FORESTRY CORPORATION OF NSW, HARDWOOD FORESTS DIVISION >;, Forestry LOCALITY MAP l{_.,J Corporation TOMERON GFores t GN MN N O.81 8 PlanN ame :HP_BB_1199_1 3 1:100,00 0 VERSION : 2 CptNo:119 9 PlanN o:1055 3 ContourInterval10 m Manage m e ntArea:NO W RA V GDA1994MGAZ on e 56 Mapshe e t:HUSKISSON (9027-4N ) DatePrinted :21/01/201 9

CROOKHAVEN RIVER Saltwater Swamp NR

Á

Á

Á Á

Á Á Á

Á

Á Á GEORGES CREEK CALLALA CREEK CURRAMBENE CREEK

sHighway

inc e Parma Creek NR Pe p p e rRoad Á Pr Á Je r Á G visBay Road Á 1191199 9 v NR

Huskisson !

Tomerong ! MOONA MOONA CREEK NP Jervis Bay NP

BOLLERANG CREEK

WORROWING WATERWAY Corramy RPBasin View ! ! ! CREEK WANDANDIAN CREEK St Georges Basin

ST GEORGES BASIN Conjola NP TULLARWALLA LAGOONTULLARWALLA INLET

G Eme rge nc y Me e tingPoin t Sealed Road s Spe c ialManage m e nt(Zon e 2) VacantCrownLan d v Helicop terLanding Are a MajorForestRoa d -HarvestingExclusion(Zone 3A ) D W aterBodie s Á EvacuationRout e MainRiver s -Spe c ialPrescription (Zon e 3B ) Á Haluag e Rout e D W aterBod ie s Ge ne ralManage m e nt(Zon e 4) ! Town s Comp artme ntofInteres t N on ForestryUse (Zon e 7) Roadsselec tio n D N ative Forest s D N ationalParkEstat e

Kilom e tre s © CrownCop yright2013.The information and d atac ontaine d inthism ap istoth e b e stofForestryCorporation’sb e lief,true and c o rec tatth r e time o f 0 2 4 6 p ublication.However,change sinc ircumstanc e safterth e p ublication m ayimp actupon th e acc uracy ofth e m aterial.No warantyorguarante r e isp rovide d b y th e Stat e of N e wSouth W ales,ForestryCorporation an d itse m p loye e san d age ntsan d no liabilityisacc e pte d forany l ossordamage ,costsorexp e ns e resulting fro m th e use orrelianc e upon the information and d atac ontaine d inthism a p TOMERON GFores t FORESTRY CORPORATION OF NSW, HARDWOOD FORESTS DIVISION Forestry N O.81 8 HARVEST PLAN OPERATIONAL MAP VERSION : 3 Corporation CptNo:119 9 Plan N a m e:HP_BB_1199_1 3 1:15,00 0 ContourInterval10 m Ma na gem entArea :NOW R A Plan N o:1055 3

GDA1994MGAZone 5 6 Ma p sheet:HUSKISSON (9027-4N ) DatePrinted :13/03/201 9

27900 0 28000 0 28100 0 28200 0 28300 0 28400 0 Sea songood R d oa d FairfaxRoa' ✓- - 0 W oo lla m ia Roa 0 d

612300 d / I 612300 / I

Y I A ron Roa r Lot1 I W a DP71542 5 B Lot2 I GH Lot171 DP84647 0 Sinc DP75596 5 la irRoa d

Lot3 ! ! N CESHI ! DP84647 0 Pep! p erRoa! !d ! ! !

PRI ! ! ! ! Lot722 S2! ! C ! DP63386 7 p t19/6R ! ! 19 ! ! Pep p erRd S1 4 ! ! ! ! oa 3 ! ! Lot1 d ! ! ! DP61837 2

!

t 2 ! ! !

!

! ! J

! ! ! er Lot2 ! ! C pt 1 1 9vi 9 / 3Rd ! s DP61837 2 Ba yRo ! 0 uod SaoRW t a Dam (10m EZ) 0 t ! 5 h 1191199 9 ! a d / I Lot73 !

612200 V 612200

! enusRoa

DP755 96 5 7 \ :::.1 !

! Lot3

! ! d

! !

(I ! 6

! ! 8 ! DP28640 4

! !

! ! Ma rsRoa

! !

/ I' I I ! Lot5 ! !

! ! !

d !

Bla c kb utRa ng ! ! !

I~ , I I ! DP70740 9

! ! 9 !

t ! ! !

! ! !

