Bylaw 3129 Amended by Bylaw 3138 - Amendment to Fees, Rates and Charges Bylaw CM#20200427.O11

"Fees, Ratesand ChargesBylaw"

Bylaw Statement: A Bylaw of the County of No. 1, in the Province of for the purpose of adopting a revised Schedule of Fees, Rates and Charges.

WHEREAS: The Mun/ci'aI GovernmentAct, R.S.A. 2000, c. M-26 (hereinafter referred to as "the Act") and amendments thereto, provides that Council may pass bylaws to establish fees on behalf of the municipality; and WHEREAS: The Act provides for the establishment of fees for licenses, permits and approvals by bylaw; and WHEREAS: The Act provides for the provision of municipal utility services subject to the terms, costs or charges established by Council.

ThEREFORE, be it resolved that the Council of the County of Grande Prairie No. 1 in the Province of Alberta, duly assembled hereby enacts as follows:

1. That this Bylaw shall be cited as the "Fees, Rates and Charges Bylaw". 2. That the 2020 Fees, Rates and Charges be established by this bylaw as attached "Schedule A" and form part of this bylaw. 3. Method of payment for fees, rates or charges to be at the discretion of the County of Grande Prairie No. 1.

EFFECTIVE DATE

1. Bylaw 3107 and amendments thereto be hereby rescinded.

2. This Bylaw shall come into force and effect on the third and final reading.

ReadaFlRSTtimethis Dayof 2SQ 2019 J J '

REEVE

Page 1 of2 countygp.abca LZL COUNTY ADMINISTRATOR

Read a SECOND timethis ____ \ Dayof 2019

REEVE

COUNTY ADMINISTRATOR

ReadaTHiRDand FiNALtimethis Dayof _ 2019.

REEVE

COUNTY ADMINISTRATOR

ATFACHMENTS:

Schedule "A" - Fees, Rates and Charges

Page 2 of 2 Schedule"A" Schedule of Fees, Rates and Charges Co5 o Gd, s Bylaw 3129

GST DESCRIPTION Current 2019 Rates Units Status CAO OFFICE 1.1 County Hats/Caps )I5ale of hats with the County logo I $ 10.001 I Per Item

COMMUNITY SERVICES A. Agricu1ture Services Board (ASB) 1.IBeaver Removal I) For up to three (3) dams per quarter section of land -- $ T - 150.00 ______- - Up to 3 dams Per Dam Over 3 ii) An additional cost per dam over and above three (3) dams on same quarter section $ 65.00 T Dams iii) Dam blasting for outside entities - a) Lead Problem Wildlife Officer $ T - - 68.40 Per Hour b) Problem Wildlife Assistant ______S 60.00 1 Per Hour

of Equipment ______2.IRental ______i) Truck Mount Sprayer (See Policy D1O) ______$ 50.00 T Per Day Late Fee ______$ ______50.00 T ______Unit is returned without being cleaned properly

______$ ______75.00 T ______ii) Tree Planter (pull type) not tree spade (See Policy DIO) ______$ 15.00 T Per Day iii) Plastic Mulch Applicator (See Policy D1O) $ ______15.00 T Per Day iv) Unit Retrieval Fee ______$ 100.00 1 Per Day v) Deposit Secured ______$ 400.00 E Per Unit

Weed Control ______3.1 ______i) Herbicide Application for Enforcement or Public Lands ______a) Operator Truck and ______$ 160.00 T Per Hour b) Kubota and Operator ______$ 175.00 1 Per Hour c) Quad Operator and ______$ 160.00 T Per Hour d) General Professional Staff ______$ 75.00 1 Per Hour e) General Labour ______$ 50.00 T Per Hour B. Enforcement 1. Control lAnimal ______Reclaim Fees: i)IAnimal ______a) First time in Pound ______$ 50.00 1 Per Animal b) time in Pound $ Second ______100.00 1 Per Animal c) _ Third and all Successive times in Pound $ ______150.00 1 Per Animal ii) _ Costs Kennel ______$ 25.00 1 Per Each Day ii) _ Surrender Fees ______$ 150.00 T PerAnimal Per Animal Pro iii) Vicious Dog License Fee $ 300.00 T / ______Rated

C. Family and Community Support Services (FCSS) Homemaker 1.1 - - Monthly <$400 (special discretionary i) income: rate) ______$ 6.50 Per Hour - Monthly $0.00 -$700 ii) income: ______$ 6.50 Per Hour - iii) Monthly income: $701 -$1000 Per ______$ 7.50 Hour iv) Monthly income: $1,001-$1,500 ______$ 8.50 Per Hour v) Monthly income: $1,501-$2.000 11.50 ______$ Per Hour - vi) Monthly income: $2,001- $2,500 13.50 ______$ Per Hour Monthly income: $2,501 -$3,000 vii) ______$ 15.50 Per Hour Monthly income: $3,001- $3,500 viii) ______$ 18.00 Per Hour Monthly income: $3,501 - $4,000 ix) ______$ 20.00 E Per Hour Monthly x) income: $4,001- $5,000 ______$ 23.00 E Per Hour Monthly - xi) income: $5,001 $6,000 ______$ 25.00 E Per Hour Monthlyincome: $6,000&up

xii) ______$ 28.00 E PerHour

Beaverlodge ______Homemaker ______2.1 - -

i) Monthly income: under$1,000 ______$ 10.00 E Per Hour $1,001-$2,000 ii) Monthly income: ______$ 15.00 Per Hour - Monthly $2,001-$3,000 iii) income: ______$ 18.00 Per Hour Monthly $3,001-$4,00 iv) income: ______$ 20.00 Per Hour - - v) Monthly income: & up $4,001 ______$ 25.00 Per Hour - -

