_.t tot'lcnoPtco crucoE rn"

(r)ds@ Jl"rn dlsc

6(tB(r)c(/)ol eEilQtloej oocruthJclolo16(6

0orCBlo oQordl fg1.otg6. @corl@c0 1g1.d.ngqrcooc6 (ooJc@aoco@o oClcq;recoo orari| oQgtl)

("o) d,GlCnC(f)olSSl ("o) oqorsl Groco6rxcnDoccol cnlcco;csa,oem.uercoflri$ 2016 (eru) card6!ffro. AcrnlfrOccfoc,go & eni1."61..&enjl.mjl. crjlercucooroilnfl (mil) ogcndcoldmlmcm Goco{6)qos ojicroBcotroo elelocd-icoct

(6nl) p|9 ocelaogojl(i GrodlcDcloco raroga,g.genilouamc(at GocrooJdl-d 9e,qosqo oolB qgoroilaqosq. oilsoGco(roo elGloc6coct (mjl) coafl crg.ld4 rgt2ooila,qos oJccoc@oil oilcooocmcm Gc&ig"ooc0 elGJoofi]GOC?

J-)' ccodlcnrd Uocruaocd @Y0(I06DlOrJ)o

WORKS UNDER ROADS DIVISION

NAM E OF DIVISION : , CONSTITUENCY KARUNAGAPAI -LY AS Amount tn 5 Costituency Name of work Physical progress NO Lakhs

PLAN WORKS Budget works 201G17. lmprovements by I Karunagapally Providing 50mm BM & 30mm BC to Old NH 231.00 Work Completed road from ch.0/000 to L/250.

Budget works 2016-17. lmprovements & Providing 2 Karunagapally 50mm BM & 30mm BC work to Alumkadavu' 3 23.5 BM&BC work completed Padmanabhan Jetty Road ch.0/000 to 4/300kn.

lmprovements by Budget works 2016'17. BM completed and BC 399 3 Karunagapally Providing BM & 30mm BC to Chittumoola work in progress Malumel road ch.0/000 to 6/000. Budget works 2017-18. Improvements to + Karunagapally Mararithottam-Kottaveettilmukku Road. (1.326 50 BM&BC work complered KM) Budget work 2ol7 -78. lmprovements to 2 Karunagapally 50 Levels approved. - Budget work 2017-18.Budget works 2017'18 lmprovements by providing DGBM & BC to Karunagapally 300 Work in progress. 3 Edayanambalam Thottathilmukku - Road Ch. 0/000 to 5/200 . Budget work 2017-18. Improvements to 4 KarunaSapally 400 Work in progress. Vawakavu- Road Ch.0/000 to 5/650. 1753,50 Flood Damages Works 18-19 lmprovements and providing taninS with BM&BC 1 Karunagapally and allied work to NH SRV Market Alummoodu 200 lnitial levels taken - Karoorkadavu 0/000 to 2/500 200 KffFB Works 2OL6-I7 KIIFB 2016-17 lmprovements to Vettamukku- , Ihevalakkara-Mynagapally-Sasthamcotta- Cross-Drainage works xl I Karunagapally,Kunnat Manapally-Oachira- Road in Kollam proSress. hoor & Mavlelikkara Disrrict. 6253.O0 NON PLAN WO RKS Pre- Monsoon 2016-17 Urgent repairs and drain I Karunagapally :learance , berm cutting of Pandakasala Kadaw 4.00 Work Completed roao. Pre- Monsoon 2016-17 Urgent repairs to damaged 2 Karunagapally Crain and providing covering slab to Pulliman 3.00 Work Completed Junction - Kottakuzhy road. Pre- Monsoon 2016-17 Urgent repairs, clearing l Karunagapally side berm cuning damaged branches of trees in TB 2.00 Work Completed Junction-Vadakkadathu Junction road.

