Highway Works Programme PDF 124 KB
Total Page:16
File Type:pdf, Size:1020Kb
To: Tonbridge and Malling Joint Transportation Board By: KCC Highways and Transportation Date: 11th June 2018 Subject: Highway Works Programme 2018/19 Classification: Information Only Summary: This report updates Members on the identified schemes approved for construction in 2018/19 1. Introduction This report provides an update and summarises schemes that have been programmed for delivery in 2018/19 Footway and Carriageway Improvement Schemes – see Appendix A Drainage Repairs & Improvements – see Appendix B Street Lighting – see Appendix C Transportation and Safety Schemes – see Appendix D Casualty Reduction Measures – see Appendix D1 Integrated Transport Schemes – see Appendix D2 Local Growth Fund – see Appendix D3 Third Party Funded Schemes – see Appendix D4 Developer Funded Work – see Appendix E Section 278 Works – see Appendix E1 Section 106 Works – see Appendix E2 Bridge Works – see Appendix F Traffic Systems – see Appendix G Combined Member Fund – see Appendix H Conclusion 1. This report is for Members information. Contact Officers: The following contact officers can be contacted on 03000 418181 Kirstie Williams Mid Kent Highway Manager Mark Simmons Tonbridge & Malling District Manager Alan Casson Senior Asset Manager Sue Kinsella Street Light Asset Manager Toby Butler Traffic & Network Solutions Asset Manager Katie Moreton Drainage & Structures Asset Manager Jamie Hare Development Agreement Manager Jamie Watson Senior Schemes Programme Manager Appendix A – Footway and Carriageway Improvement Schemes The delivery of these schemes is weather dependent; should it prove not possible to carry out these works on the planned dates, new dates will be arranged, and the residents will be informed by a letter drop to their homes. Surface Treatments - Contact Officer Clive Lambourne Micro Surfacing Road Name Parish Extent of Works Current Status Fen Pond Road Ightham From boundary House to Kemsing Road Programmed for 20th June 2018 Birling Road Snodland Dryland Road to Pout Road Programmed for 28th June 2018 Taylors Lane Trottiscliffe From Trottiscliffe Road to A227 Wrotham Road Junction Programmed for 25th (Vigo Hill) June 2018 Mill Lane Hildenborough Vine Lane to Underriver house Road Programmed for 18th June 2018 Exedown Road Wrotham From junction Old Terrys Lodge for 670 SE of junction Programmed for 25th (X559180 Y159693) June 2018 Danns Lane Wateringbury From A26 to end of Highway Boundary Programmed for 28th June 2018 Riding Lane Hildenborough From B245 Tonbridge Road to Long Leys Completed Cornwallis Avenue Tonbridge From Higham Lane to Hadlow Stair Road Programmed for 29th May 2018 Martin Hardie Way Tonbridge Whole road Completed Postponed pending Aldon Lane Addingon Whole Road further investigation Easterfields Lane East Malling From junction with Rocks Completed Road to Railway Bridge Surface Dressing Bull Lane Aylesford Greenfield Close to Hawkes Road To be programmed for Summer 2018 High Street Wouldham From Ferry Lane to Knowle Road To be programmed for Summer 2018 Knowle Road Wouldham From Cornwall Crescent to Pilgrim’s Way To be programmed for Summer 2018 Machine Resurfacing – Contact Officer Mr Byron Lovell Road Name Parish Extent of Works Current Status A2045 Walderslade Fostington Way to M2 Walderslade Completed Woods Junction 3 Interchange B245 London Road to A227 Old London Road Tonbridge Completed Shipbourne Road Retexturing 100m approach to single A26 Quarry Hill Road Tonbridge Completed lane flyover A21 heading northbound into Tonbridge Retexturing 100 metres on either Programmed 4th June A227 Stumble Hill Shipbourne approach to cross roads with 2018 Back Lane and Hildenborough Road Junction with Mills Road/Hall To be programmed A20 London Road Aylesford Road September 2018 Pembury Road to Lodge Oak To be programmed Tudeley Lane Tonbridge Lane September 2018 Footway Improvement - Contact Officer Mr Neil Tree Road Name Parish Extent and Description of Current Status Works Entire length Dene Lodge Close Borough Green Completed (Footway Protection) Appendix B – Drainage Drainage Works – Contact Officer Kathryn Lewis Road Name Parish Description of Works Current Status No works planned Appendix C – Street Lighting Structural testing of KCC owned street lights has identified the following as requiring. A status of complete identifies that the column replacement has been carried out. Programme dates are identified for those still requiring replacement. Street Lighting Column Replacement – Contact Officer Sue Kinsella Road Name Parish Description of Works Status UKPN have STRUCTURAL REPLACEMENT Sheraton Court repaired cable Walderslade JSEN001 fault. KCC can now proceed Out of hours STRUCTURAL REPLACEMENT New Road JNAJ001 Ditton work required - j/w A20 Out of hours STRUCTURAL REPLACEMENT Station Road JSDI005 Ditton work required - j/w A20 Maidstone Road Re-raised due BBH village JMDJ 7 columns STRUCTURAL REPLACEMENT to system error UKPN cable Waveney Road Replacement of 1no streetlight Tonbridge inadequate, no JWAR014 complete with LED lantern mains cable. To assess if Replacement of 1no sign post Nepicar Roundabout this needs to Nepicar/Wrotham complete with LED Downflood be lit in this JUAQ518 following RTC area UKPN have made repairs Higham Lane Replacement of 2no streetlights Tonbridge to cable. KCC complete with LED lantern JHBZ010/011 can now proceed. 