A2. Completed Questionnaires and Emails

A2.1. For all allocations in the Councils’ adopted Local Plans and Area Action Plans, and all developments on unallocated sites of 10 dwellings or more (net) with planning permission or a resolution to grant planning permission by either of the Councils’ planning committees, a letter and questionnaire was sent to the housebuilder, developer, landowner or agent for the site. The questionnaire asked them: to provide details on whether the site is deliverable in terms of its availability, suitability and achievability; their expected delivery timetable for the site; and also to tell us the reasons for any actual or possible future delays in delivery.

A2.2. The majority of the questionnaires were sent out in March and April 2019, with some additional questionnaires sent out in subsequent months as additional sites were permitted or alternative landowner, developer or housebuilder details were found, and completed questionnaires were returned between March and July 2019. The Councils sent out the questionnaires by email or post (depending on the information available) and followed up responses through several reminder emails and telephone calls. Some additional information or updated questionnaires were received in October 2019.

A2.3. Copies of each of the completed questionnaires or emails received are included in this document, and the date received is included on each. Some of the information provided by the housebuilders, developers, landowners or agents in their completed questionnaires has been redacted due to that information being identified as commercially sensitive or personal information.

41 Response Received: Reference Landowner, Developer or Site Questionnaire (Qu), Email (E), Page Number Housebuilder Document (D) or None (N) The Paddocks Trading Estate, Cherry Hinton C1 LaSalle Investment Management N Road, C2 379-381 Milton Road, Cambridge EMG Motorgroup N Willowcroft, Histon Road, Cambridge a. 149B Histon Road BPHA N C3 b. 149 Histon Road Identified Developments N c. ATS Euromaster, 143 Histon Road ATS Euromaster Qu 52 d. Murketts Ltd, 137 Histon Road Murketts Ltd N C4 Travis Perkins, Devonshire Road, Cambridge Travis Perkins Qu 58 C5 Police Station, Parkside, Cambridge Constabulary Qu 64 70 & C6 Ridgeons, Cromwell Road, Cambridge Cambridge Investment Partnership Qu x2 77 Henry Giles House, Chesterton Road, C7 Telereal Trillium Qu 84 Cambridge C8 295 Histon Road, Cambridge Laragh Homes Qu 90 C9 Sandy Lane, Cambridge Littlebury Property Limited Qu 96 C10 Betjeman House, Hills Road, Cambridge PACE (Cambridge) Ltd N Station Area - Pink Phase (Station Road C11 Brookgate N West), Cambridge Camfields Resource Centre and Oil Depot, This Land N C12 137-139 Ditton Walk, Cambridge MRH (GB) Ltd N 149 Cherry Hinton Road and Telephone

C13 Exchange, Coleridge Road, Cambridge a. 149 Cherry Hinton Road Swiss Laundry N

42 Response Received: Reference Landowner, Developer or Site Questionnaire (Qu), Email (E), Page Number Housebuilder Document (D) or None (N) b. Telephone Exchange Telereal Trillium Qu 102 Mill Road Depot and adjoining properties, Mill C14 Cambridge Investment Partnership Qu 108 Road, Cambridge Horizon Resource Centre, 285 Coldham's C15 Cambridgeshire County Council Qu 114 Lane, Cambridge BT telephone exchange and car park, Long C16 Telereal Trillium Qu 120 Road, Cambridge Cambridge Professional Development C17 Cambridgeshire County Council Qu 126 Centre, Foster Road, Cambridge Clifton Road Area, Cambridge a. USS USS Qu 132 C18 b. Royal Mail Group Royal Mail Group N c. X-Leisure Ltd X-Leisure Ltd N d. PAT Pensions PAT Pensions N 82-88 Hills Road and 57-63 Bateman Street, C19 Trinity Hall E 138 Cambridge 636-656 Newmarket Road, Holy Cross Church Hall, East Barnwell Community

Centre and Meadowlands, Newmarket Road, Cambridge C20 a. Cambridge City Council Cambridge City Council Qu 139 b. Cambridgeshire County Council Cambridgeshire County Council N c. The Churches Trust The Churches Trust N d. Cambridge Spiritualist Centre Cambridge Spiritualist Centre N

43 Response Received: Reference Landowner, Developer or Site Questionnaire (Qu), Email (E), Page Number Housebuilder Document (D) or None (N) 315-349 Mill Road and Brookfields, Cambridgeshire Community C21 N Cambridge Services NHS Trust 146 & C22 Land north of Worts’ Causeway Commercial Estates Group Qu x2 153 C23 Land south of Worts’ Causeway This Land Qu 160 C25 Hayling House, Fen Road, Cambridge Crickmore Developments Qu 166 C26 34-36 Madingley Road, Cambridge Madingley Developments Ltd N 1 Whichcote House, Springfield Road, C27 Cambridge and land rear of Whichcote Whichcote Land Ltd N House, Milton Road, Cambridge Sorrento Hotel, 190-196 Cherry Hinton Road, C28 Sorrento Hotel N Cambridge C29 64-68 Newmarket Road, Cambridge User Friendly Properties Ltd N C30 23 and 25 Hills Road, Cambridge Dernford Developments Ltd Qu 172 Cambridge Carpets, 213 Mill Road, C31 HTS Estates Ltd N Cambridge C32 Land at Anstey Way, Cambridge Cambridge Investment Partnership Qu 179 St Regis House and 108 Chesterton Road, C33 Clare College Qu 185 Cambridge C34 Lovell Lodge, 365 Milton Road, Cambridge BF Design Solutions Qu 191 C35 Land at 300-314 Coldham’s Lane, Cambridge Cambridge (Coldhams Lane) Ltd N C37 291 Hills Road, Cambridge Gibson Developments Ltd N C38 141 Ditton Walk, Cambridge This Land N Grafton House, 64 Maids Causeway, C39 GCR Camprop Four Ltd N Cambridge

44 Response Received: Reference Landowner, Developer or Site Questionnaire (Qu), Email (E), Page Number Housebuilder Document (D) or None (N) National Institute of Agricultural Botany, C40 Marchingdale Developments Limited N Huntingdon Road, Cambridge Clay Farm – Parcels 1B, 2, 5-7, 8A, 8B, 10- GC1 Countryside Properties Qu 197 11, 12A, 12C, 13A, 13B, 14A & 14B GC2 Clay Farm - Parcels 15-18 Bovis Homes N GC4 Bell School Hill Residential Qu 203 Hill Residential / University of GC5 North West Cambridge (University Site) E 209 Cambridge Land between Huntingdon Road and Histon Barratt Homes / David Wilson GC6 N Road – NIAB Frontage Homes Land between Huntingdon Road and Histon Barratt Homes / David Wilson GC7 Qu 212 Road – NIAB Main / Darwin Green Homes Land between Huntingdon Road, Histon Barratt Homes / David Wilson GC8 Road and the A14 – Darwin Green 2 / NIAB 2 N Homes and Darwin Green 3 / NIAB 3 Cambridge East – Land north of Newmarket GC9 Hill Marshall LLP Qu 219 Road (WING) Cambridge East – Land north of Cherry Marshall Group and Endurance 225 & GC10 Qu & D Hinton Estates 233 GC11 Cambridge East – Land at Coldham's Lane Weston Homes E 239 Meadows a. Lots 1-5 Barratt Homes Qu 240 GC12 b. Riverside Barratt Homes Qu 247 c. Lots 10 & 11 Barratt Homes Qu 254 Northstowe Phase 1 GC13 b. Parcel H2 Barratt Homes Qu 261

45 Response Received: Reference Landowner, Developer or Site Questionnaire (Qu), Email (E), Page Number Housebuilder Document (D) or None (N) c. Parcel H3 Taylor Wimpey Qu 267 d. Parcel H4 Bovis Homes Qu 273 e. Parcels H5 & H6 Bovis Homes Qu 279 f. Parcel H7 Barratt Homes N g. Parcel H8 Barratt Homes N h. Parcel H9 Barratt Homes Qu 285 i. Parcel H10 Taylor Wimpey Qu 291 j. Parcel H11 Taylor Wimpey Qu 297 k. Parcel H12 Linden Homes Qu 303 l. Parcel H13 Taylor Wimpey Qu 309 GC14 Northstowe Phase 2 Homes Qu 315 GC15 Northstowe Phase 3 and later phases Homes England Qu 321 Waterbeach New Town 327 & GC16 a. western part of the site Urban & Civic Qu & D 335 b. eastern part of the site RLW Estates Qu 337 GC17 Bourn Airfield New Village Countryside Properties Qu 346 Cambourne West – Land north west of Lower GC18 Taylor Wimpey & Bovis Homes Qu 352 Cambourne Cambourne West – Land within the Business GC19 U+I E 358 Park SC2 Orchard Park – Parcel L2 Turnwood Limited E 359 SC3 Orchard Park – Parcel Com4 Marchingdale Developments Limited N SC4 Cambourne - additional 950 dwellings Taylor Wimpey N

46 Response Received: Reference Landowner, Developer or Site Questionnaire (Qu), Email (E), Page Number Housebuilder Document (D) or None (N) SC5 Fulbourn & Ida Darwin Hospitals Homes England Qu 360 Fulbourn & Ida Darwin Hospitals (land off SC6 Henderson UK Property PAIF N Fulbourn Old Drift) Papworth West Central – South of Church SC7 Flagship Group E 366 Lane Papworth West Central – Catholic Church Roman Catholic Diocese of East SC8 Qu 367 site Anglia SC9 Former Bayer CropScience Site, Hauxton Redrow Homes Qu 373 Dales Manor Business Park, Sawston a. Salmon Harvester Salmon Harvester E 379 SC11 b. Peterhouse Peterhouse N c. PAT Pensions PAT Pensions N SC12 Land north of Babraham Road, Sawston Hill Residential Qu 380 John Huntingdon Charity, Wards SC13 Land south of Babraham Road, Sawston Qu 386 Charity and RJ Driver Trust SC14 Land north of Impington Lane, Impington Hill Residential Qu 392 Land west of New Road, Melbourn – Land SC15 Granary Developments Qu 399 south west of Victoria Way Land west of New Road, Melbourn – Land at SC16 R2 Developments Ltd Qu 405 36 New Road 411 & SC17 Green End Industrial Estate, Gamlingay Morris Homes Qu & E 417 SC18 East of Rockmill End, Willingham Kier Cross Keys Qu 418 Land at Bennell Farm, West Street, SC19 Mr & Mrs Arnold Qu 424

47 Response Received: Reference Landowner, Developer or Site Questionnaire (Qu), Email (E), Page Number Housebuilder Document (D) or None (N) Histon & Impington Station Area – The SC20 Mitre Property Development Ltd Qu 431 Bishops Site, Cambridge Road, Impington Histon & Impington Station Area – Former station site including derelict Histon & SC21 Cocksedge Building Contractors Qu 437 Impington Railway Station, 94-96 Station Road, Impington SC22 Land west of 22a West Road, Gamlingay Maulden Vale Ltd Qu 443 Land rear of Cygnus Business Park, SC25 Starburst Property Ltd Qu 449 Swavesey SC27 Land to east of Cody Road, Waterbeach Matthew Homes Qu 455 Land rear of 131 The Causeway, SC28 Taylor French Developments Ltd N Bassingbourn-cum-Kneesworth SC29 18 Boxworth End, Swavesey Matthew Homes N2 SC31 East of New Road, Melbourn Hopkins Homes Qu 461 Former CEMEX Cement Works, Haslingfield SC33 Redrow Homes N Road, Barrington SC34 Land off Mill Lane, Sawston Croudace Homes Qu 467 SC35 36 Oakington Road, Cottenham Bellway Homes Qu 473 SC37 Land off Haden Way, Willingham Brampton Valley Homes Qu 479 SC38 East of Spring Lane, Bassingbourn Sanctuary Housing E 485 SC39 Rear of 7-37 Station Road, Foxton Hill Residential Qu 486 SC40 Land west of Mill Road, Over This Land Qu 492 SC41 South of West Road, Gamlingay Bushmead Homes Qu 498

2 The housebuilder has indicated to the Council’s s106 monitoring officer that construction will start on site in October 2019.

48 Response Received: Reference Landowner, Developer or Site Questionnaire (Qu), Email (E), Page Number Housebuilder Document (D) or None (N) SC42 Land at 22 Linton Road, Balsham Matthew Homes Qu 505 Monkfield Nutrition, High Street, Shingay- SC44 Patrick Ruddy Homes Qu 511 cum-Wendy SC45 7 High Street, Balsham Hill Residential Qu 517 SC46 Hallmark Hotel, Bar Hill Sanctuary Housing N SC47 Land off Rampton Road, Cottenham Gladman Developments Qu 523 SC48 Land east of Highfields Road, Caldecote Linden Homes Qu 529 SC49 Land at Hurdleditch Road, Orwell Croudace Homes Qu 535 SC50 Land rear of 130 Middlewatch, Swavesey Bushmead Homes Qu 541 West of Cemetery, The Causeway, SC51 CALA Homes Qu 547 Bassingbourn SC52 Land south of 1b Over Road, Willingham Mr Wynn N3 SC53 Land north and south of Bartlow Road, Linton Abbey Developments Qu 553 South of Thompsons Meadow, Trap Road, SC54 Guilden Morden Executive Homes N Guilden Morden SC55 West of Grace Crescent, Hardwick Hill Residential Qu 559 Rear of 18-28 Highfields Road, Highfields SC56 CALA Homes Qu 565 Caldecote SC57 Land at Teversham Road, Fulbourn Castlefield International Ltd Qu 571 SC58 Land off Bartlow Road, Castle Camps Abora Homes Qu 577 Land south and east of 77 Station Road, SC59 Lindum Group Qu 583 Willingham

3 Telephone call from Mr Wynn advising that the site is in the process of being sold.

49 Response Received: Reference Landowner, Developer or Site Questionnaire (Qu), Email (E), Page Number Housebuilder Document (D) or None (N) Lion Works, Station Road West, Whittlesford SC60 Rivertree Developments Ltd N Bridge SC61 South of 279 St Neots Road, Hardwick Clarion Housing Group E 589 SC62 Land at Oakington Road, Cottenham Persimmon Homes Qu 590 SC63 Rear of 79 High Street, Meldreth Michael Collins N SC64 Land off Gibson Close, Waterbeach Enterprise Property Group Qu 596 SC65 Land at Belsar Farm, Willingham This Land Qu 602 SC66 Land adjacent Longstanton Road, Over Bushmead Homes Qu 608 SC67 Land at Meldreth Road, Shepreth This Land N SC68 Plumbs Dairy, 107 High Street, Balsham Plumbs Property N Welbeck Strategic Land, Mr Fletcher SC69 Land off Grafton Drive, Caldecote Qu 615 and Mrs Fletcher SC70 65 Pettitts Lane, Dry Drayton Dyason Developments Ltd N SC71 Horseheath Road, Linton Ely Diocesan Board of Finance Qu 621 SC72 Land off Fen End, Over Granary Developments E 628 Land between 66-68 Common Lane, SC73 Carlton Homes E 629 Sawston SC74 Land south of Fen Drayton Road, Swavesey Bloor Homes E 630 SC75 Sheen Farm, Royston Road, Litlington This Land N SC76 Land north of Linton Road, Great Abington Laragh Homes Qu 631 Land north east of Rampton Road, SC77 This Land N Cottenham SC78 Rear of 46-56 The Moor, Melbourn Hanson Services Ltd N SC79 Land at Linton Road, Great Abington Hill Residential Qu 636

50 Response Received: Reference Landowner, Developer or Site Questionnaire (Qu), Email (E), Page Number Housebuilder Document (D) or None (N) SC81 39 Pepys Way, Girton Shelford Properties Ltd Qu 642 SC82 Land west of Balsham Road, Fulbourn Accent Housing Qu 648 SC83 Land west of Longstanton Mr & Mrs P L Stroude E 654 Former Waste Water Treatment Facility, SC84 Harrow Estates N Cambridge Road, Hauxton Land at the corner of Capper Road and Cody Cambridge and County SC85 Qu 655 Road, Waterbeach Developments Land south and west of High Street, McCarthy and Stone Retirement SC86 Qu 661 Cambourne Lifestyles

51 Questionnaire C3c Received April 2019

Greater Cambridge Housing Trajectory Questionnaire

The Councils are subject to the Freedom of Information Act 2000 and Environmental Information Regulations 2004, and laws concerning the protection of personal information. If you consider that any of the information that you provide as part of your response is commercially sensitive or personal information, please identify it as such in question 5a and please explain in question 5b how disclosure would be detrimental to your organisation. The Councils cannot guarantee non-disclosure of this information, but will apply any relevant exemption where one is clearly engaged.

