DEVELOPER PROJECT EXCLUSIVE DETAILS MARKETING ARM PROJECT DETAILS
TOTAL LAND AREA 40 HECTARES
NO. OF RESIDENTIAL LOTS 308
AVERAGE RESIDENTIAL LOT SIZE 300 SQM
NO. OF COMMERCIAL LOTS 14
AVERAGE COMMERCIAL LOT SIZE 1,000 SQM
TOTAL SALEABLE LOTS 322 AS OF JUNE 2019 LOCATION MAP SITE DEVELOPMENT PLAN
FROM KATIPUNAN AVE. TO ACROPOLIS LOYOLA ACROPOLIS LOYOLA WHY ACROPOLIS LOYOLA PROXIMITY TO QUEZON CITY 10MINS AWAY FROM KATIPUNAN AVENUE QUALITY EDUCATION UNIVERSITIES
ST. SCHOLASTICA’S ATENEO DE MANILA MIRIAM COLLEGE UNIVERSITY OF THE ACADEMY MARIKINA UNIVERSITY (Katipunan ave.) PHILIPPINES (West Drive) (Katipunan ave.) 17 MINS AWAY (Katipunan Ave.) 12 MINS AWAY 16 MINS AWAY 17 MINS AWAY NEARBY ESTABLISHMENT UP TOWN CENTER (Katipunan Ext.) 11 MINS AWAY
SHOPPING EASTWOOD MALL (Bagumbayan, Quezon City) CENTERS 32 MINS AWAY
GREENHILLS SHOPPING CENTER (Project 8, Quezon City) 34 MINS AWAY AYALA MALL FELIZ (Marcos Highway) 19 MINS AWAY
SHOPPING SM CITY MARIKINA (Marikina Highway) CENTERS 22 MINS AWAY
THE PODIUM (Ortigas Center) 40 MINS AWAY LANDMARKS
LA MESA NINOY AQUINO ECOPARK PARKS AND WILDLIFE (Novaliches) CENTER 31 MINS AWAY (Elliptical Rd) 22 MINS AWAY
QUEZON MEMORIAL CIRCLE ART IN ISLAND (Elliptical Rd, (15TH AVE. CUBAO) Diliman) 26 MINS AWAY 23 MINS AWAY HOSPITALS
MARIKINA VALLEY EAST AVE. MEDICAL COMMONWEALTH MEDICAL CENTER CENTER HOSPITAL (Sumulong Highway) (East Ave. Diliman) (Novaliches) 14 MINS AWAY 24 MINS AWAY 38 MINS AWAY HOSPITALS
WORLD CITI MEDICAL VETERANS MEMORIAL LUNG CENTER OF THE CENTER MEDICAL CENTER PHILIPPINES (Aurora Blvd, Project 4) (North Ave. Diliman) (Quezon Ave, Diliman) 24 MINS AWAY 24 MINS AWAY 26 MINS AWAY OUR LADY OF PENTECOST CHURCH (Katipunan Avenue) 14 MINS AWAY
SANTA MARIA DELLA STRADA PARISH CHURCH CHURCHES (Pansol Ave, Diliman) 18 MINS AWAY
MONASTERIO REAL DE STA. CLARA DE MANILA (Katipunan Avenue) 19 MINS AWAY LIVING IN MARIKINA
• A portion of Acropolis Loyola is also situated in Marikina – the country’s Shoe Capital. • Marikina, a city rich with history and culture and sustainable urban development, is approximately only 21 KM from Manila. FUTURE DEVELOPMENTS MARIKINA-VISTA REAL BRIDGE
• Construction of a 414.9m, 4-lane (2 lanes per direction with 3m sidewalks), 2-span prestressed concrete extradosed bridge to connect Marikina side (at Kabayani road) and Vista Real side (at Stockholm and Delhi Streets) • Proposed bridge will be between Tumana Bridge and Batasan- San Mateo Bridge • Target start of implementation: 2020 • Target date of completion: 2023
SOURCE: http://www.neda.gov.ph/wp-content/uploads/2018/06/Infrastructure-Flagship-Projects-as-of-June-2018.pdf GOOGLE MAPS: https://www.google.com/maps/dir//Kabayani+Rd,+Nangka,+Marikina,+Metro+Manila/@14.6651018,121.0915534,2167m/dat a=!3m1!1e3!4m9!4m8!1m0!1m5!1m1!1s0x3397b98cbb8c34f1:0x2226543c02ef889a!2m2!1d121.1026552!2d14.6706281!3e 0 JP RIZAL –LOPEZ JAENA BRIDGE
TARGET TARGET PROJECT TITLE DESCIRPTION IMPLEMENTATION COMPLETION DATE DATE
• Involves the construction of a 594.2 m (of which, main bridge: J.P. Rizal - Lopez 100 m) Jaena Bridge • 2-lane (with 3m sidewalks) Steel (initially submitted as 2020 2023 ReposoGuatemala Nielsen Arch Bridge Bridge) • To connect J.P. Rizal Street and Lopez Jaena Street in Marikina City.
