PROGRESS REPORT ON N.R.I. WORKS - ZILLA PRAJAPARISHAD,

Name of Dollors/ S. Name of the Name of the Name of the Statge of Year the Name of the Work Pounds Est. Cost Date No. Mandal Habitation Donor Work Rice) Cost/ lakhs)

Division received Lakhs) (Rs.in Lakhs) Progs.No. Department Z.P.General (Rs.inlakhs) funds (Rs.in the Estimated SGRY (CashSGRY + received(Rs.in Adm. Sanction S.F.C.64% asof NRI NRI contribution G.P.Contribution

Formation of the 2002- 1 P.R. Guntur Nambur Uppalagunta road of Sridhar R.Vyuur $1,650 2.20000 0.00000 1.42385 0.00000 0.77615 7306/2002-P5 20.03.2003 Completed 03 Nambur village

Providing Additional 2002- accomodation of Polypop Coorporation 2 P.R. Guntur Prathipadu China Kondrupadu $6,570 9.52000 2.32000 4.08000 0.00000 3.12000 7306/02-P5 25.03.2003 Completed 03 Z.P.H.School at China Nadella Gangadhar Kondrupadu

Providing additional 2002- rooms to Polypop Coorporation 3 P.R. Guntur Prathipadu Chinakondrupadu $6,220 8.50000 2.21520 3.32284 0.00000 2.96196 7306/2002-P5 18.02.2003 Completed 03 Z.P.HighSchool Nadella Gangadhar ,Chinakondrupadu. Constn.of Three additional rooms with 2002- staircase to Gowtham 4 P.R. Guntur Sattenapalli Gudipudi $10,400 8.50000 0.00000 5.50000 0.00000 3.00000 7306/2002-P5 22.06.2002 Completed 03 Z.P.H.S.Building Pinnamaneni (Contribution Rs:3.00 Lakhs) Constn.of Three additional rooms to 2002- Gowtham 5 P.R. Guntur Sattenapalli Gudipudi Z.P.H.S.Building 7.50000 2.25000 3.25000 0.00000 2.00000 7306/2002-P5 22.06.2002 Completed 03 Pinnamaneni (Contribution Rs:2.00 Lakhs)

Const. of compound 2002- 6 P.R. Guntur Sattenapalli Nandigama wall and gate to N.Rao Kopuri $6,300 8.50000 0.00000 5.52920 0.00000 2.97080 7306/2002-P5 20.03.2003 Completed 03 Z.P.High School .

Construction of C.C.Road from Kpta.Raghunadha Babu 2002- 7 P.R. Guntur Ponnekallu (H) to B.Panaiah (H) at Sudhir B.Ponnam $825 1.30000 0.00000 0.91225 0.00000 0.38775 7306/2002-P5 08.10.2002 Completed 03 Ponnekallu Village (Contribution Rs.38775/-) Construction of Community Hall 2002- building near Anjeneya 1200 UK 8 P.R. Guntur Thulluru Rayapudi M.V.Rama Rao 2.80000 0.84000 1.06000 0.00000 0.90000 7306/2002-P5 14.08.2002 Completed 03 swamy temple at Pounds Rayapudi (Contribution Rs:0.90 Lakhs)

Name of Dollors/ S. Name of the Name of the Name of the Statge of Year the Name of the Work Pounds Est. Cost Date No. Mandal Habitation Donor Work Rice) Cost/ lakhs)

Division received Lakhs) (Rs.in Lakhs) Progs.No. Department Z.P.General (Rs.inlakhs) funds (Rs.in the Estimated SGRY (CashSGRY + received(Rs.in Adm. Sanction S.F.C.64% asof NRI NRI contribution G.P.Contribution Completion of the in- complete Community Hall building with compound wall near 2002- Anjeneya swamy 850 9 P.R. Guntur Thulluru Rayapudi M.V.Rama Rao 1.80000 0.00000 1.17950 0.00000 0.62050 7306/2002-P5 28.12.2002 Completed 03 temple at Rayapudi of UK Pounds Thulluru Mandal (contribution of Pounds:850/- (nearly Rs:62050/- Construction of compound wall & 2002- Chowdary 10 P.R. Guntur Vinjanampadu Ground levelling to $2,150 3.00000 0.00000 1.98950 0.00000 1.01050 7306/2002-P5 21.02.2003 Completed 03 Chirumamilla Z.P.High School, Vinjanampadu. Providing C.C. Road from S.Bapaiah (H) to M.Venkateswara Rao 2002- (H) in 11 P.R. Gopalamvaripalem Gopinath Gopalam $4,000 3.50000 1.23000 1.22000 0.00000 1.05000 7306/2002-P5 31.08.2002 Completed 03 Gopalamvaripalem (V) of Chilakaluripet (M) (Contribution Rs:1.05 Lakhs) Providing C.C. Road from Maha Lakshmamma Chettu to 2002- P.Kotaiah (H) in 12 P.R. Narasaraopet Chilakaluripet Gopalamvaripalem Gopinath Gopalam 2.75000 0.97000 0.95500 0.00000 0.82500 7306/2002-P5 31.08.2002 Completed 03 Gopalamvaripalem (V) of Chilakaluripet (M) (Contribution Rs:0.825 Lakhs) Completion of incomplete Community 2002- 13 P.R. Narasaraopet Rompicherla Annavaram Hall at Annavaram Ramanjaneyulu $1,700 2.40000 0.80000 0.80000 0.00000 0.80000 7306/2002-P5 15.03.2003 Completed 03 Village of Rompicherla Mandal. Construction of 3 additional rooms to 2002- Z.P.High School at 14 P.R. Narasaraopet Nadigadda Vijaya Kanneganti $7,200 10.00000 0.00000 6.50000 0.00000 3.50000 184/2002-P5 27.11.2002 Completed 03 Nadigadda (Contribution Rs.350000/-) Constn.of Sub-Mersible cause way across 2002- Konkeru Vagu at 22.6.2002 15 P.R. Narasaraopet Vinukonda Pittambanda Srikanth K.Gudavalli $5,000 10.00000 5.14000 1.56000 0.00000 3.30000 7306/2002-P5 Completed 03 Pittambanda 24.09.2002 (Contribution Rs:3.30 Lakhs)

Name of Dollors/ S. Name of the Name of the Name of the ibution Statge of Year the Name of the Work Pounds Est. Cost Date No. Mandal Habitation Donor Work Rice) Cost/ lakhs)

Division received Lakhs) (Rs.in Lakhs) Progs.No. Department Z.P.General (Rs.inlakhs) funds (Rs.in the Estimated SGRY (CashSGRY + received(Rs.in Adm. Sanction S.F.C.64% asof NRI NRI contr G.P.Contribution Providing CC road to Ambedkar Road in 2002- 16 P.R. Amruthaluru Amruthaluru Amruthaluru S.R.Anjaneyulu $3,136 5.00000 1.50000 2.00000 0.00000 1.50000 7306/2002-P5 22.06.2002 Completed 03 (Contribution Rs:1.50 Lakhs) Construcition of CC road in Nagalingam 2002- 17 P.R. Tenali Amruthaluru Amruthaluru Venkata Sastry Bazar Meenakshi Paruchuri $500 0.70000 0.00000 0.46500 0.00000 0.23500 7306/2002-P5 27.11.2002 Completed 03 (Contribution Rs.23500/-) Constn.of CC roads in 2002- Moparru village Guthikonda Ravindra 18 P.R. Tenali Amruthaluru Moparru $4,500 6.00000 1.80000 2.40000 0.00000 1.80000 7306/2002-P5 22.06.2002 Completed 03 (Contribution Rs:1.80 Babu Lakhs)

Constn.of CC roads in 2002- Harijanawada of Guthikonda Ravindra 19 P.R. Tenali Amruthaluru Moparru $900 1.50000 0.45000 0.60000 0.00000 0.45000 7306/2002-P5 22.06.2002 Completed 03 Moparru (Contribution Babu Rs:0.45 Lakhs) Laying of 250 Mts. CC road from Panguluri Srinivasa Rao [H] 2002- 20 P.R. Tenali Cheruvujammulapalem (Society President) to Puvvada Tanuja $3,300 4.50000 0.00000 2.92100 0.00000 1.57900 7306/2002-P5 30.10.2002 Completed 03 Kurravari Cheruvu (Constribution Rs.156750/-) Constn.of community centre in Harijanawada 2002- 21 P.R. Tenali Pedapulivarru (Ura Malapalli) Gangadhar Nadella $2,800 2.00000 0.60000 0.80000 0.00000 0.60000 7306/2002-P5 22.06.2002 Completed 03 (Contribution Rs:0.60 Lakhs) Constn.of Compound wall to Z.P.H.S., 2002- 22 P.R. Tenali Bhattiprolu Pedapulivarru Pedapulivarru Gangadhar Nadella 2.00000 0.60000 0.77000 0.00000 0.63000 7306/2002-P5 22.06.2002 Completed 03 (Contribution Rs:0.63 Lakhs) Formation of CC road from High School to 2002- 23 P.R. Tenali Bhattiprolu Pedapulivarru Gutta Radhakrishna (H) Gangadhar Nadella 0.40000 0.12000 0.16000 0.00000 0.12000 7306/2002-P5 22.06.2002 Completed 03 (50.0 Mtrs)(Contribution Rs:0.12 Lakhs) Construction of Library- 2002- cum-Community Hall in Lakshmi Ganga 24 P.R. Guntur Bodipalem $5,820 5.00000 0.00000 3.20000 0.00000 1.80000 7306/2002-P5 28.12.2002 Completed 03 Bodipalem (Contribution Chowdary Rs.180000/-) Maintenance to Z.P.High School at 2002- Lakshmi Ganga 25 P.R. Guntur Kakumanu Bodipalem Bodipalem. $500 0.65000 0.00000 0.41000 0.00000 0.24000 7306/2002-P5 28.12.2002 Completed 03 Chowdary (Contribution Rs.24000/-)

Name of Dollors/ S. Name of the Name of the Name of the st. Cost Statge of Year the Name of the Work Pounds E Date No. Mandal Habitation Donor Work Rice) Cost/ lakhs)

Division received Lakhs) (Rs.in Lakhs) Progs.No. Department Z.P.General (Rs.inlakhs) funds (Rs.in the Estimated SGRY (CashSGRY + received(Rs.in Adm. Sanction S.F.C.64% asof NRI NRI contribution G.P.Contribution

Construction of Toilets 2002- Paruchuri 26 P.R. Guntur Kakumanu to Z.P.H.School at $725 1.00000 0.00000 0.66000 0.00000 0.34000 7306/2002-P5 20.02.2003 Completed 03 Venkateswarallu Chinalingayapalem