SITE DETAILS

Site: WILLOWCROFT, HISTON ROAD Ownership: Developers: Identified Development Ltd and BPHA e.g. housebuilder, Landowners: ATS Euromaster and Murketts Ltd developer, landowner Cambridge Local Plan 2018 - Site R2 (approximately 78 dwellings), Planning Status: 14/1254/FUL (demolition of 1 dwelling and 15 new dwellings), e.g. allocation, 15/1286/S73, 15/1369/FUL (23 dwellings), 17/0412/S73 (amended outline planning design, reduces number of dwellings to 21 dwellings) permission, detailed The site is allocated in the Cambridge Local Plan (adopted in October planning permission, 2018) for approximately 78 dwellings. Part of the site has detailed resolution to grant planning permission for demolition of 1 dwelling and construction of 36 planning permission dwellings. This is the Councils’ assessment of progress towards delivery of this Councils’ site based on our current knowledge: assessment: At March 2018, no construction had started on site. Anticipated year for works to start on 2019/2020 site: Anticipated year for development to be 2024/2025 completed:

The developers identified above are not Please confirm whether the site details, developers of the ATS Euromaster including Councils’ assessment, set out 1a ownership. No developer has yet been above are still correct. If not, please formally identified by ATS Euromaster. This provide updated details. is still in process. Please confirm if you are the correct contact for this site on an ongoing 1b basis. If not, please provide updated contact details.

AVAILABILITY

52 Is the site available immediately Yes. Subject to rebuilding of part of the ATS for development? Euromaster facility as previously identified. 2a Available is defined as: the site is controlled by a housing developer who has expressed an intention to develop or the landowner has expressed an intention to sell.

If not, why not? 2b e.g. is there an existing use on the N/A site?

If the site is not available immediately, when will it 2c N/A become available for development?

Are you still undertaking any site assessment work? If so, Site investigation surveys to be undertaken as part 2d please provide us with further of development process. details.

If your site is allocated, but does not yet have planning permission, when do you 2e anticipate that you will submit a planning application or receive a decision on a submitted planning application?

If your site has outline planning permission, but does not yet have detailed planning permission, when do you anticipate that you will submit a 2f N/A detailed (reserved matters) planning application or receive a decision on a submitted detailed (reserved matters) planning application?

ACHIEVABILITY

Is the development achievable and viable? If not, please provide details in responding to Yes. 3a the questions below explaining how this will be overcome. Achievable is defined as: having a realistic prospect that housing will be delivered on site within five years.

53 Infrastructure and Access

Please provide details: N/A

Legal and Ownership Are there any constraints that could Please provide details: N/A delay development? For all that apply, please provide specific Discharge of Conditions 3b details for your site and what impact these Please provide details: N/A constraints will have on your timescales for delivery. Other (e.g. contamination)

Please provide details: Asbestos removal from existing buildings on the site – such remediation work to be carried out as part of the development process.

Market Conditions

Please provide details: Currently N/A

Site Preparation Costs Are there any market or cost factors that could Please provide details: Currently N/A. delay development? For all that apply, please provide specific 3c Infrastructure Costs details for your site and what impact these factors will have on Please provide details: Currently N/A. your timescales for delivery. Planning Obligations

Please provide details: Currently N/A.

How do you anticipate these constraints and factors will be 3d overcome? When do you think N/A these constraints and factors will be overcome?

54 If your trajectory is dependent on certain assumptions, such as availability and timing of infrastructure, site preparation, 3e submission of a planning application, a decision on a planning application or discharge of conditions, what are your assumptions?

DELIVERY TIMETABLE & HOUSING TRAJECTORY

When do you estimate you will 4a start works on site?

When do you estimate you will 4b deliver the first housing 2023 completions?

When do you estimate you will 4c complete development of the 2023/24 site?

Please complete the housing trajectory [see final page] Planning Application not table [see final page] with details of your 4d yet submitted, so trajectory anticipated as anticipated housing completions in before. future years.

If your actual completions Market Conditions for 2017-2018 differ from the number anticipated in Please provide details: the previous published housing trajectory [see final page], what is the 4e reason? For all that apply, Site Specific Reasons please provide specific details for your site and Please provide details: what impact this has had on your timescales for delivery.

If your projected Market Conditions completions for future years differ from the Please provide details: 4f number anticipated in previous published housing trajectory [see

55 final page], what is the Site Specific Reasons reason? For all that apply, please provide specific Please provide details: details for your site and what impact this has had on your timescales for delivery.

COMMERCIALLY SENSITIVE INFORMATION

Have you provided any information that you would regard as commercially 5a sensitive? If yes, please specify which answers this applies to. Please explain in detail how disclosure of this information 5b would be detrimental to your organisation.

Please return to:

Email to: [email protected]

Post to: Jenny Nuttycombe, Senior Planning Policy Officer Greater Cambridge Shared Planning c/o Hall Cambourne Business Park Cambourne CB23 6EA

By no later than 20 March 2019

56 Please complete the housing trajectory table below with details of your anticipated housing completions in future years:

All years are based on financial years i.e. 1 April – 31 March Post 2033 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 2031-32 2032-33

Housing trajectory published in 0 0 21 14 0 0 21 22 0 0 0 0 0 0 0 0 0 December 2017

Actual dwelling 0 completions recorded

Please provide your current best estimate of completions by year MARKET HOUSING

Please provide your current best estimate of completions by year AFFORDABLE HOUSING

n/a = not available, this site was not included in the housing trajectory published in December 2017.

57 Questionnaire C4 Received April 2019

Greater Cambridge Housing Trajectory Questionnaire

The Councils are subject to the Freedom of Information Act 2000 and Environmental Information Regulations 2004, and laws concerning the protection of personal information. If you consider that any of the information that you provide as part of your response is commercially sensitive or personal information, please identify it as such in question 5a and please explain in question 5b how disclosure would be detrimental to your organisation. The Councils cannot guarantee non-disclosure of this information, but will apply any relevant exemption where one is clearly engaged.

SITE DETAILS

Site: TRAVIS PERKINS, DEVONSHIRE ROAD Ownership: e.g. housebuilder, Landowner: Travis Perkins developer, landowner Planning Status: e.g. allocation, outline planning Cambridge Local Plan 2018 - Site R9 permission, detailed The site is allocated in the Cambridge Local Plan (adopted in October planning permission, 2018) for approximately 43 dwellings. resolution to grant planning permission This is the Councils’ assessment of progress towards delivery of this site based on our current knowledge: Councils’ assessment: The site is allocated in the Cambridge Local Plan (adopted in October 2018) for approximately 43 dwellings. Anticipated year for works to start on 2020/2021 site: Anticipated year for development to be 2020/2021 completed:

Please confirm whether the site details, including Councils’ assessment, set out The site is likely to be available for 1a above are still correct. If not, please redevelopment by 2022 provide updated details. Please confirm if you are the correct contact for this site on an ongoing 1b basis. If not, please provide updated contact details.

AVAILABILITY

58 Is the site available immediately No for development? 2a Available is defined as: the site is controlled by a housing developer who has expressed an intention to develop or the landowner has expressed an intention to sell.

If not, why not? 2b e.g. is there an existing use on the Existing use on the site site?

If the site is not available immediately, when will it 2c c.2021/2022 become available for development?

Are you still undertaking any site assessment work? If so, 2d No please provide us with further details.

If your site is allocated, but does not yet have planning permission, when do you 2e anticipate that you will submit a 2020/2021 planning application or receive a decision on a submitted planning application?

If your site has outline planning permission, but does not yet have detailed planning permission, when do you anticipate that you will submit a 2f detailed (reserved matters) planning application or receive a decision on a submitted detailed (reserved matters) planning application?

ACHIEVABILITY

Is the development achievable and viable? If not, please provide details in responding to 3a the questions below explaining how this will be overcome. Achievable is defined as: having a realistic prospect that housing will be delivered on site within five years.

59 Infrastructure and Access

Please provide details:

Are there any Legal and Ownership constraints that could delay development? Please provide details: For all that apply, please provide specific 3b details for your site and Discharge of Conditions what impact these constraints will have Please provide details: on your timescales for delivery. Other (e.g. contamination)

Please provide details:

Market Conditions

Please provide details:

Are there any market or Site Preparation Costs cost factors that could delay development? Please provide details: For all that apply, please provide specific 3c details for your site and Infrastructure Costs what impact these factors will have on Please provide details: your timescales for delivery. Planning Obligations

Please provide details:

How do you anticipate these constraints and factors will be 3d overcome? When do you think these constraints and factors will be overcome?

60 If your trajectory is dependent on certain assumptions, such as availability and timing of infrastructure, site preparation, 3e submission of a planning application, a decision on a planning application or discharge of conditions, what are your assumptions?

DELIVERY TIMETABLE & HOUSING TRAJECTORY

When do you estimate you will 4a 2022 start works on site?

When do you estimate you will 4b deliver the first housing 2022/2023 completions?

When do you estimate you will 4c complete development of the 2022/2023 site?

Please complete the housing trajectory table [see final page] with details of your 4d [see final page] anticipated housing completions in future years.

Market Conditions If your actual completions for 2017-2018 differ from Please provide details: the number anticipated in the previous published housing trajectory [see final page], what is the 4e Site Specific Reasons reason? For all that apply, please provide specific details for your site and Please provide details: Delayed relocation of existing use what impact this has had to alternative site on your timescales for delivery.

If your projected Market Conditions completions for future years differ from the Please provide details: 4f number anticipated in previous published housing trajectory [see

61 final page], what is the Site Specific Reasons reason? For all that apply, please provide specific Please provide details: details for your site and what impact this has had on your timescales for delivery.

COMMERCIALLY SENSITIVE INFORMATION

Have you provided any information that you would regard as commercially 5a sensitive? If yes, please specify which answers this applies to. Please explain in detail how disclosure of this information 5b would be detrimental to your organisation.

Please return to:

Email to: [email protected]

Post to: Jenny Nuttycombe, Senior Planning Policy Officer Greater Cambridge Shared Planning c/o South Cambridgeshire Hall Cambourne Business Park Cambourne CB23 6EA

By no later than 20 March 2019

62 Please complete the housing trajectory table below with details of your anticipated housing completions in future years:

All years are based on financial years i.e. 1 April – 31 March Post 2033 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 2031-32 2032-33

Housing trajectory published in 0 0 0 43 0 0 0 0 0 0 0 0 0 0 0 0 0 December 2017

Actual dwelling 0 completions recorded

Please provide your current best estimate of completions by year MARKET HOUSING

Please provide your current best estimate of completions by year AFFORDABLE HOUSING

n/a = not available, this site was not included in the housing trajectory published in December 2017.

63 Questionnaire C5 Received March 2019

Greater Cambridge Housing Trajectory Questionnaire

The Councils are subject to the Freedom of Information Act 2000 and Environmental Information Regulations 2004, and laws concerning the protection of personal information. If you consider that any of the information that you provide as part of your response is commercially sensitive or personal information, please identify it as such in question 5a and please explain in question 5b how disclosure would be detrimental to your organisation. The Councils cannot guarantee non-disclosure of this information, but will apply any relevant exemption where one is clearly engaged.

SITE DETAILS

Site: POLICE STATION, PARKSIDE Ownership: e.g. housebuilder, Landowner: Cambridgeshire Constabulary developer, landowner Planning Status: e.g. allocation, outline planning Cambridge Local Plan 2018 - Site M4 permission, detailed The site is allocated in the Cambridge Local Plan (adopted in October planning permission, 2018) for approximately 50 dwellings. resolution to grant planning permission This is the Councils’ assessment of progress towards delivery of this site based on our current knowledge:

The site is allocated in the Cambridge Local Plan (adopted in October 2018) for approximately 50 dwellings. We have previously been advised that the first housing completions are anticipated in Councils’ 2022/2023. assessment: A Statement of Common Ground was agreed between Cambridge City Council and Cambridgeshire Constabulary in March 2015, which agreed that whilst a suitable site for relocation of the police station will need to be found, residential development on the site can be delivered within the plan period, and that the most likely time-frame for development was 2020-2021. Anticipated year for works to start on 2022/2023 site: Anticipated year for development to be 2022/2023 completed:

Please confirm whether the site details, including Councils’ assessment, set out 1a above are still correct. If not, please Correct provide updated details.

64 Please confirm if you are the correct contact for this site on an ongoing 1b basis. If not, please provide updated contact details.

AVAILABILITY

Is the site available immediately for development? No 2a Available is defined as: the site is controlled by a housing developer who has expressed an intention to develop or the landowner has expressed an intention to sell.

If not, why not? 2b e.g. is there an existing use on the Existing Police Station use site?

If the site is not available immediately, when will it Once the South Cambridgeshire Police Station 2c become available for is operational development?

Are you still undertaking any site assessment work? If so, 2d please provide us with further Further evaluation work will be required details.

If your site is allocated, but does not yet have planning permission, when do you A planning application will not be submitted until 2e anticipate that you will submit a the South Cambridgeshire Police Station is planning application or receive contacted and further evaluation work complete a decision on a submitted planning application?

If your site has outline planning permission, but does not yet have detailed planning permission, when do you anticipate that you will submit a 2f detailed (reserved matters) n/a planning application or receive a decision on a submitted detailed (reserved matters) planning application?

65 ACHIEVABILITY

Is the development achievable and viable? If not, please provide details in responding to Yes 3a the questions below explaining how this will be overcome. Achievable is defined as: having a realistic prospect that housing will be delivered on site within five years.

Infrastructure and Access

Please provide details: Unknown at this stage

Are there any Legal and Ownership constraints that could delay development? Please provide details: Unknown at this stage For all that apply, please provide specific 3b details for your site and Discharge of Conditions what impact these constraints will have Please provide details: Unknown at this stage on your timescales for delivery. Other (e.g. contamination)

Please provide details: Unknown at this stage

Market Conditions

Please provide details: Unknown at this stage Are there any market or cost factors that could delay development? Site Preparation Costs For all that apply, please provide specific 3c Please provide details: Unknown at this stage details for your site and what impact these factors will have on Infrastructure Costs your timescales for delivery. Please provide details: Unknown at this stage

66 Planning Obligations

Please provide details: Unknown at this stage

How do you anticipate these constraints and factors will be If identified the constraints will be addressed 3d overcome? When do you think these constraints and factors and evaluated. will be overcome?

If your trajectory is dependent on certain assumptions, such as availability and timing of infrastructure, site preparation, 3e submission of a planning n/a application, a decision on a planning application or discharge of conditions, what are your assumptions?

DELIVERY TIMETABLE & HOUSING TRAJECTORY

When do you estimate you will 4a start works on site? 2022/2023

When do you estimate you will 4b deliver the first housing 2023 completions?

When do you estimate you will 4c complete development of the 2023/2024 site?

Please complete the housing trajectory table [see final page] with details of your 4d [see final page] anticipated housing completions in future years.

If your actual completions Market Conditions for 2017-2018 differ from the number anticipated in Please provide details: 4e the previous published housing trajectory [see final page], what is the

67 reason? For all that apply, Site Specific Reasons please provide specific details for your site and Please provide details: what impact this has had on your timescales for delivery.

If your projected Market Conditions completions for future years differ from the Please provide details: number anticipated in previous published housing trajectory [see 4f final page], what is the Site Specific Reasons reason? For all that apply, please provide specific details for your site and Please provide details: what impact this has had on your timescales for delivery.

COMMERCIALLY SENSITIVE INFORMATION

Have you provided any information that you would regard as commercially 5a sensitive? If yes, please No specify which answers this applies to. Please explain in detail how disclosure of this information 5b would be detrimental to your organisation.

Please return to:

Email to: [email protected]

Post to: Jenny Nuttycombe, Senior Planning Policy Officer Greater Cambridge Shared Planning c/o South Cambridgeshire Hall Cambourne Business Park Cambourne CB23 6EA

By no later than 20 March 2019

68 Please complete the housing trajectory table below with details of your anticipated housing completions in future years:

All years are based on financial years i.e. 1 April – 31 March Post 2033 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 2031-32 2032-33

Housing trajectory published in 0 0 0 0 0 50 0 0 0 0 0 0 0 0 0 0 0 December 2017

Actual dwelling 0 completions recorded

Please provide your current best estimate of 30 completions by year MARKET HOUSING

Please provide your current best estimate of completions by year 20 AFFORDABLE HOUSING

n/a = not available, this site was not included in the housing trajectory published in December 2017

69 Questionnaire C6 Received March 2019

Greater Cambridge Housing Trajectory Questionnaire

The Councils are subject to the Freedom of Information Act 2000 and Environmental Information Regulations 2004, and laws concerning the protection of personal information. If you consider that any of the information that you provide as part of your response is commercially sensitive or personal information, please identify it as such in question 5a and please explain in question 5b how disclosure would be detrimental to your organisation. The Councils cannot guarantee non-disclosure of this information, but will apply any relevant exemption where one is clearly engaged.