Page 1 of 12 WI- Schedule of Fees, Rates and Charges Bylaw3l29

GST DESCRIPTION Current 2019 Rates Units Status 3.1 Contract Rate i) Social Services $18.00 plus $60/km B Per Hour

ii) Veteran Affairs $18.00 plus $.60/kns B Per Hour

iii) WCB (Workers Compensation Board) $18.00 plus $.60/km E Per Hour 4.IRental i) Playschool Portable - minimum 2 hours rental - $ 25.00 1 Per Hour ii) Wellington Centre - minimum 2 hours rental $ 25.00 1 Per Hour

D. Regional Fire Services 1. Fire Rescue Fees (as per Bylaw 2924) ______jfire Rescue Response to False Alarms: For the first response related to malfunctioning Fire Safety Installations or other a) safety monitoring devices, at the same premises responded to during each calendar No Fee year. ______b) Second (2) response to a False Alarm ______$ 100.00 E Per Call c) Third (3) response to a False Alarm $ ______500.00 B Per Call ) Engines, Tenders, Rescue, Ladder, Boat: - I a) per apparatus, per hour or portion thereof $ - lAs ______500.00 E Per Hour Utility vehicles, squad, brush truck, trailers, fire prevention vehicles, mobile command post, 4x4 mobile pumps, quads, skidoos and any other unspecified apparatus:

a) Per apparatus, per hour or portion thereof I ______$ 350.00 E Per Hour

Good Apparatus

DanBerous ______2.1 ______Per apparatus, for the first sixty minutes or portion thereof, plus expenses, and a 1S% 1st Hour, Plus handling charge for all materials and supplies $ 1,200.00 B Expense & 15% ______Handling ______Charge ______Each Additional Per apparatus, for each subsequent sixty minutes or portion thereof, plus expenses, and a Hour, Plus Expense $ 700 00 E 15% handling charge for all materials and supplies & 15% Handling Charge ______

related to operational Staffing: ______3.lCosts ______Per Hour Per i) Per member, per hour or portion thereof $ 125.00 E ______Member

Administration Fees (as per Bylaw 2924) ______4.IFire ______i) Request for the Administrative Service of a Member (including Witness Interviews) ______Per Member, Per a) per member, per hour or portion thereof plus expenses (2 hours minimum charge) $ 125.00 E Hour 2 Hour Mm Plus Per Hour b) Plus: thereafter, per member, per sixty minutes or portion thereof $ 90.00 E Thereafter Including c) Plus: actual expenses incurred Actual Expenses Incurred ______

E. Parks 1.1 Group Day Use/Overnight Camping Fees i) Pipestone Creek Park -non electrical sites ______$ 26.00 I Per Night/Unit ii) Pipestone Creek Park - electrical sites ______$ 36.00 I Per Night/Unit iii) Pipestone Creek Park Group Area 1- overnight $ I ______360.00 Per Night -- - iv) _ Pipestone Creek Park Group Area 2- overnight $ ______130.00 1 FirstS Units _ v) Pipestone Creek Park Group Area- Daytime Special Events $ ______250.00 I Per Day - _ vi) Pipestone Creek Park Day Use Area 1 $ ______100.00 I Per Day -- - - vii) Pipestone Creek Park Day Use Area 1 $ ______50.00 I Per 1/2 Day viii) Pipestone Creek Park Day Use Area 2 $ 250.00 ______I Per Day ix) Pipestone Creek Park Day Use Area 2 $ 125.00 I ______Per 6 Hours - -

x) Hommy Park- electrical sites $

______36.00 I Per Night/unit Per Day/$5Q Per xi) Hommy Park - Daytime Group Special Events (md. camp shelter) $ 100.00 I

r 0 0 countygp.ab.ca Schedule of Fees, Rates and Charges Bylaw 3129

GST DESCRIPTION Current 2019 Rates Units Status

xiii Kleskun Park $ -- -- -______26.00 I Per Night -

- Per Day $30 Per xiii) Kleskun Park Daytime Group Special Events $ 60.00 I /

______- ______

______Day 1/2 --

- xiv) Bear Lake - ______$ 26.00 I Per Night

- Per Day! $50 xv) Bear Lake Daytime Group Special Events (md. camp shelter) $ 100.00 I Per ______1/2 Day xvi) Demmitt Park - ______$ 20.00 I Per Night

- Per Day $50 Per xvii) Demmitt Park Daytime Group Special Events $ 100.00 I / ______

______Day ______1/2

Per Night - xviii) Old Bezanson Townsite- Group Overnight $ 130.00 I First 5 ______Units Per Day xix) Old Bezanson Townsite- Daytime Group Special Events $ 100.00 / $50 Per 1/2 Day

- Per Night -First5 xx) BearHill- Group Overnight $ 130.00 I ______Units Per Day $50 xxi) Bear Hill- Daytime Group Special Events $ 100.00 I / Per ______-______1/2 Day