Providing CC road from R&B road to Bhavanam 2002- Sankara Rao house in 27 P.R. Tenali Nagaram Zillepalli Prasad Devabhathuni $1,200 0.82000 0.00000 0.53500 0.00000 0.28500 7306/2002-P5 30.10.2002 Completed 03 Zillepalli (Contribution Rs.28500/-)(56,490/- +D.W.Project) Construction of Pucca side drains and C.C. 2003- 28 P.R. Guntur Amaravathi Narukullapadu road at R&B road to B.R.Yalamanchali $6,150 3.00000 0.96000 0.99000 0.00000 1.05000 7306/2002-P5 22.04.2003 Completed 04 Gandhi Bomma at Narukullapadu vidllage Construction of Pucca side drains land C.C. 2003- 29 P.R. Guntur Amaravathi Narukullapadu road Gandhi Bommal to B.R.Yalamanchali 5.25000 1.68000 1.74031 0.00000 1.82969 7306/2002-P5 22.04.2003 Completed 04 P.W.Scheme at Narukullapadu Providing two additonal 2003- class rooms 30 P.R. Guntur Guntur Mallavaram Ravuri Ramesh $1,500 1.90700 0.00000 1.23950 0.00000 0.66750 7306/2002-P5 06.02.2004 Completed 04 M.P.U.P.School in Mallavaram village Providing pipeline for supplying drinking water 2003- from Krishna water Sankara Eye 31 R.W.S. Guntur Pedakakani Pedakakani $7,735 9.94500 0.00000 6.46425 0.00000 3.48075 690/2004-P4 06.02.2004 Completed 04 Resorvoir to Sankara Foundation Eye hospitald at Pedakakani C.C. road from Moparthi Venkateswara Rao 2003- house to Kaveti 32 P.R. Guntur Pedakakani Jammula Subba Rao $1,555 2.00000 0.00000 1.30025 0.00000 0.69975 7306/2002-P5 09.06.2003 Completed 04 Venkateswara Rao house in Uppalapadu village Construction of 2003- additional class room to 33 P.R. Guntur 75 Tyallur G.Padma $1,350 1.72609 0.00000 1.12196 0.00000 0.60413 7306/2002-P5 09.01.2004 Completed 04 Z.P.H.School building in 75 tyallur Formation of C.C. road with drains from Bapatla 2003- Srinivasa Rao 34 P.R. Guntur Nagulapadu road to Arvapalli $2,000 2.60000 0.00000 1.69400 0.00000 0.90600 7306/2002-P5 06.09.2003 Completed 04 Veleneni Krishna House in Nagulapadu village

Name of Dollors/ S. Name of the Name of the Name of the Statge of Year the Name of the Work Pounds Est. Cost Date No. Mandal Habitation Donor Work Rice) Cost/ lakhs)

Division received Lakhs) (Rs.in Lakhs) Progs.No. Department Z.P.General (Rs.inlakhs) funds (Rs.in the Estimated SGRY (CashSGRY + received(Rs.in Adm. Sanction S.F.C.64% asof NRI NRI contribution G.P.Contribution Providing C.C. road from Ramalayam to 2003- 35 P.R. Guntur Garaduchalapalem Kaluva Babu house in Gangadhar Nadella $1,110 1.40971 0.00000 0.91631 0.00000 0.49340 7306/2002-P5 01.03.2004 Completed 04 Garudachalapalem H/o Takkellapalem Construction of a 2003- Building for Z.P.High 36 P.R. Guntur Sattenapalli Kattamuru M.Ramesh Babu $3,887 5.55000 1.60000 2.20000 0.00000 1.75000 7306/2002-P7 24.08.2003 Completed 04 School, Kattamuru of Sattenapalli Mandal

Construction of Gram 2003- Panchayat Office 37 P.R. Guntur Vatticherukuru Rao M.Chalasani $4,875 6.26785 0.00000 4.07410 0.00000 2.19375 7306/2002-P5 03.01.2004 Completed 04 building in Pallapadu village Providing C.C. road to the Main road from 2003- 38 P.R. Narasaraopet Machavaram Chennayapalem Water Tank (R&B) road Bandla Hanumaiah $2,437 3.14071 0.00000 2.04146 0.00000 1.09925 7306/2002-P5 15.12.2003 Completed 04 to S.T. colony in Chennayapalem village Providing C.C. Road from Kandimalla 2003- 39 P.R. Narasaraopet Kanaparru Venkateswaralu house N.Suresh Babu $2,300 2.95800 0.00000 1.92300 0.00000 1.03500 7306/2002-P5 15.12.2003 Completed 04 to Z.P. road in Kanaparru Village,

Improvements to the 2003- 40 P.R. Narasaraopet Narasaraopet Jonnalagadda Communityhall at Ram Mohan Musunuri $3,565 4.51860 0.00000 2.93709 0.00000 1.58151 7306/2002-P5 18.12.2003 Completed 04 Jonnalagadda

Improvements to 2003- 41 P.R. Narasaraopet Narasaraopet Jonnalagadda community hall building Ram Mohan Musunuri $900 1.15000 0.00000 0.74800 0.00000 0.40200 7306/2002-P5 23.11.2003 Completed 04 in Jonnalagadda village.

Construction of four 2003- additional rooms for 42 P.R. Narasaraopet Narasaraopet Kakani Prasad Danda $5,000 6.42900 0.00000 4.17900 0.00000 2.25000 7306/2002-P5 19.12.2003 Completed 04 Z.P.H.School, Kakani village

Completion of 2003- incompleted community Nalluri Nageswara 43 P.R. Narasaraopet Kandlakunta $2,275 2.90485 0.00000 1.88815 0.00000 1.01670 7306/2002-P5 03.03.2004 Completed 04 hall in Kandlakunta Rao village

Development of 2003- Community hall Srinivasa R. 44 P.R. Narasaraopet Rompicherla Annavaram $1,700 2.19000 0.00000 1.42022 0.00000 0.76978 7306/2002-P5 07.10.2003 Completed 04 building at Annavaram Gonuguntla village

Name of Dollors/ S. Name of the Name of the Name of the Statge of Year the Name of the Work Pounds Est. Cost Date No. Mandal Habitation Donor Work Rice) Cost/ lakhs)

Division received Lakhs) (Rs.in Lakhs) Progs.No. Department Z.P.General (Rs.inlakhs) funds (Rs.in the Estimated SGRY (CashSGRY + received(Rs.in Adm. Sanction S.F.C.64% asof NRI NRI contribution G.P.Contribution Providing Culvert 2003- earthwork and Gravel to V.Jaganmohan 45 P.R. Narasaraopet Rompicherla $2,161 2.76000 0.00000 1.79403 0.00000 0.96597 7306/2002-P5 11.02.2004 Completed 04 the road from Reddy Karlakunta to Inumella

Gravelling the road from 2003- V.Jaganmohan 46 P.R. Narasaraopet Rompicherla Karlakunta Karlakunta to Inumella $2,161 2.77000 0.00000 1.80216 0.00000 0.96784 7306/2002-P5 17.10.2003 Completed 04 Reddy in Rompicherla Mandal

Construction of 2003- 47 P.R. Narasaraopet Veldurthy Veldurthy Compound wall to Rao M.Chalasani $2,437 3.14071 0.00000 2.04146 0.00000 1.09925 7306/2002-P5 03.01.2004 Completed 04 Z.P.H.School Veldurthi

Providing C.C. road 2003- from R&B road to water 48 P.R. Tenali Amruthaluru Thurumella G.Ravindranath $1,050 1.33351 0 0.86678 0.00000 0.46673 7306/2002-P5 21.02.2004 Completed 04 tank via Rice Mill in Thurumella village

Development of Zilla 2003- 49 P.R. Tenali Amruthaluru Amarthaluru Parishad High School at Raja Veeraiah Kodali $2,437 3.25000 1.04000 1.07000 0.00000 1.14000 7306/2002 P5 09.05.2003 Completed 04 Amarthaluru

Providing C.C. road from Avula Subba Rao 2003- 50 P.R. Tenali Amruthaluru Mulpur house to Movva S.R.Anjaneyulu $1,520 1.93040 0.00000 1.25476 0.00000 0.67564 7306/2002-P5 08.03.2004 Completed 04 Sreenivasa Rao house in Mulpur village. Providing C.C. road from Kosaraju 2003- Umamaheswara Rao 51 P.R. Tenali Amruthaluru Thurumella S.Veeramasuneni $1,400 1.78000 0.00000 1.15700 0.00000 0.62300 7306/2002-P5 06.02.2004 Completed 04 house to west side canal bund in Thurumella village Prov. C.C. Road from Potharlanka Tippaiah 2003- 52 P.R. Tenali Bhattiprolu Pedapulivarru House to Kosaraju S.Rao Kosaraju $2,300 3.10000 0.00000 2.02000 0.00000 1.08000 7306/2002-P5 15.04.2003 Completed 04 Chandramouli House in Pedapulivarru Village

2003- Renovation of Z.P.High Krishna 53 P.R. Tenali Bhattiprolu Vellaturu $10,000 10.00000 0.00000 6.50000 0.00000 3.50000 7306/2002-P5 06.09.2003 Completed 04 School at Vellaturu Pamidimukkala

2003- Renovation of Z.P.High Krishna 54 P.R. Tenali Bhattiprolu Vellaturu 3.05000 0.00000 1.98489 0.00000 1.06511 7306/2002-P5 26.09.2003 Completed 04 School at Vellatur Pamidimukkala

tion tion Name of Dollors/ S. Name of the Name of the Name of the Statge of Year the Name of the Work Pounds Est. Cost Date No. Mandal Habitation Donor Work Rice) Cost/ lakhs)

Division received Lakhs) (Rs.in Lakhs) Progs.No. Department Z.P.General (Rs.inlakhs) funds (Rs.in the Estimated SGRY (CashSGRY + received(Rs.in Adm. Sanction S.F.C.64% asof NRI NRI contribu G.P.Contribution Providing C.C. road with side drainsin Surya devara 2003- 55 P.R. Guntur Chebrolu Chebrolu devebhakthuni vari Lakshmi Narayana $3,000 3.85285 0.00000 2.50435 0.00000 1.34850 7306/2002-P5 02.12.2003 Completed 04 street in Chebrolu Prasad village Providing cement 2003- concrete pavement to Surendra Babu 56 P.R. Tenali Cherukupalli Kavuru $2,500 3.35000 1.07000 1.11625 0.00000 1.16375 7306/2002 P5 01.05.2003 Completed 04 the Parvataneni vari Parvathaneni steet in Kavur Village.

Completion of 2003- incomplete C.C.road to Parvathaneni Budda 57 P.R. Tenali Cherukupalli Kavuru $1,250 1.65000 0.52000 0.55812 0.00000 0.57188 7306/2002-P5 25.06.2003 Completed 04 the Parvatanenivari Bhagavan street in Kavuru village

2003- Providing PWS Scheme Rama Sarma 58 R.W.S. Tenali Cherukupalli Ponnapalli $7,625 10.00000 0.00000 6.50000 0.00000 3.50000 7751/2003-P4 15.10.2003 Completed 04 to Ponnapalli village Ponnapalli

Providing C.C. to S.C. B.C.Localities in Chilumuru village of Mandal. (a) Kanchagare Sowri (H) to M.Danamma (H) 2003- 59 P.R. Guntur Duggirala (b)V.Jeevaratnam (H) to Nannapaneni Sajana $6,870 8.90000 2.84800 2.93200 0.00000 3.12000 7306/2002-P5 22.04.2003 Completed 04 Alapati Pedapurnaiah field in H.W. © Peruri Krishna (H) to G.P.Oiffice (Rajaka colony) (d) Khadar (H) to Ma Providing C.C. to village internal roads in Chiluvuru village of (1) Alapati Hari Babu Bazar 2003- Katragadda Krishna 60 P.R. Guntur Duggirala Chiluvuru (2) Krishna Mandirama $7,000 9.30000 2.97600 3.06900 0.00000 3.25500 7306/2002-P5 22.04.2003 Completed 04 Prasad Bazar (3) Katragadda Krishna Prasad (H) (R&B Road) to Gadde Sambaiah (H) (4)Yella Sambasiva Rao (H) to Babu shop Construction of Yadla Seetharamaiah 2003- 61 P.R. Guntur Duggirala Chiluvuru Nagabhushanamma Yadla Hema Prasad $6,240 8.10000 0.00000 5.26739 0.00000 2.83261 7306/2002-P5 16.10.2003 Completed 04 Library Building in Chiluvuru village.

