Whether it is a violation case and application is being submitted under Notification No. No S.O.804(E) dated 14.03.2017 ?

Name of the Project/s Steels Pvt. Ltd. Brief summary of project Annexure-Brief summary of project 1. Proposal Number IA/RJ/IND/34039/2015 Project Cost (in lacs) 3034

2. S. No. in the schedule 3(a) Metallurgical industries (ferrous & non ferrous)

Project Sector Industrial Projects - 1

Proposed capacity/area/length/tonnage to be Proposed Capacity - 60,000 TPA of Billets; Area - 5600 3. handled/command area/lease area/number Sq.m ha. or wells to be drilled

4. New/Expansion/Modernization New

5. Existing Capacity/Area etc. ha.

6. Category of project i.e. 'A' or 'B' A

Does it attract the general condition? If yes, Yes 7. please specify d) Inter-State boundaries and international boundaries

8. Does it attract the specific condition? If yes, No please specify

9. SP-29, F 20-24 RIICO Industrial Area, Khushkhera (), Location of the project (Raj.) Shape of the project land Block (Polygon)

Uploaded GPS file Annexure-GPS file Uploaded copy of survey of Toposheet Annexure-Survey of india toposheet SP-29, F 20-24 RIICO Industrial Area, Khushkhera (Bhiwadi), Plot/Survey/Khasra No. Alwar (Raj.) Town / Village Bhiwadi State of the project

Details of State of the project

S.no State Name District Name Tehsil Name

(1.) Rajasthan Alwar 10. Nearest railway station along with distance Junction, 20.0 km in kms Nearest airport along with distance in kms IGIA Airport, 58.0 km

Nearest Town/City/District Headquarters 11. Tapukarah , 3.0 km along with distance in kms

Village Panchayats, Zila Parishad, Muncipal 12. Corporation, Local body (Complete postal address with telephone nos. to be given)

13. Name of the Applicant Anurag

14. Registered Address SP-29, F 20-24, RIICO Industrial Area, Khushkhera (Bhiwadi)

Address for correspondance: Name of the Company KHUSHKHERA STEELS PRIVATE LIMITED Name of the Applicant Anurag Designation (Owner/ Partner/ CEO) Director Pin code 110044 15. E-mail [email protected] Telephone No. 1493-520360 Fax No. 1493- Copy of documents in support of the competence/authority of the person making NIL this application to make application on behalf of the User Agency .

16. Details of Alternative Sites examined, if any. Location of these sites should be shown on a No toposheet

17. Whether part of Interlinked projects? No

Whether separate application of Interlinked 18. N/A project has been submitted?

19. If Yes, MoEF file number N/A Date of submission N/A

20. If No, Reason N/A

21. Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given (i) Whether the proposal involves approval/clearance under the Forest No (Conservation) Act,1980? (ii) Whether the proposal involves approval/clearance under the wildlife No (Protection) Act,1972? (iii) Whether the proposal involves approval/clearance under the C.R.Z No notification, 2011?

22. Whether there is any Government No Order/Policy relevant/relating to the site?

23. Whether any Forest Land Involved? Area of Forest land Involved (hectares) N/A

24. Whether there is any litigation pending No against the project and/or land in which the project is proposed to be set up? (a) Name of the Court N/A (b) Name of the Sub court N/A (c) Case No. N/A (d) Orders/directions of the court, if any and N/A relevance with the proposed project

(II) Activity

Construction, operation or decommissioning of the Project involving actions, which will cause 1 physical changes in the locality (topography, land use, changes in water bodies, etc.)

S.No Details there of (with approximate Information/Checklist confirmation Yes/No quantities/rates, wherever possible) with source of information data

The plot is in RIICO notified industrial area hence no Permanent or temporary change in land use, land conversion is required. Slightly change in land cover or topography including increase topography is anticipated due to the industrial shed 1.1 No in intensity of land use (with respect to local development (machinery and plant installation) up to land use plan) finished level and area only. However there will be no change on land use, land cover or topography.

Clearance of existing land, vegetation and The proposed site is clear. Hence no change Clearance 1.2 No buildings? of vegetation and buildings is anticipated.

