INTRODUCTION

The firm of Kunzman Associates, Inc. is pleased to provide this revised focused traffic analysis for the Dollar General project located at 10166 Alta Sierra Drive in the County of Nevada. The Dollar General project consists of a 9,100 square foot and is located between Alta Sierra Drive and Little Valley Road, north of the intersection of Little Valley Road and Alta Sierra Drive (see Figure 1). Figure 2 illustrates the project site plan.

Although this is a technical report, every effort has been made to write the report clearly and concisely. To assist the reader with those terms unique to transportation engineering, a glossary of terms is provided within Appendix A.

TRAFFIC IMPACT ANALYSIS CRITERIA

As stated in the Traffic Impact Analysis Guidelines, County of Nevada (November 2013), a traffic impact study may be required when a project meets at least one of the following criteria:

1. Project will substantially change the off-site transportation system or connections to it or may create or exacerbate a hazard to public safety.

2. Project is inconsistent with the current General Plan land use or current Nevada County Transportation Commission Traffic Model AND generates more traffic than the current General Plan or Traffic Model.

3. Project generates 100 or more new peak hour vehicle trips, or

4. Project generates 40 or more vehicle trips through an existing Level of Service C intersection in rural regions or Level of Service D in community regions during the AM or PM peak hour, or

5. Project generates 10 or more vehicle trips through an existing Level of Service D, E, or F intersection in rural regions or Level of Service E or F in community regions.

1111 Town & Country Road, Suite 34 Orange, California 92868 (714) 973-8383

www.traffic-engineer.com

Mr. Dan Biswas, VP of Development CJS DEVELOPMENT II, LLC March 25, 2015

A traffic study may still be required where projects may significantly increase traffic during other time periods (i.e. daily, weekend, etc.), impacts an already congested or high‐collision location, or when specific site access and/or safety issues are of concern.

EXISTING TRAFFIC CONDITIONS

Figure 3 identifies the existing conditions for study area roadways. The number of through lanes for existing roadways and the existing intersection controls are identified.

Existing intersection traffic conditions were established through morning and evening peak hour traffic counts obtained by Kunzman Associates, Inc. from June 2014 (see Appendix B). Explicit peak hour factors have been calculated using the data collected for this effort as well. The morning and evening peak hour traffic volumes were identified by counting the two‐hour periods from 7:00 AM – 9:00 AM and 4:00 PM – 6:00 PM.

In order to provide for a "conservative" analysis, a growth rate of 9% has been applied to the existing morning and evening peak hour traffic volumes. Since the Pleasant Ridge Union School District went on summer break the week before the traffic counts were taken, and June traffic volumes may be less than during other months of the year due to school not being in session, vacations, etc., a growth rate was determined to provide for "peak month" traffic conditions. Existing average daily traffic volumes were obtained from the 2012 Traffic Volumes on California State Highways by the California Department of Transportation for SR‐49 Golden Chain Highway north and south of Alta Sierra Drive. The average daily traffic volumes for these two segments were compared to the peak month average daily traffic volumes resulting in a 7% increase in average daily traffic volumes for SR‐49 Golden Chain Highway south of Alta Sierra Drive, and a 11% increase in average daily traffic volumes for SR‐49 Golden Chain Highway north of Alta Sierra Drive. The average of 9% was used as the growth rate to reflect "peak month" traffic conditions and applied to the existing morning and evening peak hour traffic volumes.

The technique used to assess the capacity needs of an intersection is known as the Intersection Delay Method (see Appendix C) based on the 2010 Highway Capacity Manual – Transportation Research Board. To calculate delay, the volume of traffic using the intersection is compared with the capacity of the intersection.

The definition of an intersection deficiency has been obtained from the County of Nevada General Plan. The General Plan states that peak hour intersection operations of Level of Service C or better are generally acceptable for Rural Regions, except where existing Level of Service is less than C. In these situations, the Level of Service shall not be allowed to drop below the existing Level of Service. The General Plan states that peak hour intersection operations of Level of Service D or better are generally acceptable for Community Regions, except where existing Level of Service is less than D. In these situations, the Level of Service shall not be allowed to drop below the existing Level of Service. According to the County of Nevada Transportation Department staff, the proposed project is located in a Community Region, and therefore any intersection operating at Level of Service E to F will be considered deficient.

www.traffic-engineer.com

2

Mr. Dan Biswas, VP of Development CJS DEVELOPMENT II, LLC March 25, 2015

If the project traffic causes an intersection or roadway segment to worsen from an acceptable Level of Service to an unacceptable Level of Service or is distributed to an intersection or roadway segment currently operating at an unacceptable Level of service, the project is determined to cause a significant impact which may be mitigated. It is acceptable to mitigate an intersection or roadway segment from an unacceptable Level of Service to an acceptable Level of Service.

The existing delay and Level of Service for the study area intersections are shown in Table 1. The study area intersections currently operate within acceptable Levels of Service during the peak hours for Existing traffic conditions. The Existing delay worksheets are provided in Appendix D.

PROJECT TRIP GENERATION

Trip generation rates were determined for daily traffic, morning peak hour inbound and outbound traffic, and evening peak hour inbound and outbound traffic for the proposed land use. By multiplying the trip generation rates by the land use quantity, the project generated traffic volumes are determined.

Table 2 exhibits the trip generation rates, project peak hour volumes, and project daily traffic volumes. The trip generation rates are derived from the Institute of Transportation Engineers, Trip Generation, 9th Edition, 2012. In the absence of data from the Institute of Transportation Engineers, the morning and evening peak hour inbound/outbound ratio splits for specialty /strip commercial were obtained from the San Diego Association of Governments, Traffic Generators, April 2003.

The proposed project has been identified as a Variety Store (Land Use: 814) in the Institute of Transportation Engineers, Trip Generation, 9th Edition, 2012. A Variety Store (15 study locations) is described as follows:

A variety store is a retail store that sells a broad range of inexpensive items often at a single price. These stores are typically referred to as "dollar stores". Items sold at these stores typically include kitchen supplies, cleaning products, home office supplies, food products, household goods, decorations and toys. These stores are sometimes stand‐alone sites, but they may also be located in small strip centers. Free‐standing (Land Use 815) is a related use.

The proposed development is projected to generate approximately 583 daily vehicle trips, 35 of which occur during the morning peak hour and 62 of which occur during the evening peak hour.

PROJECT TRIP DISTRIBUTION

Figure 4 contains the directional distribution of the project trips for the proposed land use. To determine the trip distribution for the proposed project, peak hour traffic counts of the existing directional distribution of traffic for existing areas in the vicinity of the site and other additional information on future development and traffic impacts in the area were reviewed.

www.traffic-engineer.com

3

Mr. Dan Biswas, VP of Development CJS DEVELOPMENT II, LLC May 20, 2015

STUDY AREA TRAFFIC CONDITIONS

The study area intersections were analyzed for Existing Plus Project, Year 2035 Without Project, and Year 2035 With Project traffic conditions (see Appendix D). According to the County of Nevada Transportation Department staff at the time the initial study was conducted, there were no existing projects in the area large enough to warrant an analysis of Existing Plus Approved Projects traffic conditions. Since then, the Forest Springs Mobile Home Park north of the project site has been approved for a 62 dwelling unit expansion. According to the Institute of Transportation Engineers, Trip Generation, 9th Edition, 2012 (Land Use: 240) the trip generation for this project is approximately 27 vehicles during the morning peak hour and 37 vehicles during the evening peak hour. With the majority of vehicles projected to travel north on SR‐49, this project is not anticipated to generate significant traffic on the study are intersections and is encompassed within the annual ambient growth rate. Year 2035 was identified for future cumulative conditions. Since the Countywide Traffic Model was being updated when the initial study was conducted, future traffic volume forecasts were not available. In lieu of future traffic forecasts, an annual areawide growth rate of 1.0 percent has been applied for Year 2035 traffic conditions. The growth rate was provided by County of Nevada Transportation Department staff. For Year 2035 traffic conditions, existing traffic volumes have been increased by 1.0 percent annually over a 21 (2035 ‐ 2014) year period, culminating in a Year 2035 growth rate of 23.24 (1.01^21) percent over existing traffic volumes.

