SMART SOLUTIONS

Helping contractors save money and enhance productivity WINTER 2015

EMC Sees 30-Percent Labor Savings with Victaulic 3D Renderings and Installation-Ready Couplings

Having installed Victaulic grooved products numerous times, Environmental Mechanical Contractors, Inc. (EMC) knew Victaulic could help them meet a tight deadline for renovations at Kansas’ Fort Leavenworth. Working with Victaulic’s Construction Piping Services department (CPS) to create 3D renderings of the project also allowed EMC The will rename their new facility Sloan Park in to minimize rework and identify and troubleshoot potential honor of its new partnership with Illinois-based Sloan Valve Company. Sloan problems. products have been in the Cubs’ since 1914.

“We picked up a 30-percent labor savings from fabrication to Chicago Cubs’ Spring Training install[ation] because of the isometric drawings and Victaulic Installation-Ready™ couplings,” said Marcus Howell, Facility To Be Named Sloan Park EMC’s senior project manager on the Fort Leavenworth Sloan Signs On as Cubs’ Legacy Partner and Official project (now director of construction operations). continued on page 14 Water Efficiency Partner As reported in the Summer 2014 issue of Smart Solutions, ’s Chicago Cubs specified Illinois- based Sloan Valve Company’s plumbing systems for its spring training facility in Mesa, AZ. Recently, the Cubs announced that Sloan has joined the organization as a Legacy Partner and the team’s Official Water Efficiency Partner. As part of this agreement, the Cubs’ spring train- ing facility will be named Sloan Park.

Sloan, the world’s leading manufacturer of intelligent water solutions, will help the Cubs expand their ongoing sustain- ability efforts and improve the fan experience at Sloan Park and at Wrigley Field. Sloan’s expertise in water efficiency will help the Cubs reduce their overall environmental impact— especially important in drought-prone areas such as .

“We are a global organization founded in Chicago, so part- Installation-Ready technology from Victaulic allowed EMC to increase productivity and safety on the job and meet compressed schedules for the Fort nering with another iconic Chicago brand is a natural fit. Leavenworth renovation. continued on page 16

7 WHAT'S INSIDE

F. W. Spencer Meets Tight Deadline with Jay R. Smith...... 3 Parker Hannifin Assists Lynch with Cleanroom Retrofit...... 4 8 Carrier Helps Hospital Earn LEED Certification, Rebate...... 6 Sauer Increases Productivity by 300 Percent with Tri Tool ...... 7 Viega Provides Tips for Preventing Waterborne Pathogens...... 11 10 Laptop Computer and Mobile Device Security Tips from CNA...... 12 SMART SOLUTIONS Proud To Be Partners Helping contractors save money Finding new ways to increase productivity and save money means and enhance productivity constantly keeping an eye out for products and services that can help. Jim Thomas, president and owner of JS Thomas Service, Smart Solutions showcases new tech- Inc., found the answer he needed in a story he read in Smart nologies and promotes cost-saving and Solutions. In this issue, learn how JS Thomas moved from paper productivity-enhancing applications service tickets to iPads® using iBusiness Technologies’ MobiliForms, speeding up available from members of MCAA’s customer billing and payment. Manufacturer/Supplier Council. Smart Solutions is published biannually for That’s just one example in this issue of how contractors rely on MCAA Supplier contractor members of MCAA and its Partners. William F. Lynch Co., Inc. recommended Parker Hannifin’s Transair alumi- subsidiaries. num piping over copper piping to meet a tight deadline and save costs. Environmental Mechanical Contractors, Inc. teamed with Victaulic’s Construction Piping Services department to create 3D renderings, minimizing rework and troubleshooting potential All information in this newsletter problems. Working with Sauer Group, Tri Tool Field Services developed weld proce- was supplied by members of MCAA’s dures and deployed its portable machine tools and AdaptARC multiprocess welding Manufacturer/Supplier Council. MCAA systems, improving Sauer Group’s productivity as much as 300 percent. is not responsible for any claims made regarding products or services mentioned. Supplier partners take partnership seriously. The enduring relationship between Major League Baseball’s Chicago Cubs and the Sloan Valve Company has led to Cynthia Buffington the Cubs naming their spring training facility Sloan Park. Senior Executive Director Also in this issue, Zurn Industries, LLC engineered a range of customized prod- Jan Grillo ucts in less than four weeks for the rapid renovation of Orlando’s Citrus Bowl Director, Membership Stadium. Carrier worked closely with New Jersey’s Shore Medical Center to achieve LEED® Silver certification and earn a $117,000 energy-efficiency rebate in the process. By installing a Variable Refrigerant Flow zoning system, Mitsubishi Adrienne Breedlove Electric US Cooling & Heating Division helped an energy-efficiency consulting Director, Publications firm slash their electricity and gas costs.

Dana Trevas Contractors are always looking for creative ways to achieve their goals. Thomas Consultant J. Dyer used innovative aerial service provider Erickson Incorporated to place air handling units and a condenser on a plant roof in less than one hour. Geiler Plumbing found that using Wayne Water Systems’ Blue Angel Pumps cut down their installation time, improving overall productivity. F. W. Spencer & Son, Inc. turned to Jay R. Smith Mfg. Co.® for products designed with prefabrication in mind, allowing them to meet the accelerated deadline for the NFL’s new Levi’s® 1385 Piccard Drive Stadium. The Waldinger Corporation discovered that PENTA Technologies’ Rockville, MD 20850-4340 Mobile Field Service application not only saved time but also boosted sales and marketing opportunities. 301-869-5800 Fax 301-869-3520 Smart Solutions also includes advice you can use to manage risk. Viega offers e-mail [email protected] tips to improve plumbing design to avoid bacteria build-up. CNA describes how www.mcaa.org to protect laptops and mobile devices from theft and data breaches. This issue is filled with examples of how MCAA Supplier Partners are proud to be your part- ners in productivity.

Jim Allen, Chairman F. W. Spencer & Son Meets Levi’s Stadium’s Tight Deadline Thanks to Jay R. Smith Prefab- Ready Products

With just over two years to build tasks occurring all at the same time. the NFL’s new Levi’s® Stadium, To keep the project moving quickly, F. W. Spencer & Son, Inc. turned to Jay R. Smith Mfg. Co. got the mate- Jay R. Smith Mfg. Co.® for prod- rials requested together and shipped ucts designed with prefabrication them before they were even needed in mind, allowing them to meet the on the job. accelerated deadline. Installing a big battery of water closets typically Prefab Paves the Way involves prefabrication to save time, for Smooth Installation but the building of Levi’s Stadium in “We built the entire job basically in Santa Clara, CA, took prefab work a warehouse,” said Steve Sandkohl, to another level entirely. With careful project manager at F. W. Spencer & planning and quick turnaround on Son. That meant every battery, every F. W. Spencer & Son relied on prefabrication to materials, F. W. Spencer & Son suc- fixture location, and all the rough-in ensure smooth, speedy installation of plumbing ceeded in constructing all the fixtures plumbing work for the concessions fixtures to meet the accelerated schedule in its warehouse and installing them and restrooms were completely built for the new Levi’s Stadium. Jay R. Smith Mfg. Co. Quarterback Water Closet Supports were in time. The stadium is home to the and fastened right into a concrete designed with prefabrication in mind. San Francisco 49ers. slab in the prefab warehouse. Stadium was the first project to use Usually, a contractor gets everything Jay R. Smith Mfg. Co. Quarterback the new Quarterback Water Closet approved and then starts the proj- Water Closet Supports were designed Support. ect. But for Levi’s Stadium, timing with prefabrication in mind. F. W. was everything. All aspects of the Spencer & Son chose them based on Because F. W. Spencer & Son was work had to be done efficiently and anchorage requirements and ease building as much as possible ahead quickly. F. W. Spencer & Son was of mounting to shipping channel of time, how to transport the fin- able to manage multiple complex for transport to the jobsite. Levi’s ished build to the stadium was a key consideration in choosing the mate- rials. “It doesn’t do any good to do prefab if you can’t safely transport without damage,” said Sandkohl. “A lot of the decision-making on elements we used weighed all those factors.”

