SPC on Transportation and Transit Agenda Package

Total Page:16

File Type:pdf, Size:1020Kb

SPC on Transportation and Transit Agenda Package AGENDA SPC ON TRANSPORTATION AND TRANSIT March 20, 2019, 1:00 PM IN THE COUNCIL CHAMBER Members Councillor S. Keating, Chair Councillor J. Davison, Vice-Chair Councillor G. Chahal Councillor S. Chu Councillor J. Farkas Councillor E. Woolley Councillor J. Magliocca Mayor N. Nenshi, Ex-Officio 1. CALL TO ORDER 2. OPENING REMARKS 3. CONFIRMATION OF AGENDA 4. CONFIRMATION OF MINUTES 4.1 Minutes of the Regular Meeting of the SPC on Transportation and Transit, dated 2019 February 27 5. CONSENT AGENDA 5.1 Status of Outstanding Motions, TT2019-0331 6. POSTPONED REPORTS (including related/supplemental reports) None 7. ITEMS FROM OFFICERS, ADMINISTRATION AND COMMITTEES 7.1 Southland Station Pedestrian Connectivity, TT2019-0235 7.2 Interim Alternative Uses of Blue Line and Green Line LRT Rights-of-Way, TT2019-0204 7.3 Green Line Q1 2019 Update - TT2019-0245 8. ITEMS DIRECTLY TO COMMITTEE 8.1 REFERRED REPORTS None 8.2 NOTICE(S) OF MOTION None 9. URGENT BUSINESS 10. CONFIDENTIAL ITEMS 10.1 ITEMS FROM OFFICERS, ADMINISTRATION AND COMMITTEES None 10.2 URGENT BUSINESS 11. ADJOURNMENT Item # 4.1 MINUTES SPC ON TRANSPORTATION AND TRANSIT February 27, 2019, 9:30 AM IN THE COUNCIL CHAMBER PRESENT: Councillor S. Keating, Chair Councillor J. Davison, Vice-Chair Councillor G. Chahal Councillor S. Chu Councillor J. Farkas Councillor J. Magliocca *Councillor D. Farrell ALSO PRESENT: Acting City Clerk D. Williams Legislative Assistant L. Gibb 1. CALL TO ORDER Councillor Keating called the Meeting to order at 9:30 a.m. 2. OPENING REMARKS Councillor Keating provided opening remarks and acknowledged International Pink T- Shirt day. 3. CONFIRMATION OF AGENDA Moved by Councillor Farkas That the Agenda for the 2019 February 27 Regular Meeting of the SPC on Transportation and Transit be confirmed. MOTION CARRIED 4. CONFIRMATION OF MINUTES 4.1 Minutes of the Regular Meeting of the Transportation and Transit Committee, 2018, December 6 Moved by Councillor Magliocca That the Minutes of the Regular Meeting of the SPC on Transportation and Transit held 2018 December 6, be confirmed. MOTION CARRIED 5. CONSENT AGENDA Unconfirmed Minutes 2019 February 27 Page 1 of 3 ISC: UNRESTRICTED Item # 4.1 None 6. POSTPONED REPORTS None 7. ITEMS FROM OFFICERS, ADMINISTRATION AND COMMITTEES 7.1 Transportation Bylaw Changes, TT2019-0205 A PowerPoint presentation entitled "Transportation Bylaw Changes" dated 2019 February 27, was distributed, with respect to Report TT2019-0205. Speaker Tom Nelson Moved by Councillor Farrell That the Administration Recommendations be amended by adding a new Recommendation 3, as follows, and by renumbering the Recommendations accordingly: "3. That Council amend the Calgary Traffic Bylaw, 26M96 to rescind the Parking adjacent to mid-block curb brakes, as set out in the document received at today's meeting." MOTION CARRIED Moved by Councillor Davison That with respect to Report TT2019-0205, the following be approved, as amended: 1. That Council give three readings to the proposed Charter bylaw to amend: a. the Calgary Traffic Bylaw 26M96; and b. the Calgary Parking Bylaw 41M2002. 2. That Council give three readings to the proposed bylaw to amend: a. the Calgary Traffic Bylaw 26M96; b. the Street Bylaw 20M88; c. the Stephen Avenue Mall Bylaw 52M87; d. the Barclay Mall Bylaw 17M84; e. the Calgary Parking Bylaw 41M2002; f. the Calgary Transit Bylaw 4M81; g. the Mall Between Second Street S.E. and First Street S.E. on Eighth Avenue Bylaw 26M85; and h. the Municipal Complex Bylaw 38M2012 3. That Council amend the Calgary Traffic Bylaw, 26M96 to rescind the Parking adjacent to mid-block curb brakes, as set out in the document received at today's meeting; and 4. That the report be directed to the 