NORTH CENTRAL RAILWAY

Shri Narendra Modi Hon'ble Prime Minister

BHADOHI PARLIAMENTARY CONSTITUENCY , the most populous state of the nation, is served by North Central Railway along with Northern, North Vinay Kumar Tripathi Eastern and East Central Railways. Indian Railways (IR) plays a General Manager very important role in development of the state and provide North Central Railway connectivity for freight and passengers, including international tourists. IR has a history of more than 160 years in the state and has the highest route kilometers - 9100 route kilometers-with in it, which is 14% of entire Indian Railways network. IR has made Uttar Pradesh proud by giving it Nation's first semi high speed train Gatimaan Express, which initially ran between Agra and Delhi. It has now been extended upto Jhansi - a move that will boost tourism in Bundelkhand region of Uttar Pradesh. After Gatiman, the nation's first engineless semi high speed train set "Vande Bharat Express" which is running from New Delhi to is also serving the state of Uttar Pradesh. Efforts for further development of railway infrastructure in Uttar Pradesh have been intensified in last seven years with 461% more investment in comparison to previous years. Results of such a massive investment are becoming visible with enhanced infrastructure and modern passenger amenities. Soon the era of congestion and inconvenience will be matter of past and a new Railway equipped with state-of-the art facilities will be able to serve the citizens in a better manner and provide them enhanced value for their money. The longest stretch of the under construction Eastern Dedicated Freight Corridor i.e. almost 57% of the entire length lies in Uttar Pradesh from Pt. Deen Dayal Upadhyaya Jn. to Ghaziabad. In this brochure, we have compiled the important contributions and achievements of Indian Railways in the development of the BHADOHI constituency of Uttar Pradesh in last seven years. I hope that it will serve as a ready reckoner for those eager to know about the role of Railways in the development of this constituency. It may be noted that the budgets allocated to various projects are not apportioned constituency wise but reflect the cost of the project. INPUTS BY RAILWAY IN BHADOHI PARLIAMENTARY CONSTITUENCY BHADOHI PARLIAMENTARY CONSTITUENCY A. ASSEMBLY SEGMENTS : Bhadohi, Pratpapur, , Handia, Aurai B. WORK COMPLETED IN LAST SEVEN YEARS : 1. INFRASTRUCTURAL DEVELOPMENTS: GDoubling work in progress from Lohta to Bhadohi (39 km). G Doubling work in progress from Bhadohi to (31 km). GConstruction of Foot Over Bridge at Bhadohi, Mondh and Suriyawon stations. GKatka-Madho Singh -Road Over Bridge in lieu of Level Crossing No. 30 at a cost of Rs. 1751 Lakh. G4-lane road over bridge in lieu of level crossing No. 30-C in Janghai-Varanasi section near Bhadohi at a cost of Rs. 76.54 Cr. GDoubling work in Parsipur - Bhadohi section 08 km at a cost of Rs. 26.00 Cr. GLevel Crossing No. -32 on Varanasi-Prayagraj Rambagh section at a cost of Rs. 230.73 Lakhs. 