Appendix E. Watershed Rankings Raw Results from RPS Tool
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Thames River Basin Partnership Partners in Action Quarterly Report
Thames River Basin Partnership Partners in Action Quarterly Report Summer 2018 Volume 47 The Thames River watershed includes the Five Mile, French, Moosup, Natchaug, Pachaug, Quinebaug, Shetucket, Willimantic, and Yantic Rivers and all their tributaries. We’re not just the "Thames main stem." Greetings from the Thames River Basin Partnership. Once again this quarter our partners have proven their ability to work cooperatively on projects compatible with the TRBP Workplan and in support of our common mission statement to share organizational resources and to develop a regional approach to natural resource protection. I hope you enjoy reading about these activities as much as I enjoy sharing information about them with you. For more information on any of these updates, just click on the blue website hyperlinks in this e-publication, but be sure to come back to finish reading the rest of the report. Jean Pillo, Watershed Conservation Project Manager Eastern Connecticut Conservation District And TRBP Coordinator Special Presentation If you missed the July 2018 meeting of the Thames River Basin Partnership, then you missed a presentation by Chuck Toal, Avalonia Land Conservancy’s development and programs director. Chuck gave a presentation on the 50 years of accomplishments of ALC as a regional land trust. ALC is focused on 22 towns in southeastern Connecticut. ALC, which oversees 4000 acres of preserved land, achieved accreditation in 2017. Their success has resulted from a working board of directors and the establishment of town committees to focus on smaller areas. Their current focus is to be more selective on land acquisition, particularly concentrating on building blocks of open space while also building an endowment fund land stewardship going forward. -
Ffy 2019 Annual Listing of Obligated Projects Per 23 Cfr 450.334
FFY 2019 ANNUAL LISTING OF OBLIGATED PROJECTS PER 23 CFR 450.334 Agency ProjInfo_ID MassDOT _Project Description▼ Obligation FFY 2019 FFY 2019 Remaining Date Programmed Obligated Federal Advance Federal Fund Fund Construction Fund REGION : BERKSHIRE MassDOT 603255 PITTSFIELD- BRIDGE REPLACEMENT, P-10-049, LAKEWAY DRIVE OVER ONOTA 10-Jul-19 $2,919,968.00 $2,825,199.25 Highway LAKE MassDOT 606462 LENOX- RECONSTRUCTION & MINOR WIDENING ON WALKER STREET 15-Apr-19 $2,286,543.00 $2,037,608.80 Highway MassDOT 606890 ADAMS- NORTH ADAMS- ASHUWILLTICOOK RAIL TRAIL EXTENSION TO ROUTE 21-Aug-19 $800,000.00 $561,003.06 Highway 8A (HODGES CROSS ROAD) MassDOT 607760 PITTSFIELD- INTERSECTION & SIGNAL IMPROVEMENTS AT 9 LOCATIONS ALONG 11-Sep-19 $3,476,402.00 $3,473,966.52 Highway SR 8 & SR 9 MassDOT 608243 NEW MARLBOROUGH- BRIDGE REPLACEMENT, N-08-010, UMPACHENE FALLS 25-Apr-19 $1,281,618.00 $1,428,691.48 Highway OVER KONKAPOT RIVER MassDOT 608263 SHEFFIELD- BRIDGE REPLACEMENT, S-10-019, BERKSHIRE SCHOOL ROAD OVER 20-Feb-19 $2,783,446.00 $3,180,560.93 Highway SCHENOB BROOK MassDOT 608351 ADAMS- CHESHIRE- LANESBOROUGH- RESURFACING ON THE 25-Jun-19 $4,261,208.00 $4,222,366.48 Highway ASHUWILLTICOOK RAIL TRAIL, FROM THE PITTSFIELD T.L. TO THE ADAMS VISITOR CENTER MassDOT 608523 PITTSFIELD- BRIDGE REPLACEMENT, P-10-042, NEW ROAD OVER WEST 17-Jun-19 $2,243,952.00 $2,196,767.54 Highway BRANCH OF THE HOUSATONIC RIVER BERKSHIRE REGION TOTAL : $20,053,137.00 $19,926,164.06 Wednesday, November 6, 2019 Page 1 of 20 FFY 2019 ANNUAL LISTING OF OBLIGATED PROJECTS PER -
LIS Impervious Surface Final Report