Plant area/ shed area, Roads, Green belt area etc. will 1.3 Creation of new land uses? Yes created.

Pre-construction investigations e.g. bore 1.4 No -- houses, soil testing?

No major construction activity is required. Only machinery installation and erection (concrete base for 1.5 Construction works? No these new machineries) work will be required. Hence no change on physical environmental from proposed activity is anticipated.

1.6 Demolition works? No --

Temporary sites used for construction works No housing facilities will be provided for the construction 1.7 No or housing of construction workers? workers.

Induction furnaces (each of 10 tons) with adequate Above ground buildings, structures or stack height and related machinery is proposed to be 1.8 earthworks including linear structures, cut No installed. Excavation of soil will b very little or and fill or excavations and fill or excavations insignificant.

Underground works including mining or 1.9 No -- tunnelling?

1.10 Reclamation works? No --

1.11 Dredging? No --

1.12 Offshore structures? No --

The proposed project will lead to installation of two new induction furnaces (10 ton & 10 ton) to achieve 1.13 Production and manufacturing processes? No proposed production capacity of Billets. Production will not lead to any change in physical environment. 1.14 Facilities for storage of goods or materials? No Separate storage yard provided for storage of raw material, products.

The water consumption in the unit is for cooling and is in continuous bleed recycle, treated water from settling Facilities for treatment or disposal of solid 1.15 No tank was utilized for plantation purposes. The domestic waste or liquid effluents? waste water is being sent into septic tank followed by soak pit.

Facilities for long term housing of 1.16 No No housing facilities will be provided to the workers. operational workers?

The proposed project will come up within the existing New road, rail or sea traffic during 1.17 No premises. The unit is well located nearby all means of construction or operation? transport.

New road, rail, air water borne or other transport infrastructure including new or 1.18 No Not required altered routes and stations, ports, airports etc?

Closure or diversion of existing transport 1.19 routes or infrastructure leading to changes No Not required in traffic movements?

New or diverted transmission lines or 1.20 No Not required pipelines?

Impoundment, damming, culverting, 1.21 realignment or other changes to the No Not required hydrology of watercourses or aquifers?

1.22 Stream crossings? No Not required

Abstraction or transfers of water from Water requirement shall be 26 KLD. Water storage tank 1.23 Yes ground or surface waters? : 2 Nos. Source: RIICO Supply/ Ground water.

Not anticipated, There are no water bodies and natural Changes in water bodies or the land surface 1.24 No drainage passing through the site area. No run-off or affecting drainage or run-off? drainage will change.

Local laborers and raw material will be transported via Transport of personnel or materials for 1.25 No the existing Infrastructure. The Total man power is 72 construction, operation or decommissioning? persons.

Long-term dismantling or decommissioning 1.26 No -- or restoration works?

Ongoing activity during decommissioning 1.27 which could have an impact on the No -- environment?

Influx of people to an area in either Impact will be insignificant as local people will be 1.28 No temporarily or permanently? provided employment.

1.29 Introduction of alien species? No --

1.30 Loss of native species or genetic diversity? No --

1.31 Any other actions? No --

Use of Natural resources for construction or operation of the Project (such as land, water, materials 2 or energy, especially any resources which are non-renewable or in short supply): S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data

The plot is in RIICO notified industrial area, documents Land especially undeveloped or agricultural 2.1 No related to land / rent deed appended herewith the land (ha) application.

Water (expected source & competing users) Water requirement shall be 26 KLD. Source of water 2.2 Yes unit: KLD RIICO supply/ Ground water.

2.3 Minerals (MT) No --

Construction material – stone, aggregates, 2.4 No -- sand / soil (expected source – MT)

2.5 Forests and timber (source – MT) No --

The proposed power demand is 5.5 MV. Power Energy including electricity and fuels connection from 33 kv line from,the nearest GSS located 2.6 (source, competing users) Unit: fuel No in RIICO industrial area, Khushkhera, Alwar, Connected (MT),energy (MW) load is 8 MV. Contract demand is 5.5 MV.