------I, ' ,'...... _ e RoaI I ! ! !

d !

! ! 14 Va lon Roa 1 ! l I d - --11 Lot154 d / I I DP75596 5 ! / I I Lot152 ! DP75596 5

! ! Lot28 Lot1 51 d ! Parm a Creek N R DP755 96 5 DP75592 8 Lot156 C1

! ! W ool lam ia N R

DP75596 5 ! C2

orRoa ! !

Cpt1207/5Roa !

Cast

! ! 13 ! ! ! ! !

! ! ! 10 Lot27

!

Lot92 Po luxRoa ! DP75592 8 l DP75596 5 d 11

! ! ! 0 0 12 ! ! ! ! ! ! 612100 612100

!

! !

! !

! !

! !

! !

! !

! !

! !

! !

! ! ! !

! !

! !

! !

! !

! ! ! ! !

e

on Reka wH Avenu a Lot70 d DP75596 5 d Lot7 DP78766 9 Lot8 DP78766 9

rth r Pritcha Huski son R s oa Pine ForestRoa d d

27900 0 28000 0 28100 0 28200 0 28300 0 28400 0

! StateForestBound a r y 0# Melaleuc a b iconvex a (Pap erba rk ) MinorRoa d s(EPLStand a rd ) Strea m PZ1stOrder(10m ) H Tem p oraryDry W ea the r Overhea d Powerlin e MinorRoa d s(Other ) Strea m PZ2n d Order(20m ) " " - D D Existing Crossin g Telstr a Und ergroun d Cab le Prop ose d ControlLin e -Strea m PZ3r d Order(30m ) !H Perma nentBee SetDownPoin t LiDARCo rec tedr LICDraina g e D PrivateProp ert y -Strea m PZ4thOrder(50m ) # Telec om m unica tion Sit e Ind icitiveUnm a p p e d Draina ge Fea ture s FMZ3B( W ildlife)-RU1STSMed iu m Exc lude d Fores t Da m (10 m EZ ) Sea led Roa d s FMZ3B(VisualAesthetics)-RU2STSMed iu m D N a tiona lParkEstat e

Prep a red Byem ily.ba gg s Date:18/10/201 8 - © CrownCop yright2013.The informa tion a n d d a t a c ontaine d inthism a p istothe b estofForestryCorporation’sbelief,truea n d c o r rec tatthe time ofp ublica tion.However,cha ngesinc umstanc esa fterthe p ublica tion m a yimp a c tupon th e 0 0. 5 1 1.5 Kilom etre s a c c urac y ofthe m a terial.No w a rrantyorguarantee isp rovided b ythe StateofN ewSouthW a les,ForestryCorporation a nd itsem p loyeesa nd a gentsa nd no liab ilityisa c c ep ted forany lo sorda m a ge,costsorexp enseresulting fro s m th e useorrelianc e upon the informa tion a n d d a t a c ontaine d inthism a p TOMERON GFores t FORESTRY CORPORATION OF NSW, HARDWOOD FORESTS DIVISION ~ '- Forestry N O.81 8 FOREST TYPE MAP V ERSION : 2 /,(J Corporation CptNo :119 9 Plan N a m e:HP_BB_1199_1 3 1:1,95 1 0 ContourInterva l10 m Ma na gem entArea :NOW R A Plan N o :1055 3

GDA1994MGAZone 5 6 Ma psheet:HUSKISSON (9027-4N ) DatePrinted:21/01/201 9

27900 0 28000 0 28100 0 28200 0 28300 0 I I I ..... ___ - I I o R oI a don I ^ / I

l I l Sinc la irRo a d a rrB 0# ,..... # -----,---,1 - -- ...... ~ - -...... -­ X^# ! I , GHW AY ! ! I ! -~/ ! ! PepperRo a d! # ! ! ! ! ! ! ! !

! N CESHI ! ! ! ! ! ! PRI ! ! ! ! # l -- - " ,, - - •c ^ ! ! 0# ' , ~t,s------: :-.--! !- ---.; ------0# ' 1 ! ! 6Ro a d " ! ! I , I Cpt1199/ ! \ • ••• ! I , '· ! ~ , ------! I X" , ; ' \ •-.-, ,

I X ---. ---- .-, ·--C !

! ! , ',_ p

! ! --- t11

I !