I Pre- Monsoon 2016-17 Clearin8 side drain, 4 Karunagapally construction of slabs and minor Pot hole rePair in 2.00 work Completed Karunagapally NH to Block Head Quarters road. Pre-monsoon l6-17. Clearing the side drain and Providing urgent patch repairs to side walls & 5 Karunagapally 3.00 Work Completed :overing slab to side drain in front of Oachira Prabrahma Temple ch.0/500 to 7/200. Pre- Monsoon 2016-17 Providing urgent patch repairs to side drain , Cutting raised berm and side 6 Karunagapally Crain clearing, minor pot hole repair, cutting 2.O Work Completed branches of trees in Edayanambalam- I Ihottathilmukku road. Pre- Monsoon 2016-17 Cutting raised berm and ;ide drain clearing. minor pot hole repair, curring 7 Karunagapally branches of trees in - 2.O Work Completed & Changankulangara-Vallikkavu road. Pre- Monsoon 2016-17. Cutting raised berm and ;ide drain clearing, minor pot hole repair, cutting 8 Karunagapally branches of trees in Puthiyakavu-Chakkuvally road 2.O work Completed , Kottapuzhakkal-Thazhava road and Puthiyakavu- Kattilkadavu road.

Pre-monsoon 16-17. Clearing the side drain, filling potholes using department shelmac and Providing ) Karunagapally 3.00 Work Completed pipe to prevent water stagnation at AVHS Junction ch.3,/500 on Puthiyakaur- Chak-kuvally road.

O/R.Minor Repain (S/R) 2016-17 . Providing 20 mm bit Chipping Carpet to Vawakkavu-Vallikkavu 10 Karunagapally 4.50 Work Completed road between ch 2,2000 to 4/000.(Oachira Section) C/R.Minor Repairs 2016-77 Providing 20 mm bit Chipping Carpet to Edayanambalam- 11 Karunagapally 4.00 Work Complered Ihoftathilmukku road ch 0/000 to 2/4oo. (Oachira section) S,/R.Minor Repairs (S,/R) 2016-17 . Providing 20 mm Chipping Carpet to Changankulangara- t2 Karunagapally 5.00 Work Complered Vallikkavu road between ch 2/500 to 4/OOO. (Oachira section) O/R.Major Repairs 2016-17 Providing bit cC to 13 Karunagapally Old NH oachira road ch 0/000 to 1/200. (Oachira 8.00 Work Completed Section) S,/R Major Repairs 2016-17 Providing interlocking cobbles, covering slabs and bit CC to Oachira- Karunagapally 8.00 work Completed I4 Ayiramthengu road ch 2/600 to 5,/100. (Oachira Section) o,/R.Minor Repair works 2016-17. Providing 20 15 Karunagapally mm bit CC to Kottapuzhakkal-Thazhava road ch s.00 Work Completed 9/2OO to 13/OO0. (Oachira Section) C/R.Minor Repair works 2016-17. Providing 20 16 Karunagapally mm bit CC to Alumkadaw-Alumpeedika road ch 4.00 Work Completed 3/000 to 4/000. (Oachira Section) O/R.Minor Repair work 2016-17. Providing 20 17 Karunagapally mm bit CC to Chittumoola-Malumel Road from s.00 Work Completed Ch. 0/000 to 2/500. (KarunagaPally Section) O,/R.Minor Repair works 2016'17. Providing 20 mm bit CC to Padanayarkulangara'Sasthamcotta Completed 1B Karunagapally s.00 work Road from Ch. 1/OOO ro 4/200. (KarunagaPally Section) )/R.Minor Repair works 2016-17. Providing 20 Work Completed 19 Karunagapally nm bit cC to Karunagapally-Alumkadavu Road 5.00 iom Ch. 0/000 to 2/000. (Karunagapally Section)