The technique used to assess the capacity needs of an intersection is known as the Intersection Delay Method (see Appendix D) based on the 2010 Highway Capacity Manual – Transportation Research Board. To calculate delay, the volume of traffic using the intersection is compared with the capacity of the intersection. The signalized intersections are considered deficient (Level of Service F) if the overall intersection critical volume to capacity ratio equals or exceeds 1.0, even if the Level of Service defined by the delay value is below the defined Level of Service standard. The volume to capacity ratio is defined as the critical volumes divided by the intersection capacity. A volume to capacity ratio greater than 1.0 implies an infinite queue.

For Existing Plus Project traffic conditions, the study area intersections are projected to operate at acceptable Levels of Service during the peak hours (see Table 3).

For Year 2035 Without Project traffic conditions, the study area intersections are projected to operate at acceptable Levels of Service during the peak hours (see Table 4).

For Year 2035 With Project traffic conditions, the study area intersections are projected to operate at acceptable Levels of Service during the peak hours (see Table 5).

TRAFFIC QUEUING ANALYSIS

Based upon discussions with County of Nevada Transportation Department staff, traffic queues at the study area intersections were evaluated. The lane storage lengths for Year 2035 With Project traffic conditions were determined based on the 95th percentile traffic queue lengths per the 2010 Highway Capacity Manual.

www.traffic-engineer.com

4

Mr. Dan Biswas, VP of Development CJS DEVELOPMENT II, LLC May 20, 2015

As shown in the following table, the existing turn pocket lengths exceed the expected 95th percentile traffic queue lengths, except for the southbound left turn pocket at the intersection of SR‐49 Golden Chain Highway and Little Valley Road which is projected to be deficient by 6 feet, and the dwestboun left turn pocket at the intersection of SR‐49 Golden Chain Highway and Alta Sierra Drive which is projected to be deficient by 25 feet. The 95th percentile queue lengths shown are the greater between the morning and evening peak hours.

95th Percentile Turn Pocket Sufficient Intersection Turn Pocket Queue Length Length Queuing SR‐49 Golden Chain Highway at: Little Valley Road ‐ #1 SB Left 181 Feet 175 Feet No SB Left 163 Feet 425 Feet Yes SR‐49 Golden Chain Highway at: NB Right 63 Feet 275 Feet Yes Alta Sierra Drive ‐ #2 WB Left 85 Feet 160 Feet Yes WB Right 185 Feet 160 Feet No

SIGHT DISTANCE ANALYSIS

Figure 5 shows the summary for the sight distance analysis. The posted speed limit along Alta Sierra Drive is 25 miles per hour. Per the County of Nevada Department of Transportation Standard Drawings, Required Site Line at Intersections/Driveways (A‐6), the minimum required stopping site distance for the prevailing speed on a major road of 25 miles per hour is 150 feet. Appendix D contains the site distance standards. These requirements are consistent with Table 201.1 in the Highway Design Manual.

The stopping sight distance minimum requirement is 150 feet for the intersection of Alta Sierra Drive and Project Access, as the posted speed limit along Alta Sierra Drive is 25 miles per hour. The driver's eye for a vehicle located at the Project Access intending to head either northbound or southbound on Alta Sierra Drive is situated 42 inches above the pavement and 15 feet back from the edge of the travelway. The driver must have a minimum unobstructed sight line of 150 feet looking southbound at an object 51 inches above the pavement situated in the center of the northbound traffic lane, and must have a minimum unobstructed sight line of 150 feet looking northbound at an object 51 inches above the pavement situated in the center of the southbound traffic lane.

Stopping sight distance requires 150 feet of unobstructed line of sight at the intersection of Alta Sierra Drive and Project Access. The intersection of Alta Sierra Drive at Project Access provides more than 150 feet and adequate stopping sight distance is provided.

The restricted use areas are limited to the property frontage along the north and south sides of Alta Sierra Drive at Project Access. No objects within the restricted use areas should exceed the maximum height of eighteen (18) inches to insure a clear line of sight.

Figure 6 shows the maximum sight distance available at the project access location.

www.traffic-engineer.com

5

Mr. Dan Biswas, VP of Development CJS DEVELOPMENT II, LLC May 20, 2015

TRUCK TURNING TEMPLATES

Figures 7 and 8 show the truck turning templates for the project access. Truck turning templates are provided for both inbound and outbound truck turning movements at the project access. The truck turning templates utilized a WB‐67 truck and are therefore a "worst case" analysis if Alta Sierra Drive became a STAA designated roadway, whereas the roadway is currently restricted to the California Legal trucks which are shorter in overall length than the STAA truck (WB‐67).

EMERGENCY ACCESS

Figure 9 illustrates the distances from Alta Sierra Drive and Little Valley Road to the entrance eof th building and property boundary for an emergency vehicle parked along Alta Sierra Drive or Little Valley Road. Since these distances are less than 1,000 feet, adequate emergency access is provided because emergency personnel can park along Alta Sierra Drive or Little Valley Road and provide emergency services in the event that the project access is blocked and inaccessible.

TRAFFIC IMPACT FEES

To offset the traffic impacts on the roadway network of future developments, the County of Nevada collects a Regional Transportation Mitigation Fee. The project site is located within the Western Nevada County Regional Transportation Mitigation Fee program area.e Th fee is calculated by multiplying the number of project‐generated daily vehicle trips (583) by the cost of $110 per retail trip, for a total of $64,130. In addition, the Local Traffic Mitigation Fee is assessed at $40 per retail trip, for a total of $23,320. The cumulative total for both fees is $87,450. It should be noted that Regional Transportation Mitigation Fee and Local Traffic Mitigation Fee shall both be calculated using the most recent fee schedules in effect at the time the fees are due.

CONCLUSIONS

The proposed development is projected to generate approximately 583 daily vehicle trips, 35 of which occur during the morning peak hour and 62 of which occur during the evening peak hour.

For Existing Plus Project traffic conditions, the study area intersections are projected to operate at acceptable Levels of Service during the peak hours.

For Year 2035 Without Project traffic conditions, the study area intersections are projected to operate at acceptable Levels of Service during the peak hours.

For Year 2035 With Project traffic conditions, the study area intersections are projected to operate at acceptable Levels of Service during the peak hours.

Stopping sight distance requires 150 feet of unobstructed line of sight at the intersection of Alta Sierra Drive and Project Access. The intersection of Alta Sierra Drive at Project Access provides more than 150 feet and adequate stopping sight distance is provided.

www.traffic-engineer.com

6

Mr. Dan Biswas, VP of Development CJS DEVELOPMENT II, LLC May 20, 2015

The Western Nevada County Regional Transportation Mitigation Fee for the project site is $64,130. The Local Traffic Mitigation Fee is $23,320. The cumulative total for both fees is $87,450. It should be noted that Regional Transportation Mitigation Fee and Local Traffic Mitigation Fee shall both be calculated using the most recent fee schedules in effect at the time the fees are due.

RECOMMENDATIONS

The following improvements are recommended in conjunction with the proposed development to ensure adequate circulation within the project itself (see Figure 10).

Construct Alta Sierra Drive from the north project boundary to the south project boundary at its ultimate half‐section width including landscaping and parkway improvements in conjunction with development adhering to sight distance requirements.

Construct Little Valley Road from the north project boundary to the south project boundary at its ultimate half‐section width including landscaping and parkway improvements in conjunction with development adhering to sight distance requirements.

The site should provide sufficient parking spaces to meet County of Nevada parking code requirements in order to service on‐site parking demand.