Once everything was air-tested and complete, F. W. Spencer & Son cut the finished installation into man- ageable sections to be transported to the jobsite. Because everything had been staged with precision, it was a case of simply coupling everything together onsite.

Custom Designs Meet Client Demands The job also called for modified Building a new professional sports stadium would typically take at least three years, but Levi’s Stadium was completed in just over two years, thanks to contractors like F. W. Spencer & Son, who used a massive heavy-duty trench drains to be prefabrication effort and prefab-ready products from Jay R. Smith Mfg. Co. to meet the short deadline. continued on page 17

SMART SOLUTIONS 3 WINTER 2015 Parker Hannifin’s Transair Aluminum Piping Helps Lynch Complete Cleanroom Retrofit in Six Months To meet a tight deadline, William F. open the door, the minute particles, Lynch Co., Inc. recommended Parker if any, blow out instead of in,” Butler Hannifin’s Transair aluminum piping said. “We’re also very particular over copper piping, saving installa- about the room’s temperature and tion time, labor, and material costs. humidity.” By using Transair, Lynch was able to install twice the piping specified in The company found a 193,000-square- the initial design and still finish the foot abandoned building with 58,400 job on time. square feet for the cleanroom and another 18,000 square feet for clean- Nypro, a plastics injection molding room expansion. The rest of the company in Clinton, MA, contracted building houses support, warehouse/ Lynch, of Worcester, MA, to retro- shipping, and offices. Project work fit an abandoned building so that it included rework of the mechanical could expand and upgrade its health systems and the design and installa- care production facility. As facilities tion of a compressed clean dry air age and building restrictions tighten, (CDA) system. CDA air is critical retrofitting an older building for to Nypro’s manufacturing process, modern-day manufacturing can be primarily for molding equipment and challenging, especially in the medi- other pneumatic devices in the assem- cal industry. In addition, the project bly area that operate the high-speed timeline allowed just six months for assembly equipment. construction. Aluminum: Alternative to Copper Seizing an Opportunity Initially, Nypro wanted to install a Nypro has been negotiating with a copper CDA piping system, which pharmaceutical company to fill the would have taken more than 1,300 medical delivery devices manufac- labor hours, said Lynch’s president, tured by Nypro with the medicine at Mac Lynch. The complex project the time of production, improving schedule did not provide enough efficiency for both parties. However, time for a CDA installation. After Top: Parker Hannifin’s Transair aluminum piping Nypro’s Clinton facility was too exploring options to reduce man- was so easy to install that Lynch was able to small to handle the expanded scope hours, Lynch recommended Parker install twice as much as the initial design called of work, said Senior Manager of Hannifin’s Transair aluminum piping. for and still meet Nypro’s six-month project deadline. Maintenance & Facilities Mark Middle: Unlike traditional copper piping, Transair Butler. “The initial design had about 2,300 does not require any brazing or purge gases, feet of CDA piping,” Lynch said. eliminating the need for that added labor expense for the Nypro retrofit. “One man can install most of Nypro sought an additional location “As the project evolved and all par- the pipe alone, and the fittings save quite a bit of for its health care division with ade- ties saw the advantages of using labor,” said Mac Lynch, president of Lynch. quate space for an ISO 8-compliant this system, other phases of the Bottom: The Nypro installation required about 5,400 feet of CDA pipe, which would have taken cleanroom, which has strict regula- project incorporated Transair into more than 1,300 labor hours with copper— tions regarding airborne particulate the design. Total installed CDA pipe exceeding the project’s six-month deadline. With cleanliness. The room also required was more than double the initial Parker Hannifin’s lightweight Transair piping and quick-connect fittings, Lynch met the deadline and laminar flow—in which air flows in design—about 5,400 feet, a little over the CDA requirements. a parallel pattern with no mixing of a mile—and we still met the project layers—and HEPA air filters installed deadline.” in the ceiling, Butler pointed out. and easier to manage than copper Using Transair allowed Lynch to and does not require any brazing or “We keep the particle count down by meet the deadline and the CDA purge gases, observed Lynch, thus pressurizing the room, so when you requirements. Aluminum is lighter continued on page 16

SMART SOLUTIONS 4 WINTER 2015 down a description of work, inven- The Waldinger Corporation Finds PENTA tory usage, labor, meter readings, Mobile App Drives Productivity and Sales and purchases only to have someone in the office rekey all of that infor- The Waldinger Corporation—a a small handheld device, the ES400. mation into PENTA. Now, PENTA leading HVAC, plumbing, sheet The solution accomplished many of Mobile captures the information, metal, electrical, and service contrac- their goals, but it was not as intuitive we review it in the office, and then tor with local presence throughout as they would have liked. “The new it’s automatically entered” into the Iowa, Nebraska, Kansas, and iOS version that we are now running continued on page 15 Missouri—expected that using on iPad minis™ has been extremely PENTA Technologies’ Mobile Field well-received,” said Miller. “The soft- Service application would improve ware is much more intuitive and has productivity and save money when many new features, and the hardware it came to capturing and keying in is stable.” information. “What we may have underestimated is the ability of our The company adopted PENTA sales team to use the added abil- Mobile Field Service so that its tech- ities to market our services,” said nicians would have more complete Dave Miller, Waldinger’s senior vice information to better serve custom- president of Operations. “We have ers. Technicians can now see previous definitely had proven results on the service history by piece of equip- sales and marketing fronts.” ment, so they know more going into the call. Waldinger’s first mobile experiences Technicians at The Waldinger Corporation were with the original Windows® Waldinger also wanted to elimi- appreciate how easy it is to use PENTA’s Mobile Field Service on an iPad. The app has improved version of the PENTA Mobile nate duplication of efforts. Miller productivity and customer service, which has application, which were running on explained, “Technicians used to write translated into more sales for Waldinger.

Geiler Plumbing Cuts Installation Times with third-party security system notifi- cation, while the autodialer allows Wayne Water Systems’ Blue Angel Pumps plumbers to input up to five numbers (including their own) to be alerted in Geiler Plumbing found that using have about 15 lead wires coming over the event flooding occurs. Is this ben- Wayne Water Systems’ Blue Angel and each one has to be hooked to eficial to the consumer? “I think it is, Pumps cut down their installation a certain side. It’s nice that they for quite a few reasons,” Varos said. time, improving overall productivity. (Blue Angel) color-code all of “People never go down and The new Blue Angel Pumps’ Pre- them.” continued on page 17 Assembled Back-Up and Primary System combines all the components The cast-iron primary pump needed for a sump pump with a pushes 60 gallons per minute, high-quality backup pump and an while the fully submersible autodialer that can notify up to five thermoplastic backup pump numbers. pushes 47. The backup system includes connection ports for “It’s definitely easier (the installa- tion). You’re not playing with acid, Blue Angel Pumps’ Pre-Assembled and you don’t have to put prongs in Back-Up and Primary System combines anywhere and make sure you have all the components needed for a sump everything wired up correctly,” said pump with a high-quality backup pump and an autodialer that can notify up to five Jose Varos, technician for Geiler numbers, which simplified installation and Plumbing. “With the old ones, you’d saved time for Geiler Plumbing.