SRC: http://www.neda.gov.ph/wp-content/uploads/2018/06/Infrastructure-Flagship-Projects-as-of-June-2018.pdf
• Will decongest traffic in existing bridges in the area • Will help mitigate the risk of overloading other existing bridges (e.g. other bridges in Pasig, and bridges crossing Marikina River and Manggahan Floodway) • Will increase road network and alleviate overall traffic congestion in Metro Manila • Meets new seismic design specifications and the impact of climate change, thus will help enhance resilience of Metro Manila road network against disasters and climate change
http://www.neda.gov.ph/wp-content/uploads/2018/06/Infrastructure-Flagship-Projects-as-of-June-2018.pdf https://www.adb.org/sites/default/files/project-documents/52181/52181-001-cp-en.pdf MEGA MANILA SUBWAY
• 28.3 KM LINE (to be number LINE 9) which will run from North to South between cities of QC, Pasig, Makati, Taguig, and Parañaque • First direct airport link • Lessen traffic congestion in EDSA, and other connecting major thoroughfares. • More socio-economic activities and balanced urban development, which means more job opportunities, and increase of population drive. • Better connectivity via north-south backbone for the Greater Capital Region. Hence, easier travel. It also means better accessibility in Makati, Taguig, Parañaque.
httnews/2017/04/19/Metro-Manila-subway-Mega-Manila-Subway-project-Duterte.html httnews/2017/04/19/Metro-Manila-subway-Mega-Manila-Subway-project-Duterte.html KATIPUNAN AVE. EXTENSION
• A 5.76 km extension project from the corner of Katipunan Ave. and MWSS passing through Loyola Grand Villas, properties owned by the Government Service Insurance System, the Armed Forces of the Philippines Mutual Benefit Association, Inc., Capitol Homes, Vista Real Subdivision, Filinvest Northview Subdivision • Aims to decongest Batasan, San Mateo Rizal, Katipunan Ave., Commonwealth Ave. (Quezon City), and other connecting major thoroughfares • Will result in economic boom due to possibility of further increase in developments will also drive more people to look for residential lots/subdivisions in the area
OTHER DEVELOPMENTS PROJECT FILLING Additional 3 METER-filling was added to the existing land level. SETBACK FROM THE RIVER 96 METERS FROM THE CENTER OF MARIKINA RIVER (setback as prescribed by the Marikina Government) FEATURES AND AMENITIES FEATURES AND AMENITIES
• Fully-landscaped entrance gate with guardhouse • Swimming Pool • Covered Basketball Court • Covered Tennis Court • Wide concrete road network • Paved sidewalks with concrete curbs and gutters • Underground storm drainage system • Shade trees and mercury lamps along the roads BASIC RESTRICTIONS RESIDENTIAL
MINIMUM RESIDENTIAL HOUSE COST PHP 7 MILLION RESIDENTIAL SETBACKS
CORNER LOT REGULAR LOT FRONT: 3 METERS FRONT: 3 METERS FACING THE STREETS: L/R SIDE: 2 METERS 3 METERS REAR: 2 METERS SIDES: 2 METERS
VERTICAL HEIGHT NOT HIGHER THAN 14 METERS COMMERCIAL
MINIMUM COMMERCIAL ESTABLISHMENT COST PHP 40 MILLION
COMMERCIAL ESTABLISHMENT SETBACKS
FRONT (FACING THE ROAD): 5 METERS SIDES: 2 METERS REAR: 2 METERS
VERTICAL HEIGHT NOT HIGHER THAN 35 METERS MARCH 2020 *Price, terms, and discounts are subject to change without prior notice. *Sta. Lucia Marketing reserves the right to correct any figure herein in case of typographical or computation error. *The content of this material does not form any part of an offer or contract, nor shall any contract be made based on the content.