BUDGET WORKS DETAILS OFWORKSUNDERPWD BUILDINGSDIVISION,THALASSERYDURIN 1 2 1 Fire & Rescue

2 Budget page No./ Item no.

3 Budget Provision in lakhs Mattannur 4 LA Constituency Thalassery 5 Division

Home (F) Dept 6 Department Name ofProject Fire Station,Mattannur. Construction ofbuilding for 4059-60-051-85 Quarters Kannur Rescue StationandStaff Construction ofFireand 4059-60-051-85 01 21 41 61 81 02 22 42 62 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7

4059-60-051-85 4059-60-051-85 Head of Account

GO(MS)No.225/13 Home dated,07/09/13 for Rs.900L AS No. Date & Amount

900.00L

33/CE/BL/2014-15 dated

TS No, Date & Amount MARCH 2017 4.2.15 for Rs.900 Lakhs Fire &Rescue

30.4.15 Date of tender

SE(K) 64/2015-16 Dated: Agreement No. & Date 08/01/2016 Page

1 ULCCS Ltd Name of Contractor

Tender percentage

80280384/- Estimate PAC

98038381/- Agreed PAC

12 Months Period of completion in months

Site Hand over Date 15.09.2015

14/09/2016 Date of completion as per agreement

Extended Date of Completion

Actual date of completion Present Stage submitted on Revised A.S completion G THEYEAR2016-2017 sep 2016- proposal Nearing 5Crores

94% Physical progress(%) Electrical workin Estimate under Electrification preparation Stages of final stage

112375+10281658 Expenditure up to current month

Amount required upto this financial year

Remarks 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

General Education

Ele. Estimate submitted to ele. Dn. KKD Esd 5/11-12 4059-01-051-86-16 Dated 20/04/2011 Rs.2,82,000/-Work 3 Work completed Construction of AEO tendered due date 55.00 100% 64.43% 8145562 9 Months 9 P.I Rajeev 5529575/- 9092280/-

Thalassery 10.12.2015

Kalliassery Office,Payangadi. 29.10.2011 28.01.2014 28.10.2014 30.07.2015

for Rs.55 Lakhs Rs.55 for Work Awarded to the 4059-01-051-86-16

PWD(E) Department contractor Sri.Sunil Periyaram Kannur 49/ CE/ BL/11-12 dtd 12/8/11 dtd BL/11-12 CE/ 49/ SE(K)36/2013-14 dt 28.01.2014 dt SE(K)36/2013-14 Go(Rt)No:1817/10/PWD dtd 2/12/2010 2/12/2010 dtd Go(Rt)No:1817/10/PWD

Ele. Estimate 4202-01-202-91 submitted to ele. Construction of 10 class room Dn. KKD Esd 4 Work completed 38/14-15 Dated 100%

buildings for GHSS 6.8.15 198.00 Pradeep P 10158623 Thalassery 18 Months 18 30% above 30% 16/11/2015 16-11-2015 15-05-2017 10/10/2014

in Kannur 1,94,84,847/- 2,53,30,301/- 4202-01-202-91

General Education Rs.7,10,000/- SE(K) 43/2015-16 Dated: Dated: 43/2015-16 SE(K) CR/12/2014-15 dtd 14/7/14 dtd CR/12/2014-15 dated,12/11/13 Rs.198 Lakhs Rs.198 dated,12/11/13 G.O (Rt) No.4780/2013/ G.Edn G.Edn No.4780/2013/ (Rt) G.O

Ele. Estimate submitted to ele. 4202-01-202-91(P) Dn. KKD Esd 02/14-15 Dated 5 Construction of a building for Work completed 28 /04 /2014 100% Lakhs 125.00 9 Months 9 Azhikode GHSS Pallikkunnu 12.9.2014 Thalassery 24.04.2015 13517882/- 17423198/-

P.MAJUSH Rs5,70,000/- 23--01-2016 28.89% above above 28.89% Being Tenderd 4202-01-202-91(P) General Education (SC) Education General

CR 4/14-15 dt 3.06.2014 dt 4/14-15 CR From Ele.Div KKD dated,Tvm 12/11/13 Rs.125 Rs.125 12/11/13 dated,Tvm SE(K)01/2015-16 Dt.17.4.15 SE(K)01/2015-16 G.O (Rt) No.4780/2013/ G.Edn G.Edn No.4780/2013/ (Rt) G.O

Page 2 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

4202-01-202-91(P) Construction of 6 Nos. Class rooms on the top Ele. Estimate submitted to ele. of the existing ground Dn. KKD Dated 6 floor building of Chala Work completed 26 /04 /2016 85.00 100% Lakhs 31.5.14

8108418 Rs4,00,000/- 9 Months 9 9691992/- Thalassery 17-01-2014

Dharmadam Higher Secondary Being Tenderd 19.53% ABOVE 19.53% K.V. VALSARAJ. School at Chala in 4202-01-202-91(P) From Ele.Div KKD Chembilode Panchayath Dt.29.01.14 DR/87/13-14 EE/BLD/74/14-15 DT. 31.01.15 DT. EE/BLD/74/14-15

General Education(SC) Department in G.O (Rt) No.4780/2013/ Gl/Edn dated,12/11/13 Rs.85 Rs.85 dated,12/11/13 Gl/Edn No.4780/2013/ (Rt) G.O

4202-01-202-93(P) Structure Construction of a building Completed. Estimate to be 7 65% for G.V.H.S.S Madai, 2016 Masonry in submitted Society 100 Lakhs 100 Thalassery 12 Months 12 Kalliassery 9--02-2015 93,53,420/- progress 23--06-2016 22--06-2017 Kannur (Boys) 1,02,98,115/- 4202-01-202-93(P) 10.10% above estimate rate dated,22/8/14 Rs.100 Lakhs Lakhs Rs.100 dated,22/8/14 DR./7/2014-15 dtd 22.11.2014 dtd DR./7/2014-15 EE/BLD/29/2016-2017 dt. 16--06- dt. EE/BLD/29/2016-2017 M/sKerala LandReforms Co-Op- G.O(Rt) No.3371/2014/G.Edn Tvm Tvm No.3371/2014/G.Edn G.O(Rt)

4202-01-202-92(P) Structure Estimate to be 8 Construction of a building for

completed 85% submitted 50 Lakhs 50 G.V..H.S.S Kannur Months 9 Thalassery Kalliassery 54,97,888/- 60,53,175/- 09-02-2015 23--06-2016 22--03-2017 10.10% above 10.10% 4202-01-202-92(P) 16/10/2014 Rs. 50 Lakhs 50 Rs. 16/10/2014 M/sKerala LandReforms General Education (SC) Dept (SC) Education General Development Co-Op- Society Co-Op- Development DR77/2014-15dtd 03/12/2014 DR77/2014-15dtd GO(Rt) No.4213/14/G.Edn Dated,Tvm Dated,Tvm No.4213/14/G.Edn GO(Rt) EE/BLD/30/2016-2017 dt. 16--06-2016 dt. EE/BLD/30/2016-2017

Page 3 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

4202-01-202-91(P) Column for I st 9 Goverrnment Town HSS, Work awarded

floor in progress 25% Kannur

Kannur 18monthz 150 Lakhs 150 Thalassery 3.9% above 3.9% K.C. Joseph 29--06-2016 28--12-2017 1,37,66,475/- 1,43,03,368/- Rs.150 Lakhs Rs.150 for Rs.150 Lakhs Lakhs Rs.150 for 4202-01-202-91(P) General Educatin (SC) GO(Rt) No.152/15 General General No.152/15 GO(Rt) Education dated,13/01/2015 dated,13/01/2015 Education 2806/2015-16 Dated: 23/01/2016 23/01/2016 Dated: 2806/2015-16 SE(K)/28/2016-2017 dt. 21/06/2016 dt. SE(K)/28/2016-2017

4202-01-202-91 (P) HSE- Annual Plan 2015-16- Upto plinth 10 Construction of class rooms beam level 20% 2016

Peravoor for Higher reached 9669168/- 9283369/- 100 Lakhs 100 Thalassery 12 Months 12 Ashraf P K 30-06-2016 29-06-2017 Secondary School at Lakhs 100 Rs. General Education Chavassery Kannur (P) 4202-01-202-91 3.99 % below estimate rate estimate below % 3.99 GO(Rt) No.176/2016/General No.176/2016/General GO(Rt) EE/BLD/34/2016-17 Dated: 22--06- Dated: EE/BLD/34/2016-17 Education dated,Tvm 16/01/2016 for for 16/01/2016 dated,Tvm Education

4202-01-202-92 Construction of a Estimate building for Complete under 11 GVHSS,Tagore d preparatio 100% 50 Lakhs 50 Vidyanikethan,Tali 50 Lakhs 4864073/- 4377666/- Thalassery

Six Months n Taliparamba 11--07-2016 4202-01-202-92

paramba in Kannur -10%) Below(

District Lakhs Rs.50 02--03-2016 General Education Dept. Education General 812/2016-17 dated: 10--06-2016 for Rs. Rs. for 10--06-2016 dated: 812/2016-17 GO(Rt) No.924/2016/G.Edn dated: dated: No.924/2016/G.Edn GO(Rt) M/S MCN Infrastructure Solutions Infrastructure MCN M/S EE/BLD/58/2016-17 Dated.05/08/2016 EE/BLD/58/2016-17

Page 4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

4202-01-202-93 work (P)Construction of held up a building for 12 due to Government

102 Lakhs CRZ 9484917/- 8491520/- Thalassery 12 Months Kalliassery Welfare LP School Raju Joseph Raju 12--02-2016 issue 4202-01-202-93 (P) EE/BLD/28/2016-17 9.999% below Estimate rate 9.999% below 2324/2015-16 Dated: 4--01-2016 dated,Tvm 04--08-2015 Rs.102 Lakhs Rs.102 04--08-2015 dated,Tvm General Education (P) Dept. Education General GO(MS) No.3228/2015/General Education Education No.3228/2015/General GO(MS)

4202-01-202-93 (P) T S estimate 13 Construction of New building resubmitted for GHSS Thalassery Taliparamba 293.62.Lacks General Education 4202-01-202-93 (P) 4202-01-202-93 G.O (Rt) No.3368/2016/G.Edn No.3368/2016/G.Edn (Rt) G.O dated,14/10/16 Rs.293.62.Lacks dated,14/10/16

4202-01-202-91 t Construction of Higher Structure completed Electrical estimate 14 Secondary class rooms and a artmen 50% 105L Masonry in to be submitted p 9 Months 9 Azhikode hall for CHM GHSS Thalassery

De progress

Valapattanam 4202-01-202-91 dtd 16/1/2016 Rs.105L 16/1/2016 dtd General Education (SC) (SC) Education General 817/2016-17 for Rs. 105 L L 105 Rs. for 817/2016-17 GO(Rt)No.176/2016/Gl. Edn Edn GO(Rt)No.176/2016/Gl. HEALTH -ALOPATHY

Page 5 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

4210-04-107-99 Construction of a building for 15 work completed. Elefn completed 66.5

Regional Public Health 100% Kannur 30/6/08 6999903 5599922/- Thalassery 25% above 25% Labouratory, Kannur 06-02-2009 4210-04-107-99 SE(K)03/2009-10 6/10/2009- 14/1/11 6/10/2009- M.Muhammed Kunhi M.Muhammed 5/CE/ B& LW/ 08-09 dtd dtd 08-09 LW/ B& 5/CE/ dtd 12/6/08 Rs.66.5 Lakhs Rs.66.5 12/6/08 dtd Go (Rt) 2042/08 / H & FWD FWD & H / 2042/08 (Rt) Go t i m b em to su h t d 4210-01-110-93 Construction of building for

16 women & Children Hospital Work completed Requeste 100% bill Kannur

at Mangattuparamba in l 21488264 Thalassery 36 Months 36 submitted to SE 30513334/- 30513334/- 10000000/- 10-11-1999 09-11-2002 31-12-2010 Taliparamba Rs. 300.00 L 300.00 Rs. 225.49 Lakhs 225.49 p na 4210-01-110-93 Kannur District. fi

sli d tte CE/15/98-99 Dt. 25/2/99 Dt. CE/15/98-99 i m b SE(K)19/1999-2000 dt 06.11.99 dt SE(K)19/1999-2000 su GO(RT)4458/97 Dt. 26/12/98 Rs. 300.00 L 300.00 Rs. 26/12/98 Dt. GO(RT)4458/97 SCC K M/S State Construction Corporation Ltd Ltd Corporation Construction State Kerala M/S workslip and closure agreement for submitting to SE. work

Compo. Tender Ele PAC 830486/- 4210-03-105-99 + (9.8%)=911874 Construction of Nursing Balance Work Work awaeded to 17 completed the contractor Sri. School at Kannur .(Malabar 100% 29.12.11 158.00 L 158.00 Azhikode 20488807 16000573 Thalassery 30.06.2010 30.06.2010 31.07.2014 25.14Lakhs 30-04-2013 package) Joseph Raju Vinodkumar M 4210-03-105-99

SE(K)17/2010-11 ,City Electricals 118/CE/B&LW/09-10 dt, 22/12/09 dt, 118/CE/B&LW/09-10 GO(Rt)No.1048/09/PWD dt, 14/7/09 158.00 L 158.00 14/7/09 dt, GO(Rt)No.1048/09/PWD

Page 6 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

Rew. of MM2 and MS1 wards completed Elfn 4210-01-110-93 Estimate of

18 District 18 Work completed canteen/ kitchen 273L 100% 273.00 Kannur

submitted ti EE, 4123542 16201702 23-7-2013 22-7-2015 Thalassery Hospital,Kannur 2.15% below 2.15% Rs.273 Lakhs Rs.273 Ele,KKD on 4210-01-110-93 C.H Abdul Nizar Abdul C.H SE(K)48/2012-13 29.10.2015 for RS.640000/- 144/CE/BLDs/11-12 dtd 24/3/12 dtd 144/CE/BLDs/11-12 GO(Rt) No:955/11/PWD dtd 20/711 20/711 dtd No:955/11/PWD GO(Rt)

Ele. Estimate 4210-04-107-99 prepared for Rs. 2,00,000/- Providing additional facilities 19 Work completed tendered Two 30.00 to Regional Public Health Lab 100% Kannur 21.3.14 20.9.14 31.12.14 20.12.14 1823013 1804783 times from Ele. 6 months months 6 1% below 1% 1593587/- Thalassery

Kannur Santhosh P C Sub Dn.TLY No 4210-04-107-99 4210-04-107-99

EE/BLD/73/2013-14 EE/BLD/73/2013-14 Response CC Ist & FinalCC Ist & bill paid DR/89/13-14 dated,29/1/14 DR/89/13-14 dated,Tvm 25/10/13 Rs.30 Lakhs Rs.30 25/10/13 dated,Tvm GO(Rt) No.3596/2013/H & FWD FWD & No.3596/2013/H GO(Rt)

Quarters finishing work 4210-01-110-66 Plan in progress. Strengthening of existing Canteen Estimate in

20 Women & Children Hospital, 18 Masonry

85% Electrical Division Mangattuparamba, Kannur 329.00 completed Thalassery B. ABBAS B. 31.03.2015 30.09.2016 29937326/- 36904564/- Taliparamba District above 25.64% Plastering 64/CE/BLDS/13-14

4210-01-110-66 Plan 4210-01-110-66 completed tile

16/11/2013 Rs.329 Lakhs Rs.329 16/11/2013 work in progress SE(K)50/14-15 Dt 24.03.2015 Dt SE(K)50/14-15 GO(Rt) No.3822/2013/H & FWD dated,Tvm dated,Tvm FWD & No.3822/2013/H GO(Rt)

Page 7 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

4210-01-110-74 (P) Finishing work 21 Construction of new building Electrical arrainged

in progress 90% 1153284 60 Lakhs 60 at PHC , Kannur Months 9 57,61,849 Thalassery 70,91,108/- 23-07-2015 4210-01-110-74 (P) 4210-01-110-74 Thomas Kannanthanath Thomas 23.07% above estimate rate estimate above 23.07% DR-101/2014-15 dt 07/03/2015 dt DR-101/2014-15 EE/BLD/ /2015-16 dt 16.11.2015 dt /2015-16 EE/BLD/ G.O(Rt) No.2980/2014/H & FWD FWD & No.2980/2014/H G.O(Rt) Dated,Tvm 30/08/2014 Rs.60 Lakhs Rs.60 30/08/2014 Dated,Tvm HEALTH -AYURVEDA

4210-03-101-93 (Plan) Land acquisition for Structural work Estimate in 22 Ayurveda college,kannur and 60% 2016 near completion Electrical Division 260.00 B Abbas B 6.7.2015 31.3.2015 construction of Women and 27407015 Thalassery 15 Months 15 Kalliassery 23343001/- 09--02-2016 08--05-2017 Children Hospital Lakhs Rs.260 4210-03-101-93 (Plan) 4210-03-101-93 G.O(Rt) No.1750/2014/H No.1750/2014/H G.O(Rt) 17.41% above estimate rate estimate above 17.41% 45/CE/BLDGS/2014-15 dtd dtd 45/CE/BLDGS/2014-15 &FWD Dated,Tvm 29/5/14 29/5/14 Dated,Tvm &FWD Health & Family Welfare (P) SE(K) 76/15-16 Dated:06-02- 76/15-16 SE(K)

4210-03-101-93 Construction of RMO Reached up to Estimate in 23 Quarters and quarters for 25% 2016 lintel level Electrical Division 16.40 L 16.40 supdt. in Aurveda Abbas B 6544301/- 7133288/- H & FWD H & Thalassery 10 Months 10 Kalliassery 20--06-2016 19--04-2017 12--02-2016

college,kannur 4210-03-101-93 dated: 13--01-2016 dated: Dated,Tvm 30/10/14 Dated,Tvm 9% above estimate rate estimate above 9% G.O(Rt) No.3533/2014/H & FWD FWD & No.3533/2014/H G.O(Rt) EE/BLD/31/2016-17 dated: 20--06- dated: EE/BLD/31/2016-17 Order No.KNR/2015-16/2015/4467 No.KNR/2015-16/2015/4467 Order

Page 8 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 e 'bl etition p n Hon i

the g 8/2013 5 36 -

4210-01-101-93(P) Estimate for C Construction of Nurses balance Elefn Completed 24 e WP Bill Rs. 1080733/- id

16.4 L 16.4 quarters in Aurveda

135.00 work 1886507 4.7.2007 riate order after hearin 14217277 H & FWD H & Thalassery Kalliassery on v p 31-03-2012 i

college,kannur Lakhs Rs.135 t C. H Pavithran submitted i ro 7.2% above E/R above 7.2% 4/7/2007-3/7/2008 4210-01-101-93(P) pp a pet a d ass a e p 74/CE/B&LW/05-06 dt, 30/3/06 dt, 74/CE/B&LW/05-06 fil SE(K)/16/2007-08 dated,04/07/08 SE(K)/16/2007-08 high court of Kerala .Hon,ble High Court directed to Go(RT) 815/05 /H&FWD dt, 19/3/05 with SS SS with 19/3/05 dt, /H&FWD 815/05 Go(RT) ontractor C consider and

4210-03-101-93 construction of quarters for 25 Work completed to be tendered

last Grade servents in Aurveda 100% 98 lakh 98 S Rajan S 3888335 H & FWD H & 8292371/- 9536227/- Thalassery 15 Months 15 Kalliassery college,kannur 05-12-2014 04-03-2016 31-05-2016 15% above E/R above 15% 4210-03-101-93 DR/62/2013-14 DR/62/2013-14 dated,15/11/2013 9/8/12. Rs.98lakh G.O Rt No. 2661/12 H & FWD FWD & H 2661/12 No. Rt G.O EE/BLD/63/2014-15 dt 28/11/14 dt EE/BLD/63/2014-15

4210-03-101-93 26 construction of Play ground in Work completed lakh lakh 100% 30 lakh lakh 30 31.3.15 4.9.14 Aurveda college,kannur 4077846 H & FWD H & 4000782/- 31.3.15 Thalassery Kalliassery 5.3.2014 6 months months 6 DR/12/12.13 DR/12/12.13 dated,21/3/13 4210-03-101-93 dated,26/02/2014 K V Padmanabhan V K 20.12 % above E/R above % 20.12 EE/BLD/63/2013-14 EE/BLD/63/2013-14 & FWD 9/8/12 Rs.30 Rs.30 9/8/12 FWD & G.O Rt No. 2661/12 H H 2661/12 No. Rt G.O CC 1stfinal bill paid &

Page 9 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

Ele. Estimate submitted Work 4210-03-101-93 tendered from Ele. Construction of Additional Dvn. KKD due date 10.12.2015 27 floor to Mens hostel(First Work completed lakh Short tender Date 100% S Rajan S 60. lakh 7731272

floor) in Ayurveda college, Months 9 H & FWD H & Thalassery Kalliassery 24/07/2014 23/04/2015 31/08/2015 9 months 9 02-03-2016 Work 64,44,154/- 77,92,271/- Kannur 4210-03-101-93 awarded to the dtd.17.07.2014 20.92 % above E/R above % 20.92

contractor M/S billCC1st Part paid & DR/07/13.14 dated,17/4/13 DR/07/13.14 EE/BLD/21/ 2014-15 EE/BLD/21/ SPANDS Go(Rt)No. 2036/12 dated 19/6/12 Rs.60. Rs.60. 19/6/12 dated 2036/12 Go(Rt)No.

4210-03-101-93 Work Providing additional fecilities( completed and Elefn Completed 28 handed over to Bill Rs. 167534/- X- ray building) in Ayurveda 100% 15.00 L 15.00 1675895 6 Months 6 H&FWD 1463587/- Thalassery Kalliassery 23.11.2012 college,kannur (X ray building) 22-05-2013 GAC authority 5% above E/R above 5% dated,19/11/12 4210-03-101-93 E Ramakrishnan E 8/3/12 Rs.15.00 L Rs.15.00 8/3/12 EE/BLD/11/2012-13 EE/BLD/11/2012-13 DR-1/2012-13 dtd 16/8/12 dtd DR-1/2012-13 G1-1140/2012 / DAME dtd dtd DAME / G1-1140/2012

4210-03-101-93 Construction of compound 29 Work completed 37.50 wall for Ayurveda 100% 15.3.14 1.8.2013 3646043 30/3/2014 3499192/- H & FWD H & Thalassery Kalliassery college,kannur 31/01/2014 dated,23/7/13 4210-03-101-93 8.2% below E/R below 8.2% K V Padmanabhan EE/BLD/15/2013-14 EE/BLD/15/2013-14 dated 9/8/12 Rs.37.5 Lakhs Lakhs Rs.37.5 9/8/12 dated DR/11/12-13 dated,21/3/13 DR/11/12-13 Go Rt No.2661/12 H&FWD H&FWD No.2661/12 Rt Go

Electrical Estimate 4210-03-101-87(P) prepaired Rs 30 Construction of medicine store Work completed 110000 Being 100% 30.00L S Rajan S 3337710 3032806

31/05/14 tendered from Ele. Ayurveda College Kannur months 6 Thalassery Kalliassery 10% above above 10% 25/05/2015 09-05-2014 08-11-2014 Sub DIV 4210-03-101-87(P) EE/BLD/10/2014-15 dated,19/06/13 Rs.30.00L dated,19/06/13 DR/60/13-14 dated,26/10/13 DR/60/13-14 Go(Rt) No.2148/2013 /H.FWD /H.FWD No.2148/2013 Go(Rt) Higher Education

Page 10 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

4202-01-203-96 Malabar Ele. Estimate package-Constructon of submitted for Rs. 31 Academic seminar Block for Work completed 5,60000/Revised 100% 7/6/12 420.00

B Abbas B to 11L-, Elefn

Govt Brennen 45148935 Thalassery 20 Months 20 39% above 39% 08-11-2013 07-07-2015 Dharmadam work completed College,Thalassery 4202-01-203-96 SE(K) 25/2013-14 SE(K) 14/7/09 Rs.420 Lakhs Rs.420 14/7/09 34524946+ 21674671 34524946+ Go(Rt)No:1048/09 dtd dtd Go(Rt)No:1048/09 41/ CE/BLDS/12-13 dtd dtd CE/BLDS/12-13 41/ CC IInd & Final billCC IInd& paid

Composite tender 4202-01-203-96 Ele estimate Malabar package- submitted Rs. 794321/- TE 22% 32 Work completed Constructon of new Total 969072/- 100% 130.00 M Niyas 4375447 Azhikode 13763816 10559798 12882954 Thalassery 12 Months Months 12 22% above 22% 31/08/2014 27/08/2014 block for Govt womens 27-10-2010 26-10-2011 Elefn completed Rs.130 Lakhs Rs.130 College, Kannur. 4202-01-203-96 Bill Amount nRs 583789/- SE(K) 36/2010-11, 27/10/2010 36/2010-11, SE(K) Go(Rt)No:1048/09 dtd 14/7/09 14/7/09 dtd Go(Rt)No:1048/09 148/CE/B&LW/09-10 dtd 29/01/10 dtd 148/CE/B&LW/09-10

4202-01-203-99 construction of Ladies Finishing work in progress Estimate in 33 hostel building for

tiling to be 80% Electrical Division B Abbas B 7123560/- 8968562/- Thalassery brennenn College, Months 12 09-06-2015 01-06-2016 01-05-2017 started Dharmadam 25.90 %above 25.90 4202-01-203-99