On‐site traffic signing/striping should be implemented in conjunction with detailed construction plans for the project site.

As is the case for any roadway design, the County of Nevada should periodically review traffic operations in the vicinity of the project once the project is constructed to assure that the traffic operations are satisfactory.

It has been a pleasure to service your needs on this project. Should you have any questions or if we can be of further assistance, please do not hesitate to call at (714) 973‐8383.

Sincerely,

KUNZMAN ASSOCIATES , INC. KUNZMAN ASSOCIATES, INC.

Bryan Crawford William Kunzman, P.E. Associate Principal

#5780b

www.traffic-engineer.com

7 Table 1

Existing Intersection Delay and Level of Service

Intersection Approach Lanes1 Peak Hour Traffic Northbound Southbound Eastbound Westbound Delay‐LOS2 3 Intersection Control L T R L T R L T R L T R Morning Evening SR‐49 Golden Chain Highway (NS) at: Little Valley Road (EW) ‐ #1 CSS01.50.51100000.500.514.2‐B 18.2‐C Alta Sierra Drive (EW) ‐ #2 TS0211100001019.0‐A 10.5‐B Johnson Place (NS) at: Alta Sierra Drive (EW) ‐ #3 CSS 0 0 0 0.5 0 0.5 0.5 0.5 0 0 0.5 0.5 11.6‐B 11.0‐B Little Valley Road (NS) at: Alta Sierra Drive (EW) ‐ #5 AWS01001001001010.3‐B 9.8‐A

1 When a right turn lane is designated, the lane can either be striped or unstriped. To function as a right turn lane there must be sufficient width for right turning vehicles to travel outside the through lanes. L = Left; T = Through; R = Right

2 Delay and level of service has been calculated using the following analysis software: HCS+ Version 5.6. Per the 2010 Highway Capacity Manual, overall average for intersection delay and level of service are shown for intersections with traffic signal or all way stop control, the delay and level of service for the worst individual movement (or movements sharing a single lane) are shown.

3 CSS = Cross Street Stop; TS = Traffic Signal; AWS = All Way Stop

8 Table 2

Project Trip Generation1

Peak Hour Morning Evening Land Use Quantity Units2 Inbound Outbound Total Inbound Outbound Total Daily Trip Generation Rates Variety Store 9.100 TSF 2.29 1.52 3.81 3.41 3.41 6.82 64.03 Trips Generated Variety Store 9.100 TSF 21 14 35 31 31 62 583

1 Source: Institute of Transportation Engineers, Trip Generation, 9th Edition, 2012, Land Use Category 814. Since morning and evening peak hour inbound/ outbound ratios are not available, the morning and evening peak hour inbound/outbound ratio splits for specialty retail/strip commercial has been obtained from the San Diego Association of Governments, Traffic Generators, April 2003.

2 TSF = Thousand Square Feet

9 Table 3

Existing Plus Project Intersection Delay and Level of Service

Intersection Approach Lanes1 Peak Hour Traffic Northbound Southbound Eastbound Westbound Delay‐LOS2 3 Intersection Control L T R L T R L T R L T R Morning Evening SR‐49 Golden Chain Highway (NS) at: Little Valley Road (EW) ‐ #1 CSS01.50.51100000.500.514.2‐B 19.0‐C Alta Sierra Drive (EW) ‐ #2 TS0211100001019.2‐A 11.1‐B Johnson Place (NS) at: Alta Sierra Drive (EW) ‐ #3 CSS 0 0 0 0.5 0 0.5 0.5 0.5 0 0 0.5 0.5 11.9‐B 11.3‐B Alta Sierra Drive (NS) at: Project Access (EW) ‐ #4 CSS 00.50.50.50.500000.5 0 0.5 10.9‐B 10.5‐B Little Valley Road (NS) at: Alta Sierra Drive (EW) ‐ #5 AWS01001001001010.5‐B 10.1‐B

1 When a right turn lane is designated, the lane can either be striped or unstriped. To function as a right turn lane there must be sufficient width for right turning vehicles to travel outside the through lanes. L = Left; T = Through; R = Right; 1 = Improvement

2 Delay and level of service has been calculated using the following analysis software: HCS+ Version 5.6. Per the 2010 Highway Capacity Manual, overall average for intersection delay and level of service are shown for intersections with traffic signal or all way stop control, the delay and level of service for the worst individual movement (or movements sharing a single lane) are shown.

3 CSS = Cross Street Stop; TS = Traffic Signal; AWS = All Way Stop

10 Table 4

Year 2035 Without Project Intersection Delay and Level of Service

Intersection Approach Lanes1 Peak Hour Traffic Northbound Southbound Eastbound Westbound Delay‐LOS2 Intersection Control3 L T R L T R L T R L T R Morning Evening SR‐49 Golden Chain Highway (NS) at: Little Valley Road (EW) ‐ #1 CSS01.50.51100000.500.516.8‐C 22.9‐C Alta Sierra Drive (EW) ‐ #2 TS02111000010110.1‐B 13.7‐B Johnson Place (NS) at: Alta Sierra Drive (EW) ‐ #3 CSS 0 0 0 0.5 0 0.5 0.5 0.5 0 0 0.5 0.5 11.7‐B 11.6‐B Little Valley Road (NS) at: Alta Sierra Drive (EW) ‐ #5 AWS01001001001010.4‐B 10.5‐B

1 When a right turn lane is designated, the lane can either be striped or unstriped. To function as a right turn lane there must be sufficient width for right turning vehicles to travel outside the through lanes. L = Left; T = Through; R = Right

2 Delay and level of service has been calculated using the following analysis software: HCS+ Version 5.6. Per the 2010 Highway Capacity Manual, overall average for intersection delay and level of service are shown for intersections with traffic signal or all way stop control, the delay and level of service for the worst individual movement (or movements sharing a single lane) are shown.

3 CSS = Cross Street Stop; TS = Traffic Signal; AWS = All Way Stop

11 Table 5

Year 2035 With Project Intersection Delay and Level of Service

Intersection Approach Lanes1 Peak Hour Traffic Northbound Southbound Eastbound Westbound Delay‐LOS2 Intersection Control3 L T R L T R L T R L T R Morning Evening SR‐49 Golden Chain Highway (NS) at: Little Valley Road (EW) ‐ #1 CSS01.50.51100000.500.516.8‐C 22.7‐C Alta Sierra Drive (EW) ‐ #2 TS02111000010110.2‐B 14.8‐B Johnson Place (NS) at: Alta Sierra Drive (EW) ‐ #3 CSS 0 0 0 0.5 0 0.5 0.5 0.5 0 0 0.5 0.5 11.9‐B 12.0‐B Alta Sierra Drive (NS) at: Project Access (EW) ‐ #4 CSS 00.50.50.50.500000.5 0 0.5 11.7‐B 11.1‐B Little Valley Road (NS) at: Alta Sierra Drive (EW) ‐ #5 AWS01001001001010.5‐B 10.8‐B

1 When a right turn lane is designated, the lane can either be striped or unstriped. To function as a right turn lane there must be sufficient width for right turning vehicles to travel outside the through lanes. L = Left; T = Through; R = Right; 1 = Improvement

2 Delay and level of service has been calculated using the following analysis software: HCS+ Version 5.6. Per the 2010 Highway Capacity Manual, overall average for intersection delay and level of service are shown for intersections with traffic signal or all way stop control, the delay and level of service for the worst individual movement (or movements sharing a single lane) are shown.