2019 March 18, Combined Meeting of Council to the Public Hearing portion of the Agenda Unconfirmed Minutes 2019 February 27 Page 2 of 3 ISC: UNRESTRICTED Item # 4.1 MOTION CARRIED 8. ITEMS DIRECTLY TO COMMITTEE None 8.1 REFERRED REPORTS None 8.2 NOTICE(S) OF MOTION None 9. URGENT BUSINESS None 10. CONFIDENTIAL ITEMS 10.1 ITEMS FROM OFFICERS, ADMINISTRATION AND COMMITTEES None 10.2 URGENT BUSINESS None 11. ADJOURNMENT Moved by Councillor Chahal That this meeting adjourn at 10:17 a.m. MOTION CARRIED The following item has been forwarded to the 2019 March 18 Combined Meeting of Council: Public Hearing Portion Transportation Bylaw Changes, TT2019-0205 The next Regular Meeting of the SPC on Transportation and Transit will be held on 2019 March 20 at 9:30 a.m. CONFIRMED BY COMMITTEE ON ________________________________ ________________________________ CHAIR ACTING CITY CLERK Unconfirmed Minutes 2019 February 27 Page 3 of 3 ISC: UNRESTRICTED Page 1 of 2 Item #5.1 Transportation Report to ISC: UNRESTRICTED SPC on Transportation and Transit TT2019-0331 2019 March 20 Status of Outstanding Motions EXECUTIVE SUMMARY Outstanding motions for the SPC on Transportation and Transit ADMINISTRATION RECOMMENDATION: That the SPC on Transportation and Transit receives this report for information. PREVIOUS COUNCIL DIRECTION / POLICY On 2007 February 06, Personnel and Accountability Committee approved PAC2007-05 Status of Outstanding Motions and Directions, directing Administration to bring forward as an item of business to each SPC a list of tabled and referred motions and reports for each committee; such lists to be reviewed by each Standing Policy Committee to be dealt with on a quarterly basis. BACKGROUND This report and attachment provides a summary of outstanding motions and directions for the SPC on Transportation and Transit as of 2019 March 20. INVESTIGATION: ALTERNATIVES AND ANALYSIS Not applicable. Stakeholder Engagement, Research and Communication Not applicable. Strategic Alignment Not applicable. Social, Environmental, Economic (External) Not applicable. Financial Capacity Current and Future Operating Budget: Not applicable. Current and Future Capital Budget: Not applicable. Risk Assessment Not applicable. Approval(s): Michael Thompson concurs with this report. Author: Lorie Boychuk Page 2 of 2 Item #5.1 Transportation Report to ISC: UNRESTRICTED SPC on Transportation and Transit TT2019-0331 2019 March 20 Status of Outstanding Motions REASON(S) FOR RECOMMENDATION(S): This is a report for information, to assist the committee in tracking its initiatives over time. ATTACHMENT(S) 1. Attachment – Status of Outstanding Motions as of 2019 March 20. Approval(s): Michael Thompson concurs with this report. Author: Lorie Boychuk TT2019-0331 ATTACHMENT STATUS OF OUTSTANDING MOTIONS AS OF 2019 March 20 ITEM ANTICIPATED T&T OWNER PAGE MEETING DATE GM OUTSTANDING REPORTS JAN-DEC 2019 1-3 TRANS TRANSPORTATION BYLAW CHANGES Q1 2019 TP 3 INTERIM ALTERNATIVE USES OF BLUE LINE Q1 2019 TP 4 AND GREEN LINE LRT ROW SOUTHLAND STATION PEDESTRIAN Q1 2019 TP 5 CONNECTIVITY HILLHURST SUNNYSIDE MAP STUDY Q2 2019 TP 5 AT GRADE LRT CROSSING SAFETY Q2 2019 TRANSIT 5 SPEED LIMIT REDUCTION UPDATE #1 Q2 2019 ROADS/TP 6 GREEN LINE GARDENS Q2 2019 GL 7 ROUTE AHEAD UPDATE – PRIORITIZATION Q3 2019 TRANSIT 7 FRAMEWORK COMPLETE STREETS AND RESIDENTIAL Q4 2019 TP 7 STREETS UPDATE SAFER MOBILITY PLAN ANNUAL REPORT Q4 2019 ROADS 7 BIKE SHARE IN CALGARY UPDATE Q4 2019 TP 7 SPEED LIMIT REDUCTION UPDATE #2 Q4 2019 ROADS/TP 8 CALGARY GOODS MOVEMENT STRATEGY Q2 2021 TP 9 TT2019-0331 ATT Page 1 of 10 ISC: Unrestricted ANTICIPATED OWNER PAGE ITEMS FOR OTHER COMMITTEES MEETING DATE CALGARY TRANSIT EXPANDED PROGRAMS Q1 2019 TRANSIT 9 EVALUATION CALGARY TRANSIT PARK AND RIDE REVIEW Q2 2019 TRANSIT 9 UPDATE ACTIVATE YYC RESULTS Q2 2019 TP 9-10 TT2019-0331 ATT Page 2 of 10 