! ! , . 0#

-- ! ! ! -- -. ! ! , ;;:c., I ------..... , .. 99/3.. - X ! I X ,, --, Ro a d I _ _ ! ! ' #\ ·-

0 I \ • ," > • ) 0 ! Jervi I ~ -- ! 119 9 - I 1199 ' , ' ! sBa yR 612200 ' V enusRo a d - ,- ! 612200

! ' ' '

' I -•--•-••-•-•.,.,., - ! o a d ! ! ! ! '

' .. , ' #,, ...... ;.. --....

!

! ! ! ! ! !

,, ! --- - I

/ !

! ! !

..,....------~ ------! Ma r I

1/ sRo! a d ! !

! !

! ! !

! ! , -, I

1: ', ! !

! ! , ',

! !

! ! ..~ -· ·--- ..

! ! ! !

! ! I - !

, , ! -- ' ~ ! ! / !

,J --- ! - !

! ! .'.

- ! . ·------. ---~--. . .. -·-. ··• ! X I I ! ! 0# I I I - -- j l1',, ! I - I ! ll a V I I I I 0# \

Ii '-,., '-\ I I Rn o ! ! I I 0# r ' o a rRo d I I 0# d a o ! I I ! I -_/ I Cast

! j - • ! I I

Cpt1207/ I I ! ! ! ! ! I I

! ! I I ! ! ~--~~=------:-~--:--! , I ! ,-•:•---,.,.,.__ I II

5Ro d a ! ! ! ...... - , Po lluxRo a d

I .. ~--••• I ! ! !@ I ' .... •------...... ! ' .... -..... jt::, ! 0 ' .... -_ 0 ! ! ! ! _.--.... ! !

612100 0# ! 612100

! !

! ~'

! ! ....

! ! .. ---~-

! ! .. ,, 0# ! !

... ______! _

,.. ! ...

! !

! !

,_ !

___ _ ! 0#

! !

! !

! ! !

! !

! !

--~T !

! !

! !

! !

! ! H I ! I a w I --- ...;;. .·· =- --1 - ' ' _ I -- I ken Ro ad I --- l. ___ i ------. 0# ' J

---- 27900 0 28000 0 28100 0 28200 0 28300 0 Indicative Forest Type (YA) Gross Area (Ha) ! X " StateForestBounda r y Yelow-bel liedGlide l r Grey-hea ded Flying-fo x Coa stalMo istFores t Coastal Moist Forest 77 0# Melaleuc a b ico nvexa (Paperba rk) ^ Glo ssyBlac k-Coc ka to o LiDARC o rrec ted LICDraina g e -Spo tedt Gu m # Sca rletRob i n # Sqaure-tailedKit e IndicitiveUnm a pped Draina ge Fea ture s -N o n Fores t Spotted Gum 135 XX Yelow-bel liedGlider(Hea l rdc a l l) ^ Gang-ga ng Coc ka to o Sea ledRoa d s - Non Forest 1 X _ Spo ted-tailedt Quo ll GreaterGlide r Mino rRoa ds(EPLStanda rd ) Total 213 !@ Ma sked Ow l # LitleLorikeet t Mino rRoa ds(Other )

Prepared Byem ily.ba gg s Date:18/10/201 8 © Crown Copyright2013.The informa tion a nd da t a c o ntained inthism a pist o the b estofForestryCo rporation’sb elief,truea nd c o rrec tatthe time o fpublica tion.However,cha ngesinc umstanc esafterthe publica tion m a yimpac tupon th e 0 0. 5 1 Kilom etre s a c c urac yo fthe m a terial.N o w a rrantyo rguarantee isprovided b ythe Stateo fN ew SouthW a les,ForestryCorporation a nd itsem ployeesand a gentsand no liab ilityisa c c epted foranylo so rda m a ge,co stso rexpenseresulting from th s e useorrelianc e upon the informa tion a nd da t a c o ntained inthism a p

Hardwood Forests Division Forestry Harvest and Haul Plan Corporation

State Forest Tomerong Compartments 1199

Management Area IFOA Region South Coast

Harvest Plan No. 10553 Supply Zone Coastal

Legal Conditions Native Forest Harvesting in accordance with IFOA conditions. Specified Forestry Activities do not have EPL coverage. To implement this plan you must hold a current Contractors Licence. Standard Harvest Plan Conditions and Operating Procedures apply. Survey expiry date for this plan is 31/01/2024.