3 CSS = Cross Street Stop; TS = Traffic Signal; AWS = All Way Stop

12

Figure 5 Sight Distance Analysis

150'

150'

Legend = Restricted Use Area = Stopping Sight Distance

NTS 5780b/5 Kunzman Associates, Inc. Over 35 Years of Excellent Service 17 Figure 6 Maximum Sight Distance

171'

233'

Legend = Restricted Use Area = Maximum Sight Distance

NTS 5780b/6 Kunzman Associates, Inc. Over 35 Years of Excellent Service 18

APPENDIX A

Glossary of Transportation Terms

GLOSSARY OF TRANSPORTATION TERMS

COMMON ABBREVIATIONS

AC: Acres ADT: Average Daily Traffic Caltrans: California Department of Transportation DU: Dwelling Unit ICU: Intersection Capacity Utilization LOS: Level of Service TSF: Thousand Square Feet V/C: Volume/Capacity VMT: Vehicle Miles Traveled

TERMS

AVERAGE DAILY TRAFFIC: The total volume during a year divided by the number of days in a year. Usually only weekdays are included.

BANDWIDTH: The number of seconds of green time available for through traffic in a signal progression.

BOTTLENECK: A constriction along a travelway that limits the amount of traffic that can proceed downstream from its location.

CAPACITY: The maximum number of vehicles that can be reasonably expected to pass over a given section of a lane or a roadway in a given time period.

CHANNELIZATION: The separation or regulation of conflicting traffic movements into definite paths of travel by the use of pavement markings, raised islands, or other suitable means to facilitate the safe and orderly movements of both vehicles and pedestrians.

CLEARANCE INTERVAL: Nearly same as yellow time. If there is an all red interval after the end of a yellow, then that is also added into the clearance interval.

CORDON: An imaginary line around an area across which vehicles, persons, or other items are counted (in and out).

CYCLE LENGTH: The time period in seconds required for one complete signal cycle.

CUL‐DE‐SAC STREET: A local street open at one end only, and with special provisions for turning around.

DAILY CAPACITY: The daily volume of traffic that will result in a volume during the peak hour equal to the capacity of the roadway.

DELAY: The time consumed while traffic is impeded in its movement by some element over which it has no control, usually expressed in seconds per vehicle.

DEMAND RESPONSIVE SIGNAL: Same as traffic‐actuated signal.

DENSITY: The number of vehicles occupying in a unit length of the through traffic lanes of a roadway at any given instant. Usually expressed in vehicles per mile.

DETECTOR: A device that responds to a physical stimulus and transmits a resulting impulse to the signal controller.

DESIGN SPEED: A speed selected for purposes of design. Features of a highway, such as curvature, superelevation, and sight distance (upon which the safe operation of vehicles is dependent) are correlated to design speed.

DIRECTIONAL SPLIT: The percent of traffic in the peak direction at any point in time.

DIVERSION: The rerouting of peak hour traffic to avoid congestion.

FORCED FLOW: Opposite of free flow.

FREE FLOW: Volumes are well below capacity. Vehicles can maneuver freely and travel is unimpeded by other traffic.

GAP: Time or distance between successive vehicles in a traffic stream, rear bumper to front bumper.

HEADWAY: Time or distance spacing between successive vehicles in a traffic stream, front bumper to front bumper.

INTERCONNECTED SIGNAL SYSTEM: A number of intersections that are connected to achieve signal progression.

LEVEL OF SERVICE: A qualitative measure of a number of factors, which include speed and travel time, traffic interruptions, freedom to maneuver, safety, driving comfort and convenience, and operating costs.

LOOP DETECTOR: A vehicle detector consisting of a loop of wire embedded in the roadway, energized by alternating current and producing an output circuit closure when passed over by a vehicle.

MINIMUM ACCEPTABLE GAP: Smallest time headway between successive vehicles in a traffic stream into which another vehicle is willing and able to cross or merge.

MULTI‐MODAL: More than one mode; such as automobile, bus transit, rail rapid transit, and bicycle transportation modes.

OFFSET: The time interval in seconds between the beginning of green at one intersection and the beginning of green at an adjacent intersection.

PLATOON: A closely grouped component of traffic that is composed of several vehicles moving, or standing ready to move, with clear spaces ahead and behind.

ORIGIN‐DESTINATION SURVEY: A survey to determine the point of origin and the point of destination for a given vehicle trip.

PASSENGER CAR EQUIVALENTS: One car is one Passenger Car Equivalent. A truck is equal to 2 or 3 Passenger Car Equivalents in that a truck requires longer to start, goes slower, and accelerates slower. Loaded trucks have a higher Passenger Car Equivalent than empty trucks.

PEAK HOUR: The 60 consecutive minutes with the highest number of vehicles.

PRETIMED SIGNAL: A type of traffic signal that directs traffic to stop and go on a predetermined time schedule without regard to traffic conditions. Also, fixed time signal.

PROGRESSION: A term used to describe the progressive movement of traffic through several signalized intersections.

SCREEN‐LINE: An imaginary line or physical feature across which all trips are counted, normally to verify the validity of mathematical traffic models.

SIGNAL CYCLE: The time period in seconds required for one complete sequence of signal indications.

SIGNAL PHASE: The part of the signal cycle allocated to one or more traffic movements.

STARTING DELAY: The delay experienced in initiating the movement of queued traffic from a stop to an average running speed through a signalized intersection.

TRAFFIC‐ACTUATED SIGNAL: A type of traffic signal that directs traffic to stop and go in accordance with the demands of traffic, as registered by the actuation of detectors.

TRIP: The movement of a person or vehicle from one location (origin) to another (destination). For example, from home to store to home is two trips, not one.

TRIP‐END: One end of a trip at either the origin or destination; i.e. each trip has two trip‐ends. A trip‐end occurs when a person, object, or message is transferred to or from a vehicle.

TRIP GENERATION RATE: The quantity of trips produced and/or attracted by a specific land use stated in terms of units such as per dwelling, per acre, and per 1,000 square feet of floor space.

TRUCK: A vehicle having dual tires on one or more axles, or having more than two axles.

UNBALANCED FLOW: Heavier traffic flow in one direction than the other. On a daily basis, most facilities have balanced flow. During the peak hours, flow is seldom balanced in an urban area.

VEHICLE MILES OF TRAVEL: A measure of the amount of usage of a section of highway, obtained by multiplying the average daily traffic by length of facility in miles.

APPENDIX B

Traffic Count Worksheets

ALL TRAFFIC DATA Nevada County (916) 771-8700 All Vehicles on Unshifted [email protected] File Name : 14-7430-001 State Route 49-Little Valley Road.ppd Nothing on Bank 1 Date : 6/19/2014 Nothing on Bank 2 Unshifted Count = All Vehicles State Route 49 Little Valley Road State Route 49 Turnout Southbound Westbound Northbound Eastbound START TIME LEFT THRU RIGHT UTURNS APP.TOTAL LEFT THRU RIGHT UTURNS APP.TOTAL LEFT THRU RIGHT UTURNS APP.TOTAL LEFT THRU RIGHT UTURNS APP.TOTAL Total Uturn Total 07:00 3 131 0 0 134 0 0 1 0 1 0 146 0 0 146 0 0 0 0 0 281 0 07:15 2 158 0 0 160 2 0 4 0 6 0 199 0 0 199 0 0 0 0 0 365 0 07:30 4 175 0 0 179 1 0 6 0 7 0 300 0 0 300 0 0 0 0 0 486 0 07:45 1 158 0 0 159 0 0 7 0 7 0 274 2 0 276 0 0 0 0 0 442 0 Total 10 622 0 0 632 3 0 18 0 21 0 919 2 0 921 0 0 0 0 0 1574 0

08:00 4 165 0 0 169 0 0 3 0 3 0 239 0 0 239 0 0 0 0 0 411 0 08:15 6 168 1 0 175 1 0 9 0 10 0 241 1 0 242 0 0 0 0 0 427 0 08:30 4 160 1 0 165 1 0 5 0 6 0 223 0 0 223 0 0 0 0 0 394 0 08:45 9 170 1 0 180 0 0 7 0 7 0 248 0 0 248 0 0 0 0 0 435 0 Total 23 663 3 0 689 2 0 24 0 26 0 951 1 0 952 0 0 0 0 0 1667 0