Dharmadom EE/BLD/52/15-16 25 Lakhs , 60 Lakhs 60 , Lakhs 25 Rs. 25.00 L deposited by UGC by deposited L 25.00 Rs. DR-88/2014-15 dtd 01/01/2015 dtd DR-88/2014-15 GO(Rt) No. 2093/09/Hedn dtd Tvm, , Tvm Dated,29/3/14 Rs.25 Lakhs , 60 Lakhs 11/12/2009 & GO(Rt) No.707/2014/ H & Edn

4202-01-203-85 Construction of Permission not received from building for Government Estimate under 34 Archiological preparation Lakhs Brennen College of 170.00 Department till Thalassery Thalassery 03-08-2016 date

Teacher 4202-01-203-85

Education,Thalasery. Kannanthanam Thomas Dated,Tvm 9/1/14 Rs.170 Rs.170 9/1/14 Dated,Tvm G.O(Rt) No. 53/2014/H.Edn 53/2014/H.Edn No. G.O(Rt)

Page 11 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

4202-01-203-96 Electrical estimate Column Construction of College submitted to EE 35 raising in electrical kkd 15%

Auditorium for Govt. 220.00 20.86%

B Abbas B dated 4-10-2008

Azhikode progress Thalassery 15 Months 15 21234701/- 25664260/- 12-10-2015 29-02-2016 Women’s College, Kannur 28--05-2017 for Rs 3.7L 4202-01-203-96 Higher Education (C ) dept ) (C Education Higher SE(K) 87/2015-16 Dated: 22--02-2016 Dated: 87/2015-16 SE(K) 65Lakhs depositedby Collage Authorities P2-1644/12/Coll.Edn dt 27/6/13 for Rs. 65 L 65 Rs. for 27/6/13 dt P2-1644/12/Coll.Edn GO(Rt)No. 978/13/Hedn 31/5/2013 for Rs. 100L, 100L, Rs. for 31/5/2013 978/13/Hedn GO(Rt)No. G.O(Rt) No.356/2013/H.Edn Dated,Tvm 14/3/13, 14/3/13, Dated,Tvm No.356/2013/H.Edn G.O(Rt) CR/16/2014-15 dtd 28--08-2014 for Rs. 220 Lakhs 220 Rs. for 28--08-2014 dtd CR/16/2014-15

Construction of compound wall for Government 36 work completed 100%

Brennen College, 50.00L 4954871 4608030 4829727/- Thalassery Rs.50 Lakhs Six Months Six Dharmadam

Thalassery dated,26/09/13 DR/56/2013-14 DR/56/2013-14 Muhammed Ahnas Muhammed GO(Rt). No.978/2013 EE/BLD/39/2013-14 H.Edn dated,31/5/2013

4202-01-203-87 Construction of Library Plastering Estimate in 37 Complex at Government

completed 65% Electrical Division 300.00 B Abbas B Thalassery Brennen College, Months 12 31.01.2015 16/10/2014 22707480/- Dharmadam 31--01-2015 01--10-2015 30--09-2016 14.89% above 14.89% Thalassery 4202-01-203-87 20/CE/BL/2014-15 dtd dtd 20/CE/BL/2014-15 GO(Rt) No.53/2014/H.Edn dated,Tvm, 9/1/14 Rs.300 Lakhs

4202-01-203-85 Construction of Estimate under 38 Mathematics Block in shuttering for

30% preparation 100.00

9397186 slab in progress 11596128 14/7/2015 P.I Rajeev Thalassery Govt. Brennen Months 12 22-08-2014 Dharmadam 22--07-2015 21--07-2016 23.40% above 23.40% College,Thalassery 4202-01-203-85 DR-36/14-15 dt 10/7/14 dt DR-36/14-15 GO(Rt) No.53/2014/H.Edn EE/BLD/29/2015-16 dtd dtd EE/BLD/29/2015-16 dated,Tvm, 9/1/14 Rs.100 Lakhs

Page 12 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

4202-01-203-88 Ele. Estimte for Ground floor Construction of Ladies Rs.620000/- column reached 39 Hostel for Govt. Brennen submitted to EE,

upto sunshade 10% 150.00 Ele. KKD. Dated 212971 15 months 15 Thalassery Thalassery College of Teacher 14550599/- 17793316/- 12-04-2015 03-03-2017 level 26.06.2014 Education Thalassery 4202-01-203-88 P Mohammad Shabeer Mohammad P Soil investigationwork G.O(Rt) No.356/2013/ No.356/2013/ G.O(Rt) 17/03/2015 ( Quotation) ( 17/03/2015 22.29% above estimate rate estimate above 22.29% CR/23/2014-15 Dated: 29/11/2014 Dated: CR/23/2014-15 H.Edn.dated,14/03/13 Rs.150 Lakhs Rs.150 H.Edn.dated,14/03/13 SE(K) 47/2015-16 Dated: 24/11/2015 Dated: 47/2015-16 SE(K) 99

4202-02-104-99 ‐ DTE- Construction of 104

‐ Agreement 40 Compound wall at executed Lakhs 02 70 lakhs lakhs 70 ‐ Mattannur Thalassery Government Polytechnic Rs.67 Lakhs Rs.67 College, Mattannur 4202 Higher Education (L) Dept. (L) Education Higher GO(Rt) No.2127/2016/HEDN No.2127/2016/HEDN GO(Rt) Dated,Tvm 12--08-2016 Rs.70 Rs.70 12--08-2016 Dated,Tvm 2016 of EE ,( B) Thalassery for for Thalassery B) ,( EE of 2016 PRICE 3410/2016-17 Dated.09--12- 3410/2016-17 PRICE

4202-02-105-90 90 DTE-Construction of ‐ Estimate under Concrete Laboratory and 105 41 ‐ preparation for Lakhs Departmental Library at 02

‐ TS 160 lakhs lakhs 160 Thalassery Taliparamba Government Engineering

College, Kannur 4202 Higher Education (L) Dept. (L) Education Higher GO(Rt) No.2127/2016/HEDN No.2127/2016/HEDN GO(Rt) Dated,Tvm 12--08-2016 Rs.160 Rs.160 12--08-2016 Dated,Tvm

Page 13 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

4058-00-103-99 Digging an open well 3.00 m Work tendered. 42 dia and providing pumpset No response

attached to Government Press 232.58L Thalassery Rs. 675000/- Rs.

kannur 4058-00-103-99 Higher Education (H) Dept. (H) Education Higher Tvm 27/1/2016 Rs.232.58 L Rs.232.58 27/1/2016 Tvm GO(Rt)No.269/16/H.Edn dtd dtd GO(Rt)No.269/16/H.Edn 2989/2016-17 dtd 31/10/16 for for 31/10/16 dtd 2989/2016-17

Page 14 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

Home

4216-01-106-98 Construction of new road and renewal of existing 43 Work completed 100%

road in the compound of 160.00 6Months 23/08/14 FCC paid FCC 24/2/2014 Thalassery 31/01/2015 30/01/2015 14282762/- 14335798/- O CUllasan Taliparamba

KAP 4th Battalion, below 10.26& 4216-01-106-98 Mangattuparamba, Kannur SE(K)40/2013-14 CR/34/13-14 dtd 6/1/14 dtd CR/34/13-14 GO(R)No.1249/2013/ PWD PWD GO(R)No.1249/2013/ dated,23/09/2013 Rs.160 Lakhs Rs.160 dated,23/09/2013

2059-00-053-99 Urgent repairs and Estimate amount Work Rs. 75,000/- work 44 renovation works to the

15.00 completed, arranged from Sub Kannur K Anees 1423651 1637199 24/09/14 6 months months 6 1631151/- Thalassery residential building of IG 25/03/2014 06-06-2014 Dn. 15% above E/R above 15% of Police, Kannur 2059-00-053-99 EE/BLD/02/2014-15 DR/76/2013-14 dt 1/1/14 dt DR/76/2013-14 G.O(Rt) No.1620/2013/PWD Dated,Tvm 9/12/13 Rs.15 Lakhs

4059-60-051-71 Modernisation of Kitchen block in Jail- Repair for tiled Agreement 45 roofing, flooring, doors and 65L executed Lakhs

windows and other urgent Months 4 5010884/- 3950114/- Thalassery 06.02.2017 21.17% below 21.17% P V Manoharan V P maintenance works of Kitchen 4059-60-051-71 block at Central Prison, Kannur Lakhs Rs.65 22/3/16 GO(Rt)No.1024/2016/Home dtd dtd GO(Rt)No.1024/2016/Home EE/BLD/97/2016-17 Dated.23.02.2017 3603/2016-17 dtd 27/12/16 for Rs. 65 Rs. for 27/12/16 dtd 3603/2016-17

Page 15 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 92 ‐ Construction of prayer hall, 106

‐ Work to be 46 yoga/meditation hall in Central arranged 02 Scheme ‐

Prisons, Tvm and Kannur Crore 2.5 Thalassery Home(B) Dept. 2235 GO (MS) No.318/2016/ Home dated. Tvm 17/12/2016 Home Dept-Prisons- Annual Plan 92 ‐

Establishment of computer lab 106 ‐ Work to be 47 arranged

in Central Prison,Kannur 02 Scheme 9 Lakhs 9 ‐ Thalassery Home(B) Dept. 2235 GO (MS) No.318/2016/ Home dated. Tvm 17/12/2016 Home Dept-Prisons- Annual Plan 70 ‐

Vigilance and Anti Corruption 051 ‐ Work to be 48 arranged

Bureau Kannur 01 ‐ 202 Lakhs 202 Thalassery Vigilance( C) Dept. 4059 GO(Rt) No.59/2017/Vig Dated. Tvm 31/3/2017 Judicial

Page 16 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

4059-60-051-98 Malabar package- Elefn completed Work 49 Construction of Court Bill amount

25% completed. 100% 1429125/- 13456644 16820805 20/1/2013 Thalassery complex,Thaliparamba. 21/07/2010 21002270/- Taliparamba 16500000.00 O V Sreedharan 4059-60-051-98 (50%CSS) 20/7/10-20/1/12 3/SEJ/Ekn/2010-11 14/7/2009 Rs.165 Lakhs Rs.165 14/7/2009 Go(Rt) No:1046/2009/ PWd dtd dtd PWd No:1046/2009/ Go(Rt) 79/CE/B&LW/09-10 dtd 5/11/10 dtd 79/CE/B&LW/09-10

4059-60-051-38 Construction of building Work Electrification 50 completed. completed for Sub – Court at 100% with SS 9099281 26/1/2007 Payyannur Thalassery 27/01/2006 30/12/2009 K M Majeed 126.82 Lakhs 126.82 Dt. 26/3/05 for for 26/3/05 Dt. Payyannur(50% CSS) SS with L 87.5 4059-60-051-38 7/SEJ/Ekn/06-07 dtd. 27/3/00 Rs.87.5 L L Rs.87.5 27/3/00 dtd. 27/01/2006-31/12/2009 27/01/2006-31/12/2009 GO (Rt) 1230/00/Home 1230/00/Home (Rt) GO 75/CE/B&LW/ 2004-05 2004-05 75/CE/B&LW/

4059-60-051-38 Tentative Construction of Family drawings from Estimate under 51 DRIQ received, court building at court preparation

Kannur Estimate Thalassery compound, Kannur. submitted (50%CSS) 4059-60-051-38

4059-60-051-38 Construction of a building for Judicial First Clss Estimate Estimate under 52 Magistrate court, submitted preparation 550 Lakhs 550 Lakhs 550 Thalassery

Kuthuparamba Koothuparamba. (50% 4059-60-051-38 CSS)

Page 17 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

4059-60-051-38 Detailed A.R drawing obtained Stimulus package- investigation Estimate under 53 Construction of building work completed preparation

650.00 & Submitted to

Thalassery Thalassery for Thalassery court.(50% CE for including Rs.650 Lakhs Rs.650 CSS) 4059-60-051-38 in (KIFBI)

Detailed 4216-01-700-93 Revised Construction of Quarters estimate for Estimate under 54 for Additional District 105 lakhs preparation submitted to

Thalassery Thalassery Judge and MACT Judge at CE vide no. F4- Thalasery 4216-01-700-93 748/06 dt 8/3/13

4059-60-051-83 Construction of additional building for Library - Work to be 55 Adhalath , Recreation started 4400000 5324538 6 Months 6 Alouj A L

Thalassery Thalassery Centre and dining hall 38.50 Lakhs 38.50 13--02-2014 4059-60-051-83 Home ( C) Dept. attached to District Court Thalassery (44 Lakhs) GO(Rt) No.1783/2013/Home No.1783/2013/Home GO(Rt) EE/BLD/28/15-16 Dated: 6-7-15 Dated: EE/BLD/28/15-16 DR-61/2013-14 Dated.15--11-2013 Dated.15--11-2013 DR-61/2013-14 Dated.Tvm 27--06-2013 Rs.38.50 Lakhs Rs.38.50 27--06-2013 Dated.Tvm

Page 18 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

Labour

4202-02-800-95 1/3 slab form Estimate under 56 Construction of I.T.I in work in first 35% 2016 preparation 400 L 400 floor progress 37160654 34001999 Thalassery Kurumathur Panchayath. Months 15 31--03-2016 Taliparamba 4202-02-800-95 Dasan.T. Pallikkunnu Dasan.T. 8.5% below estimate rate estimate below 8.5% 08-07-2015 Rs.400 Lakhs Rs.400 08-07-2015 SE(K)29/2016-17 dated,14--07- SE(K)29/2016-17 3420/2015-16 Dated: 19/02/2016 Dated: 3420/2015-16 GO(Rt) No.902/2015/LBR dated: dated: No.902/2015/LBR GO(Rt)

Construction of Estimate amount hostel for Work Rs. 2L work 57 arranged from completed ITI(women), 100% Sub Dn. And Kannur Thalassery K Anees 4485374 5045597 3000000 3273238/- Kannur 50.00Lakhs completed DR-24/2013-14 EE/BLD/47/2013-14 GO(Rt) 142/12/LBR dated,24/1/ 12 Rs.50 Lakhs

Ele. Est submitted 4202-02-800-95 No. EL4.1501/10 Malabar package - dt. 12/8/10 Rs. 6L 58 Work completed RE prepared for 100% 2.26%

Construction of new block 471.00 K J Joy J K 8L work 42659059 41791299 55670655 Thalassery 24 Months 24 Kalliassery 31/12/2014 27/11/2014 06-09-2011 08-06-2013

building I.T.I Madayi. completed Bill Stay vaccated 4202-02-800-95 SE(K) 10/2011-12 SE(K) amount 7,22,855/- 14/7/2009 Rs.471.00 Lakhs Rs.471.00 14/7/2009 Go(Rt0No: 1048/09/ PWd dtd dtd PWd 1048/09/ Go(Rt0No: 125/CE/BL/10-11 dtd 16/11/10 dtd 125/CE/BL/10-11

Page 19 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

Ele. Est No. EL1 1283/11 dt. 7/11 Rs. 4.85L. Work 4059-01-051-71 Work Tendered to T. 59 Construction of I.T.I completed and Prakasan.PAC. 100% Lakhs 8.98% 150.00 4073263 Peravoor handed over Rs.379282+15%= K Hassan 11675067 12723481 Thalassery Peravoor Ist Phase 436175/- 4059-01-051-71 SE(K)36/2011-12

7/12/2011 - 6/12/12 - 7/12/2011 Elefn completed Bill Rs. 3,97,213/- 47A/CE/BL/11-12 dtd 12/8/11 dtd 47A/CE/BL/11-12 Go(Rt0No: 1184/09/ PWd dtd 14/8/2009 Rs.150 Rs.150 14/8/2009 dtd PWd 1184/09/ Go(Rt0No:

4202-02-800-95 (Construction of ITI Building 2012-13 (P)) Foundation in Estimate under 60 Construction of a new progress 5% preparation 200.00 Kannur Rs.200 L Rs.200 Thalassery building for Upgradation Months 15 29/09/2014 19965375/- 26641796/- 18-12-2015 17--03-2017 Rs.225 Lakhs Rs.225

of Govt: women's ITI, E/R above 33.44% K M Kunhikrishnan M K Kannur (P)) 2012-13 Building GO(Rt) 1306/2012/LBR dtd 22/8/12 22/8/12 dtd 1306/2012/LBR GO(Rt) SE(K) 56/2015-16 dated: 11/12/2015 dated: 56/2015-16 SE(K) 4202-02-800-95 (Construction of ITI ITI of (Construction 4202-02-800-95 CR/44/2013-14 Dated: 12/02/2014 for for 12/02/2014 Dated: CR/44/2013-14

4202-02-800-95 Construction of building Reached upto Ele estimate Rs. 61 ground floor 750,000/- 45%

for Regional Directorate in 150.00 Kannur slab 15/02/2014 to EE Thalassery 15 Months 15 13399961/- 18033668/- 05-06-2015 04-09-2016 29-09-2014

ITI . Kannur above 34.58% 4202-02-800-95 K.M. Kunhikrishnan K.M. 22/8/12 Rs..150 Lakhs Rs..150 22/8/12 SE(K)9/2015-16 dt 8/5/2015 dt SE(K)9/2015-16 GO(Rt) 1306/2012/LBR dtd dtd 1306/2012/LBR GO(Rt) CR/45/2013-14 dt 12/2/2014 dt CR/45/2013-14

Page 20 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

4225-01-800-89 (P) Works & Building Finishing work 62 Construction of Boys nearing in Work in progress 98% 260.00 K.J Joy K.J Building

completion 6070331 18Months Thalassery Kalliassery 30% above 30% 23973223/- 31165190/- Hostel attached to ITI 03-06-2015 22-11-2015 21--05-2017 Rs.260 Lakhs Rs.260 Madai at Kannur District T1-19547/07 dated,22/11/13 dated,22/11/13 T1-19547/07 4225-01-800-89 (P) Works & & Works (P) 4225-01-800-89 1/CE/BL/2014-15 dtd 30.4.2014 dtd 1/CE/BL/2014-15

4202-02-800-95 Column raising upto sunshade Civil Works (Plan) Estimate pending 63 level and

15% with AEE Construction of a building sunshade 175 Lakhs 175 Thalassery 12 Months 12 18326166/- 21291340/-

Kuthuparamba for ITI Kuthuparamba partially

Abdul Rahiman M K M Rahiman Abdul completed 06/08/2015( Quotation) 06/08/2015( Labour & Skills (C ) Dept ) (C Skills & Labour 16.18% above Estimate rate Estimate above 16.18% CR/29/2014-15 Dated: 09/03/2015 Tvm 18/09/2014 Rs.175 Lakhs Rs.175 18/09/2014 Tvm SE(K) 61/2015-16 Dated: 31/12/2015 G.O(Rt) No.1281/14/LBR, Dated, Dated, No.1281/14/LBR, G.O(Rt) 4202-02-800-95 Civil Works (Plan) Works Civil 4202-02-800-95

4202-02-800-95- Civil Suggessions sent to Works(P) 2015-16 Architectural Estimate Industrial Training wing by client 64 submitted to Chief department. Department- Construction Engineer Payyannur Thalassery of new building at Lakhs 350 Estimate 4202-02-800-95 submitted to Government ITI, CE for TS 25/09/2015 Rs.350 Lakhs Rs.350 25/09/2015 regrdingthe availability ofland. GO(Rt) No.1318/2015/LBR Dated: Dated: No.1318/2015/LBR GO(Rt) addressed Director of Industrial training training Industrial of Director addressed

Page 21 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

4202-02-800-95-civil works(Plan) T.S estimate to 65 be resubmitted

Peravur Construction of I.T.I Peravoor 2nd Phase Lakhs 350 08-2016 Rs.350 Lakhs Rs.350 08-2016 G.O (Rt)No. 1032/2016/LBR Dt. 12- Dt. 1032/2016/LBR (Rt)No. G.O NCC

4202-03-800-91 200 Lakhs 200 Civil work 66 N.C. C.Complex , Completed

200L completed 100% 504551 Payyannur Thalassery 18 Months 18 07/10/2014 17686980/- 21224375/- 10-10-2014 04-09-2016 31-03-2016 Payyannur 01-06-2014 20% above E/R above 20% 4202-03-800-91 Mohammed Ahnas B Ahnas Mohammed 31.03.12 Rs. SE(K) 21/2014-15 Dated: Dated: 21/2014-15 SE(K) Go (Rt) No. 685/2012/H. Edn dt. dt. Edn 685/2012/H. No. (Rt) Go CR/13/2013-14 Dated: 23/09/2013 Dated: CR/13/2013-14 Pubic works

Electrical estimate submitted .Esd- 146/10-11 Dated 4059-01-051-86 4/1/2011.Rs.393000/- Work Tender Date 07-04- 67 New Rest House At completed. 2016 Work awarded 100% 4700195 Peravoor 6 months months 6 4631258/- 5719604/- Thalassery Peravoor. (Balance work) to the contractor 17-06-2014 23.5% above 23.5% 17.5 50lakh

4059-01-051-86 Sri.Deepesh P , Thomas Kannanthanath Thomas DR/79/2013-14 dtd 2/1/14 dtd DR/79/2013-14 29/5/12.Rs.17 .5, 50 Lakhs 50 .5, 29/5/12.Rs.17 GO(Rt) No. 981/12 PWD Dated Dated PWD 981/12 No. GO(Rt) GO(Rt) 1102/03 PWD Dt.11/11/03 Dt.11/11/03 PWD 1102/03 GO(Rt) EE/BLD/49/2014-15 dtd 10/10/2014 dtd EE/BLD/49/2014-15

Page 22 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

4059-60-051-86 Improvements to the PWD Inspection Electrification 68 Bangalow at Mattannur work completed.

25.00 completed 100% 2415532 2916141 Mattannur Thalassery

by Providing Parking above 25% Rs.25 Lakhs Rs.25 4059-60-051-86 23/2/11- 22/7/11 23/2/11- Ground, Paved foot path SE(K)55/2010-11 M K Abdul Rahiman Abdul K M

and mandapam 14/05/10 dtd CR-08/2010-11 CE/BL/KNR/239/08 dtd 18/02/2010 18/02/2010 dtd CE/BL/KNR/239/08

4059-01-051-86 Ground floor Estimate in 69 Reconstruction of Rest 25%

Lakhs slab laid Electrical Division Kannur Niyas. M. 330 Lakhs 330 18 months 18 Thalassery House Kannur 26828082/- 16-06-2016 15-12-2017 30--03-2016 2,85,18,251/- 4059-01-051-86 6.30 % above estimate rate dated,30/8/14 Rs.330 Lakhs Rs.330 dated,30/8/14 GO(Rt) No.1226/14,PWD TVM TVM No.1226/14,PWD GO(Rt) SE(K)/20/2016-2017 dt. 08--06-2016 dt. SE(K)/20/2016-2017 3233/2015-16 Dated: 11/02/2016 for Rs.330

4216-01-106-98 Construction of Men's Structureal Design to be Estimate under 70 Hostel for Government obtained by preparation Kannur G.O(Rt) 307 Lakhs 307 Thalassery Sevants in NGO Quarters outsourcing Rs.307 Lakhs Rs.307 Compound, Kannur 4216-01-106-98 No.1716/2014/PWD No.1716/2014/PWD Dated,Tvm 10/12/2014 10/12/2014 Dated,Tvm Registration

Page 23 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

4059-01-051-95 Work started Construction of new Electrical estimate 71 (Soil Building for Sub-Registrar 3% submitted

06-2016 investigation) 9128581/- Mattannur 100 Lakhs 100 Thalassery Shameer P 18 Months 18 26/09/2015 10040526/- Rs.100 Lakhs Rs.100 office Mattannur Lakhs Rs.100 4059-01-051-95 Tvpm dated, 20/02/2015) 20/02/2015) dated, Tvpm 9.999% above estimate rate estimate above 9.999% GO(Rt) No.112/2015 (Taxes (Taxes No.112/2015 GO(Rt) 680/2015-16 dtd 30.7.2015 for for 30.7.2015 dtd 680/2015-16 EE/BLD/14/2016-17 Dated: 08-- Dated: EE/BLD/14/2016-17 Revenue

4059-01-05-86 Additional works to 72 Work completed No electrical work 25.00 Mini Civil Station 100% 2760015 Thalassery Thalassery Rs.25 Lakhs Rs.25 DR/66/13-14 DR/66/13-14 ,Thalasery. 4059-01-05-86 dated,27/11/13 Bill not submitted M/S MosonEstaite EE/BLD/23/2014-15 R/2013 Dated,26/9/13 Dated,26/9/13 R/2013 AS.No.CE/Bldgs/6213/KN

4216-01-106-98 Renovation to work completed 73

7.00 and FCC paid Lakhs Kannur Govt.Quarters at Kannur 995980 18/11/05 Thalassery 4216-01-106-98 Dt.. Manoranjan P C 10/3/06-7/7/2006 GO(Rt)No:802/05 GO(Rt)No:802/05 DR-7/2005-06 dtd dtd DR-7/2005-06 EE/BLD/9/2005-06 PWD dtd 24/8/05 Rs.7 Rs.7 24/8/05 dtd PWD

4059-01-051-96 Construction of building Finishing work 74 to be tendered

in progress 20% for Village Lakhs 06-2016 Revanue 2904250 Peravoor 34 Lakhs 34 Thalassery 12 Months 12 04/02/2016 03-01-2016 2664449.60 T T Mathew