Certification Timber products removed from the plan area are within the Defined Forest Area covered by Australian Forestry Standard AS4708:2013 Certificate 604224 Resources Forester Date: Prepared by 18/03/2014 Josh Driscoll Josh Driscoll

Regional Manager Date: Approved by Daniel Tuan 25/03/2014 Daniel Tuan

Abbreviations FT = Forest Technician, HC = Harvesting Coordinator, PtS= Protection Supervisor, HS = Harvesting Supervisor, RC = Roading Coordinator, Crew = Harvest Contractor/Forest Operators, IFOA = Integrated Forestry Operations Approval, TSL = Threatened Species Licence, EPL = Environment Protection Licence, FL = Fisheries Licence, CH = Cultural Heritage, SOP = Standard Operating Procedure.

1. Harvest Area Details Cpt 1199 Plan Compartment ID 20731 Gross Area (ha) 213 Harvest Area (ha) 180 Estimated Yield (m3) 3,800 Yield/ha (m3/ha) 22 Slope (% 0-20 degrees) 100 Contractor must ensure timber removed is allocated to the correct compartment when Slope (% 20-25 degrees) 0 entered into Electronic Delivery Docket. Slope (% 25-30 degrees) 0

Document title: HP_BB_1199_13_v3 Version No.3 Page 1 of 13 Harvest Plan no.: 20731 Approval Date: 25/03/2014 Expiry Date: 31/1/2024 Warning: a printed copy of this document may be uncontrolled. Please verify this is the latest version prior to use. 2. Management Conditions on Boundaries Boundary Conditions Private Property Private property surrounds the compartment, as indicated on the HPOM. Private property owners have been notified of the scheduled harvesting and post-harvest burning. The PP boundary must be located and marked by the FT. The boundary location should be identified using on ground survey markers (cairns, blazes, pegs etc) and compass bearings. As a last resort FCMapApp and GPS may be used with caution. Seek advice from the planner if required. FMZ The entire compartment is FMZ 3B – Special Prescription (Visual, Wildlife & Education). The silvicultural treatment detailed in the harvesting prescription table of this plan (STS medium) is considered to adequately address the values of this zone. No special prescriptions apply. FMZ 3B (Visual) – A visual protection zone exists 100 metres wide parallel to the Jervis Bay Road. The FT is not required to mark this boundary but must supervise implementation of modified harvesting prescriptions (see table 7). FMZ 3B (Wildlife) – The majority of the Net Harvest Area is FMZ 3B (Wildlife). In this zone, the management and production activities should aim to maintain the area as a contiguous forested wildlife corridor within the Jervis Bay area. The moderate intensity STS silviculture combined with stream exclusion zones, will achieve this management objective. FMZ 3B (Education) – A small area to the east of the intersection of Castor Road and Mars Road. Research A Silvicultural demonstration site was established in 1995 consisting of six square plots (80m x 80m) and two triangular plots. One triangular plot occurs within the compartment and is located east of the Castor road and Mars road intersection. This area is to be treated the same as the surrounding area. An area at Dump 5 with five wooden pegs was discovered during surveys. This is not associated with any known trials or research plots. This area is to be treated the same as the surrounding area. Any other inventory plots located during the harvesting operation which are not shown on the HPOM or described above are to be treated the same as the surrounding area. National Park Woollamia Nature Reserve forms the south eastern boundary of the planning unit area. No harvest disturbance is permitted within National Park or Nature Reserves. The south eastern boundary of the harvest area is a 4th order drainage line and there is a further 300m of excluded forest between the harvest area and the Woollamia Nature Reserve. The boundary between compartment 1199 and Nature Reserve does not require marking and control lines are not required along the boundary. Cultural Heritage Surveys have been conducted. No sites occur within the compartment. If any potential heritage sites are identified notify the planner immediately.

* Where field boundary marking instructions differ from SOP2: Exclusion Zone Boundary Management, the instructions in this Harvest Plan apply.

Document title: HP_BB_1199_13_v3 Version No.3 Page 2 of 13 Harvest Plan no.: 20731 Approval Date: 25/03/2014 Expiry Date: 31/1/2024 Warning: a printed copy of this document may be uncontrolled. Please verify this is the latest version prior to use. 3. Expected Yields

Volume Product Estimates Species Species Mix (Sawlog) (m3) HQ Large Sawlog (Quota) 0 SG 40% HQ Small Sawlog 600 BBT 40% Poles, Piles and Girders 1,700 IBK 5% LQ Sawlog (Salvage) 500 TRP 5% Pulp (1m3 = 1.2t) 500 BW 5% Firewood/Misc (1m3 = 1.2t) 500 WS 5% Total 3,800

