Pre-Feasibility Report
Total Page:16
File Type:pdf, Size:1020Kb
PRE-FEASIBILITY REPORT FOR PROPOSED LNG & LPG IMPORT FACILITIES WITH CAPTIVE JETTY AND BREAKWATERS 1. LNG CAPACITY OF 11 MMTPA (PHASE I - 5.5 MMTPA, PHASE II - 5.5 MMTPA) WITH OFFSHORE & ONSHORE STORAGE TANKS 2. LPG CAPACITY OF 4 MMTPA (PHASE I – 2.0 MMPTA, PHASE II – 2.0 MMTPA) WITH OFFSHORE AND ONSHORE STORAGE TANKS At Chirra Yanam (V), Katrenikona Mandal, East Godavari District, Andhra Pradesh, INDIA Project Proponent: M/s Hindustan LNG Limited 6-2-913/914,2nd Floor, Progressive Towers Khairatabad, Hyderabad-500004, INDIA Mail : [email protected], [email protected] Environment Consultant: Bhagavathi Ana Labs Pvt. Limited (A Bureau Veritas Group Company) 7-2-C-14, Industrial Estate, Sanathnagar, Hyderabad 500018 Hindusthan LNG Limited Pre Feasibility Report CONTENTS EXECUTIVE SUMMARY ........................................................................................................... 4 1. INTRODUCTION OF THE PROJECT ................................................................................. 6 1.1. IDENTIFICATION OF PROJECT AND PROJECT PROPONENT. .................................. 6 1.2. BRIEF DESCRIPTION OF NATURE OF THE PROJECT ................................................ 7 1.3. NEED FOR THE PROJECT ............................................................................................ 7 1.4. DEMAND- SUPPLY GAP ................................................................................................ 7 1.5. IMPORTS VS. INDIGENOUS PRODUCTION ................................................................. 8 1.6. EMPLOYMENT GENERATION DUE TO THE PROJECT ............................................... 8 2. PROJECT DESCRIPTION. ................................................................................................. 9 2.1. TYPES OF PROJECT INCLUDING INTERLINKED AND INTERDEPENDENT PROJECT, IF ANY. .................................................................................................................... 9 2.2. LOCATION ...................................................................................................................... 9 2.3. DETAILS OF ALTERNATE SITES .................................................................................. 9 2.4. SIZE OR MAGNITUDE OF OPERATION .......................................................................15 2.5. PROJECT DESCRIPTION WITH PROCESS DETAILS .................................................15 2.6. RAW MATERIAL REQUIRED ........................................................................................16 2.7. RESOURCES OPTIMIZATION ......................................................................................16 2.8. AVAILABILITY OF WATER, ENERGY /POWER ............................................................16 2.9. QUANTITY OF WASTES TO GENERATED ..................................................................16 2.10. SCHEMATIC REPRESENTATIONS EIA ....................................................................17 3. SITE ANALYSIS ................................................................................................................18 3.1. CONNECTIVITY .............................................................................................................18 3.2. LAND FORM, LAND USE AND LAND OWNERSHIP .....................................................18 3.3. TOPOGRAPHY (ALONG WITH MAP) ............................................................................18 3.4. EXISTING LAND USE PATTERN ..................................................................................18 3.5. EXISTING INFRASTRUCTURE .....................................................................................18 3.6. SOIL CLASSIFICATION .................................................................................................18 3.7. CLIMATIC DATA FORM THE SECONDARY SOURCES. ..............................................18 3.8. SOCIAL INFRASTRUCTURE AVAILABLE .....................................................................20 4. PLANNING BRIEF .............................................................................................................21 4.1. PLANNING CONCEPT ...................................................................................................21 4.2. POPULATION PROJECTION ........................................................................................21 4.3. LAND USE PLANNING ..................................................................................................21 4.4. ASSESSMENT OF INFRASTRUCTURE DEMAND .......................................................21 4.5. AMENITIES/ FACILITIES ...............................................................................................21 5. PROPOSED