Form I Page -2 Building Stone Quarry Project of Mr
Total Page:16
File Type:pdf, Size:1020Kb
Building Stone Quarry Project of Mr. A.H. Sheriff form i Form I Page -2 Building Stone Quarry Project of Mr. A.H. Sheriff APPENDIX I (See paragraph – 6) FORM – I (I) BASIC INFORMATION Sl. Item Details No. 1 Name of the project/s Building stone quarry project of Mr. A.H. Sheriff 2 S. No. in the schedule 1(a) 3 Proposed capacity/area/length/tonnage The Proposed capacity of Building stone to be handled/command area/lease production is at a maximum of 1, 13,300 Tonnes area/number of wells to be drilled Per Annum. Applied mining Area = 1.8130 Hectares. The lease area exhibits hilly terrains; Part of the lease land is already under mining and the remaining lease land is covered with native trees, shrubs, herbs, grass, climbers, bushes etc. The topography of the lease area is hilly. The highest elevation of the lease area is 94m RL and lowest is 34m RL. As the Lease area is hill slope, the drainage of the lease area is towards south. Existing Quarry. 4 New/ Expansion/ Modernization New Proposal for Environmental Clearance. Existing capacity/Area etc. The project is been granted with Quarrying Lease as per Proceedings of The Director of Mining and Geology, Order No. 331/2014-15/8448/M3/2014 5 Dated – 20-08-2014 and Pro. Order No. 855/2007- 08/178/M3/2008 Dated – 27-02-2008 for extraction of Granite Building Stone over an Extent of 1.8130 Hectares. 6 Category of project i.e. `A’ or ‘B’ Category – B2 Does it attract the general condition? If 7 The project does not attract the general condition. yes, please specify. Does it attract the specify condition? If 8 The project does not attract specific condition. yes, please specify. Location The building stone quarry project is situated at Survey No. 1087/1A2 (P), of Mulavoor Village, Muvattupuzha Taluk, Ernakulam District, Kerala, over an Extent of 1.8130 Hectares 9 Latitude: 10°02’11.70”N to 10°02’17.78”N Longitude: 76°34’30.70”E to 76°34’38.78”E Plot/ Survey/ Khasra No. 1087/1A2 (P) Village Mulavoor Taluka Muvattupuzha Form I Page -3 Building Stone Quarry Project of Mr. A.H. Sheriff District Ernakulam State Kerala Nearest railway station/ airport along Aluva Railway Station: 25.20 KM North West 10 with distance in kms Cochi International Airport: 23.58 KM North West Nearest Town, city, District Nearest Town: Muvattupuzha, 6.0 KM South 11 Headquarters along with distance in Nearest City: Ernakulam, 31.0 KM South West kms District HQ: Ernakulam, 31.0 KM South West Village Panchayats, ZilaParishad, Paipra Grama Panchayat Municipal Corporation, Local body Paipra, Pezhakkappilly, (complete postal addresses with Cochin – 686 669 12 telephone nos. to be given) Ph: 0485 – 2813607 0485 – 2814710 www.lsgkerala.in/paiprapanchayat 13 Name of the applicant Mr. A.H. Sheriff Mr. A.H. Sheriff, Proprietor Registered Address M/s A.H. Sheriff Quarry Ettukattil House, Edathala North P.O. 14 Aluva Taluk, Ernakulam District, Kerala State - 683 564 Mobile No: +91 9745341001 E – Mail: [email protected] Address for correspondence: Name Mr. A.H. Sheriff Designation (Owner/Partner/CEO) Proprietor Address Mr. A.H. Sheriff, Proprietor M/s A.H. Sheriff Quarry Ettukattil House, Edathala North P.O. 15 Aluva Taluk, Ernakulam District, Kerala State - 683 564 Mobile No: +91 9745341001 E – Mail: [email protected] Pin Code 683 564 E-mail [email protected] Mobile No. +91 9745341001 Fax No. - Details of Alternative Sites examined, if Not Applicable. This is a site specific project. 16 any. Location of these sites should be shown on a Topo sheet. 17 Interlinked Projects There is no interlinked project. Whether separate application of As there is no interlinked project, no application 18 interlinked project has been submitted? has been submitted. 19 If yes, date of submission Not Applicable 20 If no, reason Not applicable Form I Page -4 Building Stone Quarry Project of Mr. A.H. Sheriff Whether the proposal involves approval/ clearance under: if yes, details of the same and their status to be given. (a) The Forest (Conservation) Act, No forest land involved. 