Per Day $50 Per xxii) Red Willow- Daytime Special Events $ 100.00 I / ______

______Day ______1/2

- xxiii Event Security Deposit ______$ 500.00 E Per Booking 2.IFaci ities Leslie Church- Daytime Event i)fGlen ______$ 100.00 I Per Day Leslie Church Grounds- Daytime Event ii)JGlen ______$ 50.00 I Per Day 3.1 Cemetery Plots i) Cemetery Plot ______$ 200.00 1 Per Plot ii) Cremation Placement - existing plot ______$ 100.00 1 Per Placement iii) Additional maintenance fee- added to each plot or placement $ 100.00 1 Per Plot/Placement iv) Columbarium ______$ 1,250.00 1 Per Niche v) Columbarium Placement (Second Ashes) ______$ 250.00 1 Per Niche 4.ICommunhty Tribute: ______Tree --______$ - 1,000.00 ii -______1 Per Tree ii) with Plague (25 year period) Bench ______$ -______T - - 2,500.00 Per Bench iii) Plague only on existing Bench ______$ 250.00 1 Per Bench

CORPORATE SERVICES A. ______IASSESSMENT: ______1st 10 pages/then 1. Assessment records $ 50.00 E $15/per page thereafter 2.ITax Certificates i) Tax certificate $ 35.00 E Per Certificate

- - $5.00 with $10.00 u) Landowner names & address (in accordance with FOIP only) . E Per Name mm. charge

3.ITax Notification Charge I $ 67.001 E Per Parcel 4.MGASection299Request I I $ 200.00! I PerReguest

Page 3 ofl2 Schedule 01 Fees, Rates and Charges Bylaw

GST DESCRIPTION Current 2019 Rates Units Status B. FINANCIAL SERVICES on Accounts 1.IPenalties _

- One Time i) Unpaid water and sewer accounts interest 3.50% E Late ______

______Payment ______Penalty

Unpaid taxes - unpaid after 30th (or after first day July Per Bylaw #2261 ii) June business in if June 30th falls on a non-business day) 3.00% E & Amendments ______Thereto Per Bylaw #2261 iii) Unpaid taxes after last business day in October 12.00% E & Amendments ______Thereto ivl Unpaid general receivables may be charged up to ______1.50% E Per Month

2.Charge for insufficient funds or otherwise returned payment I I $ 42.50 E Per Cheque 3. ISheri11IBailiff Fees Collection Cost I) seizure for non-payment of account cost plus $25 collection fee Per Account

4.!Administrstion charge-rebillable items (at the discretion of the Manager) I up to 10%I T Above Cost 5.IOnIineTaxAccountPaymentFee 2.2%l E TotalAmount C. INFORMATION SYSTEMS 1.1 Printed County Map i) Colored Map (large - full County, including historical versions ofthe ownership map) $ 25.00 I Per Map ii) Color Folded Map $ 25.00 I Per Map iii) Large Format Address Map $ 30.00 I Per Map 2.1 Digital County Ownership Map Charge for each download ofa digital ownership map - must sign a license agreement i) $250.00 before are able to download T Per Download

¯I Consulting Per Hour With i) GIS Consultation; includes custom map design $125.00 T 1/2 Hour Mm. Per Hour With mm) Information Systems Consultation $125.00 T 1/2

______Hour Mm.

D. LEGISLATIVE SERVICES 1.1 Road Allowance Lease and Public Utility Lot Lease i) Application fee $ - 200.00 ______- T Per Application

ii) RoadAllowance&PULLease _ $ --______- - 50.00 - - 1 - PerMile/Year iii) Minimum charge per lease $ 25.00 T Per Year

2. IGrazing land lease rates plus taxes _ _ i) Application fee $ 200.00 T _ Per Application _ ii) Grazing Land Lease $ 0.60 T _ _ _ _ PerAcre/Year iii) Minimumcharge $ 25.00 T PerYear

3.jSale or lease of County owned land (reserve price for tenders to reflect current market value) ______I) Sale of land - Commercial use Market Value T - ______ii) Sale of land - Exempt use

______Market Value T - ______iii) Land Lease - use ______Market Value T Per lndustrial/Comnmemdal - Acre/Year $

fee ______200.00 a)IApplication _ T PerApplication - iv) I Land Lease - Agricultural use & Recreational use Market Value T Per Acre/Year a)IApplicationfee $ 200.00 - T PerApplication

- _ Lease Registered Not for Protit $1.00/year T v)lLand - - Per Application a) $ - lApplication fee ______Per Application

4.1 Formal FOIP Request (plus all applicable charges as per FOIP Act) i)IMinimum charge I $ 25.00 Each

0 0 countygp.ab.ca Schedule of Fees, Rates and Charges Bylaw 3129

GST DESCRIPTION Current 2019 Rates Units Status

5.jEnvironmental Enquiries per location i)IMinimum charge I $ 200.001 'I' Each

6.Photocopying Facsimile / ______i) Community or charitable organizations - black & white No ______fee - ii) Community or charitable organizations - color $ ______0.30 1 Per - Copy iii) Minutes, bylaws, plans and other routinely disclosed documents $ ______1.00 T Per Page _ iv) Outgoing facsimile - per page $ ______1.50 T Per Page v) System produced reports: ______

