004) 19 Reappropriation: 20 General Fund--Federal ...... $6,815,000 21 Appropriation: 22 General Fund--Federal ...... $1,909,000 23 Prior Biennia (Expenditures) ...... $1,010,000 24 Future Biennia (Projected Costs) ...... $0 25 TOTAL ...... (($7,825,000)) 26 $9,734,000

27 Sec. 2009. 2009 c 497 s 2038 (uncodified) is amended to read as 28 follows: 29 FOR THE DEPARTMENT OF VETERANS AFFAIRS 30 Minor Works - Facilities Preservation (30000003) 31 Appropriation: 32 State Building Construction Account--State ...... (($500,000)) 33 $775,000 34 Prior Biennia (Expenditures) ...... $0

Code Rev/KK:cro Official Print - 37 S-5586.2/10 1 Future Biennia (Projected Costs) ...... $6,585,000 2 TOTAL ...... (($7,085,000)) 3 $7,360,000

4 Sec. 2010. 2009 c 497 s 2067 (uncodified) is amended to read as 5 follows: 6 FOR THE DEPARTMENT OF CORRECTIONS 7 Washington Corrections Center for Women: Roof Replacement 8 (30000178) 9 Appropriation: 10 State Building Construction Account--State . . . . . (($1,832,000)) 11 $1,557,000 12 Prior Biennia (Expenditures) ...... $0 13 Future Biennia (Projected Costs) ...... $0 14 TOTAL ...... (($1,832,000)) 15 $1,557,000

16 NEW SECTION. Sec. 2011. A new section is added to 2009 c 497 17 (uncodified) to read as follows: 18 FOR THE DEPARTMENT OF CORRECTIONS 19 Washington State Penitentiary: Housing Units, Kitchen, and Site 20 Work (30000482) 21 Appropriation: 22 State Building Construction Account--State ...... $5,990,000 23 Public Safety Reimbursable Bond Account ...... $829,000 24 Subtotal Appropriation ...... $6,819,000 25 Prior Biennia (Expenditures) ...... $0 26 Future Biennia (Projected Costs) ...... $44,000,000 27 TOTAL ...... $50,819,000

28 Sec. 2012. 2009 c 497 s 2072 (uncodified) is amended to read as 29 follows: 30 FOR THE DEPARTMENT OF CORRECTIONS 31 Clallam Bay Corrections Center: Replace 5 Towers and Housing Roofs 32 (30000108) 33 The appropriation in this section is subject to the following

Code Rev/KK:cro Official Print - 38 S-5586.2/10 1 conditions and limitations: The funding is provided solely for the 2 replacement of roofs on offender housing units. 3 Appropriation: 4 State Building Construction Account--State . . . . . (($3,000,000)) 5 $2,550,000 6 Prior Biennia (Expenditures) ...... $0 7 Future Biennia (Projected Costs) ...... $0 8 TOTAL ...... (($3,000,000)) 9 $2,550,000

10 Sec. 2013. 2009 c 497 s 2075 (uncodified) is amended to read as 11 follows: 12 FOR THE DEPARTMENT OF CORRECTIONS 13 Monroe Corrections Center: Water Line Replacements (30000137) 14 Appropriation: 15 State Building Construction Account--State . . . . . (($1,809,000)) 16 $1,538,000 17 Prior Biennia (Expenditures) ...... $0 18 Future Biennia (Projected Costs) ...... $0 19 TOTAL ...... (($1,809,000)) 20 $1,538,000

21 Sec. 2014. 2009 c 497 s 2078 (uncodified) is amended to read as 22 follows: 23 FOR THE DEPARTMENT OF CORRECTIONS 24 Washington State Penitentiary: Kitchen Improvements (20061007) 25 Reappropriation: 26 State Building Construction Account--State ...... (($402,000)) 27 $0 28 Prior Biennia (Expenditures) ...... $228,000 29 Future Biennia (Projected Costs) ...... $0 30 TOTAL ...... (($630,000)) 31 $228,000

32 Sec. 2015. 2009 c 497 s 2068 (uncodified) is amended to read as 33 follows:

Code Rev/KK:cro Official Print - 39 S-5586.2/10 1 FOR THE DEPARTMENT OF CORRECTIONS 2 300 Minimum Security Bed Expansion - Three Locations (20082850) 3 Reappropriation: 4 State Building Construction Account--State ...... (($321,000)) 5 $15,000 6 Prior Biennia (Expenditures) ...... $156,000 7 Future Biennia (Projected Costs) ...... $0 8 TOTAL ...... (($477,000)) 9 $171,000

10 Sec. 2016. 2009 c 497 s 2054 (uncodified) is amended to read as 11 follows: 12 FOR THE DEPARTMENT OF CORRECTIONS 13 Washington State Penitentiary: Replace Roofs (20081007) 14 Reappropriation: 15 State Building Construction Account--State . . . . . (($1,200,000)) 16 $180,000 17 Prior Biennia (Expenditures) ...... $589,000 18 Future Biennia (Projected Costs) ...... $0 19 TOTAL ...... (($1,789,000)) 20 $769,000

21 Sec. 2017. 2009 c 497 s 2064 (uncodified) is amended to read as 22 follows: 23 FOR THE DEPARTMENT OF CORRECTIONS 24 Mission Creek Corrections Center for Women: 100-Bed Expansion 25 (20082020) 26 Reappropriation: 27 State Building Construction Account--State . . . . . (($5,331,000)) 28 $4,419,000 29 Prior Biennia (Expenditures) ...... $1,296,000 30 Future Biennia (Projected Costs) ...... $0 31 TOTAL ...... (($6,627,000)) 32 $5,715,000

Code Rev/KK:cro Official Print - 40 S-5586.2/10 1 NEW SECTION. Sec. 2018. A new section is added to 2009 c 497 2 (uncodified) to read as follows: 3 FOR THE DEPARTMENT OF CORRECTIONS 4 Westside Corrections Complex: Siting and Predesign (92000032) 5 Appropriation: 6 State Building Construction Account--State ...... $2,600,000 7 Prior Biennia (Expenditures) ...... $0 8 Future Biennia (Projected Costs) ...... $0 9 TOTAL ...... $2,600,000

(End of part)

Code Rev/KK:cro Official Print - 41 S-5586.2/10 1 PART 3 2 NATURAL RESOURCES

3 Sec. 3001. 2009 c 497 s 3059 (uncodified) is amended to read as 4 follows: 5 FOR THE DEPARTMENT OF ECOLOGY 6 Kittitas Groundwater Study (30000029) 7 The appropriation in this section is subject to the following 8 conditions and limitations: 9 By September 30, 2010, if, after consultation with major Yakima 10 basin governments and stakeholders, the department of ecology and 11 Kittitas county reach an agreement on a preferred approach, including 12 the appropriate geographic scope and administering entity, the 13 appropriation may be fully or partially redirected for the following 14 purposes: 15 (1) Funds may be provided to develop and implement water banking 16 and transfer methods and agreements that are fully protective of senior 17 water rights and that protect domestic groundwater users and improve 18 the profitability of farming operations. The legislature finds such 19 activities to be in the public interest because they can help sustain 20 the viability of the agricultural economy and enhance the certainty of 21 water supplies for domestic groundwater users. 22 (2) Funds may be provided to lease or purchase water rights to 23 create a reserve water supply for domestic groundwater users that have 24 a groundwater right with a priority date later than May 10, 1905, as 25 well as for all out-of-priority groundwater users. In securing water 26 for such domestic groundwater users, strong preference shall be given 27 to the use of water banking and transfer methods that provide 28 alternatives to permanent purchase and dry-up of agricultural water 29 rights in the basin, including dry-year options, water banking, long- 30 term water supply lease agreements, long-term agricultural land 31 fallowing agreements, and reduced consumptive use through efficiency or 32 alternative cropping arrangements while maintaining historic return 33 flows. 34 (3) A portion of the appropriation may be used for administrative 35 costs, not to exceed four percent, and other costs associated with

Code Rev/KK:cro Official Print - 42 S-5586.2/10 1 leasing or acquiring and transferring the water rights. All costs 2 shall be fully recovered from participating domestic water users for 3 their prorated portion of the cost, including but not limited to the 4 costs of securing a water right or rights for this purpose, costs 5 associated with the development and implementation of alternative 6 agricultural water transfer methods, associated annual operational 7 costs, and federal water service contract costs owed to the United 8 States bureau of reclamation. Funds recovered in this manner shall be 9 deposited in the state and local improvement revolving fund and may be 10 used for any purpose provided in this section. 11 Appropriation: 12 State and Local Improvements Revolving Account 13 (Water Supply Facilities)--State ...... $700,000 14 Prior Biennia (Expenditures) ...... $0 15 Future Biennia (Projected Costs) ...... $0 16 TOTAL ...... $700,000

17 Sec. 3002. 2009 c 497 s 3039 (uncodified) is amended to read as 18 follows: 19 FOR THE DEPARTMENT OF ECOLOGY 20 Flood Protection Study (20082855) 21 The reappropriation in this section is subject to the following 22 conditions and limitations: The reappropriation in this section is 23 provided solely for the department to conduct a study to determine the 24 number of decertified levees in the state and to identify strategies 25 for maintaining accreditation, re-accrediting, or recertifying ((the)) 26 levees so that they ((provide)) are recognized by federal agencies as 27 providing optimum protection for the communities protected by the 28 levees. The department must prioritize areas to include in the study 29 based on population and the economic impact of potential flood damage. 30 The study must include the following components: 31 (1) A working group of levee managers, local agencies, and 32 stakeholders to advise and inform the study; 33 (2) ((A)) In-state examples of the costs and processes of technical 34 review of the structural integrity of levee systems; 35 (3) An inventory, map, and ((rate the effectiveness)) description 36 of the level of protection of existing levee systems; ((and))

Code Rev/KK:cro Official Print - 43 S-5586.2/10 1 (4) The development of strategies and actions needed to improve the 2 existing levee system and to ensure certification by the United States 3 army corps of engineers for one-hundred year flood protection; 4 (5) The identification of current funding sources and the amounts 5 available for levee improvements; and 6 (6) Recommendation for additional new funding sources and options. 7 (7) The study must be completed and a report provided to the 8 appropriate legislative committees by ((July)) December 1, 2010. 9 (8) The study under this section is exempt from the provisions of 10 section 602, chapter 3, Laws of 2010 and section 7, chapter 5, Laws of 11 2009. 12 Reappropriation: 13 State Building Construction Account--State ...... $280,000 14 Prior Biennia (Expenditures) ...... $0 15 Future Biennia (Projected Costs) ...... $0 16 TOTAL ...... $280,000

17 Sec. 3003. 2009 c 497 s 3007 (uncodified) is amended to read as 18 follows: 19 FOR THE DEPARTMENT OF ECOLOGY 20 Sunnyside Valley Irrigation District Water Conservation (20052851) 21 Reappropriation: 22 State Building Construction Account--State ...... $2,800,000 23 Appropriation: 24 State Building Construction Account--State . . . . . (($2,850,000)) 25 $7,250,000 26 Prior Biennia (Expenditures) ...... $4,147,000 27 Future Biennia (Projected Costs) ...... $4,000,000 28 TOTAL ...... (($13,797,000)) 29 $18,197,000

30 Sec. 3004. 2009 c 497 s 3049 (uncodified) is amended to read as 31 follows: 32 FOR THE DEPARTMENT OF ECOLOGY 33 Upper Columbia River Black Sand Beach Cleanup (30000016) 34 Appropriation: 35 State Building Construction Account--State . . . . . (($3,000,000))

Code Rev/KK:cro Official Print - 44 S-5586.2/10 1 $500,000 2 Prior Biennia (Expenditures) ...... $0 3 Future Biennia (Projected Costs) ...... $0 4 TOTAL ...... (($3,000,000)) 5 $500,000

6 Sec. 3005. 2009 c 497 s 3054 (uncodified) is amended to read as 7 follows: 8 FOR THE DEPARTMENT OF ECOLOGY 9 Storm Water Retrofit and Low-Impact Development Grant Program 10 (30000097) 11 The appropriations in this section are subject to the following 12 terms and conditions: 13 (1) $1,343,000 of the state toxics control account--state 14 appropriation is provided solely for storm water retrofit and low- 15 impact development in the city of Bremerton. 16 (2) $6,929,000 of the local toxics control account--state 17 appropriation and $1,071,000 of the state toxics control account--state 18 appropriation is provided solely for local governments to build 19 staffing capacity to address storm water in their communities and to 20 improve storm water research, data management, and monitoring. 21 (3) The remaining moneys must be allocated through a grant process 22 to local governments covered by national pollutant discharge 23 elimination system municipal phase I or phase II permits to fund local 24 government projects or activities that mitigate or prevent 25 contamination of storm water or the recontamination of receiving waters 26 previously remediated under federal or state-approved activities. 27 Appropriation: 28 State Building Construction Account--State . . . . . (($3,000,000)) 29 $30,334,000 30 State Toxics Control Account--State ...... $15,737,000 31 State and Local Improvements Revolving Account - Waste 32 Disposal Facilities ...... $1,284,000 33 State and Local Improvements Revolving Account - Waste 34 Disposal Facilities, 1980 ...... $325,000 35 Local Toxics Control Account--State ...... $6,929,000 36 Subtotal Appropriation ...... (($4,609,000))

Code Rev/KK:cro Official Print - 45 S-5586.2/10 1 $54,609,000 2 Prior Biennia (Expenditures) ...... $0 3 Future Biennia (Projected Costs) ...... $0 4 TOTAL ...... (($4,609,000)) 5 $54,609,000

6 Sec. 3006. 2009 c 497 s 3060 (uncodified) is amended to read as 7 follows: 8 FOR THE DEPARTMENT OF ECOLOGY 9 Remedial Action Grant Program (30000039) 10 The appropriation in this section is subject to the following 11 conditions and limitations: $3,000,000 is provided solely for the city 12 of Bothell to remediate soil contamination. 13 Appropriation: 14 State Building Construction Account--State ...... $37,700,000 15 Local Toxics Control Account--State ...... $38,211,000 16 Subtotal Appropriation ...... $75,911,000 17 Prior Biennia (Expenditures) ...... $0 18 Future Biennia (Projected Costs) ...... $180,000,000 19 TOTAL ...... (($217,700,000)) 20 $255,911,000

21 Sec. 3007. 2009 c 497 s 3020 (uncodified) is amended to read as 22 follows: 23 FOR THE DEPARTMENT OF ECOLOGY 24 Breazeale Interpretive Center (20082856) 25 Reappropriation: 26 General Fund--Federal ...... (($270,000)) 27 $419,000 28 Prior Biennia (Expenditures) ...... (($225,000)) 29 $76,000 30 Future Biennia (Projected Costs) ...... $0 31 TOTAL ...... $495,000

32 NEW SECTION. Sec. 3008. A new section is added to 2009 c 497 33 (uncodified) to read as follows:

Code Rev/KK:cro Official Print - 46 S-5586.2/10 1 FOR THE DEPARTMENT OF ECOLOGY 2 Settlement Funding to Clean Up Toxic Sites (30000145) 3 Appropriation: 4 Cleanup Settlement Account--State ...... $8,500,000 5 Prior Biennia (Expenditures) ...... $0 6 Future Biennia (Projected Costs) ...... $0 7 TOTAL ...... $8,500,000

8 NEW SECTION. Sec. 3009. A new section is added to 2009 c 497 9 (uncodified) to read as follows: 10 FOR THE DEPARTMENT OF ECOLOGY 11 Cleanup Asarco Contamination on Vashon/Maury Islands and Mines 12 (91000009) 13 The appropriation in this section is subject to the following 14 conditions and limitations: $4,100,000 of the cleanup settlement 15 account appropriation and $10,900,000 of the state toxics control 16 account appropriation are provided solely for the department of ecology 17 to assist King County in the acquisition and remediation of property on 18 Vashon and Maury Islands. The properties are in the Tacoma smelter 19 plume area and are contaminated with arsenic and other heavy metals 20 from the Asarco smelter. 21 Appropriation: 22 Cleanup Settlement Account--State ...... $4,100,000 23 State Toxics Control Account--State ...... $10,900,000 24 Subtotal Appropriation ...... $15,000,000 25 Prior Biennia (Expenditures) ...... $0 26 Future Biennia (Projected Costs) ...... $0 27 TOTAL ...... $15,000,000

28 NEW SECTION. Sec. 3010. A new section is added to 2009 c 497 29 (uncodified) to read as follows: 30 FOR THE DEPARTMENT OF ECOLOGY 31 Clean Up Toxic Sites - Puget Sound (30000144) 32 The appropriation in this section is subject to the following 33 conditions and limitations: $17,500,000 of the cleanup settlement

Code Rev/KK:cro Official Print - 47 S-5586.2/10 1 account--state appropriation is provided solely for cleanup activities 2 associated with the Asarco contamination in Everett. 3 Appropriation: 4 State Building Construction Account--State ...... $511,000 5 Cleanup Settlement Account--State ...... $18,300,000 6 State Toxics Control Account--State ...... $22,387,000 7 Subtotal Appropriation ...... $41,198,000 8 Prior Biennia (Expenditures) ...... $0 9 Future Biennia (Projected Costs) ...... $0 10 TOTAL ...... $41,198,000

11 NEW SECTION. Sec. 3011. A new section is added to 2009 c 497 12 (uncodified) to read as follows: 13 FOR THE DEPARTMENT OF ECOLOGY 14 Reducing Diesel Particle Emissions in Tacoma (30000139) 15 The appropriation in this section is provided contingent upon the 16 department working with the Port of Tacoma to establish a diesel idling 17 reduction program. The department shall report to the legislature by 18 December 1, 2010, on the progress of the diesel idling reduction 19 program and other efforts to reduce diesel particle emissions in 20 Tacoma. 21 Appropriation: 22 Air Pollution Control Account--State ...... $1,000,000 23 Prior Biennia (Expenditures) ...... $0 24 Future Biennia (Projected Costs) ...... $0 25 TOTAL ...... $1,000,000

26 NEW SECTION. Sec. 3012. A new section is added to 2009 c 497 27 (uncodified) to read as follows: 28 FOR THE DEPARTMENT OF ECOLOGY 29 Reducing Wood Smoke Particle Emissions in Tacoma (30000140) 30 Appropriation: 31 Air Pollution Control Account--State ...... $600,000 32 Prior Biennia (Expenditures) ...... $0 33 Future Biennia (Projected Costs) ...... $0 34 TOTAL ...... $600,000

Code Rev/KK:cro Official Print - 48 S-5586.2/10 1 NEW SECTION. Sec. 3013. A new section is added to 2009 c 497 2 (uncodified) to read as follows: 3 FOR THE DEPARTMENT OF ECOLOGY 4 Water Pollution Control Revolving Fund Program Match (91000008) 5 Appropriation: 6 Public Works Assistance Account--State ...... $1,400,000 7 Prior Biennia (Expenditures) ...... $0 8 Future Biennia (Projected Costs) ...... $0 9 TOTAL ...... $1,400,000

10 NEW SECTION. Sec. 3014. A new section is added to 2009 c 497 11 (uncodified) to read as follows: 12 FOR THE DEPARTMENT OF ECOLOGY 13 Water Pollution Control Revolving Fund Program (30000142) 14 Appropriation: 15 Water Pollution Control Revolving 16 Account--State ...... $25,000,000 17 Water Pollution Control Revolving 18 Account--Federal ...... $12,000,000 19 Subtotal Appropriation ...... $37,000,000 20 Prior Biennia (Expenditures) ...... $0 21 Future Biennia (Projected Costs) ...... $0 22 TOTAL ...... $37,000,000

23 Sec. 3015. 2009 c 497 s 3052 (uncodified) is amended to read as 24 follows: 25 FOR THE DEPARTMENT OF ECOLOGY 26 Safe Soils Remediation Program (30000019) 27 Appropriation: 28 State Building Construction Account--State . . . . . (($4,000,000)) 29 $2,380,000 30 Cleanup Settlement Account--State ...... $1,620,000 31 Subtotal Appropriation ...... $4,000,000 32 Prior Biennia (Expenditures) ...... $0 33 Future Biennia (Projected Costs) ...... $0 34 TOTAL ...... $4,000,000