20 columns STRUCTURAL PROGRAMME Various roads KINGS HILL awaiting 2018 STATS 8 signs & WEST MALLING STRUCTURAL PROGRAMME columns Various roads & LEYBOURNE 2018 awaiting STATS 10 signs & STRUCTURAL PROGRAMME columns Various roads LARKFIELD 2018 awaiting STATS SNODLAND & STRUCTURAL PROGRAMME 7 columns Various roads WOULDHAM 2018 awaiting STATS 6 signs & DITTON & EAST STRUCTURAL PROGRAMME columns Various roads MALLING 2018 awaiting STATS 17 signs & BBH & STRUCTURAL PROGRAMME columns Various roads WALDERSLADE 2018 awaiting STATS AYLESFORD, STRUCTURAL PROGRAMME 5 columns Various roads B/GREEN, 2018 awaiting IGHTHAM STATS 1 column STRUCTURAL PROGRAMME Three Elm Lane Golden Green awaiting 2018 STATS 12 signs & STRUCTURAL PROGRAMME column Various roads TON - Vauxhall 2018 awaiting STATS 13 signs & TON – Judd & STRUCTURAL PROGRAMME columns Various roads Medway 2018 awaiting STATS 1 column STRUCTURAL PROGRAMME Carpenters Lane Hadlow waiting STATS 2018 6 columns TON – Cage STRUCTURAL PROGRAMME Various roads awaiting Green & Castle 2018 STATS 3 columns TON – Trench & STRUCTURAL PROGRAMME Various roads awaiting Higham 2018 STATS Appendix D – Transportation and Safety Schemes Appendix D1 – Casualty Reduction Measures Identified to address a known history of personal injury crashes. Lead Location Parish Description of Works Current Status officer A 229 Lord Additional lane lines on Lees Aylesford Ian Grigor Works ordered. circulatory lane. roundabout A 228 Ashton Replacement of direction Paul Way junction Leybourne Works ordered. signs at junction. Brand with A 20 Appendix D2 – Integrated Transport Schemes All other LTP funded non-casualty reduction schemes Lead Location Parish Description of Works Current Status officer Phase 1: A 25 Footway widening between Borough Michael Maidstone Griggs Way and Minters Substantially complete. Green Hardy Road Orchard and resurfacing part of carriageway. Phase 2: 1. Convert existing Zebra crossing on the A 227 (outside Sainsbury) to a Puffin crossing plus surfacing work; 2. Convert existing Zebra crossing on the A 25 (outside of the Recreation A 25 Works substantially Borough Ground) between Hill View Thomas Maidstone complete. Defect works Green and Griggs Lane to a Puffin Williams Road to be completed crossing plus surfacing work; and 3. Extend the 30mph speed limit westward from outside of No 92 on the A 25 by approximately 100 metres and provide a Gateway Sign on Glasdon white fence post style. Appendix D3 – Local Growth Fund Lead Location Parish Description of Works Current Status officer Consultation in progress. Route split into 2 phases. Phase 1 Installation of a cycle route – St John’s Rd junction A26 from the Tonbridge either as a whole route or with Culverden Park to borough and parts of a route on the A26 Damien Queens Road junction. boundary to its Tunbridge from Grosvenor Road, Cock junction with Wells Tunbridge Wells to Brook Phase 2 – London Brook Street Street, Tonbridge. Road junction with Mabledon to Brook Street, Tonbridge Tonbridge Works completed. Angels to Further work to install Tonbridge Partly on-carriageway, railings on Hilden Brook Station Cycle Andy Tonbridge partly off-carriageway cycle bridge near cricket club Route Phase 1 Padgham route provision. under design, (Darenth installation anticipated Avenue to Autumn 2018. London Road) Scheme requires land Tonbridge agreement with Angels to Tonbridge School. KCC Tonbridge Partly on-carriageway, Public Rights of Way Station Cycle Jamie Tonbridge partly off-carriageway cycle team continuing in Route Phase 2 Watson route provision. negotiations with school (London Road to agree suitable route. to Tonbridge No progress this Station) quarter Appendix D4 – Third Party Funded Schemes Lead Location Parish Description of Works Current Status officer Works substantially Provision of a new link to A 21 Vauxhall completed. Ongoing the A 21 NMU and Lane to Tonbridge issues with Toucan upgrading of the existing Ian Grigor Tudeley Lane, crossing installation shared pedestrian/cycle Tonbridge due to power supply route. problems. Appendix E – Developer Funded Works Appendix E1 - (Section 278 Works) Developer Funded Works (Section 278 Works) Description of Current File