Any other natural resources (use appropriate 2.7 No -- standard units)

Use, storage, transport, handling or production of substances or materials, which could be harmful 3 to human health or the environment or raise concerns about actual or perceived risks to human health

S.No Details thereof (with approximate Information/Checklist confirmation Yes/No quantities/rates, wherever possible) with source of information data

Use of substances or materials, which are hazardous (as per MSIHC rules) to human 3.1 No -- health or the environment (flora, fauna, and water supplies

Changes in occurrence of disease or affect 3.2 disease vectors (e.g. insect or water borne No -- diseases)

Affect the welfare of people e.g. by changing 3.3 No -- living conditions?

Vulnerable groups of people who could be 3.4 affected by the project e.g. hospital patients, No -- children, the elderly etc.

3.5 Any other causes No --

4 Production of solid wastes during construction or operation or decommissioning (MT/month)

S.No Details thereof (with approximate Information/Checklist confirmation Yes/No quantities/rates, wherever possible) with source of information data

4.1 Spoil, overburden or mine wastes No -- 4.2 Municipal waste (domestic and or Yes The waste will be collected in waste bins (colored coded commercial wastes) bins) as per waste type and disposed to municipality sites. Domestic municipal solid waste generation : 36 kg/day

Hazardous wastes (as per Hazardous Waste 4.3 No -- Management Rules)

4.4 Other industrial process wastes No --

4.5 Surplus product No --

Domestic waste water is proposed routed to septic tank Sewage sludge or other sludge from effluent 4.6 No connected with soak pit. Hence, no generation of sewage treatment sludge at site.

4.7 Construction or demolition wastes No --

4.8 Redundant machinery or equipment No --

4.9 Contaminated soils or other materials No --

4.10 Agricultural wastes No --

4.11 Other solid wastes No --

5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)

S.No Details thereof (with approximate Information/Checklist confirmation Yes/No quantities/rates, wherever possible) with source of information data

D. G. set (200 KVA) will provide with adequate safe Emissions from combustion of fossil fuels 5.1 Yes stack height of 5.0 m above the roof of the D. G. house from stationary or mobile sources for proper air emission dispersion.

The main point source in the unit will be proposed two 5.2 Emissions from production processes Yes furnaces ( each of 10 tons).

The fugitive emissions will be from vehicular traffic due to transportation and material handling. Exhaust gas Emissions from materials handling including 5.3 Yes from the vehicles will be main source of noxious air storage or transport pollutant, therefore only PUCC vehicles will be used to minimize this effect.

During erection of the machinery, radiations & light from Emissions from construction activities 5.4 No welding will be main pollution. However, the impact will including plant and equipment be temporary & insignificant.

Dust or odours from handling of materials 5.5 including construction materials, sewage and No -- waste

5.6 Emissions from incineration of waste No --

Emissions from burning of waste in open air 5.7 No -- (e.g. slash materials, construction debris)

5.8 Emissions from any other sources No --

6 Generation of Noise and Vibration, and Emissions of Light and Heat:

S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data

From operation of equipment e.g. engines, 6.1 No -- ventilation plant, crushers

Operation of furnaces; material handling (raw material & product) creates noise, & vibrations. Steel manufacturing process involves heat stress due to high temperature intensive process. The thermal emission is 6.2 From industrial or similar processes Yes also accompanied by hot gaseous emissions. The shed of the furnaces will have roof top ventilators so that hot gases do not collect at the furnace area. The plant will be automated so that there will be very little exposure of workers to such areas.

6.3 From construction or demolition No --

6.4 From blasting or piling No --

6.5 From construction or operational traffic No --

6.6 From lighting or cooling systems No --

6.7 From any other sources No --

Risks of contamination of land or water from releases of pollutants into the ground or into sewers, 7 surface waters, groundwater, coastal waters or the sea:

S.No Details thereof (with approximate Information/Checklist confirmation Yes/No quantities/rates, wherever possible) with source of information data

From handling, storage, use or spillage of 7.1 No -- hazardous materials

The domestic effluent from domestic activities will be From discharge of sewage or other effluents generated the same will be disposed off in septic 7.2 to water or the land (expected mode and No connected with soak pit. Periodical sludge removal after place of discharge) 5 years or more will be done and the generated sludge will be used as manure.

