Highway Works Programme PDF 124 KB To: Tonbridge and Malling Joint Transportation Board By: KCC Highways and Transportation Date: 11th June 2018 Subject: Highway Works Programme 2018/19 Classification: Information Only Summary: This report updates Members on the identified schemes approved for construction in 2018/19 1. Introduction This report provides an update and summarises schemes that have been programmed for delivery in 2018/19 Footway and Carriageway Improvement Schemes – see Appendix A Drainage Repairs & Improvements – see Appendix B Street Lighting – see Appendix C Transportation and Safety Schemes – see Appendix D Casualty Reduction Measures – see Appendix D1 Integrated Transport Schemes – see Appendix D2 Local Growth Fund – see Appendix D3 Third Party Funded Schemes – see Appendix D4 Developer Funded Work – see Appendix E Section 278 Works – see Appendix E1 Section 106 Works – see Appendix E2 Bridge Works – see Appendix F Traffic Systems – see Appendix G Combined Member Fund – see Appendix H Conclusion 1. This report is for Members information. Contact Officers: The following contact officers can be contacted on 03000 418181 Kirstie Williams Mid Kent Highway Manager Mark Simmons Tonbridge & Malling District Manager Alan Casson Senior Asset Manager Sue Kinsella Street Light Asset Manager Toby Butler Traffic & Network Solutions Asset Manager Katie Moreton Drainage & Structures Asset Manager Jamie Hare Development Agreement Manager Jamie Watson Senior Schemes Programme Manager Appendix A – Footway and Carriageway Improvement Schemes The delivery of these schemes is weather dependent; should it prove not possible to carry out these works on the planned dates, new dates will be arranged, and the residents will be informed by a letter drop to their homes. Surface Treatments - Contact Officer Clive Lambourne Micro Surfacing Road Name Parish Extent of Works Current Status Fen Pond Road Ightham From boundary House to Kemsing Road Programmed for 20th June 2018 Birling Road Snodland Dryland Road to Pout Road Programmed for 28th June 2018 Taylors Lane Trottiscliffe From Trottiscliffe Road to A227 Wrotham Road Junction Programmed for 25th (Vigo Hill) June 2018 Mill Lane Hildenborough Vine Lane to Underriver house Road Programmed for 18th June 2018 Exedown Road Wrotham From junction Old Terrys Lodge for 670 SE of junction Programmed for 25th (X559180 Y159693) June 2018 Danns Lane Wateringbury From A26 to end of Highway Boundary Programmed for 28th June 2018 Riding Lane Hildenborough From B245 Tonbridge Road to Long Leys Completed Cornwallis Avenue Tonbridge From Higham Lane to Hadlow Stair Road Programmed for 29th May 2018 Martin Hardie Way Tonbridge Whole road Completed Postponed pending Aldon Lane Addingon Whole Road further investigation Easterfields Lane East Malling From junction with Rocks Completed Road to Railway Bridge Surface Dressing Bull Lane Aylesford Greenfield Close to Hawkes Road To be programmed for Summer 2018 High Street Wouldham From Ferry Lane to Knowle Road To be programmed for Summer 2018 Knowle Road Wouldham From Cornwall Crescent to Pilgrim’s Way To be programmed for Summer 2018 Machine Resurfacing – Contact Officer Mr Byron Lovell Road Name Parish Extent of Works Current Status A2045 Walderslade Fostington Way to M2 Walderslade Completed Woods Junction 3 Interchange B245 London Road to A227 Old London Road Tonbridge Completed Shipbourne Road Retexturing 100m approach to single A26 Quarry Hill Road Tonbridge Completed lane flyover A21 heading northbound into Tonbridge Retexturing 100 metres on either Programmed 4th June A227 Stumble Hill Shipbourne approach to cross roads with 2018 Back Lane and Hildenborough Road Junction with Mills Road/Hall To be programmed A20 London Road Aylesford Road September 2018 Pembury Road to Lodge Oak To be programmed Tudeley Lane Tonbridge Lane September 2018 Footway Improvement - Contact Officer Mr Neil Tree Road Name Parish Extent and Description of Current Status Works Entire length Dene Lodge Close Borough Green Completed (Footway Protection) Appendix B – Drainage Drainage Works – Contact Officer Kathryn Lewis Road Name Parish Description of Works Current Status No works planned Appendix C – Street Lighting Structural testing of KCC owned street lights has identified the following as requiring. A status of complete identifies that the column replacement has been