PROJECT COMPLETION REPORT Mapping and Monitoring Changes in Impervious Surfaces in the Long Island Sound Watershed March 2006 James D. Hurd, Research Associate Daniel L. Civco, Principal Investigator Sandy Prisloe, Co-Investigator Chester Arnold, Co-Investigator Center for Land use Education And Research (CLEAR) Department of Natural Resources Management & Engineering College of Agriculture and Natural Resources The University of Connecticut Storrs, CT 06269-4087 Table of Contents Introduction . 4 Study Area and Data . 5 Land Cover Classification . 7 Sub-pixel Classification Overview . 8 Initial Sub-pixel Classification . 10 Post-classification Processing . 10 Validation . 13 Reseults and Discussion. 15 References . 18 Appendix A: Per Pixel Comparison of Planimetric and Estimated Percent Impervious Surfaces .. 21 Appendix B: Comparison of Planimetric and Estimated Percent Impervious Surfaces Summarized Over Grid Cells of Various Sizes. 34 Appendix C: Summary of Impervious Surfaces per Sub-regional Watershed . 46 Appendix D: Table of Deliverables . 56 i List of Figures Figure 1. Hydrologic impact of urbanization flowchart . 5 Figure 2. Study area . 6 Figure 3. Examples of land cover for 1985, 1990, 1995, and 2002 . 8 Figure 4. IMAGINE Sub-pixel Classifier process . 9 Figure 5. Examples of raw impervious surface estimates for 1985, 1990, 1995, and 2002 11 Figure 6. Examples of final impervious surface estimates for 1985, 1990, 1995, and 2002 14 Figure A-1. 1990 West Hartford validation data (area 1) and difference graph . 22 Figure A-2. 1990 West Hartford validation data (area 2) and difference graph . 23 Figure A-3. 1995 Marlborough validation data and difference graph . 24 Figure A-4. 1995 Waterford validation data (area 1) and difference graph . -
Geographical Distribution and Potential for Adverse Biological Effects of Selected Trace Elements and Organic Compounds in Strea
Geographical Distribution and Potential for Adverse Biological Effects of Selected Trace Elements and Organic Compounds in Streambed Sediment in the Connecticut, Housatonic, and Thames River Basins, 1992-94 By Robert F. Breault and Sandra L. Harris Abstract exceed sediment-quality guidelines over a wider geographical area, although usually by lower Streambed-sediment samples were collected ratios of contaminant concentration to sediment- in 1992-94 at selected sites in the Connecticut, quality guideline than the organic compounds. Housatonic, and Thames River Basins to determine the geographical distribution of trace elements and organic compounds and their INTRODUCTION potential for adverse biological effects on aquatic organisms. Chromium, copper, lead, mercury, The Connecticut, Housatonic, and Thames River Basins study unit is one of 59 National Water-Quality nickel, zinc, chlordane, DDT, PAHs, and PCBs Assessment (NAWQA) study units nationwide. The were detected in samples from throughout the study unit drainage basin comprises an area of almost basins, but concentrations of these constituents 16,000 mi2 and extends through parts of the Province of generally were lowest in the northern forested Quebec, Canada, eastern Vermont, western New Hamp- drainage basins and highest in the southern shire, west-central Massachusetts, nearly all of Connect- urbanized drainage basins of Springfield, icut, and small parts of New York and Rhode Island. Massachusetts, and Hartford, New Haven and The study unit is entirely within the New Bridgeport, Connecticut. Possible anthropogenic England Physiographic Province (Fenneman, 1938), a sources of these contaminants include industrial plateau-like upland that rises gradually from the sea but effluent; municipal wastewater; runoff from includes numerous mountain ranges and individual agricultural, urban and forested areas; and peaks. -
CT DEEP 2018 FISHING REPORT NUMBER 1 Channel Catfish (Ictalurus Punctatus) 4/26/2018 Brown Trout (Salmo Trutta)
CT DEEP 2018 FISHING REPORT NUMBER 1 Channel catfish (Ictalurus punctatus) 4/26/2018 Brown Trout (Salmo trutta) YOU CAN FIND US DIRECTLY ON FACEBOOK. This page features a variety of information on fishing, hunting, and wildlife watching in Connecticut. The address is www.facebook.com/CTFishandWildlife. INLAND REPORT OPENING DAY – We had a short blast of warm air temperatures that gave anglers a comfortable Opening Day, however, water temperatures were very cold, possibly contributing to difficult catching for many. Fisheries staff were out at eight of the twelve Trout Parks were stocked on Opening Day and the many kids Connecticut’s Trout & Salmon Stamp: Connecticut present enjoyed helping us stock. Catch percentage has implemented a Trout and Salmon Stamp. 