Hampton Roads Transportation Project Priorities

Prepared by HRTPO Staff Revised March 21, 2013

2034 LRTP Regionally Funded Construction Projects Rank in 2034 LRTP Priorizaon Roadway Systems include Interstate, Primary, Urban. Priorizaon Locality Roadway Project Cost Category Funding is allocated according to roadway system. Scores System (in Millions) Primary Roadway System / Midtown Tunnel/MLK Extension Norfolk/ 1 242 $2,100.0 (Hampton Blvd to I‐264) Portsmouth Bridge & Dominion Blvd (0.05 mi N. of Great Bridge Blvd to 0.75 Tunnel Chesapeake 2 221 $426.0 mi. S. of Cedar Road) Projects Urban Roadway System

Lesner Bridge (E. Straord Rd to Page Ave) Beach 1 173 $89.00

Interstate Roadway System I‐64 Peninsula Widening (Jefferson Ave (exit 255) to Ft Newport 1 178 $260.1 Euss Blvd (exit 250)) News Primary Roadway System Route 17 (George Washington Memorial Hwy) (1.27 mi S. of Lakeside Dr. (Hampton Hwy) to 1.52 mi N. of York County 1 202 $32.7 Lakeside Dr (Dare Rd)) Route 460 ( poron) (Bowers Hill to Suffolk/Isle of 2 187 $1,3961 Zuni) Wight Route 17 (George Washington Memorial Hwy) (1.52 mi York County 4 146 $8.0 N. of Lakeside Dr (Dare Rd) to Denbigh Blvd) Urban Roadway System

Lynnhaven Pkwy (Indian River Rd to Centerville Tnpk) Virginia Beach 1 191 $20.4

Route 58 (Holland Rd) (Suffolk Bypass to 0.7 mi. W. Suffolk 2 180 $75.0 Highway Manning Bridge Rd) Projects Military Hwy at Northampton Blvd Connuous Flow Norfolk 6 157 $49.8 Interchange

Holland Rd (Nimmo Pkwy to Dam Neck Rd) Virginia Beach 10 141 $25.9

Witchduck Rd (I‐264 to Virginia Beach Blvd) Virginia Beach 11 141 $32.1

Laskin Rd (Republic Rd to Oriole Dr) Virginia Beach 21 114 $66.5

Indian River Rd (Lynnhaven Pkwy to Elbow Rd) Virginia Beach 23 109 $73.4

Newport Atkinson Blvd (Jefferson Ave to Warwick Blvd) 24 107 $10.0 News

Laskin Rd (Oriole Dr to 30th/31st St) Virginia Beach 31 100 $23.1

Elbow Rd/Dam Neck Rd (Indian River Rd to VA Beach Virginia Beach 35 98 $49.4 Amphitheater)

Urban Roadway System Intermodal Craney Island Connector (VA‐164 to Craney Island Projects Portsmouth 1 189 $436.0 Marine Terminal (Future)) 1 James City Transit WATA Administrave Operaons Center N/A N/A $9.0 County

Passenger Newport News Mulmodal High‐Speed and Intercity Newport N/A N/A $20.0 Rail Passenger Rail Staons Development News N/A ‐ Not evaluated in Priorizaon Analysis 1 Updated project cost for the enre Route 460 corridor from Suffolk Bypass to I‐295 in Prince George County/Petersburg. Source: Office of Transportaon Public‐Private Partnerships, VDOT, December 2012

2034 LRTP Locally Funded Construction Projects Rank in 2034 LRTP Priorizaon Roadway Systems include Interstate, Primary, Urban. Priorizaon Locality Roadway Project Cost Category Funding is allocated according to roadway system. Scores System (in Millions) Urban Roadway System Bridge & Tunnel Mills Godwin Bridge (Bridge Road) Suffolk 3 150 $60.0 Projects High Street (Churchland Bridge) Portsmouth 6 132 $23.0

Urban Roadway System

Seaboard Rd (Princess Anne to Nimmo Pkwy) Virginia Beach 7 155 $8.7

Bridge Road (Godwin Br to Chesapeake City Line) Suffolk 8 154 $90.0

Dam Neck Rd (Holland Rd to Drakesmile Rd) Virginia Beach 19 114 $34.8

Holland Rd (Rosemont Rd to Independence Blvd) Virginia Beach 20 114 $56.5

Dam Neck Rd (Drakesmile Rd to London Bridge Rd) Virginia Beach 22 109 $48.9

Indian River Rd (Centerville Tnpk to Ferrell Pkwy) Virginia Beach 26 104 $74.2

First Colonial Rd (Old Donaon Pkwy to Virginia Beach Virginia Beach 28 103 $51.0

Newtown Rd (Baker Rd to Virginia Beach Blvd) Virginia Beach 32 100 $23.5

West Neck Pkwy Ext'd (Elbow Rd to N. Landing Rd) Virginia Beach 36 98 $49.1

Centerville Tnpk (Indian River Rd to Kempsville Rd) Virginia Beach 39 97 $44.2

Rosemont Rd (Virginia Beach Blvd to Holland Rd) Virginia Beach 40 96 $86.9

Providence Rd (Kempsville Rd to Princess Anne Rd) Virginia Beach 44 92 $63.8

Centerville Tnpk (Kempsville Rd to Chesapeake CL) Virginia Beach 45 90 $28.6 Highway Projects General Booth Blvd (Oceana Blvd to Dam Neck Rd) Virginia Beach 52 86 $37.4

Ferrell Pkwy (Indian River Rd to Indian Lakes Blvd) Virginia Beach 57 82 $33.2

Lynnhaven Pkwy (Holland Rd to Princess Anne Rd) Virginia Beach 59 82 $92.7

Ferrell Pkwy (Indian Lakes to Pleasant Valley Rd) Virginia Beach 60 81 $42.3 Nimmo Pkwy (Indian River Rd & N. Landing Rd to West Virginia Beach 63 74 $41.1 Neck Pkwy Ext'd) Princess Anne Rd (Upton Dr to General Booth Blvd) Virginia Beach 67 70 $22.9

London Bridge Rd (Dam Neck Rd to Shipps Corner Rd) Virginia Beach 76 66 $40.8

Birdneck Rd (I‐264 to Virginia Beach Blvd) Virginia Beach 85 59 $21.1

Cleveland St (Witchduck Rd to Clearfield Ave) Virginia Beach 86 59 $13.6

Kempsville Rd Intersecon at Indian River Rd Virginia Beach N/A N/A $11.6

First Colonial Rd Intersecon at Virginia Beach Blvd Virginia Beach N/A N/A $28.2 2 Shore Dr (Marlin Bay Dr to E. Straord Rd (bridge Virginia Beach N/A N/A $14.8

Shore Dr (Page Ave to Great Neck Rd) Virginia Beach N/A N/A $12.9

Shore Dr (Pleasure House Rd to Treasure Island Dr) Virginia Beach N/A N/A $18.4

Passenger Harbor Park Mulmodal High‐Speed and Intercity Norfolk N/A N/A $6.0 Rail Passenger Rail Staon Development N/A ‐ Not evaluated in Priorizaon Analysis

2034 LRTP Ongoing Transportation Studies

I‐64 Peninsula Corridor

Patriots Crossing

Hampton Roads Bridge‐Tunnel

Southeastern Parkway and Greenbelt

High‐Speed and Intercity Passenger Rail

Virginia Beach Transit Extension

Route 60 Relocaon

Skiffes Creek Connector

Croaker Road

Longhill Road

Air Terminal Interchange

I‐64 Southside Widening (including High‐Rise Bridge replacement) Note: List of studies not in a prioritized order

Unfunded Projects for Future Consideration Rank in 2034 LRTP Priorizaon Roadway Systems include Interstate, Primary, Urban. Priorizaon Locality Roadway Project Cost Category Funding is allocated according to roadway system. Score System (in Millions)

Interstate Roadway System Newport News/ James City I‐64 (Ft Euss Blvd to Route 199/exit 242) 1 178 $7791 County/York Highway County Projects Interstate Interchange System

I‐64/I‐264 Interchange (including Witchduck Norfolk/ 3 192 $270 Interchange) Virginia Beach

I‐64 Interchange Improvement at Ft Euss Blvd1 Newport News 8 149 $134

Bridge & Interstate Roadway System Tunnel I‐64 Southside Widening (I‐64/I‐464 to I‐64/I‐664 at Projects Chesapeake 8 160 $1,0802 3 Bowers Hill) 1 Updated cost esmate for the enre project corridor from I‐664 in Hampton Roads to I‐95 in Richmond is $4,700 Million ‐ $7,300 Million. Source: VDOT Dra EIS, October 2012 2 Updated planning level cost esmate for the enre I‐64 corridor from I‐464 interchange to I‐664/I‐264 at Bowers Hill is $870 Million. The cost esmate includes $500 Million to replace the ; It does not include the interchange work at I‐464 or Bowers Hill. Source: VDOT, October 2012

Transportation Projects included in the 2034 Fiscally‐Constrained LRTP Hampton Roads Transportation Project Priorities

Funded Ongoing Studies To Richmond/I-295 "/ Interchange Studies

Roadway Studies

Multimodal Studies J ames City County Gloucester County Funded Projects for Construction

§¨¦64 !. Planned Intersection Projects 199 OP ¤p Planned HSIPR Stations Williamsburg p£ p£ Planned Transit O&M Center York County Planned Roadway Projects ut60 Committed Roadway Projects "/ Committed Rail Projects "/ Committed Interchange Projects ¤p Poquoson !. Committed Intersection Projects Newport News Unfunded Projects for Future Consideration

Hampton"/ "/ Interchanges for Consideration

Roadway Projects for Consideration ¤p

258 «¬ ut13 10 "/ «¬ ¨¦§564 Norfolk IsleIsle OfOf WightWight CountyCounty ¦¨§664 "/

¤p "/ ¦¨§264!. !. ut460 Portsmouth To Petersburg/I-295 ¦¨§264 !. §¦¨464

tu58 ut460 §¨¦64 Virginia Beach

Suffolkut58 ut13 Chesapeake 168 ut17 OP 4 Miles 0361.5 Note: The alignment of any project is not set until the final design is completed. Prepared by HRTPO Staff

2034 Vision Plan Unfunded Projects

5

2034 Vision Plan—Unfunded Highway Projects

Estimated Cost of Project (YOE**) Project Name From To Locality Prioritization Score (in Millions) Southeastern Parkway I‐264 Chesapeake Expy Multi 180 $2,500 I‐64 Peninsula Widening Route 199 (Exit 242) Fort Eustis Blvd (Exit 250) Multi 178 $7791 Route 60 Relocated Newport News CL Blow Flats Rd JCC 140 $34 Route 60 Relocated Fort Eustis Blvd James City CL NN 135 $29 Mt. Pleasant Road, Chesapeake Expy Etheridge Rd CHE 134 $26 Phase 1 Cedar Road Albermarle Dr Battlefield Blvd CHE 121 $10 I‐64 North Peninsula Route 199 (Exit 242) New Kent County Line Multi 119 $1,0982 Widening J. Clyde Morris Blvd I‐64 York CL NN 114 $48 (Route 17) Route 17 (G.W. Route 171 (Victory Newport News CL YORK 109 $15 Memorial Highway) Boulevard) Route 17 (G.W. Route 173 (Denbigh Route 105 (Fort Eustis YORK 109 $17 Memorial Highway) Boulevard) Boulevard) Route 17 (G.W. Route 171 (Victory Hampton Highway YORK 108 $12 Memorial Highway) Boulevard) Route 17 (G.W. Route 105 (Fort Eustis Coleman Bridge YORK 106 $78 Memorial Highway) Boulevard) Route 171 (Victory Route 134 (Hampton Poquoson CL YORK 106 $26 Boulevard) Highway) Virginia Beach Blvd Glenrock Rd Newtown Rd NOR 104 $85 Mt. Pleasant Road, Etheridge Rd Centerville Tnpk CHE 103 $20 Phase 2 Route 17 (G.W. 1 mi North of Coleman Main Street GLO 102 $89 Memorial Highway) Bridge Oyster Point Road Jefferson Ave Warwick Blvd (Rte 60) NN 101 $65 Brambleton Ave Midtown Tunnel I‐264 NOR 100 $76 Jefferson Avenue (Route Green Grove Lane Fort Eustis Blvd (Route 105) NN 99 $29 143) Hampton Blvd 21st St 38th St NOR 98 $27 Little Creek Road Tidewater Dr Shore Dr NOR 97 $113 Victory Blvd Wythe Creek Rd York CL POQ 97 $11 South Independence Holland Rd South Plaza Trail VB 96 $22 Blvd Route 17 (George Route 171 (Victory Route 134 (Hampton Washington Memorial YORK 95 $4 Boulevard) Highway) Highway) Independence Blvd Haygood Rd Northampton Blvd VB 94 $98 Princess Anne Road Providence Rd Salem Rd VB 94 $17 Dam Neck Road Princess Anne Rd Holland Rd VB 90 $31 Liberty Parkway (Patrick Oyster Point Rd Freedom Way NN 89 $5 Henry Place) Shore Drive Norfolk CL Diamond Springs Rd VB 88 $6 South Church Street Battery Park Rd Talbot Dr IoW 87 $12 Denbigh Blvd (Route Independence Blvd Fort Eustis Blvd (Route 105) NN 87 $12 173) Rosemont Road Buckner Blvd Lynnhaven Pkwy VB 87 $13 Newtown Road Virginia Beach Blvd Curlew Dr NOR 86 $129 6 Ironbound Road (Rt. Richmond Road Longhill Connector WBG 86 $4 615) Hanbury Road Johnstown Rd Battlefield Blvd CHE 85 $16 Ongoing Transportation Study 1,2 Updated cost estimate for the entire I‐64 project corridor from I‐664 in Hampton Roads to I‐95 in Richmond is $4,700 Million ‐ $7,300 Million. Source: VDOT Draft EIS, October 2012 **YOE ‐ Cost estimates are expressed in Year‐0f‐Expenditure (YOE) dollars.

2034 Vision Plan—Unfunded Highway Projects (Cont.)

Estimated Cost of Project (YOE**) Project Name From To Locality Prioritization Score (in Millions) General Booth Blvd Princess Anne Rd Dam Neck Rd VB 84 $117 North Great Neck Road Virginia Beach Blvd Wolfsnare Rd VB 84 $27 Ferrell Pkwy Pleasant Valley Rd Salem Rd VB 82 $31 Coliseum Drive Coliseum Dr at Sentara Armistead Ave HM 80 $4 Connector Mooretown Road Northern Terminus of Rochambeau Dr/Croaker Rd JCC 76 $16 Extension Mooretown Rd Route 17 (G.W. Main Street Ark Rd GLO 75 $35 Memorial Highway) Holland Road Dam Neck Rd Rosemont Rd VB 75 $57 US 258 Widening US 460 Sunset Dr IoW 71 $12 Laskin Road Great Neck Road Republic Rd VB 71 $47 Sandbridge Road Princess Anne Rd Atwoodtown Rd VB 71 $40 Constitution Dr East Crossing of I‐264 South Independence Blvd VB 70 $117 (Extension) West Neck Road North Landing Rd Indian River Rd VB 69 $5 Shoulders Hill Road Nansemond Pkwy (Route Bridge Rd (Route 17) SUF 68 $41 (Route 626) 337) West Crossing of I‐264 Aragona Blvd Bonney Rd VB 68 $51 General Booth Blvd Birdneck Rd Oceana Blvd VB 67 $37 Salem Road Elbow Rd Independence Blvd VB 67 $20 Virginia Beach Blvd I‐264 First Colonial Rd VB 67 $75 West Neck Pkwy Ext'd North Landing Rd Indian River Rd VB 67 $16 Butts Station Road Kempsville Rd Centerville Tnpk CHE 66 $21 Battery Park Road S. Church Street Nike Park Road IoW 66 $146 Route 17 (G.W. Sawyers Mill Rd Moses Grandy Trail CHE 65 $11 Memorial Highway) Jeanne Street Constitution Dr Independence Blvd VB 65 $7 Skiffes Creek Connector Green Mount Pkwy Route 143 JCC 64 $35 (Rte 60/143 Connector) Intersection Waters Road Phase 2Old Vintage Rd Johnstown Rd CHE 63 $16 North Lynnhaven Road Kings Grant Rd Virginia Beach Blvd VB 63 $10 Silina Drive Rosemont Rd South Lynnhave Rd VB 63 $19 Woodlake Drive Woodlake Dr Battlefield Blvd CHE 62 $6 Extended South Lynnhaven Road Virginia Beach Blvd Lynnhaven Pkwy VB 61 $11 Dominion Blvd (US 17 Airport Access Road West Rd CHE 59 $12 South) Princess Anne Road Sandbridge Rd Indian River Rd VB 56 $31 Harpersville Road Warwick Blvd (Rte 60) Jefferson Ave NN 55 $122 Indian River Road Elbow Rd North Landing Rd VB 55 $131 7 Waters Road Phase 1 Washington Dr Old Vintage Rd CHE 50 $12 Indian River Road West Neck Rd North Landing Rd VB 48 $43 Salem Road Elbow Rd North Landing Rd VB 47 $57 Seaboard Road Princess Anne Rd (North) Princess Anne Rd (South) VB 46 $59 Ongoing Transportation Study **YOE ‐ Cost estimates are expressed in Year‐0f‐Expenditure (YOE) dollars.

2034 Vision Plan—Unfunded Highway Interchange Projects Estimated Cost of Project Prioritization Project Name From To Locality (YOE**) Score (in Millions) I‐264/Witchduck Interchange NA NA VB 192 $173

I‐264 EB Ramp from I‐64 WB Curlew Dr Witchduck Rd Multi 179 $97 I‐264/Independence Blvd NA NA VB 168 $250 Interchange I‐64/464 Interchange I‐64 EB / Battlefield Blvd I‐464 NB CHE 154 $19 Air Terminal Interchange NA NA NOR 150 $23 I‐64 @ Ft. Eustis Blvd NA NA NN 149 $134 I‐264/Lynnhaven Interchange NA NA VB 145 $140 Phase II I‐64 Interchange @ Bland NA NA NN 141 $129 Blvd/Denbigh Blvd I‐64/City Line Interchange and I‐64 Centerville Tnpk Multi 114 $105 Arterial Chesapeake Expressway Interchange @ Mt. Pleasant NA NA CHE 102 $26 Road Northampton Blvd/Shore Dr NA NA VB 99 $33 Interchange I‐64 @ Military Hwy Northbound I‐64 Eastbound NOR 80 $29 I‐664/Terminal Avenue I‐664 at Terminal Interchange Jefferson Ave via 12th St. NN 65 $18 Interchange Ongoing Transportation Study Project for Future Consideration **YOE ‐ Cost estimates are expressed in Year‐0f‐Expenditure (YOE) dollars.

2034 Vision Plan—Unfunded Bridge & Tunnel Projects

Estimated Cost of Project (YOE**) Project Name From To Locality Prioritization Score (in Millions)

Patriots Crossing I‐564 I‐664 & VA‐164 Multi 221 $2,9322

HRBT/I‐64 (8‐lane) I‐64 / I‐664 Coliseum Junction I‐64 / I‐564 Junction Multi 208 $4,0001

Third Crossing: I‐664 I‐64 / I‐664 Coliseum Junction I‐64 / I‐664 Bowers Hill Junction Multi 179 $2,462 Widening

MLK Freeway extension I‐264 I‐464 POR 176 $883 to I‐464

Fort Eustis Blvd Bridge Replacements over Lee Warwick Blvd I‐64 NN 166 $6 Hall Resevoir

I‐64 Southside Widening (includes High‐Rise I‐64 / I‐464 Junction I‐64 / I‐664 Bowers Hill Junction CHE 160 $1,0803 Bridge replacement) Kings Highway Bridge Governors Wharf Lighthouse Drive SUF 139 $90 Warwick Blvd Bridge 8 Replacement over Lake Gatewood Road J. Clyde Morris Blvd NN 135 $7 Maury Ongoing Transportation Study