carried out. Programme dates are identified for those still requiring replacement. Street Lighting Column Replacement – Contact Officer Sue Kinsella Road Name Parish Description of Works Status UKPN have STRUCTURAL REPLACEMENT Sheraton Court repaired cable Walderslade JSEN001 fault. KCC can now proceed Out of hours STRUCTURAL REPLACEMENT New Road JNAJ001 Ditton work required - j/w A20 Out of hours STRUCTURAL REPLACEMENT Station Road JSDI005 Ditton work required - j/w A20 Maidstone Road Re-raised due BBH village JMDJ 7 columns STRUCTURAL REPLACEMENT to system error UKPN cable Waveney Road Replacement of 1no streetlight Tonbridge inadequate, no JWAR014 complete with LED lantern mains cable. To assess if Replacement of 1no sign post Nepicar Roundabout this needs to Nepicar/Wrotham complete with LED Downflood be lit in this JUAQ518 following RTC area UKPN have made repairs Higham Lane Replacement of 2no streetlights Tonbridge to cable. KCC complete with LED lantern JHBZ010/011 can now proceed. 20 columns STRUCTURAL PROGRAMME Various roads KINGS HILL awaiting 2018 STATS 8 signs & WEST MALLING STRUCTURAL PROGRAMME columns Various roads & LEYBOURNE 2018 awaiting STATS 10 signs & STRUCTURAL PROGRAMME columns Various roads LARKFIELD 2018 awaiting STATS SNODLAND & STRUCTURAL PROGRAMME 7 columns Various roads WOULDHAM 2018 awaiting STATS 6 signs & DITTON & EAST STRUCTURAL PROGRAMME columns Various roads MALLING 2018 awaiting STATS 17 signs & BBH & STRUCTURAL PROGRAMME columns Various roads WALDERSLADE 2018 awaiting STATS AYLESFORD, STRUCTURAL PROGRAMME 5 columns Various roads B/GREEN, 2018 awaiting IGHTHAM STATS 1 column STRUCTURAL PROGRAMME Three Elm Lane Golden Green awaiting 2018 STATS 12 signs & STRUCTURAL PROGRAMME column Various roads TON - Vauxhall 2018 awaiting STATS 13 signs & TON – Judd & STRUCTURAL PROGRAMME columns Various roads Medway 2018 awaiting STATS 1 column STRUCTURAL PROGRAMME Carpenters Lane Hadlow waiting STATS 2018 6 columns TON – Cage STRUCTURAL PROGRAMME Various roads awaiting Green & Castle 2018 STATS 3 columns TON – Trench & STRUCTURAL PROGRAMME Various roads awaiting Higham 2018 STATS Appendix D – Transportation and Safety Schemes Appendix D1 – Casualty Reduction Measures Identified to address a known history of personal injury crashes. Lead Location Parish Description of Works Current Status officer A 229 Lord Additional lane lines on Lees Aylesford Ian Grigor Works ordered. circulatory lane. roundabout A 228 Ashton Replacement of direction Paul Way junction Leybourne Works ordered. signs at junction. Brand with A 20 Appendix D2 – Integrated Transport Schemes All other LTP funded non-casualty reduction schemes Lead Location Parish Description of Works Current Status officer Phase 1: A 25 Footway widening between Borough Michael Maidstone Griggs Way and Minters Substantially complete. Green Hardy Road Orchard and resurfacing part of carriageway. Phase 2: 1. Convert existing Zebra crossing on the A 227 (outside Sainsbury) to a Puffin crossing plus surfacing work; 2. Convert existing Zebra crossing on the A 25 (outside of the Recreation A 25 Works substantially Borough Ground) between Hill View Thomas Maidstone complete. Defect works Green and Griggs Lane to a Puffin Williams Road to be completed crossing plus surfacing work; and 3. Extend the 30mph speed limit westward from outside of No 92 on the A 25 by approximately 100 metres and provide a Gateway Sign on Glasdon white fence post style. Appendix D3 – Local Growth Fund Lead Location Parish Description of Works Current Status officer Consultation in progress. Route split into 2 phases. Phase 1 Installation of a cycle route – St John’s Rd junction A26 from the Tonbridge either as a whole route or with Culverden Park to borough and parts of a route on the A26 Damien Queens Road junction. boundary to its Tunbridge from Grosvenor Road, Cock junction with Wells Tunbridge Wells to Brook Phase 2 – London Brook Street Street, Tonbridge. Road junction with Mabledon to Brook Street, Tonbridge Tonbridge Works completed. Angels to Further work to install Tonbridge Partly on-carriageway, railings on Hilden Brook Station Cycle Andy Tonbridge partly off-carriageway cycle bridge near cricket club Route Phase 1 Padgham route provision. under design, (Darenth installation anticipated Avenue to Autumn 2018. London Road) Scheme requires land Tonbridge agreement with Angels to