Code Rev/KK:cro Official Print - 49 S-5586.2/10 1 NEW SECTION. Sec. 3016. A new section is added to 2009 c 497 2 (uncodified) to read as follows: 3 FOR THE DEPARTMENT OF ECOLOGY 4 Wastewater Treatment and Water Reclamation (92000041) 5 The appropriation in this section is provided solely for wastewater 6 treatment and reclamation projects as follows:

7 Project Funding 8 Potlatch wastewater treatment and reclamation ...... $1,645,000 9 Willapa Harbor sewer project ...... $1,000,000 10 Omak sanitary sewer project ...... $450,000 11 Sultan wastewater treatment facility ...... $335,000

12 Appropriation: 13 State Building Construction Account--State ...... $3,430,000

14 Prior Biennia (Expenditures) ...... $0 15 Future Biennia (Projected Costs) ...... $0 16 TOTAL ...... $3,430,000

17 Sec. 3017. 2009 c 497 s 3093 (uncodified) is amended to read as 18 follows: 19 FOR THE STATE PARKS AND RECREATION COMMISSION 20 Flaming Geyser State Park Park-wide Infrastructure Redevelopment 21 (30000173) 22 Appropriation: 23 State Building Construction Account--State . . . . . (($3,533,000)) 24 $3,003,000 25 Prior Biennia (Expenditures) ...... $0 26 Future Biennia (Projected Costs) ...... $0 27 TOTAL ...... (($3,533,000)) 28 $3,003,000

29 Sec. 3018. 2009 c 497 s 3094 (uncodified) is amended to read as 30 follows: 31 FOR THE STATE PARKS AND RECREATION COMMISSION 32 Sanitary Sewer Collection System (30000269)

Code Rev/KK:cro Official Print - 50 S-5586.2/10 1 Appropriation: 2 State Building Construction Account--State . . . . . (($3,820,000)) 3 $3,247,000 4 Prior Biennia (Expenditures) ...... $0 5 Future Biennia (Projected Costs) ...... $0 6 TOTAL ...... (($3,820,000)) 7 $3,247,000

8 Sec. 3019. 2009 c 497 s 3090 (uncodified) is amended to read as 9 follows: 10 FOR THE STATE PARKS AND RECREATION COMMISSION 11 Wastewater Treatment Upgrade (30000447) 12 Appropriation: 13 State Building Construction Account--State . . . . . (($1,850,000)) 14 $1,572,000 15 Prior Biennia (Expenditures) ...... $0 16 Future Biennia (Projected Costs) ...... $0 17 TOTAL ...... (($1,850,000)) 18 $1,572,000

19 Sec. 3020. 2009 c 497 s 3091 (uncodified) is amended to read as 20 follows: 21 FOR THE STATE PARKS AND RECREATION COMMISSION 22 Cama Beach State Park (30000101) 23 Appropriation: 24 State Building Construction Account--State . . . . . (($3,265,000)) 25 $2,775,000 26 Prior Biennia (Expenditures) ...... $0 27 Future Biennia (Projected Costs) ...... $0 28 TOTAL ...... (($3,265,000)) 29 $2,775,000

30 Sec. 3021. 2009 c 497 s 3085 (uncodified) is amended to read as 31 follows: 32 FOR THE STATE PARKS AND RECREATION COMMISSION 33 Federal Grant Authority (30000006)

Code Rev/KK:cro Official Print - 51 S-5586.2/10 1 The appropriation in this section is provided contingent upon the 2 commission providing advance notice to the appropriate fiscal 3 committees of the legislature and the office of financial management 4 before applying for federal grants for acquisition of park lands and 5 facilities. The commission shall submit this information in the form 6 of a report that explains the funding source, the match and use 7 requirements, a description of the project that will be funded, and a 8 description of future impacts to the operating budget. 9 Appropriation: 10 General Fund--Federal ...... (($990,000)) 11 $1,990,000 12 Prior Biennia (Expenditures) ...... $0 13 Future Biennia (Projected Costs) ...... $4,000,000 14 TOTAL ...... (($4,990,000)) 15 $5,990,000

16 NEW SECTION. Sec. 3022. A new section is added to 2009 c 497 17 (uncodified) to read as follows: 18 FOR THE STATE PARKS AND RECREATION COMMISSION 19 State Park - Wastewater System (30000483) 20 Appropriation: 21 State Building Construction Account--State ...... $300,000 22 Prior Biennia (Expenditures) ...... $0 23 Future Biennia (Projected Costs) ...... $2,600,000 24 TOTAL ...... $2,900,000

25 Sec. 3023. 2009 c 497 s 3109 (uncodified) is amended to read as 26 follows: 27 FOR THE RECREATION AND CONSERVATION FUNDING BOARD 28 Washington Wildlife and Recreation Program (20044002) 29 The reappropriations in this section are subject to the following 30 conditions and limitations: Any amount of the reappropriations that is 31 not obligated to a specific project may be used to fund alternate 32 projects approved by the legislature from the same account in biennia 33 succeeding that in which the moneys were originally appropriated. 34 Reappropriation:

Code Rev/KK:cro Official Print - 52 S-5586.2/10 1 Outdoor Recreation Account--State ...... $1,499,000 2 Habitat Conservation Account--State ...... (($4,789,000)) 3 $4,319,000 4 Subtotal Reappropriation ...... (($6,288,000)) 5 $5,818,000 6 Prior Biennia (Expenditures) ...... $38,712,000 7 Future Biennia (Projected Costs) ...... $0 8 TOTAL ...... (($45,000,000)) 9 $44,530,000

10 Sec. 3024. 2009 c 497 s 3133 (uncodified) is amended to read as 11 follows: 12 FOR THE RECREATION AND CONSERVATION FUNDING BOARD 13 Washington Wildlife Recreation Grants (20084011) 14 The reappropriations in this section are subject to the following 15 conditions and limitations: 16 (1) The reappropriations are provided solely for the approved list 17 of projects in LEAP capital document No. 2007-3 as developed on March 18 17, 2007, and LEAP capital document No. 2008-1 as developed on February 19 13, 2008. 20 (2) If additional funds are available after funding the farmlands 21 preservation account projects approved in subsection (1) of this 22 section, the committee may: Provide one-time grants of up to $25,000 23 each to counties requesting assistance in developing farmlands 24 preservation strategies for the purpose of seeking grants from the 25 farmlands preservation account in future grant cycles. 26 (3) Funds reappropriated for distribution according to the 27 provisions of RCW 79A.15.040(1)(c) must be allocated forty percent to 28 local government projects and sixty percent to state agency projects. 29 If the cumulative total of local government projects is less than forty 30 percent of the total distribution to this category, the difference may 31 be allocated to state agency projects. 32 (4) Up to $627,299 of the reappropriation from the riparian 33 protection account is provided solely for the Chehalis river surge 34 plain natural area preserve. This amount may not be expended for the 35 project until the department of natural resources has completed a 36 management plan for the preserve that maintains recreational access and

Code Rev/KK:cro Official Print - 53 S-5586.2/10 1 that management plan is presented to the house of representatives 2 capital budget and senate ways and means committees. 3 Reappropriation: 4 Farmlands Preservation Account--State ...... (($5,300,000)) 5 $4,319,000 6 Riparian Protection Account--State ...... $12,500,000 7 Habitat Conservation Account--State ...... $23,956,000 8 Outdoor Recreation Account--State ...... $22,994,000 9 Subtotal Reappropriation ...... (($64,750,000)) 10 $63,769,000 11 Prior Biennia (Expenditures) ...... $35,250,000 12 Future Biennia (Projected Costs) ...... $0 13 TOTAL ...... (($100,000,000)) 14 $99,019,000

15 Sec. 3025. 2009 c 497 s 3138 (uncodified) is amended to read as 16 follows: 17 FOR THE RECREATION AND CONSERVATION FUNDING BOARD 18 Aquatic Lands Enhancement Account (30000007) 19 The appropriation in this section is subject to the following 20 conditions and limitations: The appropriation is provided solely for 21 the list of projects in LEAP capital document No. 2009-3, developed 22 March 9, 2009. 23 Appropriation: 24 State Building Construction Account--State . . . . . (($5,025,000)) 25 $4,025,000 26 Aquatic Lands Enhancement Account--State ...... $1,000,000 27 Subtotal Appropriation ...... $5,025,000 28 Prior Biennia (Expenditures) ...... $0 29 Future Biennia (Projected Costs) ...... $20,100,000 30 TOTAL ...... $25,125,000

31 Sec. 3026. 2009 c 497 s 3157 (uncodified) is amended to read as 32 follows: 33 FOR THE DEPARTMENT OF FISH AND WILDLIFE 34 Voights Creek Hatchery (20081003)

Code Rev/KK:cro Official Print - 54 S-5586.2/10 1 The appropriation in this section is subject to the following 2 conditions and limitations: 3 (1) $200,000 of the amount appropriated is provided solely for the 4 repair necessary to restore the facility for limited operations; 5 (2) $550,000 of the amount appropriated is provided ((solely)) for 6 property acquisition and permitting. No later than June 1, 2010, the 7 department shall submit to the office of financial management and the 8 fiscal committees of the legislature construction costs that total no 9 more than fourteen million dollars. 10 If the department does not acquire property, the amount provided in 11 this subsection shall lapse; and 12 (3) $50,000 of the amount appropriated is provided solely for the 13 department to participate in a work group with the Puyallup Tribe of 14 Indians that will make recommendations no later than December 1, 2009, 15 regarding the options for improving production from hatcheries along 16 the Puyallup river system while reducing cost. Options to be 17 considered include shifting production among the hatcheries, 18 consolidation of hatcheries, and shifting responsibilities for 19 construction, maintenance and operations of hatcheries. 20 Reappropriation: 21 State Building Construction Account--State ...... $150,000 22 Appropriation: 23 State Building Construction Account--State ...... $800,000 24 Prior Biennia (Expenditures) ...... $355,000 25 Future Biennia (Projected Costs) ...... $1,800,000 26 TOTAL ...... $3,105,000

27 Sec. 3027. 2009 c 497 s 3168 (uncodified) is amended to read as 28 follows: 29 FOR THE DEPARTMENT OF FISH AND WILDLIFE 30 Mitigation Projects and Dedicated Funding (20082048) 31 ((The reappropriation in this section is subject to the following 32 conditions and limitations:)) (1) The reappropriation and the 33 appropriation in this section are provided contingent upon the 34 department providing advance notice to the appropriate fiscal 35 committees of the legislature and the office of financial management 36 before applying for federal grants for acquisition of fish and wildlife

Code Rev/KK:cro Official Print - 55 S-5586.2/10 1 habitat lands. The department shall submit this information in the 2 form of a report that explains the funding source, the match and use 3 requirements, a description of the project that will be funded, and a 4 description of future impacts to the operating budget. 5 (2) Up to $2,300,000 of the reappropriation is provided solely for 6 capital projects and engineering to pay the total cost of labor and 7 materials provided by the department of fish and wildlife. 8 Reappropriation: 9 General Fund--Federal ...... $9,000,000 10 Appropriation: 11 General Fund--Private/Local ...... $2,500,000 12 Game Special Wildlife Account--Federal ...... $600,000 13 Game Special Wildlife Account--Private/Local ...... $900,000 14 General Fund--Federal ...... (($25,000,000)) 15 $31,000,000 16 Subtotal Appropriation ...... (($29,000,000)) 17 $35,000,000 18 Prior Biennia (Expenditures) ...... $19,125,000 19 Future Biennia (Projected Costs) ...... $114,800,000 20 TOTAL ...... (($171,925,000)) 21 $177,925,000

22 Sec. 3028. 2009 c 497 s 3169 (uncodified) is amended to read as 23 follows: 24 FOR THE DEPARTMENT OF FISH AND WILDLIFE 25 Minor Works - Facility Preservation (30000149) 26 Appropriation: 27 State Building Construction Account--State ...... (($677,000)) 28 $420,000 29 Prior Biennia (Expenditures) ...... $0 30 Future Biennia (Projected Costs) ...... $10,000,000 31 TOTAL ...... (($10,677,000)) 32 $10,420,000

33 NEW SECTION. Sec. 3029. A new section is added to 2009 c 497 34 (uncodified) to read as follows:

Code Rev/KK:cro Official Print - 56 S-5586.2/10 1 FOR THE DEPARTMENT OF FISH AND WILDLIFE 2 Leque Island Highway 532 Road Protection (92000019) 3 Appropriation: 4 State Building Construction Account--State ...... $680,000 5 Prior Biennia (Expenditures) ...... $0 6 Future Biennia (Projected Costs) ...... $0 7 TOTAL ...... $680,000

8 Sec. 3030. 2009 c 497 s 3172 (uncodified) is amended to read as 9 follows: 10 FOR THE DEPARTMENT OF FISH AND WILDLIFE 11 Minor Works - Road Maintenance and Abandonment Plan (30000022) 12 Appropriation: 13 State Building Construction Account--State . . . . . (($1,000,000)) 14 $950,000 15 Prior Biennia (Expenditures) ...... $0 16 Future Biennia (Projected Costs) ...... $4,050,000 17 TOTAL ...... (($5,050,000)) 18 $5,000,000

19 Sec. 3031. 2009 c 497 s 3178 (uncodified) is amended to read as 20 follows: 21 FOR THE DEPARTMENT OF FISH AND WILDLIFE 22 Minor Works - Dam and Dike (30000145) 23 Appropriation: 24 State Building Construction Account--State ...... (($943,000)) 25 $897,000 26 Prior Biennia (Expenditures) ...... $0 27 Future Biennia (Projected Costs) ...... $3,780,000 28 TOTAL ...... (($4,723,000)) 29 $4,677,000

30 Sec. 3032. 2009 c 497 s 3182 (uncodified) is amended to read as 31 follows: 32 FOR THE DEPARTMENT OF FISH AND WILDLIFE 33 Minor Works - Programmatic (30000179)

Code Rev/KK:cro Official Print - 57 S-5586.2/10 1 Appropriation: 2 State Building Construction Account--State ...... (($400,000)) 3 $250,000 4 Prior Biennia (Expenditures) ...... $0 5 Future Biennia (Projected Costs) ...... $5,500,000 6 TOTAL ...... (($5,900,000)) 7 $5,750,000

8 NEW SECTION. Sec. 3033. A new section is added to 2009 c 497 9 (uncodified) to read as follows: 10 FOR THE DEPARTMENT OF FISH AND WILDLIFE 11 Carpenter Creek Estuary Restoration (92000023) 12 The appropriation in this section is provided solely for estuary 13 restoration in Carpenter Creek. 14 Appropriation: 15 State Building Construction Account--State ...... $2,784,000 16 Prior Biennia (Expenditures) ...... $0 17 Future Biennia (Projected Costs) ...... $0 18 TOTAL ...... $2,784,000

19 NEW SECTION. Sec. 3034. A new section is added to 2009 c 497 20 (uncodified) to read as follows: 21 FOR THE DEPARTMENT OF FISH AND WILDLIFE 22 Puget Sound General Investigation for Nearshore Restoration 23 (92000025) 24 Appropriation: 25 State Toxics Control Account--State ...... $1,030,000 26 Prior Biennia (Expenditures) ...... $0 27 Future Biennia (Projected Costs) ...... $0 28 TOTAL ...... $1,030,000

29 NEW SECTION. Sec. 3035. A new section is added to 2009 c 497 30 (uncodified) to read as follows: 31 FOR THE DEPARTMENT OF FISH AND WILDLIFE 32 Puget Sound Flood Plain Restoration Projects (91000004)

Code Rev/KK:cro Official Print - 58 S-5586.2/10 1 The appropriation in this section is subject to the following 2 conditions and limitations: 3 (1) $185,000 of the appropriation is provided solely for the South 4 Fork Nooksack River and tributaries restoration project. 5 (2) $381,000 of the appropriation is provided solely for the 6 Nooksack Forks large woody debris placement project. 7 Appropriation: 8 State Building Construction Account--State ...... $566,000 9 Prior Biennia (Expenditures) ...... $0 10 Future Biennia (Projected Costs) ...... $0 11 TOTAL ...... $566,000

12 Sec. 3036. 2009 c 497 s 3197 (uncodified) is amended to read as 13 follows: 14 FOR THE DEPARTMENT OF NATURAL RESOURCES 15 Natural Resources Real Property Replacement (30000051) 16 The appropriation in this section is subject to the following 17 conditions and limitations: The appropriation is provided solely for 18 acquisition of working forest lands at risk of conversion to nonforest 19 uses and working natural resource lands that will protect and enhance 20 the value of trust land holdings. The legislature finds that the 21 chronic loss of working forest lands threatens the long-term prospects 22 of the timber products and other natural resource industries, which in 23 turn threatens the long-term economic return for the beneficiaries of 24 state trust lands. Acquisition of these lands is intended to help 25 stabilize the primary source of revenue to trust land beneficiaries. 26 The department shall submit a report to the appropriate committees of 27 the legislature by October 1, 2010, and every two years thereafter, 28 indicating the lands purchased under this section, showing the 29 locations, acres, purchase price, and within that purchase price, the 30 value of the property attributed to the future value of timber harvests 31 given an expected rate of return for timber lands, and the value of the 32 property attributed to future development of the property. It is the 33 intent of the legislature to lease the development rights of these 34 conversion lands and retain them as long-term working natural resource 35 lands under the sustainable harvest plan. Working forest lands

Code Rev/KK:cro Official Print - 59 S-5586.2/10 1 acquired under this section shall be managed at a level equal to or 2 greater than seventy-five percent of the expected harvest under the 3 sustainable harvest plan. 4 The department shall not proceed with the Ice Harbor land exchange 5 prior to June 30, 2011. 6 Appropriation: 7 Natural Resources Real Property Replacement 8 Account--State ...... $50,000,000 9 Prior Biennia (Expenditures) ...... $0 10 Future Biennia (Projected Costs) ...... $200,000,000 11 TOTAL ...... $250,000,000

12 Sec. 3037. 2009 c 497 s 3203 (uncodified) is amended to read as 13 follows: 14 FOR THE DEPARTMENT OF NATURAL RESOURCES 15 Trust Land Transfer (30000066) 16 The appropriation in this section is subject to the following 17 conditions and limitations: 18 (1) The total appropriation is provided to the department solely to 19 transfer from trust status, or enter into fifty year leases for, 20 certain trust lands of statewide significance deemed appropriate for 21 state park, fish and wildlife habitat, natural area preserve, natural 22 resources conservation area, open space, housing and essential 23 government services, or recreation purposes. The approved list of 24 properties for lease or transfer is identified in the LEAP capital 25 document No. 2009-2a, developed April 23, 2009. 26 (2) Property transferred under this section must be appraised and 27 transferred at fair market value. The value of the timber transferred 28 must be deposited by the department to the common school construction 29 account in the same manner as timber revenues from other common school 30 trust lands. No deduction may be made for the resource management cost 31 account under RCW 79.64.040. The value of the land transferred must be 32 deposited in the natural resources real property replacement account. 33 (3) Property subject to lease agreements under this section must be 34 appraised at fair market value. Lease terms must be fifty years with 35 options to renew for an additional fifty years. Lease payments must be 36 lump sum payments for the entire term of the lease at the beginning of