4. Haulage Haul Route East along Pepper Road (FCNSW owned road) turning north west (left) onto Jervis Bay Road (Shoalhaven Shire Council owned 100km/hr road) and then north or south via (RMS controlled 100km/hr Road). The intersection of Pepper Road and Jervis Bay road has been assessed as meeting a minimum of 200m on both approaches. Therefore additional signage in accordance with a traffic control plan is not required School Bus Routes Jervis Bay Road is used by a school buses between the hours of 7:30am to 8:30 am and 3:30pm to 4:30pm. On weekdays, to the greatest extent practicable, log haulage should avoid school bus times on the above roads. Traffic Control Plan Traffic control is required when harvesting within 2 tree lengths of Jervis Bay Road road. The production Supervisor is responsible for the development and implementation of a TCP if required. The HC must assess Forestry Road intersections along the haulage route for additional signage requirements

5. Community Issue Detail Conditions

Noise All dumps When working in areas close to residential properties, machinery (including chainsaws) operating hours will be limited to between 7am and 8pm Monday to Friday, and 8am to 12pm on Saturdays. Machinery must not be operated on Sundays and Public Holidays.

Notifications Required Nil All relevant notifications have been conducted. A notification list for FCNSW staff is available from the planner. Private Property owners of must be contacted before harvesting within two tree lengths of the Private Property boundary. A contact list is available as an attachment to this plan.

Document title: HP_BB_1199_13_v3 Version No.3 Page 3 of 13 Harvest Plan no.: 20731 Approval Date: 25/03/2014 Expiry Date: 31/1/2024 Warning: a printed copy of this document may be uncontrolled. Please verify this is the latest version prior to use. Permit to Enter Nil Required

Neighbours

National Parks Nil Woollamia Nature Reserve forms the south eastern boundary of the planning unit area. The south eastern boundary of the harvest area is a 4th order drainage line and there is a further 300m of excluded forest between the harvest area and the Woollamia Nature Reserve. The boundary between compartment 1199 and Nature Reserve does not require marking and control lines are not required along the boundary. No harvest disturbance is permitted within National Park or Nature Reserves. Myrtle Rust has been identified within the Pests/Weeds Myrtle Rust compartment at three locations (table below shows coordinates) and has been flagged with pink tape in the field. Refer to Southern Region Myrtle Rust field guide attached to this plan.

Identified Myrtle Rust (MGA)

Eastings Northings

280109 6122144

279883 6122202

279887 6122216

To prevent further spread the crew/haulage operators must ensure all harvesting machinery, equipment and vehicles heading west from or south into Victoria are checked and all infected vegetation removed.

Forest Permits 3 apiary ranges are occupied. Contact Name Site # Contact

I I I I Bee Permit holders must be contacted by the HC at least two weeks prior to use of any log dumps that are occupied by bee hives. Log dump 6 is a permanent set down site. The crew must

leave the dump free of debris and the dump surface even and flat.

Document title: HP_BB_1199_13_v3 Version No.3 Page 4 of 13 Harvest Plan no.: 20731 Approval Date: 25/03/2014 Expiry Date: 31/1/2024 Warning: a printed copy of this document may be uncontrolled. Please verify this is the latest version prior to use.

6. Infrastructure Infrastructure Conditions

Utilities Underground Telecommunication cable owned by Telstra runs adjacent to Jervis Bay Road and Caster Road in the eastern corner of the compartment and is shown on the HPOM. The FT must check the field markers to ensure they are adequate if requires hang additional flagging tape to show location. If snigging or forwarding over the cable is required the crew must contact an Accredited Plant Locator (Coastal Cable Locators Pty Ltd) on 02 4457 1258 or 0427 975 777 to determine cable depth and suitable crossing point prior to commencing the activity. The crew must report all damage to underground utilities immediately.

Overhead Powerlines An overhead electricity line runs from the intersection of Jervis Bay Rd and Pepper Rd, parallel with Pepper Rd to Mar’s Rd intersection and continues parallel with Mar’s Rd until Log Dump 7. Safe Work Practice for working near overhead power lines must be implemented by the crew before any work is undertaken within 2 tree lengths. Telecommunications A telecommications tower occurs to the east of Dump 7. tower Safe Work Practice for working near overhead power lines must be implemented by the crew before any work is undertaken within 2 tree lengths.

Control Lines for Post In this compartment, post log burning must be prevented from entering the Log Burning private property. Refer also to Section 5: Community – Neighbour above. Control lines to be constructed by the crew are indicatively mapped on HPOM, however final location will depend on snig tracks and areas harvested. The PA must liaise with the Protection Coordinator during harvesting to more accurately plan where control lines are required.