_ - a) 1st 20 pages ______$ 5.00 1 Per Page _ b) excessof 20 pages $ ______1.00 1 PerPage vi)Documents-1st20pages $ ______6.25 1 PerPage a)Iexcessof 20 pages $ ______1.50 1 PerPage 7.1 l'l i) County Flags $ 100.00 'I Per Item _ I ii) Alberta Flags $ 75.00 I Item - Per - iii) Flags I $ 50.00 I Per Item

8. and Development Appeal:

ISubdivision_ _ _ i) Subdivision and DevelopmentAppeal Board $ 500.00 E Per Appeal - ii) Legislative Services Administration Fee $ 75.00 E Per Flour

Assessment Review Board Appeal Deposits (***refundable if appeal successful) _ i) Residential& Farmland $ 100.00 _ E _ - PerAppeal ii) All Other $ 500.00 B PerAppeal

iol Joint Assessment Review Board Appeals i) I Legislative Services Administrative Fee I $ 75.00 E Per Hour PLANNING & DEVELOPMENT Development Permit Applications: (the fee for the permit is largest fee associated with any uses applied for) ______1.1 ______i $ Commercial ______500.00 Per Permit - ii) ndustrial ______$ 500.0 ______Per Permit - - iii) Signs $ ______75.0 Per Permit - iv) Single family residential ______$ 100.0 ______Per Permit - v) Multiple residential $ ______100.0 Per Unit vi) Minor Home Occupation ______$ ______100.0 Per Permit - - vii) Major Home Occupation $ 500.0 ______Per Permit - - viii) Agricultural Home Occupation ______$ 500.0 Per Permit - - - ix) Fences $ 50.0 ______Per Permit - x Variances $ 50.0 ______Per Permit - xi Decks ______$ 50.0 Per Permit - - xii Dugout $ 100.0 ______Per Permit - xiii dditions < 10% of original building size 50.0 Per Permit - xiv gricultural pursuits 50.0 Per Permit - ccessorybuildings =or <2255qft ______$ 50.0 PerPermit .' - xvi Tower ommunication Residential ______$ 100.0 Per Permit - - xvii ommunication Tower Non- Residential $ 500.0 ______B Per Permit - xviii E Per tiuities ______75.00 Permit xix $ 500.0 E nstitutional ______Per Permit xx ommercial Recreation $ 500.0 E Per ______Permit xxi enewal Fee $ ______100.0 E Per Permit

2.IDevelopment Permit Penalty as per i) policy ______

lApplied ______- _ a) $ 1,000.00 E Per Permit Single family residential ______b) 1,000.00 Multiple residential ______$ E Per Unit _ c) Occupation $ 200.00 E Per Minor Home ______Permit _ $ d) Major Home Occupation ______5,000.00 E Per Permit _ $ 5,000.00 e) Commercial ______8 Per Permit 1) _ $ 5,000.00 E Per Permit Industrial ______g) _ $ 500.00 Signs ______E Per Permit

Page 5 ofl2 ii;t Schedule of Fees, Rates and Charges Bylaw 3129

GST DESCRIPTION Current 2019 Rates Units Status Residential: Structures =1 <225 sqft (accessory buildings, detached garages, h) additions) fence, dugout, deck, communications towers > 75 ft not requiring $ 100.00 E Per Permit guywires, wind turbines ______i) Residential: Structures > 225 sqft (accessory buildings, detached garages & additions) $ 1,000.00 E Per Permit j) Agricultural Home Occupation 5,000.00 ______$ E Per Permit

3.Development -Agreement Charges

The greater of $200 i) Legal & Engineering (minimum $200.00) I Per Agreement or 1% of Securities

4.Building Permits - $100 minimum permit fee for all building permits ______Per $1,000 of I) New Construction (based on construction valuation) $ 6.00 E Construction Value ______- - PersqftofMain ii) RelocationofBuilding $ 0.25 E ______floor Per sqft of Main iii) Mobile homes/modulars/RTMs $ 0.20 fi ______--______Floor Per $1,000 of iv) Small Residential (Additions, Garages, Decks) (based on construction valuation) $ 6.00 E Construction Value v) Residential $

Demolition ______100.00 E Per Permit - vi) Demolition Non-Residential (minimum $100.00) ______$ 0.50 E Per sqm Note: All bui!din,q permitfees are subject to Safety Codes Council Fee (5CC) - 4% ofpermi fee (minimum charge $4.50, maximum charg $560.00)

Permits ______5.IEIectrical ______i) I Residential Installations - New homes/basement deveiopment/garage/iarge renos a) sqft $ 135.00 Up to 1200 ______E

- - ______b) to 1500 $ 150.00 1201 sqft ______c) to 2000 $ 180.00 E 1501 sqft ______- d) sqft $ 200.00 2001 to 2500 ______E ______e) to 5000 sqft ______$ 220.00 E

2501 ______$220.00~$0.10 per fj Over5000sqft E ______

sgft sgft ______over 5000 ______ii) $ Connection ______E Mobile/modular/RIM 135.00 ______Installation Costs ($) - other than above installations - small renos/commercial/ ______industrial/etc. ______¯ $ 75.00 0-1,000 ______E - ______¯ $ ______85.0 E 1,000.01-1,500 ______- ¯ $ ______1,500.01-2,00D ______100.0 E