Code Rev/KK:cro Official Print - 60 S-5586.2/10 1 the lease. The department shall calculate such lump sum payments using 2 professional appraisal standards. These lease payments may not exceed 3 the fee simple purchase price based on current fair market value and 4 must be deposited by the department to the common school construction 5 account in the same manner as lease revenues from other common school 6 trust lands. No deduction may be made for the resource management cost 7 account under RCW 79.64.040. 8 (4) All reasonable costs incurred by the department to implement 9 this section are authorized to be paid out of the appropriations. 10 Authorized costs include the actual cost of appraisals, staff time, 11 environmental reviews, surveys, and other similar costs and shall not 12 exceed ((one and nine-tenths)) two and six-tenths percent of the 13 appropriation. 14 (5) Intergrant exchanges between common school and other trust 15 lands of equal value may occur if the exchange is in the interest of 16 each trust, as determined by the board of natural resources. 17 (6) Prior to or concurrent with conveyance of these properties, the 18 department, with full cooperation of the receiving agencies, shall 19 execute and record a real property instrument that dedicates the 20 transferred properties to the purposes identified in subsection (1) of 21 this section. Transfer and lease agreements for properties identified 22 in subsection (1) of this section must include terms that restrict the 23 use of the property to the intended purpose. Transfer and lease 24 agreements may include provisions for receiving agencies to request 25 alternative uses of the property, provided the alternative uses are 26 compatible with the original intended public purpose and the department 27 and legislature approves such uses. 28 (7) The department and receiving agencies shall work in good faith 29 to carry out the intent of this section. However, the department or 30 receiving agencies may remove a property from the transfer list based 31 on new, substantive information, if it is determined that transfer of 32 the property is not in the statewide interest of either the common 33 school trust or the receiving agency. 34 (8) The department shall execute trust land transfers that, after 35 the deduction of reasonable costs as provided in subsection (4) of this 36 section, eighty percent of the total value of transferred property is 37 timber value and is deposited in the common school construction

Code Rev/KK:cro Official Print - 61 S-5586.2/10 1 account. To achieve the eighty percent requirement, the department may 2 choose to lease properties originally intended as transfers. 3 (9) $4,189,000 of the amount appropriated is provided solely for 4 fifty-year leases of development rights from timber lands at risk of 5 conversion to non-timber land uses purchased from appropriations in the 6 2007-2009 fiscal period. 7 (10) ((On June 30, 2011,)) The state treasurer shall transfer all 8 remaining uncommitted funds from this appropriation to the common 9 school construction account and the appropriations in this section 10 shall be reduced by an equivalent amount. 11 Appropriation: 12 State Building Construction Account--State ...... $100,133,000 13 Prior Biennia (Expenditures) ...... $0 14 Future Biennia (Projected Costs) ...... $400,000,000 15 TOTAL ...... $500,133,000

16 NEW SECTION. Sec. 3038. A new section is added to 2009 c 497 17 (uncodified) to read as follows: 18 FOR THE DEPARTMENT OF NATURAL RESOURCES 19 Forest Hazard Reduction and Biomass Equipment (91000003) 20 The appropriation in this section is subject to the following 21 conditions and limitations: 22 (1) The natural resources equipment account appropriation in this 23 section is provided solely for the purchase of forest biomass feedstock 24 processing equipment appropriate for forest biomass-to-energy projects 25 in eastern Washington in areas with a scarcity of primary wood 26 processing facilities, or for making grants on a competitive basis to 27 local governments or nonprofit entities in such local areas for 28 purchase of such equipment. Equipment purchased, either by the 29 department or a grantee, must be made available for lease, or other 30 lawful means of conveyance, or be operated directly, for use in forest 31 biomass-to-energy projects in an area of eastern Washington with a 32 scarcity of primary wood processing facilities. In providing for the 33 use of such equipment, consideration shall be given by the department 34 or grantee in the opportunity for the forest biomass-to-energy project 35 to promote forest treatments to improve forest health and/or remove

Code Rev/KK:cro Official Print - 62 S-5586.2/10 1 hazardous buildup of forest fuels. Consideration may also be given to 2 generating jobs in counties with high rates of unemployment. 3 (2) The state building construction account--state appropriation is 4 provided solely for forest improvement treatments on forest lands of 5 eastern Washington with the five highest priority fire and disease 6 hazards in Stevens, Ferry, Lincoln, Pend Oreille, Okanogan, Yakima, 7 Kittitas, and Spokane counties. Forest treatments on private lands 8 funded by this appropriation require an agreement with the property 9 owner that includes a commitment to maintain the improvements to forest 10 health. 11 Appropriation: 12 Natural Resources Equipment Account ...... $750,000 13 State Building Construction Account--State ...... $2,000,000 14 Subtotal Appropriation ...... $2,750,000 15 Prior Biennia (Expenditures) ...... $0 16 Future Biennia (Projected Costs) ...... $0 17 TOTAL ...... $2,750,000

18 NEW SECTION. Sec. 3039. A new section is added to 2009 c 497 19 (uncodified) to read as follows: 20 FOR THE DEPARTMENT OF NATURAL RESOURCES 21 Removal/Cleanup of Asarco Docks in Ruston/Commencement Bay 22 (91000004) 23 Appropriation: 24 Resource Management Cost Account--State ...... $2,050,000 25 Prior Biennia (Expenditures) ...... $0 26 Future Biennia (Projected Costs) ...... $0 27 TOTAL ...... $2,050,000

28 NEW SECTION. Sec. 3040. A new section is added to 2009 c 497 29 (uncodified) to read as follows: 30 FOR THE DEPARTMENT OF NATURAL RESOURCES 31 Puget Sound Cleanup and Recovery (92000003) 32 The appropriation in this section is subject to the following 33 conditions and limitations: $1,030,000 of the cleanup settlement 34 account--state appropriation is provided solely for removal of 35 contaminated pilings and habitat restoration in Commencement Bay.

Code Rev/KK:cro Official Print - 63 S-5586.2/10 1 These funds are provided contingent upon receiving concurrence from the 2 department of ecology that the project is aligned with the ten year 3 plan for cleaning up Asarco- related contamination. 4 Appropriation: 5 Cleanup Settlement Account--State ...... $1,030,000 6 Prior Biennia (Expenditures) ...... $0 7 Future Biennia (Projected Costs) ...... $0 8 TOTAL ...... $1,030,000

9 NEW SECTION. Sec. 3041. A new section is added to 2009 c 497 10 (uncodified) to read as follows: 11 FOR THE DEPARTMENT OF NATURAL RESOURCES 12 Forest Riparian Easement Program (30000070) 13 The appropriation in this section is subject to the following 14 conditions and limitations: 15 (1) $600,000 of the forest and fish support account appropriation 16 is provided contingent upon the sale of the king air by the department. 17 The office of financial management shall allot only an amount that is 18 equivalent to the proceeds received from the sale of the king air and 19 no more than $600,000. 20 (2) If the appropriation in this section is less than the level 21 demanded in submitted applications, the department of natural resources 22 shall prioritize the use of the funds as follows: 23 (3) Highest priority shall be given to applications that include 24 one or more of the following conditions, in the following priority 25 order: (a) The greatest proportion of riparian buffer impacted in the 26 related forest practices application; (b) lands in deferred tax status 27 of classified timber land or classified open space as defined in RCW 28 84.34.020; (c) lands at greatest risk of conversion to other land uses 29 as determined by county zoning and land classifications and proximity 30 to urban growth areas or other areas of concentrated land development; 31 (d) lands that are certified by a forest certification recognized by 32 the department; (e) the applicant has not received a forestry riparian 33 easement since July 1, 2007; (f) the applicant is not a nonprofit 34 organization; (g) the applicant has been waiting three years or more 35 for a forestry easement purchase; and (h) the application does not

Code Rev/KK:cro Official Print - 64 S-5586.2/10 1 include any of the conditions specified in subsection (2) of this 2 section. 3 (4) The lowest priority shall be given to applications that include 4 any of the following conditions: (a) The forest management activities 5 for the aggregated ownership of the landowner referenced in the 6 application, his or her spouse, and his or her children exceed the 7 small forest landowner definition in RCW 76.13.120(2)(c); (b) the 8 applicant has had legal ownership for less than five years, except when 9 the applicant is a lineal descendant of a landowner meeting this 10 condition; (c) the applicant has an outstanding violation of the forest 11 practices act under chapter 76.09 RCW; (d) the applicant is in default 12 on a financial obligation to an agency of the state including 13 noncompliance with a child support order under RCW 74.20A.320; (e) the 14 application is for land on which other conservation easements have been 15 executed and recorded on the title; or (f) the land is owned by a 16 nonprofit organization that does not have deferred tax designations of 17 either classified timber land or classified open space as defined in 18 RCW 84.34.020 and does not have a county-recognized forest management 19 plan. 20 (5) The department of natural resources shall use legally binding 21 affidavits to obtain from the applicants any supplemental information 22 necessary to assist in prioritizing the use of the funds appropriated 23 in this section. The department must verify the prioritized use of the 24 funds appropriated in this section by: (a) Investigating a random 25 subset of affidavits for easements purchased for an amount less than 26 one hundred thousand dollars; and (b) investigating all easements 27 purchased for an amount in excess of one hundred thousand dollars. 28 (6) The department shall work with interested stakeholders to 29 develop recommendations for changes to the ongoing eligibility, 30 prioritization, and policy provisions of the forestry riparian easement 31 program specified in RCW 76.13.120. In developing these 32 recommendations, the department and the interested stakeholders shall 33 consider the inclusion of the conditions utilized in this section to 34 establish eligibility and prioritization of funding. The department 35 and the interested stakeholders shall submit final recommendations in 36 the form of legislation to the office of financial management and the 37 legislature by October 1, 2010. 38 Appropriation:

Code Rev/KK:cro Official Print - 65 S-5586.2/10 1 State Building Construction Account--State ...... $500,000 2 Forest and Fish Support Account--State ...... $600,000 3 Subtotal Appropriation ...... $1,100,000 4 Prior Biennia (Expenditures) ...... $0 5 Future Biennia (Projected Costs) ...... $0 6 TOTAL ...... $1,100,000

7 NEW SECTION. Sec. 3042. A new section is added to 2009 c 497 8 (uncodified) to read as follows: 9 FOR THE DEPARTMENT OF NATURAL RESOURCES 10 Elk River Estuarine Lands Acquisition (91000007) 11 Appropriation: 12 General Fund--Federal ...... $1,000,000 13 Prior Biennia (Expenditures) ...... $0 14 Future Biennia (Projected Costs) ...... $0 15 TOTAL ...... $1,000,000

(End of part)

Code Rev/KK:cro Official Print - 66 S-5586.2/10 1 PART 4 2 TRANSPORTATION

3 Sec. 4001. 2009 c 497 s 4008 (uncodified) is amended to read as 4 follows: 5 FOR THE WASHINGTON STATE DEPARTMENT OF TRANSPORTATION 6 Commute Trip Reduction for Thurston County State Agencies 7 (92000001) 8 The appropriation in this section is subject to the following 9 conditions and limitations: The appropriation is provided solely for 10 implementation of chapter 427, Laws of 2009 (Substitute Senate Bill No. 11 6088 (commute trip reduction)). 12 Appropriation: 13 State Vehicle Parking Account--State ...... (($734,000)) 14 $650,000 15 Prior Biennia (Expenditures) ...... $0 16 Future Biennia (Projected Costs) ...... $0 17 TOTAL ...... (($734,000)) 18 $650,000

19 NEW SECTION. Sec. 4002. A new section is added to 2009 c 497 20 (uncodified) to read as follows: 21 FOR THE WASHINGTON STATE DEPARTMENT OF TRANSPORTATION 22 Freight Mobility Study - SR 12 & Schouweiler Road (91000001) 23 The appropriation in this section is subject to the following 24 conditions and limitations: The appropriation is provided solely for 25 the department of transportation to conduct a study on improving 26 freight mobility on state route no. 12 in the vicinity of Elma. The 27 study shall include a review of possible improvements to freight 28 mobility at Schouweiler Road. 29 Appropriation: 30 State Building Construction Account--State ...... $500,000 31 Prior Biennia (Expenditures) ...... $0 32 Future Biennia (Projected Costs) ...... $0

Code Rev/KK:cro Official Print - 67 S-5586.2/10 1 TOTAL ...... $500,000

2 NEW SECTION. Sec. 4003. A new section is added to 2009 c 497 3 (uncodified) to read as follows: 4 FOR THE WASHINGTON STATE PATROL 5 High Speed Driving Simulators (92000001) 6 The appropriation in this section is subject to the following 7 conditions and limitations: The appropriation is provided solely for 8 the purchase of two mobile high speed driving simulators. The 9 Washington state patrol must assist in the purchase of the simulators 10 and vehicles for transporting the simulators, and transfer ownership of 11 the simulators and vehicles to the appropriate agency after 12 consultation with stakeholders. The Washington state patrol must train 13 the trainers on the use of the simulators. The simulators are intended 14 to move among local police and sheriff departments in order to reduce 15 the risks to officers and the public from high speed pursuits. 16 Appropriation: 17 State Building Construction Account--State ...... $600,000 18 Prior Biennia (Expenditures) ...... $0 19 Future Biennia (Projected Costs) ...... $0 20 TOTAL ...... $600,000

(End of part)

Code Rev/KK:cro Official Print - 68 S-5586.2/10 1 PART 5 2 EDUCATION

3 Sec. 5001. 2009 c 497 s 5007 (uncodified) is amended to read as 4 follows: 5 FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION 6 Vocational Skills Centers (20084300) 7 Reappropriation: 8 State Building Construction Account--State . . . . (($58,546,000)) 9 $55,546,000 10 Prior Biennia (Expenditures) ...... $15,161,000 11 Future Biennia (Projected Costs) ...... $0 12 TOTAL ...... (($73,707,000)) 13 $70,707,000

14 Sec. 5002. 2009 c 497 s 5008 (uncodified) is amended to read as 15 follows: 16 FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION 17 Northeast King County Skills Center (20084855) 18 Appropriation: 19 School Construction/Skills Center Building 20 Account--State ...... (($9,049,000)) 21 $8,052,000 22 Prior Biennia (Expenditures) ...... $550,000 23 Future Biennia (Projected Costs) ...... $0 24 TOTAL ...... (($9,599,000)) 25 $8,602,000

26 Sec. 5003. 2009 c 497 s 5009 (uncodified) is amended to read as 27 follows: 28 FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION 29 North Central Technical Skills Center (20084861) 30 Appropriation: 31 School Construction/Skills Center Building 32 Account--State ...... (($4,007,000))

Code Rev/KK:cro Official Print - 69 S-5586.2/10 1 $3,960,000 2 Prior Biennia (Expenditures) ...... $50,000 3 Future Biennia (Projected Costs) ...... $18,500,000 4 TOTAL ...... (($22,557,000)) 5 $22,510,000

6 Sec. 5004. 2009 c 497 s 5002 (uncodified) is amended to read as 7 follows: 8 FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION 9 School Construction Assistance Grants (20084200) 10 The appropriation and the reappropriation in this section are 11 subject to the following conditions and limitations: 12 For school construction projects funded through the school 13 construction assistance grant program, the superintendent of public 14 instruction shall require mapping the design of new facilities and 15 remapping the design of facilities to be remodeled. 16 Reappropriation: 17 Common School Construction Account--State ...... $176,922,000 18 Appropriation: 19 State Building Construction Account--State ...... $137,267,000 20 Prior Biennia (Expenditures) ...... $477,570,000 21 Future Biennia (Projected Costs) ...... $0 22 TOTAL ...... $791,759,000

23 Sec. 5005. 2009 c 497 s 5013 (uncodified) is amended to read as 24 follows: 25 FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION 26 Vocational Skills Center Minor Capital Projects (30000002) 27 Appropriation: 28 School Construction and Skill Centers Building 29 Account--State ...... (($3,694,000)) 30 $3,594,000 31 Prior Biennia (Expenditures) ...... $0 32 Future Biennia (Projected Costs) ...... $0 33 TOTAL ...... (($3,694,000)) 34 $3,594,000

Code Rev/KK:cro Official Print - 70 S-5586.2/10 1 Sec. 5006. 2009 c 497 s 5014 (uncodified) is amended to read as 2 follows: 3 FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION 4 2009-11 School Construction Assistance Grant Program (30000031) 5 The appropriation in this section is subject to the following 6 conditions and limitations: 7 (1) ((The office of the superintendent of public instruction shall 8 develop a tracking system to increase accuracy in predicting the timing 9 of school district claims for reimbursement for school construction 10 assistance grants. The office of the superintendent of public 11 instruction shall also improve its communication with school districts 12 regarding the status of grant projects and create requirements 13 regarding the timing of reimbursement claims. The office of the 14 superintendent of public instruction shall submit a report on the 15 progress of the new tracking and communication system to the 16 appropriate committees of the legislature by November 15, 2009. The 17 report must include a list of school district capital projects 18 receiving state funding and each project's anticipated final 19 reimbursement date. 20 (2))) In calculating square foot eligibility for state assistance 21 grants, kindergarten student headcount shall not be reduced by fifty 22 percent. 23 (2) For school construction projects funded through the school 24 construction assistance grant program, the superintendent of public 25 instruction shall require mapping the design of new facilities and 26 remapping the design of facilities to be remodeled. 27 (3) Up to $17,000,000 of the state building construction account-- 28 state appropriation in this section is for the Grand Coulee Dam school 29 district school project, contingent on the availability of sufficient 30 contributions from federal, local, or private sources to make up the 31 remainder of the total cost of the project. The Grand Coulee Dam 32 school district is faced with a unique set of local funding barriers 33 and federal funds may substitute as the usual requirement for school 34 district participation. In the event sufficient matching contributions 35 are not secured, these funds shall lapse. 36 (4) $250,000 of the common school construction account--state 37 appropriation is provided solely for the office of the superintendent 38 of public instruction to develop a K-12 facility inventory and

Code Rev/KK:cro Official Print - 71 S-5586.2/10 1 condition system based on option number 3, described in the joint 2 legislative audit and review committee's January 2010 report, "K-12 3 Pilot Facility Inventory, Condition and Use System" as providing semi- 4 customized information capabilities with complete state data. The 5 office of the superintendent of public instruction must require school 6 districts to submit any energy audits completed for K-12 public school 7 buildings to be incorporated in the inventory system. It is the 8 legislature's intent to improve the availability of information 9 regarding the local use of state funds provided for school maintenance. 10 Although school facilities are constructed by, and the property of, 11 local jurisdictions, the legislature encourages school districts to 12 invest in activities that extend the useful life of school district 13 facilities. The state's general taxpayers have an interest in 14 information regarding these local decisions since state policy has been 15 to contribute funds in the biennial omnibus operating budget for 16 facilities' maintenance and to contribute capital budget funds to 17 eligible districts for renovation and replacement of buildings. In 18 light of 2010 legislation enacting changes to RCW 28A.150.260 that 19 increase state funding for school maintenance from $73.27 per annual 20 average full-time equivalent K-12 student to $153.18 per student by the 21 2015-16 school year, with annual adjustments for inflation thereafter, 22 it is the legislature's intent to facilitate development of an 23 information system that will provide better data regarding school 24 districts' use of any state funds provided to assist with maintenance 25 and to monitor facilities' conditions. 26 Appropriation: 27 State Building Construction Account--State . . . . (($369,920,000)) 28 $259,000,000 29 Common School Construction Account--State . . . . (($259,029,000)) 30 $200,826,000 31 Common School Construction Account--Federal . . . . (($2,500,000)) 32 $1,700,000 33 School Construction and Skill Centers Building 34 Account--Bond--State ...... (($58,284,000)) 35 $59,428,000 36 Subtotal Appropriation ...... (($689,733,000)) 37 $520,954,000 38 Prior Biennia (Expenditures) ...... $0

Code Rev/KK:cro Official Print - 72 S-5586.2/10 1 Future Biennia (Projected Costs) ...... $3,921,000,000 2 TOTAL ...... (($4,610,733,000)) 3 $4,441,954,000