),/R.Minor Repair works 2016-17. Providing 20 Work Completed 20 Karunagapally nm bit CC to Vallikkavu- Alumkadavu- road ch 4.00 l/000 to 3/000. (Oachira Section) 3,/R. Minor Repairs (S,/R) 2016-17. Providing 20 mm Chipping Carpet to Oachira Railway Station Work Completed 21 Karunagapally 4.00 road between ch 0/000 to 2/000. (Oachira Section) S,/R Major Repair work (S/R) 2016-17. Raising water logSed portion by providing interlocking 7 .QO Work Completed 22 Karunagapally cobbles and side drain with covering slab to TB Junction-Vadakkedathumukku Road between Ch. 0,/0oO to 0/500. .(Karunagapally Section) O,/R.Minor Repair works 2016-lT Providing 20 mm bit CC to NH-Sree Rama Varma Market Road from ch. 0/000 to 1/000. Work Completed Karunagapally 4.50 23 O,/R Minor Repairs 20L6'17 . Providing 20 mm bit CC to Pulliman Jn-Kottakuzhy road (Thachayilmukku) Ch. 1/000 to 2/000. S,/R. Major Repairs (S/R) 2016-17 . Providing to side drain and interlocking cobbles - 9.00 Work Completed 24 Karunagapally Kunjanadikulam-Madathilkarazhma road between ch 0/000 ro 1/000. (Oachira Section) S,/R.Major Repair works (S/R) 2016-17. cross drain work Construction of Side Drain and 7.O0 Work Complered 25 Karunagapally Karunagapally-Alumkadavu Road Ch. 1/600. (Karunagapally Section) O,/R.Major RePairs 2076'17, Providing 20 mm bit Chipping CarPet to Puthiyakavu-Chakkuvally road ComPleted Karunagapally 7.OO lWork ch 0,2000 to 3/000 and sidedrain at A\IHS iunction. (Oachira Section) )re-Monsoon patch repairs 17-18. Urgent using I bitumen,/ ready mix. filling Pot holes lepanmental I clearing CC drain and Culvens, replacing cover ;labs. provision for berm cutting. eanhen drain . ruttting branches of trees etc in old NH Portions, A.lumkadavu-AlumPeedika road, Ayiramthen gu 2.OO lWork ComPleted 27 lKarunagapallY Edayanambalam-Thottathilmukku, Back water road , Oachira Ayiramthengu road, to 7/200 Oachira Prabrahma Temple ch.0/500 ' Vallikkavu'Alumkadavu road, Vawakkavu- Thazhava road, Vawakkavu-Vallikkavu road , Changankulangara-Vallikkavu road and Connected Roads.

Pre-Monsoon 17-18. Urgent Patch rePairs using departmental bitumen/ ready mix, filling pot holes cover , clearing CC drain and Culvens, replacing slabs, provision for berm cutting, earthen drain , ComPleted of trees etc Kunjanadikulam- 3.50 lWork 28 lKarunagaPallY cufttinS branches Madathilkarazhma road, -Anayadi road, Naluvila'Parumba road, Oachira Railway station road, Oachira OId NH road in 3 bits lozooO to 1/600, and connected Roads' I Pre-Monsoon 17-18. Urgent Patch repalrs uslng depanmental bitumen/ ready mix, filling pot holes , clearing CC drain and Culvens, replacing cover slabs, provision for berm cutting, earthen drain, Work Completed 9 Karunagapally cuttting branches of trees in etc Oachira 3.50 Thamarakulam road, Pallimukku-Manjadimukku road, Panentemukku- road, Puthentheruvu-Thurayilkadavu, Puthiyakarru- Kattilkadavu road and Connected Roads

Pre-Monsoon 17-18. Urgent Patch rePairs using Cepanmental bitumen/ ready mix, filling pot holes , clearing CC drain and Culvens, rePlacing cover slabs,provision for berm cutting, eanhen drain, cuttting branches of trees in 13/9 etc in Old N.H Portions in Karunagapally LAC,zKnp Sn,Champakadavu-Kallumoodu mukku road, Work Completed 30 Karunagapally Chittumoola-Malumel road, - 3.00 Malumel road , Kuttippuram-Marithottam road A.lumkadavu -Padmanabhanjetty road ,NH to SRV Market road ,S.V Market road ,Public Office -Kallummoottilkadavu road,Padanayarkulangara -Karoorkkadavu road,Karunagappally Block Head Quarters road ,TB muklu -Vadakkadathumukku road and Connected Roads.

WP 2077 -18 Providing 20mm CC to Old NH near to 10.00 Work Completed 31 Karunagapally Lalaji Jn to Kannetty Bridge Road.ch 0/000 0/92s. S/R 2017-18 Construction of drain and Reconstruction of existing damaged drain covering Nork Completed Karunagapally i 5.00 32 slab in Karunagappally-Alumkadavu Road Betn ch.0/000 to 1/500 WP 2077 -78. Providing 20mm bit CC to I0.00 Work Completed 33 Karunagapally Karunagappally-Alumkadavu Road from ch.0/000 to 1/500 l/P 2017 -78. Providing 20mm bit Cc to 10.00 Work Completed 34 Karunagapally Karunagappally-Alumkadavu Road from ch. 1/500 to 3/740 R/P 2Ol7'18. Providing 20mm bit CC to ch 15.00 Work Completed 35 Karunagapally Padanayarkulangara- Karoorkadanr Road 0/000 to 2/oo0 O,/R Construction of Drain and cover slab in Public office Kallummoottilkl€davu road from 10.00 Work Completed 36 Karunagapally Kaniyamthekkemukku to Makkazhathu Jn ch.0,2000 to l/ 500. 20mm bit cc to SV o/P.2077-78. Providing 7 .00 ork Completed Karunagapally Market road from ch.0/000 to 1/500 CC to SV C/R 2077-I8. Providing 20mm bit 7.OO ork Completed 38 Karunagapally Market road from ch.1/500 to 2/900 O/P.2Of7-18. Providing 20mm bit CC to ch 2,/000 to 10.00 ork Complered 39 KarunagapallY Kuttippuram-Malummel Road from 3/045 O/P.2Ol7-18. Providing 20mm bit CC to ch 2/000 11.00 ork Completed 40 Karunagapally Kuttippuram-Mararithottam Road from ro 4/20O