ISC: Unrestricted DATE OF ANTICIPATED ITEM SOURCE SUBJECT REQUEST MEETING DATE At its meeting of 2007 June 20, the Personnel and Accountability Committee approved the following (PAC2007-05), That Administration, on a quarterly basis, bring MAR forward as an item of JUN business to each Standing OUTSTANDING 2007 SEP COUNCIL Policy Committee a list of REPORTS JUNE DEC tabled and referred motions T&T and reports for each committee; such lists to be reviewed by each Standing Policy Committee to be dealt with on a quarterly basis. That with respect to Report TT2019-0205, the following be approved, as amended: 1. That Council give three readings to the proposed Charter bylaw to amend: a. the Calgary Traffic Bylaw 26M96; and b. the Calgary Parking Bylaw 41M2002. 2. That Council give three readings to the proposed bylaw to amend: TRANSPO BYLAW 2018 TT2019- a. the Calgary Traffic Q1 2019 CHANGES JULY 0205 Bylaw 26M96; COUNCIL b. the Street Bylaw 20M88; c. the Stephen Avenue Mall Bylaw 52M87; d. the Barclay Mall Bylaw 17M84; e. the Calgary Parking Bylaw 41M2002; f. the Calgary Transit Bylaw 4M81; g. the Mall Between Second Street S.E. and First Street S.E. on Eighth Avenue Bylaw 26M85; and TT2019-0331 ATT Page 3 of 10 ISC: Unrestricted h. the Municipal Complex Bylaw 38M2012 3. That Council amend the Calgary Traffic Bylaw, 26M96 to rescind the Parking adjacent to mid- block curb brakes, as set out in the document received at today's meeting; and 4. That the report be directed to the 2019 March 18, Combined Meeting of Council to the Public Hearing portion of the Agenda NOW THEREFORE BE IT RESOLVED that City Council directs City Administration to: ISC: UNRESTRICTED 2018 May 28 Regular Meeting of Council 15 1. Explore potential interim alternative uses for the reserved LRT ROWs for the Blue Line NE, north of Saddletowne Station, that may include, but are not INTERIM limited to, transit ALTERNATIVE 2018 C2018- improvements, pedestrian Q1 2019 USES OF BLUE MAY 0689 and bicycle infrastructure, T&T LINE AND GREEN and parks that can be LINE LRT ROW converted to LRT infrastructure. 2. Provide an assessment of feasibility, capital costs required, return on investment and timelines for the potential interim uses.
Recommended publications
  • 2020 May Engagement Boards-Segment 1 V14
    Moving the Green Line forward As the city’s largest job creation project, construction of Green Line Stage 1 will be a critical component of the COVID-19 recovery eort. We want to be ready when Calgary is ready. Creating jobs for Calgary The Green Line LRT project generates jobs in the short-term and long-term. The Enabling Works program is keeping people working today and will continue to generate jobs between now and when the main construction is scheduled to start in 2021. Construction of Stage 1 of the Green Line will create approximately 20,000 jobs (12,000 direct and 8,000 indirect). Ready for procurement We have completed the evaluation of the responses to the Request for Qualications for Segment 1 and will be announcing the shortlisted proponents in June 2020. We are nalizing the Request for Proposals for Segment 1 and will be releasing this to the shortlisted proponents in July 2020. We have previously shortlisted four proponents for the supply of our light rail vehicles (LRVs) for the Green Line and the Request for Proposals for these new low oor vehicles will be released to the successful proponents in June 2020. Segment 1 station descriptions Ramsay/Inglewood Ramsay/Inglewood Station This station will be an elevated “bridge” station located over 11 Street S.E., and will run parallel to the CP Rail bridge, that will serve the communities of Ramsay and Inglewood. There will be an at-grade access on the west end of the station, near Jeeries Park, and a station entrance building that will provide access to the elevated station platforms.