SMART SOLUTIONS 5 WINTER 2015 Carrier Helps Hospital Earn LEED Certification and $117,000 Energy Rebate To meet the Shore Medical Center’s leadership decided to add a new To meet the customer’s efficiency goal of obtaining LEED® certifi- Surgical Pavilion where physicians goals, Carrier recommended an cation, Carrier specified a range of and staff in the facility’s numer- “N+1” cooling system in which each chillers and a web-based integration ous Centers of Excellence could component has a backup device for system for its new Surgical Pavilion, employ the latest technology to safety and reliability—specifying two earning the Medical Center a provide optimal patient care in 23XRV AquaEdge™ chillers and $117,000 rebate from the New Jersey safe, comfortable surroundings. one 30HXC AquaForce® chiller as Clean Energy Program™ in the The resulting pavilion houses 11 an emergency backup. With a peak process. state-of-the-art surgical suites facility load of 700 tons, the 200-ton as well as beautifully appointed 30HXC chiller provides emergency Shore Medical Center, formerly patient and family areas. redundancy for either 500-ton known as Shore Memorial 23XRV chiller. The 23XRV chillers Hospital, provides a broad range Hospital leadership wanted to maxi- have an Integrated Part Load Value of health care services to the peo- mize energy efficiency in the cooling (IPLV) of .326 kW/ton, a marker of ple of southern New Jersey. The system of the new facility as one step very high efficiency in operation. main campus is located in Somers toward earning LEED certification. Point, with a regional Dialysis Other sustainable features included a Center in Northfield, about four- white roof and rooftop gardens and and-a-half miles away. To meet the exclusive use of building materi- “While the technical the needs of a diverse population als manufactured within 500 miles of in the 21st century, the hospital Somers Point. capabilities of the i-Vu interface are excellent, it’s Top: Carrier installed an i-Vu Pro web-based user interface to integrate new Carrier the savings—in both time AquaEdge 23XRV water-cooled chillers with ancillary equipment and the existing and money—of combining BACnet Building Automation System at Shore Medical Center, which saves the engineering system monitoring, diag- staff both time and money. nostics, and notification Bottom: Thanks to high-efficiency Carrier chillers and monitoring systems, Shore Medical by email that make it an Center’s new state-of-the-art Surgical Pavilion not only obtained LEED Silver certification but invaluable tool for us.” also earned a $117,000 energy rebate from the New Jersey Clean Energy Program. —Anthony Carino, Chief Engineer, Shore Medical Center

Darryl Hitchcock, sales manager at Carrier, said, “The 23XRV AquaEdge chillers are so reliable that even when, at start-up, the cooling towers were returning water that was above optimum temperature, the chillers just kept running efficiently while we resolved the situation.”

Carrier also installed an i-Vu®Pro web-based user interface to inte- grate the new chillers with some existing equipment and the existing BACnet® Building Automation System. Anthony Carino, chief continued on page 19

SMART SOLUTIONS 6 WINTER 2015 Sauer Group Increases Productivity by 300 Percent with Tri Tool High-Performance Welding Solutions

Sauer Group wanted to ensure services subcontractor who was also high-quality welds while reducing an original equipment manufacturer time and costs on a natural gas (OEM) of welding and portable processing station project, so they machine tools. Prior experience with used Tri Tool Inc.’s AdaptARC® Tri Tool’s field machining services led system, configured for flux core arc Sauer Group to consult Tri Tool for welding (FCAW) deposition, which a comprehensive field machining and increased productivity 300 percent welding solution. over traditional stick welding. Brian Stahovec, project superintendent for Working with Sauer Group and Sauer Group, said, “The welding Mark West Energy Partners, Tri Tool process we’re using was developed by Field Services developed, tested, and Tri Tool in conjunction with Sauer validated weld procedures per ASME especially for this project. Utilizing B31.8 and deployed certified project Top: Sauer Group cut costs and stayed on schedule thanks to Tri Tool, which redesigned a that method, we’ve been able to not managers, machinists, and welders torch head to perform the large-bore eccentric only cut costs but also make sure the using patented Tri Tool portable I.D. weld overlay, counterbore, weld prep, and schedule’s been maintained.” machine tools and AdaptARC mul- finished weld in under 36 hours from identification tiprocess welding systems. To meet to weld-out. The project involved a cryogenic schedule constraints, two sets of two Bottom: Using Tri Tool’s AdaptARC system increased Sauer Group’s productivity 300 natural gas processing and com- weld heads, each operating in tandem percent over traditional stick welding, saving the pressor station for the Marcellus continued on page 18 contractor two to three shifts of welding time. and Utica Shales where oil and gas were separated and the final prod- uct was delivered directly from the active well using horizontal drilling and hydraulic fracturing. The Sauer Group’s work on the project for Mark West Energy Partners was the largest undertaking of its kind in its 100-plus-year history.

The project scope called for outdoor installation of 1,920 linear feet of 36”–42” outside-diameter X 1” wall finger-type slug catchers fabricated from seam-welded High Grade API 5L X70 pressure piping using ER70S-2 high-tensile-strength filler material. Tasks identified in initial planning included restoring shop-fab- ricated spool ends to specification, precision-machining a total of 54 weld joints to ensure proper fit-up, and performing 100-percent X-ray welds at accelerated deposition rates.

To achieve their goals, Sauer Group decided to work with an onsite field

SMART SOLUTIONS 7 WINTER 2015 With a Lift from Erickson, Thomas July 12, 2014

J. Dyer’s Installation, Labor Costs 6:15 Erickson’s Aircrane helicopter and Plummet AM crew arrived on the jobsite Toyota Motor Manufacturing Plant’s Rooftop Units Placed in Less Than an Hour 6:30 Thomas J. Dyer and Erickson AM crews conducted a safety briefing Thomas J. Dyer placed six air handling units and a con- denser on a plant roof in less than one hour by relying on innovative aerial service provider Erickson Incorporated. 7:00 The lift portion of the project began Thomas J. Dyer commissioned Erickson to lift and place AM the HVAC components onto curb installations on top of the Toyota Motor Manufacturing plant in Georgetown, KY. After the air handling units and condenser were placed 7:34 The HVAC components were on the single-story building by helicopter, Thomas J. Dyer AM safely placed on the roof crews completed the installation.

On July 12, 2014, Erickson’s Aircrane helicopter and crew Seven lifts + flight time = 34 minutes arrived on the jobsite at 6:15 a.m., and Thomas J. Dyer and Erickson crews conducted a safety briefing at 6:30 a.m. The lift portion of the project began at 7:00 a.m., and the HVAC components were safely placed on the roof by 7:34 a.m. With a total of seven lifts and a flight time of just 34 minutes, Erickson proved instrumental in accomplishing Thomas J. Dyer’s goals in a short time while exceeding safety expectations. Although the lift was quickly com- pleted, it was no small undertaking. All seven placements were flown with steel cable rigging as 4-point lifts, and package weights ranged from 3,950 pounds to 12,800 pounds.

Thomas J. Dyer’s collaboration with Erickson represents an effective, efficient, and modern approach to infrastruc- ture installation and construction. Erickson’s placement lifts not only saved time on the ground, but also saved labor costs because they were much more efficient than standard ground-based methods. In addition, the project was approved by the Owner Controlled Insurance Program (OCIP) in which Toyota is enrolled.

