FAX / POST

mmm

~. 1:f~fctmqIfUl,"1I-I/4/C!>41l1il C!>f1Q+i/2017 /10.11 ~:02~2017 No: WRPC/Comml.-1/4/ABTDSM/2017/1 0.1I 1),0') 1 Date: 02nd November 2017

ool't ITo, - (~~~/Asperlist)

~:- ~ 02.10.17ir OS.10.17QCfi'ef;T~~fm:;J)l!>ftl!>l"1 ~~ ~ I Sub: - DSM settlement statement for the Week from 02.10.17 to 08.10.17.

~/Sir,

Enclosed please find the statement of DSM charges for the week from 02.10.17 to OS.10.17. The statement of DSM charges from 02.10.17 to OS.10.17 issued on 30.10.2017 was withdrawn on 01.1.0.2017 due to revised Data (S01 Report) submitted by WRLDC vide their letter no. WRLDC/SO-1/1530/2016/Revision dated 01.11.17, RRAS settlement statement issued on 30.10.2017 is enclosed. Details of the above DSM account is available on WRPC website www.wrpc.nic.in. The Deviation Settlement Statement with payable I receivable particulars in line with CERC (Central Regulatory Commission) Deviation Settlement Mechanism and related matters Regulation, 2014. The due dates for payment I receipts shall be as per these Regulations. Details of the above DSM statement (alongwith 15 minutes time block-wise data) is available on WRPC website www.wrpc.nic.in. All concerned entities are requested to intimate any discrepancy I error for necessary action at our end. "

"'\ ~/Yours faithfully, 11/ J 1 1 ~ Encl:: '34 U'dlI'1f11":/As Above .(f74' 1 tJ '1u] !J

~.~. ~./J. K. Rathod) arm. arN.htffoh<:j)/Supdtg.Eng.(Comml.) Mailing list:

1. Executive Director (Finance), Ltd., Vadodara-390 007. Fax: 0265- 2344543. 2. Chief Engineer (LD), Gujarat Energy Transmission Corpn. Ltd., Vadodara- 390 021 3. Chief General Manager (Comml), MP Power Management Co.Ltd., Jabalpur-482 008. Fax: 0761-2664749. 4. Chief Engineer (LD), M P Power Transmission Company Ltd.,SLDC, Jabalpur 482 008. Fax: 0761-2661884 5. Chief Engineer (Comml), Chhattisgarh State Power Distribution Co. Ltd., Raipur – 492 013. Fax: 0771-5066942 6. Chief Engineer (LD), Chhattisgarh State Power Transmission Co. Ltd., Bhilai-490 024. 7. Chief Engineer (PP), State Electricity Distribution Co. Ltd., Mumbai-400 051. Fax: 022-26475012. 8. Chief Engineer (LD), State Load Despatch Centre, MSETCL, New Mumbai - 400 708. Fax: 022-27601769 9. Chief Electrical Engineer, Panjim, Goa-403 001. Fax: 0832-2222354 10. Executive Engineer, Electricity Department, Daman-396 210. Fax: 0260-2250889 11. Executive Engineer (Elect), Electricity Department, Silvassa-396 230. Fax:0260- 2642338/236/787 12. General Manager (Comml), NTPC Ltd., New Delhi-110 003. Fax: 011-24364606 13. Regional Executive Director (West), NTPC Ltd., Mumbai-400 093. Fax- 28259345 14. General Manager (Com. & CP), NTPC SAIL Power Co. Pvt. Ltd., New Delhi -110 066. Fax: 011-26717383/63/66 15. Executive Director (Comml), PGCIL, Gurgaon, Haryana-122 001. Fax- 0124-2571760-61 16. General Manager, WRTS-I, PGCIL, Nagpur-440 026. Fax: 0712-2641366. 17. Addl. General Manager (Comml), WRTS-IL, PGCIL, Vadodara-440 026 18. Executive Director, POSOCO, WRLDC, Mumbai-400 093. Fax: 022-28202630 19. Dy. General Manager (Comml), Ratnagiri Gas & Power Pvt. Ltd., Mumbai-400 093. Fax: 28269057. 20. Addl. Chief Engineer (R & C), Gujarat Energy Trans. Corpn. Ltd., Vadodara-390 007 21. Chief Engineer (Trans. O&M), MSETCL, Mumbai-400 051 22. General Manager (Comml), LANCO Amarkantak Power Private Ltd., Gurgaon – 122 016. Fax: 01124-4741024 23. Vice President, Jindal Power Ltd., Tamnar, Raigarh, Chhattisgarh – 496 001. Fax:011- 26739151. Fax: 07767-281993 24. Executive Director (Comml), Ltd., Ahmedabad- 380 009. Fax: 02641-612008 25. AVP (Power Trading), GMR Energy Trading Ltd., Bangalore-560 029. 26. DGM Finance, CGPL, UMPP Mundra, Kutch-370 435. 27. AGM (O&M/O&E) Ratnagiri Gas and Power Pvt Limited PO: Anjanvel, Taluka: Guhaghar Disstt: Ratnagiri (Maharastra) - Pin 415703 28. Vice President (Powe CG) ACB Ltd., 2*135 MW Kasaipali Power Project, Kasaipali, P.O.- Jawali, Tehsil-Katghora, Korba –chhatisgarh-495445. Fax: 07815-285887 29. GM (O&M) Bharat Aluminium co. Ltd (BALCO), P.O. Balco Nagar, Distt. Korba -495684 Chhattisgarh. Fax: 07759-243068 30. AGM (F&A), DCPP JSPL, Dongamahua captive power plant (4*135 MW), Dhaurabhata(PO) Raigarh-496107 (CG). Fax: 07767-200400 31. Director, Jaypee , village sirchopi, Agasod P.O. Bina-470113 Distt. Sagar(MP) 32. Sr. Vice President (EPMPL), Essar Power MP Limited, Thana road, Near Chunkumari stadium, Waidhan, Dist. Singrauli (MP)-486886. Fax: 07805-234438