Tonbridge School. KCC Tonbridge Partly on-carriageway, Public Rights of Way Station Cycle Jamie Tonbridge partly off-carriageway cycle team continuing in Route Phase 2 Watson route provision. negotiations with school (London Road to agree suitable route. to Tonbridge No progress this Station) quarter Appendix D4 – Third Party Funded Schemes Lead Location Parish Description of Works Current Status officer Works substantially Provision of a new link to A 21 Vauxhall completed. Ongoing the A 21 NMU and Lane to Tonbridge issues with Toucan upgrading of the existing Ian Grigor Tudeley Lane, crossing installation shared pedestrian/cycle Tonbridge due to power supply route. problems. Appendix E – Developer Funded Works Appendix E1 - (Section 278 Works) Developer Funded Works (Section 278 Works) Description of Current File
Recommended publications
  • Subject: Highway Works Programme 2011/12
    To: Tonbridge and Malling Joint Transportation Board By: KCC Highways, Transportation & Waste Date: Subject: Highway Forward Works Programme – 2019/20 onwards Classification: Information Only Summary: This report updates Members on the identified schemes approved for construction 1. Introduction This report provides an update and summarises schemes that have been programmed for delivery in 2019/20. Kent County Council has agreed a substantial increase in the budget for planned highway works over the next three years, and as a result we are still in the process of identifying and designing schemes for inclusion in our full Year One to Two (2019/20 and 2020/21) and Year Three to Five (2021/22 to 2023/24) programmes. Because of this, we have decided to publish an interim programme, and to publish the full programmes later this year. For some assets this interim programme covers approximately the first six months of 2019/20, whilst for others it includes most of the works planned for the whole year. This programme is subject to regular review and may change for a number of reasons including budget allocation, contract rate changes, and to reflect KCC’s changing priorities. The programme and extent of individual sites within the programme may also be revised following engineering assessment during the design phase. Road, Footway & Cycleway Renewal and Preservation Schemes – see Appendix A Drainage Repairs & Improvements – see Appendix B Street Lighting – see Appendix C Transportation and Safety Schemes – see Appendix D Casualty Reduction Measures Externally funded schemes Local Growth Fund Developer Funded Works – see Appendix E Bridge Works – see Appendix F Traffic Systems – see Appendix G Combined Member Fund – see Appendix H Conclusion 1.
    [Show full text]
  • Annex 1 Medway Valley A228/A20 Corridors Outline Public Transport
    Annex 1 Medway Valley A228/A20 Corridors Outline Public Transport Strategy. 1.0 Scope of the Strategy. 1.1 This note is prepared to inform the parallel M20 Junction 3-5 Study undertaken by the Highways Agency. The area of interest includes the A228 corridor from Holborough to Kings Hill and the A20 Corridor from West Malling to Maidstone. It includes key development sites at Kings Hill, Leybourne Grange, Holborough Quarry and Peters Village and Aylesford. 1.2 In developing any improvement schemes for the M20 it is important that an integrated approach is adopted and that there is a complementary package of public transport improvements and improved facilities for pedestrians and cyclists on the County road network. This also needs to be matched by a sustainable pattern of new development and measures to reduce the number of car trips in the peak hours. 2.0 Existing Situation Existing Public Transport Services 2.1 West Malling Railway Station 2.1.1 The area benefits from rail services operating from West Malling railway station which lies close to the existing A228 bypass. From here there is a regular half-hourly service to London Victoria via Bromley and a less frequent service to Charing Cross and an hourly off peak service to Cannon Street. To the east the rail services provide direct connections to Maidstone and Ashford, where rail services to Europe are available. 2.1.2 As well as taxi services, there is a shuttle bus service linking West Malling railway station with West Malling and Kings Hill. Most rail passengers though arrive by car and many park at the station car parks and at other locations in the area.