SITE DETAILS

Site: RIDGEONS, CROMWELL ROAD Ownership: e.g. housebuilder, Landowner: Rigeons Land LLP developer, landowner Planning Status: e.g. allocation, outline planning Cambridge Local Plan 2018 - Site R12 & 16/1904/OUT (up to 245 permission, detailed dwellings) planning permission, The site has outline planning permission for up to 245 dwellings. resolution to grant planning permission This is the Councils’ assessment of progress towards delivery of this site based on our current knowledge:

Outline planning permission for the site was granted in June 2018. A condition on the planning permission allows three years for the submission of reserved matters planning application(s); therefore a reserved matters planning application would need to be submitted by Councils’ June 2021. assessment: A Statement of Common Ground was agreed between Cambridge City Council and Ridgeons in March 2015, which agreed that whilst the time-frame for development within the Council’s 2014 Annual Monitoring Report is 2022-2027, it is agreed that the site could come forward earlier in the plan period, subject to ongoing work on relocation arrangements.

Anticipated year for works to start on 2019/2020 site: Anticipated year for development to be 2023/2024 completed:

70 The information provided above is broadly correct but is no longer up to date. Relevant updates are as follows:

1) In addition to the Outline Consent having been granted in 2018, the site is now also the subject of a planning application seeking full permission for the erection of 295 dwellings, application reference Please confirm whether the site details, 19/0288/FUL. including Councils’ assessment, set out 1a above are still correct. If not, please 2) In terms of availability, Ridgeons provide updated details. have now relocated from the site. The site has been purchased by Cambridge City Council and is vacant and available for development.

3) The landowner is now Cambridge City Council. The developer is Cambridge Investment Partnership LLP.

Please confirm if you are the correct contact for this site on an ongoing 1b basis. If not, please provide updated contact details.

AVAILABILITY

Yes. Permission has also been granted to demolish the existing buildings on site to facilitate an early Is the site available immediately start of the development, if the current planning for development? 2a application is approved. Demolition is due to commence in March 2019. Available is defined as: the site is controlled by a housing developer who has expressed an intention to develop or the landowner has expressed an intention to sell.

If not, why not? 2b e.g. is there an existing use on the N/A site?

If the site is not available immediately, when will it 2c N/A become available for development?

71 Are you still undertaking any The site has been the subject of a full suite of site site assessment work? If so, assessments and these assessments and reports 2d please provide us with further are available for viewing within application details. 19/0288/FUL

If your site is allocated, but does not yet have planning permission, when do you N/A – the site has outline permission and is the 2e anticipate that you will submit a subject of a current full application, as detailed planning application or receive above. a decision on a submitted planning application?

If your site has outline planning permission, but does not yet have detailed planning permission, when do you anticipate that you will submit a A full detailed application has been lodged. The 2f detailed (reserved matters) target determination date is the 3rd June 2019 planning application or receive a decision on a submitted detailed (reserved matters) planning application?

ACHIEVABILITY

Is the development achievable The development, as set out in the current and viable? If not, please application for 295 dwellings is considered to be provide details in responding to achievable and viable. When all s106 requests 3a the questions below explaining have been made in the context of the current how this will be overcome. planning application, the viability will be reviewed. Achievable is defined as: having a realistic prospect that housing will be delivered on site within five years.

Infrastructure and Access

Please provide details: Not that we are aware of. Are there any constraints that could delay development? Legal and Ownership For all that apply, please provide specific 3b Please provide details: Not that we are aware of. details for your site and what impact these constraints will have Discharge of Conditions on your timescales for delivery. Please provide details: Not that we are aware of

72 Other (e.g. contamination)

Please provide details: No. Ground conditions have been the subject of extensive investigation.

Market Conditions

Please provide details: This remains a risk for the entire housing market. If market values fall significantly this could delay development but in the current state of the market the development will proceed.

Are there any market or Site Preparation Costs cost factors that could delay development? Please provide details: Not that we are aware of For all that apply, please provide specific 3c details for your site and Infrastructure Costs what impact these factors will have on Please provide details: Not that we are aware of your timescales for delivery. Planning Obligations

Please provide details: Not that we are aware of but this will need to be reviewed as consultation responses are received in the context of the current application.

How do you anticipate these Planning obligations risk will be confirmed on constraints and factors will be completion of the section 106 agreement estimated 3d overcome? When do you think September 2019. these constraints and factors Market risk will be ongoing until all the market will be overcome? homes are sold estimated 2023/24.

If your trajectory is dependent on certain assumptions, such as availability and timing of infrastructure, site preparation, Our assumptions are that the current planning 3e submission of a planning application is positively determined in Summer application, a decision on a 2019. planning application or discharge of conditions, what are your assumptions?

73 DELIVERY TIMETABLE & HOUSING TRAJECTORY

When do you estimate you will 4a 2019/2020 start works on site?

When do you estimate you will 4b deliver the first housing 2021/2022 completions?

When do you estimate you will 4c complete development of the 2023/2024 site?

Please complete the housing trajectory table [see final page] with details of your 4d [see final page] anticipated housing completions in future years.

Market Conditions If your actual completions for 2017-2018 differ from Please provide details: the number anticipated in the previous published N/A housing trajectory [see final page], what is the Site Specific Reasons 4e reason? For all that apply, please provide specific Please provide details: details for your site and what impact this has had The earlier delivery assumptions reflect the fact that on your timescales for Ridgeons have now relocated from the site, sold the land delivery. and that the site is now available for development.

If your projected Market Conditions completions for future years differ from the Please provide details: 4f number anticipated in previous published N/A housing trajectory [see

74 final page], what is the Site Specific Reasons reason? For all that apply, please provide specific Please provide details: details for your site and what impact this has had The earlier delivery assumptions reflect the fact that on your timescales for Ridgeons have now relocated from the site, sold the land delivery. and that the site is now available for development.

Since the outline approval for 245 dwellings, Cambridge Investment Partnership has submitted a detailed application for 295 dwellings, 40% of which are affordable housing.

COMMERCIALLY SENSITIVE INFORMATION

Have you provided any information that you would regard as commercially 5a No sensitive? If yes, please specify which answers this applies to. Please explain in detail how disclosure of this information 5b N/A would be detrimental to your organisation.

Please return to:

Email to: [email protected]

Post to: Jenny Nuttycombe, Senior Planning Policy Officer Greater Cambridge Shared Planning c/o South Cambridgeshire Hall Cambourne Business Park Cambourne CB23 6EA

By no later than 20 March 2019

75 Please complete the housing trajectory table below with details of your anticipated housing completions in future years:

All years are based on financial years i.e. 1 April – 31 March

18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 ------Post Post 2033 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032

Housing trajectory published in 0 0 0 50 70 75 50 0 0 0 0 0 0 0 0 0 0 December 2017

Actual dwelling 0 completions recorded

Please provide your current best estimate of 0 0 0 30 74 73 0 0 0 0 0 0 0 0 0 0 completions by year MARKET HOUSING

Please provide your current best estimate of 0 0 0 22 48 48 0 0 0 0 0 0 0 0 0 0 completions by year AFFORDABLE HOUSING

n/a = not available, this site was not included in the housing trajectory published in December 2017.

76 Questionnaire C6 Received October 2019

Greater Cambridge Housing Trajectory Questionnaire

The Councils are subject to the Freedom of Information Act 2000 and Environmental Information Regulations 2004, and laws concerning the protection of personal information. If you consider that any of the information that you provide as part of your response is commercially sensitive or personal information, please identify it as such in question 5a and please explain in question 5b how disclosure would be detrimental to your organisation. The Councils cannot guarantee non-disclosure of this information, but will apply any relevant exemption where one is clearly engaged.

SITE DETAILS

Site: RIDGEONS, CROMWELL ROAD Ownership: e.g. housebuilder, Landowner: Rigeons Land LLP developer, landowner Planning Status: e.g. allocation, outline planning Cambridge Local Plan 2018 - Site R12 & 16/1904/OUT (up to 245 permission, detailed dwellings) planning permission, The site has outline planning permission for up to 245 dwellings. resolution to grant planning permission This is the Councils’ assessment of progress towards delivery of this site based on our current knowledge:

Outline planning permission for the site was granted in June 2018. A condition on the planning permission allows three years for the submission of reserved matters planning application(s); therefore a Councils’ reserved matters planning application would need to be submitted by assessment: June 2021. A Statement of Common Ground was agreed between Cambridge City Council and Ridgeons in March 2015, which agreed that whilst the time-frame for development within the Council’s 2014 Annual Monitoring Report is 2022-2027, it is agreed that the site could come forward earlier in the plan period, subject to ongoing work on relocation arrangements. Anticipated year for works to start on 2019/2020 site: Anticipated year for development to be 2023/2024 completed:

77 The information provided above is broadly correct but is no longer up to date. Relevant updates are as follows:

1) In addition to the Outline Consent having been granted in 2018, the site is now also the subject of a planning application seeking full permission for the erection of 295 dwellings, application reference Please confirm whether the site details, 19/0288/FUL. This application was granted including Councils’ assessment, set out 1a planning approval in June 2019. above are still correct. If not, please provide updated details. 2) In terms of availability, Ridgeons have now relocated from the site. The existing buildings have been demolished, the site has been remediated and construction will be underway in November 2019.

3) The landowner is now Cambridge City Council. The developer is Cambridge Investment Partnership LLP. Please confirm if you are the correct contact for this site on an ongoing 1b basis. If not, please provide updated contact details.

AVAILABILITY

Yes. All existing buildings have now been Is the site available immediately demolished and the site has been remediated. for development? 2a Construction will commence in November 2019. Available is defined as: the site is controlled by a housing developer who has expressed an intention to develop or the landowner has expressed an intention to sell.

If not, why not? 2b e.g. is there an existing use on the N/A site?

If the site is not available immediately, when will it 2c N/A become available for development?

Are you still undertaking any The site has been the subject of a full suite of site site assessment work? If so, assessments and these assessments and reports 2d please provide us with further are available for viewing within application details. 19/0288/FUL.

78 If your site is allocated, but does not yet have planning permission, when do you 2e anticipate that you will submit a N/A planning application or receive a decision on a submitted planning application?

If your site has outline planning permission, but does not yet have detailed planning permission, when do you anticipate that you will submit a 2f N/A detailed (reserved matters) planning application or receive a decision on a submitted detailed (reserved matters) planning application?

ACHIEVABILITY

Is the development achievable and viable? If not, please provide details in responding to Yes 3a the questions below explaining how this will be overcome. Achievable is defined as: having a realistic prospect that housing will be delivered on site within five years.

Infrastructure and Access

Please provide details: Not that we are aware of.

Are there any Legal and Ownership constraints that could delay development? Please provide details: Not that we are aware of. For all that apply, please provide specific 3b details for your site and Discharge of Conditions what impact these constraints will have Please provide details: Not that we are aware of. on your timescales for delivery. Other (e.g. contamination)

Please provide details: No. Ground conditions have been the subject of extensive investigation.

79 Market Conditions

Please provide details: This remains a risk for the entire housing market. If market values fall significantly this could Are there any market or delay development but in the current state of the market the cost factors that could development will proceed. delay development? Site Preparation Costs For all that apply, please provide specific Please provide details: Not that we are aware of 3c details for your site and what impact these Infrastructure Costs factors will have on your timescales for Please provide details: Not that we are aware of delivery. Planning Obligations

Please provide details: No

How do you anticipate these constraints and factors will be Market risk will be ongoing until all the market 3d overcome? When do you think homes are sold estimated 2023/24. these constraints and factors will be overcome?

If your trajectory is dependent on certain assumptions, such as availability and timing of infrastructure, site preparation, 3e submission of a planning N/A application, a decision on a planning application or discharge of conditions, what are your assumptions?

DELIVERY TIMETABLE & HOUSING TRAJECTORY

When do you estimate you will 4a 2019/2020 start works on site?

When do you estimate you will 4b deliver the first housing 2021/2022 completions?

When do you estimate you will 4c complete development of the 2023/2024 site?

80 Please complete the housing trajectory table [see final page] with details of your 4d [see final page] anticipated housing completions in future years.

Market Conditions If your actual completions for 2017-2018 differ from Please provide details: the number anticipated in the previous published N/A housing trajectory [see final page], what is the Site Specific Reasons 4e reason? For all that apply, please provide specific Please provide details: details for your site and what impact this has had The earlier delivery assumptions reflect the fact that on your timescales for Ridgeons have now relocated from the site, sold the land delivery. and that the site is now available for development.

Market Conditions

Please provide details: If your projected completions for future N/A years differ from the number anticipated in Site Specific Reasons previous published housing trajectory [see Please provide details: 4f final page], what is the reason? For all that apply, The earlier delivery assumptions reflect the fact that please provide specific Ridgeons have now relocated from the site, sold the land details for your site and and that the site is now available for development. what impact this has had Since the outline approval for 245 dwellings, Cambridge on your timescales for Investment Partnership has been granted planning delivery. approval for 295 dwellings, 40% of which are affordable housing.

COMMERCIALLY SENSITIVE INFORMATION

Have you provided any information that you would regard as commercially 5a No sensitive? If yes, please specify which answers this applies to.

81 Please explain in detail how disclosure of this information 5b N/A would be detrimental to your organisation.

Please return to:

Email to: [email protected]

Post to: Jenny Nuttycombe, Senior Planning Policy Officer Greater Cambridge Shared Planning c/o South Cambridgeshire Hall Cambourne Business Park Cambourne CB23 6EA

By no later than 20 March 2019

82 Please complete the housing trajectory table below with details of your anticipated housing completions in future years:

All years are based on financial years i.e. 1 April – 31 March

18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 ------Post Post 2033 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032

Housing trajectory published in 0 0 0 50 70 75 50 0 0 0 0 0 0 0 0 0 0 December 2017

Actual dwelling 0 completions recorded

Please provide your current best estimate of 0 0 0 30 74 73 0 0 0 0 0 0 0 0 0 0 completions by year MARKET HOUSING

Please provide your current best estimate of 0 0 0 22 48 48 0 0 0 0 0 0 0 0 0 0 completions by year AFFORDABLE HOUSING

n/a = not available, this site was not included in the housing trajectory published in December 2017.

83 Questionnaire C7 Received March 2019

Greater Cambridge Housing Trajectory Questionnaire

The Councils are subject to the Freedom of Information Act 2000 and Environmental Information Regulations 2004, and laws concerning the protection of personal information. If you consider that any of the information that you provide as part of your response is commercially sensitive or personal information, please identify it as such in question 5a and please explain in question 5b how disclosure would be detrimental to your organisation. The Councils cannot guarantee non-disclosure of this information, but will apply any relevant exemption where one is clearly engaged.

SITE DETAILS

Site: HENRY GILES HOUSE, CHESTERTON ROAD Ownership: e.g. housebuilder, Landowner: Telereal Trillium developer, landowner Planning Status: e.g. allocation, outline planning Cambridge Local Plan 2018 - Site R4 permission, detailed The site is allocated in the Cambridge Local Plan (adopted in October planning permission, 2018) for approximately 48 dwellings. resolution to grant planning permission This is the Councils’ assessment of progress towards delivery of this site based on our current knowledge:

The site is allocated in the Cambridge Local Plan (adopted in October 2018) for approximately 48 dwellings. Councils’ A Statement of Common Ground was agreed between Cambridge City assessment: Council and Telereal Trillium in April 2015, which agreed that the most likely time-frame for development is 2019 to 2023, although it is possible that development will come forward earlier as plans to bring forward the site are underway, and that the existing uses on the site do not preclude the site’s developability within the plan period. Anticipated year for works to start on 2029/2030 site: Anticipated year for development to be 2029/2030 completed:

Please confirm whether the site details, Telereal considers that the Site is suitable including Councils’ assessment, set out 1a for approximately 100 dwellings and will be above are still correct. If not, please available 2029/30 provide updated details.

84 Please confirm if you are the correct contact for this site on an ongoing 1b basis. If not, please provide updated contact details.

AVAILABILITY

Is the site available immediately No for development? 2a Available is defined as: the site is controlled by a housing developer who has expressed an intention to develop or the landowner has expressed an intention to sell.

If not, why not? 2b e.g. is there an existing use on the Currently occupied by Jobcentre plus site?

If the site is not available immediately, when will it 2c 2029/2030 become available for development?

Are you still undertaking any site assessment work? If so, 2d No please provide us with further details.

If your site is allocated, but does not yet have planning permission, when do you 2e anticipate that you will submit a 2029/2030 planning application or receive a decision on a submitted planning application?

If your site has outline planning permission, but does not yet have detailed planning permission, when do you anticipate that you will submit a 2f N/A detailed (reserved matters) planning application or receive a decision on a submitted detailed (reserved matters) planning application?

85 ACHIEVABILITY

Is the development achievable and viable? If not, please No, as the Site is occupied by Jobcentre Plus. provide details in responding to However, it is viable 3a the questions below explaining how this will be overcome. Achievable is defined as: having a realistic prospect that housing will be delivered on site within five years.