This kind of project is not new to Erickson. The company prides itself on the delivery and installation of heavyweight ventilation and air conditioning units onto a variety of challenging rooftops and structures. Erickson’s Aircrane is uniquely designed, piloted, and crewed to perform special- ized lifts. Erickson has successfully and safely placed over 40,000 HVAC units onto multistoried buildings, automobile plants, and aviation hangers across North America and Europe.

The Erickson Aircrane helicopter placed six air handling units and a condenser on a plant roof in less than one hour, minimizing installation and For more information, visit ericksonaviation.com. labor costs for Thomas J. Dyer.

SMART SOLUTIONS 8 WINTER 2015 bring to life his familiar service ticket, JS Thomas Service, Inc., Gets Paid Faster Using which now easily captures essen- MobiliForms from iBusiness Technologies tial information and automatically computes parts, materials, and labor By making the transition from iBusiness Technologies has part- hours. JS Thomas’ existing refrigerant paper service tickets to iPads® nered with Apple® to provide the log, pricing request sheet, and time using iBusiness Technologies’ iPad-based MobiliForms solution to sheet are also now all iPad-based. MobiliForms, JS Thomas Service, Inc., MCAA members. Field techs are now sped up its billing process, so now interactively completing their familiar, Using 13 iPads, the JS Thomas ser- they get paid faster. The move also identical forms and instantly sending vice team stores completed forms and improved customer satisfaction. them back to the office for same-day project documentation in the cloud for Because MobiliForms is compatible invoicing. This process eliminates immediate access by the office. This with QuickBooks®, the switch was paper forms that can be difficult to instant accessibility boosts customer easy. read, get lost, or need to be driven or satisfaction by speeding up processing shipped back to the office. Technicians and ensuring tight recordkeeping. JS Thomas is a full-line mechanical love the ability to capture images and service company supporting custom- even mechanical sounds right into For Thomas, the ability to leverage mobile solutions for daily invoicing without the upheaval of replacing “I am most pleased with how MobiliForms has accelerated our his software was a tremendous ben- billing process, positively impacting our cash flow” efit of the transition from paper to MobiliForms. “I saw MobiliForms as —Jim F. Thomas, President, JS Thomas Service, Inc. a way to neaten service tickets, proj- ect the expertise of our technicians, ers in the commercial office, medical, MobiliForms. Customers like sign- and look more professional to our manufacturing, industrial, and data ing on the iPad. The compatibility customers, but I am most pleased center businesses throughout Atlanta of MobiliForms with QuickBooks with how MobiliForms has acceler- and north Georgia. “We have some provides JS Thomas with a low-cost, ated our billing process, positively of the best technicians in the indus- powerful, and complete business sys- impacting our cash flow.” try working for us,” proudly stated tem with mobile capabilities. Jim F. Thomas, president and second generation owner of JS Thomas. Thomas collaborated with iBusiness For more information call 877-565- “Our HVAC service team members Technologies’ programming team to 3261 or visit iBusiness-Tech.com. rank among the best in Atlanta in expertise—from two-ton split systems to 1,000-plus-ton centrifugal chillers. Unfortunately, their handwriting and paperwork organization skills sometimes do not rise to the same top-notch levels.”

Thomas does not hire his field team members on the basis of managing paperwork, however, and his home office staff did their best to handle the paper service tickets that came in weekly from the field. When Thomas read in Smart Solutions about how iBusiness Technologies is working with other MCAA member com- panies to convert paper forms and project documents to mobile, he knew he had found a solution to his JS Thomas technicians Danny Hunter and Tony Bussie use iPad-based MobiliForms at a customer’s site. The burdensome and common problem. switch from paper to digital forms has sped up billing and improved customer satisfaction.

SMART SOLUTIONS 9 WINTER 2015 Contractors completed a massive renovation of Orlando’s famed Citrus Bowl Stadium in 10 months thanks to Zurn Industries. Zurn was able to engineer and ship customized drainage products and carriers in less than four weeks. With Hurry-Up Offense and Zurn Products, Orlando’s Citrus Bowl Stadium Renovation Completed in Ten Months

When the scoreboard of the original products were specified for all of prefabricate sturdy units that were Orlando Citrus Bowl Stadium was these spaces. then moved to the site and installed torn down in January 2014, the proj- with no damage or leaks. ect team began a hurry-up offense “Zurn’s Custom Specification to complete a roughly $200-million Drainage products and carrier banks Construction crews worked in renovation in only ten months. Zurn were engineered, approved, ordered, 24-hour shifts, and everyone Industries, LLC was drafted to pro- and shipped in less than four weeks,” associated with the project was vide its products and to meet the said Bill Verdecchia, director of laser-focused on the play clock. challenges of an expedited project Specification Drainage Product Products that allowed for fast, easy timeline with made-to-order require- Marketing & Engineering for Zurn. installation were essential. ments. The roster of products used in this The Citrus Bowl project demon- Everything below the stadium’s upper project is lengthy and filled with strates the breadth of engineered deck was targeted for demolition and high-performance veterans, includ- water solutions that Zurn provides. reconstruction to update the storied ing stainless steel linear floor drains, “It makes it so much easier for venue, which opened in 1936. The lavatory and urinal carrier banks, everyone involved to specify, install, game plan provides Orlando, FL, closet carriers, stormwater drainage, and use products that are designed a modernized stadium the city can custom debris covers, wall hydrants, to work as total building systems,” use to host College Football Playoff cleanouts and light-duty grease said Frank Schaetzke, National Sales games, World Cup soccer, and other traps, floor sinks, and floor drain Manager for Zurn. “And needless to major entertainment events that stabilizers. say, this is a huge building.” require a big, modern venue. Plumbing contractors found that Florida Citrus Sports runs major The large-scale renovation included using Zurn carriers enabled them events in the Citrus Bowl. The group new restrooms, concessions, kitchen to cut the installation time in half was instrumental in getting the sta- facilities, and a team facilities build- for water closets, urinals, and lava- dium renovated. ing, as well as locker rooms for tories. They also found that using athletes and game officials. Zurn Zurn products allowed them to continued on page 19