INFRASTRUCTURE .....................................................................................22 5.1. INDUSTRIAL AREA (PROCESSING AREA) ..................................................................22 5.2. RESIDENTIAL AREA (NON PROCESSING AREA) .......................................................22 5.3. GREEN BELT.................................................................................................................22 5.4. SOCIAL INFRASTRUCTURE .........................................................................................22 5.5. CONNECTIVITY (TRAFFIC AND TRANSPORTATION ROAD/ RAIL/METRO/ WATER WAYS) ......................................................................................................................................22 5.6. SEWERAGE SYSTEM ...................................................................................................22 5.7. INDUSTRIAL WASTE MANAGEMENT ..........................................................................22 Bhagavathi Ana Labs Pvt. Ltd. (a Bureau Veritas Group Company) IND.BH.41.16.0310/HSR Rev. 00, Draft for submission to client 2/29 Hindusthan LNG Limited Pre Feasibility Report 5.8. SOLID WASTE MANAGEMENT.....................................................................................22 6. REHABILITATION AND RESETTLEMENT (R & R) PLAN .................................................23 7. PROJECT SCHEDULE & COST ESTIMATES ...................................................................24 7.1. ESTIMATED PROJECT COST ALONG WITH ANALYSIS IN TERMS OF ECONOMIC VIABILITY OF THE PROJECT. .................................................................................................24 8. ANALYSIS OF PROPOSAL (FINAL RECOMMENDATIONS) ............................................25 8.1. FINANCIAL AND SOCIAL BENEFITS ............................................................................25 9. REFERENCE: ....................................................................................................................26 TABLE OF FIGURES FIGURE 1: DEMAND SUPPLY GAP PROJECTION (MMSCMD) ....................................... 7 FIGURE 2: INDEX MAP SHOWING THE PROJECT SITE ................................................ 10 FIGURE 3: MAP OF THE AREA 10 KM AROUND THE PROJECT SITE ....................... 11 FIGURE 4: CAPTIVE JETTY MAP .......................................................................................... 12 FIGURE 5: CAPTIVE JETTY MAP WITH COORDINATES ................................................ 13 FIGURE 6: ENVIRONMENTAL SENSITIVITY MAP ............................................................ 14 TABLES TABLE 1 : CLIMATOLOGICAL DATA STATION: IMD, KAKINADA ...........................................20 TABLE 2 : SUMMARY OF PROJECT DESIGN / DETAILS .......................................................27 Bhagavathi Ana Labs Pvt. Ltd. (a Bureau Veritas Group Company) IND.BH.41.16.0310/HSR Rev. 00, Draft for submission to client 3/29 Hindusthan LNG Limited Pre Feasibility Report EXECUTIVE SUMMARY S .No Description Details 1. Name of the Project Proposed LNG and LPG import facilities with Captive Jetty & Breakwaters (a) LNG Capacity of 11 MMTPA (Phase I - 5.5 MMTPA, Phase II - 5.5 MMTPA) and Floating Storage Unit (FSU), Land based Storage Tanks (240000 m³ each in 2 stages) and Truck Loading Terminal (12 Bay) (b) LPG capacity of 4 MMTPA (Phase I - 2.0 MMTPA, Phase II - 2.0 MMTPA) with Offshore and Onshore Storage Tanks 2. Location and Features of the Chirra Yanam, Katrenikona Mandal, East Terminal Godavari District, Andhra Pradesh. Proposed Terminal : Rs.2800 Crores (Rupees Two thousand and Eight hundred Crores only) (a) LNG Capacity of 11 MMTPA (Phase I - 5.5 MMTPA, Phase II - 5.5 MMTPA) and Floating Storage Unit (FSU), Land based Storage Tanks (240000 m³ each in 2 stages) and Truck Loading Terminal (12 Bay) (b) LPG capacity of 4 MMTPA (Phase I - 2.0 MMTPA, Phase II - 2.0 MMTPA) with Offshore and Onshore Storage Tanks (1000m3 along with truck loading facilities) Project Features : (1) Development of necessary facility/equipment for ship berthing and mooring, LNG, LPG unloading arms with all safety measures (2) LNG, LPG storage and transportation (3) LNG insulated Cryogenic Pipeline for onshore facility (4) LNG Re- gasification facilities (5) Truck loading facilities for LNG and LPG (6) Natural gas pipeline for connectivity to existing GAIL gas distribution grid. The imported LNG and LPG will be unloaded from the vessel into Floating Storage Unit (FSU). LNG and LPG is transferred and stored in the land based storage tanks. After Regasification (RLNG) Bhagavathi Ana Labs Pvt. Ltd. (a Bureau Veritas Group Company) IND.BH.41.16.0310/HSR Rev. 00, Draft for submission to client 4/29 Hindusthan LNG Limited Pre Feasibility Report S .No Description