4 Sec. 5007. 2009 c 497 s 5011 (uncodified) is amended to read as 5 follows: 6 FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION 7 ((Health, Safety,)) Energy Efficiency and Small Repair Grants 8 (91000007) 9 The appropriation in this section is subject to the following 10 conditions and limitations: 11 (1) Up to $3,000,000 of the appropriation is provided solely for 12 nonrecurring costs associated with school facility repairs and 13 renovations necessary for health and safety. The office of the 14 superintendent of public instruction, after consulting with maintenance 15 and operations administrators of school districts, shall develop 16 criteria for providing funding for specific projects to stay within the 17 appropriation level provided in this section. The criteria must 18 include, but are not limited to, the following: (a) Limiting recipient 19 district applications to one hundred thousand dollars per three-year 20 period; (b) limiting districts eligible to receive the grant only once 21 in any three-year period; and (c) requiring any district receiving 22 funding provided in this section to demonstrate a consistent commitment 23 to addressing school facilities needs. 24 (2) ((The)) $50,000,000 of the new appropriation is provided solely 25 for energy operational cost savings ((and safety and health 26 infrastructure)) improvements to school facilities ((initiated after 27 July 1, 2009)). The appropriation must be distributed using the 28 performance-based contracting method of delivering energy operational 29 cost savings ((and safety and health infrastructure)) improvements to 30 public facilities((, unless the minimal cost or the immediacy of the 31 project makes performance-based contracting impracticable. If the 32 minimal cost or immediacy of the project makes performance-based 33 contracting impracticable, the school district must receive a waiver 34 from the office of the superintendent of public instruction in order to 35 use the appropriation to address safety and health needs)). 36 (3) The superintendent of public instruction must report to the

Code Rev/KK:cro Official Print - 73 S-5586.2/10 1 appropriate committees of the legislature and the office of financial 2 management on the timing and use of the funds by the end of each fiscal 3 year, until the funds are fully expended. 4 (4) $100,000 of the appropriation is provided solely to the Monroe 5 public schools for retrofitting the Frank Wagner Elementary chimney. 6 Appropriation: 7 State Building Construction Account--State . . . . (($20,000,000)) 8 $70,000,000 9 Prior Biennia (Expenditures) ...... $0 10 Future Biennia (Projected Costs) ...... $0 11 TOTAL ...... (($20,000,000)) 12 $70,000,000

13 NEW SECTION. Sec. 5008. A new section is added to 2009 c 497 14 (uncodified) to read as follows: 15 FOR THE WASHINGTON STATE CENTER FOR CHILDHOOD DEAFNESS AND HEARING 16 LOSS 17 Lloyd Auditorium Emergency Repairs (30000012) 18 Appropriation: 19 State Building Construction Account--State ...... $2,500,000 20 Prior Biennia (Expenditures) ...... $0 21 Future Biennia (Projected Costs) ...... $0 22 TOTAL ...... $2,500,000

23 Sec. 5009. 2009 c 497 s 5027 (uncodified) is amended to read as 24 follows: 25 FOR THE UNIVERSITY OF WASHINGTON 26 Balmer Hall Reconstruction (20081004) 27 The reappropriation in this section is subject to the following 28 conditions and limitations: For construction of the facility 29 identified in this section, the university is authorized to issue a 30 bond or bonds financed from building fee and trust land revenue 31 deposited into the university bond retirement account in accordance 32 with RCW 28B.20.700 through 28B.20.740, provided that: (1) The total 33 amount of debt to be serviced from the building account shall not 34 exceed $42,800,000; (2) if bonds for the project are issued as build 35 America bonds, federal refunds on the bond interest cost shall be

Code Rev/KK:cro Official Print - 74 S-5586.2/10 1 deposited into the University of Washington building account 2 proportional to this project's share of the total bond issuance; and 3 (3) for the portion of the project that is serviced by building fee and 4 trust land revenues, the university shall select the financing method 5 that results in the lowest cost to the University of Washington 6 building account. 7 Reappropriation: 8 State Building Construction Account--State ...... $3,000,000 9 Prior Biennia (Expenditures) ...... $1,000,000 10 Future Biennia (Projected Costs) ...... (($38,600,000)) 11 $0 12 TOTAL ...... (($42,600,000)) 13 $4,000,000

14 Sec. 5010. 2009 c 497 s 5029 (uncodified) is amended to read as 15 follows: 16 FOR THE UNIVERSITY OF WASHINGTON 17 Interdisciplinary Academic Building (20082003) 18 The reappropriation in this section is subject to the following 19 conditions and limitations: In conjunction with the reappropriation in 20 this section, the University of Washington is authorized to issue a 21 bond or bonds in an amount not to exceed $53,554,000 in value for 22 construction of the molecular engineering building identified in this 23 section. The bond shall be financed from building fee and trust land 24 revenues deposited into the university's bond retirement account, in 25 accordance with RCW 28B.20.700 through 28B.20.740, provided that: (1) 26 If bonds for the project are issued as build America bonds, federal 27 refunds on the bond interest cost shall be deposited into the 28 University of Washington building account proportional to this 29 project's share of the total bond issuance; and (2) for the portion of 30 the project that is serviced by building fee and trust land revenues, 31 the university shall select the financing method that results in the 32 lowest cost to the University of Washington building account. 33 Reappropriation: 34 State Building Construction Account--State ...... $1,000,000 35 Prior Biennia (Expenditures) ...... $4,000,000 36 Future Biennia (Projected Costs) ...... $0

Code Rev/KK:cro Official Print - 75 S-5586.2/10 1 TOTAL ...... $5,000,000

2 Sec. 5011. 2009 c 497 s 5024 (uncodified) is amended to read as 3 follows: 4 FOR THE UNIVERSITY OF WASHINGTON 5 Clark Hall Renovation (20061007) 6 Reappropriation: 7 Education Construction Account--State ...... (($2,000,000)) 8 $967,000 9 Appropriation: 10 State Building Construction Account--State ...... $183,000 11 Prior Biennia (Expenditures) ...... $16,054,000 12 Future Biennia (Projected Costs) ...... $0 13 TOTAL ...... (($18,054,000)) 14 $17,204,000

15 Sec. 5012. 2009 c 497 s 5023 (uncodified) is amended to read as 16 follows: 17 FOR THE UNIVERSITY OF WASHINGTON 18 Savery Hall Renovation (20061005) 19 Reappropriation: 20 Gardner-Evans Higher Education Construction 21 Account--State ...... (($11,000,000)) 22 $10,822,000 23 Prior Biennia (Expenditures) ...... $50,510,000 24 Future Biennia (Projected Costs) ...... $0 25 TOTAL ...... (($61,510,000)) 26 $61,332,000

27 Sec. 5013. 2009 c 497 s 5026 (uncodified) is amended to read as 28 follows: 29 FOR THE UNIVERSITY OF WASHINGTON 30 Denny Hall Renovation (20081002) 31 Reappropriation: 32 State Building Construction Account--State . . . . . (($1,700,000)) 33 $0

Code Rev/KK:cro Official Print - 76 S-5586.2/10 1 Prior Biennia (Expenditures) ...... $3,200,000 2 Future Biennia (Projected Costs) ...... (($47,992,000)) 3 $49,692,000 4 TOTAL ...... (($53,692,000)) 5 $52,892,000

6 Sec. 5014. 2009 c 497 s 5028 (uncodified) is amended to read as 7 follows: 8 FOR THE UNIVERSITY OF WASHINGTON 9 Intermediate Student Service and Classroom Improvements (20081005) 10 Reappropriation: 11 Education Construction Account--State ...... (($7,245,000)) 12 $311,000 13 Appropriation: 14 State Building Construction Account--State ...... $6,934,000 15 Prior Biennia (Expenditures) ...... $6,036,000 16 Future Biennia (Projected Costs) ...... $0 17 TOTAL ...... $13,281,000

18 Sec. 5015. 2009 c 497 s 5037 (uncodified) is amended to read as 19 follows: 20 FOR THE UNIVERSITY OF WASHINGTON 21 Lewis Hall Renovation (20081003) 22 Reappropriation: 23 State Building Construction Account--State . . . . . (($1,000,000)) 24 $478,000 25 Prior Biennia (Expenditures) ...... $1,000,000 26 Future Biennia (Projected Costs) ...... $23,585,000 27 TOTAL ...... (($25,585,000)) 28 $25,063,000

29 Sec. 5016. 2009 c 497 s 5030 (uncodified) is amended to read as 30 follows: 31 FOR THE UNIVERSITY OF WASHINGTON 32 UW Tacoma (20082005) 33 The appropriations in this section are subject to the following 34 conditions and limitations: For construction of the facility

Code Rev/KK:cro Official Print - 77 S-5586.2/10 1 identified in this section, the university is authorized to issue a 2 bond or bonds financed from building fee and trust land revenue 3 deposited into the university bond retirement account in accordance 4 with RCW 28B.20.700 through 28B.20.740, provided that: (1) The total 5 amount of debt to be serviced for this project from the building 6 account shall not exceed $7,450,000; (2) if bonds for all or a portion 7 of the project are issued as build America bonds, federal refunds on 8 the bond interest cost shall be deposited into the University of 9 Washington building account proportional to this project's share of the 10 total bond issuance; and (3) for the portion of the project that is 11 serviced by building fee and trust land revenues, the university shall 12 select the financing method that results in the lowest cost to the 13 University of Washington building account. 14 Reappropriation: 15 State Building Construction Account--State ...... $4,000,000 16 Appropriation: 17 State Building Construction Account--State . . . . (($34,000,000)) 18 $16,768,000 19 University of Washington Building Account--State . . . $14,007,000 20 Subtotal Appropriation ...... $30,775,000 21 Prior Biennia (Expenditures) ...... $2,150,000 22 Future Biennia (Projected Costs) ...... (($17,044,000)) 23 $0 24 TOTAL ...... (($57,194,000)) 25 $36,925,000

26 Sec. 5017. 2009 c 497 s 5041 (uncodified) is amended to read as 27 follows: 28 FOR THE UNIVERSITY OF WASHINGTON 29 Preventative Facility Maintenance and Building System Repairs 30 (30000287) 31 Appropriation: 32 University of Washington Building 33 Account--State ...... (($25,825,000)) 34 $20,741,000 35 Prior Biennia (Expenditures) ...... $0 36 Future Biennia (Projected Costs) ...... $103,300,000

Code Rev/KK:cro Official Print - 78 S-5586.2/10 1 TOTAL ...... (($129,125,000)) 2 $124,041,000

3 Sec. 5018. 2009 c 497 s 5035 (uncodified) is amended to read as 4 follows: 5 FOR THE UNIVERSITY OF WASHINGTON 6 UW Tacoma - Land Acquisition (20092003) 7 ((Reappropriation: 8 Education Construction Account--State ...... $469,000)) 9 Appropriation: 10 University of Washington Building Account--State . . . . $2,469,000 11 Prior Biennia (Expenditures) ...... $1,531,000 12 Future Biennia (Projected Costs) ...... $0 13 TOTAL ...... (($2,000,000)) 14 $4,000,000

15 Sec. 5019. 2009 c 497 s 5039 (uncodified) is amended to read as 16 follows: 17 FOR THE UNIVERSITY OF WASHINGTON 18 Minor Works - Facility Preservation (30000027) 19 Appropriation: 20 State Building Construction Account--State . . . . (($26,000,000)) 21 $19,135,000 22 University of Washington Building 23 Account--State ...... (($8,175,000)) 24 $15,040,000 25 Subtotal Appropriation ...... $34,175,000 26 Prior Biennia (Expenditures) ...... $0 27 Future Biennia (Projected Costs) ...... $146,000,000 28 TOTAL ...... $180,175,000

29 Sec. 5020. 2009 c 497 s 5055 (uncodified) is amended to read as 30 follows: 31 FOR THE WASHINGTON STATE UNIVERSITY 32 Minor Works - Preservation (30000065) 33 Appropriation: 34 State Building Construction Account--State . . . . (($16,128,000))

Code Rev/KK:cro Official Print - 79 S-5586.2/10 1 $23,903,000 2 Washington State University Building Account-- 3 State ...... (($10,000,000)) 4 $2,225,000 5 Subtotal Appropriation ...... $26,128,000 6 Prior Biennia (Expenditures) ...... $0 7 Future Biennia (Projected Costs) ...... $0 8 TOTAL ...... $26,128,000

9 Sec. 5021. 2009 c 497 s 5047 (uncodified) is amended to read as 10 follows: 11 FOR THE WASHINGTON STATE UNIVERSITY 12 WSU Vancouver - Applied Technology and Classroom Building 13 (20062950) 14 In conjunction with the appropriation in this section, Washington 15 State University is authorized to issue a bond or bonds in an amount 16 not to exceed $10,000,000 in value for construction of the facility 17 identified in this section. The bond must be financed from building 18 fee and trust land revenues deposited into the university's bond 19 retirement account in accordance with RCW 28B.30.700 through 20 28B.30.780. 21 Reappropriation: 22 State Building Construction Account--State ...... $1,500,000 23 Appropriation: 24 State Building Construction Account--State . . . . (($26,742,000)) 25 $23,593,000 26 Prior Biennia (Expenditures) ...... $3,420,000 27 Future Biennia (Projected Costs) ...... $0 28 TOTAL ...... (($31,662,000)) 29 $28,513,000

30 Sec. 5022. 2009 c 497 s 5054 (uncodified) is amended to read as 31 follows: 32 FOR THE WASHINGTON STATE UNIVERSITY 33 WSU Spokane - Riverpoint Biomedical & Health Sciences (20162953) 34 Appropriation: 35 State Building Construction Account--State . . . . . (($4,340,000))

Code Rev/KK:cro Official Print - 80 S-5586.2/10 1 $7,840,000 2 Prior Biennia (Expenditures) ...... $0 3 Future Biennia (Projected Costs) ...... (($39,775,000)) 4 $70,775,000 5 TOTAL ...... (($44,115,000)) 6 $78,615,000

7 Sec. 5023. 2009 c 497 s 5056 (uncodified) is amended to read as 8 follows: 9 FOR THE WASHINGTON STATE UNIVERSITY 10 Minor Works - Program (30000066) 11 Appropriation: 12 State Building Construction Account--State . . . . . (($7,042,000)) 13 $17,527,000 14 ((Washington State University Building Account-- 15 State ...... $10,485,000 16 Subtotal Appropriation ...... $17,527,000)) 17 Prior Biennia (Expenditures) ...... $0 18 Future Biennia (Projected Costs) ...... $3,073,000 19 TOTAL ...... $20,600,000

20 Sec. 5024. 2009 c 497 s 5057 (uncodified) is amended to read as 21 follows: 22 FOR THE WASHINGTON STATE UNIVERSITY 23 Preventative Facility Maintenance and Building System Repairs 24 (30000287) 25 Appropriation: 26 Washington State University Building Account-- 27 State ...... (($10,115,000)) 28 $28,375,000 29 Prior Biennia (Expenditures) ...... $0 30 Future Biennia (Projected Costs) ...... $40,460,000 31 TOTAL ...... (($50,575,000)) 32 $68,835,000

33 Sec. 5025. 2009 c 497 s 5064 (uncodified) is amended to read as 34 follows:

Code Rev/KK:cro Official Print - 81 S-5586.2/10 1 FOR THE EASTERN WASHINGTON UNIVERSITY 2 Patterson Hall Remodel (20062002) 3 Reappropriation: 4 State Building Construction Account--State ...... $400,000 5 Appropriation: 6 State Building Construction Account--State . . . . (($26,600,000)) 7 $24,170,000 8 Prior Biennia (Expenditures) ...... $1,734,000 9 Future Biennia (Projected Costs) ...... $34,416,000 10 TOTAL ...... (($63,150,000)) 11 $60,720,000

12 Sec. 5026. 2009 c 497 s 5061 (uncodified) is amended to read as 13 follows: 14 FOR THE EASTERN WASHINGTON UNIVERSITY 15 Minor Works - Health, Safety, and Code Requirements (20081002) 16 Reappropriation: 17 Education Construction Account--State ...... (($1,500,000)) 18 $157,000 19 Appropriation: 20 State Building Construction Account--State ...... $1,343,000 21 Prior Biennia (Expenditures) ...... $2,500,000 22 Future Biennia (Projected Costs) ...... $0 23 TOTAL ...... $4,000,000

24 Sec. 5027. 2009 c 497 s 5065 (uncodified) is amended to read as 25 follows: 26 FOR THE EASTERN WASHINGTON UNIVERSITY 27 Preventive Maintenance and Building System Repairs (30000044) 28 Appropriation: 29 Eastern Washington University Capital Projects 30 Account--State ...... (($2,217,000)) 31 $4,409,000 32 Prior Biennia (Expenditures) ...... $0 33 Future Biennia (Projected Costs) ...... $8,868,000 34 TOTAL ...... (($11,085,000))

Code Rev/KK:cro Official Print - 82 S-5586.2/10 1 $13,277,000

2 Sec. 5028. 2009 c 497 s 5068 (uncodified) is amended to read as 3 follows: 4 FOR THE EASTERN WASHINGTON UNIVERSITY 5 Minor Works - Facility Preservation (30000054) 6 Appropriation: 7 State Building Construction Account--State . . . . . (($3,000,000)) 8 $1,375,000 9 Eastern Washington University Capital Projects 10 Account--State ...... $1,625,000 11 Subtotal Appropriation ...... $3,000,000 12 Prior Biennia (Expenditures) ...... $0 13 Future Biennia (Projected Costs) ...... $12,000,000 14 TOTAL ...... $15,000,000

15 Sec. 5029. 2009 c 497 s 5079 (uncodified) is amended to read as 16 follows: 17 FOR THE CENTRAL WASHINGTON UNIVERSITY 18 Minor Works - Infrastructure Preservation (30000009) 19 Appropriation: 20 State Building Construction Account--State ...... (($690,000)) 21 $601,000 22 Central Washington University Capital Projects 23 Account--State ...... (($2,050,000)) 24 $2,139,000 25 Subtotal Appropriation ...... $2,740,000 26 Prior Biennia (Expenditures) ...... $0 27 Future Biennia (Projected Costs) ...... $12,000,000 28 TOTAL ...... $14,740,000

29 Sec. 5030. 2009 c 497 s 5080 (uncodified) is amended to read as 30 follows: 31 FOR THE CENTRAL WASHINGTON UNIVERSITY 32 Minor Works - Facility Preservation (30000016) 33 Appropriation: 34 ((State Building Construction Account--State))

Code Rev/KK:cro Official Print - 83 S-5586.2/10 1 Central Washington University Capital Projects 2 Account--State ...... $2,610,000 3 Prior Biennia (Expenditures) ...... $0 4 Future Biennia (Projected Costs) ...... $12,000,000 5 TOTAL ...... $14,610,000

6 Sec. 5031. 2009 c 497 s 5083 (uncodified) is amended to read as 7 follows: 8 FOR THE CENTRAL WASHINGTON UNIVERSITY 9 Preventative Facility Maintenance and Building System Repairs 10 (30000287) 11 Appropriation: 12 Central Washington University Capital 13 Project Account--State ...... (($2,422,000)) 14 $4,407,000 15 Prior Biennia (Expenditures) ...... $0 16 Future Biennia (Projected Costs) ...... $9,688,000 17 TOTAL ...... (($12,110,000)) 18 $14,095,000

19 Sec. 5032. 2009 c 497 s 5092 (uncodified) is amended to read as 20 follows: 21 FOR THE EVERGREEN STATE COLLEGE 22 Minor Works - Preservation (30000003) 23 Appropriation: 24 State Building Construction Account--State ...... (($760,000)) 25 $4,007,000 26 The Evergreen State College Capital Projects 27 Account--State ...... (($3,765,000)) 28 $518,000 29 Subtotal Appropriation ...... $4,525,000 30 Prior Biennia (Expenditures) ...... $0 31 Future Biennia (Projected Costs) ...... $0 32 TOTAL ...... $4,525,000

33 Sec. 5033. 2009 c 497 s 5094 (uncodified) is amended to read as 34 follows:

Code Rev/KK:cro Official Print - 84 S-5586.2/10 1 FOR THE EVERGREEN STATE COLLEGE 2 Laboratory and Art Annex Building Renovation (30000026) 3 Appropriation: 4 ((State Building Construction Account--State)) The 5 Evergreen State College Capital Projects 6 Account--State ...... $4,849,000 7 Prior Biennia (Expenditures) ...... $0 8 Future Biennia (Projected Costs) ...... $0 9 TOTAL ...... $4,849,000