Name of Dollors/

S. Name of the Name of the Name of the ribution Statge of Year the Name of the Work Pounds Est. Cost Date No. Mandal Habitation Donor Work Rice) Cost/ lakhs)

Division received Lakhs) (Rs.in Lakhs) Progs.No. Department Z.P.General (Rs.inlakhs) funds (Rs.in the Estimated SGRY (CashSGRY + received(Rs.in Adm. Sanction S.F.C.64% asof NRI NRI contribution G.P.Cont Completion of 2003- incomplete Library cum Chowdary 62 P.R. Guntur Kakumanu Bodipalem $2,060 2.68000 0.00000 1.75300 0.00000 0.92700 7306/2002-P5 06.09.2003 Completed 04 communnity hall in OR.Lakshmi Gan ga Bodipalem village.

Renovation of Burial 2003- 63 P.R. Guntur Kakumanu Bodipalem ground in Bodipalem Ganga Chowdary $1,500 1.95000 0.00000 1.26591 0.00000 0.68409 7306/2002-P5 06.09.2003 Completed 04 village

Constructionof 2003- Z.P.HighSchool 6000 UK 64 P.R. Guntur Kakumanu Kommuru V.Ranga Rao 10.00000 0.00000 6.50000 0.00000 3.50000 7306/2002-P5 21.02.2004 Completed 04 buildingin Kommuru Pounds village

Providing additional 2003- accommodation to 65 P.R. Guntur Kakumanu Kommuru V.Ranga Rao 4.54286 0.00000 2.95286 0.00000 1.59000 7306/2002-P5 21.02.2004 Completed 04 Z.P.HighSchool in Kommuruvillage

Metalling the internal 2003- 66 P.R. Tenali Buddam roads in Buddam Gram Alluru Raju $10,000 4.00000 0.00000 2.60000 0.00000 1.40000 7306/2002-P5 15.11.2003 Completed 04 Panchayat

Providing C.C. internal 2003- 67 P.R. Tenali Karlapalem Buddam roads in Buddam Alluru Raju 8.85000 0.00000 5.75000 0.00000 3.10000 7306/2002-P5 15.11.2003 Completed 04 Grampanchayat

Providing 2003- Addl.Accomodation 68 P.R. Tenali Karlapalem Karlapalem Bagya Kolli $1,100 1.50000 0.48000 0.50184 0.00000 0.51816 7306/2002-P5 23.06.2003 Completed 04 tothe Z.P.HighSchool at Karlapalem

Construction of 2003- Chittemma 69 P.R. Tenali Kollur Kollur Community hall at $6,700 9.10000 2.91000 3.00644 0.00000 3.18356 7306/2002-P5 25.06.2003 Completed 04 Nanapaneni Kollur village

Construction of additional 2003- accommodation to the Chittemma 70 P.R. Tenali Kollur Kollur 8.00000 0.00000 5.20000 0.00000 2.80000 7306/2002-P5 25.11.2003 Completed 04 proposed Zilla Parishad Nanapaneni High School(Girls) in Kollur Village.

Name of Dollors/ S. Name of the Name of the Name of the Statge of Year the Name of the Work Pounds Est. Cost Date No. Mandal Habitation Donor Work Rice) Cost/ lakhs)

Division received Lakhs) (Rs.in Lakhs) Progs.No. Department Z.P.General (Rs.inlakhs) funds (Rs.in the Estimated SGRY (CashSGRY + received(Rs.in Adm. Sanction S.F.C.64% asof NRI NRI contribution G.P.Contribution Construction of Veterinary 2003- 71 P.R. Tenali Kollur Kollur Hospitalbuilding in Chowdary Kommineni $14,700 5.00000 3.38201 0.00000 0.00000 1.61799 3793/2003P8 01.12.2003 Completed 04 Kollur village(cash 219801 and rice 14.80) Completion of 2003- incomplete 72 P.R. Tenali Kollur Kollur Chowdary Kommineni 3.40500 0.00000 2.21323 0.00000 1.19177 7306/2002-P5 24.03.2004 Completed 04 Z.P.H.School (Girls) in Kollur village Construction of Rural Sports Indoor Stadium at 2003- Narasaraju 73 P.R. Tenali P.V.Palem P.V.Palem P.V.Palem.(Z.P.General $6,325 10.00000 0.00000 7.02000 0.00000 2.98000 7306/2002-P5 23.06.2003 Completed 04 Bhagya Kolli funds 5.02076+ M.P.1.00 +G.P. 1.00 Total Rs7.02076. Providing additional 2003- OHSR to PWS Scheme Dhrama Pracharak 74 R.W.S. Guntur Brahmanakoduru $9,345 8.00000 2.56000 2.64000 0.00000 2.80000 7306/2002-P5 15.05.2003 Completed 04 at Brahmanakoduru Ramineni village Providing C.C. road from Suda 2003- Venkateswarlu House Dhrama Pracharak 75 P.R. Guntur Ponnur Brahmanakoduru 2.60000 0.83200 0.85800 0.00000 0.91000 7306/2002-P5 19.05.2003. Completed 04 to Nerella Hari house in Ramineni Brahmana Koduru Village Providing C.C. road from Gullapudi 2003- Rambabu House to Dhrama Pracharak 76 P.R. Guntur Ponnur Brahmanakoduru 1.00000 0.32000 0.33000 0.00000 0.35000 7306/2002-P5 19.05.2003. Completed 04 Lajapathi Rao Shop in Ramineni Brahmana Koduru village. Providing C.C. road to 2003- Bank Street in Dhrama Pracharak 77 P.R. Guntur Ponnur Brahmanakoduru 0.85000 0.27200 0.28050 0.00000 0.29750 7306/2002-P5 19.05.2003. Completed 04 Brahmana Koduru Ramineni Village Construction of additional 2003- Lakshmi Nirmala 78 P.R. Guntur Ponnur Nidubrolu accommodation to $2,150 2.75543 0.00000 1.79103 0.00000 0.96440 7306/2002-P5 17.01.2004 Completed 04 Gogineni Z.P.H.School atNidubrolu

Levelling the ground 2003- 79 P.R. Guntur Ponnur Vellaluru work at VellaLuru Sriharibabu Surineni $1,100 1.50000 0.48000 0.50261 0.00000 0.51739 7306/2002 P5 01.05.2003 Completed 04 Village

Name of Dollors/ S. Name of the Name of the Name of the Statge of Year the Name of the Work Pounds Est. Cost Date No. Mandal Habitation Donor Work Rice) Cost/ lakhs)

Division received Lakhs) (Rs.in Lakhs) Progs.No. Department Z.P.General (Rs.inlakhs) funds (Rs.in the Estimated SGRY (CashSGRY + received(Rs.in Adm. Sanction S.F.C.64% asof NRI NRI contribution G.P.Contribution Construction of 2003- additional Ravindra Rao 80 P.R. Tenali Peteru $11,032 4.18400 0.00000 2.71960 0.00000 1.46440 7306/2002-P5 09.01.2004 Completed 04 accommodation to Paruchuri Z.P.H.School Peteru

Construction of 2003- additional Ravindra Rao 81 P.R. Tenali Repalle Peteru 10.00000 0.00000 6.50000 0.00000 3.50000 7306/2002-P5 09.01.2004 Completed 04 accommodation to Paruchuri Z.P.H.School Peteru

Construction of Foot 2003- Bridge on Kommuru Ranga Nayiki 82 P.R. Tenali Tenali Gudiwada $7,000 9.20000 2.94000 3.04000 0.00000 3.22000 7306/2002-P5 25.06.2003 Completed 04 channal at Gudiwada Yalavarthi village

Completion of 2003- incomplete foot bridge Ranga Nayiki 83 P.R. Tenali Tenali Gudiwada $3,000 3.89000 0.00000 2.53144 0.00000 1.35856 7306/2002-P5 09.10.2003 Completed 04 at Gudivada village on Yalavarthi Kommamur canal Completion of the construction of Foot 2003- Ranga Nayiki 84 P.R. Tenali Tenali Gudiwada Bridge at Gudivada $2,000 2.57145 0.00000 1.67145 0.00000 0.90000 7306/2002-P5 27.02.2004 Completed 04 Yalavarthi village on Kommamuru canal. Construction of additional 2003- accommodation to the 85 P.R. Tenali Tenali sangam Jagarlamudi J.Madhavaiah $2,150 2.74000 0.00000 1.78110 0.00000 0.95890 7306/2002-P5 01.12.2003 Completed 04 Zilla Parishad High School Building at Sangam Jagarlamudi Construction of 2003- Sachivalayam building Sridhar Reddy 86 P.R. Tenali Tsunduru Pedagadelavarru $5,000 6.38300 0.00000 4.14895 0.00000 2.23405 7306/2002-P5 03.03.2004 Completed 04 in Pedagadelavarru Gundam village

Providing C.C. road in 2003- Vallabhaneni 87 P.R. Tenali Zampani Sagarla Bazar in $5,125 2.25000 0.00000 1.46250 0.00000 0.78750 7306/2002-P5 29.10.2003 Completed 04 Yugandhar Zampani village

Providing C.C. road in 2003- Vallabhaneni 88 P.R. Tenali Vemuru Zampani Kothapalem main road 1.50000 0.00000 0.97500 0.00000 0.52500 7306/2002-P5 29.10.2003 Completed 04 Yugandhar in Zampani village

Completion of 2004- incomplete pumping 6-05-2004. 89 R.W.S. Guntur Tadikonda Kanteru Bobba Siva Prakash $7,411.73 9.22000 0.00000 5.90000 0.00000 3.32000 2319/2004-P5 Completed 05 main to D.W.Tank in 02.12.2004 Kanteru Village

Name of Dollors/ S. Name of the Name of the Name of the Statge of Year the Name of the Work Pounds Est. Cost Date No. Mandal Habitation Donor Work Rice) Cost/ lakhs)

Division received Lakhs) (Rs.in Lakhs) Progs.No. Department Z.P.General (Rs.inlakhs) funds (Rs.in the Estimated SGRY (CashSGRY + received(Rs.in Adm. Sanction S.F.C.64% asof NRI NRI contribution G.P.Contribution Providing Ground Levelling and 2004- 14-07- 90 P.R. Guntur Sattenapalli Phanidem Compound wall for the Prasad Podila $11,486 10.00000 0.00000 6.50000 0.00000 3.50000 2996/2004-P5 Completed 05 2004. Z.P.H.School in Phanidem

Providing approach CC 2004- 14-07- 91 P.R. Guntur Sattenapalli Phanidem road to Z.P.H.School in Prasad Podila 4.71809 0.00000 3.06676 0.00000 1.65133 2996/2004-P5 Completed 05 2004. Phanidem

Completion of 2004- incomplete Panchayat 92 P.R. Guntur Vatticherukuru Pallapadu Prasad Podila 2.55625 0.00000 1.66156 0.00000 0.89469 2996/2004-P5 10.08.2004 Completed 05 Office Building in Pallapadu Completion of incomplete Communtiy 2004- 93 P.R. Guntur Chinavadlapudi Hall in Chinavadlapudi Karuna Valeveti $2,500 3.28571 0.00000 2.13571 0.00000 1.15000 2996/2004-P5 10.01.2004 Completed 05 Village in . Completion of 2004- incomplete Panchayat 94 P.R. Guntur Vatticherukuru Pallapadu Krishnaiah Parimi $640 0.76847 0.00000 0.49182 0.00000 0.27665 2996/2004-P5 01.07.2005 Completed 05 Office Building in Pallapadu - 36% Construction of C.C.Drains from Karnati 2004- Smt Chava Prathi 95 P.R. Guntur Atchempat Ambadipudi Nageswara Rao house $700 0.84203 0.00000 0.53890 0.00000 0.30313 2996/2004-P5 02.10.2005 Completed 05 Rao P.Ganta to Parupalli Venkaiah House.