SMART SOLUTIONS 10 WINTER 2015 bacteria establishes itself in the lungs, Viega Provides causing pneumonia-like symptoms. Tips for Preventing Legionella colonization in plumbing systems can pose a significant threat. Waterborne Sources of Legionella in a building Pathogens in system may include piping systems, cooling towers, decorative fountains, Plumbing Systems standalone ice machines, and spas. Specific to piping systems, shower In the United States plumbing vapor or the mist from a lavatory industry, focus on water quality and aerator in which the bacteria exists waterborne pathogens is increas- can introduce Legionella into the ing. For public water systems, the respiratory system. Environmental Protection Agency regulates 88 different contaminants. Temperature and flow conditions in a Viega’s new double drop elbow fittings allow Of these, Legionella has received the commercial plumbing system matter a single fixture to generate flow through many fixtures up to the point of connection, minimizing most recent attention. more than material type. Regardless dead legs between tees and wall penetrations of the piping, fitting, and sealing ele- that can harbor stagnant water and foster Legionella is the bacteria that can ments used, most modern plumbing bacteria growth. cause legionellosis. (Legionnaires’ systems are designed using a branch- disease is a form of legionellosis.) If and-tee concept, which often results to prevent it from occurring in the not treated properly, legionellosis can in dead legs. Dead legs result in stag- first place. Design strategies can be fatal. When legionellosis occurs, nant water, and stagnant water poses be coupled with good operational building owners and engineers may a significant risk of harboring and and maintenance practices and a face legal action and damage from fostering microbial growth. secondary disinfection program to negative public relations surround- effectively prevent a problem before ing the case. The best defense for a Legionella bacteria that reside in it begins. commercial plumbing system is to stagnant water conditions will flour- understand waterborne pathogens ish within a broad temperature range, The challenge with any type of and how to minimize the risks they typically 95°F to 122°F. Because bac- disinfection, including thermal disin- pose. teria multiply exponentially every few fection, is its reach. If the process is minutes, undisturbed sections of pip- not complete, there is a risk of leav- How Waterborne Pathogens ing can be the source of Legionella ing bacteria and biofilm undisturbed Spread in Plumbing Systems contamination for the entire system. throughout the system, allowing Legionella is a naturally occurring regrowth. To discourage microbial bacteria that affects the body’s respi- Legionella secretes a polymeric slime, colonization, all parts of a system ratory system. Once aspirated, the forming a biofilm on the inside should experience flow and be main- of the pipe wall. Once the biofilm tained at the proper temperature. forms, it serves as a protective blan- ket for bacteria living within it and Even with recirculation, stagnation can withstand extreme treatment can occur in dead legs because of the methods such as thermal and chem- lack of water exchange, which rep- ical disinfection. If the colony is resents a challenge to the plumbing not rendered inert throughout the system designer. Dead legs should be system, it will recolonize after treat- eliminated wherever possible. ment, regardless of the treatment method used. One solution is to daisy-chain fix- tures so their individual drops (dead Legionella, the bacteria that causes Legionnaires’ Five Tips To Minimize legs) are avoided. Any time one fix- disease and legionellosis, can reside in stagnant Microbial Growth ture is used, the remaining fixtures water in a plumbing system. Once established, One of the best approaches for mini- will see flow up to the point of con- the bacteria can multiply exponentially every few minutes. mizing the risk of Legionella forming nection even if they are not used. Photo: Janice Haney Carr, Centers for Disease Control and Prevention. in a building plumbing system is continued on page 19

SMART SOLUTIONS 11 WINTER 2015 means of preventing this data leak- The Real Cost of a Lost Laptop Is $49,246 age—disabling or monitoring usage Laptop Computer and Mobile Device Security Tips from CNA of USB ports, content filtering, and other methods are possible. Laptop computers are vital tools areas for theft of portable devices. • If it is determined that storage used by a wide population of con- Warn end-users to maintain extra on portable devices or removable tractors and are also the number-one vigilance in these areas. media is absolutely necessary, risk they are facing due to theft. these data must be protected, and Since laptop computers and hand- Potential losses associated with expo- encryption is the most common held devices are not typically used sure of sensitive data stored on stolen means of doing so. in a fixed, securable location such laptop and desktop computers can be as a jobsite, additional measures are much greater than the cost associated Encryption is the process of mak- needed to protect them. with replacing the stolen equipment. A ing data unreadable except to those key finding of the Ponemon Institute’s who possess the appropriate key to • A formal security policy detailing The Cost of a Lost Laptop study con- decode and read the data. Many state end-user responsibility for secur- ducted in 2009 was that the average breach notification laws do not man- ing these devices and the data value of a lost laptop was $49,246. date notification of affected parties they contain is essential. Devices This value is based on seven cost com- if the data involved are encrypted. should never be left unattended. ponents: replacement cost, detection, Following are two resources for • Cable locks and docking stations forensics, data breach, lost intellec- encrypting stored data: should be used but only when the tual property costs, lost productivity, device is left in a secure location, and legal, consulting, and regulatory EFS—The Encrypted File System such as an office, for short periods. expenses. Occurrence of a data breach has been available on professional • These security methods are represents 80 percent of the cost. versions of Microsoft Windows® easily compromised, and high- Therefore, it is important to take addi- since Windows 2000. EFS allows er-security options should be tional steps to prevent losses related to file-level encryption of sensitive files. used when leaving a laptop in data breaches associated with the theft Additionally, Microsoft BitLocker® an office overnight (locked in of data storage devices and media. Drive Encryption is available on storage area, file cabinet, etc.). Microsoft Windows XP and Vista®. • Travel procedures should address • First, carefully evaluate the need With BitLocker, all data on a PC common high-risk situations: for storage of sensitive infor- can be encrypted, preventing unau- • Avoid storage in automobiles. mation on any type of portable thorized users from being able to • Do not leave devices unattended device or removable media. In circumvent operating system pass- in hotel rooms. many cases, it will be determined words and access data. • Airport security areas, check-in that the need for storing informa- counters, baggage claim, tion on these difficult-to-secure The Data Encryption Toolkit for restrooms, food courts, and curb- devices is not worth the benefit Mobile PCs, from Microsoft, provides side pick-up areas are all high-risk given today’s threat environment. guidance and software tools needed • Where possible, prohibit such to effectively use both EFS and storage in an information security BitLocker for encryption of sensitive policy but also evaluate technical data. See http://technet.microsoft. com/en-us/library/cc500474.aspx.

For more information, visit https://www.cna.com.

MCAA thanks CNA for being a benefactor of MCAA 2015. This information is presented for illustrative purposes only and has been developed from sources believed to be reliable. CNA accepts no responsibility for the accuracy or complete- ness of this information. CNA is a registered trademark of CNA Financial Corporation. Copyright © 2014 CNA. All rights reserved.

SMART SOLUTIONS 12 WINTER 2015 • A great ability for load-sharing Mitsubishi Electric’s VRF Zoning Systems Slash (not possible with conventional Electric, Gas Costs for Franklin Energy systems) • Ingenious INVERTER®-driven By installing a Variable Refrigerant January 2011. Formerly the Smith compressor Flow (VRF) zoning system from Brothers processing plant (Port • Small footprint and lightweight Mitsubishi Electric US Cooling & Washington was once famous for modularity of the outdoor units Heating Division in its new head- the national distribution of white • Industry-exclusive simultaneous quarters, Franklin Energy Services, fish, chub, perch, and trout), the cooling and heating ability LLC saved 32 percent in electricity building is on the National Register and 48 percent in gas in its first year, for Historic Places. According to Data Demonstrate Savings compared with average usage for a Franklin Energy CEO Paul Schueller, Mark T. Kuntz, P.E., Mitsubishi comparable building. The savings are the company had always made its Electric’s vice president of Marketing all the more impressive because the headquarters a showcase for the & Engineered Solutions, said, new headquarters are in a historic firm’s approach to energy efficiency. “Franklin Energy is a very high-pro- building in Port Washington, WI. “We have a long history of select- file project for us. They have an ing underutilized buildings for our excellent reputation for helping Franklin Energy has consulted with headquarters and regional offices,” utilities and municipalities all over utilities, municipalities, and states to Schueller said. the U.S. achieve impressive energy create energy-efficiency programs for their commercial, industrial, agricul- Energy Usage CBECS Average Franklin Energy Actual Savings tural, and residential customers since Electric 17.9 kWh/ft2/y 12.2 kWh/ft2/y 32% 1994. For example, Franklin Energy’s Focus on Energy program has been Gas 42.3 ft3/ft2/y 21.9 ft3/ft2/y 48% working with Wisconsin residents and businesses for more than 10 years to install cost-effective energy-efficient The choice to use Mitsubishi Electric’s savings through sound program and renewable energy projects. VRF zoning technology was based on implementation practices.” several factors: A Showcase for Energy Efficiency Kuntz said that Mitsubishi Electric is Franklin Energy moved its • Energy savings delighted that Franklin Energy selected 10,000-square-foot national head- • Ease of installation the Mitsubishi Electric VRF zoning quarters into a historic structure • Superb quietness (sound attenu- system for its headquarters building. on the shores of Lake Michigan in ation) “Not only do we respect Franklin Energy’s work in the area of energy efficiency, but the installation provided an opportunity for our engineers to collect 12 months of solid energy-sav- ings quantification,” Kuntz said.