21 1980? (b) The Wildlife (Protection) Act, 1972? No national Park/Wildlife sanctuary within 10 km radius area. (c) The C. R. Z. Notification, 1991? The area does not fall under CRZ. 1. Quarrying Lease as per Proceedings of The Director of Mining and Geology, Order No. 331/2014-15/8448/M3/2014 Dated – 20-08-2014 and Pro. Order No. 855/2007- 08/178/M3/2008 Dated – 27-02-2008 for Whether there is any Government extraction of Granite Building Stone over 22 Order/ Policy relevant/ relating to the an Extent of 1.8130 Hectares. site? 2. Kerala State Pollution Control Board Consent to Operate. File No: PCB/DO- EKM/IQR-68/R/09 3. Explosive License No: E/SC/KL/22/1316(E57083) Forest land involved (hectares) No, there is no forest land involved in the project 23 area. Whether there is any litigation pending against the project and/ or land in which the project is propose to be set up? (a) Name of the Court 24 Not Applicable (b) Case No. (c) Orders/ directions of the Court, if any and its relevance with the proposed project. Form I Page -5 Building Stone Quarry Project of Mr. A.H. Sheriff (II) Activity 1. Construction operation or decommissioning of the project involving actions, which will cause physical changes in the locality (topography, land use changes in water bodies, etc.) Details thereof (with approximate Sl. Information/Checklist Yes/ quantities/rates, wherever possible) with No. confirmation No sources of information data The topography will be changed after the quarrying of Building stone as per the Mining plan. Conventional Open cast Semi Permanent or temporary change in Mechanized Mining with 5.0 meter bench land use, land cover or topography height with a bench width of 5.0 meter is 1.1 including increase in intensity of Yes proposed. land use (with respect to local land At end of the mine life, thick plantation will be use plan) developed on the top benches and partly backfilled mine void. Water body will be developed in the remaining mined out pit in the lower benches. Part of lease area is already under mining and remaining land comprise of coconut & rubber plantation having topsoil with average Clearance of existing land, 1.2 Yes thickness of 0.30m to 0.40m. The rubber & vegetation and building? coconut trees in the lease area will have to be cleared for quarrying. There is no building in the area. The entire area will be used for quarrying of building stone. Temporary approach road within the area will be maintained for easy access of men and 1.3 Creation of new land uses? Yes machinery which will be well maintained till life of the mine. At conceptual stage, the area will be converted into mine benches covered with thick plantation and water body. Pre-construction investigations e.g. 1.4 No Not Applicable bore houses, soil testing? There will not be any significant construction 1.5 Construction works? Yes activity except for workers rest room and office. 1.6 Demolition works? No Not Applicable Temporary sites used for 1.7 construction works or housing of No Not Applicable construction workers? Above ground buildings, structures 1.8 or earth works including linear No Not Applicable structures, cut and fill or Form I Page -6 Building Stone Quarry Project of Mr. A.H. Sheriff excavations Underground works including 1.9 No Not Applicable mining or tunneling? At the end of life of mine, lower benches of excavated area will be converted into water 1.10 Reclamation works? Yes pond and thick plantation will be carried out on top benches and safety barrier area. 1.11 Dredging? No Not Applicable 1.12 Offshore structures? No Not Applicable Semi Mechanized open cast method of deployment by Excavator & Jack Hammer Drilling and small scale blasting for mining of mineral. The salient features of mining method are:- The height of the bench will be 5.0 m and width will not less than the height of the bench. The mining will be done from top to bottom. Production and manufacturing 1.13 Yes Considering the stability of rocks the final processes? slope or ultimate pit slope will 60° from vertical. Small scale blasting with low charge of holes will be done to loosen the rocks. Haul road will be developed up to point of loading and will not have gradient more than 1 in 16. Transportation of the mineral from mine to destination will be by tarpaulin covered trucks. Facilities for storage of goods or Temporary facility for storage of mineral will be 1.14 No materials? developed in mine site. The top soil & over burden thickness varies from avg. 0.30 m to 0.40 m. The topsoil excavated from the quarry will be dumped separately at pre determined place and subsequently will be utilized in spreading over reclaimed areas for plantation. Facilities for treatment or disposal 1.15 No The over burden will be utilized for laying of solid waste or liquid effluents? internal haul road and will form base in reclamation/plantation. Domestic waste water will be discharged in Septic Tank followed by soak pit. No process effluent will be generated during quarry operation. Form I Page -7 Building Stone Quarry Project of Mr. A.H. Sheriff Facilities for long term housing of Mostly local persons will be employed. 1.16 No operational workers? New road, rail or sea traffic during There will be stone transportation traffic from 1.17 Yes construction or operation? mine to the buyer’s location.