    [Show full text]
  • Smart Sponge Aids Environmental Protection
    jan17civilsspotlight2 4/12/70 5:58 am Page 6 06 JANUARY 2017 CIVILS SPOTLIGHT www.wateractive.co.uk Smart Sponge aids Design - the future environmental protection of civil engineering Snodland Railway Station now machine will also be installed. Sustainable Transport Fund gullies or as a retrofit unit. A new partnership with the dom to spark new ideas. on the Southeastern rail net- (LSTF) and the Railway There are two types of University of Derby is rein- Whether they discover the work in Kent, UK operated a ACCESSIBILITY Heritage Trust (£32,000). SGA available, the SGAP2 - forcing the commitment of next breakthrough in iron- full service from June 1856 Outside the station Other partners include Smart Gully Adapter for use Wrekin Products, manufac- work design, or they cleverly and continued until it stopped Southeastern is creating bet- Tonbridge and Malling with Plastic Gullies and the turer of intelligent products engineer marginal gains that selling train tickets in 1986. ter access for buses, cyclists Borough Council, Kent SGAC2 - Smart Gully Adapter for civil engineering, to further improve whole-of-life The station building has since and pedestrians and extending Community Rail Partnership for use with Concrete Gullies. explore the future of man- performance for customers, been used as an Indian take- the car park to 44 spaces from and Network Rail, with which Alternatively customers can hole covers, gully grates and we’re very exciting to see away outlet and taxi office 7 and from 1 accessible space Southeastern is working to quote a gully size and prefer- geosynthetics. the results.” with its nearby signal box now to 2 accessible parking spaces.
    [Show full text]
  • Snodland Kent
    Land at Cemetery Road Snodland Kent Design & Access Statement Full Planning Application March 2020 Contacts Berkeley Homes (Eastern Counties) Ltd Berkeley House 7 Oakhill Road Sevenoaks Kent TN13 1NQ berkeleygroup.co.uk Architects: OSP Architecture Broadmede House Farnham Business Park Weydon Lane Farnham Surrey GU9 8QT tel: 01252 267878 osparchitecture.com 20056 March 2020 Ordnance Survey data © Crown Copyright. All rights reserved. Licence number 100007327 Contents 1.0 Background 1.1 Planning Application ........................................................ 6 1.2 Location ........................................................................... 6 1.3 Structure of this Statement .............................................. 7 2.0 Site Description and Context 2.1 Site Description ............................................................. 10 2.2 Site Context ................................................................... 10 2.3 Local Facilities ............................................................... 12 2.4 Local Vernacular ............................................................ 13 3.0 Design Framework 3.1 Introduction .................................................................... 16 3.2 Emerging Local Plan ..................................................... 16 3.3 Design Policy and Guidance ......................................... 16 3.4 National Design Guide ................................................... 17 3.5 Other Design Guidance ................................................. 17 3.6 Opportunities
    [Show full text]
  • (Public Pack)Supplementary Reports of Director of Planning, Housing And
    SUPPLEMENTARY REPORTS AREA 3 PLANNING COMMITTEE DATED 26 November 2015 Snodland TM/15/03043/FL Snodland East And Ham Hill Alterations and improvements to station forecourt at Snodland Railway Station High Street Snodland for Network Rail Infrastructure Limited Additional information: The applicant has submitted an additional letter which seeks to clarify and address some of the issues raised by local residents, the contents of which are reproduced as follows: “With regard to the neighbours parking, the proposed scheme has been designed to avoid taking any of the existing residents parking. It is noted that Tonbridge and Malling Borough Council have proposals to install double yellow lines in locations which are considered unsuitable for parking (adjacent to road junctions and the level crossing) however this does not form part of our application and may go ahead regardless of the station improvement plans. To cover the cost of running and managing the car park, Southeastern (as station manager) would look to charge for car parking at the station. As there is currently very limited car parking at the station, it is considered that some passengers are currently parking on the highway surrounding the station. Southeastern have also received complaints from passengers that there is not enough car parking at this station. By providing additional car parking spaces in a car park covered by CCTV and lighting (to the Car Park Mark specification), Southeastern hope that the improved facility will encourage station users to park at the station and not on the highway. It should also be noted that the Kent County Council (KCC) Highways team have suggested that a residents parking zone in the area may be a good solution, however they have also explained within their consultation response that any concerns regarding this are not material to this application.