Using actual utility meter data as well as measured data from an energy monitoring system, the results showed significant energy savings compared to the average Commercial Buildings Energy Consumption Survey (CBECS) energy usage for a building of its size and construction type (see the chart).

These results validated the original energy model projections. The actual The small footprint and lightweight modularity of Mitsubishi Electric’s R-2 Series outdoor units allowed for rooftop installation at the new Franklin Energy headquarters, helping to transform an historic building into a energy usage for electricity and gas model of energy efficiency. continued on page 20

SMART SOLUTIONS 13 WINTER 2015 VICTAULIC continued from page 1

Going Deep Renovations at Fort Leavenworth, the oldest active United States Army post west of Washington, D.C., focused on Building 120, also known as Eisenhower Hall. It includes the Combined Arms Research Library, high-tech classrooms, a conference center, and the DePuy auditorium. In operation for over 180 years, the facility required a full restoration of its three-story, 220,000-square-foot interior.

With their expertise in sustainable projects and quick-turnaround com- mercial/industrial HVAC heating and EMC partnered with Victaulic’s CPS for BIM, creating isometric drawings that solved unique challenges. For example, laying out piping in 3D allowed EMC to overcome space constraints and include more piping in the cooling, sheet metal, ductwork and mechanical room at Fort Leavenworth. piping design, EMC was selected for the renovations. The most involved 3D renderings to identify the pad, “The isometrics changed the way aspect of the project was replacing the equipment, and overall piping lay- EMC communicated,” said Howell. existing HVAC system with a more outs and provide prefabrication “It gave our team a clear picture energy-efficient hybrid geoexchange support. of how the finished job would look system featuring 240 geothermal wells and allowed us to accelerate project drilled 500 feet into the earth. The Strategic Planning collaboration and efficiency in real new system would enable Building “Environmental Mechanical time. It also minimized the potential 120 to achieve a 40-percent energy Contractors firmly believes that if we for miscommunication by eliminating savings under the ASHRAE 90.1- spend time upfront to make the right the need to use our own imagination 2001 standards. Other renovations decisions prior to construction, like to interpret the plans.” included a new HVAC installation we did with Victaulic Construction within the library, complete removal Piping Services, it will have a direct Improving Safety and Savings and revamp of restrooms on all and positive result on the project’s To help avoid delays and save time three floors of the building, general success,” said Howell. “Having this and money, EMC enacted a variety mechanical and maintenance repairs, aspect under our control helps assure of processes, including developing and a full-building test and balance of the project schedule. That means accurate bills-of-material (configured the HVAC system. responsiveness, cost-effectiveness, from the pipe routing drawings) to and delivering on time to the specifi- ensure precise material orders and Racing against the clock with $8 cations the project requires.” roll grooving and prefabricating the million for mechanical upgrades and pipe at their headquarters. Using a tight deadline of only 540 calen- Using the drawings allowed for stra- detailed pipe cut sheets provided dar days, EMC engaged Victaulic tegic planning to ensure economical, by CPS, pipe marking, lengths, and to overcome the challenge of not practical, and proper installation quantity data offered a guide for only a compressed schedule, but also and to avoid conflict and changes crew members to match the pipe configuring the piping around an at the time of implementation. For to the isometrics. Furthermore, to existing geothermal system. Howell example, refining pipe routings in the help increase the speed and ease was familiar with CPS, Victaulic’s drawings guaranteed there would be of field installation, EMC shipped drafting and building information proper clearance for installation and preassembled lengths to the jobsite modeling (BIM) services, and called maintenance, which was especially for final assembly. They also labeled on them to draw and coordinate the beneficial when making accommoda- the additional grooved products and mechanical room. At EMC’s request, tions for the new geothermal water accessories with location and date the CPS team developed isometric system. information.

SMART SOLUTIONS 14 WINTER 2015 PENTA continued from page 5

PENTA system used in the home office.

In addition, Waldinger sought to facilitate equipment service history reporting. “Since this mobile solution allows us to easily track and report service history by piece of equipment, Victaulic’s BIM services and Installation-Ready couplings saved EMC 30 percent in labor costs as they we can communicate more effectively renovated Building 120 (Eisenhower Hall) at U.S. Army post Fort Leavenworth. Projects included replacing the existing HVAC system with a more energy-efficient hybrid geoexchange system featuring 240 geothermal wells. with facility directors. This has been an effective way to sell our services to Isometric drawings solved unique standard grooved couplings are fast larger chain accounts,” said Miller. challenges within the mechanical and easy to use, but these are even room. Space constraints were over- more so. We’d use them for every- The original Windows mobile version come by laying out the piping in thing if we could, and we’re excited of the software was frustrating for 3D. Four-inch pipes connected the that they’re available for 10" and 12" some technicians, but the new iOS distribution piping and heat pumps sizes now as well.” version is quite the opposite, Miller for the 640-ton geothermal heating pointed out. “All of our technicians and cooling system, while pipes 12" While cost, schedule, and a job’s bot- have embraced PENTA Mobile Field in diameter and smaller were used tom line are important components Service… and you’d have a hard time for connections off the chilled, hot, to a project, even more so is the prying it out of their hands!” condenser, and geothermal waters in safety of its team. Grooved mechan- the mechanical room. Just as large as ical systems require no hot work, Miller said Waldinger is just scratching the other systems in the mechanical making them inherently safer than the surface of the benefits that can be room, the geothermal water pip- welding by minimizing the risk of arc realized from mobile technologies. “We ing connected to the underground flash and fire hazard. With no weld- will certainly be looking to expand our heat exchange, requiring EMC to ing, EMC was able to eliminate the use over the coming years to improve reroute the pipes to accommodate unproductive time associated with efficiencies and to provide more bene- the new system. To avoid costly spe- fire watch. Additionally, transporting fits to our customers,” he noted. cialty joints, Victaulic CPS specified complete assemblies to the construc- tightly stacked triple-service valves, tion site allowed EMC to reduce Miller added that PENTA Mobile providing elasticity and vibration material handling, further controlling Field Service was simple to imple- attenuation while avoiding flexible the work environment and minimiz- ment. “We selected a pilot group for connectors for pumps. ing risk. testing, which allowed us to determine best practices for the solution before At the onset of the project, EMC “We use Victaulic on every project rolling it out to the rest of our com- planned to weld the systems. But we can because we know the value pany,” he said. He suggested other to increase productivity and safety they bring in helping us deliver a companies planning to implement on the job and meet compressed successful job,” said Howell. “After mobile applications “start small, schedules, they chose Victaulic cou- working with the Victaulic CPS team develop your list of best practices, and plings, which feature proprietary on the Fort Leavenworth project, our then move to your larger rollout.” Installation-Ready technology for people were really sold on it, so now piping up to 8" in diameter. Howell we also use Victaulic drawing services For more information, visit stated that these couplings contrib- on large mechanical rooms when we www.penta.com. uted to labor savings on the project can.” because they can be installed in less than half the time of standard For more information, visit www. grooved couplings and up to five victaulic.com. times faster than welding. “We are huge fans of these new MCAA thanks Victaulic for being a couplings,” said Howell. “Victaulic major sponsor of MCAA 2015.