Infrastructure and Access

Please provide details:

No Are there any Legal and Ownership constraints that could delay development? Please provide details: For all that apply, please provide specific No 3b details for your site and Discharge of Conditions what impact these constraints will have Please provide details: on your timescales for delivery. No Other (e.g. contamination)

Please provide details:

No

Market Conditions

Please provide details: Are there any market or cost factors that could No delay development? Site Preparation Costs For all that apply, please provide specific 3c Please provide details: details for your site and what impact these No factors will have on Infrastructure Costs your timescales for delivery. Please provide details:

No

86 Planning Obligations

Please provide details:

No

How do you anticipate these constraints and factors will be 3d overcome? When do you think N/A these constraints and factors will be overcome?

If your trajectory is dependent on certain assumptions, such as availability and timing of infrastructure, site preparation, 3e submission of a planning Site not available for development until 2029/2030 application, a decision on a planning application or discharge of conditions, what are your assumptions?

DELIVERY TIMETABLE & HOUSING TRAJECTORY

When do you estimate you will 4a 2029/2030 start works on site?

When do you estimate you will 4b deliver the first housing 2029/2030 completions?

When do you estimate you will 4c complete development of the 2030/2031 site?

Please complete the housing trajectory table [see final page] with details of your 4d [see final page] anticipated housing completions in future years.

If your actual completions Market Conditions for 2017-2018 differ from the number anticipated in Please provide details: 4e the previous published housing trajectory [see final page], what is the

87 reason? For all that apply, Site Specific Reasons please provide specific details for your site and Please provide details: what impact this has had on your timescales for N/A delivery.

If your projected Market Conditions completions for future years differ from the Please provide details: number anticipated in previous published N/A housing trajectory [see 4f final page], what is the Site Specific Reasons reason? For all that apply, please provide specific details for your site and Please provide details: what impact this has had on your timescales for Site occupied by Jobcentre Plus delivery.

COMMERCIALLY SENSITIVE INFORMATION

Have you provided any information that you would regard as commercially 5a No sensitive? If yes, please specify which answers this applies to. Please explain in detail how disclosure of this information 5b N/A would be detrimental to your organisation.

Please return to:

Email to: [email protected]

Post to: Jenny Nuttycombe, Senior Planning Policy Officer Greater Cambridge Shared Planning c/o South Cambridgeshire Hall Cambourne Business Park Cambourne CB23 6EA

By no later than 20 March 2019

88 Please complete the housing trajectory table below with details of your anticipated housing completions in future years:

All years are based on financial years i.e. 1 April – 31 March Post 2033 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 2031-32 2032-33

Housing trajectory published in 0 0 0 0 0 48 0 0 0 0 0 0 0 0 0 0 0 December 2017

Actual dwelling 0 completions recorded

Please provide your current best estimate of 50 10 completions by year MARKET HOUSING

Please provide your current best estimate of 40 completions by year AFFORDABLE HOUSING

n/a = not available, this site was not included in the housing trajectory published in December 2017

89 Questionnaire C8 Received April 2019

90 91 92 93 94 95 Questionnaire C9 Received April 2019

Greater Cambridge Housing Trajectory Questionnaire

The Councils are subject to the Freedom of Information Act 2000 and Environmental Information Regulations 2004, and laws concerning the protection of personal information. If you consider that any of the information that you provide as part of your response is commercially sensitive or personal information, please identify it as such in question 5a and please explain in question 5b how disclosure would be detrimental to your organisation. The Councils cannot guarantee non-disclosure of this information, but will apply any relevant exemption where one is clearly engaged.

SITE DETAILS

Site: SANDY LANE Ownership: e.g. housebuilder, Landowner: Littlebury Property Limited developer, landowner Planning Status: e.g. allocation, 03/0406/FUL (18 dwellings), 06/1305/FUL (3 dwellings), 03/1241/FUL outline planning (5 dwellings), 06/0544/FUL (1 dwelling) & 09/1024/EXP (pending, permission, detailed extension of time) planning permission, The site has detailed planning permission for 28 dwellings. resolution to grant planning permission This is the Councils’ assessment of progress towards delivery of this site based on our current knowledge: Councils’ assessment: At March 2018, a material start had been made on site, however the 28 dwellings had not been started. Anticipated year for works to start on 2020 site: Anticipated year for development to be 2022 completed:

Please confirm whether the site details, including Councils’ assessment, set out 1a Confirmed above are still correct. If not, please provide updated details. Please confirm if you are the correct contact for this site on an ongoing 1b basis. If not, please provide updated contact details.

AVAILABILITY

96 Is the site available immediately Yes for development? 2a Available is defined as: the site is controlled by a housing developer who has expressed an intention to develop or the landowner has expressed an intention to sell.

If not, why not? 2b e.g. is there an existing use on the N/A site?

If the site is not available immediately, when will it 2c N/A become available for development?

Are you still undertaking any site assessment work? If so, 2d No please provide us with further details.

If your site is allocated, but does not yet have planning permission, when do you 2e anticipate that you will submit a N/A planning application or receive a decision on a submitted planning application?

If your site has outline planning permission, but does not yet have detailed planning permission, when do you anticipate that you will submit a 2f N/A detailed (reserved matters) planning application or receive a decision on a submitted detailed (reserved matters) planning application?

ACHIEVABILITY

Is the development achievable and viable? If not, please provide details in responding to Yes 3a the questions below explaining how this will be overcome. Achievable is defined as: having a realistic prospect that housing will be delivered on site within five years.

97 Infrastructure and Access

Please provide details:

Are there any Legal and Ownership constraints that could delay development? Please provide details: For all that apply, please provide specific 3b details for your site and Discharge of Conditions what impact these constraints will have Please provide details: on your timescales for delivery. Other (e.g. contamination)

Please provide details:

Market Conditions

Please provide details: Awaiting outcome of Brexit and hopefully an improvement in market confidence.

Are there any market or Site Preparation Costs cost factors that could delay development? Please provide details: No For all that apply, please provide specific 3c details for your site and Infrastructure Costs what impact these factors will have on your timescales for Please provide details: No delivery. Planning Obligations

Please provide details: No

How do you anticipate these constraints and factors will be 3d overcome? When do you think See above - 2020 these constraints and factors will be overcome?

98 If your trajectory is dependent on certain assumptions, such as availability and timing of infrastructure, site preparation, 3e submission of a planning No application, a decision on a planning application or discharge of conditions, what are your assumptions?

DELIVERY TIMETABLE & HOUSING TRAJECTORY

When do you estimate you will 4a 2020 start works on site?

When do you estimate you will 4b deliver the first housing 2021/2 completions?

When do you estimate you will 4c complete development of the 2022/3 site?

Please complete the housing trajectory table [see final page] with details of your 4d [see final page] anticipated housing completions in future years.

If your actual completions Market Conditions for 2017-2018 differ from the number anticipated in Please provide details: the previous published housing trajectory [see final page], what is the 4e reason? For all that apply, Site Specific Reasons please provide specific details for your site and Please provide details: what impact this has had on your timescales for delivery.

If your projected Market Conditions completions for future years differ from the Please provide details: 4f number anticipated in previous published housing trajectory [see

99 final page], what is the Site Specific Reasons reason? For all that apply, please provide specific Please provide details: details for your site and what impact this has had on your timescales for delivery.

COMMERCIALLY SENSITIVE INFORMATION

Have you provided any information that you would regard as commercially 5a sensitive? If yes, please specify which answers this applies to. Please explain in detail how disclosure of this information 5b would be detrimental to your organisation.

Please return to:

Email to: [email protected]

Post to: Jenny Nuttycombe, Senior Planning Policy Officer Greater Cambridge Shared Planning c/o South Cambridgeshire Hall Cambourne Business Park Cambourne CB23 6EA

By no later than 20 March 2019

100 Please complete the housing trajectory table below with details of your anticipated housing completions in future years:

All years are based on financial years i.e. 1 April – 31 March Post 2033 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 2031-32 2032-33

Housing trajectory published in 0 0 0 0 0 0 0 0 0 23 0 0 0 0 0 0 0 December 2017

Actual dwelling 0 completions recorded

Please provide your current best estimate of 29 completions by year MARKET HOUSING

Please provide your current best estimate of 0 completions by year AFFORDABLE HOUSING

n/a = not available, this site was not included in the housing trajectory published in December 2017.

101 Questionnaire C13b Received March 2019

Greater Cambridge Housing Trajectory Questionnaire

The Councils are subject to the Freedom of Information Act 2000 and Environmental Information Regulations 2004, and laws concerning the protection of personal information. If you consider that any of the information that you provide as part of your response is commercially sensitive or personal information, please identify it as such in question 5a and please explain in question 5b how disclosure would be detrimental to your organisation. The Councils cannot guarantee non-disclosure of this information, but will apply any relevant exemption where one is clearly engaged.

SITE DETAILS

149 CHERRY HINTON ROAD AND TELEPHONE EXCHANGE, Site: COLERIDGE ROAD Ownership: e.g. housebuilder, Landowner: Swiss Laundry Ltd and Telereal Trillium developer, landowner Planning Status: e.g. allocation, outline planning Cambridge Local Plan 2018 - Site R8 permission, detailed The site is allocated in the Cambridge Local Plan (adopted in October planning permission, 2018) for approximately 33 dwellings. resolution to grant planning permission This is the Councils’ assessment of progress towards delivery of this site based on our current knowledge: Councils’ assessment: The site is allocated in the Cambridge Local Plan (adopted in October 2018) for approximately 33 dwellings. Anticipated year for works to start on Post Plan Period site: Anticipated year for development to be Post Plan Period completed:

Please confirm whether the site details, including Councils’ assessment, set out Site not available until after the Plan Period 1a above are still correct. If not, please due to it being currently occupied by BT provide updated details.

Please confirm if you are the correct contact for this site on an ongoing 1b basis. If not, please provide updated contact details.

AVAILABILITY

102 Is the site available immediately No for development? 2a Available is defined as: the site is controlled by a housing developer who has expressed an intention to develop or the landowner has expressed an intention to sell.

If not, why not? 2b e.g. is there an existing use on the Currently being occupied by BT site?

If the site is not available immediately, when will it 2c Post Plan Period become available for development?

Are you still undertaking any site assessment work? If so, 2d No please provide us with further details.

If your site is allocated, but does not yet have planning permission, when do you 2e anticipate that you will submit a Post Plan Period planning application or receive a decision on a submitted planning application?

If your site has outline planning permission, but does not yet have detailed planning permission, when do you anticipate that you will submit a 2f N/A detailed (reserved matters) planning application or receive a decision on a submitted detailed (reserved matters) planning application?

ACHIEVABILITY

Is the development achievable and viable? If not, please Site is viable but not achievable as currently provide details in responding to occupied by BT. 3a the questions below explaining how this will be overcome. Achievable is defined as: having a realistic prospect that housing will be delivered on site within five years.

103 Infrastructure and Access

Please provide details:

No Are there any Legal and Ownership constraints that could delay development? Please provide details: For all that apply, please provide specific No 3b details for your site and Discharge of Conditions what impact these constraints will have Please provide details: on your timescales for delivery. No Other (e.g. contamination)

Please provide details:

No

Market Conditions

Please provide details:

No Are there any market or Site Preparation Costs cost factors that could delay development? Please provide details: For all that apply, please provide specific No 3c details for your site and Infrastructure Costs what impact these factors will have on Please provide details: your timescales for delivery. No Planning Obligations

Please provide details:

No

How do you anticipate these constraints and factors will be 3d overcome? When do you think N/A these constraints and factors will be overcome?

104 If your trajectory is dependent on certain assumptions, such as availability and timing of infrastructure, site preparation, Site not available for development until after the 3e submission of a planning Plan Period. application, a decision on a planning application or discharge of conditions, what are your assumptions?

DELIVERY TIMETABLE & HOUSING TRAJECTORY

When do you estimate you will 4a Post Plan Period start works on site?

When do you estimate you will 4b deliver the first housing Post Plan Period completions?

When do you estimate you will 4c complete development of the Post Plan Period site?

Please complete the housing trajectory table [see final page] with details of your 4d [see final page] anticipated housing completions in future years.

If your actual completions Market Conditions for 2017-2018 differ from the number anticipated in Please provide details: the previous published housing trajectory [see N/A final page], what is the 4e reason? For all that apply, Site Specific Reasons please provide specific details for your site and Please provide details: what impact this has had on your timescales for Site currently occupied by BT delivery.

If your projected Market Conditions completions for future years differ from the Please provide details: 4f number anticipated in previous published No housing trajectory [see

105 final page], what is the Site Specific Reasons reason? For all that apply, please provide specific Please provide details: details for your site and what impact this has had Site currently occupied by BT on your timescales for delivery.

COMMERCIALLY SENSITIVE INFORMATION

Have you provided any information that you would regard as commercially 5a No sensitive? If yes, please specify which answers this applies to. Please explain in detail how disclosure of this information 5b would be detrimental to your organisation.

Please return to:

Email to: [email protected]

Post to: Jenny Nuttycombe, Senior Planning Policy Officer Greater Cambridge Shared Planning c/o South Cambridgeshire Hall Cambourne Business Park Cambourne CB23 6EA

By no later than 20 March 2019

106 Please complete the housing trajectory table below with details of your anticipated housing completions in future years:

All years are based on financial years i.e. 1 April – 31 March Post 2033 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 2031-32 2032-33

Housing trajectory published in 0 0 0 0 0 0 0 0 0 0 0 0 33 0 0 0 0 December 2017

Actual dwelling 0 completions recorded

Please provide your current best estimate of 20 completions by year MARKET HOUSING

Please provide your current best estimate of 13 completions by year AFFORDABLE HOUSING

n/a = not available, this site was not included in the housing trajectory published in December 2017.

107 Questionnaire C14 Received July 2019

Greater Cambridge Housing Trajectory Questionnaire

The Councils are subject to the Freedom of Information Act 2000 and Environmental Information Regulations 2004, and laws concerning the protection of personal information. If you consider that any of the information that you provide as part of your response is commercially sensitive or personal information, please identify it as such in question 5a and please explain in question 5b how disclosure would be detrimental to your organisation. The Councils cannot guarantee non-disclosure of this information, but will apply any relevant exemption where one is clearly engaged.

SITE DETAILS

Site: MILL ROAD DEPOT AND ADJOINING PROPERTIES, MILL ROAD Ownership: Housebuilder: Cambridge Investment Partnership (Hill Residential and e.g. housebuilder, Cambridge City Council) developer, landowner Planning Status: e.g. allocation, outline planning Cambridge Local Plan 2018 - Site R10, 17/2245/FUL (182 dwellings) & permission, detailed 18/1947/S73 (pending, additional 4 dwellings) planning permission, The site has detailed planning permission for 182 dwellings. resolution to grant planning permission This is the Councils’ assessment of progress towards delivery of this site based on our current knowledge:

Councils’ Detailed planning permission for the site was granted in June 2018. A assessment: detailed planning application seeking amendments, including 4 additional dwellings, was submitted in December 2018, and is being considered by the Council. We have previously been advised that the development could be completed by 2021/2022. Anticipated year for works to start on 2019/2020 site: Anticipated year for development to be 2021/2022 completed:

Cambridge Investment Partnership is Hill Investment Partnerships (not Residential) and the S73 application was approved at committee in June 2019, subject to a Please confirm whether the site details, variation of the s106 agreement. Phase 2 including Councils’ assessment, set out 1a of the development was also approved at above are still correct. If not, please committee in June 2019 to provide a further provide updated details. 50 homes i.e. 236 in total. The site title should be ‘Mill Road Depot’ only (no adjoining properties) and include both phases as a single development.

108 Please confirm if you are the correct contact for this site on an ongoing 1b basis. If not, please provide updated contact details.

AVAILABILITY

Is the site available immediately Yes – under construction for development? 2a Available is defined as: the site is controlled by a housing developer who has expressed an intention to develop or the landowner has expressed an intention to sell.

If not, why not? 2b e.g. is there an existing use on the N/A site?

If the site is not available immediately, when will it 2c N/A become available for development?

Are you still undertaking any site assessment work? If so, 2d N/A please provide us with further details.

If your site is allocated, but does not yet have planning permission, when do you 2e anticipate that you will submit a N/A planning application or receive a decision on a submitted planning application?

If your site has outline planning permission, but does not yet have detailed planning permission, when do you Both phases and the S73 now have planning anticipate that you will submit a 2f approval subject to completion of s106 agreements detailed (reserved matters) and Phase 1 is under construction. planning application or receive a decision on a submitted detailed (reserved matters) planning application?

ACHIEVABILITY

109 Is the development achievable and viable? If not, please provide details in responding to Yes 3a the questions below explaining how this will be overcome. Achievable is defined as: having a realistic prospect that housing will be delivered on site within five years.