Office 4059-01-051-96 3072/2015-16 dated: dated: 3072/2015-16 9.00 % above estimate rate estimate above % 9.00 GO(Rt) No.6856/2015/Rev No.6856/2015/Rev GO(Rt) dated,Tvm 23/12/2015 Rs.34 Rs.34 23/12/2015 dated,Tvm EE/BLD/35/2016-17 Dated: 29-- Dated: EE/BLD/35/2016-17

Page 24 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

SC/ST Development

4225-01-277-98 75 Costruction of Pre-Metric Work completed work completed 55.00 100% 6819155 9 Months 9 5685946/- Thalassery Hostel ,Sreekandapuram.. 31/03/2016 07-03-2014 06-12-2014 Rs.55 Lakhs Rs.55 Bino George Bino 19.93 % above % 19.93 4225-01-277-98 GO(Rt) No:728/12 No:728/12 GO(Rt) EE/BLD/65/2013-14 SCSTDD dtd 18/5/12 18/5/12 dtd SCSTDD DR6/13-14 dated,17/4/13 DR6/13-14

Construction of Premetric Structure hostel for boys in completed. Estimate in 76 80% Taliparamba Municipality 85Lakhs Plastering Electrical Division 18700000 19136515 Thalassery 12 Months 12 18/02/2016 17/02/2017 completed Taliparamba (Morazha) dated,27/10/14 Dated:10/2/2016 SE(K) 79/2015-16 79/2015-16 SE(K) Rs.165 Lakhs ,85 Lakhs M Muhammed Kunhi Muhammed M 165lakhs Revised AS G.O(Rt) No.1805/14 G.O.ADVC 3/1822/11 dated,12/5/11 CR/01/2015-16 Dated: 10/06/2015 Dated: CR/01/2015-16

4225-02-277-88 Ele. Est. MRS,,Kannur. - submitted. 77 Construction of Plus two Work completed No. EL4-1110/10 100% 85.00 L 85.00 9108582 dt. 15/6/10 Rs. 6500000 11197180 Thalassery 12 Months 12

Kalliassery block,hostel, dormttory and 01-03-2014 28-02-2015

22.93% above 22.93% 2.7L 4225-02-277-88

additional class room T Kutty Narayanan 17/9/12 Rs.85 Lakhs Rs.85 17/9/12 EE/BLD/57/2013-14 DR 18/12-13 dated,26/3/13 18/12-13 DR Go(Rt)1225/2012/ scstdd dtd dtd scstdd Go(Rt)1225/2012/

Page 25 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

Type 1: structural work completed type 2:Two number quarters in plastering stage.Library block structure completed Administrative 4225-02-277-51 block STD-Model maintenance Residentail work completed Hostel repairing Estimate 78 School(Boys) Pattuvam, work pending 80% submitted 411.00L

50526843 Type II: P I Rajeev Thalassery 18 Months 18 Kalliassery Kannur-Various 15-01-2016 14-07-2017 36875524.00 37.02% Above 37.02%

4225-02-277-51 2 Nos. Construction works and Finishing in renovation works 6/8/2015 dated: Quotation progress SE(K) 62/2015-16 Dated: 07/01/2015 Dated: 62/2015-16 SE(K) 10/CE/BLDGS/2014-15 dated,18/07/2014 10/CE/BLDGS/2014-15 GO(Rt) No.1618/2013 /SC.ST DD Dated,Tvm 13/11/2013 Rs.411 Lakhs Rs.411 13/11/2013 Dated,Tvm DD /SC.ST No.1618/2013 GO(Rt)

Stationery

4058-103-99 Construction Ele. Est. submitted of a building for Flat type Nearing for Rs. 12L- 79 245 quarters for Govt:Press, completion 90% dt23/8/2013, Azhikode Thalassery 18 Months 18 24773864/- 35998902/- 08-12-2015 Arrange 11--02-2017 4058-103-99 Rs.245 Lakhs Rs.245 45.31%above Kannur Rveendran. vk SE/K/22/15-14Dt.4-8-15 27/CE/BC/13-14Dt.15.10.13 Go(t) 2392/12/ Hedn dtd 7/11/12 7/11/12 dtd Hedn 2392/12/ Go(t)

Page 26 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

Construction of Waste paper shed H.Edn dated: 80 at Government 100% Jinose K 2 Months Azhikode 1670755/- 1555472/- Thalassery Press, Kannur Rs.17 Lakhs Rs.17 for Rs. 17 Lakhs Work completed 27/01/2016 Rs.17 Lakhs Higher Education Dept. Education Higher 815/2016-17 dated: 10/06/2016 EE/BLD/57/2016-17 dated.05/08/2016 EE/BLD/57/2016-17 GO(Rt) No.269/16/ 6.90% below estimate rate estimate below 6.90% Technical Education

Ele. Estimate submited for Rs. 4202-02-103-99 6L Ele-684474 Stimulus package- Excess 8.9% 81 Construction of Building Wok completed Total 7,45,392 /- 100%

195.00 L 195.00 Revised Estimate 21999133 27385262 Thalassery 18 Months 18

for Technical High School, above 90% 14413296/- 19-04-2013 18-10-2014 Taliparamba Bino George Bino Rs.195 Lakhs Rs.195 Rs.12L submitted 4202-02-103-99 31/3/15, 31/7/15 31/3/15, Naduvil SE(K)02/2013-14 to EE, Ele. KKD. On 28.07.2015 125/CE/B&Lw/09-10 dtd 5/1/10 dtd 125/CE/B&Lw/09-10 Go(rt) No: 1048/09 /PWd dtd 14/7/09 14/7/09 dtd /PWd 1048/09 No: Go(rt)

Composite Tender. 4202-02-104-99 Ele. Estimate Mala bar package- Nearing submited .58L 82

completion 99% ekectrical work

Construction of New block 300.00 16081611 3742038/- 5800159/- Mattannur Thalassery 24 Months 24 21/3/2014 55% above 55%

15-06-2010 started and in for Polytechnic Mattannur. 22--03-2012 4202-02-104-99 Muhammed Haji Muhammed progress 14/7/09 Rs.300 Lakhs Rs.300 14/7/09 Civil-20264340, Electrical - - Electrical Civil-20264340, - Electrical -31409727, Civil SE(K) 64/2011-12 dt 13.3.12 dt 64/2011-12 SE(K) Go(Rt) No:1046/09/PWD dtd dtd No:1046/09/PWD Go(Rt) 139/CE/B&LW/09-10 dtd 20/1/10 dtd 139/CE/B&LW/09-10

Page 27 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

4202-02-104-99 Construction of Library for AR drawing Estimate under 83 womens residential under preparation

10.61 L 10.61 preparation Payyannur Thalassery Polytechnic

College,. 4202-02-104-99 Technical Education

ESD 55/13-14 Dated15/02/2014 to EE KkD Amount 4202-02-104-99 6,80,000/- tendered from Ele. Divn. Construction of Staff KKDShort Tender 84 Work completed Date 02-03-2016 76.00 100%

quarters(type II) 29/2/14 7830122 8417381 9 Months 9 29-2-2014 Mattannur

Shameer P Work awarded to the 28/11/2014 7.5% above 7.5% Rs.76 Lakhs Rs.76

Polytechnic, Mattannur 4202-02-104-99 contractor Sri.Vinodkumar M DR -5/13-14 dated,17/4/13 -5/13-14 DR Higher Education (C ) dept ) (C Education Higher City Electricals Sreekandapuram EE/BLD/59/2013-14 dtd 22/2/2014 22/2/2014 dtd EE/BLD/59/2013-14 Go(Rt)No:912/12HEdn.dtd 18/5/12 18/5/12 Go(Rt)No:912/12HEdn.dtd

4202-02-104-99 Construction of Type-II Foundation in 85 Quarters For Work tendered progress 47179 133.00 23/04/18 Payyannur Thalassery Govt.Polytechnic,payyannu Months 18 17/12/2013 24/10/2016 14001806/- 18422176/- 31.57% above 31.57% K.P Divakaran 4202-02-104-99 Higher Education Higher Dated.24/10/2016

r.(10 families) 44/2016-17 SE(K) 28/1/2015 (Quotation 28/1/2015 28/1/12 Rs.133 Lakhs Rs.133 28/1/12 CR/27/2013-14 Dated: Dated: CR/27/2013-14 Go(Rt) No:199/12 /Hedn, dtd dtd /Hedn, No:199/12 Go(Rt)

Ele. Estimate submitted to E.E for Rs. 5,20,000/- ESD 4202-02-104-99 10/13-14 Dated 18/6/2013 Tendered Construction of Type-IV Ele. Divn. KKD due 86 Quarters For Work completed date 04.12.2015Short 76.00 100% Tender Date 02-03- 9936611 9 Months 9 10512570 16/4/2014 31/5/2015 8046490/- Payyannur Thalassery Govt.Polytechnic,payyannu 30/05/2015 15-01-2015 Rs.76 Lakhs Rs.76 2016 Work awarded 13.49% above 13.49% Saji Sreedharan Saji 4202-02-104-99 Higher Education Higher r. (four families) to the contractor EE/BLD/3/2014-15 EE/BLD/3/2014-15 Sri.Vinodkumar M City Electricals DR/10/13-14 Dated,02/05/2013 DR/10/13-14 Sreekandapuram Go(Rt) No:912/12 /Hedn, dtd 18/5/12 18/5/12 dtd /Hedn, No:912/12 Go(Rt)

Page 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

4202-02-104-99 Malabar package - .Elefn Construction of Golden works 87 completed.Bill

23% completed. 100% 7/1/10

Jubilee building for 100.00 Kannur 31/3/12 K Anees 6282162 7727059 Rs.6,24,000/- 7160436 5339945/- Thalassery Govt:poly Technic 4202-02-104-99 SE(K)33/2010-11 20/10/2010-19/6/11

College, Kannur Lakhs Rs.100 14/7/09 Go(Rt)1046/09/PWD dtd dtd Go(Rt)1046/09/PWD 127/CE/B&LW/09-10 dtd dtd 127/CE/B&LW/09-10

5051-80-800-89 Mala bar package- Composite Tender. Construction of E.K Electrification 88 Work completed completed. Bill Nayanar memorial model 100% 210.00 L 210.00 17/11/09 Azhikode 21316805 25/6/2010 24/6/2012 16/4/2012 9550000/- Thalassery 24 Months 24 30% above 30% poly technic college.( 16397542/- Rs. 4,24,046/- 5051-80-800-89 SE(K) 13/2010-11 SE(K) M Muhammed Kunhi Muhammed M malabar packge) Lakhs Rs.210 14/7/09 92/CE/B&LW/09-10 dtd dtd 92/CE/B&LW/09-10 GO(Rt)1048/09/PWD dt, dt, GO(Rt)1048/09/PWD

4202-01-203-99 Malabar package - Revised Electrical estimate submitted Construction of Staff No.ED1/146/2008

89 quarters type II , III 18 Work completed Dated 10/10/2013 100% 5.4.13 240.00 Kannur 4.10.14 to EE,KKD for Rs. 26329228 Thalassery 35% above 35% block out of V Block 25440751/- 34345013/- Rs.240 Lakhs Rs.240 1325000 work P V Manoharan V P 4202-01-203-99 18 Months 26/9/14 Months 18

in GCE Kannur – (30 started CC IV th & Part Bill families) 146/CE/Blds/11-12dtd 24/3/12 146/CE/Blds/11-12dtd SE(K)56/2012-13 dated, 27/3/13 dated, SE(K)56/2012-13 GO(Rt)1048/09/PWD dtd 14/7/09 14/7/09 dtd GO(Rt)1048/09/PWD

4202-02-105-99 Construction of Basic Electrical Estimate 90 Work completed 36LSubmitted 450 L 450 work shop & mechanical 100% B Abbas B 15Months Thalassery 8--05-2016 46231765/- 58395342/- 21-07-2014 02-09-2015 21--04-2016 Taliparamba 26.31 %above 26.31

Lab, G.C.E Kannur 4202-02-105-99 28/5/12 450 lakh 450 28/5/12 SE(K)41/2014-15dtd 2/2/15 SE(K)41/2014-15dtd G.O Rt 969/12 / Hedn dated dated Hedn / 969/12 Rt G.O 10/CE/BL/2013-14 dtd 15/6/2013 dtd 10/CE/BL/2013-14

Page 29 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

4202-01-203-99 AR drawing Estimate under 91 Construction of TTI under preparation 1.46 L 1.46 preparation Education Payyannur Thalassery 4202-01-203-99

Ele. Estimate 4202-02-105-99 submitted to EE, Construction of Ladies KkD 5/11/2013 Rs. 1300000/-Tender Hostel for SC/ST students Date 11-11-2015

92 18 Work completed Work awarded to the 100%

under AICTE scheme for 300.00 348946/- 10862247 25-9-2014

Thalassery Contractor 24-03-2016 Taliparamba 290407888/- Govt. Engineering ABOVE 20%

4202-02-105-99 Sri.Vinodkumar M Higher Education Higher

College,Kannur P.V.MANOHARAN City Electricals

49/CE BL/13.14 Dt.7.12.13 BL/13.14 49/CE Sreekandapuram dated,21/5/13 Rs.300 Lakhs Rs.300 dated,21/5/13 SE(K)29/14-15. Dt.29.10.14 SE(K)29/14-15. G.O(Rt) No.873/2013/H Edn. Edn. No.873/2013/H G.O(Rt)

4202-02-105-99 Construction of community 93 Auditorium -Balance work Work completed Ele. Work Started 100% 270.00 9 Months 9 12753640 Thalassery

for Govt. Engineering Ltd. ULCC above 25% 17347316/- 21684144/- 31--03-2015 30--12-2015 Taliparamba 15.Dt.30.9.14 4202-02-105-99

College, Kannur 17/PWD/BLD/14- dated,23/4/14 Rs.270 Lakhs SE(58)/14-15Dt.31.03.2015 G.O(Rt) No.797/2014/H.Edn Tvm

4202-02-104-99 Construction of new building Nearing Estimate under 94 for two storied drawing hall,

completion 95% preparation 100.00 Kannur G.O(Rt)

Govt. Polytechnic college, Months 9 10/7/2014 9181707/- Thalassery 22/05/2015 21/02/2016 11936219/- 11-11-2014

Kannur 4202-02-104-99 Dated:14/05/2015 30.00% above E/R above 30.00% DR-34/2014-15 dt dt DR-34/2014-15 Mohammed Shabeer Mohammed EE/BLD/13/2015-16 EE/BLD/13/2015-16 No.1132/2014/H.Edn Tvm Tvm No.1132/2014/H.Edn dated,11/6/14 Rs.100 Lakhs Rs.100 dated,11/6/14

Page 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

4202-02-104-99 Construction of Staff Foundation Estimate under 95 Quarters Type III work in progress preparation Lakhs Lakhs 145.50 Mattannur Thalassery Government Polytechnic

College, Mattannur 4202-02-104-99 Higher Education (L ) dept ) (L Education Higher CR-36/15-16 dtd 30/5/2015 dtd CR-36/15-16 G.O(Rt) No.808/2014/H.Edn No.808/2014/H.Edn G.O(Rt) Dated,TVm 23/4/2014 Rs.145.50 Rs.145.50 23/4/2014 Dated,TVm

2059-60-053-99 Leak Proofing 96 Work completed 2016 arrangements toA Block at 100% 25 Lakhs 25 3 Months 3 2491056/- 2142059/- Thalassery Taliparamba GCE, Kannur Musthafa B S 2059-60-053-99 2016 for Rs.25 Lakhs Rs.25 for 2016 -03-2016 Rs.25 Lakhs Rs.25 -03-2016 14.01% below estimate rate estimate below 14.01% No.1270/2016-17 dated: 30--06- dated: No.1270/2016-17 EE/BLD/59/2016-17 Dated.12--08- EE/BLD/59/2016-17 GO(Rt) No.617/2016/PWD Dated: 4- Dated: No.617/2016/PWD GO(Rt)

4202-02-105-99 Government Engineering College, Kannur- Construction of Community Auditorium 97 Work completed

having a seating capacity 100% 3 Months 3 6700622/- 7259454/- 67,11,000/- 27500000/- of 1000 Nos. additional 14--03-2016 4202-02-105-99 Uralungal Society Society Uralungal estimate for balance work Lakhs Rs.275 2014 proposal for acoustic rate estimate above 8.34% treatment EE/BLD/42/2016-17 Dated: 05--07-2016 Dated: EE/BLD/42/2016-17 2520/2015-16 Dated: 14--01-2016 for Rs. Rs. for 14--01-2016 Dated: 2520/2015-16 GO(Rt) No.797/2014/H.Edn dated Tvm 23--04- Tvm dated No.797/2014/H.Edn GO(Rt)

Page 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

4202-02-103-99 Govt. Technical High 98 School, Kannur- Work tendered Lakhs Kannur

Thalassery Construction of Compound 49.65 Lakhs 49.65

wall 4202-02-103-99 Technical Education Dept. Education Technical 2016 EE (B) Tly Rs.49.65 Lakhs Rs.49.65 Tly (B) EE 2016 2016 of Purchase Section Rs.49.65 Rs.49.65 Section Purchase of 2016 PRICE 3398/2016-17 Dated.8--12- 3398/2016-17 PRICE No.D4/41648/15/DTE Dated: 13--01- Dated: No.D4/41648/15/DTE

4202-02-104-99 Urgent repairs to Garment Agreement 99 Lab attached with Textile executed Kannur 993245 1212757 13 Lakhs 13 3 Months 3 8--8-2016 CT Saheer Thalassery Technology at Govt. Poly Rs.13 Lakhs Rs.13 18.10% below 18.10% technic College Kannur 4202-02-104-99 Technical Education Dept. Education Technical Purchase Section Rs.13 Lakhs Rs.13 Section Purchase EE/BLD/63/2016-17 Dated.26--09-2016 EE/BLD/63/2016-17 PRICE 1439/2016-17 Dated.11--07-2016 Dated.11--07-2016 1439/2016-17 PRICE No.D4/17043/15/DTE Dated: 05--11-2015 of of 05--11-2015 Dated: No.D4/17043/15/DTE Veterinary

4403-00-101-99(P) construction of building for 100 Work completed Estimate submitted 55.00 Regional Desease 100% Kannur 4902283 6 months months 6 6274432/- Thalassery 17-03-2015 07-09-2015 06-03-2016

diagnostic centre, Kannur Anil Kumar K above 27.99% 4403-00-101-99(P) dated,28/8/14 Rs.55 Lakhs Rs.55 dated,28/8/14 DR-87/2014-15 dtd 1/1/2015 dtd DR-87/2014-15 G.O(Rt) No.1590/2014/AD Tvm Tvm No.1590/2014/AD G.O(Rt) EE/BLD/33/2015-16 dtd 16/8/2015 dtd EE/BLD/33/2015-16

Page 32 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

4403-102-96(P) Land not Strenthening of dept farms Ele estimate handed over 101 Construction of a Duck prepared for

2016 hence work to

36.00 L 36.00 1,92,000/- 6 months months 6 3061028/- 3792308/- Mattannur dept farms dept Thalassery farm in the goat farm at, be cancelled 11--07-2016 K C Joseph Kommeri GO(Rt) No.703/2014/ AD AD No.703/2014/ GO(Rt) 23.89 % above estimate rate estimate above % 23.89 DR-07/2014-15 dtd 20/5/2014 dtd DR-07/2014-15 4403-102-96(P) Strenthening of of Strenthening 4403-102-96(P) Dated,Tvm, 29/3/14 Rs.36 Lakhs Rs.36 29/3/14 Dated,Tvm, EE/BLD/40/2016-17 Dated: 30--06- Dated: EE/BLD/40/2016-17

4403-00-102-99 Construction of a building for district veterinary store Nearing Revised estimate 102 Animal disease control

completion 92% submitted Lakhs 155.00 Kannur Thalassery project store and office in Months 12 12646492/- 16006664/- 28-05-2014 02-07-2015 01-07-2016 26.57% above 26.57% 4403-00-102-99 District veterinary Centre M.K Ratnakaran Kannur SE(K)06/2015-16 dtd 24.4.15 dtd SE(K)06/2015-16 CR/46/2013-14 dtd 12/12/2014 dtd CR/46/2013-14 Agriculture (Animal Husbandry )Dept Husbandry (Animal Agriculture G.O(Rt)No.1166/12/AD/ dt. 28/5/12 Rs.155 Rs.155 28/5/12 dt. G.O(Rt)No.1166/12/AD/

4403-00-101-99-Plan Colum raising Estimate under 103 Construction of first floor to in progress 5% preparation 45 Lakhs 45 Veterinary Poly clinic months 9 3720766/- 3493055/- Thalassery K C Joseph C K Rs.45 Lakhs Rs.45 16--06-2016 4403-00-101-99-Plan 6.12% below estimate rate estimate below 6.12% 3763/2015-2016 Dated: 01--03-2016 M2.34335/2014/PLG Dated,22/06/2015 Dated,22/06/2015 M2.34335/2014/PLG EE/BLD/44/2016-17 Dated: 12--07-2016 Dated: EE/BLD/44/2016-17

Page 33 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

t 4403-00-102-96 (P) Construction of Hatchery at Estimate under 104 artmen preparation p Regional Poultry Farm, Kannur 50 Lakhs 50 Thalassery De Mundayad, Kannur Lakhs Rs.50 Animal Husbandry Husbandry Animal 4403-00-102-96 (P) (P) 4403-00-102-96 No.M2-6275/2016/Plg. No.M2-6275/2016/Plg. Tvm Dated: 03--03-2016 03--03-2016 Dated: Tvm Social Justice

4235‐60‐80‐98(P) Department 105 Construction of ramp for Work completed 15.65 100% Lakhs Sujith C 1439302 1511867 1143823 oldage Home , Azhikode Months 6 Azhikode Thalassery 4235-60-80-98(P) Justice 6 months 28/5/14

EE/BLD/38/2013-14 DR-44/2013/14 dated,6/6/13 DR-44/2013/14 Social G4/49281/09 dated,07/6/11 Rs.15.65 Rs.15.65 dated,07/6/11 G4/49281/09

15 ‐ paid

Construction of Model Complete bill V

Department Anganavady at d and

106 dated,29/4/14

Lakhs

final Kunnumel in Irikkur handed Irikkur 15 Navas & ‐ 20 1898309 1869834 1597369

Thalassery Grama Panchayath over Justice

1st

EE/BLD/31/2014 CC Social dated,31/12/13Rs.20 Lakhs DR/05/14 ICDS/A7-29728/13

Page 34 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 /

2015 14 13/03 ‐

4235‐02‐10‐96 (P) ‐ 01 09 ‐

Construction of an ‐ (P)

Justice

14 13

Anganwady for Dated: 96

rate ‐ Rs.11,66,000/

Lakhs

Department Kuthuparamba‐ 15 Work

10 ‐ ‐ Social 107 (Quotation)

Dated: 100%

Additional in Dated: completed Months

02

of ‐ 1166000 1094122 1166000

4 Thalassery

Kunnothuparamba Raghuthaman Justice 2015

Estimate

‐ Rs.11.66 Kuthuparamba K 18498/14 3 4235 ‐

Grama Panchayath in ‐ Kannur District 3 Director Social

DR:102/2015 EE/BLD/84/2014 ICDS.A7

4235‐02‐10‐96 (P) Construction of

Proposed Model Dated: Rs.11.66 ‐ Anganvadi building rate No.44 in Grama 29/12/14 (P)

Justice Panchayath Peravoor 96 ‐ Dated:13/2/2015

2015 Department Block, in

estimate Work

10 ‐

Dated: Social ‐ 108 Rs.11,66,000/ 15 Mathai

‐ 01 Kannur Distirct 100% Lakhs completed Months 02 ‐ 15

D of ‐

1166000 1166000 1084008 4 Thalassery V 14 below Justice

4235 18498/14 Director Social

‐ 2.11% 14 DR:83/2014 ‐ 09 EE/BLD/78/2014 ‐ ICDS.A7 13

Page 35 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

‐ Social

4235‐02‐10‐96 (P) of Construction of (P)

29/12/2014 Lakhs

Proposed Model Main slab 96 rate ‐ Rs.11,66,000/

George Department Anganvadi building completed

10 Dated:03/02/2014 Director ‐

109 Dated: M

No.127 in Maloor Grama Finishing in Months 02 15

14 Rs.11.66 ‐ ‐

1166000 1114682 1166000 ‐ 15 4 Thalassery ‐

Panchayath Peravoor 14/01/2015 progress Justice Estimate 09

‐ Shibu 18498/14

Block Iritty Taluk in 4235 ‐ 13

Kannur Distirct Justice Social ICDS.A7 DR:81/2014 Dated: EE/BLD/75/14

Dated: Rs.11.66 ‐

4235‐02‐102‐96 (P) CC

Construction of (P)

Justice 29/12/2014

Proposed Model 96 ‐ rate

Nihas

Dated:23/02/2015 2015 2015 Department

Anganwadi Building Work (Quotation)

‐ ‐

Social 110 102 ‐ Rs.11,66,000/ Dated:

15

02 06

100% Lakhs

No.02 in Koodali Grama ‐ completed Months ‐ ‐

of 02

1166000 1114073 1166000 ‐ 15 4 Thalassery 2015 ‐ 24 23

Panchyath, Iritty Block , ‐ Justice Estimate

02

Iritty Taluk in Kannur ‐ 4235 Mohammed 10 18498/14

District Director Social

‐ 14 ‐ DR:82/2014 09 EE/BLD/81/2014 ‐ ICDS.A7 13

Page 36 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

Order 2016 ‐

No.ICDS‐ 2016 ‐ 11 ‐

A7‐ 09 7755/15 ‐‐

4235‐02‐102‐96(P) 96(P) Structure ‐ Dated: 16‐ Electrical Dated.22 below Department

Construction of Model completed

102 ‐ 111 06‐2015 Lakhs Estimate to

17 Poulose Dated.28 50%

Anganwady building at ‐ Nearing Months

02 O 13 ‐ of the 1169720 1044560 be prepared

6 17 Thalassery ‐ in T completion Justice 10.70% Director

4235 of Social

Social JusticeRs.1

3Lakhs 2648/2016 EE/BLD/79/2016

Order 2016 ‐

No.ICDS‐ 03 A7‐ ‐‐ Lakhs 04

4235‐02‐102‐96(P) ‐ ‐ 96(P)

7755/15 13 ‐ Construction of Model dtd.

Department Dated: 16‐ Work

16, below 102

‐ ‐ Lakhs

112 Anganwady building at 16

‐ 100%

06‐2015 months completed

02 Sujith.C 13 Payatyal in ‐ 8 Thalassery 1247062/ 1240827/ 0.5%

of the 29/02/2016 Justice Grama Panchayath Director 4235

of Social 2441/2015 Social Justice EE/BLD/63/2015

Page 37 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

Order No.ICDS.A 4235‐02‐102‐96(P) C ‐ ‐ 96(P) 7‐ Construction of New ‐ super Department Lakhs

18498/14 below

Dated.05.11.2016

102

113 Anganwady building to ‐ structure in Dated: 13‐ Months 17

02

‐ progress

Kunhimangalam ‐ 6 Thalassery 1113699/ 1111695/ 30.09.2016 11.66 09‐2014 Ravindran 0.18% Justice Panchayath Rs.11.66 4235 Lakhs Social EE/BLD/73/16 As per site condition amount allotted is insufficient. Hence requested for Order revised AS vide letter No. D3‐ No.ICDS.A 328/2015

4235‐02‐102‐96(P) 96(P) 7‐ Dated:2‐2‐2015 ‐ addressed to Department

Construction of Model 18498/14 Lakhs

102 the Director 114 ‐ Anganwady building at Dated: 13‐ Social Justice 02 ‐

Thalassery Department 09‐2014 11.66 Justice Rs.11.66 4235 Lakhs Social

Page 38 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 2015 ‐ 02

Order ‐‐ 11

No.ICDS.A 06/01/2015

4235‐02‐102‐96(P) 96(P) 7‐ ‐ Department Dated:

Construction of Model 18498/14 Lakhs Work

MCN

102

115 ‐ Dated:

15 Anganwady building at Dated: 13‐ completed 100% Months ‐

02 ‐ 1166000 1149172 15 4 M/S Thalassery ‐

Kalliassery 09‐2014 11.66 Justice Rs.11.66 4235 Lakhs Social 89/2014 ‐ DR EE/BLD/77/2014

Health and Family

Welfare Department SID‐ construction of Permanent District 23/04/2015 Early Intervention A S Centre‐ E K Nayanar accorded. Dated: Memorial Sructural Government Women design to Lakhs Department

&FWD

116 and Children's be obtained

Hospital 26000000 Thalassery Rs.260 Justice Mangattuparamba in by Kannur District outsourcin Social g No.1244/2015/H

(Rt)

GO

Page 39 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

for 2016

4235‐02‐102‐96(P) 07 ‐‐ C

C 12

Construction of Model

Dated:3/3/2015 ‐ ‐

‐ ‐ Anganavady building 96(P) ‐ 16/02/2016

Lakhs Nihas

Department

Centre NO.120, Dated: Work

102

117 ‐ 17 completed 100% Kashimukku II Months ‐

02 18498/14 Dated: ‐ Peravoor

6 ‐ Thalassery 1100710/ 1100710/ Justice

Chavassery Iritty Rs.1166000/ Rs.1166000/

16 Rs.11.66 ‐

Muncipality, Kannur 4235 Muhammed

Social District No.ICDS/A7

3302/2015 EE/BLD/43/2016 Order

Construction of for

Anganwadi building at rate

Thavarol (No.34) Lakhs

Dated:

Model‐2 in Chengali ‐ ‐ 13/06/2016

Grama Panchayath Dated.09.09.2016 Rs.13 Work Lakhs

estimate

118 Lakhs

17

‐ 100%

Rameshan completed Months

7756/15 13 ‐ dated: 8 V

Thalassery 1257152/ 1177649/ Rs.13

17 M below ‐

23/06/2015 5.95 ICDS/A7 831/2016 EE/BLD/66/2016

Page 40 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 ASSET DEVELOPMENT SCHEME PAYYANNUR CONSTITUENCY

4202-01-202-99 Secondary School Electrical

Building (NP) 2014 Nearing 1 ‐ work 35% 95% (NP)

Construction of first floor 12 completion 727853 ‐ 2397853 3237102 25 Lakhs 25 completed Payyannur Thalassery Six Months Six 30/04/2016 06-11-2013 to existing ground floor for 09-11-2014 V V Musthafa V V 03 MASSHSS Ettikulam DR/16/2012-13 dt.26/3/13 DR/16/2012-13 EE/BLD/69/13-14 dtd.5/3/14 EE/BLD/69/13-14 General Education(M) Department Education(M) General GO(Rt)1265/13/G.Edn dt.16/3/13, 25 L 25 dt.16/3/13, GO(Rt)1265/13/G.Edn 4202-01-202-99 Secondary School Building Building School Secondary 4202-01-202-99

Electrical Estimate forRs. 2,50,000/- 4202-01-202-99 submitted Secondary School tenderd from Building (NP) Ele. Div

2014 Work 2 Construction of new ‐ KKD,work 50 L 50 24% 100%

05 completed ‐ Sujith C 4443635 5510107

building for GHSS Months 9 awarded to the 15-6-2015 Payyannur Thalassery 01-04-2015 30-04-2015 in Kannur 04 contractor Sri 4038235+1368959 District (Quotation) 04-03-14 Vinodkumar DR/33/2013-14 dated,6/6/13 DR/33/2013-14

EE/BLD/76/13-14 dtd.28/3/14 EE/BLD/76/13-14 M City General Education(M) Department Education(M) General Electricals GO(Rt)1266/13/ G.Edn dt16/3/13, 50 L 50 dt16/3/13, G.Edn GO(Rt)1266/13/ sreekandapura

4202-01-202-99 Secondary School Building (NP) Building School Secondary 4202-01-202-99 m

Page 41 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

4210-02-110-96 - Acquisition nd Electrical Allopathy Land Estimate

Acquisition and building 2013 Work forRs. 3 ‐ 25 L 25 100%

(NP) Constructin of new 06 completed 1,00,000/- llopathy La llopathy 23.10% ‐ 2939554 2371330 2919107 31-07-14 6 Months 6 31-7-2014 Payyannur Thalassery O.P block for PHC 05-05-2014 Elefn P V Krishnan V P 11

Ramanthali (NP) building and completed 6-11-2013 (Quotation) 6-11-2013 DR/17/2012-13 dt.26/3/13 DR/17/2012-13 cc IInd & Final bill paid EE/BLD/37/13-14 dt.6/11/13 EE/BLD/37/13-14 Health and Family Welfare Department Welfare Family and Health GO(Rt)No.845/2013, H&FWD dt.14/3/13, 25L dt.14/3/13, H&FWD GO(Rt)No.845/2013, 4210-02-110-96 - A - 4210-02-110-96

4202-01-202-99 Secondary School

2014 Nearing ‐

4 Building (NP) Constructin L Completed 50 L 50 95%

03 completion 21.85% ‐ 4794709 5842353

of second floor for GHSS Months 9 Payyannur Thalassery 24-08-2013 12-04-2014 31-05-2016 Building(NP) V V Musthafa V V Mathamangalam 14 DR/15/2013-14 dated,10/5/13 DR/15/2013-14 EE/BLD/70/13-14 dt.05/03/14 EE/BLD/70/13-14 General Education( M) Department M) Education( General 4202-01-202-99 Secondary School School Secondary 4202-01-202-99 GO(Rt)No.1220/13/G.Edn dt.15/3/13, 50 dt.15/3/13, GO(Rt)No.1220/13/G.Edn

Page 42 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

4202-02-800-85-Projects under LAC ADF(NP) Ele. Estimate Nearing 5 Constructin of Indoor Rs.200000/- completion 80% 25.88% 120 lakh 120

handball stadium at GHSS ADF(NP) Prepaired 11127038 14006715 12 months 12 Payyannur Thalassery 15/11/2016 14-07-2014

Vayakkara 16/11/2015 Abdul Latheef M A M Latheef Abdul 14/5/13 Rs.120 Lakhs Rs.120 14/5/13 CR/47/13-14 Dated:12/2/14 CR/47/13-14 General Education(M) Department Education(M) General SE(K) 42/2014-15 Dated: 5-2-2015 Dated: 42/2014-15 SE(K) 4202-02-800-85-Projects under LAC LAC under 4202-02-800-85-Projects GO(Rt)No.2038/2013/G.Edn dated TVM TVM dated GO(Rt)No.2038/2013/G.Edn

4210-02-800-95-project under LAC ADF(NP)

Constructin of first floor 2014 Work 6 ‐ Completed 100%

cum ramp in existing block 05 completed 50 lakh 50 ‐ Sujith C 1250644 4820741 5206400 9 Months 9 ADF(NP) Payyannur Thalassery 16/02/2015 of ayurveda Hospital 16-02-2015 31-05-2015 8% above E/R above 8% 17 Payyannur dated,4/5/13 Rs.50 Lakhs Rs.50 dated,4/5/13 DR/34/2013-14 dated,6/6/13 DR/34/2013-14 EE/BLD/11/14-15 dt.09/5/14 EE/BLD/11/14-15 GO(Rt) NO.1541/13/H &FWD &FWD NO.1541/13/H GO(Rt) Health & Family Welfare (D)Dept. 4210-02-800-95-project under LAC LAC under 4210-02-800-95-project

4515-00-800(NP) (Deposit Work) Constructin of open stage and pavalion

2014 Work To be 7 amenities to Kankol ‐ 100%

10 completed retendered 40 lakh 40 14.40% ‐ 3909474 4472438 21-08-13 Grama Months 6 Payyannur Thalassery 07-09-2014 31-01-2015 11-11-2014 LSGD (DB) LSGD Rs.40 Lakhs Rs.40 01

Panchayath ground in Narayanankutty Kannur District EE/BLD/44/13-14 dt.4/1/14 EE/BLD/44/13-14 DR/36/2013-14 dated,6/6/13 DR/36/2013-14 4515-00-800(NP) (Deposit Work) (Deposit 4515-00-800(NP) GO(Rt)1214/2013/LSGD dated,6/5/13 dated,6/5/13 GO(Rt)1214/2013/LSGD

Page 43 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

4210-02-800-95- Project under LAC- ted: 16/11/2015

14 Rs.53 Lakhs Nearing 2016

ADS(NP) ‐ 8 completio tendered 03 Construction of new 94% ‐‐ Payyannur 4780382 6566333 Thalassery 53 Lakhs

6 Months n ADS(NP) 3--09-2016

building for PHC 04 M/s.Jose Antony M/s.Jose

Pulingome 28-01-15 Quotation 37.36 % above estimate rate Health & Family Welfare (M)Dept. DR-48/2014-15 Dated: 22/08/14 Dated, Tvm 23/07/ G.O(Rt) No.2514/2014/H & FWD, EE/BLD/46/15-16 da 4210-02-800-95- Project under LAC-

4202-01-800-88- Project under LAC- Slab Edn Dated, Tvm

ADS(NP) ated.28/09/2016 Construction of completed.p 9 artition To be tendered second floor for the work in 40% Payyannur Thalassery 41 Lakhs 6 Months ADS(NP) 3839510/- 4703400/- existing building of Sri. Rajan S progress GHSS Peringome in 13/8/14 Rs.41 Lakhs Kannur District 22.50% above estimate rate General Education(M) Department Education(M) General DR:63/2014-15 Dated: 27/09/2014 4202-01-800-88-Project under LAC- EE/BLD/69/2016-17 D G.O(Rt) No.3246/2014/G.

Page 44 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

4210-02-800-95 Projects under LAC- ADS(NP)

2016 Civil work 10 Construction of new ‐ tendered

08 completed 100% ‐ B Abbas Payyannur 8430192 Thalassery Radiology block for ADS(NP) 10392741 100 Lakhs 12 Months 06-09-2015 01-07-2017 Government Taluk 01 23.28% above E/R Hospital Payyannur EE/BLD/53/2015-16 Tvm 18/10/14 Rs.100 Lakhs Rs.100 18/10/14 Tvm 4210-02-800-95 Projects under LAC- under Projects 4210-02-800-95 Health & Family Welfare (M) Department (M) Welfare Family & Health DR-78/2014-15 Dated: 10-12-2014 GO(Rt) No.3411/2014/H & FWD Dated, Dated, FWD & No.3411/2014/H GO(Rt)

4202-01-800-88 Construction of a H.Edn, Tvm Plastering building for Estimate in 11 work in Electrical Government Arts & 55% Division 300 lakh Payyannur Thalassery progress 30.6.2016 18 Months Joy Joseph 2--03-2016 28957148/- 28117391/- Science College, 2.9% below Peringome Higher Education ( C ) Dept. ) C ( Education Higher dated,21/05/2015 Rs.300 Lakhs GO(Rt).1107/2015/ SE(K)12/2016-17 dtd.30--05-2016 3209/2015-16 Dated: 11--02-2016 for 300 Lakhs 300 for 11--02-2016 Dated: 3209/2015-16 4202-01-800-88-Project under LAC-ADS(NP) under 4202-01-800-88-Project KALLIASSERY CONSTITUENCY

Page 45 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

Electrical Estimate 4202-01-203(NP) forRs. Construction of a 4,15,000/-

2014 Work 12 building for college of ‐ submitted EE 100%

07 completed 19.70% ‐ 100 lakh 100 8939188 KkD dt 10700208 12 months 12

Thalassery Applied Sceince for 24-08-2013 03-06-2015 31-07-2015 30-07-2015 Kalliasserry 03 26/3/13, 100 L 100 26/3/13, 31/10/2012 T Narayanankutty T IHRD Pattuvam 4202-01-203(NP) Technical Education Technical Elefn EE/BLD/67/13-14 dt.1/3/14 EE/BLD/67/13-14 DR/16/2013-14 dated,10/5/13 DR/16/2013-14

GO(Rt)No.487/2013/H.Edn dt dt GO(Rt)No.487/2013/H.Edn Completed ,

Electrical 4202-01-202-99 Estimate KPR Gopalan forRs. 2013

‐ Work 13 Memorial Govt. Higher 3,78,000/- 2013 07 100%

100 L 100 completed 24/7/14 100 lakh 100 8960680 8817309 8732515 ‐‐ K. Anees submitted Education 12 Months 12 Thalassery Secondary school Kalliasserry 1.6% Below 1.6% 20--07-2014 25 building Kalliassery 4202-01-202-99 Elefn. Completed DR/30/2013-14 dated 6/6/2013 dated DR/30/2013-14 EE/BLD/18/2013-14 Dated: 02--08- Dated: EE/BLD/18/2013-14 GO(Rt)No.894/13/G.Edn dt.23/2/13 GO(Rt)No.894/13/G.Edn

4202-01-800-88

Construction of a G.Edn dated building for stadium Work To be

14 15 completed retendered

cum Pavilion at 100% Education 160 lakh 3117765 Thalassery Kalliasserry

Cherukunnu High 15877063/- 15799014/- 31.07.2014 31.10.2015 0.53%BELOW 4202-01-800-88 School Ground CC1st & Part bill Tvm, 21/2/14, 160 L P.V. MANOHARAN SE (k)/12/14-15Dt.31.07.14 CR/3/2014-15/Dt.30.05.2014 GO(Rt) No. 917/ 2014/

Page 46 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

4202-02-800-85- Projects under MLA ADF(NP) LAC-ADF-2015-16- Kalliassery ted:01--03-2016 for ated.17/08/2016 Constituency- 06-2016 for Rs.50 Lakhs Work 15 completed Construction of Stage 100% Thalassery 50 Lakhs 9 Months Kalliasserry 49,97,123 4586859/-

and green room for Rs.50 Lakhs folklore Kalagramam M/S Kodikkandi Group

at 8.21% below Estimate rate Graman Panchayath -

Phase I EE/BLD/62/2016-17 D 4202-02-800-85-Projects under MLA ADF(NP) GO(Rt) No.105/2016/CLAD da No..1038/2016-17 dated: 22-- TALIPARAMBA CONSTITUENCY

4202-01-202-99 Electrical Secondary School Estimate Building (NP) Work forRs. 2013

16 ‐ 8 (NP)

100% 3Lsubmitted Construction of FF for ‐

30 lakh 30 completed & Final paid 2564002 2521440 2389744 6 Months 6 15-2-2014 Thalassery st 07-09-2013 15-03-2014 Taliparamba 16 office block of GHSS below 1.66% Elefn Morazha Narayanankutty T completed CC 1 EE/BLD/19/13-14 dt.7/8/13 EE/BLD/19/13-14 DR/25/2013-14 dated,6/6/13 DR/25/2013-14 General Education (M) Department (M) Education General GO(Rt)No.955/13/G.Edn dt 27/2/13, 30 L 30 27/2/13, dt GO(Rt)No.955/13/G.Edn 4202-01-202-99 Secondary School Building Building School Secondary 4202-01-202-99

Page 47 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

Electrical Estimate forRs. 1.90Lsubmitted tendered from 4202-01-202-99 Ele. Sub Construction of a Work Divn.Date 18- 17 01-2016 Work building for IMNS completed 100% 40 lakh 40 Niyas M Niyas 3720460 3573130 3384693 Education Thalassery awarded to the Taliparamba Nine months Nine GHSS class room below 3.96% 4202-01-202-99 contractor Sri Vinodkumar M EE/BLD/29/13-14 dt.9/9/13 EE/BLD/29/13-14 DR-28/2013-14 dated,6/6/13 DR-28/2013-14 City Electricals Sreekandapuram GO(Rt)No.964/2013 G.Edn dt.27/2/13, 40 L 40 dt.27/2/13, G.Edn GO(Rt)No.964/2013

4202-02-800-85- Projects under LAC- ADF(NP) Construction Electrical

of a building for smart 2014 Work 18 ‐ work 100% class room for Tagore 12 Completed 33.54% ‐ 150 lakh 150 completed 13454219 17966764 12 Months 12 Thalassery 19-12-2015 31-05-2016 Taliparamba R Dharmaraj Rs.150 Lakhs Rs.150

Vidyanikethan 20

Taliparamba Kannur 6491580+6423405 14-07-2014 (Quotation) 14-07-2014

District CC 1st & Part bill paid General Education(M) Department Education(M) General CR/35/2013-14 Dated: 09-01-2014 Dated: CR/35/2013-14 SE(K) 35/2014-15 Dated: 16-12-2014 Dated: 35/2014-15 SE(K) 4202-02-800-85-Projects under LAC-ADF(NP) under 4202-02-800-85-Projects G.O(Rt)No.2371/13/Gen. Edn. Dpt.TVM dt.7.6.13 dt.7.6.13 Dpt.TVM Edn. G.O(Rt)No.2371/13/Gen.

Page 48 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

4202-01-800-88 Projects under LAC ADS (NP) Construction Electrical 2015

‐ Work 19 of Semi Permanent estimate under (NP) 09

completed 100% 35Lakhs 4474332 ‐‐ 6 Months 6 preparation 3417086/-

Thalassery building in front of 9--03-2016 05-08-2015 Taliparamba 30.94% above 30.94% P Balakrishnan P existing stage in Govt. 10

HSS Mayyil /2014 No.1114 G.O(Rt) General Education (M) Dept. (M) Education General DR-11/2014-15 Dated: 26-5-2014 Dated: DR-11/2014-15 G.Edn,Dated,Tvm 01/03/14 Rs.35 Lakhs Rs.35 01/03/14 G.Edn,Dated,Tvm 4202-01-800-88 Projects under LAC ADS ADS LAC under Projects 4202-01-800-88

4202-01-800-88 Projects under LAC ADS (NP) Construction Work 20 Completed

2015 completed of First floor in Higher 100% 4296362 5712873 31-10-14 6 Months 6 Thalassery 3223341/- Taliparamba

Secondary Block IMNS Lakhs 45.70 32.97% above 32.97% GHSS Mayyil M V Rameshan under LAC ADS (NP) ADS LAC under General Education(M) Dept. Education(M) General 4202-01-800-88 Projects Projects 4202-01-800-88 Dated 10/6/14 Rs.45.70 Lakhs Rs.45.70 10/6/14 Dated G.O(Rt) No.2268/2014 G.Edn, G.Edn, No.2268/2014 G.O(Rt) DR/31/2014-15 Dated:10-7-14 DR/31/2014-15 EE/BLD/27/2015-16 Dated:18-06- EE/BLD/27/2015-16

4202-01-800-88- Projects under LAC-ADS(NP) Construction of New building for High School

2015 Work tendered no 21 Classrooms for Kutteri ‐

12 response completed 100% ‐

Government High School 4216316 Education 6 Months 6 Thalassery ADS(NP) 3385240/- Taliparamba 29-07-2014 05-11-2016 35.00 Lakhs 35.00 at Pariyaram Grama 11 24.55% above E/R above 24.55% Panchayath in Taliparamba (MCN) Mohanan C in Kannur District G.O(Rt) No.1124/2014/G.Edn No.1124/2014/G.Edn G.O(Rt) Dated,Tvm 01/3/14 Rs.35 Lakhs Rs.35 01/3/14 Dated,Tvm DR-10/2014-15 Dated: 26-5-2014 Dated: DR-10/2014-15 EE/BLD/22/2015-16 Dated: 5-6-15 Dated: EE/BLD/22/2015-16 4202-01-800-88- Projects under LAC- under Projects 4202-01-800-88-

Page 49 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

4202-01-800-88 Projects under LAC ADS (NP) Construction of a New building for High School Class Electrical

2015 Work 22 rooms for Kalikadavu ‐ work tendered- 06 100% Lakhs completed ‐ 3330734 4320961 No response 4284023 9 Months 9 Thalassery Govt. High School at Taliparamba 16-09-2014 Mohanan C 12-05-2015 03-01-2016 26-02-2016 35.00 Lakhs 35.00 06 Kurumathur Grama above 29.73%

General Education Dept. Education General Panchayath in Taliparamba in Kannur District Dated:26-6-2014 DR-22/2014-15 EE/BLD/23/2015-16 Dated: 5-6-2015 Dated: EE/BLD/23/2015-16 4202-01-800-88 Projects under LAC ADS (NP) ADS LAC under Projects 4202-01-800-88 G.O(Rt) No.1187/2014/G.Edn,Dated,Tvm 04/3/14 Rs.35 Rs.35 04/3/14 No.1187/2014/G.Edn,Dated,Tvm G.O(Rt)

8443-00-108-PW Deposit LSGD-LAC- ADF-Taliparamba Finishing 2016 for Rs. 60 Lakhs constituency- GD dated: 26/03/2013 23 work in

Construction of 95%

Thalassery progress 60 Lakhs Community hall 9 Months 5572656/- 4981954/- Taliparamba 11--07-2016 for Rs. 60 Lakhs building at P Prakashan T Malappattam Grama

Panchayath 8443-00-108-PW Deposit EE/BLD/54/2016-17 Dated: 03--08-2016 471/2016-17 dated: 02/06/ GO(Rt) No.798/2013/LS

Page 50 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

IRIKKUR CONSTITUENCY

4202-01-201-99 Work Construction of a

2014 completed 24 building for Kaniyanchal ‐ Work Awarded 100%

05 and bill Irikkur 50 lakh 50 21.03% ‐ 5676376 4499139 5445308 9 Months 9 Education

Thalassery Govt. Higher Secondary for 50.00 L 50.00 for 20-02-2015 30-04-2015 30-03-2015 24-08-2013 submitted & Final bill paid 21 AnishMathew 4202-01-201-99 school nd cc II DR-45/2013-14 dated,11/6/13 DR-45/2013-14 EE/BLD/12/2014-15 dt.14/5/14 EE/BLD/12/2014-15 Go(Rt) 807/13/ H.Edn dtd 19/2/13 19/2/13 dtd H.Edn 807/13/ Go(Rt)

4202-01-201-99 Work Construction of first Electrical

2014 completed 25 floor to Sreekandapuram ‐ Work in 100%

07 and bill Irikkur 50 lakh 50 18.59% S Rajan ‐ 3993593 4736002 4873300

6 Months 6 progress Education

Thalassery Govt. Higher Secondary 24-01-2015 15-11-2014 submitted 25 school 4202-01-201-99 19/2/13 for 50.00 L 50.00 for 19/2/13 CC IInd & Final bill paid IInd & Final CC Go(Rt) 808/13/ H.Edn dtd dtd H.Edn 808/13/ Go(Rt) DR-26/2013-14 dated,6/6/13 DR-26/2013-14 EE/BLD/24/2014-15 dt.21/7/14 EE/BLD/24/2014-15

4202-02-104-99 Electical Construction of a

2014 Work estimate to be 26 building for Govt. Poly ‐ 100%

07 completed changed and Irikkur 50 lakh 50 19.06% 18-8-12 ‐ 5953000 4919335 5856960 9 Months 9