______- 5 115.0 ¯ 2,000.01-2.500 ______8 ______-- ______¯ 125.00 E 2,500.01-3,000 ______$ 140.00 E 3,000.01-3,500 ______! ______¯ 155.00 ______0 500.01-4,000 ______-- ¯ 160.00 0 .000.01-4,500 ______165.00

¯ ______E 500.01 -5,000 ______

-

¯ ______180.00 E .000.01-5,500 ______- -- ¯ 185.00 E .500.01-6,000 ______- ¯ 195.00 E 000.01-6,500 ______- - ¯ 200.00 E .500.01-7,000 ______- - 205.00 ¯ 7.000.01-7,500 ______- - 215.00 ¯ 7,500.01-8,000 ______- - -

- 220.00 ¯ ______8,000.01 8,500 ______225.00 ¯ .500.01-9,000 ______- - 235.00 ______¯ ______.000.01-9.500 - - 240.00 ______¯ .500.01-10,000 ______- - 245.00 ¯ 0,000.01-11,000 ______- - 255.00 ______¯ 1,000.01-12,000 ______- - ¯ 260.00 12,000.01-13,000 ______- - -

______265.00 ¯ 3,000.01-14,000 ______- - 275.00 ______¯ 4,000.01- ______15.000 - - 280.00 ______¯ 5,000.01 -16,000 ______- - ¯ 16.000.01-17,000 ______285.00 - - ______-- -

Page 6of12 Schedule of Fees, Rates and Charges C o s, Bylaw 3129

GST DESCRIPTION Current 2019 Rates Units Status

¯ 17,000.01- 18,000

- ______$ 295.00 E ______¯ 18,000.01-19,000 ______

______$ - 300.00 E - ______¯ 19,000.01-20,000 ______

______$ - 305.00 E ______

$305.00 ~ (or ¯ Over 20,000 $5.00/$1000 E portion of) over $20,000 install Cost

- iv) Temporary and underground service conductors and feeders for contractors 80.00 $200.00 + v) Annual Maintenance permits $125/hr E ______

over 2 hrs ______Note: All electric permit are subject to Safety Codes Council Fee (SCC) - ofpermitfee (minimum ______fees 4% charge $4.50, maximum charge $560.00)

Gas Permits 6.1 ______Installations (Natural Gas, Propane, etc.)

i)lResidential ______a) Based on number ofoutlets ______

______¯1-2 ______$ 80.00 E ______3 ______¯ ______$ 104.00 ______$ 117.00 ______

______$ 221.00

______¯5-10 ______-is ______$ 273.00 ______¯ii ______16-20 ______$ 390.00

______¯ ______- $390.00 + $7.00 for ¯ Over 20 E ______sach outlet ______over 20 ______ii) n - Residential Installations (Natural Gas, Propane, etc.) ______IN ______a Based BTU Input on ______¯ 10,000-20,000 ______$ 80.00 ______20,001-110,000 ______$ 104.00 ______¯ ______- ¯ 110,001-210,000 ______$ 143.00 - ______¯ 210,001-350,000 $ 195.00 ¯ 350,001-1,000,000 ______$ 260.00 ______

$260.00 + $7.00 for each 100,000 BTU(or ¯ Over 1,000,000 . E portion of) over 1,000,000 BTU

b) Temporary Gas Natural ______¯ 0-500,000 ______$ 120.00 E ______¯ 500,001- 1,000,000 ______$ 200.00 E - -- -- ______$200.00 + $5.00 for each 100,000 Bill (or ¯ Over 1,000,000 . E portion of) over ______

- - 1,000,000 ______- iiijP'opane Tank Sets (for each tank set) (Residential and Non- Residential) a) gallons 0- 300 ______$ 96.00 E ______-1,000 gallons 501 ______$ ______132.00 E ______gallons

Over 1,000 ______

______$ 180.00 E ______together ______Each additional tank manifolded ______add $50 E ______Secondary to stage regulator line second ______add $50 ______E ______Vaporize Connection tank(s) to ______add ______of $50 E ______Propane tank set permits only include tank setting, other permits are requiredfor the connection and is based on the above residential and non-residential ______fees. ______Note: Allgas permitfees are subject to Safety Codes Council Fee (SCC) - 4% ofpermitfee (minimum charge $4.50, maximum charge $560.00)

Page 7of12 Schedule of Fees, Rates and Charges Bylaw 3129

GST DESCRIPTION Current 2019 Rates Units Status

7I Plumbing Permits i)1 Residential & Non - Residential Installations (based on number of fixtures) ______$ ______100.00 E

______¯1-5 ______¯ 6 $ ______110.00 E ______

______$ ______120.00 ______$ ______130.00

______¯8______- $ ______140.00

- ______

______¯io ______$ 150.00

______¯ii ______$ 160.00 ¯ 12 ______$ 170.00 - ______

______¯13 ______$ 180.00 ______

______¯14 ______$ 190.00 ______

______¯is ______$ zoo.oo ______$ ______¯16 ______210.00 ______$ ______220.00

______¯17 ______18 $ ______¯ ______230.00 - - ______¯ 19 $ ______240.00 E ______¯ 20 $ ______250.00 fi ______$250.00 + $5.00 for ¯ 0ver20 E each fixture over 20

Note: All plumbing permitfees are subject to Safety Codes Council Fee (5CC) - 4% ofpermitfee (minimum charge $4.50, maximum charge $560.00) 8.1 Private Sewage Disposal system (PSDS) Permits I) Cistern, Holding tanks, Septic tank upgrades, Alterations $ 150.00 E ii) Fields, Mounds, Sand Filters, Treatment Tanks, Open Discharge $ 200.00 E Note: All PSDS permitfees are subject to Safety Codes Council Fee (SCC) - 4% ofpermitfee (minimum charge $4.50, maximum charge $560.00) 9.IPermit Penalties (Applied as per Policy i) I Double permit fee for work started without a permit The amount is added to the un- I Double permit fee I E I Note: All permitfees & penalties are subject to Safety Codes Council Fee (SCC) - 4% ofpermitfee (minimum charge $4.50, maximum charge $560.00) 10. lAdditional Inspection i) Requested Inspections or Re-Inspections S 125.00 Ii Per Hour

11.llnspection Penalties- Coverage of Work Prior to Inspections (Applied as per Policy ______I) First occurrence Education! Warning E ii) Second occurrence

______$ F -______250.00 Per - Infraction - iii) Third ______occurrence ______$ 500.00 F Per Infraction Removal of Material iv) Fourth occurrence to Expose Work E Requiring Inspection

12.1 Permit Alternative Solutions or Variances For anything that falls outside the realm ofthe Codes, and must be of equal or greater 1 $ 225 00 E Per Variance safety to is in the Codes. what covered ______I ______

13.1 Rezoning - see 18. Planning Bylaws. Land Use Bylaw Amendments

Application Fees 14.ISubdivision ______$ 200.00 E Per Application Plus: Each title affected (including balance, MR, ER, PUL, condominium units and $ common property) F Per Title

15. and Condominium Fees Endorsement ______ISubdivision ______Each title (s) affected (including balance, MR, ER, PUL, condominium units and i) $ 15000 E community property) Per title ______ii) Time Extension $ 100.00 E Per Application

Page 8 of 12 .

Schedule of Fees, Rates and Charges Bylaw 3129

DESCRIPTION Current 2019 Rates Units Status

- Development Agreement Charges ______16..ISubdivision ______The greater of $200 I) Legal & Engineering (minimum $200.00) T Per Agreement or 1% of Securities ii) Development Agreement Penalty (Applied as per Policy ______a) First occurrence ______1% of Securities E b) Second occurrence

______of - 2% Securities E -- c) Third and Subsequent occurrences ______5% of Securities E

Planning Bylaws - New or Amendment Applications ______17.1 ______i)jLandliseBylawAmendments $ ______500.00 E PerApplication a) Plus: Public Hearing Advertising Cost ______$ ______700.00 E - Per Application ii) Municipal Development Plan (new or amended)

______$ 10,000.00 B Per Application iii) Area Structure Plan (new or amended) $ ______10,000.00 E Per Application iv) IDP Intermunicipal Development Plan $ 10,000.00 ______E Per Application v) Road closures, removal of Municipal Reserve designation, etc. $ 500.00 E Per Application a) Hearing advertising ______Plus: Public cost I ______$ 700.00 E Per Application

Real Property Reports (RPR) Compliance ______18.! / ______

I) Review & Stamp Surveyor's Certificate - for compliance with LUB-Basic (RPR) $ 50.00 E Per Review

ii) Review & Stamp Surveyor's Certificate - for compliance with LUB-Rush (RPR) $ 100.00 E Per Review

iii) Review Surveyors Certificate- non-compliance (RPR) $ 25.00 E Per Review

19.1 Planning Only Information Searches 1)1 Planning information only (minimum charge of 1 hour) $ ______100.001 1 Per Hour 20.IPrinted Copies of Planning Documents I) County Municipal Development Plan (MDP) $ _ - - ______50.00 E Per Copy _ _ ii) Intermunicipal Development Plan (lDP) $ 50.00 ______E PerCopy iii) County Land Use Bylaw (LUB) $ ______100.00 B Per Copy _ iv) Area Structure Plans (ASP) ______$ 50.00 E Per Copy

PUBLIC WORKS ______

1.IDustControl_ - i) Dust Control - Calcium Chloride - residential ______$ 4.40 E Per Meter - ii) Dust Control - Calcium Chloride - commercial or industrial ______$ E Per Meter 6.60J. - iii) Dust Control - Spec Crude - commercial or industrial per meter $ E ______Per - - Meter 2L9J. - - iv) Dust Control - Spec Crude - up to 150 meters residential $ E ______Per Meter 19.20j - v) Dust Control - Spec Crude - over 150 meters or past deadline for applications $ ______21.95j E Per Meter - - *App!ications accepted after deadline require the approval ofthe Manager ofPub! c Works

of Water ______2.ISale ______I Bezanson water-residential

______$ - 121.00 E - Flat 2-Mth Rate ii Bezanson water-commercial ______$ 303.00 E Flat 2-Mth Rate iii of LaGlace ______$ 116.00 E Flat 2-Mth Rate - iv HamletofTeepeeCreek ______$ 116.00 E Flat2-MthRate v Bezanson School Charges 1,160.00 ______$ B Flat 2-Mth Rate vi School Charges 1,025.00 ______$ E Flat 2-Mth Rate vii Bezanson Truck Fill Water Sales $ 9.00 E Per M3 ______viii Miscellaneous rates: ¯ meter installation Water ______$ 500.00 B Per Meter ¯ service call - normal office hours 30.00 E Per Call Out ¯ call $ service -other than office hours ______100.00 E Per Call Out ¯ application fee - temporary & construction (no deposit required/md turn on) 40.00 E Per Application ¯ service kill in pavement $ ______400.00 B Per Service Kill ¯

service kill all others ______$ 250.00 E Per Service Kill ¯ shutoff or action due to non-payment $ 30.00 collection ______E Per Visit