Infrastructure and Access

Please provide details: N/A

Are there any Legal and Ownership constraints that could delay development? Please provide details: N/A For all that apply, please provide specific 3b details for your site and Discharge of Conditions what impact these constraints will have Please provide details: N/A on your timescales for delivery. Other (e.g. contamination)

Please provide details: N/A

Market Conditions

Please provide details: The site is 50% private sale and 50% council rented. If market conditions worsened significantly, Are there any market or the private sale element could potentially be delayed but the cost factors that could council rented element will still be delivered to the current delay development? programme. For all that apply, please provide specific Site Preparation Costs 3c details for your site and what impact these Please provide details: N/A factors will have on your timescales for delivery. Infrastructure Costs

Please provide details: N/A

110 Planning Obligations

Please provide details: N/A

How do you anticipate these constraints and factors will be 3d overcome? When do you think We anticipate more market certainty post-Brexit. these constraints and factors will be overcome?

If your trajectory is dependent on certain assumptions, such as availability and timing of infrastructure, site preparation, 3e submission of a planning N/A application, a decision on a planning application or discharge of conditions, what are your assumptions?

DELIVERY TIMETABLE & HOUSING TRAJECTORY

When do you estimate you will Phase 1 commenced in July 2018. 4a start works on site? Phase 2 is expected to commence in September.

When do you estimate you will 4b deliver the first housing Spring 2020 completions?

When do you estimate you will 4c complete development of the Spring 2022 site?

Please complete the housing trajectory table [see final page] with details of your 4d [see final page] anticipated housing completions in future years.

If your actual completions Market Conditions for 2017-2018 differ from the number anticipated in Please provide details: N/A 4e the previous published housing trajectory [see final page], what is the

111 reason? For all that apply, Site Specific Reasons please provide specific details for your site and Please provide details: Delayed basement construction what impact this has had resulting from delays in achieving approval from Anglian on your timescales for Water and the Environment Agency. Partly due to site delivery. contamination and technical drainage issues.

If your projected Market Conditions completions for future years differ from the Please provide details: N/A number anticipated in previous published housing trajectory [see 4f final page], what is the Site Specific Reasons reason? For all that apply, please provide specific Please provide details: Programme updated to reflect details for your site and initial delays to basement construction – fewer earlier what impact this has had completions but all homes still expected to complete by on your timescales for 2022. delivery.

COMMERCIALLY SENSITIVE INFORMATION

Have you provided any information that you would regard as commercially 5a No sensitive? If yes, please specify which answers this applies to. Please explain in detail how disclosure of this information 5b N/A would be detrimental to your organisation.

Please return to:

Email to: [email protected]

Post to: Jenny Nuttycombe, Senior Planning Policy Officer Greater Cambridge Shared Planning c/o South Cambridgeshire Hall Cambourne Business Park Cambourne CB23 6EA

By no later than 20 March 2019

112 Please complete the housing trajectory table below with details of your anticipated housing completions in future years:

All years are based on financial years i.e. 1 April – 31 March Post 2033 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 2031-32 2032-33

Housing trajectory published in 0 0 54 55 58 0 0 0 0 0 0 0 0 0 0 0 0 December 2017

Actual dwelling 0 completions recorded

Please provide your current best estimate of 0 0 43 75 0 0 0 completions by year MARKET HOUSING

Please provide your current best estimate of 0 0 43 75 0 0 0 completions by year AFFORDABLE HOUSING

n/a = not available, this site was not included in the housing trajectory published in December 2017.

113 Questionnaire C15 Received March 2019

Greater Cambridge Housing Trajectory Questionnaire

The Councils are subject to the Freedom of Information Act 2000 and Environmental Information Regulations 2004, and laws concerning the protection of personal information. If you consider that any of the information that you provide as part of your response is commercially sensitive or personal information, please identify it as such in question 5a and please explain in question 5b how disclosure would be detrimental to your organisation. The Councils cannot guarantee non-disclosure of this information, but will apply any relevant exemption where one is clearly engaged.

SITE DETAILS

Site: HORIZON RESOURCE CENTRE, 285 COLDHAM'S LANE Ownership: e.g. housebuilder, Landowner: Cambridgeshire County Council developer, landowner Planning Status: e.g. allocation, outline planning Cambridge Local Plan 2018 - Site R11 permission, detailed The site is allocated in the Cambridge Local Plan (adopted in October planning permission, 2018) for approximately 40 dwellings. resolution to grant planning permission This is the Councils’ assessment of progress towards delivery of this site based on our current knowledge: Councils’ assessment: The site is allocated in the Cambridge Local Plan (adopted in October 2018) for approximately 40 dwellings. We have previously been advised that the site could be delivered at the end of the plan period. Anticipated year for works to start on 2029/2030 site: Anticipated year for development to be 2030/2031 completed:

Please confirm whether the site details, including Councils’ assessment, set out 1a Correct above are still correct. If not, please provide updated details. Please confirm if you are the correct contact for this site on an ongoing 1b basis. If not, please provide updated contact details.

AVAILABILITY

114 Is the site available immediately No for development? 2a Available is defined as: the site is controlled by a housing developer who has expressed an intention to develop or the landowner has expressed an intention to sell.

If not, why not? Currently is occupied by Cambridgeshire County 2b e.g. is there an existing use on the Council site?

If the site is not available Potential for it to be available in the next 0-10 years immediately, when will it 2c subject to it being declared surplus to operational become available for requirements development?

Are you still undertaking any site assessment work? If so, 2d No further information can be provided at this time please provide us with further details.

If your site is allocated, but does not yet have planning permission, when do you 2e anticipate that you will submit a No further information can be provided at this time planning application or receive a decision on a submitted planning application?

If your site has outline planning permission, but does not yet have detailed planning permission, when do you anticipate that you will submit a 2f N/A detailed (reserved matters) planning application or receive a decision on a submitted detailed (reserved matters) planning application?

ACHIEVABILITY

Is the development achievable and viable? If not, please provide details in responding to Yes 3a the questions below explaining how this will be overcome. Achievable is defined as: having a realistic prospect that housing will be delivered on site within five years.

115 Infrastructure and Access

Please provide details: Highways Access

Are there any Legal and Ownership constraints that could delay development? Please provide details: For all that apply, please provide specific 3b details for your site and Discharge of Conditions what impact these constraints will have Please provide details: on your timescales for delivery. Other (e.g. contamination)

Please provide details:

Market Conditions

Please provide details:

Are there any market or Site Preparation Costs cost factors that could delay development? Please provide details: For all that apply, please provide specific 3c details for your site and Infrastructure Costs what impact these factors will have on Please provide details: your timescales for delivery. Planning Obligations

Please provide details:

How do you anticipate these constraints and factors will be 3d overcome? When do you think these constraints and factors will be overcome?

116 If your trajectory is dependent on certain assumptions, such as availability and timing of infrastructure, site preparation, 3e submission of a planning application, a decision on a planning application or discharge of conditions, what are your assumptions?

DELIVERY TIMETABLE & HOUSING TRAJECTORY

When do you estimate you will 4a Unknown at this time start works on site?

When do you estimate you will 4b deliver the first housing Unknown at this time completions?

When do you estimate you will 4c complete development of the Unknown at this time site?

Please complete the housing trajectory table [see final page] with details of your 4d [see final page] anticipated housing completions in future years.

If your actual completions Market Conditions for 2017-2018 differ from the number anticipated in Please provide details: the previous published housing trajectory [see final page], what is the 4e reason? For all that apply, Site Specific Reasons please provide specific details for your site and Please provide details: what impact this has had on your timescales for delivery.

If your projected Market Conditions completions for future years differ from the Please provide details: 4f number anticipated in previous published housing trajectory [see

117 final page], what is the Site Specific Reasons reason? For all that apply, please provide specific Please provide details: details for your site and what impact this has had on your timescales for delivery.

COMMERCIALLY SENSITIVE INFORMATION

Have you provided any information that you would regard as commercially 5a sensitive? If yes, please specify which answers this applies to. Please explain in detail how disclosure of this information 5b would be detrimental to your organisation.

Please return to:

Email to: [email protected]

Post to: Jenny Nuttycombe, Senior Planning Policy Officer Greater Cambridge Shared Planning c/o South Cambridgeshire Hall Cambourne Business Park Cambourne CB23 6EA

By no later than 20 March 2019

118 Please complete the housing trajectory table below with details of your anticipated housing completions in future years:

All years are based on financial years i.e. 1 April – 31 March Post 2033 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 2031-32 2032-33

Housing trajectory published in 0 0 0 0 0 0 0 0 0 0 0 0 20 20 0 0 0 December 2017

Actual dwelling 0 completions recorded

Please provide your current best estimate of completions by year MARKET HOUSING

Please provide your current best estimate of completions by year AFFORDABLE HOUSING

n/a = not available, this site was not included in the housing trajectory published in December 2017.

119 Questionnaire C16 Received March 2019

Greater Cambridge Housing Trajectory Questionnaire

The Councils are subject to the Freedom of Information Act 2000 and Environmental Information Regulations 2004, and laws concerning the protection of personal information. If you consider that any of the information that you provide as part of your response is commercially sensitive or personal information, please identify it as such in question 5a and please explain in question 5b how disclosure would be detrimental to your organisation. The Councils cannot guarantee non-disclosure of this information, but will apply any relevant exemption where one is clearly engaged.

SITE DETAILS

Site: BT TELEPHONE EXCHANGE AND CAR PARK, LONG ROAD Ownership: e.g. housebuilder, Landowner: Telereal Trillium developer, landowner Planning Status: e.g. allocation, outline planning Cambridge Local Plan 2018 - Site R14 permission, detailed The site is allocated in the Cambridge Local Plan (adopted in October planning permission, 2018) for approximately 76 dwellings. resolution to grant planning permission This is the Councils’ assessment of progress towards delivery of this site based on our current knowledge:

The site is allocated in the Cambridge Local Plan (adopted in October 2018) for approximately 76 dwellings. A Statement of Common Ground was agreed between Cambridge City Councils’ Council and Telereal Trillium in April 2015, which agreed that the assessment: timing of release of the site is dependent on it no longer being required for BT operational purposes, that expectations are that the site is most likely to come forward towards the end of the plan period between 2026 - 2031, and that the existing uses on the site and site constraints such as underground cabling would not preclude the site’s developability within the plan period. Anticipated year for works to start on Post plan period site: Anticipated year for development to be Post plan period completed:

Please confirm whether the site details, Site available post plan period due to a including Councils’ assessment, set out 1a number of businesses operating on the above are still correct. If not, please site. provide updated details.

120 Please confirm if you are the correct contact for this site on an ongoing 1b basis. If not, please provide updated contact details.

AVAILABILITY

Is the site available immediately No for development? 2a Available is defined as: the site is controlled by a housing developer who has expressed an intention to develop or the landowner has expressed an intention to sell.

If not, why not? 2b e.g. is there an existing use on the Existing businesses on the site site?

If the site is not available immediately, when will it 2c Post Plan Period become available for development?

Are you still undertaking any site assessment work? If so, 2d No please provide us with further details.

If your site is allocated, but does not yet have planning permission, when do you 2e anticipate that you will submit a Post Plan Period planning application or receive a decision on a submitted planning application?

If your site has outline planning permission, but does not yet have detailed planning permission, when do you anticipate that you will submit a 2f N/A detailed (reserved matters) planning application or receive a decision on a submitted detailed (reserved matters) planning application?

ACHIEVABILITY

121 Is the development achievable and viable? If not, please Site is viable. However, not achievable due to the provide details in responding to existing businesses on the site 3a the questions below explaining how this will be overcome. Achievable is defined as: having a realistic prospect that housing will be delivered on site within five years.

Infrastructure and Access

Please provide details:

No Are there any Legal and Ownership constraints that could delay development? Please provide details: For all that apply, please provide specific No 3b details for your site and Discharge of Conditions what impact these constraints will have Please provide details: on your timescales for delivery. No Other (e.g. contamination)

Please provide details:

No

Market Conditions

Please provide details:

No Are there any market or Site Preparation Costs cost factors that could delay development? Please provide details: For all that apply, please provide specific No 3c details for your site and Infrastructure Costs what impact these factors will have on Please provide details: your timescales for delivery. No Planning Obligations

Please provide details:

No

122 How do you anticipate these constraints and factors will be 3d overcome? When do you think N/A these constraints and factors will be overcome?

If your trajectory is dependent on certain assumptions, such as availability and timing of infrastructure, site preparation, 3e submission of a planning Availability of site for development post Plan Period application, a decision on a planning application or discharge of conditions, what are your assumptions?

DELIVERY TIMETABLE & HOUSING TRAJECTORY

When do you estimate you will 4a Post Plan Period start works on site?

When do you estimate you will 4b deliver the first housing Post Plan Period completions?

When do you estimate you will 4c complete development of the Post Plan Period site?

Please complete the housing trajectory table [see final page] with details of your 4d [see final page] anticipated housing completions in future years.

If your actual completions Market Conditions for 2017-2018 differ from the number anticipated in Please provide details: the previous published housing trajectory [see N/A final page], what is the 4e reason? For all that apply, Site Specific Reasons please provide specific details for your site and Please provide details: what impact this has had on your timescales for Site currently occupied by a number of businesses delivery.

123 If your projected Market Conditions completions for future years differ from the Please provide details: number anticipated in previous published N/A housing trajectory [see 4f final page], what is the Site Specific Reasons reason? For all that apply, please provide specific details for your site and Please provide details: what impact this has had on your timescales for Site currently occupied by a number of businesses delivery.

COMMERCIALLY SENSITIVE INFORMATION

Have you provided any information that you would regard as commercially 5a No sensitive? If yes, please specify which answers this applies to. Please explain in detail how disclosure of this information 5b would be detrimental to your organisation.

Please return to:

Email to: [email protected]

Post to: Jenny Nuttycombe, Senior Planning Policy Officer Greater Cambridge Shared Planning c/o South Cambridgeshire Hall Cambourne Business Park Cambourne CB23 6EA

By no later than 20 March 2019

124 Please complete the housing trajectory table below with details of your anticipated housing completions in future years:

All years are based on financial years i.e. 1 April – 31 March Post 2033 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 2031-32 2032-33

Housing trajectory published in 0 0 0 0 0 0 0 0 0 0 0 0 46 30 0 0 0 December 2017

Actual dwelling 0 completions recorded

Please provide your current best estimate of 46 completions by year MARKET HOUSING

Please provide your current best estimate of 30 completions by year AFFORDABLE HOUSING

n/a = not available, this site was not included in the housing trajectory published in December 2017.

125 Questionnaire C17 Received March 2019

Greater Cambridge Housing Trajectory Questionnaire

The Councils are subject to the Freedom of Information Act 2000 and Environmental Information Regulations 2004, and laws concerning the protection of personal information. If you consider that any of the information that you provide as part of your response is commercially sensitive or personal information, please identify it as such in question 5a and please explain in question 5b how disclosure would be detrimental to your organisation. The Councils cannot guarantee non-disclosure of this information, but will apply any relevant exemption where one is clearly engaged.

SITE DETAILS

CAMBRIDGE PROFESSIONAL DEVELOPMENT CENTRE, FOSTER Site: ROAD Ownership: e.g. housebuilder, Landowner: Cambridgeshire County Council developer, landowner Planning Status: e.g. allocation, outline planning Cambridge Local Plan 2018 - Site R16 permission, detailed The site is allocated in the Cambridge Local Plan (adopted in October planning permission, 2018) for approximately 67 dwellings. resolution to grant planning permission This is the Councils’ assessment of progress towards delivery of this site based on our current knowledge: Councils’ assessment: The site is allocated in the Cambridge Local Plan (adopted in October 2018) for approximately 67 dwellings. Anticipated year for works to start on 2027/2028 site: Anticipated year for development to be 2030/2031 completed:

Please confirm whether the site details, including Councils’ assessment, set out 1a Correct above are still correct. If not, please provide updated details. Please confirm if you are the correct contact for this site on an ongoing 1b basis. If not, please provide updated contact details.

AVAILABILITY

126 Is the site available immediately No for development? 2a Available is defined as: the site is controlled by a housing developer who has expressed an intention to develop or the landowner has expressed an intention to sell.

If not, why not? Currently is occupied by Cambridgeshire County 2b e.g. is there an existing use on the Council site?

If the site is not available Potential for it to be available in the next 0-10 years immediately, when will it 2c subject to it being declared surplus to operational become available for requirements development?

Are you still undertaking any site assessment work? If so, 2d No further information can be provided at this time. please provide us with further details.

If your site is allocated, but does not yet have planning permission, when do you 2e anticipate that you will submit a No further information can be provided at this time planning application or receive a decision on a submitted planning application?

If your site has outline planning permission, but does not yet have detailed planning permission, when do you anticipate that you will submit a 2f N/A detailed (reserved matters) planning application or receive a decision on a submitted detailed (reserved matters) planning application?