Existing Fire Trails Existing fire trails and through access should be left in a trafficable condition, free of harvesting debris and any installed rollovers must be trafficable.

7. Harvesting Conditions

Silviculture Type Harvesting Objectives and Stand Condition

Stand description The harvest area is a predominantly even aged regrowth forest dominated by Spotted Gum and Blackbutt, with occurrences of Grey Ironbark, Red Bloodwood, White Stringybark, Turpentine and Bluegum. The harvest area has undergone selective harvesting (targeting sawlogs) in the 90’s and previous to that mining timbers were cut in the 80s.

Document title: HP_BB_1199_13_v3 Version No.3 Page 5 of 13 Harvest Plan no.: 20731 Approval Date: 25/03/2014 Expiry Date: 31/1/2024 Warning: a printed copy of this document may be uncontrolled. Please verify this is the latest version prior to use. Objectives of the The primary product of the harvesting is poles and high quality large sawlogs operations (quota logs). Parts of felled logs that do not meet pole or high quality log specifications are segregated and graded into other classifications such as high quality small sawlogs, salvage sawlogs, pulp logs & miscellaneous timbers e.g. split & round posts, firewood, mining timbers & craftwood. To minimize as far as practical damage to and removal of regeneration and advanced regrowth.

In the areas shown on HPOM as “FMZ 3B STS Medium (visual)” an additional objective is to minimize the visual impact of the operation. STS Medium Crew to remove all merchantable sawlog stems from mature trees not marked for retention. RU1 Crew to retain well-formed seed trees of preferred species at ~40 m spacing HC to instruct crew to retain patches of quality advanced regeneration where they occur. Crew to remove all merchantable stems not marked for retention and ensure mechanical disturbance creates a suitable seed bed for regeneration. The crew is responsible for protecting retained seed trees and retaining patches of advanced regeneration.

STS Medium (Visual) Apply STS medium condition detailed above, retaining additional trees as necessary to ensure the retained stand has an even spacing of trees with no large RU2 gaps in the canopy. HC may choose to mark trees for removal if this assists the contractor in tree selection. Within 100m of Jervis Bay Road, remove heads or flatten them by cutting them and spreading them. Snigging of timber should be as far away as practical from any roads which are adjacent to the visual area. Where possible understory alongside the road or regrowth to be retained as a visual screen. Forest technician to mark growers for retention as required. Crew is to select trees for removal and avoid damage to retained growers and patched of advanced regeneration.

Excluded Forest As mapped. No harvesting or snigging to occur within this area. To be retained for future harvesting treatments and to manage IFOA basal area limits for this harvesting event.

Monitoring The HC must conduct Basal Area monitoring in areas treated with STS medium. Any changes to treatment and offset areas need to be endorsed by the Operations Planning Manager. IFOA Limits STS Medium STS Tract 180ha Pre-harvest BA 21m2 Post-harvest BA 14m2 Planned Removal 35%

Document title: HP_BB_1199_13_v3 Version No.3 Page 6 of 13 Harvest Plan no.: 20731 Approval Date: 25/03/2014 Expiry Date: 31/1/2024 Warning: a printed copy of this document may be uncontrolled. Please verify this is the latest version prior to use. 8. Tree Retention - refer to TSL booklet for full conditions

Prescription Condition/Responsibility

Mark-Up – the FT is responsible for marking up the forest ahead of harvesting operations consistent Forest Mark Up and Tree Retention SOP

Compartment Mark-Up Survey Compartment mark-up surveys must be conducted at least 100m in advance of operations. The survey must search for threatened and (5.1, 5.2) protected species features listed in conditions 5.1 and 5.2 of the TSL.

Hollow-bearing and Regrowth Zone – TSL 5.6 conditions apply. Recruitment tree retention (H Additional H trees for Greater Glider condition does not apply. and R) FT must select and mark 5 H trees/ha where available and one R for each H retained.

Significant Food Resources FT must mark for retention- 4 Eucalypt feed trees/2 ha where they occur. All glider sap feed trees, stands of forest oak and forest oak feed trees (5.6 g) must be marked for retention. Ironbark and Spotted Gum are suitable E tree species present in these compartments.

Harvesting - crew and HC responsibilities

Protection of Retained Trees Trees marked or selected for retention must not be felled. (5.6g) The crew must minimise damage to H, R and E trees by using directional felling. Harvesting debris should not accumulate within 5 m of retained trees. Where debris does accumulate the crew must removed or flatten to < 1m high. The HC must be notified of any badly damaged retained trees and they must assess and record if a replacement retained tree is required.