33. Vice-President, ACB India ltd. 7th floor, Corporate house, Ambience tower, National highway Gurgaon-122001 Haryana. 34. Sasan Power limited, Dhirubahi ambani knowledge city, 1 block, 2nd floor, north wing, Thane-belapur road, Navi Mumbai-400710. Fax: 022-30386999 35. KSK Mahanadi Power CO. LTD, 8-2-293/82/A/431/A, Road no 22, Jubilee hills, Hyderabad- 500033. Fax: 040-23559930 36. Plant Head,GMR EMCO Energy ltd. B1, MIDC, Growth centre, Warora-post Chandrapur- dist,Mahrashtra-442907. Fax: 080-40432180 37. Vice president (Comml.), Vandana Vidhut ltd., Vandana Bhavan, M.G. Road, Raipur- 492001-CG. Fax: 0771-4006001 38. Korba west power co. Limited, village chhotte bhandar, P.O. Babe Bhandar,Tehsil Pussore Dist. Raigarh, chhattisgarh-49610 39. Ms. D B Power Ltd., 3rd floor, Naman corporate link, C-31, G-block, BKC Bandra eastMumbai-400051. Fax: 096-99610110 40. Vice President-Power Infrastructure Plant- B MRSS, Essar Steel Ltd 27th km, Surat Hazira Road, Surat-394270 Gujarat. Fax: 0261-6685544 41. Jaypee Nigrie Super Thermal Power Project (A Unit of Jaiprakash Power Ventures Limited) Vill- Nigrie, Tehsil- SaraiDistt. - Singrauli, MP-486669. Fax: 011-26145389 42. GM-Coordination, Dhariwal Infrastruture LtdCESC ltd,CESC House, ChowringheeSquare, Kolkata-700001. Fax: 07172-237992 43. Chief General Manager, RKM Powergen pvt ltd, Village Uchpinda, PO Dhurkot, Via chandrapur, Tehsil- Dabra, Janjgir-Champa dist, Chhattisgarh-495692. Fax 0776-2214012 44. GM (Operations) MB Power (Madhya Pradesh) LimitedHotel Govindam, Kotma Road,Anuppur, Madhya Pradesh – 484224. Fax: 011-47624229 45. Head Project, Jhabua power ltd, Vill. Berela, post Attariya, Tehsil Ghansore, Dist-Seoni- 480997 (MP). Fax: 011-23368729 46. Sr. Vice-President (Power) TRN Energy Pvt ltd.18, Vasant Enclave, Rao tula ram marg, New Delhi-110057 47. Member Secretary, Northern Regional Power Committee, New Delhi 110 016 48. Member Secretary, Southern Regional Power Committee, Bangalore 560 009 49. Member Secretary, Eastern Regional Power Committee, Kolkata-700 033 50. Member Secretary, North Eastern Regional Power Committee, Shillong 793 303 51. Chief Engineer (GM), Central Electricity Authority, New Delhi –110 066. 52. GM, INRPRD, NRB, BARC, MUMBAI 53. Chief Superintendent, Kakrapar Atomic Power Project-3&4,NPCIL, Kakrapar Gujarat Site, P.O. Anumala, Via Vyara, District: Tapi, Gujarat-394651, Fax No: 02626-233745

