Jsw Salem Works
Total Page:16
File Type:pdf, Size:1020Kb
JSW SALEM WORKS EXECUTIVE SUMMARY for Expansion of Special Alloy Steel plant from 1 to 1.3 MTPA & Captive power plant from 67 to 97 MW at Mecheri, Mettur Taluk, Salem District - Tamilnadu MECON LIMITED (A Govt . of India Enterprise) BANGALORE MEC/Q76L/01/S2/R0 November 2015 6 ; ;;6;; 6; 6 6 E E 6;E 6 6 ; ; 6E; ;; S 6E; UV ;; 6E; Z 6 1 Total Existing Proposed Capacity Capacity Manufacturing Facilities Expansion after (MTPA) (MTPA) Expansion (MTPA) 1.0 Coke Oven Plant -1 (Non – Recovery 0.50 - 0.5 Type ) 2.0 Sinter Plant – 1 (20 Square Meter) 0.175 - 0 2.1 Sinter Plant – 2 (90 Square Meter) 1.06 - 1.06 2.2 Sinter Plant – 3 (90 Square Meter) - 1.06 1.06 4.0 Blast Furnace – 1 (402 to 650 Cubic 0.367 0.316 0.683 Meter)* 4.0 Blast Furnace – 2 (550 to 650 Cubic 0.578 0.105 0.683 Meter) 5.0 Energy Optimising Furnace – 1 (45 T to 0.41 0.23 0.64 65 T) 5.1 Energy Optimising Furnace – 2 (65 T) 0.62 - 0.62 7.0 Ladle Furnace - 1 with Common VD 45T/heat 20 T/heat 65 T/heat (45 T to 65 T) 7.1 Ladle Furnace – 2 (65 T) 65 - 65 T/heat T/heat 7.2 Ladle Furnace - 3 common VD (65 T) 65 T/heat - 65 T/heat 7.3 Ladle Furnace - 4 (65 T) 65 T/heat - 65 T/heat 8.0 Continuous Casting Machine - 1 0.35 - 0.35 8.1 Continuous Casting Machine - 2 0.5 - 0.5 8.2 Continuous Casting Machine - 3 - 0.45 0.45 9.0 Bar & Rod Mill Augmentation 0.4 0.08 0.48 9.1 Blooming Mill Augmentation 0.36 0.12 0.48 10.0 Pickling and Annealing Steel unit - 0.06 0.06 11.0 Peeled and ground - 0.04 0.04 12.0. Air Separation Plant 1 – 150 Ton/Day 150 - 150 T/day T/day 12.1 Air Separation Plant 2 – 390 Ton/Day 390 - 390 T/day T/day 12.2 Air Separation Plant 3 – 250 Ton/Day - 250 T/day 250 T/day 13.0 Captive Power Plant 1 (7 MW) 7 MW - 7 MW 13.1 Captive Power Plant 2 (2 x 30 MW) 2X30 - 2X30 MW MW 13.2 Captive Power Plant 3 (1 x 30) - 30 MW 30 MW *Construction of new BF of 650 m3 or modifying the present BF from 402 to 650 m3. 2 S; ;;S; E;S; ; Z;; S; Z 6;; 6 6 W S 6 6 6 X 6 6; 6W ; c X 3 ; ; 6 E 6 6 ; X; 6 E Z EZ 6 ; W ; $$ Z6))))) Z) ) ) ) ) ))) c; EZE ;6 ; ; ; EE ; && ;;E E E E Z6 c E EZc Z )))))) )))))) )))) W Z)) ) ))) c6 ))) * 4 6 6;E ; Z )) 6 ; ) )) 6 W ; " UW ;6 ;E) ) ; ; ) ;E6X 6 ;; "; E 6; -- ; ; ;;c;;E #)#%%'' 6 )#)#) )% ) )%%) #)# )%% 6)') %)#% )#% )') %%)% %) )) %% ### ;c ;X X ; ZE EE; ;c E6 6 Z; ZX 5 E6 6E ;; ; E ; 6E E;; 6 c 6W W ; 6 Ec Z 6 Z;' E E E ; ; # E 6;; 6 ;; c Z 6; c E6 Z Z 6 ; Z c 6 S 6 0 Z ;6 S Z; E ;6;; ; ; X; ;;;;c " ;E ; c c W W Z; E ; $ ; cZ ; Z 6 c 67 E c E Z6cZ6 c 7 -- %) E E #) ) )) ;E ) ) ;6 #) ) E ) ) ; ) ) Z E ) ) E %%) %%) %#) Z Z %) Z E %) ; 8 llllllllllll & ! " # - $ & % ====== & ====== ' $& ( =&= ) == !! !! H !" !# G !$ $ !% !& -$ 9 JSW Steel Limited EIA/EMP Report for Proposed Pottaneri Village, Salem Dist., Tamil Nadu Capacity Expansion of 1 to 1.3 MTPA Integrated Steel Plant Executive Summary PROJECT NAME AND LOCATION JSW Salem works presently, operating a steel plant with the name plate capacity of 1 MTPA. The demand for special alloy steel was growing at the rate of 15% a year. In order to tap the potential market in special alloys, it planned to enhance the capacity of special alloy steel from 1 to 1.3 MTPA and expansion of power plant capacity from 67 to 97 MW. The proposed expansion of JSW, Salem works is located at M.Kallipatti & Pottaneri Village, Mecheri panchayat, Mettur Taluk, Salem District of Tamil Nadu state. The nearest town Mecheri is located at a distance of 3 km in NE direction from the project site. The site lies in seismic zone-II as per seismic zone mapping of India. There is no capable fault within the study area. The site is well connected by road (SH 20) and rail and Mecheri road railway siding is existing at the back of present plant. PRODUCTS AND CAPACITIES The existing plant is possessing EC issued by MoEF for 1 MTPA vide their letter number F. No. J-11011/281/2006-IA.II (I) dt. 2nd January, 2007. The details of major technological unit’s capacity for existing and proposed expansion are given below: E - 