    [Show full text]
  • Snodland Station
    Snodland Station On the instruction of London and South Eastern Railway Limited Catering Opportunity On the instruction of LSER Catering Opportunity SNODLAND STATION ME6 5AN The station is served by services operated by Southeastern run to Paddock Wood, Tonbridge and Maidstone West. Snodland Station is located in Kent between Rochester and Maidstone. Location Rent An opportunity exists to let a unit adjacent to the We are inviting offers for this temporary opportunity. booking hall of Snodland railway station opening to Business plans detailing previous experience with the front of the station and the platform. visuals should be submitted with the financial offer. Description Business Rates Snodland Station was redeveloped with a new station opening in April 2016. The tenant shall be responsible for business rates. A search for the Rateable Value using the station Within the new station building is provision for a postcode and the Valuation Office Agency website has catering unit opening both into the ticket hall and onto not provided any detail. It is recommended that the Maidstone bound platform. interested parties make their own enquiries with the The premises has 63amp single phase power, water Local Authority to ascertain what business rates will and drainage and is 8m², 2.77m x 3.11m reducing be payable. from 2.77m to 2.47m at the fire place. Local Authority is Tonbridge and Malling Borough The station is listed and so Listed Building Consent will Council. be required. Information from the Office of the Rail Regulator Other Costs stipulates that in 2019/20 there were over 378,000 The tenant will be responsible for all utilities, business passenger entries and exits per annum.
    [Show full text]
  • Subject: Highway Works Programme 2011/12
    To: Tonbridge and Malling Joint Transportation Board By: KCC Highways and Transportation Date: 26th September 2016 Subject: Highway Works Programme 2016/17 Classification: Information Only Summary: This report updates Members on the identified schemes approved for construction in 2016/17 1. Introduction This report provides an update and summarises schemes that have been programmed for delivery in 2016/17 Footway and Carriageway Improvement Schemes – see Appendix A Drainage Repairs & Improvements – see Appendix B Street Lighting – see Appendix C Transportation and Safety Schemes – see Appendix D Casualty Reduction Measures – see Appendix D1 Integrated Transport Schemes – see Appendix D2 Local Growth Fund – see Appendix D3 Developer Funded Work – see Appendix E Section 278 Works – see Appendix E1 Section 106 Works – see Appendix E2 Bridge Works – see Appendix F Traffic Systems – see Appendix G Combined Member Fund – see Appendix H Conclusion 1. This report is for Members information. Contact Officers: The following contact officers can be contacted on 03000 418181 Alan Casson Resurfacing Manager Katie Moreton Drainage Manager Sue Kinsella Street Lighting Manager Toby Butler Intelligent Transport Systems Manager Katie Moreton (Interim) Structures Manager Jamie Hare Development Agreement Manager Louise Rowlands Development Planner Jamie Watson Transportation and Safety Schemes Manager Jamie Watson Combined Member Fund Manager Appendix A – Footway and Carriageway Improvement Schemes The delivery of these schemes is weather dependent; should
    [Show full text]
  • Transport Business Case Report West Kent LSTF – Tackling Congestion
    Transport Business Case Report West Kent LSTF – Tackling Congestion CO04300262/029 Revision 02 March 2015 Document Control Sheet Project Name: West Kent LSTF – Tackling Congestion Project Number: CO04300262 Report Title: Transport Business Case Report Report Number: 029 Issue Prepared Reviewed Approved Status/Amendment 00 Name: Name: Name: Paul Beecham Tim Lynn Steve Whittaker Signature: Signature: Signature: Date: 02/02/15 Date: 02/02/15 Date: 02/02/15 01 Name: Name: Name: Paul Beecham Tim Lynn Steve Whittaker Signature: Signature: Signature: Date: 20/02/15 Date: 20/02/15 Date: 20/02/15 Name: Name: Name: Signature: Signature: Signature: Date: Date: Date: Name: Name: Name: Signature: Signature: Signature: Date: Date: Date: Contents 1.1 SELEP Schemes – Business Case Preparation ....................................................... 