Stag Retention (Dead standing The crew should retain stags where safe to do so. trees 5.6e) The crew must record the date, DBH, risk and location of unsafe stags removed

Impenetrable Understory In areas mapped by the FT as Impenetrable Understory procedures for harvesting in un-marked forest must be implemented by the HC and Crew.

Significant Food Resources The crew should avoid damaging flowering or fruiting banksias or grass trees. (5.6 g)

Document title: HP_BB_1199_13_v3 Version No.3 Page 7 of 13 Harvest Plan no.: 20731 Approval Date: 25/03/2014 Expiry Date: 31/1/2024 Warning: a printed copy of this document may be uncontrolled. Please verify this is the latest version prior to use.

9. Site-Specific Flora and Fauna

Boundary Prescription Condition Type

Riparian Habitat Pink/Red Implement filter strip (hard) and protection zone (soft) around Protection (5.7) Tape drainage features as shown on the HPOM. Refer to SOP1. FT must mark the location of UMDL with red (5m) tape and 1st order protection zone boundary with pink tape. (Lidar Corrected) The crew will locate and protect all 2nd order and above streams with GPS.

Ground Habitat N/A Due to the presence of Scarlet Robin damage to ground habitat should (5.17 d) be minimised. The crew should not collect dead fallen timber from the forest floor.

Melaleuca biconvexa Pink Three records are located the compartment. Refer to HPOM and MGA (6.16.2) Tape coordinates listed below:

Eastings Northings Notes

282217 6120910 Located during planning, not marked

282154 6120970 Historic record, not marked during planning

281854 6121530 Historic record, not marked during planning

Condition 6.16.2 applies where if records are detected in or within 20m of the compartment implement: - 10m exclusion around individuals - 10m buffer zone around the exclusion zone. In the buffer zone snigging and selective tree removal is permitted, post log burning is to be excluded as far as practical. When applying condition 6.16.2 to this record, the exclusion zone must be marked by the FT. Apply condition 6.16.2 to any additional individuals of this species detected during the operation. Eucalyptus Pink No records present within the compartment. sturgissiana, Tape Pterostylis ventricose If records are detected in or within 20m of the compartment (6.16.2) implement: - 10m exclusion around individuals - 10m buffer zone around the exclusion zone. In the buffer zone snigging and selective tree removal is permitted, post log burning is to be excluded as far as practical.

Eastern Bristlebird Pink No records present within the compartment. Dasyornis Tape If this species is detected in or within 100m of the compartment brachypterus boundaries cease operations immediately and inform PS.

Document title: HP_BB_1199_13_v3 Version No.3 Page 8 of 13 Harvest Plan no.: 20731 Approval Date: 25/03/2014 Expiry Date: 31/1/2024 Warning: a printed copy of this document may be uncontrolled. Please verify this is the latest version prior to use. Rhizanthella slateri Pink No records present within the compartment. Tape If this species is detected in or within 100m of the compartment boundaries cease operations immediately and inform PS. Species profile is attached to plan.

Threatened Frog Pink A dam is present in the compartment near Dump 5 and is shown on the General Protection Tape HPOM. A 10m exclusion zone applies around the dam. Measures (5.12a) The FT must mark the exclusion zone boundary with pink tape.

Fish N/A No fisheries licence conditions apply.

* Where field boundary marking instructions differ from SOP2: Exclusion Zone Boundary Management, the instructions in this Harvest Plan apply.

10. Soil & Water – Refer to EPL Booklet for full conditions

Issue Assessment Conditions

EPL Scheduled Activity No

Unmapped drainage Line Permitted Apply UMDL BMP’s. The FT must mark UMDL’s using harvesting red (5m) tape

Inherent hazard level 2 Nil

Inherent Hazard Level 4 Areas No Nil

Dispersible Soils No Nil

Mass Movement / Instability No Nil

Seasonality Conditions No Nil

Historical or existing erosion No Nil

Ground cover >70% Nil

Seasonal Burning conditions No Nil

Log Dumps SOP 5 HC is responsible for authorising moving the location of a log dump.

Roading management during SOP 6 Refer to SOP 6. harvesting HC is responsible for monitoring road and crossing drainage during haulage.

Wet Weather and Rutting SOP 6 Crew is responsible for implementing automatic closures and following notified closures. HC is responsible for ensuring crew notified when notified closure is lifted.

