Ideas for transformation The Government wants to turn the areas along the 10km river into spaces for people to gather for activities, and for there to be a seamless path from Lower Peirce Reservoir, where the river starts, to Gardens by the Bay and the Central Business District.

Lower Peirce Reservoir

CENTRAL EXPRESSWAY

Kallang River station UPPER Bishan station ROAD

MacRitchie Reservoir BRADDELL ROAD

Braddell PIE bridge station Potentially, a cycling bridge will be built over and across the Pan-Island Expressway (PIE) from St Andrew’s Village to Mar Thoma Road. Cyclists will no longer need to climb 83 steps to cross an overhead bridge straddling the 16-lane expressway. station AY W S S E

R

P

MAR THOMA X

E PAN-ISLAND EXPRESSWAY Distripark ROAD R A The private B E L industrial estate, Widened CTE A AY crossing station G P a former rubber LAN The underpass KAL factory, could be under the Central redeveloped to Expressway (CTE) include housing, could be widened KALLANG a park and and deepened, BAHRU recreational and turned into spaces. Lavender Kallang a gathering station space. station

CRAWFORD Stadium STREET station

Kampong Bugis The 17.4ha site underpass bounded by Kallang With the Road, underpass, users and Crawford Street of the Kallang park is set to be turned connector will not into a car-lite need to cross Marina residential precinct, Kallang Bahru Reservoir with a network of Road via a traf c walkways and crossing before cycling paths. climbing down a narrow ight of stairs to Kallang Distripark. SOURCE & PHOTOS: URBAN REDEVELOPMENT AUTHORITY STRAITS TIMES GRAPHICS