Construction of Farmers 2004- Guduru Nageswara 96 P.R. Guntur Thulluru rest House at Rayapudi $2,500 3.02486 0.00000 1.93591 0.00000 1.08895 2996/2004-P5 02.10.2005 Completed 05 Rao Lift Irrigation Scheme.

2004- Const. of Veternary 97 P.R. Guntur Vatticherukuru Pallapadu Tana Foundation. $3,169 3.80000 1.21253 1.21253 0.00000 1.37494 1638/2004-P8 23.03.2005 Completed 05 Hospital Building.

Const. of CC road from 2004- Sri Pudota Chinnaiah 98 P.R. Guntur Turakapalem Puvvada Lavanya $2,250 2.69888 0.00000 1.72728 0.00000 0.97160 2996/2004-P5 24.03.2005 Completed 05 house to Church compound.

Completion of 2004- Satyanarayana 99 P.R. Guntur Mangalagiri Chinavadlapudi incomplete compound $1,000 1.20114 0.00000 0.76873 0.00000 0.43241 2996/2004-P5 24.03.2005 Completed 05 Valiveti wall to community hall.

Name of Dollors/ S. Name of the Name of the Name of the Statge of Year the Name of the Work Pounds Est. Cost Date No. Mandal Habitation Donor Work Rice) Cost/ lakhs)

Division received Lakhs) (Rs.in Lakhs) Progs.No. Department Z.P.General (Rs.inlakhs) funds (Rs.in the Estimated SGRY (CashSGRY + received(Rs.in Adm. Sanction S.F.C.64% asof NRI NRI contribution G.P.Contribution

2004- Const. of community 100 P.R. Guntur Vatticherukuru Pallapadu Tana Foundation. $1,706 2.05606 0.00000 1.31588 0.00000 0.74018 2996/2004-P5 24.03.2005 Completed 05 hall .

Providing compound 2004- 101 P.R. Guntur Pedanandipadu Kopparru wall and fencing to Babu N Jasti $5,000 6.02603 0.00000 0.00000 3.85666 2.16937 2996/2004-P5 24.03.2005 Completed 05 Z.P.H.School

2004- Development of Sambasiva 102 P.R. Guntur utukuru 2400 2.87250 0.00000 0.00000 1.83840 1.03410 3623/2005-P5 02.07.2005 Completed 05 Z.P.High School

2004- Providing C.C. Road in 103 P.R. Narasaraopet Nadendla Kanaparru N.Suresh Babu $2,370 2.95574 0.00000 1.92123 0.00000 1.03451 2996/2004-P5 05.05.2004 Completed 05 Kanapparru Village

Providing Side Drains 2004- 104 P.R. Narasaraopet Nadendla Kanaparru and CC road in Suneetha Mannam $1,400 1.80360 1.17234 0.00000 0.63126 2996/2004-P5 14.07.2004. Completed 05 Kanaparru

Const. of additional 2004- 105 P.R. Narasaraopet Chilakaluripet Boppudi class rooms to Apparao Guntu $2,213 2.66708 0.00000 0.00000 1.70693 0.96015 2996/2004-P5 24.03.2005 Completed 05 Z.P.H.School

Const. of additional 2004- Gandikota Satya 106 P.R. Narasaraopet Nekarikallu Challagundla class rooms to $6,700 8.06011 0.00000 0.00000 5.15847 2.90164 2996/2004-P5 24.03.2005 Completed 05 Lakshmi Kanth. Z.P.H.School

2004- Construction of C.C. Kotapati Samba Siva 25-05-2004 107 P.R. Tenali Bhattiprolu Oleru $4,600 5.54261 0.00000 3.54727 0.00000 1.99534 2996/2004 P5 Completed 05 road. Rao 10.02.2005

Completion of incomplete Veternary 2004- 108 P.R. Tenali Kollur Kollur Hospital Building in G.L.N.Reddy $4,900 4.50000 1.36300 1.56200 0.00000 1.57500 1638/2004-P8 1-10-2004. Completed 05 Kolluru Village& Mandal. Completion of 2004- incomplete 04-10- 109 P.R. Tenali Kollur Kollur G.L.N.Reddy 1.83460 1.19249 0.00000 0.64211 2996/2004-P5 Completed 05 Z.P.H.School (Girls) in 2004. Kollur village

Name of Dollors/ S. Name of the Name of the Name of the Statge of Year the Name of the Work Pounds Est. Cost Date No. Mandal Habitation Donor Work Rice) Cost/ lakhs)

Division received Lakhs) (Rs.in Lakhs) Progs.No. Department Z.P.General (Rs.inlakhs) funds (Rs.in the Estimated SGRY (CashSGRY + received(Rs.in Adm. Sanction S.F.C.64% asof NRI NRI contribution G.P.Contribution

2004- Renovation of Burial Katragadda Krishna 20-10- 110 P.R. Guntur Duggirala Thummapudi $550 0.53035 0.34475 0.00000 0.18560 2996/2004-P5 Completed 05 Ground. Prasad 2004.

Construction of Community Hall Near 2004- by Gram Panchayat Katragadda Krishna 20-10- 111 P.R. Guntur Duggirala Thummapudi 0.17680 0.00000 0.11490 0.00000 0.06190 2996/2004-P5 Completed 05 Office at Thummapudi Prasad 2004. Village in Duggirala Mandal. Construction of Additional Class rooms to Zilla Parishad High 2004- Siva Sankar 20-10- 112 P.R. Tenali Kollur Ananthavaram School Building at $7,582.50 10.00000 0.00000 6.52949 0.00000 3.47051 2996/2004-P5 Completed 05 Kanakamedala 2004. Ananthavaram Village of Kolluru Mandal - Phase I Construction of CC road from Kurapati Srinivasa Rami Reddy Alla 2004- 113 P.R. Tenali Munnagi Reddy House to Kallam Meka Venkata Siva $3,000 3.85000 0.00000 2.50000 0.00000 1.35000 2996/2004-P5 26.10.2004 Completed 05 Srinivasa Reddy house Parvathi (Pallapugidi bazar). Construction of 2004- additional class Rooms Siva Sankar 114 P.R. Tenali Kollur Ananthavaram $6,700 8.29180 0.00000 5.30675 0.00000 2.98505 2996/2004-P5 20.01.2005 Completed 05 (Phase - II) to Kanakamedala Z.P.H.School. - 36%

Providing CC road 2004- Pavuluri Krishna 115 P.R. Tenali Amruthaluru Govada towards Z.P.H.School $1,700 2.04139 0.00000 1.30649 0.00000 0.73490 2996/2004-P5 10.01.2005 Completed 05 Babu Building.

2004- Construction of 116 P.R. Tenali Kollur Pesarlanka G.Sambasiva Rao $3,915 4.56750 0.00000 2.92320 0.00000 1.64430 2996/2004-P5 10.02.2005 Completed 05 community hall .

2004- 117 P.R. Tenali Bhattiprolu Pedapulivarru Providing C.C road. Nadella Gangadhar $4,587 5.47772 0.00000 0.000 3.50574 1.97198 2996/2004-P5 22.02.2005 Completed 05

Construction of 2004- Additional G.L.N.Reddy 118 P.R. Tenali Kollur Kollur $4,750 8.50131 0.00000 0.000 5.44084 3.06047 2996/2004-P5 22.02.2005 Completed 05 Accomodation to ATA Foundation Z.P.H.S.

Const. of Additonal 2004- Krishna 119 P.R. Tenali Bhattiprolu Vellaturu Class rooms to $5,406 6.51533 0.00000 4.16981 2.34552 2996/2004-P5 01.03.2005 Completed 05 Pamidimukkala Z.P.H.School.

Name of Dollors/ S. Name of the Name of the Name of the Statge of Year the Name of the Work Pounds Est. Cost Date No. Mandal Habitation Donor Work Rice) Cost/ lakhs)

Division received Lakhs) (Rs.in Lakhs) Progs.No. Department Z.P.General (Rs.inlakhs) funds (Rs.in the Estimated SGRY (CashSGRY + received(Rs.in Adm. Sanction S.F.C.64% asof NRI NRI contribution G.P.Contribution

Const. of additiona 2004- Siva Sankar 120 P.R. Tenali Kollur Ananthavaram class rooms (Phase - $7,000 8.44639 0.00000 5.40569 3.04070 2996/2004-P5 02.03.2005 Completed 05 Kanakamedala III) to Z.P.H.School.

Providing Cc road from 2004- Z.P Road to 121 P.R. Tenali Bapatla Narasayapalem Rajendra K Manam $2,000 2.41039 0.00000 1.54265 0.00000 0.86774 2996/2004-P5 01.03.2005 Completed 05 Doppalapudi Subba Rao house. Providing Compound wall Levelling of Play 2004- Katragadda 122 P.R. Guntur Ponnur Nidubrolu Ground and additional $7,000 8.39408 0.00000 0.00000 5.37221 3.02187 2996/2004-P5 23.03.2005 Progress 05 Amarendranadh Amenities to Z.P.High School.

2004- Dr.Paruchuri 123 P.R. Guntur Kakumanu Appapuram Const. of shelter. $1,687 2.03319 0.00000 1.30124 0.00000 0.73195 2996/2004-P5 24.03.2005 Completed 05 Anjaneyulu

2004- Cosntn. Of Veterinary 124 P.R. Guntur Duggirala Pedapalem Mrs. Ghattamaneni $3,200 7.36349 2.35632 2.35631 0.00000 2.65086 2360/2005-P8 23.05.2005. Completed 05 Hospital building.

Formation of Gravel Road from - 2005- Prathipadu R&B road to Sadasiva Rao 125 P.R. Guntur Prathipadu Gottipadu $3,350 4.05000 0.00000 2.59141 0.00000 1.45820 3623/2005-P5 23.05.2005 Completed 06 Kondrupadu via Guntupalli. Papannakunta towards NS Canal. Laying of CC road with side drains from 2005- Sri Raj Mohan 126 P.R. Guntur Pedanandipadu Palaparru Kommineni Nageswara $2,000 2.40000 0.00000 1.53532 0.00000 0.86468 3623/2005-P5 23.05.2005 Completed 06 Muddna Rao House to R&B road. Construction of 2005- Covering Structure in Budda Kumar 127 P.R. Guntur Pedanandipadu Palaparru $400 0.47666 0.00000 0.30506 0.00000 0.17160 3623/2005-P5 25.05.2005 Completed 06 burial ground with Muddana K.L.N.Platform.