16:00 18 242 2 0 262 2 0 8 0 10 0 221 3 0 224 0 0 0 0 0 496 0 16:15 18 269 0 0 287 1 0 7 0 8 0 247 2 0 249 0 0 0 0 0 544 0 16:30 25 269 0 0 294 1 0 7 0 8 0 231 0 0 231 0 0 0 0 0 533 0 16:45 20 264 0 0 284 1 0 7 0 8 0 223 0 0 223 0 0 0 0 0 515 0 Total 81 1044 2 0 1127 5 0 29 0 34 0 922 5 0 927 0 0 0 0 0 2088 0

17:00 20 230 0 0 250 1 0 2 0 3 0 209 1 0 210 0 0 0 0 0 463 0 17:15 37 341 0 0 378 0 0 4 0 4 0 236 1 0 237 0 0 0 0 0 619 0 17:30 21 273 0 0 294 1 0 3 0 4 0 251 2 0 253 0 0 0 0 0 551 0 17:45 17 224 1 0 242 0 0 4 0 4 0 205 1 0 206 0 0 0 0 0 452 0 Total 95 1068 1 0 1164 2 0 13 0 15 0 901 5 0 906 0 0 0 0 0 2085 0

Grand Total 209 3397 6 0 3612 12 0 84 0 96 0 3693 13 0 3706 0 0 0 0 0 7414 0 Apprch % 5.8% 94.0% 0.2% 0.0% 12.5% 0.0% 87.5% 0.0% 0.0% 99.6% 0.4% 0.0% 0.0% 0.0% 0.0% 0.0% Total % 2.8% 45.8% 0.1% 0.0% 48.7% 0.2% 0.0% 1.1% 0.0% 1.3% 0.0% 49.8% 0.2% 0.0% 50.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% ALL TRAFFIC DATA Nevada County (916) 771-8700 All Vehicles on Unshifted [email protected] File Name : 14-7430-001 State Route 49-Little Valley Road.ppd Nothing on Bank 1 Date : 6/19/2014 Nothing on Bank 2 Unshifted Count = All Vehicles AM PEAK State Route 49 Little Valley Road State Route 49 Turnout HOUR Southbound Westbound Northbound Eastbound START TIME LEFT THRU RIGHT UTURNS APP.TOTAL LEFT THRU RIGHT UTURNS APP.TOTAL LEFT THRU RIGHT UTURNS APP.TOTAL LEFT THRU RIGHT UTURNS APP.TOTAL Total Peak Hour Analysis From 07:30 to 08:30 Peak Hour For Entire Intersection Begins at 07:30 07:30 4 175 0 0 179 1 0 6 0 7 0 300 0 0 300 0 0 0 0 0 486 07:45 1 158 0 0 159 0 0 7 0 7 0 274 2 0 276 0 0 0 0 0 442 08:00 4 165 0 0 169 0 0 3 0 3 0 239 0 0 239 0 0 0 0 0 411 08:15 6 168 1 0 175 1 0 9 0 10 0 241 1 0 242 0 0 0 0 0 427 Total Volume 15 666 1 0 682 2 0 25 0 27 0 1054 3 0 1057 0 0 0 0 0 1766 % App Total 2.2% 97.7% 0.1% 0.0% 7.4% 0.0% 92.6% 0.0% 0.0% 99.7% 0.3% 0.0% 0.0% 0.0% 0.0% 0.0% PHF .625 .951 .250 .000 .953 .500 .000 .694 .000 .675 .000 .878 .375 .000 .881 .000 .000 .000 .000 .000 .908

PM PEAK State Route 49 Little Valley Road State Route 49 Turnout HOUR Southbound Westbound Northbound Eastbound START TIME LEFT THRU RIGHT UTURNS APP.TOTAL LEFT THRU RIGHT UTURNS APP.TOTAL LEFT THRU RIGHT UTURNS APP.TOTAL LEFT THRU RIGHT UTURNS APP.TOTAL Total Peak Hour Analysis From 16:45 to 17:45 Peak Hour For Entire Intersection Begins at 16:45 16:45 20 264 0 0 284 1 0 7 0 8 0 223 0 0 223 0 0 0 0 0 515 17:00 20 230 0 0 250 1 0 2 0 3 0 209 1 0 210 0 0 0 0 0 463 17:15 37 341 0 0 378 0 0 4 0 4 0 236 1 0 237 0 0 0 0 0 619 17:30 21 273 0 0 294 1 0 3 0 4 0 251 2 0 253 0 0 0 0 0 551 Total Volume 98 1108 0 0 1206 3 0 16 0 19 0 919 4 0 923 0 0 0 0 0 2148 % App Total 8.1% 91.9% 0.0% 0.0% 15.8% 0.0% 84.2% 0.0% 0.0% 99.6% 0.4% 0.0% 0.0% 0.0% 0.0% 0.0% PHF .662 .812 .000 .000 .798 .750 .000 .571 .000 .594 .000 .915 .500 .000 .912 .000 .000 .000 .000 .000 .868 ALL TRAFFIC DATA Nevada County (916) 771-8700 All Vehicles on Unshifted [email protected] File Name : 14-7430-002 State Route 49-Alta Sierra Drive.ppd Nothing on Bank 1 Date : 6/19/2014 Nothing on Bank 2 Unshifted Count = All Vehicles State Route 49 Alta Sierra Drive State Route 49 Southbound Westbound Northbound Eastbound START TIME LEFT THRU RIGHT UTURNS APP.TOTAL LEFT THRU RIGHT UTURNS APP.TOTAL LEFT THRU RIGHT UTURNS APP.TOTAL LEFT THRU RIGHT UTURNS APP.TOTAL Total Uturn Total 07:00 4 129 0 0 133 34 0 23 0 57 0 112 6 0 118 0 0 0 0 0 308 0 07:15 2 138 0 0 140 27 0 38 0 65 0 164 5 0 169 0 0 0 0 0 374 0 07:30 6 191 0 0 197 51 0 62 0 113 0 247 13 0 260 0 0 0 0 0 570 0 07:45 6 161 0 0 167 38 0 44 0 82 0 241 12 0 253 0 0 0 0 0 502 0 Total 18 619 0 0 637 150 0 167 0 317 0 764 36 0 800 0 0 0 0 0 1754 0

08:00 6 152 0 0 158 28 0 43 0 71 0 182 9 0 191 0 0 0 0 0 420 0 08:15 13 148 0 0 161 24 0 37 0 61 0 200 11 0 211 0 0 0 0 0 433 0 08:30 13 153 0 0 166 30 0 45 0 75 0 170 6 0 176 0 0 0 0 0 417 0 08:45 16 151 0 0 167 25 0 51 0 76 0 199 10 0 209 0 0 0 0 0 452 0 Total 48 604 0 0 652 107 0 176 0 283 0 751 36 0 787 0 0 0 0 0 1722 0

16:00 19 223 0 0 242 22 0 40 0 62 0 181 29 0 210 0 0 0 0 0 514 0 16:15 24 219 0 0 243 17 0 31 0 48 0 217 27 0 244 0 0 0 0 0 535 0 16:30 25 237 0 0 262 18 0 29 0 47 0 196 20 0 216 0 0 0 0 0 525 0 16:45 30 240 0 0 270 9 0 24 0 33 0 206 40 0 246 0 0 0 0 0 549 0 Total 98 919 0 0 1017 66 0 124 0 190 0 800 116 0 916 0 0 0 0 0 2123 0

17:00 29 221 0 0 250 23 0 33 0 56 0 200 27 0 227 0 0 0 0 0 533 0 17:15 35 302 0 0 337 14 0 29 0 43 0 206 46 0 252 0 0 0 0 0 632 0 17:30 38 242 0 0 280 25 0 27 0 52 0 231 37 0 268 0 0 0 0 0 600 0 17:45 36 194 0 0 230 19 0 24 0 43 0 177 29 0 206 0 0 0 0 0 479 0 Total 138 959 0 0 1097 81 0 113 0 194 0 814 139 0 953 0 0 0 0 0 2244 0