ACHIEVABILITY

Is the development achievable and viable? If not, please provide details in responding to Yes 3a the questions below explaining how this will be overcome. Achievable is defined as: having a realistic prospect that housing will be delivered on site within five years.

127 Infrastructure and Access

Please provide details:

Are there any Legal and Ownership constraints that could delay development? Please provide details: For all that apply, please provide specific 3b details for your site and Discharge of Conditions what impact these constraints will have Please provide details: on your timescales for delivery. Other (e.g. contamination)

Please provide details:

Market Conditions

Please provide details:

Are there any market or Site Preparation Costs cost factors that could delay development? Please provide details: For all that apply, please provide specific 3c details for your site and Infrastructure Costs what impact these factors will have on Please provide details: your timescales for delivery. Planning Obligations

Please provide details:

How do you anticipate these constraints and factors will be 3d overcome? When do you think these constraints and factors will be overcome?

128 If your trajectory is dependent on certain assumptions, such as availability and timing of infrastructure, site preparation, 3e submission of a planning application, a decision on a planning application or discharge of conditions, what are your assumptions?

DELIVERY TIMETABLE & HOUSING TRAJECTORY

When do you estimate you will 4a Unknown at this time start works on site?

When do you estimate you will 4b deliver the first housing Unknown at this time completions?

When do you estimate you will 4c complete development of the Unknown at this time site?

Please complete the housing trajectory table [see final page] with details of your 4d [see final page] anticipated housing completions in future years.

If your actual completions Market Conditions for 2017-2018 differ from the number anticipated in Please provide details: the previous published housing trajectory [see final page], what is the 4e reason? For all that apply, Site Specific Reasons please provide specific details for your site and Please provide details: what impact this has had on your timescales for delivery.

If your projected Market Conditions completions for future years differ from the Please provide details: 4f number anticipated in previous published housing trajectory [see

129 final page], what is the Site Specific Reasons reason? For all that apply, please provide specific Please provide details: details for your site and what impact this has had on your timescales for delivery.

COMMERCIALLY SENSITIVE INFORMATION

Have you provided any information that you would regard as commercially 5a sensitive? If yes, please specify which answers this applies to. Please explain in detail how disclosure of this information 5b would be detrimental to your organisation.

Please return to:

Email to: [email protected]

Post to: Jenny Nuttycombe, Senior Planning Policy Officer Greater Cambridge Shared Planning c/o South Cambridgeshire Hall Cambourne Business Park Cambourne CB23 6EA

By no later than 20 March 2019

130 Please complete the housing trajectory table below with details of your anticipated housing completions in future years:

All years are based on financial years i.e. 1 April – 31 March Post 2033 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 2031-32 2032-33

Housing trajectory published in 0 0 0 0 0 0 0 0 0 0 15 20 17 15 0 0 0 December 2017

Actual dwelling 0 completions recorded

Please provide your current best estimate of completions by year MARKET HOUSING

Please provide your current best estimate of completions by year AFFORDABLE HOUSING

n/a = not available, this site was not included in the housing trajectory published in December 2017.

131 Questionnaire C18a Received April 2019

132 133 134 135 136 137 Email C19 Received April 2019

From: Bidwells Sent: 24 April 2019 13:09 Subject: RE: Greater Cambridge Housing Trajectory - 82-88 Hills Road and 57-63 Bateman Street (C19)

I have liaised with our client and we report to you that there is no change to the position, thus, the position is the same as reported last year.

138 Questionnaire C20a Received March 2019

Greater Cambridge Housing Trajectory Questionnaire

The Councils are subject to the Freedom of Information Act 2000 and Environmental Information Regulations 2004, and laws concerning the protection of personal information. If you consider that any of the information that you provide as part of your response is commercially sensitive or personal information, please identify it as such in question 5a and please explain in question 5b how disclosure would be detrimental to your organisation. The Councils cannot guarantee non-disclosure of this information, but will apply any relevant exemption where one is clearly engaged.

SITE DETAILS

636-656 NEWMARKET ROAD, HOLY CROSS CHURCH HALL, Site: EAST BARNWELL COMMUNITY CENTRE AND MEADOWLANDS, NEWMARKET ROAD Ownership: Landowner: Cambridge City Council, Cambridgeshire County Council, e.g. housebuilder, The Churches Trust, Cambridge Spiritualist Cente developer, landowner Planning Status: e.g. allocation, outline planning Cambridge Local Plan 2018 - Site R6 permission, detailed The site is allocated in the Cambridge Local Plan (adopted in October planning permission, 2018) for approximately 75 dwellings. resolution to grant planning permission This is the Councils’ assessment of progress towards delivery of this site based on our current knowledge: Councils’ assessment: The site is allocated in the Cambridge Local Plan (adopted in October 2018) for approximately 75 dwellings. Anticipated year for works to start on 2021/2022 site: Anticipated year for development to be 2023/2024 completed:

Please confirm whether the site details, including Councils’ assessment, set out 1a Updated as above above are still correct. If not, please provide updated details. Please confirm if you are the correct contact for this site on an ongoing 1b basis. If not, please provide updated contact details.

AVAILABILITY

139 Is the site available immediately No for development? 2a Available is defined as: the site is controlled by a housing developer who has expressed an intention to develop or the landowner has expressed an intention to sell.

If not, why not? Sites are being independently pursued by existing 2b e.g. is there an existing use on the owners – exploratory talks to incorporate sites into a site? joint scheme for delivery are in their early stages.

If the site is not available immediately, when will it 2c 2020/21 become available for development?

Are you still undertaking any site assessment work? If so, Yes – site capacity studies will be required for a joint 2d please provide us with further scheme taking in the whole R6 area. details.

If your site is allocated, but does not yet have planning permission, when do you Planning submission indicative date: end March 2e anticipate that you will submit a 2021. Completion of planning process likely end planning application or receive March 2022 a decision on a submitted planning application?

If your site has outline planning permission, but does not yet have detailed planning permission, when do you anticipate that you will submit a 2f N/a detailed (reserved matters) planning application or receive a decision on a submitted detailed (reserved matters) planning application?

ACHIEVABILITY

Is the development achievable and viable? If not, please Unknown – indicative scheme still being drawn up provide details in responding to and parameters agreed. 3a the questions below explaining how this will be overcome. Achievable is defined as: having a realistic prospect that housing will be delivered on site within five years.

140 Infrastructure and Access

Please provide details:

N/a at this stage

Legal and Ownership

Please provide details:

Multiple owners on R6 development site. Church of England and Cambridge Spiritualist Centre both own sections of the site, as do the City and County Councils.

At time of writing the City and County Council land may be Are there any pursued jointly or independently but funding has been made constraints that could available through One Public Estate to incorporate all parts of delay development? the site into the East Cambridge Regeneration and For all that apply, Development project. This project is still in its early stages please provide specific 3b and so the relationship between the parts of the site has not details for your site and been formalised. what impact these constraints will have Consequently the board to allocate the One Public Estate on your timescales for funding will meet throughout the year and will be seeking to delivery. coordinate efforts alongside the independent efforts to bring forward sites.

Discharge of Conditions

Please provide details:

N/a at this stage

Other (e.g. contamination)

Please provide details:

N/a at this stage

Are there any market or Market Conditions cost factors that could delay development? Please provide details: 3c For all that apply, please provide specific Not identified at this stage details for your site and

141 what impact these Site Preparation Costs factors will have on your timescales for Please provide details: delivery. Not identified at this stage

Infrastructure Costs

Please provide details:

Not identified at this stage

Planning Obligations

Please provide details:

Not identified at this stage

How do you anticipate these In March and April the first meetings are scheduled constraints and factors will be for key stakeholders to discuss the use of One 3d overcome? When do you think Public Estate funding, with which an indicative these constraints and factors scheme can be solidified. will be overcome?

If your trajectory is dependent A core assumption in the trajectory is that further on certain assumptions, such funding will become available to physically deliver as availability and timing of the scheme. So far, the only funding available for infrastructure, site preparation, the site to be delivered jointly is through One Public 3e submission of a planning Estate. application, a decision on a planning application or The City and County Councils do have allocated discharge of conditions, what budgets for the regeneration of existing facilities but are your assumptions? these have not been incorporated as yet.

DELIVERY TIMETABLE & HOUSING TRAJECTORY

When do you estimate you will 4a 30/3/2022 start works on site?

When do you estimate you will 4b deliver the first housing 30/3/2023 completions?

When do you estimate you will 4c complete development of the 30/03/2026 site?

142 Please complete the housing trajectory table [see final page] with details of your 4d Complete anticipated housing completions in future years.

If your actual completions Market Conditions for 2017-2018 differ from the number anticipated in Please provide details: the previous published housing trajectory [see N/A final page], what is the 4e reason? For all that apply, Site Specific Reasons please provide specific details for your site and Please provide details: what impact this has had on your timescales for N/A delivery.

Market Conditions If your projected completions for future Please provide details: years differ from the number anticipated in Secured One Public Estate Funding has made it possible previous published to fund investigation and feasibility work. This has housing trajectory [see enabled the forecast of a tentative delivery timetable for 4f final page], what is the the site subject to approval by the parties involved. reason? For all that apply, please provide specific Site Specific Reasons details for your site and what impact this has had Please provide details: on your timescales for delivery. N/A

COMMERCIALLY SENSITIVE INFORMATION

Have you provided any information that you would regard as commercially 5a No sensitive? If yes, please specify which answers this applies to. Please explain in detail how disclosure of this information 5b No would be detrimental to your organisation.

Please return to:

143 Email to: [email protected]

Post to: Jenny Nuttycombe, Senior Planning Policy Officer Greater Cambridge Shared Planning c/o South Cambridgeshire Hall Cambourne Business Park Cambourne CB23 6EA

By no later than 20 March 2019

144 Please complete the housing trajectory table below with details of your anticipated housing completions in future years:

All years are based on financial years i.e. 1 April – 31 March

18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 ------Post Post 2033 022 2017 2018 2019 2020 2021 2 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032

Housing trajectory published in 0 0 0 0 0 15 20 20 20 0 0 0 0 0 0 0 0 December 2017

Actual dwelling 0 completions recorded

Please provide your current best estimate of completions by year MARKET HOUSING

Please provide your current best estimate of completions by year AFFORDABLE HOUSING

n/a = not available, this site was not included in the housing trajectory published in December 2017.

145 Questionnaire C22 Received March 2019

Greater Cambridge Housing Trajectory Questionnaire

The Councils are subject to the Freedom of Information Act 2000 and Environmental Information Regulations 2004, and laws concerning the protection of personal information. If you consider that any of the information that you provide as part of your response is commercially sensitive or personal information, please identify it as such in question 5a and please explain in question 5b how disclosure would be detrimental to your organisation. The Councils cannot guarantee non-disclosure of this information, but will apply any relevant exemption where one is clearly engaged.

SITE DETAILS

Site: LAND NORTH OF WORTS' CAUSEWAY Ownership: e.g. housebuilder, Developer: Commercial Estates Group developer, landowner Planning Status: e.g. allocation, outline planning Cambridge Local Plan 2018 - Policy 27 / Site GB1 permission, detailed The site is allocated in the Cambridge Local Plan (adopted in October planning permission, 2018) for approximately 200 dwellings. resolution to grant planning permission This is the Councils’ assessment of progress towards delivery of this site based on our current knowledge:

The site is allocated in the Cambridge Local Plan (adopted in October 2018) for approximately 200 dwellings. We have previously been advised that the development could be completed by 2021/2022. Councils’ A Statement of Common Ground was agreed between Cambridge City assessment: Council and Commercial Estates Group in February 2015, which agreed that the site is suitable for development to contribute towards Cambridge’s housing needs to 2031, that the site is immediately available for development and deliverable so will make an early contribution to meeting housing need, and that development could be achieved within five years from existing road access with limited investment in infrastructure. Anticipated year for works to start on 2019/2020 site: Anticipated year for development to be 2021/2022 completed:

146 The Councils’ assessment is no longer up to date. Whilst it was previously advised Please confirm whether the site details, that the development could be completed including Councils’ assessment, set out 1a by 2021/2022, this no longer stands in light above are still correct. If not, please of the delay to the Local Plan adoption. It is provide updated details. now considered that the site will feasibly be completed by the end of 2023. Please confirm if you are the correct contact for this site on an ongoing 1b basis. If not, please provide updated contact details.

AVAILABILITY

Is the site available immediately Yes for development? 2a Available is defined as: the site is controlled by a housing developer who has expressed an intention to develop or the landowner has expressed an intention to sell.

If not, why not? 2b e.g. is there an existing use on the N/A site?

If the site is not available immediately, when will it 2c N/A become available for development?

Are you still undertaking any An outline application is currently being prepared in site assessment work? If so, relation to the site, encompassing a wide range of 2d please provide us with further site assessment work as required to support the details. application.

If your site is allocated, but does not yet have planning permission, when do you An outline application is currently being prepared 2e anticipate that you will submit a with the intention to submit in July 2019, with a planning application or receive decision anticipated by the end of 2019. a decision on a submitted planning application?

147 If your site has outline planning permission, but does not yet have detailed planning permission, when do you anticipate that you will submit a 2f N/A detailed (reserved matters) planning application or receive a decision on a submitted detailed (reserved matters) planning application?

ACHIEVABILITY

Is the development achievable and viable? If not, please provide details in responding to Yes 3a the questions below explaining how this will be overcome. Achievable is defined as: having a realistic prospect that housing will be delivered on site within five years.

Infrastructure and Access

Please provide details: There are no constraints, assuming that independent access onto Wort’s Causeway can be facilitated enabling immediate development of the site.

Are there any constraints that could Legal and Ownership delay development? For all that apply, Please provide details: N/A please provide specific 3b details for your site and what impact these Discharge of Conditions constraints will have on your timescales for Please provide details: N/A delivery.

Other (e.g. contamination)

Please provide details: N/A

Are there any market or Market Conditions cost factors that could 3c delay development? Please provide details: N/A For all that apply, please provide specific

148 details for your site and Site Preparation Costs what impact these factors will have on Please provide details: N/A your timescales for delivery. Infrastructure Costs

Please provide details: N/A

Planning Obligations

Please provide details: N/A

How do you anticipate these constraints and factors will be 3d overcome? When do you think N/A these constraints and factors will be overcome?

If your trajectory is dependent on certain assumptions, such as availability and timing of infrastructure, site preparation, The trajectory is subject to outline permission being 3e submission of a planning granted by the end of 2019. application, a decision on a planning application or discharge of conditions, what are your assumptions?

DELIVERY TIMETABLE & HOUSING TRAJECTORY

Subject to outline permission being granted by the end of 2019, it is envisaged that construction works When do you estimate you will will commence by the start of 2021. This allows a 4a start works on site? suitable time period of approximately 14 months for the sale of land and any necessary pre-construction enabling works.

When do you estimate you will 4b deliver the first housing 2021 completions?

When do you estimate you will 4c complete development of the 2023 site?

149 Please complete the housing trajectory table [see final page] with details of your 4d [see final page] anticipated housing completions in future years.

If your actual completions Market Conditions for 2017-2018 differ from the number anticipated in Please provide details:N/A the previous published housing trajectory [see final page], what is the 4e reason? For all that apply, Site Specific Reasons please provide specific details for your site and Please provide details: N/A what impact this has had on your timescales for delivery.

Market Conditions

Please provide details:N/A

If your projected completions for future Site Specific Reasons years differ from the number anticipated in Please provide details:The previously-published housing previous published trajectory was the result of the agreed Statement of housing trajectory [see Common ground between Commercial Estates Group and 4f final page], what is the Cambridge City Council in 2015, and advice given at the reason? For all that apply, time that the site could be completed by 2021. please provide specific details for your site and However, the examination of the Cambridge Local Plan what impact this has had extended beyond the time period that was originally on your timescales for considered. As such, the resultant effect is that the site delivery. has been delayed in being brought forward as the allocation of the site was not confirmed until October 2018.

COMMERCIALLY SENSITIVE INFORMATION

150 Have you provided any information that you would regard as commercially 5a N/A sensitive? If yes, please specify which answers this applies to. Please explain in detail how disclosure of this information 5b N/A would be detrimental to your organisation.

Please return to:

Email to: [email protected]

Post to: Jenny Nuttycombe, Senior Planning Policy Officer Greater Cambridge Shared Planning c/o South Cambridgeshire Hall Cambourne Business Park Cambourne CB23 6EA

By no later than 20 March 2019

151 Please complete the housing trajectory table below with details of your anticipated housing completions in future years:

All years are based on financial years i.e. 1 April – 31 March Post 2033 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 2031-32 2032-33

Housing trajectory published in 0 0 60 80 60 0 0 0 0 0 0 0 0 0 0 0 0 December 2017

Actual dwelling 0 completions recorded

Please provide your current best estimate of 36 48 36 completions by year MARKET HOUSING

Please provide your current best estimate of 24 32 24 completions by year AFFORDABLE HOUSING

n/a = not available, this site was not included in the housing trajectory published in December 2017.