Document title: HP_BB_1199_13_v3 Version No.3 Page 9 of 13 Harvest Plan no.: 20731 Approval Date: 25/03/2014 Expiry Date: 31/1/2024 Warning: a printed copy of this document may be uncontrolled. Please verify this is the latest version prior to use. Snigging SOP 8 Crew is responsible for progressive drainage of snig tracks

Snig Track Crossings SOP 9 HC is responsible to ensure snig track crossings are approved prior to use and rehabilitated upon completion.

11. Snig Track Crossing Approvals All crossing approvals are shown on the operational map – any other feature crossings must be assessed, recorded below and approved by the Operations Planning Manager before use.

Crossing EPA Conditions Approval Utilise existing road surface crossing (as per EPL). S1, mapped 2nd order, occurs N/A Install rock as required. as a drainage depression at the crossing point. Existing Crossing Utilise existing road/bridge surface crossing (as per S2, Mapped 3rd order, earth N/A EPL). Install rock as required. deck bridge.

Existing Crossing

12. Operational Plan Briefing:

See HC Notes documentation for Compartment 1199 (in OneDrive) for persons briefed on this plan.

13. Acknowledgement of Briefing:

See HC Notes documentation for Compartment 1199 (in OneDrive) for persons briefed on this plan.

Document title: HP_BB_1199_13_v3 Version No.3 Page 10 of 13 Harvest Plan no.: 20731 Approval Date: 25/03/2014 Expiry Date: 31/1/2024 Warning: a printed copy of this document may be uncontrolled. Please verify this is the latest version prior to use. 14. Standard Operating Procedures: The following SOP’s apply to this plan. FCNSW staff and the crew must hold a copy on site whilst operating and comply with the conditions set out in each SOP.

Procedure Title Number 1 Drainage Feature Protection

2 Exclusion Zone Boundary Management

3 Forest Mark-Up

4 Operating in Inherent Hazard Level 3 Areas

5 Log Dump Operation and Use

6 Road and Crossing Management and Wet Weather Controls

7 Safety Requirements

8 Snigging and Snig Track Crossings

9 Tree felling and servicing of logs and products

Document title: HP_BB_1199_13_v3 Version No.3 Page 11 of 13 Harvest Plan no.: 20731 Approval Date: 25/03/2014 Expiry Date: 31/1/2024 Warning: a printed copy of this document may be uncontrolled. Please verify this is the latest version prior to use. Roading Plan: Maintenance works not completed by RC must be recorded and passed onto the HC for completion and documentation. The start and finish dates of all maintenance and construction must be recorded on the roading sheet within the HC Notes excel document in OneDrive, along with other relevant changes or explanations. All rubber flaps on minor forest roads must be removed and replaced with trafficable rollover banks on completion of operation. Summary of roading requirements Feature Details Works Required Existing roads to be used. 8,648m/6 Yes New roads to be constructed 0 NA Existing crossings used 4 Yes New crossings to be constructed 0 NA Length of road >10° 0m NA Borrow pits and gravel pits 0 NA Mass movement prescriptions apply No NA Dispersible soil conditions apply No NA Seasonality provisions apply No NA

Checklist of works required on roads & crossings Road/Crossing Name Works Required Pepper Road Grade/reshape pavement where required. 1,176 m Roadside Clearing (3m either side) where required. Mars Road Maintain existing mitre drains – ensure clear & working. 1,637 m Reshape Rollover drainage where required. Castor Road RC/HC Comments: 3,293 m Pollux Road 896 m Venus Road 886 m Cpt 1199/6 Rd 760 m (Contractors responsibility)

C1 (Castor Road) Natural Causeway crossing. Mapped order drainage Armour depression with rock/gravel if required in wet conditions. line, occurs as a drainage Northern approach 5-30m drainage: Install new mitres on either side of line in the field. road at 30m. E 0282068 Southern approach 5-30m drainage: Maintain existing rollover at 20m. N 6121489 RC/HC Comments:

Document title: HP_BB_1199_13_v3 Version No.3 Page 12 of 13 Harvest Plan no.: 20731 Approval Date: 25/03/2014 Expiry Date: 31/1/2024 Warning: a printed copy of this document may be uncontrolled. Please verify this is the latest version prior to use. C2 (Castor Road) Armour depression with rock/gravel if required in wet conditions. Mapped 1st order drainage Northern approach 5-30 m drainage: Install new mitres on either side of line, occurs as a drainage road at 23m. depression in the field. The existing rollover drainage structure <5m north of C2 to be removed. E 0281583 Southern approach 5-30m drainage: The existing mitres 28m south of C2 N 6121449 is proposed to be maintained. RC/HC Comments: