DPWH Surigao Del Sur 1St DEO, Tandag City Annual Procurement Plan for FY 2018

Total Page:16

File Type:pdf, Size:1020Kb

DPWH Surigao Del Sur 1St DEO, Tandag City Annual Procurement Plan for FY 2018 DPWH Surigao del Sur 1st DEO, Tandag City Annual Procurement Plan for FY 2018 Schedule for Each Procurement Activity Estimated Budget (PhP) Code Procurement PMO/ Mode of Source of Remarks Submission/ Advertisement/P Notice of Contract (PAP) Program/Project End-User Procurement Opening of Funds Total MOOE CO (brief description of Program/Activity/Project) osting of IB/REI Award Signing Bids 18NH0001 Tago CIS Protection Construction Flood Management Program/ Construction of Flood Works (River Bank Protection), Competitive Bidding 11/16-22/17 12/5/2017 1/9/2018 1/18/2018 GoP 28,371,000.00 - 28,371,000.00 Section Mitigation Structures and Drainage Systems San Miguel,Surigao del Sur 320101102502000 18NH0002 Const. of Dike Revetment along Tago River Flood Management Program/ Construction/ Rehabilitation Construction Basin (Gamut Section) Competitive Bidding 11/16-22/17 12/5/2017 1/9/2018 1/18/2018 GoP 34,300,000.00 - 34,300,000.00 of Flood Mitigation Facilities within Major River Basins Section Protecting Gamut Bridge, and Principal Rivers Tago,Surigao del Sur 320102100585000 18NH0003 Const. of MP Building Construction Local Infrastructure Program/ Buildings And Other (Phase II), Poblacion, Competitive Bidding 11/16-22/17 12/5/2017 1/9/2018 1/18/2018 GoP 1,980,000.00 - 1,980,000.00 Section Structures Madrid,Surigao del Sur 300104205512000 18NH0004 Benoni Bridge Construction Bridge Program/ Retrofitting/ Strengthening of Permanent (B00654MN) along SDCR, Competitive Bidding 11/16-22/17 12/5/2017 1/9/2018 1/18/2018 GoP 9,800,000.00 - 9,800,000.00 Section Bridges Carrascal,Surigao del Sur 310303100390000 18NH0005 Carac-an Bridge Construction Bridge Program/ Rehabilitation/ Major Repair of (B00659MN) along SDCR, Competitive Bidding 11/16-22/17 12/5/2017 1/9/2018 1/18/2018 GoP 10,045,000.00 - 10,045,000.00 Section Permanent Bridges Madrid,Surigao del Sur 310304100279000 18NH0006 Gamut Bridge Construction Bridge Program/ Rehabilitation/ Major Repair of (B00700MN) along SDCR, Competitive Bidding 12/08-12/17 12/27/2017 1/16/2018 1/24/2018 GoP 5,880,000.00 - 5,880,000.00 Section Permanent Bridges Tago,Surigao del Sur 310304100278000 18NH0007 Sto. Nino Bridge Construction Bridge Program/ Retrofitting/ Strengthening of Permanent (B00731MN) along SDCR, San Competitive Bidding 12/08-12/17 12/27/2017 1/16/2018 1/24/2018 GoP 3,920,000.00 - 3,920,000.00 Section Bridges Agustin,Surigao del Sur 310303100393000 18NH0008 Const. of MP Bldg. Construction Local Infrastructure Program/ Buildings And Other (Phase II), Carrascal, Competitive Bidding 11/16-22/17 12/5/2017 1/9/2018 1/18/2018 GoP 1,980,000.00 - 1,980,000.00 Section Structures Madrid,Surigao del Sur 300104205511000 18NH0009 Const. of Consuelo Construction Flood Management Program/ Construction of Flood Seawall,Consuelo,Cantilan,Surig Competitive Bidding 11/16-22/17 12/5/2017 1/9/2018 1/18/2018 GoP 34,300,000.00 - 34,300,000.00 Section Mitigation Structures and Drainage Systems ao del Sur 320101102496000 18NH0010 Lambunao Bridge Construction Bridge Program/ Rehabilitation/ Major Repair of (B00667MN) along SDCR, Competitive Bidding 11/16-22/17 12/5/2017 1/9/2018 1/18/2018 GoP 5,880,000.00 - 5,880,000.00 Section Permanent Bridges Lanuza,Surigao del Sur 310304100284000 18NH0011 Tago-Gamut Bridge Construction Bridge Program/ Rehabilitation/ Major Repair of (B00701MN) along SDCR, Competitive Bidding 11/16-22/17 12/5/2017 1/9/2018 1/18/2018 GoP 6,860,000.00 - 6,860,000.00 Section Permanent Bridges Tago,Surigao del Sur 310304100285000 18NH0012 Daniog Bridge I Construction Bridge Program/ Retrofitting/ Strengthening of Permanent (B00664MN) along SDCR, Competitive Bidding 11/16-22/17 12/5/2017 1/9/2018 1/18/2018 GoP 5,880,000.00 - 5,880,000.00 Section Bridges Lanuza,Surigao del Sur 310303100391000 18NH0013 Magasang Bridge Construction Bridge Program/ Retrofitting/ Strengthening of Permanent (B00655MN) along SDCR, Competitive Bidding 11/17-23/17 12/6/2017 1/11/2018 1/22/2018 GoP 3,920,000.00 - 3,920,000.00 Section Bridges Cantilan,Surigao del Sur 310303100392000 18NH0014 Kag-ayongan Bridge Construction Bridge Program/ Rehabilitation/ Major Repair of (B00670MN) along SDCR, Competitive Bidding 12/30/17-01/05/18 1/22/2018 2/5/2018 2/14/2018 GoP 3,920,000.00 - 3,920,000.00 Section Permanent Bridges Lanuza,Surigao del Sur 310304100283000 18NH0015 Cagpangi Bridge (B001407MN) along Jct. Gamut- Construction Bridge Program/ Rehabilitation/ Major Repair of Competitive Bidding 11/17-23/17 12/6/2017 1/11/2018 1/22/2018 GoP 5,880,000.00 - 5,880,000.00 San Miguel-Bayugan Road, Section Permanent Bridges Tago,Surigao del Sur 310304100278000 18NH0016 Bon-ot Bridge Construction Bridge Program/ Rehabilitation/ Major Repair of (B00653MN) along SDCR, Competitive Bidding 12/08-12/17 12/27/2017 1/16/2018 1/24/2018 GoP 5,880,000.00 - 5,880,000.00 Section Permanent Bridges Carrascal,Surigao del Sur 310304100277000 18NH0017 Access Road Leading CONVERGENCE AND SPECIAL SUPPORT PROGRAM/ Construction to Diatagon Port,Lianga,Surigao Competitive Bidding 11/17-23/17 12/6/2017 1/11/2018 1/22/2018 GoP 20,580,000.00 - 20,580,000.00 Construction/ Improvement of Access Roads leading to Section del Sur Seaports 3002021100086000 18NH0018 Access Road Leading CONVERGENCE AND SPECIAL SUPPORT PROGRAM/ to Buenavista Beach Resort, Construction Competitive Bidding 11/17-23/17 12/6/2017 1/11/2018 1/22/2018 GoP 9,408,000.00 - 9,408,000.00 Construction/ Improvement of Access Roads leading to Brgy. Buenavista, Section Declared Tourism Destinations Tandag,Surigao del Sur 300203100655000 18NH0019 Habuyo Bridge Construction Bridge Program/ Rehabilitation/ Major Repair of (B00646MN) along SDCR, Competitive Bidding 11/17-23/17 12/6/2017 1/11/2018 1/22/2018 GoP 2,940,000.00 - 2,940,000.00 Section Permanent Bridges Carrascal,Surigao del Sur 310304100281000 8NH0020 Kaayongan Bridge Construction Bridge Program/ Rehabilitation/ Major Repair of (B00645MN) along SDCR, Competitive Bidding 12/08-12/17 12/27/2017 1/16/2018 1/24/2018 GoP 4,900,000.00 - 4,900,000.00 Section Permanent Bridges Carrascal,Surigao del Sur 310304100282000 18NH0021 Const. of San Pedro Construction Flood Management Program/ Construction of Flood Competitive Bidding 11/17-23/17 12/6/2017 1/11/2018 1/22/2018 GoP 34,300,000.00 - 34,300,000.00 Seawall, Cantilan,Surigao del Sur Section Mitigation Structures and Drainage Systems 320101102500000 18NH0022 Const. of Dike Revetment along Tago River Flood Management Program/ Construction/ Rehabilitation Construction Basin (Caromata Section) Competitive Bidding 11/27-12/03/17 12/18/2017 1/12/2018 1/18/2018 GoP 34,300,000.00 - 34,300,000.00 of Flood Mitigation Facilities within Major River Basins Section Protecting the NIA Dam, San and Principal Rivers Miguel,Surigao del Sur 320102100584000 18NH0023 Const. of Multi- Construction Local Infrastructure Program/ Buildings And Other Purpose Bldg., Lanuza,Surigao Competitive Bidding 11/27-12/03/17 12/18/2017 1/12/2018 1/18/2018 GoP 1,980,000.00 - 1,980,000.00 Section Structures del Sur 300104205520000 18NH0024 Monong Bridge Construction (B00694MN) along SDCR, Tandag Competitive Bidding 11/27-12/03/17 12/18/2017 1/12/2018 1/18/2018 GoP 73,340,000.00 - 73,340,000.00 Bridge Program/ Widening of Permanent Bridges Section City,Surigao del Sur 310305100061000 18NH0025 NRJ SDCR St. CONVERGENCE AND SPECIAL SUPPORT PROGRAM/ Construction Christine Coastway Beach Road, Competitive Bidding 11/27-12/03/17 12/18/2017 1/12/2018 1/18/2018 GoP 19,600,000.00 - 19,600,000.00 Construction/ Improvement of Access Roads leading to Section Lianga,Surigao del Sur Seaports 300202100088000 18NH0026 Const. of Covered Construction Local Infrastructure Program/ Buildings And Other Court, Brgy. Cabas-an, Competitive Bidding 11/27-12/03/17 12/18/2017 1/12/2018 1/18/2018 GoP 1,980,000.00 - 1,980,000.00 Section Structures Cantilan,Surigao del Sur 300104205500000 18NH0027 Const. of MP Bldg., Construction Local Infrastructure Program/ Buildings And Other Brgy. Badong, Tago,Surigao del Competitive Bidding 11/27-12/03/17 12/18/2017 1/12/2018 1/18/2018 GoP 1,980,000.00 - 1,980,000.00 Section Structures Sur 300104205513000 18NH0028 Const. of Covered Construction Local Infrastructure Program/ Buildings And Other Court, Brgy. Gata, San Competitive Bidding 11/27-12/03/17 12/18/2017 1/12/2018 1/18/2018 GoP 1,980,000.00 - 1,980,000.00 Section Structures Agustin,Surigao del Sur 300104205501000 18NH0029 Const. of MP Bldg., Construction Local Infrastructure Program/ Buildings And Other Brgy. Tigabong, Cantilan,Surigao Competitive Bidding 11/30-12/06/17 12/19/2017 1/15/2018 1/23/2018 GoP 1,980,000.00 - 1,980,000.00 Section Structures del Sur 300104205502000 18NH0030 Const. of Covered Construction Local Infrastructure Program/ Buildings And Other Court, Brgy. Anibongan Competitive Bidding 11/30-12/06/17 12/19/2017 1/15/2018 1/23/2018 GoP 1,980,000.00 - 1,980,000.00 Section Structures NHS,Lianga,Surigao del Sur 300104205496000 18NH0031 Const. of MP Construction Local Infrastructure Program/ Buildings And Other Bldg.,Brgy. Baras,San Competitive Bidding 11/30-12/06/17 12/19/2017 1/15/2018 1/23/2018 GoP 1,980,000.00 - 1,980,000.00 Section Structures Miguel,Surigao del Sur 300104205514000 18NH0032 Const. of MP Construction Local Infrastructure Program/ Buildings And Other Bldg.,Brgy. Libas Sud,San Competitive Bidding 11/30-12/06/17 12/19/2017 1/15/2018 1/23/2018 GoP 1,980,000.00 - 1,980,000.00 Section Structures Miguel,Surigao del Sur 300104205516000 18NH0033 Const.
Recommended publications
  • 1St Technical Report 2006
    Type of Report: First Technical Report Executing Sustainable Ecosystem International Agency: Corp. (SUSTEC) Ordinal Number: PD 167/02 Rev. 2 (F) Title of Project: Integration of Forest Management Units (FMU) into a Sustainable Development Unit (SDU) through Collaborative Forest Management in Surigao del Sur, The Philippines Period Covered: November 2004 – June 2006 Place and date of Quezon City, Philippines issue: June 31, 2006 KEY PROJECT STAFF Project Director: Ricardo M. Umali Assistant Project Director: Bernardo D. Agaloos, Jr. Field Coordinator: Feliciano T. Opeña Administrative / Finance Officer: Rhodora G. Padilla CONSULTANTS INVOLVED (THIS REPORT): Team Leader and NRM Specialist: Dr. J. Adolfo V. Revilla, Jr. Conservation Planning Specialist Dr. Emmanuel R. G. Abraham GIS / Remote Sensing Specialist Dr. Nathaniel C. Bantayan Forest Management Specialist Dr. Jeremias A. Canonizado Watershed Management Specialist Dr. Rex Victor O. Cruz Institutional/ Rural Development Specialist Prof. Rodegelio B. Caayupan Environmental Lawyer / Legal Specialist Atty. Eleno O. Peralta Natural Resource Economist Dr. Nicos D. Perez Sociologist / IEC Specialist Dr. Cleofe S. Torres Agro-forestry/ Livelihood Specialist Dr. Neptale Q. Zabala SUPPORT STAFF: GIS Technical Staff Angelito O. Arjona Administrative Assistant Brenda M. Caraan Technical Assistant Nieves C. Hibaya Messenger Alexander S. Recalde Sustainable Ecosystems International Corp. No. 19-A Matimtiman St., Teachers Village West, Diliman, Quezon City, Philippines Tel: + (632) 434-2596 Fax:
    [Show full text]
  • DPWH Surigao Del Sur 1St DEO, Tandag City Updated Final Annual Procurement Plan for FY 2019
    DPWH Surigao del Sur 1st DEO, Tandag City Updated Final Annual Procurement Plan for FY 2019 Schedule for Each Procurement Activity Estimated Budget (PhP) Remarks Contract Procurement PMO/ Mode of Source of Submission/ Advertisement/P Notice of Contract (brief description of ID No. Program/Project End-User Procurement Opening of Funds Total MOOE CO osting of IB/REI Award Signing Program/Activity/Project) Bids Retrofitting/Strengthening of Permanent Bridges Cabangahan Construction Retrofitting/Strenghtening of 19NH0001 Br. (B01408MN) along Jct. Competitive Bidding 10/18-24/18 11/06/18 05/15/19 05/24/19 GoP 2,940,000.00 2,940,000.00 Section Permanent Bridge Gamut-San Miguel Bayugan Road, Tago, Surigao del Sur Retrofitting/Strengthening of Permanent Bridges Cagbato Br. Construction Retrofitting/Strenghtening of 19NH0002 (B00707MN) along Surigao- Competitive Bidding 10/18-24/18 11/06/18 05/15/19 05/24/19 GoP 3,430,000.00 3,430,000.00 Section Permanent Bridge Davao Coastal Road, Bayabas, Surigao del Sur Retrofitting/Strengthening of Permanent Bridges Hinayhayan Br. 1 (B00711MN) along Surigao- Construction Retrofitting/Strenghtening of 19NH0003 Competitive Bidding 10/18-24/18 11/06/18 05/15/19 05/24/19 GoP 5,880,000.00 5,880,000.00 Davao Coastal Road, Brgy. Section Permanent Bridge Hinayhayan, Cagwait, Surigao del Sur Retrofitting/Strengthening of Permanent Bridges Hinayhayan Br. 2 (B00712MN) along Surigao- Construction Retrofitting/Strenghtening of 19NH0004 Competitive Bidding 10/18-24/18 11/06/18 05/15/19 05/24/19 GoP 3,920,000.00 3,920,000.00 Davao Coastal Road, Brgy.
    [Show full text]
  • Guidelines for Authors
    FLOOD HAZARD MAPPING OF RIVER BASINS IN CARAGA REGION, MINDANAO, PHILIPPINES THROUGH THE CSU PHIL-LIDAR 1 PROJECT Meriam Makinano-Santillan and Jojene R. Santillan CSU Phil-LiDAR 1, Caraga Center for Geoinformatics, Caraga State University Ampayon, Butuan City 8600 Philippines Email: Email: [email protected] KEY WORDS: LiDAR, flood hazard mapping, Caraga Region, Mindanao, Philippines ABSTRACT: In this paper, we share our activities and recent accomplishments in utilizing high spatial resolution Light Detection and Ranging (LiDAR) datasets and other geospatial datasets and techniques for flood hazard mapping of river basins in Caraga Region, Mindanao, Philippines through the CSU Phil-LiDAR 1 project. CSU Phil-LiDAR 1 is one of several projects under the “Phil-LiDAR1: Hazard Mapping of the Philippines using LiDAR” program initiated and supported by the Department of Science and Technology (DOST). Projects under this program are being implemented nationwide by fifteen (15) higher education institutions (HEIs) for 3 years starting 2014. An extension of the University of the Philippines’ Disaster Risk Exposure Assessment for Mitigation (DREAM) program, Phil-LIDAR 1′s purpose is for HEIs to utilize LiDAR datasets to generate flood hazard maps of their assigned project areas which are distributed throughout the Philippines. CSU Phil-LiDAR 1 in particular aims to derive Digital Surface Models (DSMs) and Digital Terrain Models (DTMs) from preprocessed LiDAR data, and to utilize these elevation datasets, together with data gathered from field surveys (cross-sections, bathymetry and hydrology) as inputs in the development of flood models. The flood models are then used to generate flood hazard maps of the river basins and watersheds of Caraga Region.
    [Show full text]
  • Making a Difference in Mindanao
    MAKING A DIFFERENCE IN MINDANAO Joel Mangahas MAKING A DIFFERENCE IN MINDANAO Joel Mangahas i © 2010 Asian Development Bank All rights reserved. Published 2010. Printed in the Philippines. ISBN 978-92-9092-072-4978-92-9092-079-3 Publication Stock No. RPT102219 Cataloging-In-Publication Data Asian Development Bank Making a difference in Mindanao. Mandaluyong City, Philippines: Asian Development Bank, 2010. 1. Development. 2. Development assistance. 3. Mindanao, Philippines. I. Asian Development Bank. ] Development Bank (ADB) or its Board of Governors or the governments they represent. ADB does not guarantee the accuracy of the data included in this publication and accepts no responsibility for any consequence of their use. By making any designation of or reference to a particular territory or geographic area, or by using the term “country” in this document, ADB does not intend to make any judgments as to the legal or other status of any territory or area. ADB encourages printing or copying information exclusively for personal and noncommercial use with proper acknowledgment of ADB. Users are restricted from reselling, redistributing, or creating derivative works for commercial purposes without the express, written consent of ADB. Note: In this report, “$” refers to US dollars. Asian Development Bank 6 ADB Avenue, Mandaluyong City 1550 Metro Manila, Philippines Tel +63 2 632 4444 Fax +63 2 636 2444 www.adb.org For orders, please contact: Department of External Relations Fax +63 2 636 2648 [email protected] Contents Abbreviations iv Land of
    [Show full text]
  • Pdf | 523.76 Kb
    Injured - 18 (2 in Northern Samar, 12 in Compostela Valley, 1 in Lanao del Norte and 3 in Misamis Oriental) Missing -12 (7 in Eastern Samar, 1 in Northern Samar, 2 in Misamis Oriental, 1 in Surigao del Sur and 1 in Agusan del Norte) C. Damaged Houses (Tab D1) Totally damaged houses - 2,570 Partially damaged houses - 9,733 D. Cost of Damage (Tab D2) Agriculture PhP 233.27 Million Infrastructure 431.85 Million Total PhP 665.12 Million III. Areas Declared Under State of Calamity Region Prov/City/Mun Date Declared Resolution Nos. V Catanduanes Jan 14, 2009 SP Res 008-2009 X Misamis Oriental Jan 15, 3009 SP Res1 s 2009 Cagayan de Oro City Jan 15 SP Res 01-2009 Gingoog City Jan 16,2009 SP Res 9482-2009 Linamon, Lanao del Norte Jan 14,2009 SP Res 07-s 2009 CARAGA Agusan del Norte Jabonga Jan 8, 2009 SB Res 01-2009 Las Nieves Jan 16, 200 SB Res 012-2009 Agusan del Sur Prosperidad Jan 13, 2009 Mun Res 02 s 2009 Veruela Jan 13, 2009 Mun Res 02 s 2009 Sta Josefa Jan 14, 2009 Mun Res 02 s 2009 Esperanza Jan 14, 2009 SB Res 004 s 2009 Rosario Jan 15, 2009 SB Res 01 s 2009 Sibagat Jan 16, 2009 SB Res 05 s 2009 Lanuza Jan 15, 2009 SB Res 07 s 2009 San Francisco Jan 16, 2009 SB Res 08 s 2009 XI Asuncion, Davao del Norte Laak , Compostela Valley IV. Humanitarian Assistance A. Cost of Humanitarian Assistance The estimated cost of assistance provided by NDCC, DSWD, DOH, LGUs, other GOs and NGOs in all areas affected is PhP26,476,208.66, broken down as follows: Agencies In Kind Amount OCD-NDCC 3,250 sacks of rice PhP2,920,000.00 DSWD Assorted relief supplies, family food packs, clothing and , hot meals, mats, blankets 11,484,262.23 DSWD-ARMM 73,000.00 DOH Assorted medicines and supplies water 2,496,594.33 containers sodium hypochlorite, watercontainer, disinfectant and cash allocation (QRF) LGUs Food and non-food items, medical services, 8,299,483.10 cooked food financial assistance NGOs Assorted relief goods, cash , used clothing, 1,202,869.00 Total PhP26,476,208.66 B.
    [Show full text]
  • Cience Anutechnolosy \Tilfr*Llffirg
    g:T weruurffi:@ $cienceanuTechnolosy -' \tilfr*llffirg$[eggt tpdia $grTiGe F r*s r{A?rs}rsrs*r}n{G r{HlrrspA'sn ffi ilffiild|sqns Page: llQ Date: 0 e JAN2017 aA,tting' Bah-Bah-Talocogon area in Agusan del evacuees at various evacuation centers Poft and 561 passengers in Macapaga makeslandfall. .. <1 Sw is reported not passable to both heavy here. Port, both in Surigao City and close tc andlightvehicles due to overflowed flood Initially, at least 103 families in RTR 1,000passengers in Nasipit Intemationa Signal No. t has been hoisted over has crossed Paiawan. waters from creeks and rivers. town and nearby Jabonga town in Agusan Sea Port in Nasipit Agusan del Norte. Cuyo Island in Palawan, Bohol, Siquijor, By Thursday, Auring is expected to "We are closely monitoring the na- del Norte already evacuated to various Philippine Coast Guad and maritime Negros Oriental, Negros Occidental, leave the country's area of responsibility tional highways in Bunawan Brook and evacuation centers there, PDRRMC also authorities temporarily suspended the Southern Leyte, Cebu, Guimaras, Blue Alert Tbento in Agusan del Sur (connecting reported. sailing of vessels and other sea crafts southern part of Iloilo, southern part of The National Disaster Risk Reduction Caraga-Davao regions), and in San Along with the DSWD, the PDRRMC boundforLwon,Visayas and neighboring Antique. Agusan del Norte, Swigao del and Management Council NDRRMC) Miguel, Surigao del Sur as flood waters yesterday also initially served FFPs to islands in Surigao del Norte and Surigac Sur, Surigao del Norte including Siargao raised the "Blue Alert" status and di- reportedly rise from Tago river in Surigao affected 48families temporarily sheltered del Sur effective Saturdaynight.
    [Show full text]
  • Geosciences Division
    GEOSCIENCES DIVISION VULNERABILITY AND RISK ASSESSMENT One of the major contribution of the Mines and Geosciences Bureau to the Disaster Risk Reduction Management / Climate Change Adaptation initiatives of the National Government thru a new project, Vulnerability and Risk Assessment (VRA) which started in year 2015. With the accomplished geohazard maps as a key input, VRA primarily aims to generate exposure maps of the population, build-up areas and lifeline infrastructures such as roads to rain-induced hazards such as flooding and landslides. It however also provides an opportunity to update the existing geohazard maps and validate those cities or municipalities in which the 10K geohazard mapping and assessment was undertaken thru outsource and thru MOA with mining companies. 10K Geohazard Maps and the hazard exposure maps generated by the VRA activity proved useful to the Local Government Unit as a vital input in their respective Contingency Planning, Preparedness and Mitigation Plan for Disaster Risk Reduction as well as their integration with the Comprehensive Land Use plan. For CY 2017, twelve (12) municipalities of Caraga Region were covered by the VRA program (Figure 1). These are: 1. Magallanes, Agusan del Norte 2. Las Nieves, Agusan del Norte 3. Sibagat, Agusan del Sur 4. Santa Josefa, Agusan del Sur 5. Tago, Surigao del Sur 6. San Miguel, Surigao del Sur 7. La Paz, Agusan del Sur 8. San Jose, Province of Dinagat islands 9. San Luis, Agusan del Sur 10. Talacogon, Agusan del Sur 11. Bunawan, Agusan del Sur 12. Rosario, Agusan del Sur Updating of 1:10,000-scale landslide and flood susceptibility geohazard maps of San Miguel, Surigao del Sur generated by SRDP Consultancy Services was done during the VRA activity.
    [Show full text]
  • The History, World Views and Socio-Cultural Transition of the Manobolandia
    International Journal of Education and Research Vol. 1 No. 12 December 2013 The History, World Views and Socio-Cultural Transition of the Manobolandia Ramel D. Tomaquin, DPA,Ph.D. Abstract: The paper delves in the discussion of the ethno history of the Manobo’s in Surigao del Sur, Philippines. It covers in the dialogue of their world views, oral tradition/narratives, topography of their earliest settlements, indigenous religious ceremonies and rituals, socio-cultural change and drivers of cultural transition. Ethnographic method was used. Free, Prior and Informed consent was secured in the Manobo communities. Among the most potent drivers of cultural transitions of the Manobo’s were the introduction of tertiary education in the heart of the Manobolandia (Manoboland) in Carromata San Miguel Surigao del Sur which provided quality and affordable higher education to the Manobo’s, the opening of lumber and mining companies in the sites, the passage of the Philippine Indigenous Peoples Act of 1997 made them aware of their rights such their ownership of the ancestral domains claims. Movement for the preservation of their cultural institutions as part of Philippine traditions/cultural inheritance and for posterity had been instituted by various Philippine agencies. Key Words: Manobo’s, Rituals, Cultural Change, Manobolandia, Cultural Transition _________________________________________________________________________________________ 1. The Philippines is a pluralistic society a melting pot of various ethic groups such: the dominant Tagalog, Ilokano, Cebuano, Hiligaynon population, the Muslim Filipinos and the Indigenous Peoples (IP’s) also called Lumads (Natives/Homegrown inhabitants in the area) .The IP’s often times lag behind with the services of different governmental units in the Philippines.
    [Show full text]
  • FLOOD SUSCEPTIBILITY MAP Y
    125°47'30"E 125°50'0"E 125°52'30"E 125°55'0"E 125°57'30"E 126°0'0"E 126°2'30"E 126°5'0"E 126°7'30"E 126°10'0"E E FLOOD SUSCEPTIBILITY MAP y a m i o R i v e r C arac-a MUNICIPALITY OF LANUZA n o River River Eyami Carrascal Province of Surigao del Sur P3 ! P2 N !! urc P1 ia Cre ek (10k Baseline Data) P4 Sitio Catupgas ! Cantilan P5 Sitio Cabanahan C ! a t P5 Ganga u ! p g a P1 Bay-bay s ! C r r e e Bunga e k iv 3Bunga Elem. School R 8 LEGEND: n P2 a P6 Sitio Cagmino - ! c ! a r a C P5 Badjang ! 9 Municipality P3 Piagawan 9°15'0"N ! 9°15'0"N LANDSLIDE 8 P2 Barangay Sibahay Elem. School ! VERY HIGH P1 Makugihon P4 CapadianCapadian Daycare Center P33 Sibahay! Areas usually with steep to very steep slopes and underlain by ! ! ! 3 P1 Daisy 8! P4 ! weak materials. Recent landslides, escarpments and tension Purok cracks are present. Human initiated effects could be an P2 Malinawon aggravating factor. ! P4 Baybay 3 HIGH ! School Areas usually with steep to very steep slopes and underlain by Habag Primary School!Habag 83 weak materials. Areas with numerous old and inactive landslides. Lanuza Rural Health Unit K MODERATE ! Zone! IV Health Facility P3 Bangus!ZoneK! I ! Areas with moderately steep slopes. Soil creep and other P1 Gawad Kalinga ! ! 8 ! indications for possible landside occurrence are present.
    [Show full text]
  • Flood Depth and Velocity Impact Assessment of Historical Flooding Events Using Lidar and 2D Numerical Modeling
    FLOOD DEPTH AND VELOCITY IMPACT ASSESSMENT OF HISTORICAL FLOODING EVENTS USING LIDAR AND 2D NUMERICAL MODELING Jennifer T. Marqueso, Arthur M. Amora, Jojene R. Santillan, Meriam Makinano-Santillan, Amor L. Gingo, Linbert C. Cutamora, Jesiree L. Serviano, Ronald M. Makinano CSU Phil-LiDAR 1 Project, Caraga Center for Geo-Informatics, College of Engineering and Information Technology, Caraga State University, Ampayon, Butuan City, 8600, Philippines E-mail: [email protected] KEYWORDS: Flood Depth, Flood Velocity, Impacts, LiDAR, 2D Numerical Modelling ABSTRACT: This paper applies a framework that integrates LiDAR data with hydrologic and 2-dimensional (2D) hydraulic modeling to generate detailed information of flood depths and velocities that are often needed for planning and mitigating the effects of flooding. Both the flood depth and velocity are important considerations whenever flooding occurs and can be a vital input in determining safe evacuation centers and routes. The models primarily utilize the 1-m spatial resolution LiDAR-derived Digital Elevation Models as source of elevation data associated with roughness coefficients derived from generated land cover map and recorded rainfall data. The approach was applied to the Tago River Basin in Mindanao, Philippines, primarily as a wayt to reconstruct and generate flood depth and velocity information during tropical storms Lingling (local name: Agaton) and Jangmi (local name: Seniang) in the year 2014. The framework also allows GIS-based impact assessment wherein the number of structures and area of land cover that were affected were quantified based on the simulated flood depths and velocities. 1. INTRODUCTION Flood hazard maps are important sources of information for flood preparedness as well as for planning and implementation of flood mitigation strategies, including vulnerability assessment of affected communities (FEMA, 2012).