1 Executive Summary © 2015 MECON Limited. All rights reserved JSW Steel Limited EIA/EMP Report for Proposed Pottaneri Village, Salem Dist., Tamil Nadu Capacity Expansion of 1 to 1.3 MTPA Integrated Steel Plant Total Existing Proposed Capacity Capacity Manufacturing Facilities Expansion after (MTPA) (MTPA) Expansion (MTPA) 1.0 Coke Oven Plant -1 (Non – Recovery 0.50 - 0.5 Type ) 2.0 Sinter Plant – 1 (20 Square Meter) 0.175 - 0 2.1 Sinter Plant – 2 (90 Square Meter) 1.06 - 1.06 2.2 Sinter Plant – 3 (90 Square Meter) - 1.06 1.06 4.0 Blast Furnace – 1 (402 to 650 Cubic 0.367 0.316 0.683 Meter)* 4.0 Blast Furnace – 2 (550 to 650 Cubic 0.578 0.105 0.683 Meter) 5.0 Energy Optimising Furnace – 1 (45 T to 0.41 0.23 0.64 65 T) 5.1 Energy Optimising Furnace – 2 (65 T) 0.62 - 0.62 7.0 Ladle Furnace - 1 with Common VD 45T/heat 20 T/heat 65 T/heat (45 T to 65 T) 7.1 Ladle Furnace – 2 (65 T) 65 - 65 T/heat T/heat 7.2 Ladle Furnace - 3 common VD (65 T) 65 T/heat - 65 T/heat 7.3 Ladle Furnace - 4 (65 T) 65 T/heat - 65 T/heat 8.0 Continuous Casting Machine - 1 0.35 - 0.35 8.1 Continuous Casting Machine - 2 0.5 - 0.5 8.2 Continuous Casting Machine - 3 - 0.45 0.45 9.0 Bar & Rod Mill Augmentation 0.4 0.08 0.48 9.1 Blooming Mill Augmentation 0.36 0.12 0.48 10.0 Pickling and Annealing Steel unit - 0.06 0.06 11.0 Peeled and ground - 0.04 0.04 12.0. Air Separation Plant 1 – 150 Ton/Day 150 - 150 T/day T/day 12.1 Air Separation Plant 2 – 390 Ton/Day 390 - 390 T/day T/day 12.2 Air Separation Plant 3 – 250 Ton/Day - 250 T/day 250 T/day 13.0 Captive Power Plant 1 (7 MW) 7 MW - 7 MW 13.1 Captive Power Plant 2 (2 x 30 MW) 2X30 - 2X30 MW MW 13.2 Captive Power Plant 3 (1 x 30) - 30 MW 30 MW *Construction of new BF of 650 m3 or modifying the present BF from 402 to 650 m3. E - 2 Executive Summary © 2015 MECON Limited. All rights reserved JSW Steel Limited EIA/EMP Report for Proposed Pottaneri Village, Salem Dist., Tamil Nadu Capacity Expansion of 1 to 1.3 MTPA Integrated Steel Plant LAND REQUIREMENT The total area of the existing plant is 586.09 acres, in which the existing facilities have occupied about 350 acres. The proposed expansion facilities will be occupying about 29 acres. The total plantation area is 194 acres i.e. 33% of the total area available. The land is under the possession of JSW categorized under industrial land. No eco sensitive zones or reserve forests exist within 5 km. However, Solappadi, Gonur and Vanavasi RF are falling at a distance of 9 km and 7 km respectively. There are no industries with 10 km radius. RAW MATERIAL REQUIREMENT The raw material required for the proposed capacity expansion along with the source is listed in table below: Present Post Exp. Sl. Raw material Quantity Quantity Source NO. MMT/Year MMT/Year Iron ore fines Indigenous/Imported 1 0.845 1.47 2 Iron ore pellets NA 0.5 Indigenous source 3 Lump ore 0.806 0.705 Indigenous/Imported 4 Coking coal 0.585 0.585 Imported 5 Non coking coal for COP 0.147 0.147 Imported 6 Non coking coal for PCI 0.147 0.215 Imported 7 Power plant coal 0.172 0.172 Indigenous/Imported 8 Coke breeze for SP 0.023 0.023 In house 9 Limestone 0.08 0.135 Imported/indigenous 10 Dolomite 0.091 0.147 Indigenous 11 Quartzite 0.030 0.039 Indigenous 12 Dunite 0.030 0.039 Indigenous 13 Lime powder 0.0585 0.0945 Imported/indigenous 14 Mill scale 0.097 0.158 Indigenous E - 3 Executive Summary © 2015 MECON Limited. All rights reserved JSW Steel Limited EIA/EMP Report for Proposed Pottaneri Village, Salem Dist., Tamil Nadu Capacity Expansion of 1 to 1.3 MTPA Integrated Steel Plant Present Post Exp. Sl. Raw material Quantity Quantity Source NO. MMT/Year MMT/Year 15 Purchase coke 0 0.156 Imported 16 Anthracite 0.039 0.095 Imported WATER REQUIREMENT An agreement already exists between PWD and JSW to utilize 5 MGD of raw water from downstream of river Cauvery. Presently, about 3.17 MGD of raw water is utilized through an intake facilities located at downstream of Mettur dam which meets the 1 MTPA capacity of steel plant and captive power plant of 67 MW.