AIJAZ IQBAL Contact No.:0300-8230089,| E- Mail:[email protected]

~MECNANICAL ENGINEER~

~ Credibility backed by proven ability to adapt and work effectively within a variety of situations including changes in job demands; changing or competing priorities ~

~ Ability to understand complex situations, tasks or problems, analyze them using a systematic approach and identify patterns and connections between situations that are not inherently obvious ~

PROFESSIONAL SUMMARY Role of Expertise  Over 16 years of experience in the field of mechanical construction  Study and installation & commissioning knowledge of codes and standards - API-  Projects Management activities including preparation of proposals, 650, API-620, API- Project execution plan & Project Procurement Plan. Collaborate with the 1104, ASME SEC, V, VIII, IX ANSI B.31.3. company core group of management to develop and execute strategic  ASME Section business plans, operational goals, and performance metrics that drive II,V,VIII & IX productivity and ensure a high level of satisfaction. Devise, plan, and implement to improve performance such as quality, productivity, timely  ISO 9001:2008, staffing/recruitment, training, attrition and costs at various 14001:2004 projects/assignments.  OHSAS 18001:2007  Identify, analyze and resolve a wide range of technical, process and operational challenges or issues, by providing quick and decisive  Level II in Magnetic solutions. Assures that contract compliance, documentation and Particle Testing information is up to date and cascaded to all levels of the relevant from ASNT as per business area. Takes a lead role in communicating with clients, in SNT-TC 1A matters of support, performance, reporting, billing, systems, business  Level II in Radiography development and complaints Key Roles Testing from ASNT as per SNT-TC 1A  Mechanical construction / Fabrication, Welding, Erection, Equipment’s,  Level II in Ultra Installation and check of heavy industrial process equipment / piping. Sonic Testing from  Familiar with NDT techniques, Sandblasting / Painting, Insulation, ASNT as per SNT-TC Equipment, Grouting, Storage tanks calibration, Hydro testing, etc. 1A  Experience of the, Monitoring of Construction Work, Preparation of the

Fabrication procedures, Preparation of the Q.C plan/ Inspection Documents, Work preparation documents, Correspondence with clients, Deal with Sub contractors.

CAREER OVERVIEW

 AUGUST 2016- Till date with Ghulam Farooq Group (Greaves Air-conditioning) as Manager Projects–

 I have been working as Manager projects & Staffing Services with below job responsibilities:

 Responsible for execute the activities of Mechanical & Plumbing Services & Equipment as per standard & specification.  Testing, Commissioning & Performance of VCD’s, VCA’s,VAV’s,FAHU’s, FCH’s, AHU’s, Pumps, Chillers & Cooling Towers as per specifications.  Prepare Technical Submittals & Shop Drawings.  Responsible to control and monitor project total expenditure including verifying and checking of invoices and claims from suppliers, vendors and subcontractors to ensure that all project expenditures are captured and properly recorded.  Provide planning and cost controlling support for all projects which includes variation reporting, monitoring of milestone progress to the preparation of customer billing processes, etc  Updating Programmed & Tracking project progress, highlighting the outcomes of update and communicating it with operations team.  Preparing Project Dashboard, Weekly/Monthly Project progress reports.  Planning and Execution of Project.  Installation of Air conditioning and ventilation system.  Up gradation of ventilation and air conditioning system. Coordinating between head of clients/Consultants/Contractors for successful completion of jobs and induction and termination of staff.  To supervise the construction in terms of proper method, material reservation and optimum output of labor.  To give full and extensive instruction to the team.

  To execute the works according to the latest approved revision of drawings and /or instruction of authorized authorities.  Analyzing and resolving field problems.  Reporting to management  Materials take off from contract drawings  Knowledge of local authority rules and regulations.  Committed to DSI HSE requirements and all applicable legislations and contractual requirements affecting the HSE activities at project site and administrative offices.  MEP services, follow up of material, testing and commissioning all the equipment.

PREVIOUS EMPLOYMENT  October 2007 - August 2016 with Descon Engineering (Pvt.) Ltd as Deputy Manager Projects

 Deputy Manager Projects at Metro, & Yunus Wind Power Projects

 Metro Wind Power Company Limited & Gul Ahmed Wind Power Limited is a subsidiary of Metro Group of Companies. Metro Group of Companies was setting up a 50MW each wind farm at Jhampir District Thatta, Sindh. My duties & responsibilities include:  Design review and implementation of technical documents/specifications, drawings of BOP and other mechanical equipment’s in accordance with specifications and as per contract & original equipment manufacture’s recommendations & international standards  Responsible for supervising & monitoring erection & commissioning activities of Wind Turbine Generator (WTG) & complex  Responsible for monitor and supervising manufacturing of WTG tower and ensure that manufacturing is done as per WTG manufacture recommendations & approve design.  Responsible for implementation and monitoring of all mechanical works related works at site  Responsible for site inspections, preparing reports and their documentation.  Responsible to coordinate with site team, and third party for inspections and testing of equipment as per protocol.  To ensure that all the work done are in accordance with the approved construction drawings, contract documents, project specifications, and all applicable standards.