3 1.2 Purpose of Report ............................................................................................. 3 1.3 Specific Scheme ................................................................................................ 3 2 Scheme Summary .............................................................................................. 5 2.1 Introduction to Project ....................................................................................... 5 2.2 Category of Transport Business Case .................................................................. 6 2.3 Overall Summary of Gap Analysis Exercise ........................................................... 6 2.4 The Transport Business Case
    [Show full text]
  • (Public Pack)Agenda Document for Area 3 Planning Committee, 26/11/2015 19:30
    Public Document Pack TONBRIDGE & MALLING BOROUGH COUNCIL EXECUTIVE SERVICES Gibson Building Chief Executive Gibson Drive Julie Beilby BSc (Hons) MBA Kings Hill, West Malling Kent ME19 4LZ West Malling (01732) 844522 NB - This agenda contains proposals, Contact: Committee Services recommendations and options. These do [email protected] not represent Council policy or decisions 18 November 2015 until they have received proper consideration through the full decision making process. To: MEMBERS OF THE AREA 3 PLANNING COMMITTEE (Copies to all Members of the Council) Dear Sir/Madam Your attendance is requested at a meeting of the Area 3 Planning Committee to be held in the Civic Suite, Gibson Building, Kings Hill, West Malling on Thursday, 26th November, 2015 commencing at 7.30 pm. Deposited plans will be available for Members' inspection for half an hour before the start of the meeting. Yours faithfully JULIE BEILBY Chief Executive A G E N D A PART 1 - PUBLIC 1. Apologies for Absence 2. Declarations of Interest 3. Minutes 5 - 8 To confirm as a correct record the Minutes of the meeting of Area 3 Planning Committee held on 8 October 2015 Decisions to be taken by the Committee 4. Development Control 9 - 12 Introduction and Glossary 5. TM/15/03043/FL - Snodland Railway Station High Street 13 - 22 Snodland 6. Alleged Unauthorised Development 14/00346/USEM - Corio 23 - 28 Farm Wateringbury Road East Malling 7. Urgent Items Any other items which the Chairman decides are urgent due to special circumstances and of which notice has been given to the Chief Executive.
    [Show full text]
  • Snodland and ‘Cementopolis’ 1841‐1881
    SNODLAND AND ‘CEMENTOPOLIS’ 1841‐1881 ANDREW ASHBEE © Andrew Ashbee 2017 Published 2017 by Andrew Ashbee, 214, Malling Road, Snodland, Kent ME6 5EQ e-mail: [email protected] ii CONTENTS Introduction iv I The Village Grows 1 II Agriculture, Cement, Paper 28 III Road, Rail, River 68 IV Church and School 105 V Community 138 Appendices: 1 Statistics: Registers: Snodland 155 Registers: Halling 156 Registers: Burham 157 Registers: Wouldham 158 Registers: Cuxton 159 2 Census occupations (introduction) 160 Snodland 161 Halling 165 Burham 167 Wouldham 169 Cuxton 171 3 Comparative population growth for Birling, Cuxton, Aylesford and East Malling 172 4 Snodland cement workers 1841‐1881 173 5 Snodland papermakers 1841‐1881 182 Further Reading 195 iii iv SNODLAND AND ‘CEMENTOPOLIS’ 1841-1881 INTRODUCTION ‘Cementopolis’ is a word coined by Victorian newspaper writers to describe the group of industrial workings which had grown up on the banks of the Medway, especially in the four parishes of Burham, Halling, Snodland and Wouldham. Some of the largest lime and cement factories in the country were developed here in what had hitherto been a predominantly rural area and their activities caused some amazement for visitors expecting the delights of the ‘Garden of England’. Encouraged and accompanied by travellers as enterprising as myself, I have recently employed a summer holiday in visiting a town known as Cementopolis, of which I had for years only heard dim, vague, and doubtful accounts. It is not unpleasantly situated in an amphitheatre of hills with a river branch for its base, filled with a flotilla of shipping. Its inhabitants are numerous and industrious, though what it is they are doing it is not easy for a stranger to discover.