SMART SOLUTIONS 15 WINTER 2015 SLOAN PARKER HANNIFIN continued from page 1 continued from page 4

Sloan products have been in Wrigley eliminating the need for that added a big selling point for Nypro. Field since 1914, and this exciting new expense. partnership with the Chicago Cubs “Long-time, experienced facility helps Sloan tell its story on a major- “We didn’t need a big crew hanging managers have ways of doing things league level,” said Jim Allen, president the larger Transair pipe,” Lynch said. that work for them and are hesitant of Sloan. “One man can install most of the to move in a different direction. It’s pipe alone, and the fittings save quite just human nature,” Lynch said. “We Allen continued, “Water is an increas- a bit of labor.” believe that the Transair system, ingly important natural resource. By once assembled, is as good as any helping communities and organizations Easy to Install, Repair other. We knew we could give Nypro like the Chicago Cubs save water, Sloan During the project, workers built the same quality they expected for a helps to raise awareness of water con- section mock-ups on the shop floor lower price.” servation in this country and around before fitting them in the ceiling the world. Responsible use of water braces. Only one pipe joint in the Transair’s smooth interior and full- is critical to local communities and to entire installation leaked during the bore design ensure optimal and the world. Our partnership with the testing process, and the quick-con- constant airflow. Once installed, Chicago Cubs organization gives us nect fittings allowed for an easy fix. Transair is guaranteed to resist corro- the opportunity to help build winning sion, which prolongs the life of both teams through sustainable solutions.” “With a brazed joint, we would have the piping and the facility’s equipment. had to cut it out, replace with new, Cubs Chairman Tom Ricketts noted, rebraze and purge again, costing a “I’ve known about Transair for a “Teaming up with Sloan is an import- day’s labor plus materials,” Lynch while and knew their specifications ant move for the Chicago Cubs. said. “With Transair the repair was and claims,” Lynch said. “They deliv- Sloan brings more than a century of about 20 minutes, even at 25 feet ered on these claims.” experience and success in creating cut- above floor level.” ting-edge water solutions for a wide Two compressors (150 horsepower variety of venues all around the world. Transair also costs less than copper, and 350 horsepower) supply the We are pleased to work with and learn said Lynch. The Transair cost savings CDA, and a branch for a future from Sloan as we enhance our facilities over a pressed copper system were 350-horsepower compressor was and build for the future.” $24,100, just under 10 percent, and added. Piping was sized and installed would be more if compared with a based on the specific pressure deliv- As part of the expansion and res- brazed system. The cost savings were ery needs throughout the facility. toration of Wrigley Field and its surrounding facilities, known as the 1060 Project, the Cubs will use Sloan’s products to expand their sustainabil- ity efforts. At Sloan Park and Wrigley Field, Sloan will showcase their prod- ucts and state-of-the-art water-saving technologies. Sloan is the sixth Legacy Partner of the Chicago Cubs, joining Anheuser-Busch, ATI Physical Therapy, Starwood Hotels and Resorts, Under Armour, and Wintrust.

For more information, call 800- 9-VALVE-9 (982-5839) or visit sloanvalve.com.

Nypro had just six months to retrofit an abandoned building so that it could expand its manufacturing to include MCAA thanks Sloan Valve Company a pre-filled drug delivery device. Lynch convinced them to use Parker Hannifin’s Transair aluminum piping for being a benefactor of MCAA 2015. instead of copper, saving installation time, labor, and material costs.

SMART SOLUTIONS 16 WINTER 2015 JAY R. SMITH continued from page 3

Over sixty percent of the system installed on both sides of the field, to box the trench drains in, essen- ranges from 3" to 6" in diameter, and specifically in areas where heavy equip- tially using the channel for support. the rest from 1/2" to 1 1/2". ment would be moving in and out As a result, everything stayed straight of the stadium. Once again, Jay R. on the ground. Quick Turnaround Smith Mfg. Co. moved quickly. They With Parker’s extensive distributor designed a heavy-duty grate to go with “The only way we could get the job network, the project’s supplier, the trench drains that could withstand done in such a short timeframe was F. W. Webb of Boston, was able to get different load ratings. Ninety-foot to do it this way. You can have the Lynch materials quickly, sometimes sections were shipped to the staging prefab work going on for a longer with a one-day turnaround. warehouse where all the channels were amount of time. While they were connected together for each layout. building we were prefabbing,” said “Timing was everything for them,” Each section was framed and bonded Sandkohl. At the job’s peak, they said F. W. Webb’s Inside Sales/ together. The trench drains were then had 200 plumbers working. Customer Service Representative Mike lifted onto flatbed trucks with cranes Costa. “Webb has a good reputation and taken to the stadium. Levi’s Stadium, the first United of going out of our way to keep a cus- States professional football stadium tomer happy. We paid the extra freight The prefabrication allowed longer to achieve LEED Gold certification, charges and did what we could do to runs to be installed faster on the hosted its first regular-season NFL get materials out to Lynch when they jobsite with no delays to the job game in September 2014. It will also needed them.” schedule because the joints were host domestic and international already made. All the contractor soccer, college football, motocross, F. W. Webb pulled from nearby distribu- needed to do once the assembly was concerts, and various civic events and tion centers that keep a large quantity of delivered to the jobsite was to set in can expand for major events, such as material in stock, helping the company place and secure the trench drain run Super Bowl 50 in February of 2016. meet same-day orders, Costa said. Webb’s for the pour. intercompany trucking services helped For more information, visit www. get materials from one place to another Because the trench drains were made jrsmith.com. quickly, sometimes with two orders in of fiberglass, there was some concern one day. “That’s a value-added thing for that they could be brittle. To address MCAA thanks Jay R. Smith Mfg. Co. Webb that a lot of companies don’t do,” the concern, a strut channel was used for being a supporter of MCAA 2015. Costa noted.

The project was completed in October 2014, meeting the deadline. From plan- ning to completion, the entire project took nine months, with design work con- WAYNE tinuing through part of the build-out. continued from page 5

“Transair was very helpful in walking look at their sump pump. I’ve gone it’s actually working.” When he first us through their product and getting out on inspections, and it’s full to the installed a system, Varos said, “I things off on the right foot,” Lynch drain tile, where it’s been running for expected to go downstairs and see said. “As contractors, we don’t like who knows how long.” water everywhere because of how surprises. For this project, Transair’s quiet the pump was.” support eliminated surprises, making A bright LCD screen displays the us and the owner very happy.” time, date, and various messages Varos continued, “It’s just really about the current state of the pri- nice—for ease of installation, the For more information, visit www.parker. mary and backup pumps. The system simplicity, and how user-friendly it com. is also extremely quiet while it runs. is.” “It is super quiet. It’s very nice. The MCAA thanks Parker Hannifin for only thing I hear is the check-valve For more information, visit www. being a supporter of MCAA 2015. when it closes, and that’s how I know waynewatersystems.com.

SMART SOLUTIONS 17 WINTER 2015 TRI TOOL continued from page 7 and loaded with 1/16" wire, were run simultaneously, laying a total of 160–240 lb. of filler material per day. The AdaptARC system saved the contractor two to three shifts of welding time.

“Whether it’s safety, whether it’s quality, whether it’s just imple- menting their systems and bringing personnel on board, [the partner- ship with Tri Tool has] been an added plus to the entire project, and I highly recommend them,” said A field machinist makes preparations to ensure a reliable weld on the pipes for a natural gas processing and compressor station. Tri Tool’s attention to quality and safety enabled Sauer Group to perform excellent welds at Stahovec. a rapid pace, meeting the project’s schedule constraints.