 Worked for FFCEL & FWEL Wind Power Projects

 It is certainly an honor for me to work on ’s first wind power project that turned out to be a success in the first place. I contributed a lot since it was the first project of its kind so I worked with well establishing new set of jobs/procedures regarding erection, supervision, material handling, site handling, codes and standard compliance, abiding by the HSE parameters and became one of the skilled engineers who climbed up the wind turbine personally to kill all the punch list points, shortcomings and technical fabrication related issues raised by client, inspected and witnessed them as well  To look after the fabrication of Wind Tower, Fit up and welding of shell courses as per drawing, procedures and technical specifications.  To quantify and measure the progress of the work.  To produce daily and weekly activity, manpower and equipment reports.  Able to communicate fluently and clearly in English with clients, site foremen regarding technical matters.  Able to make recommendations to superiors where improvements in quality or project effectiveness may be made.  Coordinate with production department to ensure timely completion of project without compromising with the quality performance of project.  To countercheck all the inspection activities to keep surveillance on production department.  Ensuring implementation of project quality inspection plan (QIP)  To prepare monthly report showing gap analysis between planned and actual.  To prepare variance report, monitoring and controlling of project and progress status well in time.  To conduct final visual & dimensional inspection of wind towers.  To validate consistency of welding and inspection data.  Taking care of issuance of welding electrodes, sub arc flux for welding processes like MAG, SAW, and SMAW.  To supervise the Fit up of internal sockets of platforms, ladders, cable trays, attachment points etc.  To coordinate the NDT activities of Wind Tower welding such as MPI, UT and RT.  To coordinate the execution of Grit Blasting of Wind Tower sections and painting activities.  To supervise the installation of Wind Tower Internals such as platforms, ladder, cable, trays and bolt torqueing of ladder, holder and platforms.  Detailed coordination and progress monitoring to head office in (WPS, PQR, Fit up, Welding, Dimensions, DPT, VT, UT, RT, Testing, Blasting, painting, internals installation and dispatch of tower sections.

  Worked For MOL Pakistan Oil & Gas Co.B.V through PDIL

 Worked for MOL Pakistan Oil & Gas Co. B.V. as a Sr.Engineer QA/QC since November 2008 to 2010 MOL intends to develop Manzalai Field by installing a Gathering system and Central Processing Facility (CPF) for the production and sale of natural gas and condensate. This new CPF consists of two trains of gas, produced water and condensate treatment facility with a total design capacity of 300 MMSCFD.

 Responsibilities:

 Inspection of piping, Vessels fabrication and erection according to the specification and Codes, B31.3  Monitor welding activities to ensure work is being carried out in accordance with the approved welding procedures.  Inspection of surface preparation, coating and passivity Installation & pre-commissioning inspection of stationary equipment, rotary equipment and structural steel.  Implementation of codes, standards & quality inspection plans  Welding & Fabrication of storage tanks according to API 650  Witness of Welder Qualification Test (WQT) according to ASME IX

 June 2007 - November 2008 with Zeeshan Engineers (Pvt) LTD as Project Coordinator

 . Worked For TOTAL PARCO Bulk Oil Terminal Machike / TOTAL Lubricant Blending Plant

Worked for Total Parco Bulk Oil Terminal Machike Sheikhupura since June 2007 to November 2008 as Project coordinator deputed at TOTAL PARCO, Machike oil Terminal,Machike Sheikhupura.

 November 2006 – May 2007 with Bhpbillition Petroleum Pty Limited as Inspection Engineer

 Worked For Bhpbilliton Petroleum (Pvt). Ltd

 Worked for Bhpbilliton Petroleum (pty) (ltd) as a QA/QC Engineer for Phase 2 Project Zamzama Gas Plant Dadu, since November 2006 to May 2007

 Responsibilities:

 To ensure that the manufacturing of all equipment’s like vessels, heat exchangers, Fin fan coolers, skids and associated piping, prefabrication of spools and steel structure shall performs QA/QC activities in compliance with contract requirements.  Coordinate with production department to ensure timely completion of project without compromising with the quality performance of project.  To ensure proper maintenance and update calibration record of measurement apparatus/equipment.  To ensure material traceability with MTC.  Witnessed and reviewed all NDT activities.  To verify the all inspection activities with Field installation checklist before commissioning of any system of the plant.  To verify reinstatement work after hydro-testing.  To verify punch list items before & after commissioning.