152 Questionnaire 22 Received October 2019

Greater Cambridge Housing Trajectory Questionnaire

The Councils are subject to the Freedom of Information Act 2000 and Environmental Information Regulations 2004, and laws concerning the protection of personal information. If you consider that any of the information that you provide as part of your response is commercially sensitive or personal information, please identify it as such in question 5a and please explain in question 5b how disclosure would be detrimental to your organisation. The Councils cannot guarantee non-disclosure of this information, but will apply any relevant exemption where one is clearly engaged.

SITE DETAILS

Site: LAND NORTH OF WORTS' CAUSEWAY Ownership: e.g. housebuilder, Promoter: Commercial Estates Group developer, landowner Planning Status: e.g. allocation, outline planning Cambridge Local Plan 2018 - Policy 27 / Site GB1 permission, detailed The site is allocated in the Cambridge Local Plan (adopted in October planning permission, 2018) for approximately 200 dwellings. resolution to grant planning permission This is the Councils’ assessment of progress towards delivery of this site based on our current knowledge:

The site is allocated in the Cambridge Local Plan (adopted in October 2018) for approximately 200 dwellings. We have previously been advised that the development could be completed by 2021/2022. Councils’ A Statement of Common Ground was agreed between Cambridge City assessment: Council and Commercial Estates Group in February 2015, which agreed that the site is suitable for development to contribute towards Cambridge’s housing needs to 2031, that the site is immediately available for development and deliverable so will make an early contribution to meeting housing need, and that development could be achieved within five years from existing road access with limited investment in infrastructure. Anticipated year for works to start on 2019/2020 site: Anticipated year for development to be 2021/2022 completed:

153 The Councils’ assessment is no longer up to date. Whilst it was previously advised that the development could be completed Please confirm whether the site details, by 2021/2022, this no longer stands in light including Councils’ assessment, set out 1a of the delay to the Local Plan adoption and above are still correct. If not, please delays in pre-application engagement due provide updated details. to lack of a case officer. It is now considered that the site will feasibly be completed by the end of 2025. Please confirm if you are the correct contact for this site on an ongoing 1b basis. If not, please provide updated contact details.

AVAILABILITY

Is the site available immediately Yes for development? 2a Available is defined as: the site is controlled by a housing developer who has expressed an intention to develop or the landowner has expressed an intention to sell.

If not, why not? 2b e.g. is there an existing use on the N/A site?

If the site is not available immediately, when will it 2c N/A become available for development?

An outline application has been being prepared Are you still undertaking any since early 2019 in relation to the site, site assessment work? If so, encompassing a wide range of site assessment 2d please provide us with further work as required to support the application. details. Progress to an application have been halted through lack of a case officer.

If your site is allocated, but does not yet have planning permission, when do you It is anticipated an outline application will be 2e anticipate that you will submit a submitted in December 2019, with a decision planning application or receive anticipated by mid-2020. a decision on a submitted planning application?

154 If your site has outline planning permission, but does not yet have detailed planning permission, when do you anticipate that you will submit a 2f N/A detailed (reserved matters) planning application or receive a decision on a submitted detailed (reserved matters) planning application?

ACHIEVABILITY

Is the development achievable and viable? If not, please provide details in responding to Yes 3a the questions below explaining how this will be overcome. Achievable is defined as: having a realistic prospect that housing will be delivered on site within five years.

Infrastructure and Access

Please provide details: There are no constraints, assuming that independent access onto Wort’s Causeway can be facilitated enabling immediate development of the site.

Are there any constraints that could Legal and Ownership delay development? For all that apply, Please provide details: N/A please provide specific 3b details for your site and what impact these Discharge of Conditions constraints will have on your timescales for Please provide details: N/A delivery.

Other (e.g. contamination)

Please provide details: N/A

Are there any market or Market Conditions cost factors that could 3c delay development? Please provide details: N/A For all that apply, please provide specific

155 details for your site and Site Preparation Costs what impact these factors will have on Please provide details: N/A your timescales for delivery. Infrastructure Costs

Please provide details: N/A

Planning Obligations

Please provide details: N/A

How do you anticipate these constraints and factors will be 3d overcome? When do you think N/A these constraints and factors will be overcome?

If your trajectory is dependent on certain assumptions, such as availability and timing of infrastructure, site preparation, The trajectory is subject to outline permission being 3e submission of a planning granted by mid-2020. application, a decision on a planning application or discharge of conditions, what are your assumptions?

DELIVERY TIMETABLE & HOUSING TRAJECTORY

Subject to outline permission being granted by mid- 2020, it is envisaged that construction works will commence by the end of 2021. This allows a When do you estimate you will 4a suitable time period of approximately 18 months for start works on site? the sale of land after outline permission, preparation and determination of reserved matters by the buyer and any necessary pre-construction enabling works.

When do you estimate you will 4b deliver the first housing 2022 completions?

When do you estimate you will 4c complete development of the 2025 site?

156 Please complete the housing trajectory table [see final page] with details of your 4d [see final page] anticipated housing completions in future years.

If your actual completions Market Conditions for 2017-2018 differ from the number anticipated in Please provide details: N/A the previous published housing trajectory [see final page], what is the 4e reason? For all that apply, Site Specific Reasons please provide specific details for your site and Please provide details: N/A what impact this has had on your timescales for delivery.

Market Conditions

Please provide details: N/A

If your projected Site Specific Reasons completions for future years differ from the Please provide details: The previously-published housing number anticipated in trajectory was the result of the agreed Statement of previous published Common ground between Commercial Estates Group and housing trajectory [see Cambridge City Council in 2015, and advice given at the 4f final page], what is the time that the site could be completed by 2021. reason? For all that apply, please provide specific However, the examination of the Cambridge Local Plan details for your site and extended beyond the time period that was originally what impact this has had considered and progress of pre-application discussions on your timescales for on an outline application have been slow due to the lack delivery. of a case officer. As such, the resultant effect is that the site has been delayed in being brought forward as the allocation of the site was not confirmed until October 2018 and pre-application discussions are still ongoing.

COMMERCIALLY SENSITIVE INFORMATION

157 Have you provided any information that you would regard as commercially 5a N/A sensitive? If yes, please specify which answers this applies to. Please explain in detail how disclosure of this information 5b N/A would be detrimental to your organisation.

Please return to:

Email to: [email protected]

Post to: Jenny Nuttycombe, Senior Planning Policy Officer Greater Cambridge Shared Planning c/o South Cambridgeshire Hall Cambourne Business Park Cambourne CB23 6EA

By no later than 20 March 2019

158 Please complete the housing trajectory table below with details of your anticipated housing completions in future years:

All years are based on financial years i.e. 1 April – 31 March

18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 ------Post Post 2033 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032

Housing trajectory published in 0 0 60 80 60 0 0 0 0 0 0 0 0 0 0 0 0 December 2017

Actual dwelling 0 completions recorded

Please provide your current best estimate of 36 48 36 completions by year MARKET HOUSING

Please provide your current best estimate of 24 32 24 completions by year AFFORDABLE HOUSING

n/a = not available, this site was not included in the housing trajectory published in December 2017.

159 Questionnaire C23 Received April 2019

Greater Cambridge Housing Trajectory Questionnaire

The Councils are subject to the Freedom of Information Act 2000 and Environmental Information Regulations 2004, and laws concerning the protection of personal information. If you consider that any of the information that you provide as part of your response is commercially sensitive or personal information, please identify it as such in question 5a and please explain in question 5b how disclosure would be detrimental to your organisation. The Councils cannot guarantee non-disclosure of this information, but will apply any relevant exemption where one is clearly engaged.

SITE DETAILS

Site: LAND SOUTH OF WORTS' CAUSEWAY Ownership: e.g. housebuilder, This Land Ltd (Developer) developer, landowner Planning Status: e.g. allocation, outline planning Cambridge Local Plan 2018 - Policy 27 / Site GB2 permission, detailed The site is allocated in the Cambridge Local Plan (adopted in October planning permission, 2018) for approximately 230 dwellings. resolution to grant planning permission This is the Councils’ assessment of progress towards delivery of this site based on our current knowledge: Councils’ assessment: The site is allocated in the Cambridge Local Plan (adopted in October 2018) for approximately 230 dwellings. The first completions are anticipated in 2020/21. Anticipated year for works to start on 2020 site: Anticipated year for development to be 2024/2025 completed:

Please confirm whether the site details, including Councils’ assessment, set out 1a above are still correct. If not, please provide updated details. Please confirm if you are the correct contact for this site on an ongoing 1b basis. If not, please provide updated contact details.

AVAILABILITY

160 Is the site available immediately Yes, pending planning consent for development? 2a Available is defined as: the site is controlled by a housing developer who has expressed an intention to develop or the landowner has expressed an intention to sell.

If not, why not? 2b e.g. is there an existing use on the site?

If the site is not available immediately, when will it 2c become available for development?

Are you still undertaking any site assessment work? If so, 2d please provide us with further details.

If your site is allocated, but does not yet have planning permission, when do you 2e anticipate that you will submit a Application will be submitted 2019 planning application or receive a decision on a submitted planning application?

If your site has outline planning permission, but does not yet have detailed planning permission, when do you anticipate that you will submit a 2f detailed (reserved matters) planning application or receive a decision on a submitted detailed (reserved matters) planning application?

ACHIEVABILITY

Is the development achievable and viable? If not, please provide details in responding to Yes 3a the questions below explaining how this will be overcome. Achievable is defined as: having a realistic prospect that housing will be delivered on site within five years.

161 Infrastructure and Access

Please provide details: Highways issues may be problematic as well as utility infrastructure with a requirement to move (or design around) significant water and gas mains.

Are there any Legal and Ownership constraints that could delay development? Please provide details: An existing farm tenancy (not vacant For all that apply, possession) please provide specific 3b details for your site and what impact these Discharge of Conditions constraints will have on your timescales for delivery. Please provide details: Yet to be determined

Other (e.g. contamination)

Please provide details:

Market Conditions

Please provide details: Potential Brexit influence

Are there any market or Site Preparation Costs cost factors that could delay development? Please provide details: Release of tenancy agreement For all that apply, please provide specific 3c details for your site and Infrastructure Costs what impact these factors will have on Please provide details: Access and utilities (see above) your timescales for delivery. Planning Obligations

Please provide details: Yet to be determined

162 How do you anticipate these constraints and factors will be 3d overcome? When do you think Yet to be determined these constraints and factors will be overcome?

If your trajectory is dependent on certain assumptions, such as availability and timing of infrastructure, site preparation, 3e submission of a planning Planning consent to be achieved circa October 2019 application, a decision on a planning application or discharge of conditions, what are your assumptions?

DELIVERY TIMETABLE & HOUSING TRAJECTORY

When do you estimate you will 4a 2020 start works on site?

When do you estimate you will 4b deliver the first housing 2021 completions?

When do you estimate you will 4c complete development of the 2025 site?

Please complete the housing trajectory table [see final page] with details of your 4d [see final page] anticipated housing completions in future years.

If your actual completions Market Conditions for 2017-2018 differ from the number anticipated in Please provide details: the previous published housing trajectory [see final page], what is the 4e reason? For all that apply, Site Specific Reasons please provide specific details for your site and Please provide details: what impact this has had on your timescales for delivery.

163 If your projected Market Conditions completions for future years differ from the Please provide details: number anticipated in previous published housing trajectory [see 4f final page], what is the Site Specific Reasons reason? For all that apply, please provide specific details for your site and Please provide details: what impact this has had on your timescales for delivery.

COMMERCIALLY SENSITIVE INFORMATION

Have you provided any information that you would regard as commercially 5a sensitive? If yes, please specify which answers this applies to. Please explain in detail how disclosure of this information 5b would be detrimental to your organisation.

Please return to:

Email to: [email protected]

Post to: Jenny Nuttycombe, Senior Planning Policy Officer Greater Cambridge Shared Planning c/o South Cambridgeshire Hall Cambourne Business Park Cambourne CB23 6EA

By no later than 20 March 2019

164 Please complete the housing trajectory table below with details of your anticipated housing completions in future years:

All years are based on financial years i.e. 1 April – 31 March Post 2033 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 2031-32 2032-33

Housing trajectory published in 0 0 0 30 50 50 50 50 0 0 0 0 0 0 0 0 0 December 2017

Actual dwelling 0 completions recorded

Please provide your current best estimate of 18 30 30 30 30 completions by year MARKET HOUSING

Please provide your current best estimate of 12 20 20 20 20 completions by year AFFORDABLE HOUSING

n/a = not available, this site was not included in the housing trajectory published in December 2017.

165 Questionnaire C25 Received April 2019

Greater Cambridge Housing Trajectory Questionnaire

The Councils are subject to the Freedom of Information Act 2000 and Environmental Information Regulations 2004, and laws concerning the protection of personal information. If you consider that any of the information that you provide as part of your response is commercially sensitive or personal information, please identify it as such in question 5a and please explain in question 5b how disclosure would be detrimental to your organisation. The Councils cannot guarantee non-disclosure of this information, but will apply any relevant exemption where one is clearly engaged.

SITE DETAILS

Site: HAYLING HOUSE, FEN ROAD Ownership: e.g. housebuilder, Developer: Crickmore Developments developer, landowner Planning Status: e.g. allocation, outline planning 16/0617/FUL (demolition of 1 dwellings and 14 new dwellings) permission, detailed The site has detailed planning permission for the demolition of 1 planning permission, dwelling and the construction of 14 dwellings. resolution to grant planning permission This is the Councils’ assessment of progress towards delivery of this site based on our current knowledge: Councils’ assessment: At March 2018, the existing dwelling had been demolished and the 14 new dwellings had not yet been started. We have previously been advised that the development would be completed in 2019/2020. Anticipated year for works to start on 2019/2020 site: Anticipated year for development to be 2019/2020 completed:

Please confirm whether the site details, including Councils’ assessment, set out 1a Yes above are still correct. If not, please provide updated details. Please confirm if you are the correct contact for this site on an ongoing 1b basis. If not, please provide updated contact details.

AVAILABILITY

166 Is the site available immediately Part of the site currently leased to the County for development? Council for the construction of a new cycle bridge 2a Available is defined as: the site is controlled by a housing developer who has expressed an intention to develop or the landowner has expressed an intention to sell.

If not, why not? 2b e.g. is there an existing use on the site?

If the site is not available immediately, when will it 2c Sep 2019 become available for development?

Are you still undertaking any site assessment work? If so, 2d No please provide us with further details.

If your site is allocated, but does not yet have planning permission, when do you 2e anticipate that you will submit a N/A planning application or receive a decision on a submitted planning application?

If your site has outline planning permission, but does not yet have detailed planning permission, when do you anticipate that you will submit a 2f N/A detailed (reserved matters) planning application or receive a decision on a submitted detailed (reserved matters) planning application?

ACHIEVABILITY

Is the development achievable and viable? If not, please provide details in responding to Yes 3a the questions below explaining how this will be overcome. Achievable is defined as: having a realistic prospect that housing will be delivered on site within five years.

167 Infrastructure and Access

Please provide details: Possible delay with construction of adjacent cycle bridge.

Are there any Legal and Ownership constraints that could delay development? Please provide details: No For all that apply, please provide specific 3b details for your site and Discharge of Conditions what impact these constraints will have on your timescales for Please provide details: No (all discharged) delivery. Other (e.g. contamination)

Please provide details: No

Market Conditions

Please provide details: N/A

Are there any market or Site Preparation Costs cost factors that could delay development? Please provide details: N/A For all that apply, please provide specific 3c details for your site and Infrastructure Costs what impact these factors will have on Please provide details: N/A your timescales for delivery. Planning Obligations

Please provide details: No

How do you anticipate these constraints and factors will be 3d overcome? When do you think these constraints and factors will be overcome?

168 If your trajectory is dependent on certain assumptions, such as availability and timing of infrastructure, site preparation, 3e submission of a planning application, a decision on a planning application or discharge of conditions, what are your assumptions?

DELIVERY TIMETABLE & HOUSING TRAJECTORY

When do you estimate you will 4a Sep 2019 start works on site?

When do you estimate you will 4b deliver the first housing Dec 2020 completions?

When do you estimate you will 4c complete development of the March 2021 site?

Please complete the housing trajectory table [see final page] with details of your 4d [see final page] anticipated housing completions in future years.

If your actual completions Market Conditions for 2017-2018 differ from the number anticipated in Please provide details: the previous published housing trajectory [see final page], what is the 4e reason? For all that apply, Site Specific Reasons please provide specific details for your site and Please provide details: what impact this has had on your timescales for delivery.

If your projected Market Conditions completions for future years differ from the Please provide details: 4f number anticipated in previous published housing trajectory [see

169 final page], what is the Site Specific Reasons reason? For all that apply, please provide specific Please provide details: details for your site and what impact this has had on your timescales for delivery.