Emergent needs presented chal- “Our continued diligence and focus and inventory enabled Tri Tool to lenges to both quality and schedule. on quality in conjunction with the redesign a torch head to perform Out-of-round pipe identified onsite use of the AdaptARC system has the large-bore eccentric I.D. weld required inside-diameter (I.D.) weld further reduced our rejection rate to overlay, counterbore, weld prep, and overlay and counterboring to achieve below .5 percent, an industry ‘top finished weld in under 36 hours from fit-up while maintaining minimum tier’ performance indicator for this identification to weld-out. wall thickness. Working outdoors type of work,” said Pat Flippen, vice subjected critical equipment to president of Tri Tool Field Services. Tri Tool’s expertise lies in applica- severe conditions, but the rugged tions engineering and execution of construction of the AdaptARC plus Tri Tool is the only service pro- industry-specific field machining and the initial assessment and quali- vider deploying both precision field welding solutions. Tri Tool Inc. is fications of the FCAW processes machining and mechanized welding committed to the safe and successful resulted in a remarkably low weld systems of its own patented design completion of its clients’ projects, on rejection rate. The welding system and manufacture, making it the only schedule and within budget. is so easy to use that Tri Tool has true sole source for both specialty trained and certified two additional field machining and welding solu- “We found a nice partner with Tri local welders who are now contribut- tions. This unique set of experience, Tool,” said Dave Kretin, project ing on this project. capabilities, manufacturing capacity, manager for Sauer Group. “Due to the quality of people they had that developed the welding procedure, we were basically doing about 7" per minute with both welders run- ning and putting down about 3/16" thickness [per pass]. That is out- standing—we’re getting 6 hours a weld! A few of the QA/QC guys and the nondestructive testing companies said that they’ve never seen a film that looked so good after we shot the weld. They’re all 100% X-rays. Tri Tool’s done an outstanding job, and I really enjoyed working with them.” To create precision welds on a tight schedule for a cryogenic natural gas processing and compressor station in the Marcellus and Utica Shales, Sauer Group partnered with Tri Tool Field Services, which developed weld procedures and deployed workers using Tri Tool portable machine tools and AdaptARC multiprocess welding For more information, visit www. systems. tritool.com.

SMART SOLUTIONS 18 WINTER 2015 ZURN CARRIER continued from page 10 continued from page 6

“Just seeing it in real life, to be able Blue Florida Classic football game engineer for Shore Medical Center, to walk into the bowl—it just blows November 22, 2014. The stadium said, “The trending capabilities me away,” said Steve Hogan, CEO of hosted the nationally televised of the i-Vu interface are superb: Florida Citrus Sports, speaking to the Buffalo Wild Wings Citrus Bowl on we know at any moment what any Orlando Sentinel. “Most of the country New Year’s Day. given component is doing. In the that would look at bringing business to event of an alarm, the system will Orlando has heard about this now, but For more information, visit www.zurn. alert me by text or email so I can once they actually come and experi- com. act immediately, and the diagnos- ence it, I think all bets are off.” tics make it simple to determine the MCAA thanks Zurn Industries for problem. The new stadium was unveiled just being a benefactor of MCAA 2015. days before the annual Florida “In addition, the i-Vu interface is a real time- and energy-saver because we can monitor the heat pumps at the Dialysis Center from our offices here on the main campus, which saves us a 20-minute drive each way,” Carino continued. “We can tell immediately whether there is a problem in Northfield, without los- ing all that valuable time.”

Carino went on to say, “While the technical capabilities of the i-Vu Left: Prefabricating Zurn carrier systems allowed quick installation of plumbing systems in the modernized interface are excellent, it’s the sav- Citrus Bowl Stadium. The sturdy prefabricated systems were installed onsite with no damages or leaks. ings—in both time and money—of Right: “Zurn’s Custom Specification Drainage products and carrier banks were engineered, approved, ordered, combining system monitoring, and shipped in less than four weeks,” said Bill Verdecchia, director of Specification Drainage Product Marketing & Engineering for Zurn. Here, the prefabricated carriers are waiting to be transported to the Citrus diagnostics, and notification by Bowl for installation. email that make it an invaluable tool for us.”

VIEGA Shore Medical Center’s efforts continued from page 11 to build a sustainable health care facility were rewarded. The 23XRV In the case of seldom-used remote Legionella within the plumbing AquaEdge chillers qualified for fixtures, water can be forced through system requires specific attention a $117,000 rebate from the New the fixture (up to the point of con- as well as which disinfection meth- Jersey Clean Energy Program, nection) with the use of a venturi. ods and design concepts are best an energy-efficiency initiative of This concept manipulates the pres- for minimizing that risk. Water the New Jersey Board of Public sure across the fixture to induce flow, quality and sound plumbing design Utilities. Shore Medical Center thereby eliminating the dead leg that involve far more than installing achieved LEED Silver certification serves that fixture. piping to connect fixtures. As for the new Surgical Pavilion. plumbing requirements and risks With flow, temperatures can be better evolve, so too must the plumbing For more information, call maintained, and disinfectant residual industry. 800-CARRIER or visit www. can reach much more of the system. commercial.carrier.com. These concepts require the designer to For more information, visit www. reconsider the branch-and-tee concept. viega.us. MCAA thanks Carrier for being a major sponsor of MCAA 2015. It is up to the system designer MCAA thanks Viega for being a to determine when the risk of benefactor of MCAA 2015.

SMART SOLUTIONS 19 WINTER 2015 MITSUBISHI Please thank these companies for their continued from page 13 generous support of MCAA 2015!

Benefactor AB&I Foundry – Flashlight/Power Charger CNA – Final Program, Dessert Party Co-sponsor Daikin Group – Wednesday Evening Beverages Ferguson – Spouse Program Johnson Controls, Inc. – Opening Breakfast By installing Mitsubishi Electric’s VRF zoning MILWAUKEE TOOL – Maui Souvenir system in its new headquarters, energy-efficiency Sloan Valve Company – Shuttles and Wailea Map Guide consultants Franklin Energy saved 32 percent in electricity and 48 percent in gas in their first year. Viega – Student Chapter Activities The individual room controls maximize comfort for the occupants. Zurn Industries, LLC – Convention Planning Guide were within one and five percent of Major the models, respectively. While saving a great deal of energy is an excellent ANVIL International – Annual Fun Run/Walk result, comfort was still a top priority Baltimore Aircoil Company, Inc. – Dessert Party Co-sponsor for Franklin Energy and the people Bradford White Corporation – Convention Tote Bag working on site. Carrier Corporation – Golf Tournament Co-sponsor “This Mitsubishi Electric EVAPCO, Inc. – Souvenir Photos, Workshop Handouts VRF zoning system has been Morrison Supply Company – Chocolates a lifesaver for individual Mueller Industries, Inc. – Closing Breakfast NIBCO INC. – Tennis Tournament, Annual Awards of Excellence Breakfast comfort and for helping us SIEMENS – Opening Party Beverages save on energy costs.” Tyco Mechanical Products (Grinnell) – Maui Souvenir — Paul Schueller, CEO, Victaulic – Golf Tournament Co-sponsor Franklin Energy Weldbend Corporation – Journal and Pen

Supporter “Because of the building’s orienta- Apollo Valves – Hospitality Lounge Refreshments tion and outdated glass windows, Charlotte Pipe & Foundry – Convention Update solar gain was a huge issue for our ERICO – Sun Products HVAC systems selection,” Schueller Parker Hannifin – Program-at-a-Glance, Monday Refreshment Break said. “This Mitsubishi Electric VRF zoning system has been a lifesaver for ® Jay R. Smith Mfg. Co. – Badges and Lanyards individual comfort and for helping Trane – Tuesday and Wednesday Refreshment Breaks us save on energy costs. Because of the Mitsubishi Electric INVERTER technology and individual room con- trols, the perimeter offices in this old building have been very comfortable in all seasons.”

For more information, visit www. mitsubishipro.com.