WRPC MUMBAI Format-AS7: RRAS Settlement Account for the week issued on A. Payments to the RRAS Provider(s) from the DSM Pool for UP Regulation

WRPC MUMBAI Format-AS7: RRAS Settlement Account for the week 02-10-2017 to 08-10-2017 issued on 30-10-2017 A. Payments to the RRAS Provider(s) from the DSM Pool for UP Regulation for the week 02-10-2017 to 08-10-2017 Sr. No. RRAS Energy Fixed Charges Variable Markup as Total Charges Provider Name scheduled to (Rs) Charges (Rs) per CERC (A+B+C) VAE under (A) (B) Order (Rs) RRAS (MWh) (C)

1 CGPL 0 0 0 0 0 2 GANDHAR-APM 178.0625 187144 327279 89031 603454 3 GANDHAR-NAPM 27.02 28398 57066 13510 98974 4 GANDHAR-RLNG 4269.955033 4487723 19155019 2134978 25777719 5 KAPS 0 0 0 0 0 6 KAWAS-APM 35.5875 30036 67011 17794 114841 7 KAWAS-NAPM 19.455 16420 41284 9728 67431 8 KAWAS-RLNG 5517.68279 4656924 25254434 2758841 32670200 9 KAWAS-zLIQ 0 0 0 0 0 10 KSTPS I&II 190 125400 261820 95000 482220 11 KSTPS7 0 0 0 0 0 12 MOUDA 331.9725 634731 880723 165986 1681441 13 MOUDA_II 2068.76115 2801103 5773912 1034381 9609396 14 NSPCL 1280.31 2217497 2820523 640155 5678175 15 RGPPL-GAS 0 0 0 0 0 16 RGPPL-RLNG 0 0 0 0 0 17 RGPPL_EBID 0 0 0 0 0 18 RGPPL_IR 6824.394115 8803468 24567819 3412197 36783484 19 SASAN 51.2825 8718 66616 25641 100975 20 SIPAT I 0 0 0 0 0 21 SIPAT II 48 60096 62448 24000 146544 22 TAPS-I 0 0 0 0 0 23 TAPS-II 0 0 0 0 0 24 VSTPS I 233.9075 193442 345481 116954 655877 25 VSTPS II 0 0 0 0 0 26 VSTPS III 304.86 321627 421926 152430 895984 27 VSTPS IV 613.425 971052 853274 306713 2131038 28 VSTPS V 357.8625 587252 498145 178931 1264328 0 00000 B. Payments by the RRAS Provider(s) to the DSM Pool for DOWN Regulation for the week 02-10-2017 to 08-10-2017 Sr. No. RRAS Provider Name Energy Scheduled Total Variable Variable charges from VAE under Charges for to be paid to the RRAS (MWh) generation reduced DSM Pool (Rs) (Rs) (A) (B = 75% of A) 1CGPL 0 0 0 2GANDHAR-APM 0 0 0 3GANDHAR-NAPM 0 0 0 4GANDHAR-RLNG 0 0 0 5KAPS 0 0 0 6KAWAS-APM 0 0 0 7KAWAS-NAPM 0 0 0 8KAWAS-RLNG 0 0 0 9KAWAS-zLIQ 0 0 0 10KSTPS I&II 0 0 0 11KSTPS7 0 0 0 12MOUDA 0 0 0 13MOUDA_II 0 0 0 14NSPCL 0 0 0 15RGPPL-GAS 0 0 0 16RGPPL-RLNG 0 0 0 17RGPPL_EBID 0 0 0 18RGPPL_IR 0 0 0 19SASAN 0 0 0 20SIPAT I 0 0 0 21SIPAT II 0 0 0 22TAPS-I 0 0 0 23TAPS-II 0 0 0 24VSTPS I 0 0 0 25VSTPS II 0 0 0 26VSTPS III 0 0 0 27VSTPS IV 0 0 0 28VSTPS V 0 0 0 0000 0000 C. Reimbursement of Fixed Charges by RRAS Provider to the Original Beneficiaries for the week 02-10-2017 to 08-10-2017