100% was from 60 to 80% at a number of the Trout Parks of the revenue from your investment comes to the including Stratton Brook, Black Rock, Kent Falls, DEEP Bureau of Natural Resources for Fisheries Chatfield Hollow, Valley Falls Park, Southford Falls, and programs. Great Hollow. Many other locations, both river and The Trout and Salmon Stamp is $5 for anyone age 18 stream as well as lake and pond did not give up their or older, including those 65 or older, and $3 for CT recently stocked trout so easily. residents age 16-17. The Stamp is required for the harvest (keeping) of Over 300,000 trout were stocked before Opening Day trout or salmon. into nearly 100 lakes and ponds and over 120 rivers The Stamp is required to FISH in one of these places: and streams located throughout Connecticut. -
Final Amendment to the Restoration Plan
Final Amendment to the Housatonic River Basin Final Natural Resources Restoration Plan, Environmental Assessment, and Environmental Impact Evaluation for Connecticut May 2013 State of Connecticut, Department of Energy and Environmental Protection United States Fish and Wildlife Service National Oceanic and Atmospheric Administration Contents 1.0 INTRODUCTION .................................................................................................................... 4 2.0 ALTERNATIVES ANALYSIS ................................................................................................ 7 2.1 No Action Alternative ........................................................................................................... 7 2.2 Proposed Preferred Alternative ............................................................................................. 7 2.2.1 Power Line Marsh Restoration ...................................................................................... 7 2.2.2 Long Beach West Tidal Marsh Restoration ................................................................. 10 2.2.3 Pin Shop Pond Dam Removal...................................................................................... 12 2.2.4 Old Papermill Pond Dam Removal Feasibility Study ................................................. 15 2.2.5 Housatonic Watershed Habitat Continuity in Northwest Connecticut ........................ 18 2.2.6 Tingue Dam Fish Passage ........................................................................................... -
2014 Aquatic Invasive Species Surveys of New York City Water Supply Reservoirs Within the Catskill/Delaware and Croton Watersheds
2014 aquatic invasive species surveys of New York City water supply reservoirs within the Catskill/Delaware and Croton Watersheds Megan Wilckens1, Holly Waterfield2 and Willard N. Harman3 INTRODUCTION The New York City Department of Environmental Protection (DEP) oversees the management and protection of the New York City water supply reservoirs, which are split between two major watershed systems, referred to as East of Hudson Watersheds (Figure 1) and Catskill/Delaware Watershed (Figure 2). The DEP is concerned about the presence of aquatic invasive species (AIS) in reservoirs because they can threaten water quality and water supply operations (intake pipes and filtration systems), degrade the aquatic ecosystem found there as well as reduce recreational opportunities for the community. Across the United States, AIS cause around $120 billion per year in environmental damages and other losses (Pimentel et al. 2005). The SUNY Oneonta Biological Field Station was contracted by DEP to conduct AIS surveys on five reservoirs; the Ashokan, Rondout, West Branch, New Croton and Kensico reservoirs. Three of these reservoirs, as well as major tributary streams to all five reservoirs, were surveyed for AIS in 2014. This report details the survey results for the Ashokan, Rondout, and West Branch reservoirs, and Esopus Creek, Rondout Creek, West Branch Croton River, East Branch Croton River and Bear Gutter Creek. The intent of each survey was to determine the presence or absence of the twenty- three AIS on the NYC DEP’s AIS priority list (Table 1). This list was created by a subcommittee of the Invasive Species Working Group based on a water supply risk assessment. -
Remediation General Permit Notice of Intent: Silver Lake High School, Kingston, MA: Signature Page, Plans, and Supporting Labora