Thalassery Technic Collge Naduvil 12-06-2014 31-12-2015 30-12-2015 Bino George Bino resubmitted 03 in Kannur District 4202-02-104-99 Technical Education Technical Go(Rt) 254/13/ H.Edn dtd dtd H.Edn 254/13/ Go(Rt) DR.13/12-13 Dated,21/3/13 Dated,21/3/13 DR.13/12-13 20/2/13 for 50.00L EE/BLD/66/2013-14 dt.28/2/14 EE/BLD/66/2013-14

Page 51 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

4202-01-800-88 Project under Edn Dated,Tvm LAC-ADS-(NP)

2015 Work 3 Times 27 Construction of a ‐ (NP)

02 tendered Irikkur completed 100% ‐ 4728099 6123361 Thalassery

School building for 6 Months 31-10-2014 15-08-2015 31-12-2015 16-12-2015 50.00Lakhs 16 GHS Rayrome in T O Paulose 29.51% above E/R 3362324+2847154 Kannur District 24/2/14 Rs.50 Lakhs General Education(M) Department Education(M) General DR-101/2013-14 Dated:21-03-2014 EE/BLD/3/2015-16 Dated: 23-04-2015 Dated: EE/BLD/3/2015-16 G.O(Rt) No.966 /2014/G. 4202-01-800-88 Project under LAC-ADS-

4210-02-800-95 Projects under LAC- ADS(NP) Electrical 14 Rs.50 Lakhs 2015 Work 28 Construction of a ‐ work in 09 Irikkur completed 100% ‐ progress 4652926 5985059 Thalassery

building for Govt. 6 Months ADS(NP) 20-11-2014 08-08-2015 31-12-2015 11-11-2015 50.00Lakhs 02 Ayurveda Hospital T O Paulose 3931078+2120963 Nellipara 28.63 % above E/R Dated,Tvm 11/7/ DR/57/2014-15 Dated: 3-9-2014 GO(Rt) No.2362/2014/H& FWD Health & Family Welfare (D) Department (D) Welfare Family & Health 4210-02-800-95 Projects under LAC- EE/BLD/04/2014-15 Dated:23-04-2015

Page 52 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 1

4210-02-800-95 Projects under LAC-

ADS(NP) 2015 Work Work in 29 ‐

11 progress Irikkur

completed 100%

Construction of a Saji C ‐ 4689904 6076709 2023263 Thalassery 6 Months ADS(NP) Rs.50 Lakhs Rs.50 29.08.2016 31-10-2014 29-05-2016 50.00Lakhs building for Govt. 30 29.57% above CHC Kootumugham Health & Family Welfare (M)Department DR-09/2014-15 Dated:26-05-2014 GO(Rt)No.1435/2014 /H&FWD, dt, 6/5/14, 6/5/14, dt, /H&FWD, GO(Rt)No.1435/2014 4210-02-800-95 Projects under LAC- EE/BLD/40/2014-15 Dated: 10-09-20

4210-02-800-95 Projects under LAC-

ADS(NP) 2015 Work 14 Rs.50 Lakhs 30 ‐ Completed 02

Irikkur completed Construction of IP 100% ‐ Navas V 4590026 5163779 Thalassery 6 Months ADS(NP) 24-11-2014 23-08-2015 23-01-2016 50.00Lakhs 24 21--01-2016

Ward Building at 12.5% above CHC Irikkur Dated,Tvm 7/7/ DR-55/2014-15 Dated:3-9-2014 Health & Family Welfare (M)Department G.O(Rt) No. 2293/2014 H & FWD EE/BLD/80/2014-15 Dated:19-02-2015 EE/BLD/80/2014-15 4210-02-800-95 Projects under LAC-

Page 53 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

Electrical estimate submitted to 4202-02-800-88- EE,Ele.Dn. Projects under LAC- Edn Dated, Tvm KKD dated

ADS (NP) 2015 Work 15/02/2016 31 ‐

06 for Rs. Irikkur Construction of completed 100% ‐ Education 6014976 5881427 Thalassery

4456528/- 400000/- 22.12.2015 K S Jospeh 28-01-2015 Six Months 50.00Lakhs additional building for 23 GHSS Being tenderd

13/08/14 Rs.50 Lakhs from Ele Div

34.97% above estimate rate KKD- Completed DR-70/2014-15 Dated: 21-10-2014 EE/BLD/26/2015-16 Dated: 18-06-2015 G.O(Rt) No.3245/2014/G. 4202-02-800-88-Projects under LAC-ADS (NP)

4210-02-800-95- Projects under LAC- ADS(NP) 14 Rs.25 Lakhs 2015

‐ Work 32 Construction of No response 11 Irikkur completed 100% ‐‐ 2209121 3102269 Thalassery 30-03-15

Quarters ( 6 Months ADS(NP) Saji Joseph Saji 25.00Lakhs 19--05-2016 Type III ) for Doctor's 20 at PHC Udyagiri 40.43% above E/R Dated,Tvm 24/10/ Health & Family Welfare (M)Department EE/BLD/49/2015-16 Dated: 20--11-2015 Dated: EE/BLD/49/2015-16 GO(Rt) No.3451/2014 H & FWD DR-79/2014-15 Dated: 10-12-2014 4210-02-800-95-Projects under LAC-

Page 54 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 4

4202-01-800-88 2016

Construction of ‐ Electrical 33 Completed

02 work arranged Irikkur 100% additional building for Lakhs ‐‐ Education 4513690 6187366 Thalassery 6 Months 17-3-2015 50.00Lakhs Mohanan K 16--08-2016 GHSS Nidungom 17 4202-01-800-88 37.08% above E/R Dated,Tvm 27/08/2014 Rs.50 G.O(Rt) No.3437/2014/G.Edn EE/BLD/14/2015-16 Dated:16/05/2015 EE/BLD/14/2015-16 DR-71/2014-15 Dated: 28-10-201

4515-00-800-96 project under LAC Work ADS NP ( Complete Deposit Work) d Fund to 34 Renovation of be No provision Irikkur 100% 2483749 3183421 Thalassery

Swimming pool and 6 Months obtained 25.00Lakhs construction of Baby Joseph from 28.17% above E/R dressing room at Work) NP( Deposit LSGD

Nellikutty Tvm,31/07/14 Rs.25 Lakhs DR-54/2014-15 Dated: 3-9-2014 G.O(Rt) No.1982/2014/LSGD,Dated, EE/BLD/14/2015-16 Dated: 16-05-2015 4515-00-800-96 project under LAC ADS

Page 55 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

ADS-2014-15, Irikkur LAC- Construction of a building for AS to be Electrical 35 Krishibhavan at estimate under

Irikkur accorded preparation

Thalassery Udayagiri in Udayagiri 25 Lakhs 25 Lakhs Grama Panchayath in Kannur District

4210-02-800-95(01)- Projects under LAC - ADS LAC -ADS- FWD Dated,Tvm Irkkur- Construction of 2016

‐ Work under 36 building for Primary

06 preparation Irikkur completed 100% ‐‐

Thalassery Health Centre, 40 Lakhs 3993878/- 3674767/- 12 Months 03-11-2016 Raju Joseph 19--06-2017 Therthally at Alakkode 20

Grama Panchayath, 5/8/15 Rs.40 Lakhs

Kannur District 7.99% below estimate rate DR-3157/2015-16 for Rs.40 Lakhs Health and Family Welfare (M) Department (M) Welfare Family and Health EE/BLD/32/2016-17 Dated: 20--06-2016 GO(Rt) No.2545/2015/H& 4210-02-800-95(01)-Projects under LAC -ADS

Page 56 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

4202-01-800-88- Projects under LAC- dn.dated: Tvm 2016

ADS(NP) LAC-ADS- ‐ structural Under 37 06 70% preparation Irikkur Irikkur- Construction of completed ‐‐ Thalassery 50 Lakhs ADS(NP) 4747176/- 4547795/- 12 Months 03-11-2016

a building for GHSS, Raju Joseph 21--06-2017 22 16/7/2015 Rs.50 Lakhs 4.2% below Estimate rate General Eduation(M) Department Eduation(M) General 3158/2015-16 for Rs.50 Lakhs EE/BLD/33/2016-17 Dated: 22--06-2016 Dated: EE/BLD/33/2016-17 4202-01-800-88-Projects under LAC- GO(Rt) No.2870/2015/Ge 4202-01-800-88-Projects under LAC-ADS(NP) Higher Education-Legislative Assembly Constituency- Asset Development Scheme (LAC- ADS) Construction of additional building at Edn dated,Tvm Technical High School , 2016

‐ Work Under 38 Naduvil,Kannur District

06 preparation Irikkur completed 100% ‐‐ Siju K C Thalassery 50 Lakhs 9 Months ADS(NP) 4656717/- 4336335/- 22/03/2016 14--03-2017 15 6.88% below estimate rate dated.10/7/2015 Rs.50 Lakhs 3645/2015-16 for Rs.50 Lakhs 4202-01-800-88-Projects under LAC- EE/BLD/27/2016-17 Dated: 15--06-2016 GO(Rt) No.1763/2015/H.

Page 57 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

4210-02-800-95(1)- Projects under LAC- ADS ADS 2014-15 Irikkur LAC - 2016

‐ Work Tendered, No 39 Construction of a 07

ADS response Irikkur completed 100% ‐‐

Thalassery building at PHC 50 Lakhs 4756057/- 5039042/- 11/01/2016 11/01/2016 12 Months 03-11-2016 17--07-2017 Chengalayi in 18 M V Rameshan

Chengalayi Panchayath, Lakhs Rs.50 5/8/2015

Kannnur District 5.95% above estimate rate Health and Family Welfare (M) Department (M) Welfare Family and Health TS No. KNR/2015-16/2015/3573 dated: dated: KNR/2015-16/2015/3573 No. TS 4210-02-800-95(1)-Projects under LAC- GO(Rt) No.2546/2015/H&FWD dated,Tvm dated,Tvm No.2546/2015/H&FWD GO(Rt) EE/BLD/47/2016-17 Dated: 18--07-2016

4202-01-800-88- Projects under LAC- ADS ADS 2014-15-Irkkur LAC- Edn dated Tvm Construction of 2016

‐ Work to Electrical 40 additional building for 2015/3367 dated: 4-1- 07

2016 work awarded Irikkur be started ‐‐

Thalassery Governemnt Poly 75 Lakhs 7478078/- 18 Months 03-11-2016 01--01-2018 technic College, Naduvil 02

(First floor East block ) 20/7/15 Rs.75 Lakhs Anish Mathew, Alakkode 3.3 % below estimate rate

Higher Education (L) Department (L) Education Higher in Naduvil Grama Panchayath, Kannur EE/BLD/41/2016-17 Dated.02--07-2016 GO(Rt) No.1858/2015/H. 4202-01-800-88- Projects under LAC-ADS TS No.KNR/2015-16/

Page 58 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 N

ADS- 2015-16 Irikkur LAC- Construction of an ated.8--11-2016 dn. Dated: 02--03- Auditorium s under LAC-ADS( Work 41 building in Irikkur completed 100% Thalassery Irikkur C S Saju C 3765879 3366695 40 Lakhs HSS at Irikkur 6 Months 10.60 below 12--08-2016 Grama Panchayath 2016 Rs.40 Lakhs in Kannur District General Education Dept. Education General EE/BLD/77/2016-17 D GO(Rt) No.919/2016/GE 4202-01-800-88-Project No.816/2016-17 Dated: 10/06/2016 for Rs.40 Lakhs Rs.40 for 10/06/2016 Dated: No.816/2016-17

Page 59 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

AZHIKODE CONSTITUENCY Electrical Estimate 4202-01-800-95 forRs. 2013

‐ Work 42 CHMGHSS 3,50,000/- 07 completed 100% 26/7/14 Azikode 100 lakh 100 8904823 8712479 8027842 ‐‐ submitted , Education 12 Months 12 Thalassery dated,6/6/13 P Pradeepan 18--06-2014 2.16% Below 2.16% 27 4202-01-800-95 DR-32/2013-14 DR-32/2013-14 electrification GO(Rt)No.1260/13 GO(Rt)No.1260/13 completed /G.Edn dt, 16/3/13, 100 L 100 16/3/13, dt, /G.Edn EE/BLD/13-14 Dt.27/7/13 EE/BLD/13-14 2013

4202-02-800-85 ‐ Work Electrification 43 10 completed 100% completed GMLPS Mangadovu lakh 50 Azikode 4374829 4291707 ‐‐ 9 Months 9 Education Thalassery 21--07-2014 08--07-2014 1.90% below 1.90% 22 4202-02-800-85 & Final& bill paid Abdul Rahiman P P P Rahiman Abdul 28/5/13 Rs.50 Lakhs Rs.50 28/5/13 3644655(3478628+166027) DR-53/2013-14 dated,30/8/13 DR-53/2013-14 EE/BLD/34/13-14 dt.21/10/13 EE/BLD/34/13-14 GO(Rt)No.2228/13 /G.Edn dt, dt, /G.Edn GO(Rt)No.2228/13 Civil & Electrical work completed- CC 1st 1st CC completed- work Electrical & Civil

Electrical Estimate forRs. 2,30,000/- submitted 4202-01-202-99 tendered from 2014

‐ Work 44 GHSS Azhikode Ele. Divn Date 02 100% 6.90%

50 lakh 50 completed Azikode 4570845 4886233 ‐‐ 9 Months 9 16-12-2015 Education

Thalassery ( Meenkunnu) 13--11-2014 K Anilkumar K 14

4202-01-202-99 Work awarded to the EE/BLD/51/13-14 dt.6/2/14 EE/BLD/51/13-14 DR-31/2013-14 dated,6/6/13 DR-31/2013-14 4621982 (3929700+650745) 4621982

contractor CC IIIrd &Final bill paid M/S SPANDS Kozhikode GO(Rt)No.1223/2013 G.Edn dt.15/3/13, 50 L 50 dt.15/3/13, G.Edn GO(Rt)No.1223/2013

Page 60 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

Electrical Estimate 4202-01-202-99 forRs. 2013

Constructin of first ‐ Work 3,58,000/- 45 09 floor for GHSS completed 100% submitted Azikode Niyas M Niyas 100 lakh 100 8424426 8166639 7076546 ‐‐ Education 12 Months Months 12 Thalassery 09--09-2014

3.06% below 3.06% Being

Kannatiparamba 10 4202-01-202-99 tendered from Ele. Divn EE/BLD/28/13-14 dt,9/9/13 EE/BLD/28/13-14 DR-39/2013-14 dated,6/6/13 DR-39/2013-14 CC IIIrd &Final bill paid GO(Rt)No.1288/13/H.Edn dt19/3/13, 100L dt19/3/13, GO(Rt)No.1288/13/H.Edn

Electrical estimate submitted to EE, PlanningTVM dated 04/04/2013 4202-02-800-85-00-NV for Rs. 120000/- 2014

‐ Work 46 Construction of class ,Revised Estimate 01 completed 100% 40 lakh 40

12.50% Submitted to EE Azikode 2325284 3659992 4117491 ‐‐ 9 Months 9 Education Rajeev P I

Thalassery room for GHSS Puzhathi

29--10-2014 30--04-2015 23--04-2015 Ele Div KKD Date 30 29-11-2015 for Rs

4202-02-800-85-00-NV 300000/- Being EE/BLD/46/13-14 dt,29/1/14 EE/BLD/46/13-14

DR-55/2013-14 dated,30/8/13 DR-55/2013-14 from Ele. Divn GO(Rt) No.2157/13/Gen.Edn dated,23/5/13 Rs.40 Lakhs Rs.40 dated,23/5/13 No.2157/13/Gen.Edn GO(Rt)

Page 61 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

Electrical estimate for 1,80,000/- 4202-02-800-85 submitted 2 times tenderd 2014

Construction of FF for ‐ Work 47 from Ele.sub 04 100% Govt UP School Lakhs completed 50 lakh 50 12.40% Azikode 4700916 4467979 5022008 ‐‐ 9 Months Months 9

C.P Ayub C.P Div Date 16- Education Thalassery Pappinassery 21--01-2015 19--01-2015 22

4202-02-800-85 12-2015 and18-01- DR-52/2013-14 dated,30/8/13 DR-52/2013-14 2016 CC IInd & Final bill paid

EE/BLD/7/14-15 dated,25/04/2014 EE/BLD/7/14-15 No Response GO(Rt)No.2230/13 TVM Edn dt 28.5.13 Rs.50 Rs.50 28.5.13 dt Edn TVM GO(Rt)No.2230/13

4202-01-800-85 Construction of Entry 2014

gate and reconstruction ‐ Work No electrical 48 03 of compound wall at 100% work

50 lakh 50 completed 14.99% Azikode 4694913 5398680 ‐‐ 9 Months Months 9 Education Thalassery K Siddique K 9--12-2014 CHMGHSS 30--05-2015 20--05-2015 10 valappattanam 4202-01-800-85 Edn dt 28.5.13 Rs.50 Lakhs Rs.50 28.5.13 dt Edn EE/BLD/71/13-14 dt.10/3/14 EE/BLD/71/13-14 DR-51/2013-14 dated,30/8/13 DR-51/2013-14 GO(Rt)No.2225/13 TVM Gen. Gen. TVM GO(Rt)No.2225/13

4202-01-800-88 Electrical Civil estimate under Construction of Indoor 49 work preparation

Stadium at VKKM Govt. 100% 80 Lakh 80 Azikode 1783275

9 Months Months 9 No provision 7850589/- 8848399/- Thalassery completed GO(Rt) No. No. GO(Rt) 21--01-2016 MANJUSH.P

College, Kannur 22/04/2015 12.71 ABOVE 12.71 16DT.18.04.15

4202-01-800-88 in the estimate EE/BLD/1/2015- Higher Education Higher 5/3/14 Rs.80 Lakhs Lakhs Rs.80 5/3/14 DR/I/2014-15DT.21.4.14 482/2014/H.Edn TVM dt. dt. TVM 482/2014/H.Edn

Page 62 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

4202-01-800-88-

Projects under LAC- Edn Dated,Tvm hirakkal, Kannur

ADS(NP) 2016 Work 50 ‐ Completed completed. 03 Construction of 100% Azikode 100 Lakh 100 ‐‐ 9278052 Thalassery 12 Months 8--03-2017 9 11551175/- Building for GHSS 01-11-2016 24/2/14 Rs.100 Lakhs General Education(M) Dept. Education(M) General 24.50% above estimate rate DR-30/2014-15 Dated: 26-6-2014 Rajan Azhikodan, C EE/BLD/08/2016-17 Dated: 30--05-2016 Dated: EE/BLD/08/2016-17 4202-01-800-88-Projects under LAC-ADS(NP) under 4202-01-800-88-Projects G.O(Rt) No.980/ 2014/G.

4202-01-800-88 Electrical Projects under estimate

LAC ADS (NP) .Edn Dated, Tvm submitted to 2015

‐ Work EE,Ele.Dn. 51 Construction of a

07 KKD dated

completed 100% 50 Lakh 50 Azikode ‐‐ 4867600 4869180 Thalassery 6 Months Vyshak P Mini Stadium for 4869180/- 01/03/2013 23-12-2014 20--01-2016 31--03-2016 30--03-2016 21 GHSS Azhikode Estimate rate for Rs. 2,30,000/- General Education(M) Dept. Education(M) General (Meenkunnu) 30/06/2014 Rs.50 Lakhs DR-68/2014-15 Dated: 17-10-2014 EE/BLD/69/2014-15 Dated: 23-01-2015 4202-01-800-88 Projects under LAC ADS (NP) ADS LAC under Projects 4202-01-800-88 G.O(Rt) No.2563/2014 G

Page 63 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

4202-01-800-88 Projects under LAC ADS (NP) G.H.S.S

Azhikode 02/07/2014 Rs.25 Work No electrical 52

(NP) work 100% (Meenkunnu) Lakhs completed 25 Lakh 25 Azikode 2378093 3067740 Thalassery 4 Months 28-10-2014

Construction of K V Valsaraj compound wall and 29% above E/R General Education(M) Dept. Education(M) General gate DR-47/2014-15 Dated: 22-08-2014 Dated,Tvm 4202-01-800-88 Projects under LAC ADS LAC under Projects 4202-01-800-88 EE/BLD/30/2015-16 Dated: 21-07-2015 G.O(Rt) No.2607/2014/G.Edn

Construction of TS estimate Electrical 53 indoor Stadium at under estimate under 75 Lakh 75 Lakh 75 Azikode preparation preparation Thalassery valapatanam

4515-00-800-96 Projects under LAC-ADS(NP) AS Electrical 54 Construction of accorded to estimate under 30 Lakh 30 Azikode LSGD preparation Thalassery Mini Stadium at LAC-ADS(NP)

Local Self Govt(D.A) Self Local kakkad in Puzhathi Pt. GO(Rt) No.2583/15/LSGD Dated:22-08-15 Rs.30 Lakhs 4515-00-800-96 Projects under

Page 64 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

4202-01-800-88 Projects under LAC halode, Kannur .Edn Dated,Tvm

ADS (NP) ated:01-03-2016 ted: 31/10/2014

Construction of main 2016 work No electrical 55 ‐ work entry gate for 03 completed 100% Azikode ‐ Thalassery 25 Lakh 6 Months 2407296/- 3018990/- 21/12/2015 08-09-2016 V.K.K.M Memorial 09 Government Womens 25.41 % above E/R Higher Education( C) Dept. C) Education( Higher College, Kannur 1/10/14 Rs.25 Lakhs DR-72/2014-15 da EE/BLD/56/2015-16 D M/s Kodikkady group, C G.O(Rt) No.2347/2014/ H 4202-01-800-88 Projects under LAC ADS (NP)

4202-01-800-88 Projects under LAC- structure

ADS(NP) Edn dated,Tvm work Electrical Construction of a rakkal, Kannur completed 56 estimate in

building for . Masonry 65% Azikode 65 Lakhs 65 Division Thalassery 9 Months ADS(NP) 6081441/- 5566951/-

Pappinissery Welfare Rs.65 Lakhs 11--07-2016 work in School in Kannur progress. 25/8/2015 Rs.65 Lakhs General Education(M) Dept. Education(M) General District O C Ullasan, Chi 4202-01-800-88 Projects under LAC- No.841/2016-17 dated: 13--06-2016 for EE/BLD/56/2016-17 Dated:05--08-2016 GO(Rt) No.3612/2015/G.

Page 65 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

Renovation work of Estimate 57 Chirakkal Stadium in submitted Azikode

Thalassery Kannur District

4202-01-800-88- Projects under LAC-

ADS(NP) Rs. 74 Lakhs T.14--06-2016 Work Electrical

LAC-ADS- ects under LAC- estimate for 2016

‐ nearing 58 Construction of 2nd Rs.5 Lakhs in 06 completio 95% Azikode

‐‐ ElectricalDivis Thalassery

floor at Higher Niyas.M 74 Lakhs 9 Months ADS(NP) 6839273/- 6408399/-

22/03/2016 n 16--03-2017 17 ion General Education Secondary Block for GHSS GO(Rt) No.3611/2015/G.Edn dated,Tvm 25/8/15 Rs.74 Lakhs 4202-01-800-88-Proj EE/BLD/25/2016-17 D DR No.3650/2015-16 for

LAC-ADS-Construction Site of new building for 59 handed Govt. HSS 250 L

Thalassery over. Azhikode Kannadiparamba Tvm 1/3/2016 Rs.250 Lakhs 4202-01-800-88-Projects under LAC-ADS under 4202-01-800-88-Projects GO(Rt)No. 870/2016/G.Edn dtd KANNUR CONSTITUENCY

Page 66 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

Ele Estimate Dated 11/11/2013 Rs.150000/- Two times 2014

4202-01-202-99 ‐ Work 60 tenderd from 10 GHSS 100% 50 lakh 50 Kannur completed Sadique 4524197 ‐‐ 6 Months 6 Ele.Sub Div Education 5655246/- Thalassery 24--08-2013 09--07-2015 08--10-2015 25.% ABOVE 25.% 10

4202-01-202-99 Date 16-12- 2015 and18- DR-40/2013-14 dated,6/6/13 DR-40/2013-14 EE/BLD/45/14-15DT.1.10.14 01-2016,No response GO(Rt)No.640/13/G.Edn dt.12/2/13, 50 L 50 dt.12/2/13, GO(Rt)No.640/13/G.Edn

Electrical Estimate 4202-01-202-99 forRs. Construction of 407500/- submitted

additional first floor 2014 Work 61 ‐ Tendere 3 100%

02 completed building on the top of 7.20% 25 lakh 25 Kannur ‐ 2418401 2592526 2570537

6 Months 6 times from Education Thalassery 18-10-2013 25-08-2014 25-08-2014

existing building of 26

4202-01-202-99 Ele. Divn. No GHSS Mundery M/S Moson'sEstate response DR-21/2013-14 dated,5/6/13 DR-21/2013-14 EE/BLD/62/13-14 dt.26/2/14 EE/BLD/62/13-14 Being retendered GO(Rt)No.1258/13/H.Edn dt.16/3/13, 25L dt.16/3/13, GO(Rt)No.1258/13/H.Edn

Page 67 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

4210-02-800-95 Construction of a building for Family Welfare 2016

‐ Work Electrical 62 Sub 03 completed. work tendered 100% Lakhs Kannur lakh 25 ‐‐ 2385013 Thalassery 6 Months Centre(Health) in 2928796/- 07--09-2016 17--12-2015 08

R.S No.129/13 at 4210-02-800-95 M/S Kodikkandy group Kodikkandy M/S Munderi Grama 22.80% above estimate rate

Panchayath Tvm. 12/11/2013 Rs.25 Lakhs EE/BLD/57/2015-16 dt,02--03-2016 Health and Family Welfare (M) Dept. DR/75/2013-14 dated,4--12-13 for Rs.25 G.O (Rt) No.3782/2013/H & FWD Dated,

Electrical estimate

4202-01-800-88 Edn Dated,Tvm submitted to 15

Construction of ‐ Work EE,B.TLy 63 9 ‐‐ completed dated 100%

Kannur Building for Govt. lakh 50 S Rajan 4657708 5843095 15 Thalassery 22/12/2013 01-07-2015 Six Months THSS Kannur 14-03-2016 4202-01-800-88

Technical Education Technical for Rs. 25.45% above E/R

16/07/14 Rs. 50 Lakhs 150,000 DR-65/2014-15 Dated: 07-10-14 EE/BLD/39/2015-16 Dated: 09-9-2015 G.O(Rt) No.2803/14/G.