    [Show full text]
  • G/AG/N/PHL/49 15 February 2018 (18-0988) Page: 1/16 Committee On
    G/AG/N/PHL/49 15 February 2018 (18-0988) Page: 1/16 Committee on Agriculture Original: English NOTIFICATION The following submission, dated 29 January 2018, is being circulated at the request of the delegation of Philippines. The notification concerns domestic support commitments (Table DS:1 and the relevant supporting tables) for the calendar year 2012. _______________ Table DS:1 DOMESTIC SUPPORT: PHILIPPINES REPORTING PERIOD: CALENDAR YEAR 2012 Current Total Aggregate Measurement of Support Total AMS commitment level Currency Current Total AMS (from Section I of Part IV of the Schedule) (from Section I of Part IV of the Schedule) (from attached Supporting Tables) 1 2 3 0 G/AG/N/PHL/49 - 2 - Supporting Table DS:1 DOMESTIC SUPPORT: PHILIPPINES REPORTING PERIOD: CALENDAR YEAR 2012 Measures exempt from the reduction commitment – "Green Box" Measure Type Name and description of measure with reference to criteria in Annex 2 Monetary value Data Sources Note PHP,thousand 1 2 3 4 2.General Services 2 (a). Research General research relating to particular products 2,992,419 2012 General Appropriations Act Subtotal: 2,992,419 G/AG/N/PHL/49 2 (b). Pest and disease control Pest and disease control, including plant and animal quarantine 73,415 2012 General Appropriations Act Subtotal: 73,415 - 2 (c). Training services General training services 319,217 2012 General 3 Appropriations Act - Subtotal: 319,217 2 (d). Extension and advisory services Extension and advisory services 4,493,190 2012 General Appropriations Act Subtotal: 4,493,190 2 (e). Inspection services Inspection services of particular products for health, safety, grading or 231,479 2012 General standardization purposes Appropriations Act Subtotal: 231,479 2 (f).
    [Show full text]
  • Lipcaaic O( :Ijr Fef Crrtarp EIGHTEENTH CONGRESS of the REPUBLIC of the PHILIPPINES First Regular Session 'If HUG 20 P2 ■-46
    lipcaaic o( :ijr fef crrtarp EIGHTEENTH CONGRESS OF THE REPUBLIC OF THE PHILIPPINES First Regular Session 'If HUG 20 P2 ■-46 S,E N A T E _ s. No. 9 ^ 2 RECEIVcDbV; Introduced by Senator Grace Poe AN ACT FOR THE PROTECTION, CONSERVATION AND REHABILITATION OF WATERSHEDS SUPPORTING THE NATIONAL IRRIGATION SYSTEM (NIS) TO ENSURE CONTINUOUS SUPPLY OF WATER FOR AGRICULTURAL PRODUCTION AND SELF-SUFFICIENCY IN FOOD AND PROVIDING FUNDS FOR THE PURPOSE Explanatory Note Water is essential to life and all living things. It is undisputable that without water, there can be no life. To plants, water is critical for growth and good production. Insufficiency in water can lead to low yields that would affect the food availability and sufficiency. The Philippines is an agricultural country with abundant river systems that can supply the water needs of the farming community, but the agricultural sector has suffered a lot due to the devastation caused by flash floods and rising levels of waters due to excessive surface run-offs from forests and other watersheds that can no longer be contained by the river systems. The damages wrought by the rampaging waters to agriculture and livelihood are immeasurable and what is worrisome is the occurrence of floods every year without letup. The changing weather patterns are being attributed to global warming and climate change is the simplest answer being given every time there is havoc brought about by the increasing volume of rainfall. While it may be true that we are experiencing the indirect effects of global warming, there are man-made actions that are directly contributory to the devastations brought about by flooding, e.g., man's insensitivity to his environment, the uncontrolled use of our forests and watersheds resources and the indiscriminate use of land resources that should have been reserved for forest use only.
    [Show full text]