BANGLADESH BARC_TAPS II BSPHCL-ER CR_IR_MS CSEB DD DELHI DNH GEB GOA HARYANA HVDC_BHD HVDC_CHAMPA HVDC_VIN JHARKHAND JK MPSEB CGPL 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 GANDHAR-APM 0 0 0 0 010661 0 19956 2 8387 0 0 0 0 0 6604 73457 GANDHAR-NAPM 0 0 0 0 0 0 0 0 0 809 0 0 0 0 0 0 0 GANDHAR-RLNG 0 0 0 0 0 72690 0 3237081785140 200610 0 0 0 0 0 1021 1233793 KAPS 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 KAWAS-APM 0 0 0 0 0 0 0 0 0 1633 0 0 0 0 0 10 28393 KAWAS-NAPM 0 0 0 0 0 0 0 0 0 595 0 0 0 0 0 0 0 KAWAS-RLNG 0 0 0 0 0137786 0 7849351149826 170336 0 0 0 0 0 776 1592621 KAWAS-ZLIQ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 KSTPS I&II 0 0 0 0125400 0 0 0 0 0 0 0 0 0 0 0 0 KSTPS7 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 MOUDA 0 0 0 0468549 91374 0 54170 0 7561 0 0 0 0 0 0 12813 MOUDA_II 0 0 0 01048140 54404 0 161381 2193 6420 0 0 0 0 0 0 626741 NSPCL 0 0 0 01617925530580 0 66481 0 0 0 0 0 0 0 0 0 RGPPL_IR 0 0 04174595 0 0 0 0 0 0 0 0 0 0 0 0 0 RGPPL-GAS 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 RGPPL-RLNG 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 SASAN 0 0 0 0 0 06189 0 0 0 0 0 0 0 0 0 0 SIPAT I 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 SIPAT II 0 0 0 060096 0 0 0 0 0 0 0 0 0 0 0 0 SOLAPUR 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 SSP 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 TAPS-I 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 TAPS-II 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 VSTPS I 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0192382 VSTPS II 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 VSTPS III 0 0 0 0321627 0 0 0 0 0 0 0 0 0 0 0 0 VSTPS IV 0 0 0 0971052 0 0 0 0 0 0 0 0 0 0 0 0 VSTPS V 0 0 0 0587252 0 0 0 0 0 0 0 0 0 0 0 0 (blank) 0 0 0 0000000 0 0 0 0 00 0 Grand Total 0 0 0 4174595 5200041 897495 6189 1410631 2937161 396351 0 0 0 0 0 8410 3760200 C. Reimbursement of Fixed Charges by RRAS Provider to the Original Beneficiaries for the week 02-10-2017 to 08-10-2017

MSEB NCR_IR_NR NVVN_COAL_CSEB NVVN_COAL_MSEB PUNJAB RAJ_SOLAR_MPSEB RPPC SAIL_BSP_CSEB SER_IR-ER UPPCL UTTRAKHAND WCR_IR_MP WR_IR_GEB (blank) Grand Total CGPL 00 0 00 00 000 00000 GANDHAR-APM 68077 0 0 0 0 0 0 0 0 0 0 0 00187144 GANDHAR-NAPM 27589 0 0 0 0 0 0 0 0 0 0 0 0028398 GANDHAR-RLNG 870761 0 0 0 0 0 0 0 0 0 0 0 004487723 KAPS 00 0 00 00 000 00000 KAWAS-APM 0 0 0 0 0 00 0 00 0 0 0030036 KAWAS-NAPM 15825 0 0 0 0 0 0 0 0 0 0 0 0016420 KAWAS-RLNG 820644 0 0 0 0 0 0 0 0 0 0 0 004656924 KAWAS-ZLIQ 00 0 00 00 000 00000 KSTPS I&II 0 0 0 0 0 00 0 00 0 0 00125400 KSTPS7 00 0 00 00 000 00000 MOUDA 0 0 0 0 0 265 0 0 0 0 0 0 00634732 MOUDA_II 889333 0 0 0 0 12490 0 0 0 0 0 0 002801103 NSPCL 0 0 0 0 0 0 0 1212 0 0 0 0 002216198 RGPPL_IR 0 782861 0 0 0 0 0 0 2797482 0 0 0 1048530 08803468 RGPPL-GAS 00 0 00 00 000 00000 RGPPL-RLNG 00 0 00 00 000 00000 SASAN 0 0 0 0 0 00 0 0 0 2529 0 008718 SIPAT I 00 0 00 00 000 00000 SIPAT II 0 0 0 0 0 00 0 00 0 0 0060096 SOLAPUR 00 0 00 00 000 00000 SSP 00 0 00 00 000 00000 TAPS-I 00 0 00 00 000 00000 TAPS-II 00 0 00 00 000 00000 VSTPS I 0 0 0 0 0 1060 0 0 0 0 0 0 00193442 VSTPS II 00 0 00 00 000 00000 VSTPS III 0 0 0 0 0 00 0 00 0 0 00321627 VSTPS IV 0 0 0 0 0 00 0 00 0 0 00971052 VSTPS V 0 0 0 0 0 00 0 00 0 0 00587252 (blank) 00 0 00 00 000 00000 Grand Total 2692228 782861 0 0 0 13815 0 1212 2797482 0 2529 0 1048530 026129732 Subject: RE: WR Implemented schedule data for the week 02-08 October-2017 Date: 20/10/17 12:16 PM To: "'[email protected]'" <'[email protected]'>, From: WRLDC STOA "'[email protected]'" <'[email protected]'>, "'[email protected]'" <'[email protected]'>, "'[email protected]'" <'[email protected]'>

