Invitation for Bid for the rehabilitation of existing community rainwater harvesting facilities of , Kalaidhoo, , , , , Kunahandhoo, and at in Maldives.

The bid clarification meeting was organized on 5th October 2015 to clarify the technical or any other issues related to the ITB.

The bid clarification meeting had been initiated by power point presentation by UNOPS followed by a question and answer session.

Pre-bid clarification meeting: Venue: UNDP Conference room, Edhuruhiyaa, 9th floor, Male’ , Maldives

# Organization/Potential bidder Pre bid meeting (05th October 2015) Name of representative 1 UNI Company Pvt Ltd Ahmed Nazeef Ismail Nasih 2 Yuman Pvt Ltd Naseer 3 WCW Habyb 4 SASE Construction Saudulla 5 Rishthaa Company Mohamed 6 Golden Lane Noorain 7 FENAKA Jaleel 8 L5 Construction and Trade Pvt Ltd Hussain Ali

9 UNOPS Govindarajan Saravanan 10 UNOPS Mustafa Iqbal Azam 11 UNOPS Aminath Nawal 12 UNOPS Fathimath Amani

The matters raised by the bidders during the pre-bid meeting and the clarifications are as follows.

Query raised Reply/clarification 1 Will the project be awarded as one project to one Yes, one contractor to 9 islands. contractor? 2 Can the bid security be submitted as a cashiers Yes cheque from the bank? 3 Is there a minimum requirement for insurance? Insurance should be provided as stated in the ITB 4 Will the bid bond from insurance company be UNOPS shall accept this bid bond from accepted? registered Insurance company from Maldives as an exception from the national bidders. 5 In Maldives, there is no standard minimum Technical experience of proposed person national technical qualification certification. Also, shall provide CV include complete details National contractors may not have technical of works with contact details of previous people working with them with the mentioned client shall be accepted education qualification, but they do have people with 10 to 15 years of work experience. Since the Bid document says certification plus experience, will their technical people with only experience be accepted? 6 Tanks required in the islands have to be imported The works consists of supply of materials and hence, procurement, logistics and customs and implementation of civil works in the clearance of imported cargo will take some time. islands, however these are not dependent Does UNOPS still consider 60 days will be sufficient activities. The Civil works are simple repair for completion all required works in 9 islands? works/ minor pipe laying and require a good management; it also advised to start the both activities together to mitigate the risk of project delay. 7 Is it lump sum payment method contract? No, it is a measure and pay contract.

8 Will there be any pipe excavation works? Very minimum excavation works in this project. All details drawings are provided for all islands clearly marking the required works and locations. 9 Will there be any demolition of water tanks? If so, Yes there is demolition works required what are the sizes and would it be concrete tanks and these are marked in the drawings. In or PVC tanks? some islands there are PVC tanks and concrete tanks are in two islands Isdhoo and Mundoo. These are reflected in the BOQ. 10 How is the disposal arrangements? Need discuss with Island Council and each island contains waste management rules. All Disposal of waste should be carried out according to the island disposal methods. 11 Do we have to use imported sand or local sand for Solid blocks with river sand should be used

all the masonry works? for masonry walls (inside and out).

12 Should the contractors use aerated blocks or Compressed blocks. compressed blocks?

13 Does the bidders have to submit the soft copy of Soft copies and hard copies should be the full bid document after signing and stamping all submitted with signature and company the pages or just the BOQ only? stamp. 14 Can bidders quote for preliminary price? Preliminary price is a fixed price, as already indicated in the BOQ. 15 Does the bidder have to submit the preliminary in Yes 1 bill for each island? Further clarifications can be emailed to UNOPS and we will send the reply to all bidders.

Additional Amendment made by UNOPS:

Prepared by: Fathimath Amani

Thank you.

Approved by Pre-cleared by