 November 2005 – December 2006 with Shell Pakistan Limited as site coordinator

 Worked For SHELL Pakistan (Limited)

 Since 1st Nov 2005 to Dec 2006 as a site engineer deputed at DP installation Shell Keamari. I have attended Shell permit to work system at keamari Karachi and authorized for controlling the project activities at site. I have been involved in following projects at shell.  Demolition and reconstruction of HSD storage tank dia 118 fit height 44.5 fit and dia 120 fit and height 44.5.  Rehabilitation and construction of 16”& 8” diameter pipeline.  Maintenance and repair of different diameter tanks valves, pumps & generators.  Project Planning & execution

 August 2004 – November 2005 with Alstom Pakistan formally AEG as Production Engineer

 Worked For Alstom Pakistan Pvt. (Ltd) formally AEG Pakistan (Pvt). Ltd

 Since August 2004 to Nov 2005 as a Production Engineer. Here I was responsible for the construction of 132kv grid station, installation of H.V L.V panel testing commissioning.  Involved in panel manufacturing, coordination with clients.

  Worked for Moody International ((Pvt). Ltd

 Worked for MOODY INTERNATIONAL (pvt) (Ltd) since January 2004 till July2004.  Here I was responsible for the coordination of all the Quality related activities as per QIP and standards requirement, with the client, subcontractors and inspectors.  Progress Monitoring of the Project, Human Resource for the Project, Preparation and presentation of Quality reports to clients monthly invoicing and billing.

 Worked For PARCO Wopp White Oil Pipeline Project

Worked for Papco Wopp (White oil pipeline project) since Feb 2003 till December 2004 as QA/QC Engineer and deputed at Pumping Station White Oil Pipeline Project (PAPCO) Here I was responsible for the coordination with client to ensure the execution of work as per specification and standards. WQT, preparation of WPS. Inspection of storage tanks as per API 650, Welding Inspection as per ASME SECTION IX, Preparing Weekly Progress Monitoring.

 Worked for BOSICOR Oil Refinery Pakistan (Pvt). Ltd

Worked for BOSICOR OIL REFINERY (Pvt) (Ltd) since Jan, 2002 till Feb, 2003 and deputed at Bosicor oil refinery project as QA /QC Engineer. My job included Inspection, Progress Monitoring, Preparing weekly progress report, Quality Control, according to specification, Drawings API-650, API-620, ASME SEC IX and test of the tanks like, VBT, OPT, X-RAY, DPT, Performance of EXTERNAL FLOATING ROOFS, INTERNAL FLOATING Roofs, Seal Installation, Peaking, Bending, Welding Quality, Hydro testing, Sand Blasting/Painting, Insulation, Calibration and other test as per requirement of Code/Standards. External floating roof type tanks diameter 30.48m and 14.61m height for storage of crude oil.

 PROJECTS HANDLED  ASTOLA PROJECT (GETZ PHARMA PVT. LTD)  Metro, Gul Ahmed & Yunus Wind Power Projects  FFCEL & FWEL Wind Power Projects  MOL Pakistan Oil & Gas Co.B.V  TOTAL PARCO Bulk Oil Terminal Machike / TOTAL Lubricant Blending Plant Karachi  Bhpbilliton Petroleum (Pvt). Ltd  SHELL Pakistan (Limited)  Moody International ((Pvt). Ltd  PARCO Wopp White Oil Pipeline Project

 PROFESSIONAL ENHANCEMENT

 Level II in Magnetic Particle Testing from ASNT as per SNT-TC 1A  Level II in Radiography Testing from ASNT as per SNT-TC 1A  Level II in Ultra Sonic Testing from ASNT as per SNT-TC 1A  Permit to work system Training at Shell Pakistan limited.  HSSE Training at Shell Pakistan limited.  Attended the different HSSE related Courses from BP Pakistan (pvt) (ltd).  On job training in various departments of Shell Pakistan limited.  HSSE Management  HSSE Organization, Responsibilities & Resources  Safety at Site  Contractors -HSSE  Firefighting requirement  Good Team Leader & player

 Credentials  2002 B.E Mechanical from MUET Sindh Pakistan

 Date of Birth: 1st October, 1976|| Linguistic Abilities: English, Urdu,Punjabi & Sindhi  Address: House No: A-11, Semorina Apartment, Block –13 A Gulshan-e-Iqbal, Karachi