Sir,

In continuation to the trailing mail, losses not to be applied to SAIL-BSP from NSPCL wef 05/10/2017.

Regards, Prashanth, Sr.Engineer, Market Operations, WRLDC, POSOCO. Mob:7715960002

From: WRLDC STOA

Sent: 20 October 2017 11:23

To: '[email protected]'; '[email protected]'; '[email protected]'; '[email protected]'

Cc: '[email protected]'; '[email protected]'; Abhimanyu Gartia ; Abhishek Kumar Gupta ; Amit Prasad Gupta ; '[email protected]'; '[email protected]'; '[email protected]'; '[email protected]'; '[email protected]'; '[email protected]'; '[email protected]'; '[email protected]'; '[email protected]'; '[email protected]'; '[email protected]'; '[email protected]'; 'ed- [email protected]'; '[email protected]'; '[email protected]'; '[email protected]'; '[email protected]'; '[email protected]'; '[email protected]'; '[email protected]'; '[email protected]'; '[email protected]'; '[email protected]'; '[email protected]'; '[email protected]'; '[email protected]'; '[email protected]'; '[email protected]'; '[email protected]'; '[email protected]'; '[email protected]'; '[email protected]'; '[email protected]'; '[email protected]'; '[email protected]'; '[email protected]'; '[email protected]'; '[email protected]'; '[email protected]'; '[email protected]'; '[email protected]'; '[email protected]'; '[email protected]'; '[email protected]'; '[email protected]'; '[email protected]'

Subject: WR Implemented schedule data for the week 02-08 October-2017

Sir,

Please find herewith attached file containing the implemented schedule data for the week 02-08 October-2017.

The revision no. for Implemented Schedule data of WRLDC submitted to WRPC for DSM for this week is as follows.

Date Revision

02-10-2017 75

03-10-2017 93 04-10-2017 67

05-10-2017 87

06-10-2017 89

07-10-2017 75

08-10-2017 78

NSPCL- SAIL BSP Regarding-

As per the CERC Order Dtd. 05/10/2017 against Petition No. 211/MP/2011, No POC losses shall be applied on power scheduled from NSPCL to SAIL-BSP.

This is implemented in WBES. But, in Zloss DBF file generated for Accounting there is only information for Buyer/Seller losses. Provision for Transaction-wise losses is not there.

The Injection and Drawal losses will be applied for all the transactions from NSPCL except SAIL BSP.

This is not possible in WBES at present. Presently the loss is skipped for NSPCL-SAIL BSP by hard-coding in WBES.

However, the permanent solution is to provide a skip option in Share allocation Page for Buyer-Seller combination is under discussion with PWC

It is therefore requested that WRPC may implement the same at your end while preparing the REA/DSM accounts by not applying the Injection and Withdrawal losses for NSPCL-SAIL BSP transaction

New Schedule Code for the week 02-08 October 2017-

New Schedule code for “SKS Power Generation Limited” is “X5” which is with effect from 00:00 hrs of 06.10.2017. WRPC PX code for this generator is X5_PX.

Regards,

Prashanth,

Sr.Engineer,

Market Operations,

WRLDC, POSOCO.

Mob:7715960002

* This e-mail is an official email of Power System Operation Corporation Ltd (POSOCO), is confidential and intended to use by the addressee only. If the message is received by anyone other than the addressee, please return the message to the sender by replying to it and then delete the message from your computer. Internet e-mails are not necessarily secure. The Power System Operation Corporation Ltd.(POSOCO) does not accept responsibility for changes made to this message after it was sent. Whilst all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the onward transmission, opening or use of this message and any attachments will not adversely affect its systems or data. No responsibility is accepted by the POSOCO in this regard and the recipient should carry out such virus and other checks as it considers appropriate. Visit our website at www.posoco.in *