10 Sec. 5034. 2009 c 497 s 5093 (uncodified) is amended to read as 11 follows: 12 FOR THE EVERGREEN STATE COLLEGE 13 Minor Works - Health, Safety, Code Compliance (30000016) 14 Appropriation: 15 State Building Construction Account--State . . . . . (($2,515,000)) 16 $1,953,000 17 The Evergreen State College Capital Projects 18 Account--State ...... $562,000 19 Subtotal Appropriation ...... $2,515,000 20 Prior Biennia (Expenditures) ...... $0 21 Future Biennia (Projected Costs) ...... $0 22 TOTAL ...... $2,515,000

23 Sec. 5035. 2009 c 497 s 5097 (uncodified) is amended to read as 24 follows: 25 FOR THE EVERGREEN STATE COLLEGE 26 Preventative Facility Maintenance and Building System Repairs 27 (30000287) 28 Appropriation: 29 The Evergreen State College Capital Projects 30 Account--State ...... (($760,000)) 31 $4,007,000 32 Prior Biennia (Expenditures) ...... $0 33 Future Biennia (Projected Costs) ...... $0 34 TOTAL ...... (($760,000))

Code Rev/KK:cro Official Print - 85 S-5586.2/10 1 $4,007,000

2 NEW SECTION. Sec. 5036. A new section is added to 2009 c 497 3 (uncodified) to read as follows: 4 FOR THE EVERGREEN STATE COLLEGE 5 Feasibility Study of Biomass Gasification Project (92000007) 6 Appropriation: 7 State Building Construction Account--State ...... $125,000 8 Prior Biennia (Expenditures) ...... $0 9 Future Biennia (Projected Costs) ...... $0 10 TOTAL ...... $125,000

11 Sec. 5037. 2009 c 497 s 5104 (uncodified) is amended to read as 12 follows: 13 FOR THE WESTERN WASHINGTON UNIVERSITY 14 Minor Works - Program (20082093) 15 Reappropriation: 16 State Building Construction Account--State ...... $1,500,000 17 Western Washington University Capital Projects 18 Account--State ...... (($2,500,000)) 19 $587,000 20 Subtotal Reappropriation ...... (($4,000,000)) 21 $2,087,000 22 Appropriation: 23 State Building Construction Account--State ...... $1,913,000 24 Prior Biennia (Expenditures) ...... $6,000,000 25 Future Biennia (Projected Costs) ...... $0 26 TOTAL ...... $10,000,000

27 Sec. 5038. 2009 c 497 s 5100 (uncodified) is amended to read as 28 follows: 29 FOR THE WESTERN WASHINGTON UNIVERSITY 30 Miller Hall Renovation (20041953) 31 Reappropriation: 32 State Building Construction Account--State ...... $2,000,000 33 Appropriation:

Code Rev/KK:cro Official Print - 86 S-5586.2/10 1 State Building Construction Account--State . . . . (($54,625,000)) 2 $45,744,000 3 Prior Biennia (Expenditures) ...... $3,773,000 4 Future Biennia (Projected Costs) ...... $0 5 TOTAL ...... (($60,398,000)) 6 $51,517,000

7 Sec. 5039. 2009 c 497 s 5111 (uncodified) is amended to read as 8 follows: 9 FOR THE WESTERN WASHINGTON UNIVERSITY 10 Preventative Facility Maintenance and Building System Repairs 11 (30000287) 12 Appropriation: 13 Western Washington University Capital Projects 14 Account--State ...... (($3,614,000)) 15 $5,814,000 16 Prior Biennia (Expenditures) ...... $0 17 Future Biennia (Projected Costs) ...... $14,456,000 18 TOTAL ...... (($18,070,000)) 19 $20,270,000

20 NEW SECTION. Sec. 5040. A new section is added to 2009 c 497 21 (uncodified) to read as follows: 22 FOR THE WASHINGTON STATE HISTORICAL SOCIETY 23 Vancouver National Historic Reserve West Barracks (91000002) 24 The appropriation in this section is subject to the following 25 conditions and limitations: 26 (1) Project funds are available on a reimbursement basis only, and 27 shall not be advanced under any circumstances. 28 (2)(a) The Washington state historical society shall include 29 provisions in the contract under this section that require that: (i) 30 Capital improvements be held by the grantee for a specified period of 31 time that is appropriate to the amount of the grant; and (ii) the 32 facility be used to provide a public benefit. 33 (b) If the grantee is found to be out of compliance with provisions 34 of the contract, the grantee shall repay to the state general fund the

Code Rev/KK:cro Official Print - 87 S-5586.2/10 1 principal amount of the grant plus interest calculated at the rate of 2 interest on state of Washington general obligation bonds issued most 3 closely to the date of authorization of the grant. 4 Appropriation: 5 State Building Construction Account--State ...... $1,000,000 6 Prior Biennia (Expenditures) ...... $0 7 Future Biennia (Projected Costs) ...... $0 8 TOTAL ...... $1,000,000

9 NEW SECTION. Sec. 5041. A new section is added to 2009 c 497 10 (uncodified) to read as follows: 11 FOR THE WASHINGTON STATE HISTORICAL SOCIETY 12 Vancouver National Historic Reserve Visitors Center (91000001) 13 Appropriation: 14 State Building Construction Account ...... $750,000 15 Prior Biennia (Expenditures) ...... $0 16 Future Biennia (Projected Costs) ...... $0 17 TOTAL ...... $750,000

18 Sec. 5042. 2009 c 497 s 5115 (uncodified) is amended to read as 19 follows: 20 FOR THE WASHINGTON STATE HISTORICAL SOCIETY 21 Washington Heritage Projects (20044004) 22 The reappropriation in this section is subject to the following 23 conditions and limitations: The reappropriation is adjusted for the 24 termination of the Bigelow House preservation association project which 25 is no longer viable. 26 Reappropriation: 27 State Building Construction Account--State ...... (($690,000)) 28 $657,000 29 Prior Biennia (Expenditures) ...... $3,310,000 30 Future Biennia (Projected Costs) ...... $0 31 TOTAL ...... (($4,000,000)) 32 $3,967,000

Code Rev/KK:cro Official Print - 88 S-5586.2/10 1 Sec. 5043. 2009 c 497 s 5116 (uncodified) is amended to read as 2 follows: 3 FOR THE WASHINGTON STATE HISTORICAL SOCIETY 4 Statewide - Washington Heritage Project Grants (20064004) 5 The reappropriation in this section is subject to the following 6 conditions and limitations: 7 (1) The reappropriation is subject to the provisions of section 8 ((733)) 212, chapter ((488)) 371, Laws of ((2005)) 2006. 9 (2) The reappropriation is adjusted for the termination of the 10 Village Theatre project which is no longer viable. 11 Reappropriation: 12 State Building Construction Account--State . . . . . (($1,318,000)) 13 $1,253,000 14 Prior Biennia (Expenditures) ...... $3,346,000 15 Future Biennia (Projected Costs) ...... $0 16 TOTAL ...... (($4,664,000)) 17 $4,599,000

18 Sec. 5044. 2009 c 497 s 5118 (uncodified) is amended to read as 19 follows: 20 FOR THE WASHINGTON STATE HISTORICAL SOCIETY 21 Washington Heritage Grants (20074004) 22 The reappropriation in this section is subject to the following 23 conditions and limitations: 24 (1) The reappropriation is subject to the project list in section 25 5137, chapter 520, Laws of 2007. 26 (2) The reappropriation is adjusted for the termination of the 27 Martin Luther King Ballet project which is no longer viable. 28 (3) The reappropriation for the historic Seattle PDA project is 29 transferred to the Center for Wooden Boats. 30 Reappropriation: 31 State Building Construction Account--State . . . . . (($7,630,000)) 32 $7,580,000 33 Prior Biennia (Expenditures) ...... $2,370,000 34 Future Biennia (Projected Costs) ...... $0 35 TOTAL ...... (($10,000,000))

Code Rev/KK:cro Official Print - 89 S-5586.2/10 1 $9,950,000

2 Sec. 5045. 2009 c 497 s 5120 (uncodified) is amended to read as 3 follows: 4 FOR THE WASHINGTON STATE HISTORICAL SOCIETY 5 Washington Heritage Project Capital Grants (30000011) 6 The appropriation in this section is subject to the following 7 conditions and limitations: 8 (1) The appropriation is subject to the provisions of RCW 9 27.34.330. 10 (2) The appropriation is provided solely for the following list of 11 projects. 12 (3) The 2011-13 projects must be selected based on their readiness 13 to proceed.

14

15 Project Recommended 16 Wenatchee Valley Museum $150,000 17 West Point Light Station $300,000 18 Des Moines Field House $420,000 19 Washington Hall $381,000 20 Percival Landing $567,000 21 Roslyn City Hall & Library $194,000 22 ((Spokane County courthouse $500,000)) 23 Snoqualmie Chapel car #5 $125,000 24 Edmonds Carnegie Library $48,000 25 museum 26 Ilwaco museum collections $41,000 27 Minkler Mansion $200,000 28 Cheney house for a museum $87,000 29 Longview Columbia theatre $1,000,000 30 Chinook School $350,000 31 Territorial Courthouse of 1858 $167,000 32 Hanford Interpretive Center $147,000 33 Carnegie Library Museum $883,000 34 Dynamite Train Canopy $50,000 35 King Street Station $750,000

Code Rev/KK:cro Official Print - 90 S-5586.2/10 1 Lakewood Carriage House $110,000 2 Lincoln School $175,000 3 Quincy Pioneer Church $195,000 4 Ezra Meeker Mansion $100,000 5 Port Townsend Storage Facility $450,000 6 Puyallup Church Spire $17,000 7 Morris House and Washington $27,000 8 Harbor School 9 Kalama Interpretive Center $212,000 10 Foss Waterway Seaport $750,000 11 Building 12 Pioneer State Bank Building $201,000 13 Kirkman House $32,000 14 Malo Sawmill $70,000 15 Stimson-Green Mansion $23,000 16 Lightship #83 $335,000 17 Masonic Temple Building $350,000 18 Wilkeson Centennial $10,000 19 Monument 20 Eddon Boatyard ways and dock $243,000 21 Commencement Restoration $86,000 22 Vessel Shenandoah $179,000 23 ((Walt's Mill $75,000)) 24 TOTAL (($10,000,000)) 25 $9,425,000

26 Appropriation: 27 State Building Construction Account--State . . . . (($10,000,000)) 28 $9,425,000 29 Prior Biennia (Expenditures) ...... $0 30 Future Biennia (Projected Costs) ...... $40,000,000 31 TOTAL ...... (($50,000,000)) 32 $49,425,000

33 Sec. 5046. 2009 c 497 s 5174 (uncodified) is amended to read as 34 follows: 35 FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM

Code Rev/KK:cro Official Print - 91 S-5586.2/10 1 Seattle Central Community College: Wood Construction Center 2 (20081216) 3 Reappropriation: 4 State Building Construction Account--State ...... $2,000,000 5 Appropriation: 6 State Building Construction Account--State . . . . (($24,645,000)) 7 $19,760,000

8 Prior Biennia (Expenditures) ...... $549,000 9 Future Biennia (Projected Costs) ...... $0 10 TOTAL ...... (($27,194,000)) 11 $22,309,000

12 Sec. 5047. 2009 c 497 s 5176 (uncodified) is amended to read as 13 follows: 14 FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM 15 Peninsula College: Business and Humanities Center (20081218) 16 Reappropriation: 17 State Building Construction Account--State ...... $1,200,000 18 Appropriation: 19 State Building Construction Account--State . . . . (($33,627,000)) 20 $29,644,000 21 Prior Biennia (Expenditures) ...... $1,100,000 22 Future Biennia (Projected Costs) ...... $0 23 TOTAL ...... (($35,927,000)) 24 $31,944,000

25 Sec. 5048. 2009 c 497 s 5127 (uncodified) is amended to read as 26 follows: 27 FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM 28 Tacoma Community College - Science Building (20012687) 29 Reappropriation: 30 State Building Construction Account--State . . . . . (($1,773,000)) 31 $855,000 32 Prior Biennia (Expenditures) ...... $30,123,000 33 Future Biennia (Projected Costs) ...... $0

Code Rev/KK:cro Official Print - 92 S-5586.2/10 1 TOTAL ...... (($31,896,000)) 2 $30,978,000

3 Sec. 5049. 2009 c 497 s 5180 (uncodified) is amended to read as 4 follows: 5 FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM 6 Green River Community College - Trades and Industry Building 7 (20081222) 8 Reappropriation: 9 State Building Construction Account--State ...... $11,000 10 Appropriation: 11 State Building Construction Account--State . . . . . (($2,625,000)) 12 $1,707,000 13 Prior Biennia (Expenditures) ...... $127,000 14 Future Biennia (Projected Costs) ...... (($28,737,000)) 15 $29,655,000 16 TOTAL ...... $31,500,000

17 Sec. 5050. 2009 c 497 s 5171 (uncodified) is amended to read as 18 follows: 19 FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM 20 Minor Works - Facility Preservation - Roof Repairs (20081010) 21 Reappropriation: 22 Education Construction Account--State ...... (($2,500,000)) 23 $392,000 24 State Building Construction Account--State ...... $1,000,000 25 Subtotal Reappropriation ...... (($3,500,000)) 26 $1,392,000 27 Appropriation: 28 State Building Construction Account--State ...... $2,108,000 29 Prior Biennia (Expenditures) ...... $4,176,000 30 Future Biennia (Projected Costs) ...... $0 31 TOTAL ...... $7,676,000

32 Sec. 5051. 2009 c 497 s 5182 (uncodified) is amended to read as 33 follows:

Code Rev/KK:cro Official Print - 93 S-5586.2/10 1 FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM 2 Skagit Valley College - Academic and Student Services Building 3 (20081224) 4 Reappropriation: 5 State Building Construction Account--State ...... $35,000 6 Appropriation: 7 State Building Construction Account--State . . . . . (($2,116,000)) 8 $1,730,000 9 Prior Biennia (Expenditures) ...... $101,000 10 Future Biennia (Projected Costs) ...... (($28,949,000)) 11 $29,335,000 12 TOTAL ...... $31,201,000

13 Sec. 5052. 2009 c 497 s 5210 (uncodified) is amended to read as 14 follows: 15 FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM 16 Roof Repairs "A" (30000010) 17 Appropriation: 18 State Building Construction Account--State . . . . . (($8,493,000)) 19 $2,627,000 20 Community/Technical College Capital Projects 21 Account--State ...... $6,854,000 22 Subtotal Appropriation ...... $9,481,000 23 Prior Biennia (Expenditures) ...... $0 24 Future Biennia (Projected Costs) ...... (($24,000,000)) 25 $42,000,000 26 TOTAL ...... (($32,493,000)) 27 $51,481,000

28 Sec. 5053. 2009 c 497 s 5183 (uncodified) is amended to read as 29 follows: 30 FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM 31 Lower Columbia College - Health and Science Building (20081225) 32 Appropriation: 33 State Building Construction Account--State . . . . . (($2,969,000)) 34 $2,187,000

Code Rev/KK:cro Official Print - 94 S-5586.2/10 1 Prior Biennia (Expenditures) ...... $2,500,000 2 Future Biennia (Projected Costs) ...... (($36,405,000)) 3 $37,187,000 4 TOTAL ...... $41,874,000

5 Sec. 5054. 2009 c 497 s 5184 (uncodified) is amended to read as 6 follows: 7 FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM 8 Grays Harbor College - Science and Math Building (20081226) 9 Reappropriation: 10 State Building Construction Account--State ...... $45,000 11 Appropriation: 12 State Building Construction Account--State . . . . . (($3,583,000)) 13 $2,292,000 14 Prior Biennia (Expenditures) ...... $231,000 15 Future Biennia (Projected Costs) ...... (($40,478,000)) 16 $41,769,000 17 TOTAL ...... $44,337,000

18 Sec. 5055. 2009 c 497 s 5217 (uncodified) is amended to read as 19 follows: 20 FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM 21 Seattle Central Community College - Seattle Maritime Academy 22 (30000120) 23 Appropriation: 24 State Building Construction Account--State . . . . . (($2,839,000)) 25 $1,337,000 26 Prior Biennia (Expenditures) ...... $0 27 Future Biennia (Projected Costs) ...... (($15,483,000)) 28 $16,985,000 29 TOTAL ...... $18,322,000

30 Sec. 5056. 2009 c 497 s 5218 (uncodified) is amended to read as 31 follows: 32 FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM 33 Yakima Valley Community College - Palmer Martin Building (30000121) 34 Appropriation:

Code Rev/KK:cro Official Print - 95 S-5586.2/10 1 State Building Construction Account--State . . . . . (($1,464,000)) 2 $997,000 3 Prior Biennia (Expenditures) ...... $0 4 Future Biennia (Projected Costs) ...... (($13,509,000)) 5 $13,976,000 6 TOTAL ...... $14,973,000

7 Sec. 5057. 2009 c 497 s 5219 (uncodified) is amended to read as 8 follows: 9 FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM 10 North Seattle Community College - Technology Building Renewal 11 (30000129) 12 Appropriation: 13 State Building Construction Account--State . . . . . (($2,976,000)) 14 $2,084,000 15 Prior Biennia (Expenditures) ...... $0 16 Future Biennia (Projected Costs) ...... (($22,337,000)) 17 $23,229,000 18 TOTAL ...... $25,313,000

19 Sec. 5058. 2009 c 497 s 5220 (uncodified) is amended to read as 20 follows: 21 FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM 22 Green River Community College - Science Math and Technology 23 Building (30000130) 24 Appropriation: 25 State Building Construction Account--State . . . . . (($1,700,000)) 26 $1,315,000 27 Prior Biennia (Expenditures) ...... $0 28 Future Biennia (Projected Costs) ...... (($15,545,000)) 29 $15,930,000 30 TOTAL ...... $17,245,000

31 Sec. 5059. 2009 c 497 s 5204 (uncodified) is amended to read as 32 follows: 33 FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM 34 Tacoma Community College - Health Careers Center (20082701)

Code Rev/KK:cro Official Print - 96 S-5586.2/10 1 Reappropriation: 2 State Building Construction Account--State ...... $15,000 3 Appropriation: 4 State Building Construction Account--State . . . . . (($2,946,000)) 5 $1,811,000 6 Prior Biennia (Expenditures) ...... $240,000 7 Future Biennia (Projected Costs) ...... (($35,565,000)) 8 $36,700,000 9 TOTAL ...... $38,766,000

10 Sec. 5060. 2009 c 497 s 5205 (uncodified) is amended to read as 11 follows: 12 FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM 13 Bellevue Community College - Health Science Building (20082702) 14 Appropriation: 15 State Building Construction Account--State . . . . . (($4,350,000)) 16 $2,910,000 17 Prior Biennia (Expenditures) ...... $144,000 18 Future Biennia (Projected Costs) ...... (($36,506,000)) 19 $37,946,000 20 TOTAL ...... $41,000,000

21 Sec. 5061. 2009 c 497 s 5206 (uncodified) is amended to read as 22 follows: 23 FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM 24 Bates Technical College - Mohler Communications Technology Center 25 (20082703) 26 Reappropriation: 27 State Building Construction Account--State ...... $20,000 28 Appropriation: 29 State Building Construction Account--State . . . . . (($1,755,000)) 30 $1,192,000 31 Prior Biennia (Expenditures) ...... $153,000 32 Future Biennia (Projected Costs) ...... (($23,398,000)) 33 $23,961,000 34 TOTAL ...... $25,326,000

Code Rev/KK:cro Official Print - 97 S-5586.2/10 1 Sec. 5062. 2009 c 497 s 5208 (uncodified) is amended to read as 2 follows: 3 FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM 4 Clark College - Health and Advanced Technologies Building 5 (20082705) 6 Reappropriation: 7 State Building Construction Account--State ...... $14,000 8 Appropriation: 9 State Building Construction Account--State . . . . . (($2,506,000)) 10 $2,324,000 11 Prior Biennia (Expenditures) ...... $236,000 12 Future Biennia (Projected Costs) ...... (($33,598,000)) 13 $33,780,000 14 TOTAL ...... $36,354,000