Construction of Shed 2005- Budda Kumar 128 P.R. Guntur Pedanandipadu Palaparru with Platform in burial $2,500 2.97000 0.00000 1.89748 0.00000 1.07252 3623/2005-P5 25.05.2005 Completed 06 Muddana ground.

2005- Improvements to PHC 129 P.R. Guntur Pedanandipadu Palaparru Anjani Kalahsthi $3,800 4.40000 1.40800 1.40800 0.00000 1.58400 2360/2005-P8 25.05.2005 Completed 06 Sub -Center building.

Name of Dollors/ S. Name of the Name of the Name of the Statge of Year the Name of the Work Pounds Est. Cost Date No. Mandal Habitation Donor Work Rice) Cost/ lakhs)

Division received Lakhs) (Rs.in Lakhs) Progs.No. Department Z.P.General (Rs.inlakhs) funds (Rs.in the Estimated SGRY (CashSGRY + received(Rs.in Adm. Sanction S.F.C.64% asof NRI NRI contribution G.P.Contribution

2005- Cost. Of Overhead 130 R.W.S. Guntur Thulluru Borupalem NageswararaoGuduru $3,500 4.90000 0.00000 2.68193 0.71000 1.50807 4855/2005-P4. 18.10.2005. Completed 06 Storage Reservior .

2005- Const. of Santhi 131 R.W.S. Guntur Pedakakani Ramachandrapalem $8,000 9.60713 0.00000 6.14856 0.00000 3.45857 4855/2005/P4 12.07.2005 Completed 06 P.W.S.Scheme . Ramanavarapu

2005- Renovation of Hindu 132 P.R. Guntur Thulluru Thullur Sucha Kukatla $2,800 3.35000 0.00000 2.14357 0.00000 1.20643 3623/05-P5 23.08.2005 Completed 06 Funeral Ground

2005- Const. of Bridge on Arakuti Rammohan 133 P.R. Guntur Mangalagiri Yerrabalem $8,300 9.97000 0.00000 6.38250 0.00000 3.58750 3623/05/P5 30.11.2005 Completed 06 Kondaveeti Vagu. Reddy

Const of Additioanl 2005- 134 P.R. Guntur Pedakakani Pedakakani class rooms to Harish Koya $2,900 3.64400 0.00000 0.00000 2.33205 1.31195 3623/05/P5 02.12.2005 Completed 06 Z.P.H.School.

Providing C.C.Road 2005- 135 P.R. Guntur Sattenapalli Nandigama from milk center to Venkata Rao Kamani $2,560 3.20000 0.00000 0.00000 2.04800 1.15200 3623/05/P5 02.12.2005 Completed 06 K.Venkatarao house.

Renovation to the 2005- 136 P.R. Guntur Pedakakani Nambur Burrial Ground near Subba Reddy Tamma $1,100 1.34000 0.00000 0.85820 0.00000 0.48180 3623/05/P5 14.03.2006 Completed 06 well.

Levelling of Site and 2005- 137 P.R. Guntur Pedakakani Nambur Improvements to the Sridhar Reddy Vuyuru $1,700 2.07000 0.00000 1.32489 0.00000 0.74511 3623/05/P5 14.03.2006 Completed 06 Burrial Ground.

Completion of 2005- 138 P.R. Narasaraopet Nekarikallu Turakapalem incomplete Community Chinnaiah Kondaveeti $1,820 4.10408 0.00000 2.62661 0.00000 1.47747 2996/2004-P5 04.12.2005 Completed 06 hall Building.

Name of Dollors/ S. Name of the Name of the Name of the Statge of Year the Name of the Work Pounds Est. Cost Date No. Mandal Habitation Donor Work Rice) Cost/ lakhs)

Division received Lakhs) (Rs.in Lakhs) Progs.No. Department Z.P.General (Rs.inlakhs) funds (Rs.in the Estimated SGRY (CashSGRY + received(Rs.in Adm. Sanction S.F.C.64% asof NRI NRI contribution G.P.Contribution

2005- Development of Venkata Krishna 139 P.R. Narasaraopet Nadendla Chandavaram $3,250 2.78000 0.00000 0.00000 1.77803 1.00197 3623/2005-P5 18.10.2005 Completed 06 M.P.P.School(L E) Parimi

Construction of Kitchen 2005- Venkata Krishna 140 P.R. Narasaraopet Nadendla Chandavaram Shed 1.08200 0.00000 0.00000 0.69260 0.38940 3623/2005-P5 18.10.2005 Completed 06 Parimi M.P.P.School(L.E.)

Const of Compound 2005- wall and levelling of low 141 P.R. Narasaraopet Nekarikallu Challagundla Achuyuth K.Gopisetti $6,500 8.09200 0.00000 0.00000 5.17863 2.91337 3623/05-P5 02.12.2005 Completed 06 lying areas of play ground to Z.P.H.School

Construction of 2005- 142 P.R. Narasaraopet Nekarikallu Challagundla incomplete class rooms Achuyuth K.Gopisetti $2,475 3.07500 0.00000 0.00000 1.96787 1.10713 3623/05-P5 02.12.2005 Completed 06 of Z.P.H.School

2005- Construction of ZPH 143 P.R. Narasaraopet Venkatapuram N.G.Krishna Reddy $4,000 4.95000 0.00000 3.16811 0.00000 1.78189 3623/05-P5 10.01.2006 Completed 06 School.

2005- Construction of Koteswararao 144 P.R. Narasaraopet Rompicherla Paragaticherla $2,400 2.92094 0.00000 1.86940 0.00000 1.05154 3623/2005-P5 14.02.2006 Completed 06 Community Hall. Nallapati

2005- Construction of CC road 145 P.R. Narasaraopet Rompicherla Karlakunta Prasad V.S.Manam $2,300 2.81000 0.00000 1.79913 0.00000 1.01087 3623/2005-P5 08.04.2006 Completed 06 in Vellamvari Bazar.

Completion of 2005- 146 P.R. Tenali Tsunduru Pedagadelavarru incomplete Grama Si Srinivas Bikkena $1,500 1.80000 0.00000 1.15173 0.00000 0.64827 3623/2005 - P5 23.05.2005 Completed 06 Sachivalayam Building.

Completion of 2005- incompletion CC Road Kosaraju Vijaya 147 P.R. Tenali Bhattiprolu Pedapulivarru $5,967 2.18000 0.00000 1.39300 0.00000 0.78700 3623/2005-P5 25.05.2005 Completed 06 from Kosaraju Subba Saradi Rao (H) to Karakatta.

Const of CC road from 2005- Kosaraju Vijaya 148 P.R. Tenali Bhattiprolu Pedapulivarru Kosaraju Subba Rao 5.00000 0.00000 3.20000 0.00000 1.80000 2996/2004-P5 09.05.2005 Completed 06 Saradi house to Karakatta

Name of Dollors/ S. Name of the Name of the Name of the Statge of Year the Name of the Work Pounds Est. Cost Date No. Mandal Habitation Donor Work Rice) Cost/ lakhs)

Division received Lakhs) (Rs.in Lakhs) Progs.No. Department Z.P.General (Rs.inlakhs) funds (Rs.in the Estimated SGRY (CashSGRY + received(Rs.in Adm. Sanction S.F.C.64% asof NRI NRI contribution G.P.Contribution

Providing Drinking 2005- 149 R.W.S. Guntur Ponnur Nidubrolu water and Sanitation Amarendranath $1,140 1.36319 0.00000 0.87244 0.00000 0.49075 4855/05-P4 22.08.2005 Completed 06 work to Z.P.H.School

Construction of 2005- 150 P.R. Tenali Kollur Kollur Community hall cum Tana Foundation. $2,769 3.30000 1.05467 1.05466 0.00000 1.19067 2360/05-P8 15.10.2005 Completed 06 library

Const. of C.C road from 2005- Srinivas 151 P.R. Tenali Amruthaluru Thurumella R&B road to A.Veeraiah $1,000 1.19400 0.00000 0.00000 0.76400 0.43000 3623/2005-P5 18.10.2005 Completed 06 Veeramasuneni house.

Construction of 2005- 152 P.R. Guntur Ponnur Brahmanakoduru Veterinary Dharma Pracharak $3,500 4.50000 1.44000 1.44000 0.00000 1.62000 2360/2005-P8 15.10.2005 Completed 06 Hospitalbuilding.

Maintenance to the 2005- road from Narakoduru 153 P.R. Guntur Chebrolu Narakoduru Jayanth Babu $2,500 2.98600 0.00000 0.00000 1.91100 1.07500 3623/2005-P5 26.10.2005 completed 06 Village to Chebrolu Donka.

Maintenance to the 2005- road from Tenali - 154 P.R. Guntur Chebrolu Chebrolu Sathish Vemana $3,680 4.50000 0.00000 0.00000 2.88000 1.62000 3623/2005-P5 15.11.2005 Completed 06 Guntur R&B road to Chebrolu Donka.

2005- Completion of 155 P.R. Tenali Kollur Ananthavaram Kanakamedala Siva $8,370 10.00000 0.00000 0.00000 6.39370 3.60630 3623/2005-P5 30.11.2005 Completed 06 incomplete ZPH School.

Providing C.C. road 2005- from Nannapaneni 156 P.R. Guntur Kakumanu Gunaranjan $2,455 3.00000 0.00000 0.00000 1.92000 1.08000 3623/05/P5 02.12.2005 Completed 06 Durga Prasad (H) to Jenda Chettu. Providing metal road with side canals from 2005- Koyi Venkata 157 P.R. Guntur Chebrolu Narakoduru Guntur - Tenali By pass $6,570 8.32500 0.00000 0.00000 5.32777 2.99723 3623/05/P5 02.12.2005 Completed 06 Ramana Rao Road (Via) Hindu Burial ground.

Completion of approach 2005- Ranga Nayiki 158 P.R. Tenali Tenali Gudivada road from foot bridge on $2,000 2.46100 0.00000 1.57500 0.00000 0.88600 3623/05/P5 02.12.2005 Completed 06 Yalavarthi Kommamuri Cenal

Name of Dollors/ S. Name of the Name of the Name of the Statge of Year the Name of the Work Pounds Est. Cost Date No. Mandal Habitation Donor Work Rice) Cost/ lakhs)

Division received Lakhs) (Rs.in Lakhs) Progs.No. Department Z.P.General (Rs.inlakhs) funds (Rs.in the Estimated SGRY (CashSGRY + received(Rs.in Adm. Sanction S.F.C.64% asof NRI NRI contribution G.P.Contribution Levelling the play 2005- ground of Z.P.H.School Pamidimukkala 159 P.R. Tenali Bhattiprolu Vellaturu $3,000 3.50000 1.09000 1.09000 0.00000 1.32000 2360/2005-P8 10.01.2006 Completed 06 and construction of Krishna Toilets.