S . Signature Requirements : the Notice of Intent must be signed by the operator in accordance with the signatory requirements of 40 CFR Section 122 .22. including the following certification : 1 cert,y tinder penalty of law that thus document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, I certify that the information submitted is, to the best of my knowledge and belief, true, accurate, and complete . I cert f, that I am aware that there are significant penalties for submitting false information, including the possibility of fine and inrprisonnrentfor knowing violations . Facility /Site Name : StIvev L.P kc/ d.. p $e.Loo ~ ~, 1 Operator signature: 1 Title : -,CL ~~ 1 Date: ZS 12-vv b Remediation General Permit -Notice of Intent 21 ~YIS,06 ~r FI UN 41IE xtsDA~ CHECK VALVE HUNG PARTICILATE FILTER AIR/WATER SEPARATOR OIL SCAVENGE LINE KNOCKOUT TANK 2' DISCHARGE PRESSIRE GAUGE (0-3 PSI ) INLET (2' NPT) AIR/OIL SEPARATOR TANK - OIL GAUGE i 55 LOW LEVEL SWITCH 0 AIR COOLED HEAT EXCHANGER 0 0 Tuthill Vacu um Systems EOPX - 100 Im UIL DG No. DRAWN : TM 0 lw/03 B997-A100 :56 A APPROVED : ff4E MA CAD FILE W : 996-452A 9EEI I IF 2 a N o® ®®® ®~ R o 1 1111 F =n 0 0 0 0 0 Horiick Co . inc. y ~u~n~uba.+a 91 Pxpn Pok piK s.w. -
Bedrock Geologic Map of the New Milford Quadrangle, Litchfield and Fairfield Counties, Connecticut
U.S. DEPARTMENT OF THE INTERIOR U.S. GEOLOGICAL SURVEY Prepared in cooperation with the State of Connecticut, Geological and Natural History Survey BEDROCK GEOLOGIC MAP OF THE NEW MILFORD QUADRANGLE, LITCHFIELD AND FAIRFIELD COUNTIES, CONNECTICUT By Gregory J. Walsh1 Open-File Report 03-487 This report is preliminary and has not been reviewed for conformity with U.S. Geological Survey editorial standards (or with the North American Stratigraphic Code). Any use of trade, product, or firm names in this publication is for descriptive purposes only and does not imply endorsement by the U.S. Government. ______________________________________________________________________________ 1U.S. Geological Survey P.O. Box 628 Montpelier, Vermont 05601 The map and database of this report are available online at: http://pubs.usgs.gov/of/2003/of03-487/ USGS Open File Report 03-487 On the cover: Photograph of Lake Candlewood from Hubbell Hill in Sherman. View is to the south. Green Island and Deer Island are visible in the center of the view. The Vaughns Neck peninsula is visible on the left side of the photograph. Bedrock Geologic Map of the New Milford Quadrangle, Litchfield and Fairfield Counties, Connecticut 2 USGS Open File Report 03-487 TABLE OF CONTENTS INTRODUCTION .......................................................................................................................... 4 STRATIGRAPHY .......................................................................................................................... 6 MESOPROTEROZOIC GNEISS.............................................................................................. -
Lower Farmington River and Salmon Brook Management Plan June 2011 West Branch Salmon Brook Photo: Joyce Kennedy
Lower Farmington River and Salmon Brook Management Plan June 2011 West Branch Salmon Brook Photo: Joyce Kennedy Front Cover: Farmington River upstream of Unionville, photo by Tom Cameron Though originally from the Midwest, Tom Cameron and his wife have adopted and are truly at home on the Farmington River near Collinsville. For the last 7 years his photography work has been almost entirely outdoors. Special interests include unique lighting conditions, water subjects such as reflections and captured motion, sunrises, and a variety of critters from heron to spiders. Back Cover: Painting by Bill Simpson, Artist/Fly Fisherman, wmsimpson.com When viewing Bill Simpson’s paintings there is the sensation of walking alongside him as he shares his favorite haunts with us. Together we search shoreline sandbars and rips where stripers and blues fight the tide with the safety of deep water near by, or he may lead us above a wooded stream where dappled light rakes the water camouflaging undisturbed trout. Lower Farmington River and Salmon Brook Management Plan June 2011 