    [Show full text]
  • Calgary Canadian Environmental Assessment Agency Summary of a Project Description
    The City of Calgary Canadian Environmental Assessment Agency Summary of a Project Description Green Line Maintenance and Storage Facility 8 February 2019 307074-02081-800 – EN-REP-0001 ISC: Unrestricted The City of Calgary Canadian Environmental Assessment Agency Summary of a Project Description Green Line Maintenance and Storage Facility Disclaimer The attached Report (the “Report”) has been prepared by WorleyParsons Canada Services Ltd., operating as Advisian (Advisian) for the benefit of the City of Calgary (the “Client”) in accordance with the agreement between Advisian and the Client, including the scope of work, purpose and objectives detailed therein. 1. USE OF REPORT BY CLIENT This report has been prepared by Advisian for the exclusive use of the Client and their agents, who are assumed to have reviewed the scope of work for this project and understand its limitations. The report and its contents are intended for the sole use of the Client as stated below. The Client shall at all times be entitled to fully use and rely on this report, including all attachments, drawings, and schedules, for the specific purpose for which the report was prepared, in each case notwithstanding any provision, disclaimer, or waiver in the report that reliance is not permitted. The Client shall at all times be entitled to provide copies of the report to City Council, City of Calgary regulatory boards, City of Calgary employees, officers, agents, affiliates, advisors, consultants, parties contracting with The City of Calgary, lenders and assignees and other governmental authorities and regulatory bodies having jurisdiction, each of whom shall also be similarly entitled to fully use and rely on the report in the same manner and to the same extent as The Client for the specific purpose for which the report was prepared.
    [Show full text]
  • Green Line LRT Updated Segment 2 (16 Avenue N to Elbow River) Alignment, Station Location and Concept Plan
    GC2020-0583 Attachment 4 Green Line LRT Updated Segment 2 (16 Avenue N to Elbow River) Alignment, Station Location and Concept Plan ISC: Unrestricted Page 1 of 45 GC2020-0583 Attachment 4 Executive Summary This document outlines the updated Green Line Segment 2 alignment and station location plan and presents concepts that illustrate how this segment might look like. Segment 2 extends from 16 Avenue N and Centre Street N south to the Elbow River in the Beltline. The alignment was updated in order to bring the project cost estimates within budget, manage construction risk, and best deliver the vision of the project. The updated Segment 2 alignment and station location plan includes: • surface-running LRT on Centre Street N; • a bridge over the Bow River; • 2.5 km of tunnel in the Downtown and Beltline; and • 6 stations (2 at surface, 4 underground). To develop the updated Segment 2 alignment, station location and concept plan, planning and design objectives were developed from internal and external stakeholder interests and from public feedback from Green Line public engagement sessions, community meetings and stakeholder workshops. These design objectives will be used to inform the development of the functional design for the project. Segment 2 – Updated alignment and station location plan Figure identifies sections of Segment 2 alignment that are at-grade (solid lines), tunnel (dashed line) and bridge (solid line with black outline). ISC: Unrestricted Page 2 of 45 GC2020-0583 Attachment 4 Centre Street N Downtown (Eau Claire, Chinatown & Downton Core) The LRT alignment will run along the surface of The alignment continues from the new LRT bridge across the Centre Street N in the middle of the road, with a single lane Bow River, over the Bow River Pathway, and travels south of traffic in each direction and no on-street parking.