1 Updated cost estimate for the entire project is $4,800 Million to 7,900 Million. Source: VDOT Draft EIS, December 2012. 2 Updated cost estimate is $3,122 Million ‐ $4,224 Million. Source: VDOT website. 3 Updated planning level cost estimate for the entire I‐64 corridor from I‐464 interchange to I‐664/I‐264 at Bowers Hill is $870 Million. The cost estimate includes $500 Million to replace the High Rise Bridge; It does not include the interchange work at I‐464 or Bowers Hill. Source: VDOT, October 2012 **YOE ‐ Cost estimates are expressed in Year‐0f‐Expenditure (YOE) dollars.

2034 Vision Plan—Unfunded Intermodal Projects Estimated Cost of Project Prioritization Project Name From To Locality (YOE**) Score (in Millions) Route 13/337 E Finney Ave Flyover Pinner St SUF 139 $25 Washington St Hampton Blvd (Route 337) Interchange ‐ Trouville Hampton Blvd NOR 115 $204 Int'l Terminal Blvd Gate Improvement Ave/Portor St

**YOE ‐ Cost estimates are expressed in Year‐0f‐Expenditure (YOE) dollars.

2034 Vision Plan—Unfunded Transit Projects

Prioritization Estimated Total Capital Cost of Project Name From To Locality Score Project

VB Fixed Guideway Norfolk CL @ LRT Oceanfront VB 204 *See note below Transit Project1 terminus Naval Station Norfolk Fixed Guideway Transit Newtown Road Naval Station Norfolk NOR 187 n/a Project Naval Station Norfolk Fast Ferry Service Newport News NN 130 n/a and Norfolk Waterside

Peninsula Fixed Christopher Newport Guideway Transit Huntington Pointe NN 113 n/a University Project (A3 Alignment)

Peninsula Fixed Newport News City Guideway Transit Denbigh Blvd NN 111 n/a Hall Project (A1 Alignment) Ongoing Transportation Study

* Initial preliminary capital costs for the fixed guideway (light rail & bus rapid transit) alternatives between Newtown Road and Oceanfront via NCRR ROW are $807 Million for Light Rail and $450 Million for Bus Rapid Transit. The costs are no longer current and are being refined as part of HRT's Virginia Beach Transit Extension Study (VBTES) . Source: HRT website

2034 Vision Plan—Unfunded Passenger Rail Projects Estimated Total Capital Cost of Prioritization Project Name From To Locality Project (YOE**) Score (in Millions) High‐Speed and Intercity Richmond Hampton Roads Multi N/A $785 (Tier I FEIS) Passenger Rail 9 Ongoing Transportation Study **YOE ‐ Cost estimates are expressed in Year‐0f‐Expenditure (YOE) dollars.

HRTPO Staff

Dwight L. Farmer, P.E. Executive Director/Secretary

Camelia Ravanbakht, Ph.D. Deputy Executive Director

LRTP Team Pavithra Parthasarathi, Ph.D., P.E. Principal Transportation Engineer

Dale M. Stith, AICP, GISP Senior Transportation Planner

Theresa Jones Transportation Engineer

Public Involvement Team Kendall L. Miller Public Involvement & Title VI Administrator

Brian Chenault Community Outreach Planner

Brian Miller Web & Graphics Designer

Voting members include a representative from the following: an elected official from each locality, listed in the map:

*A portion of Gloucester County is included in the metropolitan planning area. Public

Transit 64 Agencies

Williamsburg Area 64 Transit Authority State 64

564 Agencies 664

Virginia Department 64 of Transportation 264 264

264 464 Virginia Department 64 64 of Rail and Public Transportation

Virginia Port Authority Virginia General Non-Voting members include Assembly a representative from the following: Two Members of Chief Administrative Officers Virginia Department of Aviation Freight Transportation Advisory for all Member Localities Committee the Virginia Senate Peninsula Airport Authority Federal Highway Military Liaisons Two Members of Administration Norfolk Airport Authority Invited Participants from the the Virginia House Federal Transit Administration Citizen Transportation Advisory Commonwealth Transportation of Delegates Federal Aviation Administration Committee Board