COMMERCIALLY SENSITIVE INFORMATION

Have you provided any information that you would regard as commercially 5a No sensitive? If yes, please specify which answers this applies to. Please explain in detail how disclosure of this information 5b would be detrimental to your organisation.

Please return to:

Email to: [email protected]

Post to: Jenny Nuttycombe, Senior Planning Policy Officer Greater Cambridge Shared Planning c/o South Cambridgeshire Hall Cambourne Business Park Cambourne CB23 6EA

By no later than 20 March 2019

170 Please complete the housing trajectory table below with details of your anticipated housing completions in future years:

All years are based on financial years i.e. 1 April – 31 March Post 2033 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 2031-32 2032-33

Housing trajectory published in 0 0 13 0 0 0 0 0 0 0 0 0 0 0 0 0 0 December 2017

Actual dwelling -1 completions recorded

Please provide your current best estimate of 4 10 completions by year MARKET HOUSING

Please provide your current best estimate of completions by year AFFORDABLE HOUSING

n/a = not available, this site was not included in the housing trajectory published in December 2017.

171 Questionnaire C30 Received April 2019

172 173 174 175 176 177 178 Questionnaire C32 Received March 2019

Greater Cambridge Housing Trajectory Questionnaire

The Councils are subject to the Freedom of Information Act 2000 and Environmental Information Regulations 2004, and laws concerning the protection of personal information. If you consider that any of the information that you provide as part of your response is commercially sensitive or personal information, please identify it as such in question 5a and please explain in question 5b how disclosure would be detrimental to your organisation. The Councils cannot guarantee non-disclosure of this information, but will apply any relevant exemption where one is clearly engaged.

SITE DETAILS

Site: LAND AT ANSTEY WAY Ownership: Housebuilder: Cambridge Investment Partnership (Hill Residential and e.g. housebuilder, Cambridge City Council) developer, landowner Planning Status: e.g. allocation, 17/1133/DEMDET (demolition of 28 dwellings) & 17/2214/FUL (56 outline planning dwellings) permission, detailed The site has detailed planning permission for the demolition of 28 planning permission, dwellings and construction of 56 dwellings. resolution to grant planning permission This is the Councils’ assessment of progress towards delivery of this site based on our current knowledge: Councils’ assessment: At March 2018, all 28 existing dwellings had been demolished. Detailed planning permission for the 56 new dwellings was granted in July 2018. Anticipated year for works to start on - 1st October 2018 site: Anticipated year for development to be - 8th May 2020 completed:

Please confirm whether the site details, including Councils’ assessment, set out 1a Correct above are still correct. If not, please provide updated details. Please confirm if you are the correct contact for this site on an ongoing 1b basis. If not, please provide updated contact details.

AVAILABILITY

179 Is the site available immediately N/A In Construction for development? 2a Available is defined as: the site is controlled by a housing developer who has expressed an intention to develop or the landowner has expressed an intention to sell.

If not, why not? 2b e.g. is there an existing use on the N/A site?

If the site is not available immediately, when will it 2c N/A become available for development?

Are you still undertaking any site assessment work? If so, 2d No please provide us with further details.

If your site is allocated, but does not yet have planning permission, when do you 2e anticipate that you will submit a N/A planning application or receive a decision on a submitted planning application?

If your site has outline planning permission, but does not yet have detailed planning permission, when do you anticipate that you will submit a 2f N/A detailed (reserved matters) planning application or receive a decision on a submitted detailed (reserved matters) planning application?

ACHIEVABILITY

Is the development achievable and viable? If not, please provide details in responding to Yes 3a the questions below explaining how this will be overcome. Achievable is defined as: having a realistic prospect that housing will be delivered on site within five years.

180 Infrastructure and Access

Please provide details: No

Are there any Legal and Ownership constraints that could delay development? Please provide details: No For all that apply, please provide specific 3b details for your site and Discharge of Conditions what impact these constraints will have Please provide details: No on your timescales for delivery. Other (e.g. contamination)

Please provide details: No

Market Conditions

Please provide details: No

Are there any market or Site Preparation Costs cost factors that could delay development? Please provide details: No For all that apply, please provide specific 3c details for your site and Infrastructure Costs what impact these factors will have on Please provide details: No your timescales for delivery. Planning Obligations

Please provide details: No

How do you anticipate these constraints and factors will be 3d overcome? When do you think N/A these constraints and factors will be overcome?

181 If your trajectory is dependent on certain assumptions, such as availability and timing of infrastructure, site preparation, 3e submission of a planning N/A application, a decision on a planning application or discharge of conditions, what are your assumptions?

DELIVERY TIMETABLE & HOUSING TRAJECTORY

When do you estimate you will 4a 1st October 2018 start works on site?

When do you estimate you will 4b deliver the first housing 28th February 2020 completions?

When do you estimate you will 4c complete development of the 8th May 2020 site?

Please complete the housing trajectory table [see final page] with details of your 4d [see final page] anticipated housing completions in future years.

If your actual completions Market Conditions for 2017-2018 differ from the number anticipated in Please provide details: N/A the previous published housing trajectory [see final page], what is the 4e reason? For all that apply, Site Specific Reasons please provide specific details for your site and Please provide details: N/A what impact this has had on your timescales for delivery.

If your projected Market Conditions completions for future years differ from the Please provide details: N/A 4f number anticipated in previous published housing trajectory [see

182 final page], what is the Site Specific Reasons reason? For all that apply, please provide specific Please provide details: N/A details for your site and what impact this has had on your timescales for delivery.

COMMERCIALLY SENSITIVE INFORMATION

Have you provided any information that you would regard as commercially 5a No sensitive? If yes, please specify which answers this applies to. Please explain in detail how disclosure of this information 5b would be detrimental to your organisation.

Please return to:

Email to: [email protected]

Post to: Jenny Nuttycombe, Senior Planning Policy Officer Greater Cambridge Shared Planning c/o South Cambridgeshire Hall Cambourne Business Park Cambourne CB23 6EA

By no later than 20 March 2019

183 Please complete the housing trajectory table below with details of your anticipated housing completions in future years:

All years are based on financial years i.e. 1 April – 31 March

18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 ------Post Post 2033 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032

Housing trajectory published in 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 December 2017

Actual dwelling 0 completions recorded

Please provide your current best estimate of completions by year MARKET HOUSING

Please provide your current best estimate of 49 7 completions by year AFFORDABLE HOUSING

n/a = not available, this site was not included in the housing trajectory published in December 2017.

184 Questionnaire C33 Received April 2019

Greater Cambridge Housing Trajectory Questionnaire

The Councils are subject to the Freedom of Information Act 2000 and Environmental Information Regulations 2004, and laws concerning the protection of personal information. If you consider that any of the information that you provide as part of your response is commercially sensitive or personal information, please identify it as such in question 5a and please explain in question 5b how disclosure would be detrimental to your organisation. The Councils cannot guarantee non-disclosure of this information, but will apply any relevant exemption where one is clearly engaged.

SITE DETAILS

Site: ST REGIS HOUSE AND 108 CHESTERTON ROAD Ownership: e.g. housebuilder, Landowner: Clare College developer, landowner Planning Status: e.g. allocation, outline planning 17/0970/FUL (14 dwellings) permission, detailed The site has detailed planning permission for 14 dwellings. planning permission, resolution to grant planning permission This is the Councils’ assessment of progress towards delivery of this Councils’ site based on our current knowledge: assessment: Detailed planning permission was granted in May 2018. Anticipated year for works to start on August 2018 site: Anticipated year for development to be November 2010 completed:

Please confirm whether the site details, including Councils’ assessment, set out 1a Yes, still correct. above are still correct. If not, please provide updated details. Please confirm if you are the correct contact for this site on an ongoing 1b basis. If not, please provide updated contact details.

AVAILABILITY

Is the site available immediately 2a yes for development?

185 Available is defined as: the site is controlled by a housing developer who has expressed an intention to develop or the landowner has expressed an intention to sell.

If not, why not? 2b e.g. is there an existing use on the n/a site?

If the site is not available immediately, when will it 2c n/a become available for development?

Are you still undertaking any site assessment work? If so, 2d no please provide us with further details.

If your site is allocated, but does not yet have planning permission, when do you 2e anticipate that you will submit a n/a planning application or receive a decision on a submitted planning application?

If your site has outline planning permission, but does not yet have detailed planning permission, when do you anticipate that you will submit a 2f n/a detailed (reserved matters) planning application or receive a decision on a submitted detailed (reserved matters) planning application?

ACHIEVABILITY

Is the development achievable and viable? If not, please provide details in responding to yes 3a the questions below explaining how this will be overcome. Achievable is defined as: having a realistic prospect that housing will be delivered on site within five years.

186 Infrastructure and Access

Please provide details: no outstanding constraints/issues

Legal and Ownership Are there any constraints that could Please provide details: no outstanding constraints/issues delay development? For all that apply, please provide specific 3b Discharge of Conditions details for your site and what impact these Please provide details: ongoing; no issues expected constraints will have on your timescales for delivery. Other (e.g. contamination)

Please provide details: no outstanding constraints/issues

Market Conditions

Please provide details: no outstanding constraints/issues

Are there any market or Site Preparation Costs cost factors that could delay development? Please provide details: no outstanding constraints/issues For all that apply, please provide specific 3c details for your site and Infrastructure Costs what impact these factors will have on Please provide details: no outstanding constraints/issues your timescales for delivery. Planning Obligations

Please provide details: no outstanding constraints/issues

How do you anticipate these constraints and factors will be 3d overcome? When do you think no major outstanding constraints/issues these constraints and factors will be overcome?

187 If your trajectory is dependent on certain assumptions, such as availability and timing of infrastructure, site preparation, 3e submission of a planning n/a application, a decision on a planning application or discharge of conditions, what are your assumptions?

DELIVERY TIMETABLE & HOUSING TRAJECTORY

When do you estimate you will 4a August 2018 start works on site?

When do you estimate you will 4b deliver the first housing November 2020 completions?

When do you estimate you will 4c complete development of the November 2020 site?

Please complete the housing trajectory table [see final page] with details of your 4d [see final page] anticipated housing completions in future years.

If your actual completions Market Conditions for 2017-2018 differ from the number anticipated in Please provide details: n/a the previous published housing trajectory [see final page], what is the 4e reason? For all that apply, Site Specific Reasons please provide specific details for your site and Please provide details: n/a what impact this has had on your timescales for delivery.

If your projected Market Conditions completions for future years differ from the Please provide details: n/a 4f number anticipated in previous published housing trajectory [see

188 final page], what is the Site Specific Reasons reason? For all that apply, please provide specific Please provide details: n/a details for your site and what impact this has had on your timescales for delivery.

COMMERCIALLY SENSITIVE INFORMATION

Have you provided any information that you would regard as commercially 5a no sensitive? If yes, please specify which answers this applies to. Please explain in detail how disclosure of this information 5b n/a would be detrimental to your organisation.

Please return to:

Email to: [email protected]

Post to: Jenny Nuttycombe, Senior Planning Policy Officer Greater Cambridge Shared Planning c/o South Cambridgeshire Hall Cambourne Business Park Cambourne CB23 6EA

By no later than 20 March 2019

189 Please complete the housing trajectory table below with details of your anticipated housing completions in future years:

All years are based on financial years i.e. 1 April – 31 March

18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 ------Post Post 2033 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032

Housing trajectory published in 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 December 2017

Actual dwelling 0 completions recorded

Please provide your current best estimate of 14 completions by year MARKET HOUSING

Please provide your current best estimate of - completions by year AFFORDABLE HOUSING

n/a = not available, this site was not included in the housing trajectory published in December 2017.

190 Questionnaire C34 Received March 2019

Greater Cambridge Housing Trajectory Questionnaire

The Councils are subject to the Freedom of Information Act 2000 and Environmental Information Regulations 2004, and laws concerning the protection of personal information. If you consider that any of the information that you provide as part of your response is commercially sensitive or personal information, please identify it as such in question 5a and please explain in question 5b how disclosure would be detrimental to your organisation. The Councils cannot guarantee non-disclosure of this information, but will apply any relevant exemption where one is clearly engaged.

SITE DETAILS

Site: LOVELL LODGE, 365 MILTON ROAD Ownership: e.g. housebuilder, Landowner: BF Design Solutions developer, landowner Planning Status: e.g. allocation, outline planning 17/1709/FUL (14 dwellings) permission, detailed The site has detailed planning permission for 14 dwellings. planning permission, resolution to grant planning permission This is the Councils’ assessment of progress towards delivery of this Councils’ site based on our current knowledge: assessment: Detailed planning permission was granted in May 2018. Anticipated year for works to start on Feb 2019 site: Anticipated year for development to be Jan 2020 completed:

Please confirm whether the site details, including Councils’ assessment, set out Details updated- Incorrect number of units 1a above are still correct. If not, please and ownership provide updated details. Please confirm if you are the correct contact for this site on an ongoing 1b basis. If not, please provide updated contact details.

AVAILABILITY

Is the site available immediately 2a Yes for development?

191 Available is defined as: the site is controlled by a housing developer who has expressed an intention to develop or the landowner has expressed an intention to sell.

If not, why not? 2b e.g. is there an existing use on the n/a site?

If the site is not available immediately, when will it 2c n/a become available for development?

Are you still undertaking any site assessment work? If so, 2d No please provide us with further details.

If your site is allocated, but does not yet have planning permission, when do you 2e anticipate that you will submit a n/a planning application or receive a decision on a submitted planning application?

If your site has outline planning permission, but does not yet have detailed planning permission, when do you anticipate that you will submit a 2f n/a detailed (reserved matters) planning application or receive a decision on a submitted detailed (reserved matters) planning application?

ACHIEVABILITY

Is the development achievable and viable? If not, please provide details in responding to Yes 3a the questions below explaining how this will be overcome. Achievable is defined as: having a realistic prospect that housing will be delivered on site within five years.

192 Infrastructure and Access

Please provide details: None

Are there any Legal and Ownership constraints that could delay development? Please provide details: None For all that apply, please provide specific 3b details for your site and Discharge of Conditions what impact these constraints will have Please provide details: None on your timescales for delivery. Other (e.g. contamination)

Please provide details: None

Market Conditions

Please provide details: Planning costs and delays impacted deliverability of site with market conditions slowing down

Are there any market or Site Preparation Costs cost factors that could delay development? Please provide details: None For all that apply, please provide specific 3c details for your site and Infrastructure Costs what impact these factors will have on Please provide details: None your timescales for delivery. Planning Obligations

Please provide details: Delayed S106 signing impacted deliverability of site with market conditions slowing down

How do you anticipate these constraints and factors will be Factors were overcome but delays have meant a 3d overcome? When do you think cautious delivery of the site these constraints and factors will be overcome?

193 If your trajectory is dependent on certain assumptions, such as availability and timing of infrastructure, site preparation, 3e submission of a planning None application, a decision on a planning application or discharge of conditions, what are your assumptions?

DELIVERY TIMETABLE & HOUSING TRAJECTORY

When do you estimate you will 4a Feb 2019 start works on site?

When do you estimate you will 4b deliver the first housing Jan 2020 completions?

When do you estimate you will 4c complete development of the Jan 2020 site?

Please complete the housing trajectory table [see final page] with details of your 4d anticipated housing completions in future years.

If your actual completions Market Conditions for 2017-2018 differ from the number anticipated in Please provide details:n/a the previous published housing trajectory [see final page], what is the 4e reason? For all that apply, Site Specific Reasons please provide specific details for your site and Please provide details: n.a what impact this has had on your timescales for delivery.

If your projected Market Conditions completions for future years differ from the Please provide details: n/a 4f number anticipated in previous published housing trajectory [see

194 final page], what is the Site Specific Reasons reason? For all that apply, please provide specific Please provide details: details for your site and what impact this has had on your timescales for delivery.

COMMERCIALLY SENSITIVE INFORMATION

Have you provided any information that you would regard as commercially 5a sensitive? If yes, please specify which answers this applies to. Please explain in detail how disclosure of this information 5b would be detrimental to your organisation.

Please return to:

Email to: [email protected]

Post to: Jenny Nuttycombe, Senior Planning Policy Officer Greater Cambridge Shared Planning c/o South Cambridgeshire Hall Cambourne Business Park Cambourne CB23 6EA

By no later than 20 March 2019

195 Please complete the housing trajectory table below with details of your anticipated housing completions in future years:

All years are based on financial years i.e. 1 April – 31 March Post 2033 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 2031-32 2032-33

Housing trajectory published in 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 December 2017

Actual dwelling 0 completions recorded

Please provide your current best estimate of 14 completions by year MARKET HOUSING

Please provide your current best estimate of 0 completions by year AFFORDABLE HOUSING

n/a = not available, this site was not included in the housing trajectory published in December 2017

196