Completion of 2005- 160 P.R. Guntur Ponnur Brahmanakoduru incomplete Veternay Dharma Pracharak $1,750 2.00000 0.64000 0.64000 0.00000 0.72000 2360/2005-P8 10.01.2006 Completed 06 Hospital Building.

2005- Development of ZPH 161 P.R. Tenali Kollur Ananthavaram K.Krishnamurthy $2,220 9.17200 0.00000 0.00000 5.86993 3.30207 3623/2005-P5 13.02.2006 Completed 06 School.

Providing additional 2005- 162 P.R. Tenali Amarthaluru Amarthaluru class rooms to ZPH Syam kota $2,220 2.77200 0.00000 1.77411 0.00000 0.99789 3623/2005-P5 13.02.2006 Completed 06 School.

Construction of 2005- Compound wal to SC Venkateswara R 163 P.R. Guntur Ponnur Jupudi $2,500 3.06000 0.00000 1.95825 0.00000 1.10175 3623/2005-P5 14.03.2006 Completed 06 Community Hall( ZPGF Rayapaneni 15% SC) Construction of Community Hall for 2006- Jayram Komati, 164 P.R. Guntur Guntur Guntur A.P.P.R. Class-IV $2,250 2.78000 0.00000 1.78000 0.00000 1.00000 2578/05/P5 09.08.2006 Completed 07 Kalpana Komati Employees Community in Z.P. Compound.

Completion of 2006- 165 P.R. Guntur Vatticherukuru Pallapadu Incomplete Vererinary Raghu Korrapati $1,706 0.75000 0.41159 0.06841 0.00000 0.27000 2571/06/P8 29.09.2006 Completed 07 Hospital Building.

Providing Covering 2006- Structure and 1 KM Buddha kumar 166 P.R. Guntur Pedanandipadu Palaparru $2,400 3.00000 0.00000 1.92000 0.00000 1.08000 2578/05/P5 10.08.2006 Completed 07 Plotform in Burrial muddana Ground.

2006- Construction of Not 167 P.R. Guntur Pedanandipadu Ravipadu Sambaiah Kanakala $6,666 5.63872 3.09437 0.51441 0.00000 2.02994 2571/sgry-P8 29.09.2006 07 subcenter building started

2006- Providing internal cc 168 P.R. Guntur Pedanandipadu Ravipadu Sambaiah Kanakala 2.81936 0.00000 1.80439 0.00000 1.01497 2578/05/P5 .10.2006 Completed 07 roads with side drains

Name of Dollors/ S. Name of the Name of the Name of the Statge of Year the Name of the Work Pounds Est. Cost Date No. Mandal Habitation Donor Work Rice) Cost/ lakhs)

Division received Lakhs) (Rs.in Lakhs) Progs.No. Department Z.P.General (Rs.inlakhs) funds (Rs.in the Estimated SGRY (CashSGRY + received(Rs.in Adm. Sanction S.F.C.64% asof NRI NRI contribution G.P.Contribution

Construction of Hall in 2006- Chandrasekhar 169 P.R. Guntur Sattenapalli Brugubanda the Campus of ZPH $8,280 7.28800 1.82200 1.82200 0.00000 3.64400 2578/05/P5 29.03.2007 Completed 07 Chintapalli School.

Providing 2006- 170 R.W.S. Narasaraopet Machavaram Chennayapalem P.W.S.Scheme( Z.P. Hanumaiah Bandla $3,000 3.65000 0.00000 2.34000 0.00000 1.31000 2360/2005-P8 06.05.2006 Completed 07 9%)

2006- Construction of Drinking 171 R.W.S. Narasaraopet Machavaram Chennayapalem Jayramkomati $1,100 1.34440 0.0000 0.86040 0.00000 0.48400 4855/2005-P4 05.05.2006 Completed 07 Water

2006- 172 P.R. Narasaraopet Chilakaluripet Tatapudi Providing CC Roads. Ramana Gogagattu $12,489 10.00000 0.0000 0.0000 6.4000 3.6000 3623/2005-P5 08.04.2006 Completed 07

Improvements to ZPHSchool I.e., 2006- 173 P.R. Narasaraopet Obulesunipalli approach road and Jayramkomati 0.90805 0.0000 0.5812 0.0000 0.3269 2578/05-P5 11.05.2006 Completed 07 levelling the site in ZPH School

Providing CC road from 2006- Nallapati Koteswara 174 P.R. Narasaraopet Narasaraopet Ikkurru B. Seshaiah (H) to $1,300 1.63486 0.0000 1.0463 0.0000 0.5886 2578/05-P5 10.08.2006 Completed 07 Rao B.Rama Rao (H)

Formation of CC road from High School to 2006- Koteswararao 175 P.R. Narasaraopet Rompicherla Paragaticherla Gutta Radhakrishna (H) $2,400 1.76097 0.0000 1.1270 0.0000 0.6340 2578/05-P5 10.08.2006 Completed 07 Nallapati (50.0 Mtrs)(Contribution Rs:0.12 Lakhs) Construction of 2006- community hall. Poleswara Rao 176 P.R. Narasaraopet Chilakaluripet Lingamguntla $3,000 2.65920 0.0000 1.3296 0.0000 1.3296 2578/05-P5 24.01.2007 Completed 07 (ZPGF 50%- 50% NRI Bethamcherla Share Esst.Cost)

Gopalakrishana 2006- Completion of 177 P.R. Narasaraopet Piduguralla Venkatapuram Reddy $1,700 1.49600 0.0000 0.7480 0.0000 0.7480 2578/05-P5 24.01.2007 Completed 07 incomplete ZPH School. Radhika Rampa

Providing Additional 2006- Nannapaneni 178 P.R. Guntur Ponnur Doppalapudi Class Rooms to $3,000 3.65000 0.00000 0.00000 2.33600 1.31400 3623/2005-P5 08.04.2006 Completed 07 Ayyanna Rao M.P.Elementary School.

Name of Dollors/ S. Name of the Name of the Name of the Statge of Year the Name of the Work Pounds Est. Cost Date No. Mandal Habitation Donor Work Rice) Cost/ lakhs)

Division received Lakhs) (Rs.in Lakhs) Progs.No. Department Z.P.General (Rs.inlakhs) funds (Rs.in the Estimated SGRY (CashSGRY + received(Rs.in Adm. Sanction S.F.C.64% asof NRI NRI contribution G.P.Contribution

2006- 179 P.R. Guntur Ponnur Nidubrolu Repairs to Z.P.H.School Global information $11,600 3.61000 0.00000 0.00000 2.31000 1.30000 3623/2005-P5 08.04.2006 Completed 07

Providing Additional 2006- 180 P.R. Guntur Ponnur Nidubrolu Class Rooms Global information 10.00000 0.00000 0.00000 6.40000 3.60000 3623/2005-P5 08.04.2006 Completed 07 toZ.P.H.School.

Completion of 2006- Incomplete construction Not 181 R.W.S. Tenali Bhattiprolu Oleru Global information $1,850 2.78000 0.00000 1.78000 0.00000 1.00000 4855/2005/P4 15.04.2006 07 of OHSR at SC Colony started of Venkata Rama Nagar

Providing CC road from 2006- S.R.Anjaneyulu 182 P.R. Tenali Amruthaluru Amruthaluru R&B to Panchayat main $5,686 2.57853 0.00000 1.65026 0.00000 0.92827 2578/2005-P5 11.05.2006 Completed 07 Paruchuri Road.

Providing CC road from 2006- Z.P.H.School to 20.05.2006, 183 P.R. Tenali Repalle Nalluripalem Y.Ramesh $14,000 9.50000 0.00000 6.08000 0.00000 3.42000 2578/2005-P5 Completed 07 Dalitavada (Via) 10.08.2006 Ramalayam.

2006- Providing Addl. Class 184 P.R. Guntur Duggirala Pedakonduru Kiran Kumar Alla $6,320 7.81397 0.00000 5.00094 0.00000 2.81303 2578/2005-P5 23.05.2006 Completed 07 Rooms to ZPH School

Venkata 2006- Improvements to the Nimmagadda 185 P.R. Guntur Duggirala KantamrajuKonduru $2,620 3.19000 1.75059 0.28941 0.00000 1.15000 2571/sgry-P8 29.09.2006 Completed 07 Burial Ground Anjani P.Nimmagadda

Providing CC road from 2006- 186 P.R. Tenali Repalle Nalluripalem Elementary School to Y.Ramesh $14,000 4.00000 0.00000 2.56000 0.00000 1.44000 2578/05-P5 10.08.2006 Completed 07 Gandhi Statue

Providing CC road from 2006- 187 P.R. Tenali Repalle Nalluripalem Dalitavada Library to Y.Ramesh 3.50000 0.00000 2.24000 0.00000 1.26000 2578/05-P5 10.08.2006 Completed 07 R&B Road

Completion of approach 2006- Ranga Nayiki 188 P.R. Tenali Tenali Gudivada road from foot bridge on $14,000 0.36653 0.00000 0.23457 0.00000 0.13196 2578/05-P5 10.08.2006 Completed 07 Yalavarthi Kommamuri Cenal

Name of Dollors/ S. Name of the Name of the Name of the Statge of Year the Name of the Work Pounds Est. Cost Date No. Mandal Habitation Donor Work Rice) Cost/ lakhs)

Division received Lakhs) (Rs.in Lakhs) Progs.No. Department Z.P.General (Rs.inlakhs) funds (Rs.in the Estimated SGRY (CashSGRY + received(Rs.in Adm. Sanction S.F.C.64% asof NRI NRI contribution G.P.Contribution Construction of 3 additional class rooms, 2006- 189 P.R. Tenali Karlapalem Yazali compound wall, water Madhavi Kondapalli $8,100 10.00000 0.00000 6.40000 0.00000 3.60000 2578/05-P5 10.08.2006 Completed 07 tank & toilet facilities to Z.P.H.School Providing additional 2006- Mahalakshmi 190 P.R. Tenali Bhattiprolu Pesarlanka class rooms to ZPH $2,252 2.86128 0.00000 1.83122 0.00000 1.03006 2578/05-P5 .10.2006 Completed 07 Gullapalli School. Providing road from Bonthu Venkata Reddy's house to main 2006- road iva Narapareddy 191 P.R. Guntur Duggirala Munnagi Hima Bindu Meka $4,500 4.00680 1.00170 1.00170 0.00000 2.00340 2578/2005-P5 24.01.2007. Completed 07 house (ZPGF 35%,- 25%in Esst.Cost SGRY Regular 25% of the Esst.cost) Completion of incomplete Veternary 2006- 1850 UK 192 P.R. Guntur Duggirala Pedapalem Hospital Dr.Mrs.Ghattamaneni 3.16800 0.87120 0.71280 0.00000 1.58400 2571/2006-p8 29.03.2007 Completed 07 Pounds Building.(SGRY 20% Component & ZPZF)

2006- Construction of Hindu Dr.S.R.Anjaneyulu 193 P.R. Tenali Amarthaluru Amarthaluru $1,200 1.04810 0.00000 0.52405 0.00000 0.52405 2578/2006-P5 29.03.2007 Completed 07 Law Aparakarma Sala. paruchuri

2006- Construction of Library 194 P.R. Tenali Cherukupalli Ponnapalli Sarma ponnapalli $6,790 5.81672 1.59960 1.30876 0.00000 2.90836 2571/2006-P8 31.03.2007 Completed 07 Building.