15 Sec. 5063. 2009 c 497 s 5165 (uncodified) is amended to read as 16 follows: 17 FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM 18 Lake Washington Technical College - Allied Health Building 19 (20062697) 20 Reappropriation: 21 State Building Construction Account--State ...... $900,000 22 Appropriation: 23 State Building Construction Account--State . . . . (($25,986,000)) 24 $23,876,000 25 Prior Biennia (Expenditures) ...... $1,029,000 26 Future Biennia (Projected Costs) ...... $0 27 TOTAL ...... (($27,915,000)) 28 $25,805,000

29 Sec. 5064. 2009 c 497 s 5177 (uncodified) is amended to read as 30 follows: 31 FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM 32 Spokane Falls Community College - Chemistry and Life Science 33 Building (20081219) 34 Reappropriation:

Code Rev/KK:cro Official Print - 98 S-5586.2/10 1 State Building Construction Account--State ...... $1,200,000 2 Appropriation: 3 State Building Construction Account--State . . . . (($27,800,000)) 4 $21,007,000 5 Prior Biennia (Expenditures) ...... $1,320,000 6 Future Biennia (Projected Costs) ...... $0 7 TOTAL ...... (($30,320,000)) 8 $23,527,000

9 Sec. 5065. 2009 c 497 s 5178 (uncodified) is amended to read as 10 follows: 11 FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM 12 Spokane Community College - Technical Education Building (20081220) 13 Reappropriation: 14 State Building Construction Account--State ...... $1,600,000 15 Appropriation: 16 State Building Construction Account--State . . . . (($30,718,000)) 17 $24,037,000 18 Prior Biennia (Expenditures) ...... $793,000 19 Future Biennia (Projected Costs) ...... $0 20 TOTAL ...... (($33,111,000)) 21 $26,430,000

22 Sec. 5066. 2009 c 497 s 5191 (uncodified) is amended to read as 23 follows: 24 FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM 25 Spokane Falls Community College - Music Building 15 Renovation 26 (20081320) 27 Reappropriation: 28 State Building Construction Account--State ...... $475,000 29 Appropriation: 30 State Building Construction Account--State . . . . (($13,806,000)) 31 $10,459,000 32 Prior Biennia (Expenditures) ...... $667,000 33 Future Biennia (Projected Costs) ...... $0 34 TOTAL ...... (($14,948,000)) 35 $11,601,000

Code Rev/KK:cro Official Print - 99 S-5586.2/10 1 Sec. 5067. 2009 c 497 s 5151 (uncodified) is amended to read as 2 follows: 3 FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM 4 Green River Community College - Humanities and Classroom Building 5 Debt Service (20061205) 6 The appropriations in this section are subject to the following 7 conditions and limitations: The community/technical college capital 8 projects account appropriation in this section is subject to the 9 following conditions and limitations: The appropriation is provided 10 solely for debt service on the capital project account certificate of 11 participation issued for construction of this facility. The state 12 board shall work with the office of the state treasurer to identify 13 ways to expedite repayment of the debt incurred on this project that is 14 in excess of actual project costs in order to minimize unnecessary 15 demands upon building account revenue. 16 Reappropriation: 17 State Building Construction Account--State ...... $1,054,000 18 Appropriation: 19 Community/Technical College Capital Projects 20 Account--State ...... $4,044,000 21 Prior Biennia (Expenditures) ...... $1,827,000 22 Future Biennia (Projected Costs) ...... (($0)) 23 $36,432,000 24 TOTAL ...... (($2,881,000)) 25 $43,357,000

26 Sec. 5068. 2009 c 497 s 5181 (uncodified) is amended to read as 27 follows: 28 FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM 29 Bellingham Technical College - Instructional Resource Center Debt 30 Service (20081223) 31 The appropriations in this section are subject to the following 32 conditions and limitations: The community/technical college capital 33 projects account appropriation is provided solely for debt service on 34 the capital project account certificate of participation issued for 35 construction of this facility. The state board shall authorize only as

Code Rev/KK:cro Official Print - 100 S-5586.2/10 1 much debt as is needed to complete the project, not to exceed a total 2 of $27,000,000. 3 Reappropriation: 4 State Building Construction Account--State ...... $1,000,000 5 Appropriation: 6 Community/Technical College Capital Projects 7 Account--State ...... $2,288,000 8 Prior Biennia (Expenditures) ...... (($0)) 9 $824,000 10 Future Biennia (Projected Costs) ...... (($0)) 11 $37,994,000 12 TOTAL ...... (($1,000,000)) 13 $42,106,000

14 Sec. 5069. 2009 c 497 s 5190 (uncodified) is amended to read as 15 follows: 16 FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM 17 Spokane Community College - Building 7 Renovation (20081319) 18 Reappropriation: 19 State Building Construction Account--State ...... $986,000 20 Appropriation: 21 State Building Construction Account--State . . . . . (($9,748,000)) 22 $8,343,000 23 Prior Biennia (Expenditures) ...... $23,000 24 Future Biennia (Projected Costs) ...... $0 25 TOTAL ...... (($10,757,000)) 26 $9,352,000

27 Sec. 5070. 2009 c 497 s 5192 (uncodified) is amended to read as 28 follows: 29 FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM 30 Pierce College Fort Steilacoom - Cascade Core (20081321) 31 Reappropriation: 32 State Building Construction Account--State ...... $1,200,000 33 Appropriation: 34 State Building Construction Account--State . . . . (($15,000,000)) 35 $13,099,000

Code Rev/KK:cro Official Print - 101 S-5586.2/10 1 Community/Technical College Capital Projects 2 Account--State ...... $8,500,000 3 Subtotal Appropriation ...... $21,599,000 4 Prior Biennia (Expenditures) ...... $1,042,000 5 Future Biennia (Projected Costs) ...... $0 6 TOTAL ...... (($17,242,000)) 7 $23,841,000

8 Sec. 5071. 2009 c 497 s 5168 (uncodified) is amended to read as 9 follows: 10 FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM 11 North Seattle Community College - Employment Resource Center 12 (20062851) 13 Reappropriation: 14 State Building Construction Account--State ...... $700,000 15 Appropriation: 16 State Building Construction Account--State . . . . . (($5,000,000)) 17 $7,676,000 18 Prior Biennia (Expenditures) ...... $1,790,000 19 Future Biennia (Projected Costs) ...... $0 20 TOTAL ...... (($7,490,000)) 21 $10,166,000

22 Sec. 5072. 2009 c 497 s 5135 (uncodified) is amended to read as 23 follows: 24 FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM 25 Clark College - East County Satellite (20041689) 26 Reappropriation: 27 Gardner-Evans Higher Education Construction 28 Account--State ...... (($5,000,000)) 29 $4,780,000 30 Prior Biennia (Expenditures) ...... $24,876,000 31 Future Biennia (Projected Costs) ...... $0 32 TOTAL ...... (($29,876,000)) 33 $29,656,000

Code Rev/KK:cro Official Print - 102 S-5586.2/10 1 Sec. 5073. 2009 c 497 s 5195 (uncodified) is amended to read as 2 follows: 3 FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM 4 Bellevue Community College - L Building Emergency Repairs 5 (20081850) 6 Reappropriation: 7 State Building Construction Account--State . . . . . (($1,460,000)) 8 $387,000 9 Prior Biennia (Expenditures) ...... $203,000 10 Future Biennia (Projected Costs) ...... $0 11 TOTAL ...... (($1,663,000)) 12 $590,000

13 Sec. 5074. 2009 c 497 s 5223 (uncodified) is amended to read as 14 follows: 15 FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM 16 Minor Works - Preservation (30000210) 17 Appropriation: 18 ((State Building Construction Account--State . . . . $15,116,000)) 19 Community/Technical College Capital Projects 20 Account--State ...... $16,000,000 21 Prior Biennia (Expenditures) ...... $0 22 Future Biennia (Projected Costs) ...... $0 23 TOTAL ...... (($15,116,000)) 24 $16,000,000

25 Sec. 5075. 2009 c 497 s 5179 (uncodified) is amended to read as 26 follows: 27 FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM 28 Everett Community College - Index Hall Replacement (20081221) 29 Reappropriation: 30 State Building Construction Account--State ...... $1,150,000 31 Appropriation: 32 State Building Construction Account--State . . . . . (($2,301,000)) 33 $2,157,000 34 Prior Biennia (Expenditures) ...... $1,650,000

Code Rev/KK:cro Official Print - 103 S-5586.2/10 1 Future Biennia (Projected Costs) ...... (($40,205,000)) 2 $40,349,000 3 TOTAL ...... $45,306,000

4 Sec. 5076. 2009 c 497 s 5213 (uncodified) is amended to read as 5 follows: 6 FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM 7 Minor Works - Program (30000078) 8 Appropriation: 9 State Building Construction Account--State ...... $3,858,000 10 Community/Technical College Capital Projects 11 Account--State ...... (($9,714,000)) 12 $12,227,000 13 Subtotal Appropriation ...... (($13,572,000)) 14 $16,085,000 15 Prior Biennia (Expenditures) ...... $0 16 Future Biennia (Projected Costs) ...... $80,000,000 17 TOTAL ...... (($93,572,000)) 18 $96,085,000

19 Sec. 5077. 2009 c 497 s 5164 (uncodified) is amended to read as 20 follows: 21 FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM 22 Spokane Falls Community College - Campus Classrooms (20062696) 23 Reappropriation: 24 State Building Construction Account--State . . . . . (($1,450,000)) 25 $883,000 26 Prior Biennia (Expenditures) ...... $434,000 27 Future Biennia (Projected Costs) ...... $0 28 TOTAL ...... (($1,884,000)) 29 $1,317,000

30 NEW SECTION. Sec. 5078. A new section is added to 2009 c 497 31 (uncodified) to read as follows: 32 FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM 33 Construction Contingency Pool (92000007)

Code Rev/KK:cro Official Print - 104 S-5586.2/10 1 The appropriation in this section is provided solely for allocation 2 by the state board for community and technical colleges for major 3 construction and renovation projects that confront emergent and 4 unavoidable costs in excess of the construction contingency and 5 management reserves included in the project appropriation. The board 6 shall report at least quarterly to the office of financial management 7 and the legislative capital budget committees on requests for and 8 allocations from the pool. 9 Appropriation: 10 State Building Construction Account--State ...... $3,076,000 11 Gardner-Evans Higher Education Construction 12 Account--State ...... $263,000 13 Subtotal Appropriation ...... $3,339,000 14 Prior Biennia (Expenditures) ...... $0 15 Future Biennia (Projected Costs) ...... $0 16 TOTAL ...... $3,339,000

17 Sec. 5079. 2009 c 497 s 5224 (uncodified) is amended to read as 18 follows: 19 FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM 20 Preventative Facility Maintenance and Building System Repairs 21 (30000287) 22 Appropriation: 23 Community and Technical Colleges Capital 24 Projects Account--State ...... (($22,800,000)) 25 $0 26 Prior Biennia (Expenditures) ...... $0 27 Future Biennia (Projected Costs) ...... $91,208,000 28 TOTAL ...... (($114,008,000)) 29 $91,208,000

30 Sec. 5080. 2009 c 497 s 5143 (uncodified) is amended to read as 31 follows: 32 FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM 33 Centralia Community College - Science Building (20042850) 34 Reappropriation: 35 State Building Construction Account--State ...... $194,000

Code Rev/KK:cro Official Print - 105 S-5586.2/10 1 Gardner-Evans Higher Education Construction 2 Account--State ...... (($3,000,000)) 3 $2,737,000 4 Subtotal Reappropriation ...... (($3,194,000)) 5 $2,931,000 6 Prior Biennia (Expenditures) ...... $28,919,000 7 Future Biennia (Projected Costs) ...... $0 8 TOTAL ...... (($32,113,000)) 9 $31,850,000

10 Sec. 5081. 2009 c 497 s 5167 (uncodified) is amended to read as 11 follows: 12 FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM 13 Clover Park Technical College - Allied Health Care Facility 14 (20062699) 15 Reappropriation: 16 State Building Construction Account--State . . . . . (($1,020,000)) 17 $323,000 18 Prior Biennia (Expenditures) ...... $1,425,000 19 Future Biennia (Projected Costs) ...... $0 20 TOTAL ...... (($2,445,000)) 21 $1,748,000

(End of part)

Code Rev/KK:cro Official Print - 106 S-5586.2/10 1 PART 6 2 MISCELLANEOUS AND SUPPLEMENTAL PROVISIONS

3 Sec. 6001. 2009 c 497 s 6009 (uncodified) is amended to read as 4 follows: 5 ACQUISITION OF PROPERTIES AND FACILITIES THROUGH FINANCIAL 6 CONTRACTS. The following agencies may enter into financial contracts, 7 paid from any funds of an agency, appropriated or nonappropriated, for 8 the purposes indicated and in not more than the principal amounts 9 indicated, plus financing expenses and required reserves pursuant to 10 chapter 39.94 RCW. When securing properties under this section, 11 agencies shall use the most economical financial contract option 12 available, including long-term leases, lease-purchase agreements, 13 lease-development with option to purchase agreements or financial 14 contracts using certificates of participation. Expenditures made by an 15 agency for one of the indicated purposes before the issue date of the 16 authorized financial contract and any certificates of participation 17 therein are intended to be reimbursed from proceeds of the financial 18 contract and any certificates of participation therein to the extent 19 provided in the agency's financing plan approved by the state finance 20 committee. 21 State agencies may enter into agreements with the department of 22 general administration and the state treasurer's office to develop 23 requests to the legislature for acquisition of properties and 24 facilities through financial contracts. The agreements may include 25 charges for services rendered. 26 Those noninstructional facilities of higher education institutions 27 authorized in this section to enter into financial contracts are not 28 eligible for state funded maintenance and operations. Instructional 29 space that is available for regularly scheduled classes for academic 30 transfer, basic skills, and workforce training programs may be eligible 31 for state funded maintenance and operations. 32 (1) Department of corrections: ((Enter into a financing contract 33 for up to $17,958,000 plus financing expenses and required reserves 34 pursuant to chapter 39.94 RCW to purchase or build work release beds, 35 violator beds, or other community-based re-entry facilities.)) Enter

Code Rev/KK:cro Official Print - 107 S-5586.2/10 1 into a financing contract for up to $12,400,000 plus financing expenses 2 and required reserves pursuant to chapter 39.94 RCW to move 3 correctional industries facilities and operations from McNeil island 4 corrections center to Stafford creek corrections center. 5 (2) Community and technical colleges: 6 (a) Enter into a financing contract on behalf of Walla Walla 7 Community College for up to $1,000,000 plus financing expenses and 8 required reserves pursuant to chapter 39.94 RCW to purchase up to 40 9 acres of land. 10 (b) Enter into a financing contract on behalf of Bellingham 11 Technical College for up to $1,390,000 plus financing expenses and 12 required reserves pursuant to chapter 39.94 RCW to develop an 13 instructional resource center. 14 (c) Enter into a financing contract on behalf of Bellingham 15 Technical College for up to (($28,968,000)) $27,000,000 plus financing 16 expenses and required reserves pursuant to chapter 39.94 RCW to develop 17 an instructional resource center. The cost of this financing contract 18 shall be paid from the community and technical colleges capital 19 projects account. This facility shall be eligible for maintenance and 20 operations funding on the same terms as if constructed with state 21 general obligation bonds. 22 (d) Enter into a financing contract on behalf of Edmonds Community 23 College for up to $5,000,000 plus financing expenses and required 24 reserves pursuant to chapter 39.94 RCW to provide space for allied 25 health and construction industry. 26 (e) Contingent upon the sale and purchase specified in section 5071 27 of this act, enter into a financing contract on behalf of Spokane 28 Community College for up to $3,400,000 plus financing expenses and 29 required reserves pursuant to chapter 39.94 RCW to purchase the 30 Riverpoint One building. 31 (f) Enter into a financing contract on behalf of North Seattle 32 Community College for up to $8,900,000 plus financing expenses and 33 required reserves pursuant to chapter 39.94 RCW to develop an 34 employment resource center. 35 (g) Enter into a financing contract on behalf of Everett Community 36 College for up to $25,000,000 plus financing expenses and required 37 reserves pursuant to chapter 39.94 RCW to develop a student fitness and 38 health center.

Code Rev/KK:cro Official Print - 108 S-5586.2/10 1 (h) Enter into a financing contract on behalf of Wenatchee Valley 2 Community College for up to $2,700,000 plus financing expenses and 3 required reserves pursuant to chapter 39.94 RCW to purchase a music and 4 art center. 5 (i) Enter into a financing contract on behalf of Green River 6 Community College for up to $20,000,000 plus financing expenses and 7 required reserves pursuant to chapter 39.94 RCW to develop a 40,000 8 square foot addition to Green River Kent station. 9 (j) Enter into a financing contract on behalf of Walla Walla 10 Community College for up to $1,000,000 plus financing expenses and 11 required reserves pursuant to chapter 39.94 RCW for the water and 12 environment center. 13 (k) Enter into a financing contract pursuant to chapter 39.94 RCW 14 on behalf of Green River Community College for up to $26,532,000 plus 15 financing expenses and required reserves to construct a new classrooms 16 facility as specified in project 20061205. The cost of this financing 17 contract shall be paid from the community and technical colleges 18 capital projects account. This facility shall be eligible for 19 maintenance and operations funding on the same terms as if constructed 20 with state general obligation bonds. 21 (3) Parks and recreation commission: Enter into a financing 22 contract for up to $2,500,000 plus financing expenses and required 23 reserves pursuant to chapter 39.94 RCW for the lodge. 24 The parks and recreation commission shall use energy savings 25 performance contracting if practicable. The lodge shall be operated by 26 a private concessionaire under a contract with the parks and recreation 27 commission that is a qualified management contract under the applicable 28 internal revenue service guidelines. 29 (4) Department of general administration: Enter into a financing 30 contract for up to $27,144,000 plus financing expenses and required 31 reserves pursuant to chapter 39.94 RCW for the rehabilitation of the 32 John L. O'Brien building, subject to approval of the project scope by 33 the speaker of the house of representatives and the chief clerk of the 34 house of representatives. 35 (5) Department of ecology: Enter into a financing contract for up 36 to $11,000,000 plus financing expenses and required reserves pursuant 37 to chapter 39.94 RCW to rebuild the east wall of the department of 38 ecology's headquarters building in Lacey, Washington.

Code Rev/KK:cro Official Print - 109 S-5586.2/10 1 (6) Washington State University: Enter into a financing contract 2 for up to $15,000,000 plus financing expenses and required reserve 3 pursuant to chapter 39.94 RCW for a student information system. 4 (7) Department of social and health services: Enter into a 5 financing contract for up to $15,850,000 plus financing expenses and 6 required reserves pursuant to chapter 39.94 RCW to construct or 7 renovate specialized housing and treatment facilities for youth 8 committed to the juvenile rehabilitation administration. The debt 9 service is to be paid with the savings associated with closure of the 10 Maple Lane school.

11 NEW SECTION. Sec. 6002. A new section is added to 2009 c 497 12 (uncodified) to read as follows: 13 FOR THE DEPARTMENT OF GENERAL ADMINISTRATION--ENERGY SAVINGS 14 PERFORMANCE CONTRACTING. (1) The department of general administration, 15 in fulfilling its requirement to maintain a registry of energy service 16 contractors pursuant to RCW 39.35A.050, shall update the preapproved 17 list of energy services companies that are qualified to provide 18 services to public facilities in the state by June 30, 2010. 19 (2) The department of general administration must develop 20 guidelines that are consistent with national and international energy 21 savings performance standards for the implementation of energy savings 22 performance contracting projects June 30, 2010.