By deposition of pollutants emitted to air into 7.3 No -- the land or into water

7.4 From any other sources No --

Is there a risk of long term build up of 7.5 pollutants in the environment from these No -- sources?

Risk of accidents during construction or operation of the Project, which could affect human health 8 or the environment

S.No Details thereof (with approximate Information/Checklist confirmation Yes/No quantities/rates, wherever possible) with source of information data

From explosions, spillages, fires etc from 8.1 storage, handling, use or production of No -- hazardous substances 8.2 From any other causes No --

Could the project be affected by natural Site falls in which is classified in Zone III disasters causing environmental damage 8.3 No (moderate risk zone; MSK VIII zone or less). No major (e.g. floods, earthquakes, landslides, event reported so far. cloudburst etc)?

Factors which should be considered (such as consequential development) which could lead to 9 environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality

Details thereof (with approximate S.No Information/Checklist confirmation Yes/No quantities/rates, wherever possible) with source of information data

Lead to development of supporting utilities, ancillary development or development stimulated by the project which could have impact on the environment e.g.:

Supporting infrastructure (roads, power 9.1 supply,waste or waste water treatment, No -- etc.) housing development extractive industries supply industries Other

Lead to after-use of the site, which could 9.2 No -- have an impact on the environment

9.3 Set a precedent for later developments No --

Have cumulative effects due to proximity to 9.4 other existing or planned projects No -- with similar effects

(III) Environmental Sensitivity

Aerial distance (within 15km.) Proposed S.No Areas Name/Identity project location boundary

Areas protected under international conventions, national or local legislation for 1 No None their ecological, landscape, cultural or other related value

Areas which are important or sensitive for ecological reasons - Wetlands, watercourses Khori Kalan P.F. 6.0 Km E, Gondhan P.F. 8.0 Km 2 Yes or other water bodies, coastal zone, NE, Banvan P.F. 5.0 km ENE biospheres, mountains, forests

Areas used by protected, important or sensitive species of flora or fauna for 3 No None breeding, nesting, foraging, resting, over wintering, migration

Inland, coastal, marine or underground 4 No None waters 5 State, National boundaries No Rajasthan – Haryana interstate Border 4.0 Km, NE

Routes or facilities used by the public for Railway Station - Rewari R.S, 21.0Km NW Airport - 6 access to recreation or other tourist, pilgrim Yes Delhi Airport - 58 km NNE, Highway - SH-25, 3.0 areas KM, NE

7 Defence installations No None

8 Densely populated or built-up area Yes Bhiwadi, 11.0 Km, NNE

Areas occupied by sensitive man-made land Hospitals, temples, shops, educational institution 9 uses (hospitals, schools, places of worship, Yes facilities are well developed in Bhiwadi town with in community facilities) 11.0 km.

Areas containing important, high quality or scarce 10 resources.(ground water resources,surface No None resources,forestry,agriculture,fisheries,tourism,minerals)

Bhiwadi was declared under CEPI as per MoEF OM Areas already subjected to pollution or no. No. J-11013/5/2010-1A.11 (1) dated that the 11 environmental damage.(those where existing Yes 17th Sep, 2013. The proposed area falls within 11 legal environmental standards are exceeded) km radius of the study area.

Areas susceptible to natural hazard which could cause the project to present Site falls in Alwar District which occupies Zone III environmental problems (earthquakes, 12 No (moderate risk zone; MSK VIII zone): No major subsidence, landslides, erosion, flooding or event reported so far. extreme or adverse climatic conditions) similar effects

(IV) Proposed Terms of Reference for EIA studies

1 Uploaded Proposed TOR File Annexure-TOR file

Uploaded scanned copy of covering 2 Annexure-scanned copy of covering letter letter

3 Uploaded Pre-Feasibility report(PFR) Annexure-PFR

Uploaded additional attachments(only 4 Annexure-Additional attachments single pdf file) (V) Undertaking

I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.

V. Name of Applicant Anurag (i) Designation Director Name of Company (Applicant Name KHUSHKHERA STEELS PRIVATE LIMITED should not be given here) Address SP-29, F 20-24, RIICO Industrial Area, Khushkhera (Bhiwadi)