    [Show full text]
  • Anderson Station Park and Ride Plan 1. Introduction 2. Previous Council
    TT2016-0719 ATTACHMENT 1 Anderson Station Park and Ride Plan 1. Introduction In response to Report TT2016-0319, Council directed Administration to "Report back to the SPC on Transportation and Transit with a park and ride plan for Anderson Station no later than 2016 September." In order to support transit-oriented development (TOD) at Anderson Station park and ride lot, Real Estate and Development Services (RE&DS) and Calgary Transit are developing a plan to balance park and ride supply with land redevelopment opportunities. This is necessary to balance the customer demand for park and ride stalls during redevelopment of the station area. 2. Previous Council Direction/Policy At the 2016 June 20 Regular Meeting of Council, Council amended and accepted the recommendations outlined in TT2016-0319 – A Review of Calgary Transit Park and Ride, and directed Administration to: 1. Develop a general park and ride strategy for current and future CTrain stations with the goal of optimizing park and ride and Transit Oriented Development (TOD) opportunities to achieve an overall target to serve approximately 15 percent of weekday peak period CTrain trips based on the park and ride planning criteria outlined in Attachment 1. 2. Enable shared use parking in the vicinity of CTrain stations and major bus use terminals through Land Use and Policy provisions. 3. Explore additional funding for park and ride development and management using surplus revenues from other parking. 4. Transition towards a system of 100 percent monthly reserved parking with differential pricing based on demand and offer a system of daily reserved parking that utilizes vacant monthly reserved spaces.
    [Show full text]
  • Transportation Report to Strategic Meeting of Council 2017 May 15
    Transportation Report to ISC: UNRESTRICTED Strategic Meeting of Council C2017-0467 2017 May 15 Page 1 of 10 GREEN LINE LRT: BUILDING THE CORE EXECUTIVE SUMMARY This report presents the recommended first stage of construction for the Green Line Light Rail Transit (LRT): 16 Avenue N (Crescent Heights) to 126 Avenue SE (Shepard) laying the foundation for Calgary’s next LRT line. This core project will improve mobility choices, support community development, provide greater transportation choices to access Calgary’s community amenities and resources, and is essential to support Calgary’s growth. The Green Line LRT is a momentous investment in Calgary’s future and marks our city’s most extensive transit expansion serving our city for many generations to come. Defining the first (core) stage of construction over the coming decade is necessary to provide clear direction to the other orders of government on the project scope and in order to secure project funding so that detailed design and construction can proceed. Administration is presenting our assessment of where to commence the construction of Green Line. Supported by a detailed evaluation to compare and contrast the numerous staging options, the core project will establish a strong foundation of LRT service and supporting facilities (such as the maintenance and storage facility) required to operate the new line. The core project will complete the most technically complex and capital intensive aspects of the long-term vision. The core project has the highest readiness; Administration is confident that The City can move quickly into construction while minimizing risks to The City. This foundational core project will best facilitate future extensions and demonstrates The City’s commitment to implementing the long-term vision for the Green Line LRT.
    [Show full text]
  • Upper Canada Railway Society I
    NCORPORATED 1952 NUMBER 455 SEPTEMBER 1987 UPPER CANADA RAILWAY SOCIETY BOX 122 STATION "A" TORONTO, ONTARIO I Phot'mmo Calgary's Heritage Park includes a short streetcar line as well as a steam railway. Pictured here is a replica of a Calgary Municipal Railway car, 14, which reportedly utilized some parts salvaged from the original oar, scrapped circa 1964 after an ill-fated preservation effort. .p^^ Wickson The simple design of the stations on Calgary's Northwest LET line is evident in this photo. Note the concrete ties. Opening of the line was scheduled for September, 1987. p jQj,gg BC Hydro Rail SD38-2 382. The colour scheme is dark blue. The railway's power was formerly painted yellow with redlettering and trim. —Ron Lipsett SEPTEMBER 1987 3 YELLOW BOARD FOR THE ACR Incorporated in 1899; Algoma Central operated for many years primarily as a wilderness railroad to transport iron ore and forest products out of Northern Ontario; Xn more.recent years the organization has become a diversified transportatioh-company,' moving bulk products and freight by water, rail and road. It operates a fleet of 18 dry bulk cargo ships, principally on the .Great Lakes and the St. Lawrence Seaway. Its main railway line runs 295 miles north from Sault Ste. Marie and serves the natural resource, manufacturing and tourist industries of the Algoma Region of Northern Ontario. ACR's-fleet of trucks carries general shipments on routes extending from Detroit and Buffalo to Toropto and Montreal. ACR also has developed commercial real estate complexes in Sault Ste. Marie and Elliot Lake, Ont.