Construction of 2006- Vamsi M. Ancha 195 P.R. Guntur Duggirala Emani compound wall for $11,500 9.89206 0.00000 4.94603 0.00000 4.94603 2571/2006-P8 16.04.2007 Completed 07 Vibha S. Ancha. Z.P.H.School

Improvements to Sri 2007- Abbineni- 196 P.R. Guntur Pedanandipadu Vejandla Gangaiah Jaya Prasad $1,600 1.27664 0.00000 0.63832 0.00000 0.63832 2578/05/P5 20.09.2007 Completed 08 guntapalem Hindu Burial Ground.

Providing C.C. road from Panchayat Office 2007- 197 P.R. Guntur Tadikonda Mukkamala to Yerramreddy Venu Madhav Kurra $2,700 1.08540 0.00000 0.54270 0.00000 0.54270 2578/2006-P5 03.04.2008 Completed 08 Lakshminarayana House. Providing C.C. road form Dharmaboina 2007- 198 P.R. Guntur Tadikonda Mukkamala Yelamandaiah house to Venu Madhav Kurra 1.08540 0.00000 0.54270 0.00000 0.54270 2578/2006-P5 03.04.2008 Completed 08 Pusani Ranga Rao House.

Name of Dollors/ S. Name of the Name of the Name of the Statge of Est. Cost Year the Name of the Work Pounds 64%of s Date No. Mandal Habitation Donor Work Rice) Cost/ lakhs)

Division received Lakhs) (Rs.in Lakhs) Progs.No. Department Z.P.General (Rs.inlakhs) funds (Rs.in the Estimated SGRY (CashSGRY + received(Rs.in Adm. Sanction S.F.C. a NRI NRI contribution G.P.Contribution Development (Completion of incomplete compound 2007- Rao Koteswara 199 P.R. Guntur wall, construction of $6,825 5.48884 0.00000 2.74442 0.00000 2.74442 2578/2006-P5 03.04.2008 Completed 08 Boddu additional class rooms & Toilets) of Z.P.High School.

2007- Ramachan- constructionof individual Ramakrishna S. 200 R.W.S. Guntur Pedakakani $1,650 1.28750 0.00000 0.64375 0.00000 0.64375 1337/08-P7 13.03.2008 Completed 08 drapalem toilets Moparthi

Completion of the 2007- 201 P.R. Narasaraopet Chilakaluripet Tatapudi construction of internal Ramana Gogagattu $12,489 5.32639 0.0000 3.4089 0.0000 1.9175 3623/2005-P5 17.04.2007 Completed 08 CC roads.

Construction of 2007- 202 P.R. Narasaraopet Nadendla Nadendla Auditorium near Suresh Velagapudi $12,820 9.94264 0.0000 4.9713 0.0000 4.9713 2578/2006-P5 10.01.2008 Completed 08 Amarayya Matt.

Constn.of compound 29.05.2007 2007- wall and improvements ------203 P.R. Guntur Kakumanu Bodipalem Dr. Ganga Chowdary $4,760 4.03838 0.00000 2.01838 0.00000 2.02000 2578/2006-P5 Completed 08 to the Community hall in Revised Bodipalem village 23.11.07

Construction of class 2007- Srinivasa Palati 204 P.R. Guntur Ponnur Nidubrolu rooms and compound $4,570 4.04076 0.00000 2.02038 0.00000 2.02038 2578/2006-P5 22.09.2007 Completed 08 Tannuja Palati wall to Z.P.High School.

Completion of incomplete construction of community hall for 2008- Jaya rama rao Komati 205 P.R. Guntur Guntur Guntur APPR Class IV $5,000 3.98742 0.00000 1.99371 0.00000 1.97081 2578/206-P5 04.05.2008 Completed 09 Kalpana Komati employees community hall in Zilla Parishad compound,

Construciton of Dr. Dandamudi Babu 2008- 206 P.R. Guntur Prathipadu Ganikapudi community hall behind Rajendra Prasad, $15,000 10.00000 0.00000 5.00000 0.00000 5.00000 3134/2008-P5 29.05.2008 Completed 09 ramalyam. U.S.A

Completion of Construction of Dr. Dandamudi Babu 2008- Community hall behind 207 P.R. Guntur Prathipadu Ganikapudi Rajendra Prasad, 2.33600 0.00000 1.16800 0.00000 1.16000 3134/2008-P5 30.12.2008 Completed 09 Ramalayam in U.S.A Gankipudi village of .

Name of Dollors/ S. Name of the Name of the Name of the Statge of Year the Name of the Work Pounds Est. Cost Date No. Mandal Habitation Donor Work Rice) Cost/ lakhs)

Division received Lakhs) (Rs.in Lakhs) Progs.No. Department Z.P.General (Rs.inlakhs) funds (Rs.in the Estimated SGRY (CashSGRY + received(Rs.in Adm. Sanction S.F.C.64% asof NRI NRI contribution G.P.Contribution

Providing Infrastructural 2008- Anjaneya Reddy 208 P.R. Narasaraopet Machavaram Vemavaram facilities to Z.P.High $900 0.75740 0.0000 0.3787 0.0000 0.3787 3134/2008-P5 05.07.2008 Completed 09 Dondeti School.

Providing Benches to Anji Reddy Gadhe 2008- $600 209 P.R. Narasaraopet Machavaram Vemavaram Z.p.H.School in Sathyanarayana 1.08708 0.00000 0.54354 0.00000 0.54354 3134/08P5 14.11.2008 Completed 09 $500 Vemavaram. Reddy Sanampudi

08.07.2008 2008- Construction of PHC Surendra Avula 210 P.R. Tenali Amruthaluru Gowada $4,600 5.55000 0.00000 3.55000 0.00000 2.00000 2572/sgry-P8 ------Completed 09 subcentre building Sunitha Avula 24.7.08

Providing C.C. Road from Kota Sambasiva Rao house to 2008- Chadalawada Madhusudan Rao 211 P.R. Tenali Cherukupalli Gudavalli $3,200 3.13150 0.00000 1.56575 0.00000 1.56575 3134/2008 P5 30.12.2008 Completed 09 Venkateswara Rao Ganta hoiuse in Gudavalli village of Cherukupalli Mandal. Completion of incomplete construction of community hall for 2009- 212 P.R. Guntur Guntur Guntur APPR Class IV Jaya rama rao Komati $2,000 1.86200 0.00000 0.93100 0.00000 0.93100 3134/2008-P5 26.06.2009 Completed 10 employees community hall in Zilla Parishad compound, Construction to Complete the incomplete Ancha 2009- 213 P.R. Tenali Prathipadu Ganikapudi venkaiah&Ayyappa Ravi K.Chundi $10,200 9.73896 0.00000 4.86948 0.00000 4.86948 2250/2009/p5 23.10.2009 Completed 10 Community hall at Ganikapudi (v) of Prathipadu (M) Construction to Complete the incomplete Ancha 2009- 214 P.R. Tenali Prathipadu Ganikapudi venkaiah&Ayyappa Srinivasa Rao Edara $10,200 9.73896 0.00000 4.86948 0.00000 4.86948 2250/2009/p5 23.10.2009 Completed 10 Community hall at Ganikapudi (v) of Prathipadu (M) Laying of CC road from D.Venkateswarlu, House to 2009- 215 P.R. Tenali Bapatla Narasayapalem M.Sukhayamma house Rajendra Manam $2,510.60 2.30000 0.00000 1.15064 0.00000 1.14936 2250/2009/P5 24.12.2009 Completed 10 at village of Narasayapalem(v), Bapatla(M).

Name of Dollors/ S. Name of the Name of the Name of the Statge of Year the Name of the Work Pounds Est. Cost Date No. Mandal Habitation Donor Work Rice) Cost/ lakhs)

Division received Lakhs) (Rs.in Lakhs) Progs.No. Department Z.P.General (Rs.inlakhs) funds (Rs.in the Estimated SGRY (CashSGRY + received(Rs.in Adm. Sanction S.F.C.64% asof NRI NRI contribution G.P.Contribution Development of Hindu 2009- Burial ground at Madan Mohan 216 P.R. Guntur Medikonduru Siripuram $4,000 3.60000 0.00000 1.80000 0.00000 1.80000 2250/09/P5 18.02.2010 Completed 10 Sripuram (V) R.Veluvolu Medikonduru (M)

Construction of Addl. 2010- Class Rooms at 217 P.R. Tenali Cherukupalli Rajavolu DIVI NAVEENA $4,640 4.00000 0.00000 2.00000 0.00000 2.00000 2229/10/P5 06.08.2010 Completed 11 Z.P.H.School Rajavolu (V), Cherukupalli (M)

Construction 3 class 2010- rooms at ZPHS 218 P.R. Narasaraopet Krosuru Vutukoru S.SRIHARI.G.BABU, $983.75 5.70000 0.00000 2.85000 0.00000 2.85000 2229/10/P5 27.09.2010 Completed 11 Vutukuru (V), Krosuru Mandal. Formation of CC Road from Kacheri 2010- 219 P.R. Narasaraopet Nadendla Nedendla Vepachettu to G.Sanjeev Kumar $9,420 7.00000 0.00000 3.50000 0.00000 3.50000 2229/10/P5 09.11.2010 Completed 11 Anjaneya Swamy Temple at Nadendla Construction of Side Drain (In Side Wall) 2010- 220 P.R. Narasaraopet Nadendla Nedendla in the way of G.Sanjeev Kumar 1.36548 0.00000 0.68274 0.00000 0.68274 2229/10/P5 09.11.2010 Completed 11 Chellama Kondalu Hills at Nadendla Formation of Internal C.C Road in S.C colony from Ragula 2011- gadda Sarojini House 221 P.R. Guntur Ponnur Gollamudi V.C.Nannapaneni $10,760 3.75000 0.00000 1.87500 0.00000 1.87500 1588/11/P5 25.04.2011 Completed 12 to Deverapally Subbaiah House in Gollamudi of Ponnuru (M) Formation of Internal C.C.Road in B.C. colony from Angire 2011- kula Venkateswarlu 222 P.R. Guntur Ponnur Gollamudi V.C.Nannapaneni 3.75000 0.00000 1.87500 0.00000 1.87500 1588/11/P5 25.04.2011 Completed 12 House to Kankipati Ankaiah House in Gollamudi (V) Ponnuru (M) Formation of Internal CC Road in SC colony from 2011- Kankipati Raja Rao 223 P.R. Guntur Ponnur Gollamudi V.C.Nannapaneni 2.00000 0.00000 1.00000 0.00000 1.00000 1588/11/P5 25.04.2011 Completed 12 House to Kankipati Nageswara Rao House in Gollamudi (V) Ponnuru (M)

Name of Dollors/ S. Name of the Name of the Name of the Statge of Year the Name of the Work Pounds Est. Cost Date No. Mandal Habitation Donor Work Rice) Cost/ lakhs)