¯ -

shut-off and turn on customer service: ______- - ______* during normal hours business ______$ 30.00 E Per Incident

0 0 countygp.ab.ca Schedule of Fees, Rates and Charges Bylaw 3129

DESCRIPTION Current 2019 Rates Units Status¯GST

* after normal business hours $ 100.00 E -______Per Incident ¯ fee for winter construction service $ 250.00 -- E Per --______Incident Iwater Access fees per Temporary Diversion License (TDL) ¯ Lessthan75000cubesofwaterperTDL ______$ - 350 E PerCubicMeter ¯ Greater than 75.000 cubes of water per TDL $ 2.75 E Per Cubic Meter

3.ISewage Rates

Teepee Creek - residential ______$ 42.00 E Flat 2 Mth Rate ______i Teepee Creek - commercial $ 80.00 E Flat 2 Mth Rate ii LaGlace - residential ______$ 42.00 E Flat 2 Mth Rate iv LaGlace - commercial ______$ 80.00 E Flat 2 Mth Rate V Bezanson - residential 42.00 E Flat 2 Mth Rate vi Bezanson - commercial 80.00 E Flat 2 Mth Rate vii Valhalla - residential 42.00 E Flat 2 Mth Rate viii Valhalla - commercial ______$ 80.00 B Flat 2 Mth Rate ix Bezanson School Charges $ 434.00 E Flat 2 Mth Rate x Valhalla, LaGlace, and Teepee Creek Schools ______$ 380.00 E Flat 2 Mth Rate xi Teepee Creek Stampede Grounds 42.00 E Flat 2 Mth Rate

4. Capital Charges & Connection Charges ______IUtihtv ______Bezanson-capitalcharge ______i -______$ 10.00 E Flat 2 Mth Rate ii Bezanson - capital charge commercial ______$ 30.00 E Flat 2 Mth Rate iii Bezanson, LaGlace, Teepee Creek - water connect charge (new services only) ______$ 100.00 E Per Connection

iv) Bezanson, LaGlace, Teepee Creek, Valhalla - sewer connect charge (new services only) $ 100.00 E Per Connection v) Water & Sewer application fee ______$ 42.00 E Per Account Water & Sewer connection cost recovery fee - Dunes & Tamarack Estates Phase 2 (new vi) $ 15,000.00 E Per New Parcel parcels at subdivision application)

vii) Water & Sewer connection cost recovery fee - County Industrial Park Phase 1 ______$ 10,800.00 E Per Acre viii) West Aqua Waterline cost recovery fee a) adjacent to water Parcels line ______$ 10,000.00 E Per Parcel b) Newlysubdividedparcels ______$ -______5,000.00 E -- PerParcel ix) Iwater connection_cost recovery fee- Bezanson 100th Street Water line a) Parcels on West Side ofWater Line ______$ 10,500.00 E Per Parcel b) line Parcels on East Side of Water ______$ 13,500.00 E Per Parcel Recovery fee for new connection for Bezanson, LaGlace, Teepee Creek, Valhalla x) Costrecovery E Full Cost Recovery (water sewer)- This amount is full cost recovery ______&/or ______xi) Certified Technician & Truck 95.00 Ii Water/Wastewater ______$ Per Hour - Ridge Ii xii) Waterline Cost Recovery Fee Sandy Phase 1 ______$ 15,200.00 Per Parcel

Recycling & Landfill Fees 5.Garbage Collection, ______Curbside ______collection: i)IGarbage - -

a) HamletofClairmont ______$ 9.50 E Monthly

b) Wedgewood ______$ 10.50 E Monthly

c) Westlake Village ______$ 11.50 B Monthly d) Carriage Lane Estates 12.50 E Monthly e) Maple Ridge Estates 13.50 E Monthly - - - I) Taylor Estates 14.50 E Monthly - g) Whispering Ridge 15.50 E Monthly - Dunes on #17 16.50 E Monthly h) - i) Residential Waste Cart 70.00 B Per Cart - - j) BagTag ______$ 3.00 E PerTag - ii) Recycling collection: Curbside ______I - a) 4.75 E Monthly HamletofClairmont - b) Wedgewood 5.75 Monthly - E_ C) Carriage Lane 6.75 E Monthly d) Maple Ridge 7.75 E Monthly - e) Taylor 8.75 E Monthly Estates - - f) WhisperingRidge 9.75 E Monthly - g) Westpoint Estates 10.75 Monthly - E_ h) on #17 11.75 E Monthly Dunes - - ______

Fees: ______iii)ILandfill --

a) Regional ______Landfill: ______-

-county; - ¯ Commercial/Industrial (county and non minimum charge $5.00) ______$ 95.00 E Per Tonne