R /P 20f7-18. widening& Providing 20mm bit CC ork Completed - athilkkarazhm a Road 15.00 Ka runagapally ro Ku njanad ikk ulam Mad from ch.0/000 to I,/000 cc to Alumkadavu R/P 2017- 18..Providing 20mm 10.00 Work Completed 42 Karunagapally -Alumpeedika road 0/000 to 1/000

cc Alumkadavu VP 2017- l8..Providing 20mm to 10.00 Work Completed 43 Karunagapally -Alumpeedika road 1/000 to21000 to Vallikkavu- R/P 2017'18..Providing 20mm cc 10,00 Work Completed +4 Karunagapally Alumkadavu road 0/000 to1l000

cc to O/R 2016-17.Providing 20mm bit 10.00 Work Completed Karunagapally Vawakkavu'Thazhava road at ch 0/000 to 5/650

WIP Visit 2017-18. Visit of Hon'ble President of s.00 Work Completed 46 Karunagapally lndia' Providing 20mm bit CC to Public office Jn Kallumoottilkadavu road Ch.0/000 to 3/450. WIP Visit 2017'18. Visit of Hon'ble President of Work Completed Karunagapally -Providing 20mm bit CC to Oachira 8.50 Aviramthensu road Ch.4/000 to 5,/000. WIP Visit 2017-18. Visit of Hon'ble President of 10.00 Work Completed 48 Karunagapally India. Providing 20mm bit CC to Ayiramthengu Backwater road ch 0/750 to 2/900

WIP Visit 2017'18. Visit of Hon'ble President of 11.00 Work Completed 49 Karunagapally tndia- Providing 20mm bit CC to Edayanambalam- Ihottathilmukku Road. Ch. 0/000 to 2/48Q.

WIP Visit -2017'18.Visit of Hon'ble President of 7.OO Work Completed 50 Karunagapally lndia - Providing 2Omm bit CC to Vawakkavu- Vallikkavu road ch 0/000 to 4/080. WIP Visit 2017 18. Visit of Hon'ble President of India- Providing 20mm thick bit CC to 11.50 Work Completed Karunagapally 51 Changankulangara -Vallikkalru road 0/000 to 4/000 & Old NH Oachira Ch. 0/000 to O/7QO. WIP Visit -2077'18. Visit of Hon'ble President of lWork ComPlere.l Karunagapally India -Providing Barricade from Azheekkal hedge 7.00 ro Arnritapuri and Bit CC to . VVIP Visit -2017-18. Visit of Hon'ble President of NH Oachira & 10.00 Work Completed 53 Karunagapally lndia -Providing Barricade from Old Oachira Ayiramrhengu road to WP 2017 -78 Providing 20mm bit CC l5.oo lWork ComPleted 54 lKarunagapallY Vallikkavu- Alumkadavu road ch 1/500 to 2/500'

bit CC to 21.R./P 2017-18 Providing 20mm 15.00 lWork ComPleted 55 Karunagapally y'allikkavu- Alumkadavu road ch 2,/500 to 3/900'

22.WP 2017 -78 Providing 20mm bit CC to i0.00 Work Completed Karunagapally 56 Oachira -Thamarakulam road ch 0/000 to 3/287 '