    [Show full text]
  • In Weeks Before Death the End of This Summer
    Four editions delivered to over 88,000 homes every month downsmail.co.uk MallingMalling EditionEdition Maidstone & Malling’s No. 1 newspaper FREE Maidstone Town | Maidstone East | Maidstone South | Malling March 2016 No. 227 News Cancer victim ‘ignored’ River connection A NEW bridge over the River Medway is due to open at in weeks before death the end of this summer. 4 Young carers praise A WIDOW claims her late husband was misdiagnosed and disrespected TRIBUTES were paid to young by healthcare staff in the weeks before his death. carers to celebrate the annual awareness day. 10 Joan Godding has lodged a formal “We will be forever haunted by to the hospital four days later, only complaint against the hospital trust leaving him ill, in pain, unwell and to be told he had not allowed suffi- after she battled to get her husband alone. However, we knew we had to cient time for it to heal. Homes on print land Brian into Tunbridge Wells Hospital do this; it was the only way.” Ten days later, when Mr God- NEW housing could be built on after Maidstone diagnosed his can- The family wants a written apol- ding’s speech became slurred, his the former Aylesford cer as soft tissue damage and arthri- ogy for the treatment Mr Godding wife feared he had suffered a stroke. Newsprint site. 12 tis. Crippled with pain and too ill to received in Maidstone and Tun- Paramedics said they could not take travel in a car, Mr Godding (77) bridge Wells hospitals and a thor- him to Tunbridge Wells Hospital in spent hours waiting for ambulances ough investigation into the case.
    [Show full text]
  • Monday 26 March 2018, 5.00-7.00Pm Hilton Hotel, Bearsted Road, Maidstone, ME14 5AA AGENDA Approx Time Page 1. Welcome, Introduc
    A partnership between the business community and local government & a federated arm of the South East Local Enterprise Partnership Monday 26 March 2018, 5.00-7.00pm Hilton Hotel, Bearsted Road, Maidstone, ME14 5AA AGENDA Approx Page time 1. Welcome, introductions and apologies for absence 5.00 - 2. Declaration of Interests 5.02 - 3. Minutes of previous meeting, matters arising & action tracker 5.05 2 & 17 4. The East Kent Growth Framework 5.10 19 5. South East LEP’s Strategic Economic Plan Refresh: Next steps 5.45 21 and local engagement 6. The South East Creative Economy Network’s Creative 6.00 24 Workspace Masterplan 7. Local Growth Fund 1, 2 & 3: Delivery Progress Report 6.20 46 8. Governance & Transparency of LEPs 6.40 78 9. AOB 6.55 - For information items: A. KMEP and SELEP future meeting dates 116 1 A partnership between the business community and local government & a federated arm of the South East Local Enterprise Partnership ITEM 3A Date: 26 March 2018 Subject: DRAFT MINUTES of a meeting of the Kent & Medway Economic Partnership (KMEP) held at the Village Hotel, Maidstone on 29 January 2018. Attendees: KMEP Board Members Geoff Miles (Chair | The Maidstone Studios) David Jukes (Tunbridge Wells Borough Council) Paul Carter (Kent County Council) Jeremy Kite (Dartford Borough Council) Rodney Chambers (Medway Council) David Monk (Shepway District Council) Miranda Chapman (Pillory Barn Design Ltd) Jon Regan (Hugh Lowe Farms Ltd & Weald Granary Simon Cook (Canterbury City Council) Ltd) Mike Cosgrove (Swale Borough Council alternate) Paul Thomas (Dev. Land Services Ltd) Sarah Dance (Sarah Dance Associates) David Turner (Gravesham Borough Council) Chris Hare (Mid Kent College alternate) Prof.
    [Show full text]