Page 10 ofl2 IIf "'r- 71 Schedule of Fees, Rates and Charges Bylaw 3129

GST DESCRIPTION Current 2019 Rates Units Status

Residential - non member (minimum charge $5.00) $ ______¯ ______95.00 E Per Tonne Special Handling - ______¯ ______$ 190.00 E Per Tonne Mixedloads ______¯ ______$ 190.00 E PerTonne ¯ Uncovered Loads Commercial/Industrial ______$ 190.00 E Per Tonne ¯ Vehiclehulks $ ______300.00 E PerVehicle ¯ Items containing Freon (refrigeration etc.) ______No fee ¯ Cleanwoodwaste ______$ 47.50 E Perlonne ¯ Clean metal waste $ ______47.50 E Perlonne Clean Concrete Tipping fees ______¯ ______$ 30.00 E Per Tonne

______Oilfleld Liner $ ______1,200.00 E Per Load b) Clairmont Landfill: - Composter ______Purchase of Recovery ______'Cost Per Item PurchaseofDigester ______"CostRecovery" Perltem ¯ (county and non-county; minimum charge - $ $10.00) ______95.00 Per Tonne Commercial/Industrial - - ¯ Residential - Non County (minimum charge - $10.00) ______$ 95.00 Per Tonne ¯ Special Handling - ______$ 190.00 Per Tonne ¯ Mixedloads - - ______$ 190.00 - PerTonne ¯ Uncovered Loads $ Commercial/Industrial ______190.00 Per Tonne ¯ Commercial - Non-County Tires Recycle Fee ______$ 47.50 Per Tonne - ¯ County residential with untarped or unsecured loads $ ______20.00 Per Load - ¯ Vehiclehulks $ ______300.00 PerVehicle - ¯ Clean wood waste ______$ 47.50 B Per Tonne ¯ Metal Tipping fees ______$ 47.50 E Per Tonne I Concrete Tipping fees Clean ______$ 30.00 E Per Tonne ¯ Oilfield Liner ______$ 1,200.00 E Per Load I Mobile Home Tipping Fees $ ______1,000.00 E Flat Rate 6.1 Miscellaneous Items I) Permit Issue Administration Fee $ ______200.00 B Per Permit Community Aggregate Payment Levy Fee (Bylaw....J ii) ______$ 0.40 E PerTone

7. Operations (Bylaw 2638) ______ISeism1 ______i) Source line $ 746.00 T Per km-Source Line Per ii) Receiver line $ 186.00 T km:Receiver ______Line iii) Administrative Process (Bylaw 2696) ______$ 125.00 T Per km iv) PW review of Seismic Program on site (Bylaw 2696) $ ______500.00 T Per km v) Final Inspection (Bylaw 2696) $ ______125.00 T Per km vi) Installation of Flat Line in County Road Right-of-Way ______¯0to3milesofFlatLine ______$ ______- - - 2,500.00 ______Greater than 3 miles ¯ ______$ - - 5,000.00 ______To access water on County-owned or managed lands

vii) ______

- ______¯ Undeveloped access ______$ ______500.00 ______Per Day ¯ Developed ______access ______$ 1,500.00 l)ay ______Per

Approaches ______8.1 ______Well Site Approach Fees i) ______$

400.00 ______Approach Culvert Extension ______ii) County Installed $ -______- 250.00 ______iii) Rate Payer Installed $ 250.00 Refundable Deposit

High Pressure Pipeline Crossing Fee (maximum of 1 per fee) $ 9.1 ______400.00 E Per Crossing

Heavy Load Agreements ______10.1 ______I) Refundable ______$ 5,000.00 E Per Mile - ii) Non- Refundable $ ______6,000.00 T Per Mile

and Gas Surface Lease Agreement ______11.1011 ______Each (or as i) Adverse Effect $ 2,500.00 T ______

______negotiated) Per Acre (or ii) Loss ofuse ofthe land $ 400.00 T as ______

______negotiated)

TITP rr 0 0 couritygp.ab.ca Schedule of Fees, Rates and Charges Bylaw 3129

GST DESCRIPTION Current 2019 Rates Units Status

12.Signage ______Hr + Minimum 1 hour i) ton or ton Sign Truck $ 99.00 1/2 3/4 Materials Flat Rate Charge

Hr + Minimum 1 hour ii) 1 ton Sign Truck $ 175.00 Materials Flat Rate Charge

Hr + Minimum 1 hour iii) S ton Drill Truck $ 202.00 Materials Flat Rate Charge

13.1 Rural Addressing i) I Provision and Installation of rural addressing signage - new subdivision parcels I I $ 155.00 I E Per Sign

14. Drilling Rig Pennits I $ 800.00 T Per Permit i5.Service Rig Permits I I $ 200.001 T PerPermit 16.1 Non-refundable tender deposit I $ 25.001 E Per Tender A.ISHOP 1.j Labour Rate i)Ilnternal I $ 100.00 E Per Hour - -- I I ii)IExternal I I $ 100.00 T I PerHour 2.IParts

_ Cost i)Ilnternal I I I _ I - ii)IExternal I I Cost+10% I T I

3.IFueI _ _

i)Ilnternal ______Cost _ E - I I I ii)IExternal I I Cost+10% I T I GSTMAYBEAPPLICABLE TO SOME OF THERATES ON THIS SCHEDULE, AS REQUIRED UNDER THEEXCISE TAXACT.

Page 12 ofl2