2. IMPROVEMENT IN PASSENGER AMENITIES: G100% LED lights provided at all Stations. G Ticket window at Handia Khas at a cost of Rs. 0.50 Lakhs. GPlatform Shelters and Seating arrangement at Bhadohi, Modh, Suriawan stations. GIncrease in level of platform no.2 Bhadohi, Modh Suriawan stations. GImprovement to sheeting of existing platform shelters between Pratapgarh to Chaukhandi at a cost of Rs. 0.60 Cr. GEliminating shortfall in MEA of PP shelter at D, E & F category stations in Varanasi Division at a cost of Rs. 12 Lakhs. GUTS counter at 15 stations of Varanasi Division at a cost of Rs. 3.88 Lakhs. GSolar power pack system with battery bank at B class station, D class station and E Class stations in Varanasi Division at a cost of Rs. 50.65 Lakhs. GProvision of Tapped Water Supply arrangement and toilets at 29 stations of Varanasi Division at a cost of Rs. 180.74 Lakhs. GRaising and extension of platfrom at Madhosingh station in Varanasi Division at a cost of Rs. 60.32 Lakhs. GProvision of waiting hall at Janghai and Bhadohi. At Bhadohi Station GFirst class waiting room for Gents and Ladies. G Divyang Toilet . GConstruction of 4 gents and 4 ladies toilets. G Installation of Water Vending Machine. GImprovement of platform surface of platform-1 by providing kota stone. GExtension of Platform No. 1. G 02 ATVM. G Provision of Coach Guidance system, Digital Clcok and computerized announcement system. At Gyanpur Station GLow cost shelters, RCC benches, stainless steel benches & dustbins at a cost of Rs. 9 Lakh. GLow cost passenger platform shelter Atraura Halt at a cost of Rs. 2.0 Lakhs. G Roofing sheet on Foot Over Bridge (FOB) at a cost of Rs. 0.60 Lakhs. GTrain display boards provided Road at a cost of Rs. 2.50 Lakhs. G100% LED lights provided at Madhosingh at a cost of Rs. 7 Lakhs. C. OTHER DEVELOPMENTS New Trains introduced with stoppage over Bhadohi Constituency: GTrain No. 14259/14260 Lucknow - Mugalsarai Ekatmata Express. GTrain No. 75115/75116 Prayag-Ghazipur City Demu Passenger train. Stoppages at Bariyaram, Saraikan sarai, Suriwana, Mondh, Bhadohi, Parsipur and Kapsethi. GTrain No. 22428/22427 Anand Vihar (T) - Ballia Weekly Express. G Train No. 75105/75106 City - Mau Demu Passenger. GTrain No. 22427/22428 Ballia - Anand Vihar (T) Weekly Express. GTrain No. 19421/19422 Ahmedabad - Patna Weekly Express. G Train No. 15117/15118 Manduadih - Jabalpur Weekly Express. GTrain No. 15559/15560 Darbhanga - Ahmedabad Weekly Jansadharan Express. GTrain No. 12581/12582 Manduadih - New Delhi Express. D. ON-GOING WORKS GElectrification of 44 manned level crossings. GIntegrated Emergency Response Management System Video Surveillance System at Bhadohi & Janghai stations. Renovation of Portico and Facade of station building. GCirculating area and drainage system of circulating area at Bhadohi & Janghai stations. GUTS link over OFC media as main link in Varanasi-Janghai section. GElimination of Level Crossing No.-32 between Madho Singh-Ahimanpur station by LHS at a cost of Rs. 230.73 Lakh. GUTS counter at 15 stations. G Solar power system with battery bank at various stations. GImprovement to existing PF surface at stations between Pirthiganj to Chaukhandi. GProvision of Display system at platforms and waiting rooms for Train enquiry at different stations. GAugmentation of public address equipment system with computerised announcement system at Bhadohi, Janghai, Shahganj, Kundaharnamganj, Lalganj, Lalgopal, Jais, Gursahaiganj and Gauriganj. GJanghai - Varanasi - 2-lane Road Over Bridge in lieu of level crossing no. 31-B near Bhadohi. GJanghai-Varanasi 2-lane Road Over Bridge at level crossing no. 41-C near Suriawan. GProvision & upgradation of Divyang toilets at various stations. G Provision of First FOB at Baryaram station. GRaising of Platform No. 1 of Saraikansrai, Suryawan, Mondh, Parsipur, Chaukhandi stations. GRaising and Extention of Platform at Kachhwa Road & Katka station in Varanasi Division at a cost of Rs. 400.00 Lakhs.

Flagging off of Ghazipur City-Prayag DEMU Train Ballia-Anandvihar Bhrigu Express

Bhadhohi Railway Station