23.PJP 2017 -18 Providing 20mm bit CC to road ch 0/000 10.00 Work Completed 57 Karunagapally Changankulangara-vallikunnam to2/ 500. U.Wp ZOtl':]8 Providing CC to Oachira railway 10.00 Work Completed 58 Karunagapally station road ch 0/000 ro 1/7LQ 25.WP 2077 -18 Providing 20mm bit CC to ch 0,2000 5.00 Work Completed 59 KarunagapallY Kottapuzhakkal -Thazhava road ro3l650. 26.WP 2077 -78. Providing 20mm bit cc to TB Road b/w ch0/000 10.00 Work Completed 60 Karunagapally mukku - Vadakkadthumukku t tol/000 27.WP 2077-18. Providing 20mm bit cc to TB Road b/w ch 1/100 10.00 Work ComPleted 51 Karunagapally mukku - Vadakkadthumukku to 2/200 WP ZO|T -LB Providing 20mm bit CC to Old NH- cz Karunagapally Pullimaan Jn ch 0/000 to 0/500 and other allied 15.00 Work Completed works in Kov Section. 10.S/R 2017-18 construction of drain and 63 Karunagapally :overing slab in Changankulangara - Vallikkavu 15.00 Work Complered road ch 0/200 to 1/500. 11.S/R 2017- 18 Maintenance ofPuthentheruvu o.t Karunagapally 10.00 Work Comphted Ihurayilkadavu Ferry at Ch.4/000. Pre-Monsoon S/R 2018-19. Urgent Maintenance 65 Karunagapally of various Bridges under Bridges section 2.00 Iender stage Karunagapally.

Pre-Monsoon 2018-19. Removal of silt from Drain using Tipper, Cuning and removal of unsafe trees, 66 Karunagapally fallen down trees and branches, filling of urgent 3.00 Work Completed potholes using shellmac/departmental bitumen etc in various roads in Oachira Section.

Pre-Monsoon 2018-19. Urgent patch repairs and pot hole filling, cleaning of drains and choked up culverts, cutting down of trees and branches etc in Public office Kallumoottilkadavu road, 57 Karunagapally 3.00 Work Completed Karunagapally Alumkadaru road, SV Market road, Padanayarkulangara-Karoorkadavu road, Pulliman In Kottakuzhy road, TB muk-ku Vadakkedathu road and other connected roads.

Pre-monsoon 18-19.Providing covering slabs and 58 Karunagapally rther urgent works for various roads under roads 3.00 Work Completed rection Oachira Pre-monsoon 18-19.Providing covering slabs and 69 Karunagapally )ther urgent works for various roads under roads 2.50 Work Completed ;ection Karunagapally,. C/R 2078-79 Providing 20mm bit chipping carpet 70 Karunagapally to Pulliman Jn- Kottakkuzhy road b/w ch 1/000 to 10.00 Work Complered 2/OOO.

O/R 2018-19 Providing 20mm bit chipping carpet 71 Karunagapally ro Karunagappally Alumkadavu- meet Lalaji 10.00 Work Completed Panikkarkadavu road b,/w ch 0/000 to 1/045.

O/R 2018-19 Providing 20mm bit chipping carpet 72 Karunagapally to Oachira- Ayiramthengu road b,/w ch 0,/000 ro 15.00 Work Completed 4/99s. O/R 2018-19 Providing 20mm bit chipping carpet 73 Karunagapally to Changankulangara- Vallikkavu road b,/w ch 17.50 Work Completed J/000 to 4/200 C/R 2018-19 Providing 20mm bit chipping carpet 74 Karunagapally to Vavvakavu- Vallikkaru road b/w ch 0/000 to 15.00 Work Completed 3/33O S,/R 2018- 19 Reconstruction of Retaining wall at 75 Karunagapally ch O / 7 OO of Changankulangara-Vallikl

FDR - 2018-19, Providing close graded CC to 78 Karunagapally 20.00 Work Completed Ayiramthengu Backwater road ch 0/000 to 2/901

FDR - 2018-19 - Providing close graded CC to 79 Karunagapally 10.00 pending Pulliman Jn Kottakuzhi Road ch 0,/000 to 1/000 Iarring

FDR - 2018-19 - Providing close graded CC to 30 Karunagapally 15.00 Iarring pending Padanayarkulangra-Karoorkadavu 2/OOO ro 4/3SO