Grand Total 302 3101 0 0 3403 404 0 580 0 984 0 3129 327 0 3456 0 0 0 0 0 7843 0 Apprch % 8.9% 91.1% 0.0% 0.0% 41.1% 0.0% 58.9% 0.0% 0.0% 90.5% 9.5% 0.0% 0.0% 0.0% 0.0% 0.0% Total % 3.9% 39.5% 0.0% 0.0% 43.4% 5.2% 0.0% 7.4% 0.0% 12.5% 0.0% 39.9% 4.2% 0.0% 44.1% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% ALL TRAFFIC DATA Nevada County (916) 771-8700 All Vehicles on Unshifted [email protected] File Name : 14-7430-002 State Route 49-Alta Sierra Drive.ppd Nothing on Bank 1 Date : 6/19/2014 Nothing on Bank 2 Unshifted Count = All Vehicles AM PEAK State Route 49 Alta Sierra Drive State Route 49 HOUR Southbound Westbound Northbound Eastbound START TIME LEFT THRU RIGHT UTURNS APP.TOTAL LEFT THRU RIGHT UTURNS APP.TOTAL LEFT THRU RIGHT UTURNS APP.TOTAL LEFT THRU RIGHT UTURNS APP.TOTAL Total Peak Hour Analysis From 07:30 to 08:30 Peak Hour For Entire Intersection Begins at 07:30 07:30 6 191 0 0 197 51 0 62 0 113 0 247 13 0 260 0 0 0 0 0 570 07:45 6 161 0 0 167 38 0 44 0 82 0 241 12 0 253 0 0 0 0 0 502 08:00 6 152 0 0 158 28 0 43 0 71 0 182 9 0 191 0 0 0 0 0 420 08:15 13 148 0 0 161 24 0 37 0 61 0 200 11 0 211 0 0 0 0 0 433 Total Volume 31 652 0 0 683 141 0 186 0 327 0 870 45 0 915 0 0 0 0 0 1925 % App Total 4.5% 95.5% 0.0% 0.0% 43.1% 0.0% 56.9% 0.0% 0.0% 95.1% 4.9% 0.0% 0.0% 0.0% 0.0% 0.0% PHF .596 .853 .000 .000 .867 .691 .000 .750 .000 .723 .000 .881 .865 .000 .880 .000 .000 .000 .000 .000 .844

PM PEAK State Route 49 Alta Sierra Drive State Route 49 HOUR Southbound Westbound Northbound Eastbound START TIME LEFT THRU RIGHT UTURNS APP.TOTAL LEFT THRU RIGHT UTURNS APP.TOTAL LEFT THRU RIGHT UTURNS APP.TOTAL LEFT THRU RIGHT UTURNS APP.TOTAL Total Peak Hour Analysis From 16:45 to 17:45 Peak Hour For Entire Intersection Begins at 16:45 16:45 30 240 0 0 270 9 0 24 0 33 0 206 40 0 246 0 0 0 0 0 549 17:00 29 221 0 0 250 23 0 33 0 56 0 200 27 0 227 0 0 0 0 0 533 17:15 35 302 0 0 337 14 0 29 0 43 0 206 46 0 252 0 0 0 0 0 632 17:30 38 242 0 0 280 25 0 27 0 52 0 231 37 0 268 0 0 0 0 0 600 Total Volume 132 1005 0 0 1137 71 0 113 0 184 0 843 150 0 993 0 0 0 0 0 2314 % App Total 11.6% 88.4% 0.0% 0.0% 38.6% 0.0% 61.4% 0.0% 0.0% 84.9% 15.1% 0.0% 0.0% 0.0% 0.0% 0.0% PHF .868 .832 .000 .000 .843 .710 .000 .856 .000 .821 .000 .912 .815 .000 .926 .000 .000 .000 .000 .000 .915 ALL TRAFFIC DATA Nevada County (916) 771-8700 All Vehicles on Unshifted [email protected] File Name : 14-7430-003 Johnson Place-Alta Sierra Drive.ppd Nothing on Bank 1 Date : 6/19/2014 Nothing on Bank 2 Unshifted Count = All Vehicles Johnson Place Alta Sierra Drive Alta Sierra Drive Southbound Westbound Northbound Eastbound START TIME LEFT THRU RIGHT UTURNS APP.TOTAL LEFT THRU RIGHT UTURNS APP.TOTAL LEFT THRU RIGHT UTURNS APP.TOTAL LEFT THRU RIGHT UTURNS APP.TOTAL Total Uturn Total 07:00 0 0 0 0 0 0 60 0 0 60 0 0 0 0 0 1 8 0 0 9 69 0 07:15 0 0 1 0 1 0 59 0 0 59 0 0 0 0 0 1 5 0 0 6 66 0 07:30 0 0 1 0 1 0 111 3 0 114 0 0 0 0 0 2 10 0 0 12 127 0 07:45 1 0 1 0 2 0 77 0 0 77 0 0 0 0 0 3 16 0 0 19 98 0 Total 1 0 3 0 4 0 307 3 0 310 0 0 0 0 0 7 39 0 0 46 360 0

08:00 0 0 0 0 0 0 72 2 0 74 0 0 0 0 0 0 12 0 0 12 86 0 08:15 1 0 0 0 1 0 57 3 0 60 0 0 0 0 0 2 20 0 0 22 83 0 08:30 0 0 4 0 4 0 65 3 0 68 0 0 0 0 0 5 13 0 0 18 90 0 08:45 1 0 1 0 2 0 70 1 0 71 0 0 0 0 0 5 24 0 0 29 102 0 Total 2 0 5 0 7 0 264 9 0 273 0 0 0 0 0 12 69 0 0 81 361 0

16:00 3 0 2 0 5 0 51 1 0 52 0 0 0 0 0 3 38 0 0 41 98 0 16:15 5 0 2 0 7 0 42 6 0 48 0 0 0 0 0 2 47 0 0 49 104 0 16:30 2 0 2 0 4 0 37 3 0 40 0 0 0 0 0 0 40 0 0 40 84 0 16:45 1 0 1 0 2 0 29 1 0 30 0 0 0 0 0 5 60 0 0 65 97 0 Total 11 0 7 0 18 0 159 11 0 170 0 0 0 0 0 10 185 0 0 195 383 0

17:00 4 0 4 0 8 0 46 4 0 50 0 0 0 0 0 1 49 0 0 50 108 0 17:15 6 0 7 0 13 0 31 3 0 34 0 0 0 0 0 3 75 0 0 78 125 0 17:30 5 0 2 0 7 0 36 2 0 38 0 0 0 0 0 4 59 0 0 63 108 0 17:45 2 0 4 0 6 0 37 2 0 39 0 0 0 0 0 7 52 0 0 59 104 0 Total 17 0 17 0 34 0 150 11 0 161 0 0 0 0 0 15 235 0 0 250 445 0

Grand Total 31 0 32 0 63 0 880 34 0 914 0 0 0 0 0 44 528 0 0 572 1549 0 Apprch % 49.2% 0.0% 50.8% 0.0% 0.0% 96.3% 3.7% 0.0% 0.0% 0.0% 0.0% 0.0% 7.7% 92.3% 0.0% 0.0% Total % 2.0% 0.0% 2.1% 0.0% 4.1% 0.0% 56.8% 2.2% 0.0% 59.0% 0.0% 0.0% 0.0% 0.0% 0.0% 2.8% 34.1% 0.0% 0.0% 36.9% 100.0% ALL TRAFFIC DATA Nevada County (916) 771-8700 All Vehicles on Unshifted [email protected] File Name : 14-7430-003 Johnson Place-Alta Sierra Drive.ppd Nothing on Bank 1 Date : 6/19/2014 Nothing on Bank 2 Unshifted Count = All Vehicles AM PEAK Johnson Place Alta Sierra Drive Alta Sierra Drive HOUR Southbound Westbound Northbound Eastbound START TIME LEFT THRU RIGHT UTURNS APP.TOTAL LEFT THRU RIGHT UTURNS APP.TOTAL LEFT THRU RIGHT UTURNS APP.TOTAL LEFT THRU RIGHT UTURNS APP.TOTAL Total Peak Hour Analysis From 07:30 to 08:30 Peak Hour For Entire Intersection Begins at 07:30 07:30 0 0 1 0 1 0 111 3 0 114 0 0 0 0 0 2 10 0 0 12 127 07:45 1 0 1 0 2 0 77 0 0 77 0 0 0 0 0 3 16 0 0 19 98 08:00 0 0 0 0 0 0 72 2 0 74 0 0 0 0 0 0 12 0 0 12 86 08:15 1 0 0 0 1 0 57 3 0 60 0 0 0 0 0 2 20 0 0 22 83 Total Volume 2 0 2 0 4 0 317 8 0 325 0 0 0 0 0 7 58 0 0 65 394 % App Total 50.0% 0.0% 50.0% 0.0% 0.0% 97.5% 2.5% 0.0% 0.0% 0.0% 0.0% 0.0% 10.8% 89.2% 0.0% 0.0% PHF .500 .000 .500 .000 .500 .000 .714 .667 .000 .713 .000 .000 .000 .000 .000 .583 .725 .000 .000 .739 .776

PM PEAK Johnson Place Alta Sierra Drive Alta Sierra Drive HOUR Southbound Westbound Northbound Eastbound START TIME LEFT THRU RIGHT UTURNS APP.TOTAL LEFT THRU RIGHT UTURNS APP.TOTAL LEFT THRU RIGHT UTURNS APP.TOTAL LEFT THRU RIGHT UTURNS APP.TOTAL Total Peak Hour Analysis From 17:00 to 18:00 Peak Hour For Entire Intersection Begins at 17:00 17:00 4 0 4 0 8 0 46 4 0 50 0 0 0 0 0 1 49 0 0 50 108 17:15 6 0 7 0 13 0 31 3 0 34 0 0 0 0 0 3 75 0 0 78 125 17:30 5 0 2 0 7 0 36 2 0 38 0 0 0 0 0 4 59 0 0 63 108 17:45 2 0 4 0 6 0 37 2 0 39 0 0 0 0 0 7 52 0 0 59 104 Total Volume 17 0 17 0 34 0 150 11 0 161 0 0 0 0 0 15 235 0 0 250 445 % App Total 50.0% 0.0% 50.0% 0.0% 0.0% 93.2% 6.8% 0.0% 0.0% 0.0% 0.0% 0.0% 6.0% 94.0% 0.0% 0.0% PHF .708 .000 .607 .000 .654 .000 .815 .688 .000 .805 .000 .000 .000 .000 .000 .536 .783 .000 .000 .801 .890 ALL TRAFFIC DATA Nevada County (916) 771-8700 All Vehicles on Unshifted [email protected] File Name : 14-7430-004 Little Valley Road-Alta Sierra Drive.ppd Nothing on Bank 1 Date : 6/19/2014 Nothing on Bank 2 Unshifted Count = All Vehicles Little Valley Road Alta Sierra Drive Little Valley Road Alta Sierra Drive Southbound Westbound Northbound Eastbound START TIME LEFT THRU RIGHT UTURNS APP.TOTAL LEFT THRU RIGHT UTURNS APP.TOTAL LEFT THRU RIGHT UTURNS APP.TOTAL LEFT THRU RIGHT UTURNS APP.TOTAL Total Uturn Total 07:00 3 0 0 0 3 0 57 5 0 62 0 0 0 0 0 0 7 1 0 8 73 0 07:15 2 0 0 0 2 0 61 1 0 62 0 0 0 0 0 0 5 0 0 5 69 0 07:30 1 0 1 0 2 0 108 5 0 113 0 0 1 0 1 1 9 0 0 10 126 0 07:45 3 1 3 0 7 0 77 2 0 79 0 0 0 0 0 0 9 1 0 10 96 0 Total 9 1 4 0 14 0 303 13 0 316 0 0 1 0 1 1 30 2 0 33 364 0

08:00 2 0 2 0 4 0 66 2 0 68 1 0 0 0 1 1 10 0 0 11 84 0 08:15 4 1 5 0 10 1 52 4 0 57 0 0 0 0 0 0 18 0 0 18 85 0 08:30 3 0 3 0 6 1 62 8 0 71 1 0 0 0 1 0 15 0 0 15 93 0 08:45 4 0 4 0 8 2 66 4 0 72 0 0 1 0 1 0 21 1 0 22 103 0 Total 13 1 14 0 28 4 246 18 0 268 2 0 1 0 3 1 64 1 0 66 365 0

16:00 15 0 3 0 18 1 44 3 0 48 1 0 1 0 2 2 34 0 0 36 104 0 16:15 16 1 4 0 21 0 32 9 0 41 3 0 2 0 5 0 47 2 0 49 116 0 16:30 28 0 1 0 29 0 35 5 0 40 0 0 0 0 0 9 36 0 0 45 114 0 16:45 20 2 2 0 24 1 28 5 0 34 1 1 1 0 3 1 54 2 0 57 118 0 Total 79 3 10 0 92 2 139 22 0 163 5 1 4 0 10 12 171 4 0 187 452 0

17:00 18 0 0 0 18 1 46 1 0 48 2 0 1 0 3 5 50 0 0 55 124 0 17:15 30 0 3 0 33 0 38 7 0 45 1 0 0 0 1 1 71 0 0 72 151 0 17:30 25 0 1 0 26 0 40 3 0 43 0 0 0 0 0 0 59 1 0 60 129 0 17:45 18 0 0 0 18 1 35 2 0 38 3 0 0 0 3 1 53 0 0 54 113 0 Total 91 0 4 0 95 2 159 13 0 174 6 0 1 0 7 7 233 1 0 241 517 0

Grand Total 192 5 32 0 229 8 847 66 0 921 13 1 7 0 21 21 498 8 0 527 1698 0 Apprch % 83.8% 2.2% 14.0% 0.0% 0.9% 92.0% 7.2% 0.0% 61.9% 4.8% 33.3% 0.0% 4.0% 94.5% 1.5% 0.0% Total % 11.3% 0.3% 1.9% 0.0% 13.5% 0.5% 49.9% 3.9% 0.0% 54.2% 0.8% 0.1% 0.4% 0.0% 1.2% 1.2% 29.3% 0.5% 0.0% 31.0% 100.0% ALL TRAFFIC DATA Nevada County (916) 771-8700 All Vehicles on Unshifted [email protected] File Name : 14-7430-004 Little Valley Road-Alta Sierra Drive.ppd Nothing on Bank 1 Date : 6/19/2014 Nothing on Bank 2 Unshifted Count = All Vehicles AM PEAK Little Valley Road Alta Sierra Drive Little Valley Road Alta Sierra Drive HOUR Southbound Westbound Northbound Eastbound START TIME LEFT THRU RIGHT UTURNS APP.TOTAL LEFT THRU RIGHT UTURNS APP.TOTAL LEFT THRU RIGHT UTURNS APP.TOTAL LEFT THRU RIGHT UTURNS APP.TOTAL Total Peak Hour Analysis From 07:30 to 08:30 Peak Hour For Entire Intersection Begins at 07:30 07:30 1 0 1 0 2 0 108 5 0 113 0 0 1 0 1 1 9 0 0 10 126 07:45 3 1 3 0 7 0 77 2 0 79 0 0 0 0 0 0 9 1 0 10 96 08:00 2 0 2 0 4 0 66 2 0 68 1 0 0 0 1 1 10 0 0 11 84 08:15 4 1 5 0 10 1 52 4 0 57 0 0 0 0 0 0 18 0 0 18 85 Total Volume 10 2 11 0 23 1 303 13 0 317 1 0 1 0 2 2 46 1 0 49 391 % App Total 43.5% 8.7% 47.8% 0.0% 0.3% 95.6% 4.1% 0.0% 50.0% 0.0% 50.0% 0.0% 4.1% 93.9% 2.0% 0.0% PHF .625 .500 .550 .000 .575 .250 .701 .650 .000 .701 .250 .000 .250 .000 .500 .500 .639 .250 .000 .681 .776