Page 68 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

4202-01-800-88 Projects under LAC Finishing

ADS (NP) 2015 Agreement 64 ‐ work in 90% (NP)

02 executed 50 lakh 50 Kannur Construction of ‐ 4555552 4965552 Thalassery progress. 9% above 30-7-2014 1--11-2015 Six Months Building for Govt. 05 HSS Kannur 8/1/2014 Rs.50 Lakhs General Education(M) Dept. Education(M) General K Aboobacker Siddique G.O (Rt) No.138/14/H.EdnDt.Tvm. DR-100/2013-14 Dated: 21/03/2014 EE/BLD/06/2015-16 Dated: 24-04-2015 4202-01-800-88 Projects under LAC ADS

4202-02-800-85- Projects under LAC- ADS(NP) Construction of first

floor building . Edn dated,23/4/14 Work Electrical to 65 be started 100%

Kannur (Balance portion ) of lakh 50 completed 5460562 4666361 5634631 Thalassery 6 Months 30-7-2014 Siddique K 17/09/2015 17/09/2015 21/04/2015 Golden Jubilee Rs.50 Lakhs Technical Education Technical

Building at Govt. Poly 20.75% above E/R Technic College

Kannur DR-02/2014-15 Dated: 23-4-14 EE/BLD/07/2015-16 Dated: 28-4-2015 G.O (Rt) No.794/ 14 H 4202-02-800-85-Projects under LAC-ADS(NP)

Page 69 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 5

4202-01-800-88- Projects under

LAC-ADS(NP) G.Edn. Tvm, Work Electrical

Construction of 2016 66 ‐ completed estimate under 07 100% Kannur class room for ‐ 25 Lakhs 25 preparation S. Rajan Thalassery . ADS(NP) 26/12/2015 24,50,116/- 28,21,798/- 06-04-2017 07 Government Talap Nine months Mixed UP School 15.17% above estimate rate General Education (M) Department (M) Education General

Kannur dated,24/03/2015 Rs.25 Lakhs GO(Rt) No.1152/2015/ 4202-01-800-88-Projects under LAC- EE/BLD/39/2016-2017 dt.30--06-2016 692/2015-16 Dated:31/07/2015 for Rs.2

4202-01-800-88- Projects under LAC-

ADS(NP) ADS-LAC- Edn dated Tvm, 2016 for Rs.25 Lakhs

Construction of 2016 Work 67 ‐

03 completed 100% Kannur compound wall and ‐ 25 Lakhs 25 Thalassery Six months 18/02/2016 24,94,482/- 24,27,131/- 09 K. Siddique 02--09-2017

providing gate for 2.70% below GVHSS

Payyambalam, Kannur 16/07/2015 Rs.25 Lakhs General Education (M) Department (M) Education General EE/BLD/58/2015-16 dt. 02--03-2016 GO(Rt) No.2884/2015/G. 4202-01-800-88-Projects under LAC-ADS(NP) 2813/2015-16 Dated: 23/01/

Page 70 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

4202-01-800-88- Site changed Projects under from LAC-ADS(NP) original

Construction of 2016 for Rs.20 Lakhs location. 2016 dn dated,Tvm, 16/07/2015 68 Volley ball Court ‐ Location 06 Kannur ‐ 20 Lakhs 20

Thalassery not yet

and basket ball Six months 18/02/2016 19,89,191/- 18,36,023/- 08-12-2016 09 Rs.20 Lakhs finalised Court for GVHSS Shibu. M George. by school Payyambalam 7.7% below estimate rate

General Education (M) Department (M) Education General authorities ,Kannur . EE/BLD/13/2016-2017 dt. 02--06-2016 4202-01-800-88-Projects under LAC-ADS(NP) 2815/2015-16 dated:23/01/ GO(Rt) No.2868/2015/G.E

Page 71 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

202-01-800-88 Projects under ted,Tvm Rs.50 Lakhs

LAC-ADS(NP) 2016 for Rs.50 Lakhs 2016

ADS-LAC- ‐ Work to be 69

06 retendered 100% Kannur Construction of a completed ‐‐ 50 Lakhs 50 Thalassery K. Anees 47,61,174/- 51,42,068/- 08--02-2016 15--03-2017 16 building for Nine months

GHSS,Thottada, 8% above estimate rate

General Education(M)Department General Kannur EE/BLD/17/2016-2017 dt. 13--06-2016 4202-01-800-88 Projects under LAC-ADS(NP) No.2402/2015-16 dated: 07/01/ GO(Rt) No.2864/2015/G.Edn da

Page 72 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

ADF-Kannur LAC -Construction of class room (3 Nos. ) in first floor and stair room for GVHSS for Girls Payyambalam, Plastering ated,Tvm 27/02/2016 of and Estimate to be Kannur District 2016

70 ‐ M) Dept. Rs.45 Lakhs finishing 7

85% prepared ‐ Kannur 45 Lakhs 45 S Rajan work in Thalassery 9 Months 4396033/- 4251404/- 16--06-2016 19-4-2016 20 progress. EE/BLD/45/2016-17 General Education (M)Dept. Education General 3.29% below estimate rate General Education ( 4202-01-800-88-Projects under LAC-ADS GO(Rt) No.841/2016/G.Edn D 448/2016-17 Dated: 01-06-2016 (PRICE) for Rs.45 Lakhs

LAC-ADS-

Construction of Edn Dated, Tvm toilet block for Site not 71 Govt. VHSS identified Kannur 30 Lakhs 30 Thalassery Payyambalam in ADS(NP) Kannur District General Education (M) Dept. (M) Education General 21--07-2016 Rs.30 Lakhs 4202-01-800-88-Projects under LAC- GO(Rt) No.2377/2016/G.

Page 73 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

DHARMADAM CONSTITUENCY

Ground floor 4515-00-800-96-Project slab under LAC-ADF(NP) completed. Truss 2016

(Deposit work) ‐ 72 fabrication To be tendered 70% 2014 02 Construction of Lakhs

300 lakh 300 for roof is in ‐‐ 18 Months 18 Thalassery 27898830/- 37384432/- 06-02-2014 LSGD (DB) LSGD Dharmadam Auditorium in 14--08-2018 (Deposit work)

15 progress. CC Grama Panchayath Limited ULCC S 1st & part bill 34% above estimate rate estimate above 34% submitted Electrification submitted SE(K) 99/2015-16 Dated: 04--03-2016 Dated: 99/2015-16 SE(K) 4515-00-800-96-Project under LAC-ADF(NP) LAC-ADF(NP) under 4515-00-800-96-Project Reg NO: 62/CE/BL/10947/KNR/2013 Dated:24-1- 62/CE/BL/10947/KNR/2013 NO: Reg GO(Rt) No.1290/2013/LSGD dated,15/5/13 Rs.300 Rs.300 dated,15/5/13 No.1290/2013/LSGD GO(Rt)

4515-00-800-96 (Deposit Work) Improvements work Work No electrical 73 100% LSGD for Muzhappilangadu completed work 100 lakh 100 9963482 8680186 12 Months 12 Thalassery Dharmadam Grama Panchayath Lakhs Rs.100 12.88% BELOW 12.88% stadium A M Latheef Abdul DR-54/2013-14 dated,30/8/13 DR-54/2013-14 EE/BLD/36/13-14 dt.30/10/13 EE/BLD/36/13-14 4515-00-800-96 (Deposit Work) (Deposit 4515-00-800-96 GO(Rt) No.1479/13/LSGD Tvm 6/6/13 6/6/13 Tvm No.1479/13/LSGD GO(Rt)

Electrical 4202-800-85 estimate Construction of Work 2014

74 ‐ 1 100% Lakhs completed for Rs. Additonal Building for ‐ 50 lakh 50 4756005 4646617 4693453 9 Months 9 Education dt,12/8/13 Thalassery 16-10-2014 25-09-2014 Dharmadam dated,6/6/13 17 4202-800-85 GHSS Chala Valsaraj V K 170,000 Elefn. DR-29/2013-14 DR-29/2013-14 2.30% below E/R below 2.30% EE/BLD/25/13-14 EE/BLD/25/13-14 Completed GO(Rt)NO. 2042/2013 2042/2013 GO(Rt)NO. GEdn. Dated,14/5/13 Rs.50 Rs.50 Dated,14/5/13 GEdn.

Page 74 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

4202-01-800-88 Projects under LAC Nearing

ADS (NP) Edn Dated,Tvm completio

Construction of a 2015 n RE Electrical 75 ‐ 95% Seminar Hall for 06 (120 L) to awarded ‐ 100 lakh 100 3535393 8977887 Thalassery 11571599 Dharmadam M K Renu 12 Months 05.09.2016 06-05-2016 Brennen College 06 be

Thalassery in Kannur 28.89% above E/R sanctioned

District 08/08/2014 Rs.100 Lakhs Higher Education( C )Department C Education( Higher DR-56/2014-15 Dated: 3-9-2014 EE/BLD/21/2015-16 Dated: 27-5-2015 G.O(Rt) No.1889/2014/H. 4202-01-800-88 Projects under LAC ADS (NP)

Page 75 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

Estimate Submitted to Secretary to Govt. LSGD TVM vide letter No. CE/BL/PLG-LAC- ADS/KNR/2200/1 4 dt. 18/3/14 The proposal was returned for making corrections. As per Lr. Dtd. 03.10.2016 the Secretary to Govt * Construction of & Special Propo Officer, Chief sal Gallery and complex Minister Office, Electrical cancel this proposal estimate led for Dhramadam cancelled and the 76 utilise the amount for Rs. Fund LSGD Grama Panchayath lakh 60 lakh 60 to construction at 4,75,000/- transfe Thalassery

Dharmadam rred Stadium in Kannur GHSS prepared

(Deposit Work) to District Palaya d HSS

Page 76 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

4202-01-800-88- Projects under LAC- ADS(NP) Construction of building for Govt A.K.G. Smaraka G.Edn/Tvm 2015

‐ Work Electrical 77 Higher Secondary

09 work awarded 100%

60 lakh 60 completed

School Pinarayi in ‐‐ 6000000 7657322 Thalassery ADS(NP) Dharmadam Six Months 03--03-2016 10

Kannur District Sri. Alouj A L 34.03% above E/R 31-10-2014 (Quotation) General Education (M) Dept. (M) Education General DR-17/2014-15 Dated:16-6-14 EE/BLD/38/15-16 Dated:1-9-2015 dated,5/5/14 Rs.60 Lakhs 4202-01-800-88-Projects under LAC- G.O(Rt)No.1718/ 2014/ 4202-01-800-88 Projects under LAC- ADS-(NP) Construction of building for

Government E.K Edn Dated,Tvm Electrical Nayanar Memorial Work 78 work to be (NP)

Higher Secondary completed 100% 75 lakh 75

N Babu started 5754275 6863294 8963462 Thalassery 9 Months Dharmadam 27/2/2016 28/5/2015 School at in 24-11-2014 30.60% above E/R

Kannur District 1/7/14 Rs.75 Lakhs General Education(M) Dept. Education(M) General DR-58/2014-15 Dated: 3-9-2014 EE/BLD/16/2015-16 Dated: 21-05-2015 G.O(Rt) No.2588/2014/G. 4202-01-800-88 Projects under LAC-ADS-

Page 77 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

Kerala Budget 2014-15 Asset Development Fund- Dharmadam Constituency- Estimate Electrical 79 Construction of Buds submitted estimate under

School at Anjarakandy Lakhs 25 Lakhs 25 preparation Thalassery for AS Dharmadam Grama Panchayath in Kannur District

Sewage treatment Estimate 80 plant at submitted

25 Lakhs 25 Lakhs 25 for AS Thalassery Dharmadam Anjarakkandi

4202-01-800-88-Projects under LAC- ADS(NP) Edn Dtd TVM

Construction of 1st floor ated:02/06/2016 Electrical 2016

to the existing building for ‐ Complete 81 work

Govt. A.K.G Smaraka 06 100%

70 lakh 70 d

‐‐ completed Thalassery 9 Months ADS(NP) Dharmadam Higher Secondary School 6463924/- 8217587/- 08-06-2015 08--03-2017 Peralassery in Kannur 09 M K Rathnakaran 27.13% above E/R District 10/6/14 Rs.70 Lakhs General Education(M) Dept. Education(M) General DR-32/2014-15 Dated:10-7-2014 4202-01-800-88-Projects under LAC- EE/BLD/11/2016-17 D GO(Rt) No. 2264/2014/G.

Page 78 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

4515-00-800-96-Project Electrical under LAC-ADS(NP) estimate Construction of building for Rs. 620,00 for Community Centre and Work 82 prepared

LSGD reading room at Keezhara 100% 25 lakh 25 completed Being tenderd Thalassery 6.months ADS(NP) Dharmadam in Peralassery Grama 2266170/- 2662750/-

17.5% Above from Ele.Sub Panchayath in Kannur K.ANILKUMAR. Div District dated,1/3/14 Rs.25 Lakhs DR/12/14-15DT.26.05.14 EE/BLD/82/14-15 DT.21.10.14 G.O(Rt)No.614/ 2014/LSGD/Tvm 4515-00-800-96-Project under LAC-

4515-00-800-96 - Electrical Projects under LAC- estimate ADS(NP) (Deposit prepaired for

Work) Renovation of 2014 Work Rs 200000/- 83 ‐

11 Being 100% Mini Stadium lakh 25 completed ‐ 18-7-14 25-5-15 2256693 2640331 Thalassery 6 Months LSGD (DA) LSGD Dharmadam 13-5-2015 28-5-2015

Sujith A K Tenderd from Kannadivelicham at 14 Anjarakandi in 17% above E/R Ele.Sub Div (No fund) ADS(NP) (Deposit Work)

Kannur District dated,14/5/14 Rs.25 Lakhs DR-13/2014-15 Dated:12-6-2014 G.O(Rt)No.1155/ 2014/LSGD/Tvm 4515-00-800-96 -Projects under LAC- EE/BLD/54/2014-15 Dated: 5-11-2014

Page 79 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 L

LAC-ADS-2014-15 Dharmadam Constituency- Nearing Renovation to the 84 completio open Stadium at 85% 25 Lakhs 25 ADS(NP) Thalassery

6 Months n Dharmadam 2446965/- 2202513/-

Makrery in 18--07-2016 Peralasssery Grama (DA) Dept. Rs.25 Lakhs Rs.25 Dept. (DA)

Panchayath 9.99% below estimate rate Local Self Government (DA) Dept. (DA) Government Self Local 4515-00-800-96 Projects under LAC- under Projects 4515-00-800-96 C P Santhosh, Chovva, Kannur 08--07-2015 of Local Self Government Government Self Local of 08--07-2015 EE/BLD/61/2016-17 Dated.16--08-2016 EE/BLD/61/2016-17 GO(Rt) No.2064/2015/LSGD Dated,Tvm Dated,Tvm No.2064/2015/LSGD GO(Rt) 447/2016-17 dated: 01-06-2016 for Rs.25 Rs.25 for 01-06-2016 dated: 447/2016-17

As per Lr. Dt. 03.10.2 016 of Construction building for first Estimate the 85 Special floor to Palayad Govt. HSS submitted Education Education Thalassery Officer, Dharmadam Chief Ministe r Office

Construction of Second Floor Estimate 86 to GHSS Vengad submitted Education Education Thalassery Dharmadam

Page 80 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

Construction of Garbage Treaatment Plant (Plastic Submitted to 87 Recycling Unit)at AS

Thalassery Anjarakandy Gram Panchayath Dharmadam

Construction of Auditorium (II Submitted for 88 phase) Pinarayi Grama AS Panchayath Thalassery Dharmadam

Improvements to Play Ground Estimate under 89 at AKG Memorial GHSS preparation Pinarayi Thalassery Dharmadam

Page 81 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

Improvements to Play Ground Estimate under 90 at GHSS Palayad preparation Thalassery Dharmadam

THALASSERY CONSTITUENCY

Electrical Estimate 4210-02-800-95 Work forRs. 91 Ayurveda Dispensary

completed. 100% 200000/- 50 lakh 50 36.50% 3657802 4992900 4164135 9 Months 9

Thalassery Thalassery Kadiroor Elefn. FCC Paid 4210-02-800-95 Health-Ayurveda Completed Nohammed Nihas CC Nihas Nohammed EE/BLD/48/13-14 dt,31/1/14 EE/BLD/48/13-14 DR/58/2013-14 Dated,20/9/13 DR/58/2013-14 dated,4/5/13 Tvm Rs.50 Lakhs Rs.50 Tvm dated,4/5/13 GO(Rt) NO.1541/13 H & FWD FWD & H NO.1541/13 GO(Rt)

Revised Electrical 4210-02-110-306-01-00- Estimate Work 92 PV PHC forRs.400000p 55%

completed 100% 50 lakh 50

4574786 7090918 repaired. 6023983/- Thalassery Thalassery Building K Ahammad K Health Alopathi dt.11/3/13, 50 L 50 dt.11/3/13, Elefn. Completed 4210-02-110-306-01-00-PV 4210-02-110-306-01-00-PV DR-27/2013-14 dated,6/6/13 DR-27/2013-14 G.O(Rt)No.793/13 H&FWD H&FWD G.O(Rt)No.793/13 EE/BLD/75/13-14 dt,27/3/14 EE/BLD/75/13-14

Page 82 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

Asset Development Scheme 2013-14- Dumbed Thalassery LAC- earth Construction of a removed Electrical 93 estimate under building for by 500 lakh 500 preparation Thalassery Thalassery

Government College , Chandran P K College Chokli Thalassery, Authority 25/10/2016( Opening) 25/10/2016( 27/03/2015 Rs.500 Lakhs Rs.500 27/03/2015

Higher Education ( B ) Dept. ) B ( Education Higher Kannur Agreement executed. Work started GO(Rt) No.624/2015/H.Edn Dated,Tvm Dated,Tvm No.624/2015/H.Edn GO(Rt) 4202-01-800-88- Projects under LAC ADS(NP) LAC under Projects 4202-01-800-88- No.1660/2016-2017 Dated.06--09-2016 No.1660/2016-2017

Work cancelled Asset Development vide letter Scheme 2013-14- No KB/152/14 Thalassery LAC- No Electrical 94 dated Approach road to work

100 lakh 100 lakh 100 16/09/2014 Thalassery Thalassery Government College of M.L.A to Higher Education Higher Thalassery the PWD Minister, Kerala

Page 83 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

Renovation work of existing Kadhirur Work in 95

Stadium in Kadhirur progress 30% 50 Lakhs 50 Anees K 3883468 3161143 6 Months 6 Thalassery Thalassery

Panchayath 31--10-2016 18.60 % below % 18.60 LAC-ADS(NP) General Education (M) Dept. (M) Education General GO(Rt) No.2378/2016/G.Edn No.2378/2016/G.Edn GO(Rt) EE/BLD/81/2016-17 Dated.26--11-2016 EE/BLD/81/2016-17 No.2456/2016-17 Dated.6--09-2016 No.2456/2016-17 4202-01-800-88-Projects under Dated,Tvm 21--07-2016 Rs.50 Lakhs Rs.50 21--07-2016 Dated,Tvm

Kerala Budget 2014-15 Estimate Asset Development Fund- Thalassery Constituency- submitted Construction of building to CE Electrical 96 for Vadakkumbad ( Work estimate under Government Higher preparation 100 Lakhs 100 Lakhs 100 Thalassery transferre Thalassery Secondary d to School,Erancholi Grama LSGD) Panchayath Kannur District

Page 84 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

LAC -ADS-2015-16- Work Construction of building tendered. 97 for Government L. P Lakhs Agreemen 50 Lakhs 50 4517172 4241625 Thalassery Thalassery 18 Months 18 School below 4.10 Rs.50 Lakhs Rs.50 12--08-2016 t executed General Education Dept. Education General M S Muhammed Rafeeque Muhammed S M EE/BLD/64/2016-17 Dated.05--09-2016 EE/BLD/64/2016-17 4202-01-800-88-Projects under LAC-ADS under 4202-01-800-88-Projects No.515/2016-17 Dated: 03--06-2016 for Rs. 50 Rs. for 03--06-2016 Dated: No.515/2016-17 GO(RT) No.920/2016/G.Edn Dated: 02--03-2016 Dated: No.920/2016/G.Edn GO(RT)

LAC-ADS- Construction of a building for Govt. Footing 98 HSS Thiruvangad in completed Navas V Navas 100 Lakhs 100 ADS(NP) 8966426/- 7074510/- 12 months 12 Thalassery Thalassery Kannur District 31--10-2016 21.10 % above % 21.10 General Education (M) Education General 21--07-2016 Rs.100 Lakhs Rs.100 21--07-2016 2643/2016-17 Dated.28--09-2016 2643/2016-17 EE/BLD/88/16-17 Dated.05.01.2017 EE/BLD/88/16-17 4202-01-800-88-Project under LAC- under 4202-01-800-88-Project GO(Rt) No.2374/2016/G.Edn Dated, Tvm Tvm Dated, No.2374/2016/G.Edn GO(Rt)

Page 85 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

LAC-ADS- Construvtion Agreemen 99 of a Building for Govt. t executed Girls HSS, Thalassery 100 Lakhs 100 Mohan K Mohan ADS(NP) 8939249/- 7339123/- 12 months 12 01/17 Thalassery Thalassery Rs.100 Lakhs Rs.100 31--10-2016 17.90% below estimate rate estimate below 17.90% General Education Department Education General EE/BLD/87/16-17 Dated.5.01.2017 EE/BLD/87/16-17 4202-01-800-88-Projects under LAC- under 4202-01-800-88-Projects Reg. No.2644/2016-17 Dated,28--09-2016 No.2644/2016-17 Reg. GO.(Rt) No.2415/2016/G.Edn Dated.25-07-2016 Dated.25-07-2016 No.2415/2016/G.Edn GO.(Rt)

LAC-ADS- Construvtion Work to 100 of a Building for GHSS, be started

Kavumbhagam 2015-16 100 Lakhs 100 Thalassery Thalassery 19-12-2016 3247/2016-17 2016 Rs.100 Lakhs Rs.100 2016 General Education Department Education General 4202-01-800-88-Project under LAC-ADS LAC-ADS under 4202-01-800-88-Project GO (Rt) No.2980/2016/G.Edn Dated.19--09- No.2980/2016/G.Edn (Rt) GO

GO(Rt) LAC-ADS- 15-16 No.608/2016 Estimate for Construction of Building 101 /Ayush T.S to be forAyurvedic Hospital , Dated submitted 85 Lakhs 85

Thalassery Thalassery Thalassery 24/12/2016

Page 86 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

LAC-ADS- Additional works to Academic Block - Construction by the Estimate Organising Committee at 102 under Govt. College,Chokli, preparation

Thalassery Thalassery Providing well, Pump House, Removal of earth, Planting and electrification works etc.