23 NEW SECTION. Sec. 6003. A new section is added to 2009 c 497 24 (uncodified) to read as follows: 25 FOR THE OFFICE OF FINANCIAL MANAGEMENT. The office of financial 26 management budget instructions, required by chapter 43.88 RCW, must 27 instruct all agencies submitting budget requests for building 28 renovations and improvements and operating budget requests for facility 29 leases to conduct preliminary energy audits if proposed renovations or 30 improvements involve building envelope, heating, ventilating, air 31 conditioning, controls, and lighting. The budget instructions must 32 also direct agencies to contact the department of general 33 administration for assistance, if necessary.

34 NEW SECTION. Sec. 6004. A new section is added to 2009 c 497 35 (uncodified) to read as follows:

Code Rev/KK:cro Official Print - 110 S-5586.2/10 1 DEBT AFFORDABILITY STUDY. The office of the state treasurer shall 2 prepare a debt affordability study by December 1, 2010, that provides 3 an assessment of the state's current debt portfolio and an analysis of 4 the impact of future debt issuance. The study must include but is not 5 limited to: An overview of the state's outstanding and projected debt; 6 the structure of the debt portfolio; the cost of existing debt; sources 7 of funds for interest, principal, or lease payments; and the purposes 8 for which debt instruments and financing contracts are issued. To 9 assist with this work, the office of the state treasurer shall convene 10 and staff a work group to include staff from the fiscal committees of 11 the state house of representatives and state senate and the office of 12 financial management.

13 NEW SECTION. Sec. 6005. A new section is added to 2009 c 497 14 (uncodified) to read as follows: 15 FOR SPOKANE COMMUNITY COLLEGE. The Washington state military 16 department shall transfer building 100 and 5.47 acres of associated 17 land at Geiger field to Spokane community college for the development 18 of a Spokane aerospace technology center.

19 Sec. 6006. 2008 c 5 s 1 (uncodified) is amended to read as 20 follows: 21 Pursuant to chapter 43.155 RCW, the following project loans 22 recommended by the public works board are authorized to be made with 23 funds appropriated from the public works assistance account, and no 24 loan authorized in this act shall bear an interest rate greater than 25 one-half of one percent: 26 (1) Arlington--sanitary sewer project--expand and upgrade the 27 wastewater treatment plant and biosolids composting facility to meet 28 new discharge limitations, produce a higher quality effluent, and 29 accommodate future growth ...... $10,000,000 30 (2) Auburn--street project--reconstruct approximately 0.3 miles of 31 roadway with four travel lanes to bring up to current arterial and 32 truck route standards and modify intersection to optimize efficiency 33 and level of service ...... $1,800,000 34 (3) Blaine--sanitary sewer project--construct a new wastewater 35 treatment plant and section of outfall pipe to increase treatment

Code Rev/KK:cro Official Print - 111 S-5586.2/10 1 capacity, produce reuse quality water, and improve Puget Sound water 2 quality for shellfish ...... $10,000,000 3 (4) Bonney Lake--domestic water project--replace approximately 4 71,000 linear feet of leaky water mains to reduce current water loss by 5 ten percent ...... $5,352,000 6 (5) Bonney Lake--sanitary sewer project--replace approximately 7 12,000 linear feet of failing interceptor sewer pipes . . . .$4,648,000 8 (6) Buckley--sanitary sewer project--rebuild the wastewater 9 treatment plant to provide nutrient removal and meet state and federal 10 discharge regulations and the construction of an 11 interceptor ...... $5,000,000 12 (7) Camas--sanitary sewer project--construct improvements to the 13 wastewater treatment facilities to provide class A biosolids at the 14 main sewage pump station ...... $10,000,000 15 (8) Clark county--road project--construct new road segments, widen 16 roadways, improve and redesign intersections, and install and modify 17 traffic signals necessary to improve a major interchange with two 18 freeways ...... $10,000,000 19 (9) Clark regional wastewater district--sanitary sewer project-- 20 modify existing and construct new wastewater facilities to process 21 approximately 4.65 million gallons more of wastewater per day and 22 ensure treatment processes continue to be in compliance with current 23 regulations ...... $8,000,000 24 (10) Coal creek utility district--sanitary sewer project--construct 25 sewer lift station, approximately 1,250 lineal feet of gravity sewer 26 main, and 500 feet of force main to provide public sewer to 27 approximately 25 properties on a lake that have private septic systems 28 that have failed or are in prefailure status ...... $898,875 29 (11) College Place--domestic water project--construct two steel 30 tanks, a booster station, approximately 6,000 feet of transmission 31 line, 3,400 feet of water mains, three pressure reducing valves, and 32 associated telemetry to rectify a deficiency in fire flow and standby 33 water storage protection ...... $4,710,051 34 (12) Cowlitz county public utility district No. 1--domestic water 35 project--construction of approximately six new groundwater supply 36 wells, 2,100 feet of raw water piping a new water treatment plant 37 producing approximately 20 million gallons per day of potable water,

Code Rev/KK:cro Official Print - 112 S-5586.2/10 1 and approximately 4,350 feet of transmission main to connect to the 2 system to replace current water supply that is being impacted by 3 increasing water sediment ...... $3,213,000 4 (13) Ephrata--domestic water project--replace approximately 68,000 5 feet of failing water mains, 50,000 feet of failing water service 6 pipes, and the resurfacing of 20 miles of overlaying roadway, including 7 approximately 100 fire hydrants, 400 catch basins, 15 storm sewer 8 drywells, 22,000 feet of curb and gutter, and 16,000 feet of storm 9 sewer pipe ...... $6,605,727 10 (14) Freeland water district--domestic water project--connect a new 11 well and new reservoir to the existing system, rehabilitate the 12 existing well, and install new equipment to increase system 13 reliability, redundancy, and capacity. Install new chlorination 14 equipment to improve water quality ...... $347,516 15 (15) Gig Harbor--sanitary sewer project--improvements to the 16 wastewater treatment plant including new equipment and electrical work, 17 add a third clarifier, install ultraviolet disinfection, and extend and 18 upsize the outfall ...... $10,000,000 19 (16) Highline water district--domestic water project--construction 20 of 11,350 feet of transmission main and looping of pipes to eliminate 21 low pressures and fire flows and improve water quality, and create a 22 new pressure zone to correct high pressures ...... $5,390,418 23 (17) Karcher creek sewer district--sanitary sewer project--install 24 a new sewer system, including a lift station and approximately 3,600 25 lineal feet of sewer main, in conjunction with a road project to 26 service approximately 17 homes that will lose their septic systems due 27 to the road project ...... $1,358,130 28 (18) Kennewick--sanitary sewer project--construct improvements to 29 critical wastewater treatment plant processes to enhance reliability, 30 improve energy efficiency and redundancy, as well as increase the 31 capacity of the sludge pumping station ...... $5,500,000 32 (19) Kent--street project--construct two bridges, one for the 33 roadway over a set of railroad tracks, and one for railroad tracks over 34 a lowered roadway. This will grade separate the tracks from the 35 roadway to provide safe and reliable operations twenty-four hours a 36 day ...... $10,000,000 37 (20) King county--sanitary sewer project--construct 13,100 lineal

Code Rev/KK:cro Official Print - 113 S-5586.2/10 1 feet of pipe to convey approximately 9 million gallons per day of 2 reclaimed water to reduce withdrawals of 250-acre feet per year from 3 the Sammamish river ...... $7,000,000 4 (21) La Center--sanitary sewer project--upgrade wastewater 5 treatment plant to reduce the levels of nitrogen discharged in the 6 effluent and approximately doubling the operation of the plant and 7 producing class A reuse water ...... $10,000,000 8 (22) Lake Forest Park water district--domestic water project-- 9 replace approximately 6,915 lineal feet of undersized and corroded 10 water pipes to improve safety and reliability of the system by reducing 11 pipe failures and increasing fire flow ...... $917,935 12 (23) Lake Stevens--sanitary sewer project--construct a new 13 wastewater treatment plant, 9,500 feet of interceptor line, a pump 14 station, and an outfall pipe in partnership with Lake Stevens sewer 15 district ...... $10,000,000 16 (24) Lake Stevens sewer district--sanitary sewer project--construct 17 a new wastewater treatment plant, 9,500 feet of interceptor line, a 18 pump station, and an outfall pipe in partnership with the city of Lake 19 Stevens ...... $10,000,000 20 (25) Lakewood--sanitary sewer project--construct 3 pump stations, 21 approximately 17,200 linear feet of force mains, 13,500 linear feet of 22 gravity collector pipe line, and 320 side sewer stubs to service two 23 neighborhoods currently served exclusively by septic 24 systems ...... $1,840,000 25 (26) LOTT alliance--sanitary sewer project--construct approximately 26 7,400 feet of force main and replace existing pump station with new 27 1,000 gallon per minute pump station ...... $4,003,807 28 (27) Mansfield--sanitary sewer project--expand and rehabilitate 29 wastewater treatment lagoons and effluent spray irrigation system as 30 well as remove the discharge of groundwater from basement sump pumps to 31 the collection system ...... $235,600 32 (28) Midway sewer district--sanitary sewer project--replace 33 approximately 16,500 lineal feet of sewer mains and 50 manholes to 34 reduce infiltration and inflow ...... $3,782,500 35 (29) Mount Vernon--sanitary sewer project--upgrade existing 36 wastewater treatment plant, including a new pretreatment facility, 4 37 additional clarifiers, upgrade aeration basins, installation of an 38 ultraviolet disinfection system, and odor control system . $10,000,000

Code Rev/KK:cro Official Print - 114 S-5586.2/10 1 (30) Newcastle--road project--reconstruct, widen, and signalize 2 approximately 5,200 linear feet of road to 2 lanes in each direction, 3 add left turn lanes, sidewalks, bicycle lanes, install lighting 4 systems, replace two-lane bridge with a four-lane bridge, and install 5 new traffic signals ...... $5,000,000 6 (31) Olympia--sanitary sewer project--install approximately 6,500 7 linear feet of sewer mains and construct a lift station to serve 63 8 homes with failing on-site sewage systems ...... $1,808,375 9 (32) Olympus Terrace sewer district--sanitary sewer project-- 10 rehabilitate approximately 9,350 linear feet of sewer trunkline, 11 construct approximately 9,800 linear feet of high-flow storm water 12 bypass piping for excess flow, construct approximately 4,150 linear 13 feet of road access, and restore creek habitat ...... $8,000,000 14 (33) Omak--sanitary sewer project((--add 2 compost containers, 15 convert storage tank to sludge holding tank, and install a second 16 headworks screen to increase the wastewater treatment plant capacity by 17 35 percent)) ...... $450,000 18 (34) Port Angeles--sanitary sewer project--construct approximately 19 11,500 feet of sewer main, modify a storage tank, and modify the 20 wastewater treatment plant ...... $10,000,000 21 (35) Regional board of mayors--solid waste project--close landfill 22 site by capping and sealing with a soil cap ...... $859,500 23 (36) Regional board of mayors--solid waste project--construct a new 24 solid waste transfer station, including structures and 25 equipment ...... $1,541,000 26 (37) Ronald wastewater district--sanitary sewer project-- 27 rehabilitate 2 lift stations by replacing pumps, valves, fittings, 28 piping, odor control systems, and electrical equipment . . . . $955,400 29 (38) Seattle--domestic water project--replace floating pumps with 30 land-based pump station with a maximum capacity of approximately 250 31 million gallons per day, including 8 pumps, concrete structure, a 32 tunnel, approximately 4,000 feet of pipeline, and a standby 33 generator...... $10,000,000 34 (39) Sedro-Woolley--sanitary sewer project--rehabilitate or replace 35 4 interceptor segments totaling approximately 29,700 linear feet, 36 install 2 pump stations, and upgrade the secondary clarifier in order 37 to lift a building moratorium ...... $6,023,491

Code Rev/KK:cro Official Print - 115 S-5586.2/10 1 (40) Shelton--sanitary sewer project--construct a satellite 2 reclamation plant with a capacity of approximately 0.4 million gallons 3 per day to produce class A reclaimed water, approximately 22,000 linear 4 feet of sewer pipelines, and approximately 25,000 linear feet of 5 reclaimed water force main ...... $2,079,360 6 (41) Shelton--sanitary sewer project--replace approximately 38,480 7 linear feet of mainline sewers to reduce inflow and 8 infiltration ...... $5,737,500 9 (42) Skagit county sewer district No. 2--sanitary sewer project-- 10 upgrade wastewater treatment plant to a water reclamation facility to 11 provide class A reclaimed water with a capacity of approximately 0.35 12 million gallons per day ...... $10,000,000 13 (43) Snohomish--sanitary sewer project--construct approximately 14 1,900 feet of sewer pipe, a new pump station with a capacity of 15 approximately 8,000 gallons per minute, and approximately 4,300 feet of 16 force main to reduce overflows ...... $2,000,000 17 (44) Snohomish--sanitary sewer project((--upgrade existing 18 wastewater treatment plant including a new influent flow structure, 19 screens, aerators, effluent filtration, ultraviolet disinfection, 20 effluent pump station, improvements to the existing lagoons, and 21 electrical improvements)) ...... $4,500,000 22 (45) Snohomish county--road project--construct a new, approximately 23 two-mile, two-lane truck route around the city of Granite Falls, 24 including 3 roundabouts to improve safety and air quality in the 25 downtown area ...... $10,000,000 26 (46) Southwest Suburban sewer district--sanitary sewer project-- 27 replace and/or slipline approximately 5,470 feet of trunk/interceptor 28 sewer main and construct a new lift station to reduce 29 overflows ...... $3,268,250 30 (47) Tacoma--domestic water project--replace 3 open-topped concrete 31 reservoirs with 2 enclosed concrete reservoirs of approximately 33 32 million gallons each and related piping to comply with the safe 33 drinking water act and a bilateral compliance agreement . . $10,000,000 34 (48) Tekoa--sanitary sewer system--reconstruct approximately 1,000 35 feet of failing sewer line and manholes to reduce significant 36 groundwater infiltration ...... $135,115 37 (49) Three rivers regional wastewater authority--sanitary sewer

Code Rev/KK:cro Official Print - 116 S-5586.2/10 1 project--construct 2 clarifiers and associated piping to replace 2 2 failed clarifiers at the wastewater plant ...... $6,630,750 3 (50) Washougal--sanitary sewer project--construct a new wastewater 4 treatment plant headworks, including a fine screen, grit removal, and 5 replace approximately 150 linear feet of gravity sewer, and make 6 improvements to the lagoons, including 450 linear feet of piping, 7 modify overflow structures, and a new pump ...... $3,100,000 8 (51) Yakima--domestic water project--develop a new, approximately 9 3,000 gallon per minute, domestic water well, including drilling, 10 placement of casing, a new pump house, and connection to the existing 11 water distribution system in order to augment the water supply during 12 drought conditions ...... $2,257,200 13 (52) Yakima--street project--construct 2 underpasses and 14 reconstruct 3 lanes on each roadway under a railroad mainline to 15 accommodate additional rail and reduce traffic and emergency response 16 delays and air pollution ...... $3,000,000

17 Sec. 6007. RCW 43.155.050 and 2009 c 564 s 940 are each amended to 18 read as follows: 19 (1) The public works assistance account is hereby established in 20 the state treasury. Money may be placed in the public works assistance 21 account from the proceeds of bonds when authorized by the legislature 22 or from any other lawful source. Money in the public works assistance 23 account shall be used to make loans and to give financial guarantees to 24 local governments for public works projects. Moneys in the account may 25 also be appropriated to provide for state match requirements under 26 federal law for projects and activities conducted and financed by the 27 board under the drinking water assistance account. Not more than 28 fifteen percent of the biennial capital budget appropriation to the 29 public works board from this account may be expended or obligated for 30 preconstruction loans, emergency loans, or loans for capital facility 31 planning under this chapter; of this amount, not more than ten percent 32 of the biennial capital budget appropriation may be expended for 33 emergency loans and not more than one percent of the biennial capital 34 budget appropriation may be expended for capital facility planning 35 loans. During the 2009-2011 fiscal biennium, the legislature may 36 transfer from the public works assistance account to the general fund 37 and the city-county assistance account such amounts as reflect the

Code Rev/KK:cro Official Print - 117 S-5586.2/10 1 excess fund balance of the account. During the 2009-2011 fiscal 2 biennium, sums in the public works assistance account may be used for 3 the water pollution control revolving fund program match in section 4 3013 of this act. 5 (2) The job development fund is hereby established in the state 6 treasury. Moneys in the job development fund may be spent only after 7 appropriation.

8 Sec. 6008. RCW 28B.20.725 and 1969 ex.s. c 223 s 28B.20.725 are 9 each amended to read as follows: 10 The board is hereby empowered: 11 (1) To reserve the right to issue bonds later on a parity with any 12 bonds being issued; 13 (2) To authorize the investing of moneys in the bond retirement 14 fund and any reserve account therein; 15 (3) To authorize the transfer of money from the University of 16 Washington building account to the bond retirement fund when necessary 17 to prevent a default in the payments required to be made out of such 18 fund; 19 (4) To create a reserve account or accounts in the bond retirement 20 fund to secure the payment of the principal of and interest on any 21 bonds; 22 (5) To authorize the transfer to the University of Washington 23 building account of any money on deposit in the bond retirement fund in 24 excess of debt service for a period of three years from the date of 25 such transfer on all outstanding bonds payable out of such fund. 26 However, during the 2009-2011 fiscal biennium, the legislature may 27 transfer to the University of Washington building account moneys that 28 are in excess of the debt service due within one year of the date of 29 transfer on all outstanding bonds payable out of the bond retirement 30 fund.

31 Sec. 6009. RCW 28B.30.750 and 1969 ex.s. c 223 s 28B.30.750 are 32 each amended to read as follows: 33 The board is hereby empowered: 34 (1) To reserve the right to issue bonds later on a parity with any 35 bonds being issued;

Code Rev/KK:cro Official Print - 118 S-5586.2/10 1 (2) To authorize the investing of moneys in the bond retirement 2 fund and any reserve account therein; 3 (3) To authorize the transfer of money from the Washington State 4 University building account to the bond retirement fund when necessary 5 to prevent a default in the payments required to be made out of such 6 fund; 7 (4) To create a reserve account or accounts in the bond retirement 8 fund to secure the payment of the principal of and interest on any 9 bonds; 10 (5) To authorize the transfer to the Washington State University 11 building account of any money on deposit in the bond retirement fund in 12 excess of debt service for a period of three years from the date of 13 such transfer on all outstanding bonds payable out of such fund. 14 However, during the 2009-2011 fiscal biennium, the legislature may 15 transfer to the Washington State University building account moneys 16 that are in excess of the debt service due within one year of the date 17 of transfer on all outstanding bonds payable out of the bond retirement 18 fund.

19 NEW SECTION. Sec. 6010. A new section is added to 2009 c 497 20 (uncodified) to read as follows: 21 FOR THE STATE TREASURER--TRANSFERS 22 University of Washington bond retirement fund: 23 For transfer to the University of Washington 24 building account for fiscal year 2010 ...... $14,000,000

25 Sec. 6011. RCW 43.160.080 and 2008 c 327 s 11 are each amended to 26 read as follows: 27 There shall be a fund in the state treasury known as the public 28 facilities construction loan revolving account, which shall consist of 29 all moneys collected under this chapter and any moneys appropriated to 30 it by law. Disbursements from the revolving account shall be on 31 authorization of the board. In order to maintain an effective 32 expenditure and revenue control, the public facilities construction 33 loan revolving account shall be subject in all respects to chapter 34 43.88 RCW. During the 2009-2011 biennium, sums in the public 35 facilities construction loan revolving account may be used for

Code Rev/KK:cro Official Print - 119 S-5586.2/10 1 community economic revitalization board export assistance grants and 2 loans in section 1018 of this act and for matching funds for the 3 federal energy regional innovation cluster in section 1017 of this act.