PM PEAK Little Valley Road Alta Sierra Drive Little Valley Road Alta Sierra Drive HOUR Southbound Westbound Northbound Eastbound START TIME LEFT THRU RIGHT UTURNS APP.TOTAL LEFT THRU RIGHT UTURNS APP.TOTAL LEFT THRU RIGHT UTURNS APP.TOTAL LEFT THRU RIGHT UTURNS APP.TOTAL Total Peak Hour Analysis From 16:45 to 17:45 Peak Hour For Entire Intersection Begins at 16:45 16:45 20 2 2 0 24 1 28 5 0 34 1 1 1 0 3 1 54 2 0 57 118 17:00 18 0 0 0 18 1 46 1 0 48 2 0 1 0 3 5 50 0 0 55 124 17:15 30 0 3 0 33 0 38 7 0 45 1 0 0 0 1 1 71 0 0 72 151 17:30 25 0 1 0 26 0 40 3 0 43 0 0 0 0 0 0 59 1 0 60 129 Total Volume 93 2 6 0 101 2 152 16 0 170 4 1 2 0 7 7 234 3 0 244 522 % App Total 92.1% 2.0% 5.9% 0.0% 1.2% 89.4% 9.4% 0.0% 57.1% 14.3% 28.6% 0.0% 2.9% 95.9% 1.2% 0.0% PHF .775 .250 .500 .000 .765 .500 .826 .571 .000 .885 .500 .250 .500 .000 .583 .350 .824 .375 .000 .847 .864

APPENDIX C

Explanation and Calculation of Intersection Delay

EXPLANATION AND CALCULATION OF INTERSECTION LEVEL OF SERVICE USING DELAY METHODOLOGY

The levels of service at the unsignalized and signalized intersections are calculated using the delay methodology in the Highway Capacity Manual. This methodology views an intersection as consisting of several lane groups. A lane group is a set of lanes serving a movement. If there are two northbound left turn lanes, then the lane group serving the northbound left turn movement has two lanes. Similarly, there may be three lanes in the lane group serving the northbound through movement, one lane in the lane group serving the northbound right turn movement, and so forth. It is also possible for one lane to serve two lane groups. A shared lane might result in there being 1.5 lanes in the northbound left turn lane group and 2.5 lanes in the northbound through lane group.

For each lane group, there is a capacity. That capacity is calculated by multiplying the number of lanes in the lane group times a theoretical maximum lane capacity per lane time’s 12 adjustment factors.

Each of the 12 adjustment factors has a value of approximately 1.00. A value less than 1.00 is generally assigned when a less than desirable condition occurs.

The 12 adjustment factors are as follows:

1. Peak hour factor (to account for peaking within the peak hour)

2. Lane utilization factor (to account for not all lanes loading equally)

3. Lane width

4. Percent of heavy trucks

5. Approach grade

6. Parking

7. Bus stops at intersections

8. Area type (CBD or other)

9. Right turns

10. Left turns

11. Pedestrian activity

12. Signal progression

The maximum theoretical lane capacity and the 12 adjustment factors for it are all unknowns for which approximate estimates have been recommended in the Highway Capacity Manual. For the most part, the recommended values are not based on statistical analysis but rather on educated estimates. However, it is possible to use the delay method and get reasonable results as will be discussed below.

Once the lane group volume is known and the lane group capacity is known, a volume to capacity ratio can be calculated for the lane group.

With a volume to capacity ratio calculated, average delay per vehicle in a lane group can be estimated. The average delay per vehicle in a lane group is calculated using a complex formula provided by the Highway Capacity Manual, which can be simplified and described as follows:

Delay per vehicle in a lane group is a function of the following:

1. Cycle length

2. Amount of red time faced by a lane group

3. Amount of yellow time for that lane group

4. The volume to capacity ratio of the lane group

The average delay per vehicle for each lane group is calculated, and eventually an overall average delay for all vehicles entering the intersection is calculated. This average delay per vehicle is then used to judge Level of Service. The Level of Services are defined in the table that follows this discussion.

Experience has shown that when a maximum lane capacity of 1,900 vehicles per hour is used (as recommended in the Highway Capacity Manual), little or no yellow time penalty is used, and none of the 12 penalty factors are applied, calculated delay is realistic. The delay calculation for instance assumes that yellow time is totally unused. Yet experience shows that most of the yellow time is used.

An idiosyncrasy of the delay methodology is that it is possible to add traffic to an intersection and reduce the average total delay per vehicle. If the average total delay is 30 seconds per vehicle for all vehicles traveling through an intersection, and traffic is

added to a movement that has an average total delay of 15 seconds per vehicle, then the overall average total delay is reduced.

The delay calculation for a lane group is based on a concept that the delay is a function of the amount of unused capacity available. As the volume approaches capacity and there is no more unused capacity available, then the delay rapidly increases. Delay is not proportional to volume, but rather increases rapidly as the unused capacity approaches zero.

Because delay is not linearly related to volumes, the delay does not reflect how close an intersection is to overloading. If an intersection is operating at Level of Service C and has an average total delay of 18 seconds per vehicle, you know very little as to what percent the traffic can increase before Level of Service E is reached.

LEVEL OF SERVICE DESCRIPTION1

Level Average Total Delay Of Per Vehicle (Seconds) Service Description Signalized Unsignalized A Level of Service A occurs when progression is 0 to 10.00 0 to 10.00 extremely favorable and most vehicles arrive during the green phase. Most vehicles do not stop at all. Short cycle lengths may also contribute to low delay. B Level of Service B generally occurs with good 10.01 to 20.00 10.01 to 15.00 progression and/or short cycle lengths. More vehicles stop than for Level of Service A, causing higher levels of average total delay. C Level of Service C generally results when there is fair 20.01 to 35.00 15.01 to 25.00 progression and/or longer cycle lengths. Individual cycle failures may begin to appear in this level. The number of vehicles stopping is significant at this level, although many still pass through the intersection without stopping. D Level of Service D generally results in noticeable 35.01 to 55.00 25.01 to 35.00 congestion. Longer delays may result from some combination of unfavorable progression, long cycle lengths, or high volume to capacity ratios. Many vehicles stop, and the proportion of vehicles not stopping declines. Individual cycle failures are noticeable. E Level of Service E is considered to be the limit of 55.01 to 80.00 35.01 to 50.00 acceptable delay. These high delay values generally indicate poor progression, long cycle lengths, and high volume to capacity ratios. Individual cycle failures are frequent occurrences. F Level of Service F is considered to be unacceptable 80.01 and up 50.01 and up to most drivers. This condition often occurs with oversaturation, i.e., when arrival flow rates exceed the capacity of the intersection. It may also occur at high volume to capacity ratios below 1.00 with many individual cycle failures. Poor progression and long cycle lengths may also be major contributing causes to such delay levels.

1 Source: Highway Capacity Manual Special Report 209, Transportation Research Board, National Research Council, Washington, D.C., 2000.

Existing

Existing Plus Project

Year 2035 Without Project

Year 2035 With Project

APPENDIX D

Sight Distance Standards

1111 Town & Country Road, Suite 34 Orange, California 92868 (714) 973-8383

www.traffic-engineer.com