_. .. ' GREATER MUNICIPAL CORPORATION

From: To The PIO & Executive Engineer, Sri Kareem Ansari, Project Division SZ-I, Yugantar (6ZAGSCV3), 5th Floor, Parking Complex, H. No. 3-4-142/6, , Abids, GHMC, Hyderabad - 500027, HYDERABAD.

Lr.No: ~6~ /EE /PD SZ-1 / GHMC / 2018-19 Dated: t ~ .12.2018

Gentleman,

Sub:- GHMC - Engg - EE PDSZ-1 - RTI application of Sri. Kareem Ansari - Information regarding the GHMC works carried out in Chandrayanagutta Constituency since 2014 to till date - Section 6(3) of RTI Act, 2005 - Reply furnishing - Reg. Ref: 1. Your RTI Application dated: 24.10.2018 addressed to The P.1.O, O/o The Commissioner, GHMC, State. 2. ENDT. No.1999/RTI/CE(P)/GHMC/K 11/2018/44, dt.20-11-2018, of PIO/ Dy. CE (P), 0/ o Chief Engineer (Project), GHMC. * * * * * With reference to the subject cited above, the reply for the information sought under RTI Act, 2005, the list of works carried out in Chandrayangutta Constituency since 2014 to till date along with expenditure is herewith enclosed in detail.

~v-\\V- PIO & Executive Engineer, Project Division SZ-I GHMC Copy submitted to:

1. The PIO/Dy.CE (P), GHMC for favour of information. I 2. The Superintending Engineer, (P)SZ, GHMC for favour of inforamtion. ,. ·- Details of the works taken up since 2014 to till date in Chandrayanagutta Constituency

Estimate Expenditure S No Name of the work Amount Status of work (Rs.in Lakhs) (Rs. In Lakhs) 2014-15 Construction and Repair to the Footpath from to I 16.00 Completed 11.49 Chandrayangutta via , Falaknuma, GHMC

Providing BT Road from Chandrayanagutta flyover on both side left 2 38.00 Completed 33.66 and Right side service roads. Providing Road Markings from Charrninar to Chandrayangutta Fly 3 27.00 Completed 24.30 - Over, GHMC

Repair and rectification of existing damaged BT Road surface from 4 49.00 Completed 43.01 Charminar to Chandrayangutta via Laldarwaza, Falaknuma, GHMC

Junction Improvement works at 5 Junctions in Chandrayanagutta Constituency by construction of footpath wath kerbing, rectification 5 8.90 Completed 7.18 of road damages, Zebra Crossing paintinB, road marking and providing raliing, PD SZ-1, GHMC Provrding BT road on main road under junction improvement work 6 49.95 Completed 39.53 at Phisalbanda (Midhani) on Inner Ring Road, GHMC Provrding BT road on both rervice roads under Junction 7 improvement work at Phisalbanda (Midhani) on Inner Ring Road, 38.00 Completed 31.37 GHMC 2015-16

Providing Footpath & Road Marking underJunction Improvement at 8 7.00 Completed 4.96 Phisalbanda {Midhani) on Inner Ring Road, GHMC, Hyderabad. Laying of CC Road in the widened portion from Zahra. Bee Dargah 9 to DRDL via Kummarwadi, Habeeb Nagar, Rakshapuram in the left 99.50 Completed 60.56 side between Ch.0.0 to Ch.900.0 mts Providing BT Road on Right side under Junction Improvement work 10 35.00 Completed 23.85 at Owaisi Hospital on Inner Ring Road , GHMC

Providing Footpath & Road Marking under Junction Improvement at 11 6.00 Completed 4.03 Owaisi Hospital on Inner Ring Road, GHMC, Hyderabad

Laying of CC Road in the widened portion I 12 H.No.16-I-487/AtoGandH.No.16-1-487/1 from 9.45 Completed 5.70 Jn.to Madannapet Grave Yard Laying of CC Road in the widened portion H.No. 17-2-594/7, H.No16-2-16/5 to 12 and H.No. 16-1-524/8 13 9.85 Completed 5.92 from Chanchalguda Jn.to Madannapet Grave Yard Recarpeting of BT Roads in the various locations of 14 305.00 Progress 35.32 Chandravanazutta Assembly Constituency Construction of Multilevel Flyover/ Grade Separator at Owaisi 15 Hospital Junction in Hyderabad under Engineering Procurement and 6,300.00 Progress 218.33 construction (EPC) Turnkey (Package V) Construction of Flexible pavement in the widened portion from 16 Chandrayanagutta flyover to Pilli Dargah (Barkas - Srisailam Road) 314.00 To be started - Balance work 2016-17 Formation of CC Road from T Jun.to IS Sadan Jn.left side 17 50.00 Completed 26.34 of the road Widenign places Layng of CC Road and Construction of Retaining wall from Laad 18 Eazar (Julu Khana)to Mitikasher under Charminar Pedestrianisation 32.50 Completed 28.84 Project .>'

Estimate Expenditure S No Name of the work Amount Status of work (Rs.in Lakhs) (Rs. In Lakhs) Laying of CC road in the widened portion from Zohra Bee Dargah to DRDL, via Kumarwadi, Habeeb Nagar, Rakshapuram in both left & 19 196.00 Completed 148.62 Right side between Ch. 900mts to Ch. 1800.0mts

2017-18

Formation of CC Road and Footpath in the widened portion from 20 590.00 To be started - Habeeb Nagar to DRDL (Via) Rakshapuram proposed 60' wide road I Formation of CC Road in the widened portion from Zohra bee 21 dargah to Habeeb Nagar via Kumaarwadi, between Ch 0.0m to Ch 96.00 Progress 27.80 1370.0m (left over portions)

Formation of CC Road and Footpath in the widening portion from 22 junction on Balapur road in hafeezbaba nagar"C" block to DRDO 595.00 To be started - compound wall for proposed 60' wide road Construction of East side retaining wall & balance boundary wall of 23 360.00 Progress - Multi Purpose stadium at Bandlaguda (Khalsa) Construction of balance 4th, 5th floor & terrace floor of the south 24 zone office building in survey No. 142 T.S.No. 6, Block-I, Ward 580.00 Progress - 279 at Kandikal Village Bandlazuda Mandal.. 2018-19

Extension of existing Grade Separator at Chandrayanagutta to the 25 3,700.00 To be started - Junction of Barkas Road - Kandikalgate and Inner Ring Road

~~>::~\\V Execu~e Engineer, PDSZ-1, GHMC ~(Y