4 Sec. 6012. 2009 c 497 s 6004 (uncodified) is amended to read as 5 follows: 6 (1) The office of financial management may ((authorize a)) transfer 7 ((of)) appropriation authority provided for a capital project that is 8 in excess of the amount required for the completion of ((such)) the 9 project ((to another capital project for which the appropriation is 10 insufficient. No such transfer may be used to expand the capacity of 11 any facility beyond that intended in making the appropriation. Such 12 transfers may be effected only between capital appropriations to a 13 specific department, commission, agency, or institution of higher 14 education and only between capital projects that are funded from the 15 same fund or account. No transfers may occur between projects to local 16 government agencies except where the grants are provided within a 17 single omnibus appropriation and where such transfers are specifically 18 authorized by the implementing statutes that govern the grants. 19 (2) The office of financial management may find that an amount is 20 in excess of the amount required for the completion of a project only 21 if: (a) The project as defined in the notes to the budget document is 22 substantially complete and there are funds remaining; or (b) bids have 23 been let on a project and it appears to a substantial certainty that 24 the project as defined in the notes to the budget document can be 25 completed within the biennium for less than the amount appropriated in 26 this act. 27 (3))), based on the authorized scope, to the risk pool in section 28 1021. 29 (2) For the purposes of this section, the intent is that each 30 project be defined as proposed to the legislature in the governor's 31 budget document, unless it clearly appears from the legislative history 32 that the legislature intended to define the scope of a project in a 33 different way. 34 (((4) Transfers of funds to an agency's infrastructure savings 35 appropriation are subject to review and approval by the office of 36 financial management. Expenditures from an infrastructure savings 37 appropriation are limited to projects that have a primary purpose to

Code Rev/KK:cro Official Print - 120 S-5586.2/10 1 correct infrastructure deficiencies or conditions that: (a) Adversely 2 affect the ability to utilize the infrastructure for its current 3 programmatic use; (b) reduce the life expectancy of the infrastructure; 4 or (c) increase the operating costs of the infrastructure for its 5 current programmatic use. Eligible infrastructure projects may include 6 structures and surface improvements, site amenities, utility systems 7 outside building footprints and natural environmental changes or 8 requirements as part of an environmental regulation, a declaration of 9 emergency for an infrastructure issue in conformance with RCW 10 43.88.250, or infrastructure planning as part of a facility master 11 plan. 12 (5) A report of any transfer effected under this section, except 13 emergency projects or any transfer under $250,000, shall be filed with 14 the legislative fiscal committees of the senate and house of 15 representatives by the office of financial management at least thirty 16 days before the date the transfer is effected. The office of financial 17 management shall report all emergency or smaller transfers within 18 thirty days from the date of transfer.)) 19 (3) The office of financial management shall not allot any portion 20 of a capital budget appropriation for: (a) Contingencies above the 21 amount required for completion of a project as described in budget 22 documents submitted as part of the governor's capital budget request or 23 consistent with legislative history; (b) proposed alternates submitted 24 in bid documents if agencies cannot document a programmatic need and an 25 operational budget savings resulting from the completion of the 26 alternate project component that would pay for the cost of the 27 alternate within eight years; or (c) for any equipment costs or project 28 scope beyond what was described in the budget documents submitted as 29 part of the governor's capital budget request. 30 (4) The office of financial management shall submit a monthly 31 report of approved allotments, subject to this section, by project. 32 The report shall include the accepted base bid and any approved 33 alternates with the analysis demonstrating sufficient operational 34 budget savings.

35 Sec. 6013. RCW 90.71.370 and 2009 c 479 s 74 are each amended to 36 read as follows: 37 (1) By December 1, 2008, and by September 1st of each even-numbered

Code Rev/KK:cro Official Print - 121 S-5586.2/10 1 year beginning in 2010, the council shall provide to the governor and 2 the appropriate fiscal committees of the senate and house of 3 representatives its recommendations for the funding necessary to 4 implement the action agenda in the succeeding biennium. The 5 recommendations shall: 6 (a) Identify the funding needed by action agenda element; 7 (b) Address funding responsibilities among local, state, and 8 federal governments, as well as nongovernmental funding; and 9 (c) Address funding needed to support the work of the partnership, 10 the panel, the ecosystem work group, and entities assisting in 11 coordinating local efforts to implement the plan. 12 (2) In the 2008 report required under subsection (1) of this 13 section, the council shall include recommendations for projected 14 funding needed through 2020 to implement the action agenda; funding 15 needs for science panel staff; identify methods to secure stable and 16 sufficient funding to meet these needs; and include proposals for new 17 sources of funding to be dedicated to Puget Sound protection and 18 recovery. In preparing the science panel staffing proposal, the 19 council shall consult with the panel. 20 (3) By November 1st of each odd-numbered year beginning in 2009, 21 the council shall produce a state of the Sound report that includes, at 22 a minimum: 23 (a) An assessment of progress by state and nonstate entities in 24 implementing the action agenda, including accomplishments in the use of 25 state funds for action agenda implementation; 26 (b) A description of actions by implementing entities that are 27 inconsistent with the action agenda and steps taken to remedy the 28 inconsistency; 29 (c) The comments by the panel on progress in implementing the plan, 30 as well as findings arising from the assessment and monitoring program; 31 (d) A review of citizen concerns provided to the partnership and 32 the disposition of those concerns; 33 (e) A review of the expenditures of funds to state agencies for the 34 implementation of programs affecting the protection and recovery of 35 Puget Sound, and an assessment of whether the use of the funds is 36 consistent with the action agenda; and 37 (f) An identification of all funds provided to the partnership, and

Code Rev/KK:cro Official Print - 122 S-5586.2/10 1 recommendations as to how future state expenditures for all entities, 2 including the partnership, could better match the priorities of the 3 action agenda. 4 (4)(a) The council shall review state programs that fund facilities 5 and activities that may contribute to action agenda implementation. By 6 November 1, 2009, the council shall provide initial recommendations 7 regarding program changes to the governor and appropriate fiscal and 8 policy committees of the senate and house of representatives. By 9 November 1, 2010, the council shall provide final recommendations 10 regarding program changes, including proposed legislation to implement 11 the recommendation, to the governor and appropriate fiscal and policy 12 committees of the senate and house of representatives. 13 (b) The review in this subsection shall be conducted with the 14 active assistance and collaboration of the agencies administering these 15 programs, and in consultation with local governments and other entities 16 receiving funding from these programs: 17 (i) Water pollution control facilities financing, chapter 70.146 18 RCW; 19 (ii) The water pollution control revolving fund, chapter 90.50A 20 RCW; 21 (iii) The public works assistance account, chapter 43.155 RCW; 22 (iv) The aquatic lands enhancement account, RCW 79.105.150; 23 (v) The state toxics control account and local toxics control 24 account and clean-up program, chapter 70.105D RCW; 25 (vi) The acquisition of habitat conservation and outdoor recreation 26 land, chapter 79A.15 RCW; 27 (vii) The salmon recovery funding board, RCW 77.85.110 through 28 77.85.150; 29 (viii) The community economic revitalization board, chapter 43.160 30 RCW; 31 (ix) Other state financial assistance to water quality-related 32 projects and activities; and 33 (x) Water quality financial assistance from federal programs 34 administered through state programs or provided directly to local 35 governments in the Puget Sound basin. 36 (c) The council's review shall include but not be limited to: 37 (i) Determining the level of funding and types of projects and

Code Rev/KK:cro Official Print - 123 S-5586.2/10 1 activities funded through the programs that contribute to 2 implementation of the action agenda; 3 (ii) Evaluating the procedures and criteria in each program for 4 determining which projects and activities to fund, and their 5 relationship to the goals and priorities of the action agenda; 6 (iii) Assessing methods for ensuring that the goals and priorities 7 of the action agenda are given priority when program funding decisions 8 are made regarding water quality-related projects and activities in the 9 Puget Sound basin and habitat-related projects and activities in the 10 Puget Sound basin; 11 (iv) Modifying funding criteria so that projects, programs, and 12 activities that are inconsistent with the action agenda are ineligible 13 for funding; 14 (v) Assessing ways to incorporate a strategic funding approach for 15 the action agenda within the outcome-focused performance measures 16 required by RCW 43.41.270 in administering natural resource-related and 17 environmentally based grant and loan programs. 18 (5) During the 2009-11 fiscal biennium, the council's review must 19 result in a ranking of projects affecting the protection and recovery 20 of the Puget Sound basin that are proposed in the governor's capital 21 budget submitted under RCW 43.88.060. The ranking shall include 22 recommendations for reallocation of total requested funds for Puget 23 Sound basin projects to achieve the greatest positive outcomes for 24 protection and recovery of Puget Sound and shall be submitted to the 25 appropriate fiscal committees of the legislature no later than February 26 1, 2011.

27 Sec. 6014. RCW 39.10.210 and 2007 c 494 s 101 are each amended to 28 read as follows: 29 Unless the context clearly requires otherwise, the definitions in 30 this section apply throughout this chapter. 31 (1) "Alternative public works contracting procedure" means the 32 design-build, general contractor/construction manager, and job order 33 contracting procedures authorized in RCW 39.10.300, 39.10.340, and 34 39.10.420, respectively. 35 (2) "Board" means the capital projects advisory review board. 36 (3) "Committee" means the project review committee.

Code Rev/KK:cro Official Print - 124 S-5586.2/10 1 (4) "Design-build procedure" means a contract between a public body 2 and another party in which the party agrees to both design and build 3 the facility, portion of the facility, or other item specified in the 4 contract. 5 (5) "Total contract cost" means the fixed amount for the detailed 6 specified general conditions work, the negotiated maximum allowable 7 construction cost, and the percent fee on the negotiated maximum 8 allowable construction cost. 9 (6) "General contractor/construction manager" means a firm with 10 which a public body has selected and negotiated a maximum allowable 11 construction cost to provide services during the design phase and to 12 act as construction manager and general contractor during the 13 construction phase. 14 (7) "Job order contract" means a contract in which the contractor 15 agrees to a fixed period, indefinite quantity delivery order contract 16 which provides for the use of negotiated, definitive work orders for 17 public works as defined in RCW 39.04.010. 18 (8) "Job order contractor" means a registered or licensed 19 contractor awarded a job order contract. 20 (9) "Maximum allowable construction cost" means the maximum cost of 21 the work to construct the project including a percentage for risk 22 contingency, negotiated support services, and approved change orders. 23 (10) "Negotiated support services" means items a general contractor 24 would normally manage or perform on a construction project including, 25 but not limited to surveying, hoisting, safety enforcement, provision 26 of toilet facilities, temporary heat, cleanup, and trash removal. 27 (11) "Percent fee" means the percentage amount to be earned by the 28 general contractor/construction manager as overhead and profit. 29 (12) "Public body" means any general or special purpose government, 30 including but not limited to state agencies, institutions of higher 31 education, counties, cities, towns, ports, school districts, and 32 special purpose districts, provided that for the 2009-2011 fiscal 33 biennium, the definition of public body for this chapter does not 34 include public bodies funded in section 1012 of this act if alternative 35 requirements or procedures of federal law or regulations are 36 authorized. 37 (13) "Certified public body" means a public body certified to use

Code Rev/KK:cro Official Print - 125 S-5586.2/10 1 design-build or general contractor/construction manager contracting 2 procedures, or both, under RCW 39.10.270. 3 (14) "Public works project" means any work for a public body within 4 the definition of "public work" in RCW 39.04.010. 5 (15) "Total project cost" means the cost of the project less 6 financing and land acquisition costs. 7 (16) "Unit price book" means a book containing specific prices, 8 based on generally accepted industry standards and information, where 9 available, for various items of work to be performed by the job order 10 contractor. The prices may include: All the costs of materials; 11 labor; equipment; overhead, including bonding costs; and profit for 12 performing the items of work. The unit prices for labor must be at the 13 rates in effect at the time the individual work order is issued. 14 (17) "Work order" means an order issued for a definite scope of 15 work to be performed pursuant to a job order contract.

16 Sec. 6015. RCW 39.94.040 and 2003 c 6 s 2 are each amended to read 17 as follows: 18 (1) Except as provided in RCW 28B.10.022, the state may not enter 19 into any financing contract for itself if the aggregate principal 20 amount payable thereunder is greater than an amount to be established 21 from time to time by the state finance committee or participate in a 22 program providing for the issuance of certificates of participation, 23 including any contract for credit enhancement, without the prior 24 approval of the state finance committee. Except as provided in RCW 25 28B.10.022, the state finance committee shall approve the form of all 26 financing contracts or a standard format for all financing contracts. 27 The state finance committee also may: 28 (a) Consolidate existing or potential financing contracts into 29 master financing contracts with respect to property acquired by one or 30 more agencies, departments, instrumentalities of the state, the state 31 board for community and technical colleges, or a state institution of 32 higher learning; or to be acquired by an other agency; 33 (b) Approve programs providing for the issuance of certificates of 34 participation in master financing contracts for the state or for other 35 agencies; 36 (c) Enter into agreements with trustees relating to master 37 financing contracts; and

Code Rev/KK:cro Official Print - 126 S-5586.2/10 1 (d) Make appropriate rules for the performance of its duties under 2 this chapter. 3 (2) In the performance of its duties under this chapter, the state 4 finance committee may consult with representatives from the department 5 of general administration, the office of financial management, and the 6 department of information services. 7 (3) With the approval of the state finance committee, the state 8 also may enter into agreements with trustees relating to financing 9 contracts and the issuance of certificates of participation. 10 (4) Except for financing contracts for real property used for the 11 purposes described under chapter 28B.140 RCW, the state may not enter 12 into any financing contract for real property of the state without 13 prior approval of the legislature. For the purposes of this 14 requirement, a financing contract must be treated as used for real 15 property if it is being entered into by the state for the acquisition 16 of land; the acquisition of an existing building; the construction of 17 a new building; or a major remodeling, renovation, rehabilitation, or 18 rebuilding of an existing building. Prior approval of the legislature 19 is not required under this chapter for a financing contract entered 20 into by the state under this chapter for energy conservation 21 improvements to existing buildings where such improvements include: 22 (a) Fixtures and equipment that are not part of a major remodeling, 23 renovation, rehabilitation, or rebuilding of the building, or (b) other 24 improvements to the building that are being performed for the primary 25 purpose of energy conservation. Such energy conservation improvements 26 must be determined eligible for financing under this chapter by the 27 office of financial management in accordance with financing guidelines 28 established by the state treasurer, and are to be treated as personal 29 property for the purposes of this chapter. 30 (5) The state may not enter into any financing contract on behalf 31 of an other agency without the approval of such a financing contract by 32 the governing body of the other agency.

33 NEW SECTION. Sec. 6016. The following acts or parts of acts are 34 each repealed: 35 (1) 2009 c 497 s 1089 (uncodified); 36 (2) 2009 c 497 s 2030 (uncodified); 37 (3) 2009 c 497 s 2079 (uncodified);

Code Rev/KK:cro Official Print - 127 S-5586.2/10 1 (4) 2009 c 497 s 3098 (uncodified); 2 (5) 2009 c 497 s 4009 (uncodified); 3 (6) 2009 c 497 s 5043 (uncodified); 4 (7) 2009 c 497 s 5059 (uncodified); 5 (8) 2009 c 497 s 5072 (uncodified); 6 (9) 2009 c 497 s 5084 (uncodified); 7 (10) 2009 c 497 s 5098 (uncodified); 8 (11) 2009 c 497 s 5112 (uncodified); and 9 (12) RCW 39.86.200 (Ratification) and 1987 c 297 s 11.

10 NEW SECTION. Sec. 6017. If any provision of this act or its 11 application to any person or circumstance is held invalid, the 12 remainder of the act or the application of the provision to other 13 persons or circumstances is not affected.

14 NEW SECTION. Sec. 6018. This act is necessary for the immediate 15 preservation of the public peace, health, or safety, or support of the 16 state government and its existing public institutions, and takes effect 17 immediately.

(End of bill)

Code Rev/KK:cro Official Print - 128 S-5586.2/10 INDEX PAGE # CENTRAL WASHINGTON UNIVERSITY ...... 83 COMMUNITY AND TECHNICAL COLLEGE SYSTEM ...... 91, 92 CRIMINAL JUSTICE TRAINING COMMISSION ...... 34 DEBT AFFORDABILITY STUDY ...... 111 DEPARTMENT OF COMMERCE ...... 17 DEPARTMENT OF CORRECTIONS ...... 38 DEPARTMENT OF ECOLOGY ...... 42 DEPARTMENT OF FISH AND WILDLIFE ...... 55 DEPARTMENT OF GENERAL ADMINISTRATION ...... 28 ENERGY SAVINGS PERFORMANCE CONTRACTING ...... 110 DEPARTMENT OF HEALTH ...... 36 DEPARTMENT OF LABOR AND INDUSTRIES ...... 35 DEPARTMENT OF NATURAL RESOURCES ...... 59, 60 DEPARTMENT OF SOCIAL AND HEALTH SERVICES ...... 35 DEPARTMENT OF VETERANS AFFAIRS ...... 37 EASTERN WASHINGTON UNIVERSITY ...... 82 MILITARY DEPARTMENT ...... 31 OFFICE OF FINANCIAL MANAGEMENT ...... 22, 110 RECREATION AND CONSERVATION FUNDING BOARD ...... 54 SPOKANE COMMUNITY COLLEGE ...... 111 STATE PARKS AND RECREATION COMMISSION ...... 50 SUPERINTENDENT OF PUBLIC INSTRUCTION ...... 69 THE EVERGREEN STATE COLLEGE ...... 84 UNIVERSITY OF WASHINGTON ...... 74 WASHINGTON STATE CENTER FOR CHILDHOOD DEAFNESS AND HEARING LOSS ...... 74 WASHINGTON STATE DEPARTMENT OF TRANSPORTATION ...... 67 WASHINGTON STATE HISTORICAL SOCIETY ...... 87 WASHINGTON STATE PATROL ...... 68 WASHINGTON STATE UNIVERSITY ...... 79, 80 WESTERN WASHINGTON UNIVERSITY ...... 86"

Code Rev/KK:cro Official Print - 129 S-5586.2/10 ESHB 2836 - S COMM AMD By Committee on Ways & Means

1 On page 1, line 2 of the title, after "improvements;" strike the 2 remainder of the title and insert "amending RCW 43.155.050, 28B.20.725, 3 28B.30.750, 43.160.080, 90.71.370, 39.10.210, and 39.94.040; amending 4 2009 c 497 ss 1005, 1013, 1029, 1019, 1023, 1030, 1031, 1034, 1035, 5 1039, 1040, 1045, 1046, 1048, 1054, 1055, 1065, 1071, 1075, 1060, 1061, 6 1063, 1064, 1068, 1073, 1081, 1086, 1087, 2001, 2002, 2027, 2014, 2034, 7 2037, 2038, 2067, 2072, 2075, 2078, 2068, 2054, 2064, 3059, 3039, 3007, 8 3049, 3054, 3060, 3020, 3052, 3093, 3094, 3090, 3091, 3085, 3109, 3133, 9 3138, 3157, 3168, 3169, 3172, 3178, 3182, 3197, 3203, 4008, 5007, 5008, 10 5009, 5002, 5013, 5014, 5011, 5027, 5029, 5024, 5023, 5026, 5028, 5037, 11 5030, 5041, 5035, 5039, 5055, 5047, 5054, 5056, 5057, 5064, 5061, 5065, 12 5068, 5079, 5080, 5083, 5092, 5094, 5093, 5097, 5104, 5100, 5111, 5115, 13 5116, 5118, 5120, 5174, 5176, 5127, 5180, 5171, 5182, 5210, 5183, 5184, 14 5217, 5218, 5219, 5220, 5204, 5205, 5206, 5208, 5165, 5177, 5178, 5191, 15 5151, 5181, 5190, 5192, 5168, 5135, 5195, 5223, 5179, 5213, 5164, 5224, 16 5143, 5167, 6009, and 6004 (uncodified); amending 2008 c 5 s 1 17 (uncodified); adding new sections to 2009 c 497 (uncodified); creating 18 a new section; repealing RCW 39.86.200; repealing 2009 c 497 ss 1089, 19 2030, 2079, 3098, 4009, 5043, 5059, 5072, 5084, 5098, and 5112 20 (uncodified); and declaring an emergency."

--- END ---