Lower Farmington and Salmon Brook Wild and Scenic Study C/o FRWA 749 Hopmeadow Street Simsbury, CT 06070 860 658 4442 http://www.lowerfarmingtonriver.org/ June 2011 i Lower Farmington River and Salmon Brook Management Plan June 2011 The Lower Farmington River and Salmon Brook Wild and Scenic Study Committee The Study Committee’s membership includes locally appointed representatives from each town in the Study Area, and representatives from the Connecticut Department of Environmental Protection (CT DEP), the National Park Service (NPS), the Farmington River Watershed Association (FRWA), the Salmon Brook Watershed Association (SBWA), Stanley Black & Decker, the Tariffville Village Association (TVA), the Connecticut Forest and Park Association (CFPA), Whitewater Triple Crown, and the Pequabuck River Watershed Association (PRWA). -
New Marlborough Open Space 2004
New Marlborough Open Space and Recreation Plan March, 2004 2 Table of Contents Section One: Plan Summary 5 Section Two: Statement of Purpose 7 Planning Process and Public Participation 7 Section Three: Community Se�ing 9 Section Four: Environmental Inventory and Analysis 15 A. Geology, Soils, and Topography 15 B. Landscape Character 18 C. Water Resources 18 D. Vegetation 21 E. Fisheries and Wildlife 26 F. Scenic Resources and Unique Environments 27 G. Environmental Challenges 29 Section Five: Inventory of Lands of Conservation 31 and Recreation Interest 31 A. Private Parcels With Permanent Protection 32 B. Private Parcels With Temporary Protection 35 C. Public and Nonprofit Protected Parcels 35 Section Six: Community Goals 39 A. Description of Process 39 B. Statement of Open Space and Recreation Goals 39 Section Seven: Analysis of Needs 41 A. Summary of Resource Protection Needs 41 B. Summary of Community’s Needs 43 C. Management Needs 44 Section Eight: Goals and Objectives 47 Section Nine: Five-Year Action Plan 49 Section Ten: Public Comments 59 Section Eleven: References 61 Appendix 64 3 4 Section One: Plan Summary Section One: Plan Summary Preserving rural character and protecting natural resources are the primary goals for the 2004 New Marlborough Open Space and Recreation Plan (OSRP). Situated in the most southern part of Berkshire County, New Marlborough is off the beaten path, roughly twenty miles from the nearest exit of the Massachuse�s Turnpike. The residents take pride in their sense of place and wish to maintain it. Recent decades of broad economic and demographic changes in New England are affecting the small, rural community of New Marlborough. -
Connecticut River Flow Restoration Study Report
Connecticut River Flow Restoration Study STUDY REPORT A watershed-scale assessment of the potential for flow restoration through dam re-operation THE NATURE CONSERVANCY, U.S. ARMY CORPS OF ENGINEERS, UNIVERSITY OF MASSACHUSETTS AMHERST The Connecticut River Flow Restoration Study A watershed-scale assessment of the potential for flow restoration through dam re-operation Katie Kennedy, The Nature Conservancy Kim Lutz, The Nature Conservancy Christopher Hatfield, U.S. Army Corps of Engineers Leanna Martin, U.S. Army Corps of Engineers Townsend Barker, U.S. Army Corps of Engineers Richard Palmer, University of Massachusetts Amherst Luke Detwiler, University of Massachusetts Amherst Jocelyn Anleitner, University of Massachusetts Amherst John Hickey, U.S. Army Corps of Engineers Kennedy, K., K. Lutz, C. Hatfield, L. Martin, T. Barker, R. Palmer, L. Detwiler, J. Anleitner, J. Hickey. 2018. The Connecticut River Flow Restoration Study: A watershed-scale assessment of the potential for flow restoration through dam re-operation. The Nature Conservancy, U.S. Army Corps of Engineers, and University of Massachusetts Amherst. Northampton, MA. Available: http://nature.org/ctriverwatershed For a quick, easy-to-read overview of the Connecticut River Watershed Study, see our companion “Study Overview” document, available at: http://nature.org/ctriverwatershed June 2018 Table of Contents Table of Contents ..................................................................................................................................................................................................1