KUTHUPARAMBA CONSTITUENCY

Ele estimate submitted to 4202-02-800-85 Projects EE Ele 2013

under LAC ADS (NP) ‐ Work 103 dt12/11/2014 (NP) 12

IHRD College completed 100% 100 lakh 100 9231086 9074158 ‐‐ Rs. 4, 70,000/- 9247193/- 12 Months 12 Thalassery 15--12-2014 28--02-2015 1.70% below 1.70%

Valiyavelicham Manoharan P Kuthuparamba 16 Elefn. Tvm Rs.100 Lakhs Rs.100 Tvm Technical Education Technical Completed EE/BLD/40/13-14 dt.5/12/13 EE/BLD/40/13-14 DR/48/2013-14 Dated,27/7/13 Dated,27/7/13 DR/48/2013-14 4202-02-800-85 Projects under LAC ADS ADS LAC under Projects 4202-02-800-85 GO(Rt) No.738/2013/H.Edn dated,09/5/13 dated,09/5/13 No.738/2013/H.Edn GO(Rt)

Page 87 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

4059-60-051-72 me Dated, Tvm

Projects under LAC- ted: 28/01/2016 Electrical 2016

‐ Complete 104 ADS(NP) estimate under 02 100%

50 lakh 50 d

‐‐ preparation Thalassery

Improvements to 6 Months 4822643/- 5304907/- 05.11.2016 Kuthuparamba 01--08-2016 Home(E) Dept. 02

Panoor Police Station K Raghuthaman 10% above estimate rate 07/05/2014 Rs.50 Lakhs EE/BLD/55/15-16 da Reg No.1432/2015-16 Dated: 03/10/2015 GO(Rt) No.1311/2014/Ho 4059-60-051-72 Projects under LAC-ADS(NP)

Construction of PHC

ted: 2--06-2016 Work started at Cheruvancheri in Electric post Electrical FWD Dated,Tvm 1-1- 105 Pattiam Grama replaced Estimate to be Ward instead of OP Ward 35 lakh 35 during prepared N Babu Thalassery Panchayath in Kannur 6 Months 3396560/- 4342502/- 9--10-2015

Kuthuparamba 12/2016 District 2015 Rs.35 Lakhs 27.85 % above estimate rate Health andFamily Welfare (M) Dept. DR-98/2014-15 Dated: 27--02-2015 EE/BLD/10/2016-17 da GO(Rt) No.2/2015/H & 4210-02-800-95-Projects under LAC-ADS(NP) Plan to modify for IP

Page 88 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

4202-01-800-88 Projects under LAC- ADS-(NP) Construction of Electrical 2015

‐ Work 106 building for work 08

completed 100% ‐‐ 100 lakh 100 completed 9305454 Thalassery

Government HSS at 9 Months 12469308 27-8-2014 Kuthuparamba 07--07-2016 10 Pattiam in Pattiam P Manoharan 33.71 % above E/R

General Education(M) Dept. Education(M) General Grama Panchayath in Kannur District DR-14/2014-15 Dated: 16-06-2014 GO(Rt)No.1767/14/G.Edn dt.7/5/14, 100 L 100 dt.7/5/14, GO(Rt)No.1767/14/G.Edn EE/BLD/11/2015-16 Dated: 6-5-2015 4202-01-800-88 Projects under LAC-ADS-(NP)

Page 89 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

4202-01-800-88- Projects under LAC- ADS(NP) Ele estimate prpared for Rs Construction of ated TVM 10/6/14 Rs.100 Finishing 2015

‐ . 9,20,000/- 107 building for HSS work in 09 80% submitted to Lakhs ‐‐ 100 lakh 100 33.44% 9070696 Thalassery Malabar in progress 12103937 Alouj A L

12 Months EE KKD 19-12-2014 Kuthuparamba 09--09-2016 Kottayam Malabar 10 Dt28/4/2014

General Education(M) Dept. Education(M) General Grama Panchayath in Kannur District DR-35/2014-15 Dated: 10-07-2014 EE/BLD/37/2015-16 Dated:1-9-2015 4202-01-800-88-Projects under LAC-ADS(NP) GO(Rt) No.2262/2014/G.Edn D

Page 90 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

4202-01-800-88 Projects under LAC ADS(NP) Kerala Budget 2014-15- Asset Development Fund-

Kuthuparamb Constituency- E) Lr. To send Construction of building for Dining Hall and Kitchen for Government Old L.P School, Kallarakkal at building

Kunnothparamba Grama vm 16/07/2015 Rs.24 Lakhs demolished Electrical Panchayath Kannur District 108 . Work estimate under

24 Lakhs 24 preparation

Thalassery started. 9 Months Electric wing 2399798/- 2598981/- Kuthuparamba 15--03-2016 Column in K Raghuthaman progress General Education(M) Dept. Education(M) General 8.30 % above estimate rate 1660/2015-16 Dated: 18-11-2015 EE/BLD/092016-17 dated: 02--06-2016 4202-01-800-88 Projects under LAC ADS(NP) Alreadysubmitted RE (framedstructure to get sanctionedfrom E GO(Rt) 2866/2015/GEdn, dated, T

4059-60-051-72 Dated, Tvm Agreemen Projects under LAC-

ated.11/11/2016 t Electrical ADS Construction of Aug

109 ‐ executed. estimate under SMART Village Office 17 41 Lakhs 41 preparation Thalassery

9 Months Work to 3605804/- 3966384/- 30/09/2016

Kuthuparamba Thriprangottur in Pramodan K C Revenue (F) Dept. (F) Revenue Kannur District be started 10% above estimate rate 29/05/2015 Rs.41 Lakhs 1424/2015-16 Dated:3-10-2015 EE/BLD/78/16-17 D GO(Rt) No.2747/2015/RD 4059-60-051-72 Projects under LAC-ADS

Page 91 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

LSGD- LAC-ADS 2015- 16 Renovation of Submitted 110 Ground in Pattiyam

ADS for TS LSGD LSGD Grama panchayath in 50 Lakhs 2015/4675 Thalassery

Kuthuparamba Kannur District GO(Rt) No.2694/2016/LSGD Dated.19--09-2016 Rs.50 Lakhs 4515-00-15-800-90 Projects under LAC LAC under Projects 4515-00-15-800-90

LAC-ADS 2015-16 Agreement

Construction of building Edn dated.21--07-2016 Executed. 111 2016 for Rs.66 Lakhs for Government UP Work to be 5390801 Anandan 66 Lakhs 5716660/- Thalassery School Puthussery started Rs.66 Lakhs Kuthuparamba 6/2/2017 (Opening) General Education Department 4202-01-800-88-Project under LAC-ADS under 4202-01-800-88-Project EE/BLD/96/2016-17 Dated.23.02.2017 GO(Rt) No.2373/2016/G. 3073/2016-17 Dated.9/11/

Page 92 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 old

GO(RT) LAC -ADS-2015-16- .Agreement No.920/2016 Construction of building for executed. Old

112 /G.Edn demolish to Muncipality) or ( Government L. P School building to be

Dated: 02‐‐ Lakhs 50 Thalassery Panoor demolished 03‐2016 Kuthuparamba M.S.Mohammed Rafeeq M.S.Mohammed General Education Dept. Education General building to stant work. ( Ist letter send by AE) AE) by send letter Ist ( work. stant to building 4202-01-800-88-Projects under LAC-ADS under 4202-01-800-88-Projects No.515/2016-17 Dated: 03--06-2016 for Rs. 50 Lakhs 50 Rs. for 03--06-2016 Dated: No.515/2016-17 Reminder letter to sent to school to sent to letter Reminder

LAC-ADS 2015-16. Submitted for 113 Firestation Panoor AS Thalassery Kuthuparamba

Page 93 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

LAC-ADS 2015-16. Soil Submitted for 114 Investigation AS Thalassery Kuthuparamba

2015-16 - Construction of Submitted to 115 Two class rooms for GHSS AS Kuthuparamba Thalassery Kuthuparamba

Page 94 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

MATTANNUR CONSTITUENCY

Electrical Estimate forRs. 5, 00,000/- submitted to 4202-01-202-99 Ele. Divn. Work 116 GHSS Work 44%

completed 100% 100 lakh 100 8729240 Awarded to Education 12570106 Mattannur Thalassery

complex 25/03/2015 30/11/2015 30/11/2015 Raju Joseph 26/03/2014

4202-01-202-99 the Contractor Sri Deepesh .P DR/12/2013-14 dated,2/5/13 DR/12/2013-14 CC IInd & part bill paid EE/BLD/74/13-14 dt.19/3/14 EE/BLD/74/13-14

Chaithanya (2085891+6458218+4897987) Electricals

GO(Rt)No.904/13/G.Edn dt.23/2/13, 100 L 100 dt.23/2/13, GO(Rt)No.904/13/G.Edn Kozhikode

Page 95 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

Electrical Estimate 4202-01-800-88- First floor forRs. Edn Dated,Tvm completed Projects under LAC- ted: 11--01-2016 270,000/- 2016

ADS(NP) Construction ‐ . submitted to 117 01 of building for Finishing 50% EE KKD ‐‐ Mattannur Thalassery 9 Months 4765885/- 6005015/- dt28/4/2014

Government H SS, 50.00Lakhs 14--10-2016 15 work in Being tenderd Mambaram Surendra Babu C progress 13/08/14Rs.50 Lakhs from Ele.Div General Education(M) Dept. Education(M) General 6--08-2015 ( Quotation) 26% above estimate rate KKD DR-61/2014-15 Dated: 26-9-2014 EE/BLD/54/2015-16 da G.O(Rt) No.3243/2014/G. 4202-01-800-88- Projects under LAC-ADS(NP)

Plan to

dn Dated,Tvm 23-- give Construction of a Two Electrical 2016

‐ Sunshade 118 class room for estimate under 07 completed 40% Elec

‐‐ preparation Mattannur 3041043 3041043 Thalassery Chittariparamba GHSS 32 Lakhs 9 Months Nihas C C trifi 20--04-2017 20--06-2016 21 Estimate rate catio 12-2015 Rs.32 Lakhs n 3137/2015-16 Dated: 08--02-2016 EE/BLD/46/2016-17 Dated: 18--07-2016 GO(Rt) No. 6011/15 / G.E 4202-01-800-88 Project under LAC-ADS-(NP)

Page 96 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

Construction of Estimate submitted to Building for the Secretary to Anganavady Govt. LSGD Electrical Kakkattuparamba vide letter 119 No.CE/BL/PLG/ estimate under Pattari Velliyode in LAC- preparation Mattannur Thalassery ADS/KNR/1448 25.00Lakhs 25.00Lakhs

Social Welfare Social Maloor Grama Panchayath in Kannur /14 Dated.17.12.201 District 3

4515-00-800-96 Construction of work Work shed at

LSGD Dated, Tvm will be Velliamparamba Electrical 120 executed estimate under LSGD industrial estate at preparation Mattannur Thalassery through

Keezhallur Grama 25.00Lakhs

4515-00-800-96 LSGD Panchayath in Kannur

District 24/07/2014 Rs.25 Lakhs G.O(Rt) No.1938/2014/

Page 97 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 vm, 8/7/14 4210-02-800-95- Projects under LAC- ADS(NP) Electrical Construction of FWD Dated,T Work 121 work Months

completed Primary Health Centre 100% completed Mattannur 1729401 4237785 5752793 Thalassery Six 31-10-2014 50.00Lakhs

oorathur in Padiyoor Rs.50 Lakhs P Viswanathan

Grama Panchayath in 35.75% above E/R

Health & Family Welfare Dept. Kannur District DR.38/2014-15 Dated: 15-7-2014 EE/BLD/24/2015-16 Dated: 16-6-15 4210-02-800-95-Projects under LAC-ADS(NP) G.O(Rt) No.2298/2014/H &

Page 98 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

G.O(Rt)No. 873/2016/G LAC-ADS Construction of .Edn Dt. Work 122 class rooms (FF) attached months 01-03-

completed 100% to GHSS Edayannur 50 Lakhs 50 Thalassery Mattannur 2016 Rs.50 4648927/- 4323502/- 11--07-2016 Lakhs Nine Muhammed Sabir K P 7% below estimate rate General Education (M) Dept. (M) Education General 4202-01-800-88 LAC-ADS(NP) 4202-01-800-88 EE/BLD/49/2016-17 dated.22--07-2016 EE/BLD/49/2016-17 1025/2016-17 Dated.21--06-2016 for Rs.50 Lakhs

PERAVOOR CONSTITUENCY submitted 4202-01-202-99 Construction of four Work Electrical work 123 extension class room for Govt. completed

completed 100% 75 lakh 75 75.00 L 75.00 14.50% 7333326 8396643 7662711 Peravoor 9 Months 9 Education

Thalassery HSS, Aralam in Aralam 10.02.2014 09.11.2014 31.05.2015 T T Mathew 10.02.2014

GP 4202-01-202-99 EE/BLD/52/13-14 dt,10/2/14 EE/BLD/52/13-14 DR.14/2012-13 dated,25/3/13 DR.14/2012-13 Go(RT)635/13/G.Edn dtd 12/2/13 for for 12/2/13 dtd Go(RT)635/13/G.Edn Proposal for time of time for Proposal

Page 99 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

4202-01-202-99 Construction of four Work Electrical work 124

25% completed class room for GHSS, Completed 100% 30 lakh lakh 30 3116148 2708462 3385578 Peravoor 9 Months 9 Education Thalassery Pala in Muzhakunnu GP T.T Mathew 4202-01-202-99 DR.3/2013-14 dated,15/4/13 DR.3/2013-14 EE/BLD/61/13-14 dt,24/2/14 EE/BLD/61/13-14 GO(Rt)No1222/13/G.Edn dt. 15/3/13, 30 L 30 15/3/13, dt. GO(Rt)No1222/13/G.Edn Proposal for time of extension submitted

4202-01-202-99 construction of eight Work Electrical work 125 class room for GHSS

40% completed 100%

50 lakh 50 completed 6458277 4583960 6417544 Peravoor 9 Months 9 Education

Thalassery in Peravoor 12.02.2014 14.11.2014 31.05.2015 15.02.2014

GP 4202-01-202-99 12/2/13 for 50.00 L 50.00 for 12/2/13 Thomas Kannanthanam Thomas Go(RT)634/13/G.Edn dtd dtd Go(RT)634/13/G.Edn EE/BLD/54/13-14 dt,12/2/14 EE/BLD/54/13-14 CC IIIrd & Final bill paid DR.15/2012-13 dated,25/3/13 DR.15/2012-13

Page 100 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

Electrical 4202-01-202-99 Estimate forRs. 90,000/- Construction of three Work 126 submitted

class room for GHSS completed 100% 30 lakh lakh 30 14.90% 2923021 3358551 Peravoor 9 Months 9 Being Education Thalassery 30.08.2013 24.11.2014 31.03.2015 K C JosephC K

Chavassery 25.02.2014

4202-01-202-99 tendered from Ele.Sub Divn DR/2/2013-14 dated,15/4/13 DR/2/2013-14 EE/BLD/55/13-14 dt.18/2/14 EE/BLD/55/13-14 3242829 (1887757+1355072) 3242829 GO(Rt)No1348/13/G.Edn dt 21/3/13 for 30L for 21/3/13 dt GO(Rt)No1348/13/G.Edn Proposal for time of extension submitted

4059-60-051-72 Projects under LAC- ADS(NP) VM 4/3/14 for Rs. 40 Construction of first Work Electrical

127 L work 100%

floor of PWD lakh 40 completed

Peravoor completed 4273164 Thalassery 2.6.2015 3439443/- 21-7-2014 K C Joseph Inspection Bungalow Six Months 24.24% above E/R Public Works (E) Dept. (E) Works Public at Iritty in Kannur District DR-06/2014-15 Dated: 20-5-2014 EE/BLD/73/2014-15 Dated: 30-1-2015 4059-60-051-72 Projects under LAC-ADS(NP) GO(Rt)No. 365/2014/PWD dt. T

Page 101 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

DEPOSIT WORKS

8443-00-108-PW

Deposit ng tenderd from

Govt. Brennen .Edn dated 16/6/12 Work 1 College, Dharmadam, 6-2014 for Rs. 200 Lakhs

completed 100% ubmitted to EE, KKD Dt.

Thalassery 8526697 17452217 17043835 P I Rajeev 220 Lakhs 18 Months Thalassery 07-08-2014 08-12-2014 02-11-2016 Dharmadam Rs.220 Lakhs Construction of an Ele. Div KKD Academic Block Deposited 2,20,00,000/- 8443-00-108-PW Deposit 2.34% below estimate rate SE(K)13/14-15 Dated: 2-8-2014 G.O(Rt)No.1194/2012 H Electrical estimate s 15/04/2014 Rs. 1020000/- Bei CR/5/14-15 Dated: 4-

8443-00-108-PW Deposit Construction 9/12 for 68 Lakhs of Women's Hostel for Work red with due date 2

Govt Brennen college completed 100% 3476327 5807404 75 Lakhs 9 Months Thalassery Thalassery A L Alouj 10.12.2015 66,78,515/- 20-12-2012 04-03-2013

of Teacher Education, 02--01-2014 31--05-2014

Thalassery 36 Lakhs deposited 8/7/2010Rs.75 Lakhs 15% above estimate rate 8443-00-108-PW Deposit Electrical estimate submitted to EE, GO(Rt)No. 1346/2010. H.Edn dated EE/BLD/19/12-13 Dated:25-02-2013 KKD, Work is tende DR/08/12-13 dated 28/

Page 102 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

8443-00-108-PW Deposit dn, dt, 4/9/12 Rs.100 IHRD E.K Nayanar Work 3 Completed 100% ubmitted to EE, KKD Dt. Memorial Model Lakhs 9223538 9209703 9236844 P I Rajeev Thalassery 12 Months Kalliassery 07-03-2013 Polytechnic hostel 08-02-2013 08-01-2014 30-10-2014 100.00 Lakhs 0.15% below E/R building Kalliassery Electrical Division Rs. 9236844/- deposited 8443-00-108-PW Deposit EE/BLD/17/13-14 Dated:2-8-2013 Electrical estimate s 04/09/2014 Rs. 490000/- No deposit received to GO(Rt)No.1832/2012 H E DR-23/13-14 Dated:06-06-2013 for Rs.10000000/- on i s i v Di

8443-00-108-PW l ca Deposit Construction i

of feed store cum ectr d 31/3/2011 of the Work El 4 Mini Lam,Carcus Pit to

completed d 100% Lakhs Kannur 2379505 2346430 2344505

and Open well at 6 Months Kozhikode Thalassery 09-04-2014 03-02-2015 26.00Lakhs Vinoop E V 02--08-2015 erre regional Poultry farm f 1.39% below E/R Mundayad trans 8443-00-108-PW Deposit Electrical estimate under preparation 180000 EE/BLD/44/2014-15 Dated: 25-09-2014 B3-10120/2008/Plg dt Director of Animal husbandary Rs.26.00 DR-43/2014-15 Dated:01/08/2014 for Rs.25 Lakhs Rs.25 for Dated:01/08/2014 DR-43/2014-15

Page 103 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

Work completed except boundary wall of ndant General Home eastern 8443-00-108-PW side.

Deposit Construction 10 for Rs,7.87Lakhs Contractor

5 of compound wall for cue Service Rs.8.85 Lakhs requested 470092 777694 742718 to

fire and Rescue 3 Months 5% below 8.85Lakhs Payyannur Thalassery 03-01-2011 07-09-2011 10-08-2011 station, Payyannur P V Krishnan terminate Work terminated the work No electrical work

8443-00-108-PW Deposit due to EE/BLD/3/11-12 Dated:2-7-11 objection from local people and DR- 5/2010-11 dtd 30/12/ stand still Guard Defence Fire & Res D1-14125/2008 dtd 12-3-2010 of Comma

Page 104 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

8443-00-108-PW Deposit Construction of an office room Work 6 d 16/5/11 Rs.17.00 Lakhs

above the existing completed 100% Kannur 28-5-13 K Anees 1784355 2051830 1678073 20-12-12 27-11-13 23-10-13 6 Months Thalassery porch at Govt: ITI, 17.00Lakhs 14.99% above 12 for Rs. 1 7.00Lakhs EE/BLD/4/13-14

Kannur 17 Lakhs deposited No electrical Provision 8443-00-108-PW Deposit Go(Rt) 712/2011 /LBR dt DR-5/12-13 dtd 1/9/

8443-00-108-PW Deposit Digging Work 7 an open well and d,1/6/13 Rs.11.50 Lakhs held up. 60% Kannur 957569

providing pumpset at 1029533 17-7-2013 Thalassery 10 Months 11.50 Lakhs 11.50 vanitha ITI, Kannur 6.9% below Training Director 8443-00-108-PW Deposit Muhammed Musthafa P A EE/BLD/27/2013-14 Dated: 30-8-2013 E7-13188/11(4) date DR43/2013-14 dated,6-6-2013 for Rs. 11.50 Lakhs

Page 105 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

8443-00-108-PW Deposit Providing working ted,15/6/11, Rs.6 11 for Rs. 6.00Lakhs Work 8 space for advocate 100% Lakhs completed 587454 578614 551451/-

clerks and toilet 4 Months 6.00Lakhs Thalassery Thalassery 09-01-2011 1.9% below 28--10-2014 27--02-2015

facilities, District K Raghuthaman LAW(KLBF) Dept. LAW(KLBF) Court Thalassery 8443-00-108-PW Deposit 26--06-2015, 31--10-2015 Electrical estimate under preparation EE/BLD/10/2011-12 Dated:20-03-2012 EE/BLD/10/2011-12 GO(Rt) No.507/2011, da DR/7/2011-12 dated,1/8/

8443-00-108-PW Deposit Providing working 8-2014 for Rs.4.87 Lakhs

vm Dated,07/04/2014 Work 9 space for advocate

completed 100% 480748 clerks and toilet 472854 493678 Thalassery 4.87 Lakhs 12-08-2014 Rs.4.87 Lakhs 5% above E/R Kuthuparamba facilities to Munsiff Court Kuthuparamba 8443-00-108-PW Deposit AEE/TLY/B/23/2014-15 Dated: 29/11/2014 Dated: AEE/TLY/B/23/2014-15 GO(MS) 520/14/Law, T Electrical estimate under preparation (No fund) SDK/25/2014-15 Dated: 23-

Page 106 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 Dated,Tvm 7/4/14 Agreemen t executed, trees are 8443-00-108-PW not Deposit removed Providing working ted: 7-04-14 Rs.9.72 Lakhs by court 08-2014 for Rs.9.72Lakhs 10 space for advocate GO(MS) No.519/14/Law authorities Kannur 883505 33.30% 1177712 19-02-15 Hamza K clerks and toilet 4 Months 9.72Lakhs Thalassery . facilities,Munsiff Reminder Court Kannur

8443-00-108-PW Deposit sent to court Electrical estimate under preparation EE/BLD/43/2015-16 Dated: 28-9-15 authorities or 9.72 lakhs as per Kannur. DR/46/2014-15 Dated:22- G.O(MS) No.519/14/LAW Da Revised AS obtained f

Page 107 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

8443-00-108-PW dn, dated,4/9/12 Deposit IHRD n. Work completed

College of applied 13 for Rs. 95.00 Lakhs Work 11 14 dated,12/9/13 100% science Pattuvam- completed ubmitted to EE, KKD Dt. 8668376 8191825 30-03-15 86,86,618 30-8-2013 20-9-2013 19-9-2014 12 Months Thalassery K C Joseph 95.00Lakhs Rs.95 Lakhs Taliparamba

Construction of 0.21% below ground floor 8443-00-108-PW Deposit 31-3-15 with fine Rs.2000/- EE/BLD/32/13- GO(Rt)No.1832/2012 H E Electrical estimate s 18/02/2011Rs. 290000/- Elef DR/35/2013-14 dated,6/6/

8443-00-108-PW

Deposit Construction irector General of of open well 5.00m Work 13 for Rs.11.00Lakhs 12 dia in SICA Regional completed 100% Kannur 1099752 1076595 1264999 30-01-14

Extension Centre 9 Months . Thalassery Sadhic P C Sadhic attached to Central 11.00Lakhs Prison Kannur 17.5 % above E/R 8443-00-108-PW Deposit Prisons,Tvm Rs.11.00 Lakhs EE/BLD/8/2014-15 Dated: 10-07-2014 DR-68/13-14 dated,4/12/ M2-17494/12 Dated 8/6/13 of D

Page 108 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

8443-00-108-PW FCC Deposit Construction submitted 13 of Overhead tank and asper 50% 714946 Kannur 1355067 1558327 1437500

Sump tank in District 6 Months amount Thalassery 15% above 05-06-2014 11-05-2014 09-12-2013 Jail, Kannur 12.50 Lakhs deposited EE/BLD/9/14-15 K P Balakrishnan Prisons Rs.12.50 Lakhs 8443-00-108-PW Deposit 30-4-2015 with fine of Rs.2000/- DR-17/13-14 dated,17/5/13 for Rs. M-2/2892 dated:28-8-12 of Director of

8443-00-108-PW Deposit IHRD College of vm Dated,16/7/13 Work 14 Complete

applied science 100% 630000 531981 611728 Peravoor

6 Months d 18-4-2014 Thalassery 6.30 Lakhs 6.30 Lakhs 15% above 18-12-2013 17-10-2014 30-05-2015 K Surendran

Iritty -Digging Rs.6.30 Lakhs open well 8443-00-108-PW Deposit EE/BLD/04/2014-15 Dated: 11-4-2014 CN/5808/2013/IHRD ,T DR-59/2013-14 Dated: 26-09-2013 for Rs.