Division received Lakhs) (Rs.in Lakhs) Progs.No. Department Z.P.General (Rs.inlakhs) funds (Rs.in the Estimated SGRY (CashSGRY + received(Rs.in Adm. Sanction S.F.C.64% asof NRI NRI contribution G.P.Contribution Completion of incomplete Class 2011- Rooms to the 224 P.R. Guntur Duggirala Pedakonduru Kiran Kumar Alla $4,000 3.53320 0.00000 1.76660 0.00000 1.76660 2229/10/P5 09.05.2011 Completed 12 Z.P.H.School at Pedakonduru (V) Duggirala (M) Construction of Compound Wall to Smt.Manne 2011- Vazaramma & China 225 P.R. Guntur Vatticherukuru Vatticherukuru Manne Raja Sekhar $11,500 10.00000 0.00000 5.00000 0.00000 5.04782 1588/11/P5 05.08.2011 Completed 12 Nagaiah Z.P.H.School in Vatticherukuru (V&M) Completion of incomplete C.C road 2011- from Chadalavada 226 P.R. Tenali Cherukupalli Gudavalli G.Madhusudana Rao $2,730 2.40000 0.00000 1.20000 0.00000 1.20645 1588/11/P5 09.08.2011 Progress 12 Venkateswara House to Substation in Gudavalli (V) Cherukupalli Mandal Completion of incomplete Additional 2011- Class Rooms to 227 P.R. Tenali Cherukupalli Rajavolu DIVI NAVEENA $1,287 1.00000 0.00000 0.50000 0.00000 0.57593 1588/11/P5 09.09.2011 Completed 12 Z.P.H.School in Rajavolu (V) Cherukupalli Mandal Construction of Kitchen cum Dining Hall in 2011- 228 P.R. Guntur Medikonduru Siripuram Z.P.H.School at V.Raja Sekhara Rao $5,183.56 4.50000 0.00000 2.25000 0.00000 2.35282 1588/11/P5 09.09.2011 Progress 12 Siripuram (V) . Completion of incomplet 2012- addl class rooms ZP 229 P.R. Tenali Cherukupalli Rajavolu DIVI NAVEENA $1,088 1.75000 0.00000 0.87000 0.00000 0.56876 1988/2012/p5 17.08.2012 Completed 13 High school in Rajavolu habitation Construction of Additional class room to 2012- 230 P.R. Guntur Vatticherukuru Katrapadu ZPHS in Katrapadu Madhu Korrapati $5,150 5.00000 0.00000 2.50000 0.00000 2.50000 1988/2012/P5 17.08.2012 Completed 13 village of Vatticherukuru Mandal. Consturction of Compundwall (balance portion) to Smt Manne 2012- Vazramma and Chinna 231 P.R. Guntur Vatticherukuru Vatticherukuru Manne Raja Sekhar $9,150 10.00000 0.00000 5.00000 0.00000 4.80869 1988/12/P5 07.09.2012 Completed 13 Nagaiah ZP High School of Vatticherukuru Village and Mandal

Name of Dollors/ S. Name of the Name of the Name of the Statge of Year the Name of the Work Pounds Est. Cost Date No. Mandal Habitation Donor Work Rice) Cost/ lakhs)

Division received Lakhs) (Rs.in Lakhs) Progs.No. Department Z.P.General (Rs.inlakhs) funds (Rs.in the Estimated SGRY (CashSGRY + received(Rs.in Adm. Sanction S.F.C.64% asof NRI NRI contribution G.P.Contribution Construction of 2012- community hall in 232 P.R. Tenali Chebrolu Selapadu Velagapudi Bapujirao 10.00000 0.00000 5.00000 0.00000 5.00000 1988/12/P5 18.12.2012 Completed 13 Selapadu of Construction of Additional class 2012- rooms(2 nos) to the chandana 233 P.R. Guntur Pedakakani Takkellapadu $9,492 10.00000 0.00000 5.00000 0.00000 4.99849 1988/12/P5 18.03.2013 Completed 13 ZPHS in Takkellapadu Yalamanchili village of . Construction of Compound Wall to 2013- Gaddamadugu 234 P.R. Guntur Amaravathi Karlapudi Hindu Burrial Ground at $4,155 4.88000 0 2.44000 0 2.44 1888/2003/P5 13.08.2013 completed 14 Srinivasa Karlapudi (V) of Amaravathi (M) Construction of 2014- Community Hall in 235 P.R. Tenali Chebrolu salapadu Velagapudi Bapujirao $8,503 10.00000 0 5.00000 0 4.99971 1888/2013/P5 .06.2014 completed 15 Salapadu of Chebrolu (M) Completion of incomplete Compound 2014- Gaddamadugu 236 P.R. Guntur Amaravathi karlapudi Wall to Hindu Burrial $3,435 4.00000 0 2.00000 0 2.02493 3333/2014/P5 01.07.2014 Progress 15 Srinivasa Ground at Karlapudi (V) of Amaravathi (M) Construction of Additional class room to 2014- 237 P.R. Guntur Vatticherukuru Katrapadu ZPHS in Katrapadu Madhu Korrapati $2,500 3.00000 0 1.50000 0 1.507 1888/2013/P5 30.06.2014 completed 15 village of Vatticherukuru Mandal. Construction of class rooms to Govt. High 2014- 238 P.R. Tenali Cherukupalli Kavuru Schools at Kavuru (1st Ratnam Veluvolu $7,500 9.25000 0 4.62500 0 4.47345 3333/2014/P5 01.07.2014 Progress 15 floor) (1) in Cherukupalli Mandal Construction of class rooms to Govt. High 2014- 239 P.R. Tenali Cherukupalli Kavuru Schools at Kavuru (1st Ratnam Veluvolu $7,500 9.25000 0 4.62500 0 4.47345 3333/2014/P5 01.07.2014 Progress 15 floor) (2) in Cherukupalli Mandal Constn.of Hindu Burrial 2014- ground at Machavaram 240 P.R. Guntur Ponnuru Machavaram Sridhar Yalla $3,450 4.00000 2.00000 2.07038 Rc.No.3333/2014/P5 24.09.2014 Progress 15 Village of Ponnuru Mandal

Name of Dollors/ S. Name of the Name of the Name of the Statge of Year the Name of the Work Pounds Est. Cost Date No. Mandal Habitation Donor Work Rice) Cost/ lakhs)

Division received Lakhs) (Rs.in Lakhs) Progs.No. Department Z.P.General (Rs.inlakhs) funds (Rs.in the Estimated SGRY (CashSGRY + received(Rs.in Adm. Sanction S.F.C.64% asof NRI NRI contribution G.P.Contribution

Construction of CC Roads from Shaik Rahiman (H) 2014- to Butchemma Chavidi 241 P.R. Guntur Vatticherukuru Pulladigunta 5.25000 2.63000 2.62000 Rc.No.3333/2014/P5 30.09.2014 Progress 15 and Shaik Janam(H) to Shaik Moulali (H)in BC Colony of Pulladigunta(V) Vatticherukuru Mandal Costruction of CC Road 2014- from Mannava Subba Rao 242 P.R. Guntur Vatticherukuru Pulladigunta 8.00000 4.00000 4.00000 Rc.No.3333/2014/P5 30.09.2014 Progress 15 Chavidi to M.Hari Babu (H) in Pulladigunta(V) Vatticheruku Mandal. Construction of CC road from V.Srikanth (H) to Shaik Haseena (H) and Rama 2014- 243 P.R. Guntur Vatticherukuru Pulladigunta Y.Venkateswara Rao Koteswara Rao $39,990 10.00000 5.00000 5.00000 Rc.No.3333/2014/P5 30.09.2014 Progress 15 (H)toY.Basavamma (H)in Upputuri Pulladigunta (V)of Vatticherukuru Construction of CC road from K.Venkata 2014- Mahalakshmi (H) to R&B 244 P.R. Guntur Vatticherukuru Pulladigunta 7.50000 3.75000 3.75000 Rc.No.3333/2014/P5 30.09.2014 Progress 15 Road in ST Colony of Pulladi-gunta(V)of Vatti- cherukuru Mandal Construction of CC Roads 2014- in ST Colony of 245 P.R. Guntur Vatticherukuru Pulladigunta 10.00000 5.00000 5.00000 Rc.No.3333/2014/P5 30.09.2014 Progress 15 Pulladigunta Village of Vatti-cherukuru Mandal Construction of CC Roads from Shaik Karimulla (H)to Shaik Ramjan Vali (H) & Butchamma 2014- 246 P.R. Guntur Vatticherukuru Pulladigunta Chavidi to Shaik 3.50000 1.75000 1.75000 Rc.No.3333/2014/P5 30.09.2014 Progress 15 Shamshuddin (H)in BC Colony of Pulladigunta(V)of Vatticherukuru(M) Side Drains and Metal road from O&M road to 2014- 247 P.R. Guntur Vatticherukuru Pulladigunta Syad Saida (H) in 5.75000 0.00000 2.87000 2.88000 Rc.No.3333/2014/P5 10.10.2014 Progress 15 Pulladigunta village of Vatticherukuru Mandal

Name of Dollors/ S. Name of the Name of the Name of the Statge of Year the Name of the Work Pounds Est. Cost Date No. Mandal Habitation Donor Work Rice) Cost/ lakhs)

Division received Lakhs) (Rs.in Lakhs) Progs.No. Department Z.P.General (Rs.inlakhs) funds (Rs.in the Estimated SGRY (CashSGRY + received(Rs.in Adm. Sanction S.F.C.64% asof NRI NRI contribution G.P.Contribution Completion of incomplete 2014- Dr.Bapuji Rao 248 P.R. Tenali Chebrolu Selapadu Community Hall (3rd $8,253 10.00000 5.00000 4.99971 Progress 15 Velagapudi Phase) in Selapadu of Chebrolu Mandal Construction of Bicycle Shed in 2014- Jagarlamudi 249 P.R. Tenali Tsunduru Vetapalem ZPHigh School, $3,292 4.00000 2.00000 2.01708 Progress 15 Ravibabu Vetapalem of Tsunduru Mandal Fencing the Hindu 2014- Burrial Ground Vemulapalli Siva Vara 250 P.R. Narasaraopet Nadendla Nedendla $8,128.45 10.00000 5.00000 5.00550 Progress 15 (Kakulamatham) in Prasad Babu Nadendla (V)&(M) Improvements and 2014- repairs to ZPHSchool Kirankanth 251 P.R. Guntur Tadikonda Ravela $8,400 10.00000 5.00000 5.15599 Progress 15 Ravela (V) of Nallamothu Tadikonda (M) Raising the Hindu Burrial Ground 2014- Devabhakthuni Veera 252 P.R. Narasaraopet Nadendla Nadendla (Kakula Matham) $8,006 10.00000 5.00000 4.98314 Progress 15 Venkata Kumari and Cremation Platform Fencing the Hindu Burrial Ground 2014- (Ramanujamatham) Devabhakthuni Veera 253 P.R. Narasaraopet Nadendla Nadendla $8,075.65 10.00000 5.00000 4.99217 Progress 15 and Cremation Venkata Kumari Platform in Nadendla (V)&(M) Construction of 2014- Sambasiva Reddy 254 P.R. Narasaraopet Veldurthy Veldurthy Library Building in $8,400 10.00000 5.00000 5.20956 Progress 15 Pulusu ZPHS Veldurthy Completion of incomplete 2014- Community Hall Dr.Bapuji Rao 255 P.R. Tenali Chebrolu Selapadu $8,253 10.00000 5.00000 4.99971 Progress 15 (Final Phase) in Velagapudi Selapadu of Chebrolu Mandal