FDR - 20f8,19-Providing close graded CC to 81 Karunagapally Reconstrucrion of culvert Pulliman in- Kottakuzhv 8.00 Work not started road b/w ch 0,2000 and 1/000 FDR -2018-19 Providing 20 mm close graded s2 Karunagapally :hipping carpet to Naluvila-Pavumba road ch 1s.000 Work Complered )/O0O ro z/OOQ. FDR 2018-19 Providing 20mm bit CC ro 33 Karunagapally Karunagappaly- Alumkadavu road ch 0,/0OO to 10.000 Work Complered r/500 S,/R 20f8-19 Providing providing side prorection 84 Karunagapally 10.00 Work work to Public office kallummootil kadam road Completed FDR 2018-19 Providing BC Overlay to public office 35 Karunagapally Jn to Kallummoottilkadalr: road ch 0/000 to 25.000 Work Completed v500 FDR -2018-19 Providing 20 mm close graded 86 Karunagapally chipping carpet to Kunjanadikulam- 20.000 Selection Notice Issued Madathilkarazhma road ch 2/000 to 3/360.

FDR -2018,19 Providing 20 mm close graded a7 Karunagapally chipping carpet to AVHS-Kannampallypadeenathil 15.000 Selection Notice Issued road ch 2/500 to 3/750.

FDR -2018-19 Providing 20 mm close graded 88 Karunagapally :hipping carpet to Manapally-Anayadi road ch 15.000 Selection Norice Issued 3/00Q to 4/400. TOTAL 776,OO 0BUo10, 5nll & 6nl|.mjl nlloocooqflg! oJl

qronf, eq,q"oseFe€Dd

erodlolc,olo 0€

cnle.roiloet 6t1ooilqos c"-tc,i' ruo1@1

Wtp uiti, 2017-18- Urgent traffic safety works' providing sign boards, delinealor po*t' hu'I{ clr0or- 12 916$o '..*.t, i.n"".,or tiles and painting median'-guard .grdoolloo14. from ,tones etc beNveen Km. 4621000 to 4721000 Krishnapuram to KarunagaPallY Wtp uitit 2017 - Urgent work banicading and clearing light jungles, cutting damage9.^blln:h"' of tr..*etc-bet*een Km. 4621000 to 4721000 from Krishnapuram to KarunagaPally footpath NH 66 - U.g.nt rectification of damaged and shoulJers at Ch.463/000 in front ol Parabrahrna TemPle Oachira' NH66(47) Cutting of trees standing in dangerous crL6at- condition' betwein ch.462l000 and 482/000 .grEoofla,o14. (KrishnaPuram to Chavara) NH66 (47) Road Safety measures and repairs ot crdeo" handrails of bridges under NH Sub Division' .gr8oofloo14.

NH66 (47) O.R providing shoulder at ligh school Junction and at KSRTC Junction' Karunagapally at Ch. 4711000 to 4731000 NH66 (47)construction of retaining wall between ch.463/100 and 463/500 at premier Junction' Oachira (L/S) measures at NH Urban links)

NH66 (47) raising of the damaged sholder and junctions providing interlock at .between 45,83,943/- km.+oS/0OO to 482/000) frotn vawallaw to

2017 Barricading NH 66 (47) Vrishchikotsavam cudar- the left side of CH. 463/000 in front ol r,23,490/- oarabrahma Temble, Oachira in connection rvith "g6oroiaol4. nantrandu Vilakku Maholsavam OR 2017 -18 NH66- Eviction of encroach between ch. 4691000 and 4'14/000 at

NH66 (47) Raising the water logged area and crrdor" Ch' 4621200 in 21 ,61 ,141 /- providing interlocked in NH .grdoofloo1"2. r Aj antha Junction, KrishnaPuram NH66 (47) Raising the water logged area and crrdan" providing 20 mrn Chipping carpet in old NH at .g6orofla,o14. Ch.4621000 ( Krishnapuram to Ajantha Junction) and road FDR 2018-19 NH 66 berm recrification 41.76 gj6&o "Oq4l1ooS safety work of Shankaramangalam Jn. OOl4l. premonsoon maintenance during NH66 (47) crriar" 2018- 19 clearing side drain and culvert and .grEroro1oo1";. cutting branches of trees at damaged condition between Krishnapuram to Puthiyakavu NH66 (47) premonsoon maintenance during 2018- 19 clearing side drain and culvert and 5 el6go cutting branches of trees at damaged condition between ch.470/000 to 4'741000 (Puthiyakaw - Karotturnukku) NH66 (47) premonsoon maintenance during 2018- l9 clearing side drain and culvert and cldal- 5 elago cutting branches of trees at damaged condition .grAoru;lao1";. between ch.470/000 to 4741000 ( Karottumukku to Chavara) .dq o(Tu ao6 acodlmd