Page 109 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

8443-00-108-PW Deposit Construction 15 of maternity wing for 13 Rs.200 Lakhs Taluk Head quarters 200Lakhs 23266178 Thalassery Taliparamba Hospital Taliparamba

8443-00-108-PW Deposit Work dated,Tvm 25/10/ G.O (Rt) No.3595/2013/H& FWD

completed 100% 2 0

8443-00-108-PW

Deposit Construction Electrical estimate under preparation 16 of meternity wing for Lakhs G.O (Rt) G.O (Rt)

Taluk Head quarters 177Lakhs 31900852 Thalassery 18 Months 10% below 35445391/- 02-04-2016 08-03-2017 Taliparamba Hospital,Taliparamba T P Prakasan NO.3292/2012/H&FWD 8443-00-108-PW Deposit Dated,Tvm 5/10/12 Rs.177 1980/2015-16 Dated: 11/12/2 SE(K) 70/2015-16 Dated: 28/01/ Dated: 70/2015-16 SE(K)

Page 110 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

Hostel building structure 8443-00-108-PW completed Deposit Construction plastering ated: 9/10/2015

.ST DD dated,31/03/11 in progress 17 of Para Medical

Academic 55% Institute at , 455Lakhs 41741764 11937341 Payyannur Thalassery 18 Months block first 36049541/- 02-02-2015 13-11-2015 05-12-2016 Rs.455 Lakhs 15.79% above Payyannur floor ubmitted to EE,KKD Dated column Jose Antony & Company 8443-00-108-PW Deposit work in

SE(K) 39/15-16 D progress Scheduled Castes/Scheduled Tribes Development ( B) Dept. B) ( Development Tribes Castes/Scheduled Scheduled 75/CE/BL/2013-14 Dated: 20-2-14 for Rs.4.55 Lakhs Rs.4.55 for 20-2-14 Dated: 75/CE/BL/2013-14 G.O(MS) No.44/2011/SC Electrical Estimate s 28.04.2014 Rs.2800000/-

8443-00-108-PW Deposit 3-14 for Rs. 100 Lakhs

IHRD College of H.Edn dated,23/12/13 Work 18

Applied Science Iritty completed 100% 9346690 5943079 Peravoor 11589896 100 Lakhs Thalassery 12 Months 24% above K C Joseph Construction of 1st 08-01-2014 Rs.100 Lakhs floor 100 Lakhs deposited 8443-00-108-PW Deposit Higher Education (J) Dept. Electrification work tendered EE/BLD/68/2014-15 Dated: 22-1-2015 G.O (Rt) No.2497/2013/ DR/102/2013-14 Dated: 21-

Page 111 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 0

8443-00-108-PW Deposit MHRD Construction of Women's Hostel work 19 building (

completed 100% 24-8-13 20-2-14 28-3-15 9418677 8587631 19-11-14 50 Lakhs deposited Lakhs 50 Additional Block) for 9 Months 10327485 100 Lakhs Payyannur Thalassery 02-05-2015 20.26% above Govt. Residential K P Divakaran Womens Poly technic 8443-00-108 -PW Deposit 5000000 Deposit -PW 8443-00-108 8443-00-108-PW Deposit dated,13/1/12 Rs.100 Lakhs

Payyannur GO(Rt) No.107/2012/H Edn EE/BLD/53/13-14 Dated:12-2-14 06.11.2014 Rs.450000/- No deposit received deposit No Rs.450000/- 06.11.2014 Electrical Estimatesubmitted to EE,KKD Dated DR/37/2013-14 Dated: 6-6-13 for Rs.10

8443-00-108-PW Deposit

Setting up of Investigation 20 Biomedical waste work retendered

Thalassery Thalassery management 50.00Lakhs system in General

Hospital Thalassery 8443-00-108-PW Deposit dated,4/2/14 Rs.50 Lakhs G.O (Rt) No.403/14/H & FWD

Page 112 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

8443-00-108-PW Deposit Construction Work 21 of Regional Medical

completed 100% Kannur 4527568 5654932 19-12-14

store at Kannur 6 Months Thalassery Siddique K 30-09-2015 50.00Lakhs 29--03-2016 (Homeo) Rs. 50 Lakhs 24.90% above E/R Rs.6050000/- deposited 8443-00-108-PW Deposit Electrical work completed dated,15/5/14 Rs.50 Lakhs G.O(Rt) No. 1535/2014/H & FWD EE/BLD/42/2015-16 Dated: 23-9-15 Health and Family Welfare (P) Dept. DR-67/2014-15 Dated: 17-10-2014 for

8443-00-108-PW Deposit

Asset & FWDDated, Tvm Work 22 Maintenance Fund 12-2013 for Rs,170 Lakhs

completed 100% 4296073 P V Biju 6 Months 16498151 15339981 26-9-2014 Thalassery Thalassery Renovation of 12-01-2014 11--07-2014 7.02% below General Hospital 178.00 Lakhs 8443-00-108-PW Deposit Thalassery 02/03/13 Rs.178.00 Lakhs Health and Family Welfare Dept. SE(K) 33/14-15 Dated: 20-11-2014 Electrical estimate under preparation G.O(Rt) No.690/2013/H CR/25/13-14 Dated: 9-

Page 113 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

8443-00-108-PW Deposit Higher Education Department- NCC

Establishment- ectric post Construction/Renovation of existing Town UP

School Thalassery for vm dated,30/8/14 for

11/2014 for Rs.58 Lakhs Work 23 functioning AS I(K) completed ting outside el Artillery Battery N.CC 100% 58 Lakhs 9 Months 5459518/- 7435864/- 28-1-2015 Thalassery Thalassery

Office Thalassery Rs.58 Lakhs 36.20% above Satheesh Das K EE/BLD/50/2015-16 8443-00-108-PW Deposit Electrical work Completed Higher Education (A) Dept. Letter to send for shif GO(Rt) No.2104/14/H Edn T DR/75/2014-15 Dated,22/

8443-00-108-PW Deposit Construction of a workshop hall for dated 7/7/14 for BBBT 1, BBBT 2, Work 24

BBBT -5 and urgent completed 100% Kannur 29-6-15 28-6-16 K Anees 9444031 10000000 11359280 100 Lakhs 100 Lakhs Thalassery 12 Months repair to four bay 02-10-2015 Rs. 100 lakhs

workshop Govt. ITI 20.28% above E/R 8443-00-108-PW Deposit

Kannur Electrical work Completed EE/BLD/41/2015-16 Dated: 14-9-15 GO(Rt)No. 893/14/LBR DR/73/2014-15 dated,31/10/2015 for Rs.

Page 114 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 on, on, i s i v Di

l ca i 8443-00-108-PW ectr El

Deposit

ed, 27/09/2014 for Work

25 Providing additional EE

completed 100% to Kannur 2194083 2194083 2133176 24 Lakhs d facilities to CDRF 4 Months Kozhikode 14-1-2015 17-3-2015 16-7-2015 Thalassery Rs.24 Lakhs Estimate rate for Rs. 24 lakhs

building Kannur' erre f 8443-00-108-PW Deposit Electrical work Completed trans M/S MCN Infrastructure Solutions EE/BLD/85/2014-15 Dated:17-3-2015 DR/64/2014-15 Dat GO(Rt) No.04/2014/CAD dated 17.1.14 125000

8443-00-108-PW Deposit Construction 12/2014 of the of roof protection for Work 26 leaking of main ing ITD Rs.22 Lakhs

completed 100% Kannur 2125682 2335504 2151466 22 Lakhs

building at 6 Months Thalassery 24/04/2015 23/10/2015 08-03-2015 03-03-2015 7.88% below

Government ITI for Rs.24.40 Lakhs

Women, Kannur Aboobacker Siddique Industrial Training Dept. 8443-00-108-PW Deposit EE/BLD/5/15-16 Dated: 24-4-2015 DR/97/2014-15 dated, 19/02/2015 for Director of Train E7/26977/2014 dated,11/

Page 115 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

8443-00-108-PW 11/2014 of the Deposit Work 27 Providing floor tiles to ing ITD Rs.10 Lakhs

completed 100% Kannur 996546 996546 998992/- 10 Lakhs

the Administrative 4 Months 19-2-2015 19-6-2015 Thalassery 03-03-2015 07-02-2015 Estimte rate Rs.10 Lakhs Block of ITI Kannur K Anilkumar EE/BLD/83/14-15 8443-00-108-PW Deposit DR/95/2014-15 dated,31/01/2015 for Director of Train E7/26977/2014 dated,19/

8443-00-108-PW Deposit K M M Government Masonry Women College 28 work in 88%

Kannur Construction 250.L

Azhikode progress Thalassery 17011631/- 16246108/- of new building under 26-08-2015 Rs.250 Lakhs 4.5% BELOW CQIP (Plan) for the MONTHS TEN ANEESH MATHEW 187.5 Lakhs deposited

year 2014-15 8443-00-108-PW Deposit SE (k)26/15-16 Dt.22.08.2015 Electrical estimate under preparation GO. Rt. No.846/14/H edn.dt.22.05.14 CR/36/14.15Dt.31.03.2015 for Rs.187.5.L

Page 116 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

8443-00-108-PW ST DD Dated: Deposit Work 29 USR to Premetric

completed 100% 1249925 1249800 Peravoor 4 Months 1244813/- 20-7-2015 Thalassery 12.5 Lakhs 12.5 Lakhs

Hostel for Girls Siddique K SC/ST Dept. Iritty 0.01 % below 8443-00-108-PW Deposit 13-03-2015 Rs.12.5 Lakhs EE/BLD/32/15-16 Dated: 21-8-2015 GO(Rt) No.430/2015 of SC/ DR/139/2015-16 Dated:26-05-2015 for Rs.

8443-00-108-PW Deposit Detailed Setting up of sewage 30 estimate treatment plant at Kannur

55 Lakhs submitted Rs.55 Lakhs Rs.55 Thalassery District Hospital Kannur FWD Dated: 30--06-2014 30--06-2014 Dated: FWD GO(Rt) No.2191/2014/ H& H& No.2191/2014/ GO(Rt) 8443-00-108-PW Deposit

8443-00-108-PW Deposit Construction Work 31 of toilet to ladies

completed 100% 583214 554053 7 Lakhs Rs.7 Lakhs

hostel to GBC 3 Months 9--9-2016 5% below Thalassery 6.35 Lakhs Dharmadam Dharmadam Collegiate Education Muhammed Nihas CC 8443-00-108-PW Deposit 2015 of Director of Coll. Education Education Coll. of Director of 2015 Reg No. 1265/2016-17 for Rs. EE/BLD/74/2016-17 Dated.5--11-2016 EE/BLD/74/2016-17 No.P2/8326/15/ Coll. Edn Dated: 10--03- Dated: Edn Coll. No.P2/8326/15/

Page 117 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

8443-00-108-PW Deposit Construction raining Department Work 32 of porch and parking 100% Lakhs completed Kannur 9 Lakhs 899909/- 800829/-

facilities to Women 3 Months Thalassery Rs.9 Lakhs 03-08-2016 13--06-2016 ITI Kannur 11.01% below M A Aboobacker 8443-00-108-PW Deposit EE/BLD/16/2016-17 Dated: 13--06-2016 Dated: EE/BLD/16/2016-17 3413/2015-16 Dated: 19/02/2016 for Rs.9 Director of Industiral T E7/13033/2015(4) DATED: 10/08/2015 of

8443-00-108-PW Deposit Deposit work Government Women's ITI Thottada in Work 33 ining Department Rs.11.5 100% Kannur District - Lakhs Lakhs completed Kannur 956307/- 3 Months 1075832/- Thalassery 11.5 Lakhs Providing false 22/03/2016 11.11% below

ceiling and floor tiles M A Aboobacker

to the second floor of 8443-00-108-PW Deposit Main building EE/BLD/15/2016-17 Dated: 13--06-2016 Dated: EE/BLD/15/2016-17 E7/13033/2015(4) DATED: 10/08/2015 of 3630/2015-16 Dated: 26/02/2016 for Rs.11.50 Director of Industiral Tra

Page 118 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

8443-00-108-PW Deposit Depsoit work- Government Women's ITI 2015 of Director of

17 dt. 27/04/2016 Wrok

34 Thottada in Kannur epartment Rs.13 Lakhs 100% Lakhs completed 910563 Kannur

District - Modification 13 Lakhs 9,10,563/- Thalassery 10,99,315/- 03-01-2016 10-05-2016 09-08-2016 14--06-2016 Three months and Maintenance 17.17% below works to the M.A. Aboobacker workshop building 8443-00-108-PW Deposit EE/BLD/02/2016- Industrial Training D 3071/2015-16 dated: 04/02/2016 for Rs.13.00 E7/11720/2015 dated: 23/09/

Ele 4202-01-203-99 estimateRs. . construction of Ladies , Tvm Dated,29/3/14 Finishing 275000/-EL1- 35 hostel building for work in 1670/2011 80% B Abbas B 7123560/- 12 Months Months 12 progress dated17/11/20 09-06-2015 Dharmadam brennenn College, 25.90 %above 25.90 Thalassery 11 of EE to Lakhs 60 , Lakhs 25 Rs.25 Lakhs , 60 Lakhs 60 , Lakhs Rs.25 SE Ele. Rs. 25.00 L deposited by UGC by deposited L 25.00 Rs. 8443-00-108-PW Deposit DR-88/2014-15 dtd 01/01/2015 for rs.80L for 01/01/2015 dtd DR-88/2014-15 GO(Rt) No. 2093/09/Hedn dtd Tvm, 11/12/2009 & & 11/12/2009 Tvm, dtd 2093/09/Hedn No. GO(Rt) GO(Rt) No.707/2014/ H & Edn & H No.707/2014/ GO(Rt)

Page 119 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 2016 ‐

02 Electrical 4202-01-203-96 ‐‐ estimate 22 Construction of Column submitted to 36 College Auditorium raising in EE electrical 15% 220.00 B Abbas B

Azhikode progress Dated:

15 Months 15 kkd dated 4- 21234701/- 25664260/-

12--10-2015 for Govt. Women’s 29--02-2016 28--05-2017 20.86% above above 20.86% Thalassery

16 10-2008 for College, Kannur ‐ 65 Lakhs deposited Lakhs 65

Higher Education (C ) dept ) (C Education Higher Rs 3.7L CR/16/2014-15 dtd 28/8/2014 dtd CR/16/2014-15 8443-00-108-PW Deposit 1644/12/Coll.Edn dt 27/6/13 for Rs. 65 L 65 Rs. for 27/6/13 dt 1644/12/Coll.Edn 37/2015 No.356/2013/H.Edn Dated,Tvm 14/3/13, P2- 14/3/13, Dated,Tvm No.356/2013/H.Edn

(K)

GO(Rt)No. 978/13/Hedn 31/5/2013 for Rs. 100L, G.O(Rt) G.O(Rt) 100L, Rs. for 31/5/2013 978/13/Hedn GO(Rt)No. SE

8443-00-108-PW d Deposit Construction of Premetric hostel for Nearing

37 85Lakhs boys in Taliparamba completion 70% 12 Months Months 12 20% above above 20% 15947096/- 19136515/- 03--08-2015 12--02-2016 Taliparamba Thalassery Municipality Muhammed Kunhi M Kunhi Muhammed (Morazha) 165lakhs Rs.165 Lakhs, 85 Lakhs 85 Lakhs, Rs.165 met from State fun 8443-00-108-PW Deposit SE(K) 79/2015-16 Dated: 10--02-2016 Dated: 79/2015-16 SE(K) G.O.ADVC 3/1822/11 dated,12/5/11 dated,12/5/11 3/1822/11 G.O.ADVC Electrical estimate under preparation CR/01/2015-16 Dated: 10--06-2015 for Rs. 187 Lakhs 187 Rs. for 10--06-2015 Dated: CR/01/2015-16 85 Lakhs deposited Balance fund to be Revised AS G.O(Rt) No.1805/14 dated,27/10/14 dated,27/10/14 No.1805/14 G.O(Rt) AS Revised

Page 120 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

8443-00-108-PW Deposit or Rs. 18 Lakhs Deposit Work-

Technical Education 01/2015 Purchase (D) Work 38 Government Polytechnic hnical Education Rs.18

completed. 100% Lakhs Kannur College Kannur 18 Lakhs 15,37,552 Thalassery Six months 17,17,935/- 11-03-2016 07--06-2016 06--06-2016 10.50% below Construction of comfort C.P Bhaskaran station 8443-00-108-PW Deposit Section Director of Tec 3303/2015-16 Dated.16/02/2016 f D4-36904/14 dated,Tvm 29/ EE/BLD/12/2016-2017 dt. 02--06-2016 dt. EE/BLD/12/2016-2017

Maintenance work for toilet blocks of Work 39 l Education Rs.8.70 GRWPC completed 100% Lakhs Payyannur Thalassery Payyannur-First 8.70 Lakhs 8.70 Lakhs 11--07-2016 floor Krishnan P V 8443-00-108-PW Deposit Technical Education Dept. Director of Techncia No.D4/2783/16/DTE Dated: 02--02-16 of 1026/2016-17 Dated: 21--06-2016 for Rs.

Page 121 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

Finishing Urgent Special Repairs in

40 to Nursery 11/11/2015 of Project progress.Til School Kannavam e work to 70% 16 Lakhs 4 Months 1427227/- 1350157/- Mattannur Thalassery Rs.15 Lakhs 11--07-2016 5.40% below be done Sukumaran R K 8443-00-108-PW Deposit Officer, ITDP Kannur Rs.16 Lakhs No.706/2016-17 Dated: 08/06/2016 for EE/BLD/52/2016-17 Dated.01--08-2016 No. D-680/13 Dated:

GO(RT) No. 591/2016/ Deposit Work- Urgent H.Edn Special Repairs to Men Work 41 Dated,Tvm 10%

and Ladies hostel at completed 100%

1462996 15 Lakhs 4 Months 1341834/- 1476017/- Thalassery GBC Dharmadam Dharmadam 13.50 Lakhs 26/02/201 23--05-2016

6 Rs.15 C V Santhosh kumar

8443-00-108-PW Deposit Lakhs No.180/2016-17 dated: 05/05/2016 for Rs.

Page 122 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

No. B5- 3425/2015 Construction of Foot (1) Dated: Bridge Connecting 19--12- Office Building for New Work 42 2015 of

academic and Seminar completed 100% B Abbas

Principal 568673/- 614167/- 4 Months Thalassery block at GBC 6.60 Lakhs 5.95 Lakhs Dharmadam GBC Dharmadam,Thalassery Rs.6.60

8443-00-108-PW Deposit Lakhs EE/BLD/ 21/2016-17 Dated: 14--06-2016 Dated: 21/2016-17 EE/BLD/ No.3466/2015-16 dated:22/02/2016 for Rs.

No.24 33/20 16- Deposit Work-Repair & 17, me Dated: 30-- Dated Maintenance (Roofing : Work 43 Work) to Police Barrack 05/09/ started for the functioning of 10 Lakhs 4 Months 904749/- 773470/-

Thalassery 2016

Kuthuparamba Control Room at Panoor

Amou 14.51% below M.A.Aboobacker 10 Lakhs deposited

12-2015 Rs.10 Lakhs nt: 10

8443-00-108-PW Deposit Lakhs GO(Rt) No.3363/15/Ho EE/BLD/83/2016-17 Dated.7--12-2016

Page 123 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

No.2 785/2 015- Renovation for Sanskrit 16 Work 44 block at GBC Date completed 100% Dharmadam,Thalassery 7.90% 614887/- 663463/- 3 Months Thalassery 7.10 Lakhs d: Dharmadam 18--05-2016 Rs.7.10 Lakhs 22/01 Satheesh Das K /2016 8443-00-108-PW Deposit No.B5-3425/2015(1),Dated: 19/12/2015 of Principal,GBC EE/BLD/24/15-16 Dated: 14/06/2016 Dated: EE/BLD/24/15-16

Construction of Maths Block (Additional) at Agreement 45 GBC Dharmadam, executed 18855209 250 Lakhs Thalassery 18 Months Thalassery 28.11.2016 Dharmadam Rs.250 Lakhs Rs.250 23984905.66 M/S Ansam India Ansam M/S Collegiate Education 8443-00-108-PW Deposit No.2909/2016-17 Dated.25--10-2016 Order No.P3/22680/2015/Coll.Edn Dated: Dated: No.P3/22680/2015/Coll.Edn Order 17--10-2015 of Director of Coll. Education Education Coll. of Director of 17--10-2015

Page 124 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

GAC , Kannur ted: 03--03-2016 Pariyaram- Providing Work 46 footpath attached to completed 100% 809423/- 734875/- 3 Months Thalassery Medcine Store 8.48 Lakhs 11--07-2016 Taliparamba Rs.8,48,000/- for Rs. 8,48,000/- 8443-00-108-PW Deposit 9.21% below estimate rate E Ramakrishnan Kadannappally EE/BLD/53/2016-17 dated.03--08-2016 506/GI/2016/DAME da No.1024/2016-17 Dated: 21--06-2016 for 3

Providing Acoustic treatment to Auditorium Work 47 2016

at GBC,Dharmadam, completed 100% Sujith C 30 Lakhs 6 Months 2997032/- 2979050/- 3000000/- Thalassery Thalassery Dharmadam 20--02-2016 0.6 % below 8443-00-108-PW Deposit Dharamadam Rs.30 Lakhs 2748/2015-16 Dated: 21--01- 17--12-2015 of Principal,GBC Order No. B5-2803/2015 dated: EE/BLD/59/2015-16 Dated: 3--0

Page 125 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

USR to Commerce Block Government Work 48 Brennen College, completed 100% Thalassery Dharmadam 8.68 Lakhs Dharmadam Rs.8.68 Lakhs 8443-00-108-PW Deposit Order No. A5-1020/2015/ Principal,GBC Dharmadam CDC(1) Dated. 01--03-2016 of

PRIC E Deposit work - Urgent 149/2 special repairs and 016- renovation works to 2017 Work 49 Drawing Hall at dt completed Kannur 12.00 L 3 months

Technical High School, 03/05 11,99,265/- 11,99,265/- Estimate rate DT. 14/06/2016

Kannur. /2016 K.P.Aneesh Babu 2.00 EE/BLD/18/2016-17 8443-00-108-PW Deposit Technical Education Dept. L Section 14/01/2016 Rs.12.00 Lakhs NO D4/41651/15/DTE of Purchase

Page 126 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

PRIC E 1657/ Veterinary Department- 2016- R P F Mundayad - 2017 Work 50 Construction of Ground g) dt. 27/01/2016 dt nearing 95% 10.00L Kannur Level Water Tank and 21/07 completion. 3 Months 8,97,617/- 7,84,517/- K.Siddique Pump House Rs.10 Lakhs /2016 DT. 24/09/2016 Animal Husbandry

EE/BLD/67/2016-17

8443-00-108-PW Deposit 10.00 12.60 % below estimate rate L M2-33733/2015/Pl

PRIC E Providing 'Cubicles' to 2523/ 2016- District Labour office at Work 51 2017 Additional Civil Station, completed 7.80L 100% Kannur dt 700947 553748 3 Months T P Pranav T Kannur. 09/09/ 21% below 2016 Labour and Skill dept. 7.80L 8443-00-108-PW Deposit skill(D) dt. 16/09/2015 Rs.7 G.O.(Rt.)No1262/2015 Labour and EE/BLD/80/2016-17 Dated.25--11-2016 PRIC Deposit work- E Foundation Construction of 2646/ 2016- works Watchman cabin cum 52 2017 completed.

sales room for RPF at 20% 7.80L

Kannur dt Work in Mundayad in Kannur 28/09/ progress. District Animal Husbandry 2016 27/01/2016 Rs.7.80 L

M2-33733/2015/Plg) dt. 7.80L 8443-00-108-PW Deposit

Page 127 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

Construction of Edn dated.18--09-

J) Department compound wall - second Work 53 phase at Colleg of

completed. 100%

Applied Science- 940754 793999 10 Lakhs 2 Months Kalliassery 21--11-2016

Neruvambram 15.60 % below for Rs.10 Lakhs 2015 Rs.10 Lakhs Aboobacker Siddique 8443-00-108-PW Deposit Higher Education( Reg No.2988/2016-17 dated.31--10-2016 GO(Rt) No.2446/2015/H.

Govt. Ayurveda College, Pariyaram - Re-tarring of Work to be 54

roads in college (Plan) started 830000/- Thalassery Kalliassery compound A3/818/2016-ACK dtd 21/11/2016 Rs.830000/- 2210-05-101-74-17 minor works works minor 2210-05-101-74-17

Page 128 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

Construction of building for Govt. Work 55 Ayurveda Hospital, tendered Mattannur

NABARD WORKS

Page 129 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 NABARD RIDF XVI cal KKD(Rs

Construction of ated:15/10/2013 ar K.V ,North , o EE electri building for maternity & FWD dated 6/5/11 work

1 Nil

ward attached to CHC completed 100% Health 175.65 K Anees 15362667 17358278 Peravooor Thalassery 14 Months Kozhikode 14/03/2014 13/08/2014 Iritty 13/06/2013 Rs.175.65 Lakhs 18328266+140878 12.94% above estimate rate SE(K) 22/2013-14 D 159/CE/BL/1112 dt. 28.3.12 for Rs.175.65 GO(Rt) No:1767/2011/H the Contractor Sri Gopakum Revised estimate submitted t 775000 tenderd from Ele. Div. KKD Work awarded to to awarded KKD Work Div. Ele. from 775000 tenderd

Page 130 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 NABARD RIDF XVI Ele.estimate submitted to Executive Engineer(Ele) No. ESD- 12/12-13 ated:08/05/2013 4210-01-110-75 H & FWD dated dt.3.5.12 work 2 Construction of PHC Rs.2,30,000/-

46.17 completed 100% Health to tender from 3935790 4868572 4123542 Rs.46.17

Kelakam 9 Months Peravooor Thalassery 14/05/2013 13/02/2014 20/05/2014 19/04/2014 10-09-2012

P Manoharan Ele Dn Elefn 4210-01-110-75 completed 6/5/11 Rs.46.17 Lakhs 23.70% above estimate rate 160/CE/BL-2011-12 dt.28.3.12 for EE/BLD/01/2013-14 D GO(Rt) No:1767/2011/ NEW PROPOSAL NABARD RIDF XX

Construction of building for Government T.S 3 proposal Higher Secondary submitted. Estimate Thalassery Rs.210 Lakhs Rs.210 210 Lakhs

Kuthuparamba School, Kottayam Higher Education Malabar Kannur GO(Rt) No.1014/2015/General No.1014/2015/General GO(Rt) Education Dated,Tvm 16/03/2015 16/03/2015 Dated,Tvm Education A R to be obtained to prepare Ele. Ele. prepare to obtained be to R A

Sd/‐ EXECUTIVE ENGINEER

Page 131