    [Show full text]
  • Green Line LRT in My Community
    Green Line LRT in My Community What we heard report At-Grade Stations 4 Street S.E., Highfield, Lynnwood/Millican, Ogden, South Hill, Quarry Park, Douglas Glen, Shepard April 2018 Project overview On June 26, 2017, City Council approved the full vision for the Green Line LRT. The vision for Green Line includes a 46 km route from 160 Avenue North to Seton, and 28 stations. Construction on the first 20 km is anticipated to begin in 2020, and will extend from 16 Avenue N (Crescent Heights) to 126 Avenue SE (Shepard). Construction of Stage 1 is expected to be complete by 2026. Once Stage 1 is complete, extensions will be built as funds become available to complete the full vision. The purpose of the engagement was to gather input on safety and security, aesthetics and landscaping, and access to stations to help develop guiding technical documents that will be used during construction of Green Line – Stage 1. Engagement overview In January and February 2018, The City of Calgary held open houses and pop-up sessions with community members to provide information about the Green Line LRT - Stage 1 and to collect input on station design, station area look and feel, safety and security and community experience. From January 18, 2018 to February 13, 2018 The City of Calgary hosted an online survey on its engagement portal at engage.calgary.ca/GreenLine to solicit feedback from Calgarians. Input collected from the public will be reflected in the technical documents that will guide the construction of Green Line – Stage 1. Open house sessions for at-grade stations were held at the Glenmore Inn on January 25, 2018 and the Millican Ogden Community Association on February 3, 2018.
    [Show full text]
  • Canadian Environmental Assessment Agency Project Description
    The City of Calgary Canadian Environmental Assessment Agency Project Description Green Line Maintenance and Storage Facility 8 February 2019 307074-02081-800 – EN-REP-0001 ISC: Unrestricted The City of Calgary Canadian Environmental Assessment Agency Project Description Green Line Maintenance and Storage Facility Disclaimer The attached Report (the “Report”) has been prepared by WorleyParsons Canada Services Ltd., operating as Advisian (Advisian) for the benefit of the City of Calgary (the “Client”) in accordance with the agreement between Advisian and the Client, including the scope of work, purpose and objectives detailed therein. 1. USE OF REPORT BY CLIENT This report has been prepared by Advisian for the exclusive use of the Client and their agents, who are assumed to have reviewed the scope of work for this project and understand its limitations. The report and its contents are intended for the sole use of the Client as stated below. The Client shall at all times be entitled to fully use and rely on this report, including all attachments, drawings, and schedules, for the specific purpose for which the report was prepared, in each case notwithstanding any provision, disclaimer, or waiver in the report that reliance is not permitted. The Client shall at all times be entitled to provide copies of the report to City Council, City of Calgary regulatory boards, City of Calgary employees, officers, agents, affiliates, advisors, consultants, parties contracting with The City of Calgary, lenders and assignees and other governmental authorities and regulatory bodies having jurisdiction, each of whom shall also be similarly entitled to fully use and rely on the report in the same manner and to the same extent as The Client for the specific purpose for which the report was prepared.
    [Show full text]
  • Calgary Canadian Environmental Assessment Agency Summary of a Project Description
    The City of Calgary Canadian Environmental Assessment Agency Summary of a Project Description Green Line Maintenance and Storage Facility 8 February 2019 307074-02081-800 – EN-REP-0001 ISC: Unrestricted The City of Calgary Canadian Environmental Assessment Agency Summary of a Project Description Green Line Maintenance and Storage Facility Disclaimer The attached Report (the “Report”) has been prepared by WorleyParsons Canada Services Ltd., operating as Advisian (Advisian) for the benefit of the City of Calgary (the “Client”) in accordance with the agreement between Advisian and the Client, including the scope of work, purpose and objectives detailed therein. 1. USE OF REPORT BY CLIENT This report has been prepared by Advisian for the exclusive use of the Client and their agents, who are assumed to have reviewed the scope of work for this project and understand its limitations. The report and its contents are intended for the sole use of the Client as stated below. The Client shall at all times be entitled to fully use and rely on this report, including all attachments, drawings, and schedules, for the specific purpose for which the report was prepared, in each case notwithstanding any provision, disclaimer, or waiver in the report that reliance is not permitted. The Client shall at all times be entitled to provide copies of the report to City Council, City of Calgary regulatory boards, City of Calgary employees, officers, agents, affiliates, advisors, consultants, parties contracting with The City of Calgary, lenders and assignees and other governmental authorities and regulatory bodies having jurisdiction, each of whom shall also be similarly entitled to fully use and rely on the report in the same manner and to the same extent as The Client for the specific purpose for which the report was prepared.
    [Show full text]